HARGA SATUAN
NO. JENIS PEKERJAAN SATUAN
(Rp)
1 Pekerja Hr 34,500.00
2 Tukang Kayu Hr 48,875.00
3 Tukang Batu Hr 48,875.00
4 Tukang Besi Hr 48,875.00
5 Tukang Cat Hr 48,875.00
6 Tukang Leideng Hr 48,875.00
7 Tukang Gali Hr 46,000.00
8 Tukang Plitur Hr 46,000.00
9 Tukang Kepala Hr 49,450.00
10 K e p . T u k a n g K a y u Hr 51,750.00
11 K e p . T u k a n g B a t u Hr 51,750.00
12 K e p . T u k a n g C a t Hr 51,750.00
13 K e p . T u k a n g P l i t u r Hr 51,750.00
14 K e p . T u k a n g G a l i Hr 51,750.00
15 M e k a n i k Hr 43,125.00
16 P e m b . M e k a n i k Hr 43,125.00
17 Operator alat berat Hr 49,450.00
18 P e m b . Operator Hr 40,250.00
19 S o p i r Hr 46,575.00
20 P e m b . Sopir Hr 34,500.00
file:///conversion/tmp/scratch/385673381.xlsx
DAFTAR HARGA SATUAN UPAH
EKERJAAN UMUM KABUPATEN REMBANG
UNTUK TAHUN 2011
KETERANGAN
file:///conversion/tmp/scratch/385673381.xlsx
DAFTAR HARGA SATUAN BAHAN
DINAS PEKERJAAN UMUM KABUPATEN REMBANG
UNTUK TAHUN 2011
HARGA
NO. J E N I S B A H A N SATUAN
(Rp)
1 2 3 4
I BAHAN DASAR
1 BATU KALI Bulat Utuh m3 98,000
Bulat Belah m3 99,400
Pecah 5/7 m3 123,500
Pecah 3/5 m3 189,600
Tempel m2 62,500
Batu apung kg 5,500
2 KERIKIL Sawur / Koral m3 25,000
Beton 0,5 / 1 m3 237,500
Beton 1 / 1 m4 216,700
Beton 1 / 2 m3 226,300
Beton 2 / 3 m3 224,400
Biasa m3 25,850
3 BATU BATA Ex lokal I bh 365
6 ASBES PLAT
- 100cm X 100 cm X 5 mm bh 17,300
- 100cm X 200 cm X 5 mm bh 48,000
- 100cm X 240 cm X 5 mm bh 61,600
Sekrup asbes bh 1,300
7 SENG PLAT
BJLS 0,30 panjang 180 cm m' 49,850
BJLS 0,30 panjang 240 cm m' 64,750
BWG 28 x 80 m' 38,250
BWG 28 x 90 m' 42,900
8 SENG GELOMBANG
Seng gel. Kecil 0,70 x 1,80 m lbr 49,700
Seng gel. Kecil 0,70 x 2,10 m lbr 57,400
BJLS 0,28 m' 73,800
BJLS 0,28 panjang 180 cm lbr 43,800
BJLS 0,28 panjang 240 cm lbr 58,800
9 SENG TALANG
Seng talang BJLS 26 lebar 0,60 m' 21,300
Seng talang BJLS 26 lebar 0,90 m' 30,400
Seng talang BJLS 26 lebar 1,20 m' 46,200
III . B A H A N K A Y U
1 JATI Papan m3 14,687,500
Balok/pesagen m3 14,687,500
file:///conversion/tmp/scratch/385673381.xlsx
HARGA
NO. J E N I S B A H A N SATUAN
(Rp)
1 2 3 4
3 KRUING Papan m3 5,937,500
Balok/pesagen m3 5,937,500
2 KERAMIK
Keramik warna (KW-1) 30 X 30 cm m2 45,200
Keramik warna (KW-2) 30 X 30 cm m2 40,400
Keramik putih (KW-1) 30 X 30 cm m2 36,200
Keramik putih (KW-2) 30 X 30 cm m2 32,800
Keramik 10 x 20 cm m2 50,600
Keramik 20 x 20 cm m2 43,800
Keramik 20 x 25 cm m2 48,100
Keramik 10 x 20 cm m2 39,700
3 MARMER
Marmer Tulung Agung m2 552,200
Marmer Kalimantan m2 926,750
Marmer Itali m2 1,255,550
4 GRANITO
Granito 40 x 40 polished (lokal) m2 420,750
Granito 40 x 40 polished (import) m2 459,050
Granito 60 x 60 polished (lokal) m2 419,100
Granito 60 x 60 polished (import) m2 437,500
5 GRANIT
Granit lokal m2 119,350
Granit import m2 219,800
Batu Tempel m2 61,250
file:///conversion/tmp/scratch/385673381.xlsx
HARGA
NO. J E N I S B A H A N SATUAN
(Rp)
1 2 3 4
V.BAHAN CETAK
1 BUIS BETON O dan U
Ø 15 cm - 100 cm bh 35,500
Ø 20 cm - 100 cm bh 50,000
Ø 25 cm - 100 cm bh 53,200
Ø 30 cm - 100 cm bh 62,500
Ø 40 cm - 100 cm bh 78,700
Ø 50 cm - 100 cm bh 98,200
Ø 60 cm - 100 cm bh 116,900
Ø 80 cm - 100 cm bh 177,500
Ø 100 cm - 100 cm bh 292,200
U 15 cm - 100 cm bh 49,100
U 20 cm - 100 cm bh 38,600
U 30 cm - 100 cm bh 47,500
VI . B A H A N B E S I
1 BESI BETON
Besi beton polos kg 10,100
Besi beton prestress kg 16,850
Besi beton ulir kg 13,800
2 BESI PLAT
Besi Strip kg 14,700
3 BAJA
Baja profil " L" dan "C" kg 16,850
Baja profil "IWF" kg 17,650
4 KAWAT
Kawat Ikat beton/bendrat kg 16,200
Kawat bronjong kg 16,850
Kawat las listrik kg 30,000
VII . B A H A N P I P A
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC. S. 12,5 ø 1/2" m' 4,100
Pipa PVC. S. 12,5 ø 3/4" m' 6,000
Pipa PVC. S. 12,5 ø 1" m' 10,250
Pipa PVC. S. 12,5 ø 1-1/4" m' 13,000
Pipa PVC. S. 12,5 ø 1-1/2" m' 20,200
Pipa PVC. S. 12,5 ø 2" m' 30,500
Pipa PVC. S. 12,5 ø 2-1/2" m' 43,750
Pipa PVC. S. 12,5 ø 3" m' 62,650
Pipa PVC. S. 12,5 ø 4" m' 93,550
Pipa PVC. S. 12,5 ø 5" m' 154,375
Pipa PVC. S. 12,5 ø 6" m' 200,400
Pipa PVC. S. 12,5 ø 8" m' 316,650
Pipa PVC. S. 12,5 ø 10" m' 499,500
Pipa PVC. S. 12,5 ø 12" m' 796,100
Pipa PVC. S. 12,5 ø 16" m' 1,342,050
2 Pipa Medium B Galvanis - SII
Pipa Galvanis ( 1" ) m' 108,450
file:///conversion/tmp/scratch/385673381.xlsx
HARGA
NO. J E N I S B A H A N SATUAN
(Rp)
1 2 3 4
Pipa Galvanis ( 1 1/2" ) m' 147,300
Pipa Galvanis ( 2" ) m' 276,100
VIII . B A H A N L A N G I T - L A N G I T
PLY WOOD
- Teak wood
120 X 240 X 4 mm lbr 89,600
- Tripleks
120 X 240 X 3 mm lbr 50,700
120 X 240 X 4 mm lbr 65,700
120 X 240 X 6 mm lbr 83,600
- Multipleks
. 120 X 240 X 9 mm lbr 122,900
. 120 X 240 X 12 mm lbr 184,400
Harplek 60 x 200 lbr 16,500
Harplek 50 x 200 lbr 14,300
Harplek 40 x 200 lbr 8,350
Harplek 30 x 200 lbr 10,650
Harplek 5 mm (90 x 180) lbr 27,250
Harplek 5 mm (120 x 240) lbr 100,000
Gypsum 6 mm lbr 61,900
Gypsum 9 mm lbr 75,000
Gypsum 12 mm lbr 50,750
Gypsum 20 mm lbr 54,250
Eternit 4 mm ( 100 x 100) m2 22,900
List Kayu Profil m' 6,900
Formika ukuran pintu lbr 229,550
IX . B A H A N F I N I S H I N G
1 KAYU
Menie kg 20,400
Plamur kayu kg 19,200
Ambril/amplas lbr 3,200
Batu Apung kg 5,500
Cat kayu (cukup) kg 39,700
Cat kayu (baik) kg 51,000
Siralax kg 47,300
Spiritus ltr 10,800
Dempul kg 18,500
Plinkut kg 18,800
Wood filer (INFRA) kg 31,300
Oker putih kg 20,900
Oker warna kg 22,900
Melamin kg 69,400
Kuwas 3" bh 6,900
Thinner Super daimaru liter 24,600
Thinner A liter 19,200
Foxi Cat Kg 33,200
2 TEMBOK
Kapur sirih kg 800
Plamur kg 17,500
Cat Tembok dalam (cukup) kg 14,400
Cat Tembok dalam (baik) kg
file:///conversion/tmp/scratch/385673381.xlsx
HARGA
NO. J E N I S B A H A N SATUAN
(Rp)
1 2 3 4
Cat Tembok luar (cukup) kg 17,100
Cat Tembok luar (baik)
Roll cat bh 15,500
3 BESI
Menie kg 23,700
Cat besi (baik) kg 46,700
Cat besi (cukup) kg 45,700
Minyak cat ltr 14,600
Lem Aica Aibon kg 20,700
Amplas Besi lbr 5,600
Ampelas norton no.3 buah 6,100
Ampelas Dico no.280 buah 3,400
Ampelas Dico no.120 buah 3,400
X.BAHAN KACA
Bening 5 mm m2 87,500
Rayband 5 mm m2 96,900
2 OBAT - OBATAN
Fastac 25 EC 50 mL 11,000
3 TANAMAN HIAS
Agape Batang 66,000
Angsana Batang 11,000
Apinika Buah 2,750
Bambu Hias Rumpun 26,400
Bambu Jepang Buah 18,150
Bougenville Biasa Batang 24,200
Bougenville Parigata Batang 36,300
Cemara Bola Buah 9,680
Cemara Buaya Buah 6,600
Cemara Gimbal Batang 55,000
Cemara Kipas Batang 26,620
Cemara Non Flok/Ventris Batang 72,600
Daun Walisongo Buah 11,000
Glodogan Batang 72,600
Glodogan Pecut Batang 205,700
Jaranan Batang 6,600
Kamboja Jepang Batang 48,400
Ketapang Batang 33,000
Krokot Putih Rumpun 2,750
Lamtana Rebah Batang 2,750
Lamtana Tegak Batang 18,150
Mahoni 1 Meter Batang 10,164
Mimbo Batang 6,050
Mirten Buah 11,000
Palem Botol Batang 347,300
Palem Ekor Tupai Batang 172,500
Palem Kuning Batang 23,000
file:///conversion/tmp/scratch/385673381.xlsx
HARGA
NO. J E N I S B A H A N SATUAN
(Rp)
1 2 3 4
Palem Merah Batang 28,000
Palem Raja/Putri Batang 115,000
Palem Wergu Batang 28,500
Pangkas Kuning Batang 4,000
Pangkas Merah Batang 4,000
Pinisium Batang 34,500
Rumput Jepang M2 4,600
Sawo Kecik Batang 50,600
Sikas Batang 575,000
Tanaman Taiwan Buah 3,500
Tanjung Batang 69,000
Teh - tehan Rumpun 14,000
2 Without Coupling
- 1,5” x 20 m Tertera 334,800
- 1,5” x 30 m Tertera 502,800
- 2” x 20 m Tertera 502,800
- 2” x 30 m Tertera 765,600
- 2,5” x 20 m Tertera 612,000
- 2,5” x 30 m Tertera 931,200
- 2,5” x 40 m Tertera 1,239,600
5 Straight Nozzle (Machino Coupling) With Nozzle tip, Material Brass/ Branch pipa with straight Nozzle
- 1,5’ Seamless Tertera 420,000
- 2” Seamless Tertera 532,500
- 2,5” Seamless, Short, W/O Grip Tertera 582,500
- 2,5” Seamless, Long, W/O Grip Tertera 725,000
- 2,5” Seamless, Long, W/ Grip Tertera 746,250
- 1,5’ Appron 42,250
- 2” Appron 593,125
- 2,5” Appron 966,875
8 Hose Rack
- 1,5”, 1,24 COMB Unit 536,250
- 2,5”, 1,24 COMB Unit 585,000
10 Hose Reel
- 1” Hose Reel, Swing Type Complete
With box Siamese Conention
4” x 2,5” x 2,5” Machino Coupling Tertera 1,860,000
11 Hydrant Pillar
- H14 AP 4” x 2,5” x 2,5” Tertera 5,768,400
- H13 AP 3” x 2,5” Tertera 3,084,200
12 On Trollen
file:///conversion/tmp/scratch/385673381.xlsx
HARGA
NO. J E N I S B A H A N SATUAN
(Rp)
1 2 3 4
- Type AC 15 kapasitas 6 kg buah 2,048,150
- Type AC 50 kapasitas 23 kg buah 5,830,500
XX . L A I N - L A I N
1 Alat bantu (harga rata-rata) lot 12,500
2 Aspal kg 8,500
3 Minyak aspal ltr 2,000
4 Bensin ltr 4,500
5 Solar liter 4,500
6 Minyak tanah ltr 3,600
7 Olie (minyak pelumas) liter 31,300
8 Stempet Kg 18,200
9 Gebalan rumput m2 12,450
10 Wiremesh MS m2 66,000
11 Kayu bakar m3 88,275
12 Pintu Ronsel Doble 200 x 200 x 300 buah 37,500,000
13 Pintu Ronsel Doble 150 x 150 x 300 buah 31,250,000
14 Pintu Ronsel Engkel 100 x 100 x 300 buah 15,625,000
15 Pintu Intake 100 x 100 x 300 buah 8,750,000
16 Pintu Intake 90 x 100 x 300 buah 6,875,000
17 Pintu Intake 80 x 80 x 300 buah 6,250,000
18 Pintu Intake 60 x 60 x 300 buah 5,625,000
19 Pintu Intake 50 x 50 x 300 buah 4,375,000
20 Pintu Intake 40 x 40 x 300 buah 4,062,500
21 Pintu Intake 30 x 40 x 300 buah 3,750,000
22 Nomenklatur Marmer ( 30 x 40 ) buah 494,500
23 Nomenklatur Marmer ( 15 x 20 ) buah 123,500
24 Pile Scale ( 20 x 100 ) buah 494,500
25 Pile Scale ( 12 x 100 ) buah 309,000
26 Lapisan kedap air kg 53,000
27 Nako lengkap daun 49,500
28 PAGAR BRC. Pagar BRC 90 A1 /lb 441,500
Pagar BRC 120 A1 /lb 515,000
Pagar BRC 150 A1 /lb 809,500
Pagar BRC 90 A2 /lb 367,500
Pagar BRC 120 A2 /lb 441,500
Pagar BRC 150 A2 /lb 735,500
Pipa Tiang BRC 90 - 2" unit 184,000
Pipa Tiang BRC 120 - 2" unit 213,500
Pipa Tiang BRC 150 - 2" unit 228,500
29 Minyak Beton & bekisting ltr 20,000
30 Allumunium sheet 0,3 mm (90 x 180) lbr 118,800
file:///conversion/tmp/scratch/385673381.xlsx
HARGA
NO. J E N I S B A H A N SATUAN
(Rp)
1 2 3 4
31 Shear Connector kg 10,000
rasionalisasi Rembang, A
tidak ada bahan, harga tahun kemarin tambah 5%
perbedaan tll mencolok KEPALA DINAS PEKE
sama dengan harga tahun kemarin KABUPATEN R
NIP. 19620715 19
file:///conversion/tmp/scratch/385673381.xlsx
G
200,000
70,000 100,000
125,000
60,000
15,000
225,000
170,000 225,000
165,000 225,000
110,000
130,000 175,000 80,000
350,000
130,000 175,000
85,000
85,000
145,000
175,000
55,000
40,000
55,000 53,000
800,000
1,500
65,000
file:///conversion/tmp/scratch/385673381.xlsx
MUBAROK ARDI KARYA SINAR LAUT AL HASAN
RAMAI SARANG
PANCUR REMBANG SLUKE SEDAN
5 6 7 8 9
1,000 650
300
600 800 550 550
1,500 1,100
4,900 5,500 5,000
7,500 8,800
2,000 3,500 1,500
2,500
17,000 17,500
1,600
31,000
27,500 27,000 22,500
51,000
55,000
70,000
27,000 33,000
37,000
750 2,500
40,000
47,000
55,000
68,000
15,000 16,000
22,500 27,500
17,000,000
17,000,000
file:///conversion/tmp/scratch/385673381.xlsx
MUBAROK ARDI KARYA SINAR LAUT AL HASAN
RAMAI SARANG
PANCUR REMBANG SLUKE SEDAN
5 6 7 8 9
4,500,000 6,000,000 4,000,000
4,500,000 6,000,000 4,000,000
4,000,000 6,000,000
4,000,000 6,000,000
400,000
25,000
5,000
21,000
20,000
22,000
file:///conversion/tmp/scratch/385673381.xlsx
MUBAROK ARDI KARYA SINAR LAUT AL HASAN
RAMAI SARANG
PANCUR REMBANG SLUKE SEDAN
5 6 7 8 9
40,000
30,000 55,000
50,000 70,000
70,000 80,000
85,000 100,000
115,000 115,000
165,000 185,000
30,000
19,000 33,000
27,500 50,000
13,000 27,000
25,000
31,000
44,000
62,000 52,500 50,000
file:///conversion/tmp/scratch/385673381.xlsx
MUBAROK ARDI KARYA SINAR LAUT AL HASAN
RAMAI SARANG
PANCUR REMBANG SLUKE SEDAN
5 6 7 8 9
95,000
115,000 95,000
60,000
60,000
60,000
90,000
25,000 25,000
25,000
25,000
40,000
9,000 5,000 5,000
24,000 18,000
20,000
35,000
35,971 12,000 60,000
file:///conversion/tmp/scratch/385673381.xlsx
MUBAROK ARDI KARYA SINAR LAUT AL HASAN
RAMAI SARANG
PANCUR REMBANG SLUKE SEDAN
5 6 7 8 9
3,555 8,000 62,000 7,000
22,000
12,500 16,000 11,000 12,000
5,000
5,000
5,000 2,000
5,000 2,000
225,000 55,000
55,000 25,000
950,000 250,000
90,000 100,000 82,500 90,000
300,000 250,000
450,000 150,000
file:///conversion/tmp/scratch/385673381.xlsx
MUBAROK ARDI KARYA SINAR LAUT AL HASAN
RAMAI SARANG
PANCUR REMBANG SLUKE SEDAN
5 6 7 8 9
28,000
28,000
file:///conversion/tmp/scratch/385673381.xlsx
MUBAROK ARDI KARYA SINAR LAUT AL HASAN
RAMAI SARANG
PANCUR REMBANG SLUKE SEDAN
5 6 7 8 9
file:///conversion/tmp/scratch/385673381.xlsx
MUBAROK ARDI KARYA SINAR LAUT AL HASAN
RAMAI SARANG
PANCUR REMBANG SLUKE SEDAN
5 6 7 8 9
file:///conversion/tmp/scratch/385673381.xlsx
MUBAROK ARDI KARYA SINAR LAUT AL HASAN
RAMAI SARANG
PANCUR REMBANG SLUKE SEDAN
5 6 7 8 9
Pressure 10 Kg/cm2
file:///conversion/tmp/scratch/385673381.xlsx
MUBAROK ARDI KARYA SINAR LAUT AL HASAN
RAMAI SARANG
PANCUR REMBANG SLUKE SEDAN
5 6 7 8 9
