CONTRACTORS: 25
MARKET REMARKS: 32
FINAL COMMENTS: 34
SOURCES: 37
The INTSOK Office Brazil is glad to help your company should you require more
detailed information regarding Brazilian market issues. Please contact your local
advisor for further information. Enjoy the reading,
The Basins
Espírito Santo Basin:
[06.09.2011]
New Oil Off Espírito Santo
Petrobras announced several discoveries:
June - new oil in the BM-ES-23 block, in deep-waters. Discovery well, 1-BRSA-926D-ESS,
christened Brigadeiro, drilled by Diamond‟s Ocean Clipper rig. EVD is 4,720 m and 1,899 m
of SWD.
July – new oil and gas block at approximately 4,200 m of drilling depth, 1-BRSA-939-ESS
(Pé-de-Moleque) and 1-BRSA-936D-ESS (Quindim) wells, both drilled by the Gold Star and
Petrobras 10.000 rigs, respectively.
BM-ES-23 Petrobras-operated (with a 65% stake) located east of the Golfinho and Canapu
fields. Petrobras is operator of BM-ES-23, with Shell (20%) and Inpex (15%) as partners.
Both companies plan minimum exploration program in the area. Petrobras intends to send
evaluation plan to National Petroleum Agency (ANP), scheduled May 2013.
[05.16.2011]
Petrobras Onshore In Espírito Santo
In 2011, Petrobras will invest R$ 280 million ($170 million USD) in exploratory onshore
campaigns. Expectations of 49 wells in the North Region, including 12 in hopes of new
reservoirs. Company will acquire seismic 3-D data in the region, already drilling12 wells
onshore since January. Three drilling rigs intended to carry-out campaigns in the northern
part of the state; expectations to increase steam injection capacity in the fields of Fazenda
Alegre and Rio Preto Oeste. Petrobras currently produces from 380 onshore wells in state.
[05.30.2011] [04.18.2011]
Espírito Santo Oil Traces
Petrobras reports discovery traces of oil in the BM-ES-22 block, maintaining working
partnership with mining company Vale, in the basin. The strike occurred at a depth of 2,153
meters in the ES-M-527 area. Petrobras acquired the block in 2004 at the 6th Round of
Bidding. Last year, company sold 25% of the block to Vale with a 10% stake in neighboring
BM-ES-21 block, operated by Petrobras in partnership with Repsol.
Santos Basin:
[08.04.2011] 18h14m / By Felipe Maciel
Piracucá gets FPSO In 2015
Petrobras to start operations in Piracucá Field, (former block BM-S-7 of the Santos Basin) by
2015. Field to get FPSO with production capacity of 25,000 bpd of liquids (oil plus water) and
2 million m3 per day natural gas. Production unit will be anchored in 190 m depth.
Development plan calls for drilling four wells for evaluation, one for contingencies, 2012. Well
completion should take place in 2013 /2014, about the time when reduction system will be
ready for installation. Petrobras project partner, Repsol, estimates initial field development
cost at $490 million USD. Piracucá estimates site volume of 550 million barrel oil, equivalent
(boe). Petrobras operates block with 63% participation. Partner Repsol, holds 37%.011]
17h02m / from the newsroom
Guará Sul Connected
Petrobras reports Guará Sul extension well drilled in BM-S-9, pre-salt of the Santos Basin
with good reservoir conditions and lateral continuity with discovery well.
Pressure monitoring, comparing to discovery well, presently in extended well test (EWT),
confirm the connection.
Company will carry out formation tests to evaluate reservoir productivity. Prospect is 5.7 km
to the south of the pioneer well at water depth of 2,156 m. Guará Sul is 315 km off coast, São
Paulo state.
[07.28.2011] 18h14m / By Cláudia Siqueira
Schahin/Modec Wins Cernambi
Schahin/Modec consortium presented lowest tender run price by Petrobras for the FPSO
chartering for future use in Cernambi area / Santos Basin pre-salt region. Daily rate close to
$610,000 USD. The other competitor group, Odebrecht/Teekay, proposes $1.1million USD
daily rate. Petrobras decided to charter unit with producing-specs of 120,000 barrels/day of
oil and 6 million m³/day of gas, with installation for separating-out CO2 gas..
Petrobras looks to lower daily rate. Negotiations expected to begin August until month end.
Everything points towards oil company establishing $599,000 USD/day, as ceiling.
www.intsok.com | 5
& Co., Ltd. (Mitsui, head office: Chiyoda-ku, Tokyo; president: Masami Iijima) and Mitsubishi
Corporation (Mitsubishi, head office: Chiyoda-ku, Tokyo; president: Ken Kobayashi) have
agreed to invest in building and chartering a floating production, storage, and offloading
system (FPSO) to GUARA B.V, a Dutch company belonging to BM-S-9 consortium
members. The FPSO will be delivered offshore Brazil and used to develop the giant pre-salt
region of the Santos Basin, in the BM-S-9 block (Guara Area) under consortium concession,
comprised of the following three companies: Petróleo Brasileiro S.A - Petrobras (45%), BG
E&P Brasil Ltda - BG (30%), and Repsol Sinopec Brasil S.A - Repsol Sinopec (25%).
Mitsui and Mitsubishi will finalize capital investment in Dutch company Guara MV23 B.V.
(MV23), a subsidiary established by MODEC. MODEC is currently converting the VLCC (very
large crude oil carrier) Radiant Jewel into an FPSO, under the ownership of MV23. At
conversion completion, system will be named FPSO Cidade de Sao Paulo MV23, and
deployed to BM-S-9 (Guara) Block off Brazilian coast with vast oil reserves beneath rock and
salt layers, to a depth of 5,000 meters.
Topsides modules will be lifted and integrated on the FPSO in Brazil. FPSO is scheduled for
4th QTR, 2012 delivery. Will be engaged in oil production for 20 years. MODEC is responsible
for engineering, procurement, construction, mobilization, and operation of FPSO, including
topsides processing equipment, hull and marine systems. MV23's Brazilian local and joint
venture partner in the tender, Schahin Group, considering a certain-share participation as a
shareholder of MV23. Schahin Group plans to stake various operation roles of FPSO.
Campos Basin:
Repsol Takes Over BM-ES-30
Repsol Sinopec acquired 30% share owned by Ecopetrol and Hess Brasil in exploratory
block BM-ES-30, Espírito Santo. Present-area ownership at 40%, currently holds 100% of
the block and will be responsible for operation.
Acquisition indicates Repsol Sinopec will move to second exploratory period of block, drilling
well by 2012. Hess, former owner, drilled block in 2009 - no indication of hydrocarbons. Sold
during sixth round of bidding by the ANP, BM-ES-3 - located northern Parque das Baleias /
Campos Basin, Espírito Santo state.
www.intsok.com | 6
OGX has found hydrocarbons in well 1-OGX-52-RJS, called Tambora, on block BM-C-41 (C-
M-592), in shallow waters, Campos Basin. OGX group owns 100% of block.
Well located approximately 93 km off coast - state of Rio de Janeiro, approximate water
depth of 130 m. The Ocean Ambassabor began drilling July 4th.
[07.22.2011] 16h56m / By Felipe Maciel
Espadarte To Receive A New FPSO
Petrobras should install FPSO Cidade de Rio das Ostras on Espadarte field in the Campos
Basin next year. Unit presently exploiting prospect of Aruanã in block BM-C-36. Responsible
for extended well test (EWT) in well 3-ESP-22D-RJS.
