No. Title of the Paper - First Semester s marks Marks
Power Plant Familiarisation-I
(Power Plant Introduction & Safety, Generators &
1 transformers) 3 50 100 150
Total 1050
First Semester Examination 1
Title of the Paper - Second Semester
2
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
1. The duration of the course leading to the Post Graduate Diploma In Thermal
Power Plant Engineering shall be one academic year(52 weeks) divided into
two semesters.
A candidate shall have to pass all the two semester examinations within a
maximum period of three years of his/her admission to the first semester of
Post Graduate Diploma In Thermal Power Plant Engineering programme
failing which he/she will be deemed to be unfit for the programme. However,
a candidate, who having passed the first semester examination discontinues
his studies, for legitimate and justified reasons may be permitted to join
second semester within one year of his passing the first semester
examination.
3.(a) The first semester examination shall be open to a regular student who
I) has been on the rolls of the Institute during the first semester;
II) has at least 75% attendance in the class during the semester;
III) has obtained pass marks in the internal assessment/
workshop/practical exam. and
IV) bears a good moral character
(b) The second semester examination shall be open to a regular student who:
i) has been on the rolls of the Institute for the concerned semester
ii) has at least 75% attendance in the class during the semester;
iii) has passed the first semester examination and
iv) bears a good moral character.
3
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
may be deposited one month before start of the semester examination ie. Rs.
1600/- for first semester and Rs 1600/- for second semester.
5. The external examiner(s) will set the question papers as per the criteria laid
down in the Scheme of Examination for the program. Evaluation of semester
exam answer sheets will not be done in the same Institute. All the written
semester exams will be of three hour duration.
7. Mobile phones, any extra piece of paper, notebook are banned in the exam
hall. A student indulging in exam malpractices may be expelled by the
invigilator/Chief Supdt. for one year from the exam and he will be able to take
the semester exams only after one year.
9. The Examination for the first semesters shall ordinarily be held in the month of
January and for the second semester in the month of July or on such dates as
may be fixed by the Director General, NPTI.
(ii) Each successful candidate shall receive a copy of the detailed marks card
on having passed the Semester Examination.
12. The list of successful candidates after the Second semester examination shall be
arranged as under in two divisions on the basis of the aggregate marks
obtained in the first and second semester examinations taken together and
the division obtained by the candidate will be stated in his certificate.
a) Those who obtain 50% marks but less than 60% marks
SECOND DIVISION;
FIRST DIVISION;
c) Those who pass all the two semester examinations at the first attempt
obtaining 75% or more marks in the aggregate shall be declared to
have passed with - DISTINCTION
C. EVALUATION
13. (i) The Principal Director/ Course Coordinator of the Institute will preserve
the records on the basis of which the, Internal Assessment awards
have been prepared upto one month from the date of declaration of the
semester examination results. This record will be disposed off after one
month. The first Semester results must be declared before 20 th of
February of each year.
(ii) Candidate(s) who has not obtained pass marks in the Internal
Assessment in any paper(s) will not be allowed to take examination in
the said paper(s) in the relevant semester. He/she will, however, be
provided opportunity to appear before the Committee of Examiners, to
be constituted by the Principal Director/ Director of the concerned
Institute to re-assess performance of the candidate and the internal
assessment given by the Committee shall be final.
15. (i) The candidate shall be required to submit three copies of his Project
Report. The last date for receipt of Project Report in the office of the
Institute shall be one week before the commencement of the Second
semester Examination.
(ii) The Project Report shall be evaluated as per the guidelines specified in
the Scheme of Examination, jointly by the external and the internal
examiners. The appointment of the external examiner shall be made by
the Director General on the recommendation of the Principal Director of
the respective institute.
5
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
(iii) The marks obtained by the candidate for the project report shall be
taken into account when he appears in any future examination under
reappear clause.
(b) The marks obtained by the candidate for the viva-voce/workshop shall
be taken into account when he appears in any future examination
under re-appear clause.
17. The Project Report and Training Report, wherever specified will be submitted
in the typed form as per the following requirements:
(i) The typing should be done on both sides of the paper (instead of single
side printing)
(ii) The font size should be 12 with Times Roman Format.
