Assignment B
Case study
Assignment C
The matrix itself consists of two dimensions, product structure/product life cycle
and process structure/process life cycle.
(A): product process matrix
(D): all
Generally, resources for processing have �����.availability with temporary in-
process storage capability needed while jobs wait for subsequent processing.
(A): regular
(B): limited
(C): unlimited
(D): constant
(B): structure
(C): materials
(D): all
(B): Products
(C): both
(D): none
Since the volume is ���. than that of the job shop, many processes can be utilized
in repetition, creating a much smoother flow of work-in-process throughout the
shop.
(A): higher
(B): lower
(C): equal
(D): smaller
(B): batch
(C): both
(D): none
(B): skills
(D): all
A ��... time is the latency between the initiation and execution of a process.
(A): setup
(B): cycle
(C): lead
(D): throughput
The ���..time is included because the manufacturing company needs to know when the
parts will be available for material requirements planning
(A): shipping
(B): setup
(C): cycle
(D): lead
Lead time is also the saved time by ����..an activity before its predecessor is
completed.
(A): starting
(B): ending
(C): between
(D): equal
(D): benachmarking
In the process of ������., management identifies the best firms in their industry,
or in another industry where similar processes exist, and compares the results and
processes of those studied (the "targets") to one�s own results and processes.
(A): product process matrix
(D): benachmarking
(B): FRT
(C): PRT
(D): none
(B): CRT
(C): FRT
(D): PRT
The goal of the ����... is to understand the causal path between the action and
negative ramifications so that the negative effect can be "trimmed."
(A): NBR
(B): CRT
(C): FRT
(D): PRT
����..describes in great detail the action that will lead to the fulfillment of a
plan to implement changes
(A): evaporating cloud
(B): CRT
(C): FRT
�������.is used to measure performance using a specific indicator (cost per unit of
measure, productivity per unit of measure, cycle time of x per unit of measure or
defects per unit of measure) resulting in a metric of performance that is then
compared t
(A): product process matrix
(D): benachmarking
This process is intended to help leaders gain understanding of cause and effect in
a situation they want to improve.
(A): CRT
(B): FRT
(C): PRT
(D): ART
In project management ����... time is the time it takes to complete a task or a set
of interdependent tasks.
(A): setup
(B): cycle
(C): lead
(D): throughput
������...is a management paradigm that views any manageable system as being limited
in achieving more of its goals by a very small number of constraints.
(A): theory of constraints
(C): inventory
A �����. is anything that prevents the system from achieving its goal.
(A): constraint
(B): product
(C): process
(D): service
(B): people
(C): policy
�����.shows the future states of the system and helps to identify possible negative
outcomes of the changes (Negative Branches) and to prune them before implementing
the changes.
(A): CRT
(B): FRT
(C): PRT
(D): ART
Material flows in a sequence, such as in an assembly line. The primary work is done
in a straight sequence of events (one-to-one). The constraint is the slowest
operation.
(A): I plant
(B): A plant
(C): V plant
The general flow of material is one-to-many, such as a plant that takes one raw
material and can make many final products. Classic examples are meat rendering
plants or a steel manufacturer.
(A): T plants
(B): I plant
(C): A plant
(D): V plant
���.is based on the idea that all projects look like A-plants: all activities
converge to a final deliverable.
(A): CCPM
(B): CRT
(C): FRT
(D): PRT
Main features that distinguish critical chain from critical path are:
(A): Use of (often implicit) resource dependencies.
(B): Lack of search for an optimum solution
(B): feeding
(B): CCPM
(D): none
(B): CRT
(C): FRT
(D): PRT
�������.adopts the common idiom "a chain is no stronger than its weakest link."
(A): theory of constraints
(B): I plant
(C): A plant
(D): V plant
(B): A plant
(C): V plant
(B): FRT
(C): PRT
(D): ART
(D): benachmarking
(B): FRT
(C): PRT
(D): ART