FPSO Cidade de Rio de Ostras went through adaptation works to produce extra heavy oil at
Aruanã. Petrojarl owned, unit chartered to Petrobras for two years, with equal-period renewal
possibilities, at daily rate of $135,000 USD. FPSO has a capacity to produce 20,000
barrels/day of oil - storage capacities up to 150,000 barrels.
[07.05.2011] 17h56m / By Felipe Maciel
BM-S-8 Producing By 2018
Queiroz Galvão Exploração e Produção (QGEP) is working with hypothesis of producing first
oil from definitive system of BM-S-8 block, Santos pre-salt cluster between 2017 and 2018.
Timetable takes into account five to six years of production development after end of the
exploration period, scheduled December of next year. Company looking at purchase of 10%
stake; deal assessed at $175 million USD.
[06.28.2011] 16h35m / From the Newsroom
Aruanã EWT Has Started
Petrobras made June announcement it had started Extended Well Test (EWT) in Aruanã
area, post-salt Campos basin in well 1-RJS-661 in block C-M-401. FPSO Cidade de Rio das
Ostras also located, will produce up to 12,000 bpd, limited by equipment. Prospect C-M-401
located between Pampo and Espardarte fields between 350 and 1500 m depth. Formation
test, executed after well-drilling of 1-RJS-661, in March 2009, indicates signs of oil of 27° API
with recoverable volumes at around 280 million barrels.
[04.29.2011] 18h00m / from the newsroom
New Pre-Salt Discovery
Petrobras‟ announced new light oil discovery, Campos Basin‟s Albacora field pre-salt.
Accumulation found at 107 km off the coast and 3.2 km from the P-31 production platform.
Preliminary estimates of volume indicate new accumulation has potential-volume,
economically-recoverable in order of 350 million barrels. Well 6-AB-119D-RJS, drilled in
water depth of 380 m and reaching total depth of 4,835m, exhibited a 241 m column of oil,
found, of which 104 m in carbonate reservoirs of Macabu Formation with porosity at around
10%. The gas/oil ratio – light oil indicative - measured in samples showing values between
60 m³ and 240 m³.
[04.19.2011] 15h46m / from the newsroom
Petrobras Starts Brava EWT
Petrobras began Extended Well Test (EWT) at Brava prospect, in pre-salt, Campos Basin.
Expected to last two years, daily production of 6,000 barrels. EWT will be carried out at well
6-MRL-199-RJS, connected to P-27, now operating Voador field.
Brava EWT will allow Petrobras to obtain more information about reservoir characteristics for
later development of production. Data is also important for studying characteristics of new
wells in Marlim and Voador fields.
Solimões Basin
[07.19.2011] 17h59m the newsroom
www.intsok.com | 7
TNK-BP Enters Solimões
Petra Energia signed farm-out contract with Russia‟s TNK-BP, giving 45% stake in 21 blocks
in Solimões Basin (Amazonas). Remaining ownership interest with HRT, block operator
there.
Agreement conclusion depends upon HRT Board of Directors approval along with TNK-BP,
and Brazilian National Petroleum Agency (ANP) authorization. Value of the operation not
disclosed. Variable amount performance-dependent on assets acquired.
Degolyer & MacNaughton projects reserves of 783 million boe in blocks. Figures include 11
discoveries in region; expected to start production, 2012.
[07.15.2011] 17h51m / By Felipe Maciel
Tuscany Wins HRT Bid
Tuscany International Drilling won HRT Óleo e Gás bid for charter of work-over rig in
Solimões Basin campaigns. Unit should be delivered September with start of operations in
October. Work-over rig will be used for 3 of the 11 accumulations identified. HRT plans to
announce bid-result for acquisition of eight drilling rigs, for Solimões Basin. Plan is for single
company contract with minimum of one installation in Manaus for unit construction.
[06.06.2011] 19h36m / By Felipe Maciel, from Manaus
Two EWTs In Solimões
Before end of 2011, HRT to start two Extended Well Tests (EWT) in area of 21 Solimões
Basin exploratory blocks. Company seeks to maximize wells for testing.
Production projected to 50,000 bpd by 2015. Currently has three processing plants acquired
from Halliburton for regional oil processing. Part of gas to be re-injected and part burned.
Projected drilling capacity increases - to be accomplished with the nine drilling unit
acquisitions – should allow company to drill around 40 wells per annum in coming years. Will
increase production capacity based on EWT systems. HRT‟s goal to start first EWT in
August, in area block SOL-T-170. System will produce 1,700 bpd; implemented in six months
to a year.
www.intsok.com | 8
Flexible Line
HRT received flexible line bought to convey production of its first EWT, in block BT-SOL-1,
Solimões Basin. Line laid in July, with first oil slated for August.
Company invested $23 million USD in production facilities, including 50 km long flexible line,
used to carry oil to future Tefé River terminal location. Line to be 26 km long. Company
efforts underway to secure project environmental license. Structure will have capacity for
7,000 bpd. Company estimates production of around 1,700 bpd, which will be sold to
Petrobras and delivered in its terminal on the Solim
Sergipe Basin
[05.26.2011] 19h43m / By Felipe Maciel
ANP Approves Starfish Plan
National Petroleum Agency‟s (ANP) Board approved development plan for Aracuã field
operated by Sonangol Starfish in former SEAL-T-462 area, Sergipe Basin, part of the urban
area of Aracaju. Production through1-STAR-5D-SE well.
Sonangol Starfish drilled two exploration well - 1-STAR-5D-SE and 1-STAR-6D-SE. First-well
testing resulted in declaration of the field‟s commercial feasibility. Second, abandoned as dry,
exhibited hydrocarbon traces. Small field area accumulation, created no expectation for
additional structure drilling.
Potiguar Basin
[07.11.2011] 16h24m / By Felipe Maciel
Two New Onshore Fields
Petrosynergy declared two new fields (block REC-T-153, onshore Potiguar basin)
commercially feasible. Fields baptized Uirapuru Sudoeste and Trovoada. Company drilled
two wells in April. No hydrocarbons trace found with structures 1PSY19DBA and 1PSY18BA.
Fields are commercially feasible. Reserve estimates not revealed. Petrosynergy, has a 70%
share, partner Silver Marlim holds 30% share.
[04.25.2011] 19h07m / By Felipe Maciel
New Field In Potiguar Basin
www.intsok.com | 9
Petrobras declared commercial feasibility onshore BT-POT-9 block in Potiguar Basin. New
field named Patativa - first commerciality for National Petroleum Agency (ANP) in 2010.
Onshore field, Rio Grande do Norte, picked up by oil company in partnership with Partex,
part of Portugal-based Calouste Gulbenkian group for R$ 215,000, during second round of
ANP bids. Petrobras - operator with 85% interest, remaining 15% ownership balance,
controlled by Gulbenkian.Recôncavo Basin
[07.29.2011] 18h06m / By Felipe Maciel
Stratageo Finishes Seismic
Stratageo finished acquisition of 50 km² of 3D data in the REC-T-196, REC-T-197 and REC-
T-182 blocks, operated by Alvorada Petróleo in Recôncavo Basin. Campaign is largest
acquisition of continuous 3-D carried out in basin. Company preparing data package for oil
group and mobilizing seismic team to carry out 3-D seismic data acquisition in block REC-T-
224, - Gran Tierra is operator in Recôncavo Basin. Mobilizing efforts to follow conclusion of
campaign work, Stratageo foresees acquisition of 37 km² of data. Completion scheduled for
October.
