Escolar Documentos
Profissional Documentos
Cultura Documentos
TOTAL
TOTAL TOTAL TOTAL NON TECHNICAL TECHNICAL GENERAL
TOTAL PM CORRECTIVE TOTAL BD TOTAL ACC NUMBER OF MTBF MTTR RELIABILITY UTILISATION
NO EQUIPMENT INSPECTION UNCERTAIN TIME RUNNING AVAILABLE AVAILABLE NON AVAILABILITY AVAILIBILITY % IDLE
DURATION MAINTENANCE DURATION DURATION BREAKDOWN (HOURS) (HOURS) (%) (%)
HOURS HOURS HOURS AVAILABLE (%) (%)
HOURS
1 100-RMG-01 31.00 0.00 8.00 5.50 0.00 0.00 1.00 228.00 744.00 44.50 13.50 228.00 0.00 98.19% 94.02% 100.00% 30.65% 63.37%
2 100-RMG-02 31.00 0.00 10.00 6.75 0.00 0.00 3.00 260.00 744.00 47.75 16.75 86.67 0.00 97.75% 93.58% 100.00% 34.95% 58.64%
3 100-RMG-03 31.00 0.00 9.75 7.17 2.00 0.00 7.00 297.00 744.00 49.92 18.92 42.43 0.29 97.46% 93.29% 99.33% 39.92% 53.37%
TOTAL 93.00 0.00 27.75 19.42 2.00 0 11.00 785 2232.00 47.39 16.39 119.03 9.52% 97.80% 93.63% 99.78% 35.17% 58.46%
AGUSTIAN CHANDRA
NIPP : 279086960
Laporan Kegiatan Peraw
Bulan A
Nama Alat : RAIL MOUNTED GANTRY CRANE 01
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
6 31/03/18 12023 24 7:00 8:00 Daily Inspection
8 02/04/18 12035 24 7:00 8:00 Daily Inspection
10:00 12:00 PM 1000 HOURS 1 pcs OIL FILTER LF 14000NN
1 pcs FUEL FILTER FS1040
Laporan Kegiatan Peraw
Bulan A
Nama Alat : RAIL MOUNTED GANTRY CRANE 01
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
1 pcs WATER FILTERWF2126
100 ltr OIL ENGINEMEDITRAN SX CH4 SAE 15W40 CH4
15 ltr WATER COLLANT
1 pcs AIR FILTER 25708
9 03/04/18 12035 24 7:00 8:00 Daily Inspection
Nama Alat : RAIL MOUNTED GANTRY CRANE 01
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
Nama Alat : RAIL MOUNTED GANTRY CRANE 01
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
Nama Alat : RAIL MOUNTED GANTRY CRANE 01
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
TOTAL
AVERAGE
PT IPC
Laporan Kegiatan Peraw
Bulan A
Nama Alat : RAIL MOUNTED GANTRY CRANE 01
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
PT IPC
1 2 3 4 5 6 7 8 9
n Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
0.50 0.50 10.00 41.67 23.50 97.92
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
2.00 1.00 1.00 1.00 22.00 91.67
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
5.00 20.83 24.00 100.00
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
1.00 1.00 8.00 33.33 23.00 95.83
1.00
0.50 0.50 23.50 97.92
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
3.00 12.50 24.00 100.00
1.00
4.00 16.67 24.00 100.00
1.00
3.00 12.50 24.00 100.00
1.00
11.00 45.83 24.00 100.00
1.00
0.50 0.50 15.00 62.50 23.50 97.92
1.00
24.00 100.00
31.00 8.00 5.50 13.50 1.00 228.00 228.00 950.00 730.50 3,043.75
1.00 0.26 0.18 0.44 0.03 7.35 7.35 30.65 23.56 98.19
Jambi, 02 Mei 2018
Mengetahui,
23 =
PT IPC TERMINAL PETIKEMAS AREA JAMBI PT JASA PERALATAN
16=12+13+PELABUHAN INDONESIA
18= 19=
21 = 22=
10 11 12 13 14 15 17 20 4
PELAKSANA PERALATAN SENIOR 14 14/17 20/17
(20/4)*100 16
(22/4)*100
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Laporan Kegiatan Peraw
Bulan A
Nama Alat : RAIL MOUNTED GANTRY CRANE 02
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
6 31/03/18 13095 24 7:00 8:00 Daily Inspection
8 02/04/18 13112 24 7:00 8:00 Daily Inspection
Laporan Kegiatan Peraw
Bulan A
Nama Alat : RAIL MOUNTED GANTRY CRANE 02
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
Nama Alat : RAIL MOUNTED GANTRY CRANE 02
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
Nama Alat : RAIL MOUNTED GANTRY CRANE 02
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
19 13/04/18 13205 24 7:00 8:00 Daily Inspection
Nama Alat : RAIL MOUNTED GANTRY CRANE 02
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
1 pcs LF 14000 NN
1 pcs WF 2126
100 ltr PERTAMINA MEDITRAN
27 21/04/18 13280 24 7:00 8:00 Daily Inspection
23:00 23:45 perbaikan buffer spreader 20" 40"
TOTAL
AVERAGE
Laporan Kegiatan Peraw
Bulan A
Nama Alat : RAIL MOUNTED GANTRY CRANE 02
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
PT IP
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
10.00 41.67 24.00 100.00
1.00
7.00 29.17 24.00 100.00
1.00
7.00 29.17 24.00 100.00
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
5.00 20.83 24.00 100.00
