Escolar Documentos
Profissional Documentos
Cultura Documentos
No part of this document may be reproduced or transmitted in any form or by any means without
prior written consent of Huawei Technologies Co., Ltd.
Trademark Notice
General Disclaimer
The information in this document may contain predictive statements including, without limitation,
statements regarding the future financial and operating results, future product portfolio, new
technology, etc. There are a number of factors that could cause actual results and developments to
differ materially from those expressed or implied in the predictive statements. Therefore, such
information is provided for reference purpose only and constitutes neither an offer nor an acceptance.
Huawei may change the information at any time without notice.
Index:
Copyright © Huawei Technologies Co., Ltd. 2015. All rights reserved. .................................... 2
Trademark Notice........................................................................................................................... 2
1 Information ............................................................................................................................. 9
1.2 Q: What is the different for application capability when choose rack server VS blade
server? 9
1.3 Q: What is the advantages when use blade instead of rack server? ............................ 10
2 Chassis ................................................................................................................................... 11
2.2 Q: Does E9000 support mixed-deployment with half-width blades and full-width
blades? 12
3.1.1 Q: Where can I get the detail specification of every kind of E9000 blades?....... 12
3.2.2 Q: Is Ivy Bridge CPU supported in current released E9000 blades? ................... 13
3.3.1 Q: Does E9000 blades support memory RAS features like ECC、Memory
3.3.2 Q: Which blades can support 1.5 times height DIMMs, is there any restriction? 14
3.4 Storage........................................................................................................................ 15
3.4.4 Q: Does CH121 /CH220/CH221 support RAID card with RAID 5 function?.... 16
3.4.5 Q: Can I select RAID card with Cache for CH121/CH220/CH221? .................. 16
3.4.6 Q:Do I need to add optional battery when I select RAID card that support Cache?
17
3.4.7 Q: Why I didn’t see the RAID option list when I select CH242 in UNISTAR? . 17
3.5.1 Q:What is low-profile card? FHHL PCIe card? FHFL length card? Dual-slot card?
17
3.5.2 Q: How can CH121 support standard PCIe card? Is there any restrictions? ....... 19
3.5.4 Q: Which blades support standard PCIe card? And the limitation for PCIe cards?
20
3.5.6 Q: Does standard PCIe card on E9000 blades can support connecting cables? .. 22
3.6 Interfaces.................................................................................................................... 22