[06.13.2011] 19h17m / From the newsroom
Imetame Finds Oil And Gas
Imetame advised National Petroleum Agency (ANP) oil and gas traces found in cretaceous
layer of first three wells in blocks REC-T-210 and REC-T-211, Recôncavo Basin, Bahia.
Wildcat wells1-IME-1-BA (Acarajé Prospect), 1-IME-2-BA (Caruru Prospect), and 1-IME-3-
BA (Prosperidade Prospect), led to discovery.
First two wells located in Mata de São João (Bahia), with third at Camaçari (Bahia). IME-01
rig, owned by Imetame Energia, carried out campaign. Accumulations and traces of natural
gas and oil were found in all three wells. Two additional exploratory wells – Fé Prospect and
Harmonia Prospect – blocks were acquired during ninth round of ANP, Orteng and Delp,
partners, 33.33% each. Imetame is operator.
[04.20.2011] 16h32m / By Felipe Maciel
Offshore Wells Drilled Onshore
Petrobras will invest R$ 230 million ($144M USD) in resuming production project of the São
João fiel, Recôncavo Basin, Bahia. Will use a Cross rig to drill offshore wells from onshore.
All wells will have high inclination angle to reach offshore reservoirs
Parnaíba Basin
[08.05.2011] 19h04m / By Felipe Maciel
New Seismic In Parnaíba
National Petroleum Agency (ANP) to launch acquisition and processing bid for 42,000 shot
points of 2D reflection seismic on land. Has 10,500 acquisition stations of gravimetric and
magnetometric associated, Parnaíba Basin. Will be carried out in 30 months from contract
signing. Companies interested in competition must prove experience in acquisition of 2,000
km of 2D reflection seismic.
17-05
Parnaiba Basin Wells deliver for OGX
OGX has presented National Petroleum Agency (ANP), through subsidiary OGX Maranhão
Petróleo e Gás Ltda., declarations of commerciality for the Califórnia and Fazenda São José
accumulations discovered in PN-T-68 block within Parnaíba Basin. OGX presented ANP
commerciality declarations for California accumulation. New proposed designations are:
Gavião Azul Field for California, and for the Fazenda São José accumulation, the Gavião
Real Field. Field development plans properly submitted to ANP‟s approval by OGX and
undergoing analysis.
www.intsok.com | 10
Hydrocarbons in wells 1-OGX-34-MA and 3-OGX-38-MA, both in PN-T-68 block, Parnaíba
Basin. OGX-34 well, a wildcat well (Bom Jesus prospect) discovered a 23 meters net pay of
gas in two intervals, within Poti and Cabeças formation. Third accumulation discovered in
the region. OGX-38 - first appraisal well in Fazenda São José accumulation discovered by
OGX-22 wildcat. Encountered 43 meters net pay gas in Poti formation, surpassing initial
volume expectations. Exploration of well ongoing.
California and Fazenda São José accumulations will be OGX's first natural gas fields.
Estimated fields will reach production of 5.7 million m³ per day, 2013, for total production of
1.1 Tcf of gas. Natural gas to be produced in this region will be preferentially provided to the
power plants and scheduled for constructiong by MPX Energia S.A., an EBX group company.
In association with Petra Energia S.A., both OGX partners in the PN-T-68 block. MPX has
acquired site to construct power plant in PN-T-68 block. Have secured installation license for
1,863 MW granted by the Secretaria Estadual do Meio Ambiente do Estado do Maranhão
MPX has initiated environmental licensing process for additional 1,859 MW in the region.
Opeator OGX Maranhão Petróleo e Gás Ltda. controlled by OGX S.A. (66.6%) and MPX
Energia S.A. (33.3%), holds a 70% stake in this block. Petra Energia S.A. with remaining
30%.
Jequitinhonha Basin
[07.29.2011] 19h15m / By Felipe Maciel
Ibama Vetoes Jequitinhonha Well
Request denied to Petrobras by Ibama to renew exploratory drilling license of block BM-J-3,
Jequitinhonha Basin. Company planned to new well drilling in Velho Barreiro NW using the
drill rig Noble Paul Wolf (SS-53) in campaign.
Ibama says license rejected because request was made for oil project, different from initially
approved – one that used Manati gas field as reference for presence of gas and condensate.
Also influencing environmental agency decision was legal ruling prohibiting all petroleum
activity in 50km radius of Marine National Park of Abrolhos, and other areas near and south
of Bahia.
Block BM-J-2 acquired at 4th ANP Bidding Round. Queiroz Galvão has 100% participation of
the asset and the exploratory program agreed upon with agency requires the drilling of only
one well. Offshore Mischief rig contracted Anadarko and Statoil consortium. Have drilled first
wells.
Pelotas Basin
[03.03.2011] 19h24m / By Felipe Maciel
Gas Hydrates In the Pelotas Basin
Geodata Serviços Offshore (maritime branch Georadar), beginning campaign for geophysical
www.intsok.com | 11
data acquisition in Pelotas Basin. Campaign (contracted by PUC-RS) designed to identify
gas hydrates presence. Campaign (Geodata initiated) done using the GSO Marechal
Rondon, completed March 2011. Ship was acquired by Georadar in Norway and completely
renewed in port city of Gdansk (Poland). Approx. cost $20 million USD.
Ocean bed studies carried out and settlements samples and column of water were collected.
The project also included
carrying out experimental
program of vertical electric
sounding, the first in Brazil.
Pará-Maranhão Basin
[04.20.2011] 17h17m / By Felipe Maciel
Spec License For Fugro in Pará-Maranhão Basin
Ibama issued environmental license for Fugro‟s campaign for 2D spec seismic data
acquisition in Brazilian equatorial margin, and in Pará-Maranhão Basin.
License valid until April 1, 2012 and restricted to ship Geo Artic. Fugro campaign could result
from company interest seismic data acquisition following ANP announcement to auction
exploratory blocks of equatorial margin. Marginally explored in comparison to east periphery
of country, region could be very attractive for spec-seismic companies.
www.intsok.com | 12
Oil Companies and Operators
PETROBRAS
Ishibras Will Be Revitalized
Petrobras has opened a tender for the modernization and reactivation of the facilities at the
Inhaúma shipyard, formerly named Ishibras, in Rio de Janeiro. The idea, according to the
executive manager for the pre-salt E&P, José Miranda Formigli, is to conclude the works
between August and September of 2012 then start the conversion of four FPSO hulls that will
operate in the transfer of rights area.
The modules construction for the four FPSO‟s and the integration of the respectives modules
will be contracted early in 2012. Petrobras is working on the projects for the modules at the
present time.
Petrobras intends to begin production in the transfer of right areas in 2015. Franco, the first
area in the region to be exploited, is designated to receive and FPSO with 150,000 bpd
capacity. The other units will begin operations in 2020.
[
Three FLNG Offers
August 9th, SBM/Chiyoda, Saipem/Hyundai and Modec/Technip/JGC presented technical
and commercial proposals for the construction of an FLNG-type vessel (a floating LNG ship)
projected for use in the Santos Basin cluster. Only technical envelopes were opened.
Consortium made up of Petrobras, BG, Repsol YPF. Galp Energia coordinating process.
