VA

PRESUPUESTO : MEJORAMIENTO DE Y AMPLIACIÓN


LA OFERTA DEL SERVICIO EDUCATIVO
DE AGUA DEI.E.P
RIEGONº DE
54418
SECTORES
SAGRADO
AIJADERO,
CORAZÓNUSCUPATA,
DE JESÚSQUISCABAMBA
DEL DISTRITO YDE
HUAYLLAC,
VILCABAMBA,
DISTRITO
PROVINCIA
MICAELA
GRAU,
BASTIDAS,
REGIÓN GRAU,
APURÍ
CLIENTE : MUNICIPALIDAD PROVINCIAL DE GRAU
UBICACIÓN : VILCABAMBA-GRAU-APURIMAC
AYRIHUANCA-MICAELA BASTIDAS-GRAU-APURIMAC
CONTRATISTA : CONSORCIO VILCABAMBA
JR INGENIEROS
INSPECTOR
SUPERVISOR : ING. SAMUEL
DIOMEDESMIRANDA
FERRELFARFÁN
SARMIENTO
INICIO DE PLAZO : 11 22 DE ENERO
JUNIO 2015
2016
PLAZO : 180
210 DIAS CALENDARIO

Item Descripción

01 ESTRUCTURAS
01.01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
01.01.01 OBRAS PROVISONALES Y TRABAJOS PRELIMINARES
01.01.01.01 OBRAS PROVISIONALES
01.01.01.01.01 ALMACÉN Y OFICINAS
01.01.01.01.02 CARTEL DE OBRA DE 3.60 X 7.20 m - GIGANTOGRAFIA (BANNER)
01.01.01.01.03 CERCO PROVISIONAL DE MADERA CON TRIPLAY
01.01.01.01.04 CONSUMO DE ENERGIA ELECTRICA Y AGUA
01.01.01.01.05 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS
01.01.01.02 TRABAJOS PRELIMINARES
01.01.01.02.01 LIMPIEZA DE TERRENO MANUAL
01.01.01.03 DESMONTAJES
01.01.01.03.01 DESMONTAJE DE PUERTAS (INC. MARCOS)
01.01.01.03.02 DESMONTAJE DE VENTANAS (INC. MARCOS)
01.01.01.03.03 DESMONTAJE DE PORTONES METÁLICOS DE INGRESO
01.01.01.03.04 DESMONTAJE DE ARTEFACTOS ELECTRICOS
01.01.01.03.05 DESMONTAJE DE APARATOS SANITARIOS
01.01.01.03.06 DESMONTAJE DE CIELORASO DE TRIPLAY INC. CORREAS DE MADERA
01.01.01.03.07 DESMONTAJE DE TIJERALES DE MADERA
01.01.01.03.08 DESMONTAJE DE TECHO DE CALAMINA GALVANIZADA INC.CORREAS
01.01.01.04 DEMOLICION
01.01.01.04.01 DEMOLICION DE PISO DE CONCRETO INC. FALSO PISO
VA

PRESUPUESTO : MEJORAMIENTO DE Y AMPLIACIÓN


LA OFERTA DEL SERVICIO EDUCATIVO
DE AGUA DEI.E.P
RIEGONº DE
54418
SECTORES
SAGRADO
AIJADERO,
CORAZÓNUSCUPATA,
DE JESÚSQUISCABAMBA
DEL DISTRITO YDE
HUAYLLAC,
VILCABAMBA,
DISTRITO
PROVINCIA
MICAELA
GRAU,
BASTIDAS,
REGIÓN GRAU,
APURÍ
CLIENTE : MUNICIPALIDAD PROVINCIAL DE GRAU
UBICACIÓN : VILCABAMBA-GRAU-APURIMAC
AYRIHUANCA-MICAELA BASTIDAS-GRAU-APURIMAC
CONTRATISTA : CONSORCIO VILCABAMBA
JR INGENIEROS
INSPECTOR
SUPERVISOR : ING. SAMUEL
DIOMEDESMIRANDA
FERRELFARFÁN
SARMIENTO
INICIO DE PLAZO : 11 22 DE ENERO
JUNIO 2015
2016
PLAZO : 180
210 DIAS CALENDARIO

Item Descripción

01.01.01.04.02 DEMOLICION DE VEREDAS (EXTERIORES)


01.01.01.04.03 DEMOLICION DE MUROS DE ADOBE
01.01.01.04.04 DEMOLICIÓN DE MUROS DE LADRILLO DE CONCRETO
01.01.01.04.05 DEMOLICIÓN DE CIMIENTOS
01.01.01.04.06 DEMOLICIÓN DE SOBRECIMIENTOS
01.01.01.04.07 DEMOLICION DE MUROS DE MAMPOSTERIA DE PIEDRA
01.01.01.04.08 DEMOLICION DE GRADERIAS DE CONCRETO
01.01.01.04.09 DEMOLICION DE COLUMNAS
01.01.01.04.10 DEMOLICION DE VIGAS
01.01.01.04.11 DEMOLICION DE CIELO RASO DE YESO Y CARRIZO
01.01.01.04.12 DEMOLICION DE LAVADEROS DE CONCRETO
01.01.01.04.13 DEMOLICION DE URINARIOS DE CONCRETO
01.01.01.04.14 DEMOLICION DE BANCA DE CONCRETO
01.01.01.05 ELIMINACION DE DEMOLICIONES
01.01.01.05.01 ACARREO INTERNO MAT. PROCEDENTE DE DEMOLICION
01.01.01.05.02 ELIMINACION DE MATERIAL PROCEDENTE DE LA DEMOLICION
01.01.01.06 TRAZOS, NIVELES Y REPLANTEO
01.01.01.06.01 TRAZO Y REPLANTEO PRELIMINAR
01.01.01.06.02 REPLANTEO DURANTE LA OBRA
01.01.02 SEGURIDAD Y SALUD EN OBRA
01.01.02.01 ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO
01.01.02.02 EQUIPOS DE PROTECCION INDIVIDUAL
VA

PRESUPUESTO : MEJORAMIENTO DE Y AMPLIACIÓN


LA OFERTA DEL SERVICIO EDUCATIVO
DE AGUA DEI.E.P
RIEGONº DE
54418
SECTORES
SAGRADO
AIJADERO,
CORAZÓNUSCUPATA,
DE JESÚSQUISCABAMBA
DEL DISTRITO YDE
HUAYLLAC,
VILCABAMBA,
DISTRITO
PROVINCIA
MICAELA
GRAU,
BASTIDAS,
REGIÓN GRAU,
APURÍ
CLIENTE : MUNICIPALIDAD PROVINCIAL DE GRAU
UBICACIÓN : VILCABAMBA-GRAU-APURIMAC
AYRIHUANCA-MICAELA BASTIDAS-GRAU-APURIMAC
CONTRATISTA : CONSORCIO VILCABAMBA
JR INGENIEROS
INSPECTOR
SUPERVISOR : ING. SAMUEL
DIOMEDESMIRANDA
FERRELFARFÁN
SARMIENTO
INICIO DE PLAZO : 11 22 DE ENERO
JUNIO 2015
2016
PLAZO : 180
210 DIAS CALENDARIO

Item Descripción

01.01.02.03 EQUIPO DE PROTECCION COLECTIVA


01.01.02.04 SEÑALIZACION TEMPORAL DE SEGURIDAD
01.01.02.05 CAPACITACION EN SEGURIDAD Y SALUD
01.01.02.06 RECURSOS PARA RESPUESTA ANTE EMERGENCIAS EN SEGURIDAD Y SALUD EN EL TRABAJO
01.01.03 PLAN DE MITIGACION E IMPACTO AMBIENTAL
01.01.03.01 MANEJO DE RESIDUOS SOLIDOS
01.01.03.02 MITIGACION DE IMPACTOS
01.01.03.03 PROGRAMA DE SEGURIDAD Y SALUD
01.01.03.04 MONITOREO Y SEGUIMIENTO AMBIENTAL
01.01.03.05 CONTINGENCIAS
01.01.03.06 CIERRE DE EJECUCION DE OBRA
01.02 MOVIMIENTO DE TIERRAS
01.02.01 EXCAVACIONES DE ZANJAS Y ZAPATAS
01.02.02 EXCAVACIONES MASIVAS C/EQUIPO PESADO
01.02.03 RELLENO COMPACTADO C/EQUIPO LIVIANO - MATERIAL PROPIO C/AGUA
01.02.04 RELLENO COMPACTADO C/ EQUIPO LIVIANO - MATERIAL DE PRESTAMO C/ AGUA
01.02.05 RELLENO COMPACTADO C/ EQUIPO PESADO - MATERIAL DE PRESTAMO C/ AGUA
01.02.06 ESCARIFICADO Y COMPACTADO DE SUB-RASANTE C/ EQUIPO LIVIANO, e=0.30 m
01.02.07 ESCARIFICADO Y COMPACTADO DE SUB-RASANTE C/ EQUIPO PESADO, e=0.30 m
01.02.08 AFIRMADO DE 8" PARA PISOS INTERIORES Y EXTERIORES
01.02.09 ACARREO INTERNO MATERIAL PROCEDENTE DE LA EXCAVACION
01.02.10 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO
VA

PRESUPUESTO : MEJORAMIENTO DE Y AMPLIACIÓN


LA OFERTA DEL SERVICIO EDUCATIVO
DE AGUA DEI.E.P
RIEGONº DE
54418
SECTORES
SAGRADO
AIJADERO,
CORAZÓNUSCUPATA,
DE JESÚSQUISCABAMBA
DEL DISTRITO YDE
HUAYLLAC,
VILCABAMBA,
DISTRITO
PROVINCIA
MICAELA
GRAU,
BASTIDAS,
REGIÓN GRAU,
APURÍ
CLIENTE : MUNICIPALIDAD PROVINCIAL DE GRAU
UBICACIÓN : VILCABAMBA-GRAU-APURIMAC
AYRIHUANCA-MICAELA BASTIDAS-GRAU-APURIMAC
CONTRATISTA : CONSORCIO VILCABAMBA
JR INGENIEROS
INSPECTOR
SUPERVISOR : ING. SAMUEL
DIOMEDESMIRANDA
FERRELFARFÁN
SARMIENTO
INICIO DE PLAZO : 11 22 DE ENERO
JUNIO 2015
2016
PLAZO : 180
210 DIAS CALENDARIO

Item Descripción

01.03 CONCRETO SIMPLE


01.03.01 FALSA ZAPATA
01.03.01.01 FALSA ZAPATA - CONCRETO F'c=100 kg/cm2 + 40% P.G.
01.03.02 FALSO CIMIENTO
01.03.02.01 FALSO CIMIENTO - CONCRETO F'c=100 kg/cm2 + 40% P.G.
01.03.03 SOLADOS
01.03.03.01 SOLADOS - CONCRETO F'c=100 kg/cm2, e=2"
01.03.04 CIMIENTOS CORRIDOS
01.03.04.01 CIMIENTOS CORRIDOS - CONCRETO F'c=100 kg/cm2 + 30% P.G.
01.03.04.02 CIMIENTOS CORRIDOS - ENCOFRADO Y DESENCOFRADO
01.03.05 SOBRECIMIENTOS
01.03.05.01 SOBRECIMIENTOS - CONCRETO F'c=140 kg/cm2 + 25% P.M.
01.03.05.02 SOBRECIMIENTOS - ENCOFRADO Y DESENCOFRADO
01.03.06 FALSO PISO
01.03.06.01 FALSO PISO DE 4" CONCRETO F'c = 140 Kg/cm2
01.03.07 GRADAS
01.03.07.01 GRADAS DE CONCRETO - CONCRETO f'c=140 kg/cM2 + 25% P.M.
01.03.07.02 GRADAS DE CONCRETO - ENCOFRADO - DESENCOFRADO
01.04 CONCRETO ARMADO
01.04.01 ZAPATAS
01.04.01.01 ZAPATAS - CONCRETO F'c=280 kg/cm2
01.04.01.02 ZAPATAS - CONCRETO F'c=210 kg/cm2
VA

PRESUPUESTO : MEJORAMIENTO DE Y AMPLIACIÓN


LA OFERTA DEL SERVICIO EDUCATIVO
DE AGUA DEI.E.P
RIEGONº DE
54418
SECTORES
SAGRADO
AIJADERO,
CORAZÓNUSCUPATA,
DE JESÚSQUISCABAMBA
DEL DISTRITO YDE
HUAYLLAC,
VILCABAMBA,
DISTRITO
PROVINCIA
MICAELA
GRAU,
BASTIDAS,
REGIÓN GRAU,
APURÍ
CLIENTE : MUNICIPALIDAD PROVINCIAL DE GRAU
UBICACIÓN : VILCABAMBA-GRAU-APURIMAC
AYRIHUANCA-MICAELA BASTIDAS-GRAU-APURIMAC
CONTRATISTA : CONSORCIO VILCABAMBA
JR INGENIEROS
INSPECTOR
SUPERVISOR : ING. SAMUEL
DIOMEDESMIRANDA
FERRELFARFÁN
SARMIENTO
INICIO DE PLAZO : 11 22 DE ENERO
JUNIO 2015
2016
PLAZO : 180
210 DIAS CALENDARIO

Item Descripción

01.04.01.03 ZAPATAS - ENCOFRADO Y DESENCOFRADO


01.04.01.04 ZAPATAS - ACERO Fy=4200 Kg/cm2
01.04.02 VIGAS DE CIMENTACION
01.04.02.01 VIGAS DE CIMENTACION.-CONCRETO f'c=210 kg/cm2
01.04.02.02 VIGAS DE CIMENTACION - ENCOFRADO Y DESENCOFRADO
01.04.02.03 VIGAS DE CIMENTACION - ACERO Fy=4200 Kg/cm2
01.04.03 CIMIENTO REFORZADO
01.04.03.01 CIMIENTO REFORZADO - CONCRETO F'c=210 kg/cm2
01.04.03.02 CIMIENTO REFORZADO - ENCOFRADO Y DESENCOFRADO
01.04.03.03 CIMIENTO REFORZADO - ACERO Fy=4200 Kg/cm2
01.04.04 SOBRECIMIENTOS REFORZADOS
01.04.04.01 SOBRECIMIENTOS REFORZADOS - CONCRETO F'c=210 kg/cm2
01.04.04.02 SOBRECIMIENTOS REFORZADOS - CONCRETO F'c=140 kg/cm2
01.04.04.03 SOBRECIMIENTOS REFORZADOS - ENCOFRADO Y DESENCOFRADO
01.04.04.04 SOBRECIMIENTOS REFORZADOS - ACERO Fy=4200 Kg/cm2
01.04.05 COLUMNAS
01.04.05.01 COLUMNAS - CONCRETO F'c=280 kg/cm2
01.04.05.02 COLUMNAS - CONCRETO F'c=210 kg/cm2
01.04.05.03 COLUMNAS - ENCOFRADO Y DESENCOFRADO
01.04.05.04 COLUMNAS - ENCOFRADO Y DESENCOFRADO CIRCULAR
01.04.05.05 COLUMNAS - ACERO Fy=4200 Kg/cm2
01.04.06 COLUMNAS DE AMARRE
VA

PRESUPUESTO : MEJORAMIENTO DE Y AMPLIACIÓN


LA OFERTA DEL SERVICIO EDUCATIVO
DE AGUA DEI.E.P
RIEGONº DE
54418
SECTORES
SAGRADO
AIJADERO,
CORAZÓNUSCUPATA,
DE JESÚSQUISCABAMBA
DEL DISTRITO YDE
HUAYLLAC,
VILCABAMBA,
DISTRITO
PROVINCIA
MICAELA
GRAU,
BASTIDAS,
REGIÓN GRAU,
APURÍ
CLIENTE : MUNICIPALIDAD PROVINCIAL DE GRAU
UBICACIÓN : VILCABAMBA-GRAU-APURIMAC
AYRIHUANCA-MICAELA BASTIDAS-GRAU-APURIMAC
CONTRATISTA : CONSORCIO VILCABAMBA
JR INGENIEROS
INSPECTOR
SUPERVISOR : ING. SAMUEL
DIOMEDESMIRANDA
FERRELFARFÁN
SARMIENTO
INICIO DE PLAZO : 11 22 DE ENERO
JUNIO 2015
2016
PLAZO : 180
210 DIAS CALENDARIO

Item Descripción

01.04.06.01 COLUMNAS DE AMARRE - CONCRETO F'c=175 kg/cm2


01.04.06.02 COLUMNAS DE AMARRE - ENCOFRADO Y DESENCOFRADO
01.04.06.03 COLUMNAS DE AMARRE - ACERO Fy=4200 Kg/cm2
01.04.07 FALSA COLUMNA PLUVIAL
01.04.07.01 FALSA COLUMNA PLUVIAL - CONCRETO F'c=175 Kg/cm2
01.04.07.02 FALSA COLUMNA PLUVIAL - ENCOFRADO Y DESENCOFRADO
01.04.07.03 FALSA COLUMNA PLUVIAL - ACERO F'y=4200 Kg/cm2
01.04.08 VIGAS
01.04.08.01 VIGAS - CONCRETO 210Kg/cm2
01.04.08.02 VIGAS - ENCOFRADO Y DESENCOFRADO
01.04.08.03 VIGAS - ACERO Fy=4200 Kg/cm2
01.04.09 VIGAS DE AMARRE
01.04.09.01 VIGAS DE AMARRE - CONCRETO F'c=175 kg/cm2
01.04.09.02 VIGAS DE AMARRE - ENCOFRADO Y DESENCOFRADO
01.04.09.03 VIGAS DE AMARRE - ACERO Fy=4200 Kg/cm2
01.04.10 LOSAS MACIZA
01.04.10.01 LOSA MACIZA - CONCRETO 210 kg/cm2
01.04.10.02 LOSA MACIZA - ENCOFRADO Y DESENCOFRADO
01.04.10.03 LOSA MACIZA - ACERO Fy=4200 Kg/cm2
01.04.11 LOSAS ALIGERADAS
01.04.11.01 LOSAS ALIGERADAS - CONCRETO F'c=210 kg/cm2
01.04.11.02 LOSAS ALIGERADAS - ENCOFRADO Y DESENCOFRADO
VA

PRESUPUESTO : MEJORAMIENTO DE Y AMPLIACIÓN


LA OFERTA DEL SERVICIO EDUCATIVO
DE AGUA DEI.E.P
RIEGONº DE
54418
SECTORES
SAGRADO
AIJADERO,
CORAZÓNUSCUPATA,
DE JESÚSQUISCABAMBA
DEL DISTRITO YDE
HUAYLLAC,
VILCABAMBA,
DISTRITO
PROVINCIA
MICAELA
GRAU,
BASTIDAS,
REGIÓN GRAU,
APURÍ
CLIENTE : MUNICIPALIDAD PROVINCIAL DE GRAU
UBICACIÓN : VILCABAMBA-GRAU-APURIMAC
AYRIHUANCA-MICAELA BASTIDAS-GRAU-APURIMAC
CONTRATISTA : CONSORCIO VILCABAMBA
JR INGENIEROS
INSPECTOR
SUPERVISOR : ING. SAMUEL
DIOMEDESMIRANDA
FERRELFARFÁN
SARMIENTO
INICIO DE PLAZO : 11 22 DE ENERO
JUNIO 2015
2016
PLAZO : 180
210 DIAS CALENDARIO

Item Descripción

01.04.11.03 LOSAS ALIGERADAS - ACERO Fy=4200 Kg/cm2


01.04.11.04 LOSAS ALIGERADAS - LADRILLO DE ARCILLA HUECO 15X30X30 cm
01.04.12 ESCALERAS (GARGANTA Y GRADAS)
01.04.12.01 ESCALERAS.- CONCRETO fc=210 kg/cm2
01.04.12.02 ESCALERAS - ENCOFRADO Y DESENCOFRADO
01.04.12.03 ESCALERAS - ACERO Fy=4200 Kg/cm2
01.04.13 CISTERNA Y TANQUE ELEVADO
01.04.13.01 CISTERNA Y TANQUE ELEVADO.- CONCRETO fc=280 Kg/cm2
01.04.13.02 CISTERNA Y TANQUE ELEVADO - ENCOFRADO Y DESENCOFRADO
01.04.13.03 CISTERNA Y TANQUE ELEVADO - ACERO F'y=4200 kg/cm2
01.04.14 CANALETA DE CONCRETO
01.04.14.01 CANALETA DE CONCRETO F'c=210 Kg/cm2
01.04.14.02 CANALETA DE CONCRETO - ENCOFRADO Y DESENCOFRADO
01.04.14.03 CANALETA DE CONCRETO - ACERO F'y=4200 kg/cm2
01.04.15 RAMPA DE CONCRETO
01.04.15.01 RAMPA - CONCRETO f'c=210 kg/cM2
01.04.15.02 RAMPA, ENCOFRADO Y DESENCOFRADO
01.04.15.03 RAMPA - ACERO Fy=4200 Kg/cm2
01.05 ESTRUCTURAS METALICAS
01.05.01 VIGAS Y VIGUETAS METALICAS
01.05.01.01 VIGUETAS METALICAS VIG2
01.05.02 TIJERALES Y RETICULADOS
VA

