RFI -PAINTING-21 KM PIPELINE

PROJECT: SRLF
CONTRA
ACTIVITY Date of Date of Inspection Location
RFI No SATIP No SAIC No CTOR / Job Discipline
NUMBER Request Inspection Time Description
SUBCON

MECHANICAL 21 @15
KM Pipeline
1 3.3 SATIP-H-100-01 SAIC-H-2029 POSCO 20-Mar-18 21-Mar-18 9:00 AM KM

SRLF-R-P-PI-0543

MECHANICAL 21 KM Pipeline
2 3.5 SATIP-H-100-01 SAIC-H-2031 POSCO 14-Mar-18 15-Mar-18 9:30 AM @10 KM

SRLF-R-P-PI-0544

21 KM Pipeline
3 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 20-Mar-18 21-Mar-18 3:00 PM MECHANICAL @10-11 KM
(LOOP WISE)
SRLF-R-P-PI-0545

21 KM Pipeline
4 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 20-Mar-18 21-Mar-18 3:30 PM MECHANICAL @10-11 KM
(LOOP WISE)
SRLF-R-P-PI-0546
KM PIPELINE - POSCO
25-Apr-18
POSCO
NAPID
RFI Description Inspector
E&C SAPMT
Inspector
Inspection of primer Coat prior to Mid Coat touch up
application at Weld Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL
LINE : G07-SF-2032 HANNAN MUSTAFA RABEYA
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C

Inspection for Final Coat touch up application at Weld


Joints 8" Molten Sulfur Pipeline,Hydrotest Package K85- ABDUL
P-002-01-HT-001, LINE : G07-SF-2032 HANNAN MUSTAFA RABEYA
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C
Inspection for Surface Preparation prior to application of
primer coat touch up at Weld Joints 8" Molten Sulfur
Pipeline,
Hydrotest Package K85-P-002-01-HT-002, ABDUL
LINE : G07-SF-2032 HANNAN MUSTAFA RABEYA
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C for Pipe Weld joints /
APCS 1C Primer
In process for Galvanised
Inspection of primerRepair for Pipe
coat touch up supports
at Weld
( Date
Joints: 21-MAR
8" Moltento Sulfur
22-MAR-2018
Pipeline,).
Hydrotest Package K85-P-002-01-HT-002,
LINE : G07-SF-2032 ABDUL
( AS PER ATTACHED DRAWING SHEET ) HANNAN MUSTAFA RABEYA
Coating System : APCS 2C for Pipe Weld joints /
APCS 1C Primer for Galvanised Repair for Pipe supports
( Date : 21-MAR to 22-MAR-2018 ).
RFI -PAINTING-21 KM PIPELINE
PROJECT: SRLF
CONTRA
ACTIVITY Date of Date of Inspection Location
RFI No SATIP No SAIC No CTOR / Job Discipline
NUMBER Request Inspection Time Description
SUBCON

MECHANICAL 21 @6.5
KM Pipeline
1 SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 21-Dec-17 23-Dec-17 10:00 AM KM

MECHANICAL 21 @6.5
KM Pipeline
2 SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 21-Dec-17 23-Dec-17 10:30 AM KM

21 KM Pipeline
3 SRLF-R-P-PI- 3.6 SATIP-H-100-01 SAIC-H-2032 POSCO 24-Dec-17 25-Dec-17 8:30 AM MECHANICAL @ 8.5 KM TO 13
KM

MECHANICAL 21 @6.5
KM Pipeline
4 SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 25-Dec-17 26-Dec-17 10:00 AM KM

MECHANICAL 21 @6.5
KM Pipeline
5 SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 25-Dec-17 26-Dec-17 10:30 AM KM

MECHANICAL 21 @2.3
KM Pipeline
6 SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 27-Dec-17 28-Dec-17 10:00 AM KM

MECHANICAL 21 @2.3
KM Pipeline
7 SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 27-Dec-17 28-Dec-17 10:30 AM KM

MECHANICAL 21 KM Pipeline
8 SRLF-R-P-PI- 3.5 SATIP-H-100-01 SAIC-H-2031 POSCO 27-Dec-17 28-Dec-17 9:45 AM @ 3 & 6.5 KM
MECHANICAL 21 @2.5
KM Pipeline
9 SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 30-Dec-17 31-Dec-17 10:00 AM KM

10 SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 30-Dec-17 31-Dec-17 10:30 AM MECHANICAL 21 KM Pipeline
@2.5 KM

21 KM Pipeline
11 SRLF-R-P-PI- 3.6 SATIP-H-100-01 SAIC-H-2032 POSCO 30-Dec-17 31-Dec-17 3:00 PM MECHANICAL @ 10.3 KM TO
14.5 KM

MECHANICAL 21 KM Pipeline
13 SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 2-Jan-18 3-Jan-18 10:00 AM @2.3-2.5 KM

MECHANICAL 21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 2-Jan-18 3-Jan-18 10:30 AM @2.3-2.5 KM

SRLF-R-P-PI- 3.6 SATIP-H-100-01 SAIC-H-2032 POSCO 3-Jan-18 4-Jan-18 8:30 AM MECHANICAL 21 KM Pipeline

21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 3-Jan-18 4-Jan-18 10:00 AM MECHANICAL @ 11 KM To
16.5 KM.

21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 3-Jan-18 4-Jan-18 10:30 AM MECHANICAL @ 11 KM To
16.5 KM.

MECHANICAL 21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 4-Jan-18 6-Jan-18 10:00 AM @2.3-2.5 KM
MECHANICAL 21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 4-Jan-18 6-Jan-18 10:30 AM @2.3-2.5 KM

21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 6-Jan-18 7-Jan-18 10:00 AM MECHANICAL @ 11 KM To
16.5 KM.

21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 6-Jan-18 7-Jan-18 10:30 AM MECHANICAL @ 11 KM To
16.5 KM.

POSCO
SRLF-R-P-PI- 2.1 SATIP-H-100-01 SAIC-H-2024 POSCO 6-Jan-18 7-Jan-18 8:30 AM MECHANICAL LAYDOWN

MECHANICAL 21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 8-Jan-18 9-Jan-18 10:00 AM @2.3-2.5 KM

MECHANICAL 21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 8-Jan-18 9-Jan-18 10:30 AM @2.3-2.5 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 9-Jan-18 10-Jan-18 3:00 PM 0-1 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 9-Jan-18 10-Jan-18 3:30 PM
0-1 KM

SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 11-Jan-18 13-Jan-18 10:00 AM MECHANICAL 21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 11-Jan-18 13-Jan-18 10:30 AM MECHANICAL 21 KM Pipeline

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 11-Jan-18 13-Jan-18 3:00 PM 0-3 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 11-Jan-18 13-Jan-18 3:30 PM 0-3 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.3 SATIP-H-100-01 SAIC-H-2029 POSCO 13-Jan-18 14-Jan-18 8:30 AM 0-1 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.3 SATIP-H-100-01 SAIC-H-2029 POSCO 14-Jan-18 15-Jan-18 9:30 AM 0-1 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.5 SATIP-H-100-01 SAIC-H-2029 POSCO 14-Jan-18 15-Jan-18 9:45 AM 0-1 KM

SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 15-Jan-18 16-Jan-18 10:00 AM MECHANICAL 21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 15-Jan-18 16-Jan-18 10:30 AM MECHANICAL 21 KM Pipeline

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 15-Jan-18 16-Jan-18 3:00 PM 0-3 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 15-Jan-18 16-Jan-18 3:30 PM 0-3 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.3 SATIP-H-100-01 SAIC-H-2029 POSCO 15-Jan-18 16-Jan-18 3:45 PM 0-1 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.5 SATIP-H-100-01 SAIC-H-2031 POSCO 16-Jan-18 17-Jan-18 3:00 PM 0-1 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.3 SATIP-H-100-01 SAIC-H-2029 POSCO 16-Jan-18 17-Jan-18 3:30 PM 0-2 KM
MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 17-Jan-18 19-Jan-18 3:00 PM 2-6 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 17-Jan-18 19-Jan-18 3:30 PM 2-6 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 17-Jan-18 19-Jan-18 3:15 PM 2-6 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 17-Jan-18 19-Jan-18 3:45 PM 2-6 KM

SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 17-Jan-18 19-Jan-18 10:00 AM MECHANICAL 21 KM Pipeline

SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 17-Jan-18 19-Jan-18 10:30 AM MECHANICAL 21 KM Pipeline
MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.3 SATIP-H-100-01 SAIC-H-2029 POSCO 17-Jan-18 18-Jan-18 4:00 PM 2-3 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.5 SATIP-H-100-01 SAIC-H-2031 POSCO 18-Jan-18 20-Jan-18 3:30 PM 0-2 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.3 SATIP-H-100-01 SAIC-H-2029 POSCO 18-Jan-18 20-Jan-18 3:45 PM 2-3 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 21-Jan-18 22-Jan-18 3:00 PM 3-7 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 21-Jan-18 22-Jan-18 3:30 PM 3-7 KM

21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 21-Jan-18 22-Jan-18 10:00 AM MECHANICAL Near Sect. Van-2
21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 21-Jan-18 22-Jan-18 10:30 AM MECHANICAL Near Sect. Van-2

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 2.3 SATIP-H-100-01 SAIC-H-2026 POSCO 22-Jan-18 23-Jan-18 2:00 PM 3-7 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.5 SATIP-H-100-01 SAIC-H-2031 POSCO 23-Jan-18 24-Jan-18 3:30 PM 0-3 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.3 SATIP-H-100-01 SAIC-H-2029 POSCO 23-Jan-18 24-Jan-18 3:45 PM 3-5 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 24-Jan-18 25-Jan-18 3:00 PM 4-8 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 24-Jan-18 25-Jan-18 3:30 PM 4-8 KM
21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 24-Jan-18 25-Jan-18 10:00 AM MECHANICAL Near Sect. Van-2

21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 24-Jan-18 25-Jan-18 10:30 AM MECHANICAL Near Sect. Van-2

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 27-Jan-18 28-Jan-18 3:00 PM 4-8 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 27-Jan-18 28-Jan-18 3:30 PM 4-8 KM

21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 27-Jan-18 28-Jan-18 10:00 AM MECHANICAL Near Sect. Van-2
21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 27-Jan-18 28-Jan-18 10:30 AM MECHANICAL Near Sect. Van-2

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.5 SATIP-H-100-01 SAIC-H-2031 POSCO 27-Jan-18 28-Jan-18 8:30 AM 2-3 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.3 SATIP-H-100-01 SAIC-H-2029 POSCO 27-Jan-18 28-Jan-18 8:00 AM 3-5 KM

21 KM Pipeline
@ 0 KM
SRLF-R-P-PI- 2.1 SATIP-H-100-01 SAIC-H-2024 POSCO 28-Jan-18 29-Jan-18 8:15 AM MECHANICAL ( Temparory
Paint Storage)

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.5 SATIP-H-100-01 SAIC-H-2031 POSCO 28-Jan-18 29-Jan-18 8:30 AM 1-3 KM

MECHANICAL 21 KM Pipeline
SRLF-R-P-PI- 2.3 SATIP-H-100-01 SAIC-H-2026 POSCO 29-Jan-18 30-Jan-18 8:30 AM @ 4 KM

21 KM Pipeline
SRLF-R-P-PI- 3.5 SATIP-H-100-01 SAIC-H-2031 POSCO 29-Jan-18 30-Jan-18 9:00 AM MECHANICAL @ 2.1 KM -2.9
KM
MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.3 SATIP-H-100-01 SAIC-H-2029 POSCO 30-Jan-18 31-Jan-18 9:00 AM 4- 7KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.5 SATIP-H-100-01 SAIC-H-2031 POSCO 30-Jan-18 31-Jan-18 9:30 AM 3-5 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 30-Jan-18 31-Jan-18 3:00 PM 0-3 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 30-Jan-18 31-Jan-18 3:30 PM 0-3 KM

