N° CONCEPTO UNIDAD EJE TRAMO # PIEZAS

P-00 PR

LIMPIEZA TRAZO Y NIVELACION


DE TERRENO DE 20X7 M. CON
CINTA Y MANGUERA INCLUYE
MATERIALES MENORES,
ESTABLECIENDO REFERENCIAS
P-01 (MOJONERAS, COTAS DE NIVEL m² A-F 1-7
CON PINTURA),LIMPIEZA DEL
ÁREA, RETIRO DE BASURA,
HERRAMIENTA, EQUIPO Y MANO
DE OBRA.

DESPALME DE TERRENO
NATURAL EN 20 CM DE ESPESOR
CON MAQUINARIA. INCLUYE:
RETIRO DE CAPA VEGETAL DE 20
CM. DE ESPESOR PROMEDIO,
P-02 DESHIERBE, M. DE O., m³
HERRAMIENTA Y EQ., ACARREO
AL LUGAR DE CARGA DEL
CAMIÓN, INCLUYE
ABUNDAMIENTO.
A-F 1-7

RETIRO DE MATERIAL PRODUCTO A-F 1-7


DE LIMPIEZA Y DESPALME DEL
TERRENO. CON
RETROEXCAVADORA Y CAMION
DE VOLTEO. INCLUYE: CARGA,
P-03 DESCARGA, ACARREOS, m³
MAQUINARIA, M.O,
HERRAMIENTA, EQUIPO Y TODO
LO NECESARIO PARA SU
CORRECTA EJECUCION.

N° CONCEPTO UNIDAD EJE TRAMO # PIEZAS


C-00 C
A 2-6
C 2-6
EXCAVACION PARA D 2-4
CONTRATRABES DE LOSA DE
CIMENTACION INCLUYE: E 2-5
C-01 PERFILADO, LIMPIEZA Y m³ 2 A-E
RETIRO DE MATERIAL
SOBRANTE FUERA DE LA 3 A-E
OBRA.
EXCAVACION PARA
CONTRATRABES DE LOSA DE
CIMENTACION INCLUYE:
C-01 PERFILADO, LIMPIEZA Y m³
RETIRO DE MATERIAL
SOBRANTE FUERA DE LA
OBRA. 4 A-E
5 A-E
6 A-C
A-C 2-3
A-C 3-4
A-C 4-5
A-C 5-6
MEMBRANA PLÁSTICA
CALIBRE 300, COLOCADA C-D 2-3
C-02 m²
ENTRE LA PLATAFORMA Y C-D 3-4
LOSA DE CIMENTACIÓN. PUOT.
C-E 4-5
D-E 2-3
D-E 3-4

A 2-6
CONTRATRABES DE 20X20 Cm, C 2-6
CONCRETO F´C= 200 KG/CM2 H. D 2-4
EN O. CON REVOLVEDORA,
REFUERZO DE 4vs. DE 3/8" Y E 2-5
ESTRIBOS DE 1/4" @ 25 cms.
C-03 INCLUYE: MATERIAL, M. DE O., mL 2 A-E
CIMBRA Y DESCIMBRA, COLADO 3 A-E
Y CURADO, HERRAM., EQ.,
ACARREOS Y TODO LO 4 A-E
NECESARIO PARA SU EJECUCIÓN. 5 A-E
6 A-C

SUMINISTRO Y CONSTRUCCIÓN
DE FIRME EN LOSA DE A-C 2-6
CIMENTACION DE CONCRETO
F'c=200kg/cm2. ESPESOR 12 CM.
ARMADO CON V 3/8" @ 20 CM
C-04 S.T Y @25 CM. S.L. INCLUYE: m²
MATERIAL, M. DE O.,
HERRAMIENTA, EQUIPO,
COLADO, VIBRADO Y CURADO,
HERRAMIENTA, EQUIPO,
CIMBRADO Y DESCIMBRADO. C-E 2-5

N° CONCEPTO UNIDAD EJE TRAMO # PIEZAS


AL-00 A
A 2-6
C 2-6
MURO DE BLOCK DE CONCRETO D 2-4
DE 15x20x40 CM, ASENTADO
CON MORTERO CEMENTO- E 2-5
ARENA PROP.1:4 EN PESO,
AL-01 INCLUYE: TODO LO NECESARIO m² 2 A-E
PARA SU EJECUCION, 3 A-E
MATERIALES, MANO DE OBRA,
EQUIPO Y HERRAMIENTA. 4 A-E
5 C-E
AL-01 INCLUYE: TODO LO NECESARIO m²
PARA SU EJECUCION,
MATERIALES, MANO DE OBRA,
EQUIPO Y HERRAMIENTA.

6 A-C

SUM Y COLOC. DE CASTILLO DE A 2-6 6


CONCRETO CON SECCIÓN
TRANSVERSAL DE 15x15cms. DE
CONCRETO F'c=150kg/cm2 H. EN
O. CON REVOLVEDORA, C 2-6 7
AL-02 REFUERZO DE 4vs. DE 3/8" Y mL
ESTRIBOS DE 1/4" @ 30cms
INCL.: CIMBRADO Y
DESCIMBRADO, COLADO, MATL.,
M. DE O., HERRAM., EQ., D 2-4 3
ACARREOS.

E 2-5 5
A 2-6
C 2-6
SUM Y COLOC DE CERRAMIENTO D 2-4
CON SECCIÓN TRANSVERSAL DE E 2-5
15x20 cms. DE CONCRETO
AL-03 F'c=150kg/cm2 H. EN O. CON 2 A-E
REVOLVEDORA, REFUERZO DE 3 A-E
4vs. DE 3/8" Y ESTRIBOS DE 1/4"
@ 20 cms., INCL.: MATL., M. DE 4 A-E
O., CIMBRA Y DESCIMBRA, 5 C-E
COLADO Y CURADO, HERRAM.,
EQ., ACARREOS. mL 6 A-C
SUM. Y FAB. DE LOSA DE AZOTEA
ESPESOR 15 CM. ALIGERADA DE
CONCRETO F'c=200kg/cm2 H. EN
O. CON REVOLVEDORA A-C 2-6
CONSIDERANDO ARMADO EN
NERVADURAS SEGÚN CALCULO,
AL-04 INCL.: MATERIAL, MANO DE
OBRA, HERRAMIENTA, EQUIPO,
ACARREOS, ARMADO, COLADO,
VIBRADO,CURADO, CIMBRA Y
DESCIMBRA. C-E 2-5


2 A-E
SUM. Y FAB. DE MARQUESINA DE 5 C-E
30 CM. DE CONCRETO
AL-05 F'c=200kg/cm2 H. EN O. CON m² 6 A-C
REVOLVEDORA. INCL.: TODO LO E 2-5
NECESARIOPARA SU CORRECTA
EJECUCION. C 5-6
A 2-6
SUM. Y CONSTRUCCIÓN DE
PRETIL DE BLOCK DE CONCRETO C 5-6
DE 10x20x40cms. ASENTADO
CON MORTERO CEM-ARENA 1:4
EN LOSA DE AZOTEA A E 2-5
AL-06 CUALQUIER NIVEL CON UNA m²
ALTURA VARIABLE INCLUYE: 2 A-E
MATERIALES, M DE O,
HERRAMIENTA, EQUIPO,
ACARREOS, ANDAMIOS, PLOMEO 5 C-E
Y NIVELADO Y DESPERDICIOS.
AL-06 CUALQUIER NIVEL CON UNA m²
ALTURA VARIABLE INCLUYE:
MATERIALES, M DE O,
HERRAMIENTA, EQUIPO,
ACARREOS, ANDAMIOS, PLOMEO
Y NIVELADO Y DESPERDICIOS.
6 A-C

ENTORTADO EN AZOTEA DE 4
CM DE ESPESOR CON MORTERO A-C 2-6
CEMENTO-ARENA 1:4. INCLUYE:
MATERIALES, MANO DE OBRA,
AL-07 ACARREOS, PREPARACIÓN DE LA m²
SUPERFICIE Y TODO LO
NECESARIO PARA LA CORRECTA
EJECUCIÓN. (PUOT) C-E 2-5

A 2-6
CHAFLÁN A BASE DE MORTERO
CEMENTO-ARENA 1:4 DE 10 CM C 5-6
DE ESPESOR EN EL PERIMETRO
DE LA LOSA Y REMATE DEL E 2-5
PRETIL. INCLUYE: MATERIALES,
AL-08 MANO DE OBRA, ACARREOS, mL
ELEVACIONES, PREPARACIÓN DE 2 A-E
LA SUPERFICIE, LIMPIEZA,
HERRAMIENTA, EQUIPO Y TODO
LO NECESARIO PARA LA 5 C-E
CORRECTA EJECUCIÓN. (PUOT)
6 A-C

SUM. Y FABRIC. DE BANQUETA 2 A-E


ESPESOR 8 CMS. DE CONCRETO
F'c=150kg/cm2 HECHO EN OBRA
CON REVOLVEDORA Y REFUERZO 5 C-E
CON MALLA ELECTROSOLDADA
6-6/10-10, RALLADO A CADA
METRO CON JUNTAS DE
AL-09 TEMPERATURA A CADA 6m. m² 6 A-C
ACABADO ESCOBILLADO,
ESQUINAS CON VOLTEADOR,
INCL.: MATERIAL, MANO DE E 2-5
OBRA, HERRAMIENTA, EQUIPO,
ACARREOS, CIMBRA, DESCIMBRA,
CURADO. C 5-6
SUM Y FAB. DE REGISTRO
SANITARIO DE 60x40x60cm.
(INTERIOR) DE BLOCK DE
CONCRETO DE 15X20X40 CMS
CM. CURADO A VAPOR,
ASENTADO CON MORTERO CEM-
ARENA 1:5, CONCRETO
F'c=200kg/cm2 TAPA DE
AL-10 CONCRETO CON ANGULO DE 1" Y PZA A-F 1-7 3
ANGULO EN EL REGISTRO PARA
RECIBIR TAPA, PISO 8CM.
ESPESOR, ACABADO CEMENTO
PULIDO EN INTERIOR, INCL.:
MATERIALES, MANO DE OBRA,
HERRAMIENTA, EQ., ARMADO,
CIMBRA, DESCIMBRA,
EXCAVACIÓN.

N° CONCEPTO UNIDAD EJE TRAMO # PIEZAS


IHS-00 INSTALACION

INSTALACION HIDRAULICA
INCLUYE: TENDIDO EN
IHS-01 CIMENTACION, CUADRO DE LOTE A-F 1-7 1
MEDIDOR Y LLAVES DE
EMPOTRAR. TODO LO
NECESARIO PARA SU
EJECUCION (MANO DE OBRA,
MATERIALES, EQUIPO,
HERRAMIENTA Y PRUEBAS)
SEGÚN PROYECTO. P.U.O.T.

INSTALACION SANITARIA
INCLUYE TENDIDO EN
VIVIENDA Y DRENAJE
EXTERIOR, TODO LO
IHS-02 NECESARIO PARA SU LOTE A-F 1-7 1
EJECUCION (MANO DE OBRA,
MATERIALES, EQUIPO,
HERRAMIENTA, Y PRUEBAS)
SEGÚN PROYECTO P.U.O.T.
SUMINISTRO E INSTALACION
IHS-03 DE REGADERA, INCLUYE PZA A-F 1-7 1
LLAVES, MANERALES,
CHAPETONES, CARGA,
ACARREO DE MATERIALES
DENTRO Y FUERA DE LA OBRA
Y TODO LO NECESARIO PARA
SU CORRECTA INSTALACION

SUM. Y COLOC. DE WC Y
LAVABO PARA BAÑO, INCLUYE
HERRAJES DE CONEXIÓN,
JUNTAS DE SILICON, ASIENTO,
PRUEBA, LIMPIEZA, CARGA Y
IHS-04 PZA A-F 1-7 1
ACARREO DENTRO Y FUERA
DE LA OBRA, MANO DE OBRA
Y TODO MATERIAL NECESARIO
PARA SU CORRECTA
INSTALACION

SUMINISTRO Y COLOCACION
DE TINACO DE POLIETILENO
DE 450 LITROS DE COLOR
NEGRO, INCLUYE TAPA
ROSCADA, VALVULA DE
GLOBO ROSCADA (LLAVE DE
IHS-05 PZA A-F 1-7 1
PASO) VARILLA FLOTADOR,
LIMPIEZA, ELABORACION DE
BASE, MANO DE OBRA,
HERRAMIENTA Y TODO LO
NECESARIO PARA SU
CORRECTA INSTALACION

SUMINISTRO Y COLOCACION
DE TARJA PARA COCINA,
INCLUYE LLAVES,CESPOL DE
PLASTICO RIGIDO, TUBERIAS,
IHS-06 PZA A-F 1-7 1
CODOS, NIPLES, MANO DE
OBRA Y TODO LO NECESARIO
PARA SU CORRECTA
INSTALACION

N° CONCEPTO UNIDAD EJE TRAMO # PIEZAS


IE-00 INSTALACION ELECTRICA

INSTALACION ELECTRICA
INCLUYE: SUMINISTRO Y
COLOCACION DE POLIDUCTO,
CAJAS OCTAGONALES PARA
IE-01 PLAFON, CABLEADO, LOTE A-F 1-7 1
ALIMENTACION,
BLOCKSOQUET, CAJAS
RECTANGULARES,
TOMACORRIENTE
DOBLE(POLARIZADOS Y
POLARIZADOS CON CORTE A
TIERRA), APAGADORES, TAPAS
PARA MUROS, ACCESORIOS.
INCLUYE MANO DE PBRA,
EQUIPO Y
HERRAMIENTA.P.U.O.T.

SUMINISTRO Y COLOCACION
DE ACOMETIDAS ELECTRICAS
DE 110 VOLTS. INCLUYE:
IE-02 CABLE THW No. 8,
INTECONEXION
SUBTERRANEA, VARILLA DE
TIERRA CONECTOR Y TODO LO
NECESARIO PARA SU
EJECUCION (MANO DE OBRA,
MATERIALES, EQUIPO,
CIMBRA Y HERRAMIENTA)
P.U.O.T. PZA A-F 1-7 1

INTERRUPTOR DE SEGURIDAD
IE-03 3 POLOS 30 A.
INCLUYE:RANURA,
COLOCACION EN MURO Y
TODO LO NECESARIO PARA SU
COLOCACION. PZA A-F 1-7 1

CENTRO DE CARGA TIPO QO2


CON 3 UNIDADES DE 1X20
AMPERS, RANURA,
IE-04 PZA 2
COLOCACION EN MURO Y
TODO LO NECESARIO PARA SU
COLOCACION.
A-F 1-7
N° CONCEPTO UNIDAD EJE TRAMO # PIEZAS
IG-00 INSTA
INSTALACION DE GAS INCLUYE
TODO LO NECESARIO PARA SU
EJECUCION: MANO DE OBRA,
IG-01 LOTE 1
MATERIALES, EQUIPO,
HERRAMIENTA. SEGÚN
PROYECTO. P.U.O.T.
A-F 1-7

SUMINISTRO Y COLOCACION
DE BOILER PARA 5 LTS,
IG-02 INCLUYE BASE, MANO DE PZA 1
OBRA Y TODO LO NECESARIO
PARA SU INSTALACION.
A-F 1-7
N° CONCEPTO UNIDAD EJE TRAMO # PIEZAS
AC-00
A 2-6
APLANADO CON ESTUCO C 5-6
BLANCO LISO SOBRE MURO
EXTERIOR E INTERIOR DEL D 3-4
BAÑO.INCLUYE FILETES, E 2-5
BOTAGUAS Y RINCONES, TODO
LO NECESARIO PARA SU 2 A-E
EJECUCION (MANO DE OBRA, 3 D-E
MATERIALES, EQUIPO, CIMBRA Y
HERRAMIENTA) 4 D-E
AC-01 m²
5 C-E
6 A-C

A 3-4
APLANADO EN MUROS C 3-4
INTERIORES DEL BAÑO. 3 A-C
4 A-C

APLANADO CON ESTUCO A-C 3-4


BLANCO LISO EN CIELOS
EXTERIORES E INTERIOR DEL C 5-6
BAÑO ESPESOR PROMEDIO DE 2 D-E 3-4
CM.INCLUYE FILETES, BOTAGUAS
AC-02 Y RINCONES, TODO LO m² E 2-5
NECESARIO PARA SU EJECUCION 2 A-C
(MANO DE OBRA, MATERIALES,
EQUIPO, CIMBRA Y 5 C-E
HERRAMIENTA.)
6 A-C
A 2-6
C 2-6
APLANADO DE YESO
MUESTREADO SOBRE MUROS D 1-4
INTERIORES A CUALQUIER NIVEL,
A BASE DE YESO-AGUA, CON E 2-5
AC-03 ESPESOR PROMEDIO DE 3cm m² 2 A-E
INCL.: FILETES EN PUERTAS,
VENTANAS, NIVEL Y ESCUADRA,
MATLS, M DE O., HERRAM, EQ,
ANDAMIOS, RESANES.
APLANADO DE YESO
MUESTREADO SOBRE MUROS
INTERIORES A CUALQUIER NIVEL,
A BASE DE YESO-AGUA, CON
AC-03 ESPESOR PROMEDIO DE 3cm m²
INCL.: FILETES EN PUERTAS,
VENTANAS, NIVEL Y ESCUADRA, 3 A-E
MATLS, M DE O., HERRAM, EQ, 4 A-E
ANDAMIOS, RESANES.
5 C-E
6 A-C

APLANADO DE TIROL SOBRE


MUROS INTERIORES A
CUALQUIER NIVEL, CON ESPESOR
PROMEDIO DE 3cm INCL.:
AC-04 FILETES EN PUERTAS, VENTANAS, m² A-E 2-6
NIVEL Y ESCUADRA, MATLS, M DE
O., HERRAM, EQ, ANDAMIOS,
RESANES.

APLANADO DE YESO A-C 2-3


MUESTREADO SOBRE PLAFON A
CUALQUIER NIVEL, A BASE DE C-E 2-3
YESO-AGUA, CON UN ESP. PROM.
AC-05 DE 3cm INCL.: FILETES EN m² C-D 3-4
PUERTAS, VENTANAS, REMATES,
NIVEL Y ESCUADRA, MATLS, M DE A-C 4-6
O., HERRAM, EQ, PREPARACIÓN ,
ANDAMIOS. C-E 4-5

APLANADO DE TIROL SOBRE


PLAFON A CUALQUIER NIVEL,
CON UN ESP. PROM. DE 3cm
INCL.: FILETES EN PUERTAS,
AC-06 VENTANAS, REMATES, NIVEL Y m² A-E 2-6
ESCUADRA, MATLS, M DE O.,
HERRAM, EQ, PREPARACIÓN ,
ANDAMIOS.

PINTURA EN EXTERIORES, A
DOS MANOS DE DIFERENTES
AC-07 m² A-E 2-6
COLORES SEGUN PROYECTO
ARQUITECTONICO. PUOT.

PINTURA EN INTERIORES, A
DOS MANOS DE DIFERENTES
AC-08 m² A-E 2-6
COLORES SEGUN PROYECTO
ARQUITECTONICO. PUOT.

SUM. Y COLOC. DE
IMPERMEABILIZACIÓN EN
AZOTEA INCL. VUELTAS EN PRETIL A-C 2-6
AC-09 Y RECEPCIÓN DE COLADERAS, m²
MATERIALES, M. DE O., HERRAM.,
EQ., LIMPIEZA.
C-E 2-5

SUM. Y COLOC. DE PIEDRA C-E


LAJA EN FACHADA PRINCIPAL. 5
AC-10 m²
INCL. MATERIALES, M. DE O.,
HERRAMIENTAS,EQ.
SUM. Y COLOC. DE PIEDRA
LAJA EN FACHADA PRINCIPAL.
AC-10 m²
INCL. MATERIALES, M. DE O.,
HERRAMIENTAS,EQ. A-C
6

CONSTRUCCION DE SARDINEL, DE
10x6 CM. DE SECCION
TRANSVERSAL EN AREA DE
REGADERA. INCLUYE CONCRETO
AC-11 HECHO EN OBRA, mL A-C 3-4
REVESTIMIENTO DE LOSETA
CERAMICA ANTIDERRAPANTE Y
TODO LO NECESARIO PARA SU
CORRRECTA EJECUCION.

N° CONCEPTO UNIDAD EJE TRAMO # PIEZAS


VA-00 VITRO
SUM. Y COLOC. DE VITROPISO
MCA. VITROMEX, MOD. CARIBE
DE 1A. DE 33X33 CM. ASENTADO A-C 2-3
CON ADHESIVO CREST, CON C-E 2-3
BOQUILLA DE 3MM MCA
VA-01 BOQUICREST INCL.: MATL., M. DE m² C-D 3-4
O., HERRAM., EQ,CORTES,
DESPERDICIOS, LIMPIEZA. A-C 4-6

C-E 4-5
B 2-6
C 2-6
SUM. Y COLOC. DE ZOCLO DE 10
CM. DE ALTURA CON PISO MCA. D 2-4
VITROMEX, MOD. CARIBE DE 1A.
DE 33X33 CM ASENTADO CON E 2-5
VA-02 ADHESIVO CREST Y COLOCADO mL 2 A-E
CON BOQUILLA DE 3MM MCA
BOQUICREST. INCL.: MATL., M. DE 3 A-E
O., HERRAM., EQ, CORTES, 4 A-E
DESPERDICIOS, LIMPIEZA.
5 C-E
6 A-C

COLOCACIÓN DE PISO
ANTIDERRAPANTE 20 X 20 CM
EN ÁREAS HÚMEDAS CON
VA-03 BOQUILLA ANTI-HONGOS, m² A-C 3-4
COLOCADO CON PEGA-
AZULEJO INCLUYE TODO LO
NECESARIO PARA SU
EJECUCION (MANO DE OBRA,
MATERIALES, EQUIPO Y
HERRAMIENTA).

COLOCACIÓN DE AZULEJO 20 X B 3-4


30 CM EN ÁREAS HÚMEDAS CON
BOQUILLA ANTI-HONGOS, C 3-4
COLOCADO CON PEGA-AZULEJO
VA-04 INCLUYE TODO LO NECESARIO m²
PARA SU EJECUCION (MANO DE 3 A-C
OBRA, MATERIALES, EQUIPO Y
HERRAMIENTA).
COLOCACIÓN DE AZULEJO 20 X
30 CM EN ÁREAS HÚMEDAS CON
BOQUILLA ANTI-HONGOS,
COLOCADO CON PEGA-AZULEJO
VA-04 INCLUYE TODO LO NECESARIO m²
PARA SU EJECUCION (MANO DE
OBRA, MATERIALES, EQUIPO Y
HERRAMIENTA).
4 A-C

B 3-4
COLOCACION DE CENEFA DE 25x8
CM. COLOCADO CON PEGA- C 3-4
VA-05 mL
AZULEJO.INCLUYE TODO LO 3 A-C
NECESARIO PARA SU EJECUCION
(MANO DE OBRA, MATERIALES,
EQUIPO Y HERRAMIENTA). 4 A-C
N° CONCEPTO UNIDAD EJE TRAMO # PIEZAS
HC-00 HERRERIA, CA

SUMIN. Y COLOC. DE
VENTANA DE ALUMINO
NATURAL DE 1 1/2" . DE
1x1.20 M. CON VIDRIO DE 3
MM. DE ESPESOR. INCLUYE
HC-01 MATERIALES, SELLADOR CON PZA A-F 1-7 1
SILICON, TORNILLOS,
TAQUETES, EQUIPO,
HERRAMIENTE Y TODO LO
NECESARIO PARA SU
CORRECTA EJECUCION, PUOT.

SUMIN. Y COLOC. DE
VENTANA DE ALUMINO
NATURAL DE 1 1/2" . DE
1x1.50 M. CON VIDRIO DE 3
MM. DE ESPESOR. INCLUYE
HC-02 MATERIALES, SELLADOR CON PZA A-F 1-7 4
SILICON, TORNILLOS,
TAQUETES, EQUIPO,
HERRAMIENTE Y TODO LO
NECESARIO PARA SU
CORRECTA EJECUCION, PUOT.
SUMIN. Y COLOC. DE MARCO
GALVANIZADO Y PUERTA TIPO
MULTIPANEL LISA DE 0.90 X
2.13, INCLUYE SUJECCION DE
MARCO A BASE DE ANCLAS,
HC-03 PZA 1
PINTURA DE MARCO,
BISAGRAS, CHAPA DE PERILLA
CON LLAVE MARCA YALE, Y
TODO LO NECESARIO PARA SU
INSTALACION.

SUMIN. Y COLOC. DE MARCO


DE ALUMINIO Y PUERTA TIPO
MULTIPANEL LISA DE 0.95 X
2.13, INCLUYE SUJECCION DE
MARCO A BASE DE ANCLAS,
HC-04 PZA A-F 1-7 1
PINTURA DE MARCO,
BISAGRAS, CHAPA DE PERILLA
CON LLAVE MARCA YALE, Y
TODO LO NECESARIO PARA SU
INSTALACION.