(iii) The Project Report/Training Report may be typed in 1.5 (one and a
half) space. But the References/Bibliography should be typed in
single space.
(iv) The paper should be A-4 size.
(v) Two copies meant for the purpose of evaluation may be bound in
paper-back form and one copy should be in hard binding.
(vi) Students will select topic of the project by 30th October of each year.
Course Coordinator will submit the consolidated list of project with
name of students to the Principal Director/Director on first working day
of November.
18. The minimum percentage of marks to pass the examination in each semester
shall be :-
19. A candidate whose result is declared late without any fault on his/her part,
may attend classes for the next higher semester provisionally at his own risk
6
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
20. A candidate shall be promoted to the next higher semester if he/she passes at
least 50% of the theoretical papers (i.e. excluding subjects in which marking is
done on the basis of Viva Voce) having prescribed in the semester, failing
which he/she shall be declared as FAIL in that semester and he/she shall be
required to appear in the failed semester in all the papers currently in force as,
a private candidate (as ex-student).
E. OTHER PROVISIONS
21. Question paper for the External exams will be common for all the institute and
will be set by a faculty who will be paid honorarium of Rs. 2500/- per subject
plus postage charges on actual basis. Question paper setting will be
responsibility of one of the institute on rotation basis ie. New Delhi, Nagpur,
Neyveli and Durgapur respectively. Question papers will be broadly subjective
in nature.
22. Answer sheets of the Semester exams will not be evaluated in the parent
institute and sent for outside evaluation. The evaluator will be paid an
honorarium @ Rs. 40 per copy plus postage on actual basis. For evaluating
the project report or conducting viva voce the external and the internal
examiner will be paid honorarium of Rs. 40/- and Rs. 20/- respectively per
student plus TA. Similarly faculty evaluating for simulator will be paid
honorarium @ Rs. 20/- per student.
23. The invigilators in the semester exams will be paid a honorarium of Rs. 200/-
per sitting of 3 hour. For 30 students one invigilator, for 30-60 students two
invigilator and for more than 60 students 3 invigilators may be employed.
Principal Director/ Director in-charge will act as Chief Superintendant of the
examination and will be responsible for smooth conduct of examination and
shall be paid a lump sum honorarium of Rs 2000/- for the semester final
exams. A centre clerk and two peons (for sealing, water serving etc.) may be
appointed by the Chief Supdt. for conduct of semester examination and may
be paid an honorarium of Rs.120/- and Rs.50/- per sitting respectively. The
centre clerk will assist the Chief Supdt. in making seat plan, maintenance of
files (attendance, billing, dispatch of answer sheets etc.) for the exams.
24. Tabulation of the internal and external marks will be done by a faculty and
shall be paid honorarium @ Rs. 20 per student. He will be responsible for
collecting all the marks and tabulation and publication of the final result. The
Principal Director /Director Incharge will nominate the tabulator of their
respective institute. The tabulation records of the passed out students will be
kept with Training Officer/Course Coordinator of the respective institutes.
7
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
25. A sumptuary allowance of Rs.1000/- per month may be granted to the course
coordinator of PGDC in TPPE at the respective institutes and this expenditure
will be met from the examination fee collection. The Course Coordinator will
maintain the records of registration, feedback (to be taken once in each
semester) and will prepare the day wise module of the course and intimate
the faculty for their lectures.
26. Instruction For The Question Paper Setter: The question setter will set two
sets of question paper for each subject and mark on the envelop Set A and
Set B and seal them separately. The sealed Envelops For Set A and Set B
should be sealed in a bigger envelop and sent to the respective principal
director. The Paper setter should maintain the confidentiality of the question
paper and all rough worksheets should be destroyed. The question should be
broadly subjective in nature and should cover all parts of the syllabus. The
maximum marks for each subject is 100 and pass marks is 45. The time
allowed for each paper will be 3 hours. The subject syllabus can be identified
by the following help:
Power Plant Familiarisation II: This includes 1st to 4th week module of Power
Plant Familiarisation
All other subjects have nomenclature pertaining to the modules which have
been included.
27. The corporate quality committee will meet every year in the last week of July
to review the status of the course.