21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 31-Jan-18 1-Feb-18 10:00 AM MECHANICAL Near Sect. Van-2
21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 31-Jan-18 1-Feb-18 10:30 AM MECHANICAL Near Sect. Van-2

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.3 SATIP-H-100-01 SAIC-H-2029 POSCO 31-Jan-18 1-Feb-18 3:00 PM 1 - 7KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.5 SATIP-H-100-01 SAIC-H-2031 POSCO 1-Feb-18 3-Feb-18 9:30 AM 4-6 KM

MECHANICAL 21@KM Pipeline


SRLF-R-P-PI- 3.3 SATIP-H-100-01 SAIC-H-2029 POSCO 1-Feb-18 3-Feb-18 10:00 AM 0.5-1 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.5 SATIP-H-100-01 SAIC-H-2031 POSCO 1-Feb-18 3-Feb-18 10:30 AM 3-6 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 1-Feb-18 3-Feb-18 3:00 PM 1-3 KM
MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 1-Feb-18 3-Feb-18 3:30 PM 1-3 KM

POSCO
SRLF-R-P-PI- 2.1 SATIP-H-100-01 SAIC-H-2024 POSCO 3-Feb-18 4-Feb-18 8:30 AM MECHANICAL LAYDOWN

21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 3-Feb-18 4-Feb-18 10:00 AM MECHANICAL Near Sect. Van-2

21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 3-Feb-18 4-Feb-18 10:30 AM MECHANICAL Near Sect. Van-2

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.5 SATIP-H-100-01 SAIC-H-2031 POSCO 4-Feb-18 5-Feb-18 9:30 AM 5-7 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 5-Feb-18 6-Feb-18 3:00 PM 1-4 KM
MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 5-Feb-18 6-Feb-18 3:30 PM 1-4 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.5 SATIP-H-100-01 SAIC-H-2031 POSCO 6-Feb-18 7-Feb-18 9:30 AM 5-7 KM

MECHANICAL 21@0.5-2
KM Pipeline
SRLF-R-P-PI- 3.3 SATIP-H-100-01 SAIC-H-2029 POSCO 6-Feb-18 7-Feb-18 9:40 AM KM

21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 6-Feb-18 7-Feb-18 10:00 AM MECHANICAL Near Sect. Van-2

21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 6-Feb-18 7-Feb-18 10:30 AM MECHANICAL Near Sect. Van-2

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 7-Feb-18 9-Feb-18 3:00 PM 2-5 KM
MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 7-Feb-18 9-Feb-18 3:30 PM 2-5 KM

MECHANICAL 21@KM Pipeline


SRLF-R-P-PI- 3.5 SATIP-H-100-01 SAIC-H-2031 POSCO 8-Feb-18 10-Feb-18 9:30 AM 6-7.5 KM

MECHANICAL 21@KM Pipeline


SRLF-R-P-PI- 3.5 SATIP-H-100-01 SAIC-H-2031 POSCO 8-Feb-18 10-Feb-18 9:40 AM 6-7.5 KM

21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 8-Feb-18 10-Feb-18 10:00 AM MECHANICAL Near Sect. Van-3

21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 8-Feb-18 10-Feb-18 10:30 AM MECHANICAL Near Sect. Van-3

POSCO
SRLF-R-P-PI- 2.1 SATIP-H-100-01 SAIC-H-2024 POSCO 10-Feb-18 11-Feb-18 8:30 AM MECHANICAL LAYDOWN

MECHANICAL 21 @1-2
KM Pipeline
SRLF-R-P-PI- 3.3 SATIP-H-100-01 SAIC-H-2029 POSCO 10-Feb-18 11-Feb-18 9:00 AM KM
MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 10-Feb-18 11-Feb-18 3:00 PM 2-5 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 10-Feb-18 11-Feb-18 3:30 PM 2-5 KM

21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 11-Feb-18 12-Feb-18 10:00 AM MECHANICAL Near Sect. Van-3

21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 11-Feb-18 12-Feb-18 10:30 AM MECHANICAL Near Sect. Van-3

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 12-Feb-18 13-Feb-18 3:00 PM 2-5 KM
MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 12-Feb-18 13-Feb-18 3:30 PM 2-5 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.5 SATIP-H-100-01 SAIC-H-2031 POSCO 13-Feb-18 14-Feb-18 9:30 AM 0-1 KM

MECHANICAL 21 KM Pipeline
SRLF-R-P-PI- 3.3 SATIP-H-100-01 SAIC-H-2029 POSCO 13-Feb-18 14-Feb-18 9:45 AM @1.5-2.5 KM

21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 13-Feb-18 14-Feb-18 10:00 AM MECHANICAL Near Sect. Van-3

21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 13-Feb-18 14-Feb-18 10:30 AM MECHANICAL Near Sect. Van-3

21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 14-Feb-18 15-Feb-18 10:00 AM MECHANICAL Near Sect. Van-3

21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 14-Feb-18 15-Feb-18 10:30 AM MECHANICAL Near Sect. Van-3
MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 14-Feb-18 15-Feb-18 3:00 PM 3-6 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 14-Feb-18 15-Feb-18 3:30 PM 3-6 KM

21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 15-Feb-18 17-Feb-18 10:00 AM MECHANICAL Near Sect. Van-3

21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 15-Feb-18 17-Feb-18 10:30 AM MECHANICAL Near Sect. Van-3

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 15-Feb-18 17-Feb-18 3:00 PM 3-6 KM
MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 15-Feb-18 17-Feb-18 3:30 PM 3-6 KM

MECHANICAL 21 @2-3
KM Pipeline
SRLF-R-P-PI- 3.3 SATIP-H-100-01 SAIC-H-2029 POSCO 17-Feb-18 18-Feb-18 9:00 AM KM

21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 18-Feb-18 19-Feb-18 10:00 AM MECHANICAL Near Sect. Van-3

21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 18-Feb-18 19-Feb-18 10:30 AM MECHANICAL Near Sect. Van-3

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 18-Feb-18 19-Feb-18 3:00 PM 3-6 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 18-Feb-18 19-Feb-18 3:30 PM 3-6 KM
MECHANICAL 21 KM Pipeline
SRLF-R-P-PI-0457 2.2 SATIP-H-100-01 SAIC-H-2025 POSCO 19-Feb-18 20-Feb-18 8:00 AM @ 0 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.5 SATIP-H-100-01 SAIC-H-2031 POSCO 20-Feb-18 21-Feb-18 8:30 AM 1-2 KM

21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 20-Feb-18 21-Feb-18 2:00 PM MECHANICAL Near Sect. Van-3

21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 20-Feb-18 21-Feb-18 2:30 PM MECHANICAL Near Sect. Van-3

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 20-Feb-18 21-Feb-18 3:00 PM 4-6 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 20-Feb-18 21-Feb-18 3:30 PM 4-6 KM

MECHANICAL 21@2.5-3
KM Pipeline
SRLF-R-P-PI- 3.3 SATIP-H-100-01 SAIC-H-2029 POSCO 21-Feb-18 22-Feb-18 9:00 AM KM
21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 21-Feb-18 23-Feb-18 2:00 PM MECHANICAL Near Sect. Van-3

21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 21-Feb-18 23-Feb-18 2:30 PM MECHANICAL Near Sect. Van-3

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 21-Feb-18 23-Feb-18 3:00 PM 4-6 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 21-Feb-18 23-Feb-18 3:30 PM 4-6 KM

MECHANICAL 21 KM Pipeline
SRLF-R-P-PI- 3.3 SATIP-H-100-01 SAIC-H-2029 POSCO 21-Feb-18 22-Feb-18 9:00 AM @2.5-3.5 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.5 SATIP-H-100-01 SAIC-H-2031 POSCO 22-Feb-18 24-Feb-18 9:00 AM 1-2 KM
21 KM Pipeline
@ 0 KM
SRLF-R-P-PI- 2.1 SATIP-H-100-01 SAIC-H-2024 POSCO 22-Feb-18 24-Feb-18 8:00 AM MECHANICAL ( Temparory
Paint Storage)

21 KM Pipeline
SRLF-R-P-PI- 3.5 SATIP-H-100-01 SAIC-H-2031 POSCO 24-Feb-18 25-Feb-18 9:00 AM MECHANICAL @ 7.1 KM -8.0
KM

21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 24-Feb-18 25-Feb-18 2:00 PM MECHANICAL Near Sect. Van-3

21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 24-Feb-18 25-Feb-18 2:30 PM MECHANICAL Near Sect. Van-3

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 24-Feb-18 25-Feb-18 3:00 PM 4-6 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 24-Feb-18 25-Feb-18 3:30 PM 4-6 KM
MECHANICAL 21@3-5
KM Pipeline
SRLF-R-P-PI- 3.3 SATIP-H-100-01 SAIC-H-2029 POSCO 26-Feb-18 27-Feb-18 9:00 AM KM

21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 26-Feb-18 27-Feb-18 2:00 PM MECHANICAL Near Sect. Van-3

21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 26-Feb-18 27-Feb-18 2:30 PM MECHANICAL Near Sect. Van-3

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 26-Feb-18 27-Feb-18 3:00 PM 5-7 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 26-Feb-18 27-Feb-18 3:30 PM 5-7 KM

MECHANICAL 21 KM Pipeline
SRLF-R-P-PI- 3.5 SATIP-H-100-01 SAIC-H-2031 POSCO 28-Feb-18 1-Mar-18 9:00 AM @ 1.5-2.5 KM
21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 28-Feb-18 1-Mar-18 2:00 PM MECHANICAL Near Sect. Van-3

21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 28-Feb-18 1-Mar-18 2:30 PM MECHANICAL Near Sect. Van-3

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 28-Feb-18 1-Mar-18 3:00 PM 5-7 KM

MECHANICAL 21@
KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 28-Feb-18 1-Mar-18 3:30 PM 5-7 KM

21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 1-Mar-18 3-Mar-18 2:00 PM MECHANICAL Near Sect. Van-3

21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 1-Mar-18 3-Mar-18 2:30 PM MECHANICAL Near Sect. Van-3
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 1-Mar-18 3-Mar-18 3:00 PM MECHANICAL 21 KM Pipeline
@6-7.5 KM

MECHANICAL 21@KM Pipeline


SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 1-Mar-18 3-Mar-18 3:30 PM 6-7.5 KM

MECHANICAL 21@4-6
KM Pipeline
SRLF-R-P-PI- 3.3 SATIP-H-100-01 SAIC-H-2029 POSCO 3-Mar-18 4-Mar-18 4:00 PM KM

MECHANICAL 21@6-7.5
KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 4-Mar-18 5-Mar-18 3:00 PM KM

MECHANICAL 21@KM Pipeline


SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 4-Mar-18 5-Mar-18 3:30 PM 6-7.5 KM
MECHANICAL 21 KM Pipeline
SRLF-R-P-PI- 3.5 SATIP-H-100-01 SAIC-H-2031 POSCO 4-Mar-18 5-Mar-18 2:00 PM @ 1.5-2.5 KM

21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 5-Mar-18 6-Mar-18 3:00 PM MECHANICAL @7.5-9.5 KM
(LOOP WISE)

21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 5-Mar-18 6-Mar-18 3:30 PM MECHANICAL @7.5-9.5 KM
(LOOP WISE)