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14
4.00 14/17 20/17
11.00 45.83
(20/4)*100 20.00 16 83.33
(22/4)*100
1.00
1.00
3.00 3.00 10.00 41.67 21.00 87.50
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
10.00 41.67 24.00 100.00
1.00
10.00 41.67 24.00 100.00
1.00
2.00
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
2.00 1.00 1.00 0.09 11.00 45.83 22.00 91.67
1.00
0.75 0.75 10.00 41.67 23.25 96.88
1.00
10.00 41.67 24.00 100.00
1.00
5.00 20.83 24.00 100.00
1.00
0.50
1.00 10.00 41.67 23.00 95.83
0.50
0.50
1.00
24.00 100.00
31.00 10.00 6.75 16.25 3.00 86.67 260.00 1,083.33 727.75 3,032.29
1.00 0.32 0.22 0.52 0.10 2.80 8.39 34.95 23.48 97.82
Jambi, 02 Mei 2018
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
Mengetahui,
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Laporan Kegiatan Peraw
Bulan A
Nama Alat : RAIL MOUNTED GANTRY CRANE 03
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
4 29/03/18 11414 24 7:00 8:00 Daily Inspection
5 30/03/18 11415 24 7:00 8:00 Daily Inspection
8 02/04/18 11428 24 7:00 8:00 Daily Inspection
Laporan Kegiatan Peraw
Bulan A
Nama Alat : RAIL MOUNTED GANTRY CRANE 03
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
Nama Alat : RAIL MOUNTED GANTRY CRANE 03
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
Nama Alat : RAIL MOUNTED GANTRY CRANE 03
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
20 ltr WATER COOLANT
20 14/04/18 11541 24 7:00 8:00 Daily Inspection
Nama Alat : RAIL MOUNTED GANTRY CRANE 03
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
TOTAL
AVERAGE
Laporan Kegiatan Peraw
Bulan A
Nama Alat : RAIL MOUNTED GANTRY CRANE 03
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
PT IP
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
10.00 41.67 24.00 100.00
1.00
0.50 0.50 1.00 1.00 0.09 11.00 45.83 23.50 97.92
1.00
9.00 37.50 24.00 100.00
1.00
1.00 4.17 24.00 100.00
1.00
3.00 12.50 24.00 100.00
1.00
2.00 8.33 24.00 100.00
1.00
8.00 33.33 24.00 100.00
1.00
7.00 29.17 24.00 100.00
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
5.00 20.83 24.00 100.00
1.00
0.50 0.50 1.00 1.00 0.25 4.00 16.67 23.50 97.92
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
2.00
2.00
1.00 1.00 0.17 6.00 25.00 22.00 91.67
0.50
0.50
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
6.00 6.00 12.00 50.00 18.00 75.00
1.00
0.50 0.50 1.00 1.00 0.13 8.00 33.33 23.50 97.92
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
17.00 70.83 24.00 100.00
31.00 9.75 7.17 2.00 17.92 7.00 0.29 42.43 297.00 1,237.50 726.08 3,025.33
1.00 0.31 0.23 0.06 0.58 0.23 0.01 1.37 9.58 39.92 23.42 97.59
Jambi, 02 Mei 2018
Mengetahui,
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
PT IPC TERMINAL PETIKEMAS AREA JAMBI PT JASA PERALATAN PELABUHAN INDONESIA
PELAKSANA PERALATAN SENIOR
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
MONTHLY EQUIPMENT MAINTENANCE PERFORMANCE REPORT
BRANCH : PT IPC TERMINAL PETIKEMAS AREA JAMBI
EQUIPMENT CATEGORY : FIX JIB CRANE (FJC)
PERIOD : APRIL 2018
TOTAL
CORRECTIVE NUMBER OF TOTAL TOTAL TOTAL NON TECHNICA TECHNICAL
TOTAL PM TOTAL BD TOTAL ACC MTBF GENERAL RELIABILITY
NO EQUIPMENT INSPECTION UNCERTAIN TIME MAINTENANC BREAKDOW RUNNING AVAILABLE AVAILABLE L NON MTTR (HOURS) AVAILABILITY UTILISATION (%) % IDLE
DURATION DURATION DURATION (HOURS) AVAILIBILITY (%) (%)
E N HOURS HOURS HOURS AVAILABLE (%)
HOURS
1 100-FJC-01 31.00 0.00 7.00 17.50 0.00 0.00 5.00 125.00 744.00 55.50 24.50 25.00 0.00 96.71% 92.54% 100.00% 16.80% 76%
2 100-FJC -02 31.00 0.00 6.00 4.50 0.00 0.00 3.00 121.00 744.00 41.50 10.50 40.33 0.00 98.59% 94.42% 100.00% 16.26% 78%
TOTAL 62.00 0.00 13.00 22.00 0.00 0 8.00 246 1488.00 48.50 17.50 32.67 0.00% 97.65% 93.48% 100.00% 16.53% 76.95%
AGUSTIAN CHANDRA
NIPP : 279086960
Laporan Kegiatan Peraw
Bulan A
Nama Alat : FIX JIB CRANE 01
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
8 02/04/18 7360 24 7:00 8:00 Daily Inspection
Laporan Kegiatan Peraw
Bulan A
Nama Alat : FIX JIB CRANE 01
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
Nama Alat : FIX JIB CRANE 01
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
Laporan Kegiatan Peraw
Bulan A