SUMIN. Y COLOC. DE MARCO


GALVANIZADO Y PUERTA
TAMBOR CONDOR 90X 213,
INCLUYE SUJECCION DE
MARCO A BASE DE ANCLAS,
HC-05 PZA A-F 1-7 3
PINTURA DE MARCO,
BISAGRAS, CHAPA DE PERILLA
CON LLAVE MARCA YALE, Y
TODO LO NECESARIO PARA SU
INSTALACION.
LARGO ANCHO ALTO VOLUMEN VOL. ACUMULADO
PREELIMINARES

20 7 140 140

20 7 0.2 28 28
36.4

20 7 0.2 28 28

36.4

43.4

LARGO ANCHO ALTO VOLUMEN VOL. ACUMULADO


CIMENTACION
12.15 0.2 0.2 0.486 0.486
12.15 0.2 0.2 0.486 0.972
6.675 0.2 0.2 0.267 1.239
10.15 0.2 0.2 0.406 1.645
5.35 0.2 0.2 0.214 1.859
5.35 0.2 0.2 0.214 2.073
5.35 0.2 0.2 0.214 2.287
5.55 0.2 0.2 0.222 2.509
2.775 0.2 0.2 0.111 2.62
4.575 3.075 14.068125 18.2885625
2 3.075 6.15 26.2835625
3.5 3.075 10.7625 40.2748125
2.075 3.075 6.380625 48.569625
4.575 1.05 4.80375 54.8145
2 1.05 2.1 57.5445
3.575 3.075 10.993125 71.8355625
4.575 2.025 9.264375 83.87925
2 2.025 4.05 89.14425
115.887525
12.15 12.15 12.15
12.15 12.15 24.3
6.675 6.675 30.975
10.15 10.15 41.125
5.35 5.35 46.475
5.35 5.35 51.825
5.35 5.35 57.175
5.55 5.55 62.725
2.775 2.775 65.5

12.15 3.175 38.57625 38.57625

10.15 2.975 30.19625 68.7725

LARGO ANCHO ALTO VOLUMEN VOL. ACUMULADO


ALBAÑILERIA
11.25 2.52 28.35 28.35
11.1 2.52 27.972 50.922
2.8 2.52 7.056 56.078
7.55 2.52 19.026 73.904
5.7 2.52 14.364 85.268
5.55 2.52 13.986 97.454
4.65 2.52 11.718 109.172
2.85 2.52 7.182 114.854
2.85 2.52 7.182 120.536

2.72 16.32 16.32

2.72 19.04 35.36

2.72 8.16 43.52

2.72 13.6 57.12


11.25 11.25 11.25
11.1 11.1 22.35
2.8 2.8 25.15
7.55 7.55 32.7
5.7 5.7 38.4
4.65 4.65 43.05
4.65 4.65 47.7
2.85 2.85 50.55
2.85 2.85 53.4

12.15 3.175 38.57625 38.57625

10.15 2.975 30.19625 68.7725

6.15 0.3 1.845 1.845


3 0.3 0.9 2.745
3.15 0.3 0.945 3.69
10.75 0.3 3.225 6.915
2 0.3 0.6 7.515
12.55 0.4 5.02 5.02

1.9 0.4 0.76 5.78

10.55 0.4 4.22 10

6.45 0.4 2.58 12.58

3.1 0.4 1.24 13.82


3.45 0.6 2.07 15.89

12.55 3.25 40.7875 40.7875

10.55 3 31.65 72.4375

12.55 12.55 12.55

2 2 14.55
10.55 10.55 25.1

6.35 6.35 31.45

3 3 34.45

3.35 3.35 37.8

6.15 0.5 3.075 3.075

3 0.5 1.5 4.575

3.15 0.5 1.575 6.15

10.95 0.7 7.665 13.815

2 0.5 1 14.815
3 3

LARGO ANCHO ALTO VOLUMEN VOL. ACUMULADO


INSTALACION HIDRAULICA Y SANITARIA

1 1

1 1
1 1

1 1

1 1

1 1

LARGO ANCHO ALTO VOLUMEN VOL. ACUMULADO


1 1

1 1

2 2

LARGO ANCHO ALTO VOLUMEN VOL. ACUMULADO


INSTALACION DE GAS
1 1

1 1

LARGO ANCHO ALTO VOLUMEN VOL. ACUMULADO


ACABADOS
12.15 3.27 39.7305 39.7305
2 2.72 5.44 43.738
1.85 2.72 5.032 43.17975
8.3 2.72 22.576 64.88575
6.15 2.72 16.728 79.36375
2.025 2.72 5.508 84.87175
1.95 2.72 5.304 90.17575
3.075 2.72 8.364 97.41475
3.15 2.72 8.568 105.60775

1.85 2.72 5.032 5.032


1.85 2.72 5.032 8.264
2.925 2.72 7.956 16.22
2.85 2.72 7.752 23.972
129.57975

2.85 1.85 5.2725 5.2725


2.3 0.3 0.69 5.9625
1.95 1.85 3.6075 9.57
10.45 0.3 3.135 12.705
6.15 0.3 1.845 14.55
3 0.3 0.9 15.45

3.15 0.3 0.945 45.5


9.7 2.72 26.384 26.384
16.85 2.72 45.832 66.486
4.35 2.72 11.832 76.8605
7.7 2.72 20.944 96.9345
5.7 2.72 15.504 109.8135
5.85 2.72 15.912 124.6605
4.95 2.72 13.464 138.1245
3 2.72 8.16 145.1595
2.925 2.72 7.956 151.9905

151.9905 151.9905

4.35 2.85 12.3975 12.5325

4.35 2.85 12.3975 25.23


2 0.9 1.8 27.03
5.35 2.85 15.2475 42.6375

3.35 2.85 9.5475 52.185

52.185 52.185

150.42975

204.1755

12.55 3.25 40.7875 40.7875

10.55 3 31.65 76.2175

3.15 1.8 5.67 4.0866


3 1.8 5.4 7.9032

1.85 1.85 1.85

LARGO ANCHO ALTO VOLUMEN VOL. ACUMULADO


VITROPISOS Y AZULEJOS

4.35 2.85 12.3975 12.5325


4.35 2.85 12.3975 25.095
2 0.9 1.8 27.03
5.35 2.85 15.2475 42.615

3.35 2.85 9.5475 52.1625


9.7 9.7 9.7
13.25 13.25 22.95
2.3 2.3 25.25
7.7 7.7 32.95
5.85 5.85 38.8
4.95 4.95 43.75
4.95 4.95 48.7
3 3 51.7
3 3 54.7

1.85 2.85 5.2725 5.8145

1.85 2.62 4.847 4.847

1.85 2.62 4.847 7.894

3 2.62 7.86 15.754


2.85 2.62 7.467 23.221

1.85 1.85 1.85


0.95 0.95 2.8
3 3 5.8

2.85 2.85 8.65


LARGO ANCHO ALTO VOLUMEN VOL. ACUMULADO
HERRERIA, CANCELERIA Y CARPINTERIA

1 1

4 4
1 1

1 1

3 3
OBSERVACIONES

+30% de abundamiento

+30% de abundamiento

+ Producto de limpieza

OBSERVACIONES
(+30%)
(+30%)
(+30%)
(+30%)
(+30%)
(+30%)
(+30%)
(+30%)
(+30%)

OBSERVACIONES

(2x0.9=1.8 x 2 P1)+ (2x0.9=1.8 P2)


(2x0.95=1.9 P3)
(1x1.2= 1.2 V1)
(1x1.5= 1.5 x 2 V2)
(2x0.9= 1.8 P1)

(1x1.5= 1.5 V2)


(1x1.5= 1.5 V2)
OBSERVACIONES
OBSERVACIONES
OBSERVACIONES
OBSERVACIONES

(2x0.9= 1.8 P1)+(2+2+0.9x0.075=0.3675 FILETE P1)


(2x0.95= 1.9 P2)+(4.95x0.075=0.31725 FILETE P2)
(1x1.2= 1.2 V1)+(4.4x0.075=0.33 FILETE V1)
(2x1x1.5= 3 V2)+(5x0.075x2=0.75 FILETE V1)

(1x1.5= 1.5 V2)+(5x0.075=0.375 FILETE V2)


(1x1.5=1.5 V2)+(5x0.075=0.375 FILETE V2)

(2x0.9= 1.8 P3)+(4.9x0.075= FILETE P3)

(AREA DE LA MARQUESINA Y PRETIL)

(0.9x2 P1 + 3(0.9x2) P2)+((9.8X0.075)+(4.9x0.15)FILETEOS P1 Y P2)


(0.95x2 P3)+(5.9x0.075=0.4425 FILETE P3)
(1x1.2=1.2 V1)+(4.4x0.075=0.33 FILETE V1)
(1x1.5= 1.5x2 V2)+(5x0.075=0.375 FILETEO V2)
(0.9x2 P2)+(4.9x0.15=0.735 FILETE P2)

(1x1.5= 1.5 V2)+(5x0.075=0.375 FILETE V2)


(1x1.5= 1.5 V2)+(5x0.075=0.375 FILETE V2)

(AREA DE YESO SOBRE MUROS)

(0.9x0.15 AREA DEBAJO DE LA PUERTA)

(1.1x0.15 MOCHETA)+(0.15x0.9 AREA DEB.PTA)

(2.45x0.15)

(AREA DE YESO SOBRE PLAFON)

AREA DE ESTUCO

AREA DE YESO

(AREA DE VENTANA)
(AREA DE VENTANA)

OBSERVACIONES

(AREA DEBAJO DE LA PUERTA)


(1.1x0.15 MOCHETA)

(AREA DEB. PUERTA + AREA DEB. MOCHETA)

(AREA DEB. PUERTA+AREA SARDINEL)

(PUERTA 2x0.9)
OBSERVACIONES
CATALOGO DE COSTOS DIRECTOS
CLAVE CONCEPTO UNIDAD CANTIDAD C.D.
P-00 PREELIMINARES

LIMPIEZA TRAZO Y NIVELACION DE TERRENO DE


20X7 M. CON CINTA Y MANGUERA INCLUYE
MATERIALES MENORES, ESTABLECIENDO
P-01 REFERENCIAS (MOJONERAS, COTAS DE NIVEL m² 140 $37.73
CON PINTURA),LIMPIEZA DEL ÁREA, RETIRO DE
BASURA, HERRAMIENTA, EQUIPO Y MANO DE
OBRA.

DESPALME DE TERRENO NATURAL EN 20 CM DE


ESPESOR CON MAQUINARIA. INCLUYE: RETIRO
DE CAPA VEGETAL DE 20 CM. DE ESPESOR
P-02 PROMEDIO, DESHIERBE, M. DE O., HERRAMIENTA m³ 36.4 $23.74
Y EQ., ACARREO AL LUGAR DE CARGA DEL
CAMIÓN, INCLUYE ABUNDAMIENTO.

RETIRO DE MATERIAL PRODUCTO DE LIMPIEZA Y


DESPALME DEL TERRENO. CON
RETROEXCAVADORA Y CAMION DE VOLTEO.
P-03 INCLUYE: CARGA, DESCARGA, ACARREOS, m³ 43.4 $92.39
MAQUINARIA, M.O, HERRAMIENTA, EQUIPO Y
TODO LO NECESARIO PARA SU CORRECTA
EJECUCION.

SUBTOTAL
16% IVA%
TOTAL

CLAVE CONCEPTO UNIDAD CANTIDAD C.D.


C-00 CIMENTACION
EXCAVACION PARA CONTRATRABES DE LOSA DE
CIMENTACION INCLUYE: PERFILADO, LIMPIEZA Y
C-01 RETIRO DE MATERIAL SOBRANTE FUERA DE LA m³ 2.62 $159.79
OBRA.

MEMBRANA PLÁSTICA CALIBRE 300, COLOCADA


C-02 ENTRE LA PLATAFORMA Y LOSA DE m² 115.8875 $17.31
CIMENTACIÓN. PUOT.

CONTRATRABES DE 20X20Cm, CONCRETO F´C=


200 KG/CM2 H. EN O. CON REVOLVEDORA,
REFUERZO DE 4vs. DE 3/8" Y ESTRIBOS DE 1/4"
C-03 @ 25 cms. INCLUYE: MATERIAL, M. DE O., mL 65.5 $366.83
CIMBRA Y DESCIMBRA, COLADO Y CURADO,
HERRAM., EQ., ACARREOS Y TODO LO NECESARIO
PARA SU EJECUCIÓN.
SUMINISTRO Y CONSTRUCCIÓN DE FIRME EN
LOSA DE CIMENTACIONDE CONCRETO
F'c=200kg/cm2. ESPESOR 12 CM. ARMADO CON
C-04 V 3/8" @ 20 CM S.T Y @25 CM. S.L. INCLUYE: m² 68.7725 $420.56
MATERIAL, M. DE O., HERRAMIENTA, EQUIPO,
COLADO, VIBRADO Y CURADO, HERRAMIENTA,
EQUIPO, CIMBRADO Y DESCIMBRADO.

SUBTOTAL
IVA%
TOTAL

CLAVE CONCEPTO UNIDAD CANTIDAD C.D.


AL-00 ALBAÑILERIA
MURO DE BLOCK DE CONCRETO DE 15x20x40
CM, ASENTADO CON MORTERO CEMENTO-
AL-01 ARENA PROP.1:4 EN PESO, INCLUYE: TODO LO m² 120.536 $152.50
NECESARIO PARA SU EJECUCION, MATERIALES,
MANO DE OBRA, EQUIPO Y HERRAMIENTA.

SUM Y COLOC. DE CASTILLO DE CONCRETO CON


SECCIÓN TRANSVERSAL DE 15x15cms. DE
CONCRETO F'c=150kg/cm2 H. EN O. CON
AL-02 REVOLVEDORA, REFUERZO DE 4vs. DE 3/8" Y mL 57.12 $238.77
ESTRIBOS DE 1/4" @ 30cms INCL.: CIMBRADO Y
DESCIMBRADO, COLADO, MATL., M. DE O.,
HERRAM., EQ., ACARREOS.

SUM Y COLOC DE CERRAMIENTO CON SECCIÓN


TRANSVERSAL DE 15x20 cms. DE CONCRETO
F'c=150kg/cm2 H. EN O. CON REVOLVEDORA,
AL-03 REFUERZO DE 4vs. DE 3/8" Y ESTRIBOS DE 1/4" mL 53.4 $234.51
@ 20 cms., INCL.: MATL., M. DE O., CIMBRA Y
DESCIMBRA, COLADO Y CURADO, HERRAM., EQ.,
ACARREOS.

SUM. Y FAB. DE LOSA DE AZOTEA ESPESOR 15


CM. ALIGERADA DE CONCRETO F'c=200kg/cm2 H.
EN O. CON REVOLVEDORA CONSIDERANDO
ARMADO EN NERVADURAS SEGÚN CALCULO,
AL-04 INCL.: MATERIAL, MANO DE OBRA, m² 68.7725 $456.33
HERRAMIENTA, EQUIPO, ACARREOS, ARMADO,
COLADO, VIBRADO,CURADO, CIMBRA Y
DESCIMBRA.

SUM. Y FAB. DE MARQUESINA DE 30 CM. DE


CONCRETO F'c=200kg/cm2 H. EN O. CON
AL-05 REVOLVEDORA. INCL.: TODO LO NECESARIOPARA m² 7.515 $456.33
SU CORRECTA EJECUCION.
SUM. Y CONSTRUCCIÓN DE PRETIL DE BLOCK DE
CONCRETO DE 10x20x40cms. ASENTADO CON
MORTERO CEM-ARENA 1:4 EN LOSA DE AZOTEA
AL-06 A CUALQUIER NIVEL CON UNA ALTURA VARIABLE m² 15.89 $134.79
INCLUYE: MATERIALES, M DE O, HERRAMIENTA,
EQUIPO, ACARREOS, ANDAMIOS, PLOMEO Y
NIVELADO Y DESPERDICIOS.

ENTORTADO EN AZOTEA DE 4 CM DE ESPESOR


CON MORTERO CEMENTO-ARENA 1:4. INCLUYE:
MATERIALES, MANO DE OBRA, ACARREOS,
AL-07 PREPARACIÓN DE LA SUPERFICIE Y TODO LO m² 72.4375 $74.05
NECESARIO PARA LA CORRECTA EJECUCIÓN.
(PUOT)

CHAFLÁN A BASE DE MORTERO CEMENTO-


ARENA 1:4 DE 10 CM DE ESPESOR EN EL
PERIMETRO DE LA LOSA Y REMATE DEL PRETIL.
INCLUYE: MATERIALES, MANO DE OBRA,
AL-08 ACARREOS, ELEVACIONES, PREPARACIÓN DE LA mL 37.8 $167.66
SUPERFICIE, LIMPIEZA, HERRAMIENTA, EQUIPO Y
TODO LO NECESARIO PARA LA CORRECTA
EJECUCIÓN. (PUOT)

SUM. Y FABRIC. DE BANQUETA ESPESOR 8 CMS.


DE CONCRETO F'c=150kg/cm2 HECHO EN OBRA
CON REVOLVEDORA Y REFUERZO CON MALLA
ELECTROSOLDADA 6-6/10-10, RALLADO A CADA
AL-09 METRO CON JUNTAS DE TEMPERATURA A CADA m² 14.815 $202.98
6m. ACABADO ESCOBILLADO, ESQUINAS CON
VOLTEADOR, INCL.: MATERIAL, MANO DE OBRA,
HERRAMIENTA, EQUIPO, ACARREOS, CIMBRA,
DESCIMBRA, CURADO.

SUM Y FAB. DE REGISTRO SANITARIO DE


60x40x60cm. (INTERIOR) DE BLOCK DE
CONCRETO DE 15X20X40 CMS CM. CURADO A
VAPOR, ASENTADO CON MORTERO CEM-ARENA
1:5, CONCRETO F'c=200kg/cm2 TAPA DE
AL-10 CONCRETO CON ANGULO DE 1" Y ANGULO EN EL pza 3 $1,477.20
REGISTRO PARA RECIBIR TAPA, PISO 8CM.
ESPESOR, ACABADO CEMENTO PULIDO EN
INTERIOR, INCL.: MATERIALES, MANO DE OBRA,
HERRAMIENTA, EQ., ARMADO, CIMBRA,
DESCIMBRA, EXCAVACIÓN.

SUBTOTAL
IVA%
TOTAL

CLAVE CONCEPTO UNIDAD CANTIDAD C.D.


IHS-00 INSTALACION HIDRAULICA Y SANITARIA
INSTALACION HIDRAULICA INCLUYE: TENDIDO EN
CIMENTACION, CUADRO DE MEDIDOR Y LLAVES
DE EMPOTRAR. TODO LO NECESARIO PARA SU
IHS-01 EJECUCION (MANO DE OBRA, MATERIALES, LOTE 1 $6,164.03
EQUIPO, HERRAMIENTA Y PRUEBAS) SEGÚN
PROYECTO. P.U.O.T.

INSTALACION SANITARIA INCLUYE TENDIDO EN


VIVIENDA Y DRENAJE EXTERIOR, TODO LO
IHS-02 NECESARIO PARA SU EJECUCION (MANO DE LOTE 1 $5,049.31
OBRA, MATERIALES, EQUIPO, HERRAMIENTA, Y
PRUEBAS) SEGÚN PROYECTO P.U.O.T.

SUMINISTRO E INSTALACION DE REGADERA,


INCLUYE LLAVES, MANERALES, CHAPETONES,
IHS-03 CARGA, ACARREO DE MATERIALES DENTRO Y PZA 1 $1,856.08
FUERA DE LA OBRA Y TODO LO NECESARIO PARA
SU CORRECTA INSTALACION

SUM. Y COLOC. DE WC Y LAVABO PARA BAÑO,


INCLUYE HERRAJES DE CONEXIÓN, JUNTAS DE
SILICON, ASIENTO, PRUEBA, LIMPIEZA, CARGA Y
IHS-04 ACARREO DENTRO Y FUERA DE LA OBRA, MANO PZA 1 $3,019.38
DE OBRA Y TODO MATERIAL NECESARIO PARA SU
CORRECTA INSTALACION

SUMINISTRO Y COLOCACION DE TINACO DE


POLIETILENO DE 450 LITROS DE COLOR NEGRO,
INCLUYE TAPA ROSCADA, VALVULA DE GLOBO
IHS-05 ROSCADA (LLAVE DE PASO) VARILLA FLOTADOR, PZA 1 $2,189.75
LIMPIEZA, ELABORACION DE BASE, MANO DE
OBRA, HERRAMIENTA Y TODO LO NECESARIO
PARA SU CORRECTA INSTALACION

SUMINISTRO Y COLOCACION DE TARJA PARA


COCINA, INCLUYE LLAVES,CESPOL DE PLASTICO
IHS-06 RIGIDO, TUBERIAS, CODOS, NIPLES, MANO DE PZA 1 $1,020.92
OBRA Y TODO LO NECESARIO PARA SU CORRECTA
INSTALACION

SUBTOTAL
IVA%
TOTAL

CLAVE CONCEPTO UNIDAD CANTIDAD C.D.


IE-00 INSTALACION ELECTRICA
SUMINISTRO E INSTALACION DE POLIDUCTO
1/2". INCLUYE MANO DE OBRA, HERRAMIENTA Y
IE-01 TODO LO NECESARIO PARA SU CORRECTA ML 86.55 $44.08
EJECUCION.

SUMINISTRO E INSTALACION DE CABLE THW #12.


INCLUYE MANO DE OBRA, HERRAMIENTA Y
IE-02 TODO LO NECESARIO PARA SU CORRECTA ML 86.55 $48.45
EJECUCION.
SUMINISTRO E INSTALACION DE CABLE THW #14.
INCLUYE MANO DE OBRA, HERRAMIENTA Y
IE-03 TODO LO NECESARIO PARA SU CORRECTA ML 86.55 $46.21
EJECUCION.

INSTALACION DE PASTILLAS
TERMOMAGNETICAS, INCLUYE MANO DE OBRA,
IE-04 HERRAMIENTA Y TODO LO NECESARIO PARA SU PZA 1 $536.36
CORRECTA INSTALACION

SUMINISTRO Y COLOCACION DE SALIDA PARA


LUMINARIA. INCLUYE MANO DE OBRA,
IE-05 HERRAMIENTA Y TODO LO NECESARIO PARA SU SALIDA 12 $71.58
CORRECTA INSTALACION

SUMINISTRO Y COLOCACION DE SALIDA PARA


APAGADOR Y CONTACTO SENCILLO. INCLUYE
IE-06 MANO DE OBRA, HERRAMIENTA Y TODO LO SALIDA 2 $109.25
NECESARIO PARA SU CORRECTA INSTALACION

SUMINISTRO Y COLOCACION DE SALIDA PARA


APAGADOR DOBLE Y CONTACTO SENCILLO.
IE-07 INCLUYE MANO DE OBRA, HERRAMIENTA Y SALIDA 5 $129.25
TODO LO NECESARIO PARA SU CORRECTA
INSTALACION

SUMINISTRO Y COLOCACION DE SALIDA PARA


CONTACTO DOBLE INCLUYE MANO DE OBRA,
IE-08 HERRAMIENTA Y TODO LO NECESARIO PARA SU SALIDA 1 $95.25
CORRECTA INSTALACION

SUMINISTRO Y COLOCACION DE ACOMETIDAS


ELECTRICAS DE 110 VOLTS. INCLUYE: CABLE THW
No. 8, INTECONEXION SUBTERRANEA, VARILLA
IE-09 DE TIERRA CONECTOR Y TODO LO NECESARIO PZA 1 $764.08
PARA SU EJECUCION (MANO DE OBRA,
MATERIALES, EQUIPO, CIMBRA Y HERRAMIENTA)
P.U.O.T.

INTERRUPTOR DE SEGURIDAD 3 POLOS 30 A.


IE-10 INCLUYE:RANURA, COLOCACION EN MURO Y PZA 1 $331.71
TODO LO NECESARIO PARA SU COLOCACION.

CENTRO DE CARGA TIPO QO2 CON 4 UNIDADES


DE 1X20 AMPERS, RANURA, COLOCACION EN
IE-11 MURO Y TODO LO NECESARIO PARA SU PZA 2 $347.71
COLOCACION.
SUBTOTAL
IVA%
TOTAL

CLAVE CONCEPTO UNIDAD CANTIDAD C.D.


IG-00 INSTALACION DE GAS
INSTALACION DE GAS INCLUYE TODO LO
NECESARIO PARA SU EJECUCION: MANO DE
IG-01 OBRA, MATERIALES, EQUIPO, HERRAMIENTA. LOTE 1 $4,857.13
SEGÚN PROYECTO. P.U.O.T.
SUMINISTRO Y COLOCACION DE BOILER PARA 7
IG-02 LTS, INCLUYE BASE, MANO DE OBRA Y TODO LO PZA 1 $2,531.19
NECESARIO PARA SU INSTALACION.
SUBTOTAL
IVA%
TOTAL

CLAVE CONCEPTO UNIDAD CANTIDAD C.D.


AC-00 ACABADOS
APLANADO CON ESTUCO BLANCO LISO SOBRE
MURO EXTERIOR E INTERIOR DEL BAÑO.INCLUYE
FILETES, BOTAGUAS Y RINCONES, TODO LO
AC-01 NECESARIO PARA SU EJECUCION (MANO DE m² 129.57975 $79.35
OBRA, MATERIALES, EQUIPO, CIMBRA Y
HERRAMIENTA)

APLANADO CON ESTUCO BLANCO LISO EN


CIELOS EXTERIORES E INTERIOR DEL BAÑO
ESPESOR PROMEDIO DE 2 CM.INCLUYE FILETES,
AC-02 BOTAGUAS Y RINCONES, TODO LO NECESARIO m² 45.5 $79.35
PARA SU EJECUCION (MANO DE OBRA,
MATERIALES, EQUIPO, CIMBRA Y
HERRAMIENTA.)

APLANADO DE YESO MUESTREADO SOBRE


MUROS INTERIORES A CUALQUIER NIVEL, A BASE
DE YESO-AGUA, CON ESPESOR PROMEDIO DE
AC-03 3cm INCL.: FILETES EN PUERTAS, VENTANAS, m² 151.9905 $61.81
NIVEL Y ESCUADRA, MATLS, M DE O., HERRAM,
EQ, ANDAMIOS, RESANES.

APLANADO DE TIROL SOBRE MUROS INTERIORES


A CUALQUIER NIVEL, CON ESPESOR PROMEDIO
AC-04 DE 3cm INCL.: FILETES EN PUERTAS, VENTANAS, m² 151.9905 $45.84
NIVEL Y ESCUADRA, MATLS, M DE O., HERRAM,
EQ, ANDAMIOS, RESANES.

APLANADO DE YESO MUESTREADO SOBRE


PLAFON A CUALQUIER NIVEL, A BASE DE YESO-
AGUA, CON UN ESP. PROM. DE 3cm INCL.:
AC-05 FILETES EN PUERTAS, VENTANAS, REMATES, m² 52.185 $68.29
NIVEL Y ESCUADRA, MATLS, M DE O., HERRAM,
EQ, PREPARACIÓN , ANDAMIOS.

APLANADO DE TIROL SOBRE PLAFON A


CUALQUIER NIVEL, CON UN ESP. PROM. DE 3cm
AC-06 INCL.: FILETES EN PUERTAS, VENTANAS, m² 52.185 $65.91
REMATES, NIVEL Y ESCUADRA, MATLS, M DE O.,
HERRAM, EQ, PREPARACIÓN , ANDAMIOS.

PINTURA EN EXTERIORES, A DOS MANOS DE


AC-07 DIFERENTES COLORES SEGUN PROYECTO m² 150.42975 $21.98
ARQUITECTONICO. PUOT.
PINTURA EN INTERIORES, A DOS MANOS DE
AC-08 DIFERENTES COLORES SEGUN PROYECTO m² 204.1755 $21.98
ARQUITECTONICO. PUOT.
SUM. Y COLOC. DE IMPERMEABILIZACIÓN EN
AZOTEA INCL. VUELTAS EN PRETIL Y RECEPCIÓN
AC-09 DE COLADERAS, MATERIALES, M. DE O., m² 76.2175 $116.38
HERRAM., EQ., LIMPIEZA.

SUM. Y COLOC. DE PIEDRA LAJA EN FACHADA


AC-10 PRINCIPAL. INCL. MATERIALES, M. DE O., m² 7.9032 $713.94
HERRAMIENTAS,EQ.

CONSTRUCCION DE SARDINEL, DE 10x6 CM. DE


SECCION TRANSVERSAL EN AREA DE REGADERA.
INCLUYE CONCRETO HECHO EN OBRA,
AC-11 REVESTIMIENTO DE LOSETA CERAMICA mL 1.85 $58.84
ANTIDERRAPANTE Y TODO LO NECESARIO PARA
SU CORRRECTA EJECUCION.

SUBTOTAL
IVA%
TOTAL

CLAVE CONCEPTO UNIDAD CANTIDAD C.D.


VA-00 VITROPISOS Y AZULEJOS

SUM. Y COLOC. DE VITROPISO MCA. VITROMEX,


MOD. CARIBE DE 1A. DE 33X33 CM. ASENTADO
VA-01 CON ADHESIVO CREST, CON BOQUILLA DE 3MM m² 52.1625 $188.07
MCA BOQUICREST INCL.: MATL., M. DE O.,
HERRAM., EQ,CORTES, DESPERDICIOS, LIMPIEZA.

SUM. Y COLOC. DE ZOCLO DE 10 CM. DE ALTURA


CON PISO MCA. VITROMEX, MOD. CARIBE DE 1A.
DE 33X33 CM ASENTADO CON ADHESIVO CREST Y
VA-02 COLOCADO CON BOQUILLA DE 3MM MCA mL 54.7 $79.57
BOQUICREST. INCL.: MATL., M. DE O., HERRAM.,
EQ, CORTES, DESPERDICIOS, LIMPIEZA.

COLOCACIÓN DE PISO ANTIDERRAPANTE 20 X 20


CM EN ÁREAS HÚMEDAS CON BOQUILLA ANTI-
HONGOS, COLOCADO CON PEGA-AZULEJO
VA-03 INCLUYE TODO LO NECESARIO PARA SU m² 5.8145 $227.29
EJECUCION (MANO DE OBRA, MATERIALES,
EQUIPO Y HERRAMIENTA).

COLOCACIÓN DE AZULEJO 20 X 30 CM EN ÁREAS


HÚMEDAS CON BOQUILLA ANTI-HONGOS,
VA-04 COLOCADO CON PEGA-AZULEJO INCLUYE TODO m² 23.221 $226.22
LO NECESARIO PARA SU EJECUCION (MANO DE
OBRA, MATERIALES, EQUIPO Y HERRAMIENTA).

COLOCACION DE CENEFA DE 20x10 CM.


COLOCADO CON PEGA-AZULEJO.INCLUYE TODO
VA-05 LO NECESARIO PARA SU EJECUCION (MANO DE mL 8.65 $149.10
OBRA, MATERIALES, EQUIPO Y HERRAMIENTA).

SUBTOTAL
IVA%
TOTAL

CLAVE CONCEPTO UNIDAD CANTIDAD C.D.