28. Any other provision not contained in the above shall be governed by the rules
and regulations framed by NPTI from time to time.
8
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
FIRST
SEMESTER
PGDC IN TPPE
9
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
FORENOON AFTERNOON
DAY-2 Site Selection (Site availability, Raw Coal to Electricity (Coal /Air / Flue/ Gas/ Water /
material, Fuel, load evacuation, Water, Steam Path ,Brief description of main equipments
Transport, Pit Head Station ,Air Pollution, involved in a Thermal Power plant Station )
Topography, Skilled manpower ).
10
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
FORENOON AFTERNOON
DAY-1 Accidents (Causes & Factors, Cost of First Aid (Basics of First Aid, How injuries are
Accidents , Accidents Prevention, caused in lifting, falls etc.)
Investigation of Accidents, Reporting and
Recording Systems of Accidents)
DAY-2 Fire fighting (Fundamentals of Fire, Fire Industrial Safety & hazards(Industrial Hazards
Fighting Equipments and systems, Fire ,Protective Clothing and Equipment, Safe work
Extinguishing Methods, Demonstration of practices in power Plants, permit to work system,
various fire.) safety in moving and storage of materials,
Housekeeping Safety rules)
11
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
(Duration): 6 week
FORENOON AFTERNOON
DAY-1 Steam Cycle Theory (Carnot cycle , Coal (Types of coal and their characteristics, Their
Rankine cycle, with reference to a suitability for different kinds of Boiler, Alterations in
specific unit 500/210 MW , steam firing methods due to change of coal composition)
properties)
DAY-3 Fuel Oil Systems (Location and site Plant visit (visit to coal handling plant, visit to fuel
selection, Type of fuel used , Main oil station)
equipment and their functions
Transportation, handling , storage Fuel
oil preparation before firing)
DAY-4 Description of Main Boiler Boiler Circulation Theory (water walls boiling
(Classification and Types, Arrangements phenomena , Nucleate / Film boiling , Natural /
of main boiler , Fundamentals of Boiler Controlled / Forced circulation )
design , Location of various pressure
parts)
DAY-5 Constructional detail of Super heaters, Steam Separation theory ( Boiler Drum & its
Re heaters, Economizers, De super internals)
heaters.
12
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
DAY-1 Audio-visual / CBT Session on Drum Draught system (Theory of natural, induce,
and Drum internals balance and forced draught , Drought loss stack
effect)
DAY-2 Various Fans and their salient Air Pre heaters(Types And Functions
features (Construction detail / lubricating Constructional Details, SCAPH. Soot Blowers.)
oil system for PA fan, FD, ID fan)
DAY-4 Fuel Firing Arrangements and Electrostatic Precipitator (ESP) (Need of fly ash
Burners (corner front and rear wall separation, working principle , corona effect,
firing , Direct and indirect , Details of coal constructional details, Rapping mechanism)
and oil burners Burners tilting
Mechanism , Atomization of fuel oil
burners and igniters )
DAY-5 Ash Handling System (Fly ash Plant visit (Milling plant, Main Boiler and Fans, Ash
handling system, Bottom ash disposal handling).
system , Ash handling plant operation
,Ash handling pump, Disposal of ash
slurry ,utilization of ash)
13
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
FORENOON AFTERNOON
DAY-2 Water Supply System (soft water, Steam Turbines (Classification of Turbines
clarified water, cooling water, D. M Metallurgical considerations, Working
water) Principles
DAY-3 Description of main components i.e. Turbine lubrication Oil System Construction and
Turbine casing, rotor steam admission working Principles of main Oil pumps , Oil coolers)
valves, couplings , bearings etc.
DAY-5 Power Station Pumps (Classification of Boiler Feed Pump (Function of BFP
pumps, Centrifugal pumps, positive Constructional details)
displacement pumps)
14
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
15
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
DAY - 2 Hydrogen Cooling System and Stator Audio visual on Hydrogen cooling
Water Cooling System (Different types system
of cooling arrangements for rotor and
stator, Selection and properties of
coolant, Air cooling, Hydrogen
cooling, Stator water cooling, H2
Charging/ Purging Cycle).