file:///conversion/tmp/scratch/385673381.xlsx
MUBAROK ARDI KARYA SINAR LAUT AL HASAN
RAMAI SARANG
PANCUR REMBANG SLUKE SEDAN
5 6 7 8 9
file:///conversion/tmp/scratch/385673381.xlsx
MUBAROK ARDI KARYA SINAR LAUT AL HASAN
RAMAI SARANG
PANCUR REMBANG SLUKE SEDAN
5 6 7 8 9
file:///conversion/tmp/scratch/385673381.xlsx
LISA UMBUL REJEKI BAROKAH SUMBER LAUT
KALIORI
GUNEM BULU SUMBER LASEM
10 11 12 13 14
75,000 90,000
150,000
90,000
150,000
150,000
170,000 175,000
170,000 175,000
75,000
100,000 95,000
110,000
95,000
110,000
60,000
20,000
1,000
file:///conversion/tmp/scratch/385673381.xlsx
LISA UMBUL REJEKI BAROKAH SUMBER LAUT
KALIORI
GUNEM BULU SUMBER LASEM
10 11 12 13 14
600 700
850
300
500 540
1,050 2,000
38,000
45,000 23,000 23,000
74,000
13,000
26,000
40,000
45,000
19,000 15,500
26,000 22,500
8,000,000
8,000,000
8,000,000
8,000,000
file:///conversion/tmp/scratch/385673381.xlsx
LISA UMBUL REJEKI BAROKAH SUMBER LAUT
KALIORI
GUNEM BULU SUMBER LASEM
10 11 12 13 14
7,000,000
7,000,000
7,000,000 7,500,000
7,000,000 7,500,000
20,000
30,500 31,000
27,500 27,000
27,500 26,000 27,500
25,000 25,000
27,000
file:///conversion/tmp/scratch/385673381.xlsx
LISA UMBUL REJEKI BAROKAH SUMBER LAUT
KALIORI
GUNEM BULU SUMBER LASEM
10 11 12 13 14
25,000
35,000
55,000 42,500
65,000
70,000
85,000 90,000
160,000 122,500
240,000
17,500 19,000
25,000 29,000
120,000 56,000
210,000
371,000
647,500
file:///conversion/tmp/scratch/385673381.xlsx
LISA UMBUL REJEKI BAROKAH SUMBER LAUT
KALIORI
GUNEM BULU SUMBER LASEM
10 11 12 13 14
100,000
110,000 95,000
140,000 127,500
12,000 11,000
10,000 20,000
8,000 9,000 12,000
15,000 8,800
file:///conversion/tmp/scratch/385673381.xlsx
LISA UMBUL REJEKI BAROKAH SUMBER LAUT
KALIORI
GUNEM BULU SUMBER LASEM
10 11 12 13 14
12,000
33,500
9,500 12,000 15,000 10,500 9,500
20,000 30,000
36,000 60,000 37,000
42,000 35,000
20,000 6,500 18,500
45,000 40,000 45,000
3,750 3,000 5,000 3,500 3,000
5,000 4,000
2,000 3,000 3,000 2,000
2,000 3,000 3,000 2,000
120,000 95,000
27,500 100,000 65,000
95,000 90,000
2,000
12,000 11,500 12,000 11,000 10,500
5,000
45,000 40,000 45,000
file:///conversion/tmp/scratch/385673381.xlsx
LISA UMBUL REJEKI BAROKAH SUMBER LAUT
KALIORI
GUNEM BULU SUMBER LASEM
10 11 12 13 14
23,000
file:///conversion/tmp/scratch/385673381.xlsx
LISA UMBUL REJEKI BAROKAH SUMBER LAUT
KALIORI
GUNEM BULU SUMBER LASEM
10 11 12 13 14
file:///conversion/tmp/scratch/385673381.xlsx
LISA UMBUL REJEKI BAROKAH SUMBER LAUT
KALIORI
GUNEM BULU SUMBER LASEM
10 11 12 13 14
file:///conversion/tmp/scratch/385673381.xlsx
LISA UMBUL REJEKI BAROKAH SUMBER LAUT
KALIORI
GUNEM BULU SUMBER LASEM
10 11 12 13 14
file:///conversion/tmp/scratch/385673381.xlsx
LISA UMBUL REJEKI BAROKAH SUMBER LAUT
KALIORI
GUNEM BULU SUMBER LASEM
10 11 12 13 14
file:///conversion/tmp/scratch/385673381.xlsx
LISA UMBUL REJEKI BAROKAH SUMBER LAUT
KALIORI
GUNEM BULU SUMBER LASEM
10 11 12 13 14
24,000
file:///conversion/tmp/scratch/385673381.xlsx
LISA UMBUL REJEKI BAROKAH SUMBER LAUT
KALIORI
GUNEM BULU SUMBER LASEM
10 11 12 13 14
file:///conversion/tmp/scratch/385673381.xlsx
HARTONO RIMBA RAYA BAROKAH SIDODADI
REJO - KRAGAN
LASEM PAMOTAN SULANG SALE
15 16 17 18 19
150,000 155,000
150,000 120,000 160,000
150,000 110,000 150,000
275 250
107,143 140,000
60,000
45,000
50,000
60,000 55,000
25,000
25,000
30,000
80,000
file:///conversion/tmp/scratch/385673381.xlsx
HARTONO RIMBA RAYA BAROKAH SIDODADI
REJO - KRAGAN
LASEM PAMOTAN SULANG SALE
15 16 17 18 19
5,000 5,000
1,500 2,000
5,000
12,000
2,250 2,000
27,000
33,000 30,000
47,000
35,000
40,000
12,000 12,000
500
33,000
43,000
6,500,000
6,500,000
file:///conversion/tmp/scratch/385673381.xlsx
HARTONO RIMBA RAYA BAROKAH SIDODADI
REJO - KRAGAN
LASEM PAMOTAN SULANG SALE
15 16 17 18 19
3,500,000
3,500,000
6,000,000
6,000,000
5,000
10,000
85,000
100,000
85,000
100,000
file:///conversion/tmp/scratch/385673381.xlsx
HARTONO RIMBA RAYA BAROKAH SIDODADI
REJO - KRAGAN
LASEM PAMOTAN SULANG SALE
15 16 17 18 19
22,000
11,700 20,000
13,000 50,000
49,000
88,000
153,000
208,000
353,000
file:///conversion/tmp/scratch/385673381.xlsx
HARTONO RIMBA RAYA BAROKAH SIDODADI
REJO - KRAGAN
LASEM PAMOTAN SULANG SALE
15 16 17 18 19
45,000
90,000 95,000
115,000 110,000 130,000
15,000 17,500
13,000
2,000 3,500
30,500
30,000
30,000 20,000
5,000 5,000
15,000
15,000 20,000
37,500
5,000 8,000
3,500
80,000
150,000
70,000 90,000
225,000
175,000
file:///conversion/tmp/scratch/385673381.xlsx
HARTONO RIMBA RAYA BAROKAH SIDODADI
REJO - KRAGAN
LASEM PAMOTAN SULANG SALE
15 16 17 18 19
27,500
file:///conversion/tmp/scratch/385673381.xlsx
HARTONO RIMBA RAYA BAROKAH SIDODADI
REJO - KRAGAN
LASEM PAMOTAN SULANG SALE
15 16 17 18 19
file:///conversion/tmp/scratch/385673381.xlsx
HARTONO RIMBA RAYA BAROKAH SIDODADI
REJO - KRAGAN
LASEM PAMOTAN SULANG SALE
15 16 17 18 19
file:///conversion/tmp/scratch/385673381.xlsx
HARTONO RIMBA RAYA BAROKAH SIDODADI
REJO - KRAGAN
LASEM PAMOTAN SULANG SALE
15 16 17 18 19
file:///conversion/tmp/scratch/385673381.xlsx
HARTONO RIMBA RAYA BAROKAH SIDODADI
REJO - KRAGAN
LASEM PAMOTAN SULANG SALE
15 16 17 18 19
file:///conversion/tmp/scratch/385673381.xlsx
HARTONO RIMBA RAYA BAROKAH SIDODADI
REJO - KRAGAN
LASEM PAMOTAN SULANG SALE
15 16 17 18 19
file:///conversion/tmp/scratch/385673381.xlsx
HARTONO RIMBA RAYA BAROKAH SIDODADI
REJO - KRAGAN
LASEM PAMOTAN SULANG SALE
15 16 17 18 19
file:///conversion/tmp/scratch/385673381.xlsx
ANEKA PUNDITIRTA
KURNIA PASAR KEBOEN RAYA REMBANG JAYA ANEKA PUNDITIRTA
JAKARTA (POLY
REMBANG REMBANG DIESEL JAKARTA (UNILON)
UNGGUL)
20 21 22 23 24
file:///conversion/tmp/scratch/385673381.xlsx
ANEKA PUNDITIRTA
KURNIA PASAR KEBOEN RAYA REMBANG JAYA ANEKA PUNDITIRTA
JAKARTA (POLY
REMBANG REMBANG DIESEL JAKARTA (UNILON)
UNGGUL)
20 21 22 23 24
file:///conversion/tmp/scratch/385673381.xlsx
ANEKA PUNDITIRTA
KURNIA PASAR KEBOEN RAYA REMBANG JAYA ANEKA PUNDITIRTA
JAKARTA (POLY
REMBANG REMBANG DIESEL JAKARTA (UNILON)
UNGGUL)
20 21 22 23 24
file:///conversion/tmp/scratch/385673381.xlsx
ANEKA PUNDITIRTA
KURNIA PASAR KEBOEN RAYA REMBANG JAYA ANEKA PUNDITIRTA
JAKARTA (POLY
REMBANG REMBANG DIESEL JAKARTA (UNILON)
UNGGUL)
20 21 22 23 24
3,800 3000
5,700 5833
9,620 7667
11,880 12042
18,770 18708
28,390 27625
40,970 40833
60,210 59167
88,120 85542
144,050
190,000 184583
295,450 288333
466,220 451250
743,260 712500
1,245,690
file:///conversion/tmp/scratch/385673381.xlsx
ANEKA PUNDITIRTA
KURNIA PASAR KEBOEN RAYA REMBANG JAYA ANEKA PUNDITIRTA
JAKARTA (POLY
REMBANG REMBANG DIESEL JAKARTA (UNILON)
UNGGUL)
20 21 22 23 24
file:///conversion/tmp/scratch/385673381.xlsx
ANEKA PUNDITIRTA
KURNIA PASAR KEBOEN RAYA REMBANG JAYA ANEKA PUNDITIRTA
JAKARTA (POLY
REMBANG REMBANG DIESEL JAKARTA (UNILON)
UNGGUL)
20 21 22 23 24
file:///conversion/tmp/scratch/385673381.xlsx
ANEKA PUNDITIRTA
KURNIA PASAR KEBOEN RAYA REMBANG JAYA ANEKA PUNDITIRTA
JAKARTA (POLY
REMBANG REMBANG DIESEL JAKARTA (UNILON)
UNGGUL)
20 21 22 23 24
6,000
125,000
1,000,000
700
2,300
2,000
1,600
6,500
12500 - 75000
15000 - 25000
15000 - 25000
5000 - 75000
7500 - 75000
5000 - 25000
7500 - 25000
7500 - 25000
7500 - 25000
17500 - 75000
7500 - 50000
5000 - 35000
5000 - 35000
15000 - 75000
5000 - 25000
2500 - 5000
2500 - 5000
2500 - 5000
2500 - 5000
15000 - 250000
7500 - 150000
7500 - 150000
file:///conversion/tmp/scratch/385673381.xlsx
ANEKA PUNDITIRTA
KURNIA PASAR KEBOEN RAYA REMBANG JAYA ANEKA PUNDITIRTA
JAKARTA (POLY
REMBANG REMBANG DIESEL JAKARTA (UNILON)
UNGGUL)
20 21 22 23 24
15000 - 150000
7500 - 60000
15000 - 35000
2500 - 15000
2500 - 15000
10,000
10000 - 35000
45000 - 150000
2500 - 7500
5000 - 15000
2500 - 15000
10,000
25,000
6,700,000
30,000
1,000,000
1,300,000
35,000
165,000
15,000
7,500
3,200
22,500
5,000
file:///conversion/tmp/scratch/385673381.xlsx
ANEKA PUNDITIRTA
KURNIA PASAR KEBOEN RAYA REMBANG JAYA ANEKA PUNDITIRTA
JAKARTA (POLY
REMBANG REMBANG DIESEL JAKARTA (UNILON)
UNGGUL)
20 21 22 23 24
file:///conversion/tmp/scratch/385673381.xlsx
ANEKA PUNDITIRTA
KURNIA PASAR KEBOEN RAYA REMBANG JAYA ANEKA PUNDITIRTA
JAKARTA (POLY
REMBANG REMBANG DIESEL JAKARTA (UNILON)
UNGGUL)
20 21 22 23 24
file:///conversion/tmp/scratch/385673381.xlsx
ANEKA PUNDITIRTA
KURNIA PASAR KEBOEN RAYA REMBANG JAYA ANEKA PUNDITIRTA
JAKARTA (POLY
REMBANG REMBANG DIESEL JAKARTA (UNILON)
UNGGUL)
20 21 22 23 24
file:///conversion/tmp/scratch/385673381.xlsx
ANEKA PUNDITIRTA
KURNIA PASAR KEBOEN RAYA REMBANG JAYA ANEKA PUNDITIRTA
JAKARTA (POLY
REMBANG REMBANG DIESEL JAKARTA (UNILON)
UNGGUL)
20 21 22 23 24
file:///conversion/tmp/scratch/385673381.xlsx
ANEKA PUNDITIRTA
KURNIA PASAR KEBOEN RAYA REMBANG JAYA ANEKA PUNDITIRTA
JAKARTA (POLY
REMBANG REMBANG DIESEL JAKARTA (UNILON)
UNGGUL)
20 21 22 23 24
file:///conversion/tmp/scratch/385673381.xlsx
SENTRAL INDO 20% DI NAIK
HARGA RATA -
SAFETY 2.5% BULAT ATAU
RATA
SEMARANG 22.5% KAN TURUN
25 26 27 28 29
857,100
909,600
949,100
247,200
2,700
file:///conversion/tmp/scratch/385673381.xlsx
SENTRAL INDO 20% DI NAIK
HARGA RATA -
SAFETY 2.5% BULAT ATAU
RATA
SEMARANG 22.5% KAN TURUN
25 26 27 28 29
8,700
52,400
68,000
40,200
45,100
file:///conversion/tmp/scratch/385673381.xlsx
SENTRAL INDO 20% DI NAIK
HARGA RATA -
SAFETY 2.5% BULAT ATAU
RATA
SEMARANG 22.5% KAN TURUN
25 26 27 28 29
5,000,000 6,125,000 6,125,000 187,500
5,000,000 6,125,000 6,125,000 187,500
3,281,300
3,281,300
34,100
1,968,750 1,968,800 93,800
602,600
16,275 16,300 800
3,990 4,000 200
4,634,500
2,471,700
196,900
5,000 6,125 6,200 300
579,900
973,100
1,318,400
125,400
230,800
64,400
file:///conversion/tmp/scratch/385673381.xlsx
SENTRAL INDO 20% DI NAIK
HARGA RATA -
SAFETY 2.5% BULAT ATAU
RATA
SEMARANG 22.5% KAN TURUN
25 26 27 28 29
10,700
17,700
14,500
15,500
17,700
18,600
113,900
file:///conversion/tmp/scratch/385673381.xlsx
SENTRAL INDO 20% DI NAIK
HARGA RATA -
SAFETY 2.5% BULAT ATAU
RATA
SEMARANG 22.5% KAN TURUN
25 26 27 28 29
154,700
290,000
900
16,667 20,417 20,500 3,000
11,688 14,317 14,400 -
20,971 25,690 25,700
file:///conversion/tmp/scratch/385673381.xlsx
SENTRAL INDO 20% DI NAIK
HARGA RATA -
SAFETY 2.5% BULAT ATAU
RATA
SEMARANG 22.5% KAN TURUN
25 26 27 28 29
17,426 21,347 21,400 4,300
25,167 30,829 30,900
11,636 14,255 14,300 (1,200)
91,900
75,000 91,875 91,900 (5,000)
7,600
5,700
6,900
10,000
18,600
2,530,900
4,428,300
6,488,300
file:///conversion/tmp/scratch/385673381.xlsx
SENTRAL INDO 20% DI NAIK
HARGA RATA -
SAFETY 2.5% BULAT ATAU
RATA
SEMARANG 22.5% KAN TURUN
25 26 27 28 29
56,900
26,167 32,054 32,100 (1,300)
28,000 97,440 97,500 4,700
46,000
49,500
52,500
21,300
73,200
98,600
10,700
17,400
600
800
12,600
6,300
10,000 12,250 12,300 1,300
25,000 30,625 30,700 9,800
11,550,000 11,550,000 550,000
14,437,500
131,670 131,700 6,300
173,300
57,800
6,930,000
8,085,000 8,085,000 385,000
3,753,750 3,753,800 178,800
5,800
577,500 577,500 27,500
693,000
693,000
288,800
144,400
288,750 288,800 13,800
294,000
63,525 63,600 3,100
36,750 36,800 1,800
23,100
14,700
6,300 6,300 300
40,950 41,000 2,000
17,850 17,900 900
7,400
11,600
20,000
15,800
52,500
15,800
7,400
12,600
file:///conversion/tmp/scratch/385673381.xlsx
SENTRAL INDO 20% DI NAIK
HARGA RATA -
SAFETY 2.5% BULAT ATAU
RATA
SEMARANG 22.5% KAN TURUN
25 26 27 28 29
58,800
36,800
12,600
600
18,900
17,900
23,100
32,400
9,300
34,700
110,300
14,500
20,300
7,000
5,800
1,100
63,000
314,000
40,500
6,600
444,700
367,500
26,300
3,500
34,200
18,400
131,700
89,000
24,200
840,000
1,617,000
54,600
10,500
68,300
7,900
8,400
21,000
16,800
19,200
51,200
194,300
236,300
787,500
498,800
417,400
2,100
252,600
91,900
44,700
file:///conversion/tmp/scratch/385673381.xlsx
SENTRAL INDO 20% DI NAIK
HARGA RATA -
SAFETY 2.5% BULAT ATAU
RATA
SEMARANG 22.5% KAN TURUN
25 26 27 28 29
42,000
31,500
102,900
121,500
32,600
182,200
29,400
524,000
1,627,500
94,500
27,300
44,600
14,200
20,500
27,300
120,300
198,000
206,900
246,800
28,153,200
22,050,000
21,721,900
21,328,200
20,606,300
20,606,300
8,990,700
4,593,800
118,200
39,400
2,913,800
file:///conversion/tmp/scratch/385673381.xlsx
SENTRAL INDO 20% DI NAIK
HARGA RATA -
SAFETY 2.5% BULAT ATAU
RATA
SEMARANG 22.5% KAN TURUN
25 26 27 28 29
2,478,245 2,478,245 3,035,850 3,035,900 987,750
7,054,905 7,054,905 8,642,259 8,642,300 2,811,800
13,200
8,925 9,000 500
2,100
4,800
4,800
3,800
32,900
19,200
13,100
69,300
92,700
37,500,000
31,250,000
15,625,000
8,750,000
6,875,000
6,250,000
5,625,000
4,375,000
4,062,500
3,750,000
519,300
129,700
519,300
324,500
55,700
52,000
463,600
540,800
850,000
385,900
463,600
772,300
193,200
224,200
240,000
21,000
124,800
file:///conversion/tmp/scratch/385673381.xlsx
SENTRAL INDO 20% DI NAIK
HARGA RATA -
SAFETY 2.5% BULAT ATAU
RATA
SEMARANG 22.5% KAN TURUN
25 26 27 28 29
10,500
file:///conversion/tmp/scratch/385673381.xlsx
KET.
