Você está na página 1de 2

Dewatering System status at Eastern Portal ( Egress Tunnel )

03 No of pumps of capacity 3Hp, 10Hp and 25 Hp are being used for the dewatering at Ch 100.00 M. 02
dewatering lines of Dia. 3 inch and 4 inch have been installed for the dewatering purpose. In addition to
these 02 standby pumps of capacity 10 Hp and 25 Hp are available at site in case of any breakdowns of
any pumps.

Photographs for reference

Dewatering pump of capacity -10 Hp

Dewatering pump of capacity -25 Hp


Huge water inflow at CH 100.00

Standby pumps

Você também pode gostar