Você está na página 1de 11

Chapter 11 Selecting the Best Alternative Design Strategy

Chapter 11
Selecting the Best Alternative Design Strategy

Chapter Overview
The primary purposes of Chapter 11 are to show students that all of the software associated with a
systems development project is not developed in-house; emphasize that analysts should consider
several design strategies before choosing one to pursue for further development in design; and return
to and update the Baseline Project Plan first developed during project initiation and planning (Chapter
6). This chapter’s secondary purpose is to emphasize that the consideration of a packaged software
solution should be done after the analysis efforts are complete, not as a substitute for analysis.

The authors discuss the various sources of software and the reasoning that should be followed when
choosing among the many options available to an analysis team for developing design strategies. The
point is that the make versus buy decision is not a choice of one or the other, but is in reality a
spectrum of choices ranging from make at one end and buy at the other. Just as important, more
choices these days are made toward the buy end of the scale. The authors include a discussion of
outsourcing, an option for systems development and management that may not occur to many students
in their first systems development course.

When discussing design strategies (which the authors define as “a high-level statement about the
approach to developing an information system, which includes statements on the system’s
functionality, hardware and system software platform, and method for acquisition”), the authors
revisit Hoosier Burger’s inventory control system. The authors show how, given its system objectives
and constraints, Hoosier Burger develops a series of design strategies for its new system. The authors
present a weighted multi-criteria decision-making matrix as one method for comparing design
strategies side-by-side and selecting one alternative for further development. Instructors may want to
demonstrate design strategies that are not presented in this textbook.

In the later part of the chapter, the authors revisit and update the Baseline Project Plan from Chapter
6. Updating an entire Baseline Project Plan (BPP) is beyond the scope of this chapter, so instead the
authors list the sections of the BPP that are updated and show how more accurate information is used
to update both the cost benefit analysis and the project schedule. The BPP should be updated at this
point, since the end of the analysis phase typically is a project milestone, often with review by those
that must approve the continuation of project funding.

Instructional Objectives
Specific student learning objectives are included at the beginning of the chapter. From an instructor’s
point of view, the objectives of this chapter are to:

1. Show students that in-house developed systems are not the only source for software.

2. Teach students how to assemble the various pieces of an alternative design strategy.

3. Demonstrate how to generate three alternative design strategies for an information system,
focusing on what should and should not be part of the strategy at this stage and why.

4. Show students one method for choosing among design strategy alternatives.

137
Modern Systems Analysis and Design, 3rd edition Instructor’s Manual

5. Discuss alternative generation and design strategy selection for Internet-based electronic
commerce applications.

Classroom Ideas
1. Use Table 11-2 and an updated version of the same information from the most recent Software
Magazine survey to begin a discussion of the many, varied sources of software in the
marketplace.

2. Use Table 11-5 to summarize the alternative sources for software and how to choose among them
for specific software needs. This table can serve as the basis for a discussion of the make versus
buy decision and can be expanded to include the “not invented here” syndrome.

3. Emphasize the concept of a design strategy to your students. A design strategy is a relatively
difficult concept for many students to grasp. Their first inclination is to think of a strategy as
simply a set of system functional requirements, and that different strategies are many, moderate,
and few (basic) functions. Certainly, this is one component of a design strategy, but point out
that operational platform and acquisition source are also choices that must be made to set the
direction for design efforts.

4. Have students research the proper format and contents for Requests for Proposal and have them
create and/or present RFPs for a specific design strategy (see Problem and Exercise 2). RFP
preparation should include discussion of the hardware, software, and organizational issues
presented in this chapter.

5. Work through the Hoosier Burger example in class, including creating the multi-criteria decision
matrix. Expand student understanding of this comparison technique by introducing changes in
Hoosier Burger’s objectives and constraints and showing how these changes affect the matrix and
maybe the final choice. Alternatively, give students another example, with objectives,
constraints, and some design strategy options. Ask your students to generate alternative
strategies and the corresponding matrix. Problems and Exercises 9 and 10 are good problems for
students to work in class.

6. Using the Hoosier Burger multi-criteria decision-making matrix (Figure 11-5), show how
changes in existing weights and ratings affect the alternative strategy scores and the final choice.
Lead a class discussion on how these numbers are generated and what these numbers really
mean. Ask students how they think management will actually use the numbers provided in the
matrix. For example, what happens if management really supports one of the design strategies
that was not chosen as optimal?