PRESUPUESTO : MEJORAMIENTO DE Y AMPLIACIÓN


LA OFERTA DEL SERVICIO EDUCATIVO
DE AGUA DEI.E.P
RIEGONº DE
54418
SECTORES
SAGRADO
AIJADERO,
CORAZÓNUSCUPATA,
DE JESÚSQUISCABAMBA
DEL DISTRITO YDE
HUAYLLAC,
VILCABAMBA,
DISTRITO
PROVINCIA
MICAELA
GRAU,
BASTIDAS,
REGIÓN GRAU,
APURÍ
CLIENTE : MUNICIPALIDAD PROVINCIAL DE GRAU
UBICACIÓN : VILCABAMBA-GRAU-APURIMAC
AYRIHUANCA-MICAELA BASTIDAS-GRAU-APURIMAC
CONTRATISTA : CONSORCIO VILCABAMBA
JR INGENIEROS
INSPECTOR
SUPERVISOR : ING. SAMUEL
DIOMEDESMIRANDA
FERRELFARFÁN
SARMIENTO
INICIO DE PLAZO : 11 22 DE ENERO
JUNIO 2015
2016
PLAZO : 180
210 DIAS CALENDARIO

Item Descripción

01.05.02.01 ARCO METALICO


01.05.02.02 MONTAJE DE ARCO METALICO
01.05.03 CORREAS METALICAS
01.05.03.01 ARRIOSTRE DE TIJERALES (1/2")
01.05.04 APOYOS METALICOS
01.05.04.01 APOYOS FIJOS
01.05.04.02 APOYOS MOVILES
01.06 VARIOS
01.06.01 PERFORACION DE Ø 3/4" PARA DISPOSITIVO DE ANCLAJE
01.06.02 DISPOSITIVO DE ANCLAJE Ø 5/8 ACERO LISO
01.06.03 WATER STOP DE PVC DE 9" PROVISION Y COLOCADO DE JUNTA
01.06.04 LLORADEROS EN MURO DE CONTENCION TUB. 2"
01.06.05 FLETE TERRESTRE
02 ARQUITECTURA
02.01 MUROS Y TABIQUES DE ALBAÑILERIA
02.01.01 MURO DE BLOQUE DE CONCRETO CABEZA M: 1:4 e=1.5cm.
02.01.02 MURO DE BLOQUE DE CONCRETO SOGA M: 1:4 e=1.5cm.
02.01.03 MURO DE LADRILLO PANDERETA CANTO M : 1:4 e=1.5cm
02.01.04 MURO DE LADRILLO DE CONCRETO SOGA (15X19X39 cm. ), MEZCLA 1:4 e=1.5 cm
02.02 REVOQUES Y REVESTIMIENTO
02.02.01 REVOQUES ENLUCIDOS Y MOLDURAS
02.02.01.01 TARRAJEO PRIMARIO Y RAYADO C/ MEZC. C:A 1:5, e=1.5cm.
VA

PRESUPUESTO : MEJORAMIENTO DE Y AMPLIACIÓN


LA OFERTA DEL SERVICIO EDUCATIVO
DE AGUA DEI.E.P
RIEGONº DE
54418
SECTORES
SAGRADO
AIJADERO,
CORAZÓNUSCUPATA,
DE JESÚSQUISCABAMBA
DEL DISTRITO YDE
HUAYLLAC,
VILCABAMBA,
DISTRITO
PROVINCIA
MICAELA
GRAU,
BASTIDAS,
REGIÓN GRAU,
APURÍ
CLIENTE : MUNICIPALIDAD PROVINCIAL DE GRAU
UBICACIÓN : VILCABAMBA-GRAU-APURIMAC
AYRIHUANCA-MICAELA BASTIDAS-GRAU-APURIMAC
CONTRATISTA : CONSORCIO VILCABAMBA
JR INGENIEROS
INSPECTOR
SUPERVISOR : ING. SAMUEL
DIOMEDESMIRANDA
FERRELFARFÁN
SARMIENTO
INICIO DE PLAZO : 11 22 DE ENERO
JUNIO 2015
2016
PLAZO : 180
210 DIAS CALENDARIO

Item Descripción

02.02.01.02 TARRAJEO FROTACHADO DE MUROS INTERIORES, C/ MEZC. C:A 1:5, e=1.5cm.


02.02.01.03 TARRAJEO FROTACHADO DE MUROS EXTERIORES, C/ MEZC. C:A 1:5, e=1.5cm.
02.02.01.04 TARRAJEO DE COLUMNAS, C/ MEZC. C:A 1:5, e=1.5cm. (Inc. Vestidura de Aristas)
02.02.01.05 TARRAJEO DE COLUMNAS CIRCULARES, C/ MEZC. C:A 1:5, e=1.5cm.
02.02.01.06 TARRAJEO DE VIGAS, C/ MEZC. C:A 1:5, e=1.5cm. (Inc. Vestidura de Aristas)
02.02.01.07 TARRAJEO CON IMPERMEABILIZANTE C/ MEZC. C:A 1:4, e=1.5cm.
02.02.01.08 TARRAJEO DE MUROS DE CONCRETO, C/ MEZC. C:A 1:5, e=1.5cm.
02.02.01.09 VESTIDURA DE DERRAMES; C/ MEZC. C:A 1:5, e=1.5cm.
02.02.01.10 BRUÑAS DE 1 cm x 1 cm
02.02.01.11 PREPARACION DE RAMPAS
02.02.02 REVESTIMIENTOS
02.02.02.01 REVESTIMIENTO DE MESA DE CONCRETO CON CERAMICO .30X.30
02.02.02.02 REVESTIMIENTO DE SARDINEL DE CONCRETO CON CEMENTO PULIDO INPERMEABILIZADO
02.02.02.03 REVESTIMIENTO DE FRISO CON CEMENTO FROTACHADO
02.02.02.04 REVESTIMIENTO DE CANALETA PLUVIAL EN TECHOS/ CEMENTO PULIDO IMPERMEABILIZADO
02.02.02.05 REVESTIMIENTO CON CEMENTO FROTACHADO
02.02.02.06 REVESTIMIENTO CON CEMENTO PULIDO
02.03 CIELORRASO
02.03.01 CIELORRASOS, C/ MEZC. C:A 1:5, e=1.5cm.
02.03.02 VESTIDURA DE FONDO DE ESCALERA, C/ MEZC. C:A 1:5, e=1.5cm.
02.04 PISOS Y PAVIMENTOS
02.04.01 CONTRAPISOS
VA

PRESUPUESTO : MEJORAMIENTO DE Y AMPLIACIÓN


LA OFERTA DEL SERVICIO EDUCATIVO
DE AGUA DEI.E.P
RIEGONº DE
54418
SECTORES
SAGRADO
AIJADERO,
CORAZÓNUSCUPATA,
DE JESÚSQUISCABAMBA
DEL DISTRITO YDE
HUAYLLAC,
VILCABAMBA,
DISTRITO
PROVINCIA
MICAELA
GRAU,
BASTIDAS,
REGIÓN GRAU,
APURÍ
CLIENTE : MUNICIPALIDAD PROVINCIAL DE GRAU
UBICACIÓN : VILCABAMBA-GRAU-APURIMAC
AYRIHUANCA-MICAELA BASTIDAS-GRAU-APURIMAC
CONTRATISTA : CONSORCIO VILCABAMBA
JR INGENIEROS
INSPECTOR
SUPERVISOR : ING. SAMUEL
DIOMEDESMIRANDA
FERRELFARFÁN
SARMIENTO
INICIO DE PLAZO : 11 22 DE ENERO
JUNIO 2015
2016
PLAZO : 180
210 DIAS CALENDARIO

Item Descripción

02.04.01.01 CONTRAPISO, e=50mm.


02.04.02 PISOS
02.04.02.01 PISO DE LOSETA CERAMICO ANTIDESLIZANTE 40X40 cm
02.04.02.02 PISO DE CEMENTO PULIDO Y BRUÑADO e=2" S/COLOREAR
02.04.02.03 PISO DE PIEDRA TIPO LAJA
02.04.02.04 PISO DE ADOQUINES DE CONCRETO, e=8cm.
02.04.02.05 FRANJA DE ADOQUINES DE CONCRETO e=8cm
02.04.03 PISOS DE CONCRETO
02.04.03.01 PISO DE CONCRETO 210 Kg/cm2,, e=6", C/ ACAB. CEMENTO FROTACHADO Y BRUÑADO, INC. BASE GRANULAR
02.04.03.02 RAMPAS DE CONCRETO 210 Kg/cm2,, e=4", C/ ACAB. CEMENTO FROTACHADO Y BRUÑADO @ 0.10m. INC. BASE GRANULAR
02.04.04 SARDINELES
02.04.04.01 SARDINEL DE CONCRETO f'c=140 kg/cm2, H=0.20 m., ANCHO=0.20 m.
02.04.05 VEREDAS
02.04.05.01 VEREDA DE CONCRETO 175Kg/cm2, e=4", C/ ACAB. CEMENTO FROTACHADO Y BRUÑADO
02.05 ZOCALO Y CONTRAZOCALOS
02.05.01 ZOCALO
02.05.01.01 ZOCALO CERAMICO 40 x 40 cm
02.05.02 CONTRAZOCALOS
02.05.02.01 CONTRAZOCALO DE CERAMICO H=10cm
02.05.02.02 CONTRAZOCALO DE CEMENTO FROTACHADO H=0.20m.
02.05.02.03 CONTRAZOCALO DE CEMENTO PULIDO H = 20 cm
02.05.02.04 CONTRAZOCALO DE CEMENTO PULIDO H = 40 cm (CERCO)
VA

PRESUPUESTO : MEJORAMIENTO DE Y AMPLIACIÓN


LA OFERTA DEL SERVICIO EDUCATIVO
DE AGUA DEI.E.P
RIEGONº DE
54418
SECTORES
SAGRADO
AIJADERO,
CORAZÓNUSCUPATA,
DE JESÚSQUISCABAMBA
DEL DISTRITO YDE
HUAYLLAC,
VILCABAMBA,
DISTRITO
PROVINCIA
MICAELA
GRAU,
BASTIDAS,
REGIÓN GRAU,
APURÍ
CLIENTE : MUNICIPALIDAD PROVINCIAL DE GRAU
UBICACIÓN : VILCABAMBA-GRAU-APURIMAC
AYRIHUANCA-MICAELA BASTIDAS-GRAU-APURIMAC
CONTRATISTA : CONSORCIO VILCABAMBA
JR INGENIEROS
INSPECTOR
SUPERVISOR : ING. SAMUEL
DIOMEDESMIRANDA
FERRELFARFÁN
SARMIENTO
INICIO DE PLAZO : 11 22 DE ENERO
JUNIO 2015
2016
PLAZO : 180
210 DIAS CALENDARIO

Item Descripción

02.06 COBERTURA
02.06.01 COBERTURA CON TEJA ANDINA TIPO ETERNIT
02.06.02 COBERTURA CON TEJA DE ARCILLA EN CERCO PERIMETRAL, ASENT. C/ MEZC. C:A 1:5
02.06.03 COBERTURA DE LADRILLO PASTELERO 25 x 25 cm, ASENT. C/ MEZC. C:A 1:5 ( 3 cm, JUNTA 1.5 cm )
02.06.04 COBERTURA DE CALAMINA PINTADA
02.06.05 CUMBRERA DE TEJA ANDINA DE TIPO FALDON
02.06.06 TAPA ONDA
02.06.07 REMATE LATERAL
02.07 CARPINTERIA DE MADERA
02.07.01 PUERTAS
02.07.01.01 PUERTA APANELADA C.N. INC. MARCO DE MADERA AGUANO
02.07.01.02 PUERTA APANELADA C.N. + VISOR DE VIDRIO, INC. MARCO DE MADERA AGUANO
02.07.01.03 PUERTA APANELADA DOBLE HOJA C.N. PARA MUEBLE BAJO, INC. MARCO DE MADERA AGUANO
02.07.02 MUEBLES
02.07.02.01 TICERO DE MADERA AGUANO L=4.00m BARNIZADO
02.07.02.02 TABIQUERIA DE MADERA DE AGUANO e=1"
02.07.03 LISTONES Y/O CORREAS
02.07.03.01 LISTONES DE MADERA TORNILLO 2"x1"
02.08 CARPINTERIA METALICA Y HERRERÍA
02.08.01 VENTANAS DE FIERRO
02.08.01.01 BARRAS DE SEGURIDAD EN VENTANAS
02.08.02 PUERTAS DE PLANCHAS METALICAS
VA

PRESUPUESTO : MEJORAMIENTO DE Y AMPLIACIÓN


LA OFERTA DEL SERVICIO EDUCATIVO
DE AGUA DEI.E.P
RIEGONº DE
54418
SECTORES
SAGRADO
AIJADERO,
CORAZÓNUSCUPATA,
DE JESÚSQUISCABAMBA
DEL DISTRITO YDE
HUAYLLAC,
VILCABAMBA,
DISTRITO
PROVINCIA
MICAELA
GRAU,
BASTIDAS,
REGIÓN GRAU,
APURÍ
CLIENTE : MUNICIPALIDAD PROVINCIAL DE GRAU
UBICACIÓN : VILCABAMBA-GRAU-APURIMAC
AYRIHUANCA-MICAELA BASTIDAS-GRAU-APURIMAC
CONTRATISTA : CONSORCIO VILCABAMBA
JR INGENIEROS
INSPECTOR
SUPERVISOR : ING. SAMUEL
DIOMEDESMIRANDA
FERRELFARFÁN
SARMIENTO
INICIO DE PLAZO : 11 22 DE ENERO
JUNIO 2015
2016
PLAZO : 180
210 DIAS CALENDARIO

Item Descripción

02.08.02.01 PORTON METALICO DOBLE HOJA C/PLANCHA LAMINADA EN FRIO


02.08.03 PUERTAS DE FIERRO Y REJA METALICA
02.08.03.01 PUERTA METALICA UNA HOJA C/PLANCHA LAMINADA EN FRIO
02.08.03.02 PUERTA METALICA DOBLE HOJA C/PLANCHA LAMINADA EN FRIO
02.08.03.03 PUERTA METALICA C/PLANCHA METALICA e=1/32"
02.08.03.04 REJA TUBO REDONDO FN DE 2"
02.08.04 VENTANAS DE FIERRO Y MALLA
VENTANA DE FIERRO CON MALLA ELECTROSOLDADA
02.08.04.01
02.08.05 BARANDAS METALICAS
02.08.05.01 BARANDA METALICA, PASAMANOS C/ TUBO Ø 3", PARANTES C/ PLATINAS e=1/4, H = 0.90 M
02.08.06 PASAMANOS METALICOS
02.08.06.01 PASAMANOS DE TUBO DE FIERRO Ø=2"
02.08.06.02 PASAMANOS PARA DISCAPACITADOS EN SS.HH
02.08.07 ESCALERAS METALICAS
02.08.07.01 ESCALERA TIPO GATO DE FIERRO ( ANCHO=0.50 M)
02.08.07.02 ESCALERA DE ACERO INOXIDABLE ( ANCHO=0.60 M)
02.08.08 ELEMENTOS METALICOS ESPECIALES
02.08.08.01 TAPA METALICA DE INSPECCION ( 0.82 x 0.82 M )
02.09 CERRAJERIA
02.09.01 BISAGRAS
02.09.01.01 BISAGRA ALUMINIZADA PESADA DE 4"x4" EN PUERTAS
02.09.01.02 BISAGRA ALUMINIZADA CAPUCHINA DE 2 1/2" EN MUEBLES BAJOS
VA

PRESUPUESTO : MEJORAMIENTO DE Y AMPLIACIÓN


LA OFERTA DEL SERVICIO EDUCATIVO
DE AGUA DEI.E.P
RIEGONº DE
54418
SECTORES
SAGRADO
AIJADERO,
CORAZÓNUSCUPATA,
DE JESÚSQUISCABAMBA
DEL DISTRITO YDE
HUAYLLAC,
VILCABAMBA,
DISTRITO
PROVINCIA
MICAELA
GRAU,
BASTIDAS,
REGIÓN GRAU,
APURÍ
CLIENTE : MUNICIPALIDAD PROVINCIAL DE GRAU
UBICACIÓN : VILCABAMBA-GRAU-APURIMAC
AYRIHUANCA-MICAELA BASTIDAS-GRAU-APURIMAC
CONTRATISTA : CONSORCIO VILCABAMBA
JR INGENIEROS
INSPECTOR
SUPERVISOR : ING. SAMUEL
DIOMEDESMIRANDA
FERRELFARFÁN
SARMIENTO
INICIO DE PLAZO : 11 22 DE ENERO
JUNIO 2015
2016
PLAZO : 180
210 DIAS CALENDARIO

Item Descripción

02.09.02 CERRADURAS
02.09.02.01 CERRADURA PESADA DE DOS GOLPES
02.09.03 ACCESORIOS DE CIERRE
02.09.03.01 PICAPORTE DE 4" FIERRO
02.09.03.02 CANDADO TIPO FORTE 40 mm
02.09.04 ACCESORIOS EN GENERAL
02.09.04.01 MANIJA DE BRONCE 3" PARA PUERTAS
02.09.04.02 TIRADOR CROMADO DE 1/4"
02.10 VIDRIOS, CRISTALES Y SIMILARES
02.10.01 SISTEMA CORREDIZO Y FIJO CON VIDRIO INCOLORO LAMINADO 8 mm TIPO I
02.10.02 SISTEMA CORREDIZO Y FIJO CON VIDRIO INCOLORO LAMINADO 8 mm. TIPO II
02.11 PINTURA
02.11.01 PINTURAS EN CIELORRASOS, MUROS Y ESTRUCTURAS
02.11.01.01 PINTURA DE CIELORRASOS C/LATEX - 2 MANOS, C/ IMPRIMANTE
02.11.01.02 PINTURA DE MUROS INTERIORES C/LATEX - 2 MANOS, C/ IMPRIMANTE
02.11.01.03 PINTURA DE MUROS EXTERIORES C/OLEOMATE - 2 MANOS, C/ IMPRIMANTE
02.11.02 PINTURAS EN ESTRUCTURAS DE MADERA
02.11.02.01 PRESERVANTE EN LISTONES DE MADERA
02.11.02.02 PINTURA EN PUERTAS DE MADERA C/ BARNIZ - 2 MANOS
02.11.02.03 PINTURA EN TABIQUERIA DE MADERA C/ BARNIZ - 2 MANOS
02.11.03 PINTURAS EN ESTRUCTURAS METALICAS
02.11.03.01 PINTURA EN PUERTA METALICA C/ANTICORROSIVO Y ESMALTE - 2 MANOS
VA

PRESUPUESTO : MEJORAMIENTO DE Y AMPLIACIÓN


LA OFERTA DEL SERVICIO EDUCATIVO
DE AGUA DEI.E.P
RIEGONº DE
54418
SECTORES
SAGRADO
AIJADERO,
CORAZÓNUSCUPATA,
DE JESÚSQUISCABAMBA
DEL DISTRITO YDE
HUAYLLAC,
VILCABAMBA,
DISTRITO
PROVINCIA
MICAELA
GRAU,
BASTIDAS,
REGIÓN GRAU,
APURÍ
CLIENTE : MUNICIPALIDAD PROVINCIAL DE GRAU
UBICACIÓN : VILCABAMBA-GRAU-APURIMAC
AYRIHUANCA-MICAELA BASTIDAS-GRAU-APURIMAC
CONTRATISTA : CONSORCIO VILCABAMBA
JR INGENIEROS
INSPECTOR
SUPERVISOR : ING. SAMUEL
DIOMEDESMIRANDA
FERRELFARFÁN
SARMIENTO
INICIO DE PLAZO : 11 22 DE ENERO
JUNIO 2015
2016
PLAZO : 180
210 DIAS CALENDARIO

