Blackstone: flexible and


environmentally friendly power plant

Two single shaft combined cycle blocks -


each with centrally-mounted generator and SSS Clutch
Blackstone: flexible and
environmentally friendly power plant

Blackstone combined cycle near Boston, MA, is the first in service of five
merchant power plants, based on ALSTOM’s GT24 single-shaft combined cycle
block, which are planned for New England by American National Power.
Environmental regulations have inspired some unusual measures to reduce noise
and emission levels to create one of world’s cleanest combined cycle plants.
The arrival of the British IPP developer, significant spinning reserve. ppm. The GT24 has exceptional low
International Power, in the United ALSTOM were also breaking new NOx characteristics, but as in all
States back in 1996 was quite different ground with a single-shaft block, in a American combined cycle plants a
from their first overseas investments market which has traditionally favoured catalyst is also installed in the HRSG.
which had initially focused on large multi-shaft combined cycle systems. This is a combined ammonia system
coal and oil-fired steam plants in Asia Blackstone might have been in a three for NOx and a precious metal plate
and a combined cycle plant in Turkey shaft layout from another manufacturer. system for CO which is placed just
with their participation being as the Instead it has two single-shaft blocks ahead of the LP section where the gas
plant operators. and the advantage of this is that if they temperature is about 350°C.
Their entry into the North American have to shed load, running both units Backing this up is the stack
market was on an altogether larger down to 50 % would be more efficient emission monitoring station which
scale with the creation of American than in the alternative arrangement keeps a continuous reading of the NOx
National Power, (ANP) first to manage with one gas turbine shut down and the and CO emissions from both stacks to
a number of gas-fired CHP and small other kept running with the steam ensure that they stay within the
combined cycle plants which they turbine at part load. prescribed limits. It means, too, that
initially took over, and then to develop a Blackstone, about 80 km southwest there is an additional staff member
series of merchant power plants based of Boston is the first of the ANP New whose job is that of Environ-mental
on one or more 250 MW single-shaft England plants to come into operation Officer with responsibility to take
combined cycle blocks based on and has been running commercially emission readings and prepare the
ALSTOM’s GT24 gas turbine using the since the end of last year, despatched station’s environmental reports.
unique high efficiency sequential by ISO New England as a base load Air condensers provide for cooling,
combustion principle, and a once- plant. A similar plant in the which is a general tendency in New
through HRSG operating at a much neighbouring town of Bellingham is on England to avoid extended planning
higher steam pressure than is normally a construction schedule running about applications and intractable arguments
used for a combined cycle. nine months behind Blackstone and with green factions over water abstrac-
So far ANP have filed application will be in operation for the coming tion in securing construction permits.
for seven merchant plants with a total winter. Public water supply, however, is used
of 21 single shaft blocks: Midlothian (6) Insofar as it uses the same power for make-up of the steam cycle.
and Hays County (4) in Texas; both of train, Blackstone can be said to be a
which are now in commercial common design with the other ANP Flexibility in operation
operation; Blackstone (2) and plants, but beyond that the similarity In a Merchant Plant environment with
Bellingham (2), both in Massachusetts; ends, because this region of New no long-term power sales contracts,
Goreham (3), in Maine, which has England has some of the strictest each station is despatched by a
been delayed; and Brookhaven (2) and environmental rules in the country. regional power grid, according to its
Ramapo (2) in New York State which Noise control is particularly severe availability and efficiency. But it is in
are subject to planning consent and on requiring extensive sound insulation on regard to availability that the GT24
which work is expected to start next the HRSG, steam pipes to the air single shaft blocks are in a class of
year. condenser, the transformers, and fuel their own. This is mainly due to the
In choosing a system based on the gas compressors to attenuate sound in once-through HRSG, which with its low
GT24, ANP were impressed by the specific directions from the site towards water volume, and absence of drums,
high part-load efficiency of the housing areas. gives it a lower thermal inertia than the
sequential combustion machine. This NOx limits are also severe, with a traditional tri-pressure, horizontal,
would be important if it had to carry requirement at the stack for less than 2 natural circulation designs favoured by
Fig.1 This view of the HRSG shows the once through section , Fig.2. The steam turbine HP i n its acoustic housing with the 160
with heavy sound insulation. The long tube in the centre of the bar steam entering from the left. The gearbox, which drops the
picture is the pressurizer with the blow down tank at left. speed from 8900 to 3600 rev/min, is at right.
others and the capability to start up shutdown has taken less than an hour. to an end mounted stack. The LP
quickly if running on a daily load cycle. On a completely cold start, as after system is a conventional natural
In this operating pattern the unit a maintenance outage, the steam circulation design and is separated
would be shut down at, say 8.00 pm turbine is also starting from rest and from the HP section by the catalyst.
and a damper in the bottom of the requires steam for gland sealing and It is in the HP section that there are
stack would close to retain heat in the condenser evacuation. This can only the differences which account for much
boiler, the SSS self synchronizing come from the HRSG and thus adds to of its flexibility. This is the once through
clutch would be open and the steam the starting time as the steam turbine section which is nothing more than a
turbine behind it would be turning on its is gradually warmed up to start loading. finned tube with a stable temperature
barring gear. At 6.00 am the next In these circumstances, start-up takes gradient sustained along it. There is no
morning the button could be pushed to about 105 minutes to full load. drum and unlike the conventional