HC-00 HERRERIA, CANCELERIA Y CARPINTERIA

SUMIN. Y COLOC. DE VENTANA DE ALUMINO


NATURAL DE 1 1/2" . DE 1x1.20 M. CON VIDRIO
DE 3 MM. DE ESPESOR. INCLUYE MATERIALES,
HC-01 SELLADOR CON SILICON, TORNILLOS, TAQUETES, PZA 1 $1,189.08
EQUIPO, HERRAMIENTE Y TODO LO NECESARIO
PARA SU CORRECTA EJECUCION, PUOT

SUMIN. Y COLOC. DE VENTANA DE ALUMINO


NATURAL DE 1 1/2" . DE 1x1.50 M. CON VIDRIO
DE 3 MM. DE ESPESOR. INCLUYE MATERIALES,
HC-02 SELLADOR CON SILICON, TORNILLOS, TAQUETES, PZA 4 $1,294.82
EQUIPO, HERRAMIENTE Y TODO LO NECESARIO
PARA SU CORRECTA EJECUCION, PUOT.

SUMIN. Y COLOC. DE MARCO GALVANIZADO Y


PUERTA TIPO MULTIPANEL LISA DE 0.90 X 2.13,
INCLUYE SUJECCION DE MARCO A BASE DE
HC-03 ANCLAS, PINTURA DE MARCO, BISAGRAS, CHAPA PZA 1 $3,351.82
DE PERILLA CON LLAVE MARCA YALE, Y TODO LO
NECESARIO PARA SU INSTALACION.

SUMIN. Y COLOC. DE MARCO DE ALUMINIO Y


PUERTA TIPO MULTIPANEL LISA DE 0.95 X 2.13,
INCLUYE SUJECCION DE MARCO A BASE DE
HC-04 ANCLAS, PINTURA DE MARCO, BISAGRAS, CHAPA PZA 1 $2,160.82
DE PERILLA CON LLAVE MARCA YALE, Y TODO LO
NECESARIO PARA SU INSTALACION.

SUMIN. Y COLOC. DE MARCO GALVANIZADO Y


PUERTA TAMBOR CONDOR 90X 213, INCLUYE
SUJECCION DE MARCO A BASE DE ANCLAS,
HC-05 PINTURA DE MARCO, BISAGRAS, CHAPA DE PZA 3 $1,711.82
PERILLA CON LLAVE MARCA YALE, Y TODO LO
NECESARIO PARA SU INSTALACION.

SUBTOTAL
IVA%
TOTAL

COSTOS DIRECTOS TOTALES DE OBRA


SUBTOTAL $356,966.39
IVA% $414,081.01
TOTAL $414,081.01

$414,081.01
IMPORTE

$5,282.77

$863.99

$4,009.61

$10,156.36
$11,781.38
$11,781.38

IMPORTE

$418.66

$2,005.84

$24,027.57
$28,923.29

$55,375.36
$64,235.42
$64,235.42

IMPORTE

$18,381.18

$13,638.75

$12,523.00

$31,383.17

$3,429.34
$2,141.75

$5,364.36

$6,337.55

$3,007.11

$4,431.59

$100,637.78
$116,739.83
$116,739.83

IMPORTE
$6,164.03

$5,049.31

$1,856.08

$3,019.38

$2,189.75

$1,020.92

$19,299.47
$22,387.38
$22,387.38

IMPORTE

$3,814.97

$4,193.19
$3,999.32

$536.36

$859.01

$218.51

$646.27

$95.25

$764.08

$331.71

$695.43

$16,154.11
$18,738.77
$18,738.77

IMPORTE

$4,857.13
$2,531.19

$7,388.32
$8,570.45
$8,570.45

IMPORTE

$10,282.03

$3,610.38

$9,395.28

$6,966.67

$3,563.78

$3,439.58

$3,306.98

$4,488.50
$8,870.36

$5,642.42

$108.86

$59,674.84
$69,222.81
$69,222.81

IMPORTE

$9,810.01

$4,352.60

$1,321.58

$5,253.07

$1,289.69

$22,026.95
$25,551.26
$25,551.26

IMPORTE

$1,189.08

$5,179.28

$3,351.82

$2,160.82

$5,135.46

$17,016.46
$19,739.09
$19,739.09

TOS TOTALES DE OBRA


$356,966.39
$414,081.01
$414,081.01
PREELIMINARES
CLAVE: P-01 CONCEPTO

LIMPIEZA, TRAZO Y NIVELACION DE TERRENO DE 20X7 M. CON CINTA Y MANGUERA INCLUYE MATERIALES MENORES, ESTAB
REFERENCIAS (MOJONERAS, COTAS DE NIVEL CON PINTURA),LIMPIEZA DEL ÁREA, RETIRO DE BASURA, HERRAMIENTA, EQUIP
DE OBRA.

MATERIAL
CLAVE CONCEPTO UNIDAD
HILO PZA
CAL HIDRA BULTO
MADERA PARA ESTACA PZA
MANGUERA PARA NIVEL ML

M.O
CLAVE CONCEPTO UNIDAD
CUA-03 CUADRILLA 3 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERR MENOR %

CLAVE: P-02 CONCEPTO

DESPALME DE TERRENO NATURAL EN 20 CM DE ESPESOR CON MAQUINARIA. INCLUYE: RETIRO DE CAPA VEGETAL DE 20 CM. D
PROMEDIO, DESHIERBE, M. DE O., HERRAMIENTA Y EQ., ACARREO AL LUGAR DE CARGA DEL CAMIÓN, INCLUYE ABUNDAM

MATERIAL
CLAVE CONCEPTO UNIDAD
M.O
CLAVE CONCEPTO UNIDAD
CUA-03 CUADRILLA 3 JOR
CUA-15 CUADRILLA 15 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
RETROEXCAVADORA HORA

CLAVE: P-03 CONCEPTO

RETIRO DE MATERIAL PRODUCTO DE LIMPIEZA Y DESPALME DEL TERRENO. CON RETROEXCAVADORA Y CAMION DE VOLTEO.
CARGA, DESCARGA, ACARREOS, MAQUINARIA, M.O, HERRAMIENTA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA EJ

MATERIAL
CLAVE CONCEPTO UNIDAD

M.O
CLAVE CONCEPTO UNIDAD
CUA-15 CUADRILLA 15 JOR
CUA-16 CUADRILLA 16 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
RETROEXCAVADORA HORA
CAMION DE VOLTEO 14 M³ HORA

CIMENTACION
CLAVE: C-01 CONCEPTO
EXCAVACION PARA CONTRATRABES DE LOSA DE CIMENTACION INCLUYE: PERFILADO, LIMPIEZA Y RETIRO DE MATERIAL SOBRA
DE LA OBRA.

MATERIAL
CLAVE CONCEPTO UNIDAD

M.O
CLAVE CONCEPTO UNIDAD
CUA-01 CUADRILLA 1 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERR. MENOR %

CLAVE: C-02 CONCEPTO


MEMBRANA PLÁSTICA DE POLIETILENO CALIBRE 300, COLOCADA ENTRE LA PLATAFORMA Y LOSA DE CIMENTACIÓN. P

MATERIAL
CLAVE CONCEPTO UNIDAD
PLASTICO DE POLIETILENO M²

M.O
CLAVE CONCEPTO UNIDAD
CUA-03 CUADRILLA 3 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERR. MENOR %

CLAVE:C-03 CONCEPTO

CONTRATRABES DE 20X20 Cm, CONCRETO F´C= 200 KG/CM2 H. EN O. CON REVOLVEDORA, REFUERZO DE 4vs. DE 3/8" Y ESTRI
@ 25 cms. INCLUYE: MATERIAL, M. DE O., COLADO Y CURADO, HERRAM., EQ., ACARREOS Y TODO LO NECESARIO PARA SU E

MATERIAL
CLAVE CONCEPTO UNIDAD
CONCRETO F'C= 200 KG/CM² M³
VAR. 3/8" KG
ALAMBRON 1/4 KG
ALAMBRE QUEMADO KG

M.O
CLAVE CONCEPTO UNIDAD
CUA-02 CUADRILLA 2 JOR
CUA-09 CUADRILLA 9 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERR. MENOR %

CLAVE: C-04 CONCEPTO

SUMINISTRO Y CONSTRUCCIÓN DE FIRME EN LOSA DE CIMENTACION DE CONCRETO F'c=200kg/cm2. ESPESOR 12 CM. ARMAD
3/8" @ 20 CM S.T Y @25 CM. S.L. . INCLUYE: MATERIAL, M. DE O., HERRAMIENTA, EQUIPO, COLADO, VIBRADO Y CURADO, HER
EQUIPO.

MATERIAL
CLAVE CONCEPTO UNIDAD
CONCRETO F'C=200 KG/CM² M³
VAR. 3/8" KG
ALAMBRE QUEMADO KG

M.O
CLAVE CONCEPTO UNIDAD
CUA-02 CUADRILLA 2 JOR
CUA-09 CUADRILLA 9 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERR. MENOR %
ALBAÑILERIA
CLAVE: AL-01 CONCEPTO

MURO DE BLOCK DE CONCRETO DE 15x20x40 CM, ASENTADO CON MORTERO CEMENTO-ARENA PROP.1:4 EN PESO, INCLUYE
NECESARIO PARA SU EJECUCION, MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

MATERIAL
CLAVE CONCEPTO UNIDAD
MORTERO 1:4 M³
BLOCK 15X20X40 CM. REGIONAL PZA

M.O
CLAVE CONCEPTO UNIDAD
CUA-01 CUADRILLA 1 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERR. MENOR %

CLAVE: AL-02 CONCEPTO

SUM Y COLOC. DE CASTILLO DE CONCRETO CON SECCIÓN TRANSVERSAL DE 15x15cms. DE CONCRETO F'c=150kg/cm2 H. EN
REVOLVEDORA, REFUERZO DE 4vs. DE 3/8" Y ESTRIBOS DE 1/4" @ 20cms INCL.: CIMBRADO Y DESCIMBRADO, COLADO, MATL
HERRAM., EQ., ACARREOS.

MATERIAL
CLAVE CONCEPTO UNIDAD
CONCRETO F´C= 150 KG/CM² M³
VAR. 3/8" KG
ALAMBRON KG
ALAMBRE QUEMADO KG
CIMBRA PT

M.O
CLAVE CONCEPTO UNIDAD
CUA-02 CUADRILLA 2 JOR
CUA-09 CUADRILLA 9 JOR
CUA-10 CUADRILLA 10 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERR. MENOR %

CLAVE: AL-03 CONCEPTO

SUM Y COLOC DE CERRAMIENTO CON SECCIÓN TRANSVERSAL DE 15x20 cms. DE CONCRETO F'c=150kg/cm2 H. EN O. CON REV
REFUERZO DE 4vs. DE 3/8" Y ESTRIBOS DE 1/4" @ 20 cms., INCL.: MATL., M. DE O., CIMBRA Y DESCIMBRA, COLADO Y CURADO
EQ., ACARREOS.

MATERIAL
CLAVE CONCEPTO UNIDAD
CONCRETO F´C= 150 KG/CM² M³
VAR. 3/8" KG
ALAMBRON KG
ALAMBRE QUEMADO KG
CIMBRA PT

M.O
CLAVE CONCEPTO UNIDAD
CUA-02 CUADRILLA 2 JOR
CUA-09 CUADRILLA 9 JOR
CUA-10 CUADRILLA 10 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERR. MENOR %

CLAVE: AL-04/5 CONCEPTO


SUM. Y FAB. DE LOSA DE AZOTEA Y MARQUESINA ESPESOR 15 CM. ALIGERADA DE CONCRETO F'c=200kg/cm2 H. EN O.
REVOLVEDORA CONSIDERANDO ARMADO EN NERVADURAS SEGÚN CALCULO, INCL.: MATERIAL, MANO DE OBRA, HERRAMIEN
ACARREOS, ARMADO, COLADO, VIBRADO,CURADO.

MATERIAL
CLAVE CONCEPTO UNIDAD
CONCRETO F'C= 200 KG/CM² M³
CASETON 10 CM. PZAS
MALLA ELECTROSOLDADA 6-6/10-10 M²
MALLA POLLERA M²
VAR 3/8 KG
ALAMBRON KG
ALAM. QUEMADO KG

M.O
CLAVE CONCEPTO UNIDAD
CUA-09 CUADRILLA 9 JOR
CUA-13 CUADRILLA 13 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERRAMIENTA MENOR %
VIBRADOR P/ CONCRETO HORA
CLAVE: AL-06 CONCEPTO

SUM. Y CONSTRUCCIÓN DE PRETIL DE BLOCK DE CONCRETO DE 10x20x40cms. ASENTADO CON MORTERO CEM-ARENA 1:4 E
AZOTEA A CUALQUIER NIVEL CON UNA ALTURA VARIABLE INCLUYE: MATERIALES, M DE O, HERRAMIENTA, EQUIPO, ACAR
ANDAMIOS, PLOMEO Y NIVELADO Y DESPERDICIOS.

MATERIAL
CLAVE CONCEPTO UNIDAD
BLOCK DE 10X20X40 CM. PZAS
MORTERO 1:4 M³

M.O
CLAVE CONCEPTO UNIDAD
CUA-01 CUADRILLA 1 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERR. MENOR %

CLAVE: AL-07 CONCEPTO

ENTORTADO EN AZOTEA DE 4 CM DE ESPESOR CON MORTERO CEMENTO-ARENA 1:4. INCLUYE: MATERIALES, MANO DE
ACARREOS, PREPARACIÓN DE LA SUPERFICIE Y TODO LO NECESARIO PARA LA CORRECTA EJECUCIÓN. (PUOT)

MATERIAL
CLAVE CONCEPTO UNIDAD
MORTERO CEMENTO ARENA 1:4 M³
M.O
CLAVE CONCEPTO UNIDAD
CUA-01 CUADRILLA 1 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERR. MENOR %

CLAVE: AL-08 CONCEPTO

CHAFLÁN A BASE DE MORTERO CEMENTO-ARENA 1:4 DE 10 CM DE ESPESOR EN EL PERIMETRO DE LA LOSA Y REMATE DE


INCLUYE: MATERIALES, MANO DE OBRA, ACARREOS, ELEVACIONES, PREPARACIÓN DE LA SUPERFICIE, LIMPIEZA, HERRAMIENT
TODO LO NECESARIO PARA LA CORRECTA EJECUCIÓN. (PUOT)

MATERIAL
CLAVE CONCEPTO UNIDAD
MORTERO 1:4 M³

M.O
CLAVE CONCEPTO UNIDAD
CUA-01 CUADRILLA 1 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERR. MENOR %
CLAVE: AL-09 CONCEPTO

SUM. Y FABRIC. DE BANQUETA ESPESOR 8 CMS. DE CONCRETO F'c=150kg/cm2 HECHO EN OBRA CON REVOLVEDORA Y REFU
MALLA ELECTROSOLDADA 6-6/10-10, RALLADO A CADA METRO CON JUNTAS DE TEMPERATURA A CADA 6m. ACABADO ESC
ESQUINAS CON VOLTEADOR, INCL.: MATERIAL, MANO DE OBRA, HERRAMIENTA, EQUIPO, ACARREOS, CIMBRA, DESCIMBRA,

MATERIAL
CLAVE CONCEPTO UNIDAD
CONCRETO F´C= 150 KG/CM² M³
MALLA ELECTROSOLDAD 6-6/10-10 M²

M.O
CLAVE CONCEPTO UNIDAD
CUA-01 CUADRILLA 1 JOR
CUA-09 CUADRILLA 9 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERR. MENOR %

CLAVE: AL-10 CONCEPTO

SUM Y FAB. DE REGISTRO SANITARIO DE 60x40x60cm. (INTERIOR) DE BLOCK DE CONCRETO DE 15X20X40 CM. ASENTADO CON
CEM-ARENA 1:5, CONCRETO F'c=150kg/cm2 TAPA DE CONCRETO, ESPESOR 5 cm, ACABADO CEMENTO PULIDO EN INTERIO
MATERIALES, MANO DE OBRA, HERRAMIENTA, EQ., ARMADO, EXCAVACIÓN.
MATERIAL
CLAVE CONCEPTO UNIDAD
BLOCK 10X20X40 PZA
MORTERO 1:5 M³
CONCRETO F´C=100 KG/CM² M³
CONCRETO F´C=150 KG/CM2 M³
MARCO Y CONTRAMARCO PZA

M.O
CLAVE CONCEPTO UNIDAD
CUA-01 CUADRILLA 1 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERR. MENOR %

INSTALACION HIDRAULICA Y SANITARIA


CLAVE: IHS-01 CONCEPTO

INSTALACION HIDRAULICA INCLUYE: TENDIDO EN CIMENTACION, CUADRO DE MEDIDOR Y LLAVES DE EMPOTRAR. TODO LO N
PARA SU EJECUCION (MANO DE OBRA, MATERIALES, EQUIPO, HERRAMIENTA Y PRUEBAS) SEGÚN PROYECTO. P.U.O.

MATERIAL
CLAVE CONCEPTO UNIDAD
TUBO CPVC HIDRAULICO 1/2" ML
TUBO CPVC HIDRAULICO 3/4" ML
CODO 90° CPVC 1/2" PZA
CODO 90° CPVC 3/4" PZA
TEE CPVC 1/2" PZA
TEE CPVC 3/4" PZA
ADAPTADOR MACHO 1/2" PZA
ADAPTADOR HEMBRA 1/2" PZA
ADAPTADOR HEMBRA 3/4" PZA
ADAPTADOR UNIVERSAL 1/2" PZA
ADAPTADOR UNIVERSAL 3/4" PZA
BLISTER PARA REGADERA CPVC PZA
CEMENTO CPVC BOTE

M.O
CLAVE CONCEPTO UNIDAD
CUA-05 CUADRILLA 5 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERRAMIENTA MENOR %

CLAVE: IHS-02 CONCEPTO

INSTALACION SANITARIA INCLUYE TENDIDO EN VIVIENDA Y DRENAJE EXTERIOR, TODO LO NECESARIO PARA SU EJECUCION (
OBRA, MATERIALES, EQUIPO, HERRAMIENTA, Y PRUEBAS) SEGÚN PROYECTO P.U.O.T.

MATERIAL
CLAVE CONCEPTO UNIDAD
TUBO PVC 4" ML
TUBO PVC 2" ML
CODO PVC 90 X 2" PZA
CODO PVC 45 X 2" PZA
CODO PVC 90 X 4" PZA
CODO PVC 45 X 4" PZA
YEE PVC 4"-2" PZA
YEE PVC 4" PZA
TEE PVC 2" PZA
PEGAMENTO PVC BOTE

M.O
CLAVE CONCEPTO UNIDAD
CUA-05 CUADRILLA 5 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERRAMIENTA MENOR %

CLAVE: IHS-03 CONCEPTO


SUMINISTRO E INSTALACION DE REGADERA, INCLUYE LLAVES, MANERALES, CHAPETONES, CARGA, ACARREO DE MATERIALES
FUERA DE LA OBRA Y TODO LO NECESARIO PARA SU CORRECTA INSTALACION

MATERIAL
CLAVE CONCEPTO UNIDAD
REGADERA BUILDERS PZA
TEFLON PZA

M.O
CLAVE CONCEPTO UNIDAD
CUA-05 CUADRILLA 5 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERRAMIENTA MENOR %
CLAVE: IHS-04 CONCEPTO

SUM. Y COLOC. DE WC Y LAVABO, INCLUYE HERRAJES DE CONEXIÓN, JUNTAS DE SILICON, ASIENTO, PRUEBA, LIMPIEZA, C
ACARREO DENTRO Y FUERA DE LA OBRA, MANO DE OBRA Y TODO MATERIAL NECESARIO PARA SU CORRECTA INSTALAC

MATERIAL
CLAVE CONCEPTO UNIDAD
PAQUETE CALIFORNIA EL 4 PZAS BCO INCLUYE: PZA
SANITARIO Y LAVABO
PAQUETE BASICO DE INSTALACION LAVABO PZA
LLAVE MEZCLADORA PARA LAVABO DETROIT GRIS PZA

M.O
CLAVE CONCEPTO UNIDAD
CUA-05 CUADRILLA 5 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERRAMIENTA MENOR %

CLAVE: IHS-05 CONCEPTO


SUMINISTRO Y COLOCACION DE TINACO DE POLIETILENO DE 450 LITROS DE COLOR NEGRO, INCLUYE TAPA ROSCADA, VALVULA
ROSCADA (LLAVE DE PASO) VARILLA FLOTADOR, LIMPIEZA, ELABORACION DE BASE, MANO DE OBRA, HERRAMIENTA Y TO
NECESARIO PARA SU CORRECTA INSTALACION

MATERIAL
CLAVE CONCEPTO UNIDAD
TINACO 450 L CON ACCESORIOS PZA
M.O
CLAVE CONCEPTO UNIDAD
CUA-05 CUADRILLA 5 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERRAMIENTA MENOR %

CLAVE: IHS-06 CONCEPTO

SUMINISTRO Y COLOCACION DE TARJA PARA COCINA, INCLUYE LLAVES,CESPOL DE PLASTICO RIGIDO, TUBERIAS, CODOS, NIPLE
OBRA Y TODO LO NECESARIO PARA SU CORRECTA INSTALACION

MATERIAL
CLAVE CONCEPTO UNIDAD
PAQUETE INSTALACION 1 TARJA PZA
MEZCLADORA PARA COCINA 8" CROMO PZA

M.O
CLAVE CONCEPTO UNIDAD
CUA-05 CUADRILLA 5 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERRAMIENTA MENOR %
INSTALACION ELECTRICA
CLAVE: IE-01 CONCEPTO
SUMINISTRO E INSTALACION DE POLIDUCTO 1/2". INCLUYE MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU
EJECUCION.

MATERIAL
CLAVE CONCEPTO UNIDAD
POLIDUCTO 1/2" MTO
CINTA DE AISLAR PZA

M.O
CLAVE CONCEPTO UNIDAD
CUA-04 CUADRILLA 4 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERRAMIENTA MENOR %

CLAVE: IE-02 CONCEPTO


SUMINISTRO E INSTALACION DE CABLE THW #12. INCLUYE MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU
EJECUCION.
MATERIAL
CLAVE CONCEPTO UNIDAD
CABLE THW #12 ML
CINTA DE AISLAR PZA

M.O
CLAVE CONCEPTO UNIDAD
CUA-04 CUADRILLA 4 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERRAMIENTA MENOR %

CLAVE: IE-03 CONCEPTO


SUMINISTRO E INSTALACION DE CABLE THW #14. INCLUYE MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU
EJECUCION.

MATERIAL
CLAVE CONCEPTO UNIDAD
CABLE THW #14 ML
CINTA DE AISLAR PZA

M.O
CLAVE CONCEPTO UNIDAD
CUA-04 CUADRILLA 4 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERRAMIENTA MENOR %

CLAVE: IE-04 CONCEPTO


INSTALACION DE PASTILLAS TERMOMAGNETICAS, INCLUYE MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU
INSTALACION

MATERIAL
CLAVE CONCEPTO UNIDAD
INTERRUPTOR QO 1 POLO 20A CON VENTANA PZA
INTERRUPTOR QO 1 POLO 15A CON VENTANA PZA

M.O
CLAVE CONCEPTO UNIDAD
CUA-04 CUADRILLA 4 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERRAMIENTA MENOR %

CLAVE: IE-05 CONCEPTO


SUMINISTRO Y COLOCACION DE SALIDA PARA LUMINARIA. INCLUYE MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO
CORRECTA INSTALACION
MATERIAL
CLAVE CONCEPTO UNIDAD
CAJA OCTAGONAL PZA
ROSETA PZA

M.O
CLAVE CONCEPTO UNIDAD
CUA-04 CUADRILLA 4 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERRAMIENTA MENOR %

CLAVE: IE-06 CONCEPTO


SUMINISTRO Y COLOCACION DE SALIDA PARA APAGADOR Y CONTACTO SENCILLO. INCLUYE MANO DE OBRA, HERRAMIENTA
NECESARIO PARA SU CORRECTA INSTALACION

MATERIAL
CLAVE CONCEPTO UNIDAD
CAJA RECTANGULAR PZA
APAGADOR SENCILLO + TOMA 2P+T CON PLACA PZA

M.O
CLAVE CONCEPTO UNIDAD
CUA-04 CUADRILLA 4 JOR
MAQ.
CLAVE CONCEPTO UNIDAD
HERRAMIENTA MENOR %

CLAVE: IE-07 CONCEPTO

SUMINISTRO Y COLOCACION DE SALIDA PARA APAGADOR DOBLE Y CONTACTO SENCILLO. INCLUYE MANO DE OBRA, HERRA
TODO LO NECESARIO PARA SU CORRECTA INSTALACION

MATERIAL
CLAVE CONCEPTO UNIDAD
2 APAGADORES SENCILLOS+TOMA 2P+T CON PLACA PZA
CAJA RECTANGULAR PZA

M.O
CLAVE CONCEPTO UNIDAD
CUA-04 CUADRILLA 4 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERRAMIENTA MENOR %

CLAVE: IE-08 CONCEPTO


SUMINISTRO Y COLOCACION DE SALIDA PARA CONTACTO DOBLE INCLUYE MANO DE OBRA, HERRAMIENTA Y TODO LO NECES
SU CORRECTA INSTALACION

MATERIAL
CLAVE CONCEPTO UNIDAD
CAJA RECTANGULAR PZA
PLACA CON DOS CONTACTOS PZA

M.O
CLAVE CONCEPTO UNIDAD
CUA-04 CUADRILLA 4 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERRAMIENTA MENOR %

CLAVE: IE-09 CONCEPTO

SUMINISTRO Y COLOCACION DE ACOMETIDAS ELECTRICAS DE 110 VOLTS. INCLUYE: CABLE THW No. 8, INTECONEXION SUBT
VARILLA DE TIERRA CONECTOR Y TODO LO NECESARIO PARA SU EJECUCION (MANO DE OBRA, MATERIALES, EQUIPO Y HERR
P.U.O.T.

MATERIAL
CLAVE CONCEPTO UNIDAD
ACOMETIDA JUEGO PARA 110V PZA

M.O
CLAVE CONCEPTO UNIDAD
CUA-04 CUADRILLA 4 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERRAMIENTA MENOR %

CLAVE: IE-10 CONCEPTO


INTERRUPTOR DE SEGURIDAD 3 POLOS 30 A. INCLUYE:RANURA, COLOCACION EN MURO Y TODO LO NECESARIO PARA SU CO

MATERIAL
CLAVE CONCEPTO UNIDAD
INTERRUPTOR DE SEGURIDAD 3 POLOS 30 A PZA

M.O
CLAVE CONCEPTO UNIDAD
CUA-04 CUADRILLA 4 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERRAMIENTA MENOR %
CLAVE: IE-11 CONCEPTO
CENTRO DE CARGA DE 4 UNIDADES DE 1X20 AMPERS, RANURA, COLOCACION EN MURO Y TODO LO NECESARIO PARA SU CO

MATERIAL
CLAVE CONCEPTO UNIDAD
CENTRO DE CARGA DE 4 UNIDADES EMPOTRAR PZA

M.O
CLAVE CONCEPTO UNIDAD
CUA-04 CUADRILLA 4 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERRAMIENTA MENOR %

INSTALACION DE GAS
CLAVE: IG-01 CONCEPTO
INSTALACION DE GAS INCLUYE TODO LO NECESARIO PARA SU EJECUCION: MANO DE OBRA, MATERIALES, EQUIPO, HERRAMIE
PROYECTO. P.U.O.T.

