Você está na página 1de 3

Naveen Agrawal CEng(India)

Middle level Assignments


Project Planning, Scheduling, Budgeting, Coordination & Execution

Qualified Civil Engineer BE(Hons) & Chartered Engineer(India) with 11 years of Experience in
Construction management, Project planning, Site engineering, Coordination, Quality Assurance
and Execution in Infrastructure Projects like Roads, Railways, Airport, Hydro Power and Industrial
Projects with soft skills in MS Project, Primavera, SAP PS & MM Module, MS Excel and AutoCAD
in adherence to PMP/PMBOK Guidelines. Analytical approach in Internal Auditing of Civil Works
as per IS Codes and IIA guidelines.
+91 9910413636 eck84.naveen@gmail.com

Profile Summary Core Competencies


 Qualified Chartered Engineer Number of years
 Project Management in adherence to PMP/PMBOK Guidelines
 Internal Auditing of Civil Works as per IS Codes and IIA guidelines Project Execution
4
 Project Performance Analysis, KPI i.e. Earned Value, SPI, CPI, TCPI Reports
 Project Planning, Scheduling & Monitoring (SAP/MS Project Project Planning
8
/Excel/Primavera 6.7 Project
 Project Execution Project Scheduling
8
 Rate Analysis & Budgeting
Project Monitoring
8
Professional Experience Project Coordination
11
6 SAP MM, PS
8
5
Internal Audit
Sum of Exposure On 6
4 Site (Years)
3 Sum of Exposure Office
(Years) IT Skills
2 Number of years

1 MS Project
8
0 Primavera
Hydro Power Industrial Railways, Hydro Power Industrial 8
Roads MS Excel
11
Execution Project Planning &
Coordination VBA Programming
3
AutoCAD
10
Professional Education SAP
8
2018 Chartered Engineer, MIE, Institute of Engineers, India
2007 BE(Hons) Civil Engineering, Govt. Engineering College, Kota, Rajasthan
Personal Details
Career Timeline Date of Birth : 4th September’1984
Language : English & Hindi
Dy. Manager, Asst. Engineer Address : Plot No-96, 2nd Floor,
Project Engineer Dwarka, Sector-12A, New Delhi-
Jindal Saw Ltd Era Infra
Vastukriti Ltd 110075, INDIA
Engineering Ltd

2012-Current 2009-12 2009-09 2008-09 2007-08

Sr. Engineer Executive-Civil


Lanco Infratech Ltd GMR Energy Ltd
Work Experience
Since Mar’2012 Jindal Saw Limited, New Delhi

Deputy Manager-Project Planning & Monitoring/Internal Audit, April 2015 – Present


• Project Monitoring, Tracking, Co-ordination, Reconciliation, Audit and MIS reporting
for Industrial Projects in SAP/MS Project/Excel
Assistant Manager-Project Planning & Monitoring/Internal Audit, March 2012 – March
2015
• Project Monitoring, Tracking, Co-ordination, Reconciliation, Audit and MIS reporting
for Industrial Projects in SAP/MS Project/Excel

Projects Handled:
• Jindal Quality Tubular Limited, Budget: INR 110 Crores
• Jindal Fittings Limited: INR 117 Crores
• Jindal Saw Limited, Bhilwara Iron Ore Mining Unit: INR 1100 Crores
• IUP Jindal Ammonia Cracker Plant: INR 1 Crore

Jun’09-Mar’12 Lanco Infratech Limited, Gurgaon, Haryana

Sr. Engineer-Planning, April 2011 - March 2012


• Planning, Budgeting, Monitoring & coordination for Hydro Power Project namely
Budhil HEP (70 MW) in SAP/MS Project/Excel. Reporting to ED-Hydro and COO.
• Preparing Estimates, daily progress report, material reconciliation, client/contractor
billing for Budhil Hydro power project.
• Approval, preparation and amendments of work orders in SAP.
Engineer-Planning, June 2009 - March 2011
• Planning and Monitoring for Hydro Power Projects namely Teesta VI HEP (500 MW),
Phata HEP (76 MW) and Budhil HEP (70 MW). Reporting to ED-Hydro.
• Estimation, preparing daily progress report, material reconciliation, client/contractor
billing for all Hydro power project in SAP.