MECHANICAL 21@2-2.5
KM Pipeline
SRLF-R-P-PI- 3.5 SATIP-H-100-01 SAIC-H-2031 POSCO 6-Mar-18 7-Mar-18 9:30 AM KM

MECHANICAL 21@5-7
KM Pipeline
SRLF-R-P-PI- 3.3 SATIP-H-100-01 SAIC-H-2029 POSCO 6-Mar-18 7-Mar-18 10:00 AM KM
21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 6-Mar-18 7-Mar-18 2:00 PM MECHANICAL Near Sect. Van-4

21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 6-Mar-18 7-Mar-18 2:30 PM MECHANICAL Near Sect. Van-4

21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 7-Mar-18 8-Mar-18 3:00 PM MECHANICAL @8-11 KM
(LOOP WISE)

21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 7-Mar-18 8-Mar-18 3:30 PM MECHANICAL @8-11 KM
(LOOP WISE)

MECHANICAL 21@2-2.5
KM Pipeline
SRLF-R-P-PI- 3.5 SATIP-H-100-01 SAIC-H-2031 POSCO 10-Mar-18 11-Mar-18 9:30 AM KM
21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 8-Mar-18 10-Mar-18 2:00 PM MECHANICAL Near Sect. Van-4

21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 8-Mar-18 10-Mar-18 2:30 PM MECHANICAL Near Sect. Van-4

21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 8-Mar-18 10-Mar-18 3:00 PM MECHANICAL @8-11 KM
(LOOP WISE)

21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 8-Mar-18 10-Mar-18 3:30 PM MECHANICAL @8-11 KM
(LOOP WISE)

MECHANICAL 21 KM Pipeline
SRLF-R-P-PI- 3.5 SATIP-H-100-01 SAIC-H-2031 POSCO 11-Mar-18 12-Mar-18 9:00 AM @2-3KM
MECHANICAL 21@6-7
KM Pipeline
SRLF-R-P-PI- 3.3 SATIP-H-100-01 SAIC-H-2029 POSCO 11-Mar-18 12-Mar-18 9:30 AM KM

21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 11-Mar-18 12-Mar-18 3:00 PM MECHANICAL @10-11 KM
(LOOP WISE)

21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 11-Mar-18 12-Mar-18 3:30 PM MECHANICAL @10-11 KM
(LOOP WISE)

MECHANICAL 21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 11-Mar-18 12-Mar-18 3:10 PM @10 KM

MECHANICAL 21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 11-Mar-18 12-Mar-18 3:40 PM @10 KM
MECHANICAL 21 KM Pipeline
SRLF-R-P-PI- 3.5 SATIP-H-100-01 SAIC-H-2031 POSCO 13-Mar-18 14-Mar-18 9:00 AM @3-4KM

MECHANICAL 21@7-10
KM Pipeline
SRLF-R-P-PI- 3.3 SATIP-H-100-01 SAIC-H-2029 POSCO 13-Mar-18 14-Mar-18 9:30 AM KM

21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 13-Mar-18 14-Mar-18 3:00 PM MECHANICAL @10-11 KM
(LOOP WISE)

21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 13-Mar-18 14-Mar-18 3:30 PM MECHANICAL @10-11 KM
(LOOP WISE)

MECHANICAL 21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 13-Mar-18 14-Mar-18 3:10 PM @10 KM
MECHANICAL 21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 13-Mar-18 14-Mar-18 3:40 PM @10 KM

MECHANICAL 21 KM Pipeline
SRLF-R-P-PI- 3.5 SATIP-H-100-01 SAIC-H-2031 POSCO 14-Mar-18 15-Mar-18 9:00 AM @4-5KM

MECHANICAL 21@7-10
KM Pipeline
SRLF-R-P-PI- 3.3 SATIP-H-100-01 SAIC-H-2029 POSCO 15-Mar-18 16-Mar-18 9:30 AM KM

21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 15-Mar-18 16-Mar-18 3:00 PM MECHANICAL @10-11 KM
(LOOP WISE)

21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 15-Mar-18 16-Mar-18 3:30 PM MECHANICAL @10-11 KM
(LOOP WISE)
21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 15-Mar-18 17-Mar-18 3:00 PM MECHANICAL @16 KM

21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 15-Mar-18 17-Mar-18 3:30 PM MECHANICAL @16 KM

MECHANICAL 21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 15-Mar-18 17-Mar-18 3:10 PM @16 KM

MECHANICAL 21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 15-Mar-18 17-Mar-18 3:40 PM @16 KM

MECHANICAL 21 @5-6
KM Pipeline
SRLF-R-P-PI- 3.5 SATIP-H-100-01 SAIC-H-2031 POSCO 17-Mar-18 18-Mar-18 9:00 AM KM

21 KM Pipeline
SRLF-R-P-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 18-Mar-18 19-Mar-18 3:00 PM MECHANICAL @10-11 KM
(LOOP WISE)
21 KM Pipeline
SRLF-R-P-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 18-Mar-18 19-Mar-18 3:30 PM MECHANICAL @10-11 KM
(LOOP WISE)
21 KM PIPELINE - POSCO
25-Apr-18
POSCO
NAPID
RFI Description Inspector
E&C SAPMT
Inspector

Inspection for Surface Preparation prior to application of primer coat


touch up at Weld Joints for Cable Tray Supports / Coating System
APCS 1C (Primer Coat application only for Galvanized Repair) @ LX- ABDUL HANAN MUSTAFA RABEYA
009.(Date : 23 DEC TO 25 DEC 2017).

In process Inspection of primer coat touch up at Weld Joints for Cable


Tray Supports / Coating System APCS 1C(Primer Coat application only ABDUL HANAN MUSTAFA RABEYA
for Galvanized Repair) @ LX-009.(23 DEC TO 25 DEC 2017).

Inspection for Final Coat touch up application at Mechanical Damage


Area for 8" Molten Sulfur Pipeline / Coating System APCS 2C / Loop # ALTAF /
ABDUL HANAN RABEA
L27,L28,L29, L30 & LX-12 & L32,L33,L34,L35,L36 ( Partial balanced MUSTAFA
Upside ELBOW Touch up only)

Inspection for Surface Preparation prior to application of primer coat


touch up at Weld Joints for Cable Tray Supports / Coating System
APCS 1C (Primer Coat application only for Galvanized Repair) @ LX- ABDUL HANAN MUSTAFA RABEYA
009.(Date : 26 DEC TO 28 DEC 2017).

In process Inspection of primer coat touch up at Weld Joints for Cable


Tray Supports / Coating System APCS 1C(Primer Coat application only ABDUL HANAN MUSTAFA RABEYA
for Galvanized Repair) @ LX-009.(26 DEC TO 28 DEC 2017).

Inspection for Surface Preparation prior to application of primer coat


touch up at Weld Joints for Perforated Cable Tray Supports / Coating
System APCS 1C (Primer Coat application only for Galvanized Repair) ABDUL HANAN MUSTAFA RABEYA
@ Near Sect. Van-1 (Date : 28 DEC TO 30 DEC 2017).

In process Inspection of primer coat touch up at Weld Joints for


Perforated Cable Tray Supports / Coating System APCS 1C (Primer
Coat application only for Galvanized Repair) @ Near Sect. Van-1 ABDUL HANAN MUSTAFA RABEYA
(Date : 28 DEC TO 30 DEC 2017).

Inspection for Final Coat touch up at Weld Joints for Cable Tray
Supports / Coating System APCS 1C (Primer Coat application only for ABDUL HANAN MUSTAFA RABEA
Galvanized Repair) @ LX-006 & LX-009.
Inspection for Surface Preparation prior to application of primer coat
touch up at Weld Joints for Perforated Cable Tray Supports / Coating
System APCS 1C (Primer Coat application only for Galvanized Repair) ABDUL HANAN MUSTAFA RABEYA
@ Near Sect. Van-1 ( Date : 31 DEC TO 02-JAN- 2018 ).

In process Inspection of primer coat touch up at Weld Joints for


Perforated Cable Tray Supports / Coating System APCS 1C (Primer
Coat application only for Galvanized Repair) @ Near Sect. Van-1 ABDUL HANAN MUSTAFA RABEYA
( Date : 31 DEC TO 02-JAN- 2018 ).

Inspection for Final Coat touch up application at Mechanical Damage


Area for 8" Molten Sulfur Pipeline / Coating System APCS 2C / Loop #
L37,L38,L39, L40, L41, L42, L43,L44 & LX-12A ABDUL HANAN MUSTAFA RABEYA
( Partial balanced Upside ELBOW Touch up only) & L31, LX-13
( Partial balanced Allside ELBOW Touch up only)

Inspection for Surface Preparation prior to application of primer coat


touch up at Weld Joints for Perforated Cable Tray Supports / Coating
System APCS 1C (Primer Coat application only for Galvanized Repair) ABDUL HANAN MUSTAFA RABEYA
@ Near Sect. Van-1 ( Date : 03-JAN- to 05-JAN-2018 ).

In process Inspection of primer coat touch up at Weld Joints for


Perforated Cable Tray Supports / Coating System APCS 1C (Primer
Coat application only for Galvanized Repair) @ Near Sect. Van-1 ABDUL HANAN MUSTAFA RABEYA
( Date : 03-JAN- to 05-JAN-2018 ).

Inspection for Final Coat touch up application at Mechanical Damage


Area for 8" Molten Sulfur Pipeline / Coating System APCS 2C / Loop #
L45,L46,L47, L48, L49, L50, & LX-14, LX-15 ABDUL HANAN MUSTAFA RABEYA
( Partial balanced Upside ELBOW Touch up only)

Inspection for Surface Preparation prior to application of primer coat


touch up at Weld joint area for Guide Support Installated for 8"
Molten Sulfur Pipeline / Coating System APCS 1C (Primer coat ABDUL HANAN MUSTAFA RABEYA
application only). / . ( Partially balance areas where Guide Supports
were not installled ) ( Date : 04-JAN- to 06-JAN-2018 ).

In process Inspection for primer coat / touch up application at Weld


joint area for Guide Supporta Installated for 8" Molten Sulfur Pipeline
/ Coating System APCS 1C (Primer coat application only) ( Partially ABDUL HANAN MUSTAFA RABEYA
balance areas where Guide Supports were not installled ).
( Date : 04-JAN- to 06-JAN-2018 ).

Inspection for Surface Preparation prior to application of primer coat


touch up at Weld Joints for Perforated Cable Tray Supports / Coating
System APCS 1C (Primer Coat application only for Galvanized Repair) ABDUL HANAN MUSTAFA RABEYA
@ Near Sect. Van-1 ( Date : 06-JAN- to 08-JAN-2018 ).
In process Inspection of primer coat touch up at Weld Joints for
Perforated Cable Tray Supports / Coating System APCS 1C (Primer
Coat application only for Galvanized Repair) @ Near Sect. Van-1 ABDUL HANAN MUSTAFA RABEYA
( Date : 06-JAN- to 08-JAN-2018 ).

Inspection for Surface Preparation prior to application of primer coat


touch up at Weld joint area for Guide Support Installated for 8"
Molten Sulfur Pipeline / Coating System APCS 1C (Primer coat ABDUL HANAN MUSTAFA RABEYA
application only). / . ( Partially balance areas where Guide Supports
were not installled ) ( Date : 07-JAN- to 09-JAN-2018 ).

In process Inspection for primer coat / touch up application at Weld


joint area for Guide Supporta Installated for 8" Molten Sulfur Pipeline
/ Coating System APCS 1C (Primer coat application only) ( Partially ABDUL HANAN MUSTAFA RABEYA
balance areas where Guide Supports were not installled ).
( Date : 07-JAN- to 09-JAN-2018 ).