30
file:///conversion/tmp/scratch/385673381.xlsx
KET.
30
file:///conversion/tmp/scratch/385673381.xlsx
KET.
30
file:///conversion/tmp/scratch/385673381.xlsx
KET.
30
file:///conversion/tmp/scratch/385673381.xlsx
KET.
30
file:///conversion/tmp/scratch/385673381.xlsx
KET.
30
file:///conversion/tmp/scratch/385673381.xlsx
KET.
30
file:///conversion/tmp/scratch/385673381.xlsx
KET.
30
file:///conversion/tmp/scratch/385673381.xlsx
KET.
30
file:///conversion/tmp/scratch/385673381.xlsx
KET.
30
file:///conversion/tmp/scratch/385673381.xlsx
KET.
30
file:///conversion/tmp/scratch/385673381.xlsx
KET.
30
file:///conversion/tmp/scratch/385673381.xlsx
KET.
30
file:///conversion/tmp/scratch/385673381.xlsx
DAFTAR HARGA SATUAN BAHAN
DINAS PEKERJAAN UMUM KABUPATEN REMBANG
UNTUK TAHUN 2011
1 2 3 4
I BAHAN DASAR
1 BATU KALI Bulat Utuh m3
Bulat Belah m3
Pecah 5/7 m3
Pecah 3/5 m3
Tempel m2
Batu apung kg
2 KERIKIL Sawur / Koral m3
Beton 0,5 / 1 m3
Beton 1 / 1 m4
Beton 1 / 2 m3
Beton 2 / 3 m3
Biasa m3
3 BATU BATA Ex lokal I bh
4 PASIR Urug m3
Pasang m3
Beton (Muntilan) m3
Beton (Cepu) m3
Sirtu (pasir batu) m3
Sirtu royalty m3
Grosok m3
Abu batu m3
Abu batu (Tayu) m3
Batu alam m2
5 TANAH Padas m3
Liat m3
Biasa m3
Pilihan m3
file:///conversion/tmp/scratch/385673381.xlsx 94
1 2 3 4
Genteng pres bh
Genteng Beton bh
Genteng keramik bh
Sirap bh
Genteng kerpus jatiwangi bh
Genteng kerpus lokal bh
Genteng kerpus Beton bh
Genteng kerpus keramik bh
Genteng Jatiwangi bh
5 ASBES GELOMBANG
Asbes gelombang ( 80 x 210 ) cm bh
Asbes gel. Kecil 5 mm (90 x 180) lbr
Asbes gel. Kecil 5 mm (120 x 240) lbr
Asbes gel. Besar 5 mm (90 x 180) lbr
Asbes gel. Besar 5 mm (120 x 240) lbr
Asbes gel. Kecil 0,8 x 1,80 m lbr
Asbes gel. Kecil 0,8 x 2,40 m lbr
file:///conversion/tmp/scratch/385673381.xlsx 95
1 2 3 4
6 ASBES PLAT
- 100cm X 100 cm X 5 mm bh
- 100cm X 200 cm X 5 mm bh
- 100cm X 240 cm X 5 mm bh
Sekrup asbes bh
7 SENG PLAT
BJLS 0,30 panjang 180 cm m'
BJLS 0,30 panjang 240 cm m'
BWG 28 x 80 m'
BWG 28 x 90 m'
8 SENG GELOMBANG
Seng gel. Kecil 0,70 x 1,80 m lbr
Seng gel. Kecil 0,70 x 2,10 m lbr
BJLS 0,28 m'
BJLS 0,28 panjang 180 cm lbr
BJLS 0,28 panjang 240 cm lbr
9 SENG TALANG
Seng talang BJLS 26 lebar 0,60 m'
Seng talang BJLS 26 lebar 0,90 m'
Seng talang BJLS 26 lebar 1,20 m'
III . B A H A N K A Y U
1 JATI Papan m3
Balok/pesagen m3
2 KAMPER Papan m3
Balok/pesagen m3
3 KRUING Papan m3
Balok/pesagen m3
4 MERANTI Papan m3
Balok/pesagen m3
5 LANAN Papan m3
Balok/pesagen m3
6 BENGKIRAI Papan m3
Balok/pesagen m3
2 KERAMIK
Keramik warna (KW-1) 30 X 30 cm m2
Keramik warna (KW-2) 30 X 30 cm m2
Keramik putih (KW-1) 30 X 30 cm m2
file:///conversion/tmp/scratch/385673381.xlsx 96
1 2 3 4
4 GRANITO
Granito 40 x 40 polished (lokal) m2
Granito 40 x 40 polished (import) m2
Granito 60 x 60 polished (lokal) m2
Granito 60 x 60 polished (import) m2
5 GRANIT
Granit lokal m2
Granit import m2
Batu Tempel m2
V.BAHAN CETAK
1 BUIS BETON O dan U
Ø 15 cm - 100 cm bh
Ø 20 cm - 100 cm bh
Ø 25 cm - 100 cm bh
Ø 30 cm - 100 cm bh
Ø 40 cm - 100 cm bh
Ø 50 cm - 100 cm bh
Ø 60 cm - 100 cm bh
Ø 80 cm - 100 cm bh
Ø 100 cm - 100 cm bh
U 15 cm - 100 cm bh
U 20 cm - 100 cm bh
U 30 cm - 100 cm bh
VI . B A H A N B E S I
1 BESI BETON
Besi beton polos kg
Besi beton prestress kg
Besi beton ulir kg
2 BESI PLAT
Besi Strip kg
3 BAJA
Baja profil " L" dan "C" kg
Baja profil "IWF" kg
4 KAWAT
Kawat Ikat beton/bendrat kg
Kawat bronjong kg
Kawat las listrik kg
VII . B A H A N P I P A
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC. S. 12,5 ø 1/2" m'
Pipa PVC. S. 12,5 ø 3/4" m'
Pipa PVC. S. 12,5 ø 1" m'
Pipa PVC. S. 12,5 ø 1-1/4" m'
Pipa PVC. S. 12,5 ø 1-1/2" m'
Pipa PVC. S. 12,5 ø 2" m'
Pipa PVC. S. 12,5 ø 2-1/2" m'
file:///conversion/tmp/scratch/385673381.xlsx 97
1 2 3 4
VIII . B A H A N L A N G I T - L A N G I T
PLY WOOD
- Teak wood
120 X 240 X 4 mm lbr
- Tripleks
120 X 240 X 3 mm lbr
120 X 240 X 4 mm lbr
120 X 240 X 6 mm lbr
- Multipleks
. 120 X 240 X 9 mm lbr
. 120 X 240 X 12 mm lbr
Harplek 60 x 200 lbr
Harplek 50 x 200 lbr
file:///conversion/tmp/scratch/385673381.xlsx 98
1 2 3 4
XII . B A H A N F I N I S H I N G
1 KAYU
Menie kg
Plamur kayu kg
Ambril/amplas lbr
Cat kayu (cukup) kg
Cat kayu (baik) kg
Siralax kg
Spiritus ltr
Dempul kg
Plinkut kg
Wood filer (INFRA) kg
Oker putih kg
Oker warna kg
Melamin kg
Kuwas 3" bh
Thinner Super daimaru liter
Thinner A liter
Foxi Cat Kg
2 TEMBOK
Kapur sirih kg
Plamur kg
Cat Tembok dalam (cukup) kg
Cat Tembok dalam (baik) kg
Cat Tembok luar (cukup) kg
Cat Tembok luar (baik)
Roll cat bh
3 BESI
Menie kg
Cat besi (baik) kg
Cat besi (cukup) kg
Minyak cat ltr
Lem Aica Aibon kg
Amplas Besi lbr
Ampelas norton no.3 buah
Ampelas Dico no.280 buah
Ampelas Dico no.120 buah
XIII. B A H A N K A C A
Bening 5 mm m2
Rayband 5 mm m2
file:///conversion/tmp/scratch/385673381.xlsx 99
1 2 3 4
Engsel H bh
Engsel Nylon bh
Grendel bh
Hak Angin bh
file:///conversion/tmp/scratch/385673381.xlsx 100
1 2 3 4
XXIII. L A I N - L A I N
1 Alat bantu (harga rata-rata) lot
2 Aspal kg
3 Minyak aspal ltr
4 Bensin ltr
5 Solar liter
6 Minyak tanah ltr
7 Olie (minyak pelumas) liter
8 Stempet Kg
9 Gebalan rumput m2
10 Wiremesh MS m2
11 Kayu bakar m3
12 Pintu Ronsel Doble 200 x 200 x 300 buah
13 Pintu Ronsel Doble 150 x 150 x 300 buah
14 Pintu Ronsel Engkel 100 x 100 x 300 buah
15 Pintu Intake 100 x 100 x 300 buah
16 Pintu Intake 90 x 100 x 300 buah
17 Pintu Intake 80 x 80 x 300 buah
18 Pintu Intake 60 x 60 x 300 buah
19 Pintu Intake 50 x 50 x 300 buah
20 Pintu Intake 40 x 40 x 300 buah
21 Pintu Intake 30 x 40 x 300 buah
22 Nomenklatur Marmer ( 30 x 40 ) buah
23 Nomenklatur Marmer ( 15 x 20 ) buah
24 Pile Scale ( 20 x 100 ) buah
25 Pile Scale ( 12 x 100 ) buah
26 Lapisan kedap air kg
27 Nako lengkap daun
28 PAGAR BRC. Pagar BRC 90 A1 /lb
Pagar BRC 120 A1 /lb
Pagar BRC 150 A1 /lb
Pagar BRC 90 A2 /lb
Pagar BRC 120 A2 /lb
Pagar BRC 150 A2 /lb
Pipa Tiang BRC 90 - 2" unit
file:///conversion/tmp/scratch/385673381.xlsx 101
1 2 3 4
file:///conversion/tmp/scratch/385673381.xlsx 102
R HARGA SATUAN BAHAN
AAN UMUM KABUPATEN REMBANG
UNTUK TAHUN 2011
edisi januari 2011
HARGA (Rp)
126,100
95,700
137,900
208,550
91,900
18,400
27,500
261,250
238,400
248,950
246,850
28,450
425
61,950
144,800
309,430
171,950
106,600
79,700
119,500
116,950
211,200
90,100
33,650
55,000
49,950
68,750
196,000
2,750
65,625
54,500
91,200
11,250
897,850
952,875
994,250
116,600
258,950
2,750
9,075
1,000
2,900
1,200
1,200
file:///conversion/tmp/scratch/385673381.xlsx 103
5
1,000
4,400
11,100
6,300
10,550
3,200
9,075
19,350
3,850
45,850
53,850
80,850
88,200
105,950
47,750
61,950
file:///conversion/tmp/scratch/385673381.xlsx 104
5
19,050
52,800
67,750
1,450
54,850
71,225
42,075
47,200
54,700
63,150
81,200
53,900
68,000
23,450
33,450
50,850
15,312,500
15,312,500
8,881,300
8,881,300
6,125,000
6,125,000
3,281,300
3,281,300
3,281,300
3,281,300
8,779,200
8,779,200
35,700
2,062,500
602,600
17,050
4,200
4,855,125
2,589,400
206,250
6,500
31,050
23,900
28,750
48,750
44,450
39,850
file:///conversion/tmp/scratch/385673381.xlsx 105
5
38,400
55,650
48,200
52,900
43,700
607,450
1,019,425
1,381,100
462,825
505,000
461,000
481,250
131,300
241,800
67,375
39,050
55,000
58,550
68,750
87,800
108,050
128,600
195,250
294,000
54,000
42,450
52,250
11,100
18,550
15,200
16,200
18,500
19,400
17,850
18,550
33,000
4,500
7,100
11,275
14,600
22,800
34,100
49,700
file:///conversion/tmp/scratch/385673381.xlsx 106
5
72,600
105,500
175,100
227,600
354,700
557,400
875,700
1,513,600
5,800
6,900
8,600
16,000
23,500
43,500
65,000
119,300
162,050
303,700
98,550
55,800
72,300
91,950
135,200
202,850
18,200
15,750
file:///conversion/tmp/scratch/385673381.xlsx 107
5
9,200
11,700
29,975
110,000
73,500
82,500
55,825
59,675
25,200
7,600
252,500
22,450
21,150
3,550
44,400
56,100
77,800
11,900
20,350
25,200
34,450
24,900
25,200
76,350
7,600
30,100
23,700
36,550
900
19,250
20,000
25,700
21,400
25,700
18,600
16,100
54,000
50,300
16,050
53,100
6,150
6,700
3,750
3,750
96,250
106,600
7,900
154,800
66,800
file:///conversion/tmp/scratch/385673381.xlsx 108
5
5,950
7,150
10,450
19,500
584,450
123,750
501,950
261,250
file:///conversion/tmp/scratch/385673381.xlsx 109
5
16,750
26,000
22,800
4,950
18,300
13,700
53,100
2,651,350
4,639,150
6,797,175
59,500
36,750
102,100
46,000
51,800
55,000
22,250
76,700
103,300
11,100
18,150
71,250
13,750
9,500
2,200
4,500
4,500
10,000
20,000
20,050
13,700
72,600
97,100
41,250,000
37,500,000
17,187,500
9,625,000
7,562,500
6,875,000
6,187,500
4,812,500
4,468,750
4,125,000
543,950
135,850
543,950
339,900
58,300
54,450
485,650
566,500
890,450
404,250
485,650
809,050
193,200
file:///conversion/tmp/scratch/385673381.xlsx 110
5
224,200
240,000
22,000
130,680
11,000
file:///conversion/tmp/scratch/385673381.xlsx 111
DAFTAR ANALISA SATUAN PEKERJAAN
DINAS PEKERJAAN UMUM KABUPATEN REMBANG
UNTUK TAHUN 2011
1 2 3 4 5
I A PEKERJAAN PERSIAPAN
file:///conversion/tmp/scratch/385673381.xlsx 112
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
file:///conversion/tmp/scratch/385673381.xlsx 113
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
file:///conversion/tmp/scratch/385673381.xlsx 114
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
0.0300 Org Kepala tukang kayu
A.20 a
Biaya setiap jarak pengangkutan/langsiran 1 m3 Material = K : (
275.0000
A.21 a
Biaya setiap jarak pengangkutan / langsiran 1 zak semen = K : (
275.0000
file:///conversion/tmp/scratch/385673381.xlsx 115
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
II B PEKERJAAN TANAH
B.7 1M3 Urugan Kembali (dihitung 1/3 kali indeks pekerjaan galian)
B.8 1M3 Pemadatan Tanah
0.500 OH Pekerja
0.300 OH Pekerja
0.800 OH Pekerja
0.400 OH Tukang Batu
0.040 OH Kepala Tukang
0.150 OH Pekerja
file:///conversion/tmp/scratch/385673381.xlsx 116
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
0.250 OH Pekerja
file:///conversion/tmp/scratch/385673381.xlsx 117
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
B.19 1 M3 PEK. GALIAN TANAH MAX KEDALAMAN 2 M' DENGAN ALAT EXAVATOR 0
0.005 unit Excavator 0,7 m3
0.704 liter Solar
0.018 liter Olie (minyak pelumas)
0.005 Kg Stempet
0.005 org Operator Alat Berat
0.005 org Pemb. Operator Alat Berat
0.005 org Pekerja
B.20 1 M3 PEK. GALIAN TANAH MAX KEDALAMAN 5 M' DENGAN ALAT EXAVATOR 0
0.006 unit Excavator 0,7 m3
0.921 liter Solar
0.024 liter Olie (minyak pelumas)
0.006 Kg Stempet
0.006 org Operator Alat Berat
0.006 org Pemb. Operator Alat Berat
0.006 org Pekerja
file:///conversion/tmp/scratch/385673381.xlsx 118
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
B.24 1 M3. MENGANGKUT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUM
JARAK ANTARA 3 S/D 5 KM.