Commercial proposal re-opens August 25th pending no further delays.Technical
classification forecast results disclosed soon, possibly between August 17th and 18th. Ship
designed to liquefy 14 million m³/day of gas. [08.08.2011] 17h20m / By Felipe
www.intsok.com | 13
Petrobras charters Helicopters
Petrobras preparing heavy-duty helicopter charter before end of 2011. Company has 94
helicopters, most medium-sized. 77,000 passengers transported July, generating annual
average of 1.3 million passengers/year. Petrobras‟ E&P goal is 120 helicopters by 2020, 50%
large-scale and 50% medium-sized craft. Company expects to increase personnel
transportation capacities to 1.6 million passengers/year.
[08.04.2011] 18h14m / By Felipe
Piracucá Gets FPSO In 2015
Petrobras to start operations by 2015 in Piracucá Field, in former block BM-S-7, Santos
Basin. Will receive a FPSO, production capacity of 25,000 bpd of liquids (oil plus water) and
2 million m3 per day of natural gas. Unit to be anchored at 190 m water depth.
ANP approved development plan calls for evaluation-drilling of four wells and one for
contingencies, next year. Well development completion in 2013 /2014, same time reduction
system to be installation-ready. Repsol, partnering with Petrobras estimates initial
development will cost $ 490 million USD. Piracucá estimates site volume of 550 million
barrels of oil equivalent (boe). Block operator Petrobras - 63% and Repsol - 37%.
Petrobras split tender into five packets. First includes modules for flare systems, CO² ,sulfate
removal, water injection, utilities, automation and power generation. Packet two slated as gas
fuel and dehydration modules. Packet three features modules for CO² injection, gas
production flow, compression and steam. Packets four and five slated for oil processing t
produced water treatment, as well as power generation modules.
[08.01.2011] 17h10m / By Felipe
FPSO’s for Onerous Assignment
Petrobras‟ Board of Directors agrees to purchase four VLCC type vessels – oil tankers
conversion be converted into FPSOs for Onerous Assignment (transfer of rights),Santos
Basin‟s pre-salt. Exact payment for hull has not been announced but industry sources report
one VLCC costs-out at or near the $ 30 million USD (R$ 48.30M) mark, for a total order
amount of around US$ 120 million (R$ 193.20 M). Company has scheduled a September
conversion service bid. Bid for unit modules works, integration and construction should be
launched end of 2011 or early first quarter 2012.
[07.25.2011] 19h20m / By Cláudia Siqueira
www.intsok.com | 14
Petrobras To Invest US$ 224 B
Petrobras Board of Directors approved business plan 2011/2015, totaling US$ 224.7 billion
(R$ 389 billion)
[07.25.2011] 19h15m / By Cláudia Siqueira
Pre-salt overtakes Post-salt in production development CAPEX
www.intsok.com | 15
P-59 Is Launched In Bahia
The Rio Paraguaçu consortium (Odebrecht, Queiroz Galvão and UTC Engenharia) launched
the P-59 platform in the river, a self-elevating unit built at São Roque yard, Bahia.
Operation, supported by Brazilian Navy and local port authority. Consortium also building P-
60, self-elevating units undergoing same process in next several months. Contract worth
$700 million USD. Calls for two-unit delivery in 2011 / 2012.
[06.14.2011] 18h20m / By Felipe, from
Petrobras inks Floatel for Campos Basin
Petrobras signs $550 million USD with Lauritzen Offshore for Dan Swift floatel lease.
Unit scheduled for July arrival-date in Brazil. Platform accommodates 300 persons and is first
monocolumn-type unit for this type of service.
[06.03.2011] 17h42m / By Cláudia Siqueira
Petrobras Approves Rig Package
Petrobras' Board of Directors approved bidding process for construction of twenty-one
Brazilian-built drilling rigs. Certification of domestic content (products and services sourced in
Brazil) will be a requirement, with minimum figures specified by the National Petroleum
Agency (ANP). Part of Petrobras' overall strategy to hire twenty-eight new rigs for deepwater
pre-salt filed exploration. Early in 2011, Petrobras awarded a $4.6 billion USD rig
construction package to Sete Brasil for seven deepwater drill ships. First rig operational
expectations set for 2015. Proposal delivery expected in September.
[06.03.2011] 18h51m / By Felipe
Three competing in Prorefam III
Wilson, Sons, Brasil Supply and Navegação São Miguel presented lowest bid prices bid of
third stage of Fleet Renovation Program for Offshore Support (Prorefam). In May 27th
Petrobras received the proposals. Brasil Supply presented lowest price for three AHTS
18.000 and most likely will build them at Eisa shipyard in Rio de Janeiro. Navegação São
Miguel presented lowest price for the PSVs 4.500.
[05.30.2011] 18h25m / from the newsroom
Petrobras/EBN Charters Another 6 Panamax
Petrobras supply area has closed contract with Hidrovia South American Logistics for six
vessels charter of Panamax type. Company will supply five vessels for the transport of light
products such as gasoline and diesel and one for the transport of dark products such as
crude oil, all with a capacity for 63,500 tons. Petrobras concludes second stage of program
contracting 20 oil tankers charter. Contracts valid for 15 years. Vessels should be built in
Brazilian shipyards. Delivery between 2013 - 2017.
[05.20.2011] 19h15m / By
Petrobras Charters Three Rigs
Petrobras contracted another three drill rigs for 3,000 m to begin operations in December.
One is Odfjell and two are Ocean Rig. Total charter cost of $531 million USD (R$ 850 M), the
drillship Deepsea Metro II. In final phase of construction, heads to Brazil in December.
Ocean Rig Mykonos and Ocean Rig Corcovado, at $550 million USD each, will be used in
Santos pre-salt. It will carry out a Greenland campaign, then to Brazil, while Mykonos, in final
phase of construction, leaves Samsung shipyard at beginning final quarter 2011, also
heading to Brazil.
www.intsok.com | 16
Sinochem made agreements for strategic cooperation aimed at business opportunities in
production, exploration, commercialization of oil, and recuperation of mature fields.
SONANGOL
[07.19.2011] 18h50m / By Cláudia Siqueira
Sonangol Still Betting On Campos
Sonangol is expected to continue proceeding with exploration activity in the BM-C-45 (C-M-
498) block of Campos Basin‟s shallow water. Although no hydrocarbons discoveries were
made in its latest area drilling, the oil company has plans to continue in the region for another
two-year-period.The company is currently evaluating all data collected. At the same time, the
Angolan firm is drilling in deep waters, at the BM-C-46 (C-M-622) block, also located in
Campos, using the GSF Arctic semisubmersible rig owned by Transocean. Campaign
objective is to discover a pre-salt reservoir. Named SKUA-1, the wildcat well will reach 5,625
m in 853.8 m of water. The C-M-622 block is located in the southern quadrant of the
Maromba and Papa-Terra fields, both operated by Petrobras.ExxonMobil
[06.13.2011] 19h39m / from the newsroom
ExxonMobil Has No Plans For BM-S-22
ExxonMobil has no plans defined for block BM-S-22, in Santos Basin pre- salt. Company has
not received new license from Ibama but has recently renewed their existing license. The
license was extended to 2013 and conditions-realization of utilization wells for the Seadrill‟s
West Polaris drill ship. Exxonn has advised National Petroleum Agency (ANP) three times of
existing oil traces in BM-S-22. To date, work has failed to prove existence of discovery.
ExxonMobil, through its Esso Brasil subsidiary, has drilled well (Sabia-1), located 147
nautical miles from the shore at 2000 m water depth,reaching job completion first week of
January. The BM-S-22 block is the only one in the Santos pre-salt cluster not operated by
Petrobras
OGX
www.intsok.com | 17
potential of 40,000 b/d of oil of approximately 23° API. Block BM-C-39 lies 94 km off Rio de
Janeiro, at 105 m of water depth. The operation includes drilling a directional well (OGX-41D)
2,340 m in-depth. The wildcat well was 1-OGX-25-RJS.