3.6.2 Q: How many standard USB ports can be support by E9000 blades? ................ 22
4.1.1 Q: Where can I get the detail specification of every kind of E9000 IO modules?
23
4.1.3 Q: Where can I get the suggestion for configuration of Mezz card and IO
modules? 23
4.1.4 Q: Where can I get the detail specification for E9000 network adapters? .......... 24
4.1.5 Q:Is there any clarification info for 15.6Tbps bandwidth of E9000
4.2.4 Q: Which MEZZ card can support NIC partitions feature? ................................ 25
4.2.9 Q: How can I meet the requirement about IB connection for CH221 in HPC
project? 27
4.3.1 Q:Does the switch board support stacking? And what about inter-chassis stacking?
27
4.3.3 Q: How can I connect 10GE switch board to GE rack switch? ........................... 28
4.4.2 Q: Is there any additional license with CX911 FC switch module? .................... 29
4.4.4 Q: Does E9000 plan to provide FC switch board based on brocade switch? ...... 29
4.5.3 Q: Is there any additional license with CX311 FCOE Gateway? ........................ 31
2015-10-16 Huawei Confidential, Internal Use Only 第 5 页, 共 38 页
Huawei FusionServer E9000 Converged Infrastructure Blade
Server Pre-sales FAQs
Secret
4.6.2 Q: What kind of fiber should I provide for IB? Single-mode or Multiple-Mode?
31
4.6.3 Q: What are the IB cable options that I can choose? ........................................... 32
5 Management .......................................................................................................................... 32
5.1.2 What is the username and password when I try to log in on LCD display? ........ 32
6 Engineering ........................................................................................................................... 33
6.1.2 Q: Where can I get the certification report of E9000 AC PSU? .......................... 33
6.2.2 Q: What is the recommend PDU configurations for E9000 deployment? .......... 33
6.2.3 Q: How can I evaluate the maximum power requirement with definite BOQ
configurations? .................................................................................................................... 34
6.3.1 Q: Do E9000 blades support separate airflow paths for memory and CPU, for
6.4 Rack............................................................................................................................ 34
6.4.2 Q: Can we deliver the rack with E9000 chassis and blades installed? ................ 34
6.4.3 Q: How can I get the total weight when I make a BOQ configuration? .............. 35
7.1 Q: Where can I get the compatibility and certification information? .......................... 35
7.2 Q: Where can I get the E9000 blades’ official certification record of VMware?........ 35
2015-10-16 Huawei Confidential, Internal Use Only 第 6 页, 共 38 页
Huawei FusionServer E9000 Converged Infrastructure Blade
Server Pre-sales FAQs
Secret
7.3 Q: Where can I get the E9000 blades’ official certification record of XenServer? ..... 35
7.4 Q: Where can I get the E9000 blades’ official certification record of SUSE? ............ 35
7.5 Q: Where can I get the E9000 blades’ official certification record of Microsoft
Windows? ................................................................................................................................... 36
7.6 Q: Where can I get the E9000 blades’ official certification record of Microsoft
Hyper-V?36
7.7 Q: Where can I get the E9000 blades’ official certification record of Redhat? .......... 36
7.8 Q: Where can I get the E9000 blades’ official certification record of RHEV? ........... 36
7.9 Q: How can I get the E9000 blade spec report? .......................................................... 36
7.11 Q:What kind of grade earthquake that E9000 can resist? ........................................... 37
8.2 Q: Where can I learn some basic concept and knowledge about FCOE? ................... 37
8.3 Q: What is InfiniBand and in what scenario InfiniBand will be deployed? ................ 38
Revise Record:
Version Date Remark
V1.00 2013-09-27 Initial Version
V1.01 2013-10-24 Add and modify the document entries of:
1.4/3.2.2/3.4.4/3.5.4/4.2.1/4.2.5/4.3.3/5.1/5.2/6.4.1/6.4.2/7.11
1 Information
1.2 Q: What is the different for application capability when choose rack server
VS blade server?
A:
There is no essential difference for application capability when use rack or blades. The main
differences are the density and the physical connection way for communication:
Blade solution: The communication physical paths are physically fixed deployed by chassis and
mid plane
Rack solution: The communication physical paths are flexible deployed with with cables or
fibers
1.3 Q: What is the advantages when use blade instead of rack server?
A:
Installed in the chassis, blade servers shared share the network, I/O modules, MMs, PSUs, and heat
Higher Density: 提Provided high server density, less time and space for server deployment.
More Maintainability:Less time for installation; Easier cable layout and maintain; Central
Higher Availability: Less failure points; shared redundancy infrastructure like powers, fans, etc.
TCO reduce: Fewer number of fans, powers, cables, management access points, reduce the cost;
High efficient usage of shared fans, powers, cables, management boards, reduce the power
2 Chassis
A:
The 12U E9000 accommodates eight layers of compute nodes, with each compute node in the height
Provides excellent heat dissipation to support more DIMMs and high-performance processors
and even evolution of processors in the future. Intel's next-generation E5 series processors reach
a maximum power consumption of 145 W (10 W higher than the current ones), and the
higher than the current 155 W processors). In addition, with the same rate and capacity, DDR4
DIMM power consumption is reduced by 35% compared with the DDR3 DIMMs. In the future,
memory capacity of a server may increase by 100% with the memory rate increased by 75%
(1866 vs. 1066). The power consumption of the memory system will be two times that of the
current memory system. As power consumption of processors and DIMMs increase, the power
consumption of a single server blade will increase greatly. Most of the competitors' products
provide only 1U or 1.2U server blade slot space, which cannot meet requirements for processor
evolution in the future. The E9000, with its excellent heat dissipation, can protect customers'
investments.
Uses DIMMs at 1.5 times the usual height to provide high cost-effectiveness for large-memory
applications.
Provides sufficient space for installing standard PCIe cards, facilitating application acceleration.
Supports the design for accommodating three 2.5" or two 3.5" hard disks to support large-storage
A: Yes. But there is a little restriction: Every 4 blades form a slot group, inside a slot group, same
form factor size blades are needed ,that means either 4 half-width blades or 2 full-width blades.
Different form factor size blades can deployed between different groups.