0.0320 buah Dump Truck
0.8003 liter Solar
0.0320 liter Olie
0.0160 Kg Stempet
0.0320 org Sopir
0.0320 org Pekerja
file:///conversion/tmp/scratch/385673381.xlsx 119
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
B.33 1 M2 URUGAN PAKAI ALAT BESAR TANAH DARI LUAR DIPADATKAN (U/5000 M
0.6000 m3 Pekerjaan galian (10 org) 50 % (Analis B1)
0.6000 m3 Pek. Galian tanah berbatu (10 org) 50 % (Analis B17)
5.0000 m3 Pek. Grading plant (10) 50 % (5 x Analis B5)
1.2000 m3 Beli tanah biasa + angkut max 10 km
1.500 OH Pekerja
0.600 OH Tukang Batu
0.060 OH Kepala Tukang
file:///conversion/tmp/scratch/385673381.xlsx 120
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
1.5000 org Pekerja
0.6000 org Tukang batu
0.0600 org Kepala tukang batu
1.500 OH Pekerja
0.600 OH Tukang Batu
0.060 OH Kepala Tukang
file:///conversion/tmp/scratch/385673381.xlsx 121
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
. 1.500 OH Pekerja
0.600 OH Tukang Batu
0.060 OH Kepala Tukang
. 0.700 OH Pekerja
0.390 OH Tukang Batu
0.039 OH Kepala Tukang
C.5 1M3 Pasang Pondasi Siklop 60% Beton Camp. 1PC : 2PS : 3KR &
40% Batu Belah
0.480 m3 Batu Belah 15/20
126.000 Kg Besi Beton
194.000 Kg Portland Semen
0.312 m3 Pasir Beton (Cepu)
0.468 m3 Koral Beton
1.800 Kg Kawat Beton
3.000 OH Pekerja
0.850 OH Tukang Batu
0.085 OH Kepala Tukang
2.380 OH Pekerja
0.300 OH Tukang Batu
0.030 OH Kepala Tukang
1.000 OH Pekerja
file:///conversion/tmp/scratch/385673381.xlsx 122
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
0.670 OH Tukang Batu
0.067 OH Kepala Tukang
file:///conversion/tmp/scratch/385673381.xlsx 123
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
IV D P E K E R JAAN DINDING
0.3000 OH Pekerja
0.1000 OH Tukang Batu
0.0100 OH Kepala Tukang
0.3000 OH Pekerja
file:///conversion/tmp/scratch/385673381.xlsx 124
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
0.1000 OH Tukang Batu
0.0100 OH Kepala Tukang
0.3000 OH Pekerja
0.1000 OH Tukang Batu
0.0100 OH Kepala Tukang
file:///conversion/tmp/scratch/385673381.xlsx 125
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
V E PEKERJAAN PLESTERAN
file:///conversion/tmp/scratch/385673381.xlsx 126
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
7.7600 Kg Portland Semen
0.0230 m3 Pasir Pasang
0.2000 OH Pekerja
0.1500 OH Tukang batu
0.0015 OH Kepala Tukang
0.2200 OH Pekerja
0.1200 OH Tukang batu
0.0120 OH Kepala Tukang
file:///conversion/tmp/scratch/385673381.xlsx 127
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
0.2000 OH Pekerja
0.1500 OH Tukang batu
0.0015 OH Kepala Tukang
0.2600 OH Pekerja
0.2000 OH Tukang batu
0.0200 OH Kepala Tukang
0.1500 OH Pekerja
0.0700 OH Tukang batu
0.0070 OH Kepala Tukang
0.2500 OH Pekerja
0.1000 OH Tukang batu
0.0100 OH Kepala Tukang
0.3000 OH Pekerja
0.1400 OH Tukang batu
0.0140 OH Kepala Tukang
0.1500 OH Pekerja
0.1000 OH Tukang batu
file:///conversion/tmp/scratch/385673381.xlsx 128
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
0.0100 OH Kepala Tukang
VI F PEKERJAAN K A Y U
F.1 1M3 Membuat Kosen Pintu & Jendela Kayu klas I
1.1000 m3 Kayu Klas I (Jati) , Balok
1.2500 Kg Paku Biasa 2" - 5 "
1.0000 Kg Lem Kayu
6.0000 OH Pekerja
20.0000 OH Tukang Kayu
2.0000 OH Kepala Tukang
6.0000 OH Pekerja
20.0000 OH Tukang Kayu
2.0000 OH Kepala Tukang
0.3500 OH Pekerja
1.0500 OH Tukang Kayu
0.1050 OH Kepala Tukang
1.0000 OH Pekerja
2.5000 OH Tukang Kayu
0.2500 OH Kepala Tukang
0.8000 OH Pekerja
2.0000 OH Tukang Kayu
0.2000 OH Kepala Tukang
F.6 1M2 Membuat Pintu & Jendela Jalusi Kayu Kelas I (Jati)
0.0640 m3 Kayu Kelas I (Jati), papan
0.5000 kg Lem Kayu
1.0000 OH Pekerja
3.0000 OH Tukang Kayu
0.3000 OH Kepala Tukang
F.7 1M2 Membuat Pintu Plywood Rangkap rangka Kayu Bengkirai lbr s/d
file:///conversion/tmp/scratch/385673381.xlsx 129
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
0.0250 m3 Kayu Bengkirai, papan
0.0300 Kg Paku Biasa 1/2" - 1"
0.5000 Kg Lem Kayu
1.0000 Lbr Plywood tebal 4 mm
0.6000 OH Pekerja
2.0000 OH Tukang Kayu
0.2000 OH Kepala Tukang
F.8 1M2 Membuat Pintu Plywood rangkap, rangka expose kayu Bengkirai
0.0256 m3 Kayu Bengkirai, papan
0.0300 Kg Paku Biasa 1/2" - 1"
0.5000 Kg Lem Kayu
1.0000 Lbr Plywood tebal 4 mm uk.90x220cm
0.8000 OH Pekerja
2.0000 OH Tukang Kayu
0.2000 OH Kepala Tukang
0.5000 OH Pekerja
2.0000 OH Tukang Kayu
0.2000 OH Kepala Tukang
0.5000 OH Pekerja
2.0000 OH Tukang Kayu
0.2000 OH Kepala Tukang
file:///conversion/tmp/scratch/385673381.xlsx 130
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
F.11 1M2 Membuat Pintu Teakwood Rangkap Rangka Kayu Kelas I (jati)
0.0250 m3 Kayu Kelas I (Jati), papan
0.0300 Kg Paku Biasa 1/2" - 1"
0.3000 Kg Lem Kayu
1.0000 Lbr Teakwood tebal 4 mm
0.8000 OH Pekerja
2.0000 OH Tukang Kayu
0.2000 OH Kepala Tukang
F.12 1M2 Membuat Pintu Teakwood Rangkap Lapis Formika Rangka ekspo
Kayu Bengkirai
0.0250 m3 Kayu Bengkirai, papan
0.0300 Kg Paku Biasa 1/2" - 1"
0.0800 Kg Lem Kayu
1.0000 Lbr Teakwood tebal 4 mm
0.5000 Lbr Formika
0.8000 OH Pekerja
2.5000 OH Tukang Kayu
0.2500 OH Kepala Tukang
F.14 1 M2 DAUN PINTU TRIPLEK DOUBLE UKURAN PINTU LAPIS FORMIKA ( KM/W
0.0150 m3 Rangka kayu bengkirai (ram pintu)
1.0000 lbr Triplek 4 mm ukuran pintu
0.5000 lbr Formika
0.2000 kg Paku triplek
0.5000 kg Lem putih ( FOX )
0.2000 kg Lem kuning ( aica aibon )
4.0000 OH Pekerja
12.0000 OH Tukang Kayu
1.2000 OH Kepala Tukang
file:///conversion/tmp/scratch/385673381.xlsx 131
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
6.0000 OH Pekerja
20.0000 OH Tukang Kayu
2.0000 OH Kepala Tukang
2.4000 OH Pekerja
7.2000 OH Tukang Kayu
0.7200 OH Kepala Tukang
file:///conversion/tmp/scratch/385673381.xlsx 132
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
F.18 1M2 Pasang Pintu Plywood & Formika Rangka Kayu Bengkirai
0.0196 m3 Kayu Bengkirai, papan
0.0300 Kg Paku Biasa 1/2" - 1"
0.3000 Kg Lem Kayu
0.5000 Lbr Plywood tebal 4 mm
1.0000 Lbr Formika
0.8000 OH Pekerja
2.5000 OH Tukang Kayu
0.2500 OH Kepala Tukang
1.0000 OH Pekerja
2.6000 OH Tukang Kayu
0.2600 OH Kepala Tukang
0.1000 OH Pekerja
0.1000 OH Tukang Kayu
0.0100 OH Kepala Tukang
0.1000 OH Pekerja
0.1000 OH Tukang Kayu
0.0100 OH Kepala Tukang
0.1200 OH Pekerja
0.1200 OH Tukang Kayu
0.0120 OH Kepala Tukang
file:///conversion/tmp/scratch/385673381.xlsx 133
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
0.1000 OH Pekerja
0.2000 OH Tukang Kayu
0.0250 OH Kepala Tukang
0.1000 OH Pekerja
0.2000 OH Tukang Kayu
0.0200 OH Kepala Tukang
0.1500 OH Pekerja
0.2500 OH Tukang Kayu
0.0250 OH Kepala Tukang
0.1500 OH Pekerja
0.4500 OH Tukang Kayu
0.0450 OH Kepala Tukang
F.27 1M2 Pas. Dinding Pemisah Teakwood Rangkap Rangka Kayu Bengkira
0.0280 m3 Kayu Bengkirai, balok
0.1500 Kg Paku Biasa 2" - 5"
0.8600 Lbr Teakwood tebal 4mm
0.5600 Kg Lem kayu
0.1500 OH Pekerja
0.4500 OH Tukang Kayu
0.0450 OH Kepala Tukang
0.6000 OH Pekerja
1.8000 OH Tukang Kayu
0.1800 OH Kepala Tukang
0.0250 OH Pekerja
0.0750 OH Tukang Kayu
file:///conversion/tmp/scratch/385673381.xlsx 134
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
0.0075 OH Kepala Tukang
0.1000 OH Pekerja
0.0500 OH Tukang Kayu
0.0050 OH Kepala Tukang
G.1 1M3 Membuat Beton mutu f'c=7,4 Mpa (K100), slum (12±2)cm, w/c = 0,
247.0000 Kg Portland Semen
0.6207 m3 Pasir Beton (Cepu)
0.7400 m3 Kerikil (maksimum 30 mm)
1.6500 OH Pekerja
0.2750 OH Tukang Batu
0.0280 OH Kepala Tukang
G.2 1M3 Membuat Beton mutu f'c=9,8 Mpa (K125), slum (12±2)cm, w/c = 0,
276.0000 Kg Portland Semen
0.5914 m3 Pasir Beton (Cepu)
0.7496 m3 Kerikil (maksimum 30 mm)
1.6500 OH Pekerja
0.2750 OH Tukang Batu
0.0280 OH Kepala Tukang
G.3 1M3 Membuat Beton mutu f'c=12,2 Mpa (K150), slum (12±2)cm, w/c = 0
299.0000 Kg Portland Semen
0.5707 m3 Pasir Beton (Cepu)
0.7533 m3 Kerikil (maksimum 30 mm)
1.6500 OH Pekerja
0.2750 OH Tukang Batu
0.0280 OH Kepala Tukang
G.4 1M3 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c =
230.0000 Kg Portland Semen
0.6379 m3 Pasir Beton (Cepu)
0.7607 m3 Kerikil (maksimum 30 mm)
1.2000 OH Pekerja
0.2000 OH Tukang Batu
0.0200 OH Kepala Tukang
G.5 1M3 Membuat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c =
326.0000 Kg Portland Semen
0.5429 m3 Pasir Beton (Cepu)
0.7622 m3 Kerikil (maksimum 30 mm)
file:///conversion/tmp/scratch/385673381.xlsx 135
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
1.6500 OH Pekerja
0.2500 OH Tukang Batu
0.0250 OH Kepala Tukang
G.6 1M3 Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm,w/c = 0
352.0000 Kg Portland Semen
0.5221 m3 Pasir Beton (Cepu)
0.7637 m3 Kerikil (maksimum 30 mm)
1.6500 OH Pekerja
0.2500 OH Tukang Batu
0.0250 OH Kepala Tukang
G.7 1M3 Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c =
371.0000 Kg Portland Semen
0.4986 m3 Pasir Beton (Cepu)
0.7756 m3 Kerikil (maksimum 30 mm)
1.6500 OH Pekerja
0.2500 OH Tukang Batu
0.0250 OH Kepala Tukang
G.8 1M3 Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm,w/c = 0
384.0000 Kg Portland Semen
0.4943 m3 Beton (Muntilan)
0.7696 m3 Kerikil (maksimum 30 mm)
1.6500 OH Pekerja
0.2500 OH Tukang Batu
0.0250 OH Kepala Tukang
G.9 1M3 Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (12±2)cm, w/c
406.0000 Kg Portland Semen
0.4886 m3 Beton (Muntilan)
0.7600 m3 Kerikil (maksimum 30 mm)
1.6500 OH Pekerja
0.2500 OH Tukang Batu
0.0250 OH Kepala Tukang
G.10 1M3 Membuat Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm,w/c = 0
413.0000 Kg Portland Semen
0.4864 m3 Beton (Muntilan)
0.7563 m3 Kerikil (maksimum 30 mm)
1.6500 OH Pekerja
0.2500 OH Tukang Batu
0.0250 OH Kepala Tukang
G.11 1M3 Membuat Beton mutu f'c=28,8 MPa (K325), slum (12±2)cm,w/c = 0
439.0000 Kg Portland Semen
0.4786 m3 Beton (Muntilan)
0.7452 m3 Kerikil (maksimum 30 mm)
2.1000 OH Pekerja
file:///conversion/tmp/scratch/385673381.xlsx 136
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
0.3500 OH Tukang Batu
0.0350 OH Kepala Tukang
file:///conversion/tmp/scratch/385673381.xlsx 137
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
G.12 1M3 Membuat Beton mutu f'c=31,2 MPa (K350), slum (12±2)cm, w/c =
448.0000 Kg Portland Semen
0.4764 m3 Beton (Muntilan)
0.7407 m3 Kerikil (maksimum 30 mm)
2.1000 OH Pekerja
0.3500 OH Tukang Batu
0.0350 OH Kepala Tukang
0.0070 OH Pekerja
0.0070 OH Tukang Besi
0.0007 OH Kepala Tukang
0.0050 OH Pekerja
0.0050 OH Tukang Besi
0.0005 OH Kepala Tukang
0.5200 OH Pekerja
0.2600 OH Tukang Kayu
0.0260 OH Kepala Tukang
G.15a 1M3 Pasang Bekisting Sloof, Ringbalk, Kolom, Balok Lantai dengan P
0.3996 m3 Kayu Perancah
0.4000 Kg Paku biasa 2" - 5"
0.3000 OH Pekerja
0.5000 OH Tukang Kayu
0.0500 OH Kepala Tukang
0.5200 OH Pekerja
0.2600 OH Tukang Kayu
0.0260 OH Kepala Tukang
file:///conversion/tmp/scratch/385673381.xlsx 138
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
0.6600 OH Pekerja
0.3300 OH Tukang Kayu
0.0330 OH Kepala Tukang
file:///conversion/tmp/scratch/385673381.xlsx 139
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
0.6600 OH Pekerja
0.3300 OH Tukang Kayu
0.0330 OH Kepala Tukang
0.6600 OH Pekerja
0.3300 OH Tukang Kayu
0.0330 OH Kepala Tukang
0.6600 OH Pekerja
0.3300 OH Tukang Kayu
0.0330 OH Kepala Tukang
0.6600 OH Pekerja
0.3300 OH Tukang Kayu
0.0330 OH Kepala Tukang
file:///conversion/tmp/scratch/385673381.xlsx 140
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
0.1500 OH Pekerja
0.0500 OH Tukang Kayu
0.0050 OH Kepala Tukang
file:///conversion/tmp/scratch/385673381.xlsx 141
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
5.3000 OH Pekerja
0.2750 OH Tukang batu
1.3000 OH Tukang Kayu
1.0500 OH Tukang Besi
0.2620 OH Kepala Tukang
5.6500 OH Pekerja
0.2750 OH Tukang batu
1.5600 OH Tukang Kayu
1.4000 OH Tukang Besi
0.3230 OH Kepala Tukang
7.0500 OH Pekerja
0.2750 OH Tukang batu
1.6500 OH Tukang Kayu
2.1000 OH Tukang Besi
0.4030 OH Kepala Tukang
file:///conversion/tmp/scratch/385673381.xlsx 142
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
3.2000 Kg Paku Biasa 2" - 5"
1.6000 Ltr Minyak Bekisting
210.0000 Kg Besi Beton Polos
3.0000 Kg Kawat Beton
336.0000 Kg Portland Semen
0.5400 m3 Pasir Beton (Cepu)
0.8100 m3 Koral Beton
0.1400 m3 Kayu Balok
2.8000 Lbr Plywood 9 mm
18.0000 Btg Dolken diameter 8 / 4mm
6.3500 OH Pekerja
0.2750 OH Tukang batu
1.6500 OH Tukang Kayu
1.4000 OH Tukang Besi
0.3330 OH Kepala Tukang
file:///conversion/tmp/scratch/385673381.xlsx 143
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
5.3000 OH Pekerja
0.2750 OH Tukang batu
1.3000 OH Tukang Kayu
1.0500 OH Tukang Besi
0.2650 OH Kepala Tukang
5.3000 OH Pekerja
0.2750 OH Tukang batu
1.3000 OH Tukang Kayu
1.0500 OH Tukang Besi
0.2620 OH Kepala Tukang
5.6500 OH Pekerja
0.2750 OH Tukang batu
file:///conversion/tmp/scratch/385673381.xlsx 144
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
1.5600 OH Tukang Kayu
1.4000 OH Tukang Besi
0.3230 OH Kepala Tukang
0.1800 OH Pekerja
0.0200 OH Tukang batu
0.0200 OH Tukang Kayu
0.0200 OH Tukang Besi
0.0060 OH Kepala Tukang
file:///conversion/tmp/scratch/385673381.xlsx 145
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
0.2970 OH Pekerja
0.0330 OH Tukang batu
0.0330 OH Tukang Kayu
0.0330 OH Tukang Besi
0.0100 OH Kepala Tukang
file:///conversion/tmp/scratch/385673381.xlsx 146
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
0.1250 lot Peralatan (oksigen,solar,elpiji,kawat las)
file:///conversion/tmp/scratch/385673381.xlsx 147
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
0.1500 OH Pekerja
0.0750 OH Tukang Kayu
0.0080 OH Kepala Tukang
0.1500 OH Pekerja
0.0600 OH Tukang Kayu
0.0060 OH Kepala Tukang
0.4000 OH Pekerja
0.2000 OH Tukang Batu
0.0200 OH Kepala Tukang
0.1400 OH Pekerja
0.0750 OH Tukang Kayu
0.0080 OH Kepala Tukang
0.2000 OH Pekerja
0.1000 OH Tukang Kayu
0.0100 OH Kepala Tukang
file:///conversion/tmp/scratch/385673381.xlsx 148
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
H.6 1 M2 Pasang Atap Sirap
60.0000 Lbr Genteng Sirap
0.2000 Kg Paku Biasa 1/2" - 1"
0.1660 OH Pekerja
0.2500 OH Tukang Kayu
0.0250 OH Kepala Tukang
0.4000 OH Pekerja
0.2000 OH Tukang Batu
0.0200 OH Kepala Tukang
file:///conversion/tmp/scratch/385673381.xlsx 149
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