Item Descripción

02.11.03.02 PINTURA EN BARRAS DE SEGURIDAD DE VENTANAS C/ANTICORROSIVO Y ESMALTE - 2 MANOS


02.11.03.03 PINTURA EN CALAMINA DE COBERTURA C/ANTICORROSIVO Y ESMALTE - 2 MANOS
02.11.03.04 PINTURA EN PASAMANOS C/ANTICORROSIVO Y ESMALTE - 2 MANOS
02.11.04 PINTURA EN CONTRAZOCALOS, BARANDAS Y OTROS
02.11.04.01 PINTURA EN BARANDA C/ANTICORROSIVO Y ESMALTE - 2 MANOS
02.11.04.02 PINTURA DE CONTRAZOCALO DE C/OLEOMATE-2MANOS C/IMPRIMANTE
PINTURA DEMARCATORIA DE SEGURIDAD
02.11.04.03
PINTURA DEMARCATORIA EN LOSA DEPORTIVA
02.11.04.04
PINTURA EN LOSA DEPORTIVA
02.11.04.05
02.12 VARIOS, LIMPIEZA Y JARDINERIA
02.12.01 VARIOS
02.12.01.01 SELLO ELASTOMERICO CON RELLENO DE POLIESTIRENO EXPANDIDO, e=1/2"; CIRCULACION
02.12.01.02 SELLO ELASTOMERICO CON RELLENO DE POLIESTIRENO EXPANDIDO, e=3.00cm; AMBAS CARAS
02.12.01.03 JUNTA ASFALTICA DE 1"EN EXTERIORES
02.12.01.04 CANALETA Fº.Gº. PARA EVACUACION PLUVIAL
02.12.01.05 TUBERIA PVC-SAP Ø 4" INCLUIDO ACCESORIOS PARA EVACUACION PLUVIAL
02.12.01.06 PIZARRA ACRILICA 3.60x1.20m. SIN TICERO
02.12.01.07 GARGOLA DE CONCRETO S/DISEÑO
02.12.01.08 ARCO DE FULBITO Y TABLERO BASQUET
02.12.01.09 TUBO PARA VOLEY INC. REDES Y DADOS DE ANCLAJE
02.12.01.10 ASTA DE BANDERA INC. INSTALACION
02.12.02 TRABAJOS DE LIMPIEZA
VA

PRESUPUESTO : MEJORAMIENTO DE Y AMPLIACIÓN


LA OFERTA DEL SERVICIO EDUCATIVO
DE AGUA DEI.E.P
RIEGONº DE
54418
SECTORES
SAGRADO
AIJADERO,
CORAZÓNUSCUPATA,
DE JESÚSQUISCABAMBA
DEL DISTRITO YDE
HUAYLLAC,
VILCABAMBA,
DISTRITO
PROVINCIA
MICAELA
GRAU,
BASTIDAS,
REGIÓN GRAU,
APURÍ
CLIENTE : MUNICIPALIDAD PROVINCIAL DE GRAU
UBICACIÓN : VILCABAMBA-GRAU-APURIMAC
AYRIHUANCA-MICAELA BASTIDAS-GRAU-APURIMAC
CONTRATISTA : CONSORCIO VILCABAMBA
JR INGENIEROS
INSPECTOR
SUPERVISOR : ING. SAMUEL
DIOMEDESMIRANDA
FERRELFARFÁN
SARMIENTO
INICIO DE PLAZO : 11 22 DE ENERO
JUNIO 2015
2016
PLAZO : 180
210 DIAS CALENDARIO

Item Descripción

02.12.02.01 LIMPIEZA PERMANENTE EN OBRA


02.12.02.02 LIMPIEZA FINAL DE OBRA
02.12.03 TRABAJOS DE JARDINERIA
02.12.03.01 SEMBRIO DE GRASS
02.12.03.02 ARBORIZACION
02.12.04 OTROS
02.12.04.01 CANALETA DE EVACUACION PLUVIAL CON REJILLA METALICA DE PROTECCION Y REVEST. C/CEMENTO PULIDO, (ancho=0.45, Alt=0.43)
02.12.04.02 CANALETA DE EVACUACION PLUVIAL SIN REJILLA METALICA DE PROTECCION Y REVEST. C/CEMENTO PULIDO, (ancho=0.45, Alt=0.43)
02.12.04.03 BANCAS DE CONCRETO TIPO 1, 2 Y 3 L= VARIABLE
02.12.04.04 BANCAS DE CONCRETO TIPO 4
02.13 SEÑALIZACION DE SEGURIDAD Y EVACUACION
02.13.01 SEÑALIZACION DE PROHIBICION
02.13.02 SEÑALIZACION INFORMATIVA
03 INSTALACIONES SANITARIAS
03.01 APARATOS SANITARIOS Y ACCESORIOS
03.01.01 APARATOS SANITARIOS
03.01.01.01 INODORO TANQUE BAJO DE LOSA BLANCO
03.01.01.02 LAVADERO DE ACERO INOXIDABLE 1 POZA S/ ESCURRIDOR INC. GRIFERIA
03.01.01.03 LAVATORIO DE LOSA BLANCA INC. GRIFERIA TEMPORIZADA
03.01.01.04 LAVADERO CORRIDO DE CONCRETO REVEST. C/ CERAMICO 40X40
03.01.01.05 GRIFERIA PARA DUCHA SIMPLE
03.01.01.06 GRIFERIA TEMPORIZADA PARA LAVADERO DE CONCRETO
VA

PRESUPUESTO : MEJORAMIENTO DE Y AMPLIACIÓN


LA OFERTA DEL SERVICIO EDUCATIVO
DE AGUA DEI.E.P
RIEGONº DE
54418
SECTORES
SAGRADO
AIJADERO,
CORAZÓNUSCUPATA,
DE JESÚSQUISCABAMBA
DEL DISTRITO YDE
HUAYLLAC,
VILCABAMBA,
DISTRITO
PROVINCIA
MICAELA
GRAU,
BASTIDAS,
REGIÓN GRAU,
APURÍ
CLIENTE : MUNICIPALIDAD PROVINCIAL DE GRAU
UBICACIÓN : VILCABAMBA-GRAU-APURIMAC
AYRIHUANCA-MICAELA BASTIDAS-GRAU-APURIMAC
CONTRATISTA : CONSORCIO VILCABAMBA
JR INGENIEROS
INSPECTOR
SUPERVISOR : ING. SAMUEL
DIOMEDESMIRANDA
FERRELFARFÁN
SARMIENTO
INICIO DE PLAZO : 11 22 DE ENERO
JUNIO 2015
2016
PLAZO : 180
210 DIAS CALENDARIO

Item Descripción

03.01.02 ACCESORIOS SANITARIOS


03.01.02.01 JABONERA LOSA BLANCA
03.01.02.02 DISPENSADOR DE JABON LIQUIDO
03.01.02.03 PAPELERA DE CERAMICA BLANCA
03.01.02.04 TOALLERA CON SOPORTE DE LOSA Y BARRA PLASTICA COLOR BLANCO
03.01.03 INSTALACION DE APARATOS Y ACCESORIOS
03.01.03.01 INSTALACION DE APARATOS SANITARIOS
03.01.03.02 INSTALACION DE ACCESORIOS SANITARIOS
03.02 SISTEMA DE AGUA FRIA
03.02.01 SALIDA DE AGUA FRIA
03.02.01.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-P 1/2"
03.02.02 REDES DE DISTRIBUCION
03.02.02.01 RED DE DISTRIBUCION TUBERIA PVC-P CLASE 10 C/ ROSCA 1/2"
03.02.02.02 RED DE DISTRIBUCION TUBERIA PVC-P CLASE 10 C/ ROSCA 3/4"
03.02.02.03 RED DE DISTRIBUCION TUBERIA PVC-P CLASE 10 C/ ROSCA 1"
03.02.03 REDES DE ALIMENTACION
03.02.03.01 MOVIMIENTO DE TIERRAS
03.02.03.01.01 EXCAVACION DE ZANJAS PARA TUBERIA DE AGUA
03.02.03.01.02 REFINE Y NIVELACION ZANJAS
03.02.03.01.03 CAMA DE ARENA EN ZANJA
03.02.03.01.04 RELLENO Y COMPACTACION CON EQUIPO Y MAT. PROPIO
03.02.04 INSTALACION DE TUBERIA
VA

PRESUPUESTO : MEJORAMIENTO DE Y AMPLIACIÓN


LA OFERTA DEL SERVICIO EDUCATIVO
DE AGUA DEI.E.P
RIEGONº DE
54418
SECTORES
SAGRADO
AIJADERO,
CORAZÓNUSCUPATA,
DE JESÚSQUISCABAMBA
DEL DISTRITO YDE
HUAYLLAC,
VILCABAMBA,
DISTRITO
PROVINCIA
MICAELA
GRAU,
BASTIDAS,
REGIÓN GRAU,
APURÍ
CLIENTE : MUNICIPALIDAD PROVINCIAL DE GRAU
UBICACIÓN : VILCABAMBA-GRAU-APURIMAC
AYRIHUANCA-MICAELA BASTIDAS-GRAU-APURIMAC
CONTRATISTA : CONSORCIO VILCABAMBA
JR INGENIEROS
INSPECTOR
SUPERVISOR : ING. SAMUEL
DIOMEDESMIRANDA
FERRELFARFÁN
SARMIENTO
INICIO DE PLAZO : 11 22 DE ENERO
JUNIO 2015
2016
PLAZO : 180
210 DIAS CALENDARIO

Item Descripción

03.02.04.01 RED DE ALIMENTACION TUBERIA PVC-P CLASE 10 C/ ROSCA 1/2"


03.02.04.02 RED DE ALIMENTACION TUBERIA PVC-P CLASE 10 C/ ROSCA 1"
03.02.04.03 RED DE ALIMENTACION TUBERIA PVC-P CLASE 10 C/ ROSCA 1 1/2"
03.02.05 ACCESORIOS DE REDES DE AGUA
03.02.05.01 CODO PVC-P 1/2"X90°
03.02.05.02 CODO PVC-P 1"X90°
03.02.05.03 CODO PVC-P 1 1/2"X90°
03.02.05.04 CODO PVC-P 1"X45°
03.02.05.05 TEE PVC-P Ø 1"
03.02.05.06 TEE PVC-P 1 1/2"
03.02.05.07 REDUCCIONES PVC-P 2" A 1 1/2"
03.02.05.08 REDUCCIONES PVC-P 1 1/2" A 1"
03.02.05.09 REDUCCIONES PVC-P 1" A 3/4"
03.02.05.10 REDUCCIONES PVC-P 1" A 1/2"
03.02.05.11 UNION UNIVERSAL PVC-P Ø 1"
03.02.06 LLAVES Y VALVULAS
03.02.06.01 LLAVE DE RIEGO CON GRIFO DE 1/2"
03.02.06.02 VALVULA COMPUERTA DE BRONCE DE Ø 1/2"
03.02.06.03 VALVULA COMPUERTA DE BRONCE DE Ø 3/4"
03.02.06.04 VALVULA COMPUERTA DE BRONCE DE Ø 1"
03.02.06.05 VALVULA CHECK DE BRONCE 1"
03.02.07 PIEZAS VARIAS
VA

PRESUPUESTO : MEJORAMIENTO DE Y AMPLIACIÓN


LA OFERTA DEL SERVICIO EDUCATIVO
DE AGUA DEI.E.P
RIEGONº DE
54418
SECTORES
SAGRADO
AIJADERO,
CORAZÓNUSCUPATA,
DE JESÚSQUISCABAMBA
DEL DISTRITO YDE
HUAYLLAC,
VILCABAMBA,
DISTRITO
PROVINCIA
MICAELA
GRAU,
BASTIDAS,
REGIÓN GRAU,
APURÍ
CLIENTE : MUNICIPALIDAD PROVINCIAL DE GRAU
UBICACIÓN : VILCABAMBA-GRAU-APURIMAC
AYRIHUANCA-MICAELA BASTIDAS-GRAU-APURIMAC
CONTRATISTA : CONSORCIO VILCABAMBA
JR INGENIEROS
INSPECTOR
SUPERVISOR : ING. SAMUEL
DIOMEDESMIRANDA
FERRELFARFÁN
SARMIENTO
INICIO DE PLAZO : 11 22 DE ENERO
JUNIO 2015
2016
PLAZO : 180
210 DIAS CALENDARIO

Item Descripción

03.02.07.01 CAJAS PARA VALVULAS 0.20 x 0.20 M.


03.02.07.02 CAJA PARA MEDIDOR
03.02.08 EMPALMES Y PRUEBAS HIDRAULICA
03.02.08.01 PRUEBA HIDRAULICA Y DESINFECCION DE TUBERIAS
03.03 SISTEMA DE DRENAJE PLUVIAL
03.03.01 RED DE RECOLECCION
03.03.01.01 PASE DE DRENAJE PLUVIAL C/TUBERIA DE PVC-P Ø 4"
03.03.01.02 PASE DE DRENAJE PLUVIAL C/TUBERIA DE PVC-P Ø 6"
03.03.02 TUBERIAS DE BAJADA Y MONTANTES
03.03.02.01 MONTANTE Y/O BAJANTES PLUVIAL CON TUB PVC-P Ø 4"
03.03.03 ACCESORIOS DE REDES PLUVIALES
03.03.03.01 CODO PVC-P 4"X45°
03.03.03.02 CODO PVC-P 4"X90°
03.03.04 ADITAMIENTOS VARIOS
03.03.04.01 CAJA DE REG. CONCR. - 30 x 60cm TAPA CONCRETO
03.03.05 EMPALMES Y PRUEBAS HIDRAULICAS
03.03.05.01 PRUEBA HIDRAULICA DE ESCORRENTIA EN RED PLUVIAL
03.03.05.02 DESCARGA PLUVIAL A LA RED PUBLICA
03.04 SISTEMA DE DESAGUE
03.04.01 SALIDAS DE DESAGUE Y VENTILACION
03.04.01.01 SALIDA DE DESAGUE EN PVC-P 4"
03.04.01.02 SALIDA DE DESAGUE EN PVC-P 2"
VA

PRESUPUESTO : MEJORAMIENTO DE Y AMPLIACIÓN


LA OFERTA DEL SERVICIO EDUCATIVO
DE AGUA DEI.E.P
RIEGONº DE
54418
SECTORES
SAGRADO
AIJADERO,
CORAZÓNUSCUPATA,
DE JESÚSQUISCABAMBA
DEL DISTRITO YDE
HUAYLLAC,
VILCABAMBA,
DISTRITO
PROVINCIA
MICAELA
GRAU,
BASTIDAS,
REGIÓN GRAU,
APURÍ
CLIENTE : MUNICIPALIDAD PROVINCIAL DE GRAU
UBICACIÓN : VILCABAMBA-GRAU-APURIMAC
AYRIHUANCA-MICAELA BASTIDAS-GRAU-APURIMAC
CONTRATISTA : CONSORCIO VILCABAMBA
JR INGENIEROS
INSPECTOR
SUPERVISOR : ING. SAMUEL
DIOMEDESMIRANDA
FERRELFARFÁN
SARMIENTO
INICIO DE PLAZO : 11 22 DE ENERO
JUNIO 2015
2016
PLAZO : 180
210 DIAS CALENDARIO

Item Descripción

03.04.01.03 SALIDA DE VENTILACION EN PVC 2"


03.04.02 REDES DE DISTRIBUCION
03.04.02.01 RED DE DISTRIBUCION TUBERIA DE PVC-SAP 2"
03.04.02.02 RED DE DISTRIBUCION TUBERIA DE PVC-SAP 4"
03.04.02.03 MONTANTE Y/O VENTILACION CON TUB. PVC-P DE 4"
03.04.03 REDES COLECTORAS
03.04.03.01 MOVIMIENTO DE TIERRAS
03.04.03.01.01 EXCAVACION DE ZANJAS PARA TUBERIA
03.04.03.01.02 REFINE Y NIVELACION ZANJAS
03.04.03.01.03 CAMA DE ARENA EN TUBERIA
03.04.03.01.04 RELLENO Y COMPACTACION CON EQUIPO Y MAT. PROPIO
03.04.04 INSTALACION DE TUBERIAS
03.04.04.01 RED COLECTORA CON TUBERIA DE PVC-SAP Ø 4"
03.04.05 ACCESORIOS DE REDES
03.04.05.01 CODO PVC-P 2"X90°
03.04.05.02 CODO PVC-P 4"X90°
03.04.05.03 YEE C/ REDUCCION 4"-2"
03.04.05.04 YEE PVC-P SIMPLE DE 4"
03.04.05.05 TEE SANITARIA PVC-P Ø 4"
03.04.06 ADITAMIENTO VARIOS
03.04.06.01 CAJA SUMIDERO 20X20 CON REJILLA DE FIERRO REMOVIBLE - TUB Ø 3
03.04.06.02 REGISTRO DE BRONCE 4"
VA

PRESUPUESTO : MEJORAMIENTO DE Y AMPLIACIÓN


LA OFERTA DEL SERVICIO EDUCATIVO
DE AGUA DEI.E.P
RIEGONº DE
54418
SECTORES
SAGRADO
AIJADERO,
CORAZÓNUSCUPATA,
DE JESÚSQUISCABAMBA
DEL DISTRITO YDE
HUAYLLAC,
VILCABAMBA,
DISTRITO
PROVINCIA
MICAELA
GRAU,
BASTIDAS,
REGIÓN GRAU,
APURÍ
CLIENTE : MUNICIPALIDAD PROVINCIAL DE GRAU
UBICACIÓN : VILCABAMBA-GRAU-APURIMAC
AYRIHUANCA-MICAELA BASTIDAS-GRAU-APURIMAC
CONTRATISTA : CONSORCIO VILCABAMBA
JR INGENIEROS
INSPECTOR
SUPERVISOR : ING. SAMUEL
DIOMEDESMIRANDA
FERRELFARFÁN
SARMIENTO
INICIO DE PLAZO : 11 22 DE ENERO
JUNIO 2015
2016
PLAZO : 180
210 DIAS CALENDARIO

Item Descripción

03.04.06.03 SUMIDERO DE BRONCE 2"


03.04.06.04 SOMBRERO PARA VENTILACION DE PVC DE 2"
03.04.07 CAMARA DE INSPECCION
03.04.07.01 CAJAS DE REGISTRO
03.04.07.01.01 CAJA DE REG. CONCR. - 30 x 60cm TAPA CONCRETO
03.04.08 EMPALMES Y PRUEBAS HIDRAULICAS
03.04.08.01 PRUEBA HIDRAULICA + ESCORRENTIA DE TUB. DESAGUE
03.05 SISTEMA DE CISTERNA Y TANQUE ELEVADO
03.05.01 RED DE CISTERNA Y TANQUE ELEVADO
03.05.01.01 TUBO DE FºGº DE 2 1/2 - SUCCION
03.05.01.02 TUBO DE FºGº DE 4" - REBOSE DE CISTERNA
03.05.01.03 TUBO DE FºGº DE 4" - REBOSE Y LIMPIEZA
03.05.01.04 TUBO DE FºGº DE 2" - IMPULSION
03.05.01.05 TUBO DE FºGº DE 2" - ALIMENTACION
03.05.02 VALVULAS
03.05.02.01 VALVULA DE PIE CON CANASTILLA Ø 2 1/2"
03.05.02.02 VALVULA COMPUERTA DE BRONCE 2"
03.05.02.03 VALVULA CHECK 2 1/2 "
03.05.03 ACCESORIOS DE CISTERNA Y TANQUE ELEVADO
03.05.03.01 UNION UNIVERSAL DE FIERRO GALVANIZADO DE 3"
03.05.03.02 UNION UNIVERSAL DE FIERRO GALVANIZADO DE 2"
03.05.03.03 TAPON DE CEBADO 3"
VA

PRESUPUESTO : MEJORAMIENTO DE Y AMPLIACIÓN


LA OFERTA DEL SERVICIO EDUCATIVO
DE AGUA DEI.E.P
RIEGONº DE
54418
SECTORES
SAGRADO
AIJADERO,
CORAZÓNUSCUPATA,
DE JESÚSQUISCABAMBA
DEL DISTRITO YDE
HUAYLLAC,
VILCABAMBA,
DISTRITO
PROVINCIA
MICAELA
GRAU,
BASTIDAS,
REGIÓN GRAU,
APURÍ
CLIENTE : MUNICIPALIDAD PROVINCIAL DE GRAU
UBICACIÓN : VILCABAMBA-GRAU-APURIMAC
AYRIHUANCA-MICAELA BASTIDAS-GRAU-APURIMAC
CONTRATISTA : CONSORCIO VILCABAMBA
JR INGENIEROS
INSPECTOR
SUPERVISOR : ING. SAMUEL
DIOMEDESMIRANDA
FERRELFARFÁN
SARMIENTO
INICIO DE PLAZO : 11 22 DE ENERO
JUNIO 2015
2016
PLAZO : 180
210 DIAS CALENDARIO