Nama Alat : FIX JIB CRANE 01
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
Nama Alat : FIX JIB CRANE 01
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
PT IP
Laporan Kegiatan Peraw
Bulan A
Nama Alat : FIX JIB CRANE 01
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
PT IP
1 2 3 4 5 6 7 8 9
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
0.50 0.50 3.00 12.50 23.50 97.92
1.00
0.50 0.50 1.00 1.00 0.25 4.00 16.67 23.50 97.92
1.00
3.50 3.50 1.00 1.00 0.33 3.00 12.50 20.50 85.42
1.00
3.00 3.00 1.00 1.00 0.50 2.00 8.33 21.00 87.50
1.00
24.00 100.00
1.00
24.00 100.00
1.00
8.00 33.33 24.00 100.00
1.00
1.00 4.17 24.00 100.00
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
4.00 16.67 24.00 100.00
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
1.00 1.00 7.00 29.17 23.00 95.83
1.00
7.00 29.17 24.00 100.00
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
5.00 20.83 24.00 100.00
1.00
1.00
7.50
7.50 1.00 1.00 0.33 3.00 12.50 16.50 68.75
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
24.00 100.00
31.00 7.00 17.50 23.00 5.00 25.00 125.00 520.83 721.00 3,004.17
1.00 0.23 0.56 0.74 0.16 0.81 4.03 16.80 23.26 96.91
Jambi, 02 Mei 2018
Mengetahui,
23 =
PT IPC TERMINAL PETIKEMAS AREA JAMBI PT JASA PERALATAN PELABUHAN INDONESIA
16=12+13+ 18= 19=
21 = 22=
10
PELAKSANA11PERALATAN 12
SENIOR 13 14 15
14
17
14/17 20/17
20 4
(20/4)*100 16
(22/4)*100
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Laporan Kegiatan Peraw
Bulan A
Nama Alat : FIX JIB CRANE 02
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
8 02/04/18 7252 24 7:00 8:00 Daily Inspection
13:00 15:00 pemasangan stopper luffing 4 kg KAWAT LAS LB 52
7 pcs GERINDA TIPIS
Laporan Kegiatan Peraw
Bulan A
Nama Alat : FIX JIB CRANE 02
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
4 set BAUT 27 ml
9 03/04/18 7260 24 7:00 8:00 Daily Inspection
9:00 10:00 setting limit swicth
11:00 11:30 penambahan oil gearbox luffing 10 ltr OLI MASRI RG 460
11:30 12:00 penambahan oil engine MEDITRAN 15W40
10 04/04/18 7265 24 7:00 8:00 Daily Inspection
9:00 11:30 PM 250 hours 2 pcs OIL FILTERLF9070
1 pcs WATER SEPERATORFS1006
1 pcs FUEL FILTERFF105D
2 pcs WATER FILTERWF2075
OIL ENGINEMEDITRAN SX CH4 SAE 15W40
150 ltr
CH4
11 05/04/18 7271 24 7:00 8:00 Daily Inspection
9:00 11:00 cleaning carbon brush 1 tbg CONTAC CLEANER
12 06/04/18 7272 24 7:00 8:00 Daily Inspection
Nama Alat : FIX JIB CRANE 02
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
Laporan Kegiatan Peraw
Bulan A
Nama Alat : FIX JIB CRANE 02
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
Nama Alat : FIX JIB CRANE 02
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
PT IP
Laporan Kegiatan Peraw
Bulan A
Nama Alat : FIX JIB CRANE 02
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
PT IP
1 2 3 4 5 6 7 8 9
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
24.00 100.00
1.00
2.00 8.33 24.00 100.00
1.00
6.00 25.00 24.00 100.00
1.00
2.00 8.33 24.00 100.00
1.00
24.00 100.00
1.00
24.00 100.00
1.00
24.00 100.00
1.00
2.00
2.00 1.00 1.00 0.13 8.00 33.33 22.00 91.67
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 2.00 17
1.00 1.00 20 4
14 14/17 0.13
20/17 8.00 33.33 22.00 91.67
(20/4)*100 16
(22/4)*100
1.00
1.00
1.50 1.00 1.00 0.20 5.00 20.83 22.50 93.75
0.50
0.50
1.00
2.50
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
1.00 4.17 24.00 100.00
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
9.00 37.50 24.00 100.00
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
1.00 (22/4)*100
8.00 33.33 24.00 100.00
1.00
31.00 6.00 4.50 8.00 3.00 40.33 121.00 504.17 736.00 3,066.67
1.00 0.21 0.16 0.26 0.10 1.30 3.90 16.26 23.74 98.92
Jambi, 02 Mei 2018
Mengetahui,
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24
PT JPPI 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
MONTHLY EQUIPMENT MAINTENANCE PERFORMANCE REPORT
BRANCH : PT IPC TERMINAL PETIKEMAS AREA JAMBI
EQUIPMENT CATEGORY : HEAD TRUCK (HDT)
PERIOD : APRIL 2018
TOTAL
CORRECTI
NUMBER OF TOTAL TOTAL TOTAL NON TECHNICA TECHNICAL GENERAL
UNCERTAIN TOTAL PM VE TOTAL BD TOTAL ACC MTBF RELIABILITY
NO EQUIPMENT INSPECTION BREAKDOW RUNNING AVAILABLE AVAILABLE L NON MTTR (HOURS) AVAILABILITY AVAILIBILITY UTILISATION (%) % IDLE