0.1250 OH Pekerja
0.2500 OH Tukang Kayu
0.0250 OH Kepala Tukang
0.1200 OH Pekerja
0.0600 OH Tukang Kayu
0.0060 OH Kepala Tukang
0.1500 OH Pekerja
0.0700 OH Tukang Kayu
0.0080 OH Kepala Tukang
0.0300 OH Pekerja
0.0700 OH Tukang Kayu
0.0070 OH Kepala Tukang
0.0700 OH Pekerja
0.1000 OH Tukang Kayu
0.0100 OH Kepala Tukang
0.6000 OH Pekerja
0.8000 OH Tukang Kayu
0.0800 OH Kepala Tukang
file:///conversion/tmp/scratch/385673381.xlsx 150
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
I.4 1 M2 Langit-langit Gypsum Board, tebal 9 mm
0.3640 Lbr Gypsum Board
0.1100 Kg Paku Sekrup
0.1000 OH Pekerja
0.0500 OH Tukang Kayu
0.0050 OH Kepala Tukang
0.0500 OH Pekerja
0.0500 OH Tukang Kayu
0.0050 OH Kepala Tukang
file:///conversion/tmp/scratch/385673381.xlsx 151
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
0.1500 OH Pekerja
0.2500 OH Tukang Kayu
0.0250 OH Kepala Tukang
0.1500 OH Pekerja
0.2500 OH Tukang Kayu
0.0250 OH Kepala Tukang
0.2000 OH Pekerja
0.3000 OH Tukang Kayu
0.0300 OH Kepala Tukang
3.3000 OH Pekerja
1.1000 OH Tukang Batu
0.0010 OH Kepala Tukang
1.0000 OH Pekerja
1.5000 OH Tukang Batu
1.5000 OH Kepala Tukang
1.2000 OH Pekerja
0.1450 OH Tukang Batu
0.1500 OH Kepala Tukang
file:///conversion/tmp/scratch/385673381.xlsx 152
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
0.6800 Kg Portland Semen
0.0560 m3 Pasir Pasang
0.0240 m3 Pasir Urug
0.1400 OH Pekerja
0.0700 OH Tukang Batu
0.0070 OH Kepala Tukang
0.3800 OH Pekerja
0.1900 OH Tukang Batu
0.0190 OH Kepala Tukang
file:///conversion/tmp/scratch/385673381.xlsx 153
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
0.0360 OH Pekerja
0.0600 OH Tukang Ledeng
0.0060 OH Kepala Tukang
0.0396 OH Pekerja
0.0660 OH Tukang Ledeng
0.0066 OH Kepala Tukang
0.0432 OH Pekerja
0.0720 OH Tukang Ledeng
0.0072 OH Kepala Tukang
0.0468 OH Pekerja
0.0780 OH Tukang Ledeng
0.0078 OH Kepala Tukang
0.0504 OH Pekerja
0.0840 OH Tukang Ledeng
0.0084 OH Kepala Tukang
0.0540 OH Pekerja
0.0900 OH Tukang Ledeng
0.0090 OH Kepala Tukang
0.0675 OH Pekerja
file:///conversion/tmp/scratch/385673381.xlsx 154
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
0.1125 OH Tukang Ledeng
0.0113 OH Kepala Tukang
0.0810 OH Pekerja
0.1350 OH Tukang Ledeng
0.0135 OH Kepala Tukang
file:///conversion/tmp/scratch/385673381.xlsx 155
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
0.0020 lot Alat Bantu
0.0600 OH Pekerja
0.0400 OH Tukang Ledeng
0.0700 OH Pekerja
0.1700 OH Tukang Ledeng
0.1950 OH Pekerja
0.0060 OH Kepala Tukang
0.0650 OH Tukang Ledeng
file:///conversion/tmp/scratch/385673381.xlsx 156
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
0.0900 OH Pekerja
0.2000 OH Tukang Ledeng
0.2550 OH Pekerja
0.0080 OH Kepala Tukang
0.0850 OH Tukang Ledeng
0.4000 OH Pekerja
0.0130 OH Kepala Tukang
0.1350 OH Tukang Ledeng
file:///conversion/tmp/scratch/385673381.xlsx 157
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
0.1000 m3 Pasir pasang
0.2000 Org Pekerja
0.3000 Org Tukang batu
0.0300 Org Kepala tukang batu
0.0500 lot Peralatan
file:///conversion/tmp/scratch/385673381.xlsx 158
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
file:///conversion/tmp/scratch/385673381.xlsx 159
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
1/500 x Biaya menggilas
1/200 x Sewa motor walls
1/2 x Aspal untuk lem 0,5 kg
file:///conversion/tmp/scratch/385673381.xlsx 160
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
1.0000 OH Tukang
3.0000 OH Pekerja
1.0000 lot Alat Bantu
1.0000 OH Tukang
3.1000 OH Pekerja
1.0000 lot Alat Bantu
1.1000 OH Tukang
3.2000 OH Pekerja
1.0000 lot Alat Bantu
1.2000 OH Tukang
3.3000 OH Pekerja
1.0000 lot Alat Bantu
file:///conversion/tmp/scratch/385673381.xlsx 161
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
1.5000 jam Excavator (+ operator)
1.3000 OH Tukang
3.4000 OH Pekerja
1.0000 lot Alat Bantu
1.4000 OH Tukang
3.5000 OH Pekerja
1.0000 lot Alat Bantu
1.5000 OH Tukang
3.6000 OH Pekerja
1.0000 lot Alat Bantu
1.0000 OH Tukang
2.4250 OH Pekerja
1.0000 lot Alat Bantu
1.0000 OH Tukang
2.4250 OH Pekerja
1.0000 lot Alat Bantu
0.0600 OH Pekerja
0.0600 OH Tukang Besi
0.0060 OH Kepala Tukang
0.0600 OH Pekerja
0.0600 OH Tukang Besi
0.0060 OH Kepala Tukang
file:///conversion/tmp/scratch/385673381.xlsx 162
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
1.0500 Lbr Seng Plaat
0.0150 Kg Paku Biasa 1 - 2,5 cm
0.0190 m3 Kayu Papan Klas II atau III
0.2000 OH Pekerja
0.4000 OH Tukang Kayu
0.0250 OH Kepala Tukang
K.4 1 M' Memasang Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS 30
Lebar 45 cm
1.0500 Lbr Seng Plaat
0.0100 Kg Paku Biasa 1 - 2,5 cm
0.5000 Kg Besi strip
0.1500 OH Pekerja
0.3000 OH Tukang Kayu
0.0300 OH Kepala Tukang
0.0100 OH Pekerja
0.5000 OH Tukang Kayu
0.0100 OH Kepala Tukang
0.0050 OH Pekerja
0.5000 OH Tukang Kayu
0.0050 OH Kepala Tukang
0.0150 OH Pekerja
0.1500 OH Tukang Kayu
0.0150 OH Kepala Tukang
file:///conversion/tmp/scratch/385673381.xlsx 163
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
0.0100 OH Pekerja
0.1000 OH Tukang Kayu
0.0100 OH Kepala Tukang
0.0200 OH Pekerja
0.2000 OH Tukang Kayu
0.0200 OH Kepala Tukang
0.0150 OH Pekerja
0.1500 OH Tukang Kayu
0.0150 OH Kepala Tukang
0.0200 OH Pekerja
0.2000 OH Tukang Kayu
0.0200 OH Kepala Tukang
0.0250 OH Pekerja
0.2500 OH Tukang Kayu
0.0250 OH Kepala Tukang
0.0150 OH Pekerja
0.1500 OH Tukang Kayu
0.0150 OH Kepala Tukang
0.2700 OH Pekerja
0.1300 OH Tukang Batu
0.0130 OH Kepala Tukang
file:///conversion/tmp/scratch/385673381.xlsx 164
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
6.9300 Buah Ubin Granito 40x40 cm
9.8000 Kg Portland Semen
0.0450 m3 Pasir Pasang
1.3000 Kg Semen Warna
0.2500 OH Pekerja
0.1200 OH Tukang Batu
0.0120 OH Kepala Tukang
0.6200 OH Pekerja
0.3500 OH Tukang Batu
0.0350 OH Kepala Tukang
file:///conversion/tmp/scratch/385673381.xlsx 165
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
0.6200 OH Pekerja
0.3500 OH Tukang Batu
0.0350 OH Kepala Tukang
0.6200 OH Pekerja
0.3500 OH Tukang Batu
0.0350 OH Kepala Tukang
0.6000 OH Pekerja
0.4500 OH Tukang Batu
0.0450 OH Kepala Tukang
0.6000 OH Pekerja
0.4500 OH Tukang Batu
0.0450 OH Kepala Tukang
0.7200 OH Pekerja
0.6500 OH Tukang Batu
0.0650 OH Kepala Tukang
file:///conversion/tmp/scratch/385673381.xlsx 166
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
M.9 1 M2 Pasang Dinding Batu Paros / Batu Tempel Hitam
1.1000 m2 Batu Paros
11.7500 Kg Portland Semen
0.0350 m3 Pasir Pasang
0.6200 OH Pekerja
0.3500 OH Tukang Batu
0.0350 OH Kepala Tukang
file:///conversion/tmp/scratch/385673381.xlsx 167
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
file:///conversion/tmp/scratch/385673381.xlsx 168
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
0.0200 Kg Minyak Cat
0.1000 lbr Amplas
0.0400 OH Pekerja
0.0400 OH Tukang Cat
0.0040 OH Kepala Tukang
0.0700 OH Pekerja
0.0750 OH Tukang Cat
0.0075 OH Kepala Tukang
file:///conversion/tmp/scratch/385673381.xlsx 169
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
0.0700 OH Pekerja
0.0090 OH Tukang Cat
0.0060 OH Kepala Tukang
0.0700 OH Pekerja
0.1050 OH Tukang Cat
0.0040 OH Kepala Tukang
0.0200 OH Pekerja
0.0630 OH Tukang Cat
0.0063 OH Kepala Tukang
0.0280 OH Pekerja
0.0420 OH Tukang Cat
0.0042 OH Kepala Tukang
0.0200 OH Pekerja
0.2000 OH Tukang Cat
0.0020 OH Kepala Tukang
0.2500 OH Pekerja
file:///conversion/tmp/scratch/385673381.xlsx 170
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
0.2250 OH Tukang Cat
0.0225 OH Kepala Tukang
0.5000 OH Pekerja
0.8000 OH Tukang Cat
0.3000 OH Kepala Tukang
file:///conversion/tmp/scratch/385673381.xlsx 171
No. KODE KOEF SAT. URAIAN PAKERJAAN
1 2 3 4 5
Rembang,
KEPALA DINAS PE
NIP. 19620715
file:///conversion/tmp/scratch/385673381.xlsx 172
ANALISA SATUAN PEKERJAAN
AAN UMUM KABUPATEN REMBANG
UNTUK TAHUN 2011
48,875.00 9,775.00
34,500.00 13,800.00
51,750.00 1,035.00
101,437.38
4,855,125.00 58,261.50
16,750.00 335.00
4,855,125.00 33,985.88
48,875.00 4,887.50
34,500.00 3,450.00
51,750.00 517.50
1,180,572.00
35,700.00 44,625.00
3,281,300.00 590,634.00
16,750.00 14,237.50
16,200.00 17,820.00
1,312.50 45,937.50
144,800.00 36,200.00
261,250.00 39,187.50
425.00 12,750.00
54,850.00 13,712.50
54,450.00 108,900.00
96,250.00 7,700.00
66,800.00 10,020.00
5,950.00 1,785.00
98,550.00 5,913.00
48,875.00 97,750.00
48,875.00 48,875.00
34,500.00 69,000.00
51,750.00 15,525.00
file:///conversion/tmp/scratch/385673381.xlsx 173
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
1,011,665.25
35,700.00 60,690.00
3,281,300.00 689,073.00
16,750.00 5,025.00
1,312.50 13,781.25
171,950.00 5,158.50
261,250.00 13,062.50
54,850.00 82,275.00
48,875.00 97,750.00
34,500.00 34,500.00
51,750.00 10,350.00
3,450.00
34,500.00 3,450.00
file:///conversion/tmp/scratch/385673381.xlsx 174
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
37,512.25
17,050.00 17,050.00
13,700.00 3,425.00
-
48,875.00 8,308.75
34,500.00 8,625.00
51,750.00 103.50
230,011.50
34,500.00 230,011.50
230,011.50
34,500.00 230,011.50
4,312.50
34,500.00 4,312.50
file:///conversion/tmp/scratch/385673381.xlsx 175
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
51,750.00 1,552.50
Keterangan :
K = Biaya
( L + 75 ))/25
a = Upah Pekerja
L = Jarak angkut
file:///conversion/tmp/scratch/385673381.xlsx 176
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
13,800.00
34,500.00 13,800.00
34,500.00
34,500.00 34,500.00
51,750.00
34,500.00 51,750.00
41,400.00
34,500.00 41,400.00
1,725.00
34,500.00 1,725.00
11,385.00
34,500.00 11,385.00
K = Biaya
a = Upah Pekerja
L = Jarak pembuangan
84,690.00
61,950.00 74,340.00
34,500.00 10,350.00
10,350.00
34,500.00 10,350.00
152,600.00
61,950.00 24,780.00
196,000.00 26,460.00
55,000.00 52,140.00
34,500.00 27,600.00
48,875.00 19,550.00
51,750.00 2,070.00
87,375.00
13,700.00 82,200.00
34,500.00 5,175.00
file:///conversion/tmp/scratch/385673381.xlsx 177
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
136,545.00
106,600.00 127,920.00
34,500.00 8,625.00
18,147.00
34,500.00 18,147.00
file:///conversion/tmp/scratch/385673381.xlsx 178
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
file:///conversion/tmp/scratch/385673381.xlsx 179
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
UT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRUCK
15,161.26
250,000.00 8,003.20
4,500.00 3,601.44
20,000.00 640.26
20,050.00 320.93
46,575.00 1,491.00
34,500.00 1,104.44
10,343.75
34,500.00 8,625.00
13,750.00 1,718.75
94,225.00
68,750.00 82,500.00
34,500.00 10,350.00
13,750.00 1,375.00
file:///conversion/tmp/scratch/385673381.xlsx 180
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
155,725.00
196,000.00 39,200.00
55,000.00 55,000.00
34,500.00 34,500.00
48,875.00 24,437.50
51,750.00 2,587.50
245,525.00
144,800.00 144,800.00
196,000.00 39,200.00
34,500.00 34,500.00
48,875.00 24,437.50
51,750.00 2,587.50
Err:509
34,500.00 8,625.00
Err:509 Err:509
13,750.00 1,718.75
5,346.88
34,500.00 5,175.00
13,750.00 171.88
1,896.88
34,500.00 1,725.00
13,750.00 171.88
534,373.00
95,700.00 114,840.00
1,312.50 265,125.00
144,800.00 70,228.00
34,500.00 51,750.00
48,875.00 29,325.00
51,750.00 3,105.00
478,683.50
95,700.00 105,270.00
1,312.50 213,937.50
144,800.00 75,296.00
file:///conversion/tmp/scratch/385673381.xlsx 181
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
34,500.00 51,750.00
48,875.00 29,325.00
51,750.00 3,105.00
456,291.20
95,700.00 114,840.00
1,312.50 178,500.00
144,800.00 78,771.20
34,500.00 51,750.00
48,875.00 29,325.00
51,750.00 3,105.00
file:///conversion/tmp/scratch/385673381.xlsx 182
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
379,136.10
95,700.00 114,840.00
1,312.50 80,062.50
196,000.00 28,812.00
144,800.00 71,241.60
34,500.00 51,750.00
48,875.00 29,325.00
51,750.00 3,105.00
186,831.90
95,700.00 114,840.00
61,950.00 26,762.40
34,500.00 24,150.00
48,875.00 19,061.25
51,750.00 2,018.25
95,700.00 45,936.00
11,100.00 1,398,600.00
1,312.50 254,625.00
171,950.00 53,648.40
261,250.00 122,265.00
17,850.00 32,130.00
34,500.00 103,500.00
48,875.00 41,543.75
51,750.00 4,398.75
563,457.60
95,700.00 43,065.00
1,312.50 254,625.00
144,800.00 45,177.60
261,250.00 122,265.00
34,500.00 82,110.00
48,875.00 14,662.50
51,750.00 1,552.50
34,500.00 34,500.00
file:///conversion/tmp/scratch/385673381.xlsx 183
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
48,875.00 32,746.25
51,750.00 3,467.25
64,399.50
48,875.00 1,955.00
51,750.00 207.00
34,500.00 62,100.00
13,750.00 137.50
file:///conversion/tmp/scratch/385673381.xlsx 184
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
80,499.38
48,875.00 2,443.75
51,750.00 258.75
34,500.00 77,625.00
13,750.00 171.88
96,599.25
48,875.00 2,932.50
51,750.00 310.50
34,500.00 93,150.00
13,750.00 206.25
128,799.00
48,875.00 3,910.00
51,750.00 414.00
34,500.00 124,200.00
13,750.00 275.00
75,879.28
425.00 29,750.00
1,312.50 24,871.88
144,800.00 5,502.40
34,500.00 10,350.00
48,875.00 4,887.50
51,750.00 517.50
70,157.63
425.00 29,750.00
1,312.50 18,860.63
144,800.00 5,792.00
34,500.00 10,350.00
file:///conversion/tmp/scratch/385673381.xlsx 185
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
48,875.00 4,887.50
51,750.00 517.50
34,500.00 10,350.00
48,875.00 4,887.50
51,750.00 517.50
file:///conversion/tmp/scratch/385673381.xlsx 186
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
67,515.15
425.00 29,750.00
1,312.50 15,093.75
144,800.00 6,226.40
34,500.00 11,040.00
48,875.00 4,887.50
51,750.00 517.50
65,416.00
425.00 29,750.00
1,312.50 12,705.00
144,800.00 6,516.00
34,500.00 11,040.00
48,875.00 4,887.50
51,750.00 517.50
150,669.43
91,900.00 101,090.00
65,625.00 7,875.00
144,800.00 4,488.80
34,500.00 6,468.75
48,875.00 10,996.88
51,750.00 19,406.25
13,750.00 343.75
767,260.90
425.00 212,500.00
65,625.00 270,217.50
144,800.00 48,218.40
34,500.00 155,250.00
48,875.00 73,312.50
51,750.00 7,762.50
673,828.80
425.00 212,500.00
65,625.00 166,215.00
144,800.00 58,788.80
34,500.00 155,250.00
48,875.00 73,312.50
51,750.00 7,762.50
585,253.90
425.00 212,500.00
65,625.00 61,582.50
196,000.00 21,560.00
