Used settlement value Used settlement value by -10
No. Type Lift off mm base on pipe support 3 Rest 10 mm. by -50 mm base on pipe support No. 3 have lift off 8 mm from top of have 10 mm gap steel in case normal between bottom of condition but in case pipe with top of pipe settlement at field it rest on support steel steel
Technical Writing A-Z: A Commonsense Guide to Engineering Reports and Theses, Second Edition, British English: A Commonsense Guide to Engineering Reports and Theses, U.S. English
Second Edition