Contract Package – 1b: Civil (Underground Section from Km0+615 to Km2+360) Design stage: Technical design
Third Party Verifier’s Response to Contractor’s Submission
From: Mr. Dao Ngoc Vinh Our ref: LINE1-PK1B-190
Chief of Third Party Verifier Date: 27 April 2018
To: Mr. ITO Kenichi
Design Manager (Shimizu – Maeda Joint Operation)
SMJO’s transmittal No: Date Submitted: Doc No. (Title):
TRS-TPV-00856 (PDF file) 13 April 2018 - Technical Design - DCN - Inner Wall –CCTN Type A (rev A)
TRS-TPV-00861 (PDF file) 08 May 2018 - Technical Design - DCN - Inner Wall – Bason Station (rev B)
No. TPV’s comment Designer’s Reply TPV’s Conclusion
( 23/4/2018) (/4/2018) /4/2018)
Crack width of inner wall thickness 300mm.
- In the report the crack width limitation is 0.2mm which is for
environmental normal condition of 0.005c.
- However, when reducing the thickness of inner wall from
500mm to 300mm, the watertighness shall be considered as
1. important case related to the cracking specified in article 7.4.1
(3) & (4) in Standard Specification for Concrete Structure.
Therefore, the permissible crack width shall be taken as
Severely corrosive of environmental conditions in table 7.4.1 of
0.0035c that using for watertighness.
Tran Van Tu
Nguyen Nhu Quynh
Dao Ngoc Vinh
Civil Engineer
Chief of Third Party Verifier
Date: 08/05/2018
Date: 08/05/2018