Description Unit Qty Rate Amount

Impervious coat to exposed RCC roof slab surface with CM(1:3) 20mm thick with 1kg of water proof compound/ bag of cement laid over roof when it
is in green including cost and conveyance of all materials to site, Cost of seigniorage charges on all materials, all taxes, finishing, curing, scaffolding
and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per
SS 903.) per 10 Sqm. (Data BLD-CSTN10-25)

cement mortar sqm 0.21 3324.89 698.23


water proof compound kg 2 115.00 230.00
Mason 1st class day 0.66 445 293.70
Mason 2nd class day 1.54 400 616.00
Mazdoor day 3.7 350 1295.00
Area allowance 40% 2204.70 881.88
Over heads & Contractor's profit 14% 4014.81 546.62
Rate / 10 Sqm 4561.42

1st floor
Basic rate of Plastering 10 Sqm 4561.42
Lift charges 10% of labour charges 0% 3086.58 0.00
Over heads & Contractor's profit 14% 0.00
Total 4561.42

2nd floor
Basic rate of Plastering for 10 Sqm 4561.42
Lift charges 10% of labour charges 10% 3086.58 308.66
Over heads & Contractor's profit 14% 42.02
Total 4912.10

3rd floor
Basic rate of Plastering for G.F. 10 Sqm 4561.42
Lift charges 10% of labour charges 20% 3086.58 617.32
Over heads & Contractor's profit 14% 84.05
Total 5262.79

4th floor
Basic rate of Plastering for G.F. 10 Sqm 4561.42
Lift charges 10% of labour charges 30% 3086.58 925.97
Over heads & Contractor's profit 14% 126.07
Total 5613.47

5th floor
Basic rate of Plastering for G.F. 10 Sqm 4561.42
Lift charges 10% of labour charges 40% 3086.58 1234.63
Over heads & Contractor's profit 14% 168.10
Total 5964.15

Flooring with 25.4mm thick polished shahabad stones (Tandur Blue 1st.quality)/ cuddapah slabs of size not less than 45 cmx 30 cm set over a
base coat of CM (1:8), 12mm thick (joints of stone must be flushed) over C.C. bed already laid or R.C.C. roof slabs including neat cement slurry of
honey like consistency spread at the rate of 3.30 Kgs of cement per Sq.m jointed with neat cement to full depth, including cost and conveyance of
all materials like cement, sand, water, flooring stones etc. to site, including cost of base coat (excluding cost of cement concrete bed), seigniorage
charges, sales & other taxes on all materials including all labour charges like dressing of flooring stones to the required sizes, mixing of cement
mortar, laying, curing lift charges cost of base coat etc., complete for finished item of work. (APSS No.703 & 701)

Polished Polished black Polished Polished


shahabad cuddapah betham betham
stone 15- stone 15mm cherla white cherla
18mm stone 25mm coloured
9-1 9-1 9-1 stone9-1
25mm
Data Reference BLD-CSTN
Cost of Polished shahabad/Cuddapah/
165.4/ 137.9/
betham cherla white/ bethamcherla coloured Sqm 11.00 1819.40 1516.90 4244.90 3031.60
385.9/ 275.6
stone
Cement for CM (1:8) proportion for base coat Kg 21.60 5.84 126.14 126.14 126.14 126.14
Cement for slurry Kg 33.00 5.84 192.72 192.72 192.72 192.72
cement for jointing Kg 20.00 5.84 116.80 116.80 116.80 116.80
sand for Mortor (1:8) proportion cum 0.12 403.51 48.42 48.42 48.42 48.42
1st Class Masons No 3.10 445.00 1379.50 1379.50 1379.50 1379.50
2 nd Class Masons Nos 1.10 400.00 440.00 440.00 440.00 440.00
Man mazdoor Nos 0.86 350.00 301.00 301.00 301.00 301.00
area allowance 40% 848.20 848.20 848.20 848.20
Over heads & Contractor's profit 14% 717.81 676.62 1048.04 882.85
Rate per 10 Sqm. 5989.99 5646.31 8745.73 7367.23
Rate per 1 Sqm. 599.00 564.63 874.57 736.72

Flooring with rough 50/40/25mm thick Cuddapah / Shahabad stones set over a base coat of CM(1:8) 12mm thick over CC bed already laid or RCC
roof slab including pointing with CM(1:3) duly filling joints neatly, including cost of all materials like flooring stones, cement, sand, water etc.
complete, including seigniorage charges, labour charges for dressing of flooring stones etc., complete for finished item of work.
Cuddapah Cuddapah shahabad/ shahabad/
slabs 50mm slabs 40mm tandur tandur
thick thick slabs slabs
40mm thick 25mm thick
Data Reference BLD-CSTN 9-2 9-2 9-2 9-2
Rough cuddapah/ Shabad stones 110/96/
Sqm 10.50 1155.00 1008.00 1300.95 1009.05
(50/40/25mm thick) (0.457x0.457m) 123.9/96.1
Cement for CM (1:8) proportion for base
kg 21.60 5.84 126.14
coat 126.14 126.14 126.14
Cement for CM (1:3) proportion for base
kg 9.60 5.84 5.61
coat 5.61 5.61 5.61