[06.07.2011] 18h17m / By Felipe Maciel
23 Platforms In Campos Basin
OGX plan for development of its first production projects in the Campos Basin calls for use of
23 production units through 2016, of which 12 will be FPSOs and 11 will be fixed platforms.
First five units contracted and will comprise two production systems at the Waimea and
Waikiki prospects, both in basin shallow waters. By 2013, three FPSOs guaranteed (two for
Waimea and one for Waikiki) and two fixed platforms (one for each project). Waimea, located
in BM-C-41 block, will get third FPSO and second fixed platform.
Likley that OSX-4 or OSX-5 FPSOs to be installed in area. Units currently being contracted
and should be converted overseas, with follow-up integration by OSX shipyard - also an EBX
Group company - being built in north Rio de Janeio State‟s, Porto do Açu. All of the other
FPSOs including fixed platforms, scheduled to be built at Porto do Açu. The OSX-6 through
OSX-12 FPSOs will have production capacity of 100,000 bpd and the WHP-3 through WHP-
11 jackets projected connecting-up capabilities to 30 wells. The definitive project for the
Waimea area will contain 42 wells, including 28 production wells and 12 more injectors.
Designed by the oil company, calls for use of three FPSOs and two fixed platforms.
[05.12.2011] 19h22m / From the newsroom
OGX Discovery In Santos
OGX, sole owner, found gas in 1-OGX-30-RJS well located in the S-M-270 block of the
Santos Basin. The company identified a 330-meter high column in the Salvador prospect, an
area contiguous to the Belém reserves, in OGX-17.The OGX-30 well is located 105 km off
the coast of Rio de Janeiro in 150 m of water depth. The Ocean Quest rig, owned by
Diamond, carried out the drilling.
SHELL:
www.intsok.com | 18
approval (ANP). Secret negotiations began early 2011. Shell will maintain position as
operator with 60%. If approved, will Vale‟s debut in São Francisco Basin. Company portfolio
would then have 24 exploratory blocks spread over basins of Espírito Santo, Pará-Maranhão,
Parnaíba, Santos and São Francisco.
[07.05.2011] 17h38m / From the Newsroom
Shell Leaves Santos Cluster
Queiroz Galvão Exploração e Produção (QGEP) and Barra Energia purchased, each, half of
the 20% stake that Shell Brasil owned in the BM-S-8 block, where the Bem-Te-Vi is located.
The agreements, dependent upon National Petroleum Agency (ANP) approval, represent the
pullout out of the Anglo-Dutch oil company from the Santos pre-salt cluster. In 2008,
Petrobras confirmed the discovery of oil in the pre-salt reservoirs of the block. The wildcat
well was drilled in 2,139 meters of water, reaching a final depth of 6,773 meters. The
Brazilian company is the operator of the area with a 66% stake, with Shell (20%) and Galp
(14%), as partners.
[06.15.2011] 18h36m / from the newsroom
Shell Buys Wellheads
Shell acquiring 26 wellheads from GE Oil & Gas in a deal worth about $30 million USD
through end of 2013. The agreement calls for delivery of 13 MS-700 Simblore and 13 MS-
700 systems for deep-water. Most equipment to be produced at GE plant located in Jandira
(SP) Deleveries starting September. In Brazil, GE has already delivered more than 300
wellhead systems to 11 operators.
[06.10.2011] 18h19m / By Felipe Maciel
Abalone Stopped Until 2013
Shell operated Abalone field in Parque das Concha, located in Espirito Santo part of the
Campos Basin will have production halted through January 2013. The aim is to carry out field
maintenance. Parque das Conchas covers fields of Abalone, Ostra, Argonauta- B-West and
Nautilus. Shell has 50% participation in the area, with partners Petrobras (35%) and Indian
state oil company ONGC (15%). System production expectations between 80,000 b/d and
100,000 b/d of oil
www.intsok.com | 19
STATOIL
The Norwegian oil company recently began first production (in Brazil) from the Peregrino
field, Campos Basin.
www.intsok.com | 20
Repsol - Sinopec
[07.27.2011] 13h17m / By Felipe Maciel
Repsol: New Well In The Pre-Salt
Repsol Sinopec management team approved new exploratory well-drilling proposal in block
BM-C-33. Significant discovery of oil in the pre-salt, Campos Basin recently announced.
Called the Pão de Açúcar, the prospect will have an estimated cost of $69.2 million USD.
Additional expectations to carry out production testing in area, budgeted at $15.4 million
USD. Block‟s pre-salt discovery was announced end of June, after the drilling of the Gávea
prospect (1-REPF-11A-RJS), sunk by the Stena Drillmax I rig.
www.intsok.com | 21
GALP
[05.04.2011] 17h41m / From the Newsroom, with Agencia Reuters
Galp to raise $3B USD in Brazil
Portuguese oil company Galp Energia has hired Bank of America Merrill Lynch, JPMorgan
and UBS to raise $3 billion USD through sale of a portion of its Brazilian unit. Galp plans to
raise at least $2.95 billion USD to help finance part of its large field development in Brazil‟s
pre-salt. For any buyer, new shares representing at least 20% of the Brazilian subsidiary, will
be offered. According to the Portuguese newspaper Diário Econômico, the Spanish refining
company Cepsa and the Chinese companies Sinopec, both PetroChina and CNOOC have
expressed interest in Galp-Brail share purchases.
Galp is a minority shareholder with Petrobras, co-working important discoveries of offshore
Brasilian areas, including the vast Lula, Cernambi and Lara Fields. Analysts are questioning
Galp‟s ability to finance its part of the projects, where extraction of oil will take place in areas
up-to 7,000 m deep.
Chevron
[06.16.2011] 14h28m / By Felipe Maciel, from Macaé
Frade Nearing 90,000 Bpd
Chevron has reached production of 70,000 barrels/day at the Frade field, located in Campos
Basin deep waters. Frade, 2years in production and close to reaching peak, projected at
90,000 barrels/day. Chevron, field operator, with a 51.7% stake, Petrobras (30%) and
Japanese shareholders through Frade Japão Petróleo (18.26%).
BP
[07.18.2011] 18h17m / By Felipe Maciel
BP Returns To Brazil’s Offshore
BP first campaign in the Brazilian offshore since it left Foz do Amazonas, 2005. Well
3BP4ESS being drilled by ENSCO DS-4 rig in block C-M-61, in pre-salt, Campos Basin,
Espírito Santo 4,975 m in waters and 1,426 m deep. BP to analyze Itaipu discover, made in
pre-salt block area. Devon responsible for the operation of the asset. Drilling operation
epected to run for three months.
[05.10.2011] 19h28m / By Felipe aciel
BP Back In Brazil
National Petroleum Agency (ANP) approved acquisition of Brazil‟s Devon Energy‟s assets by
United Kingdom‟s BP. Deal worth $7 billion USD. Request for assignment of Devon‟s rights
reached sagency last June, two months after largest oilfield catastrophe in the U.S. history.
