Applicable Standard Mech documents (ADMA OPCO)

STD-100 Approved manucaturer list

Third Party Inspection and Testing Requirements for New


Equipment and Materials in Manufacture.
CP-102 (BS EN 10204)
Approval of Welding Procedures
STD-103 & Welders Performance

STD-108 Flanges

SP-1000 Materials for Sour Services

Preservation of New Materials &


SP-1002 Equipment

Galvanization (Hot Dip & Spun) And


SP-1015 Applications Of Bolts

SP-1021 Water Quality for Hydrostatic Test

Thermal Insulation (Hot & Cold) of


SP-1028 Piping and Equipment

Pre and Post Weld Heat Treatment of


SP-1035 Ferrous Materials

SP-1050 PART-2 Pressurized Static Equipment


SP-1060 Process Design Criteria

Procedure for Pressure Testing of


PRO-110 Part 2: Pressure Vessels

GDL-102 Materials Selection


O) Rev Delete
0 GP 46-010 Guidance on Industry Standards for New Pressure Vesse

1a

0
ds for New Pressure Vessels
DOC no. Doc. Title Rev.No

DATA SHEET FOR


B094-000-60-41-DS-5011 NEW CLOSED DRAIN VESSEL 0
(ITEM NO. 415-V-2889)

Job Specification for Open & Closed


AD89-26-G-02503 3
Drain Vessels (Static Equipment)
SPECIFICATION FOR NEW CLOSED
AD41-415-G-16237 3
DRAIN VESSEL (Addendum)

SPECIFICATION for
SP-1050 (PART-II) Mechanical Design Criteria 0
Part-II: Pressurized Static Equipment
Guidance on Industry Standards for
GIS 46-020 28-Jul-08
Standard Vessel Details

SP-1000 ( Spec for Material for Sour Service Part 2

Guidance on Industry Standards for


GIS 46 -010 New Pressure Vessels
Spec review (Detailed Engineering for Upgrade of SLOPS
and DRAINS at USSC)
Main Clause

Scope of Supply 2.a

2.a

2.a

2.a

2.a

Design 3.1.g

3.1.i

3.1.K

3.1.1.a

3.1.2
3.2

4.c

6.4

6.5

4.9

General 4.4
4.15

Loads 5.4.1..a

Nozzle and manways 5.5.2.c

5.5.2.g.g1

5.5.2.g.g1

5.5.2.g.g1

5.5.2.L

5.5.2.M
5.5.2.n

5.5.4.j

MATERIALS AND
CORROSION 6.1.6
REQUIREMENTS

6.2.5

ACCESSORIES 7.1

INSPECTION AND 9
TESTING

HYDROSTATIC TEST

10.1
10.2

10.3

Process Manufacturee

Hardness
pec review (Detailed Engineering for Upgrade of SLOPS
and DRAINS at USSC)
Captured

SR nozzle & Manholes nozzle

Manufacturer and U stamp Nameplate

All Necessary blanks, bolring gaskets for testing purpose

One no. Extra cover flange for pump mounting nozzle with fastener
and gasket spare for maintaince purpose

Internal lining and coating

Minimum thickness of stuctural member 6 mm and continious fillet


welding

SS 304 main plate screwed by SS and engraved

Minimum thickness of internal shall be

Transpotation case 28.9m/s

Wind Speed 43m/sec (BS 6399 Part 2)


All internal bolted attachments shall be secured with double nut system

Sulpur content less than 0.003%

All pressure part material shall be normalised

Set in type nozzle

All pad shall be 50mm minimu radius

Hydrotest duration shall be 1 hour

Seat test using soap solution and air at a pressure of 103 Kpa 9g)

Vessels shall be designed with regards to transportation loads exerted


during towing from the fabrication
yard to the installation site (Refer ADMA-OPCO Design Criteria for fixed
Offshore Steel Structure SP-!030
Rev.2000) (Draft)”.

Design life equipment 30 years


Contractor shall evaluate the using of ASME VIII Div.2 as design code
when economically justified. The following guidelines shall be used to
determine when ASME VIII Div.2 should be considered:
a. When the nominal thickness of the vessel shell or heads exceeds 50
mm, irrespective of design pressure, materials, or service.
b. When the erected weight of the vessel, (excluding removable
internal and external attachments) exceeds 90 Tones .
c. For vessels with design pressures 10 MPa (1450 psi) and larger,
irrespective of service and materials of construction.

Wind design shall be in accordance with ASCE 7 and design wind


speeds stated in ADMA- OPCO STD 00 Part 2.

Nozzle flange accordance with ADMA STD-108

Rating and facing of flanged nozzles shall be in accordance with ASME


B16.5 and to ADMA OPCO STD 108.

For spiral wound and flexible graphite based gaskets, the gasket contact
surfaces shall have concentric or spiral grooves, resulting in a
roughness height within the range of 3.2-6.3 μm Ra (smooth finish) in
accordance with ASME B46.1.

Minimum gasket thickness is 3.2 mm.

Horizontal and vertical vessels shall be provided with a minimum of two


manways, one for access and one for ventilation.

Top entry and side entry manways shall be provided with a davit.
Side entry manways shall have internal handgrips and ladder rungs in
accordance with Company Specifications.

Base plate bearing stress, Anchor bolt minimum diameter, allowable


design stresses and material shall be in accordance with ADMA OPCO
SP-1051

For high-strength carbon steel and low alloy steel bolting, minimum
coatings or approved non-metallic coatings are permitted.

For large diameter vessel, internal organic non-metallic coatings may be


applied as an alternative (e.g. Glass flake epoxy etc) considering the
following:
a. The coating shall meet the upper operating/design temperatures.
b. The coating shall have the required anti-explosion decompression
properties.
c. The application of the coating is considered practical.

Stress on vessel shell due to saddle supports shall be checked in


accordance with BS PD 5500 Appendix G.

All pressure and non-pressure welds shall be visually inspected where


accessible. All segments of longitudinal, circumferential or built-up
head pressure weld seams covered or rendered inaccessible by
internals, lifting lugs or other attachments shall be fully radiographed
the entire affected length plus 25 cm (10 inches) either side prior to installation of the
attachment.

All vessels shall be designed for a future field hydrostatic test in the
erected and corroded condition and will be tested in accordance with
ADMA-OPCO PRO- 110 Part 2

The shop hydrostatic test pressure shall be 1.3 times the calculated new and
cold Maximum Allowable Pressure (M.A.P.).
Hoop stress in any part of the vessel shall not exceed 90 percent of the
minimum yield strength of the material multiplied by the joint efficiency.

The minimum hydrostatic test time required is at least 1 hour per 25


mm wall thickness with one hour minimum.

Fully killed Flanges and seamless fitting

A105-187 HB, A 234-197 HB


Highlighted point Discrepancy

SR

Extra cover flange for pump mounting


0.003

50

30 years
In datasheet metioned wind
ASCE 7 or ADMA STD 00 PART-2 specification BS 6399 Part 2

ADMA STD-108 for nozzle Flange

2 manways