Verification and Visual Inspection of Abrasives for ABDUL HANAN MUSTAFA RABEYA
Material : 1. Copper Slag : 5 Bags ( 10 Tons ).

Inspection for Surface Preparation prior to application of primer coat


touch up at Weld Joints for Perforated Cable Tray Supports / Coating
System APCS 1C (Primer Coat application only for Galvanized Repair) ABDUL HANAN MUSTAFA RABEYA
@ Near Sect. Van-1 ( Date : 09-JAN- to 11-JAN-2018 ).

In process Inspection of primer coat touch up at Weld Joints for


Perforated Cable Tray Supports / Coating System APCS 1C (Primer
Coat application only for Galvanized Repair) @ Near Sect. Van-1 ABDUL HANAN MUSTAFA RABEYA
( Date : 09-JAN- to11-JAN-2018 ).

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints 8" Molten Sulfur
Pipeline, LINE : G07-SF-2032A-01 TO 28 ABDUL HANAN MUSTAFA RABEYA
Coating System APCS 2C / Date : 10-JAN- to 12-JAN-
2018 ).

In process Inspection of primer coat touch up at Weld


Joints 8" Molten Sulfur Pipeline, LINE : G07-SF-2032A-01
TO 28 ABDUL HANAN MUSTAFA RABEYA
Coating System APCS 2C / Date : 10-JAN- to 12-JAN-
2018 ).

Inspection for Surface Preparation prior to application of primer coat


touch up at Weld Joints for Perforated Cable Tray Supports / Coating
System APCS 1C (Primer Coat application only for Galvanized Repair) ABDUL HANAN MUSTAFA RABEYA
@ Near Sect. Van-1 ( Date : 13-JAN- to 15-JAN-2018 ).
In process Inspection of primer coat touch up at Weld Joints for
Perforated Cable Tray Supports / Coating System APCS 1C (Primer
Coat application only for Galvanized Repair) @ Near Sect. Van-1 ABDUL HANAN MUSTAFA RABEYA
( Date : 13-JAN- to15-JAN-2018 ).

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints 8" Molten Sulfur
Pipeline,
LINE #: G07-SF-2032A-(33,38,46,52,57,64,72,89,94,99) ABDUL HANAN MUSTAFA RABEYA
Coating System APCS 2C / Date : 13-JAN- to 15-JAN-
2018 ).

In process Inspection of primer coat touch up at at Weld


Joints 8" Molten Sulfur Pipeline,
LINE #: G07-SF-2032A-(33,38,46,52,57,64,72,89,94,99) ABDUL HANAN MUSTAFA RABEYA
Coating System APCS 2C / Date : 13-JAN- to 15-JAN-
2018 ).

Inspection of primer Coat prior to Mid Coat touch up


application at Weld Joints 8" Molten Sulfur Pipeline, ABDUL HANAN MUSTAFA RABEYA
LINE : G07-SF-2032A-01 TO 10,15,24 & 33
Coating System APCS 2C

Inspection of primer Coat prior to Mid Coat touch up


application at Weld Joints 8" Molten Sulfur Pipeline,
LINE : G07-SF-2032A ABDUL HANAN MUSTAFA RABEYA
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C

Inspection for Final Coat touch up application at Weld


Joints 8" Molten Sulfur Pipeline, LINE : G07-SF-2032A ABDUL HANAN MUSTAFA RABEYA
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints for Perforated Cable
Tray Supports / Coating System APCS 1C (Primer Coat ABDUL HANAN MUSTAFA RABEYA
application only for Galvanized Repair) @ Near Sect.
Van-1
( Date : 16-JAN- to 18-JAN-2018 ).
In process Inspection of primer coat touch up at Weld
Joints for Perforated Cable Tray Supports / Coating
System APCS 1C (Primer Coat application only for ABDUL HANAN MUSTAFA RABEYA
Galvanized Repair) @ Near Sect. Van-1
( Date : 16-JAN- to18-JAN-2018 ).

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints 8" Molten Sulfur
Pipeline,
LINE #: G07-SF-2032A ABDUL HANAN MUSTAFA RABEYA
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C for Pipe Weld joints /
APCS 1C Primer for Galvanised Repair for Pipe supports
Date : 16-JAN- to 18-JAN-2018 ).

In process Inspection of primer coat touch up at at Weld


Joints 8" Molten Sulfur Pipeline,
LINE #: G07-SF-2032A
( AS PER ATTACHED DRAWING SHEET ) ABDUL HANAN MUSTAFA RABEYA
Coating System : APCS 2C for Pipe Weld joints /
APCS 1C Primer for Galvanised Repair for Pipe supports
Date : 16-JAN- to 18-JAN-2018 ).

Inspection of primer Coat prior to Mid Coat touch up


application at Weld Joints 8" Molten Sulfur Pipeline,
LINE : G07-SF-2032A ABDUL HANAN MUSTAFA RABEYA
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C

Inspection for Final Coat touch up application at Weld


Joints 8" Molten Sulfur Pipeline, LINE : G07-SF-2032A ABDUL MUSTAFA RABEYA
( AS PER ATTACHED DRAWING SHEET ) HANNAN
Coating System APCS 2C

Inspection of primer Coat prior to Mid Coat touch up


application at Weld Joints 8" Molten Sulfur Pipeline, ABDUL
LINE : G07-SF-2032A MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C
Inspection for Surface Preparation prior to application of
primer coat touch up at Weld Joints 8" Molten Sulfur
Pipeline, ABDUL
LINE #: G07-SF-2032A MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C
Date : 19-JAN- to 21-JAN-2018 .

In process Inspection of primer coat touch up at Weld


Joints 8" Molten Sulfur Pipeline,
LINE #: G07-SF-2032A ABDUL MUSTAFA RABEYA
( AS PER ATTACHED DRAWING SHEET ) HANNAN
Coating System : APCS 2C
Date : 19-JAN- to 21-JAN-2018 .

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld joint area for Special Guide
Support Installated for 8" Molten Sulfur Pipeline. ABDUL
LINE #: G07-SF-2032A MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 1C
Date : 19-JAN- to 21-JAN-2018 .

In process Inspection of primer coat touch up at Weld


joint area for Special Guide Support Installated for 8"
Molten Sulfur Pipeline. ABDUL
LINE #: G07-SF-2032A MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 1C
Date : 19-JAN- to 21-JAN-2018 .

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints for Perforated Cable
Tray Supports / Coating System APCS 1C (Primer Coat ABDUL MUSTAFA RABEYA
application only for Galvanized Repair) @ Near Sect. HANNAN
Van-2
( Date : 19-JAN- to 21-JAN-2018 )

In process Inspection of primer coat touch up at Weld


Joints for Perforated Cable Tray Supports / Coating ABDUL
System APCS 1C (Primer Coat application only for MUSTAFA RABEYA
HANNAN
Galvanized Repair) @ Near Sect. Van-2
( Date : 19-JAN- to 21-JAN-2018 )
Inspection of primer Coat prior to Mid Coat touch up
application at Weld Joints 8" Molten Sulfur Pipeline, ABDUL
LINE : G07-SF-2032A MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C

Inspection for Final Coat touch up application at Weld


Joints 8" Molten Sulfur Pipeline, LINE : G07-SF-2032A ABDUL MUSTAFA RABEYA
( AS PER ATTACHED DRAWING SHEET ) HANNAN
Coating System APCS 2C

Inspection of primer Coat prior to Mid Coat touch up


application at Weld Joints 8" Molten Sulfur Pipeline, ABDUL
LINE : G07-SF-2032A MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints 8" Molten Sulfur
Pipeline,
LINE #: G07-SF-2032B ABDUL MUSTAFA RABEYA
( AS PER ATTACHED DRAWING SHEET ) HANNAN
Coating System : APCS 2C for Pipe Weld joints /
APCS 1C Primer for Galvanised Repair for Pipe supports
( Date : 22-JAN- to 24-JAN-2018 ).

In process Inspection of primer coat touch up at Weld


Joints 8" Molten Sulfur Pipeline,
LINE #: G07-SF-2032B ABDUL
( AS PER ATTACHED DRAWING SHEET ) MUSTAFA RABEYA
HANNAN
Coating System : APCS 2C for Pipe Weld joints /
APCS 1C Primer for Galvanised Repair for Pipe supports
( Date : 22-JAN- to 24-JAN-2018 ).

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints for Perforated Cable
Tray Supports / Coating System APCS 1C (Primer Coat ABDUL MUSTAFA RABEYA
application only for Galvanized Repair) @ Near Sect. HANNAN
Van-2
( Date : 22-JAN- to 24-JAN-2018 )
In process Inspection of primer coat touch up at Weld
Joints for Perforated Cable Tray Supports / Coating ABDUL
System APCS 1C (Primer Coat application only for MUSTAFA RABEYA
HANNAN
Galvanized Repair) @ Near Sect. Van-2
( Date : 22-JAN- to 24-JAN-2018 )

Inspection for Equipment : Air Compressor / Equipment ABDUL MUSTAFA RABEYA


Number : C185/445224UHWE04 HANNAN

Inspection for Final Coat touch up application at Weld


Joints 8" Molten Sulfur Pipeline,Hydrotest Package K85- ABDUL
P-002-01-HT-001, LINE : G07-SF-2032A MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C

Inspection of primer Coat prior to Mid Coat touch up


application at Weld Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL MUSTAFA RABEYA
LINE : G07-SF-2032 HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints 8" Molten Sulfur
Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL
LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C for Pipe Weld joints /
APCS 1C Primer for Galvanised Repair for Pipe supports
( Date : 25-JAN- to 27-JAN-2018 ).

In process Inspection of primer coat touch up at Weld


Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001,
LINE : G07-SF-2032 ABDUL MUSTAFA RABEYA
( AS PER ATTACHED DRAWING SHEET ) HANNAN
Coating System : APCS 2C for Pipe Weld joints /
APCS 1C Primer for Galvanised Repair for Pipe supports
( Date : 25-JAN- to 27-JAN-2018 ).
Inspection for Surface Preparation prior to application of
primer coat touch up at Weld Joints for Perforated Cable
Tray Supports / Coating System APCS 1C (Primer Coat ABDUL MUSTAFA RABEYA
application only for Galvanized Repair) @ Near Sect. HANNAN
Van-2
( Date : 25-JAN- to 27-JAN-2018 )

In process Inspection of primer coat touch up at Weld


Joints for Perforated Cable Tray Supports / Coating ABDUL
System APCS 1C (Primer Coat application only for MUSTAFA RABEYA
HANNAN
Galvanized Repair) @ Near Sect. Van-2
( Date : 25-JAN- to 27-JAN-2018 )

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints 8" Molten Sulfur
Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL
LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C for Pipe Weld joints /
APCS 1C Primer for Galvanised Repair for Pipe supports
( Date : 28-JAN to 30-JAN-2018 ).

In process Inspection of primer coat touch up at Weld


Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001,
LINE : G07-SF-2032 ABDUL MUSTAFA RABEYA
( AS PER ATTACHED DRAWING SHEET ) HANNAN
Coating System : APCS 2C for Pipe Weld joints /
APCS 1C Primer for Galvanised Repair for Pipe supports
( Date : 28-JAN- to 30-JAN-2018 ).

