Project Report on

Wireless Auto Power Trip


During Gas Leakage
Under Subject of
DESING ENGINEERING –IIA
Semester – V
(Electrical branch)

Submitted by:
Kotadiya Nikunj R. 141120109022
Patel Hardik R. 141120109032
Patel Hardik M. 141120109033
Pansuriya Satish M. 151123109011

Assi. Proff. Bhargav Patel Assi. Proff. Hitesh Patel


Faculty Guide Head of Department

1|Page
Electrical Engineering Department

Pacific School of Engineering,


Surat
CERTIFICATE
This is to certify that the project entitled

Wireless Auto Power Trip


During Gas Leakage

Submitted by

Kotadiya Nikunj R. 141120109022


Patel Hardik R. 141120109032
Patel Hardik M. 141120109033
Pansuriya Satish M. 151123109011

In partial fulfillments of the requirement for the DESIGN ENGINEERING 2A


(2150001).In Electrical Engineering Department of Pacific School of Engineering,
Surat is recorded on his own work carried out under my supervision and guidance.
The matter embodied here is not being submitted elsewhere forward of any degree
or diploma.

Bhargav Patel Hitesh S Patel


Faculty Guide Head of Department

2|Page
Electrical Engineering Department
Pacific School of Engineering, Surat

:: EXAMINER S’ CERTIFICATE OF APPROVAL::

This is to certify that the project entitled

Wireless Auto Power Trip


During gas leakage

SUBMITTED BY
Kotadiya Nikunj R. 141120109022
Patel Hardik R. 141120109032
Patel Hardik M. 141120109033
Pansuriya Satish M. 151123109011

in partial fulfillment of the requirement for the DESIGN ENGINEERING-2A (2150001) in

Electrical Engineering Department of Pacific School of Engineering, Surat is hereby

approved for submitted his/her project for 5th semester.

Place:

Date: EXAMINER SIGN

3|Page
ACKNOWLEDGEMENT

It is our great pleasure to acknowledgement the assistance and contribution of the


individual. Who co-operated us to complete the practical work successfully. First
and foremast our wish to express our deep and thanks to Head of Department of
Pacific school of engineering and our practical guide Prof. Bhargav Patel, for their
enthusiastic guidance and helping in successful completion of practical work. They
provided us their precious time for valuable suggestion and encouragement
throughout the work. It is foe their patience, guidance and encouragement at all
time that work has shaped up the way it is.
A practical is teamwork and reflects the contribution of many people. A number
people contributed their time and efforts in making this practical work a success
we would like to thank everyone who contributed their time efforts to help in
completing the practical world.

4|Page
INDEX

Sr.No. CONTENTS PAGE No.

1 Introduction 6

2 AEIOU Summary 7

3 Ideation Canvas 10

4 User Canvas 11

5 Product Development Canvas 12


6 Reverse Engineering through SCAMPER 13
7 LNM Canvas 15
8 Circuit Diagram 17
9 Material List 18
10 References 19

5|Page
Introduction
Our team visited The Company Name Garden Silk Mills which is situated at
Kadodara-Bardoli Highway. We were seen the power production in this company.
It may be 150mw power plant. They produce captive power for their requirement
only.

As per GTU rules we required information of any types of projects in five steps
which is AEIOU shown here.

1. ACTIVITIES

2. ENVIRONMENT

3. INTERACTION

4. OBJECTS

5. USER

This all factors are a part of GTU shodh yatra phase1 so we are try to find a points
which is help our projects regarding our subjects.

Now, we are shown here what we are observed actually, we referred this all
topics one by one in briefly.

6|Page
AEIOU SUMMARY

(1) ACTIVITIES

In this topic we are seen the different activities which were done in
company during visit.
Following points are observed during visit,
1) Employees park their cars and bikes
2) Labors drink tea
3) Security man checks visitor by metal detector machine
4) Some labors are doing their work in field area
5) Material transportation is done
6) Employee gives some training about machine operation
When we visited company, there were farewell party is organized for a
retirement of senior employee.

7|Page
(2) ENVIRONMENT

In this topic we observed about company atmosphere.