TIME DURATION MAINTENA DURATION DURATION (HOURS) (%)
N HOURS HOURS HOURS AVAILABLE (%) (%)
NCE
HOURS
1 100-HDT-03 31.00 0.00 2.00 1.00 0.00 0.00 4.00 102.00 744.00 34.00 3.00 25.50 0.00 99.60% 95.43% 100.00% 13.71% 82%
2 100-HDT-05 31.00 0.00 3.00 2.50 0.00 0.00 1.00 75.00 744.00 36.50 5.50 75.00 0.00 99.26% 95.09% 100.00% 10.08% 85%
3 100-HDT-06 31.00 0.00 3.00 0.00 0.00 0.00 1.00 76.00 744.00 34.00 3.00 76.00 0.00 99.60% 95.43% 100.00% 10.22% 85%
4 100-HDT-07 31.00 0.00 4.00 6.50 0.00 0.00 2.00 110.00 744.00 41.50 10.50 55.00 0.00 98.59% 94.42% 100.00% 14.78% 80%
5 100-HDT-08 31.00 0.00 4.00 1.00 0.00 0.00 2.00 107.00 744.00 36.00 5.00 53.50 0.00 99.33% 95.16% 100.00% 14.38% 81%
TOTAL 155.00 0.00 16.00 11.00 0.00 0 10.00 470 3720.00 37.17 6.17 61.50 0.00% 99.17% 95.00% 100.00% 13.13% 81.88%
% PM Compliance 100%
AGUSTIAN CHANDRA
NIPP : 279086960
Laporan Kegiatan Peraw
Bulan A
Nama Alat : HEAD TRUCK 03
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
6 31/03/18 7747 24 7:00 8:00 Daily Inspection
8 02/04/18 7756 24 7:00 8:00 Daily Inspection
Laporan Kegiatan Peraw
Bulan A
Nama Alat : HEAD TRUCK 03
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
Nama Alat : HEAD TRUCK 03
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
19 13/04/18 7791 24 7:00 8:00 Daily Inspection
Nama Alat : HEAD TRUCK 03
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
TOTAL
AVERAGE
Laporan Kegiatan Peraw
Bulan A
Nama Alat : HEAD TRUCK 03
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
PT IP
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
1.00 4.17 24.00 100.00
1.00
24.00 100.00
1.00
6.00 25.00 24.00 100.00
1.00
1.00 4.17 24.00 100.00
1.00
1.00 1.00 1.00 1.00 4.17 24.00 100.00
1.00
24.00 100.00
1.00
9.00 37.50 24.00 100.00
1.00
24.00 100.00
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
5.00 20.83 24.00 100.00
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
1.00 1.00 1.00 1.00 0.33 3.00 12.50 23.00 95.83
1.00
3.00 12.50 24.00 100.00
1.00
1.00 4.17 24.00 100.00
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
1.00 4.17
(20/4)*100 24.00 16 100.00
(22/4)*100
1.00
4.00 16.67 24.00 100.00
31.00 2.00 1.00 3.00 4.00 25.50 102.00 425.00 741.00 3,087.50
1.00 0.06 0.03 0.10 0.13 0.82 3.29 13.71 23.90 99.60
Jambi, 02 Mei 2018
Mengetahui,
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Laporan Kegiatan Peraw
Bulan A
Nama Alat : HEAD TRUCK 05
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
8 02/04/18 7862 24 7:00 08:00 Daily Inspection
Laporan Kegiatan Peraw
Bulan A
Nama Alat : HEAD TRUCK 05
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
Nama Alat : HEAD TRUCK 05
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
Laporan Kegiatan Peraw
Bulan A
Nama Alat : HEAD TRUCK 05
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
19 13/04/18 7881 24 7:00 08:00 Daily Inspection
9:30 10:00 penggantian waher 1 pcs WASHER MOTOR
Nama Alat : HEAD TRUCK 05
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
TOTAL
AVERAGE
PT IP
Laporan Kegiatan Peraw
Bulan A
Nama Alat : HEAD TRUCK 05
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
PT IP
1 2 3 4 5 6 7 8 9
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
24.00 100.00
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
24.00 100.00
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
1.00 4.17 24.00 100.00
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
24.00 100.00
1.00
0.50 0.50 1.00 1.00 1.00 23.50 97.92
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
24.00 100.00
31.00 3.00 2.50 5.50 1.00 75.00 75.00 312.50 738.50 3,077.08
1.00 0.10 0.08 0.18 0.03 2.42 2.42 10.08 23.82 99.26
Jambi, 02 Mei 2018
Mengetahui,
PT IPC TERMINAL PETIKEMAS AREA JAMBI PT JASA PERALATAN PELABUHAN INDONESIA
PELAKSANA PERALATAN SENIOR
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
PT IPC TERMINAL PETIKEMAS AREA JAMBI PT JASA PERALATAN PELABUHAN INDONESIA 21 = 22=
23 =
10PELAKSANA11
PERALATAN SENIOR 16=12+13+ 18= 19=
12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Laporan
Nama Alat : HEAD TRUCK 06
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume
