Hydro Pumped Storage

Power Plant

POWER
Alstom pumped
storage plant
THE CONCEPT BEHIND HYDRO PUMPED STORAGE
Managing the balance between of storing large amounts of excess generation capacities and ramping up
energy production and consumption energy, allowing power plants to their power generation from renew-
levels has become an issue of growing successfully manage that balancing ables such Wind and Solar that are
importance in order to guarantee act. not intermittent.
the stability of electrical networks.
This is becoming even more impor-
Pumped storage hydroelectricity is tant as more and more countries
the only economic and flexible means are increasing their nuclear power

In pumped storage plants, Pump turb- representing approximately 3% of ins-


ines transfer water to a high storage tantaneous global generating capacity.
reservoir during off-peak hours, thereby In recent years, the profitability of pum-
levelling out the daily generated load. ped storage plants has increased as a
consequence of increased price volatility
The energy used for pumping the water is on electricity spot markets. Alstom is the
derived from other energy sources, such clear world leader having captured on
as nuclear, fossil and renewable power average 47% of the pumped storage mar-
plants, whose power output cannot be ket share per year since 2004.
adjusted to follow load fluctuations. The
stored water can then be used for hy- Alstom provides a complete range of
droelectric power generation to cover pumped storage electromechanical In the latter case, specialised Alstom
temporary peaks in demand. equipment. teams have developed specific skills for
This includes Pump turbines, motor-ge- optimising the complete plant configura-
The advantage of this technology is that it nerators, control systems and optimised tion so that the highest global water-to-
can come online very quickly, making it a hydro-mechanical and balance of plant wire performance is achieved.
useful tool to balance the varying electri- equipment. Depending on the customer
city demand from consumers or unplan- preference, these can be supplied either
ned outages of other power plants. separately or as an integrated turnkey
plant.
Today there are over 130 GW of pumped
storage in operation around the world,

2
Global leader Key benefits
With more than 25 per cent of the Energy storage for grid regulation
world’s installed power generation As the only solution for efficiently storing large amounts of energy, pumped storage
base, Alstom is a global leader in power power plant act as a quick response for peak load energy supply.
generation, setting the benchmark for
innovative technologies that provide Ancillary services
clean and efficient power solutions for Pumped storage technology provides network frequency and voltage regulation,
its customers. reserve capacity, black start capabilities, as well as reactive power production.

Alstom designs, manufactures, supplies, Increased plant efficiency


installs and services the broadest range of Pumped storage technology increases profitability for plant owners in volatile elec-
systems for power generation and indus- tricity spot markets and allows optimisation of global operations of power plant
trial markets, with a portfolio of products fleets and electrical network infrastructures.
that extends across the entire energy
value chain for all fuel types, from fossil, Highest global cycle efficiency
biomass to nuclear and renewables. With approximately 80% efficiency pumped storage plants have the highest global
cycle efficiency compared to other power plants.
Alstom can supply these products as sin-
gle components or as complete turnkey Environmentally-friendly
power plants, which, through its Plant Pump turbines have a positive environmental impact by enabling increased use of
Integrator™ approach and smart grid renewable energy sources.
solutions, are optimised to deliver maxi-
mum value for the customer throughout
the lifetime of the plant.

Alstom’s specialists have developed


extensive experience in engineering,
procuring and constructing new plants
as well as retrofitting, servicing and
modernising existing power plants.

Operating in more than 70 countries,


Alstom is always close to the customer
to ensure rapid response with the right
level of service excellence.
Hydropower Plant IntegratorTM

3
Pumped storage plant control systems
Alstom developed and qualified specific • Openness is achieved through the
control system solutions as well as de- use of Ethernet at all levels, support-
dicated machine control equipment, in ing both a large set of international
order to guarantee safe, optimised power communication protocols and gateways
plant operations. to connect third party equipment.

In 2008, Alstom launched the ALSPA® A complete set of dedicated plant control
CONTROPLANT™ control system, a major software is provided with the CONTRO-
evolution for Alstom control systems. The PLANT system, providing all standard
turbine speed load governor (NEYRPIC® control room functions, enhanced human-
T.SLG) and the automatic voltage regu- machine interface (HMI) with advanced
lator (CONTROGEN™ AVR), both Alstom information management tools, remote
proprietary equipment, are integrated in access through web server, report gene-
the ALSPA CONTROPLANT system. ration, alarm management, statistics etc.

This new CONTROPLANT solution is Complementary CONTROCAD® engi-


designed to meet three key requirements: neering software tools are provided for
reliability, modularity, and openness. maintenance and configuration of Alspa
• Reliability of the system is aimed at Controplant, and a plant simulator is
meeting the highest plant availability available for personnel training.
standards. This is guaranteed through
the use of industrial products from Finally, the Hydroset software package
carefully selected market leaders, the provides a complete set of advanced hydro
use of secure communication networks process functions such as joint unit control,
and the capability of the system to dam control and valley control optimisa-
implement redundancy at all levels. tion. The latter is achieved through long
term and short term forecasting tools.
• Modularity allows cost effective cus-
tomised solutions using pre-qualified
modules, for medium to large new or
retrofit plants, in simple or redundant
configurations.