open the stack damper and start the horizontal boiler in which the tubes are
gas turbine using a static starting HRSG design hanging and therefore supporting their
device forcing the generator to act as a Combustion Engineering, now the own weight, in the once-through
motor until the gas turbine has reached ALSTOM Power Boiler Division, have a section they are installed horizontally
a sustained firing speed, whereupon long history of involvement with once- across the direction of gas flow and
the generator reverts to type and is through boilers. Seventy years ago they supported in tube plates suspended on
accelerated up to synchronous speed. were the first licensee of Sulzer who the main structure.
This takes about 20 minutes. were the original developers of the This is the design principle which
The gas turbine is then loaded to once through design for large steam has been used in the vertical HRSG’s
about 50 MW and held there with the boilers. Their once-through HRSG for developed in Europe. The tube plates
HRSG dumping steam to the the GT24 has an HP output at 160 support the horizontal tubes which
condenser until it is of sufficient quality bars, which is higher than achieved form a series of parallel serpentine
to supply the steam turbine which then with a drum type natural circulation paths which are free to expand. At the
accelerates to 3600 rev/min. At this HRSG, but is a common steam pres- tube ends expansion joints link
point the clutch engages to create a sure in many coal and oil-fired power individual tubes above and below in the
single shaft and the complete power plants still operating around the world. matrix. HRSG’s of this design have
train can start loading. By 7.00 am the The once-through HRSG is a two been used for the past 30 years in
block is already delivering full output pressure device and in appearance Europe in combined cycles which have
into the network. From start-up to full resembles the competing tri-pressure performed mid load duty with daily or
load on a warm start after an overnight type, with a horizontal gas path leading weekly starts in some countries in
from the 16th stage and passes it
through the cooler to the first and
second stages of the LP turbine
section.
Feed water for the OTC’s is taken
from the HP economiser stage and
returns to the pressuriser at about
480°C. With such a high pressure
differential from steam to gas there is
no risk of gas leaking into the steam
cycle and moisture detectors on the
gas side can find any leaks should
they occur.
The HRSG is not the only novelty
in this combined cycle. The steam
turbine is also different being a 2-
speed design with a 25 MW HP
section running at 8900 rev/min. This
is coupled through a Flender
Graffenstaden gearbox to a
combined IP/LP cylinder turning at
3600 rev/min.
Fig 3. The gas turbine is housed in a spacious acoustic enclosure shown here This turbine design is based on
looking towards the HRSG with the fuels manifold of the first combustor stage at that of the VAX system which was
centre and the cooling air bleed pipes leading off to the OTC units. developed in Sweden in the 1970’s.
Some of the earliest examples of
support of a large nuclear base load. steam from the gas turbine OTC these steam turbines have been
Though it is in principle steam- units enters. Air is taken from the installed in industrial CHP schemes
filled when it is operating, the once GT24 compressor at two bleed in the United States, some are in
through boiler requires a pressurizer. points and has to be cooled before it combined cycle schemes, and others
This is a vessel which is attached at can be sent to the turbine blades and in coal- or oil fired steam power
a position corresponding to the start vanes. The OTC units are simple plants using the same steam
of the HP evaporator in a once-through coolers which are conditions as applied here.
conventional HRSG. At start up it connected in parallel on the steam For the GT24 combined cycles, at
contains water which gradually side, which is at 160 bars, and are full load the HRSG is delivering
evaporates as the temperature and isolated from each other on the air steam at 160 bars, 565°C to the HP
pressure build up so that when the side. One unit takes air from the cylinder which discharges to the
160 bar operating pressure is compressor discharge at 30 bars and reheater at 37 bars. The reheated
reached it is filled with steam. after cooling it sends it on to the HP steam at 565°C is sent to the IP.
The pressurizer is also where the turbine vanes: the other takes air Because of the 2-speed turbine
design, which even allowing for the
gearbox is more efficient than a
conventional single speed turbine of
the same capacity, there cannot be a
straight through axial condenser. The
LP exhausts to the side to the ducts
which lead it up to the air condenser.
While on the matter of avail-
ability, an important component of
the single-shaft block is the SSS
clutch which is placed between the
generator and the steam turbine. The
clutch is rated to the steam turbine
and is of the new locking pawl type
specially developed for the single-
shaft application. With this design as
soon as the generator starts to slow
down and drop out of synchronous
speed, the clutch opens and, as the
pawls lift out of engagement they are
locked in position so that there is no
Fig 4. General view of an HRSG showing sound insulation on the once through risk of their dropping to reengage
section. The yellow hut beside the nearer stack is the emission monitoring when the gas turbine and generator
position which collects data from both stacks to see that NOx is less than 2 ppm are at rest and the steam turbine is
still running down on its barring gear.
This feature was very important 7bars 320˚C
for certain operators, such as
Enfield (November/December 2001,
page 29) who had to run a series of 160 bars, 565˚C
boroscopic inspection outages
Reheat: 37 bars, 565˚C
during their trial run of the modified
HP booster
cooling arrangements. These could 270 Separator pump
be done on a week end, shutting MW
down Friday night with the unit cool Blow down
Air condenser
enough to access on Sunday make OTC's
(15 cells)
the inspection, and have everything
LP feed pump Fuel gas preheater
back on full load by 10.00 am on
Monday. Similarly the clutch imparts
freedom for short outages to fix gas Fig.5 Schematic of the steam cycle of one of the Blackstone blocks. Two-pressure
turbine or electrical auxiliaries over steam cycle, using once-through HRSG for good operational flexibility with much
weekends. faster starting times than competing HRSG designs in the United States.