(PT)
(EHM)
1 2 3 4 5 6 7 8
8 02/04/18 8101 24 7:00 8:00 Daily Inspection
Laporan
Nama Alat : HEAD TRUCK 06
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume
(PT)
(EHM)
1 2 3 4 5 6 7 8
Nama Alat : HEAD TRUCK 06
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume
(PT)
(EHM)
1 2 3 4 5 6 7 8
18 12/04/18 8124 24 7:00 8:00 Daily Inspection
Laporan
Nama Alat : HEAD TRUCK 06
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume
(PT)
(EHM)
1 2 3 4 5 6 7 8
Nama Alat : HEAD TRUCK 06
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume
(PT)
(EHM)
1 2 3 4 5 6 7 8
TOTAL
AVERAGE
Laporan Kegiatan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
Down Time
Down Time
Down Time
Down Time
Down Time
31.00 3.00 3.00 1.00 76.00
1.00 0.10 0.10 0.03 2.45
Jambi, 02 Mei 2018
Mengetahui,
PT IPC TERMINAL PETIKEMAS AREA JAMBI PT JASA PERALATAN PELABUHAN INDONESIA
PELAKSANA PERALATAN SENIOR
Laporan Kegiatan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
Down Time
Mekanik Keterangan
Jam % Jam %
23 =
21 = 22=
20 4 24 25
(20/4)*100 16
(22/4)*100
Mekanik Keterangan
Jam % Jam %
23 =
21 = 22=
20 4 24 25
(20/4)*100 16
(22/4)*100
Mekanik Keterangan
Jam % Jam %
23 =
21 = 22=
20 4 24 25
(20/4)*100 16
(22/4)*100
Mekanik Keterangan
Jam % Jam %
23 =
21 = 22=
20 4 24 25
(20/4)*100 16
(22/4)*100
Mekanik Keterangan
Jam % Jam %
23 =
21 = 22=
20 4 24 25
(20/4)*100 16
(22/4)*100
2.00 8.33 24.00 100.00 PT JPPI
23 =
21 = 22=
20 4 24 25
(20/4)*100 16
(22/4)*100
ANDI MUHAJIRIN
MANAGER AREA
Laporan Kegiatan Peraw
Bulan A
Nama Alat : HEAD TRUCK 07
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
8 02/04/18 6208 24 7:00 08:00 Daily Inspection
Laporan Kegiatan Peraw
Bulan A
Nama Alat : HEAD TRUCK 07
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
Nama Alat : HEAD TRUCK 07
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
19 13/04/18 6241 24 7:00 08:00 Daily Inspection
10:00 16:00 perbaikan mufler 1 kg KAWAT LAS LB 52
Nama Alat : HEAD TRUCK 07
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
TOTAL
Laporan Kegiatan Peraw
Bulan A
Nama Alat : HEAD TRUCK 07
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
AVERAGE
PT IP
PT IP
Laporan Kegiatan Peraw
Bulan A
Nama Alat : HEAD TRUCK 07
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
1.00 4.17 24.00 100.00
1.00
24.00 100.00
1.00
5.00 20.83 24.00 100.00
1.00
1.00 4.17 24.00 100.00
1.00
1.00 4.17 24.00 100.00
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
5.00 20.83 24.00 100.00
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
2.00
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
1.00 (22/4)*100
6.00 25.00 24.00 100.00
31.00 4.00 6.50 10.50 2.00 55.00 110.00 458.33 733.50 3,056.25
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00 0.13 0.21 0.34 0.06 1.77 3.55 14.78 23.66 98.59
Jambi, 02 Mei 2018
Mengetahui,
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
Laporan Kegiatan Pera
Bulan
Nama Alat : HEAD TRUCK 08
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
8 02/04/18 6156 24 7:00 8:00 Daily Inspection
Laporan Kegiatan Pera
Bulan
Nama Alat : HEAD TRUCK 08
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
Nama Alat : HEAD TRUCK 08
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
19 13/04/18 6187 24 7:00 8:00 Daily Inspection
Nama Alat : HEAD TRUCK 08
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
Nama Alat : HEAD TRUCK 08
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
TOTAL
AVERAGE
PT IP
PT IP
Laporan Kegiatan Pera
Bulan
Nama Alat : HEAD TRUCK 08
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
0.50 0.50 1.00 1.00 1.00 23.50 97.92
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
5.00 20.83 24.00 100.00
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
0.50 0.50 3.00 12.50 23.50 97.92
1.00
24.00 100.00
1.00
3.00 12.50 24.00 100.00
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
1.00 (22/4)*100
5.00 20.83 24.00 100.00
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
24.00 100.00
31.00 4.00 1.00 5.00 2.00 53.50 107.00 445.83 739.00 3,079.17
1.00 0.13 0.03 0.16 0.06 1.73 3.45 14.38 23.84 99.33
Jambi, 02 Mei 2018
Mengetahui,
PT IPC TERMINAL PETIKEMAS AREA JAMBI PT JASA PERALATAN PELABUHAN INDONESIA