DAY - 3 Hydrogen Seal Oil System (Details of Generator Excitation System and
the system, Function and purpose of AVR (Principles, Simple arrangem-
differential pressure regulator and nts of excitor and its field winding,
pressure oil regulators, Types of Classification of excitation system -
Hydrogen seals and their construction High Frequency / static excitation
details). system - their merits and demerits,
Automatic Voltage Regulator).
16
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
17
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
DAY - 2 Class Room briefing on Main steam. Class Room briefing on Hydrogen
Cold reheat, Hot reheat lines, cooling, stator water cooling, seal
condensate & feed water lines, BFP, oil system, switchyard, AC/DC
CW schemes. auxiliary power supply system,
DAY - 4 Boiler - Feed Water Schemes (Feed Steam Schemes (MS, CR & HRH
control station arrangement, lines up to turbine control valves
economiser connections, economiser including HP/LP by pass, location
recirculation lines, boiler drum, water of safety valves, vents and drains,
wall connections; drain header, blow auxiliary PRDS schemes, auxiliary
down lines, CBD, IBD, SH/RH, steam distribution, soot blowing
attemperator station). steam lines).
DAY – 5 Air and Flue Gas Schemes (ID,FD, PA Fuel Schemes (Scheme of RC
fans and their control system including bunkers and RC feeders, Coal mill
Seal air/ Scanner air/ Igniter air connections. Light oil and.
Fans/Systems/ Damper control for atomising air system, location of
secondary air. trip valves, air control valves,
nozzles valves and igniters. Heavy
oil and atomising steam system).
18
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
DAY - 3 Turbine Oil System (Turbine lube oil CW System and Cooling Towers
schemes, lube oil purification schemes, (locating moving screens, CW
location of MOT & lube oil pumps, Oil Pumps, Venting arrangements,
coolers, cooling water connections. Valve locations, Chlorination
schemes).
DAY - 4 Generator (Seal oil scheme, Hydrogen Switchyard (GT to feeder line
scheme, Stator water cooling schemes, arrangements, locating various
Excitation arrangements). transformers (GT, UA SAT, CTO,
PTO), switchgears, isolator
earthing arrangement, buses etc
19
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
FORENOON AFTERNOON
DAY - 1 Availability of electrical supply to Boiler pre light up checks.
the equipment (source feeder of each (Meaning of line up, shut down,
equipment, points of the isolation of tripping, starting etc. no pending
the equipment, locking during permits, Local checks.)
isolation, permit to work system).
DAY - 3 Operation of FD & PA Fans (Pre Mill operation (Pre checks, flow
checks, flow path line up, permissives, path line up, permissives.
interlocks). interlocks).
DAY - 4 FSSS (Secondary air, burner tilt, fuel Drum level control, Super heater/
and air control). Re-heater temperature control and
their interlocks.
DAY – 5 Operation of turbine lub oil system and Operation of condensate and feed
barring gear. water system (BFP Heaters, CEP).
20
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
21
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
DAY - 2 Working with Coal Mill Operator (Shift taking Continue .....
over/handing over checks, Pre start checks,
Routine checks, Mechanical Isolation of mills,
Cold and hot air damper operation, Activities
during emergency in mill area, Changing over of
seal air filter, Oil filling into mill gear box)..
Note:- The students shall Undertake the 'Rotational On-job Training (Oprn)’,in the Power Station
identified by the concerned NPTI. The course Co-ordinator shall make the appropriate shift
roaster suiting to local conditions/shift roaster of the power plant.
22
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
23
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
DAY - 13 Working with Turbine Desk Operator (Shift handing Continue .....
over & taking over, Receiving report from supervisors
and operators, .Logging of parameters, Operation
Procedure of main equipment, ATT & ATRS operation,
Emergency operation).
24
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
25
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
26
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
(Duration) : 2 Weeks
Erection, Commissioning
1st Week
FORENOON AFTERNOON
DAY - 1 Preparation of commissioning, trial run Chemical cleaning of Boiler
of various equipments, commissioning preparation for boiler light up,
of valves, air and gas tightness test of thermal flow test of water walls and
boiler. economisers, steam blowing.