7. In class, compare and contrast Hoosier Burger’s multi-criteria decision matrix with other
decision-making techniques (such as elimination by aspects, allocating points out of some total,
or ranking). Have students judge when each technique is preferable to others and why. Discuss
the concept of mandatory, essential, and desirable features or criteria. Discuss how to apply
these three kinds of features/criteria under different multi-criteria decision-making techniques.

8. In class, work through the Baseline Project Plan and the changes that were discussed in the
chapter, using Figures 11-6 through 11-10 and Tables 11-6 and 11-7. Have students make some
of the specific changes that are discussed more abstractly in the text. Discuss with students the
reasoning behind a Baseline Project Plan and the purpose it serves. (At this point, you may want
to assign Problem and Exercise 7.)

138
Chapter 11 Selecting the Best Alternative Design Strategy

9. Have students identify an Internet-based electronic commerce application, perhaps one that you
have discussed in previous class periods. For this application, have students investigate different
design strategies.

Answers to Key Terms


Suggested answers are provided below. These answers are presented top-down, left to right.

8. Web server 5. Outsourcing


3. Design strategy 6. Request for proposal
7. Scalable 1. Application server
4. Enterprise resource planning 2. Application service provider

Answers to Review Questions


1. The deliverables from generating alternatives and selecting the best one include: (1) identifying
at least three substantively different system design strategies for building the replacement
information system; (2) choosing the design strategy judged most likely to lead to the most
desirable information system; and (3) preparing (updating) a Baseline Project Plan for turning
the most likely design strategy into a working information system.

2. Analysts generate three alternatives because three alternatives can neatly represent both ends and
the middle of a continuum of potential solutions.

3. Six sources of software are identified in the text. These include hardware manufacturers,
packaged software producers, custom software producers, enterprise-wide solutions, application
service providers, and in-house developers. Hardware manufacturers are among the world’s
leading software producers, but the software they make is limited mostly to operating systems
and utilities. In contrast, packaged software producers develop all kinds of software for all kinds
of markets. Custom software producers, sometimes called consulting firms, develop specific,
customized software that matches a client’s particular needs. Enterprise solutions consist of a
series of integrated modules; these modules are integrated to focus on business processes rather
than on business functional areas. Application service providers are organizations that host and
run computer applications for other companies, typically on a per use or license basis. In-house
development requires the resources, especially trained staff, to develop software targeted to an
organization’s own specific needs.

4. When deciding what off-the-shelf software to buy, you should compare products and vendors.
Additional criteria include (among others that are more situation-specific): cost, functionality,
vendor support, vendor viability, flexibility, documentation, response time, and ease of
installation.

5. When trying to determine if new hardware or system software are necessary, analysts focus on
whether a particular design strategy can be run on existing hardware and systems software
platforms. Advantages of running the target system on existing platforms include lower costs,
familiarity, ease of integration, and few or limited data conversion costs. On the other hand,
parts of the target system may require specific platforms, new platforms allow for substantial
upgrading, and a new platform may allow the organization to radically change its computing
operations. An RFP is a formal document that provides detailed specifications about a target
information system and asks vendors for information on how they would develop the system.
139
Modern Systems Analysis and Design, 3rd edition Instructor’s Manual

Analysts use RFPs as a way to get vendors to perform the necessary research into specific design
strategies and the hardware and systems software vendors believe are necessary for developing
the new system.

6. Other than hardware and software, issues analysts must consider include implementation issues
(such as changes in work relationships, training, and disruptions in work procedures) and
organizational issues (such as cost of implementation, determining what management will
support, and whether users will accept the new system).

7. Analysts consider many issues in developing alternative solutions to information system


problems. Of particular interest are the system owner’s and users’ prioritized system objectives
and system (and development) constraints. Analysts consider which design strategies would
minimally satisfy objectives and not violate constraints, on the one hand, as well as which design
strategies would meet or exceed objectives with minimal violation of constraints. Many possible
design strategies exist between these two extreme positions.

8. While alternative design strategies are compared in many different reasonably objective ways, the
chosen design strategy depends on what management’s true objectives are for a particular
development project. Management may ignore constraints, or alternatively, choose the least
expensive system to develop, regardless of which design strategy appeared to be the best in the
objective comparison.