The points which observed are following:
1) There were very dust of coal in air
2) High noise in machine area
3) There were also hot in surrounding machine
4) Very high humidity was observed in atmosphere
Co incidentally raining was done when we were visiting company.
(3) INTERACTION

In this point we are shown about interaction between two people regarding
to work which are shown below
1) Security man was asking to visitor about purpose of visiting.
2) Other Security man checks employee gate pass for entering.
3) Employee gives some instruction about work or job to labors.
4) Employee gives information about his work area and company product
to trainee who are vocational. One special notes is that head of
department held emergency meeting about fire safety and fire hazards.

(4) OBJECTS

In this topic we are collected different types of objects which are listed as
below:
1) Indicators
2) Computers
3) Cars and Bikes
4) Control panel of machine
5) Fire extinguisher
6) Cooling tower
7) Pipes
8) Coal etc.
We are seen the special object “CHOPPER” which was near admin building.

8|Page
(5) USERS

In this point we listed all users which were we met and seen.
They are as below:
1) Employees (General manager, Senior manager, Officers and Executives)
2) Security guards
3) Workers
4) Labors
5) Visitors
6) Peons
We visited company is the Silk Mills. So, Special user we have to see during
visiting is model (Actress) and also observe that we are also (D.E. student)
special user.

9|Page
IDEATION CANVAS
In the field of activities, we have introduced that the basic information will
be available to all.

10 | P a g e
Empathy mapping canvas
There has not been any change in the empathy mapping canvas because
the users, stakeholders and the activities remain the same.

11 | P a g e
PRODUCT DEVELOPMENT CANVAS
There has been no change in this particular canvas.

12 | P a g e
REVERSE ENGINEERING THROUGH SCAMPER
SCAMPER is based on the notation that everything new is some addition or
modification of the something that already exists.

It is the checklist of nine creative thinking principles.

S - Substitute?

C - Combine?

A - Adapt?

M - Modify? Magnify?

P - Put to other use?

E - Eliminate?

R - Rearrange? Reverse?

Substitute

This can be a great facility. It can be used in other places too. We just have
to substitute its name and its basic details with respect to that place. And also
have to create a backend database for that place.

Combine

This facility is combined with fire safety and rout direction screen.

Adapt

Our facility is adapted to microcontroller for smartness. Because of this we


can save electrical energy and easy to understand safety awareness.

13 | P a g e
Modify / Magnify

In our system we have modified that we use protective relay for tripping of
power supply while LPG leakage.

Put to other use

Our system can be use easily by any people who are illiterate or literate.
They can easily learn to use this system even if they don’t have the idea of our
purpose. It is intended to be used by the local people but the other people like
tourist can also use.

Eliminate

Nothing to eliminate from the current system. It would impact in its


experience of using.

Rearrange/Reverse

If this system would have been introduced earlier, it would have made a
great benefit to the brand as the people get to know about the service easily and
enjoy it for daily travelling.

Feedback analysis

It will be a very helpful system. No other this type of system for our city
provides this kind of services. And for the new people in the city it will be very
helpful safety against LPG leakage.

14 | P a g e
LNM Canvas
Purpose/ Product Concept
 Wireless auto power trip during gas leakage

Application standards and Design Specifications


 Long Life Facility

Component Material’s Strength Criteria


 Gas sensor, Encoder, Decoder
 Microcontroller

Methods/Theories/Application process involved


 Power supply system
 Digital Electronics

15 | P a g e
16 | P a g e
Circuit Diagram

17 | P a g e
Material List
Semiconductors:
1) IC1:7805,5V voltage regulator
2) IC2:LM393 dual comparator
3) D1,D2:1n4007 rectifier diode
4) T1:TIP122 npn Darlington transistor

Resistors
1) R1,R3:1-kilo-ohm
2) R2:15ohm,0.5W
3) VR1,VR2:10 kilo-ohm potmeter

Capacitor
1) C1:1000micro farad,25volt electrolytic

Miscellaneous
1) CON1:2-pin connector terminal
2) X1:230V AC primary to 12V-0-12V,750mA secondary transformer
3) PZ1:12V high gain siren/buzzer
4) GS1:Mq-6 LPG sensor
5) Microcontroller

18 | P a g e
REFERENCE

 Wikipedia – website
 Power system – B.L.Therejja
 Basic electronics – V K Gupta
 Microprocessor and controller – Dr Raghuram