Você está na página 1de 5

n= 0.

01 adim
hab por lote = 7 hab
aport media = 200 lt/hab/dia
cs= 2 PROPUESTO

COTAS DEl TERRENO LONGITUD (m) POBLACION (hab)


TRAMO
inicial final propia tributaria acumulada sevida
1--2 350.73 350.57 100 0 100 168
2--3 350.57 349.62 80 100 180 42
3--4 349.62 349.33 95 180 275 63
POBLACION (hab) GASTOS (Lps) PENDIENTE
acumulada Qmin Qmed Qmaxinst QmasExt pendiente pendiente corregida
168 1.5000 0.3889 1.6235 3.2470 0.0016 0.002
210 1.5000 0.4861 2.0126 4.0252 0.0119 0.01
273 1.5000 0.6319 2.5882 5.1764 0.0031 0.004

lvssjv
DIAMETRO TUBO LLENO TETAmin'' TETAmin
RH f(TETA) f''(TETA)
(m) Q (lps) V (m/s) (rad) (rad)
0.2000 19.0683 0.6070 1.8026 0.0230 0.0000 -1.7428 1.8026
0.2000 42.6380 1.3572 1.4655 0.0161 0.0000 -1.2773 1.4655
0.2000 26.9666 0.8584 1.6468 0.0197 0.0000 -1.5303 1.6468
TETAmax'' TETAmax VELOCIDADES REALES
RH f(TETA) f''(TETA)
(rad) (rad) Vmin(m/s) Vmax(m/s)
2.2269 0.0322 0.0000 -2.2539 2.2269 0.3617 0.4527
1.8922 0.0249 0.0000 -1.8608 1.8922 0.6369 0.8534
2.3051 0.0339 0.0000 -2.3315 2.3051 0.4617 0.6625
COTA DE PLANTILLA COTA CORREGIDA
inicial final inicial final
349.6300 349.4700 350.73 350.53
350.53 349.4300 350.5300 349.73
349.73 348.6300 349.7300 349.35

DIAMETRO NOMINAL DEL TUBO (cm) COLCHON MINIMO (m)

hasta 45 0.9
mayor de 45 y 122 1.0
mayor de 122 y 183 1.3
mayores de 183 1.5

Você também pode gostar