144,800.00 53,286.40
34,500.00 155,250.00
48,875.00 73,312.50
51,750.00 7,762.50
27,824.28
file:///conversion/tmp/scratch/385673381.xlsx 187
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
1,312.50 10,185.00
144,800.00 3,330.40
34,500.00 6,900.00
48,875.00 7,331.25
51,750.00 77.63
21,889.50
1,312.50 3,937.50
196,000.00 980.00
144,800.00 2,896.00
34,500.00 7,590.00
48,875.00 5,865.00
51,750.00 621.00
file:///conversion/tmp/scratch/385673381.xlsx 188
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
19,927.08
1,312.50 2,415.00
196,000.00 1,176.00
144,800.00 2,027.20
34,500.00 6,900.00
48,875.00 7,331.25
51,750.00 77.63
37,876.80
1,312.50 13,608.00
144,800.00 4,488.80
34,500.00 8,970.00
48,875.00 9,775.00
51,750.00 1,035.00
19,527.30
1,312.50 6,804.00
144,800.00 3,764.80
34,500.00 5,175.00
48,875.00 3,421.25
51,750.00 362.25
5,790.25
34,500.00 1,966.50
48,875.00 1,857.25
51,750.00 1,966.50
20,568.80
1,312.50 5,670.00
144,800.00 868.80
34,500.00 8,625.00
48,875.00 4,887.50
51,750.00 517.50
27,975.85
1,312.50 8,321.25
144,800.00 1,737.60
34,500.00 10,350.00
48,875.00 6,842.50
51,750.00 724.50
14,845.63
1,312.50 4,265.63
34,500.00 5,175.00
48,875.00 4,887.50
file:///conversion/tmp/scratch/385673381.xlsx 189
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
51,750.00 517.50
18,170,987.50
15,312,500.00 16,843,750.00
16,750.00 20,937.50
18,300.00 18,300.00
34,500.00 207,000.00
48,875.00 977,500.00
51,750.00 103,500.00
10,984,357.50
8,779,200.00 9,657,120.00
16,750.00 20,937.50
18,300.00 18,300.00
34,500.00 207,000.00
48,875.00 977,500.00
51,750.00 103,500.00
420,833.00
8,779,200.00 351,168.00
16,750.00 837.50
34,500.00 12,075.00
48,875.00 51,318.75
51,750.00 5,433.75
521,708.00
8,779,200.00 351,168.00
18,300.00 915.00
34,500.00 34,500.00
48,875.00 122,187.50
51,750.00 12,937.50
448,462.00
8,779,200.00 307,272.00
18,300.00 5,490.00
34,500.00 27,600.00
48,875.00 97,750.00
51,750.00 10,350.00
1,185,800.00
15,312,500.00 980,000.00
18,300.00 9,150.00
34,500.00 34,500.00
48,875.00 146,625.00
51,750.00 15,525.00
file:///conversion/tmp/scratch/385673381.xlsx 190
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
8,779,200.00 219,480.00
16,750.00 502.50
18,300.00 9,150.00
98,550.00 98,550.00
34,500.00 20,700.00
48,875.00 97,750.00
51,750.00 10,350.00
34,500.00 27,600.00
48,875.00 97,750.00
51,750.00 10,350.00
1,046,612.50
15,312,500.00 918,750.00
16,750.00 2,512.50
34,500.00 17,250.00
48,875.00 97,750.00
51,750.00 10,350.00
654,614.50
8,779,200.00 526,752.00
16,750.00 2,512.50
34,500.00 17,250.00
48,875.00 97,750.00
51,750.00 10,350.00
file:///conversion/tmp/scratch/385673381.xlsx 191
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
34,500.00 27,600.00
48,875.00 97,750.00
51,750.00 10,350.00
8,779,200.00 219,480.00
16,750.00 502.50
18,300.00 1,464.00
98,550.00 98,550.00
252,500.00 126,250.00
34,500.00 27,600.00
48,875.00 122,187.50
51,750.00 12,937.50
34,500.00 10,350.00
48,875.00 63,537.50
51,750.00 6,727.50
34,500.00 17,250.00
48,875.00 63,537.50
51,750.00 6,727.50
8,779,200.00 9,657,120.00
16,200.00 243,000.00
16,750.00 13,400.00
34,500.00 138,000.00
48,875.00 586,500.00
51,750.00 62,100.00
file:///conversion/tmp/scratch/385673381.xlsx 192
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
34,500.00 207,000.00
48,875.00 977,500.00
51,750.00 103,500.00
10,422,330.00
8,779,200.00 9,657,120.00
16,200.00 243,000.00
16,750.00 50,250.00
34,500.00 82,800.00
48,875.00 351,900.00
51,750.00 37,260.00
file:///conversion/tmp/scratch/385673381.xlsx 193
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
34,500.00 27,600.00
48,875.00 122,187.50
51,750.00 12,937.50
848,667.50
15,312,500.00 300,125.00
16,750.00 502.50
18,300.00 21,960.00
98,550.00 98,550.00
252,500.00 252,500.00
34,500.00 34,500.00
48,875.00 127,075.00
51,750.00 13,455.00
34,500.00 3,450.00
48,875.00 4,887.50
51,750.00 517.50
34,500.00 3,450.00
48,875.00 4,887.50
51,750.00 517.50
1,462,544.00
8,779,200.00 1,448,568.00
16,750.00 3,350.00
34,500.00 4,140.00
48,875.00 5,865.00
51,750.00 621.00
79,403.99
8,779,200.00 63,210.24
16,750.00 1,675.00
file:///conversion/tmp/scratch/385673381.xlsx 194
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
34,500.00 3,450.00
48,875.00 9,775.00
51,750.00 1,293.75
111,668.70
8,779,200.00 96,571.20
16,750.00 837.50
34,500.00 3,450.00
48,875.00 9,775.00
51,750.00 1,035.00
148,498.40
8,779,200.00 127,298.40
16,750.00 2,512.50
34,500.00 5,175.00
48,875.00 12,218.75
51,750.00 1,293.75
277,827.60
8,779,200.00 245,817.60
16,750.00 2,512.50
34,500.00 5,175.00
48,875.00 21,993.75
51,750.00 2,328.75
34,500.00 5,175.00
48,875.00 21,993.75
51,750.00 2,328.75
230,272.50
15,312,500.00 107,187.50
16,750.00 1,675.00
22,800.00 3,420.00
34,500.00 20,700.00
48,875.00 87,975.00
51,750.00 9,315.00
52,711.25
98,550.00 39,420.00
16,750.00 8,375.00
34,500.00 862.50
48,875.00 3,665.63
file:///conversion/tmp/scratch/385673381.xlsx 195
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
51,750.00 388.13
78,522.70
17,050.00 25,575.00
3,281,300.00 45,938.20
16,750.00 837.50
6,500.00 19.50
34,500.00 3,450.00
48,875.00 2,443.75
51,750.00 258.75
34,500.00 56,925.00
48,875.00 13,440.63
51,750.00 1,449.00
34,500.00 80,643.75
48,875.00 14,231.25
51,750.00 1,449.00
34,500.00 56,925.00
48,875.00 13,440.63
51,750.00 1,449.00
Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87 651,553.39
1,312.50 301,875.00
171,950.00 109,679.54
246,850.00 187,788.85
34,500.00 41,400.00
48,875.00 9,775.00
51,750.00 1,035.00
file:///conversion/tmp/scratch/385673381.xlsx 196
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
34,500.00 56,925.00
48,875.00 12,218.75
51,750.00 1,293.75
34,500.00 56,925.00
48,875.00 12,218.75
51,750.00 1,293.75
34,500.00 56,925.00
48,875.00 12,218.75
51,750.00 1,293.75
34,500.00 56,925.00
48,875.00 12,218.75
51,750.00 1,293.75
Kerja Beton mutu f'c=24,0 MPa (K275), slum (12±2)cm, w/c = 0,53 942,097.16
1,312.50 532,875.00
309,430.00 151,178.66
246,850.00 187,606.00
34,500.00 56,925.00
48,875.00 12,218.75
51,750.00 1,293.75
34,500.00 56,925.00
48,875.00 12,218.75
51,750.00 1,293.75
34,500.00 72,450.00
file:///conversion/tmp/scratch/385673381.xlsx 197
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
48,875.00 17,106.25
51,750.00 1,811.25
file:///conversion/tmp/scratch/385673381.xlsx 198
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
34,500.00 72,450.00
48,875.00 17,106.25
51,750.00 1,811.25
a= 12,542.60
11,100.00 11,655.00
17,850.00 267.75
34,500.00 241.50
48,875.00 342.13
51,750.00 36.23
110 1,379,686.00
125 1,567,825.00
20,098.75
18,550.00 19,477.50
17,850.00 178.50
34,500.00 172.50
48,875.00 244.38
51,750.00 25.88
121,718.00
2,062,500.00 82,500.00
16,750.00 5,025.00
22,000.00 2,200.00
34,500.00 17,940.00
48,875.00 12,707.50
51,750.00 1,345.50
34,500.00 10,350.00
48,875.00 24,437.50
51,750.00 2,587.50
132,030.50
2,062,500.00 92,812.50
16,750.00 5,025.00
22,000.00 2,200.00
34,500.00 17,940.00
48,875.00 12,707.50
51,750.00 1,345.50
file:///conversion/tmp/scratch/385673381.xlsx 199
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
302,146.00
2,062,500.00 82,500.00
16,750.00 6,700.00
22,000.00 4,400.00
3,281,300.00 49,219.50
135,200.00 47,320.00
35,700.00 71,400.00
34,500.00 22,770.00
48,875.00 16,128.75
51,750.00 1,707.75
file:///conversion/tmp/scratch/385673381.xlsx 200
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
311,989.90
2,062,500.00 82,500.00
16,750.00 6,700.00
22,000.00 4,400.00
3,281,300.00 59,063.40
135,200.00 47,320.00
35,700.00 71,400.00
34,500.00 22,770.00
48,875.00 16,128.75
51,750.00 1,707.75
444,946.00
2,062,500.00 82,500.00
16,750.00 6,700.00
22,000.00 4,400.00
3,281,300.00 49,219.50
135,200.00 47,320.00
35,700.00 214,200.00
34,500.00 22,770.00
48,875.00 16,128.75
51,750.00 1,707.75
353,627.50
2,062,500.00 61,875.00
16,750.00 6,700.00
22,000.00 4,400.00
3,281,300.00 65,626.00
135,200.00 47,320.00
35,700.00 107,100.00
5,000.00 20,000.00
34,500.00 22,770.00
48,875.00 16,128.75
51,750.00 1,707.75
280,421.00
2,062,500.00 61,875.00
16,750.00 6,700.00
22,000.00 3,300.00
3,281,300.00 49,219.50
135,200.00 47,320.00
35,700.00 71,400.00
34,500.00 22,770.00
48,875.00 16,128.75
51,750.00 1,707.75
90,227.50
2,062,500.00 54,450.00
16,750.00 10,050.00
35,700.00 17,850.00
file:///conversion/tmp/scratch/385673381.xlsx 201
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
34,500.00 5,175.00
48,875.00 2,443.75
51,750.00 258.75
137,425.85
3,281,300.00 55,782.10
2,062,500.00 49,500.00
16,750.00 6,700.00
34,500.00 10,350.00
48,875.00 7,331.25
51,750.00 7,762.50
128,630.25
3,281,300.00 55,782.10
135,200.00 46,914.40
16,750.00 6,700.00
34,500.00 4,140.00
48,875.00 7,331.25
51,750.00 7,762.50
file:///conversion/tmp/scratch/385673381.xlsx 202
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
34,500.00 182,850.00
48,875.00 13,440.63
48,875.00 63,537.50
48,875.00 51,318.75
51,750.00 13,558.50
34,500.00 194,925.00
48,875.00 13,440.63
48,875.00 76,245.00
48,875.00 68,425.00
51,750.00 16,715.25
34,500.00 243,225.00
48,875.00 13,440.63
48,875.00 80,643.75
48,875.00 102,637.50
51,750.00 20,855.25
file:///conversion/tmp/scratch/385673381.xlsx 203
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
16,750.00 53,600.00
22,000.00 35,200.00
11,100.00 2,331,000.00
17,850.00 53,550.00
1,312.50 441,000.00
171,950.00 92,853.00
261,250.00 211,612.50
3,281,300.00 459,382.00
135,200.00 378,560.00
35,700.00 642,600.00
34,500.00 219,075.00
48,875.00 13,440.63
48,875.00 80,643.75
48,875.00 68,425.00
51,750.00 17,232.75
file:///conversion/tmp/scratch/385673381.xlsx 204
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
34,500.00 182,850.00
48,875.00 13,440.63
48,875.00 63,537.50
48,875.00 51,318.75
51,750.00 13,713.75
34,500.00 182,850.00
48,875.00 13,440.63
48,875.00 63,537.50
48,875.00 51,318.75
51,750.00 13,558.50
34,500.00 194,925.00
48,875.00 13,440.63
file:///conversion/tmp/scratch/385673381.xlsx 205
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
48,875.00 76,245.00
48,875.00 68,425.00
51,750.00 16,715.25
34,500.00 6,210.00
48,875.00 977.50
48,875.00 977.50
48,875.00 977.50
51,750.00 310.50
file:///conversion/tmp/scratch/385673381.xlsx 206
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
75,662.68
2,062,500.00 6,187.50
16,750.00 335.00
11,100.00 39,960.00
17,850.00 892.50
1,312.50 7,218.75
171,950.00 1,547.55
261,250.00 3,918.75
34,500.00 10,246.50
48,875.00 1,612.88
48,875.00 1,612.88
48,875.00 1,612.88
51,750.00 517.50
1,006.37
34,500.00 34.50
48,875.00 48.88
51,750.00 10.35
49,450.00 9.89
40,250.00 805.00
150,000.00 30.00
4,500.00 45.00
20,000.00 20.00
13,750.00 2.75
44,402.50
19,400.00 21,340.00
34,500.00 2,070.00
48,875.00 1,466.25
51,750.00 776.25
file:///conversion/tmp/scratch/385673381.xlsx 207
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
150,000.00 18,750.00
43,412.50
18,500.00 20,350.00
34,500.00 2,070.00
48,875.00 1,466.25
51,750.00 776.25
150,000.00 18,750.00
file:///conversion/tmp/scratch/385673381.xlsx 208
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
40,357.75
34,500.00 1,725.00
48,875.00 977.50
51,750.00 155.25
150,000.00 37,500.00
83,741.63
72,600.00 73,326.00
33,000.00 3,300.00
34,500.00 3,450.00
48,875.00 3,665.63
34,254.63
1,000.00 25,000.00
34,500.00 5,175.00
48,875.00 3,665.63
51,750.00 414.00
32,418.00
1,200.00 24,000.00
34,500.00 5,175.00
48,875.00 2,932.50
51,750.00 310.50
54,243.60
2,900.00 14,500.00
1,312.50 10,500.00
144,800.00 4,633.60
34,500.00 13,800.00
48,875.00 9,775.00
51,750.00 1,035.00
34,500.00 4,830.00
48,875.00 3,665.63
51,750.00 414.00
43,057.50
2,750.00 30,250.00
16,750.00 502.50
34,500.00 6,900.00
48,875.00 4,887.50
51,750.00 517.50
file:///conversion/tmp/scratch/385673381.xlsx 209
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
177,959.50
2,589.50 155,370.00
16,750.00 3,350.00
34,500.00 5,727.00
48,875.00 12,218.75
51,750.00 1,293.75
76,018.60
9,075.00 31,762.50
16,750.00 837.50
1,312.50 14,175.00
144,800.00 4,633.60
34,500.00 13,800.00
48,875.00 9,775.00
51,750.00 1,035.00
file:///conversion/tmp/scratch/385673381.xlsx 210
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
60,527.74
81,200.00 32,480.00
16,750.00 1,005.00
16,750.00 8,375.00
210,683.95 842.74
34,500.00 4,312.50
48,875.00 12,218.75
51,750.00 1,293.75
64,558.00
81,200.00 56,840.00
16,750.00 335.00
34,500.00 4,140.00
48,875.00 2,932.50
51,750.00 310.50
34,040.25
81,200.00 24,360.00
16,750.00 670.00
34,500.00 5,175.00
48,875.00 3,421.25
51,750.00 414.00
34,500.00 1,035.00
48,875.00 3,421.25
51,750.00 362.25
72,300.00 27,112.50
16,750.00 502.50
34,500.00 2,415.00
48,875.00 4,887.50
51,750.00 517.50
34,500.00 20,700.00
48,875.00 39,100.00
51,750.00 4,140.00
file:///conversion/tmp/scratch/385673381.xlsx 211
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
38,690.50
82,500.00 30,030.00
22,800.00 2,508.00
34,500.00 3,450.00
48,875.00 2,443.75
51,750.00 258.75
12,575.00
7,600.00 7,980.00
16,750.00 167.50
34,500.00 1,725.00
48,875.00 2,443.75
51,750.00 258.75
file:///conversion/tmp/scratch/385673381.xlsx 212
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
34,500.00 5,175.00
48,875.00 12,218.75
51,750.00 1,293.75
34,500.00 5,175.00
48,875.00 12,218.75
51,750.00 1,293.75
34,500.00 6,900.00
48,875.00 14,662.50
51,750.00 1,552.50
34,500.00 113,850.00
48,875.00 53,762.50
51,750.00 51.75
318,510.50
123,750.00 123,750.00
1,312.50 7,875.00
144,800.00 1,448.00
34,500.00 34,500.00
48,875.00 73,312.50
51,750.00 77,625.00
718,107.38
501,950.00 501,950.00
501,950.00 150,585.00
1,312.50 7,875.00
144,800.00 1,448.00
34,500.00 41,400.00
48,875.00 7,086.88
51,750.00 7,762.50
79,756.51
55,000.00 60,500.00
5,737.50 154.91
file:///conversion/tmp/scratch/385673381.xlsx 213
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
1,312.50 892.50
144,800.00 8,108.80
61,950.00 1,486.80
34,500.00 4,830.00
48,875.00 3,421.25
51,750.00 362.25
128,786.23
68,750.00 75,625.00
5,737.50 3,155.63
1,312.50 13,518.75
144,800.00 8,832.80
61,950.00 4,274.55
34,500.00 13,110.00
48,875.00 9,286.25