PELAKSANA PERALATAN SENIOR
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
MONTHLY EQUIPMENT MAINTENANCE PERFORMANCE REPORT
BRANCH : PT IPC TERMINAL PETIKEMAS AREA JAMBI
EQUIPMENT CATEGORY : CHASSIS (CHS)
PERIOD : APRIL 2018
TOTAL
CORRECTI
NUMBER OF TOTAL TOTAL TOTAL NON TECHNICA TECHNICAL GENERAL
TOTAL PM VE TOTAL BD TOTAL ACC MTBF RELIABILITY
NO EQUIPMENT INSPECTION UNCERTAIN TIME BREAKDOW RUNNING AVAILABLE AVAILABLE L NON MTTR (HOURS) AVAILABILITY AVAILIBILITY UTILISATION (%) % IDLE
DURATION MAINTENA DURATION DURATION (HOURS) (%)
N HOURS HOURS HOURS AVAILABLE (%) (%)
NCE
HOURS
1 100-CHS-05 31.00 0.00 2.00 0.00 0.00 0.00 1.00 102.00 744.00 33.00 2.00 102.00 0.00 99.73% 95.56% 100.00% 13.71% 82%
2 100-CHS-06 31.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 744.00 31.00 0.00 0.00 0.00 100.00% 95.83% 0.00% 0.00% 96%
3 100-CHS-07 31.00 0.00 2.00 2.00 0.00 0.00 1.00 75.00 744.00 35.00 4.00 75.00 0.00 99.46% 95.30% 100.00% 10.08% 85%
4 100-CHS-08 31.00 0.00 2.00 0.00 0.00 0.00 1.00 76.00 744.00 33.00 2.00 76.00 0.00 99.73% 95.56% 100.00% 10.22% 85%
5 100-CHS-09 31.00 0.00 2.00 0.00 0.00 0.00 1.00 110.00 744.00 33.00 2.00 110.00 0.00 99.73% 95.56% 100.00% 14.78% 81%
6 100-CHS-10 31.00 0.00 1.00 1.00 0.00 0.00 1.00 109.00 744.00 33.00 2.00 109.00 0.00 99.73% 95.56% 100.00% 14.65% 81%
TOTAL 155.00 0.00 7.00 3.00 0.00 0 5.00 370 3720.00 33.00 2.00 98.33 0.00% 99.73% 95.56% 100.00% 13.22% 82.35%
Mengetahui,
Jambi, 02 Mei 2018
PT IPC TERMINAL PETIKEMAS AREA JAMBI PT JASA PERALATAN PELABUHAN INDONESIA
PELAKSANA PERALATAN SENIOR
ANDI MUHAJIRIN
YUHANANTA DARMA MANAGER AREA
NIPP : 285037894
AGUSTIAN CHANDRA
NIPP : 279086960
Laporan Kegiatan Peraw
Bulan A
Nama Alat : CHASSIS 05
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
8 02/04/18 7756 24 7:00 8:00 Daily Inspection
Laporan Kegiatan Peraw
Bulan A
Nama Alat : CHASSIS 05
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
15 09/04/18 7775 24 7:00 8:00 Daily Inspection
13:20 14:20 greasing all pin 4 kg SGXNL PERTAMINA
Nama Alat : CHASSIS 05
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
19 13/04/18 7791 24 7:00 8:00 Daily Inspection
Nama Alat : CHASSIS 05
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
Laporan Kegiatan Peraw
Bulan A
Nama Alat : CHASSIS 05
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
TOTAL
AVERAGE
PT IP
Laporan Kegiatan Peraw
Bulan A
Nama Alat : CHASSIS 05
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9 PT IP
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
1.00 4.17 24.00 100.00
1.00
24.00 100.00
1.00
6.00 25.00 24.00 100.00
1.00
1.00 4.17 24.00 100.00
1.00
1.00 4.17 24.00 100.00
1.00
24.00 100.00
1.00
9.00 37.50 24.00 100.00
1.00
24.00 100.00
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
5.00 20.83 24.00 100.00
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
3.00 12.50 24.00 100.00
1.00
3.00 12.50 24.00 100.00
1.00
1.00 4.17 24.00 100.00
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
1.00 4.17
(20/4)*100 24.00 16 100.00
(22/4)*100
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
1.00 (22/4)*100
4.00 16.67 24.00 100.00
31.00 2.00 2.00 1.00 102.00 102.00 425.00 742.00 3,091.67
1.00 0.06 0.06 0.03 3.29 3.29 13.71 23.94 99.73
Jambi, 02 Mei 2018
Mengetahui,
23 =
21 = 22=
16=12+13+ 18= 19=
10 TERMINAL11
PT IPC PETIKEMAS 12
AREA JAMBI 13 14 15 PT14JASA 17
PERALATAN PELABUHAN
14/17
20
INDONESIA
20/17
4
(20/4)*100 16
PELAKSANA PERALATAN SENIOR (22/4)*100
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Laporan Kegiatan Pera
Bulan
Nama Alat : CHASSIS 06
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
2 27/03/18 0 24 7:00 8:00 daily inspection
8 02/04/18 0 24 7:00 8:00 daily inspection
Laporan Kegiatan Pera
Bulan
Nama Alat : CHASSIS 06
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
Nama Alat : CHASSIS 06
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
18 12/04/18 0 24 7:00 8:00 daily inspection
19 13/04/18 0 24 7:00 8:00 daily inspection
Nama Alat : CHASSIS 06
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
Nama Alat : CHASSIS 06
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
TOTAL