Group operations
ANP have a large plant inventory
with new and existing power plants.
In Massachusets they have, besides
Blackstone, Milford a 2-2-1
combined cycle arrangement with
W501D’s, which they took over as an
operating plant, and Bellingham
which is in the final stages of
commissioning and will be in
commercial operation later this year:
three power plants within a 50 km
radius. Consequently they are to be
operated effectively as one produc-
tion unit with seven generating sets.
Under this arrangement each
plant has its normal operating team
Fig.6 The air condenser for each block, by Balcke Dürr has 15 cells and is also
of 15 with three people on five shifts heavily insulated both in the fan chambers and for the steam pipes, at right of
and supporting technical staff for picture, which send the exhaust steam up to the three rows of cooling cells
instrumentation, water chemistry,
and daily maintenance, etc.; but the water treatment plant. Noise Turbotect on-line/off line system.
management team will in some reduction is not so much realised by Both gas turbine intakes have all the
areas be shared. There will be one having the power train mounted nozzles in place and plumbing
accounts office dealing with staff indoors as by the heavy sound connections back to the dosing skid
salaries and purchases for all three insulation provided in key areas of located in Unit 1. There is also only
plants; and there will be one the outdoor equipment. one fuel gas compressor, a single-
environmental officer monitoring Measures include location of the stage centrifugal unit by Atlas Copco
emissions at all three sites. Each site gas turbine and generator and the with a Siemens electric motor driving
will bid its power into the New high speed HP section of the steam it, and housed in its own acoustically
England pool at 24 hours notice. turbine in acoustic enclosures. But insulated building
Another economy is in the use of there is no acoustic lining of the walls Despite significant climatic
trailer mounted water treatment and ceiling of the building itself. The differences between the northern
plants, which can be moved from site steam ducts up to the air condensers and southern United States, the
to site. The low make-up demand of which each have 15 large fans are entire electric power system is
the once-through HRSG means that heavily insulated as are the HRSG’s summer peaking due to warm
a store of demineralised water can with external insulation as well as summers and heavy air conditioning
be held for both units on site and internal baffles to damp down loads.
when the tanks need to be topped resonance. Noise levels as low as 35 Blackstone expect to be running
up, the treatment unit is called in dBa must be achieved in certain in base load between June and
again. Raw make-up water is taken areas. September. The inherent flexibility of
from the public supply. With two blocks a number of the GT24 block and its high part load
Walking around the site it is very auxiliaries can be shared. There is efficiency suggest that it could be
noticeable how relatively spacious it only one static starting device which running in mid load for many hours in
is, partly because there are a lot of is wired to both generators either of a style which is all to familiar to ANP
shared facilities between each block which can be selected. There is only as they hark back to their European
and the absence of any permanent one compressor washing system: a origins.
SSS Gears Limited SSS Clutch Company Inc
Park Road, Sunbury on Thames 610 West Basin Road
Middlesex TW16 5BL, England New Castle, DE 19720, USA
Telephone: +44 (0)1932 780644 Telephone: +1 302 322 8080
Fax: +44 (0)1932 780018 Fax: +1 302 322 8548

www.sssgears.co.uk www.sssclutch.com

SSS Reference NR0207_1

Você também pode gostar