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints for Perforated Cable
Tray Supports / Coating System APCS 1C (Primer Coat ABDUL MUSTAFA RABEYA
application only for Galvanized Repair) @ Near Sect. HANNAN
Van-2
( Date : 28-JAN- to 30-JAN-2018 ).
In process Inspection of primer coat touch up at Weld
Joints for Perforated Cable Tray Supports / Coating ABDUL
System APCS 1C (Primer Coat application only for MUSTAFA RABEYA
HANNAN
Galvanized Repair) @ Near Sect. Van-2
( Date : 28-JAN- to 30-JAN-2018 ).

Inspection for Final Coat touch up application at Weld


Joints 8" Molten Sulfur Pipeline,Hydrotest Package K85- ABDUL
P-002-01-HT-001, LINE : G07-SF-2032A MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C

Inspection of primer Coat prior to Mid Coat touch up


application at Weld Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL MUSTAFA RABEYA
LINE : G07-SF-2032 HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C

Verification and Visual Inspection of Paint Material : 1)


HEMPADUR 85671 (Off White ) : PART A/B 07 Cans, ABDUL MUSTAFA RABEYA
2) HEMPADUR 85671 (Red) : PART A/B 03 Cans. HANNAN
3) Thinner 08450 : 07 Cans.

Inspection for Final Coat touch up application at Weld


Joints for Special Guide supports of 8" Molten Sulfur
Pipeline,Hydrotest Package ABDUL
K85-P-002-01-HT-001, LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 1C
(Primer Coat application only for Galvanized Repair)

Inspection for Equipment : Air Compressor / Equipment ABDUL MUSTAFA RABEYA


Number : C185/445224UHWE04 HANNAN

Inspection for Final Coat touch up application at Weld


Joints for Perforated Cable Tray Supports / Near Sect. ABDUL
Van-1 MUSTAFA RABEYA
HANNAN
Coating System APCS 1C
(Primer Coat application only for Galvanized Repair)
Inspection of primer Coat prior to Mid Coat touch up
application at Weld Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL MUSTAFA RABEYA
LINE : G07-SF-2032 HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C

Inspection for Final Coat touch up application at Weld


Joints 8" Molten Sulfur Pipeline,Hydrotest Package K85- ABDUL
P-002-01-HT-001, LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints 8" Molten Sulfur
Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL
LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C for Pipe Weld joints /
APCS 1C Primer for Galvanised Repair for Pipe supports
( Date : 31-JAN to 02-FEB-2018 ).

In process Inspection of primer coat touch up at Weld


Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001,
LINE : G07-SF-2032 ABDUL MUSTAFA RABEYA
( AS PER ATTACHED DRAWING SHEET ) HANNAN
Coating System : APCS 2C for Pipe Weld joints /
APCS 1C Primer for Galvanised Repair for Pipe supports
( Date : 31-JAN to 02-FEB-2018 ).

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints for Perforated Cable
Tray Supports / Coating System APCS 1C (Primer Coat ABDUL MUSTAFA RABEYA
application only for Galvanized Repair) @ Near Sect. HANNAN
Van-2
( Date : 01-FEB to 03-FEB-2018 ).
In process Inspection of primer coat touch up at Weld
Joints for Perforated Cable Tray Supports / Coating ABDUL
System APCS 1C (Primer Coat application only for MUSTAFA RABEYA
HANNAN
Galvanized Repair) @ Near Sect. Van-2
( Date : 01-FEB to 03-FEB-2018 ).

Inspection of primer Coat prior to Mid Coat touch up


application at Weld Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL MUSTAFA RABEYA
LINE : G07-SF-2032 HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C

Inspection for Final Coat touch up application at Weld


Joints 8" Molten Sulfur Pipeline,Hydrotest Package K85- ABDUL
P-002-01-HT-001, LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C

Inspection of primer Coat prior to Mid Coat touch up


application at Weld Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL MUSTAFA RABEYA
LINE : G07-SF-2032 HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C

Inspection for Final Coat touch up application at Weld


Joints for Special Guide supports of 8" Molten Sulfur
Pipeline,Hydrotest Package ABDUL
K85-P-002-01-HT-001, LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 1C
(Primer Coat application only for Galvanized Repair)

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints 8" Molten Sulfur
Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL MUSTAFA RABEYA
LINE : G07-SF-2032 HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C
( Date : 03-FEB to 05-FEB-2018 ).
In process Inspection of primer coat touch up at Weld
Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001,
ABDUL
LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C
( Date : 03-FEB to 05-FEB-2018 ).

Verification and Visual Inspection of Paint Material : 1)


Interzinc 52 : PART A/B 03 Cans, ABDUL HANAN MUSTAFA RABEYA
3) International Thinner GTA 220 : 05 Cans.

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints for Perforated Cable
Tray Supports / Coating System APCS 1C (Primer Coat ABDUL MUSTAFA RABEYA
application only for Galvanized Repair) @ Near Sect. HANNAN
Van-2
( Date : 04-FEB to 06-FEB-2018 ).

In process Inspection of primer coat touch up at Weld


Joints for Perforated Cable Tray Supports / Coating ABDUL
System APCS 1C (Primer Coat application only for MUSTAFA RABEYA
HANNAN
Galvanized Repair) @ Near Sect. Van-2
( Date : 04-FEB to 06-FEB-2018 ).

Inspection for Final Coat touch up application at Weld


Joints 8" Molten Sulfur Pipeline,Hydrotest Package K85- ABDUL
P-002-01-HT-001, LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints 8" Molten Sulfur
Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL MUSTAFA RABEYA
LINE : G07-SF-2032 HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C
( Date : 06-FEB to 08-FEB-2018 ).
In process Inspection of primer coat touch up at Weld
Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL
LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C
( Date : 06-FEB to 08-FEB-2018 ).

Inspection for Final Coat touch up application at Weld


Joints 8" Molten Sulfur Pipeline,Hydrotest Package K85- ABDUL
P-002-01-HT-001, LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C

Inspection of primer Coat prior to Mid Coat touch up


application at Weld Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL MUSTAFA RABEYA
LINE : G07-SF-2032 HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints for Perforated Cable
Tray Supports / Coating System APCS 1C (Primer Coat ABDUL MUSTAFA RABEYA
application only for Galvanized Repair) @ Near Sect. HANNAN
Van-2
( Date : 07-FEB to 09-FEB-2018 ).

In process Inspection of primer coat touch up at Weld


Joints for Perforated Cable Tray Supports / Coating ABDUL
System APCS 1C (Primer Coat application only for MUSTAFA RABEYA
HANNAN
Galvanized Repair) @ Near Sect. Van-2
( Date : 07-FEB to 09-FEB-2018 ).

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints 8" Molten Sulfur
Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL MUSTAFA RABEYA
LINE : G07-SF-2032 HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C
( Date : 09-FEB to 10-FEB-2018 ).
In process Inspection of primer coat touch up at Weld
Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL
LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C
( Date : 09-FEB to 10-FEB-2018 ).

Inspection for Final Coat touch up application at Weld


Joints 8" Molten Sulfur Pipeline,Hydrotest Package K85- ABDUL
P-002-01-HT-001, LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C

Inspection for Final Coat touch up application at Weld


Joints for Special Guide supports of 8" Molten Sulfur
Pipeline,Hydrotest Package ABDUL
K85-P-002-01-HT-001, LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 1C
(Primer Coat application only for Galvanized Repair)

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints for Perforated Cable
Tray Supports / Coating System APCS 1C (Primer Coat ABDUL MUSTAFA RABEYA
application only for Galvanized Repair) @ Near Sect. HANNAN
Van-3
( Date : 10-FEB to 11-FEB-2018 ).

In process Inspection of primer coat touch up at Weld


Joints for Perforated Cable Tray Supports / Coating ABDUL
System APCS 1C (Primer Coat application only for MUSTAFA RABEYA
HANNAN
Galvanized Repair) @ Near Sect. Van-3
( Date : 10-FEB to 11-FEB-2018 ).

Verification and Visual Inspection of Abrasives Material : ABDUL MUSTAFA RABEYA


1. Copper Slag : 10 Bags ( 20 Tons ). HANNAN

Inspection of primer Coat prior to Mid Coat touch up


application at Weld Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL MUSTAFA RABEYA
LINE : G07-SF-2032 HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C
Inspection for Surface Preparation prior to application of
primer coat touch up at Weld Joints 8" Molten Sulfur
Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL MUSTAFA RABEYA
LINE : G07-SF-2032 HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C
( Date : 11-FEB to 12-FEB-2018 ).

In process Inspection of primer coat touch up at Weld


Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL
LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C
( Date : 11-FEB to 12-FEB-2018 ).

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints for Perforated Cable
Tray Supports / Coating System APCS 1C (Primer Coat ABDUL MUSTAFA RABEYA
application only for Galvanized Repair) @ Near Sect. HANNAN
Van-3
( Date : 12-FEB to 13-FEB-2018 ).

In process Inspection of primer coat touch up at Weld


Joints for Perforated Cable Tray Supports / Coating ABDUL
System APCS 1C (Primer Coat application only for MUSTAFA RABEYA
HANNAN
Galvanized Repair) @ Near Sect. Van-3
( Date : 12-FEB to 13-FEB-2018 ).

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints 8" Molten Sulfur
Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL MUSTAFA RABEYA
LINE : G07-SF-2032 HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C
( Date : 13-FEB to 14-FEB-2018 ).
In process Inspection of primer coat touch up at Weld
Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL
LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C
( Date : 13-FEB to 14-FEB-2018 ).

Inspection for Final Coat touch up application at Weld


Joints 8" Molten Sulfur Pipeline,Hydrotest Package K85- ABDUL
P-002-01-HT-001, LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C

Inspection of primer Coat prior to Mid Coat touch up


application at Weld Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL MUSTAFA RABEYA
LINE : G07-SF-2032 HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints for Perforated Cable
Tray Supports / Coating System APCS 1C (Primer Coat ABDUL MUSTAFA RABEYA
application only for Galvanized Repair) @ Near Sect. HANNAN
Van-3
( Date : 14-FEB to 15-FEB-2018 ).

In process Inspection of primer coat touch up at Weld


Joints for Perforated Cable Tray Supports / Coating ABDUL
System APCS 1C (Primer Coat application only for MUSTAFA RABEYA
HANNAN
Galvanized Repair) @ Near Sect. Van-3
( Date : 14-FEB to 15-FEB-2018 ).

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints for Perforated Cable
Tray Supports / Coating System APCS 1C (Primer Coat ABDUL MUSTAFA RABEYA
application only for Galvanized Repair) @ Near Sect. HANNAN
Van-3
( Date : 15-FEB to 16-FEB-2018 ).

In process Inspection of primer coat touch up at Weld


Joints for Perforated Cable Tray Supports / Coating ABDUL
System APCS 1C (Primer Coat application only for MUSTAFA RABEYA
HANNAN
Galvanized Repair) @ Near Sect. Van-3
( Date : 15-FEB to 16-FEB-2018 ).
Inspection for Surface Preparation prior to application of
primer coat touch up at Weld Joints 8" Molten Sulfur
Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL MUSTAFA RABEYA
LINE : G07-SF-2032 HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C
( Date : 15-FEB to 16-FEB-2018 ).

In process Inspection of primer coat touch up at Weld


Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL
LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C
( Date : 15-FEB to 16-FEB-2018 ).

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints for Perforated Cable
Tray Supports / Coating System APCS 1C (Primer Coat ABDUL MUSTAFA RABEYA
application only for Galvanized Repair) @ Near Sect. HANNAN
Van-3
( Date : 17-FEB to 18-FEB-2018 ).

In process Inspection of primer coat touch up at Weld


Joints for Perforated Cable Tray Supports / Coating ABDUL
System APCS 1C (Primer Coat application only for MUSTAFA RABEYA
HANNAN
Galvanized Repair) @ Near Sect. Van-3
( Date : 17-FEB to 18-FEB-2018 ).