3 Blade specification
3.1 Information
3.1.1 Q: Where can I get the detail specification of every kind of E9000 blades?
A:
You can check the detail specification from the whitepaper of E9000 blades from Huawei Enterprise
Website:
http://support.huawei.com/enterprise/productsupport?pid=19955022&idAbsPath=7919749|9856522|9856786|19
955022
Then click English on the top when you want to show English version.
http://3ms.huawei.com/mm/docMaintain/mmMaintain.do?method=showMMDetail&f_id=SV130104
32030017
3.2 Computing
A: Yes, The current released blades for E5-2600/E5-4600 series can support the next generation Ivy
Bridge CPU(Intel already released the E5-2600 V2 series CPU on 2013.9, Intel plan to released
E5-4600 V2 series CPU on 2014.Q1) without any change for the hardware, but you need to upgrade
the BIOS(When upgrade the BIOS with support for Ivy Bridge CPU, you need to power off the blade
first, and after upgrade, all BIOS parameters will be set to default values, you need to reconfigure the
BIOS parameters.
3.3 Memory
3.3.1 Q: Does E9000 blades support memory RAS features like ECC、Memory
A:
Chipkill is proprietary memory RAS feature name for multiple-bit error correction in IBM
All these memory RAS features are supported by INTEL CPU originally, we just do some related
support during server mainboard design and BIOS development. E9000 have consider that during
design and have test these features, you can check the detail with table below:
Blade ECC SDDC Memory Memory
(Chipkill) Sparing Mirroring
CH121 Yes Yes Yes Yes
CH220 Yes Yes Yes Yes
CH221 Yes Yes Yes Yes
CH222 Yes Yes Yes Yes
CH240 Yes Yes Yes Yes
3.3.2 Q: Which blades can support 1.5 times height DIMMs, is there any restriction?
A:
CH242 and CH140(Released soon) don’t support 1.5 times height memory, other blades support
that.
You must make supply forecast planning before PO, since it need longer supply time than
normal DIMMs.
3.4 Storage
A: Yes, every single disk on CH222 is hot-swappable, since the disk-drawer is still power-connected
A: E9000 hardware only support local storage that belong the blade node itself, if you want to
construct shared-storage inside E9000 chassis, related distributed storage must be apply too, like:
3.4.4 Q: Does CH121 /CH220/CH221 support RAID card with RAID 5 function?
A: Yes.
CH121/CH220/CH221 can support RAID cards with LSI 2208 chip that provide RAID 5
function(This type RAID cards include RU320,SR320). But that is waste since there are only 2
HDD/SSD in these blades; so, this RAID card is not in option list for these blades by default. If you
actually need it, you can replace the RAID card option in BOQ with option from CH240’s list.
Note: RAID cards with LSI2308 chip did not support RAID 5, this type RAID cards include RU120
and SR120.
A:
Yes.
CH121/CH220/CH221 can support LSI 2208 RAID card that provide Cache. But that is waste since
there are only 2 HDD/SSD in these blades(no need for so high performance RAID card); so, this
RAID card is not in option list in UNISTAR for these blades by default. If you actually need it, you
can replace the RAID card option in BOQ with option from CH240’s list.
3.4.6 Q:Do I need to add optional battery when I select RAID card that support Cache?
A: Yes.
You must select the option with battery in normal scenarios, otherwise customer will lost the cache
data when blade power off in unexpected situation.(There is cached-RAID card option without
battery in UNISTAR, it is there because we have definite requirement from some few customers,
since their application was so special that not care about the lost of cache data, but they care about
3.4.7 Q: Why I didn’t see the RAID option list when I select CH242 in UNISTAR?
A: In the UNISTAR, there are 2 options for CH242 blade: one option already integrated RAID card
that support RAID 0/1, another option already integrated RAID card that support RAID
3.5.1 Q:What is low-profile card? FHHL PCIe card? FHFL length card? Dual-slot
card?
A: PCIe specification developed by PCI-SIG organization has prescribed the size of standard PCIe
One example for FHFL single slot card: Huawei ES2000 SSD card
One example for FHFL dual-slot card: NVIDIA Tesla K20 GPU card
3.5.2 Q: How can CH121 support standard PCIe card? Is there any restrictions?
A: If standard PCIe card will be deployed inside CH121 or CH222, then you must add an optional
PCIe Riser card for CH121/CH222. You can see how the riser card and the PCIe card will be
When PCIe riser card was added to CH121/CH222, there are restrictions:
The maximum memory DIMMs number that CH121/CH222 supported will reduce 6 (Spread on
2 memory channels), CH121/CH222 can support maximum 18 DIMMs with PCIe riser card.