Concession
Concession Basin Operator Award Year
holder(s)
Anadarko 30%
BM-C-30 Campos BP 25% Round 6
Anadarko
(Wahoo) Basin IBV Brasil 25% (2004)
SK 20%
Exploration BP 40%
BM-C-32 Campos Round 6
BP Anadarko 33.33%
(Itaipu) Basin (2004)
SK 26.67%
BP 30%
BM-C-34 Campos Round 7
BP Petrobras 50%
(Fragata, C-M-471, C-M-473) Basin (2005)
Maersk 20%
Campos Petrobras 65% Round 7
BM-C-35 Petrobras
Basin BP 35% (2005)
www.intsok.com | 22
Camamu-
Round 7
BM-CAL-13 Almada BP BP 100%
(2005)
Basin
BP 40%
Parnaíba Round 9
BT-PN-2 BP Petrobras 40%
Basin (2007)
Vale 20%
BP 40%
Parnaíba Round 9
BT-PN-3 Petrobras Petrobras 40%
Basin (2007)
Vale 20%
Campos BP 60% Round 2
Polvo (former BM-C-8) BP
Basin SK 40% (2000)
Development / Petrobras 41.175%
Xerelete Campos
Production Petrobras BP 17.65% Zero (1998)
(Former BC-2) Basin
Total 41.175%
BP in Brazil:
BP's return to exploration and production operations in Brazil adds to investments being made
by other BP Group companies in Brazili including biofuels, lubricants and aviation fuels,
highlighting the strategic importance of Brazil for BP.
BP companies are now present in nine Brazilian states and the Federal District.
Castrol, BP's lubricants business, established lubricants plant in Rio de Janeiro in
1957,where it manufacture wide variety of engine and industrial equipment lubricants.
Air BP, the BP Group aviation fuel unit, began Brazil operations in Brazil in 2002.
Supplies aviation fuel at 13 airports in five Brazilian states and Federal District.
BP Biofuels has operated in Brazil since 2008, through 50 per cent subsidiary Tropical
Bioenergia. First oil company to produce ethanol in Brazil. BP announced (March 2011)
agreement to acquire controlling stake in CNAA (Companhia Nacional de Açúcar e
Álcool), expanding in country presence.
Prior to the Devon acquisition, BP carried out exploration activities in Brazil during the
risk contract phase in the 1970s and 1980s, and under concession regime from 1999 to
2005. BP acquired seismic data in Santos, Amazonas, Paraná and Foz do Amazonas
basin. Drilled seven wells in Santos and Foz do Amazonas basins.
ONGC
[06.02.2011] 18h29m / By Felipe Maciel
ONGC Initiates Operation
Indian oil company ONCG has begun first drilling campaign in Brazil‟s offshore fields as
operator. Drilling well 1ONGC1SPS in block BM-S-73 (S-M-1413), Santos Basin, reaching
final depth of 3,660 m, in waters 1,630 m deep. Block BM-S-73 acquired by ONGC during 9th
Round of bidding of the ANP, held in 2005. In January, the oil company granted Petrobras
and Ecopetrol 56.5% share in the block. Brazilian company has 43.5% in the area,
Colombian company has 13%. The deal was approved by the ANP.
BG
[06.22.2011] 17h09m / from the newsroom
BG Brasil Makes Grants For R&D
BG Brasil will finance 450 scholarships for students and researchers in universities outside of
Brazil, in addition to providing internships in oil and gas and creation of ecological institutes in
Brazil. A letter of intent signed June 21 with Council For Scientific and Technological
Development (CNPq) and Ministry of Science and Technology.
www.intsok.com | 23
The project calls for an outlay of $17.5 million USD over the next 5 to 8 years, and is part of
an investment plan of $1.5 billion USD in R&D/Brazil through 2025. The company hopes to
be producing 550,000 boe/d by 2020.
[04.29.2011] 18h12m / From the Newsroom
BG: US$ 70 B For Exploration
BG do Brasil, one of Petrobras partners in pre-salt projects, estimates well drilling in Guará
and Lula fields will require up to $70 billion USD over next few years. The projection was
made by Nelson Silva the president of BG in Brazil, and based on the present average
drilling costs for wells in that region.. Based on a simple calculation we see that investments
could reach $70 billion USD”, said Silva during a presentation at the Polytechnical School of
São Paulo University (USP).
HRT
Friday, August 12, 2011 Dow Jones Newswires by Diana Kink
HRT Plans to Drill 65 Wells by End-2014
HRT Participações em Petróleo, plans 65 exploration wells and develop production at 52
HRT has a cash position of 2.2 billion Brazilian Reais ($1.37 billion USD) to finance its
development program.
Karoon
[05.05.2011] 19h20m / From The Newsroom
Karoon Charters Rig In Brazil
Karoon has signed a letter of intention with Dolphin Drilling to charter the semi-submersible
rig Blackford Dolphin. The Australian oil company expects to conclude negotiations for drilling
activity in 3Q,2011. The wells lie 280 km off the coast of São Paulo, at 400 m water depth.
It‟s projected that rig-drilling will be announced by the end of this year, once interpretation of
the seismic data is completed. Karoon holds 100% of the cells S-M-1037, S-M-1101, S-M-
1102, S-M-1165 and S-M-1166, all of which are located in the Santos basin. Areas were sold
during the ninth round.
www.intsok.com | 24
Contractors:
Saipem / Hyundai in FLNG pole position:
The Saipem / Hyundai consortium had the lowest price in Petrobras competition to build a
FLNG vessel type destined to the Santos cluster, with the proposal of U$D 3.29 billion. The
value presented by the Italian-Korean group beat out bids from Modec / Technip / JGC, with
the total price of U$D $ 3.8 billion, and SBM / Chiyoda, worth U$D $ 4.8 billion.
The envelopes for prices were opened in August 25th . It is expected that the consortium
Petrobras, BG, Repsol and Galp Energia, which coordinates the process, disclose the results
of bidders ranking by early of September. The price offered by Saipem / Hyundai was well
perceived by Petrobras and its partners. Apparently, as soon as confirmed the technical
ranking of the participants, the oil company should recall the company well positioned in the
final result, to negotiate a lower price for the value proposition. Despite of rumors about a
possible bid process cancelling, Petrobras still ensures that the process follows as expected
according Maria das Graças Foster, Energy and Power‟s director. The motivation for such
thinking is due to the recent decision to postpone the FLNG project, by using the Route 3
project as alternative.
www.intsok.com | 25
[07.26.2011] 18h10m / By Felipe Maciel
Wellstream - Aker Wayfarer In Brazil
The Aker Wayfarer, chartered by Wellstream from Aker Solutions, has arrived in Brazil. The
ship will be responsible for laying of Waimea prospect production lines, operated by OGX
located in shallow waters of the Campos Basin‟s BM-C-41 block. Vessel currently docked at
the Mauá shipyard in Niterói (Rio de Janeiro). OGX is scheduling to bring out the first oil from
Waimea in October. The FPSO OSX-1, currently undergoing refitting and customization at
the Keppel Shipyard in Singapore, will exploit prospect. The unit has capacity to: 42,000 bpd
liquid processing, 40,000 bopd processing, 60,000 pbd water injection, 53 mmscfd gas
compression, 950,000 bbls storage capacity and has installed a STP mooring system.
[07.21.2011] 18h47m / By Felipe Maciel
OSX - OSX-3 Will Cost $800 Million USD
OSX has signed an $ 800 million USD contract with Modec for construction of FPSO OSX-3
to be installed in shallow waters, at Waikiki Prospect in Campos Basin‟s block BM-C-39. The
contract calls for the unit to be delivered third quarter 2013 by the shipyard in Singapore. The
FPSO OSX-3 will have a production capacity of 100,000 bpd of oil and store 1.3 million
barrels. OSX is presently preparing for project bidding of FPSOs OSX-4 and OSX-5,
engineering and integration.
www.intsok.com | 26
by the end of 2012.
