DATA Unit Number COMMENTS AND FINDINGS RECOMMENDED ACTION LEVEL PAGE #

ALL DISCIPLINES SUGGEST THIS MOTOR HAS AN OUTER PREPARE TO CHANGE THE MOTOR AT SHORT NOTICE.
1/17/14 SOUTH RECIRC BLOWER PRIORITY 2 5
RACE BEARING DEFECT IN ADVANCED STAGES. MONITOR FREQUENTLY TO ESTABLISH WEAR TREND.

BALANCE FAN. ENSURE SHEAVE ALIGNMENT IS WITHIN


ELEVATED VIBRATION SUGGESTS RESONANCE,
1/17/14 CLOSED COOLING H20 FIN FAN H TOLERANCES. INSPECT SUPPORT COMPONENTS FOR PRIORITY 3 6
IMBALANCE, OR RUNOUT MAY BE PRESENT.
LOOSENESS.

A DEFECTIVE CONDITION WITHIN THE ROTOR MAY BE


1/17/14 COMPRESSOR C-1 EAST MONITOR MONTHLY. PRIORITY 3 8
DEVELOPING.

PUMP BEARING DEFECT IN MODERATE STAGES.


MONITOR MONTHLY. ENSURE SPARE BEARINGS ARE IN
1/17/14 AMINE BOOSTER P-501-1A ELEVATED HIGH FREQUENCY ULTRASOUND AND WEAR PRIORITY 3 9
STOCK.
METALS NOTED IN OIL ANALYSIS.

THIS UNIT HAS AN INCREASE AT VANE PASS THAT


1/17/14 UNIT 7 CIRC. PUMP B COULD BE AN EARLY INDICATION OF PUMP WEAR. THIS MONITOR MONTHLY. PRIORITY 4 10
COULD BE FLOW RELATED.

MINOR ELEVATED ULTRASOUND DATA MAY INDICATE PERFORM A BLEED AND FEED OF OIL TO RETURN
1/17/14 BOILER FEEDWATER PUMP 6B POOR LUBRICATION IS DEVELOPING. LOW OIL VISCOSITY TO NORMAL. ENSURE ALL BEARINGS ARE PRIORITY 4 11
VISCOSITY. PROPERLY LUBRICATED.

1/17/14 COMPRESSOR C-1 WEST THIS MACHINE IS RUNNING AT ACCEPTABLE LIMITS. MONITOR NORMALLY. PRIORITY 5 12