Date: 24.04.18
Questionnaire on RMC
1. How can a buyer of ready mixed concrete be assured of the quantity supplied?
Miscalculation of form volume or slab thickness when actual dimensions exceed the assumed
dimensions by even a fraction.
Deflection or distortion of the formwork.
Irregular sub grade & its settlement.
Smaller quantities wasted or used in incidental works for large pours.
Measure formwork accurately & order sufficient quantity to finish the job.
For large pours, include an allowance of about 2% over planned dimensions to account for
wastage & potential increased thicknesses.
Towards the end of large pours, carefully measure the remaining volume & confirm the closing
quantity to the RMC supplier.
No. Masons ought to be restricted & transit mixer operators ought not to be forced to add water.
Consequences of such actions could be severe. Properly designed ready mixed concrete contains
optimum water. If the workability (slump) of ready mixed concrete is not as expected, the RMC
supplier should be informed. If required, dosing of admixtures along with a small quantity of
water would be done by the RMC supplier's technical personnel.
**But at present we are giving supply of RMC where water is added on site in a proper ratio
suggested by company. This must be drinking water where the pH level is between 7.0-7.4.
Page |2
Ready mixed concrete is supplied only after exhaustive laboratory & plant trials. To ensure
consistent quality, incoming raw materials are regularly tested. Sampling & testing of ready
mixed concrete is done every day as codal stipulations.
**After 7 days customer gets the primary result and after 28 days company will provide the final
result of the RMC to the customer.
International standards specify that RMC must be discharged from the transit mixer truck within
2 hours of the time of loading. It is also mandatory to make arrangements at site to ensure that full
load of ready mixed concrete is discharged within 30 minutes of arrival on site.
Mixing is prepared before 2 hours of supply. Suppose delivery time is 10 A.M in the morning the
mixture will be prepared at 8 A.M in the morning.
11. Can the dealer/customer pay the total amount to the company after finishing the
total process?
No,The dealer/customer has to pay in advance as there are special benefit is added already in the
total cost of RMC.
ACC generally use ACC F2R and ACC Concrete cement to produce RMC.
15. What quantity of RMC required for supply of 1000 Sq.Ft casting?
Company supply min 6 cbm RMC as a transit mixture can carry 6 cbm concrete.
**Lesser amount of RMC is also supplied by company as per requirement. But not in transit
mixture.
17. What should be the maximum distance for supplying the RMC from plant?
The distance should be 20 KM. Max for supplying RMC without any charge. Where an extra
charge is added per KM if the distance of the delivery site is more than 20 KM from plant.
19. What space should be required to enter a transit mixture to the site?
20. If the site is in a small space or in a by lane, can the company supply RMC?
Yes, in that case there will no supply of RMC in transit mixture. Raw materials will be supplied
into bags on the site.
Yes, it is possible.
Company will hand over the Cube test result of RMC within 7days (primary), 28 days(final) to
the dealer’s/customer’s.
The main benefit of using RMC is its quality. However the process is time saving and cost saving
also.
We can stop environment pollution occurred at the time of casting by using RMC.
26. What volume of sand and stone used to produce 1 cbm RMC?
We use 2 ton (2000 Kg) stone and sand to produce 1 cbm RMC.
There are three plants of ACC in Kolkata. Sonarpur , Rajarhat and Mahestala.
30. What are the different types of RMC that ACC is supplying currently?