Projects Handled:
• Teesta VI Hydro Electric Power Project: 500 MW
• Phata Byung Hydro Electric Power Project: 76 MW
• Budhil Hydro Electric Power project: 70 MW

Mar’09-Jun’09 Vastukriti Limited, Baddi, Himachal Pradesh

Project Engineer-Civil(Quality), March 2009- June 2009


• Supervising Project Quality of site works as per approved Quality Assurance plan
• Preparation of MIS for Quality Department for Consultant.

Projects Handled:
• Seismic Retrofitting of Proctor & Gamble Manufacturing Facility, Baddi, Himachal
Pradesh

Oct’08-Jan’09 GMR Energy Limited, Badrinath, Uttarakhand

Executive-Civil, October 2008 - January 2009


• Supervising Project site works. Site measurements for Power House and other works
including Surveying, Compiling and reporting of Daily Report, Planning and progress
monitoring.
• Successfully accomplished 200 m drift work for underground Power House with
precision in alignment.
• Facilitated site visits to World Bank representatives and contactors as representative
of client.

Projects Handled:
• GMR Badrinath Hydro Electric Power project: 300 MW
Jul’07-Oct’08 Era Infra Engineering Limited, New Delhi & MP

Assistant Engineer-Civil, July 2007 - October 2008


• Planning, budgeting, monitoring, coordination, billing, reconciliation and
presentations for various Road, Railway and Airport sites from corporate office.
• Planning, quantity estimation, monitoring, coordination, reconciliation and
presentations for MP Road project from site office and visiting corporate office on
monthly basis for billing and presentation to top management.
• Liaison with contractors, taking site measurements, dealing with consultant and
dealing with client MPRDC for billing.
• Preparing daily project report, rolling budget, cash flow, material reconciliation,
equipment & manpower performance statements, presentations and purchase
requisition for material and service in ERP.

Projects Handled:
• Palwal-Bhuteshwar Railway (INR 62 Crores)- All Civil Engineering and connected
General Electrical Works for Construction of Road bed facilities, Buildings, Box-pushing
in existing 2 ROBs including Misc. works for 3rd Line (81 Kms) on NCR
• Rewari-Ringus-Phulera-Ajmer Railway (INR 63.75 Crores)- Gauge Conversion project
(294.56 Km)-All civil & electrical works for GC of MG Railway line to BG from Rewari to
Ajmer for converting the existing twin MG & BG single line section to BG double line
section on NWR.
• Bhildi-Samdari Railway(INR 122 Crores)-
• All permanent way works including supply of ballast, p way material except rails and
PSC sleepers from KM 0 to 223.44 between M. Bhinmal & Bhildi stations in c/w gauge
conversion of existing MG railway line to BG line of BLDI-SMR section on NW Rly.
• All civil works for bridges & earthwork from Km 121.41 to 223.44 and buildings, FOBs,
platforms, L-Xings & connected electrical works from Km 0.00 to 223.44 in c/w gauge
conversion of existing MG railway line to BG line of Bhildi-Samdari section on NWR.
• Strengthening, Repairing & Widening of State Highway with fifty culverts and one
Bridge, Manasa-Bhanpura MP Road Project, Madhya Pradesh 116 Kms
• Expansion of Pune Airport, AAI, Pune

Membership • Institute of Engineers, India


Chartered Engineer, MIE, Membership number : M-1609771

Certifications • Primavera 6.7, August 2011


CADD Center, New Delhi

• AutoCAD 2004, August 2005 - October 2005


Pentamedia technologies, Kota, Rajasthan
A+ Grade in 2D Drafting, Isometric, 3D Modeling and Rendering Techniques

• Contracts Management, December 2011


Power Management Institute, NTPC Ltd, New Delhi
Trainings
• Project Planning, Monitoring & Control , May 2011 - June 2011
Indian Society for Training & Development, Nainital, Uttarakhand
Ministry of Statistics and Programme Implementation.

• Integrated Infrastructure Development at Eldeco-Sidcul (JV) Industrial Park,


June 2006 - July 2006
Ramky Infra-Consulting Pvt. Ltd, Sitarganj, Uttarakhand
Rehabilitation of existing staff quarters including Estimation and costing.
Understanding typical drawings, regular site inspections and demarcations with total
station and auto level.

• Understanding new technologies and concepts in constructions attending various


workshops and seminars, June 2005 - July 2005
Central Building Research Institute, Roorkee, Uttarakhand
Workshops and seminars on Low cost construction techniques.

Você também pode gostar