This document provides a handing over note for 7 ongoing projects with various clients. It includes details of the project name and client, a brief description of the work and any remarks or next steps. For most projects, the next steps involve submitting additional documents or payment to Indah Water Konsortium for project development charges 1 or 2. The handing over note helps provide an overview and next actions for various construction and development projects.
This document provides a handing over note for 7 ongoing projects with various clients. It includes details of the project name and client, a brief description of the work and any remarks or next steps. For most projects, the next steps involve submitting additional documents or payment to Indah Water Konsortium for project development charges 1 or 2. The handing over note helps provide an overview and next actions for various construction and development projects.
This document provides a handing over note for 7 ongoing projects with various clients. It includes details of the project name and client, a brief description of the work and any remarks or next steps. For most projects, the next steps involve submitting additional documents or payment to Indah Water Konsortium for project development charges 1 or 2. The handing over note helps provide an overview and next actions for various construction and development projects.
1. LOT 26, SIME - ADDENDUM NO.1 FOR 3,500 PE Pass to SEMENYIH DARBY o New Drawings – 3,500PE Pn.Norhaidayati PROPERTI o New specs for 3,500 PE (Bi-Act SDO) Abd Samad at ES o New BQ (3,500PE) Level 8, Oasis (SELANGO o Form of Tender Ara Damansara R) SDN BHD - COLLECT PDC 1 APPROVAL AT IWK PANDAN INDAH Collect at Level (Email approval date: 18.12.2017) 11, Block D, Menara MPAJ, Pandan Indah 2. PASAR PERBADA - SUBMISSION FOR PDC 1 MUHIBBAH NAN o Waiting for new Bank Draft (UPTOWN) KEMAJUA Bank Draft payable to INDAH WATER SHAH ALAM N NEGERI KONSORTIUM SDN BHD SELANGO Amount RM 450 R (PKNS) o Document to be prepared; To be submitted Cover letter for submission at Level 11, SPAN cert. Ir. Kamaruddin Block D, Menara Sewerage report 2 copies, attached with MPAJ, Pandan sewerage layout Indah Application and payment checklist (tick at PDC 1 ‘Bahagian IV’ – Rangkaian Paip Pembentungan (NWS) = RM450 3. BUNGALOW NIK - SWA-LR - Approved NIK AZAMUDI - SWC-LR - Approved AZAMUDIN N BIN NIK ABDUL AZIZ 4. PEJABABAT PERBADA - APPEAL HAS BEEN SUBMITTED ON 21.12.2017 Has been KENDERAAN NAN o Appeal meeting will be held 2 times in the third submitted at PKNS SEK.18, KEMAJUA week every month (Tuesday and Thursday) Level 11, Block SHAH ALAM N NEGERI D, Menara SELANGO MPAJ, Pandan R (PKNS) Indah 5. Ampangan, MARA - SUBMISSION FOR PDC 2 To be requested Negeri INCORPOR o Request for Bank Draft to MARA Inc. Sembilan ATED SDN. Bank Draft payable to INDAH WATER BHD. KONSORTIUM SDN BHD Amount RM 450
o Prepare document for PDC 2 To be submitted
Cover letter for submission at IWK SPAN cert. Ir. Kamaruddin Senawang, Level Sewerage report 2 copies, attached with 1 sewerage layout & design calculation Application and payment checklist (tick at PDC 2 ‘Bahagian IV’ – Rangkaian Paip Pembentungan (NWS) = RM450 6. BUKIT UDI - PDC 1 has been submitted Pending on CHANGGANG PROPERTY - Received comments from IWK (10.4.2017) Client action SDN. BHD. 7. SG. BENGKOKA ONE - New vertical alignment for Bengkoka Lower has been RIVER sent to Terence Baduk for his further action POWER SDN. BHD.