MATERIAL
CLAVE CONCEPTO UNIDAD
TUBERIA COBRE TIPO L 1/2" ML
TEE DE COBRE 1/2" PZA
CODO COBRE 1/2" X 90" PZA
CONECTOR ROSCA 1/2" PZA
NIPLE UNION 3/8"X1/2" PZA
LLAVE CONTROL GAS 1/2"X3/8" PZA
TEFLON PZA

M.O

CLAVE CONCEPTO UNIDAD


CUA-05 CUADRILLA 5 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERRAMIENTA MENOR %

CLAVE: IG-02 CONCEPTO

SUMINISTRO Y COLOCACION DE BOILER PARA 5 LTS, INCLUYE BASE, MANO DE OBRA Y TODO LO NECESARIO PARA SU INSTA

MATERIAL
CLAVE CONCEPTO UNIDAD
CALENTADOR AGUA LP ECONO-BOSCH 5L PZA
KIT INSTALACIÓN CALENTADOR DEPÓSITO ELÉCTRICO
3/8"
PZA

M.O
CLAVE CONCEPTO UNIDAD
CUA-05 CUADRILLA 5 JOR
MAQ.
CLAVE CONCEPTO UNIDAD
HERRAMIENTA MENOR %

ACABADOS
CLAVE: AC-01 CONCEPTO
APLANADO CON ESTUCO BLANCO LISO SOBRE MURO EXTERIOR E INTERIOR DEL BAÑO.INCLUYE FILETES, BOTAGUAS Y RINCO
LO NECESARIO PARA SU EJECUCION (MANO DE OBRA, MATERIALES, EQUIPO, CIMBRA Y HERRAMIENTA)

MATERIAL
CLAVE CONCEPTO UNIDAD
CRESTUCO BLANCO 40 KG BTO

M.O
CLAVE CONCEPTO UNIDAD
CUA-01 CUADRILLA 1 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERR. MENOR %
ANDAMIOS %
CLAVE: AC-02 CONCEPTO

APLANADO CON ESTUCO BLANCO LISO EN CIELOS EXTERIORES E INTERIOR DEL BAÑO ESPESOR PROMEDIO DE 2 CM.INCLUY
BOTAGUAS Y RINCONES, TODO LO NECESARIO PARA SU EJECUCION (MANO DE OBRA, MATERIALES, EQUIPO, CIMBRA Y HERR

MATERIAL
CLAVE CONCEPTO UNIDAD
CRESTUCO BLANCO 40 KG BTO

M.O
CLAVE CONCEPTO UNIDAD
CUA-01 CUADRILLA 1 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERR. MENOR %
ANDAMIOS %

CLAVE: AC-03 CONCEPTO

APLANADO DE YESO MUESTREADO SOBRE MUROS INTERIORES A CUALQUIER NIVEL, A BASE DE YESO-AGUA, CON ESPESOR PR
3cm INCL.: FILETES EN PUERTAS, VENTANAS, NIVEL Y ESCUADRA, MATLS, M DE O., HERRAM, EQ, ANDAMIOS, RESANE

MATERIAL
CLAVE CONCEPTO UNIDAD
YESO MAXIMO 40 KG BTO
M.O
CLAVE CONCEPTO UNIDAD
CUA-07 CUADRILLA 7 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERR. MENOR %
ANDAMIOS %

CLAVE: AC-04 CONCEPTO


APLANADO DE TIROL SOBRE MUROS INTERIORES A CUALQUIER NIVEL, CON ESPESOR PROMEDIO DE 3cm INCL.: FILETES EN
VENTANAS, NIVEL Y ESCUADRA, MATLS, M DE O., HERRAM, EQ, ANDAMIOS, RESANES.

MATERIAL
CLAVE CONCEPTO UNIDAD
TIROL MADISON BTO

M.O
CLAVE CONCEPTO UNIDAD
CUA-14 CUADRILLA 14 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERR. MENOR %
CLAVE: AC-05 CONCEPTO

APLANADO DE YESO MUESTREADO SOBRE PLAFON A CUALQUIER NIVEL, A BASE DE YESO-AGUA, CON UN ESP. PROM. DE 3c
FILETES EN PUERTAS, VENTANAS, REMATES, NIVEL Y ESCUADRA, MATLS, M DE O., HERRAM, EQ, PREPARACIÓN , ANDAM

MATERIAL
CLAVE CONCEPTO UNIDAD
YESO MAXIMO 40 KG BTO

M.O
CLAVE CONCEPTO UNIDAD
CUA-07 CUADRILLA 7 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERR. MENOR %
ANDAMIOS %

CLAVE: AC-06 CONCEPTO

APLANADO DE TIROL SOBRE PLAFON A CUALQUIER NIVEL, CON UN ESP. PROM. DE 3cm INCL.: FILETES EN PUERTAS, VENTANA
NIVEL Y ESCUADRA, MATLS, M DE O., HERRAM, EQ, PREPARACIÓN , ANDAMIOS.

MATERIAL
CLAVE CONCEPTO UNIDAD
TIROL MADISON BTO

M.O
CLAVE CONCEPTO UNIDAD
CUA-14 CUADRILLA 14 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERR. MENOR %
ANDAMIOS %

CLAVE: AC-07 CONCEPTO

PINTURA EN EXTERIORES, A DOS MANOS DE DIFERENTES COLORES SEGUN PROYECTO ARQUITECTONICO. PUOT.

MATERIAL
CLAVE CONCEPTO UNIDAD
PINTURA 19 L BLANCO OSTIÓN GRATIS KIT PARA PINTAR
CUBETA
SELLADOR VINÍLICO 19 L CUBETA

M.O
CLAVE CONCEPTO UNIDAD
CUA-06 CUADRILLA 6 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERR. MENOR %
ANDAMIOS %

CLAVE: AC-08 CONCEPTO


PINTURA EN INTERIORES, A DOS MANOS DE DIFERENTES COLORES SEGUN PROYECTO ARQUITECTONICO. PUOT.

MATERIAL
CLAVE CONCEPTO UNIDAD
PINTURA 19 L BLANCO OSTIÓN GRATIS KIT PARA PINTAR
CUBETA
SELLADOR VINÍLICO 19 L CUBETA

M.O
CLAVE CONCEPTO UNIDAD
CUA-06 CUADRILLA 6 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERR. MENOR %
ANDAMIOS %

CLAVE: AC-09 CONCEPTO


SUM. Y COLOC. DE IMPERMEABILIZACIÓN EN AZOTEA INCL. VUELTAS EN PRETIL Y RECEPCIÓN DE COLADERAS, MATERIALES,
HERRAM., EQ., LIMPIEZA.
MATERIAL
CLAVE CONCEPTO UNIDAD

IMPERMEABILIZANTE THERMOTEK BLANCO 3 AÑOS 19 L CUBETA


THERMOTEK CEMENTO ACRÍLICO BLANCO CUBETA CUBETA
THERMOTEK SELLO PRIMARIO CUBETA 19L CUBETA
HIDROCOAT REFUERZO SENCILLO 1.15 X 55 M ROLLO
CEPILLO DE IXTLE DE PADSA PZA

M.O
CLAVE CONCEPTO UNIDAD
CUA-11 CUADRILLA 11 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERRAMIENTA MENOR %

CLAVE: AC-10 CONCEPTO


SUM. Y COLOC. DE PIEDRA LAJA EN FACHADA PRINCIPAL. INCL. MATERIALES, M. DE O., HERRAMIENTAS,EQ.

MATERIAL
CLAVE CONCEPTO UNIDAD
PIEDRA PARA FACHADAS LAJA SANTO TOMAS CAJA
CREST BLANCO 20 KG. BTO
SELLADOR ACRÍLICO BASE ACEITE 1 GALÓN GALON

M.O
CLAVE CONCEPTO UNIDAD
CUA-01 CUADRILLA 1 JOR
MAQ.
CLAVE CONCEPTO UNIDAD
HERRAMIENTA MENOR %

CLAVE: AC-11 CONCEPTO


CONSTRUCCION DE SARDINEL, DE 10x6 CM. DE SECCION TRANSVERSAL EN AREA DE REGADERA. INCLUYE CONCRETO HECHO
REVESTIMIENTO DE LOSETA CERAMICA ANTIDERRAPANTE Y TODO LO NECESARIO PARA SU CORRRECTA EJECUCION

MATERIAL
CLAVE CONCEPTO UNIDAD
CONCRETO F´C= 100 KG/CM² M³

M.O
CLAVE CONCEPTO UNIDAD
CUA-01 CUADRILLA 1 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERRAMIENTA MENOR %

VITROPISOS Y AZULEJOS
VITROPISOS Y AZULEJOS
CLAVE: VA-01 CONCEPTO
SUM. Y COLOC. DE VITROPISO MCA. VITROMEX, MOD. CARIBE DE 1A. DE 33X33 CM. ASENTADO CON ADHESIVO CREST, CON B
3MM MCA BOQUICREST INCL.: MATL., M. DE O., HERRAM., EQ,CORTES, DESPERDICIOS, LIMPIEZA.

MATERIAL

CLAVE CONCEPTO UNIDAD


VITROMEX PISO CARIBE 33X33 CM. M²
CREST BLANCO 20 KG. BTO
JUNTA BTO
SEPARADORES PZA

M.O
CLAVE CONCEPTO UNIDAD
CUA-08 CUADRILLA 8 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERRAMIENTA MENOR %

CLAVE: VA-02 CONCEPTO

SUM. Y COLOC. DE ZOCLO DE 10 CM. DE ALTURA CON PISO MCA. VITROMEX, MOD. CARIBE DE 1A. DE 33X33 CM ASENTAD
ADHESIVO CREST Y COLOCADO CON BOQUILLA DE 3MM MCA BOQUICREST. INCL.: MATL., M. DE O., HERRAM., EQ, COR
DESPERDICIOS, LIMPIEZA.

MATERIAL
CLAVE CONCEPTO UNIDAD
VITROMEX PISO CARIBE 33X33 CM. M²
CREST BLANCO 20 KG. BTO
JUNTA BTO
M.O
CLAVE CONCEPTO UNIDAD
CUA-08 CUADRILLA 8 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERRAMIENTA MENOR %

CLAVE: VA-03 CONCEPTO


COLOCACIÓN DE PISO ANTIDERRAPANTE 20 X 20 CM EN ÁREAS HÚMEDAS CON BOQUILLA ANTI-HONGOS, COLOCADO CO
AZULEJO INCLUYE TODO LO NECESARIO PARA SU EJECUCION (MANO DE OBRA, MATERIALES, EQUIPO Y HERRAMIENT

MATERIAL
CLAVE CONCEPTO UNIDAD
PISO CUBIC 20X20 BEIGE 1.5M2 M²
CREST BLANCO 20 KG. BTO
JUNTA BTO

M.O
CLAVE CONCEPTO UNIDAD
CUA-08 CUADRILLA 8 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERRAMIENTA MENOR %
CLAVE: VA-04 CONCEPTO
COLOCACIÓN DE AZULEJO 20 X 30 CM EN ÁREAS HÚMEDAS CON BOQUILLA ANTI-HONGOS, COLOCADO CON PEGA-AZULEJO
TODO LO NECESARIO PARA SU EJECUCION (MANO DE OBRA, MATERIALES, EQUIPO Y HERRAMIENTA).

MATERIAL
CLAVE CONCEPTO UNIDAD
AZULEJO ALCALA BLANCO 20X30 CM VITROMEX M²
CREST BLANCO 20 KG. BTO
JUNTA BTO

M.O
CLAVE CONCEPTO UNIDAD
CUA-08 CUADRILLA 8 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERRAMIENTA MENOR %

CLAVE: VA-05 CONCEPTO


COLOCACION DE CENEFA DE 25x8 CM. COLOCADO CON PEGA-AZULEJO.INCLUYE TODO LO NECESARIO PARA SU EJECUCION (
OBRA, MATERIALES, EQUIPO Y HERRAMIENTA).

MATERIAL
CLAVE CONCEPTO UNIDAD
CENEFA 8 X 25 DKJ-1118G TILES ML
CREST BLANCO 20 KG. BTO
JUNTA BTO
M.O
CLAVE CONCEPTO UNIDAD
CUA-08 CUADRILLA 8 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERRAMIENTA MENOR %

HERRERIA,CANCELERIA Y CARPINTERIA
CLAVE: HC-01 CONCEPTO
SUMIN. Y COLOC. DE VENTANA DE ALUMINO NATURAL DE 1 1/2" . DE 1x1.20 M. CON VIDRIO DE 3 MM. DE ESPESOR. IN
MATERIALES, SELLADOR CON SILICON, TORNILLOS, TAQUETES, EQUIPO, HERRAMIENTE Y TODO LO NECESARIO PARA SU CO
EJECUCION, PUOT

MATERIAL
CLAVE CONCEPTO UNIDAD
VENTANA ALUMIPRO 120 X 100 CM NATURAL PZA

M.O
CLAVE CONCEPTO UNIDAD
CUA-01 CUADRILLA 1 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERRAMIENTA MENOR %
CLAVE: HC-02 CONCEPTO

SUMIN. Y COLOC. DE VENTANA DE ALUMINO NATURAL DE 1 1/2" . DE 1x1.50 M. CON VIDRIO DE 3 MM. DE ESPESOR. IN
MATERIALES, SELLADOR CON SILICON, TORNILLOS, TAQUETES, EQUIPO, HERRAMIENTE Y TODO LO NECESARIO PARA SU CO
EJECUCION, PUOT.

MATERIAL
CLAVE CONCEPTO UNIDAD
VENTANA ALUMIPRO 150 X 100 CM NATURAL PZA

M.O
CLAVE CONCEPTO UNIDAD
CUA-01 CUADRILLA 1 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERRAMIENTA MENOR %

CLAVE: HC-03 CONCEPTO

SUMIN. Y COLOC. DE MARCO GALVANIZADO Y PUERTA TIPO MULTIPANEL LISA DE 0.90 X 2.13, INCLUYE SUJECCION DE MARCO
ANCLAS, PINTURA DE MARCO, BISAGRAS, CHAPA DE PERILLA CON LLAVE MARCA YALE, Y TODO LO NECESARIO PARA SU INST

MATERIAL
CLAVE CONCEPTO UNIDAD
MARCO PARA PUERTA GALV MET 90X213 CM PZA
PUERTA ACERO LISA BLANCO C28 90X213 PZA
MANIJA MODELO NOGAL PZA

M.O
CLAVE CONCEPTO UNIDAD
CUA-01 CUADRILLA 1 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERRAMIENTA MENOR %

CLAVE: HC-04 CONCEPTO

SUMIN. Y COLOC. DE MARCO DE ALUMINIO Y PUERTA TIPO MULTIPANEL LISA DE 0.95 X 2.13, INCLUYE SUJECCION DE MARCO
ANCLAS, PINTURA DE MARCO, BISAGRAS, CHAPA DE PERILLA CON LLAVE MARCA YALE, Y TODO LO NECESARIO PARA SU INST

MATERIAL
CLAVE CONCEPTO UNIDAD
MARCO ALUMINIO 94 X 213 CHOCOLATE UNIVERSAL PZA
PUERTA ACERO LISA BLANCO C28 90X213 PZA
MANIJA MODELO NOGAL PZA

M.O
CLAVE CONCEPTO UNIDAD
CUA-01 CUADRILLA 1 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERRAMIENTA MENOR %

CLAVE: HC-05 CONCEPTO

SUMIN. Y COLOC. DE MARCO GALVANIZADO Y PUERTA TAMBOR CONDOR 90X 213, INCLUYE SUJECCION DE MARCO A BASE D
PINTURA DE MARCO, BISAGRAS, CHAPA DE PERILLA CON LLAVE MARCA YALE, Y TODO LO NECESARIO PARA SU INSTALA

MATERIAL
CLAVE CONCEPTO UNIDAD
MARCO PARA PUERTA GALV MET 90X213 CM PZA
PUERTA TAMBOR CONDOR 90X 213 PZA
MANIJA MODELO NOGAL PZA

M.O
CLAVE CONCEPTO UNIDAD
CUA-01 CUADRILLA 1 JOR

MAQ.
CLAVE CONCEPTO UNIDAD
HERRAMIENTA MENOR %
S

ERIALES MENORES, ESTABLECIENDO


RA, HERRAMIENTA, EQUIPO Y MANO UN M²

CANTIDAD P.U IMPORTE


0.0200 $30.00 $0.60
0.0100 $55.00 $0.55
0.0010 $6.00 $0.01
1.0000 $33.50 $33.50
$34.6560

S.R IMPORTE
CANTIDAD
0.0067 $448.26 $2.99

C.H IMPORTE
CANTIDAD
3% $2.99 $0.0897

COSTO DIRECTO $37.73


COSTOS INDIRECTOS 13% $42.64
UTILIDAD 9% $46.48
FINANCIAMIENTO 1% $46.94
CARGOS ADICIONALES 0.05% $46.97

CAPA VEGETAL DE 20 CM. DE ESPESOR


MIÓN, INCLUYE ABUNDAMIENTO. UN M³

CANTIDAD P.U IMPORTE


S.R IMPORTE
CANTIDAD
0.00571 $448.26 $2.56
0.025 $396.98 $9.92
$12.49

C.H IMPORTE
CANTIDAD
0.025 $450.00 $11.2500

COSTO DIRECTO $23.74


COSTOS INDIRECTOS 13% $26.82
UTILIDAD 9% $29.24
FINANCIAMIENTO 1% $29.53
CARGOS ADICIONALES 0.05% $29.54

RA Y CAMION DE VOLTEO. INCLUYE:


RIO PARA SU CORRECTA EJECUCION. UN M³

CANTIDAD P.U IMPORTE

S.R IMPORTE
CANTIDAD
0.02500 $396.98 $9.92
0.07143 $396.98 $28.36
$38.28

C.H IMPORTE
CANTIDAD
0.025 $450.00 $11.2500
0.07143 $600.00 $42.8571
$54.1071

COSTO DIRECTO $92.39


COSTOS INDIRECTOS 13% $104.40
UTILIDAD 9% $113.79
FINANCIAMIENTO 1% $114.93
CARGOS ADICIONALES 0.05% $114.99

TIRO DE MATERIAL SOBRANTE FUERA


UN M³

CANTIDAD P.U IMPORTE

S.R IMPORTE
CANTIDAD
0.28571 $542.99 $155.14

C.H IMPORTE
CANTIDAD
3% $155.14 $4.6542

COSTO DIRECTO $159.79


COSTOS INDIRECTOS 13% $180.57
UTILIDAD 9% $196.82
FINANCIAMIENTO 1% $198.79
CARGOS ADICIONALES 0.05% $198.89

UN M²
LOSA DE CIMENTACIÓN. PUOT. UN M²

CANTIDAD P.U IMPORTE


1.00 $15.00 $15.00

S.R IMPORTE
CANTIDAD
0.00500 $448.26 $2.24

C.H IMPORTE
CANTIDAD
3% $2.24 $0.0672

COSTO DIRECTO $17.31


COSTOS INDIRECTOS 13% $19.56
UTILIDAD 9% $21.32
FINANCIAMIENTO 1% $21.53
CARGOS ADICIONALES 0.05% $21.54

O DE 4vs. DE 3/8" Y ESTRIBOS DE 1/4"


LO NECESARIO PARA SU EJECUCIÓN. UN mL

CANTIDAD P.U IMPORTE


0.0412 $2,302.95 $94.88
2.3072 $16.52 $38.11
0.7774 $16.80 $13.06
0.7725 19.59 $15.13
$161.19

S.R IMPORTE
CANTIDAD
0.14 $765.43 $109.347
0.14 $632.14 $90.306
$199.65

C.H IMPORTE
CANTIDAD
3% $199.65 $5.9896

COSTO DIRECTO $366.83


COSTOS INDIRECTOS 13% $414.52
UTILIDAD 9% $451.83
FINANCIAMIENTO 1% $456.35
CARGOS ADICIONALES 0.05% $456.57

. ESPESOR 12 CM. ARMADO CON VAR.


VIBRADO Y CURADO, HERRAMIENTA, UN m²

CANTIDAD P.U IMPORTE


0.1236 $2,302.95 $284.64
6.3448 $16.52 $104.82
1.1588 $19.59 $22.70
$412.16

S.R IMPORTE
CANTIDAD
0.0105 $765.43 $8.06
0.0056 $632.14 $3.51
$11.57

C.H IMPORTE
CANTIDAD
3% $11.57 $0.3471

COSTO DIRECTO $420.56


COSTOS INDIRECTOS 13% $475.24
UTILIDAD 9% $518.01
FINANCIAMIENTO 1% $523.19
CARGOS ADICIONALES 0.05% $523.45

ROP.1:4 EN PESO, INCLUYE: TODO LO


HERRAMIENTA. UN M²

CANTIDAD P.U IMPORTE


0.00975 $1,676.60 $16.35
13 $7.40 $96.20
$112.55

S.R IMPORTE
CANTIDAD
0.07143 $542.99 $38.78

C.H IMPORTE
CANTIDAD
3% $38.78 $1.1635

COSTO DIRECTO $152.50


COSTOS INDIRECTOS 13% $172.32
UTILIDAD 9% $187.83
FINANCIAMIENTO 1% $189.71
CARGOS ADICIONALES 0.05% $189.80

RETO F'c=150kg/cm2 H. EN O. CON


MBRADO, COLADO, MATL., M. DE O., UN ML

CANTIDAD P.U IMPORTE


0.0232 $2,193.01 $50.82
2.3072 $16.52 $38.11
0.7092 $17.15 $12.16
0.7725 $19.59 $15.13
3.72 $4.16 $116.23

S.R IMPORTE
CANTIDAD
0.1250 $765.43 $95.68
0.0200 $632.14 $12.64
0.0167 $639.00 $10.65
$118.97

C.H IMPORTE
CANTIDAD
3% $118.97 $3.5691

COSTO DIRECTO $238.77


COSTOS INDIRECTOS 13% $269.81
UTILIDAD 9% $294.10
FINANCIAMIENTO 1% $297.04
CARGOS ADICIONALES 0.05% $297.19

0kg/cm2 H. EN O. CON REVOLVEDORA,


MBRA, COLADO Y CURADO, HERRAM., UN ML

CANTIDAD P.U IMPORTE


0.0309 $2,193.01 $67.76
2.3072 $16.52 $38.11
0.7092 $17.15 $12.16
0.7725 $19.59 $15.13
5.63 $6.44 $36.29
$169.46

S.R IMPORTE
CANTIDAD
0.0556 $765.43 $42.52
0.0200 $632.14 $12.64
0.0125 $639.00 $7.99
$63.15

C.H IMPORTE
C.H IMPORTE
CANTIDAD
3% $63.15 $1.8946

COSTO DIRECTO $234.51


COSTOS INDIRECTOS 13% $265.00
UTILIDAD 9% $288.85
FINANCIAMIENTO 1% $291.74
CARGOS ADICIONALES 0.05% $291.88

O F'c=200kg/cm2 H. EN O. CON
NO DE OBRA, HERRAMIENTA, EQUIPO, UN M²

CANTIDAD P.U IMPORTE


0.1540 $2,582.03 $397.55
0.0058 $20.16 $0.12
0.0131 $15.96 $0.21
0.0131 $13.93 $0.18
0.0024 $16.52 $0.04
0.0077 $16.80 $0.13
0.0071 $19.30 $0.14
$398.37

S.R IMPORTE
CANTIDAD
0.01667 $632.14 $10.54
0.01667 $1,530.85 $25.51
$36.05

C.H IMPORTE
CANTIDAD
3% $36.05 $1.0815
0.0833 $250.00 $20.8333
$21.9148

COSTO DIRECTO $456.33 $451.32


COSTOS INDIRECTOS 13% $515.66
UTILIDAD 9% $562.07
FINANCIAMIENTO 1% $567.69
CARGOS ADICIONALES 0.05% $567.97
ORTERO CEM-ARENA 1:4 EN LOSA DE
RAMIENTA, EQUIPO, ACARREOS, UN M²

CANTIDAD P.U IMPORTE


13 $6.00 $78.00
0.0100425 $1,676.60 $16.84
$94.84

S.R IMPORTE
CANTIDAD
0.07143 $542.99 $38.78

C.H IMPORTE
CANTIDAD
3% $38.78 $1.1635

COSTO DIRECTO $134.79


COSTOS INDIRECTOS 13% $152.31
UTILIDAD 9% $166.02
FINANCIAMIENTO 1% $167.68
CARGOS ADICIONALES 0.05% $167.76

: MATERIALES, MANO DE OBRA,


CTA EJECUCIÓN. (PUOT) UN M²

CANTIDAD P.U IMPORTE


0.04 $1,676.60 $67.06

TOTAL $67.06
S.R IMPORTE
CANTIDAD
0.01250 $542.99 $6.79

C.H IMPORTE
CANTIDAD
3% $6.79 $0.2036

COSTO DIRECTO $74.05


COSTOS INDIRECTOS 13% $83.68
UTILIDAD 9% $91.21
FINANCIAMIENTO 1% $92.13
CARGOS ADICIONALES 0.05% $92.17

DE LA LOSA Y REMATE DEL PRETIL.


E, LIMPIEZA, HERRAMIENTA, EQUIPO Y UN ML

CANTIDAD P.U IMPORTE


0.1 $1,676.60 $167.66

TOTAL $167.66

S.R IMPORTE
CANTIDAD
$542.99 $0.00

C.H IMPORTE
CANTIDAD
3% $0.00 $0.0000
COSTO DIRECTO $167.66
COSTOS INDIRECTOS 13% $189.46
UTILIDAD 9% $206.51
FINANCIAMIENTO 1% $208.57
CARGOS ADICIONALES 0.05% $208.68

ON REVOLVEDORA Y REFUERZO CON


CADA 6m. ACABADO ESCOBILLADO, UN M²
OS, CIMBRA, DESCIMBRA, CURADO.