AVERAGE
PT IP
PT IP
Laporan Kegiatan Pera
Bulan
Nama Alat : CHASSIS 06
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
18= 19=
10 11 12 13 14 15 16=12+13+14 17 20 4
14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
24.00 100.00
1.00
24.00 100.00
1.00
24.00 100.00
1.00
24.00 100.00
1.00
24.00 100.00
1.00
24.00 100.00
1.00
24.00 100.00
1.00
24.00 100.00
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
18= 19=
10 11 12 13 14 15 16=12+13+14 17 20 4
14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
24.00 100.00
23 =
21 = 22=
18= 19=
10 11 12 13 14 15 16=12+13+14 17 20 4
14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
24.00 100.00
1.00
24.00 100.00
1.00
24.00 100.00
23 =
21 = 22=
18= 19=
10 11 12 13 14 15 16=12+13+14 17 20 4
14/17 20/17
(20/4)*100 16
1.00 (22/4)*100
24.00 100.00
23 =
21 = 22=
18= 19=
10 11 12 13 14 15 16=12+13+14 17 20 4
14/17 20/17
(20/4)*100 16
(22/4)*100
24.00 100.00
31.00 1.00 744.00 3,100.00
1.00 0.03 24.00 100.00
Jambi, 02 Mei 2018
Mengetahui,
23 =
21 = 22=
18= 19=
10 11 12 13 14 15 16=12+13+14 17 20 4
14/17 20/17
(20/4)*100 16
(22/4)*100
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
Laporan Kegiatan Pera
Bulan
Nama Alat : CHASSIS 07
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
Nama Alat : CHASSIS 07
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
Nama Alat : CHASSIS 07
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
19 13/04/18 7881 24 7:00 8:00 Daily Inspection
Nama Alat : CHASSIS 07
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
Nama Alat : CHASSIS 07
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
TOTAL
AVERAGE
PT IPC TERM
PELAKS
Y
PT IPC TERM
PELAKS
Laporan Kegiatan Pera
Bulan
Nama Alat : CHASSIS 07
Engine
Hour Possible
Meter Time Y
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
24.00 100.00
1.00
24.00 100.00
1.00
3.00 12.50 24.00 100.00
1.00
24.00 100.00
1.00
24.00 100.00
1.00
24.00 100.00
1.00
8.00 33.33 24.00 100.00
1.00
24.00 100.00
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
24.00 100.00
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
2.00 2.00 1.00 1.00 1.00 1.00 4.17 22.00 91.67
1.00
24.00 100.00
1.00
24.00 100.00
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
1.00 (22/4)*100
7.00 29.17 24.00 100.00
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
24.00 100.00
31.00 2.00 2.00 4.00 1.00 75.00 75.00 312.50 740.00 3,083.33
1.00 0.06 0.06 0.13 0.03 2.42 2.42 10.08 23.87 99.46
Jambi, 02 Mei 2018
Mengetahui,
T IPC TERMINAL PETIKEMAS AREA JAMBI PT JASA PERALATAN PELABUHAN INDONESIA
PELAKSANA PERALATAN SENIOR
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
Laporan Kegiatan Peraw
Bulan
Nama Alat : CHASSIS 08
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
8 02/04/18 8101 24 7:00 8:00 Daily Inspection
Laporan Kegiatan Peraw
Bulan
Nama Alat : CHASSIS 08
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
15 09/04/18 8115 24 7:00 8:00 Daily Inspection
16:20 17:20 greasing all pin 4 kg SGXNL PERTAMINA
Nama Alat : CHASSIS 08
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
18 12/04/18 8124 24 7:00 8:00 Daily Inspection
19 13/04/18 8126 24 7:00 8:00 Daily Inspection
Nama Alat : CHASSIS 08
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
TOTAL
AVERAGE
Laporan Kegiatan Peraw
Bulan
Nama Alat : CHASSIS 08
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
PT IPC TERMINA
PELAKSAN
YUHA
NIP
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
24.00 100.00
1.00
24.00 100.00
1.00
3.00 12.50 24.00 100.00
1.00
1.00 4.17 24.00 100.00
1.00
24.00 100.00
1.00
24.00 100.00
1.00
7.00 29.17 24.00 100.00
1.00
24.00 100.00
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
3.00 12.50 24.00 100.00
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
24.00 100.00
1.00
2.00 8.33 24.00 100.00
1.00
24.00 100.00
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
1.00 (22/4)*100
24.00 100.00
31.00 2.00 2.00 1.00 76.00 76.00 316.67 742.00 3,091.67
1.00 0.06 0.06 0.03 2.45 2.45 10.22 23.94 99.73
Jambi, 02 Mei 2018
Mengetahui,
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
PC TERMINAL PETIKEMAS AREA JAMBI PT JASA PERALATAN PELABUHAN INDONESIA