The Standard PCIe card size will be limit to : Full height half size, single slot card.
A: Not support.
3.5.4 Q: Which blades support standard PCIe card? And the limitation for PCIe cards?
A:
Blade Stand PCIe PCIe Card Size Specification Restriction
slots number
CH121 1 (option) 1 * FHHL single slot PCIe card 6 DIMMs will reduced
2015-10-16 Huawei Confidential, Internal Use Only 第 20 页, 共 38 页
Huawei FusionServer E9000 Converged Infrastructure Blade
Server Pre-sales FAQs
Secret
CH220 4(Fixed) 4 * FHHL single slot PCIe card CH220 only support 1 MEZZ
OR 2* FH 7”L single slot card + 2*FH card(Mezz1)
9.75”L single slot card
CH221 2(Fixed) 2 * FHFL single slot PCIe card CH221 only support 1 MEZZ
OR 1 * FHFL dual slot PCIe card card(Mezz1) by default. If you want
to support 2 Mezz card, please refer
to the question in network chapter
below.
CH222 1 (option) 1 * FHHL single slot PCIe card 6 DIMMs will reduced
CH240 Not support -- --
CH242 1(Fixed) 1 * FHHL single slot PCIe card No yeah
Note:
R&D test one kind of PCIe card before official announcement of support that card, you can
check the current support list in UNISTAR, if the PCIe card you want to deploy didn’t in the
A: Only CH220/CH221 blades support GPU card, please check the compatibility verification
3.5.6 Q: Does standard PCIe card on E9000 blades can support connecting cables?
A:Not support.
3.6 Interfaces
A: 16MB graphics memory, maximum resolution is 1280*1024 under 60HZ with 16M true color
display.
3.6.2 Q: How many standard USB ports can be support by E9000 blades?
A: There are 3 USB 2.0 interface with high density cable on blade panel, and there is 1 standard
4 Network Specification
4.1 Information
4.1.1 Q: Where can I get the detail specification of every kind of E9000 IO modules?
A: You can check the detail specification from the whitepaper of E9000 IO modules from Huawei
Enterprise Website:
http://support.huawei.com/enterprise/productsupport?pid=19955022&idAbsPath=7919749|9856522|9856786|1
9955022
Then click English on the top when you want to show English version.
http://3ms.huawei.com/mm/docMaintain/mmMaintain.do?method=showMMDetail&f_id=SV130104
32030017
A: You can get the IO guide and quick reference for configuration for 3MS website:
http://3ms.huawei.com/mm/docMaintain/mmMaintain.do?method=showMMDetail&f_id=SV130522
07350056
4.1.3 Q: Where can I get the suggestion for configuration of Mezz card and IO
modules?
A: You can get the typical configuration suggestion from the EXCEL table from 3MS link for E9000
4.1.4 Q: Where can I get the detail specification for E9000 network adapters?
A: You can check the specification from the EXCEL table from 3MS link for E9000 IO guide in
previous question.
4.1.5 Q:Is there any clarification info for 15.6Tbps bandwidth of E9000
high-performance mid-plane?
A: Please refer to the presentation slide of E9000 IO guide (Link was provided in previous
question)
A: On Blade servers, we used uplink to refer switch board connection to outside network on
panel(Also call panel-port in some documents), used downlink to refer switch board connection to
A: It depends on the interconnection requirements from customer, please confirm that with customer.
If customer didn’t give any definite requirements about that and the customer doesn’t need high
bandwidth, you can just config 2 optical modules for ethernet/FC per IO module(Redundancy
already considered).
You may notice that there is 4 RJ45 GE ports on the panel of CX911, these ports are reserved for
with LOM, but no LOM now, so these GE ports is not usable now, it is reserved for future planning.
A: MEZZ is abbreviation for Mezzanine, it means pluggable network adapters on blade. All the
network adpaters in E9000 are MEZZ cards. An picture of E9000 MEZZ card below:
A: CNA(converged network adapter) mean ethernet adapter that can support FCOE function, E9000's
A: Very common in RFP, the requirement is to split a physical port to multiple interfaces(The
interfaces can be saw and configed in OS), usually use to seperate differnet kind of
"UMC (Universal Multi Channel)". MZ510( The 2 X 10GE CNA mezz card) and MZ512 (The 4 X
10GE CNA card) both support this feature, other mezz cards don't support this feature.