CANTIDAD P.U IMPORTE


0.08 $2,193.01 $175.44
1 $17.29 $17.29

TOTAL $192.73

S.R IMPORTE
CANTIDAD
0.01250 $542.99 $6.79
0.0050 $632.14 $3.16
TOTAL $9.95

C.H IMPORTE
CANTIDAD
3% $9.95 $0.2984

COSTO DIRECTO $202.98


COSTOS INDIRECTOS 13% $229.36
UTILIDAD 9% $250.01
FINANCIAMIENTO 1% $252.51
CARGOS ADICIONALES 0.05% $252.63

0X40 CM. ASENTADO CON MORTERO


MENTO PULIDO EN INTERIOR, INCL.: UN PZA
ACIÓN.
UN PZA

CANTIDAD P.U IMPORTE


15 $6.00 $90.00
0.6100 $1,452.90 $886.33
0.02472 $1,979.74 $48.94
0.01236 $2,193.01 $27.11
1 $285.00 $285.00
TOTAL $1,337.38

S.R IMPORTE
CANTIDAD
0.25000 $542.99 $135.75

C.H IMPORTE
CANTIDAD
3% $135.75 $4.0724

COSTO DIRECTO $1,477.20


COSTOS INDIRECTOS 13% $1,669.23
UTILIDAD 9% $1,819.46
FINANCIAMIENTO 1% $1,837.66
CARGOS ADICIONALES 0.05% $1,838.58

Y SANITARIA

DE EMPOTRAR. TODO LO NECESARIO


SEGÚN PROYECTO. P.U.O.T. UN LOTE

CANTIDAD P.U IMPORTE


22.43 $14.92 $334.58
15.55 $26.25 $408.19
25 $3.50 $87.50
3 $4.50 $13.50
6 $2.50 $15.00
0 $6.50 $0.00
2 $2.50 $5.00
1 $10.00 $10.00
2 $81.50 $163.00
3 $66.90 $200.70
2 $78.90 $157.80
1 $269.00 $269.00
4 $199.00 $796.00
$2,460.27

S.R IMPORTE
CANTIDAD
5.0000 $719.18 $3,595.89

C.H IMPORTE
CANTIDAD
3% $3,595.89 $107.8766

COSTO DIRECTO $6,164.03


COSTOS INDIRECTOS 13% $6,965.35
UTILIDAD 9% $7,592.24
FINANCIAMIENTO 1% $7,668.16
CARGOS ADICIONALES 0.05% $7,671.99

RIO PARA SU EJECUCION (MANO DE


CTO P.U.O.T. UN LOTE

CANTIDAD P.U IMPORTE


21.66 $32.20 $697.45
11.13 $13.45 $149.70
8 $3.50 $28.00
1 $3.20 $3.20
3 $12.00 $36.00
1 $10.20 $10.20
3 $14.00 $42.00
2 $28.00 $56.00
1 $5.00 $5.00
2 $159.00 $318.00
$1,345.55

S.R IMPORTE
S.R IMPORTE
CANTIDAD
5.0000 $719.18 $3,595.89

C.H IMPORTE
CANTIDAD
3% $3,595.89 $107.8766

COSTO DIRECTO $5,049.31


COSTOS INDIRECTOS 13% $5,705.72
UTILIDAD 9% $6,219.24
FINANCIAMIENTO 1% $6,281.43
CARGOS ADICIONALES 0.05% $6,284.57

ACARREO DE MATERIALES DENTRO Y


LACION UN PZA

CANTIDAD P.U IMPORTE


1 $1,775.00 $1,775.00
1 $7.00 $7.00
$1,782.00

S.R IMPORTE
CANTIDAD
0.1000 $719.18 $71.92

C.H IMPORTE
CANTIDAD
3% $71.92 $2.1575

COSTO DIRECTO $1,856.08


COSTOS INDIRECTOS 13% $2,097.37
UTILIDAD 9% $2,286.13
FINANCIAMIENTO 1% $2,308.99
CARGOS ADICIONALES 0.05% $2,310.14

NTO, PRUEBA, LIMPIEZA, CARGA Y


RA SU CORRECTA INSTALACION UN PZA

CANTIDAD P.U IMPORTE

1 $1,997.00 $1,997.00
1 $305.00 $305.00
1 $347.00 $347.00
$2,649.00

S.R IMPORTE
CANTIDAD
0.50000 $719.18 $359.59

C.H IMPORTE
CANTIDAD
3% $359.59 $10.7877

COSTO DIRECTO $3,019.38


COSTOS INDIRECTOS 13% $3,411.90
UTILIDAD 9% $3,718.97
FINANCIAMIENTO 1% $3,756.16
CARGOS ADICIONALES 0.05% $3,758.03

E TAPA ROSCADA, VALVULA DE GLOBO


OBRA, HERRAMIENTA Y TODO LO UN PZA

CANTIDAD P.U IMPORTE


1 $1,449.00 $1,449.00
S.R IMPORTE
CANTIDAD
1.00 $719.18 $719.18

C.H IMPORTE
CANTIDAD
3% $719.18 $21.5753

COSTO DIRECTO $2,189.75


COSTOS INDIRECTOS 13% $2,474.42
UTILIDAD 9% $2,697.12
FINANCIAMIENTO 1% $2,724.09
CARGOS ADICIONALES 0.05% $2,725.45

TUBERIAS, CODOS, NIPLES, MANO DE


N UN PZA

CANTIDAD P.U IMPORTE


1 $419.00 $419.00
1 $355.00 $355.00
$774.00

S.R IMPORTE
CANTIDAD
0.3333 $719.18 $239.73

C.H IMPORTE
CANTIDAD
3% $239.73 $7.1918
COSTO DIRECTO $1,020.92
COSTOS INDIRECTOS 13% $1,153.64
UTILIDAD 9% $1,257.46
FINANCIAMIENTO 1% $1,270.04
CARGOS ADICIONALES 0.05% $1,270.67

RICA

O LO NECESARIO PARA SU CORRECTA


UN ML

CANTIDAD P.U IMPORTE


1 $3.20 $3.20
0.2 $13.50 $2.70
$5.90

S.R IMPORTE
CANTIDAD
0.0500 $741.32 $37.07

C.H IMPORTE
CANTIDAD
3% $37.07 $1.1120

COSTO DIRECTO $44.08


COSTOS INDIRECTOS 13% $49.81
UTILIDAD 9% $54.29
FINANCIAMIENTO 1% $54.83
CARGOS ADICIONALES 0.05% $54.86

O LO NECESARIO PARA SU CORRECTA


UN ML
CANTIDAD P.U IMPORTE
1.0000 $7.57 $7.57
0.2 $13.50 $2.70
$10.27

S.R IMPORTE
CANTIDAD
0.05000 $741.32 $37.07

C.H IMPORTE
CANTIDAD
3% $37.07 $1.1120

COSTO DIRECTO $48.45


COSTOS INDIRECTOS 13% $54.75
UTILIDAD 9% $59.67
FINANCIAMIENTO 1% $60.27
CARGOS ADICIONALES 0.05% $60.30

O LO NECESARIO PARA SU CORRECTA


UN ML

CANTIDAD P.U IMPORTE


1.0000 $5.33 $5.33
0.2 $13.50 $2.70
$8.03

S.R IMPORTE
CANTIDAD
0.05000 $741.32 $37.07

C.H IMPORTE
C.H IMPORTE
CANTIDAD
3% $37.07 $1.1120

COSTO DIRECTO $46.21


COSTOS INDIRECTOS 13% $52.22
UTILIDAD 9% $56.91
FINANCIAMIENTO 1% $57.48
CARGOS ADICIONALES 0.05% $57.51

O LO NECESARIO PARA SU CORRECTA


UN PZA

CANTIDAD P.U IMPORTE


2 $115.00 $230.00
2 $115.00 $230.00
$460.00

S.R IMPORTE
CANTIDAD
0.10000 $741.32 $74.13

C.H IMPORTE
CANTIDAD
3% $74.13 $2.2240

COSTO DIRECTO $536.36


COSTOS INDIRECTOS 13% $606.08
UTILIDAD 9% $660.63
FINANCIAMIENTO 1% $667.24
CARGOS ADICIONALES 0.05% $667.57

NTA Y TODO LO NECESARIO PARA SU


UN SALIDA
UN SALIDA

CANTIDAD P.U IMPORTE


1 $10.68 $10.68
1 $10.00 $10.00
$20.68

S.R IMPORTE
CANTIDAD
0.06667 $741.32 $49.42

C.H IMPORTE
CANTIDAD
3% $49.42 $1.4826

COSTO DIRECTO $71.58


COSTOS INDIRECTOS 13% $80.89
UTILIDAD 9% $88.17
FINANCIAMIENTO 1% $89.05
CARGOS ADICIONALES 0.05% $89.10

DE OBRA, HERRAMIENTA Y TODO LO


UN SALIDA

CANTIDAD P.U IMPORTE


1 $9.35 $9.35
1 $49.00 $49.00
$58.35

S.R IMPORTE
CANTIDAD
0.06667 $741.32 $49.42
C.H IMPORTE
CANTIDAD
3% $49.42 $1.4826

COSTO DIRECTO $109.25


COSTOS INDIRECTOS 13% $123.46
UTILIDAD 9% $134.57
FINANCIAMIENTO 1% $135.91
CARGOS ADICIONALES 0.05% $135.98

E MANO DE OBRA, HERRAMIENTA Y


UN SALIDA

CANTIDAD P.U IMPORTE


1 $69.00 $69.00
1 $9.35 $9.35
$78.35

S.R IMPORTE
CANTIDAD
0.06667 $741.32 $49.42

C.H IMPORTE
CANTIDAD
3% $49.42 $1.4826

COSTO DIRECTO $129.25


COSTOS INDIRECTOS 13% $146.06
UTILIDAD 9% $159.20
FINANCIAMIENTO 1% $160.79
CARGOS ADICIONALES 0.05% $160.87

UN SALIDA
MIENTA Y TODO LO NECESARIO PARA
UN SALIDA

CANTIDAD P.U IMPORTE


1 $9.35 $9.35
1 $35.00 $35.00
$44.35

S.R IMPORTE
CANTIDAD
0.06667 $741.32 $49.42

C.H IMPORTE
CANTIDAD
3% $49.42 $1.4826

COSTO DIRECTO $95.25


COSTOS INDIRECTOS 13% $107.64
UTILIDAD 9% $117.32
FINANCIAMIENTO 1% $118.50
CARGOS ADICIONALES 0.05% $118.56

o. 8, INTECONEXION SUBTERRANEA,
TERIALES, EQUIPO Y HERRAMIENTA) UN PZA

CANTIDAD P.U IMPORTE


1 $655.00 $655.00

S.R IMPORTE
CANTIDAD
0.14286 $741.32 $105.90

C.H IMPORTE
CANTIDAD
3% $105.90 $3.1771

COSTO DIRECTO $764.08


COSTOS INDIRECTOS 13% $863.41
UTILIDAD 9% $941.12
FINANCIAMIENTO 1% $950.53
CARGOS ADICIONALES 0.05% $951.00

O NECESARIO PARA SU COLOCACION. UN PZA

CANTIDAD P.U IMPORTE


1 $179.00 $179.00

S.R IMPORTE
CANTIDAD
0.2000 $741.32 $148.26

C.H IMPORTE
CANTIDAD
3% $148.26 $4.4479

COSTO DIRECTO $331.71


COSTOS INDIRECTOS 13% $374.84
UTILIDAD 9% $408.57
FINANCIAMIENTO 1% $412.66
CARGOS ADICIONALES 0.05% $412.86

O NECESARIO PARA SU COLOCACION. UN PZA

CANTIDAD P.U IMPORTE


1 $195.00 $195.00

S.R IMPORTE
CANTIDAD
0.2000 $741.32 $148.26

C.H IMPORTE
CANTIDAD
3% $148.26 $4.4479

COSTO DIRECTO $347.71


COSTOS INDIRECTOS 13% $392.92
UTILIDAD 9% $428.28
FINANCIAMIENTO 1% $432.56
CARGOS ADICIONALES 0.05% $432.78

GAS

ALES, EQUIPO, HERRAMIENTA. SEGÚN


UN LOTE

CANTIDAD P.U IMPORTE


6.97 $114.50 $798.07
1 $9.30 $9.30
7 $5.50 $38.50
2 $10.90 $21.80
1 $19.90 $19.90
2 $115.00 $230.00
2 $7.00 $14.00
$1,131.57

S.R IMPORTE
CANTIDAD
5.0000 $719.18 $3,595.89

C.H IMPORTE
CANTIDAD
3% $3,595.89 $107.8766

COSTO DIRECTO $4,857.13


COSTOS INDIRECTOS 13% $5,488.55
UTILIDAD 9% $5,982.52
FINANCIAMIENTO 1% $6,042.35
CARGOS ADICIONALES 0.05% $6,045.37

NECESARIO PARA SU INSTALACION. UN PZA

CANTIDAD P.U IMPORTE


1 $1,797.00 $1,797.00

1 $549.00 $549.00
$2,346.00

S.R IMPORTE
CANTIDAD
0.25000 $719.18 $179.79
C.H IMPORTE
CANTIDAD
3% $179.79 $5.3938

COSTO DIRECTO $2,531.19


COSTOS INDIRECTOS 13% $2,860.24
UTILIDAD 9% $3,117.66
FINANCIAMIENTO 1% $3,148.84
CARGOS ADICIONALES 0.05% $3,150.42

LETES, BOTAGUAS Y RINCONES, TODO


RA Y HERRAMIENTA) UN M²

CANTIDAD P.U IMPORTE


0.2575 $159.84 $41.16

TOTAL $41.16

S.R IMPORTE
CANTIDAD
0.0667 $542.99 $36.20

C.H IMPORTE
CANTIDAD
3% $36.20 $1.0860
2.5% $36.20 $0.9050
$1.9910

COSTO DIRECTO $79.35


COSTOS INDIRECTOS 13% $89.66
UTILIDAD 9% $97.73
FINANCIAMIENTO 1% $98.71
CARGOS ADICIONALES 0.05% $98.76

ROMEDIO DE 2 CM.INCLUYE FILETES,


EQUIPO, CIMBRA Y HERRAMIENTA.) UN M²

CANTIDAD P.U IMPORTE


0.2575 $159.84 $41.16

TOTAL $41.16

S.R IMPORTE
CANTIDAD
0.0667 $542.99 $36.20

C.H IMPORTE
CANTIDAD
3% $36.20 $1.0860
2.5% $36.20 $0.9050
$1.9910

COSTO DIRECTO $79.35


COSTOS INDIRECTOS 13% $89.66
UTILIDAD 9% $97.73
FINANCIAMIENTO 1% $98.71
CARGOS ADICIONALES 0.05% $98.76

O-AGUA, CON ESPESOR PROMEDIO DE


M, EQ, ANDAMIOS, RESANES. UN M²

CANTIDAD P.U IMPORTE


0.2060 $80.00 $16.48

TOTAL $16.48
S.R IMPORTE
CANTIDAD
0.0625 $687.54 $42.97

C.H IMPORTE
CANTIDAD
3% $42.97 $1.2891
2.5% $42.97 $1.0743
$2.3634

COSTO DIRECTO $61.81


COSTOS INDIRECTOS 13% $69.85
UTILIDAD 9% $76.14
FINANCIAMIENTO 1% $76.90
CARGOS ADICIONALES 0.05% $76.94

DE 3cm INCL.: FILETES EN PUERTAS,


S, RESANES. UN

CANTIDAD P.U IMPORTE


0.2424 $77.16 $18.70

S.R IMPORTE
CANTIDAD
0.0667 $687.54 $45.84

C.H IMPORTE
CANTIDAD
3%
COSTO DIRECTO $45.84
COSTOS INDIRECTOS 13% $51.79
UTILIDAD 9% $56.46
FINANCIAMIENTO 1% $57.02
CARGOS ADICIONALES 0.05% $57.05

CON UN ESP. PROM. DE 3cm INCL.:


Q, PREPARACIÓN , ANDAMIOS. UN M²

CANTIDAD P.U IMPORTE


0.206 $80.00 $16.48

TOTAL $16.48

S.R IMPORTE
CANTIDAD
0.0714 $687.54 $49.11

C.H IMPORTE
CANTIDAD
3% $49.11 $1.4733
2.5% $49.11 $1.2278
$2.7011

COSTO DIRECTO $68.29


COSTOS INDIRECTOS 13% $77.17
UTILIDAD 9% $84.11
FINANCIAMIENTO 1% $84.96
CARGOS ADICIONALES 0.05% $85.00

ES EN PUERTAS, VENTANAS, REMATES,


DAMIOS. UN M²

CANTIDAD P.U IMPORTE


0.2424 $77.16 $18.70

TOTAL $18.70

S.R IMPORTE
CANTIDAD
0.06667 $687.54 $45.84

C.H IMPORTE
CANTIDAD
3% $45.84 $1.3751
2.50% $45.84 $1.1459
$2.5210

COSTO DIRECTO $65.91


COSTOS INDIRECTOS 13% $74.48
UTILIDAD 9% $81.18
FINANCIAMIENTO 1% $81.99
CARGOS ADICIONALES 0.05% $82.04

ARQUITECTONICO. PUOT. UN M²

CANTIDAD P.U IMPORTE

0.0069 $1,225.00 $8.41


0.0136 $839.00 $11.37
$19.78

S.R IMPORTE
CANTIDAD
0.0029 $730.26 $2.09

C.H IMPORTE
C.H IMPORTE
CANTIDAD
3% $2.09 $0.0626
2.50% $2.09 $0.05
$0.1148

COSTO DIRECTO $21.98


COSTOS INDIRECTOS 13% $24.84
UTILIDAD 9% $27.08
FINANCIAMIENTO 1% $27.35
CARGOS ADICIONALES 0.05% $27.36

ARQUITECTONICO. PUOT. UN

CANTIDAD P.U IMPORTE

0.0069 $1,225.00 $8.41


0.0136 $839.00 $11.37
$19.78

S.R IMPORTE
CANTIDAD
0.00286 $730.26 $2.09

C.H IMPORTE
CANTIDAD
3% $2.09 $0.0626
2.50% $2.09 $0.0522
$0.1148

COSTO DIRECTO $21.98


COSTOS INDIRECTOS 13% $24.84
UTILIDAD 9% $27.08
FINANCIAMIENTO 1% $27.35
CARGOS ADICIONALES 0.05% $27.36

COLADERAS, MATERIALES, M. DE O.,


UN M²
UN M²

CANTIDAD P.U IMPORTE

0.0687 $559.48 $38.42


0.0687 $799.00 $54.86
0.0154 $519.00 $7.98
0.0182 $355.00 $6.45
1.0000 $89.00 $89.00
TOTAL $107.72

S.R IMPORTE
CANTIDAD
0.01429 $588.59 $8.41

C.H IMPORTE
CANTIDAD
3% $8.41 $0.2523

COSTO DIRECTO $116.38


COSTOS INDIRECTOS 13% $131.51
UTILIDAD 9% $143.35
FINANCIAMIENTO 1% $144.78
CARGOS ADICIONALES 0.05% $144.85

O., HERRAMIENTAS,EQ. UN M²

CANTIDAD P.U IMPORTE


1 $285.00 $285.00
0.2575 $189.00 $48.67
0.05 $575.00 $333.67
$667.34

S.R IMPORTE
CANTIDAD
0.0833 $542.99 $45.25
C.H IMPORTE
CANTIDAD
3% $45.25 $1.3575

COSTO DIRECTO $713.94


COSTOS INDIRECTOS 13% $806.75
UTILIDAD 9% $879.36
FINANCIAMIENTO 1% $888.16
CARGOS ADICIONALES 0.05% $888.60

NCLUYE CONCRETO HECHO EN OBRA,


SU CORRRECTA EJECUCION UN mL

CANTIDAD P.U IMPORTE


0.00618 $1,979.74 $12.23

$12.23

S.R IMPORTE
CANTIDAD
0.08333 $542.99 $45.25

C.H IMPORTE
CANTIDAD
3% $45.25 $1.3575

COSTO DIRECTO $58.84


COSTOS INDIRECTOS 13% $66.49
UTILIDAD 9% $72.47
FINANCIAMIENTO 1% $73.20
CARGOS ADICIONALES 0.05% $73.24

EJOS
EJOS
N ADHESIVO CREST, CON BOQUILLA DE
DICIOS, LIMPIEZA. UN M²

CANTIDAD P.U IMPORTE


1.07 $83.00 $88.81
0.2575 $189.00 $48.67
0.0687 $119.86 $8.23
0.0041 $76.50 $0.32
$146.02

S.R IMPORTE
CANTIDAD
0.0667 $612.28 $40.82

C.H IMPORTE
CANTIDAD
3% $40.82 $1.2246

COSTO DIRECTO $188.07


COSTOS INDIRECTOS 13% $212.51
UTILIDAD 9% $231.64
FINANCIAMIENTO 1% $233.96
CARGOS ADICIONALES 0.05% $234.07

1A. DE 33X33 CM ASENTADO CON


DE O., HERRAM., EQ, CORTES, UN mL

CANTIDAD P.U IMPORTE


0.1030 $83.00 $8.55
0.1667 $189.00 $31.50
0.0667 $119.86 $7.99
$48.04
S.R IMPORTE
CANTIDAD
0.0500 $612.28 $30.61

C.H IMPORTE
CANTIDAD
3% $30.61 $0.9184

COSTO DIRECTO $79.57


COSTOS INDIRECTOS 13% $89.92
UTILIDAD 9% $98.01
FINANCIAMIENTO 1% $98.99
CARGOS ADICIONALES 0.05% $99.04

HONGOS, COLOCADO CON PEGA-


S, EQUIPO Y HERRAMIENTA). UN M²

CANTIDAD P.U IMPORTE


1.07 $130.00 $139.10
0.2575 $189.00 $48.67
0.0667 $119.86 $7.99
$195.76

S.R IMPORTE
CANTIDAD
0.0500 $612.28 $30.61

C.H IMPORTE
CANTIDAD
3% $30.61 $0.9184

COSTO DIRECTO $227.29


COSTOS INDIRECTOS 13% $256.84
UTILIDAD 9% $279.95
FINANCIAMIENTO 1% $282.75
CARGOS ADICIONALES 0.05% $282.89

CADO CON PEGA-AZULEJO INCLUYE


O Y HERRAMIENTA). UN M²

CANTIDAD P.U IMPORTE


1.07 $129.00 $138.03
0.2575 $189.00 $48.67
0.0667 $119.86 $7.99
$194.69

S.R IMPORTE
CANTIDAD
0.05000 $612.28 $30.61

C.H IMPORTE
CANTIDAD
3% $30.61 $0.9184

COSTO DIRECTO $226.22


COSTOS INDIRECTOS 13% $255.63
UTILIDAD 9% $278.64
FINANCIAMIENTO 1% $281.42
CARGOS ADICIONALES 0.05% $281.56

RIO PARA SU EJECUCION (MANO DE


UN mL

CANTIDAD P.U IMPORTE


1.03 $85.00 $87.55
0.25 $189.00 $47.25
0.0667 $119.86 $7.99
$142.79
S.R IMPORTE
CANTIDAD
0.0100 $612.28 $6.12

C.H IMPORTE
CANTIDAD
3% $6.12 $0.1837

COSTO DIRECTO $149.10


COSTOS INDIRECTOS 13% $168.48
UTILIDAD 9% $183.64
FINANCIAMIENTO 1% $185.48
CARGOS ADICIONALES 0.05% $185.57

ARPINTERIA
DE 3 MM. DE ESPESOR. INCLUYE
O NECESARIO PARA SU CORRECTA UN PZA

CANTIDAD P.U IMPORTE


1 $1,049.26 $1,049.26

S.R IMPORTE
CANTIDAD
0.25000 $542.99 $135.75

C.H IMPORTE
CANTIDAD
3% $135.75 $4.0724
COSTO DIRECTO $1,189.08
COSTOS INDIRECTOS 13% $1,343.66
UTILIDAD 9% $1,464.59
FINANCIAMIENTO 1% $1,479.24
CARGOS ADICIONALES 0.05% $1,479.98

DE 3 MM. DE ESPESOR. INCLUYE


O NECESARIO PARA SU CORRECTA UN PZA

CANTIDAD P.U IMPORTE


1 $1,155.00 $1,155.00

S.R IMPORTE
CANTIDAD
0.2500 $542.99 $135.75

C.H IMPORTE
CANTIDAD
3% $135.75 $4.0724

COSTO DIRECTO $1,294.82


COSTOS INDIRECTOS 13% $1,463.15
UTILIDAD 9% $1,594.83
FINANCIAMIENTO 1% $1,610.78
CARGOS ADICIONALES 0.05% $1,611.58

UYE SUJECCION DE MARCO A BASE DE


NECESARIO PARA SU INSTALACION. UN PZA
CANTIDAD P.U IMPORTE
1 $339.00 $339.00
1 $1,267.00 $1,267.00
1 $259.00 $1,606.00
$3,212.00

S.R IMPORTE
CANTIDAD
0.25000 $542.99 $135.75

C.H IMPORTE
CANTIDAD
3% $135.75 $4.0724

COSTO DIRECTO $3,351.82


COSTOS INDIRECTOS 13% $3,787.56
UTILIDAD 9% $4,128.44
FINANCIAMIENTO 1% $4,169.72
CARGOS ADICIONALES 0.05% $4,171.81

UYE SUJECCION DE MARCO A BASE DE


NECESARIO PARA SU INSTALACION. UN PZA

CANTIDAD P.U IMPORTE


1 $495.00 $495.00
1 $1,267.00 $1,267.00
1 $259.00 $259.00
$2,021.00

S.R IMPORTE
CANTIDAD
0.25000 $542.99 $135.75

C.H IMPORTE
C.H IMPORTE
CANTIDAD
3% $135.75 $4.0724

COSTO DIRECTO $2,160.82


COSTOS INDIRECTOS 13% $2,441.73
UTILIDAD 9% $2,661.48
FINANCIAMIENTO 1% $2,688.10
CARGOS ADICIONALES 0.05% $2,689.44

CION DE MARCO A BASE DE ANCLAS,


CESARIO PARA SU INSTALACION UN PZA

CANTIDAD P.U IMPORTE


1 $339.00 $339.00
1 $447.00 $447.00
1 $259.00 $786.00
$1,572.00

S.R IMPORTE
CANTIDAD
0.25000 $542.99 $135.75

C.H IMPORTE
CANTIDAD
3% $135.75 $4.0724

COSTO DIRECTO $1,711.82


COSTOS INDIRECTOS 13% $1,934.36
UTILIDAD 9% $2,108.45
FINANCIAMIENTO 1% $2,129.53
CARGOS ADICIONALES 0.05% $2,130.60
THE HOME
MATERIAL EL CLAVITO ARECON UNIDAD
DEPOT

BLOCK TIPO PESADO MTY 15x20x40 $8.20 $8.50 pza.

BLOCK REGIONAL 15x20x40 $7.50 $7.40 pza.

BLOCK REGIONAL 10x20x40 $6.00 $6.50 pza.

CEMENTO GRIS MONTERREY $180.00 $177.00 $185.00 bto.

CEMENTO GRIS IMPERCEM $185.00 $199.00 $190.00 bto.

PLASTICO DE POLIETILENO 23M² $345.00 m²

CAL HIDRATADA 25 KG. $55.00 bto.

MANGUERA PARA NIVEL 3/8". 5 mts. $33.50 tramo 5mts.

tramo 50
MADEJA DE HILO $30.00 $35.00 mts.
MADERA DE ESTACA $6.00 $6.50 pza.
YESO MAXIMO 40 KG. $80.00 bto.
BOQUICREST 10 kg - $160.00 $119.86 bto.
CEMENTO CREST BLANCO 20kg $195.00 $189.00 bto.
SEPARADORES DE PISO 3 MM (1/8") Bolsa 250
$76.50
250 PZS pzas.
CRESTUCO BLANCO 40 KG $159.84 bto.

TIROL MADISON BULTO 20 kg $77.16 bto.

ARENA TRITURADA $336.00 $330.00 m3.


GRAVA TRITURADA $336.00 $330.00 m3.
VARILLA 3/8" $99.12 $16.52 kg. Y PZA
VARILLA 1/4" - $12.53 kg
ALAMBRON $16.80 $17.15 kg.
ALAMBRE QUEMADO $19.30 $19.59 kg.
CLAVO CON CABEZA 2 1/2" $24.36 $25.79 kg.
TABLA 1-3-10 $31.50 $41.59 mto.
AZULEJO ALCALA BLANCO 20X30 CM $129.00 m2.
VITROMEX
PISO CUBIC 20X20 CM. BEIGE $130.00 m2.

VITROMEX PISO CARIBE 33X33 CM. - $83.00 $101.41 m2.


CENEFA 8 X 25 $85.00 mL

PIEDRA PARA FACHADAS LAJA SANTO $285.00 caja


TOMAS
IMPERMEABILIZANTE THERMOTEK $559.48 cubeta
BLANCO 3 AÑOS 19 L

THERMOTEK CEMENTO ACRÍLICO $799.00 cubeta


BLANCO CUBETA

THERMOTEK SELLO PRIMARIO CUBETA $519.00 cubeta


19L
HIDROCOAT REFUERZO SENCILLO 1.15 $355.00 rollo
X 55 M
CEPILLO DE IXTLE DE PADSA
$89.00 pza.

SELLADOR VINÍLICO 19 L $839.00 cubeta


PINTURA 19 L BLANCO OSTIÓN GRATIS $1,225.00 cubeta
KIT PARA PINTAR
THERMOTEK IMPER BLANCO 3 AÑOS $649.00 cubeta
CUBETA 19 L
SELLADOR ACRÍLICO BASE ACEITE 1
GALÓN $575.00 galon

MALLA GALLINERA C-20-38 (1.50M²) $16.00 $13.93 m²

CASETON DE POLIESTILENO 10X50X60 $30.00 $20.16 pza.

MALLA ELECTROSOLDADA 6-6/10-10 $16.00 $15.96 $17.29 m2.

CENTRO DE CARGA DE 4 UNIDADES


EMPOTRAR $185.00 $195.00 $210.00 pza.

INTERRUPTOR DE SEGURIDAD 3 POLOS $179.00 pza.


30 A
APAGADOR SENCILLO $12.00 $32.00 pza.

CONTACTO SENCILLO $9.00 $27.95 pza.


PLACA 1 SALIDA $15.00 $27.80 pza.
PLACA 2 SALIDAS $15.00 $29.65 pza.
PLACA 3 SALIDAS $15.00 $27.80 pza.

PLACA Y DOS CONTACTOS CIEN $35.00 pza.


BLANCO
APAGADOR SENCILLO + TOMA 2P+T
CON PLACA $49.00 pza.

2 APAGADORES SENCILLOS+TOMA
2P+T CON PLACA $69.00 pza.

INTERRUPTOR QO 1 POLO 20A CON


VENTANA $115.00 pza.

INTERRUPTOR QO 1 POLO 15A CON


VENTANA $115.00 pza.

CABLE THW #14 MCA. INDIANA $8.00 $5.33 mto.


CABLE THW #12 MCA. INDIANA $10.00 $7.57 mto.
CABLE THW #10 MCA. INDIANA $15.00 $11.98 mto.
POLIDUCTO CONDUIT 1/2" $4.00 $3.20 mto.
POLIDUCTO CONDUIT 3/4" $6.00 $4.90 mto.
ROSETA DE PORCELANA 127V. MCA $10.00 $10.66 pza.
IUSA
CAJA RECTANGULAR $12.00 $9.35 pza.
CAJA OCTOGONAL $13.00 $10.68 pza.
CINTA AISLAR 20 M - $13.50 pza.