9. Every section of the Baseline Project Plan is updated during the alternative generation and
selection step of analysis.

10. To verify vendor claims about a software package, an analyst can ask for a software
demonstration, use the software (and its documentation and training materials) personally, talk
with other users of the software, and consult independent software testing and abstracting
services (surveys available for a fee).

11.Enterprise resource planning systems consist of a series of integrated modules; these modules
pertain to specific, traditional business functions. However, these modules are integrated to
focus on business processes rather than on business functional areas. Enterprise resource
planning systems advantages include a single repository of data for all aspects of a business
process, flexible modules, less maintenance, more consistent and accurate data, and ease of
adding and integrating new modules into the existing system. Possible disadvantages of this
approach include complexity, lengthy implementation, lack of in-house expertise, expense, and
changing how the organization conducts its business.

Answers to Problems and Exercises


1. In addition to visiting Datamation’s Web site, encourage your students to also visit Software
Magazine’s Web site. Tables 11-2, 11-3, and 11-4 summarize information from Software
Magazine. The most recent Software 500 list is located at
http://www.softwaremag.com/SW500/index.html.

The software industry continues to be a high-growth, dynamic sector of the economy. Thus,
students are likely to find changes in the more recent rankings. Microsoft continues to grow and
increase its dominance. There have also been some recent mergers, which will affect the
rankings. We see changes in the rankings as companies sell more or less software. Some
software vendors have done a good job of forecasting market needs and then producing and

140
Chapter 11 Selecting the Best Alternative Design Strategy

selling good products to meet those needs. Two examples of this are Microsoft, with its
Windows-based products, and Lotus, with Notes and its bevy of other applications.

2. An organization uses the Request for Proposal (RFP) to solicit proposals from several competing
vendors. Usually, RFPs first provide background information on the company and the business
units involved in the request, an explanation of the information systems needs, a description of
what is wanted from the vendors (i.e., what information they must provide or other actions they
must take), and an explanation of any rules or procedures for the RFP and system development
process. The bulk of the document then describes the mandatory, essential, and desirable
requirements in the areas of need (e.g., functionality, hardware, software, and service). Students’
RFP outlines should include these key features.

3. In the first accompanying spreadsheet, the weights have been changed to reflect a weighting that
represents systems development projects in governmental agencies. In these settings, a great deal
of weight is given to the costs and time frame of the system being proposed. As often happens in
governmental agencies, by weighting costs and timing more heavily in this example the outcome
has changed. Alternative B and Alternative C have traded places; Alternative B now has the
highest score.

The second accompanying spreadsheet reflects changes in the ratings for each alternative.
Alternative B now has a much higher score. This shows how important ratings are and how
subtle changes and/or biases in ratings can significantly impact the final outcome.

The third spreadsheet has additional criteria of “references” and “in use.” “References” are
written references from other organizations currently using the vendor’s systems. “In use” means
that the technology proposed has been in use by a paying customer for 6 months. These are very
common criteria for organizations that value stability of the vendor and technology over
performance and state-of-the-art technology. These additional criteria do not change the
outcome; Alternative B still has the highest score.

141
Modern Systems Analysis and Design, 3rd edition Instructor’s Manual

First Spreadsheet
(Government Agencies)
Criteria Weight Alternative A Alternative B Alternative C
Rating Score Rating Score Rating Score

Requirements
Real-time data entry 10 5 50 5 50 5 50
Automatic reorder 10 1 10 5 50 5 50
Real-time data query 10 1 10 5 50 5 50
30 70 150 150

Constraints
Developer costs 25 4 100 5 125 3 75
Hardware costs 25 4 100 4 100 3 75
Operating costs 15 5 75 1 15 5 75
Ease of training 5 5 25 3 15 3 15
70 300 255 240

Total 100 370 405 390

Second Spreadsheet
(Changed Ratings)
Criteria Weight Alternative A Alternative B Alternative C
Rating Score Rating Score Rating Score

Requirements
Real-time data entry 18 5 90 5 90 5 90
Automatic reorder 18 3 54 5 90 5 90
Real-time data query 14 1 14 4 56 5 70
50 158 236 250

Constraints
Developer costs 15 5 75 5 75 3 45
Hardware costs 15 5 75 5 75 4 60
Operating costs 15 5 75 5 75 3 45
Ease of training 5 5 25 4 20 5 25
50 250 245 175