Item Descripción

03.05.03.04 CODO FºGº 2 " x 90º


03.05.03.05 TEE FºGº 2"
03.05.04 ADITAMIENTOS VARIOS
03.05.04.01 SOMBRERO VENTILACION PVC DE 2"
03.05.04.02 BRIDA DE ACERO PARA SOLDAR ROMPE AGUA DE 4" (100MM)
03.05.04.03 CONO DE REBOSE 6" x 4" DE PVC
03.05.04.04 ABRAZADERA PARA TUBERIA FºGº; e=1/8"
03.05.04.05 CONTROL AUTOMATICO PARA CISTERNA Y TANQUE ELEVADO
03.05.04.06 DADO DE APOYO DE CONCRETO PARA BOMBAS(0.40X0.70X0.20M)
03.05.05 EQUIPOS Y OTRAS INSTALACIONES
03.05.05.01 SUMINISTRO E INSTALACION DE EQUIPOS
03.05.05.01.01 SUMINISTRO E INSTALACION DE ELECTROBOMBA DE 1HP
04 INSTALACIONES ELECTRICAS
04.01 TRABAJOS PRELIMINARES
04.01.01 EXCAVACION DE ZANJAS EN REDES ELECTRICAS
04.01.02 RELLENO MANUAL C/MATERIAL PROPIO EN REDES ELECTRICAS
04.01.03 CINTA SEÑALIZADORA
04.02 SALIDAS ELECTRICAS Y DE FUERZA
04.02.01 SALIDAS PARA ALUMBRADO
04.02.01.01 SALIDA PARA ALUMBRADO EN TECHO DE PVC - NH-80 (2x4+1x2.5 (T) mm2-20mm Ø PVC-P CAJA PESADA
04.02.02 SALIDAS PARA INTERRUPTORES
04.02.02.01 INTERRUPTOR UNIPOLAR SIMPLE PVC - NH-80[2-1x4+1x2.5(T)]mm2 - 20 mm Ø PVC-P - CAJA PESADA
VA

PRESUPUESTO : MEJORAMIENTO DE Y AMPLIACIÓN


LA OFERTA DEL SERVICIO EDUCATIVO
DE AGUA DEI.E.P
RIEGONº DE
54418
SECTORES
SAGRADO
AIJADERO,
CORAZÓNUSCUPATA,
DE JESÚSQUISCABAMBA
DEL DISTRITO YDE
HUAYLLAC,
VILCABAMBA,
DISTRITO
PROVINCIA
MICAELA
GRAU,
BASTIDAS,
REGIÓN GRAU,
APURÍ
CLIENTE : MUNICIPALIDAD PROVINCIAL DE GRAU
UBICACIÓN : VILCABAMBA-GRAU-APURIMAC
AYRIHUANCA-MICAELA BASTIDAS-GRAU-APURIMAC
CONTRATISTA : CONSORCIO VILCABAMBA
JR INGENIEROS
INSPECTOR
SUPERVISOR : ING. SAMUEL
DIOMEDESMIRANDA
FERRELFARFÁN
SARMIENTO
INICIO DE PLAZO : 11 22 DE ENERO
JUNIO 2015
2016
PLAZO : 180
210 DIAS CALENDARIO

Item Descripción

04.02.02.02 INTERRUPTOR UNIPOLAR DOBLE PVC - NH-80[2-1x4+1x2.5(T)]mm2 - 20 mm Ø PVC-P - CAJA PESADA


04.02.02.03 INTERRUPTOR DE CONMUTACION SIMPLE ( 3 VIAS ) PVC - P 20 mm (NH-80 2x4+1x2.5 mm2) - CAJA PESADA
04.02.03 SALIDA PARA TOMACORRIENTES
04.02.03.01 TOMACORRIENTE MONOFASICO DOBLE C/ PUESTA A TIERRA PVC - NH-80[2-1x4+1x2.5(T)]mm2 - 20 mm Ø PVC-P - CAJA PESADA - EN PARED
04.02.03.02 TOMACORRIENTE MONOFASICO DOBLE C/ PUESTA A TIERRA PVC - NH-80[2-1x4+1x2.5(T)]mm2 - 20 mm Ø PVC-P - CAJA PESADA - EN PARED, PARA
04.02.04 SALIDA DE FUERZA
04.02.04.01 SALIDA PARA ELECTROBOMBAS C/ LINEA A TIERRA PVC - P 20 mm (NH-80 4x4+1x2.5 mm2) - CAJA PESADA
04.02.05 CAJAS DE PASE
04.02.05.01 CAJA DE PASE 100 x 100 x 40 mm
04.02.05.02 CAJA DE PASE 150 x 150 x 40 mm
04.02.06 TUBERIAS
04.02.06.01 TUBERIA PVC - P ( ELECTRICAS ) D = 40 mm
04.02.07 CONDUCTORES EN TUBERIAS
04.02.07.01 CABLE ELECTRICO NHX-90 6 mm2
04.02.07.02 CABLE ELECTRICO N2XH 10 mm2
04.02.07.03 CABLE ELECTRICO N2XH 16 mm2
04.02.07.04 CABLE ELECTRICO N2XH 25 mm2
04.02.08 TABLEROS
04.02.08.01 TABLERO DE CONTROL AUTOMATICO DE ELECTROBOMBAS
04.02.08.02 TABLERO DE DISTRIBUCIÓN CAJA METALICA CON 8 POLOS ( DEL TIPO PARA EMPOTRAR )
04.02.08.03 TABLERO DE DISTRIBUCIÓN CAJA METALICA CON 10 POLOS ( DEL TIPO PARA EMPOTRAR )
04.02.08.04 TABLERO DE DISTRIBUCIÓN CAJA METALICA CON 36 POLOS ( DEL TIPO PARA EMPOTRAR )
VA

PRESUPUESTO : MEJORAMIENTO DE Y AMPLIACIÓN


LA OFERTA DEL SERVICIO EDUCATIVO
DE AGUA DEI.E.P
RIEGONº DE
54418
SECTORES
SAGRADO
AIJADERO,
CORAZÓNUSCUPATA,
DE JESÚSQUISCABAMBA
DEL DISTRITO YDE
HUAYLLAC,
VILCABAMBA,
DISTRITO
PROVINCIA
MICAELA
GRAU,
BASTIDAS,
REGIÓN GRAU,
APURÍ
CLIENTE : MUNICIPALIDAD PROVINCIAL DE GRAU
UBICACIÓN : VILCABAMBA-GRAU-APURIMAC
AYRIHUANCA-MICAELA BASTIDAS-GRAU-APURIMAC
CONTRATISTA : CONSORCIO VILCABAMBA
JR INGENIEROS
INSPECTOR
SUPERVISOR : ING. SAMUEL
DIOMEDESMIRANDA
FERRELFARFÁN
SARMIENTO
INICIO DE PLAZO : 11 22 DE ENERO
JUNIO 2015
2016
PLAZO : 180
210 DIAS CALENDARIO

Item Descripción

04.02.09 INTERRUPTORES TERMOMAGNETICOS


04.02.09.01 INTERRUPTOR THERMOMAGNETICO MONOFASICO 2 X 15A
04.02.09.02 INTERRUPTOR THERMOMAGNETICO MONOFASICO 2 X 20A
04.02.09.03 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 30A
04.02.09.04 INTERRUPTOR TERMOMAGNETICO TRIFASICO 3 x 30 A
04.02.09.05 INTERRUPTOR TERMOMAGNETICO TRIFASICO 3 x 40 A
04.02.09.06 INTERRUPTOR TERMOMAGNETICO TRIFASICO 3 x 50 A
04.02.09.07 INTERRUPTOR TERMOMAGNETICO TRIFASICO 3 x 100 A
04.02.09.08 INTERRUPTOR DIFERENCIAL 30 mA (2x25A)
04.02.09.09 CONTACTOR AC -32X20A COTROLADO POR INTERRUPTOR HORARIO 16 A, 220V
04.02.09.10 BOTONERA DE ENCENDIDO Y APAGADO
04.02.10 PARARRAYOS
04.02.10.01 SUMINISTRO E INSTALACION DE PARARAYOS
04.02.11 SISTEMA DE PUESTA A TIERRA
04.02.11.01 SISTEMA CON MALLA DE PUESTA A TIERRA R <25 ohms
04.02.12 LAMPARAS
04.02.12.01 ARTEFACTO ADOSADO A TECHO, CON 3 LAMPARAS FLUORESCENTE 3x36W C/SOPORTE ( MODELO JOSFEL BE 3x36W O SIMILAR )
04.02.12.02 ARTEFACTO ADOSADO A TECHO, CON 2 LAMPARAS FLUORESCENTE 2x18W C/SOPORTE ( MODELO JOSFEL BE 3x36W O SIMILAR )
04.02.12.03 ARTEFACTO ADOSADO A TECHO, CON SOCKETE DE PORCELANA Y 1 LAMPARA AHORRADORA DE 50W.
04.02.12.04 COLOCACION DE LAMPARAS
04.02.12.05 LUZ DE EMERGENCIA CON 2 REFLECTORES DIRECCIONALES DE 25 W.
04.02.13 REFLECTORES Y FAROLAS
VA

PRESUPUESTO : MEJORAMIENTO DE Y AMPLIACIÓN


LA OFERTA DEL SERVICIO EDUCATIVO
DE AGUA DEI.E.P
RIEGONº DE
54418
SECTORES
SAGRADO
AIJADERO,
CORAZÓNUSCUPATA,
DE JESÚSQUISCABAMBA
DEL DISTRITO YDE
HUAYLLAC,
VILCABAMBA,
DISTRITO
PROVINCIA
MICAELA
GRAU,
BASTIDAS,
REGIÓN GRAU,
APURÍ
CLIENTE : MUNICIPALIDAD PROVINCIAL DE GRAU
UBICACIÓN : VILCABAMBA-GRAU-APURIMAC
AYRIHUANCA-MICAELA BASTIDAS-GRAU-APURIMAC
CONTRATISTA : CONSORCIO VILCABAMBA
JR INGENIEROS
INSPECTOR
SUPERVISOR : ING. SAMUEL
DIOMEDESMIRANDA
FERRELFARFÁN
SARMIENTO
INICIO DE PLAZO : 11 22 DE ENERO
JUNIO 2015
2016
PLAZO : 180
210 DIAS CALENDARIO

Item Descripción

04.02.13.01 PROYECTOR TIPO PRDI DE 1x400 DE PORTALAMPARAS


04.02.13.02 FAROLA ESFERICA PARA EXTERIOR INSTALADO EN POSTE 70W DE HALOGENURO METALICO
04.02.14 VARIOS
04.02.14.01 BUZON DE CONCRETO 1.10m x 1.10m x 1.20m
04.02.14.02 POSTE DE CONCRETO 6/70/90/180
04.02.14.03 POSTE DE CONCRETO H=11.00M
04.02.15 PRUEBAS ELECTRICAS
04.02.15.01 PRUEBAS DE AISLAMIENTO Y RESISTIVIDAD
04.03 INSTALACIONES DE COMUNICACIONES Y SEÑALES
04.03.01 CAJAS DE PASE
04.03.01.01 CAJA DE PASE 100 x 100 x 40 mm
04.03.01.02 CAJA DE PASE 150 x 150 x 40 mm
04.03.02 TUBERIAS
04.03.02.01 TUBERIA PVC - P ( COMUNICACIONES ) D = 25 mm
04.03.02.02 TUBERIA PVC - P ( COMUNICACIONES ) D = 35 mm
04.03.03 SALIDA DE COMUNICACIONES
04.03.03.01 SALIDA PARA TELEFONOS EXTERNOS
04.03.04 SALIDA PARA TIMBRES
04.03.04.01 SALIDA PARA TIMBRE
04.03.05 SALIDAS PARA TV-CABLE
04.03.05.01 SALIDA PARA TV CABLE
04.03.06 SALIDA DE COMPUTO
VA

PRESUPUESTO : MEJORAMIENTO DE Y AMPLIACIÓN


LA OFERTA DEL SERVICIO EDUCATIVO
DE AGUA DEI.E.P
RIEGONº DE
54418
SECTORES
SAGRADO
AIJADERO,
CORAZÓNUSCUPATA,
DE JESÚSQUISCABAMBA
DEL DISTRITO YDE
HUAYLLAC,
VILCABAMBA,
DISTRITO
PROVINCIA
MICAELA
GRAU,
BASTIDAS,
REGIÓN GRAU,
APURÍ
CLIENTE : MUNICIPALIDAD PROVINCIAL DE GRAU
UBICACIÓN : VILCABAMBA-GRAU-APURIMAC
AYRIHUANCA-MICAELA BASTIDAS-GRAU-APURIMAC
CONTRATISTA : CONSORCIO VILCABAMBA
JR INGENIEROS
INSPECTOR
SUPERVISOR : ING. SAMUEL
DIOMEDESMIRANDA
FERRELFARFÁN
SARMIENTO
INICIO DE PLAZO : 11 22 DE ENERO
JUNIO 2015
2016
PLAZO : 180
210 DIAS CALENDARIO

Item Descripción

04.03.06.01 SALIDA PARA DATA EN PARED


04.03.06.02 SALIDA PARA RACK DE COMPUTO
01 INSTALACIÓN DE MOBILIARIOS Y EQUIPOS
01.01 INSTALACIÓN DE MOBILIARIOS
01.01.01 CARPETA UNIPERSONAL (MESA Y SILLA) EN MADERA ÁGUANO
01.01.02 MESA CIRCULAR C/ESTRUCTURA DE MADERA ÁGUANO Y TABLERO DE FÓRMICA e=20mm
01.01.03 ESTANTE DE MELAMINE
01.01.04 CASILLERO METÁLICO INC. ACCESORIOS DE 0.4x0.40 m
01.01.05 ESCRITORIO DE MALAMINE EN "L"
01.01.06 ESCRITORIO PARA PROFESORES
01.01.07 MUEBLE PARA COMPUTADORA EN MATERIAL MELAMINE
01.01.08 SILLA GIRATORIA ATHOZ ALTO
01.01.09 SILLA GIRATORIA LINEA ARCADIA
01.01.10 SILLA DE PLÁSTICO COLOR BLANCO
01.01.11 JUEGO DE SOFA DE TRES PIEZAS
01.01.12 CAMA DE MADERA ÁGUANO DE 1 PLAZA INC. COLCHÓN
01.01.13 MESA PARA EXÁMEN Y CURACIÓN
01.01.14 ESCALINATA METÁLICA DE DOS PELDAÑOS
01.01.15 BIOMBO METÁLICO DE 02 CUERPOS
01.01.16 PAPELERA METÁLICA
01.01.17 COCINA SEMI INDUSTRIAL 04 ORNILLAS INC./BALÓN DE GAS
01.02 INSTALACIÓN DE EQUIPOS
VA

PRESUPUESTO : MEJORAMIENTO DE Y AMPLIACIÓN


LA OFERTA DEL SERVICIO EDUCATIVO
DE AGUA DEI.E.P
RIEGONº DE
54418
SECTORES
SAGRADO
AIJADERO,
CORAZÓNUSCUPATA,
DE JESÚSQUISCABAMBA
DEL DISTRITO YDE
HUAYLLAC,
VILCABAMBA,
DISTRITO
PROVINCIA
MICAELA
GRAU,
BASTIDAS,
REGIÓN GRAU,
APURÍ
CLIENTE : MUNICIPALIDAD PROVINCIAL DE GRAU
UBICACIÓN : VILCABAMBA-GRAU-APURIMAC
AYRIHUANCA-MICAELA BASTIDAS-GRAU-APURIMAC
CONTRATISTA : CONSORCIO VILCABAMBA
JR INGENIEROS
INSPECTOR
SUPERVISOR : ING. SAMUEL
DIOMEDESMIRANDA
FERRELFARFÁN
SARMIENTO
INICIO DE PLAZO : 11 22 DE ENERO
JUNIO 2015
2016
PLAZO : 180
210 DIAS CALENDARIO

Item Descripción

01.02.01 SUMINISTRO E INSTALACIÓN DE COMPUTADORA CORE 15 INC. PANTALLA 19"


01.02.02 SUMINISTRO E INSTALACIÓN DE LAPTOP 14" LCD CPU - INTEL PENTIUM P6200
01.02.03 SUMINISTRO E INSTALACIÓN DE IMPRESORA MULTIFUNCIONAL
01.02.04 SUMINISTRO E INSTALACIÓN DE FOTOCOPIADORA ELECTROPHOTPGRAFIC LASER
01.02.05 TELEVISOR LCD 32"
01.02.06 SUMINISTRO E INSTALACIÓN PROYECTOR MULTIMEDIA INC. ECRAN DE 3.00 x 2.40 m.
01.02.07 MICRÓFONO INALAMBRICO LX-700 LEXSEN
01.02.08 SUMINISTRO E INSTALACIÓN PARLANTE DE TECHO DE 80W
01.02.09 EQUIPO DE SONIDO
01.02.10 EQUIPAMIENTO PARA TÓPICO
01.02.11 MATERIAL DEPORTIVO
01.02.12 INSTRUMENTOS DE MÚSICA
01.02.13 RACK PARA TECHO
01.02.14 RELOJ CONTROL DE ASISTENCIA
01.02.15 MENAJERÍA
01.02.16 KIT DE LIBROS
02 TRANSPORTE DE MOBILIARIOS Y EQUIPOS
02.01 FLETE TERRESTRE
Costo Directo
GASTOS GENERALES (10.00%)
UTILIDAD (5.50%)
SUB TOTAL
VA

PRESUPUESTO : MEJORAMIENTO DE Y AMPLIACIÓN


LA OFERTA DEL SERVICIO EDUCATIVO
DE AGUA DEI.E.P
RIEGONº DE
54418
SECTORES
SAGRADO
AIJADERO,
CORAZÓNUSCUPATA,
DE JESÚSQUISCABAMBA
DEL DISTRITO YDE
HUAYLLAC,
VILCABAMBA,
DISTRITO
PROVINCIA
MICAELA
GRAU,
BASTIDAS,
REGIÓN GRAU,
APURÍ
CLIENTE : MUNICIPALIDAD PROVINCIAL DE GRAU
UBICACIÓN : VILCABAMBA-GRAU-APURIMAC
AYRIHUANCA-MICAELA BASTIDAS-GRAU-APURIMAC
CONTRATISTA : CONSORCIO VILCABAMBA
JR INGENIEROS
INSPECTOR
SUPERVISOR : ING. SAMUEL
DIOMEDESMIRANDA
FERRELFARFÁN
SARMIENTO
INICIO DE PLAZO : 11 22 DE ENERO
JUNIO 2015
2016
PLAZO : 180
210 DIAS CALENDARIO

Item Descripción

IGV (18%)
PRESUPUESTO TOTAL 1
EQUIPAMIENTO Y MOBILIARIO
IGV (18%)
PRESUPUESTO TOTAL 2
PRESUPUESTO TOTAL

ESTADO DE LA OBRA:
OBRA EN AVANCE NORMAL
0.64%
VALORIZACION DE OBRA Nº 03
MES MARZO DEL 2016
TIDAS,
EGIÓN GRAU,
APURÍMAC
APURÍMAC

Presupuesto Valorizaciones
Anterior Actual Acumul
Und Metrado Precio Parcial
Metrado Parcial % Metrado Parcial % Metrado
1,370,536.52 560,837.63 40.92% 343,467.36 25.06%
218,570.46 128,519.57 58.80% 35,034.20 16.03%
218,570.46 128,519.57 58.80% 35,034.20 16.03%
23,822.36 23,822.36 100.00% 0.00 0.00%
mes 6.00 150.00 900.00 6.00 900.00 100.00% - - 0.00% 6.00
u 1.00 1,470.75 1,470.75 1.00 1,470.75 100.00% - - 0.00% 1.00
m 234.20 31.68 7,419.46 234.20 7,419.46 100.00% - - 0.00% 234.20
mes 6.00 110.00 660.00 6.00 660.00 100.00% - - 0.00% 6.00
glb 1.00 13,372.15 13,372.15 1.00 13,372.15 100.00% - - 0.00% 1.00
1,485.54 1,392.01 93.70% 36.38 2.45%
m2 2,435.31 0.61 1,485.54 2,281.99 1,392.01 93.70% 59.64 36.38 2.45% 2,341.63
1,915.85 1,915.85 100.00% - 0.00%
m2 49.38 3.51 173.32 49.38 173.32 100.00% - - 0.00% 49.38
m2 54.50 2.80 152.60 54.50 152.60 100.00% - - 0.00% 54.50
u 1.00 25.46 25.46 1.00 25.46 100.00% - - 0.00% 1.00
u 83.00 2.80 232.40 83.00 232.40 100.00% - - 0.00% 83.00
u 8.00 7.01 56.08 8.00 56.08 100.00% - - 0.00% 8.00
m2 461.55 0.94 433.86 461.55 433.86 100.00% - - 0.00% 461.55
u 62.00 2.14 132.68 62.00 132.68 100.00% - - 0.00% 62.00
m2 999.22 0.71 709.45 999.22 709.45 100.00% - - 0.00% 999.22
18,777.12 18,777.12 100.00% - 0.00%
m2 1,442.98 6.21 8,960.91 1,442.98 8,960.91 100.00% - - 0.00% 1,442.98
VALORIZACION DE OBRA Nº 03
MES MARZO DEL 2016
TIDAS,
EGIÓN GRAU,
APURÍMAC
APURÍMAC

