SITE NAME : GDT

PROJECT : FOUNDATION PIPELINE BURRIED


AREA : GDT PLANT

Prepared by : Reviewed by : Approved by :

__________________ __________________ __________________

Rev. 1 Rev. 2 Rev. 3 Rev. 4 Rev. 5


Date : Date : Date : Date : Date :
Sign 1: Sign 1: Sign 1: Sign 1: Sign 1:
Sign 2 : Sign 2 : Sign 2 : Sign 2 : Sign 2 :
SITE MAP
FOUNDATION WORK FOR PIPELINE BURRIED
LOCATION : GRESIK DISTRIBUTION TERMINAL

GDT PLANT

MASPION INDUSTRIAL ESTATE

PROPOSE
NEW FOUNDATION PIPELINE

GDT PLANT
1. PERENCANAAN PEDESTAL

Penulangan Pedestal
Beban Equipment (Pq)
beban pipa 12" (include aliran) = 0.882 ton
beban sleeper = 12.71 ton
total 13.59 ton

diket :
Diameter = 30 cm
Fc' = 225 kg/cm2
Fy = 3900 kg/cm2
Ag = 30 x 30 = 900 cm2
As = 3.97995 cm2
(12 D 13 and Begel Ǿ8-150)= 3.97995 cm2

P .= 0.85 *Ag* 0.25 *"fc' +0.85 *fy*(As/Ag) (aci 318-99)

P 43.04591 ton > Pq 13.59 ton ------> (ok)

DETAIL PEDESTAL
2. PERENCANAAN FOOTPLATE

Peraturan yang dipakai sebagai patokan menentukan besar beban yang bekerja pada struktur pelat
adalah Peraturan Pembebanan Indonesia untuk Gedung 1983. Perletakan pada pelat diasumsikan
sebagai perletakan jepit penuh.
Diket :

lebar poer (b ) = 0.9 m


panjang poer (h ) = 1 m
tebal poer (l) = 0.2 m
tinggi pendestal (lp) = 1.0 m
lebar pendestal (bp) = 0.3 m
mutu beton Fc' = 300 kg/cm2
2
mutu besi Fy = 3900 kg/cm
selimut beton (d') = 5 cm
massa jenis tanah (Yt) = 1450 kg/m3 (asumsi sirtu)
massa jenis beton (Yb) = 2400 kg/m3
Ø tulangan rencana = 1.3 cm
d (h-d'-0,5 Ø tul) = 894.35 cm
Kedalaman tanah (lt) = 1.2 m
jarak antar tiang (lpj) = 0 m
lebar balok (bb) = 0 m
Panjang balok (hb) = 0 m
kedalaman urugan atas poer = 0.8 m

Beban Pondasi (P)


Pg =beban pipe 12"+sleeper = 13.59 ton
tanah urug
atas balok = 2*bb*hb*lb*Yt = 0.00
atas poer = b*h*l*Yt = 1.57 ton/titik
P = 15.16 ton

Akibat beban sendiri (W)


Ptotal balok = bb*hb*lpj*1 balok = 0.00 ton
poer = b*h*l*Yb*1 titik = 0.43 ton
pendestal = Yb*bp*bp*lp*1 titik = 0.22 ton
W = 0.65 ton

R= P+W= 15.80 ton

luas (A) = b*h = 0.90 m2


q = R/A = 17.56 ton/m2

perhitungan momen asumsi terjepit


Mu = 1/2*q*l2 = 8.78 ton/m

= 15.3
12.197 ton/m2

= 0.00035897

…….SNI 03-2847-2002

= 0.0451616 > p min 0.000359 ------> ok

As = pxbxd = 363.5125 mm
As D 13 mm tulangan = 132.665 mm
dipake tul 12D13-200 = 1591.98 mm > 363.5125 mm ------> ok