Total 100 408 481 425

142
Chapter 11 Selecting the Best Alternative Design Strategy

Third Spreadsheet
(Additional Criteria)
Criteria Weight Alternative A Alternative B Alternative C
Rating Score Rating Score Rating Score

Requirements
Real-time data entry 16 5 80 5 80 5 80
Automatic reorder 16 3 48 5 80 5 80
Real-time data query 12 1 12 4 48 5 60
44 140 208 220

Constraints
Developer costs 16 5 80 5 80 3 48
Hardware costs 13 5 65 5 65 4 52
Operating costs 8 5 40 5 40 3 24
Ease of training 3 5 15 4 12 5 15
40 200 197 139

Other
References 8 3 24 4 32 4 32
In use 8 5 40 3 24 1 8

Total 100 404 461 399

4. The list for evaluating computer hardware and system software is similar to the list for selecting
off-the-shelf application software. In addition to cost, functionality, vendor support, vendor
viability, flexibility, documentation, response time (or other performance criteria, such as number
of transactions per unit of time, other benchmark tests, or raw processor speed), and ease of
installation, we might include the current staff’s familiarity with the new system, need for
retraining, compatibility and connectivity with current systems, cost of converting old systems to
the new platform, ease of future upgrades, and the track record of the vendor in successfully
implementing this new system in other organizations.

5. For this method of evaluation to be valid, one assumes that all relevant criteria are known and
included and that the weights and ratings are accurate. More important, this method assumes
that the alternatives and criteria lend themselves to a quantitative analysis. Some people argue
that some parts of the analysis inherently cannot be quantified. For example, it is difficult to
truly explicitly rate and weight the amount of trust that you can place in a vendor and your belief
that he will indeed follow through on his claims. Further, this method assumes that the criteria
are independent of each other, and thus scores are additive.

6. Another quantitative method for choosing between alternative systems is to choose almost
exclusively based on cost. In most state and federal agencies, information systems are chosen
this way. People in these agencies are often forced by law to choose the least expensive system
that meets some minimum level of adequacy for the relevant information system needs. Indeed,
many states and parts of the federal government are attempting to change this method of
awarding governmental contracts. A second, more qualitative method chooses the vendor that
supplies the necessary system and also provides the best value-added services and components.
For example, many companies will choose a vendor that, in addition to the basic system, is
willing to supply additional training, free components, less expensive maintenance, or has offered
to enter into a strategic partnership that is of mutual benefit to both companies.

143
Modern Systems Analysis and Design, 3rd edition Instructor’s Manual

When multiple decision makers collaborate and make the decision together, several methods for
incorporating their interactive input exist. For example, for a quantitative analysis, such as that
presented in Figure 11-5, each decision maker enters his ratings for each alternative across each
criteria. This data are then summarized using a spreadsheet, and the average and/or summary
rating across all decision makers is used to choose a vendor. In addition, group support systems
can tally the individual, anonymous ideas, comments, and/or votes of multiple, collaborating
decision makers. Since many multi-criteria decision-making methods exist (e.g., another popular
technique uses pairwise comparisons), students will identify several alternatives for this question.

7. Basically, your students should include the deliverables from the three major sub-phases of
analysis: requirements determination, requirements structuring, and alternative generation and
selection. Key issues include meeting participants, the level of detail to present to Bob
Mellankamp, and, subsequently, how long the meeting should last. The meeting should not only
summarize the findings from analysis but also validate these findings by outlining the process
followed. An updated BPP should be covered. Without more information, it may be difficult for
the students to decide on other key issues. Have your students identify the information that is
needed to decide on these issues. For example, they may want to know more about
Mellenkamp’s personality and preferences before making a decision.

8. In addition to cost, functionality, vendor support, vendor viability, flexibility, documentation,


response time, and ease of installation, a number of other “real world” criteria might be included.
People often choose application packages, such as word processors and spreadsheets, based
solely on their familiarity with the packages and/or their bias toward one hardware platform or
operating system over another. To a certain extent this is functional. On the other hand, this can
be dysfunctional. For example, it is useful to consider the current staff’s familiarity with the new
application software and the resulting need for retraining. However, it is dysfunctional if a
company does not choose new software because of the employees’ lack of familiarity with the
software. Eventually, software will evolve and the market will change, and the employees (and
the company) will be left behind using antiquated technology. Additional criteria include
compatibility with currently used application software (so, for example, data can be shared),
compatibility with existing hardware and system software, ability to support a range from novice
to experienced (or power) users, and appeal of the user interface (ease of use).