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints 8" Molten Sulfur
Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL MUSTAFA RABEYA
LINE : G07-SF-2032 HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C
( Date : 17-FEB to 18-FEB-2018 ).
In process Inspection of primer coat touch up at Weld
Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL
LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C
( Date : 17-FEB to 18-FEB-2018 ).

Inspection of primer Coat prior to Mid Coat touch up


application at Weld Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL MUSTAFA RABEYA
LINE : G07-SF-2032 HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints for Perforated Cable
Tray Supports / Coating System APCS 1C (Primer Coat ABDUL MUSTAFA RABEYA
application only for Galvanized Repair) @ Near Sect. HANNAN
Van-3
( Date : 19-FEB to 20-FEB-2018 ).

In process Inspection of primer coat touch up at Weld


Joints for Perforated Cable Tray Supports / Coating ABDUL
System APCS 1C (Primer Coat application only for MUSTAFA RABEYA
HANNAN
Galvanized Repair) @ Near Sect. Van-3
( Date : 19-FEB to 20-FEB-2018 ).

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints 8" Molten Sulfur
Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL MUSTAFA RABEYA
LINE : G07-SF-2032 HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C
( Date : 19-FEB to 20-FEB-2018 ).

In process Inspection of primer coat touch up at Weld


Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL
LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C
( Date : 19-FEB to 20-FEB-2018 ).
Storage and handling of Painting Materials for Posco ABDUL MUSTAFA RABEYA
Touch up activities at KGP 21km Pipeline. HANNAN

Inspection for Final Coat touch up application at Weld


Joints 8" Molten Sulfur Pipeline,Hydrotest Package K85- ABDUL
P-002-01-HT-001, LINE : G07-SF-2032 MUSTAFA RABEYA
( AS PER ATTACHED DRAWING SHEET ) HANNAN
Coating System APCS 2C

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints for Perforated Cable
Tray Supports / Coating System APCS 1C (Primer Coat ABDUL MUSTAFA RABEYA
application only for Galvanized Repair) @ Near Sect. HANNAN
Van-3
( Date : 21-FEB to 22-FEB-2018 ).

In process Inspection of primer coat touch up at Weld


Joints for Perforated Cable Tray Supports / Coating ABDUL
System APCS 1C (Primer Coat application only for MUSTAFA RABEYA
HANNAN
Galvanized Repair) @ Near Sect. Van-3
( Date : 21-FEB to 22-FEB-2018 ).

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints 8" Molten Sulfur
Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL MUSTAFA RABEYA
LINE : G07-SF-2032 HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C
( Date : 21-FEB to 22-FEB-2018 ).

In process Inspection of primer coat touch up at Weld


Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL
LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C
( Date : 21-FEB to 22-FEB-2018 ).

Inspection of primer Coat prior to Mid Coat touch up


application at Weld Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL MUSTAFA RABEYA
LINE : G07-SF-2032 HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C
Inspection for Surface Preparation prior to application of
primer coat touch up at Weld Joints for Perforated Cable
Tray Supports / Coating System APCS 1C (Primer Coat ABDUL MUSTAFA RABEYA
application only for Galvanized Repair) @ Near Sect. HANNAN
Van-3
( Date : 23-FEB to 24-FEB-2018 ).

In process Inspection of primer coat touch up at Weld


Joints for Perforated Cable Tray Supports / Coating ABDUL
System APCS 1C (Primer Coat application only for MUSTAFA RABEYA
HANNAN
Galvanized Repair) @ Near Sect. Van-3
( Date : 23-FEB to 24-FEB-2018 ).

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints 8" Molten Sulfur
Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL MUSTAFA RABEYA
LINE : G07-SF-2032 HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C
( Date : 23-FEB to 24-FEB-2018 ).

In process Inspection of primer coat touch up at Weld


Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL
LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C
( Date : 23-FEB to 24-FEB-2018 ).

Inspection of primer Coat prior to Mid Coat touch up


application at Weld Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL MUSTAFA RABEYA
LINE : G07-SF-2032 HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C

Inspection for Final Coat touch up application at Weld


Joints 8" Molten Sulfur Pipeline,Hydrotest Package K85- ABDUL
P-002-01-HT-001, LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C
Verification and Visual Inspection of Paint Material : 1) ABDUL
HEMPADUR 85671 (Off White ) : PART A/B 10 Cans, MUSTAFA RABEYA
HANNAN
2) Thinner 08450 : 05 Cans.

Inspection for Final Coat touch up application at Weld


Joints for Perforated Cable Tray Supports / Near Sect. ABDUL
Van-2 MUSTAFA RABEYA
HANNAN
Coating System APCS 1C
(Primer Coat application only for Galvanized Repair)

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints for Perforated Cable
Tray Supports / Coating System APCS 1C (Primer Coat ABDUL MUSTAFA RABEYA
application only for Galvanized Repair) @ Near Sect. HANNAN
Van-3
( Date : 25-FEB to 26-FEB-2018 ).

In process Inspection of primer coat touch up at Weld


Joints for Perforated Cable Tray Supports / Coating ABDUL
System APCS 1C (Primer Coat application only for MUSTAFA RABEYA
HANNAN
Galvanized Repair) @ Near Sect. Van-3
( Date : 25-FEB to 26-FEB-2018 ).

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints 8" Molten Sulfur
Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL MUSTAFA RABEYA
LINE : G07-SF-2032 HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C
( Date : 25-FEB to 26-FEB-2018 ).

In process Inspection of primer coat touch up at Weld


Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL
LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C
( Date : 25-FEB to 26-FEB-2018 ).
Inspection of primer Coat prior to Mid Coat touch up
application at Weld Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL MUSTAFA RABEYA
LINE : G07-SF-2032 HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints for Perforated Cable
Tray Supports / Coating System APCS 1C (Primer Coat ABDUL MUSTAFA RABEYA
application only for Galvanized Repair) @ Near Sect. HANNAN
Van-3
( Date : 27-FEB to 28-FEB-2018 ).

In process Inspection of primer coat touch up at Weld


Joints for Perforated Cable Tray Supports / Coating ABDUL
System APCS 1C (Primer Coat application only for MUSTAFA RABEYA
HANNAN
Galvanized Repair) @ Near Sect. Van-3
( Date : 27-FEB to 28-FEB-2018 ).

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints 8" Molten Sulfur
Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL MUSTAFA RABEYA
LINE : G07-SF-2032 HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C
( Date : 27-FEB to 28-FEB-2018 ).

In process Inspection of primer coat touch up at Weld


Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL
LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C
( Date : 27-FEB to 28-FEB-2018 ).

Inspection for Final Coat touch up application at Weld


Joints 8" Molten Sulfur Pipeline,Hydrotest Package K85- ABDUL
P-002-01-HT-001, LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C
Inspection for Surface Preparation prior to application of
primer coat touch up at Weld Joints for Perforated Cable
Tray Supports / Coating System APCS 1C (Primer Coat ABDUL MUSTAFA RABEYA
application only for Galvanized Repair) @ Near Sect. HANNAN
Van-3
( Date : 1-MAR to 2-MAR-2018 ).

In process Inspection of primer coat touch up at Weld


Joints for Perforated Cable Tray Supports / Coating ABDUL
System APCS 1C (Primer Coat application only for MUSTAFA RABEYA
HANNAN
Galvanized Repair) @ Near Sect. Van-3
( Date : 1-MAR to 2-MAR-2018 ).

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints 8" Molten Sulfur
Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL MUSTAFA RABEYA
LINE : G07-SF-2032 HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C
( Date : 1-MAR to 2-MAR-2018 ).

In process Inspection of primer coat touch up at Weld


Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL
LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C
( Date : 1-MAR to 2-MAR-2018 ).

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints for Perforated Cable
Tray Supports / Coating System APCS 1C (Primer Coat ABDUL MUSTAFA RABEYA
application only for Galvanized Repair) @ Near Sect. HANNAN
Van-3
( Date : 3-MAR to 4-MAR-2018 ).

In process Inspection of primer coat touch up at Weld


Joints for Perforated Cable Tray Supports / Coating ABDUL
System APCS 1C (Primer Coat application only for MUSTAFA RABEYA
HANNAN
Galvanized Repair) @ Near Sect. Van-3
( Date : 3-MAR to 4-MAR-2018 ).
Inspection for Surface Preparation prior to application of
primer coat touch up at Weld Joints 8" Molten Sulfur
Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL MUSTAFA RABEYA
LINE : G07-SF-2032 HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C
( Date : 3-MAR to 4-MAR-2018 ).

In process Inspection of primer coat touch up at Weld


Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL
LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C
( Date : 3-MAR to 4-MAR-2018 ).

Inspection of primer Coat prior to Mid Coat touch up


application at Weld Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL MUSTAFA RABEYA
LINE : G07-SF-2032 HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints 8" Molten Sulfur
Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL MUSTAFA RABEYA
LINE : G07-SF-2032 HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C
( Date : 5-MAR to 6-MAR-2018 ).

In process Inspection of primer coat touch up at Weld


Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL
LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C
( Date : 5-MAR to 6-MAR-2018 ).
Inspection for Final Coat touch up application at Weld
Joints 8" Molten Sulfur Pipeline,Hydrotest Package K85- ABDUL
P-002-01-HT-001, LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints 8" Molten Sulfur
Pipeline,
Hydrotest Package K85-P-002-01-HT-002, ABDUL
LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C for Pipe Weld joints /
APCS 1C Primer for Galvanised Repair for Pipe supports
( Date : 6-MAR to 7-MAR-2018 ).

In process Inspection of primer coat touch up at Weld


Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-002,
LINE : G07-SF-2032 ABDUL MUSTAFA RABEYA
( AS PER ATTACHED DRAWING SHEET ) HANNAN
Coating System : APCS 2C for Pipe Weld joints /
APCS 1C Primer for Galvanised Repair for Pipe supports
( Date : 6-MAR to 7-MAR-2018 ).

Inspection for Final Coat touch up application at Weld


Joints 8" Molten Sulfur Pipeline,Hydrotest Package K85- ABDUL
P-002-01-HT-001, LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C

Inspection of primer Coat prior to Mid Coat touch up


application at Weld Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL MUSTAFA RABEYA
LINE : G07-SF-2032 HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C
Inspection for Surface Preparation prior to application of
primer coat touch up at Weld Joints for Perforated Cable
Tray Supports / Coating System APCS 1C (Primer Coat ABDUL MUSTAFA RABEYA
application only for Galvanized Repair) @ Near Sect. HANNAN
Van-4
( Date : 7-MAR to 8-MAR-2018 ).

In process Inspection of primer coat touch up at Weld


Joints for Perforated Cable Tray Supports / Coating ABDUL
System APCS 1C (Primer Coat application only for MUSTAFA RABEYA
HANNAN
Galvanized Repair) @ Near Sect. Van-4
( Date : 7-MAR to 8-MAR-2018 ).

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints 8" Molten Sulfur
Pipeline,
Hydrotest Package K85-P-002-01-HT-002, ABDUL
LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C for Pipe Weld joints /
APCS 1C Primer for Galvanised Repair for Pipe supports
( Date : 8-MAR to 9-MAR-2018 ).

In process Inspection of primer coat touch up at Weld


Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-002,
LINE : G07-SF-2032 ABDUL MUSTAFA RABEYA
( AS PER ATTACHED DRAWING SHEET ) HANNAN
Coating System : APCS 2C for Pipe Weld joints /
APCS 1C Primer for Galvanised Repair for Pipe supports
( Date : 8-MAR to 9-MAR-2018 ).