PELAKSANA PERALATAN SENIOR
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Laporan Kegiatan Peraw
Bulan A
Nama Alat : CHASSIS 09
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
8 02/04/18 6208 24 7:00 8:00 Daily Inspection
Laporan Kegiatan Peraw
Bulan A
Nama Alat : CHASSIS 09
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
Nama Alat : CHASSIS 09
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
18 12/04/18 6238 24 7:00 8:00 Daily Inspection
19 13/04/18 6241 24 7:00 8:00 Daily Inspection
Nama Alat : CHASSIS 09
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
Nama Alat : CHASSIS 09
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
TOTAL
AVERAGE
PT I
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
1.00 4.17 24.00 100.00
1.00
24.00 100.00
1.00
5.00 20.83 24.00 100.00
1.00
1.00 4.17 24.00 100.00
1.00
1.00 4.17 24.00 100.00
1.00
24.00 100.00
1.00
8.00 33.33 24.00 100.00
1.00
24.00 100.00
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
5.00 20.83 24.00 100.00
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
2.00 8.33 24.00 100.00
1.00
3.00 12.50 24.00 100.00
1.00
4.00 16.67 24.00 100.00
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
1.00 (22/4)*100
9.00 37.50 24.00 100.00
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
24.00 100.00
31.00 2.00 2.00 1.00 1.00 0.13 110.00 458.33 742.00 3,091.67
1.00 0.06 0.06 0.03 0.03 0.00 3.55 14.78 23.94 99.73
Jambi, 02 Mei 2018
Mengetahui,
PT IPC TERMINAL PETIKEMAS AREA JAMBI PT JASA PERALATAN PELABUHAN INDONESIA
PELAKSANA PERALATAN SENIOR
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
Laporan Kegiatan Peraw
Bulan A
Nama Alat : CHASSIS 10
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
8 02/04/18 6156 24 7:00 8:00 Daily Inspection
Laporan Kegiatan Peraw
Bulan A
Nama Alat : CHASSIS 10
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
Nama Alat : CHASSIS 10
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
18 12/04/18 6185 24 7:00 8:00 Daily Inspection
19 13/04/18 6187 24 7:00 8:00 Daily Inspection
Nama Alat : CHASSIS 10
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
Nama Alat : CHASSIS 10
Engine
Hour Possible
Meter Time
No Tgl Mulai Selesai Uraian Volume Part Number / Spesifikasi
(PT)
(EHM)
1 2 3 4 5 6 7 8 9
TOTAL
AVERAGE
PT IPC TERM
PELAK
Y
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
24.00 100.00
1.00
24.00 100.00
1.00
9.00 37.50 24.00 100.00
1.00
1.00 4.17 24.00 100.00
1.00
24.00 100.00
1.00
24.00 100.00
1.00
8.00 33.33 24.00 100.00
1.00
24.00 100.00
tan Perawatan dan Predictive Maintenance
Bulan April Tahun 2018
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
5.00 20.83 24.00 100.00
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
1.00
3.00 12.50 24.00 100.00
1.00
2.00 8.33 24.00 100.00
1.00
3.00 12.50 24.00 100.00
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
1.00 (22/4)*100
9.00 37.50 24.00 100.00
23 =
21 = 22=
16=12+13+ 18= 19=
10 11 12 13 14 15 17 20 4
14 14/17 20/17
(20/4)*100 16
(22/4)*100
24.00 100.00
31.00 1.00 1.00 2.00 1.00 109.00 109.00 454.17 742.00 3,091.67
1.00 0.03 0.03 0.06 0.03 3.52 3.52 14.65 23.94 99.73
Jambi, 02 Mei 2018
Mengetahui,
PT IPC TERMINAL PETIKEMAS AREA JAMBI PT JASA PERALATAN PELABUHAN INDONESIA
PELAKSANA PERALATAN SENIOR
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
PT JPPI
Mekanik Keterangan
24 25
PT JPPI
ALAT BONGKAR MUAT (USTER)
Feb-18
NO NAMA UNIT NO UNIT ASSET REGISTER
1 REACH STACKER 01 100-RST-01
2 HEAD TRUCK 04 100-HDT-04
3 HEAD TRUCK 09 100-HDT-09
4 FORKLIFT 06 100-FOD-06
5 FORKLIFT 08 100-FOD-08
6 FORKLIFT 09 100-FOD-09
7 FORKLIFT 10 100-FOD-10
8 FORKLIFT 11 100-FOD-11
9 FORKLIFT 12 100-FOD-12
10 MOBIL CRANE SUMITOMO 500 01 100-MBC-01
11 WHEEL LOADER 01 100-WHL-01
12 EXCAVATOR 01 100-EXC-01
13 GROVE 02 100-MBC-02
14 CHASSIS 11 100-CHS-11
15 CHASSIS 12 100-CHS-12
16 CONVEYOR BELT 01 100-CVB-02
### 19
### 20
### 21
### 22
### 23
### 24
### 25
### 26
### 27
### 28
### 29
### 30
### 31
LAPORAN KINERJA PEMELIHARAAN BULANAN
ALAT BONGKAR MUAT PT PELABUHAN INDONESIA II (PERSERO) CABANG. JAMBI
PERIODE TAHUN 2018
PERIODE
26 Maret 2018 s.d. 25 April 2018
PERIODE
26 Maret 2018 s.d. 25 April 2018