Escolar Documentos
Profissional Documentos
Cultura Documentos
tra
Ul CEMENTITIOUS
SCREED
C40-F10
A9-A2 fl-s1
Ultra-fast setting,
self-levelling mortar
based on special
hydraulic binders for
abrasion-resistant
flooring, thickness
from 5 to 40 mm
Ul
Before casting Ultratop, remove excess
A2fl-s1 is the fire-reaction class. sand with a vacuum cleaner.
Around 3 days after application, Ultratop Instead of Primer SN, absorbent concrete
may be dry-polished using diamond substrates may be primed with 2-3 coats
grinding disks to get a shiny, reflective of Primer G: the first coat diluted with
or similar finish on natural stone. water at a ratio of 1:1 and the second and
Ultratop may also be used to make third coats (according to the absorbency of
flooring with a “Terrazzo alla Veneziana” the substrate) at a ratio from 1:1 to 1:2.
effect, in which the dry grinding process
brings out the characteristics of the Surfaces which are not absorbent such
aggregates (colour, shape and size) to as ceramic or natural stone, on the other
create flooring with an exclusive, original hand, may be treated with a coat of
finish which is quick and easy to install.
Mapeprim SP after cleaning the surface
with a suitable detergent and abrading it
RECOMMENDATIONS
mechanically, such as by grinding.
• Do not add more water to the mix once
Spread on Ultratop before Mapeprim SP
Ultratop starts to set.
has completely hardened (from 1 to
• Do not add lime, cement, gypsum or 3 hours at +23°C and 50% R.H. - while it
other binders to the Ultratop mix. is still sticky).
Cracks in the substrate must be repaired
• Do not use Ultratop on substrates which beforehand using Eporip.
are subject to rising damp (consult the
Preparation of MAPEI Technical Services Department). Preparing the mix
the substrate by Pour the content of a 25 kg bag of
shot-blasting
• Do not use Ultratop for floating screeds. Ultratop into a container with 5.0 to 5.5 l
Ultratop must always be fixed to a solid, of clean water and continue mixing with a
compact substrate. low-speed electric mixer until a smooth,
flowable, lump-free mix is formed.
• Do not use Ultratop on wet surfaces. Let it stand for 2-3 minutes and before
applying, remix the blend for a few minutes.
• Do not use Ultratop on metallic surfaces. Only prepare the amount of Ultratop
which will be applied within 15 minutes at
• Do not use Ultratop at temperatures a temperature of +23°C. The pot life of the
lower than +5°C or higher than +35°C. mix varies according to the temperature
and reduces as the temperature increases.
• The colours of floors made using If Ultratop is to be applied on medium to
Ultratop are not always uniform, a typical large-sized surfaces, larger quantities may
feature of cementitious-based products. be prepared using a vertical-shaft mixer.
Apart from the inherent nature of this If it is mixed using mechanical means, the
kind of product, differences in the various amount of water required is the same as
colours may also be caused by the way when mixing by hand. Mix the product
the product is applied. Also, it must be until the blend is completely homogenous
cast continuously without long pauses, before laying.
Preparation of the
product with a drill
in order to guarantee perfect flatness. A mechanical mixer is indispensable when
Ultratop is applied using a rendering
APPLICATION PROCEDURE
machine. This is the only method which
Preparing the substrate
guarantees that there is a continuous flow
Substrates must be dry, solid and free
of material while casting.
of dust, loose and detached parts, paint,
wax, oil, rust and all other pollutants.
Laying the mix to obtain a “natural”
Apply special compressible band around effect and a “polished” effect
the perimeter of the rooms to be laid and Spread Ultratop by hand or with a
around any vertical elements which pass mechanical means (rendering machine with
through the floor (such as pillars and a worm-screw feeder) in a single layer of
columns). 5 to 40 mm and a smoother for a natural
finish, or at a thickness between 10 and
Concrete and/or ceramic or natural 40 mm if the floor is to be polished.
stone surfaces must be prepared by Make sure that the material is cast in
shot-blasting or milling and primed with a regular, continuous flow without
Primer SN and, where required, reinforced interruptions, to avoid defects in flatness
with Mesh 320 (glass fibre mesh) followed and particularly visible differences
by a fully broadcast of Quartz 1.2. in colour. Thanks to its self-levelling
After application, leave Primer SN properties, Ultratop eliminates all
Preparation of
Ultratop in a mixer to dry for 12-24 hours, according to the imperfections left by the smoother.