Inspection for Final Coat touch up application at Weld


Joints 8" Molten Sulfur Pipeline,Hydrotest Package K85- ABDUL
P-002-01-HT-001, LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C
Inspection for Surface Preparation prior to application of
primer coat touch up at Weld Joints for Perforated Cable
Tray Supports / Coating System APCS 1C (Primer Coat ABDUL MUSTAFA RABEYA
application only for Galvanized Repair) @ Near Sect. HANNAN
Van-4
( Date : 10-MAR to 11-MAR-2018 ).

In process Inspection of primer coat touch up at Weld


Joints for Perforated Cable Tray Supports / Coating ABDUL
System APCS 1C (Primer Coat application only for MUSTAFA RABEYA
HANNAN
Galvanized Repair) @ Near Sect. Van-4
( Date : 10-MAR to 11-MAR-2018 ).

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints 8" Molten Sulfur
Pipeline,
Hydrotest Package K85-P-002-01-HT-002, ABDUL
LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C for Pipe Weld joints /
APCS 1C Primer for Galvanised Repair for Pipe supports
( Date : 10-MAR to 11-MAR-2018 ).

In process Inspection of primer coat touch up at Weld


Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-002,
LINE : G07-SF-2032 ABDUL MUSTAFA RABEYA
( AS PER ATTACHED DRAWING SHEET ) HANNAN
Coating System : APCS 2C for Pipe Weld joints /
APCS 1C Primer for Galvanised Repair for Pipe supports
( Date : 10-MAR to 11-MAR-2018 ).

Inspection for Final Coat touch up application at Weld


Joints 8" Molten Sulfur Pipeline,Hydrotest Package K85- ABDUL
P-002-01-HT-001, LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C
Inspection of primer Coat prior to Mid Coat touch up
application at Weld Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL MUSTAFA RABEYA
LINE : G07-SF-2032 HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints 8" Molten Sulfur
Pipeline,
Hydrotest Package K85-P-002-01-HT-002, ABDUL
LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C for Pipe Weld joints /
APCS 1C Primer for Galvanised Repair for Pipe supports
( Date : 12-MAR to 13-MAR-2018 ).

In process Inspection of primer coat touch up at Weld


Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-002,
LINE : G07-SF-2032 ABDUL MUSTAFA RABEYA
( AS PER ATTACHED DRAWING SHEET ) HANNAN
Coating System : APCS 2C for Pipe Weld joints /
APCS 1C Primer for Galvanised Repair for Pipe supports
( Date : 12-MAR to 13-MAR-2018 ).

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints for Cable Tray
Supports / Coating System APCS 1C (Primer Coat ABDUL HANAN MUSTAFA RABEYA
application only for Galvanized Repair) @ LX-012.( Date :
12-MAR to 13-MAR-2018 ).

In process Inspection of primer coat touch up at Weld


Joints for Cable Tray Supports / Coating System APCS
1C(Primer Coat application only for Galvanized Repair) @ ABDUL HANAN MUSTAFA RABEYA
LX-012.( Date : 12-MAR to 13-MAR-2018 ).
Inspection for Final Coat touch up application at Weld
Joints 8" Molten Sulfur Pipeline,Hydrotest Package K85- ABDUL
P-002-01-HT-001, LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C

Inspection of primer Coat prior to Mid Coat touch up


application at Weld Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL MUSTAFA RABEYA
LINE : G07-SF-2032 HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints 8" Molten Sulfur
Pipeline,
Hydrotest Package K85-P-002-01-HT-002, ABDUL
LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C for Pipe Weld joints /
APCS 1C Primer for Galvanised Repair for Pipe supports
( Date : 14-MAR to 15-MAR-2018 ).

In process Inspection of primer coat touch up at Weld


Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-002,
LINE : G07-SF-2032 ABDUL MUSTAFA RABEYA
( AS PER ATTACHED DRAWING SHEET ) HANNAN
Coating System : APCS 2C for Pipe Weld joints /
APCS 1C Primer for Galvanised Repair for Pipe supports
( Date : 14-MAR to 15-MAR-2018 ).

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints for Cable Tray
Supports / Coating System APCS 1C (Primer Coat ABDUL HANAN MUSTAFA RABEYA
application only for Galvanized Repair) @ LX-012.( Date :
14-MAR to 15-MAR-2018 ).
In process Inspection of primer coat touch up at Weld
Joints for Cable Tray Supports / Coating System APCS
1C(Primer Coat application only for Galvanized Repair) @ ABDUL HANAN MUSTAFA RABEYA
LX-012.( Date : 14-MAR to 15-MAR-2018 ).

Inspection for Final Coat touch up application at Weld


Joints 8" Molten Sulfur Pipeline,Hydrotest Package K85- ABDUL
P-002-01-HT-001, LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C

Inspection of primer Coat prior to Mid Coat touch up


application at Weld Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-001, ABDUL MUSTAFA RABEYA
LINE : G07-SF-2032 HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints 8" Molten Sulfur
Pipeline,
Hydrotest Package K85-P-002-01-HT-002, ABDUL
LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C for Pipe Weld joints /
APCS 1C Primer for Galvanised Repair for Pipe supports
( Date : 16-MAR to 17-MAR-2018 ).

In process Inspection of primer coat touch up at Weld


Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-002,
LINE : G07-SF-2032 ABDUL MUSTAFA RABEYA
( AS PER ATTACHED DRAWING SHEET ) HANNAN
Coating System : APCS 2C for Pipe Weld joints /
APCS 1C Primer for Galvanised Repair for Pipe supports
( Date : 16-MAR to 17-MAR-2018 ).
Inspection for Surface Preparation prior to application of
primer coat touch up at Pull Box Cover,
to closure of NCR SRLF-NCR-PL-CO-032 ABDUL MUSTAFA RABEYA
LINE : G07-SF-2032 HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C

In process Inspection of primer coat touch up at Pull


Box Cover,
to closure of NCR SRLF-NCR-PL-CO-032 ABDUL MUSTAFA RABEYA
LINE : G07-SF-2032 HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints for Cable Tray
Supports / Coating System APCS 1C (Primer Coat ABDUL HANAN MUSTAFA RABEYA
application only for Galvanized Repair) @ LX-016 & LX-
017.( Date : 17-MAR to 18-MAR-2018 ).

In process Inspection of primer coat touch up at Weld


Joints for Cable Tray Supports / Coating System APCS
1C(Primer Coat application only for Galvanized Repair) @ ABDUL HANAN MUSTAFA RABEYA
LX-016 & LX-017.
( Date : 17-MAR to 18-MAR-2018 ).

Inspection for Final Coat touch up application at Weld


Joints 8" Molten Sulfur Pipeline,Hydrotest Package K85- ABDUL
P-002-01-HT-001, LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System APCS 2C

Inspection for Surface Preparation prior to application of


primer coat touch up at Weld Joints 8" Molten Sulfur
Pipeline,
Hydrotest Package K85-P-002-01-HT-002, ABDUL
LINE : G07-SF-2032 MUSTAFA RABEYA
HANNAN
( AS PER ATTACHED DRAWING SHEET )
Coating System : APCS 2C for Pipe Weld joints /
APCS 1C Primer for Galvanised Repair for Pipe supports
( Date : 19-MAR to 20-MAR-2018 ).
In process Inspection of primer coat touch up at Weld
Joints 8" Molten Sulfur Pipeline,
Hydrotest Package K85-P-002-01-HT-002,
LINE : G07-SF-2032 ABDUL MUSTAFA RABEYA
( AS PER ATTACHED DRAWING SHEET ) HANNAN
Coating System : APCS 2C for Pipe Weld joints /
APCS 1C Primer for Galvanised Repair for Pipe supports
( Date : 19-MAR to 20-MAR-2018 ).
RFI -PAINTIN
ACTIVIT CONTRA
Date of
RFI No Y SATIP No SAIC No CTOR /
Request
NUMBER SUBCON

SRLF-R-W-PI- 2.1 SATIP-H-100-01 SAIC-H-2024 POSCO 29-Dec-17

SRLF-R-W-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 29-Dec-17

SRLF-R-W-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 29-Dec-17

SRLF-R-W-PI- 3.3 SATIP-H-100-01 SAIC-H-2029 POSCO 30-Dec-17

SRLF-R-W-PI- 3.5 SATIP-H-100-01 SAIC-H-2031 POSCO 1-Jan-18

SRLF-R-W-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 7-Jan-18

SRLF-R-W-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 7-Jan-18

SRLF-R-W-PI- 3.3 SATIP-H-100-01 SAIC-H-2029 POSCO 8-Jan-18

SRLF-R-W-PI- 2.3 SATIP-H-100-01 SAIC-H-2026 POSCO 8-Jan-18

SRLF-R-W-PI- 2.1 SATIP-H-100-01 SAIC-H-2024 POSCO 8-Jan-18

SRLF-R-W-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 8-Jan-18


SRLF-R-W-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 8-Jan-18

SRLF-R-W-PI- 3.3 SATIP-H-100-01 SAIC-H-2029 POSCO 9-Jan-18

SRLF-R-W-PI- 3.5 SATIP-H-100-01 SAIC-H-2031 POSCO 10-Jan-18

SRLF-R-W-PI- 3.5 SATIP-H-100-01 SAIC-H-2031 POSCO 10-Jan-18

SRLF-R-W-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 13-Jan-18

SRLF-R-W-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 13-Jan-18

SRLF-R-W-PI- 3.3 SATIP-H-100-01 SAIC-H-2029 POSCO 14-Jan-18

SRLF-R-W-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 15-Jan-18

SRLF-R-W-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 15-Jan-18

SRLF-R-W-PI- 3.5 SATIP-H-100-01 SAIC-H-2031 POSCO 16-Jan-18

SRLF-R-W-PI- 3.3 SATIP-H-100-01 SAIC-H-2029 POSCO 16-Jan-18

SRLF-R-W-PI- 2.1 SATIP-H-100-01 SAIC-H-2024 POSCO 16-Jan-18

SRLF-R-W-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 16-Jan-18


SRLF-R-W-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 16-Jan-18

SRLF-R-W-PI- 3.5 SATIP-H-100-01 SAIC-H-2031 POSCO 17-Jan-18

SRLF-R-W-PI- 3.3 SATIP-H-100-01 SAIC-H-2029 POSCO 18-Jan-18

SRLF-R-W-PI- 2.1 SATIP-H-100-01 SAIC-H-2024 POSCO 21-Jan-18

SRLF-R-W-PI- 3.5 SATIP-H-100-01 SAIC-H-2031 POSCO 22-Jan-18

SRLF-R-W-PI- 3.6 SATIP-H-100-01 SAIC-H-2032 POSCO 23-Jan-18

SRLF-R-W-PI- 3.7 SATIP-H-100-01 SAIC-H-2033 POSCO 23-Jan-18

SRLF-R-W-PI- 3.6 SATIP-H-100-01 SAIC-H-2032 POSCO 23-Jan-18

SRLF-R-W-PI- 3.7 SATIP-H-100-01 SAIC-H-2033 POSCO 4-Feb-18

SRLF-R-W-PI- 3.7 SATIP-H-100-01 SAIC-H-2033 POSCO 8-Feb-18

SRLF-R-W-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 12-Feb-18

SRLF-R-W-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 12-Feb-18


SRLF-R-W-PI- 3.1 SATIP-H-100-01 SAIC-H-2027 POSCO 14-Feb-18

SRLF-R-W-PI- 3.2 SATIP-H-100-01 SAIC-H-2028 POSCO 14-Feb-18


RFI -PAINTING-WGP NON LIVE - POSCO
Date of Inspecti Location
Job Discipline
Inspection on Time Description