4
Alstom - the reference

in pumped storage
Alstom has been providing Pump turbines recent market trends indicate the need France, to have two dedicated Pump
for over 50 years and has supplied a total for high-speed Pump turbines at very high turbine test-rigs, thus increasing the
of 139 Pump turbine units to date. heads. In response to this, Alstom has number of test-rigs in this facility to six
invested heavily in Pump turbine R&D. and doubling its overall test capacity.
Between 1953 and 1960, orders were In 2008, it extended its turbine hydraulic
predominantly for low head units. More scale model test laboratory in Grenoble,

Alstom’s complete pump turbine range


Alstom provides Pump turbines adapted efficiency, stability, rotor-stator interac-
to the specific characteristics of each tions and absence of cavitation. Mecha-
pumped storage plant. In order to cover nical constraints are taken into account
the complete head range (from 10 m to by verifying all static and dynamic cha-
1200 m), axial, mixed or centrifugal flow racteristics using state-of-the-art Finite
runners are used. Element Method modelling (FEM) tools.

Alstom has built up an extensive Pump After this, scale model tests are carried
turbine hydraulic design portfolio, with out on one of the two dedicated Pump
more than 50 Pump turbine prototypes. turbine test-rigs in the scale model test
Between 2000 and 2009 alone, Alstom laboratory. The high accuracy level of
commissioned 14 major Pump turbine the laboratory tests (between 0.2%
projects, and since then has been working and 0.3%) ensures at an early project
on an increasing number of new projects. stage that the final Pump turbine will
This gives Alstom the strongest market meet its performance requirements.
base for designing optimised Pump tur-
bines for new projects.
Computational Fluid Dynamics
For each project, a dedicated hydraulic
team from the Alstom Global Technology
Centre uses its state-of-the-art compu-
tational fluid dynamics (CFD) tools and
laboratory tests, to simulate how the
life-size turbine will operate in order to
optimise its hydraulic performance. Parti-
cular attention is given to power output,

5
Single-stage or double-stage

to best suit site

Single-stage centrifugal units (head < 700 m)


As most of the Pump turbine projects the generator thanks to the use of an • In order to reduce costs and to limit
concern sites with 60 m to 700 m heads, intermediary dismountable shaft. power input at start-up in pumping
the majority of Alstom ’s pumped storage mode, a Static Frequency Converter
references use reversible single-stage • In addition to traditional oil lubri- (SFC) or the back-to-back method
centrifugal units. cated white metal coated bearings, are typically used, combined with
Alstom has developed several specific dewatering of the runner.
Recent developments have focussed on bearings, including self-pumping and
enhancing the performance, economy water lubricated bearings.
and reliability of these pumped storage
plants: • Different types of governing control
• Single-stage Pump turbine technology system configurations are possible,
has been expanded toward double- either using an actuating ring to
stage and multi-stage Pump turbines control all synchronized wicket gates,
for higher head units, while maintaining or using individually actuated wicket
a compact design in all configurations. gates to optimise plant stability at
start-up.
• In reply to specific maintenance
requirements and to optimise the civil • Depending on the head and cust-
engineering costs, several Pumped sto- omer preferences, a selection of inlet
rage plant configurations are possible, valves are available including butterfly
allowing runner dismantling from abo- valves, spherical valves or ring gates. Single-stage Pump turbine
ve, below or between the turbine and

6
stage regulated

conditions

Double- and multi-stage centrifugal units (head > 700 m)


For projects with very high heads, characterised by: In 2006, Alstom supplied the biggest ever
between 700 m and 1200 m, multi- • Adjustable power output double-stage Pump turbine built in the
stage Pump turbines are needed in order world, for the Yang Yang pumped storage
to ensure good hydraulic efficiency and • Better runner efficiency than with plant in South Korea. The four units,
minimise stress and vibrations incurred single-stage high heads, due to head which are equipped with two adjustable
by the turbine components. sharing between runners distributors, were built for a head of
798 m and a power level of 4 x 258 W.
One typical limitation of these multi- • Lower vibration than with single-stage
stage Pump turbines is that their power high heads
output cannot be adjusted due to the - Lower pressure pulsations
absence of adjustable wicket gates on - Higher mechanical stiffness
the lower stages.In order to overcome
this limitation, Alstom has developed a • Better stability than with single-stage
unique solution consisting of a double- high heads
stage Pump turbine equipped with two - The shaft crossing the draft tube
adjustable distributors, one for each run- improves part-load operation
ner. These units can also be dewatered at - Smoother transients with better
start up to reduce the input power. intrinsic stability at start-up