VARILLA TIERRA DE 75 CM DE LARGO $58.80 $30.34 pza.


ACOMETIDA JUEGO PARA 110V
$655.00 pza.

TUBO CPVC HIDRAULICO 1/2" $98.00 $89.50 tramo 6mts


TUBO CPVC HIDRAULICO 3/4" $157.50 tramo 6mts
CODO 90° CPVC 1/2" $3.50 pza.
TEE CPVC 1/2" $2.50 pza.
CODO 90° CPVC 3/4" $4.50 pza.

TEE CPVC 3/4" $5.00 pza.

TEE CPVC 3/4"x3/4"x1/2" $6.50 pza.

COPLE CPVC 1/2" $3.50 pza.

ADAPTADOR MACHO CPVC 1/2" $2.50 pza.


ADAPTADOR MACHO CPVC 3/4" $61.00 pza.
ADAPTADOR HEMBRA CPVC 1/2" $10.00 pza.
ADAPTADOR HEMBRA CPVC 3/4" $81.50 pza.
VALVULA DE CPVC ESFERA DE 3/4" $69.50 pza.
VALVULA DE CPVC ESFERA DE 1/2" $49.50 pza.
ADAPTADOR DE CPVC A COBRE 3/4" $66.90 pza.

ADAPTADOR DE CPVC A COBRE 1/2" $78.90 pza.

CEMENTO PARA CPVC $199.00 bote 947 ml


PAQUETE DE INSTALACION PARA $269.00 pza.
REGADERA CON CONEXIÓN A CPVC
PAQUETE PARA INSTALACION DE $305.00 pza.
LAVABO
PAQUETE PARA INSTALACION DE $419.00 pza.
FREGADERO/TARJA
TEE PVC SANITARIA 2" $5.00 pza.
TEE PVC SANITARIA 4" $19.00 pza.
YEE PVC SANITARIA 2" $8.00 pza.
YEE PVC SANITARIA 4" $28.00 pza.
YEE PVC SANITARIA DE 4"-2" $14.00 pza.
CODO 45° PVC 2" $6.00 $3.50 $3.20 pza.
CODO 90° PVC 4" $18.00 $12.00 $13.75 pza.
codo pvc sanit 2"x90 $6.00 $3.50 $3.80 pza.
CODO 45° PVC 4" $10.20 $11.00 $10.60 pza.
tubo pvc sanit norma 2" $98.00 $99.00 $80.70 TRAMo
tubo pvc sanit norma 3" $170.00 $129.48 TRAMO
tubo pvc sanit norma 4" $220.00 $229.00 $193.20 TRAMO
tubo pvc sanit norma 6" $530.00 $491.40 TRAMO
tubo pvc sanit norma 8" - TRAMO
tees pvc sanit senc cem 2x2 $8.00 $4.65 pza.
tees pvc sanit senc cem 3x3 - $10.30 pza.
tees pvc sanit senc cem 6x6 - $63.65 pza.
tees pvc sanit senc cem 4x2 - $12.55 pza.
tees pvc sanit senc cem 4x4 - $17.75 pza.

reduc pvc excentrica sanit cem 4x2 $15.00 $7.75 pza.

BRIDA FLEXIBLE 4" CORTA COFLEX $105.00 pza.

COFLEX ACERO WC 1/2" FIPX 7/8 AM-


50 CM $65.90 pza.

cemento pvc - $159.00 $163.70 bote 947 ml


REGISTRO DE ANGULO 60 X 40 CM DE $285.00
1-1/4"
tubo de cobre tipo L para gas 1/2" $114.50 mto.
tee de cobre 1/2" $9.30 pza.
codo de cobre 1/2"x45 $12.00 pza.
codo de cobre 1/2"x90 $5.50 pza.
conector rosca exterior 1/2" $10.90 pza.
conector rosca interior 1/2" $15.90 pza.
cople cobre 1/2" $4.40 pza.
niple union 1/2"x 3/8" $19.90 pza.
llave control gas 1/2"x3/8" $115.00 pza.
CALENTADOR AGUA LP ECONO-BOSCH $1,797.00 pza.
5L
TARJA 1T/1ESC DER 75X47 MEZ PIS $589.00 pza.
GAB

paq sanit california, tanque y lavabo - $1,997.00 pza.

mezcladora lav f-24q rugo $239.40 $267.37 pza.


llave control s /tuerca f-25 rugo - $32.14 pza.

brazo cromado p/regadera f-45b rugo $24.36 $23.50 pza.

REGADERA BUILDERS $1,775.00 pza.


LLAVE MEZCLADORA PARA LAVABO $347.00 pza.
DETROIT GRIS

MEZCLADORA PARA COCINA 8" $355.00 pza.


CROMO
TINACO 450 L CON ACCESORIOS
$1,449.00 pza.

KIT INSTALACIÓN CALENTADOR $549.00 pza.


DEPÓSITO ELÉCTRICO 3/8"
Cinta Teflon 1/2" x 520 PTFE . $7.00 pza.
coladera pvc universal 2-4" $50.40 $31.00 pza.
malla electrosoldada 6x6 10x10 ROLLO
lavadero granito mediano 85x65 - $448.55 pza.
castillo armex 15x15x4x1/4 $117.60 $104.81 pza.
tinaco rotoplas 450 lts - $1,449.00 $1,313.30 pza.
VENTANA ALUMIPRO 120 X 100 CM
NATURAL $1,049.26 pza.

VENTANA ALUMIPRO 150 X 100 CM


NATURAL $1,155.00 pza.

MARCO ALUMINIO 94 X 213 $495.00 pza.


CHOCOLATE UNIVERSAL
MARCO PARA PUERTA GALV MET $339.00 pza.
90X213 CM
PUERTA ACERO LISA BLANCO C28 $1,267.00 pza.
90X213
PUERTA TAMBOR CONDOR 90X 213 $447.00 pza.
Manija Modelo Nogal función Baño $259.00 pza.
Acabdo Acero Inoxidable.
agua no potable $10.00 m³
NOMBRE PRECIO UNIDAD CASA DE MATERIAL

DUELA 1X4X10" $11.00 PT MADERERIA EL PINAL

YUGO 2X4X10" $11.00 PT MADERERIA EL PINAL

POLIN 2X4x10" $11.00 PT MADERERIA EL PINAL

MADRINA 4X4X10" $11.00 PT MADERERIA EL PINAL


LIMPIEZA TRAZO Y NIVELACION 250
CARGA Y ACARREO 12
RELLENO Y COMPACTACION DE DESPALME 40
EXCAVACIÓN DE TERRENO 3.5
FABRICACION DE CONCRETO PARA PLANTILLA 10
RELLENO Y COMPACTACION DE EXCAVACIÓN 4.5
ARMADO DE CONTRATRABES 30
FABRICACION DE CONCRETO PARA CONTRATRABE 10
FABRICACION DE CONCRETO PARA FIRME 20
ARMADO Y COLADO DE FIRME 330
FABRICACION DE MURO DE BLOCK DE 15X20X40 EN PLANTA BAJA 13
FABRICACION DE CONCRETO PARA CASTILLOS 10
ARMADO Y COLADO DE CASTILLOS 50
FABRICACION DE CONCRETO PARA DALA DE CERRAMIENTO 8
ARMADO Y COLADO DE DALA DE CERRAMIENTO 15
FABRICACION DE CONCRETO PARA LOSA 14
ARMADO Y COLADO DE LOSA 60
COLOCACION DE MORTERO EN MURO 15
COLOCACION DE ESTUCO EN MURO Y PLAFON 15
APLANADO DE YESO EN MUROS 16
APLANADO DE YESO EN PLAFON 14
COLOCACION DE SOBREFIRME 60
COLOCAION DE ENTORTADO 60
COLOCACION DE VITROPISO 15
COLOCACION DE ZOCLO 20
COLOCACION DE VITROPISO ANTIDERRAPENTA EN ZONA DE DUCHA 20
COLOCACION DE PINTURA VINILICA EN MURO EXTERIOR E INTERIOR 350
COLOCACION DE SELLADOR VINILICO 350
COLOCACION DE TIROL 15
COLOCACION DE PINTURA ESMALTE EN PLAFONES 350
COLOCACION DE AZULEJO EN BAÑOS 20
COLOCACION DE AZULEJO EN COCINA 20
COLOCACION DE CENEFA EN BAÑOS Y COCINA 100
IMPERMEABILIZACION DE AZOTEA 70
COLOCACION DE PIEDRA LAJA 12
COLOCACION DE PRETIL 25
FABRICACION DE CONCRETO PARA FIRME ESCOBILLADO EN ZONA DE 200
ARMADO Y COLADO DE FIRME EN ZONA DE COCHERA 330
INSTALACION DE TINACO 1
INSTALACION DE CISTERNA 1
TENDIDO DE TUBERIA HIDRAULICA 5
INSTALACION SANITARIA 5
INSTALACION ELECTRICA 7
INSTALACION DE GAS 5
FABRICACION HE INSTALACION DE PUERTA PRINCIPAL 3
FABRICACION HE INSTALACION DE PUERTA PUERTA DE JARDIN 4
FABRICACION E INSTALACION DE VENTANA: 7
FABRICACION DE HE INSTALACION DE PUERTA Y VENTANA DE ACERO 5
FABRICACION HE INSTALACION DE PUERTA DE MADERA: 6
MONTAJE Y DESMONTAJE DE CIMBRA PARA DALA
2 CARAS 80
3 CARAS 60
MONTAJE Y DESMONTAJE DE CIMBRA PARA CATILLOS
1 CARA 100
2 CARAS 60
3 CARAS 50
MONTAJE Y DESMONTAJE CIMBRA PARA LOSA DE ENTREPISO 70
MONTAJE Y DESMONTAJE DE CIMBRA PARA LOSA DE AZOTEA 60
MONTAJE Y DESMONTAJE CIMBRA PARA ESCALERA 1
Hilo Pieza
Manguera para Nivel 3/8'' Pieza
Calhidra en Polvo Bulto
Armex 15x15 (Castillo) Pieza
Armex 15x20 (Dala) Pieza
Armex 10x10 Pieza
Alambre Recocido No. 16 Kg
Alambron 1/4" Kg
Varilla #3 (3/8") Pieza
Varilla #4 (1/2") Pieza
Varilla #5 (5/8") Pieza
Varilla #6 (3/4") Pieza
Varilla #8 (1") Pieza
Boquilla Baño BOQUICrest Ultra Max Adobe Bulto 10 kg.
Boquilla Casa-Cocina BOQUICrest Ultra Max Crema Bulto 10 kg.
Yeso Marca Máximo Bulto 40 kg.
Crestuco Color Blanco Bulto 40 kg.
Tirol Madison Bulto 20 kg.
Crest Blanco Bulto 20 kg.
Sellador para Muros Vinilico Interior Marca Berel ubeta 19 lts.
Sellador para Muros Acrilico Exterior Marca Berel ubeta 19 lts.
Pintura para Interior Vinil Acrilica Marca Berel Color Blanco ubeta 19 lts.
Impermeabilizante Thermotek 3 Años ubeta 19 lts.
THERMOTEK CEMENTO ACRÍLICO BLANCO CUBETA ubeta 19 lts.
THERMOTEK SELLO PRIMARIO CUBETA 19L ubeta 19 lts.
HIDROCOAT REFUERZO SENCILLO 1.15 X 55 M Rollo
CEPILLO DE IXTLE DE PADSA pieza
SELLADOR ACRÍLICO BASE ACEITE 1 GALÓN
galon
Malla de Refuerzo Rollo
Tubo-plus 1/2'' Pieza
Tubo-plus 3/4'' Pieza
Tubo-plus 1'' Pieza
Tubo PVC 2" Pieza
Tubo PVC 4" Pieza
Cable AWG con Forro No. 8 Caja
Cable AWG con Forro No. 10 Caja
Cable AWG con Forro No. 12 Caja
Cable AWG con Forro No. 14 Caja
Tubo Conduit 1/2" Pieza
Tubo Conduit 3/4" Pieza
Tubo de cobre Tipo "I" de 3/4" Pieza
m²/Jornada
m³/Jornada
m³/Jornada
m³/Jornada
m³/Jornada
m³/Jornada
mL/Jornada
m³/Jornada
m³/Jornada
m²/Jornada
m²/Jornada
m³/Jornada
mL/Jornada
m³/Jornada
mL/Jornada
m³/Jornada
m²/Jornada
m²/Jornada
m²/Jornada
m²/Jornada
m²/Jornada
m²/Jornada
m²/Jornada
m²/Jornada
mL/Jornada
m²/Jornada
m²/Jornada
m²/Jornada
m²/Jornada
m²/Jornada
m²/Jornada
m²/Jornada
m²/Jornada
m²/Jornada
m²/Jornada
m²/Jornada
m²/Jornada
m²/Jornada
Jornadas
Jornadas
Jornadas
Jornadas
Jornadas
Jornadas
Pza/Jornada
Pza/Jornada
Pza/Jornada
Pza/Jornada
Pza/Jornada

m/Jornada
m/Jornada

m/Jornada
m/Jornada
m/Jornada
m²/Jornada
m²/Jornada
Pza/Jornada
300 mts
5 mts
25 kg
6 mts
6 mts
6 mts
64.17 mts.
4.03 mts.
12 mts.
12 mts.
12 mts.
12 mts.
12 mts.
15 m²
15 m²
5 m²
4 m²
4.25 m²
4 m²
76 m² 1 mano
76 m² 1 mano
150 m² 2 manos
15 m²
10 m²
65 m²
0.6325 m²
1
20
100 m²
4 mts
4 mts
4 mts
6 mts
6 mts
100 mts.
100 mts.
100 mts.
100 mts.
100 mts.
100 mts.
6 mts
CLAVE CUADRILLA USO
APLANADO, EXCAVACION, CIMENTACION,MUROS, ENTORTADO,
CUA-01 COLOCACION DE PIEDRA LAJA
CUA-02 DALAS Y CASTILLOS
CUA-03 LIMPIEZA, TRAZO, NIVELACION, COMPACTACION,ETC
CUA-04 INSTALACIONES ELECTRICAS
CUA-05 INSTALACIONES GAS, HIDRAULICA Y SANITARIA
CUA-06 PINTURA
CUA-07 APLICACIÓN DE YESO
CUA-08 COLOCACION DE VITROPISO Y AZULEJO
CUA-09 ARMADOS, COLOCACION DE CASTILLOS
CUA-10 COLOCACION DE CIMBRA
CUA-11 IMPERMEABILIZACION
CUA-12 FABRICACION DE CONCRETOS Y MORTEROS
CUA-13 COLADORES (LOSA)
CUA-14 APLICACIÓN DE TIROL
CUA-15 RETIRO Y DESPALME (RETRO EXCAVADORA)
CUA-16 RETIRO Y DESPALME (CAMION DE VOLTEO)
CUA-17 INSTALACION DE PUERTAS
UNIDAD DESCRIPCION CANTIDAD

JOR OF. ALBAÑIL+ AY. ALBAÑIL+ 2/10 CABO


JOR OF. ALBAÑIL+ 2 AY. ALBAÑIL+ 3/10 CABO
JOR OF. ALBAÑIL+ AY. ALBAÑIL
JOR OF. ELECTRICISTA+ AY. ELECTRICISTA+ 2/10 CABO
JOR OF. PLOMERO+ AY. PLOMERO+ 2/10 CABO
JOR OF. PINTOR+ AY. PINTOR+ 2/10 CABO
JOR OF. YESERO+ AY. YESERO+ 2/10 CABO
JOR OF. AZULEJERO+ AY. AZULEJERO+ 2/10 CABO
JOR OF. FIERRERO + AY. FIERRERO + 2/10 CABO
JOR OF. CARPINTERO O.N.+ AY. CARPINTERO O.N.+ 2/10 CABO
JOR OF. IMPERMEABILIZADOR+ AY. IMPERMEABILIZADOR+ 2/10 CABO
JOR 2 OF. ALBAÑIL+ 2 AY. ALBAÑIL+ 4/10 CABO
JOR 2 OF. ALBAÑIL + 4 AY. ALBAÑIL+ 6/10 CABO
JOR OF. TIROLERO+ AY. TIROLERO+ 2/10 CABO
JOR OP. RETROEXCAVADORA
JOR OP. CAMION DE VOLTEO
JOR OF. CARPINTERO + AY. CARPINTERO
COSTO UNITARIO

$542.99
$765.43
$448.26
$741.32
$719.18
$730.26
$687.54
$612.28
$632.14
$639.00
$588.59
$1,085.98
$1,530.85
$687.54
396.9785965832
$396.98
$599.66
CLAVE C-100 CONCEPTO CONCRETO F'C= 100 KG/CM² UN
MATERIAL
CLAVE CONCEPTO UNIDAD CANTIDAD P.U
CEMENTO bto 5.2 $177.00
ARENA m³ 0.5 $330.00
GRAVA m³ 0.68 $330.00
AGUA m³ 0.195 $10.00
TOTAL

M.O
CLAVE CONCEPTO UNIDAD CANTIDAD S.R
CUA-12 CUAD. DE COLADORES 12 JOR 0.5 $1,085.98

MAQ.
CLAVE CONCEPTO UNIDAD CANTIDAD C.H
REVOLVEDORA 1 SACO C.H 0.5 $250.00

COSTO DIRECTO

CLAVE C-150 CONCEPTO CONCRETO F'C= 150 KG/CM² UN

CLAVE CONCEPTO UNIDAD CANTIDAD P.U


CEMENTO bto 6.46 $177.00
ARENA m³ 0.48 $330.00
GRAVA m³ 0.67 $330.00
AGUA m³ 0.21 $10.00
TOTAL

M.O
CLAVE CONCEPTO UNIDAD CANTIDAD S.R
CUA-12 CUAD. DE COLADORES 12 JOR 0.5 $1,085.98

MAQ.
CLAVE CONCEPTO UNIDAD CANTIDAD C.H
REVOLVEDORA 1 SACO C.H 0.5 $250.00

COSTO DIRECTO
CLAVE C-200 CONCEPTO CONCRETO F'C= 200KG/CM²(LOSA) UN
MATERIAL
CLAVE CONCEPTO UNIDAD CANTIDAD P.U
CEMENTO bto 7.08 $185.00
ARENA m³ 0.48 $330.00
GRAVA m³ 0.67 $330.00
AGUA m³ 0.23 $10.00
TOTAL

M.O
CLAVE CONCEPTO UNIDAD CANTIDAD S.R
CUA-13 CUAD. DE COLADORES 13 JOR 0.5 $1,530.85

MAQ.
CLAVE CONCEPTO UNIDAD CANTIDAD C.H
REVOLVEDORA 1 SACO C.H 0.5 $250.00

COSTO DIRECTO

CLAVE C-200 CONCEPTO CONCRETO F'C= 200KG/CM²(CIMENTACION) UN


MATERIAL
CLAVE CONCEPTO UNIDAD CANTIDAD P.U
CEMENTO bto 7.08 $177.00
ARENA m³ 0.48 $330.00
GRAVA m³ 0.67 $330.00
AGUA m³ 0.23 $10.00
TOTAL

M.O
CLAVE CONCEPTO UNIDAD CANTIDAD S.R
CUA-12 CUAD. DE COLADORES 12 JOR 0.5 $1,085.98

MAQ.
CLAVE CONCEPTO UNIDAD CANTIDAD C.H
REVOLVEDORA 1 SACO C.H 0.5 $250.00
COSTO DIRECTO

3 CONCRETOS: 200(CIMENTACION),200 (LOSA),150,100
IMPORTE MORTEROS: 1:3,1:5,1:6
$920.40
$165.00
$224.40
$1.95
$1,311.75 precio revolvedora 250

TABLA DE DOSIFICACION DE CONCRETO - CANTIDADES POR m3 DEL CONCRETO


IMPORTE RESISTENCIA F'C
$542.99 kg/cm2
100
150
200
IMPORTE 250
$125.00 300

$1,979.74

IMPORTE
$1,143.42
$158.40
$221.10
$2.10
$1,525.02

IMPORTE
$542.99

IMPORTE
$125.00

$2,193.01

IMPORTE
$1,309.80
$158.40
$221.10
$2.30
$1,691.60

IMPORTE
$765.43

IMPORTE
$125.00

$2,582.03

IMPORTE
$1,253.16
$158.40
$221.10
$2.30
$1,634.96

IMPORTE
$542.99

IMPORTE
$125.00
$2,302.95
CLAVE MO-1:3 CONCEPTO
CUAD. DE COLADORES 14 = 2 OF + 3 AY MATERIAL
2 OF.= $196.58 CLAVE CONCEPTO
5 AY.=$121.49 CEMENTO
S.R= 1000.61 ARENA
AGUA

m3 DEL CONCRETO
CEMENTO ARENA GRAVA AGUA
BULTOS 50KG m3 m3 m3 M.O
5.2 0.5 0.68 0.195 CLAVE CONCEPTO
6.46 0.48 0.67 0.21
7.08 0.48 0.67 0.23
7.82 0.47 0.65 0.215
9.34 0.465 0.64 0.21 MAQ.
CLAVE CONCEPTO

CLAVE MO-1:4 CONCEPTO


MATERIAL
CLAVE CONCEPTO
CEMENTO
ARENA
AGUA

M.O
CLAVE CONCEPTO

MAQ.
CLAVE CONCEPTO
CLAVE MO-1:5 CONCEPTO
MATERIAL
CLAVE CONCEPTO
CEMENTO
ARENA
AGUA

M.O
CLAVE CONCEPTO

MAQ.
CLAVE CONCEPTO

CLAVE MO-1:6 CONCEPTO


MATERIAL
CLAVE CONCEPTO
CEMENTO
ARENA
AGUA

M.O
CLAVE CONCEPTO

MAQ.
CLAVE CONCEPTO
MORTERO 1:3 UN m³

UNIDAD CANTIDAD P.U IMPORTE


bto 9 $177.00 $1,593.00
m³ 1.09 $330.00 $359.70
m³ 0.185 $10.00 $1.85

TOTAL $1,954.55 TABLA DE DOSIFICACION DEL MORTERO - CANTID


MEZCLA

1:2
UNIDAD CANTIDAD S.R IMPORTE 1:3
1:4
1:5
1:6
1:7
UNIDAD CANTIDAD C.H IMPORTE

COSTO DIRECTO $1,954.55

MORTERO 1:4 UN m³

UNIDAD CANTIDAD P.U IMPORTE


bto 7.3 $177.00 $1,292.10
m³ 1.16 $330.00 $382.80
m³ 0.17 $10.00 $1.70

TOTAL $1,676.60

UNIDAD CANTIDAD S.R IMPORTE

UNIDAD CANTIDAD C.H IMPORTE


COSTO DIRECTO $1,676.60

MORTERO 1:5 UN m³

UNIDAD CANTIDAD P.U IMPORTE


bto 6 $177.00 $1,062.00
m³ 1.18 $330.00 $389.40
m³ 0.15 $10.00 $1.50

TOTAL $1,452.90

UNIDAD CANTIDAD S.R IMPORTE

UNIDAD CANTIDAD C.H IMPORTE

COSTO DIRECTO $1,452.90

MORTERO 1:6 UN m³

UNIDAD CANTIDAD P.U IMPORTE


bto 5.3 $177.00 $938.10
m³ 1.2 $330.00 $396.00
m³ 0.14 $10.00 $1.40

TOTAL $1,335.50

UNIDAD CANTIDAD S.R IMPORTE


UNIDAD CANTIDAD C.H IMPORTE

COSTO DIRECTO $1,335.50


IFICACION DEL MORTERO - CANTIDADES POR m3 TABLA DE VARILLAS DE ACERO CORRUGADO
CEMENTO ARENA AGUA DESGINACION DIAMETRO(PULG) PESO (KG/M)

12.5 0.97 0.22 #2 1/4" 0.255


9 1.09 0.185 #3 3/8" 0.56
7.3 1.16 0.17 #4 1/2" 1
6 1.18 0.15 #5 5/8" 1.55
5.3 1.2 0.14 #6 3/4" 2.24
4.5 1.25 0.13 #8 1" 3.98
TABLA DE ALAMBRE DE ACERO
DESGINACION PESO (KG/M)
ALAMBRE QUEMADO 0.125
ELEMENTO: DALA DE CANTIDAD P.T. FACTOR DE CONTACTO CANTIDAD P.T./ML
CERRAMIENTO

DUELA DE CONTACTO
(8*1"*2*1m/3.657) 4.38 2 8.7503
SEPARADORES
(2*1"*2"*.4m/3.657) 0.4375 2 0.8750
YUGOS
(4*1"*2"*.5M/3.657) 0.82 2 1.6407

ELEMENTO: CASTILLO CANTIDAD P.T. FACTOR DE CONTACTO CANTIDAD P.T./ML

DUELA DE CONTACTO
(6*1"*2*1m/3.657) 3.28 2 6.5628
SEPARADORES
0.4375
(2*1"*2"*.4M/3.657) 2 0.8750
FACTOR DE DESPERDICIO CANTIDAD P.T./ML FACTOR DE USOS 5% CANTIDAD P.T./ML/USOS
2%

1.02 8.9253 0.05 0.4463

1.02 1.1146 0.05 0.0557

1.02 1.6735 0.05 0.0837

FACTOR DE DESPERDICIO CANTIDAD P.T./ML FACTOR DE USOS 5% CANTIDAD P.T./ML/USOS


2%

1.02 6.6940 0.05 0.3347

1.02 0.8925 0.05 0.0446


P.U. IMPORTE

$ 11.00 $ 4.91

$ 11.00 $ 0.61

$ 11.00 $ 0.92
TOTAL $ 6.44

P.U. IMPORTE

$ 11.00 $ 3.68

$ 10.78 $ 0.48
TOTAL $ 4.16
PRESUPUESTO CASA HABITACION:
CLAVE CONCEPTO UNIDAD CANTIDAD P.U. IMPORTE
P-00 PREELIMINARES

LIMPIEZA TRAZO Y NIVELACION DE TERRENO DE


20X7 M. CON CINTA Y MANGUERA INCLUYE
MATERIALES MENORES, ESTABLECIENDO
P-01 REFERENCIAS (MOJONERAS, COTAS DE NIVEL m² 140 $46.97 $6,575.14
CON PINTURA),LIMPIEZA DEL ÁREA, RETIRO DE
BASURA, HERRAMIENTA, EQUIPO Y MANO DE
OBRA.

DESPALME DE TERRENO NATURAL EN 20 CM DE


ESPESOR CON MAQUINARIA. INCLUYE: RETIRO
DE CAPA VEGETAL DE 20 CM. DE ESPESOR
P-02 PROMEDIO, DESHIERBE, M. DE O., HERRAMIENTA m³ 36.4 $29.54 $1,075.35
Y EQ., ACARREO AL LUGAR DE CARGA DEL
CAMIÓN, INCLUYE ABUNDAMIENTO.

RETIRO DE MATERIAL PRODUCTO DE LIMPIEZA Y


DESPALME DEL TERRENO. CON
RETROEXCAVADORA Y CAMION DE VOLTEO.
P-03 INCLUYE: CARGA, DESCARGA, ACARREOS, m³ 43.4 $114.99 $4,990.51
MAQUINARIA, M.O, HERRAMIENTA, EQUIPO Y
TODO LO NECESARIO PARA SU CORRECTA
EJECUCION.

SUBTOTAL $12,641.00
16% IVA% $14,663.56
TOTAL $14,663.56

CLAVE CONCEPTO UNIDAD CANTIDAD P.U. IMPORTE


C-00 CIMENTACION
EXCAVACION PARA CONTRATRABES DE LOSA DE
CIMENTACION INCLUYE: PERFILADO, LIMPIEZA Y
C-01 RETIRO DE MATERIAL SOBRANTE FUERA DE LA m³ 2.62 $198.89 $521.08
OBRA.

MEMBRANA PLÁSTICA CALIBRE 300, COLOCADA


C-02 ENTRE LA PLATAFORMA Y LOSA DE m² 115.8875 $21.54 $2,496.55
CIMENTACIÓN. PUOT.