Presupuesto Valorizaciones
Anterior Actual Acumul
Und Metrado Precio Parcial
Metrado Parcial % Metrado Parcial % Metrado
m2 83.91 6.21 521.08 83.91 521.08 100.00% - - 0.00% 83.91
m2 923.78 2.80 2,586.58 923.78 2,586.58 100.00% - - 0.00% 923.78
m2 285.53 7.76 2,215.71 285.53 2,215.71 100.00% - - 0.00% 285.53
m3 180.46 14.11 2,546.29 180.46 2,546.29 100.00% - - 0.00% 180.46
m3 2.71 14.98 40.60 2.71 40.60 100.01% - - 0.00% 2.71
m3 126.52 4.97 628.80 126.52 628.80 100.00% - - 0.00% 126.52
m3 35.39 18.82 666.04 35.39 666.04 100.00% - - 0.00% 35.39
m3 4.54 19.42 88.17 4.54 88.17 100.00% - - 0.00% 4.54
m3 0.31 19.42 6.02 0.31 6.02 100.00% - - 0.00% 0.31
m2 115.59 4.36 503.97 115.59 503.97 100.00% - - 0.00% 115.59
m3 1.17 7.66 8.96 1.17 8.96 99.98% - - 0.00% 1.17
m3 0.13 5.75 0.75 0.13 0.75 100.33% - - 0.00% 0.13
m3 0.31 10.44 3.24 0.31 3.24 100.11% - - 0.00% 0.31
27,141.28 24,978.61 92.03% - 0.00%
m3 1,549.16 6.50 10,069.54 1,425.72 9,267.18 92.03% - - 0.00% 1,425.72
m3 1,549.16 11.02 17,071.74 1,425.72 15,711.43 92.03% - - 0.00% 1,425.72
8,830.05 7,369.60 83.46% 359.15 4.07%
m2 2,435.31 1.60 3,896.50 2,269.57 3,631.31 93.19% 59.64 95.42 2.45% 2,329.21
m2 3,083.47 1.60 4,933.55 2,336.43 3,738.29 75.77% 164.83 263.73 5.35% 2,501.26
14,036.82 9,669.04 68.88% 949.16 6.76%
glb 1.00 6,150.00 6,150.00 0.70 4,305.00 70.00% 0.10 615.00 10.00% 0.80
u 30.00 156.73 4,701.90 20.00 3,134.60 66.67% 0.10 15.67 0.33% 20.10
VALORIZACION DE OBRA Nº 03
MES MARZO DEL 2016
TIDAS,
EGIÓN GRAU,
APURÍMAC
APURÍMAC

Presupuesto Valorizaciones
Anterior Actual Acumul
Und Metrado Precio Parcial
Metrado Parcial % Metrado Parcial % Metrado
glb 1.00 384.70 384.70 0.70 269.29 70.00% 0.10 38.47 10.00% 0.80
glb 1.00 651.72 651.72 0.70 456.20 70.00% 0.10 65.17 10.00% 0.80
glb 1.00 481.10 481.10 0.70 336.77 70.00% 0.10 48.11 10.00% 0.80
glb 1.00 1,667.40 1,667.40 0.70 1,167.18 70.00% 0.10 166.74 10.00% 0.80
11,399.00 7,979.30 70.00% 1,039.90 9.12%
glb 1.00 1,500.00 1,500.00 0.70 1,050.00 70.00% 0.10 150.00 10.00% 0.80
glb 1.00 1,399.00 1,399.00 0.70 979.30 70.00% 0.10 139.90 10.00% 0.80
glb 1.00 4,500.00 4,500.00 0.70 3,150.00 70.00% 0.10 450.00 10.00% 0.80
glb 1.00 1,750.00 1,750.00 0.70 1,225.00 70.00% 0.10 175.00 10.00% 0.80
glb 1.00 1,250.00 1,250.00 0.70 875.00 70.00% 0.10 125.00 10.00% 0.80
glb 1.00 1,000.00 1,000.00 0.70 700.00 70.00% - - 0.00% 0.70
111,162.45 32,615.68 29.34% 32,649.61 29.37%
m3 837.52 32.51 27,227.78 503.83 16,379.51 60.16% 81.27 2,642.09 9.70% 585.10
m3 101.64 2.34 237.84 101.64 237.84 100.00% - - 0.00% 101.64
m3 344.80 18.27 6,299.50 102.15 1,866.28 29.63% 60.26 1,100.95 17.48% 162.41
m3 16.86 26.76 451.17 - - 0.00% - - 0.00% -
m3 914.78 29.04 26,565.21 - - 0.00% 457.39 13,282.61 50.00% 457.39
m2 443.38 3.82 1,693.71 406.95 1,554.55 91.78% 28.83 110.13 6.50% 435.78
m2 2,553.18 4.65 11,872.29 - - 0.00% 2,553.18 11,872.29 100.00% 2,553.18
m2 1,495.28 9.15 13,681.81 - - 0.00% 144.00 1,317.60 9.63% 144.00
m3 772.65 10.84 8,375.53 420.09 4,553.78 54.37% 77.62 841.40 10.05% 497.71
m3 772.65 19.10 14,757.62 420.09 8,023.72 54.37% 77.62 1,482.54 10.05% 497.71
VALORIZACION DE OBRA Nº 03
MES MARZO DEL 2016
TIDAS,
EGIÓN GRAU,
APURÍMAC
APURÍMAC

Presupuesto Valorizaciones
Anterior Actual Acumul
Und Metrado Precio Parcial
Metrado Parcial % Metrado Parcial % Metrado
90,329.93 46,541.85 51.52% 11,098.13 12.29%
11,500.00 11,231.38 97.66% - 0.00%
m3 52.23 220.18 11,500.00 51.01 11,231.38 97.66% - - 0.00% 51.01
16,079.75 10,487.17 65.22% 2,866.74 17.83%
m3 73.03 220.18 16,079.75 47.63 10,487.17 65.22% 13.02 2,866.74 17.83% 60.65
8,718.22 3,131.92 35.92% 745.84 8.55%
m2 284.63 30.63 8,718.22 102.25 3,131.92 35.92% 24.35 745.84 8.55% 126.60
34,555.84 21,691.38 62.77% 6,295.26 18.22%
m3 90.52 253.00 22,901.56 57.74 14,608.22 63.79% 16.00 4,048.00 17.68% 73.74
m2 299.75 38.88 11,654.28 182.18 7,083.16 60.78% 57.80 2,247.26 19.28% 239.98
2,341.84 - 0.00% 1,190.29 50.83%
m3 3.05 301.06 918.23 - - 0.00% 1.55 466.64 50.82% 1.55
m2 46.86 30.38 1,423.61 - - 0.00% 23.82 723.65 50.83% 23.82
17,040.58 - 0.00% - 0.00%
m2 458.08 37.20 17,040.58 - - 0.00% - - 0.00% -
93.71 - 0.00% - 0.00%
m3 0.30 267.55 80.27 - - 0.00% - - 0.00% -
m2 0.44 30.55 13.44 - - 0.00% - - 0.00% -
875,393.28 384,675.22 43.94% 236,161.09 26.98%
64,686.76 47,775.86 73.86% 5,137.52 7.94%
m3 11.02 421.87 4,649.01 11.02 4,649.01 100.00% - - 0.00% 11.02
m3 96.21 360.00 34,635.60 68.99 24,836.40 71.71% - - 0.00% 68.99
VALORIZACION DE OBRA Nº 03
MES MARZO DEL 2016
TIDAS,
EGIÓN GRAU,
APURÍMAC
APURÍMAC

Presupuesto Valorizaciones
Anterior Actual Acumul
Und Metrado Precio Parcial
Metrado Parcial % Metrado Parcial % Metrado
m2 234.06 44.25 10,357.16 191.64 8,480.07 81.88% - - 0.00% 191.64
kg 3,458.62 4.35 15,045.00 2,255.26 9,810.38 65.21% 1,181.04 5,137.52 34.15% 3,436.30
12,206.38 9,488.71 77.74% - 0.00%
m3 7.46 349.89 2,610.18 5.97 2,088.84 80.03% - - 0.00% 5.97
m2 74.50 49.38 3,678.81 49.78 2,458.14 66.82% - - 0.00% 49.78
kg 1,360.32 4.35 5,917.39 1,136.03 4,941.73 83.51% - - 0.00% 1,136.03
53,499.00 15,279.33 28.56% 8,520.23 15.93%
m3 101.88 319.22 32,522.13 28.86 9,212.69 28.33% 15.00 4,788.30 14.72% 43.86
m2 251.39 38.88 9,774.04 67.12 2,609.63 26.70% 55.34 2,151.62 22.01% 122.46
kg 2,611.38 4.29 11,202.82 805.83 3,457.01 30.86% 368.37 1,580.31 14.11% 1,174.20
112,802.41 65,518.87 58.08% 17,791.63 15.77%
m3 68.34 414.77 28,345.38 51.88 21,518.27 75.91% 8.18 3,392.82 11.97% 60.06
m3 71.77 414.09 29,719.24 12.02 4,977.36 16.75% 11.78 4,877.98 16.41% 23.80
m2 798.68 30.45 24,319.81 562.07 17,115.03 70.37% 192.63 5,865.58 24.12% 754.70
kg 7,090.44 4.29 30,417.99 5,106.81 21,908.21 72.02% 852.04 3,655.25 12.02% 5,958.85
241,220.46 132,191.83 54.80% 51,281.42 21.26%
m3 8.88 414.96 3,684.84 - - 0.00% 4.44 1,842.42 50.00% 4.44
m3 135.68 349.89 47,473.08 52.06 18,215.27 38.37% 42.92 15,017.28 31.63% 94.98
m2 1,503.58 50.21 75,494.75 577.66 29,004.31 38.42% 492.71 24,738.97 32.77% 1,070.37
m2 44.67 59.76 2,669.48 - - 0.00% - - 0.00% -
kg 25,723.75 4.35 111,898.31 19,533.85 84,972.25 75.94% 2,225.92 9,682.75 8.65% 21,759.77
13,290.64 - 0.00% 7,761.92 58.40%
VALORIZACION DE OBRA Nº 03
MES MARZO DEL 2016
TIDAS,
EGIÓN GRAU,
APURÍMAC
APURÍMAC

Presupuesto Valorizaciones
Anterior Actual Acumul
Und Metrado Precio Parcial
Metrado Parcial % Metrado Parcial % Metrado
m3 7.12 448.15 3,190.83 - - 0.00% 2.45 1,097.97 34.41% 2.45
m2 100.80 50.21 5,061.17 - - 0.00% 32.37 1,625.30 32.11% 32.37
kg 1,158.31 4.35 5,038.65 - - 0.00% 1,158.31 5,038.65 100.00% 1,158.31
5,817.12 - 0.00% - 0.00%
m3 1.38 421.90 582.22 - - 0.00% - - 0.00% -
m2 42.91 104.88 4,500.40 - - 0.00% - - 0.00% -
kg 168.85 4.35 734.50 - - 0.00% - - 0.00% -
194,864.70 51,831.17 26.60% 83,897.19 43.05%
m3 131.84 367.37 48,434.06 23.10 8,486.25 17.52% 62.34 22,901.85 47.28% 85.44
m2 1,311.32 57.71 75,676.28 376.16 21,708.19 28.69% 444.81 25,669.99 33.92% 820.97
kg 16,265.37 4.35 70,754.36 4,973.96 21,636.73 30.58% 8,120.77 35,325.35 49.93% 13,094.73
3,415.66 - 0.00% 2,326.76 68.12%
m3 2.28 352.27 803.18 - - 0.00% 1.78 627.04 78.07% 1.78
m2 24.04 57.71 1,387.35 - - 0.00% 16.50 952.22 68.64% 16.50
kg 281.64 4.35 1,225.13 - - 0.00% 171.84 747.50 61.01% 171.84
4,684.85 1,453.20 31.02% 2,498.58 53.33%
m3 5.94 355.74 2,113.10 2.04 725.71 34.34% 2.83 1,006.74 47.64% 4.87
m2 31.02 44.48 1,379.77 10.20 453.70 32.88% 15.49 689.00 49.94% 25.69
kg 274.02 4.35 1,191.99 62.94 273.79 22.97% 184.56 802.84 67.35% 247.50
125,288.77 47,123.91 37.61% 45,650.83 36.44%
m3 103.90 375.65 39,030.04 29.94 11,246.96 28.82% 47.39 17,802.05 45.61% 77.33
m2 1,184.16 35.43 41,954.79 501.71 17,775.59 42.37% 378.77 13,419.82 31.99% 880.48
VALORIZACION DE OBRA Nº 03
MES MARZO DEL 2016
TIDAS,
EGIÓN GRAU,
APURÍMAC
APURÍMAC

Presupuesto Valorizaciones
Anterior Actual Acumul
Und Metrado Precio Parcial
Metrado Parcial % Metrado Parcial % Metrado
kg 4,493.75 4.35 19,547.81 1,749.90 7,612.07 38.94% 1,496.53 6,509.91 33.30% 3,246.43
u 9,863.00 2.51 24,756.13 4,179.00 10,489.29 42.37% 3,155.00 7,919.05 31.99% 7,334.00
3,753.95 3,753.96 100.00% - 0.00%
m3 4.62 475.30 2,195.89 4.62 2,195.89 100.00% - - 0.00% 4.62
m2 18.48 77.32 1,428.87 18.48 1,428.87 100.00% - - 0.00% 18.48
kg 29.70 4.35 129.20 29.70 129.20 100.00% - - 0.00% 29.70
12,474.50 7,218.17 57.86% - 0.00%
m3 10.49 539.09 5,655.05 5.12 2,760.14 48.81% - - 0.00% 5.12
m2 75.86 53.88 4,087.34 51.20 2,758.66 67.49% - - 0.00% 51.20
kg 628.07 4.35 2,732.10 390.66 1,699.37 62.20% - - 0.00% 390.66
14,335.22 3,040.21 21.21% 11,295.01 78.79%
m3 20.88 417.46 8,716.56 - - 0.00% 20.88 8,716.56 100.00% 20.88
m2 34.80 53.88 1,875.02 19.68 1,060.36 56.55% 15.12 814.67 43.45% 34.80
kg 885.02 4.23 3,743.63 468.05 1,979.85 52.89% 416.97 1,763.78 47.11% 885.02
13,052.86 - 0.00% - 0.00%
m3 13.16 325.09 4,278.18 - - 0.00% - - 0.00% -
m2 137.69 49.13 6,764.71 - - 0.00% - - 0.00% -
kg 462.06 4.35 2,009.96 - - 0.00% - - 0.00% -
186,242.85 1,100.99 0.59% 61,173.94 32.85%
41,095.85 - 0.00% - 0.00%
m 424.50 96.81 41,095.85 - - 0.00% - - 0.00% -
41,502.32 - 0.00% - 0.00%
VALORIZACION DE OBRA Nº 03
MES MARZO DEL 2016
TIDAS,
EGIÓN GRAU,
APURÍMAC
APURÍMAC

Presupuesto Valorizaciones
Anterior Actual Acumul
Und Metrado Precio Parcial
Metrado Parcial % Metrado Parcial % Metrado
u 8.00 5,018.92 40,151.36 - - 0.00% - - 0.00% -
u 8.00 168.87 1,350.96 - - 0.00% - - 0.00% -
8,140.80 - 0.00% - 0.00%
m 169.60 48.00 8,140.80 - - 0.00% - - 0.00% -
6,025.36 - 0.00% - 0.00%
u 8.00 381.37 3,050.96 - - 0.00% - - 0.00% -
u 8.00 371.80 2,974.40 - - 0.00% - - 0.00% -
89,478.53 1,100.99 1.23% 61,173.94 68.37%
u 22.00 14.82 326.04 - - 0.00% - - 0.00% -
u 22.00 17.71 389.62 - - 0.00% - - 0.00% -
m 25.70 42.84 1,100.99 25.70 1,100.99 100.00% - - 0.00% 25.70
m 32.40 8.35 270.54 - - 0.00% - - 0.00% -
glb 1.00 87,391.34 87,391.34 - - 0.00% 0.70 61,173.94 70.00% 0.70
1,071,816.86 45,412.63 4.24% 56,923.00 5.31%
110,075.37 45,412.63 41.26% 40,090.83 36.42%
m2 553.75 124.18 68,764.68 365.70 45,412.63 66.04% 100.21 12,444.08 18.10% 465.91
m2 368.65 72.75 26,819.29 - - 0.00% 296.01 21,534.73 80.30% 296.01
m2 15.11 52.79 797.66 - - 0.00% - - 0.00% -
m2 429.81 31.86 13,693.75 - - 0.00% 191.84 6,112.02 44.63% 191.84
147,238.10 - 0.00% - 8,588.98 5.83%
130,582.32 - 0.00% - 8,588.98 6.58%
m2 117.63 17.43 2,050.29 - - 0.00% - - 0.00% -
VALORIZACION DE OBRA Nº 03
MES MARZO DEL 2016
TIDAS,
EGIÓN GRAU,
APURÍMAC
APURÍMAC

Presupuesto Valorizaciones
Anterior Actual Acumul
Und Metrado Precio Parcial
Metrado Parcial % Metrado Parcial % Metrado
m2 1,100.20 18.61 20,474.72 - - 0.00% 90.10 1,676.76 8.19% 90.10
m2 1,223.90 27.21 33,302.32 - - 0.00% - - 0.00% -
m2 866.38 30.39 26,329.29 - - 0.00% 64.60 1,963.19 7.46% 64.60
m2 32.58 39.24 1,278.44 - - 0.00% - - 0.00% -
m2 711.72 36.62 26,063.19 - - 0.00% 112.89 4,134.03 15.86% 112.89
m2 29.92 30.74 919.74 - - 0.00% - - 0.00% -
m2 187.43 26.09 4,890.05 - - 0.00% - - 0.00% -
m 446.07 12.43 5,544.65 - - 0.00% 48.04 597.14 10.77% 48.04
m 670.44 6.72 4,505.36 - - 0.00% 32.42 217.86 4.84% 32.42
m2 96.30 54.25 5,224.28 - - 0.00% - - 0.00% -
16,655.79 - 0.00% - - 0.00%
m2 15.19 50.06 760.41 - - 0.00% - - 0.00% -
m 1.46 13.23 19.32 - - 0.00% - - 0.00% -
m 317.44 24.30 7,713.79 - - 0.00% - - 0.00% -
m 12.93 17.96 232.22 - - 0.00% - - 0.00% -
m2 257.32 24.30 6,252.88 - - 0.00% - - 0.00% -
m2 54.33 30.87 1,677.17 - - 0.00% - - 0.00% -
35,723.77 - 0.00% - 8,243.19 23.07%
m2 1,335.44 25.90 34,587.90 - - 0.00% 318.27 8,243.19 23.83% 318.27
m2 35.90 31.64 1,135.88 - - 0.00% - - 0.00% -
133,104.34 - 0.00% - 0.00%
21,101.50 - 0.00% - 0.00%
VALORIZACION DE OBRA Nº 03
MES MARZO DEL 2016
TIDAS,
EGIÓN GRAU,
APURÍMAC
APURÍMAC

Presupuesto Valorizaciones
Anterior Actual Acumul
Und Metrado Precio Parcial
Metrado Parcial % Metrado Parcial % Metrado
m2 844.06 25.00 21,101.50 - - 0.00% - - 0.00% -
51,321.48 - 0.00% - 0.00%
m2 844.06 55.20 46,592.11 - - 0.00% - - 0.00% -
m2 11.55 35.30 407.72 - - 0.00% - - 0.00% -
m2 26.26 43.19 1,134.17 - - 0.00% - - 0.00% -
m2 1.80 66.48 119.66 - - 0.00% - - 0.00% -
m 105.86 28.98 3,067.82 - - 0.00% - - 0.00% -
52,914.44 - 0.00% - 0.00%
m2 1,241.23 39.03 48,445.21 - - 0.00% - - 0.00% -
m2 113.75 39.29 4,469.24 - - 0.00% - - 0.00% -
3,417.26 - 0.00% - 0.00%
m 36.56 93.47 3,417.26 - - 0.00% - - 0.00% -
4,349.65 - 0.00% - 0.00%
m2 111.73 38.93 4,349.65 - - 0.00% - - 0.00% -
21,207.49 - 0.00% - 0.00%
8,176.82 - 0.00% - 0.00%
m2 171.35 47.72 8,176.82 - - 0.00% - - 0.00% -
13,030.67 - 0.00% - 0.00%
m 467.69 21.54 10,074.04 - - 0.00% - - 0.00% -
m 38.35 10.17 390.02 - - 0.00% - - 0.00% -
m 141.26 9.84 1,390.00 - - 0.00% - - 0.00% -
m 96.92 12.14 1,176.61 - - 0.00% - - 0.00% -
VALORIZACION DE OBRA Nº 03
MES MARZO DEL 2016
TIDAS,
EGIÓN GRAU,
APURÍMAC
APURÍMAC