DAY - 2 Safety Valve setting, reliable run of Alkaline flushing and commission-
boiler, Hydraulic test of boiler. ing regenerative system, acid
cleaning of oil pipe lines, oil
flushing procedure of lubricating
oil and governing, system.
27
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
(Duration) : 2 Week
Construction Management
2nd Week
FORENOON AFTERNOON
DAY - 1 Construction, Site Organisation and Construction Contracts &
Administration Estimating, Costing Contracting Construction Materials
and Bidding and Construction Project
Management Techniques
28
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
(Duration) : 1 Week
FORENOON AFTERNOON
DAY - 1 Introduction, Need for performance Factors influencing performance of
monitoring, objective, controllable and Boilers and Optimisation (Fuel
un-controllable factors, basic properties, excess air, fineness of
requirements. PF etc.)
29
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
1/2 Week
FORENOON AFTERNOON
DAY - 1 Basic chemistry (Atomic structure, Pre and post treatment of water.
elements, compounds, mixtures,
solutions, ionization, salts acids alkali
pH values).
DAY - 2 Chemical control and treatment of Classification of coal & oil, their
Boiler feed water and steam. Cooling sampling and analysis
water treatment
30
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
DAY - 4 Material selection for Design Material Protective surface treatment. (Metal
requirement, specification and relevant cleaning protective Metal coating,
standards fro boiler, turbine, generator Fabrication of precoated metals).
components – Piping and Valves :
Appreciation of component, fabrication –
metal forming, casting – forging, pipe
bending, tube manufacture.
DAY – 5 Defect analysis and life assessment. Low Group discussion and appraisal
temperature behavior. high temperature
behavior - defect assessment of
solidification crack austenite stainless steel
welds, cracking in CrMoV weldment etc.
Thermal fatigue - various tests - Defects
assessment route and calculation of
damage. Remaining life assessment
beyond design life of boilers, turbine
rotors, generator rotors etc.
31
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
32
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
FORENOON AFTERNOON
DAY - 1 Gas Turbine and Combined cycle Fuels for gas turbine plants,
power plant-introduction, basic cycles physical and chemical properties
and types of CCGT of fuels and their analyses
DAY - 3 Gas turbine support system, inlet / Waste heat recovery steam
exhaust systems, lube oil system, fire generator - Description and
protection system, governing system construction details.
Cogeneration plants.
33
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
(Duration) : 1 Week
FORENOON AFTERNOON
DAY - 1 Introduction to supercritical Arrangement of super critical
technology, advantages-World boilers and their types. Comparison
scenario in supercritical technology. between spiral water wall
circulating and vertical tubing.
DAY - 2 Special alloys for super critical boilers Differences between Supercritical
and welding techniques. and subcritical Technology
34
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
FORENOON AFTERNOON
DAY - 1 Presentation Skills: Perquisites of Assertiveness, Indicators of
effective presentation, Format of assertive behaviour, Strategies of
presentation assertive behaviour
35
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
SECOND
SEMESTER
PGDC IN TPPE
36
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
FORENOON AFTERNOON
DAY - 1 Introduction (Terminology, Methods of system earthing and the
Requirements of protective system, fault conditions, Lighting / Surge
Historical developments) Protective Instrument transformers.
Relays (Types and their applications,
Construction, Maintenance
requirements, Setting and testing).
DAY – 5 Visit to Power Station and Lab. Group discussion and appraisal.
demonstration.
37
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
FORENOON AFTERNOON
DAY-1 Need for Energy Audit and Audit Energy Management System, Energy
Procedures. Energy Audit – Auditing and their implementation
Macro Level & Micro Level. techniques for power industries.
38
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
(Duration) : 1 Week
FORENOON AFTERNOON
DAY - 1 Aims and objective of maintenance Integration of maintenance with
efficient service, high plant requirements, plant reliability,
availability, maintenance learning plant and daily work programs.
engineer's duties.
39
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
FORENOON AFTERNOON
DAY - 1 Introduction of nuclear energy, energy The fission process and fission
from nuclear fusion, plasma, energy products, radioactivity, radioactive
from nuclear fission materials
DAY - 2 Regulation for governing the Nuclear reactor and power plant-
production of power from nuclear fuel Reactor, general components of
& safety aspect. National policy nuclear reactor.
regarding Nuclear power generation.