[06.16.2011] 16h02m / By Felipe Maciel, from Macaé
FMC - Spools For Tambaú Field
FMC Technologies will deliver five spools to connect manifolds at the Tambaú field, Santos
Basin.The Tambaú field is part of a complex located at the former BS-500, where Petrobras
already produces through the Uruguá field. The FPSO Cidade de Santos will exploit two
areas and be connected to eleven wells.
New base
FMC seeks area for setting-up a new after market base. The company to analyze locations
for the facility. Construction of a new base, similar to one in Macaé, would require a near $50
million USD investment.
www.intsok.com | 27
requirement of 20%, corresponding to the assembly of the unit. Over the length of the
contract, increases will reach local content of 65%.The Italian company plans to build a Brazil
plant for crane manufacturing. Petrobras estimates a market potential of 200 offshore cranes
in the coming years, including new ships and the modernization of older units.
[05.30.2011] 17h53m / From the newsroom
NKT To Install Plant In Brazil
NKT Flexibles will set-up a flexible pipe factory in Brazil between 2013 and 2014. The plant is
projected to meet extension of supply agreement with Petrobras and will supply up to 694 km
of pipes between 4″ and 8″ to water depths of up to 2,000 m. The business is worth € 1.3
billion ($1.85 B USD) and is valid from 2012 to 2015. The agreement includes the supply of
dynamic systems of flexible rises, flexible flow lines and jumpers and accessories for
configuration of subsea pipe systems.
[05.20.2011] 15h45m / By João Montenegro
www.intsok.com | 28
of generators for eight FPSOs being built at the Rio Grande shipyard. The first equipment will
be delivered during the month of September. The construction of the first unit will be
completed next year.
The FPSOs to be used by Petrobras in Lula field in former block BM-S-11, followed by Guará
prospect in block BM-S-9, both in pre-salt cluster of Santos Basin. Lula will receive six units
and Guará will receive remaining platforms. All of FPSOs will have a production capacity of
150,000 bpd of oil.
www.intsok.com | 29
Government:
[04.28.2011] 18h30m / By Felipe Maciel
11th Round will have 174 Blocks
National Energy Policy Council (CNPE) approved scheduling 11th round National Petroleum
Agency (ANP) bidding, offering 174 exploratory blocks in nine sedimentary basins along the
Brazilian equatorial margin. Auction focuses on mature basins and new frontiers, excluding
those areas close to pre-salt region.
www.intsok.com | 30
According to Nava, besides Manaus industrial center, cities such as Rio Preto da Eva,
Itacoatiara, Itapiranga, Coari, Carauari, Jutaí and Tapauá have already begun infrastructure
projects to receive oil industry production chain companies. The expectation is that by 2013,
and the conclusion of the Tucuruí-Macapá-Manaus long transmission line and subsequent
connection of cities to the national electricity grid, centers will effectively begin to be
established.
[06.07.2011] 16h14m / By João Montenegro
R&D Clause Changes
The National Petroleum Agency (ANP) is currently evaluating the proposals made by the
Brazilian Oil, Gas and Biofuels Institute (IBP) seeking changes to how R&D funds are
managed for future contract concessions . Changes being sought include extension of fund
payment deadline, investment-increase possibilities, and reduction in red tape involved in
rendering accounts process for concession holders.
First proposal answers to concession holders‟ requirements for payment of investment
quotas, will be by June 30 of year following calendar year of the quarter in question.
9h50m / By Ricardo Vigliano, from OTC 2011, Houston
Local Content Also In Production
The National Petroleum Agency (ANP) will begin to inspect local content percentages during
production phases. The first project for inspection will be Polvo, owned by BP in the Campos
Basin. Prior to this, and to interpretation problems, the agency will need to change legislation
text. Current legislation states failure to comply could be penalized at the end of the
development plan. For agency, that moment occurs upon the installation of each production
module; for operator, this inspection comes 27 years after the concession was awarded.
According to ANP director Magda Chambriard, the change in the text seeks to better define
this moment within the context of the law. ANP identified non-compliance in the local content
index during the exploration phase in 69 blocks. Deadline for operators to present their
reasoning was June 16.
www.intsok.com | 31
Market remarks:
08-Aug
New Technologies for exploration
Petrobras CEO, José Sergio Gabrielli, believes the company is strongly interested in
development of new exploration technologies within the country. He confirms that process is
underway and should be accomplished in the short term. "By 2017, we keep the model
(exploration) we already know,” says Gabriell, “But we also know that this model will be
overcome. Among the technologies examined are alternatives for subsea separation of oil
and water. Another consideration is the use of seawater for re-injection operations. The
priority of Petrobras is finding ways to reduce weight and increase the process efficiency on
the surface, from the adoption of new materials, with the application of nano-particles and
chemical transformation of products. This model will allow even a better ships operation,
which would have capacity improvement.
08.04.2011] 18h27m /the newsroom
IOCs Increase In Brazil
In June, private companies achieved their greatest production of petroleum reported in fields
not operated by Petrobras, a total of 200,000 barrels per day. The daily average was 9.3%
greater than the 183,000 barrels per day reported the previous month, and 20.5% greater
than last year‟s average of 166,000 barrels per day. Shell registered the highest production,
with 84,000 barrels per day in Ostra, Argonauta, Bijupirá and Salema. Frade, operated by
Chevron, remained as the non-Petrobras operated field leader, racking-up the highest
individual production, a total of 67,000 barrels per day. In Peregrino, Statoil produced 24,000
barrels per day.
[07.26.2011] 17h17m / By Felipe Maciel
54 Production Systems By 2020
The new Petrobras Business Plan (2011/2015) sets as a target for its E&P area the
installation of 54 new production systems through 2020. By 2015 alone, some 19 systems
will be built, ten (10) of which in post-salt areas, eight (8) in the pre-salt and one (1) in an
onerous assignment section (Franco), raising the company‟s production capacity to 2.3
million bpd. Between 2015 and 2020, there will be another 35 production systems put into
operation. To get an idea of the size of the challenge facing Petrobras, the Campos Basin,
under development by Petrobras since the 1970s, (for example) has about 50 production
units installed.
Also scheduled are 30 new extended well tests (EWTs) for the next five years,13 of which
will be in pre-salt layer, Santos Basin, seven in the onerous assignment areas and 10 in post-
salt segments.
[06.09.2011] 19h08m / From the newsroom
Technological Park in Rio de Janeiro “fully booked”
Siemens, BG Brasil and EMC Computer Systems Brasil were selected early June to set up
Rio Technological Park research centers located on the UFRJ university campus. The
companies will occupy the last remaining available complex slots - now hosting six
companies and five laboratories - investigating pre-salt development technologies.
BG Brasil will develop research projects in limestone, CO2 management, well safety and
integrity. EMC‟s studies will be in the field of Large Data Sets, with applications in genetics,
geology and entertainment. For its part, Siemens will be working on offshore and subsea
technologies, sustainable technologies, and renewable energy sources and software
development.
In addition to latest tender winners and Schlumberger (whose technological center has been
established) Baker Hughes, FMC Technologies, Usiminas, Tenaris Confab and Halliburton,
www.intsok.com | 32
will occupy park-based research centers.
