Você está na página 1de 2

Project : Sap e-Project Implimentation

Sl No Module Process Requirement Explanation by Consultant SAP Solution

1 QM Stock Trasnfer Uncertainty calculation for equipment and linked Uncertainty calcualtion is GAP in
Inspection to the inspection report (Central Lab) Quality control module.
Development is not feasible since
frequenc for usage is low.
2 MM L/C Utilization To capture the Banks credit limit in every Pop up showing online statement is
Purchase order raised with L/C,and a pop up not feasible,and no Entries are
showing Banks limit online happening from Finanace Side