9. Some basic system alternatives include: (1) build the system in-house using a programming
language such as C or Microsoft Visual Basic; (2) purchase off-the-shelf packages, such as
Microsoft Excel and Access, along with the necessary computer and telecommunications
equipment, and use these to build the necessary systems in-house; (3) purchase custom software
and a turn-key system from either a generic information systems consulting firm such as
Andersen Consulting or EDS or from a specialized systems provider for the food retail or pizza
retail industry; or (4) outsource the systems to an outside firm.

Each of these alternatives has unique advantages and disadvantages. Given that the system needs
to be stable, easy to use, and built relatively quickly, and given that this organization probably
has little or no in-house systems personnel, the third or fourth alternatives are most realistic.

10. It is useful for students to create a spreadsheet like the one presented in Figure 11-5. Your
students should list in the criteria category each of the requirements and constraints described in
the problem, plus any other criteria that they believe are relevant. As best they can, have your
students weight each criterion and use this information to rank each of the four alternatives
presented in the previous answer. Your students will need to make some assumptions in order to
complete each of the ratings. This method of analysis is useful even for this relatively small
system. This method forces the decision maker to flesh out relevant criteria and weighting and be
as objective as possible in rating each alternative on each criterion.

144
Chapter 11 Selecting the Best Alternative Design Strategy

11. Having only one design strategy is problematic in several ways. First, there is no guarantee that
the best, correct, or even an adequate system for the situation is being developed or purchased.
This is not obvious because it is unclear if other alternatives were considered, and if they were,
those present cannot see why the one choice won out. Second, if the one strategy is chosen
because only one vendor is used, there are no benefits from having multiple vendors compete for
an RFP. For example, the vendor has no incentive to keep his price as low as possible. Third,
without the detailed, public systems specifications that are part of a competitive bid process,
there is not likely to be much in the way of written documentation to refer back to if the vendor
does not fulfill his promises. If the analysts present only one design strategy during the oral
presentation to the project steering committee or client, the recommendations are likely to be (at
worst) rejected, or (at best) accepted with great skepticism. It is also possible that those present
at the meeting will start to generate alternatives, each representing that person’s position. The
meeting will quickly deteriorate since a fair assessment of ad hoc alternatives cannot be done
within the limits of a meeting. In any event, this is not a good way to begin the development of
an information system (or build a career).

12. The list for evaluating alternative custom software developers is similar to that for selecting
off-the-shelf application software or for computer hardware and system software. In addition to
cost, functionality, vendor support, vendor viability, flexibility, documentation, response time,
and ease of installation, you might include the current staff’s familiarity with the software, need
for retraining, compatibility and connectivity with current systems, and the track record of the
vendor in successfully implementing similar software in other organizations. Such vendors
should have an established track record for developing similar software in other organizations.
Their references should be checked thoroughly, including visits to other sites. If the developer’s
role ends after the application is accepted, then the vendor’s reputation for handling this
transition from external development to internal maintenance is important. From a legal point of
view, you may want to select a custom developer based on the willingness to sign a non-
disclosure agreement, so that he is not allowed to develop a similar system for one of your
competitors, at least for a certain amount of time.

13. The project team can use the advantages of the enterprise resource planning design as part of its
strategy for selling this system. The team can stress that this solution consists of a series of
integrated modules; these modules are integrated to focus on business processes, and the firm can
integrate all parts of a business process. This approach includes a single repository of data, thus
providing more consistent and accurate data and less maintenance. These modules are flexible
and new modules are easily integrated into an existing system.

Also, an enterprise resource planning (ERP) system might be justified on the following grounds:
(1) it is a complete enterprise-wide solution that models all aspects of each transaction,
supposedly seamlessly and within a single system; (2) an ERP system is based on a single
repository of all corporate data, which implies consistency, accuracy and flexibility of the data;
and (3) adding new modules should be relatively painless as all modules are specifically designed
to work together. On the other hand, some might counter that ERP systems are complex and
require expensive outside expertise for implementation, and that the organization itself has to
adjust to fit the software's model of how organizations should operate rather than the reverse.