51,750.00 983.25
file:///conversion/tmp/scratch/385673381.xlsx 214
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
10,605.00
4,500.00 4,545.00
4,500.00 1,575.00
34,500.00 1,242.00
48,875.00 2,932.50
51,750.00 310.50
14,589.50
7,100.00 7,171.00
7,100.00 2,485.00
34,500.00 1,366.20
48,875.00 3,225.75
51,750.00 341.55
20,716.00
11,275.00 11,387.75
11,275.00 3,946.25
34,500.00 1,490.40
48,875.00 3,519.00
51,750.00 372.60
25,686.50
14,600.00 14,746.00
14,600.00 5,110.00
34,500.00 1,614.60
48,875.00 3,812.25
51,750.00 403.65
37,287.00
22,800.00 23,028.00
22,800.00 7,980.00
34,500.00 1,738.80
48,875.00 4,105.50
51,750.00 434.70
53,103.50
34,100.00 34,441.00
34,100.00 11,935.00
34,500.00 1,863.00
48,875.00 4,398.75
51,750.00 465.75
76,003.96
49,700.00 50,197.00
49,700.00 17,395.00
34,500.00 2,328.75
file:///conversion/tmp/scratch/385673381.xlsx 215
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
48,875.00 5,498.44
51,750.00 584.78
108,827.25
72,600.00 73,326.00
72,600.00 25,410.00
34,500.00 2,794.50
48,875.00 6,598.13
51,750.00 698.63
44,692.91
13,800.00 7,728.00
84,690.00 11,602.53
10,350.00 3,260.25
48,875.00 6,598.13
51,750.00 672.75
34,500.00 13,800.00
13,750.00 1,031.25
31,871.97
13,800.00 5,520.00
84,690.00 9,400.59
10,350.00 2,898.00
48,875.00 4,154.38
51,750.00 414.00
34,500.00 8,797.50
13,750.00 687.50
14,887.75
13,800.00 1,656.00
10,350.00 310.50
48,875.00 9,775.00
34,500.00 3,105.00
13,750.00 41.25
22,822.63
13,800.00 2,760.00
84,690.00 8,469.00
10,350.00 1,035.00
48,875.00 3,176.88
51,750.00 310.50
34,500.00 6,727.50
13,750.00 343.75
12,614.25
13,800.00 1,656.00
10,350.00 207.00
48,875.00 8,308.75
34,500.00 2,415.00
file:///conversion/tmp/scratch/385673381.xlsx 216
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
13,750.00 27.50
4,970.25
13,800.00 828.00
10,350.00 103.50
48,875.00 1,955.00
34,500.00 2,070.00
13,750.00 13.75
4,970.25
13,800.00 828.00
10,350.00 103.50
13,750.00 13.75
34,500.00 2,070.00
48,875.00 1,955.00
12,614.25
13,800.00 1,656.00
10,350.00 207.00
13,750.00 27.50
34,500.00 2,415.00
48,875.00 8,308.75
22,822.63
13,800.00 2,760.00
84,690.00 8,469.00
10,350.00 1,035.00
13,750.00 343.75
34,500.00 6,727.50
51,750.00 310.50
48,875.00 3,176.88
file:///conversion/tmp/scratch/385673381.xlsx 217
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
14,887.75
13,800.00 1,656.00
10,350.00 310.50
13,750.00 41.25
34,500.00 3,105.00
48,875.00 9,775.00
26,903.97
13,800.00 552.00
84,690.00 9,400.59
10,350.00 2,898.00
13,750.00 687.50
34,500.00 8,797.50
51,750.00 414.00
48,875.00 4,154.38
44,692.91
13,800.00 7,728.00
84,690.00 11,602.53
10,350.00 3,260.25
13,750.00 1,031.25
34,500.00 13,800.00
51,750.00 672.75
48,875.00 6,598.13
98,377.50
59,500.00 60,095.00
144,800.00 14,480.00
34,500.00 6,900.00
48,875.00 14,662.50
51,750.00 1,552.50
13,750.00 687.50
75,400.00
36,750.00 37,117.50
144,800.00 14,480.00
34,500.00 6,900.00
48,875.00 14,662.50
51,750.00 1,552.50
13,750.00 687.50
141,403.50
102,100.00 103,121.00
144,800.00 14,480.00
34,500.00 6,900.00
48,875.00 14,662.50
51,750.00 1,552.50
13,750.00 687.50
84,742.50
46,000.00 46,460.00
file:///conversion/tmp/scratch/385673381.xlsx 218
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
144,800.00 14,480.00
34,500.00 6,900.00
48,875.00 14,662.50
51,750.00 1,552.50
13,750.00 687.50
90,600.50
51,800.00 52,318.00
144,800.00 14,480.00
34,500.00 6,900.00
48,875.00 14,662.50
51,750.00 1,552.50
13,750.00 687.50
file:///conversion/tmp/scratch/385673381.xlsx 219
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
110,245.00
71,250 71,962.50
144,800 14,480.00
34,500.00 6,900.00
48,875.00 14,662.50
51,750.00 1,552.50
13,750.00 687.50
93,832.50
55,000.00 55,550.00
144,800.00 14,480.00
34,500.00 6,900.00
48,875.00 14,662.50
51,750.00 1,552.50
13,750.00 687.50
49,450.00 49,450.00
40,250.00 40,250.00
10,000.00 10,000.00
34,500.00 207,000.00
4,500.00 90,000.00
20,000.00 10,000.00
20,000.00 10,000.00
20,000.00 10,000.00
20,050.00 5,012.50
100,000.00
531,712.50
hari 13,292,812.50
2 / 7.500 3,544.75
1 / 7.500 1,772.38
2/25000 1,063.43
0,25/2500 1,329.28
file:///conversion/tmp/scratch/385673381.xlsx 220
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
531,712.50 1,063.43
75,000.00 375.00
9,500.00 4,750.00
file:///conversion/tmp/scratch/385673381.xlsx 221
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
167,215,721.50
61,950.00 3,097.50
95,700.00 19,140.00
34,500.00 12,937.50
13,750.00 1,650.00
167,177,657.50
61,950.00 1,239.00
137,900.00 11,032.00
34,500.00 2,587.50
13,750.00 1,650.00
48,875.00 1,955.00
51,750.00 207.00
34,500.00 8,625.00
13,750.00 1,375.00
3,907,700.00
3,628,000.00 3,628,000.00
227,150.00 113,575.00
48,875.00 48,875.00
34,500.00 103,500.00
13,750.00 13,750.00
48,875.00 48,875.00
34,500.00 106,950.00
13,750.00 13,750.00
48,875.00 53,762.50
34,500.00 110,400.00
13,750.00 13,750.00
48,875.00 58,650.00
34,500.00 113,850.00
13,750.00 13,750.00
file:///conversion/tmp/scratch/385673381.xlsx 222
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
227,150.00 340,725.00
48,875.00 63,537.50
34,500.00 117,300.00
13,750.00 13,750.00
48,875.00 68,425.00
34,500.00 120,750.00
13,750.00 13,750.00
48,875.00 73,312.50
34,500.00 124,200.00
13,750.00 13,750.00
4,258,505.00
4,010,000.00 4,010,000.00
227,150.00 102,217.50
48,875.00 48,875.00
34,500.00 83,662.50
13,750.00 13,750.00
2,156,505.00
1,908,000.00 1,908,000.00
227,150.00 102,217.50
48,875.00 48,875.00
34,500.00 83,662.50
13,750.00 13,750.00
27,554.00
18,500.00 21,275.00
16,100.00 966.00
34,500.00 2,070.00
48,875.00 2,932.50
51,750.00 310.50
27,623.00
19,400.00 22,310.00
34,500.00 2,070.00
48,875.00 2,932.50
51,750.00 310.50
file:///conversion/tmp/scratch/385673381.xlsx 223
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
47,200.00 49,560.00
16,750.00 251.25
8,779,200.00 166,804.80
34,500.00 6,900.00
48,875.00 19,550.00
51,750.00 1,293.75
54,850.00 57,592.50
16,750.00 167.50
16,200.00 8,100.00
34,500.00 5,175.00
48,875.00 14,662.50
51,750.00 1,552.50
92,100.00
66,800.00 66,800.00
34,500.00 345.00
48,875.00 24,437.50
51,750.00 517.50
91,668.75
66,800.00 66,800.00
34,500.00 172.50
48,875.00 24,437.50
51,750.00 258.75
15,775.00
7,150.00 7,150.00
34,500.00 517.50
48,875.00 7,331.25
51,750.00 776.25
file:///conversion/tmp/scratch/385673381.xlsx 224
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
12,900.00
7,150.00 7,150.00
34,500.00 345.00
48,875.00 4,887.50
51,750.00 517.50
17,450.00
5,950.00 5,950.00
34,500.00 690.00
48,875.00 9,775.00
51,750.00 1,035.00
28,125.00
19,500.00 19,500.00
34,500.00 517.50
48,875.00 7,331.25
51,750.00 776.25
21,950.00
10,450.00 10,450.00
34,500.00 690.00
48,875.00 9,775.00
51,750.00 1,035.00
24,825.00
10,450.00 10,450.00
34,500.00 862.50
48,875.00 12,218.75
51,750.00 1,293.75
114,500.00
96,250.00 105,875.00
34,500.00 517.50
48,875.00 7,331.25
51,750.00 776.25
57,280.30
956.00 25,334.00
1,312.50 13,650.00
144,800.00 1,954.80
34,500.00 9,315.00
48,875.00 6,353.75
51,750.00 672.75
583,677.38
file:///conversion/tmp/scratch/385673381.xlsx 225
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
77,137.50 534,562.88
1,312.50 12,862.50
144,800.00 6,516.00
11,250.00 14,625.00
34,500.00 8,625.00
48,875.00 5,865.00
51,750.00 621.00
134,689.75
48,750.00 57,866.25
1,312.50 13,125.00
144,800.00 6,516.00
11,250.00 16,875.00
34,500.00 21,390.00
48,875.00 17,106.25
51,750.00 1,811.25
file:///conversion/tmp/scratch/385673381.xlsx 226
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
126,898.50
1,818.87 48,200.00
1,312.50 13,650.00
144,800.00 6,516.00
11,250.00 18,225.00
34,500.00 21,390.00
48,875.00 17,106.25
51,750.00 1,811.25
708,782.38
607,450.00 643,897.00
1,312.50 10,749.38
144,800.00 6,516.00
11,250.00 7,312.50
34,500.00 21,390.00
48,875.00 17,106.25
51,750.00 1,811.25
137,094.65
874.00 46,322.00
1,312.50 12,206.25
144,800.00 2,606.40
11,250.00 30,937.50
34,500.00 20,700.00
48,875.00 21,993.75
51,750.00 2,328.75
138,972.65
1,818.87 48,200.00
1,312.50 12,206.25
144,800.00 2,606.40
11,250.00 30,937.50
34,500.00 20,700.00
48,875.00 21,993.75
51,750.00 2,328.75
740,331.50
607,450.00 619,599.00
16,750.00 33,500.00
1,312.50 16,327.50
144,800.00 3,620.00
11,250.00 7,312.50
34,500.00 24,840.00
48,875.00 31,768.75
51,750.00 3,363.75
file:///conversion/tmp/scratch/385673381.xlsx 227
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
161,887.38
91,900.00 101,090.00
1,312.50 15,421.88
144,800.00 5,068.00
34,500.00 21,390.00
48,875.00 17,106.25
51,750.00 1,811.25
519,581.50
241,800.00 241,800.00
65,625.00 17,062.50
144,800.00 4,344.00
58,300.00 58,300.00
34,500.00 34,500.00
48,875.00 146,625.00
51,750.00 10,350.00
13,750.00 6,600.00
file:///conversion/tmp/scratch/385673381.xlsx 228
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
417,684.00
241,800.00 241,800.00
65,625.00 17,062.50
144,800.00 4,344.00
58,300.00 58,300.00
34,500.00 17,250.00
48,875.00 73,312.50
51,750.00 5,175.00
13,750.00 440.00
566,999.00
461,000.00 461,000.00
65,625.00 17,062.50
144,800.00 4,344.00
58,300.00 43,725.00
34,500.00 8,625.00
48,875.00 29,325.00
51,750.00 2,587.50
13,750.00 330.00
572,106.50
461,000.00 461,000.00
65,625.00 17,062.50
144,800.00 4,344.00
58,300.00 43,725.00
34,500.00 8,625.00
48,875.00 34,212.50
51,750.00 2,587.50
13,750.00 550.00
1,556,984.00
1,381,100.00 1,381,100.00
65,625.00 17,062.50
144,800.00 4,344.00
58,300.00 58,300.00
34,500.00 17,250.00
48,875.00 73,312.50
51,750.00 5,175.00
13,750.00 440.00
1,658,881.50
1,381,100.00 1,381,100.00
65,625.00 17,062.50
144,800.00 4,344.00
58,300.00 58,300.00
34,500.00 34,500.00
48,875.00 146,625.00
51,750.00 10,350.00
13,750.00 6,600.00
5,910.00
21,150.00 1,692.00
file:///conversion/tmp/scratch/385673381.xlsx 229
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
16,050.00 321.00
3,550.00 355.00
34,500.00 1,380.00
48,875.00 1,955.00
51,750.00 207.00
14,703.75
19,200.00 2,880.00
14,400.00 2,448.00
17,100.00 2,907.00
34,500.00 2,415.00
48,875.00 3,665.63
51,750.00 388.13
file:///conversion/tmp/scratch/385673381.xlsx 230
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
32,961.88
22,450.00 4,490.00
21,150.00 3,172.50
44,400.00 7,548.00
56,100.00 14,586.00
34,500.00 2,415.00
48,875.00 439.88
51,750.00 310.50
42,599.38
22,450.00 4,490.00
21,150.00 3,172.50
44,400.00 7,548.00
56,100.00 19,635.00
34,500.00 2,415.00
48,875.00 5,131.88
51,750.00 207.00
19,250.00 1,925.00
20,000.00 2,000.00
20,000.00 5,200.00
34,500.00 690.00
48,875.00 3,079.13
51,750.00 326.03
34,500.00 966.00
48,875.00 2,052.75
51,750.00 217.35
12,709.50
16,100.00 1,610.00
53,100.00 531.00
34,500.00 690.00
48,875.00 9,775.00
51,750.00 103.50
34,500.00 8,625.00
file:///conversion/tmp/scratch/385673381.xlsx 231
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
48,875.00 10,996.88
51,750.00 1,164.38
50,300.00 5,533.00
50,300.00 8,551.00
54,000.00 4,320.00
34,500.00 17,250.00
48,875.00 39,100.00
51,750.00 15,525.00
file:///conversion/tmp/scratch/385673381.xlsx 232
HARGA SAT. JUMLAH
Rp Rp
6 8=(4X7)
40,827.88
20,350.00 610.50
34,450.00 6,890.00
24,900.00 498.00
25,200.00 252.00
18,400.00 3,680.00
77,800.00 778.00
7,600.00 760.00
11,900.00 2,380.00
3,550.00 355.00
34,500.00 8,625.00
48,875.00 13,929.38
51,750.00 2,070.00
79,808.38
20,350.00 610.50
34,450.00 6,890.00
76,350.00 26,722.50
24,900.00 498.00
25,200.00 252.00
18,400.00 1,840.00
77,800.00 15,560.00
7,600.00 76.00
11,900.00 2,380.00
3,550.00 355.00
34,500.00 8,625.00
48,875.00 13,929.38
51,750.00 2,070.00
file:///conversion/tmp/scratch/385673381.xlsx 233
DAF TAR HAR GA SAT UAN P E K E R JAAN
DINAS PEKERJAAN UMUM KABUPATEN REMBANG
UNTUK TAHUN 2011
1 2 3
I A PEKERJAAN PERSIAPAN
A.1 1M' Pagar Sementara dari Seng Gelombang Tinggi 2,00 m
A.2 1M' Pengukuran dan Pemasangan Bouwplank
A.3 1M2 Pembuatan Kantor Sementara dg Lantai Plesteran
A.4 1M2 Pembuatan Gudang Semen dan Alat-alat
A.5 1M2 Membersihkan Lapangan dan Perataan
A.6 1M2 Pembuatan Steger dari Bambu Uk. 40 x 50 x 20 cm
A.7 1M3 Bongkaran Beton Bertulang
A.8 1M3 Bongkaran Dinding Tembok Bata Merah
A.9 1 M3 MEMBONGKAR DINDING BATA / BATU (Batu / bata dipakai lagi)
A.10 1 M3 MEMBONGKAR DINDING BATA / BATU (bongkaran tidak dipakai lagi)
A.11 1M2 MEMBONGKAR PLESTERAN DINDING
A.12 1M2 MEMBONGKAR GENTENG / SIRAP (bongkaran tidak dipakai lagi)
A.13 1M2 MEMBONGKAR GENTENG / SIRAP (bongkaran dipakai lagi)
A.14 1M2 MEMBONGKAR RANGKA ATAP/RENG KASO (bongkaran tidak dipakai lagi)
A.15 1M2 MEMBONGKAR RANGKA ATAP / RENG KASO (bongkaran dipakai lagi)
A.16 1M3 MEMBONGKAR KUDA-KUDA GORDING/BALOK (bongkaran dipakai lagi)
A.17 1M3 MEMBONGKAR KUDA-KUDA GORDING/BALOK (bongkaran tidak dipakai lagi)
A.18 1M2 MEMBONGKAR PLAFOND (bongkaran dipakai lagi)
A.19 1M2 MEMBONGKAR PLAFOND (bongkaran tidak dipakai lagi)
II B PEKERJAAN TANAH
B.1 1M3 Galian Tanah Biasa Sedalam 1 m
B.2 1M3 Galian Tanah Keras Sedalam 1 m
B.3 1M3 Galian Tanah Cadas Sedalam 1 m
B.4 1M3 Galian Tanah Lumpur Sedalam 1 m
B.5 1M2 Pekerjaan Striping Setinggi 1 m
B.6 1M3 Membuang Tanah Sejauh 30 m'
B.7 1M3 Urugan Kembali (dihitung 1/3 kali indeks pekerjaan galian)
B.8 1M3 Pemadatan Tanah
B.9 1M3 Urugan Pasir
B.9a 1M3 Urugan Tanah Biasa (Tanah Tersedia)
B.10 1M3 Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL
B.11 1M2 Pemasangan Lapisan Ijuk tebal 10 cm
B.12 1M3 Urugan Sirtu
B.13 1 M3 Galian Tanah Biasa Sedalam 2 meter
file:///conversion/tmp/scratch/385673381.xlsx 234
NO. KODE URAIAN PEKERJAAN
1 2 3
B.14 1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 3 M' TENAGA MANUSIA
B.15 1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 4 M' TENAGA MANUSIA
B.16 1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 5 M' TENAGA MANUSIA
B.17 1 M3 PEK. GALIAN TANAH BANYAK TERDAPAT BATU-BATU BUNDAR
MAX KEDALAMAN 1 M' TENAGA MANUSIA
B.18 1 M3 PEK. GALIAN TANAH BERBATU MAX KEDALAMAN 1 M' TNG MANUSIA
B.19 1 M3 PEK. GALIAN TANAH MAX KEDALAMAN 2 M' DENGAN ALAT EXAVATOR 0,7 M3
B.20 1 M3 PEK. GALIAN TANAH MAX KEDALAMAN 5 M' DENGAN ALAT EXAVATOR 0,7 M3
B.21 MENGANGKUT HASIL GALIAN DENGAN DUMP TRUCK . M3/KM.
