Escolar Documentos
Profissional Documentos
Cultura Documentos
Qualified Civil Engineer BE(Hons) & Chartered Engineer(India) with 11 years of Experience in
Construction management, Project planning, Site engineering, Coordination, Quality Assurance
and Execution in Infrastructure Projects like Roads, Railways, Airport, Hydro Power and Industrial
Projects with soft skills in MS Project, Primavera, SAP PS & MM Module, MS Excel and AutoCAD
in adherence to PMP/PMBOK Guidelines. Analytical approach in Internal Auditing of Civil Works
as per IS Codes and IIA guidelines.
+91 9910413636 eck84.naveen@gmail.com
1 MS Project
8
0 Primavera
Hydro Power Industrial Railways, Hydro Power Industrial 8
Roads MS Excel
11
Execution Project Planning &
Coordination VBA Programming
3
AutoCAD
10
Professional Education SAP
8
2018 Chartered Engineer, MIE, Institute of Engineers, India
2007 BE(Hons) Civil Engineering, Govt. Engineering College, Kota, Rajasthan
Personal Details
Career Timeline Date of Birth : 4th September’1984
Language : English & Hindi
Dy. Manager, Asst. Engineer Address : Plot No-96, 2nd Floor,
Project Engineer Dwarka, Sector-12A, New Delhi-
Jindal Saw Ltd Era Infra
Vastukriti Ltd 110075, INDIA
Engineering Ltd
Projects Handled:
• Jindal Quality Tubular Limited, Budget: INR 110 Crores
• Jindal Fittings Limited: INR 117 Crores
• Jindal Saw Limited, Bhilwara Iron Ore Mining Unit: INR 1100 Crores
• IUP Jindal Ammonia Cracker Plant: INR 1 Crore
Projects Handled:
• Teesta VI Hydro Electric Power Project: 500 MW
• Phata Byung Hydro Electric Power Project: 76 MW
• Budhil Hydro Electric Power project: 70 MW
Projects Handled:
• Seismic Retrofitting of Proctor & Gamble Manufacturing Facility, Baddi, Himachal
Pradesh
Projects Handled:
• GMR Badrinath Hydro Electric Power project: 300 MW
Jul’07-Oct’08 Era Infra Engineering Limited, New Delhi & MP
Projects Handled:
• Palwal-Bhuteshwar Railway (INR 62 Crores)- All Civil Engineering and connected
General Electrical Works for Construction of Road bed facilities, Buildings, Box-pushing
in existing 2 ROBs including Misc. works for 3rd Line (81 Kms) on NCR
• Rewari-Ringus-Phulera-Ajmer Railway (INR 63.75 Crores)- Gauge Conversion project
(294.56 Km)-All civil & electrical works for GC of MG Railway line to BG from Rewari to
Ajmer for converting the existing twin MG & BG single line section to BG double line
section on NWR.
• Bhildi-Samdari Railway(INR 122 Crores)-
• All permanent way works including supply of ballast, p way material except rails and
PSC sleepers from KM 0 to 223.44 between M. Bhinmal & Bhildi stations in c/w gauge
conversion of existing MG railway line to BG line of BLDI-SMR section on NW Rly.
• All civil works for bridges & earthwork from Km 121.41 to 223.44 and buildings, FOBs,
platforms, L-Xings & connected electrical works from Km 0.00 to 223.44 in c/w gauge
conversion of existing MG railway line to BG line of Bhildi-Samdari section on NWR.
• Strengthening, Repairing & Widening of State Highway with fifty culverts and one
Bridge, Manasa-Bhanpura MP Road Project, Madhya Pradesh 116 Kms
• Expansion of Pune Airport, AAI, Pune