Guidelines for Using the Field Exercises


1. Since pricing and capabilities change rapidly, ask your students to visit the Web sites of several
vendors, including Compaq, IBM, Gateway, and Dell. For discussion purposes, three

145
Modern Systems Analysis and Design, 3rd edition Instructor’s Manual

alternatives are presented below; however, please note that the following information should be
updated each semester.

Low-end alternative: 866MHz Pentium III, 128MB of RAM, 10GB hard drive, 48X CD-ROM,
15” color monitor, running Microsoft Windows 98, and equipped with Microsoft Office 2000.
Cost is about $1,100.

Mid-range alternative: 1.4GHz Pentium IV, 128MB of RAM, 20GB hard drive, 17” color
monitor, a 48X CD-ROM, running Microsoft Windows ME, and equipped with Microsoft Office
2000. Cost is about $1,700.

High-end alternative: 1.7GHz Pentium IV, 256MB of RAM, 60GB hard drive, 21” monitor,
DVD-ROM drive, running Microsoft Windows 2000, and equipped with Microsoft Office XP
Professional. Cost is about $2,400.

2. The spreadsheet below presents the quantitative analysis for the three alternatives described in
the previous answer. The criteria are speed, storage, ease of use, reliability, costs, and time to
operation. The mid-range alternative has the highest score because it has acceptable rankings for
the performance-oriented criteria and scores well on the highly weighted criteria of costs. As is
often the case, people often buy more technology than they really need. The counter argument is
that, for PCs, one should buy as much power as they can reasonably afford so the technological
life of their equipment is longer, and they will be better able to take advantage of new software as
it becomes available.

New PC Purchase

Pentium III PIV PIV


Criteria Weight 866 MHz 1.4 GHz 1.7 GHz

Rating Score Rating Score Rating Score


Requirem ents
Speed 15 3 45 4 60 5 75
Storage 15 3 45 4 60 5 75
Ease of Use 15 4 60 5 75 5 75
Reliability 15 4 60 5 75 5 75
60 210 270 300
Constraints
Costs 25 5 125 4 100 2 50
Time to Operation 15 5 75 5 75 5 75
40 200 175 125

Total 100 410 445 425

3. Students should easily locate three different spreadsheet products and readily obtain related
information about each product. Your students might also visit a computer retailer, particularly a
large one such as CompUSA or Egghead Software. At such stores the students can test a variety
of software packages. Some of the criteria the students are likely to use include speed, ease of
use, compatibility with other packages, price, and features. It is useful for students to compare
their analyses. This comparison helps them understand how difficult it is for software vendors to
be all things to all customers.

146
Chapter 11 Selecting the Best Alternative Design Strategy

4. Business people are likely to use this list of criteria in some formal or informal way. Have your
students present their findings to the class so that they can learn about a variety of companies. It
is useful for students to see how companies actually use these criteria and methods in purchasing
off-the-shelf software.

5. Obtaining RFPs may be difficult for your students. It may be necessary for you to obtain copies
of RFPs either from business contacts or from the university. It is very useful for students to see
real RFPs. Students are amazed at how lengthy and detailed these are for larger, more complex
systems. Your students are likely to be amazed at how complicated RFPs can become for
governmental agencies.

6. Chances are any organization that a student contacts about its ERP implementation will have a
lot to say about it, provided the IT staff is willing to share the information. Typically, ERP
implementations take several years and cost quite a bit in terms of consultant fees. There are
many reasons to move to an ERP system, just as there are many reasons not to move to an ERP
system. The organization was probably attracted to the promise of uniformity and consistency
made by ERP vendors, although the exact reasons differ from firm to firm. Chances are good
that the organization has made some internal changes, such as realigning departments internally
to take advantage of the opportunities ERP systems offer, as well as to meet the demands ERP
systems make in order to operate effectively. The chances are also good that most of the
implementation work has been done by outside consultants, so for firms not used to managing
large numbers of contractors, an ERP implementation is a new and different experience. The
implementation is likely still going on at whatever firm a student happens to talk with, but it has
probably been going on for many months or years, as each ERP implementation is a learning
experience for the consultants and the adopting firm.

Guidelines for Using the Broadway Entertainment Company Cases


Guidelines and answers for using the Broadway Entertainment Company cases are available on this
textbook’s companion Web site. Please visit www.prenhall.com/hoffer to access this information.

147

Você também pode gostar