CONTRATRABES DE 20X20Cm, CONCRETO F´C=


200 KG/CM2 H. EN O. CON REVOLVEDORA,
REFUERZO DE 4vs. DE 3/8" Y ESTRIBOS DE 1/4"
C-03 @ 25 cms. INCLUYE: MATERIAL, M. DE O., mL 65.5 $456.57 $29,905.65
CIMBRA Y DESCIMBRA, COLADO Y CURADO,
HERRAM., EQ., ACARREOS Y TODO LO NECESARIO
PARA SU EJECUCIÓN.
SUMINISTRO Y CONSTRUCCIÓN DE FIRME EN
LOSA DE CIMENTACIONDE CONCRETO
F'c=200kg/cm2. ESPESOR 12 CM. ARMADO CON
C-04 V 3/8" @ 20 CM S.T Y @25 CM. S.L. INCLUYE: m² 68.7725 $523.45 $35,999.06
MATERIAL, M. DE O., HERRAMIENTA, EQUIPO,
COLADO, VIBRADO Y CURADO, HERRAMIENTA,
EQUIPO, CIMBRADO Y DESCIMBRADO.

SUBTOTAL $68,922.34
IVA% $79,949.91
TOTAL $79,949.91

CLAVE CONCEPTO UNIDAD CANTIDAD P.U. IMPORTE


AL-00 ALBAÑILERIA
MURO DE BLOCK DE CONCRETO DE 15x20x40
CM, ASENTADO CON MORTERO CEMENTO-
AL-01 ARENA PROP.1:4 EN PESO, INCLUYE: TODO LO m² 120.536 $189.80 $22,877.94
NECESARIO PARA SU EJECUCION, MATERIALES,
MANO DE OBRA, EQUIPO Y HERRAMIENTA.

SUM Y COLOC. DE CASTILLO DE CONCRETO CON


SECCIÓN TRANSVERSAL DE 15x15cms. DE
CONCRETO F'c=150kg/cm2 H. EN O. CON
AL-02 REVOLVEDORA, REFUERZO DE 4vs. DE 3/8" Y mL 57.12 $297.19 $16,975.32
ESTRIBOS DE 1/4" @ 30cms INCL.: CIMBRADO Y
DESCIMBRADO, COLADO, MATL., M. DE O.,
HERRAM., EQ., ACARREOS.

SUM Y COLOC DE CERRAMIENTO CON SECCIÓN


TRANSVERSAL DE 15x20 cms. DE CONCRETO
F'c=150kg/cm2 H. EN O. CON REVOLVEDORA,
AL-03 REFUERZO DE 4vs. DE 3/8" Y ESTRIBOS DE 1/4" mL 53.4 $291.88 $15,586.61
@ 20 cms., INCL.: MATL., M. DE O., CIMBRA Y
DESCIMBRA, COLADO Y CURADO, HERRAM., EQ.,
ACARREOS.

SUM. Y FAB. DE LOSA DE AZOTEA ESPESOR 15


CM. ALIGERADA DE CONCRETO F'c=200kg/cm2 H.
EN O. CON REVOLVEDORA CONSIDERANDO
ARMADO EN NERVADURAS SEGÚN CALCULO,
AL-04 INCL.: MATERIAL, MANO DE OBRA, m² 68.7725 $567.97 $39,060.71
HERRAMIENTA, EQUIPO, ACARREOS, ARMADO,
COLADO, VIBRADO,CURADO, CIMBRA Y
DESCIMBRA.

SUM. Y FAB. DE MARQUESINA DE 30 CM. DE


CONCRETO F'c=200kg/cm2 H. EN O. CON
AL-05 REVOLVEDORA. INCL.: TODO LO NECESARIOPARA m² 7.515 $567.97 $4,268.29
SU CORRECTA EJECUCION.
SUM. Y CONSTRUCCIÓN DE PRETIL DE BLOCK DE
CONCRETO DE 10x20x40cms. ASENTADO CON
MORTERO CEM-ARENA 1:4 EN LOSA DE AZOTEA
AL-06 A CUALQUIER NIVEL CON UNA ALTURA VARIABLE m² 15.89 $167.76 $2,665.70
INCLUYE: MATERIALES, M DE O, HERRAMIENTA,
EQUIPO, ACARREOS, ANDAMIOS, PLOMEO Y
NIVELADO Y DESPERDICIOS.

ENTORTADO EN AZOTEA DE 4 CM DE ESPESOR


CON MORTERO CEMENTO-ARENA 1:4. INCLUYE:
MATERIALES, MANO DE OBRA, ACARREOS,
AL-07 PREPARACIÓN DE LA SUPERFICIE Y TODO LO m² 72.4375 $92.17 $6,676.69
NECESARIO PARA LA CORRECTA EJECUCIÓN.
(PUOT)

CHAFLÁN A BASE DE MORTERO CEMENTO-


ARENA 1:4 DE 10 CM DE ESPESOR EN EL
PERIMETRO DE LA LOSA Y REMATE DEL PRETIL.
INCLUYE: MATERIALES, MANO DE OBRA,
AL-08 ACARREOS, ELEVACIONES, PREPARACIÓN DE LA mL 37.8 $208.68 $7,887.96
SUPERFICIE, LIMPIEZA, HERRAMIENTA, EQUIPO Y
TODO LO NECESARIO PARA LA CORRECTA
EJECUCIÓN. (PUOT)

SUM. Y FABRIC. DE BANQUETA ESPESOR 8 CMS.


DE CONCRETO F'c=150kg/cm2 HECHO EN OBRA
CON REVOLVEDORA Y REFUERZO CON MALLA
ELECTROSOLDADA 6-6/10-10, RALLADO A CADA
AL-09 METRO CON JUNTAS DE TEMPERATURA A CADA m² 14.815 $252.63 $3,742.77
6m. ACABADO ESCOBILLADO, ESQUINAS CON
VOLTEADOR, INCL.: MATERIAL, MANO DE OBRA,
HERRAMIENTA, EQUIPO, ACARREOS, CIMBRA,
DESCIMBRA, CURADO.

SUM Y FAB. DE REGISTRO SANITARIO DE


60x40x60cm. (INTERIOR) DE BLOCK DE
CONCRETO DE 15X20X40 CMS CM. CURADO A
VAPOR, ASENTADO CON MORTERO CEM-ARENA
1:5, CONCRETO F'c=200kg/cm2 TAPA DE
AL-10 CONCRETO CON ANGULO DE 1" Y ANGULO EN EL PZA 3 $1,838.58 $5,515.73
REGISTRO PARA RECIBIR TAPA, PISO 8CM.
ESPESOR, ACABADO CEMENTO PULIDO EN
INTERIOR, INCL.: MATERIALES, MANO DE OBRA,
HERRAMIENTA, EQ., ARMADO, CIMBRA,
DESCIMBRA, EXCAVACIÓN.

SUBTOTAL $125,257.71
IVA% $145,298.95
TOTAL $145,298.95

CLAVE CONCEPTO UNIDAD CANTIDAD P.U. IMPORTE


IHS-00 INSTALACION HIDRAULICA Y SANITARIA
INSTALACION HIDRAULICA INCLUYE: TENDIDO EN
CIMENTACION, CUADRO DE MEDIDOR Y LLAVES
DE EMPOTRAR. TODO LO NECESARIO PARA SU
IHS-01 EJECUCION (MANO DE OBRA, MATERIALES, LOTE 1 $7,671.99 $7,671.99
EQUIPO, HERRAMIENTA Y PRUEBAS) SEGÚN
PROYECTO. P.U.O.T.

INSTALACION SANITARIA INCLUYE TENDIDO EN


VIVIENDA Y DRENAJE EXTERIOR, TODO LO
IHS-02 NECESARIO PARA SU EJECUCION (MANO DE PZA 1 $6,284.57 $6,284.57
OBRA, MATERIALES, EQUIPO, HERRAMIENTA, Y
PRUEBAS) SEGÚN PROYECTO P.U.O.T.

SUMINISTRO E INSTALACION DE REGADERA,


INCLUYE LLAVES, MANERALES, CHAPETONES,
IHS-03 CARGA, ACARREO DE MATERIALES DENTRO Y PZA 1 $2,310.14 $2,310.14
FUERA DE LA OBRA Y TODO LO NECESARIO PARA
SU CORRECTA INSTALACION

SUM. Y COLOC. DE WC Y LAVABO PARA BAÑO,


INCLUYE HERRAJES DE CONEXIÓN, JUNTAS DE
SILICON, ASIENTO, PRUEBA, LIMPIEZA, CARGA Y
IHS-04 ACARREO DENTRO Y FUERA DE LA OBRA, MANO PZA 1 $3,758.03 $3,758.03
DE OBRA Y TODO MATERIAL NECESARIO PARA SU
CORRECTA INSTALACION

SUMINISTRO Y COLOCACION DE TINACO DE


POLIETILENO DE 450 LITROS DE COLOR NEGRO,
INCLUYE TAPA ROSCADA, VALVULA DE GLOBO
IHS-05 ROSCADA (LLAVE DE PASO) VARILLA FLOTADOR, PZA 1 $2,725.45 $2,725.45
LIMPIEZA, ELABORACION DE BASE, MANO DE
OBRA, HERRAMIENTA Y TODO LO NECESARIO
PARA SU CORRECTA INSTALACION

SUMINISTRO Y COLOCACION DE TARJA PARA


COCINA, INCLUYE LLAVES,CESPOL DE PLASTICO
IHS-06 RIGIDO, TUBERIAS, CODOS, NIPLES, MANO DE PZA 1 $1,270.67 $1,270.67
OBRA Y TODO LO NECESARIO PARA SU CORRECTA
INSTALACION

SUBTOTAL $24,020.87
IVA% $27,864.21
TOTAL $27,864.21

CLAVE CONCEPTO UNIDAD CANTIDAD P.U. IMPORTE


IE-00 INSTALACION ELECTRICA
SUMINISTRO E INSTALACION DE POLIDUCTO
1/2". INCLUYE MANO DE OBRA, HERRAMIENTA Y
IE-01 TODO LO NECESARIO PARA SU CORRECTA ML 86.55 $54.86 $4,748.26
EJECUCION.

SUMINISTRO E INSTALACION DE CABLE THW #12.


INCLUYE MANO DE OBRA, HERRAMIENTA Y
IE-02 TODO LO NECESARIO PARA SU CORRECTA ML 86.55 $60.30 $5,219.01
EJECUCION.
SUMINISTRO E INSTALACION DE CABLE THW #14.
INCLUYE MANO DE OBRA, HERRAMIENTA Y
IE-03 TODO LO NECESARIO PARA SU CORRECTA ML 86.55 $57.51 $4,977.71
EJECUCION.

INSTALACION DE PASTILLAS
TERMOMAGNETICAS, INCLUYE MANO DE OBRA,
IE-04 HERRAMIENTA Y TODO LO NECESARIO PARA SU PZA 1 $667.57 $667.57
CORRECTA INSTALACION

SUMINISTRO Y COLOCACION DE SALIDA PARA


LUMINARIA. INCLUYE MANO DE OBRA,
IE-05 HERRAMIENTA Y TODO LO NECESARIO PARA SU SALIDA 12 $89.10 $1,069.16
CORRECTA INSTALACION

SUMINISTRO Y COLOCACION DE SALIDA PARA


APAGADOR Y CONTACTO SENCILLO. INCLUYE
IE-06 MANO DE OBRA, HERRAMIENTA Y TODO LO SALIDA 2 $135.98 $271.96
NECESARIO PARA SU CORRECTA INSTALACION

SUMINISTRO Y COLOCACION DE SALIDA PARA


APAGADOR DOBLE Y CONTACTO SENCILLO.
IE-07 INCLUYE MANO DE OBRA, HERRAMIENTA Y SALIDA 5 $160.87 $804.37
TODO LO NECESARIO PARA SU CORRECTA
INSTALACION

SUMINISTRO Y COLOCACION DE SALIDA PARA


CONTACTO DOBLE INCLUYE MANO DE OBRA,
IE-08 HERRAMIENTA Y TODO LO NECESARIO PARA SU SALIDA 1 $118.56 $118.56
CORRECTA INSTALACION

SUMINISTRO Y COLOCACION DE ACOMETIDAS


ELECTRICAS DE 110 VOLTS. INCLUYE: CABLE THW
No. 8, INTECONEXION SUBTERRANEA, VARILLA
IE-09 DE TIERRA CONECTOR Y TODO LO NECESARIO PZA 1 $951.00 $951.00
PARA SU EJECUCION (MANO DE OBRA,
MATERIALES, EQUIPO, CIMBRA Y HERRAMIENTA)
P.U.O.T.

INTERRUPTOR DE SEGURIDAD 3 POLOS 30 A.


IE-10 INCLUYE:RANURA, COLOCACION EN MURO Y PZA 1 $412.86 $412.86
TODO LO NECESARIO PARA SU COLOCACION.

CENTRO DE CARGA TIPO QO2 CON 4 UNIDADES


DE 1X20 AMPERS, RANURA, COLOCACION EN
IE-11 MURO Y TODO LO NECESARIO PARA SU PZA 2 $432.78 $865.55
COLOCACION.
SUBTOTAL $20,106.03
IVA% $23,323.00
TOTAL $23,323.00

CLAVE CONCEPTO UNIDAD CANTIDAD P.U. IMPORTE


IG-00 INSTALACION DE GAS
INSTALACION DE GAS INCLUYE TODO LO
NECESARIO PARA SU EJECUCION: MANO DE
IG-01 OBRA, MATERIALES, EQUIPO, HERRAMIENTA. lote 1 $6,045.37 $6,045.37
SEGÚN PROYECTO. P.U.O.T.
SUMINISTRO Y COLOCACION DE BOILER PARA 7
IG-02 LTS, INCLUYE BASE, MANO DE OBRA Y TODO LO pza 1 $3,150.42 $3,150.42
NECESARIO PARA SU INSTALACION.
SUBTOTAL $9,195.79
IVA% $10,667.11
TOTAL $10,667.11

CLAVE CONCEPTO UNIDAD CANTIDAD P.U. IMPORTE


AC-00 ACABADOS
APLANADO CON ESTUCO BLANCO LISO SOBRE
MURO EXTERIOR E INTERIOR DEL BAÑO.INCLUYE
FILETES, BOTAGUAS Y RINCONES, TODO LO
AC-01 NECESARIO PARA SU EJECUCION (MANO DE m² 129.57975 $98.76 $12,797.42
OBRA, MATERIALES, EQUIPO, CIMBRA Y
HERRAMIENTA)

APLANADO CON ESTUCO BLANCO LISO EN


CIELOS EXTERIORES E INTERIOR DEL BAÑO
ESPESOR PROMEDIO DE 2 CM.INCLUYE FILETES,
AC-02 BOTAGUAS Y RINCONES, TODO LO NECESARIO m² 45.5 $98.76 $4,493.62
PARA SU EJECUCION (MANO DE OBRA,
MATERIALES, EQUIPO, CIMBRA Y
HERRAMIENTA.)

APLANADO DE YESO MUESTREADO SOBRE


MUROS INTERIORES A CUALQUIER NIVEL, A BASE
DE YESO-AGUA, CON ESPESOR PROMEDIO DE
AC-03 3cm INCL.: FILETES EN PUERTAS, VENTANAS, m² 151.9905 $76.94 $11,693.73
NIVEL Y ESCUADRA, MATLS, M DE O., HERRAM,
EQ, ANDAMIOS, RESANES.

APLANADO DE TIROL SOBRE MUROS INTERIORES


A CUALQUIER NIVEL, CON ESPESOR PROMEDIO
AC-04 DE 3cm INCL.: FILETES EN PUERTAS, VENTANAS, m² 151.9905 $57.05 $8,670.99
NIVEL Y ESCUADRA, MATLS, M DE O., HERRAM,
EQ, ANDAMIOS, RESANES.

APLANADO DE YESO MUESTREADO SOBRE


PLAFON A CUALQUIER NIVEL, A BASE DE YESO-
AGUA, CON UN ESP. PROM. DE 3cm INCL.:
AC-05 FILETES EN PUERTAS, VENTANAS, REMATES, m² 52.185 $85.00 $4,435.62
NIVEL Y ESCUADRA, MATLS, M DE O., HERRAM,
EQ, PREPARACIÓN , ANDAMIOS.

APLANADO DE TIROL SOBRE PLAFON A


CUALQUIER NIVEL, CON UN ESP. PROM. DE 3cm
AC-06 INCL.: FILETES EN PUERTAS, VENTANAS, m² 52.185 $82.04 $4,281.03
REMATES, NIVEL Y ESCUADRA, MATLS, M DE O.,
HERRAM, EQ, PREPARACIÓN , ANDAMIOS.

PINTURA EN EXTERIORES, A DOS MANOS DE


AC-07 DIFERENTES COLORES SEGUN PROYECTO m² 150.42975 $27.36 $4,115.99
ARQUITECTONICO. PUOT.
PINTURA EN INTERIORES, A DOS MANOS DE
AC-08 DIFERENTES COLORES SEGUN PROYECTO m² 204.1755 $27.36 $5,586.56
ARQUITECTONICO. PUOT.
SUM. Y COLOC. DE IMPERMEABILIZACIÓN EN
AZOTEA INCL. VUELTAS EN PRETIL Y RECEPCIÓN
AC-09 DE COLADERAS, MATERIALES, M. DE O., m² 76.2175 $144.85 $11,040.39
HERRAM., EQ., LIMPIEZA.

SUM. Y COLOC. DE PIEDRA LAJA EN FACHADA


AC-10 PRINCIPAL. INCL. MATERIALES, M. DE O., m² 7.9032 $888.60 $7,022.78
HERRAMIENTAS,EQ.

CONSTRUCCION DE SARDINEL, DE 10x6 CM. DE


SECCION TRANSVERSAL EN AREA DE REGADERA.
INCLUYE CONCRETO HECHO EN OBRA,
AC-11 REVESTIMIENTO DE LOSETA CERAMICA mL 1.85 $73.24 $135.49
ANTIDERRAPANTE Y TODO LO NECESARIO PARA
SU CORRRECTA EJECUCION.

SUBTOTAL $74,273.63
IVA% $86,157.42
TOTAL $86,157.42

CLAVE CONCEPTO UNIDAD CANTIDAD P.U. IMPORTE


VA-00 VITROPISOS Y AZULEJOS

SUM. Y COLOC. DE VITROPISO MCA. VITROMEX,


MOD. CARIBE DE 1A. DE 33X33 CM. ASENTADO
VA-01 CON ADHESIVO CREST, CON BOQUILLA DE 3MM m² 52.1625 $234.07 $12,209.92
MCA BOQUICREST INCL.: MATL., M. DE O.,
HERRAM., EQ,CORTES, DESPERDICIOS, LIMPIEZA.

SUM. Y COLOC. DE ZOCLO DE 10 CM. DE ALTURA


CON PISO MCA. VITROMEX, MOD. CARIBE DE 1A.
DE 33X33 CM ASENTADO CON ADHESIVO CREST Y
VA-02 COLOCADO CON BOQUILLA DE 3MM MCA mL 54.7 $99.04 $5,417.41
BOQUICREST. INCL.: MATL., M. DE O., HERRAM.,
EQ, CORTES, DESPERDICIOS, LIMPIEZA.

COLOCACIÓN DE PISO ANTIDERRAPANTE 20 X 20


CM EN ÁREAS HÚMEDAS CON BOQUILLA ANTI-
HONGOS, COLOCADO CON PEGA-AZULEJO
VA-03 INCLUYE TODO LO NECESARIO PARA SU m² 5.8145 $282.89 $1,644.89
EJECUCION (MANO DE OBRA, MATERIALES,
EQUIPO Y HERRAMIENTA).

COLOCACIÓN DE AZULEJO 20 X 30 CM EN ÁREAS


HÚMEDAS CON BOQUILLA ANTI-HONGOS,
VA-04 COLOCADO CON PEGA-AZULEJO INCLUYE TODO m² 23.221 $281.56 $6,538.18
LO NECESARIO PARA SU EJECUCION (MANO DE
OBRA, MATERIALES, EQUIPO Y HERRAMIENTA).

COLOCACION DE CENEFA DE 20x10 CM.


COLOCADO CON PEGA-AZULEJO.INCLUYE TODO
VA-05 LO NECESARIO PARA SU EJECUCION (MANO DE mL 8.65 $185.57 $1,605.20
OBRA, MATERIALES, EQUIPO Y HERRAMIENTA).

SUBTOTAL $27,415.60
IVA% $31,802.10
TOTAL $31,802.10

CLAVE CONCEPTO UNIDAD CANTIDAD P.U. IMPORTE


HC-00 HERRERIA, CANCELERIA Y CARPINTERIA

SUMIN. Y COLOC. DE VENTANA DE ALUMINO


NATURAL DE 1 1/2" . DE 1x1.20 M. CON VIDRIO
DE 3 MM. DE ESPESOR. INCLUYE MATERIALES,
HC-01 SELLADOR CON SILICON, TORNILLOS, TAQUETES, PZA 1 $1,479.98 $1,479.98
EQUIPO, HERRAMIENTE Y TODO LO NECESARIO
PARA SU CORRECTA EJECUCION, PUOT

SUMIN. Y COLOC. DE VENTANA DE ALUMINO


NATURAL DE 1 1/2" . DE 1x1.50 M. CON VIDRIO
DE 3 MM. DE ESPESOR. INCLUYE MATERIALES,
HC-02 SELLADOR CON SILICON, TORNILLOS, TAQUETES, PZA 4 $1,611.58 $6,446.33
EQUIPO, HERRAMIENTE Y TODO LO NECESARIO
PARA SU CORRECTA EJECUCION, PUOT.

SUMIN. Y COLOC. DE MARCO GALVANIZADO Y


PUERTA TIPO MULTIPANEL LISA DE 0.90 X 2.13,
INCLUYE SUJECCION DE MARCO A BASE DE
HC-03 ANCLAS, PINTURA DE MARCO, BISAGRAS, CHAPA PZA 1 $4,171.81 $4,171.81
DE PERILLA CON LLAVE MARCA YALE, Y TODO LO
NECESARIO PARA SU INSTALACION.

SUMIN. Y COLOC. DE MARCO DE ALUMINIO Y


PUERTA TIPO MULTIPANEL LISA DE 0.95 X 2.13,
INCLUYE SUJECCION DE MARCO A BASE DE
HC-04 ANCLAS, PINTURA DE MARCO, BISAGRAS, CHAPA PZA 1 $2,689.44 $2,689.44
DE PERILLA CON LLAVE MARCA YALE, Y TODO LO
NECESARIO PARA SU INSTALACION.

SUMIN. Y COLOC. DE MARCO GALVANIZADO Y


PUERTA TAMBOR CONDOR 90X 213, INCLUYE
SUJECCION DE MARCO A BASE DE ANCLAS,
HC-05 PINTURA DE MARCO, BISAGRAS, CHAPA DE PZA 3 $2,130.60 $6,391.79
PERILLA CON LLAVE MARCA YALE, Y TODO LO
NECESARIO PARA SU INSTALACION.

SUBTOTAL $21,179.35
IVA% $24,568.04
TOTAL $24,568.04

COSTO TOTAL DE OBRA


SUBTOTAL $444,294.29
IVA% $515,381.38
TOTAL $515,381.38

$5,411.13
CLAVE: AL-05 CONCEPTO
LOSA ALIGERADA 10 CM DE ESPESOR UN
MATERIAL
CLAVE CONCEPTO UNIDAD CANTIDAD P.U
CONCRETO F'C= 200 KG/CM² M³ 6.4948 $2,582.03
CASETON 10X50X60 CM. PZA 171 $20.16
MALLA ELECTROSOLDADA 6-6/10-10 M² 76.2375 $15.96
MALLA POLLERA M² 76.2375 $13.93
VAR 3/8 KG 421.744212 $16.52
ALAMBRON KG 129.5843 $16.80
ALAM. QUEMADO KG 141.7151 $19.30

M.O
S.R
CLAVE CONCEPTO UNIDAD CANTIDAD
CUA-09 CUADRILLA 9 JOR 0.01667 $632.14
CUA-13 CUADRILLA 13 JOR 0.01667 $1,530.85

MAQ.
C.H
CLAVE CONCEPTO UNIDAD CANTIDAD
HERRAMIENTA MENOR % 3% $36.05
VIBRADOR P/ CONCRETO HORA 0.0833 $250.00

COSTO DIRECTO
12% C.I
10% U
1% F
.05% C.A

CALCULO DE ACERO
VARILLAS DE 3/8"
#NERVADURAS #PZAS LONGITUD PESO DESPERDICIO
10 4 6.45 0.558 1.03
5 4 12.75 0.558 1.03
4 4 10.75 0.558 1.03
2 4 3.45 0.558 1.03
1 4 3.15 0.558 1.03
1 4 2.15 0.558 1.03
ALAMBRON
LONGITUD #NERVADURAS TOTAL
6.45 10 64.5
12.75 5 63.75
10.75 4 43
3.45 2 6.9
3.15 1 3.15
2.15 1 2.15
183.45
917.25

PZAS LARGO PESO DESPERDICTOTAL


917.25 0.54 0.254 1.03 129.5843

ALAMBRE QUEMADO
PZAS LARGO PESO DESPERDICTOTAL
3669 0.3 0.125 1.03 141.7151
TOTAL DE LOSA=76.2375 M²

IMPORTE
$16,769.73
$3,447.36
$1,216.75
$1,061.99
$6,967.21
$2,177.02
$2,735.10
$34,375.16

IMPORTE

$10.54
$25.51
$36.05

IMPORTE

$1.0815
$20.8333
$21.9148

$34,407.61

TOTAL
148.28292
146.5587
98.85528
15.862824
7.241724
4.942764
421.744212
LICITACION No.: LO-928010997-N101-2017 FECHAS

DESCRIPCION: CONSTRUCCION DE CASA HABITACION


INICIO

RAZON SOCIAL DEL LICITANTE NOMBRE Y FIRMA DEL REPRESENTANTE LEGAL

ANALISIS, CALCULO E INTEGRACION DE LOS COSTOS INDIRECTOS

IMPORTES POR ADMINIST


CONCEPTO
CENTRAL
HONORARIOS, SUELDOS Y PRESTACIONES
1.- PERSONAL DIRECTIVO $35,000.00
2.- PERSONAL DIRECTIVO $35,000.00
3.- PERSONAL ADMINISTRATIVO $24,000.00
4.- CUOTA PATRONAL DE SEGURO SOCIAL Y DEL INFONAVIT $0.00
5.- PRESTACIONES QUE OBLIGA LA LEY FEDERAL DEL TRABAJO PARA LOS CONCEPTOS 1 $0.00
6.- PASAJES Y VIATICOS DE LOS CONCEPTOS 1 A 3 $0.00
7.- LOS QUE DERIVEN DE LA SUSCRIPCION DE CONTRATOS DE TRABAJO, PARA EL
PERSONAL DE LOS CONCEPTOS 1 A 3
SUBTOTALES $ = $94,000.00
DEPRECIACION, MANTENIMIENTO Y RENTAS
1.- EDIFICIOS Y LOCALES $5,000.00
2.- LOCALES DE MANTENIMIENTO Y GUARDA $3,000.00
3.- BODEGAS $0.00
4.- INSTALACIONES GENERALES $0.00
5.- EQUIPOS, MUEBLES Y ENSERES $0.00
6.- DEPRECIACION O RENTA Y OPERACIÓN DE VEHICULOS $0.00
7.- CAMPAMENTOS $0.00
SUBTOTALES $ = $8,000.00
SERVICIOS
1.- CONSULTORES, ASESORES, SERVICIOS Y LABORATORIOS $0.00
2.- ESTUDIOS E INVESTIGACIONES $0.00
SUBTOTALES $ = $0.00
FLETES Y ACARREOS
1.- DE CAMPAMENTOS $0.00
2.- DE EQUIPO DE CONSTRUCCION $0.00
3.- DE PLANTAS Y ELEMENTOS PARA INSTALACIONES $0.00
4.- DE MOBILIARIO $0.00
SUBTOTALES $ = $0.00
GASTOS DE OFICINA
1.- PAPELERIA Y UTILES DE ESCRITORIO $400.00
2.- CORREOS, FAX, TELEFONO, TELEGRAFOS, RADIO, ETC. $400.00
3.- EQUIPO DE COMPUTACION $400.00
4.- SITUACION DE FONDOS $0.00
5.- COPIAS Y DUPLICADOS $0.00
6.- LUZ, GAS Y OTROS CONSUMOS $1,500.00
7.- GASTOS DE LICITACION $0.00
SUBTOTALES $ = $2,700.00
CAPACITACION Y ADIESTRAMIENTO
SUBTOTALES $ = $0.00
SEGURIDAD E HIGIENE
SUBTOTALES $ = $0.00
SEGURO Y FINANZAS
1.- PRIMAS POR SEGUROS $0.00
2.- PRIMAS POR FIANZAS $0.00
SUBTOTALES $ = $0.00
TRABAJOS PREVIOS Y AUXILIARES
1.- CONSTRUCCION Y CONSERVACION DE CAMINOS DE ACCESO $0.00
2.- MONTAJES Y DESMANTELAMIENTO DE EQUIPO $0.00
3.- CONSTRUCCION DE INSTALACIONES GENERALES $0.00
- DE CAMPAMENTOS $0.00
- DE EQUIPOS DE CONSTRUCCION $0.00
- DE PLANTAS Y ELEMENTOS PARA INSTALACIONES $0.00
- DE ANUNCIO DE OBRA $0.00
- DE SEÑALAMIENTO DE PROTECCION DE OBRA $0.00
SUBTOTALES $ = $0.00