[05.13.2011] 17h37m / By João Montenegro
French Research For Petrobras
At the end of this year, a group of French companies should announce setting-up of an R&D
Institute in Brazil to develop technology of interest to Petrobras. Included among projects are
solutions in acoustic communication, remote control operations, automation and robotics.
The group‟s aim is to give assistance to state company plans for decreasing numbers of
people on offshore platforms. Expectation is that the institute will have the participation of
Brazilian researchers and connections with Brazilian universities, such as the Catholic
University (PUC) and the Rio de Janeiro Federal University (UFRJ), among others.
[05.02.2011] 18h39m / By João Montenegro
Brazilian Technology In GoM
A new reduction-swaying technology in high seas monocolumns – recently developed by the
Polytechnic School of the University of São Paulo (Poli-USP) – is expected to be applied for
the first time for units located in the Gulf of Mexico‟s Cascade and Chinook fields, alos,
operated by Petrobras. Known as a “Fins Suppressing Motion-Induced Vortices System,” the
technology appears to be ideal for locations with strong currents, as is the case in the Gulf.
Technology reduces movement and effects of currents on useful life of the risers.
Objective is to use technology to substitute the strake – the frieze in the spiral welded pipes
along the monocolumn – traditionally used to reduce the impact of movement induced by
vortices impacting large floating structures. According to Poli-USP, the new system requires
20-times less steel than needed for the strakes, reducing both operator costs and platform
weight.
www.intsok.com | 33
12. Brava: 380 million barrels – June
In addition, there were more than 30 billion barrels discovered in other parts of the world in
2010, including Iran, Russia, Norway (more), Mexico, Ghana, Iraq, U.S. (more) and Oman,
bringing the total of new recoverable oil discoveries in 2010 to around 50 billion
barrels. Brazil was the clear leader in 2010, with oil found representing up to half of all new
global oil discoveries in 2010.
Hydrocarbon qualities in some areas in Brazil‟s offshore
www.intsok.com | 34
Final Comments:
Brazilian oil market tendencies
Brazil has a healthy position with respect to political risks among significant oil reserve
nations.
Given the robust investments in South America and North America, expectations are that
Brazil will put into production between 2010 and 2014, fields with total volumes
approximating proven reserves of 8.5 billion.
Chart 2: Total Reserves of fields that should be put into production by 2014, in billions of barrels of oil equivale
www.intsok.com | 35
The same enthusiasm is seen in technology investments in E&P activities at deep waters.
Neither the high costs associated with the upstream offshore segment were able to cool
down the investments. Even deep offshore remain high, so that supplies of rigs and platforms
in the year 2000 have struggled to follow the evolution of demand for such equipment.
We see that E & P initiatives in deep and ultra deep waters continue to grow in relevance and
quantity.
Brazil continues at the edge of these activities due to the PETROBRAS‟ pioneering spirit and
leadership at the upstream segment. The company faces a different problem from most of its
competitors. Although the great majority of oil companies have difficulties in carrying out
organic growth, it‟s the renewal of its reserves and increase production capacity, which
creates an opposite problem for Petrobras. It has many profitable investment opportunities to
increase the reserves and production. Even with robust cash flow, having strengthened its
capital and increases of significant financial funding, the company still cannot raise enough
capital to complete all projects it considers strategic. It is important to stress that the
company has one of the largest capital budgets in the world. In 2011, Petrobras intends to
invest $51 billion USD, 1.5 times more than $ 34 billion USD for Exxon, the world's largest
company. In fact, the pace of investments in deep offshore has remained more intense than
the other upstream segments . The main elements contributing to this are:
I) The existence of investment opportunities in this environment
II) The accumulation of knowledge and technological advances that mitigate costs
and risks
III) Competition from companies to reserves replacement and grow
IV) The oil prices stable at favorable levels, and
V) The availability of cash flow from the oil companies, from generated profits.
Thus, although the activities in deep water are more capital intensive, there remain players
able to take risks and attend the large capital requirements of this activity. The large oil
companies of PETROBRAS and Statoil, have the best conditions to work in this business
scenario, due to the investments in technology and training needed to acquire requested
skills.
Outside these figures, we have in Brazil other important players who can reinforce total
investments planned for Brazil Upstream segment (including on and offshore), such as:
HRT – announced investments about U$D 3,1 B, until 2014;
BG – 2010 gross capital expenditure commitment of U$D 13 B;
OGX – From 2011 to 2013 expected CAPEX of U$D 5 B.
www.intsok.com | 36
Sources:
http://www.energiahoje.com/
http://clippingmp.planejamento.gov.br/
http://economia.estadao.com.br/topicos/petroleo
http://hrblaw.com.br/
http://infopetro.wordpress.com/
http://netmarinha.uol.com.br/
http://news.seadiscovery.com/
http://news.yahoo.com/topics/oil-and-gas
http://www.agenciapetrobrasdenoticias.com.br/
http://www.anp.gov.br/
http://www.blogspetrobras.com.br/fatosedados/
http://www.braziloilandgas.com/
http://www.brazzilmag.com/
http://www.ce-epc.org.br/cms/
http://www.geofisicabrasil.com/
http://www.gestaonaval.org.br/
http://www.guiaoilegas.com.br/
http://www.labceo.uff.br/
http://www.latinpetroleum.com/
http://www.lexpetrolea.com.br/portal/
http://www.marinelink.com/
http://www.maritimeandenergy.com/
http://www.nicomexnoticias.com.br/
http://www.offshore-technology.com/
http://www.oilonline.com/
http://www.oilvoice.com/open/
http://www.petrobras.com.br/pt/investidores/
http://www.petroleum-economist.com/
http://www.portalnaval.com.br/
http://www.power.inf.br/site/
http://www.questoffshore.com/Home/
http://www.rigzone.com/news/
http://www.sinaval.org.br/
http://www.subseaiq.com/
http://www.subseaworld.com/
http://www.tnpetroleo.com.br/
http://www.upstreamonline.com/
Disclaimer Note:
The facts of this report are believed to be correct at the time of publication but cannot be guaranteed. Please note that the findings, conclusions and recommendations that
INTSOK delivers will be based on information gathered in good faith from both primary and secondary sources, whose accuracy we are not always in a position to guarantee.
As such INTSOK can accept no liability whatever for actions taken based on any information that may subsequently prove to be incorrect.
www.intsok.com | 37
INTSOK, Oslo INTSOK, Stavanger INTSOK, Bergen
Hoffsveien 23, 2. floor Prof. Olav Hanssens vei 7A Strandgaten 6
P.O. Box 631 Skøyen P.O. Box 8034 NO-5013 Bergen
NO-0214 Oslo, Norway NO-4068 Stavanger, Norway Norway
Phone: +47 22 06 14 80 Phone: +47 51 87 48 80 Phone: +47 91 35 14 54
Fax: +47 22 06 14 90 Fax: +47 51 87 48 81 Email: intsok@intsok.com
Email: intsok@intsok.com Email: intsok@intsok.com Web: www.intsok.com
Web: www.intsok.com Web: www.intsok.com
Represented in: BERGEN, OSLO and STAVANGER, Norway | PERTH, Australia | RIO DE JANEIRO, Brazil | ST. JOHNS, Canada | BEIJING, China |
NEW DELHI, India | ASTANA, Kazakhstan | MEXICO CITY, Mexico | KUALA LUMPUR, Malaysia | MOSCOW, Russia | | ST. PETERSBURG, Russia |
ABU DHABI, UAE | HOUSTON, USA