Você está na página 1de 2

Z1

C1

2 2

Z1
C1

Z1

C3

2 2

Z1
1.05x2.50

C1
7.10

Z1 .90x2.40

C3
ESPECIFICACIONES TECNICAS
2 2
CIMIENTO: CEMENTO HORMIGON 1:10 + 30% PIEDRA GRANDE 6" MAXIMO
SOBRECIMIENTO: CEMENTO HORMIGON 1:8 + 25% PIEDRA MEDIANA 3" MAXIMO
1.05x2.50

Z1
Z1 .90x2.40 C1

45°
C3

ØDE COLUMNA,PLACA O VIGA

45°
Ø r(cm.) a(cm.)

1/4" 1.3 6.5 2 2


3/8" 2.0 10.0
1/2" 2.5 12.5

Z1
C1

CONCRETO 1: 8
CON 25% P.M.

2 2
PATIO PATIO

CONCRETO 1:10
CON 30 % P.G.
Z1
C1

VARIABLE

1m CUADRO DE COLUMNAS
SEGUN DETALLE DE ESTRIBOS.

2 2

VARIABLE
1m

Z1
C1

.15 .15
2.55
SOLADO fc=100 kg/cm2
1
.15

BAÑO

2 2
1.10

3 2 2
.15

BAÑO

Z1 Z1 Z1 Z1 Z1
1.00

3
1

C1 C1 C1 C1 C1
.25

4
Z1
C1

1.00
CONCRETO 1: 8
CON 25% P.M.

PATIO

4.88
3.38
1 1
CONCRETO 1:10
CON 30 % P.G.

Z1
C1

1.00
SEGUN DETALLE DE ESTRIBOS.

4.75
3.75
1 1

SOLADO fc=100 kg/cm2


Z1
C1
1.00

VARIABLE

1m
24.00
4.75
3.75

VARIABLE
1m

1 1

CUADRO DE COLUMNAS Z1
C1
1.00

4.75
3.75

1 1

1 16 UNIDADES DE ACERO DE 1/2" Z1


2 10 UNIDADES DE ACERO DE 3/8" C1
1.00

3 13 ME3 DE AGRAGADO (ARENA Y PIEDRA)


4 3 M3 DE PIEDRA MEDIANA
5 65 BOLSAS DE CEMENTO
6 700 UNIDADES DE LADRILLO DE .4X.19X.12
7 8 KILOS DE ALAMBRE # 16
8 10 KILOS DE ALAMBRE # 8
9 2 DISCOS DE ACERO
10 2 ACERO DE 1/4"
3.38

4.88

1 1

Z1
1.00

C1

Você também pode gostar