TECHNICAL DATA (typical values)
In compliance with: – EN 13813 : 2002, CT - C40 - F10 - A9 - A2fl-s1
PRODUCT IDENTITY
Mixing ratio: approx. 20-22 parts water per 100 parts by weight
of Ultratop
pH of mix: approx. 12
FINAL PERFORMANCES
Requirements
Test according to
Performance characteristic Performance of product
method EN 13813 for
cementitious screeds
+ 5°C + 23°C
24 h ≥ 12 ≥ 20 Smoothing Ultratop
immediately after
5 < N/mm² < 80 spreading
Compressive strength: EN 13892-2 72 h ≥ 18 ≥ 25
(28 days)
7d ≥ 23 ≥ 30
28 d ≥ 30 ≥ 40
+ 5°C + 23°C
24 h ≥3 ≥5
1 < N/mm² < 50
Flexural strength: EN 13892-2 72 h ≥4 ≥7
(28 days)
7d ≥5 ≥9
28 d ≥7 ≥ 11
+ 23°C
+ 5°C + 23°C
Abrasion resistance
Taber abrasion test (H22 disk - ASTM D4060 7d 1.7 0.7
500 g - 200 rpm):
28 d 1 0.6
The final result
Abrasion resistance + 23°C of a floor made
EN 13892-3 1.5 < cm³/50 cm² < 22 using Ultratop
Böhme abrasion test: 28 d 9
Value declared by
Reaction to fire: EN 13501-1 A2fl-s1
manufacturer
When applying the product, respect the In order to make successive cleaning
expansion joints in the substrate and and maintenance operations easier,
form distribution joints at least every apply an even layer of Mapelux Lucida
50 m². With heated floors, the bay size or Mapelux Opaca, metallic wax over
must be no more than 25-30 m². the entire surface of the floor.
If Ultratop is applied in civil buildings
(appartaments, shops, etc.) where the “Terrazzo alla veneziana” with
rooms are smaller than 50 m², include natural aggregates type floors
distribution joints in correspondence with Procedure
door-sills or where there is a significant Prepare the substrate mechanically
variation in volume in the rooms to be as described in the “APPLICATION
coated. PROCEDURE - Preparing the
Seal joints with Mapeflex PU45 single substrate” section.
component, quick-hardening thixotropic Prime the surface with Primer SN
polyurethane sealant and adhesive with (reinforced with Mesh 320 if required)
a low modulus of elasticity for sealing and fully broadcast the surface with
expansion and distribution joints. Insert Quartz 1.2.
Mapefoam closed-cell polyethylene foam Leave Primer SN to dry for 12-24 hours,
cord in the joint beforehand to obtain according to the surrounding
the required depth and avoid the sealant temperature. Remove excess sand with
sticking to the bottom of the joint. a vacuum cleaner.
“Terrazzo alla
Floors made using Ultratop may be veneziana” effect.
Apply a coat of Mapefloor I 910 Application of
left as they are or may be polished if a (two-component epoxy binder) to act Mapefloor I 910
particular aesthetic effect is required. as a bonding promoter with a short-
In the first case (flooring left as it is) haired roller on the primed substrate and
approximately 3 days after application, prepare the mix comprising Mapefloor
the surface of Ultratop must be I 910 and natural aggregates (with
protected and then made non-absorbent particles no smaller than 0.8 cm), at a
using one of the finishing products from ratio of 1:20 in a cement mixer.
the Mapefloor Finish range. Choose
the most suitable finishing system N.B.: This ratio may be used for
according to the aesthetic effect or the aggregates with a particle size of 0.8 to
wear-resistance required. Please refer to 1.5 cm. For particles larger than 1.5 cm,
MAPEI Technical Services Department we recommend carrying out preliminary
for information. tests.
In the second case (polished surface),
apply Mapecrete Stain Protection after Mix for several minutes and pour the
completing the dry polishing operations. mix on the surface just after priming it
Finally, apply a coat of Mapelux Lucida with Mapefloor I 910 (spread on the mix
or Mapelux Opaca metallic wax to make while Mapefloor I 910 is still fresh).
successive cleaning and maintenance Compact the mix immediately after
operations simpler. spreading it on with a flat trowel or a Application of the
mixture of natural
power trowel. aggregates +
Dry polishing process Leave it to harden for at least 24 hours Mapefloor I 910
Procedure (at +20-23°C). Lower temperatures lead
Dry-polishing with a diamond-tipped to longer hardening times.
grinder may be carried out 2-3 days after
applying the mix. The surface obtained Prepare Ultratop as described in
will be completely smooth and shiny, the “APPLICATION PROCEDURE -
which reflects light, very similar to natural Preparing the mix” section and apply
stone such as granite. the fresh mortar on the hardened surface
of the aggregates, making sure that all
After the first “roughing” treatment, the voids between the aggregates are
which will lead to the formation of completely filled. Carry out this operation
surface micro-porosities, the floor must with the help of a rubber trowel or
be grouted with Ultratop Stucco, a spreader to help the mortar penetrate
special sealing product for this type of into the previously prepared substrate.
porosity which typically forms after the
preliminary treatment. Ultratop Stucco Dry polishing process procedure
is available in the same colours as Dry-polishing with a diamond-tipped
Ultratop. grinder may be carried out 2-3 days
after applying the Ultratop mortar. The
Application of
Complete the polishing operations using surface obtained will be completely Ultratop on the
the remaining tools and then finish off the smooth and shiny, which reflects light, hardened surface of
surface by applying Mapecrete Stain very similar to “terrazzo alla veneziana” the mixture made of
natural aggregates +
Protection, a specific stain-proof, water floors. Mapefloor 910
and oil-repellent product. As described previously, the floor must
time of Ultratop may increase but without
affecting its final characteristics.
The product complies with the conditions
of Annex XVII to Regulation (EC)
N° 1907/2006 (REACH), item 47.