40
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
(Duration) : 1 Week
FORENOON AFTERNOON
DAY - 1 Energy Sector Reforms, Regulations Wind Energy Systems
Environment and RE
41
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
FORENOON AFTERNOON
DAY - 1 Checking of Boiler tubes for external Hydraulic test, allowable rate of
damage due to erosion or cutting. pressure drop. Checking of welds
Method to overcome, e.g. pin holes.
strengthening of tubes in the flow
channels.
DAY - 3 Checking of isolating and regulating PA, ID & FD fan check for inlet
dampers for leakage, proper alignment, dampers bearing alignment, vibrat-
adjustment for both under cold and hot ion both radial and axial shift of
operation conditions. magnetic centre of motor and rotor,
fan blade conditions mode of
repairs, hard facing
DAY - 4 Checking of boiler mountings and their Checking the burner nozzle for
adjustments (a) Gauges glasses, (b) burnout and reasons for the same
Safety valves, their checking and and its metallurgy
settings of safety valves for blow
down and dropping
DAY – 5 Check the flow distribution in burners Check the rollers or ball wear of
adjustment of orifices or valves check coal mill also Ball ring segment
the burner flow direction and its wear. Keeping of capacity and hour
adjustment, checking of burner of operation. Check roller thrust
chamber, dampers breakage of links bearings and ring, seals
and proper gauge operation
42
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
(Duration): 4Weeks
2ND WEEK
FORENOON AFTERNOON
DAY - 1 Check the adjustment of roller of ball Check the gear-box worm and
pressure check for leakage of coal and worm wheel driver for wear and
air around journal assembly main shaft backlash allowable limits. Check
and possible contamination of classifier vane angular position
lubricating oil method for reservation proper operation and coal fineness
DAY - 3 Safety valve maintenance and its float Procedure for alkali boil out and
procedures, trouble shooting/causes acid cleaning preservation and
remedies flushing, Procedure for flushing
and preservation both wet and dry
DAY - 4 Internal checking of drum and drum Boiler bottom air seal, proper and
internals, Checking of at temperature free movement and expansion of
including spray nozzle and shock linen boiler setting when hot. Normal
water level and flow in bottom seal.
Adjustment and prevention of dust
accumulation in the seal chamber
43
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
(Duration) : 4Weeks
3RD WEEK
FORENOON AFTERNOON
DAY - 1 Checking of tubes for any obstruction Procedure of welding of tubes in
land test or temperature rise and drop membrane walls and tubes of
test. different composition
DAY - 4 Checking the rotor position with Main oil pump cleaning/flushing of
respect to clearance in HP IP and LP main oil tank, pipes, cleaning of
wheel clearance and also thrust bearing filters oil coolers, mtce. , of jacking
and its wear. Checking the condition of oil pumps.
babbit metal for scoring pitting,
chipping of or lack of bondage
between the babbit and the shell.
44
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
FORENOON AFTERNOON
DAY - 1 Maintenance of main ejectors and Checking of bearing clearances and
starting ejectors Trouble shooting allowable limits. Checking of
causes remedies, Checking of axial cylinders parting surface, for
shift indicating system for Clean oil proper matching, its grinding for
nozzle and strainers. the purpose.
DAY - 2 Checking of gland and seal strips, their Checking the coupling alignment
clearances with allowing limits. of HP IP and LP rotors and
generator and their. Setting.
Checking and setting of bearings
on foundation. Checking of shaft
sinking due to I vacuum pulling.
45
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
46
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
FORENOON AFTERNOON
DAY - 1 Objective, functions and structure of Location of load dispatch stations –
Load dispatching stations – An area, state and regional and their
overview. functions – Voltage and frequency
control. Trends in design and
engineering of load dispatch /
systems.
DAY - 2 MW and AVAR sharing between Load forecasting - Short tern and
stations and systems voltage control- long term.
Concept of base load and peak load
operations - Economic dispatch
aspects.
DAY - 4 Networking and protocol for data PC based power system study
exchange latest developments. package.