Presupuesto Valorizaciones
Anterior Actual Acumul
Und Metrado Precio Parcial
Metrado Parcial % Metrado Parcial % Metrado
114,838.79 - 0.00% - 0.00%
m2 969.57 62.63 60,724.17 - - 0.00% - - 0.00% -
m2 197.69 34.80 6,879.61 - - 0.00% - - 0.00% -
m2 14.87 35.19 523.28 - - 0.00% - - 0.00% -
m2 678.14 43.85 29,736.44 - - 0.00% - - 0.00% -
m 97.19 57.96 5,633.13 - - 0.00% - - 0.00% -
m 166.14 43.41 7,212.14 - - 0.00% - - 0.00% -
m 95.14 43.41 4,130.03 - - 0.00% - - 0.00% -
215,603.40 - 0.00% - 0.00%
31,358.15 - 0.00% - 0.00%
m2 29.40 445.75 13,105.05 - - 0.00% - - 0.00% -
m2 38.85 442.79 17,202.39 - - 0.00% - - 0.00% -
m2 3.85 272.91 1,050.70 - - 0.00% - - 0.00% -
12,758.03 - 0.00% - 0.00%
u 11.00 329.18 3,620.98 - - 0.00% - - 0.00% -
m2 26.88 339.92 9,137.05 - - 0.00% - - 0.00% -
171,487.22 - 0.00% - 0.00%
m 1,151.23 148.96 171,487.22 - - 0.00% - - 0.00% -
61,957.71 - 0.00% - 0.00%
13,125.74 - 0.00% - 0.00%
m2 63.22 207.62 13,125.74 - - 0.00% - - 0.00% -
653.99 - 0.00% - 0.00%
VALORIZACION DE OBRA Nº 03
MES MARZO DEL 2016
TIDAS,
EGIÓN GRAU,
APURÍMAC
APURÍMAC

Presupuesto Valorizaciones
Anterior Actual Acumul
Und Metrado Precio Parcial
Metrado Parcial % Metrado Parcial % Metrado
u 1.00 653.99 653.99 - - 0.00% - - 0.00% -
35,501.38 - 0.00% - 0.00%
m2 2.52 474.44 1,195.59 - - 0.00% - - 0.00% -
m2 4.08 3,078.88 12,561.83 - - 0.00% - - 0.00% -
m2 9.00 2,271.17 20,440.53 - - 0.00% - - 0.00% -
m2 2.23 584.50 1,303.44 - - 0.00% - - 0.00% -
268.58 - 0.00% - 0.00%
m2 1.48 181.47 268.58 - - 0.00% - - 0.00% -
6,053.43 - 0.00% - 0.00%
m 74.03 81.77 6,053.43 - - 0.00% - - 0.00% -
4,976.61 - 0.00% - 0.00%
m 116.55 39.83 4,642.19 - - 0.00% - - 0.00% -
m 5.94 56.30 334.42 - - 0.00% - - 0.00% -
1,206.58 - 0.00% - 0.00%
u 1.00 718.19 718.19 - - 0.00% - - 0.00% -
u 1.00 488.39 488.39 - - 0.00% - - 0.00% -
171.40 - 0.00% - 0.00%
u 2.00 85.70 171.40 - - 0.00% - - 0.00% -
4,214.21 - 0.00% - 0.00%
1,032.80 - 0.00% - 0.00%
u 136.00 7.30 992.80 - - 0.00% - - 0.00% -
u 10.00 4.00 40.00 - - 0.00% - - 0.00% -
VALORIZACION DE OBRA Nº 03
MES MARZO DEL 2016
TIDAS,
EGIÓN GRAU,
APURÍMAC
APURÍMAC

Presupuesto Valorizaciones
Anterior Actual Acumul
Und Metrado Precio Parcial
Metrado Parcial % Metrado Parcial % Metrado
2,170.22 - 0.00% - 0.00%
u 34.00 63.83 2,170.22 - - 0.00% - - 0.00% -
240.69 - 0.00% - 0.00%
pza 4.00 22.20 88.80 - - 0.00% - - 0.00% -
u 3.00 50.63 151.89 - - 0.00% - - 0.00% -
770.50 - 0.00% - 0.00%
u 37.00 13.50 499.50 - - 0.00% - - 0.00% -
u 10.00 27.10 271.00 - - 0.00% - - 0.00% -
35,333.24 - 0.00% - 0.00%
m2 104.78 127.04 13,311.25 - - 0.00% - - 0.00% -
m2 150.29 146.53 22,021.99 - - 0.00% - - 0.00% -
84,017.67 - 0.00% - 0.00%
44,122.19 - 0.00% - 0.00%
m2 2,420.15 7.54 18,247.93 - - 0.00% - - 0.00% -
m2 1,853.14 6.84 12,675.48 - - 0.00% - - 0.00% -
m2 1,496.46 8.82 13,198.78 - - 0.00% - - 0.00% -
9,279.88 - 0.00% - 0.00%
m 1,151.23 4.94 5,687.08 - - 0.00% - - 0.00% -
m2 153.86 18.71 2,878.72 - - 0.00% - - 0.00% -
m2 41.11 17.37 714.08 - - 0.00% - - 0.00% -
22,102.80 - 0.00% - 0.00%
m2 56.40 13.24 746.74 - - 0.00% - - 0.00% -
VALORIZACION DE OBRA Nº 03
MES MARZO DEL 2016
TIDAS,
EGIÓN GRAU,
APURÍMAC
APURÍMAC

Presupuesto Valorizaciones
Anterior Actual Acumul
Und Metrado Precio Parcial
Metrado Parcial % Metrado Parcial % Metrado
m 127.92 18.15 2,321.75 - - 0.00% - - 0.00% -
m2 1,356.27 13.17 17,862.08 - - 0.00% - - 0.00% -
m 103.83 11.29 1,172.24 - - 0.00% - - 0.00% -
8,512.81 - 0.00% - 0.00%
m 166.72 8.51 1,418.79 - - 0.00% - - 0.00% -
m 36.70 6.21 227.91 - - 0.00% - - 0.00% -
u 4.00 39.70 158.80 - - 0.00% - - 0.00% -
m 206.90 10.55 2,182.80 - - 0.00% - - 0.00% -
m2 364.00 12.43 4,524.52 - - 0.00% - - 0.00% -
108,340.08 - 0.00% - 0.00%
49,237.62 - 0.00% - 0.00%
m 768.79 16.97 13,046.37 - - 0.00% - - 0.00% -
m 484.73 25.96 12,583.59 - - 0.00% - - 0.00% -
m 49.49 6.36 314.76 - - 0.00% - - 0.00% -
m 203.21 47.11 9,573.22 - - 0.00% - - 0.00% -
m 78.82 34.23 2,698.01 - - 0.00% - - 0.00% -
u 11.00 247.86 2,726.46 - - 0.00% - - 0.00% -
u 8.00 60.59 484.72 - - 0.00% - - 0.00% -
u 2.00 3,171.42 6,342.84 - - 0.00% - - 0.00% -
u 1.00 424.16 424.16 - - 0.00% - - 0.00% -
u 1.00 1,043.49 1,043.49 - - 0.00% - - 0.00% -
7,980.76 - 0.00% - 0.00%
VALORIZACION DE OBRA Nº 03
MES MARZO DEL 2016
TIDAS,
EGIÓN GRAU,
APURÍMAC
APURÍMAC

Presupuesto Valorizaciones
Anterior Actual Acumul
Und Metrado Precio Parcial
Metrado Parcial % Metrado Parcial % Metrado
mes 6.00 913.46 5,480.76 - - 0.00% - - 0.00% -
glb 1.00 2,500.00 2,500.00 - - 0.00% - - 0.00% -
12,903.64 - 0.00% - 0.00%
m2 378.23 32.52 12,300.04 - - 0.00% - - 0.00% -
u 24.00 25.15 603.60 - - 0.00% - - 0.00% -
38,218.06 - 0.00% - 0.00%
m 81.64 250.07 20,415.71 - - 0.00% - - 0.00% -
m 81.17 184.21 14,952.33 - - 0.00% - - 0.00% -
m 16.07 86.58 1,391.34 - - 0.00% - - 0.00% -
u 4.00 364.67 1,458.68 - - 0.00% - - 0.00% -
162.69 - 0.00% - 0.00%
u 14.00 2.46 34.44 - - 0.00% - - 0.00% -
u 57.00 2.25 128.25 - - 0.00% - - 0.00% -
55,735.88 0.00 0.00% 3,161.13 5.67%
7,524.21 0.00 0.00% 0.00 0.00%
4,616.98 0.00 0.00% 0.00 0.00%
u 13.00 160.39 2,085.07 - - 0.00% - - 0.00% -
pza 2.00 67.70 135.40 - - 0.00% - - 0.00% -
u 5.00 115.55 577.75 - - 0.00% - - 0.00% -
m 6.45 235.08 1,516.27 - - 0.00% - - 0.00% -
pza 3.00 28.34 85.02 - - 0.00% - - 0.00% -
u 11.00 19.77 217.47 - - 0.00% - - 0.00% -
VALORIZACION DE OBRA Nº 03
MES MARZO DEL 2016
TIDAS,
EGIÓN GRAU,
APURÍMAC
APURÍMAC

Presupuesto Valorizaciones
Anterior Actual Acumul
Und Metrado Precio Parcial
Metrado Parcial % Metrado Parcial % Metrado
1,253.39 - 0.00% - 0.00%
u 5.00 47.28 236.40 - - 0.00% - - 0.00% -
u 5.00 60.97 304.85 - - 0.00% - - 0.00% -
u 13.00 42.48 552.24 - - 0.00% - - 0.00% -
u 5.00 31.98 159.90 - - 0.00% - - 0.00% -
1,653.84 - 0.00% - 0.00%
u 20.00 54.23 1,084.60 - - 0.00% - - 0.00% -
u 28.00 20.33 569.24 - - 0.00% - - 0.00% -
16,493.82 - 0.00% 920.00 5.58%
1,492.32 - 0.00% 497.44 33.33%
pto 24.00 62.18 1,492.32 - - 0.00% 8.00 497.44 33.33% 8.00
694.36 - 0.00% 422.56 60.86%
m 22.00 11.62 255.64 - - 0.00% 22.00 255.64 100.00% 22.00
m 14.50 12.42 180.09 - - 0.00% 9.50 117.99 65.52% 9.50
m 18.50 13.98 258.63 - - 0.00% 3.50 48.93 18.92% 3.50
7,186.03 - 0.00% - 0.00%
7,186.03 - 0.00% - 0.00%
m 192.50 12.17 2,342.73 - - 0.00% - - 0.00% -
m 192.50 3.42 658.35 - - 0.00% - - 0.00% -
m 192.50 5.62 1,081.85 - - 0.00% - - 0.00% -
m 192.50 16.12 3,103.10 - - 0.00% - - 0.00% -
2,823.99 - 0.00% - 0.00%
VALORIZACION DE OBRA Nº 03
MES MARZO DEL 2016
TIDAS,
EGIÓN GRAU,
APURÍMAC
APURÍMAC

Presupuesto Valorizaciones
Anterior Actual Acumul
Und Metrado Precio Parcial
Metrado Parcial % Metrado Parcial % Metrado
m 37.00 11.62 429.94 - - 0.00% - - 0.00% -
m 112.50 13.98 1,572.75 - - 0.00% - - 0.00% -
m 43.00 19.10 821.30 - - 0.00% - - 0.00% -
1,876.52 - 0.00% - 0.00%
u 4.00 25.61 102.44 - - 0.00% - - 0.00% -
u 14.00 28.44 398.16 - - 0.00% - - 0.00% -
u 2.00 28.99 57.98 - - 0.00% - - 0.00% -
pza 2.00 28.99 57.98 - - 0.00% - - 0.00% -
u 16.00 26.08 417.28 - - 0.00% - - 0.00% -
u 4.00 9.82 39.28 - - 0.00% - - 0.00% -
u 1.00 29.73 29.73 - - 0.00% - - 0.00% -
u 2.00 29.73 59.46 - - 0.00% - - 0.00% -
u 4.00 29.73 118.92 - - 0.00% - - 0.00% -
u 18.00 29.73 535.14 - - 0.00% - - 0.00% -
u 3.00 20.05 60.15 - - 0.00% - - 0.00% -
1,781.65 - 0.00% - 0.00%
u 3.00 52.09 156.27 - - 0.00% - - 0.00% -
u 3.00 135.63 406.89 - - 0.00% - - 0.00% -
u 4.00 109.12 436.48 - - 0.00% - - 0.00% -
u 4.00 106.13 424.52 - - 0.00% - - 0.00% -
u 1.00 357.49 357.49 - - 0.00% - - 0.00% -
397.80 - 0.00% - 0.00%
VALORIZACION DE OBRA Nº 03
MES MARZO DEL 2016
TIDAS,
EGIÓN GRAU,
APURÍMAC
APURÍMAC

Presupuesto Valorizaciones
Anterior Actual Acumul
Und Metrado Precio Parcial
Metrado Parcial % Metrado Parcial % Metrado
u 10.00 35.43 354.30 - - 0.00% - - 0.00% -
u 1.00 43.50 43.50 - - 0.00% - - 0.00% -
241.15 - 0.00% - 0.00%
m 35.00 6.89 241.15 - - 0.00% - - 0.00% -
7,218.65 - 0.00% - 0.00%
2,432.85 - 0.00% - 0.00%
m 97.00 17.61 1,708.17 - - 0.00% - - 0.00% -
m 36.00 20.13 724.68 - - 0.00% - - 0.00% -
1,715.64 - 0.00% - 0.00%
m 68.00 25.23 1,715.64 - - 0.00% - - 0.00% -
601.51 - 0.00% - 0.00%
pza 26.00 15.62 406.12 - - 0.00% - - 0.00%
pza 13.00 15.03 195.39 - - 0.00% - - 0.00% -
301.64 - 0.00% - 0.00%
u 1.00 301.64 301.64 - - 0.00% - - 0.00% -
2,167.01 - 0.00% - 0.00%
m 133.00 2.40 319.20 - - 0.00% - - 0.00% -
u 1.00 1,847.81 1,847.81 - - 0.00% - - 0.00% -
14,175.88 - 0.00% 2,241.13 15.81%
3,942.50 - 0.00% 1,603.28 40.67%
pto 13.00 130.40 1,695.20 - - 0.00% 1.00 130.40 7.69% 1.00
pto 17.00 99.78 1,696.26 - - 0.00% 12.00 1,197.36 70.59% 12.00
VALORIZACION DE OBRA Nº 03
MES MARZO DEL 2016
TIDAS,
EGIÓN GRAU,
APURÍMAC
APURÍMAC

Presupuesto Valorizaciones
Anterior Actual Acumul
Und Metrado Precio Parcial
Metrado Parcial % Metrado Parcial % Metrado
pto 6.00 91.84 551.04 - - 0.00% 3.00 275.52 50.00% 3.00
1,851.18 - 0.00% 411.79 22.24%
m 10.00 23.30 233.00 - - 0.00% - - 0.00% -
m 48.50 27.11 1,314.84 - - 0.00% 4.00 108.44 8.25% 4.00
m 10.50 28.89 303.35 - - 0.00% 10.50 303.35 100.00% 10.50
2,089.24 - 0.00% - 0.00%
2,089.24 - 0.00% - 0.00%
m 76.00 8.66 658.16 - - 0.00% - - 0.00% -
m 76.00 3.42 259.92 - - 0.00% - - 0.00% -
m 76.00 7.99 607.24 - - 0.00% - - 0.00% -
m 76.00 7.42 563.92 - - 0.00% - - 0.00% -
1,731.28 - 0.00% - 0.00%
m 76.00 22.78 1,731.28 - - 0.00% - - 0.00% -
1,263.99 - 0.00% 226.06 17.88%
u 2.00 28.19 56.38 - - 0.00% 2.00 56.38 100.00% 2.00
pza 16.00 15.03 240.48 - - 0.00% 3.00 45.09 18.75% 3.00
u 8.00 59.03 472.24 - - 0.00% - - 0.00% -
u 10.00 37.03 370.30 - - 0.00% - - 0.00% -
u 3.00 41.53 124.59 - - 0.00% 3.00 124.59 100.00% 3.00
1,686.45 - 0.00% - 0.00%
u 4.00 196.24 784.96 - - 0.00% - - 0.00% -
u 7.00 64.61 452.27 - - 0.00% - - 0.00% -
VALORIZACION DE OBRA Nº 03
MES MARZO DEL 2016
TIDAS,
EGIÓN GRAU,
APURÍMAC
APURÍMAC

Presupuesto Valorizaciones
Anterior Actual Acumul
Und Metrado Precio Parcial
Metrado Parcial % Metrado Parcial % Metrado
u 6.00 64.05 384.30 - - 0.00% - - 0.00% -
u 4.00 16.23 64.92 - - 0.00% - - 0.00% -
1,231.98 - 0.00% - 0.00%
1,231.98 - 0.00% - 0.00%
u 6.00 205.33 1,231.98 - - 0.00% - - 0.00% -
379.26 - 0.00% - 0.00%
m 150.50 2.52 379.26 - - 0.00% - - 0.00% -
10,323.33 - 0.00% - 0.00%
4,601.17 - 0.00% - 0.00%
m 3.00 56.93 170.79 - - 0.00% - - 0.00% -
m 10.00 159.37 1,593.70 - - 0.00% - - 0.00% -
m 10.00 66.42 664.20 - - 0.00% - - 0.00% -
m 10.00 90.52 905.20 - - 0.00% - - 0.00% -
m 14.00 90.52 1,267.28 - - 0.00% - - 0.00% -
943.46 - 0.00% - 0.00%
u 1.00 67.61 67.61 - - 0.00% - - 0.00% -
u 3.00 153.80 461.40 - - 0.00% - - 0.00% -
u 3.00 138.15 414.45 - - 0.00% - - 0.00% -
1,166.46 - 0.00% - 0.00%
u 2.00 17.54 35.08 - - 0.00% - - 0.00% -
u 6.00 17.54 105.24 - - 0.00% - - 0.00% -
u 1.00 69.64 69.64 - - 0.00% - - 0.00% -
VALORIZACION DE OBRA Nº 03
MES MARZO DEL 2016
TIDAS,
EGIÓN GRAU,
APURÍMAC
APURÍMAC

Presupuesto Valorizaciones
Anterior Actual Acumul
Und Metrado Precio Parcial
Metrado Parcial % Metrado Parcial % Metrado
u 10.00 79.74 797.40 - - 0.00% - - 0.00% -
u 2.00 79.55 159.10 - - 0.00% - - 0.00% -
1,521.06 - 0.00% - 0.00%
u 1.00 12.01 12.01 - - 0.00% - - 0.00% -
u 1.00 148.61 148.61 - - 0.00% - - 0.00% -
u 1.00 60.48 60.48 - - 0.00% - - 0.00% -
u 22.00 42.62 937.64 - - 0.00% - - 0.00% -
u 1.00 113.82 113.82 - - 0.00% - - 0.00% -
u 2.00 124.25 248.50 - - 0.00% - - 0.00% -
2,091.18 - 0.00% - 0.00%
2,091.18 - 0.00% - 0.00%
u 2.00 1,045.59 2,091.18 - - 0.00% - - 0.00% -
118,139.39 0.00 0.00% 12,781.29 10.82%
5,788.50 0.00 0.00% 0.00 0.00%
m3 113.50 28.28 3,209.78 - - 0.00% - - 0.00% -
m3 113.50 21.67 2,459.55 - - 0.00% - - 0.00% -
m 113.50 1.05 119.18 - - 0.00% - - 0.00% -
106,557.36 - 0.00% 8,262.43 7.75%
10,678.96 - 0.00% 7,548.92 70.69%
pto 116.00 92.06 10,678.96 - - 0.00% 82.00 7,548.92 70.69% 82.00
726.18 - 0.00% 13.22 1.82%
pto 23.00 10.32 237.36 - - 0.00% - - 0.00% -
VALORIZACION DE OBRA Nº 03
MES MARZO DEL 2016
TIDAS,
EGIÓN GRAU,
APURÍMAC
APURÍMAC