These double-stage regulated Pump tur- • Reduced civil engineering costs as the
bines combine the advantages of single unit is more compact and its submer-
and multi-stage Pump turbines and are gence can be reduced. Double-stage Pump turbine

7
Advanced
motor-generator technology

In the last 50 years, Alstom has sup- element stator frame provides a rigid transient operation, shaft line deflection
plied more than 328 motor-generators connection against eccentric displace- and shaft line misalignment.
for pumped storage plants worldwide. ment but allows free concentric thermal
This outstanding market recognition expansion. This arrangement also avoids One of the main advantages of this uni-
is the result of sustained R&D efforts buckling of stator laminations, which que membrane technology is that it helps
that have led to continuous technology occurs in rigid frames with non-flexible to reduce friction losses in the thrust
improvements. These constitute the foundation connections. In addition, the bearings. In fact it makes it possible to
cornerstones that over several deca- connection to the base plates is totally work at higher specific pressures on the
des guarantee the high availability and maintenance-free since no sliding pads pads, therefore minimising the bearing
stability of Alstom’s motor-generators. are necessary with oblique elements. external diameter. A second advantage
is that this system is faster to install
These units are subjected to numer- Thrust bearing pad membrane on site as it is self-adjusting. Finally, by
ous thermal cycles and high centrifugal technology measuring the membrane oil pressure,
forces, and need to withstand potential The thrust bearing is a critical compon- it is possible to determine the hydraulic
fault disturbances such as short circuits. ent of large pumped storage plants axial load on the shaft line and to carry
In reply to these design requirements, because it supports heavy weights and out turbine condition monitoring.
particularly important for peak-load operates at high speeds in two direct-
units, Alstom’s motor-generator main ions (pumping and generating mode).
features include:
• Structural design with oblique ele- Hydrodynamic thrust bearings in pumped
ments storage units operate with a very thin
• State-of-the-art thrust bearings layer of lubricating oil. In order to en-
• Permanently pre-stressed stator core sure continuous lubrication of the thrust Thrust bearing pad membrane technology
• Vacuum Pressure Impregnation (VPI) bearing pads, Alstom has developed the
insulation system & slot ripple spring membrane technology, which acts as
(even under extreme operating condi- a self-regulating mechanism to carry
tions) the bearing pads. In fact, the bearing
• Self ventilated rotor rim (standard or pads are positioned on oil-filled steel
high speed design) membranes that are hydraulically linked
• Bent pole coils (for easier assembly & to one another to always guarantee
better surface cooling) equal oil pressure under each membrane. Permanently pre-stressed stator core
Alstom's stator core lamination pressing
Oblique elements This enables the system to self adjust system is specially designed for units
Oblique elements are designed to meet an equal load distribution on the thrust with high load cycles such as pumped
motor-generator requirements like bearing pads. It does this in spite of storage, which experience frequent starts
roundness, concentricity and stability, deformations in the supporting frame and stops with high thermal expansion.
in all operating conditions. The oblique or thrust loading conditions such as The clamping bolts are positioned in the

8
packing", consisting of a double-folded pole shoe. This design concept, which
conductive polyester foil filled with a cu- eliminates the V-blocks between poles,
rable rubber compound. This system also makes the assembly easier and provides
ensures excellent grounding after instal- an increased pole coil cooling surface.
lation due to the gap-free installation.

Complex air-ventilation design solutions


Compact high-speed motor-generators
require complicated ventilation cool-
ing due to the high temperatures they
experience as a result of constant starts
and stops. This can cause malfunctions
and, on a medium to long-term basis,
can also be responsible for premat-
ure ageing of the generator.
stator yoke and ensure high, constant
distribution of the stator core pressing. To address these constraints, Alstom ap- VPI insulation system
Spring elements compensate any poten- plies one of two standard cooling techni-
tial settling of the stator lamination in ques depending on the dimensions of the
order to maintain the pre-stress in the units, using self-ventilated rotors:
stator core over long service periods.
1. S
 tandard rim-cooled ventilation de-
Vacuum Pressure Insulation system sign, which has been thoroughly tes-
The reliability of the stator win- ted in the past and provides a secure
ding is determined primarily by the and stable cooling system.
quality of its insulation. Alstom has
been using the Micadur® insula- 2. High-speed motor-generator ventila-
tion system for more than 40 years. tion design, which is specifically suited
Additional research has led to further to overcoming high-speed generator
improvements to this system, provid- constraints such as small ventilation
ing excellent results on units even under entry diameters.
severe conditions.
Bent pole coils
To ensure permanent thermal and me- In bent pole coils, the centrifugal force
chanical coupling between the stator bar of the field coil is perpendicular to the
surface and the stator core, the straight supporting surface of the insulation
por tions are supplied with "round- frame, between the pole coil and the

