Você está na página 1de 2

Abdul Rehman

CNIC : 37405-4424559-1 , Date of Birth: 06/01/1987


Passport #: HU9155591
+92-308-3648793
+92-345-5208202
rajarehan06@gmail.com

Objective: To be employed in an organization which sets the industry standards and believes in
simultaneous growth development of the organization and its employees.

Professional Summary:

Having more than 7 years of experience in Oil & Gas industry, presently working as a
Derrickman with Hilong Oil Service & Engineering Pakistan (Pvt.) Ltd. Since Jul, 2013
onwards at their Rig HL-21 engaged in gas & oil exploration project for United Energy Pakistan
Ltd.

Professional Experience:

Hilong Oil Services & Engineering, Pakistan (Pvt.) Ltd. HL-21


Derrickman July, 2013 to Present

Sinopec, Pakistan Rig-149


Derrickman April, 2010 to April, 2011

Great Wall Drilling Company, Pakistan Rig-169


Derrickman April, 2008 to Sep, 2009

Great Wall Drilling Company, Pakistan Rig-169


Floorman Jan, 2007 to Dec, 2008

Great Wall Drilling Company, Pakistan Rig-169


Roustabout Aug, 2006 to Dec, 2006

Job Descriptions (Derrickaman)


 Operates, monitors and maintains all drilling fluid systems and equipment
associated with drilling oil and gas wells from a drilling unit; directs and
coordinates work activies associated with drilling fluid system and equipment
operations and works aloft in the derrick and/or at rig floor piperacker console
running and retrieving drill string sections from the well bore.
 Clamped holding fixtures on ends of hoisting cables.
 Strung cables through pulleys and blocks.
 Repaired pumps, mud tanks and related equipment.
 Supervised crew members and provided assistance in training them.
 Inspected derricks for flaws and cleaned and oiled derricks in order to
Maintain proper working conditions.
 Listened to mud pumps and checked regularly for vibration and other problems,
in order to ensure that rig pumps and drilling mud systems were working
properly.
 Positioned and aligned derrick elements, using harnesses and platform climbing
devices.
 Set and bolted crown blocks to posts at tops of derricks.
 Guided lengths of pipe into and out of elevators.
 Monitors mud pit level and advises Driller or loss or gain. Directs mud flow
(circulation) from mud pits to hole and return as directed by Driller.
 Monitors trip tank as required by the operation and advises Driller of unforeseen
changes in level. Assists on rig floor as required.
 Assists cementing subcontractor representative with cementing operations as
directed.
 Assist in rigging up, rigging down and transporting of drilling rig and
equipment.
 Maintaining and monitoring pit equipment including pumps, shales shakers,
stirrers, charge pumps and other equipment.

Professional Trainings:

 IWCF Level-1, LMS Certificate Number: 1yLaC8AyD8


 Rutledge certified Hydrogen Sulphide Safety Training (H2S) alive trained.
 Rigging and lifting (Back Safety /Safe Lifting)
 Rig induction and orientation
 Rigging and slinging
 Manual Handling
 Confined Space Entry
 Standard crane signals
 Hazard identification and prevention
 Slips, trips and falls
 Pinch point identification
 Hand tools injury prevention
 Basic first aid CPR training
 Firefighting training
 Fire extinguisher
 Fire evacuation and ERT
 Hazard Identification/Awareness//Mitigation

Education: Matriculation
Quaid Academy, Rawalpindi
BISE, 2005

References: Available upon request

Você também pode gostar