1:NIC Mode: Every port could be splitted to 4 NICs.In this mode, 1 MZ510 can support up
2:FCOE Mode: Every port could be splitted to 3*NIC + 1* FCOE. In this mode, 1 MZ510
3: iSCSI Mode: Every port could be splitted to 3*NIC + 1*iSCSI. In this mode, 1 MZ510
Bandwidth of each NPAR can be adjusted. The step is 100 Mbps, the maximum bandwidth is 10
Gbps, and the minimum bandwidth is 0 Gbps.All the bandwidth of 4 NPARs for a port can not be
over 10Gbps. For detail configruations steps to support NPARs, please refer to user guide about
A: MZ316 is dedicated for FusionSphere and FusionCube, not available for E9000 projects.
A: By default configuration, the Mezz2 slot of CH220 is already occupied (By the signal connector
for standard PCIe card expansion slot) , so only Mezz1 of CH220 can be used to deploy network
mezz module.
A: By default configuration, the Mezz2 slot of CH221 is already occupied (By the signal connector
for standard PCIe card expansion slot) , so only Mezz1 of CH221 can be used to deploy network
-configuration by PO of CH221 can be provided, the customized-CH221 can use Mezz2 to deploy IB
4.2.9 Q: How can I meet the requirement about IB connection for CH221 in HPC
project?
4.3.1 Q:Does the switch board support stacking? And what about inter-chassis
stacking?
A: Refers to the IO module does not have switching functions only with the physical interface
conversion function. The CX116 is a GE passthrough board, and CX317 is 10GE passthrough board.
A: You can choose GE optical module to connect GE rack switch with optical fiber, or choose GE
1000Base-T module to connect GE rack switch with UTP cable. But the GE 1000Base-T module can
only interconnect with GE data rate port on other switch, it can’t adapt to 100Mbps ethernet port(FE
port).
A: Not support yeah, planned to support L3 switch on new software version on 2013.12.
4.4 FC Switch
A: The FC switch module integrated on CX911 board was OEM from QLogic, can connected to
Brocade/Cisco FC switch with NPV mode, can’t connect with E-port( E-port is not open between
different vendors)
A: No any additional license, all features of FC switch module integrated on CX911 are available
by default.
4.4.4 Q: Does E9000 plan to provide FC switch board based on brocade switch?
A: E9000 plan to provide CX912 on 2013.12, and CX912 will integrated FC switch ODM from
brocade.
A: There are different function entities defined in FCOE standard, E9000 switch boards support
The FCOE network that CX311 support (No need for rack FCOE switch):
VF_port
Blade
FCF
8G FC FC SAN
/Storage
F/E/N_port
Chassis
The FCOE network that CX310/CX312 support (Rack FCOE switch is needed):
CX310/312
10GE
VN_port Ethernet
10GE Rack FCOE
CNA
10GE/FCOE SWTICH
VF_port Switch
(FSB) (FCF)
8G FC FC SAN
Blade
F/E/N_port /Storage
A:
The FCOE Gateway switch module integrated on CX311 board was OEM from QLogic, can
connected to Brocade/Cisco FC switch with NPV mode, can’t connect with E-port( E-port is not
A: No any additional license, all features of FCOE Gateway switch module integrated on CX311
A: Yes. CX610 can support 40Gbps QDR and 56Gbps FDR, the ports are auto adaptive.
4.6.2 Q: What kind of fiber should I provide for IB? Single-mode or Multiple-Mode?
A: No need.
IB is different than Ethernet, IB cables is provided with definite length and integrated
A: We can provided IB electrical cable and optical cable, you can get the BOQ option price list
Warning: There is huge price difference between electrical IB cable and optical IB cable, and huge
price difference between different length cable, up to hundreds $ per cable, so the actual cable length
5 Management
A: You can do some basic configuration and checking tasks(like check warning) with LCD display,
operator can finish some simple maintaining jobs when enter the device room without notebook.