B.22 1 M3. MENGANGKUT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRUCK
KURANG DARI 1,5 KM.
B.23 1 M3. MENGANGKUT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRUCK
JARAK ANTARA 1,5 S/D 3 KM.
B.24 1 M3. MENGANGKUT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRUCK
JARAK ANTARA 3 S/D 5 KM.
B.25 1 M3 MERATAKAN TANAH
B.26 1 M3 PEK. URUGAN TANAH PILIHAN
B.27 1 M3 PEK. LAPISAN PUDEL 1 KP : 3 TL
B.28 1 M3 PEK. LAPISAN PUDEL 1 KP : 5 PS
B.29 1 M3 MERATAKAN TANAH DAN DITIMBRIS
B.30 1 M2 MENGAMBIL DAN PASANGAN GEBALAN
B.31 1 M' MENGANGKUT GEBALAN RUMPUT
B.32 1 M2 PEKERJAAN GEBALAN RUMPUT SAMPAI TUMBUH
B.33 1 M2 URUGAN PAKAI ALAT BESAR TANAH DARI LUAR DIPADATKAN (U/5000 M3)
file:///conversion/tmp/scratch/385673381.xlsx 235
NO. KODE URAIAN PEKERJAAN
1 2 3
C.14 1 M3 PASANGAN BATU BRONJONG UNTUK KAWAT 4 MM
C.15 1 M3 PASANGAN BATU BRONJONG UNTUK KAWAT 5 MM
IV D P E K E R JAAN DINDING
D.1 1M2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 2 Ps
D.2 1M2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 3 Ps
D.3 1M2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps
D.4 1 M2 PASANGAN 1/2 BATA MERAH 1 : 4
D.5 1 M2 PASANGAN 1/2 BATA MERAH 1 : 5
D.6 1 M2 PASANGAN BATU TEMPEL + SIARAN
D.7 1 M3 PASANGAN BATA MERAH 1 PC : 2 PS
D.8 1 M3 PASANGAN BATA MERAH 1 PC : 4 PS
D.9 1 M3 PASANGAN BATA MERAH 1 PC : 3 KP : 10 PS
V E PEKERJAAN PLESTERAN
E.1 1M2 Plesteran 1 Pc : 3 Ps Tebal 15 mm
E.2 1M2 Plesteran 1 Pc : 2 Kp : 8 Ps Tebal 15 mm
E.3 1M2 Plesteran 1 Pc : 3 Kp : 10 Ps Tebal 15 mm
E.4 1M2 Plesteran 1 Pc : 3 Ps Tebal 20 mm
E.5 1M2 Berapen 1 Pc : 5 Ps Tebal 15 mm
E.6 1M' Plesteran Skoning 1 Pc : 2 Ps lebar 10 mm
E.7 1M2 Plesteran Ciprat 1 Pc : 2 Ps
E.8 1M2 Finishing Siar Pas. Batu Kali Adukan 1 Pc : 2 Ps
E.9 1M2 Acian
VI F PEKERJAAN KAYU
F.1 1M3 Membuat Kosen Pintu & Jendela Kayu klas I
F.2 1M3 Membuat Kosen Pintu & Jendela Kayu Bengkirai
F.3 1M2 Membuat Pintu Klamp Standard Kayu Bengkirai
F.4 1M2 Membuat Daun Pintu Panel Kayu Bengkirai
F.5 1M2 Membuat Pintu & Jendela Kaca Kayu Bengkirai
F.6 1M2 Membuat Pintu & Jendela Jalusi Kayu Kelas I (Jati)
F.7 1M2 Membuat Pintu Plywood Rangkap rangka Kayu Bengkirai lbr s/d 90cm
F.8 1M2 Membuat Pintu Plywood rangkap, rangka expose kayu Bengkirai
F.9 1M2 Membuat Jalusi mati Kosen Kayu Kelas I (Jati)
F.10 1M2 Membuat Jalusi mati Kosen Kayu Bengkirai
F.11 1M2 Membuat Pintu Teakwood Rangkap Rangka Kayu Kelas I (jati)
F.12 1M2 Membuat Pintu Teakwood Rangkap Lapis Formika Rangka ekspose
Kayu Bengkirai
F.13 1 M2 DAUN PINTU TRIPLEK DOUBLE UKURAN PINTU LAPIS ALUMINIUM ( KM/WC )
F.14 1 M2 DAUN PINTU TRIPLEK DOUBLE UKURAN PINTU LAPIS FORMIKA ( KM/WC )
file:///conversion/tmp/scratch/385673381.xlsx 236
NO. KODE URAIAN PEKERJAAN
1 2 3
F.15 1M3 Memasang Konstruksi Kuda-kuda Konvensional Kayu Bengkirai
Bentang 6 M
F.16 1M3 Memasang Konstruksi Kuda-kuda Ekspose Kayu Jati
F.17 1M3 Memasang Konstruksi Gording Kayu Bengkirai
F.18 1M2 Pasang Pintu Plywood & Formika Rangka Kayu Bengkirai
F.19 1M2 Pasang Pintu Formika Double, Rangka Kayu Jati
F.20 1M2 Memasang Rangka Atap Genteng Keramik, Kayu Bengkirai
F.21 1M2 Memasang Rangka Atap Genteng Beton, Kayu Bengkirai
F.22 1M2 Pasang Rangka Atap Sirap Kayu Bengkirai
F.23 1M' Pasang Listplank Uk. (3x20)cm Kayu Bengkirai
F.24 1M' Pasang Listplank Uk. (3x30)cm Kayu Bengkirai
F.25 1M' Pasang Listplank Uk. 2x(3x20)cm Kayu Bengkirai
F.26 1M2 Pasang Rangka Dinding Pemisah Kayu Bengkirai
F.27 1M2 Pas. Dinding Pemisah Teakwood Rangkap Rangka Kayu Bengkirai
F.28 1M2 Pasang Dinding Lambriziring dari Papan jati
F.29 1M2 Pasang Plywood tebal 4mm unt Dinding
F.30 1M2 Pasang Dinding Bilik, Rangka Kayu Klas III / IV
file:///conversion/tmp/scratch/385673381.xlsx 237
NO. KODE URAIAN PEKERJAAN
1 2 3
G.20 1M2 Pasang Bekisting untuk Dinding
G.21 1M2 Pasang Bekisting untuk Tangga
G.22 1 M2 Pasang Bekisting Jembatan Cor
G.23 1 M2 BEKESTING DENGAN PAPAN
G.24 1 M2 BEKESTING DENGAN MULTIPLEX 9 MM
G.25 1 M3 Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting)
G.26 1 M3 Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting)
G.27 1 M3 Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting)
G.28 1 M3 Membuat Balok Beton Bertulang (200 kg Besi + Bekisting)
G.29 1 M3 Membuat Balok Beton Bertulang (150 kg Besi + Bekisting)
G.30 1 M3 Membuat Dinding Beton Bertulang (150 kg Besi + Bekisting)
G.31 1 M3 Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting)
G.32 1 M' Membuat Kolom Penguat Beton Bertulang (11 x 11) cm
G.33 1 M' Membuat Ring Balok Beton Bertulang (10 x 15) cm
G.34 1 M3 PAS. BETON K-175 READY MIX 6 M3 BERIKUT SLANG
G.35 1 M3 PAS. BETON K-225 READY MIX 6 M3 BERIKUT SLANG
G.36 1 M3 PAS. BETON K-300 READY MIX 6 M3 BERIKUT SLANG
G.37 1 KG PEK. ERECTION KONST. KUDA-KUDA BESI
G.38 1 KG PEKERJAAN BAJA IWF
G.39 1 KG PEKERJAAN KONSTUKSI BESI SIKU / PROFIL
G.40 1 CM PEK. PENGELASAN DENGAN LAS LISTRIK TEBAL KAWAT 4 MM
G.41 1 TITIK MELUBANG KONSTRUKSI BESI DENGAN BOR
G.42 1 M2 PEKERJAAN WIREMESH M8
file:///conversion/tmp/scratch/385673381.xlsx 238
NO. KODE URAIAN PEKERJAAN
1 2 3
I.4 1 M2 Langit-langit Gypsum Board, tebal 9 mm
I.5 1 M' List Langit-Langit Kayu Profil
I.6 1M2 Pasang Rangka Langit-langit (1,00x1,00) m, kayu Bengkirai
I.6a 1M2 Pasang Rangka Langit-langit (1,00x1,00) m, kayu Kruing
I.7 1M2 Pasang Rangka Langit-langit (60x60) cm, kayu Bengkirai
file:///conversion/tmp/scratch/385673381.xlsx 239
NO. KODE URAIAN PEKERJAAN
1 2 3
J.34a MENGGILAS 1 M2 LAPIS KULIT PENAHAN
J.34b MENGGILAS 1 M2 LAPIS KULIT PERTEGARAN
J.34c MENGGILAS LAPIS AUS ( PENETRASI )
J.34d MENGGILAS RINGAN 1 M2 OPERPENTING
J.35 100 M2 PENGASPALAN SHEET (LATASIR) TEBAL 1 CM JERENG
J.36 1M2 ASPAL SAND SHEET TEBAL 2 CM JERENG ( 1 CM PADAT )
J.37 1M2 ASPAL SAND SHEET TEBAL 3 CM JERENG ( 2 CM PADAT )
J.38 1 M3 PASIR DIBAWAH ALAS JALAN TIAP 1 M3 LAPIS PASIR
J.39 1 M2 PAS ONDERLAG BATU BELAH TEBAL 15 CM
J.40 1 M2 PAS BATU LAPIS ATAS TEBAL 6 CM
J.41 1 BTG/4 M PENGADAAN DAN PEMASANGAN CERUCUK
J.42 1 UNIT BOX PRECAST 100 x 100 x 15,TERPASANG
J.43 1 UNIT BOX PRECAST 150 x 100 x 120 x 15,TERPASANG
J.44 1 UNIT BOX PRECAST 150 x 150 x 120 x 15,TERPASANG
J.45 1 UNIT BOX PRECAST 200 x 150 x 120 x 20,TERPASANG
J.46 1 UNIT BOX PRECAST 300 x 100 x 120 x 20,TERPASANG
J.47 1 UNIT BOX PRECAST 380 x 350 x 120 x 20,TERPASANG
J.48 1 UNIT BOX PRECAST 420 x 300 x 120 x 25,TERPASANG
J.49 1 UNIT, RCP 800 x 2500, TERPASANG
J.50 1 UNIT, RCP 500 x 2500, TERPASANG
file:///conversion/tmp/scratch/385673381.xlsx 240
NO. KODE URAIAN PEKERJAAN
1 2 3
M.2 1 M2 Pasang lantai Ubin Granito Uk. 40 x 40 cm
M.3 1 M2 Pasang Lantai Keramik 30 x 30 cm
M.4 1 M2 Pasang Lantai Keramik 20 x 20 cm
M.5 1M2 Memasang Lantai Marmer ukuran 1.00x1.00 m
M.6 1 M2 Pasang Dinding Keramik 10x20 cm,
M.7 1 M2 Pasang Dinding Keramik 20x20 cm,
M.8 1M2 Memasang Dinding Marmer ukuran 1.00x1.00 m
M.9 1 M2 Pasang Dinding Batu Paros / Batu Tempel Hitam
M.10 1 M2 DINDING GRANIT IMPORT
M.11 1 M2 LANTAI GRANIT IMPORT
M.12 1 M2 LANTAI GRANITO UKURAN 60 X 60 POLISHED
M.13 1 M2 DINDING GRANITO UKURAN 60 X 60 POLISHED
M.14 1 M2 LANTAI MARMER ITALY
M.15 1 M2 DINDING MARMER ITALY
Rembang, Januari 20
file:///conversion/tmp/scratch/385673381.xlsx 241
GA SAT UAN P E K E R JAAN
UMUM KABUPATEN REMBANG
UK TAHUN 2011
edisi januari 2011
HARGA SATUAN
385,915.10
101,437.38
1,180,572.00
1,011,665.25
3,450.00
37,512.25
230,011.50
230,011.50
103,500.00
69,000.00
4,312.50
3,450.00
17,250.00
9,228.75
12,305.00
462,300.00
284,625.00
19,665.00
5,175.00
13,800.00
34,500.00
51,750.00
41,400.00
1,725.00
11,385.00
-
17,250.00
84,690.00
10,350.00
152,600.00
87,375.00
136,545.00
18,147.00
file:///conversion/tmp/scratch/385673381.xlsx 242
HARGA SATUAN
4
26,045.00
33,255.50
40,466.00
55,187.50
25,000.00
6,481.45
8,475.74
4,764.77
6,497.68
10,808.32
15,161.26
10,343.75
94,225.00
155,725.00
245,525.00
Err:509
5,346.88
1,896.88
23,511.88
91,845.00
534,373.00
478,683.50
456,291.20
379,136.10
186,831.90
2,056,646.90
563,457.60
732,301.50
12,068.75
64,399.50
80,499.38
96,599.25
128,799.00
408,636.67
file:///conversion/tmp/scratch/385673381.xlsx 243
HARGA SATUAN
4
537,861.67
699,632.50
75,879.28
70,157.63
61,591.25
67,515.15
65,416.00
150,669.43
767,260.90
673,828.80
585,253.90
27,824.28
21,889.50
19,927.08
37,876.80
19,527.30
5,790.25
20,568.80
27,975.85
14,845.63
18,170,987.50
10,984,357.50
420,833.00
521,708.00
448,462.00
1,185,800.00
456,482.50
468,650.02
1,046,612.50
654,614.50
623,055.00
608,971.50
453,919.00
440,873.00
file:///conversion/tmp/scratch/385673381.xlsx 244
HARGA SATUAN
4
10,700,120.00
18,468,550.00
10,422,330.00
642,564.82
848,667.50
120,148.74
126,469.76
1,462,544.00
79,403.99
111,668.70
148,498.40
277,827.60
372,828.60
230,272.50
52,711.25
78,522.70
685,402.95
745,316.22
748,346.78
651,553.39
779,811.34
810,740.22
834,550.25
917,367.40
942,097.16
949,707.33
999,588.32
1,009,640.64
12,542.60
1,379,686.00
1,567,825.00
20,098.75
121,718.00
868,250.00
132,030.50
302,146.00
311,989.90
444,946.00
file:///conversion/tmp/scratch/385673381.xlsx 245
HARGA SATUAN
4
353,627.50
280,421.00
90,227.50
137,425.85
128,630.25
3,305,008.38
4,103,341.38
7,398,487.63
5,758,174.63
5,522,254.63
5,202,751.38
5,274,377.88
63,710.95
75,662.68
1,002,112.50
1,057,137.50
1,098,512.50
1,006.37
44,402.50
43,412.50
39,883.13
40,357.75
83,741.63
34,254.63
32,418.00
54,243.60
39,539.63
43,057.50
177,959.50
76,018.60
60,527.74
64,558.00
34,040.25
25,941.00
35,435.00
293,795.00
file:///conversion/tmp/scratch/385673381.xlsx 246
HARGA SATUAN
4
38,690.50
12,575.00
157,237.18
73,487.50
170,403.46
752,114.25
318,510.50
718,107.38
79,756.51
128,786.23
10,605.00
14,589.50
20,716.00
25,686.50
37,287.00
53,103.50
76,003.96
108,827.25
44,692.91
31,871.97
14,887.75
22,822.63
12,614.25
4,970.25
4,970.25
12,614.25
22,822.63
14,887.75
26,903.97
44,692.91
98,377.50
75,400.00
141,403.50
84,742.50
90,600.50
110,245.00
93,832.50
41,880.05
531,712.50
file:///conversion/tmp/scratch/385673381.xlsx 247
HARGA SATUAN
4
3,544.75
1,772.38
1,063.43
1,329.28
1,774,165.00
41,671.73
59,413.38
167,307,746.50
167,215,721.50
167,177,657.50
47,862.00
3,907,700.00
5,491,150.00
6,240,202.50
7,711,400.00
11,187,312.50
19,830,800.00
22,749,137.50
4,258,505.00
2,156,505.00
27,554.00
27,623.00
244,359.80
87,250.00
92,100.00
91,668.75
15,775.00
12,900.00
17,450.00
28,125.00
21,950.00
24,825.00
114,500.00
57,280.30
file:///conversion/tmp/scratch/385673381.xlsx 248
HARGA SATUAN
4
583,677.38
134,689.75
126,898.50
708,782.38
137,094.65
138,972.65
740,331.50
161,887.38
519,581.50
417,684.00
566,999.00
572,106.50
1,556,984.00
1,658,881.50
5,910.00
14,703.75
32,961.88
42,599.38
13,220.15
8,836.10
12,709.50
27,052.25
90,279.00
40,827.88
79,808.38
file:///conversion/tmp/scratch/385673381.xlsx 249
KEGIATAN SWAKELOLA
BIDANG CIPTA KARYA