$104,700.00
COSTOS TOTALES DE INDIRECTOS $ =
$199,200.00
ANEXO AE4
TERMINO

HOJA:
DE:
EPRESENTANTE LEGAL

OS INDIRECTOS

IMPORTES POR ADMINISTRACION


CENTRAL OBRA

$35,000.00
$35,000.00 $19,000.00
$24,000.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00

$94,000.00 $19,000.00

$5,000.00 $0.00
$3,000.00 $3,500.00
$0.00 $3,500.00
$0.00 $3,500.00
$0.00 $3,500.00
$0.00 $4,000.00
$0.00 $0.00
$8,000.00 $18,000.00

$0.00 $0.00
$0.00 $0.00
$0.00 $0.00

$0.00
$0.00 $4,000.00
$0.00 $4,500.00
$0.00 $0.00
$0.00 $8,500.00

$400.00 $0.00
$400.00 $0.00
$400.00 $0.00
$0.00 $0.00
$0.00 $0.00
$1,500.00 $0.00
$0.00 $0.00
$2,700.00 $0.00

$0.00 $0.00

$0.00 $0.00

$0.00 $0.00
$0.00 $0.00
$0.00 $0.00

$0.00 $0.00
$0.00 $1,000.00
$0.00 $0.00
$0.00 $0.00
$0.00 $1,500.00
$0.00 $2,000.00
$0.00 $0.00
$0.00 $0.00
$0.00 $49,000.00

104,700.00
$94,500.00
$199,200.00
LICITACIÓN No.: LO-928010997-N101-2014 FECHAS
DESCRIPCIÓN: CONSTRUCCION DE CASA
HABITACION INICIO

RAZON SOCIAL DEL LICTANTE NOMBRE Y FIRMA DEL REP


CALCULO DEL FACTOR DE SALARIO REAL
1. Dias de percepcion pagados al año:
dias calendario de un periodo anual
dias de aguinaldo(art. 87 L.F.T.)
dias por prima vacacional(art. 80 L.F.T.)
TOTAL DE DIAS PAGADOS AL AÑO (TP)

2. Dias no trabajados al año


Domingos (Art. 69 L.F.T.)
Vacaciones (Art. 76 L.F.T.)
Descanso obligatorio (Art. 74 L.F.T.)
Dias por costumbre
Dias por condiciones climaticas extraordinarias
Dias por enfermedad
Total dias no laborados
DIAS EFECTIVOS LABORADOS (TI)
TI= (Dias Calendario de un Periodo anual) - (Dias no trabajados al año)

FACTOR SALARIO BASE COTIZACION IMSS (FSBCIMSS)


FSBCIMSS = (TP) / (Dias Calendario de un Periodo anual)

CATEGORIA Ps

Of. Albañil 0.329635713


Of. Fierrero 0.329635713
Of. Yesero 0.3159820624
Of. Tirolero 0.3159820624
Of. Plomero 0.3111111672
Of. Electricista 0.3101678022
Of. Pintor 0.3091594789
Of. Carpintero O. Negra 0.317354969
Of. Impermeabilizador 0.329635713
Of. Azulejero 0.2958068716
Of. Herrero 0.3091594789
Of. Carp. Ebanista y Plafonro 0.3069941171
Cabo 0.2948001343
Ay. Plomero 0.329635713
Ay. Albañil 0.3787548432
Ay. Carpintero O. Negra 0.348394165
Ay. Electricista 0.3247346805
Ay. Impermeabilizador 0.3500586464
Ay. Pintor 0.329635713
Ay. Azulejero 0.7922334847
Ay. Yesero 0.3318120924
Ay. Tirolero 0.3318120924
Ay. Fierrero 0.3787548432
Ay. Carp. Ebanista y Plafonero 0.348394165
Ay. Herrero 0.329635713
Peon 0.4454449391
Op. Retroexcavadora 0.3037909725
Op. Camion de volteo 0.3037909725
Op. Revolvedora 0.3201826726
Op. Vibrador p/ concreto 0.2501646365
ANEXO AT-10
FECHAS

TERMINO HOJA: DE:

NOMBRE Y FIRMA DEL REPRESENTANTE LEGAL

DIAS
365.25
15
1.5
381.75

DIAS
53
6
8
1
4
1
73
292.25

1.045174538

FACTOR DE SALARIO REAL FSR= Ps (TP/TI) + (TP/TI)

1.389701392
1.389701392
1.3754309441
1.3754309441
1.3703400084
1.3693540273
1.3683001535
1.3768658711
1.389701392
1.3543443483
1.3683001535
1.3660369725
1.3532921321
1.389701392
1.4410394562
1.4093072484
1.3845789576
1.411046922
1.389701392
1.8731968044
1.3919760884
1.3919760884
1.4410394562
1.4093072484
1.389701392
1.5107422464
1.3626891274
1.3626891274
1.3798213149
1.3066402464
LICITACION: LO-928010997-N101-2014 FECHAS
PLAZO DE EJECUCION DE LOS
TRABAJOS INICIO
DESCRIPCIÓN: CONSTRUCCION DE CASA
HABITACION . RAZON SOCIAL DEL LICITANTE NOMBRE Y FIRMA DEL REPRESENT

ANALISIS DEL FACTOR POR SEGURO SOCIAL E INFONAVIT PARA CADA CATEGORIA
CONCEPTO =AL MINL
Datos Obtenidos en el AT-10 1.04517454 PE 1.43%
Salario Min. de la zona 80.04 RDT 0.759
Salario Min. Cotizado 83.65577 PD 0.95%
Salario Min. DF 80.04 IV 2.38%
CEA 4.28%

VALORES FIJOS A
No. Categoria S. B SBC
PE % RDT %
1 Of. Albañil $196.58 $205.46 $2.06 $14.92
2 Of. Fierrero $196.58 $205.46 $2.06 $14.92
3 Of. Yesero $237.36 $248.08 $2.49 $18.02
4 Of. Tirolero $237.36 $248.08 $2.49 $18.02
5 Of. Plomero $256.33 $267.91 $2.69 $19.46
6 Of. Electricista $260.36 $272.12 $2.73 $19.76
7 Of. Pintor $264.81 $276.77 $2.78 $20.10
8 Of. Carpintero O. Negra $232.51 $243.01 $2.44 $17.65
9 Of. Impermeabilizador $196.58 $205.46 $2.06 $14.92
10 Of. Azulejero $342.28 $357.74 $3.59 $25.98
11 Of. Herrero $264.81 $276.77 $2.78 $20.10
12 Of. Carp. Ebanista y Plafonero $274.90 $287.32 $2.89 $20.86
13 Cabo $350.00 $365.81 $3.68 $26.57
14 Ay. Plomero $196.58 $205.46 $2.06 $14.92
15 Ay. Albañil $121.49 $126.98 $1.28 $9.22
16 Ay. Carpintero O. Negra $159.04 $166.22 $1.67 $12.07
17 Ay. Electricista $209.50 $218.96 $2.20 $15.90
18 Ay. Impermeabilizador $156.39 $163.45 $1.64 $11.87
19 Ay. Pintor $196.58 $205.46 $2.06 $14.92
20 Ay. Azulejero $28.82 $30.12 $0.30 $2.19
21 Ay. Yesero $191.34 $199.98 $2.01 $14.52
22 Ay. Tirolero $191.34 $199.98 $2.01 $14.52
23 Ay. Fierrero $121.49 $126.98 $1.28 $9.22
24 Ay. Carp. Ebanista y Plafonero $159.04 $166.22 $1.67 $12.07
25 Ay. Herrero $196.58 $205.46 $2.06 $14.92
26 Peon $80.00 $83.61 $0.84 $6.07
27 Op. Retroexcavadora $291.32 $304.48 $3.06 $22.11
28 Op. Camion de volteo $291.32 $304.48 $3.06 $22.11
29 Op. Revolvedora $223.12 $233.20 $2.34 $16.93
30 Op. Vibrador p/ concreto $223.12 $233.20 $2.34 $16.93
FECHAS
ANEXO AE
TERMINO 16
HOJA:
RE Y FIRMA DEL REPRESENTANTE LEGAL
DE:
A CADA CATEGORIA
>ALMINL
1.05%

0.70%
1.75%
3.15%

VALORES FIJOS APLICADOS AL (SBC) VALORES VAR. CONCEP. FIJOS APLICADOS


PD % IV % CEA % G 1.00% VC 20.40 % VA 1.50% INF 5.00 %
$1.38 $3.44 $6.19 $1.97 $16.33 $2.95 $10.27
$1.38 $3.44 $6.19 $1.97 $16.33 $2.95 $10.27
$1.66 $4.15 $7.48 $2.37 $16.33 $3.56 $12.40
$1.66 $4.15 $7.48 $2.37 $16.33 $3.56 $12.40
$1.79 $4.49 $8.07 $2.56 $16.33 $3.84 $13.40
$1.82 $4.56 $8.20 $2.60 $16.33 $3.91 $13.61
$1.85 $4.63 $8.34 $2.65 $16.33 $3.97 $13.84
$1.63 $4.07 $7.32 $2.33 $16.33 $3.49 $12.15
$1.38 $3.44 $6.19 $1.97 $16.33 $2.95 $10.27
$2.40 $5.99 $10.78 $3.42 $16.33 $5.13 $17.89
$1.85 $4.63 $8.34 $2.65 $16.33 $3.97 $13.84
$1.92 $4.81 $8.66 $2.75 $16.33 $4.12 $14.37
$2.45 $6.13 $11.03 $3.50 $16.33 $5.25 $18.29
$1.38 $3.44 $6.19 $1.97 $16.33 $2.95 $10.27
$0.85 $2.13 $3.83 $1.21 $16.33 $1.82 $6.35
$1.11 $2.78 $5.01 $1.59 $16.33 $2.39 $8.31
$1.47 $3.67 $6.60 $2.10 $16.33 $3.14 $10.95
$1.09 $2.74 $4.93 $1.56 $16.33 $2.35 $8.17
$1.38 $3.44 $6.19 $1.97 $16.33 $2.95 $10.27
$0.20 $0.50 $0.91 $0.29 $16.33 $0.43 $1.51
$1.34 $3.35 $6.03 $1.91 $16.33 $2.87 $10.00
$1.34 $3.35 $6.03 $1.91 $16.33 $2.87 $10.00
$0.85 $2.13 $3.83 $1.21 $16.33 $1.82 $6.35
$1.11 $2.78 $5.01 $1.59 $16.33 $2.39 $8.31
$1.38 $3.44 $6.19 $1.97 $16.33 $2.95 $10.27
$0.56 $1.40 $2.52 $0.80 $16.33 $1.20 $4.18
$2.04 $5.10 $9.18 $2.91 $16.33 $4.37 $15.22
$2.04 $5.10 $9.18 $2.91 $16.33 $4.37 $15.22
$1.56 $3.90 $7.03 $2.23 $16.33 $3.35 $11.66
$1.56 $3.90 $7.03 $2.23 $0.00 $3.35 $11.66
CONCEP. FIJOS APLICADOS AL (SBC)
Ʃ($) PS=Ʃ/SBC
RT 2.00% O 2.00%
$4.11 $4.11 $67.7271 0.32963571
$4.11 $4.11 $67.7271 0.32963571
$4.96 $4.96 $78.3897 0.31598206
$4.96 $4.96 $78.3897 0.31598206
$5.36 $5.36 $83.3497 0.31111117
$5.44 $5.44 $84.4034 0.3101678
$5.54 $5.54 $85.5669 0.30915948
$4.86 $4.86 $77.1216 0.31735497
$4.11 $4.11 $67.7271 0.32963571
$7.15 $7.15 $105.8226 0.29580687
$5.54 $5.54 $85.5669 0.30915948
$5.75 $5.75 $88.2051 0.30699412
$7.32 $7.32 $107.8412 0.29480013
$4.11 $4.11 $67.7271 0.32963571
$2.54 $2.54 $48.0936 0.37875484
$3.32 $3.32 $57.9117 0.34839416
$4.38 $4.38 $71.1052 0.32473468
$3.27 $3.27 $57.2188 0.35005865
$4.11 $4.11 $67.7271 0.32963571
$0.60 $0.60 $23.8636 0.79223348
$4.00 $4.00 $66.3570 0.33181209
$4.00 $4.00 $66.3570 0.33181209
$2.54 $2.54 $48.0936 0.37875484
$3.32 $3.32 $57.9117 0.34839416
$4.11 $4.11 $67.7271 0.32963571
$1.67 $1.67 $37.2454 0.44544494
$6.09 $6.09 $92.4984 0.30379097
$6.09 $6.09 $92.4984 0.30379097
$4.66 $4.66 $74.6664 0.32018267
$4.66 $4.66 $58.3382 0.25016464
LICITACIÓN No.: LO-928010997-N101-2014 FECHAS
INICIO TERMINO

DESCRIPCIÓN: CONSTRUCCION DE CASA


HABITACION
PLAZO DE EJECUCIÓN DE LOS TRABAJOS

TABULADOR DE SALARIOS BASE DE MANO DE OBRA POR JORNADA DIURNA DE 8 HRS. E INTEGRACION DE LOS SALARIOS
No PROGRESIVO DESCRIPCION SALARIO BASE POR JORNAL FACTOR SALARIO REAL
1 Of. Albañil $196.58 1.389701392
2 Of. Fierrero $196.58 1.389701392
3 Of. Yesero $237.36 1.3754309441
4 Of. Tirolero $237.36 1.3754309441
5 Of. Plomero $256.33 1.3703400084
6 Of. Electricista $260.36 1.3693540273
7 Of. Pintor $264.81 1.3683001535
8 Of. Carpintero O. Negra $232.51 1.3768658711
9 Of. Impermeabilizador $196.58 1.389701392
10 Of. Azulejero $342.28 1.3543443483
11 Of. Herrero $264.81 1.3683001535
12 Of. Carp. Ebanista y Plafonero $274.90 1.3660369725
13 Cabo $350.00 1.3532921321
14 Ay. Plomero $196.58 1.389701392
15 Ay. Albañil $121.49 1.4410394562
16 Ay. Carpintero O. Negra $159.04 1.4093072484
17 Ay. Electricista $209.50 1.3845789576
18 Ay. Impermeabilizador $156.39 1.411046922
19 Ay. Pintor $196.58 1.389701392
20 Ay. Azulejero $28.82 1.8731968044
21 Ay. Yesero $191.34 1.3919760884
22 Ay. Tirolero $191.34 1.3919760884
23 Ay. Fierrero $121.49 1.4410394562
24 Ay. Carp. Ebanista y Plafonero $159.04 1.4093072484
25 Ay. Herrero $196.58 1.389701392
26 Peon $80.00 1.5107422464
27 Op. Retroexcavadora $291.32 1.3626891274
28 Op. Camion de volteo $291.32 1.3626891274
29 Op. Revolvedora $223.12 1.3798213149
30 Op. Vibrador p/ concreto $223.12 1.3066402464
ANEXO AE 17

HOJA:

DE:

RACION DE LOS SALARIOS


SALARIO REAL
$273.19
$273.19
$326.47
$326.47
$351.26
$356.53
$362.34
$320.14
$273.19
$463.56
$362.34
$375.52
$473.65
$273.19
$175.07
$224.14
$290.07
$220.67
$273.19
$53.99
$266.34
$266.34
$175.07
$224.14
$273.19
$120.86
$396.98
$396.98
$307.87
$291.54
EQUIPO PRECIO DE RENTA
ANDAMIO $6 C/U $50 RENTA MINIMA
VIBRADOR(DE GASOLINA O ELECTRICO) $ 250.00
CORTADORA DE VARILLA NORMAL (HASTA 5$ 60.00
REVOLVEDORA $ 250.00
RETROEXCAVADORA $ 450.00 HORA
CAMION DE VOLTEO $ 600.00 VIAJE
oficial albañil $ 196.58
oficial fierrero $ 196.58
oficial electricista $ 260.36
oficial yesero $ 237.36
oficial tirolero $ 237.36
oficial impermeabilizador $ 196.58
oficial plomero $ 256.33
oficial carpintero ebanista y plafonero $ 274.90
oficial carpintero obra negra $ 232.51
oficial pintor $ 264.81
ayudante pintor $ 196.58
ayudante carpintero (dos categorias) $ 159.04
ayudante plomero $ 196.58
ayudante yesero $ 196.58
ayudante electricista $ 209.50
cabo $ 350.00
ayudante de albañil $ 121.49
ayudante fierrero $ 121.49
PEON PLOMERO $ 178.01
CABO $ 350.00
CLAVE CONCEPTO: MURO DE BLOCK UN
MATERIAL
CLAVE CONCEPTO UNIDAD CANTIDAD P.U
BLOCK 15x20x40 MTY. PZA 13 $8.50
MORTERO 1:3 m³ 0.00975 $1,954.55

TOTAL

M.O
CLAVE CONCEPTO UNIDAD CANTIDAD S.R
CUA-01 CUADRILLA 1 JOR 0.07692 $542.99

MAQ.
CLAVE CONCEPTO UNIDAD CANTIDAD C.H
HERR. MENOR % 3 $41.77

COSTO DIRECTO
12% C.I
10% U
1% F
.05% C.A

CLAVE CONCEPTO PRETIL UN


MATERIAL
CLAVE CONCEPTO UNIDAD CANTIDAD P.U
BLOCK 15x20x40 MTY. PZA 13 $8.50
MORTERO 1:3 m³ 0.00975 $1,954.55
CONCRETO F´C 100 KG/CM² m³ 0.078 $1,979.74

TOTAL

M.O
CLAVE CONCEPTO UNIDAD CANTIDAD S.R
CUA-01 CUADRILLA 1 JOR 0.10 $542.99
MAQ.
CLAVE CONCEPTO UNIDAD CANTIDAD C.H
HERR. MENOR % 3% $54.30

COSTO DIRECTO
12% C.I
10% U
1% F
.05% C.A

CLAVE CONCEPTO: FIRME F´C 150, 10 CM DE ESPESOR UN


MATERIAL
CLAVE CONCEPTO UNIDAD CANTIDAD P.U
CONCRETO F'C 150 KG/CM2 M3 0.103 $2,193.01
MALLA ELECTROSOLDADA 6-6/10-10 ROLLO 0.0103 $1,596.00
ALAMBRE QUEMADO*

TOTAL

M.O
CLAVE CONCEPTO UNIDAD CANTIDAD S.R
CUAD. ALBAÑILES JOR 0.0111 $1,628.97
CUAD. FIERREROS JOR 0.0050 $632.14

MAQ.
CLAVE CONCEPTO UNIDAD CANTIDAD C.H
HERR. MENOR % 3% $18.10

COSTO DIRECTO
12% C.I
10% U
1% F
.05% C.A

CLAVE CONCEPTO YESO UN


MATERIAL
CLAVE CONCEPTO UNIDAD CANTIDAD P.U
YESO BTO 0.2575 $90.00
TOTAL

M.O
CLAVE CONCEPTO UNIDAD CANTIDAD S.R
CUA-07 CUAD. YESERO JOR 0.0167 $687.54

MAQ.
CLAVE CONCEPTO UNIDAD CANTIDAD C.H
HERR. MENOR % 3% $11.46

COSTO DIRECTO
12% C.I
10% U
1% F
.05% C.A

CLAVE CONCEPTO PINTURA UN


MATERIAL
CLAVE CONCEPTO UNIDAD CANTIDAD P.U
PINTURA CUBETA 0.00736
SELLADOR CUBETA VER REND.

TOTAL

M.O
CLAVE CONCEPTO UNIDAD CANTIDAD S.R
$0.00

MAQ.
CLAVE CONCEPTO UNIDAD CANTIDAD C.H
HERR. MENOR % 3%

COSTO DIRECTO
12% C.I
10% U
1% F
.05% C.A

CLAVE CONCEPTO vitropiso UN


MATERIAL
CLAVE CONCEPTO UNIDAD CANTIDAD P.U
VITROPISO M2 1.0700
CREST BTO 0.343
JUNTA CAJA 0.00572
SEPARADORES PZA 0.00572
TOTAL

M.O
CLAVE CONCEPTO UNIDAD CANTIDAD S.R
CUAD. ALBAÑILES JOR 0.0167 $0.00

MAQ.
CLAVE CONCEPTO UNIDAD CANTIDAD C.H
HERR. MENOR % 3%

COSTO DIRECTO
12% C.I
10% U
1% F
.05% C.A

EL TOTAL DE COSTO DIRECTO SE DIVIDE ENTRE LOS M


CLAVE CONCEPTO LOSA ALIGERADA UN
MATERIAL
CLAVE CONCEPTO UNIDAD CANTIDAD P.U
CONCRETO F'C= m3 6.4948
CASETON 10 CM. PZA 171.000
MALLA ELECTROSOLDADA 6-6/10-10 ROLLO
MALLA POLLERA ROLLO
VAR 3/8 KG
ALAMBRON KG
ALAM. QUEMADO KG
TOTAL
M.O
CLAVE CONCEPTO UNIDAD CANTIDAD S.R
CUAD ALBAÑILES JOR
CUAD FIERREROS JOR

MAQ.
CLAVE CONCEPTO UNIDAD CANTIDAD C.H
HERR. MENOR % 3%
VIBRADOR PARA CONCRETO

COSTO DIRECTO
12% C.I
10% U
1% F
.05% C.A

CLAVE CONCEPTO CIMBRA P/DALA UN


MATERIAL
CLAVE CONCEPTO UNIDAD CANTIDAD P.U
SEPARADORES PT
DUELA DE CONTACTO PT
ESTACAS PT

TOTAL

M.O
CLAVE CONCEPTO UNIDAD CANTIDAD S.R

MAQ.
CLAVE CONCEPTO UNIDAD CANTIDAD C.H
HERR. MENOR % 3%

COSTO DIRECTO
12% C.I
10% U
1% F
.05% C.A
CLAVE CONCEPTO INST. HIDRAULICA UN
MATERIAL
CLAVE CONCEPTO UNIDAD CANTIDAD P.U

TOTAL

M.O
CLAVE CONCEPTO UNIDAD CANTIDAD S.R
CUAD. DE PLOMERO JOR DIAS QUE SE TARDE

MAQ.
CLAVE CONCEPTO UNIDAD CANTIDAD C.H
HERR. MENOR % 3% VALOR DE M.O

COSTO DIRECTO
12% C.I
10% U
1% F
.05% C.A

CLAVE CONCEPTO UN
MATERIAL
CLAVE CONCEPTO UNIDAD CANTIDAD P.U

TOTAL

M.O
CLAVE CONCEPTO UNIDAD CANTIDAD S.R
MAQ.
CLAVE CONCEPTO UNIDAD CANTIDAD C.H
HERR. MENOR % 3% 3%DE LA M.O.

COSTO DIRECTO
12% C.I
10% U
1% F
.05% C.A

CLAVE CONCEPTO UN
MATERIAL
CLAVE CONCEPTO UNIDAD CANTIDAD P.U

TOTAL

M.O
CLAVE CONCEPTO UNIDAD CANTIDAD S.R

MAQ.
CLAVE CONCEPTO UNIDAD CANTIDAD C.H
HERR. MENOR % 3%

COSTO DIRECTO
12% C.I
10% U
1% F
.05% C.A
costo y tiempo en la edificacion, suarez salazar buscar

m² CLAVE CONCEPTO: COLUMNA ALV


MATERIAL
IMPORTE CLAVE CONCEPTO UNIDAD CANTIDAD
$110.50 CONCRETO F'C 200 KG/CM2 M3 0.090125
$19.06 VAR. 3/8 KG 1.14948
VAR. 1/2 KG 4.10352
ALAMBRON 1/4 KG 1.491234
$129.56 ALAMBRE QUEMADO KG 0.7725

M.O
IMPORTE CLAVE CONCEPTO UNIDAD CANTIDAD
$41.77 CUA-02 CUADRILLA 2 JOR 0.16667
CUA-09 CUADRILLA 9 JOR 0.16667

MAQ.
IMPORTE CLAVE CONCEPTO UNIDAD CANTIDAD
$1.2531 HERR. MENOR % 3

$172.58
$193.29
$212.62
$214.74
$215.82

IMPORTE
$110.50
$19.06
$154.42

$283.98

IMPORTE
$54.30
IMPORTE
$1.6290

$339.90
$380.69
$418.76
$422.95
$423.16

IMPORTE
$225.88
$16.44 100

$242.32

IMPORTE
$18.10 90 M2
$3.16 200 M2

IMPORTE
$0.5430

$260.96
$292.28
$321.50
$324.72
$324.88

IMPORTE
$23.18
$0.00
$0.00

$23.18
36.75

IMPORTE
$11.46

IMPORTE
$0.3438

$34.98
$39.18
$43.09
$43.52
$43.55

M2

IMPORTE
#VALUE!

$0.00

#REF!

IMPORTE
$0.00

IMPORTE
$0.0000

#REF!
#REF!
#REF!
#REF!
#REF!

M2 ESTE ES IGUAL AL ZOCLO, AZULEJO, VITROPISO ANTIDERRAPANTE, CENEFA

IMPORTE
$0.00
PIEDRA LAJA: CREST, SELLADOR.
$0.00

#REF! PARA UNA VENTANA CUADRILLA DE ALUMINERO

IMPORTE
$0.00

IMPORTE
$0.0000

#REF!
#REF!
#REF!
#REF!
#REF!

DIRECTO SE DIVIDE ENTRE LOS M2 DE LOSA Y SALE UN M2


M2

IMPORTE Calculo de varillas 3/8"


$0.00 #NERVADURAS #PZAS LONGITUD PESO
10
$0.00

#REF!
IMPORTE
$0.00

IMPORTE
$0.0000

#REF!
#REF!
#REF!
#REF!
#REF!

ML

IMPORTE
$0.00

$0.00

#REF!

IMPORTE
$0.00

IMPORTE
$0.0000

#REF!
#REF!
#REF!
#REF!
#REF!
LOTE

IMPORTE
$0.00 TODO EN SALIDAS

$0.00

#REF!

IMPORTE
#VALUE!

IMPORTE
#VALUE!

#REF!
#REF!
#REF!
#REF!
#REF!

IMPORTE
$0.00

$0.00

#REF!

IMPORTE
$0.00

IMPORTE
#VALUE!

#REF!
#REF!
#REF!
#REF!
#REF!

IMPORTE
$0.00

$0.00

#REF!

IMPORTE
$0.00

IMPORTE
$0.0000

#REF!
#REF!
#REF!
#REF!
#REF!
UN mL

P.U IMPORTE
$2,302.95 $207.55
$0.00
$0.00
$0.00
$0.00
TOTAL $207.55

S.R IMPORTE
$765.43 $127.57
$632.14 $105.36
$232.93

C.H IMPORTE
$232.93 $6.9878

COSTO DIRECTO $342.11


12% C.I $383.17
10% U $421.48
1% F $425.70
.05% C.A $427.83
DESPERDICIO