47
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
FORENOON AFTERNOON
DAY-5 Power Trading and Sharing Case studies on tariff discovery through
competitive bidding, quality of power
48
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
1st WEEK
FORENOON AFTERNOON
DAY - 1 Concept and .layout of Control and Pressure Measurement and
Instrumentation in Thermal Power measuring instruments.
Plant.
49
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
50
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
1st week
FORENOON AFTERNOON
DAY - 1 Core of Information Technology (IT) Development of Computer
Information Technology Overview Technology
Data Structures Communication & Networking
Data Processing Techniques
51
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
2nd week
FORENOON AFTERNOON
DAY - 1 Concept of Geographical Information Fundamentals of GIS and Mapping
System (GIS) Data Visualisation
Basics of Geography Thematic Map Preparation
Hardware & Software Requirement
DAY – 5 Working with ARC-FM & CYMDIST Working on various softwares for
software distribution network planning and
analysis
52
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
FORENOON AFTERNOON
DAY - 1 Energy and Ecology (Definition of eco Legislation and standards for noise.
system, effect of energy on ecology air and water pollution and
and concept of green house effect). rehabilitation policy.
Environmental Protection Act
(EPA)-1986
DAY - 3 Air Pollution caused by coal and oil at. Demonstration of monitoring Air
source and due to combustion of coal quality
and oil, stack emission ESP etc.
Duration:4 Weeks
1ST WEEK
FORENOON AFTERNOON
DAY - 1 Boiler Maintenance (Acquaintance Turbine stop valves and control
with various tools and tackles, Lifting valve mtc., Turbine governing
and material handling equipments, system setting, Gland sealing
consumables and spares). system inspection, Deaerator
maintenance.
Overhauling of oil system, oil
coolers, testing for leakage,
flushing of main oil tanks etc
DAY - 2 Boiler Drum (Drum internal and Turbine Basement/ ‘0’ meter
mounting inspection) Firing Floor (condenser tube cleaning, CW
(Oil guns, igniter, air, fans, scanner air Pump Maintenance)
fans, Air heater, soot blowers, wind
box, burner, tilt and coal feeder).
Duration: 4 Weeks
2nd WEEK
FORENOON AFTERNOON
DAY - 1 Coal Handling Plant (Crusher Exposure to maintenance and
maintenance Conveyor maintenance. testing requirements for Drives
Feeder maintenance).
Coal Handling Plant (Tripper
maintenance, Stacker cum Reclaimer
maintenance
55
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
FORENOON AFTERNOON
DAY - 1 Circuit Breakers ……. Continue
DAY - 4 Cables
56
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
FORENOON AFTERNOON
DAY - 1 Cranes Lift
57
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
Note:- The tour programme can be adjusted by the Institute depending their convenience.
58
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
59
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
Module : Simulator
(Duration) : 2 Weeks
1ST WEEK
FORENOON AFTERNOON
DAY - 1 Introduction to Simulator Centre Description of Different Boiler
system and boiler lit up.
DAY - 3 Pre-checks and system line up Unit start up from cold condition.
activities in turbine side (Starting CEP,
BEPs and charging condensate/feed
water system, Charging turbine oil
system, starting oil pumps and putting
B/G on operation, Charging Aux.
steam and starting vacuum pulling in
condenser).
Module : Simulator
(Duration) : 2 Weeks
60
NATIONAL POWER TRAINING INSTITUTE
POST GRADUATE DIPLOMA COURSE IN THERMAL POWER PLANT ENGINEERING
2 ND WEEK
FORENOON AFTERNOON
DAY - 1 Milling Plant Operation and raising Discussion on: (Milling Plant,
pressure as per Boiler load Burner, Optimum Sec. Air and
requirements Drum Level control, Burner
(Operation of second set of auxiliaries Mechanism and attemperators).
and load sharing, Change over of
controls from manuals to auto).
DAY - 3 Shutting down unit from full load to 30 Unit start up from hot and warm
MW and again raising load to full load conditions.
condition.
DAY - 4 Tripping unit from full load on some Emergency problems in unit
protection and start up again from hot (Boiler. Turbine and Generator).
condition.
,
61