For more detail, you can check the < Huawei E9000 Chassis Intelligent Display V100R001
5.1.2 What is the username and password when I try to log in on LCD display?
6 Engineering
6.1 PSU
A: Yes. All the power from 6 PSUs will be merged on the power mid-plane, then provide to
http://www.plugloadsolutions.com/psu_reports/HUAWEI%20TECHNOLOGIES%20CO.,LTD_EP
W3000-12A_3000W_SO-582_Report.pdf
A: Recommendation as follow:
AC Input PDU number per Rack Max Power per Rack Plug Number Max Chassis
supported
2*220V@32A,Single 2 *220V@32A,Single phase 6.4KW 4*C19 /per PDU 1
phase PDU
4*220V@32A,Single 4 *220V@32A,Single phase 12.8KW 4*C19 /per PDU 2
phase PDU
6.2.3 Q: How can I evaluate the maximum power requirement with definite BOQ
configurations?
http://3ms.huawei.com/mm/docMaintain/mmMaintain.do?method=showMMDetail&f_id=SV121122
00360108
6.3 Cooling
6.3.1 Q: Do E9000 blades support separate airflow paths for memory and CPU, for
A: Yes, inside the blade there are plastic airflow shields to construct separate airflow paths for
6.4 Rack
A: Yes.E9000 support standard 19” Rack with 1000mm deep or 1100mm deep or 1200 mm deep.
But when you use 1000mm deep rack, you cannot deploy vertical PDU, you can just deploy
6.4.2 Q: Can we deliver the rack with E9000 chassis and blades installed?
A: Not support. When E9000 delivered, the Rack/Chassis/blade will be packed separately.
2015-10-16 Huawei Confidential, Internal Use Only 第 34 页, 共 38 页
Huawei FusionServer E9000 Converged Infrastructure Blade
Server Pre-sales FAQs
Secret
(CPUs/Memory DIMMs/HDDs will be installed on the blades before delivered, but the PCIe cards
6.4.3 Q: How can I get the total weight when I make a BOQ configuration?
A: When you finish the configuration, please click on the “statistic” tab, then you can get the
information of weight.
http://3ms.huawei.com/mm/docMaintain/mmMaintain.do?method=showMMDetail&f_id=SV130104
33470019
7.2 Q: Where can I get the E9000 blades’ official certification record of
VMware?
7.3 Q: Where can I get the E9000 blades’ official certification record of
XenServer?
7.4 Q: Where can I get the E9000 blades’ official certification record of SUSE?
7.5 Q: Where can I get the E9000 blades’ official certification record of
Microsoft Windows?
7.6 Q: Where can I get the E9000 blades’ official certification record of
Microsoft Hyper-V?
7.7 Q: Where can I get the E9000 blades’ official certification record of Redhat?
7.8 Q: Where can I get the E9000 blades’ official certification record of RHEV?
A: RedHat confirm that no RHEV certification, so there is no official certification record for RHEV,
A: No.
A: E9000 didn’t do the earthquake resistance test, since on forced requirement for this (Earthquake
resistance test are only normal requirements for CT devices, not IT devices).
E9000 has done operational vibration and shock test, you can check the specification in E9000
whitepaper:
Operational vibration Sine sweep: 5 Hz to 200 Hz, 10 m/s²
Operational shock Half sine: 100 m/s², 11 ms
But these testes cannot replace the earthquake resistance test (For example, the test that NEBS
required), so we cannot declare that what kind of grade earthquake that E9000 can resist.
A: DCB(Data Center Bridge) Enhanced lossless Ethernet, IEEE standards developed (IBM likes to
call it CEE instead, Cisco likes to use DCE instead). DCB network is a necessary prerequisite to
support FCOE networking. E9000's CX310/CX311/CX312 support DCB features. CX911 planned to
support DCB on 2013.12 with software upgrade. DCB network is: high bandwidth, low-latency,
8.2 Q: Where can I learn some basic concept and knowledge about FCOE?
A:
You can learn some basic concepts and knowledge about FCOE from the slide from below 3MS link:
http://3ms.huawei.com/mm/docMaintain/mmMaintain.do?method=showMMDetail&f_id=CIP12112
712340089
A: A high-speed cluster communication network technology, commonly used in the field of HPC, the
technology in this field is leading by Mellanox company. The network has developed multiple
generations, the commond requirements in RFQ now is to support QDR(40Gbps), FDR(56Gbps) rate,