Presupuesto Valorizaciones
Anterior Actual Acumul
Und Metrado Precio Parcial
Metrado Parcial % Metrado Parcial % Metrado
pto 9.00 13.22 118.98 - - 0.00% 1.00 13.22 11.11% 1.00
pto 12.00 30.82 369.84 - - 0.00% - - 0.00% -
8,825.73 - 0.00% 261.73 2.97%
pto 96.00 85.51 8,208.96 - - 0.00% 1.00 85.51 1.04% 1.00
pto 7.00 88.11 616.77 - - 0.00% 2.00 176.22 28.57% 2.00
329.32 - 0.00% 329.32 100.00%
pto 2.00 164.66 329.32 - - 0.00% 2.00 329.32 100.00% 2.00
184.99 - 0.00% 109.24 59.05%
pza 7.00 15.15 106.05 - - 0.00% 2.00 30.30 28.57% 2.00
pza 2.00 39.47 78.94 - - 0.00% 2.00 78.94 100.00% 2.00
6,876.38 - 0.00% - 0.00%
m 412.50 16.67 6,876.38 - - 0.00% - - 0.00% -
36,488.72 - 0.00% - 0.00%
m 415.50 16.31 6,776.81 - - 0.00% - - 0.00% -
m 907.50 18.54 16,825.05 - - 0.00% - - 0.00% -
m 339.00 23.24 7,878.36 - - 0.00% - - 0.00% -
m 90.00 55.65 5,008.50 - - 0.00% - - 0.00% -
4,362.06 - 0.00% - 0.00%
pza 1.00 600.66 600.66 - - 0.00% - - 0.00% -
pza 8.00 376.14 3,009.12 - - 0.00% - - 0.00% -
pza 1.00 376.14 376.14 - - 0.00% - - 0.00% -
pza 1.00 376.14 376.14 - - 0.00% - - 0.00% -
VALORIZACION DE OBRA Nº 03
MES MARZO DEL 2016
TIDAS,
EGIÓN GRAU,
APURÍMAC
APURÍMAC

Presupuesto Valorizaciones
Anterior Actual Acumul
Und Metrado Precio Parcial
Metrado Parcial % Metrado Parcial % Metrado
5,165.44 - 0.00% - 0.00%
pza 16.00 38.36 613.76 - - 0.00% - - 0.00% -
pza 10.00 38.36 383.60 - - 0.00% - - 0.00% -
pza 1.00 38.36 38.36 - - 0.00% - - 0.00% -
pza 6.00 71.03 426.18 - - 0.00% - - 0.00% -
pza 4.00 76.78 307.12 - - 0.00% - - 0.00% -
pza 9.00 96.63 869.67 - - 0.00% - - 0.00% -
pza 1.00 297.09 297.09 - - 0.00% - - 0.00% -
pza 25.00 82.58 2,064.50 - - 0.00% - - 0.00% -
pza 1.00 82.58 82.58 - - 0.00% - - 0.00% -
pza 1.00 82.58 82.58 - - 0.00% - - 0.00% -
3,500.00 - 0.00% - 0.00%
u 1.00 3,500.00 3,500.00 - - 0.00% - - 0.00% -
4,024.98 - 0.00% - 0.00%
u 2.00 2,012.49 4,024.98 - - 0.00% - - 0.00% -
11,434.22 - 0.00% - 0.00%
pza 64.00 69.76 4,464.64 - - 0.00% - - 0.00% -
pza 40.00 77.30 3,092.00 - - 0.00% - - 0.00% -
pza 12.00 45.50 546.00 - - 0.00% - - 0.00% -
pza 116.00 28.17 3,267.72 - - 0.00% - - 0.00% -
pza 1.00 63.86 63.86 - - 0.00% - - 0.00% -
7,574.04 - 0.00% - 0.00%
VALORIZACION DE OBRA Nº 03
MES MARZO DEL 2016
TIDAS,
EGIÓN GRAU,
APURÍMAC
APURÍMAC

Presupuesto Valorizaciones
Anterior Actual Acumul
Und Metrado Precio Parcial
Metrado Parcial % Metrado Parcial % Metrado
pza 6.00 1,075.36 6,452.16 - - 0.00% - - 0.00% -
pza 3.00 373.96 1,121.88 - - 0.00% - - 0.00% -
3,886.35 - 0.00% - 0.00%
u 5.00 303.35 1,516.75 - - 0.00% - - 0.00% -
u 3.00 592.40 1,777.20 - - 0.00% - - 0.00% -
u 1.00 592.40 592.40 - - 0.00% - - 0.00% -
2,500.00 - 0.00% - 0.00%
glb 1.00 2,500.00 2,500.00 - - 0.00% - - 0.00% -
5,793.53 - 0.00% 4,518.86 78.00%
436.96 - 0.00% 436.96 100.00%
pza 8.00 15.15 121.20 - - 0.00% 8.00 121.20 100.00% 8.00
pza 8.00 39.47 315.76 - - 0.00% 8.00 315.76 100.00% 8.00
2,810.37 - 0.00% 1,549.88 55.15%
m 37.00 16.67 616.79 - - 0.00% 37.00 616.79 100.00% 37.00
m 134.00 16.37 2,193.58 - - 0.00% 57.00 933.09 42.54% 57.00
63.90 - 0.00% 63.90 100.00%
pto 1.00 63.90 63.90 - - 0.00% 1.00 63.90 100.00% 1.00
14.18 - 0.00% - 0.00%
pto 1.00 14.18 14.18 - - 0.00% - - 0.00% -
172.86 - 0.00% 172.86 100.00%
pto 2.00 86.43 172.86 - - 0.00% 2.00 172.86 100.00% 2.00
2,295.26 - 0.00% 2,295.26 100.00%
VALORIZACION DE OBRA Nº 03
MES MARZO DEL 2016
TIDAS,
EGIÓN GRAU,
APURÍMAC
APURÍMAC

Presupuesto Valorizaciones
Anterior Actual Acumul
Und Metrado Precio Parcial
Metrado Parcial % Metrado Parcial % Metrado
pto 32.00 70.68 2,261.76 - - 0.00% 32.00 2,261.76 100.00% 32.00
pto 1.00 33.50 33.50 - - 0.00% 1.00 33.50 100.00% 1.00
342,809.44 - 0.00% - 0.00%
57,650.73 - 0.00% - 0.00%
jgo 225.00 115.50 25,987.50 - - 0.00% - - 0.00% -
u 22.00 320.00 7,040.00 - - 0.00% - - 0.00% -
u 9.00 120.00 1,080.00 - - 0.00% - - 0.00% -
u 10.00 150.00 1,500.00 - - 0.00% - - 0.00% -
u 1.00 130.00 130.00 - - 0.00% - - 0.00% -
u 22.00 180.00 3,960.00 - - 0.00% - - 0.00% -
u 30.00 200.00 6,000.00 - - 0.00% - - 0.00% -
u 10.00 140.00 1,400.00 - - 0.00% - - 0.00% -
u 13.00 95.00 1,235.00 - - 0.00% - - 0.00% -
u 150.00 37.50 5,625.00 - - 0.00% - - 0.00% -
jgo 1.00 573.23 573.23 - - 0.00% - - 0.00% -
u 1.00 270.00 270.00 - - 0.00% - - 0.00% -
u 1.00 350.00 350.00 - - 0.00% - - 0.00% -
u 1.00 30.00 30.00 - - 0.00% - - 0.00% -
u 1.00 180.00 180.00 - - 0.00% - - 0.00% -
u 1.00 45.00 45.00 - - 0.00% - - 0.00% -
u 1.00 2,245.00 2,245.00 - - 0.00% - - 0.00% -
274,394.44 - 0.00% - 0.00%
VALORIZACION DE OBRA Nº 03
MES MARZO DEL 2016
TIDAS,
EGIÓN GRAU,
APURÍMAC
APURÍMAC

Presupuesto Valorizaciones
Anterior Actual Acumul
Und Metrado Precio Parcial
Metrado Parcial % Metrado Parcial % Metrado
u 52.00 4,177.68 217,239.36 - - 0.00% - - 0.00% -
u 1.00 2,417.68 2,417.68 - - 0.00% - - 0.00% -
u 1.00 791.79 791.79 - - 0.00% - - 0.00% -
u 1.00 2,535.36 2,535.36 - - 0.00% - - 0.00% -
u 2.00 1,200.00 2,400.00 - - 0.00% - - 0.00% -
u 11.00 2,522.10 27,743.10 - - 0.00% - - 0.00% -
u 1.00 115.00 115.00 - - 0.00% - - 0.00% -
u 2.00 157.68 315.36 - - 0.00% - - 0.00% -
u 1.00 1,100.85 1,100.85 - - 0.00% - - 0.00% -
jgo 1.00 310.00 310.00 - - 0.00% - - 0.00% -
jgo 1.00 432.00 432.00 - - 0.00% - - 0.00% -
jgo 1.00 2,931.80 2,931.80 - - 0.00% - - 0.00% -
u 11.00 107.68 1,184.48 - - 0.00% - - 0.00% -
u 1.00 150.00 150.00 - - 0.00% - - 0.00% -
jgo 1.00 299.56 299.56 - - 0.00% - - 0.00% -
jgo 10.00 1,442.81 14,428.10 - - 0.00% - - 0.00% -
10,764.27 - 0.00% - 0.00%
glb 1.00 10,764.27 10,764.27 - - 0.00% - - 0.00% -
2,616,228.65 606,250.26 23.17% 416,332.78 15.91%
261,622.87 60,625.03 23.17% 41,633.28 15.91%
143,892.58 33,343.76 23.17% 22,898.30 15.91%
3,021,744.09 700,219.05 23.17% 480,864.36 15.91%
VALORIZACION DE OBRA Nº 03
MES MARZO DEL 2016
TIDAS,
EGIÓN GRAU,
APURÍMAC
APURÍMAC

Presupuesto Valorizaciones
Anterior Actual Acumul
Und Metrado Precio Parcial
Metrado Parcial % Metrado Parcial % Metrado
543,913.94 126,039.43 23.17% 86,555.58 15.91%
3,565,658.03 826,258.48 23.17% 567,419.95 15.91%
342,809.44 0.00 0.00% 0.00 0.00%
61,705.70 0.00 0.00% 0.00 0.00%
404,515.14 0.00 0.00% 0.00 0.00%
3,970,173.17 826,258.48 23.17% 567,419.95 15.91%