WGP TANK
30-Dec-17 8:00 AM MECHANICAL "C"

WGP TANK
30-Dec-17 9:45 AM MECHANICAL "C"

WGP TANK
30-Dec-17 10:00 AM MECHANICAL "C"

WGP TANK
31-Dec-17 9:00 AM MECHANICAL "C"

WGP TANK
2-Jan-18 8:30 AM MECHANICAL "C"

WGP TANK
8-Jan-18 9:45 AM MECHANICAL "B"

WGP TANK
8-Jan-18 10:00 AM MECHANICAL "B"

WGP TANK
9-Jan-18 9:00 AM MECHANICAL "B"

WGP TANK
9-Jan-18 9:30 AM MECHANICAL "C"
WGP TANK
9-Jan-18 9:45 AM MECHANICAL "C"

WGP TANK
9-Jan-18 2:00 PM MECHANICAL "C"
WGP TANK
9-Jan-18 2:30 PM MECHANICAL "C"

WGP TANK
10-Jan-18 2:30 PM MECHANICAL "C"

WGP TANK
11-Jan-18 3:00 PM MECHANICAL "B"

WGP TANK
11-Jan-18 3:15 PM MECHANICAL "C"

WGP TANK
14-Jan-18 9:30 AM MECHANICAL "A"

WGP TANK
14-Jan-18 9:45 AM MECHANICAL "A"

WGP TANK
15-Jan-18 8:00 AM MECHANICAL "A"

WGP TANK
16-Jan-18 1:30 PM MECHANICAL "B"

WGP TANK
16-Jan-18 2:00 PM MECHANICAL "B"

WGP TANK
17-Jan-18 8:00 AM MECHANICAL "A"

WGP TANK
17-Jan-18 8:15 AM MECHANICAL "B"

WGP TANK
17-Jan-18 8:30 AM MECHANICAL "B"

WGP TANK
17-Jan-18 1:30 PM MECHANICAL "A"
WGP TANK
17-Jan-18 2:00 PM MECHANICAL "A"

WGP TANK
19-Jan-18 8:00 AM MECHANICAL "B"

WGP TANK
20-Jan-18 9:00 AM MECHANICAL "A"

22-Jan-18 8:30 AM MECHANICAL WGP TANK


"A"

WGP TANK
23-Jan-18 8:30 AM MECHANICAL "A"

WGP TANK
24-Jan-18 9:00 AM MECHANICAL "B & C"

WGP NON
24-Jan-18 9:30 AM MECHANICAL LIVE

WGP TANK
24-Jan-18 9:00 AM MECHANICAL "A"

WGP NON
5-Feb-18 8:00 AM MECHANICAL LIVE
TANK A/B/C/D

WGP NON
10-Feb-18 2:30 PM MECHANICAL LIVE

WGP TANK
13-Feb-18 10:30 AM MECHANICAL "A"

WGP TANK
13-Feb-18 11:00 PM MECHANICAL "A"
WGP TANK
15-Feb-18 10:45 AM MECHANICAL "A"

WGP TANK
15-Feb-18 11:00 AM MECHANICAL "A"
ON LIVE - POSCO
NAPID POSCO E&C
RFI Description Inspector Inspector
SAPMT

Visual Verification of Paint material : 1)INTERNATIONAL ABDUL


INTERLINE 399 PART A/B : 4 CANS, 2) INTERNATIONAL THINNER MUSTAFA S.GARME
HANAN
GTA 220: 1 CANS

Inspection for Surface Preparation prior to application of primer


coat touch up at Flanges ABDUL MUSTAFA S.GARME
( Faces & Edges) on Tank C ( Roof & Shell ) / Coating System APCS HANAN
2A

In process Inspection of primer coat touch up application at


Flanges ABDUL MUSTAFA S.GARME
( Faces & Edges) on Tank C ( Roof & Shell ) / Coating System APCS HANAN
2A

Inspection of primer Coat prior to Mid Coat touch up application


at Flanges ABDUL MUSTAFA S.GARME
( Faces & Edges) on Tank C ( Roof & Shell ) / Coating System APCS HANAN
2A

Inspection for Final Coat touch up application at Flanges


( Faces & Edges) on Tank C ( Roof & Shell ) / Coating System APCS ABDUL HANAN MUSTAFA S.GARME
2A

Inspection for Surface Preparation prior to application of primer


coat touch up at Flanges ABDUL MUSTAFA S.GARME
( Faces & Edges) on Tank B ( Roof & Shell ) / Coating System APCS HANAN
2A

In process Inspection of primer coat touch up application at


Flanges ABDUL MUSTAFA S.GARME
( Faces & Edges) on Tank B ( Roof & Shell ) / Coating System APCS HANAN
2A

Inspection of primer Coat prior to Mid Coat touch up application


at Flanges ABDUL MUSTAFA ALEX
( Faces & Edges) on Tank B ( Roof & Shell ) / Coating System APCS HANNAN
2A

Inspection for Equipment : Air Compressor / Equipment Number : ABDUL MUSTAFA ALEX
AQKD-160010 HANNAN
Verification and Visual inspection for Abrasive materials ( GMA ABDUL MUSTAFA ALEX
GARNET-10 BAGS / 250 KG ) HANNAN

Inspection for Surface Preparation prior to application of primer ABDUL


coat touch up at Nozzle Weld joints of Tank C ( Roof & Shell MUSTAFA ALEX
HANNAN
Nozzle Modification work ) / Coating System APCS 2A
In process Inspection of primer coat touch up application at at ABDUL
Nozzle Weld joints of Tank C ( Roof & Shell Nozzle Modification MUSTAFA ALEX
HANNAN
work ) / Coating System APCS 2A

Inspection of primer Coat prior to Mid Coat touch up application ABDUL


at Nozzle Weld joints of Tank C ( Roof & Shell Nozzle Modification MUSTAFA ALEX
HANNAN
work ) / Coating System APCS 2A

Inspection for Final Coat touch up application at Flanges ABDUL


( Faces & Edges) on Tank B ( Roof & Shell ) / Coating System APCS MUSTAFA ALEX
HANNAN
2A

Inspection for Final Coat touch up application at Nozzle Weld ABDUL


joints of Tank C ( Roof & Shell Nozzle Modification work ) / MUSTAFA ALEX
HANNAN
Coating System APCS 2A

Inspection for Surface Preparation prior to application of primer


coat touch up at Flanges ABDUL MUSTAFA ALEX
( Faces & Edges) on Tank A ( Roof & Shell ) / Coating System APCS HANAN
2A

In process Inspection of primer coat touch up application at


Flanges ABDUL MUSTAFA ALEX
( Faces & Edges) on Tank A ( Roof & Shell ) / Coating System APCS HANAN
2A

Inspection for Final Coat touch up application at Flanges ABDUL


( Faces & Edges) on Tank A ( Roof & Shell ) / Coating System APCS MUSTAFA ALEX
HANNAN
2A

Inspection for Surface Preparation prior to application of primer ABDUL


coat touch up at Nozzle Weld joints of Tank B ( Roof & Shell MUSTAFA ALEX
HANNAN
Nozzle Modification work ) / Coating System APCS 2A

In process Inspection of primer coat touch up application at at ABDUL


Nozzle Weld joints of Tank B ( Roof & Shell Nozzle Modification MUSTAFA ALEX
HANNAN
work ) / Coating System APCS 2A

Inspection for Final Coat touch up application at Flanges ABDUL


( Faces & Edges) on Tank A ( Roof & Shell ) / Coating System APCS MUSTAFA ALEX
HANNAN
2A

Inspection of primer Coat prior to Mid Coat touch up application ABDUL


at Nozzle Weld joints of Tank B ( Roof & Shell Nozzle Modification MUSTAFA ALEX
HANNAN
work ) / Coating System APCS 2A

Visual Verification of Paint material :


1) HEMPAL HEMPADUR 45881 (RAL 1018) ABDUL MUSTAFA ALEX
PART A/B : 4 CANS, HANNAN
2)HEMPAL THINNER 08540 : 1 CANS

Inspection for Surface Preparation prior to application of primer


coat touch up at Nozzle Weld joints of Tank A ( Roof & Shell ABDUL MUSTAFA ALEX
Nozzle Modification work ) / Coating System APCS 2A HANNAN
Date : 17-JAN- to 19-JAN-2018
In process Inspection of primer coat touch up application at at
Nozzle Weld joints of Tank A ( Roof & Shell Nozzle Modification ABDUL MUSTAFA ALEX
work ) / Coating System APCS 2A HANNAN
Date : 17-JAN- to 19-JAN-2018

Inspection for Final Coat touch up application at Nozzle Weld ABDUL


joints of Tank B ( Roof & Shell Nozzle Modification work ) / MUSTAFA ALEX
HANNAN
Coating System APCS 2A

Inspection of primer Coat prior to Mid Coat touch up application ABDUL


at Nozzle Weld joints of Tank A ( Roof & Shell Nozzle Modification MUSTAFA ALEX
HANNAN
work ) / Coating System APCS 2A

Visual Verification of Paint material :


HEMPAL HEMPADUR MASTIC 45881 ABDUL MUSTAFA ALEX
JET BLACK (RAL 9005) HANNAN
PART A/B : 2 CANS

Inspection for Final Coat touch up application at Nozzle Weld ABDUL


joints of Tank A ( Roof & Shell Nozzle Modification work ) / MUSTAFA ALEX
HANNAN
Coating System APCS 2A

Inspection of Repair / Touch-up of Coatings for ABDUL


Tank B & Tank C handrails, MUSTAFA ALEX
HANNAN
Coating System APCS 26
Safety Color coding and Stenciling of Identification on piping ABDUL MUSTAFA ALEX
of Sulfur , Steam and Condensate lines. HANNAN
Inspection of Repair / Touch-up of Coatings for ABDUL
Tank A handrails, MUSTAFA ALEX
HANNAN
Coating System APCS 26

Safety Color coding and Stenciling of Identification on piping


of Sulfur , Steam and Condensate lines. ABDUL MUSTAFA ALEX
( with reference to RFI HANNAN
SRLF-R-W-PI-6730 / QMIS # 97401 )

Inspection for Safety Color coding and Stenciling of


ABDUL
Identification on piping of Drinking Water, Utility HANNAN MUSTAFA ALEX
Water,Instrument Air,Sulfur , Steam and Condensate lines.

Inspection for Surface Preparation prior to application of


Primer coat touch up at Galvanised Repair for Weld Joints of
ABDUL
Conduit Tray support HANNAN MUSTAFA ALEX
Coating System : APCS 1C (Primer Coat Only )
( Date : 13-FEB to 14-FEB-2018 ).

In process Inspection of Primer coat touch up at Galvanised


Repair for Weld Joints of Conduit Tray support ABDUL MUSTAFA ALEX
Coating System : APCS 1C (Primer Coat Only ) HANNAN
( Date : 13-FEB to 14-FEB-2018 ).
Inspection for Surface Preparation prior to application of
Primer coat touch up at Galvanised Repair for Weld Joints of
ABDUL
Conduit Tray support HANNAN MUSTAFA ALEX
Coating System : APCS 1C (Primer Coat Only )
( Date : 15-FEB to 16-FEB-2018 ).

In process Inspection of Primer coat touch up at Galvanised


Repair for Weld Joints of Conduit Tray support ABDUL MUSTAFA ALEX
Coating System : APCS 1C (Primer Coat Only ) HANNAN
( Date : 15-FEB to 16-FEB-2018 ).