9
Varspeed Pump turbines - innovative integrated solutions
Unlike conventional hydropower plants, Installation of pumped storage plants
variable speed pumped storage plants on sites characterised by wide head
use asynchronous motor-generators that variations, increases the partial load
allow the Pump turbine rotation speed to operation range to 33% of rated power
be adjusted. in turbine mode and thus increases the
generation flexibility.
As a result, Alstom's variable speed pum-
ped storage plants benefit from high • Instantaneous power output adjust-
levels of additional flexibility including: ment help to rectify sudden voltage
• Regulation of the amount of energy disruptions/variations caused by net-
absorbed in pumping mode. This fa- work problems.
cilitates energy storage when power
levels available on the network are These benefits result in improved profi-
low, reduces the number of starts and tability for pumped storage plant owners,
stops, and allows the sell of grid regu- and allow network operators to improve
lation service (network frequency and the reliability of the grid as well as the
voltage) while in pumping mode. quality of the power supplied to end
consumers.
• Operating closer to the turbines opti-
mal efficiency point, which results in Alstom has a strong position in the field
a significant increase in global plant of variable speed pumped storage, gained
efficiency. through early R&D initiatives. This key
expertise has resulted in the signing of
• Smoother operation (for example at significant contracts such as Limmern/
partial load), elimination of operation Linthal 2015 for 4 x 250 MW units and
modes prone to hydraulic instability Nant de Drance, both in Switzerland, for
or cavitation. This results in improved 4 x 165 MW units.
reliability, reduced maintenance and
increased lifetime. It also results in a
reduction in the Pump turbine submer-
gence level, reducing civil engineering
costs.

• Operating over a wider head range,


increasing the availability of the plant.

10
PUMPED STORAGE plant
project highlights

USA PORTUGAL CHINA


Dos Amigos – new: 3 x 28 MW turbine/generator units Alqueva I – new: 2 x 129 MW turbine/generator units, Heimifeng – 4 x 300 MW turbine/generator units,
Racoon Mountain – refurbishment: 4 x 476 MVA, hydromechanical equipment electrical & mechanical auxiliaries
300rpm Water Cooled Stators Alqueva II – new 2 x 134 MW turbine/generator units, Pushihe – 4 x 300 MW turbine/generator units,
hydromechanical equipment electrical & mechanical auxiliaries
BRAZIL Hohhot – 4 x 300 MW turbine/generator units,
Pedreira – new: 1 x 20 MW turbine/generator units, MOROCCO electrical & mechanical auxiliaries
Balance of Plant, Control System Afourer I&II - new: 2 x 176 MW turbine/generator Huizhou – 8 x 306 MW turbine/generator units,
units, 2 x 60 MW turbine/generator units, electrical & balance of plant, control system
mechanical auxiliaries, hydromechanical equipment,
UNITED KINGDOM Bailianhe – 4 x 306 MW turbine/generator units,
control system
Cruachan – new: 4 x 106 MW, turbine/generator units balance of plant, control system
Baoquan – 8 x 306 MW turbine/generator units,
ALGERIA balance of plant, control system
SWITZERLAND
Beni Haroun – new: 2 x 90 MW double-stage pump/
Limmern – new: 4 x 250 MW variable speed turbine/ Zanghewan – new: 4 x 255 MW turbines, control
motor units, electrical & mechanical auxiliaries, control
generator units and VSI system
system
Nant de Drance – new: 4 x 150 MW variable speed Shahe – new: 2 x 51 MW turbine/generator units,
turbine/generator units and VSI electrical & mechanical auxiliaries, gates
THAILAND
Grimsel – new: 4 x 90 MVA generators 750 rpm Lam Ta Khong – new: 2 x 260 MW turbine/generator Guangzhou – new: 4 x 306 MW turbine/air cooled
units, electrical & mechanical auxiliaries generator units 500 rpm, electrical & mechanical
SPAIN auxiliaries, control system
La Muela – new: 3 x 230 MVA generators SOUTH KOREA
Yecheon – new: 2 x 408 MW turbine/generator units,
FRANCE turnkey power plant
Grand Maison – new: 8 x 150 MW multi-stage Yang Yang – new: 4 x 250 MW double-stage regulated
turbine/generator units, 4 x 150 MW Pelton turbine/ turbine/generator units, electrical & mechanical auxilia-
generator units, Control System ries, control system

11
PWER/BPROB/HDPSTR09/eng/HYD/12.09/FR/7033 © ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical
and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. - Photo credits: Alstom 2010 - Layout: www.kineka.com.

This brochure is printed on recycled paper.


Alstom contributes to the protection of environment.