PROGRAMADO 650,757.13 24.87% 388,648.14 14.86%

EJECUTADO 606,250.26 23.17% 416,332.78 15.91%


Valorizaciones
Acumulado Saldo
Parcial % Metrado Parcial %
904,305.00 65.98% 466,231.54 34.02%
163,553.79 74.83% 55,016.68 25.17%
163,553.79 74.83% 55,016.68 25.17%
23,822.36 100.00% 0.00 0.00%
900.00 100.00% - - 0.00%
1,470.75 100.00% - - 0.00%
7,419.46 100.00% - - 0.00%
660.00 100.00% - - 0.00%
13,372.15 100.00% - - 0.00%
1,428.39 96.15% 57.14 3.85%
1,428.39 96.15% 93.68 57.14 3.85%
1,915.85 100.00% - 0.00%
173.32 100.00% - - 0.00%
152.60 100.00% - - 0.00%
25.46 100.00% - - 0.00%
232.40 100.00% - - 0.00%
56.08 100.00% - - 0.00%
433.86 100.00% - - 0.00%
132.68 100.00% - - 0.00%
709.45 100.00% - - 0.00%
18,777.12 100.00% - 0.00%
8,960.91 100.00% - - 0.00%
Valorizaciones
Acumulado Saldo
Parcial % Metrado Parcial %
521.08 100.00% - - 0.00%
2,586.58 100.00% - - 0.00%
2,215.71 100.00% - - 0.00%
2,546.29 100.00% - - 0.00%
40.60 100.01% - - 0.00%
628.80 100.00% - - 0.00%
666.04 100.00% - - 0.00%
88.17 100.00% - - 0.00%
6.02 100.00% - - 0.00%
503.97 100.00% - - 0.00%
8.96 99.98% - - 0.00%
0.75 100.33% - - 0.00%
3.24 100.11% - - 0.00%
24,978.61 92.03% 2,162.67 7.97%
9,267.18 92.03% 123.44 802.36 7.97%
15,711.43 92.03% 123.44 1,360.31 7.97%
7,728.76 87.53% 1,101.30 12.47%
3,726.74 95.64% 106.10 169.76 4.36%
4,002.02 81.12% 582.21 931.54 18.88%
10,618.21 75.65% 3,418.61 24.35%
4,920.00 80.00% 0.20 1,230.00 20.00%
3,150.27 67.00% 9.90 1,551.63 33.00%
Valorizaciones
Acumulado Saldo
Parcial % Metrado Parcial %
307.76 80.00% 0.20 76.94 20.00%
521.38 80.00% 0.20 130.34 20.00%
384.88 80.00% 0.20 96.22 20.00%
1,333.92 80.00% 0.20 333.48 20.00%
9,019.20 79.12% 2,379.80 20.88%
1,200.00 80.00% 0.20 300.00 20.00%
1,119.20 80.00% 0.20 279.80 20.00%
3,600.00 80.00% 0.20 900.00 20.00%
1,400.00 80.00% 0.20 350.00 20.00%
1,000.00 80.00% 0.20 250.00 20.00%
700.00 70.00% 0.30 300.00 30.00%
65,265.29 58.71% 45,897.16 41.29%
19,021.60 69.86% 252.42 8,206.17 30.14%
237.84 100.00% - - 0.00%
2,967.23 47.10% 182.39 3,332.27 52.90%
- 0.00% 16.86 451.17 100.00%
13,282.61 50.00% 457.39 13,282.61 50.00%
1,664.68 98.29% 7.60 29.03 1.71%
11,872.29 100.00% - - 0.00%
1,317.60 9.63% 1,351.28 12,364.21 90.37%
5,395.18 64.42% 274.94 2,980.35 35.58%
9,506.26 64.42% 274.94 5,251.35 35.58%
Valorizaciones
Acumulado Saldo
Parcial % Metrado Parcial %
57,639.99 63.81% 32,689.95 36.19%
11,231.38 97.66% 268.62 2.34%
11,231.38 97.66% 1.22 268.62 2.34%
13,353.92 83.05% 2,725.83 16.95%
13,353.92 83.05% 12.38 2,725.83 16.95%
3,877.76 44.48% 4,840.46 55.52%
3,877.76 44.48% 158.03 4,840.46 55.52%
27,986.64 80.99% 6,569.20 19.01%
18,656.22 81.46% 16.78 4,245.34 18.54%
9,330.42 80.06% 59.77 2,323.86 19.94%
1,190.29 50.83% 1,151.55 49.17%
466.64 50.82% 1.50 451.59 49.18%
723.65 50.83% 23.04 699.96 49.17%
- 0.00% 17,040.58 100.00%
- 0.00% 458.08 17,040.58 100.00%
- 0.00% 93.71 100.00%
- 0.00% 0.30 80.27 100.01%
- 0.00% 0.44 13.44 99.99%
620,836.29 70.92% 254,556.98 29.08%
52,913.39 81.80% 11,773.38 18.20%
4,649.01 100.00% - - 0.00%
24,836.40 71.71% 27.22 9,799.20 28.29%
Valorizaciones
Acumulado Saldo
Parcial % Metrado Parcial %
8,480.07 81.88% 42.42 1,877.09 18.12%
14,947.91 99.35% 22.32 97.09 0.65%
9,488.71 77.74% 2,717.67 22.26%
2,088.84 80.03% 1.49 521.34 19.97%
2,458.14 66.82% 24.72 1,220.67 33.18%
4,941.73 83.51% 224.29 975.66 16.49%
23,799.55 44.49% 29,699.44 55.51%
14,000.99 43.05% 58.02 18,521.14 56.95%
4,761.24 48.71% 128.93 5,012.80 51.29%
5,037.32 44.96% 1,437.18 6,165.50 55.04%
83,310.52 73.86% 29,491.91 26.14%
24,911.09 87.88% 8.28 3,434.30 12.12%
9,855.34 33.16% 47.97 19,863.90 66.84%
22,980.62 94.49% 43.98 1,339.19 5.51%
25,563.47 84.04% 1,131.59 4,854.52 15.96%
183,473.25 76.06% 57,747.20 23.94%
1,842.42 50.00% 4.44 1,842.42 50.00%
33,232.55 70.00% 40.70 14,240.52 30.00%
53,743.28 71.19% 433.21 21,751.47 28.81%
- 0.00% 44.67 2,669.48 100.00%
94,655.00 84.59% 3,963.98 17,243.31 15.41%
7,761.92 58.40% 5,528.73 41.60%
Valorizaciones
Acumulado Saldo
Parcial % Metrado Parcial %
1,097.97 34.41% 4.67 2,092.86 65.59%
1,625.30 32.11% 68.43 3,435.87 67.89%
5,038.65 100.00% - - 0.00%
- 0.00% 5,817.12 100.00%
- 0.00% 1.38 582.22 100.00%
- 0.00% 42.91 4,500.40 100.00%
- 0.00% 168.85 734.50 100.00%
135,728.35 69.65% 59,136.35 30.35%
31,388.09 64.81% 46.40 17,045.97 35.19%
47,378.18 62.61% 490.35 28,298.10 37.39%
56,962.08 80.51% 3,170.64 13,792.28 19.49%
2,326.76 68.12% 1,088.90 31.88%
627.04 78.07% 0.50 176.14 21.93%
952.22 68.64% 7.54 435.13 31.36%
747.50 61.01% 109.80 477.63 38.99%
3,951.77 84.35% 733.08 15.65%
1,732.45 81.99% 1.07 380.64 18.01%
1,142.69 82.82% 5.33 237.08 17.18%
1,076.63 90.32% 26.52 115.36 9.68%
92,774.73 74.05% 32,514.03 25.95%
29,049.01 74.43% 26.57 9,981.02 25.57%
31,195.41 74.35% 303.68 10,759.38 25.65%
Valorizaciones
Acumulado Saldo
Parcial % Metrado Parcial %
14,121.97 72.24% 1,247.32 5,425.84 27.76%
18,408.34 74.36% 2,529.00 6,347.79 25.64%
3,753.96 100.00% - 0.00%
2,195.89 100.00% - - 0.00%
1,428.87 100.00% - - 0.00%
129.20 100.00% - - 0.00%
7,218.17 57.86% 5,256.32 42.14%
2,760.14 48.81% 5.37 2,894.91 51.19%
2,758.66 67.49% 24.66 1,328.68 32.51%
1,699.37 62.20% 237.41 1,032.73 37.80%
14,335.21 100.00% - 0.00%
8,716.56 100.00% - - 0.00%
1,875.02 100.00% - - 0.00%
3,743.63 100.00% - - 0.00%
- 0.00% 13,052.85 100.00%
- 0.00% 13.16 4,278.18 100.00%
- 0.00% 137.69 6,764.71 100.00%
- 0.00% 462.06 2,009.96 100.00%
62,274.93 33.44% 123,967.93 66.56%
- 0.00% 41,095.85 100.00%
- 0.00% 424.50 41,095.85 100.00%
- 0.00% 41,502.32 100.00%
Valorizaciones
Acumulado Saldo
Parcial % Metrado Parcial %
- 0.00% 8.00 40,151.36 100.00%
- 0.00% 8.00 1,350.96 100.00%
- 0.00% 8,140.80 100.00%
- 0.00% 169.60 8,140.80 100.00%
- 0.00% 6,025.36 100.00%
- 0.00% 8.00 3,050.96 100.00%
- 0.00% 8.00 2,974.40 100.00%
62,274.93 69.60% 27,203.60 30.40%
- 0.00% 22.00 326.04 100.00%
- 0.00% 22.00 389.62 100.00%
1,100.99 100.00% - - 0.00%
- 0.00% 32.40 270.54 100.00%
61,173.94 70.00% 0.30 26,217.40 30.00%
102,335.62 9.55% 969,481.26 90.45%
85,503.45 77.68% 24,571.91 22.32%
57,856.70 84.14% 87.84 10,907.97 15.86%
21,534.73 80.30% 72.64 5,284.56 19.70%
- 0.00% 15.11 797.66 100.00%
6,112.02 44.63% 237.97 7,581.72 55.37%
8,588.98 5.83% 138,649.11 94.17%
8,588.98 6.58% 121,993.32 93.42%
- 0.00% 117.63 2,050.29 100.00%
Valorizaciones
Acumulado Saldo
Parcial % Metrado Parcial %
1,676.76 8.19% 1,010.10 18,797.96 91.81%
- 0.00% 1,223.90 33,302.32 100.00%
1,963.19 7.46% 801.78 24,366.09 92.54%
- 0.00% 32.58 1,278.44 100.00%
4,134.03 15.86% 598.83 21,929.15 84.14%
- 0.00% 29.92 919.74 100.00%
- 0.00% 187.43 4,890.05 100.00%
597.14 10.77% 398.03 4,947.51 89.23%
217.86 4.84% 638.02 4,287.49 95.16%
- 0.00% 96.30 5,224.28 100.00%
- 0.00% 16,655.79 100.00%
- 0.00% 15.19 760.41 100.00%
- 0.00% 1.46 19.32 100.02%
- 0.00% 317.44 7,713.79 100.00%
- 0.00% 12.93 232.22 100.00%
- 0.00% 257.32 6,252.88 100.00%
- 0.00% 54.33 1,677.17 100.00%
8,243.19 23.07% 27,480.58 76.93%
8,243.19 23.83% 1,017.17 26,344.70 76.17%
- 0.00% 35.90 1,135.88 100.00%
- 0.00% 133,104.34 100.00%
- 0.00% 21,101.50 100.00%
Valorizaciones
Acumulado Saldo
Parcial % Metrado Parcial %
- 0.00% 844.06 21,101.50 100.00%
- 0.00% 51,321.48 100.00%
- 0.00% 844.06 46,592.11 100.00%
- 0.00% 11.55 407.72 100.00%
- 0.00% 26.26 1,134.17 100.00%
- 0.00% 1.80 119.66 100.00%
- 0.00% 105.86 3,067.82 100.00%
- 0.00% 52,914.45 100.00%
- 0.00% 1,241.23 48,445.21 100.00%
- 0.00% 113.75 4,469.24 100.00%
- 0.00% 3,417.26 100.00%
- 0.00% 36.56 3,417.26 100.00%
- 0.00% 4,349.65 100.00%
- 0.00% 111.73 4,349.65 100.00%
- 0.00% 21,207.49 100.00%
- 0.00% 8,176.82 100.00%
- 0.00% 171.35 8,176.82 100.00%
- 0.00% 13,030.67 100.00%
- 0.00% 467.69 10,074.04 100.00%
- 0.00% 38.35 390.02 100.00%
- 0.00% 141.26 1,390.00 100.00%
- 0.00% 96.92 1,176.61 100.00%
Valorizaciones
Acumulado Saldo
Parcial % Metrado Parcial %
- 0.00% 114,838.80 100.00%
- 0.00% 969.57 60,724.17 100.00%
- 0.00% 197.69 6,879.61 100.00%
- 0.00% 14.87 523.28 100.00%
- 0.00% 678.14 29,736.44 100.00%
- 0.00% 97.19 5,633.13 100.00%
- 0.00% 166.14 7,212.14 100.00%
- 0.00% 95.14 4,130.03 100.00%
- 0.00% 215,603.39 100.00%
- 0.00% 31,358.14 100.00%
- 0.00% 29.40 13,105.05 100.00%
- 0.00% 38.85 17,202.39 100.00%
- 0.00% 3.85 1,050.70 100.00%
- 0.00% 12,758.03 100.00%
- 0.00% 11.00 3,620.98 100.00%
- 0.00% 26.88 9,137.05 100.00%
- 0.00% 171,487.22 100.00%
- 0.00% 1,151.23 171,487.22 100.00%
- 0.00% 61,957.72 100.00%
- 0.00% 13,125.74 100.00%
- 0.00% 63.22 13,125.74 100.00%
- 0.00% 653.99 100.00%
Valorizaciones
Acumulado Saldo
Parcial % Metrado Parcial %
- 0.00% 1.00 653.99 100.00%
- 0.00% 35,501.39 100.00%
- 0.00% 2.52 1,195.59 100.00%
- 0.00% 4.08 12,561.83 100.00%
- 0.00% 9.00 20,440.53 100.00%
- 0.00% 2.23 1,303.44 100.00%
- 0.00% 268.58 100.00%
- 0.00% 1.48 268.58 100.00%
- 0.00% 6,053.43 100.00%
- 0.00% 74.03 6,053.43 100.00%
- 0.00% 4,976.61 100.00%
- 0.00% 116.55 4,642.19 100.00%
- 0.00% 5.94 334.42 100.00%
- 0.00% 1,206.58 100.00%
- 0.00% 1.00 718.19 100.00%
- 0.00% 1.00 488.39 100.00%
- 0.00% 171.40 100.00%
- 0.00% 2.00 171.40 100.00%
- 0.00% 4,214.21 100.00%
- 0.00% 1,032.80 100.00%
- 0.00% 136.00 992.80 100.00%
- 0.00% 10.00 40.00 100.00%
Valorizaciones
Acumulado Saldo
Parcial % Metrado Parcial %
- 0.00% 2,170.22 100.00%
- 0.00% 34.00 2,170.22 100.00%
- 0.00% 240.69 100.00%
- 0.00% 4.00 88.80 100.00%
- 0.00% 3.00 151.89 100.00%
- 0.00% 770.50 100.00%
- 0.00% 37.00 499.50 100.00%
- 0.00% 10.00 271.00 100.00%
- 0.00% 35,333.24 100.00%
- 0.00% 104.78 13,311.25 100.00%
- 0.00% 150.29 22,021.99 100.00%
- 0.00% 84,017.70 100.00%
- 0.00% 44,122.19 100.00%
- 0.00% 2,420.15 18,247.93 100.00%
- 0.00% 1,853.14 12,675.48 100.00%
- 0.00% 1,496.46 13,198.78 100.00%
- 0.00% 9,279.88 100.00%
- 0.00% 1,151.23 5,687.08 100.00%
- 0.00% 153.86 2,878.72 100.00%
- 0.00% 41.11 714.08 100.00%
- 0.00% 22,102.81 100.00%
- 0.00% 56.40 746.74 100.00%
Valorizaciones
Acumulado Saldo
Parcial % Metrado Parcial %
- 0.00% 127.92 2,321.75 100.00%
- 0.00% 1,356.27 17,862.08 100.00%
- 0.00% 103.83 1,172.24 100.00%
- 0.00% 8,512.82 100.00%
- 0.00% 166.72 1,418.79 100.00%
- 0.00% 36.70 227.91 100.00%
- 0.00% 4.00 158.80 100.00%
- 0.00% 206.90 2,182.80 100.00%
- 0.00% 364.00 4,524.52 100.00%
- 0.00% 108,340.08 100.00%
- 0.00% 49,237.62 100.00%
- 0.00% 768.79 13,046.37 100.00%
- 0.00% 484.73 12,583.59 100.00%
- 0.00% 49.49 314.76 100.00%
- 0.00% 203.21 9,573.22 100.00%
- 0.00% 78.82 2,698.01 100.00%
- 0.00% 11.00 2,726.46 100.00%
- 0.00% 8.00 484.72 100.00%
- 0.00% 2.00 6,342.84 100.00%
- 0.00% 1.00 424.16 100.00%
- 0.00% 1.00 1,043.49 100.00%
- 0.00% 7,980.76 100.00%
Valorizaciones
Acumulado Saldo
Parcial % Metrado Parcial %
- 0.00% 6.00 5,480.76 100.00%
- 0.00% 1.00 2,500.00 100.00%
- 0.00% 12,903.64 100.00%
- 0.00% 378.23 12,300.04 100.00%
- 0.00% 24.00 603.60 100.00%
- 0.00% 38,218.06 100.00%
- 0.00% 81.64 20,415.71 100.00%
- 0.00% 81.17 14,952.33 100.00%
- 0.00% 16.07 1,391.34 100.00%
- 0.00% 4.00 1,458.68 100.00%
- 0.00% 162.69 100.00%
- 0.00% 14.00 34.44 100.00%
- 0.00% 57.00 128.25 100.00%
3,161.13 5.67% 52,574.77 94.33%
0.00 0.00% 7,524.21 100.00%
0.00 0.00% 4,616.98 100.00%
- 0.00% 13.00 2,085.07 100.00%
- 0.00% 2.00 135.40 100.00%
- 0.00% 5.00 577.75 100.00%
- 0.00% 6.45 1,516.27 100.00%
- 0.00% 3.00 85.02 100.00%
- 0.00% 11.00 217.47 100.00%
Valorizaciones
Acumulado Saldo
Parcial % Metrado Parcial %
- 0.00% 1,253.39 100.00%
- 0.00% 5.00 236.40 100.00%
- 0.00% 5.00 304.85 100.00%
- 0.00% 13.00 552.24 100.00%
- 0.00% 5.00 159.90 100.00%
- 0.00% 1,653.84 100.00%
- 0.00% 20.00 1,084.60 100.00%
- 0.00% 28.00 569.24 100.00%
920.00 5.58% 15,573.82 94.42%
497.44 33.33% 994.88 66.67%
497.44 33.33% 16.00 994.88 66.67%
422.56 60.86% 271.80 39.14%
255.64 100.00% - - 0.00%
117.99 65.52% 5.00 62.10 34.48%
48.93 18.92% 15.00 209.70 81.08%
- 0.00% 7,186.03 100.00%
- 0.00% 7,186.03 100.00%
- 0.00% 192.50 2,342.73 100.00%
- 0.00% 192.50 658.35 100.00%
- 0.00% 192.50 1,081.85 100.00%
- 0.00% 192.50 3,103.10 100.00%
- 0.00% 2,823.99 100.00%
Valorizaciones
Acumulado Saldo
Parcial % Metrado Parcial %
- 0.00% 37.00 429.94 100.00%
- 0.00% 112.50 1,572.75 100.00%
- 0.00% 43.00 821.30 100.00%
- 0.00% 1,876.52 100.00%
- 0.00% 4.00 102.44 100.00%
- 0.00% 14.00 398.16 100.00%
- 0.00% 2.00 57.98 100.00%
- 0.00% 2.00 57.98 100.00%
- 0.00% 16.00 417.28 100.00%
- 0.00% 4.00 39.28 100.00%
- 0.00% 1.00 29.73 100.00%
- 0.00% 2.00 59.46 100.00%
- 0.00% 4.00 118.92 100.00%
- 0.00% 18.00 535.14 100.00%
- 0.00% 3.00 60.15 100.00%
- 0.00% 1,781.65 100.00%
- 0.00% 3.00 156.27 100.00%
- 0.00% 3.00 406.89 100.00%
- 0.00% 4.00 436.48 100.00%
- 0.00% 4.00 424.52 100.00%
- 0.00% 1.00 357.49 100.00%
- 0.00% 397.80 100.00%
Valorizaciones
Acumulado Saldo
Parcial % Metrado Parcial %
- 0.00% 10.00 354.30 100.00%
- 0.00% 1.00 43.50 100.00%
- 0.00% 241.15 100.00%
- 0.00% 35.00 241.15 100.00%
- 0.00% 7,218.65 100.00%
- 0.00% 2,432.85 100.00%
- 0.00% 97.00 1,708.17 100.00%
- 0.00% 36.00 724.68 100.00%
- 0.00% 1,715.64 100.00%
- 0.00% 68.00 1,715.64 100.00%
- 0.00% 601.51 100.00%
- 0.00% 26.00 406.12 100.00%
- 0.00% 13.00 195.39 100.00%
- 0.00% 301.64 100.00%
- 0.00% 1.00 301.64 100.00%
- 0.00% 2,167.01 100.00%
- 0.00% 133.00 319.20 100.00%
- 0.00% 1.00 1,847.81 100.00%
2,241.13 15.81% 11,934.76 84.19%
1,603.28 40.67% 2,339.22 59.33%
130.40 7.69% 12.00 1,564.80 92.31%
1,197.36 70.59% 5.00 498.90 29.41%
Valorizaciones
Acumulado Saldo
Parcial % Metrado Parcial %
275.52 50.00% 3.00 275.52 50.00%
411.79 22.24% 1,439.40 77.76%
- 0.00% 10.00 233.00 100.00%
108.44 8.25% 44.50 1,206.40 91.75%
303.35 100.00% - - 0.00%
- 0.00% 2,089.24 100.00%
- 0.00% 2,089.24 100.00%
- 0.00% 76.00 658.16 100.00%
- 0.00% 76.00 259.92 100.00%
- 0.00% 76.00 607.24 100.00%
- 0.00% 76.00 563.92 100.00%
- 0.00% 1,731.28 100.00%
- 0.00% 76.00 1,731.28 100.00%
226.06 17.88% 1,037.93 82.12%
56.38 100.00% - - 0.00%
45.09 18.75% 13.00 195.39 81.25%
- 0.00% 8.00 472.24 100.00%
- 0.00% 10.00 370.30 100.00%
124.59 100.00% - - 0.00%
- 0.00% 1,686.45 100.00%
- 0.00% 4.00 784.96 100.00%
- 0.00% 7.00 452.27 100.00%
Valorizaciones
Acumulado Saldo
Parcial % Metrado Parcial %
- 0.00% 6.00 384.30 100.00%
- 0.00% 4.00 64.92 100.00%
- 0.00% 1,231.98 100.00%
- 0.00% 1,231.98 100.00%
- 0.00% 6.00 1,231.98 100.00%
- 0.00% 379.26 100.00%
- 0.00% 150.50 379.26 100.00%
- 0.00% 10,323.33 100.00%
- 0.00% 4,601.17 100.00%
- 0.00% 3.00 170.79 100.00%
- 0.00% 10.00 1,593.70 100.00%
- 0.00% 10.00 664.20 100.00%
- 0.00% 10.00 905.20 100.00%
- 0.00% 14.00 1,267.28 100.00%
- 0.00% 943.46 100.00%
- 0.00% 1.00 67.61 100.00%
- 0.00% 3.00 461.40 100.00%
- 0.00% 3.00 414.45 100.00%
- 0.00% 1,166.46 100.00%
- 0.00% 2.00 35.08 100.00%
- 0.00% 6.00 105.24 100.00%
- 0.00% 1.00 69.64 100.00%
Valorizaciones
Acumulado Saldo
Parcial % Metrado Parcial %
- 0.00% 10.00 797.40 100.00%
- 0.00% 2.00 159.10 100.00%
- 0.00% 1,521.06 100.00%
- 0.00% 1.00 12.01 100.00%
- 0.00% 1.00 148.61 100.00%
- 0.00% 1.00 60.48 100.00%
- 0.00% 22.00 937.64 100.00%
- 0.00% 1.00 113.82 100.00%
- 0.00% 2.00 248.50 100.00%
- 0.00% 2,091.18 100.00%
- 0.00% 2,091.18 100.00%
- 0.00% 2.00 2,091.18 100.00%
12,781.29 10.82% 105,358.12 89.18%
0.00 0.00% 5,788.51 100.00%
- 0.00% 113.50 3,209.78 100.00%
- 0.00% 113.50 2,459.55 100.00%
- 0.00% 113.50 119.18 100.00%
8,262.43 7.75% 98,294.94 92.25%
7,548.92 70.69% 3,130.04 29.31%
7,548.92 70.69% 34.00 3,130.04 29.31%
13.22 1.82% 712.96 98.18%
- 0.00% 23.00 237.36 100.00%
Valorizaciones
Acumulado Saldo
Parcial % Metrado Parcial %
13.22 11.11% 8.00 105.76 88.89%
- 0.00% 12.00 369.84 100.00%
261.73 2.97% 8,564.00 97.03%
85.51 1.04% 95.00 8,123.45 98.96%
176.22 28.57% 5.00 440.55 71.43%
329.32 100.00% - 0.00%
329.32 100.00% - - 0.00%
109.24 59.05% 75.75 40.95%
30.30 28.57% 5.00 75.75 71.43%
78.94 100.00% - - 0.00%
- 0.00% 6,876.38 100.00%
- 0.00% 412.50 6,876.38 100.00%
- 0.00% 36,488.72 100.00%
- 0.00% 415.50 6,776.81 100.00%
- 0.00% 907.50 16,825.05 100.00%
- 0.00% 339.00 7,878.36 100.00%
- 0.00% 90.00 5,008.50 100.00%
- 0.00% 4,362.06 100.00%
- 0.00% 1.00 600.66 100.00%
- 0.00% 8.00 3,009.12 100.00%
- 0.00% 1.00 376.14 100.00%
- 0.00% 1.00 376.14 100.00%
Valorizaciones
Acumulado Saldo
Parcial % Metrado Parcial %
- 0.00% 5,165.44 100.00%
- 0.00% 16.00 613.76 100.00%
- 0.00% 10.00 383.60 100.00%
- 0.00% 1.00 38.36 100.00%
- 0.00% 6.00 426.18 100.00%
- 0.00% 4.00 307.12 100.00%
- 0.00% 9.00 869.67 100.00%
- 0.00% 1.00 297.09 100.00%
- 0.00% 25.00 2,064.50 100.00%
- 0.00% 1.00 82.58 100.00%
- 0.00% 1.00 82.58 100.00%
- 0.00% 3,500.00 100.00%
- 0.00% 1.00 3,500.00 100.00%
- 0.00% 4,024.98 100.00%
- 0.00% 2.00 4,024.98 100.00%
- 0.00% 11,434.22 100.00%
- 0.00% 64.00 4,464.64 100.00%
- 0.00% 40.00 3,092.00 100.00%
- 0.00% 12.00 546.00 100.00%
- 0.00% 116.00 3,267.72 100.00%
- 0.00% 1.00 63.86 100.00%
- 0.00% 7,574.04 100.00%
Valorizaciones
Acumulado Saldo
Parcial % Metrado Parcial %
- 0.00% 6.00 6,452.16 100.00%
- 0.00% 3.00 1,121.88 100.00%
- 0.00% 3,886.35 100.00%
- 0.00% 5.00 1,516.75 100.00%
- 0.00% 3.00 1,777.20 100.00%
- 0.00% 1.00 592.40 100.00%
- 0.00% 2,500.00 100.00%
- 0.00% 1.00 2,500.00 100.00%
4,518.86 78.00% 1,274.67 22.00%
436.96 100.00% - 0.00%
121.20 100.00% - - 0.00%
315.76 100.00% - - 0.00%
1,549.88 55.15% 1,260.49 44.85%
616.79 100.00% - - 0.00%
933.09 42.54% 77.00 1,260.49 57.46%
63.90 100.00% - 0.00%
63.90 100.00% - - 0.00%
- 0.00% 14.18 100.00%
- 0.00% 1.00 14.18 100.00%
172.86 100.00% - 0.00%
172.86 100.00% - - 0.00%
2,295.26 100.00% - 0.00%
Valorizaciones
Acumulado Saldo
Parcial % Metrado Parcial %
2,261.76 100.00% - - 0.00%
33.50 100.00% - - 0.00%
- 0.00% 342,809.44 100.00%
- 0.00% 57,650.73 100.00%
- 0.00% 225.00 25,987.50 100.00%
- 0.00% 22.00 7,040.00 100.00%
- 0.00% 9.00 1,080.00 100.00%
- 0.00% 10.00 1,500.00 100.00%
- 0.00% 1.00 130.00 100.00%
- 0.00% 22.00 3,960.00 100.00%
- 0.00% 30.00 6,000.00 100.00%
- 0.00% 10.00 1,400.00 100.00%
- 0.00% 13.00 1,235.00 100.00%
- 0.00% 150.00 5,625.00 100.00%
- 0.00% 1.00 573.23 100.00%
- 0.00% 1.00 270.00 100.00%
- 0.00% 1.00 350.00 100.00%
- 0.00% 1.00 30.00 100.00%
- 0.00% 1.00 180.00 100.00%
- 0.00% 1.00 45.00 100.00%
- 0.00% 1.00 2,245.00 100.00%
- 0.00% 274,394.44 100.00%
Valorizaciones
Acumulado Saldo
Parcial % Metrado Parcial %
- 0.00% 52.00 217,239.36 100.00%
- 0.00% 1.00 2,417.68 100.00%
- 0.00% 1.00 791.79 100.00%
- 0.00% 1.00 2,535.36 100.00%
- 0.00% 2.00 2,400.00 100.00%
- 0.00% 11.00 27,743.10 100.00%
- 0.00% 1.00 115.00 100.00%
- 0.00% 2.00 315.36 100.00%
- 0.00% 1.00 1,100.85 100.00%
- 0.00% 1.00 310.00 100.00%
- 0.00% 1.00 432.00 100.00%
- 0.00% 1.00 2,931.80 100.00%
- 0.00% 11.00 1,184.48 100.00%
- 0.00% 1.00 150.00 100.00%
- 0.00% 1.00 299.56 100.00%
- 0.00% 10.00 14,428.10 100.00%
- 0.00% 10,764.27 100.00%
- 0.00% 1.00 10,764.27 100.00%
1,022,583.04 39.09% 1,593,645.69 60.91%
102,258.30 39.09% 159,364.57 60.91%
56,242.07 39.09% 87,650.51 60.91%
1,181,083.41 39.09% 1,840,660.77 60.91%
Valorizaciones
Acumulado Saldo
Parcial % Metrado Parcial %
212,595.01 39.09% 331,318.94 60.91%
1,393,678.43 39.09% 2,171,979.71 60.91%
0.00 0.00% 0.00 0.00%
0.00 0.00% 0.00 0.00%
0.00 0.00% 0.00 0.00%
1,393,678.43 39.09% 2,171,979.71 60.91%

1,039,405.27 39.73% 1,576,823.38 60.27%

1,022,583.04 39.09% 1,593,645.61 60.91%