Escolar Documentos
Profissional Documentos
Cultura Documentos
Volume 1
DPS Project No.: PP2618
Eidos Project No.: 15064
October 25, 2017
SIM
Detail Number A Detail Number ATC
ADJ
A.F.F.
ACOUSTICAL CEILING TILE
ADJUSTABLE
ABOVE FINISH FLOOR
L.
LAB.
LAM.
LENGTH
LABORATORY
LAMINATE
A0.1 CODE SITE PLAN AD1.0 BLDG A MAIN LEVEL DEMO PLAN & NOTES Denver Public Schools
1 INTERIOR / ALUM. ALUMINIUM LAV. LAVATORY A0.2 MAIN LEVEL CODE PLAN & OVERALL FLOOR PLAN AD1.1 BLDG B MAIN LEVEL DEMO PLAN & NOTES
SECTION D A 5.0x B E 51st Ave 1617 South Acoma
DETAIL
A 5.0x
Sheet Number
EXTERIOR
ELEVATION
Sheet Number
ALT.
APPROX.
ARCH.
ANOD.
ALTERNATE
APPROXIMATE
ARCHITECT / ARCHITECTURAL
ANODIZED
L.F.
LB., #
LVR.
LINEAL FEET
POUND
LOUVER
A0.3
A0.4
UPPER LEVEL CODE PLAN, OVERALL FLOOR PLAN & CODE ANALYSIS
OVERALL EXTERIOR ELEVATIONS & BUILDING ENVELOPE COMCHECK
AD1.2
AD2.0
BLDG A UPPER LEVEL DEMO PLAN & NOTES
MAIN LEVEL DEMO REFLECTED CEILING PLAN & ROOF DEMO PLAN
PROJECT Denver, Colorado 80223
C 720-312-9640
Detail Number View Name
APPROV.
BD.
BLDG.
APPROVED
BOARD
BUILDING
MAS.
M.O.
MAT’L.
MAX.
MASONRY
MASONRY OPENING
MATERIAL
MAXIMUM
Architecture Civil Architecture
SITE
SIM BLK. BLOCK MECH. MECHANICAL AC1.0 SITE DEMO PLAN & NOTES A1.0 BLDG A MAIN LEVEL FLOOR PLAN, SCHEDULES, DETAILS & NOTES
BUILDING AND
WALL SECTION
1
A 5.0x PLAN
View Name BLKG.
B.M.
BOT.
BLOCKING
BENCH MARK
BOTTOM
MED.
MFR.
MH.
MEDIUM
MANUFACTURER
MANHOLE
AC2.0 SITE PLAN A1.1 BLDG B SOUTH MAIN LEVEL FLOOR PLAN, SCHEDULES & NOTES
E 50th Ave Design / Build Contractor: Architects:
1/8" = 1'-0" B.O. BOTTOM OF MIN. MINIMUM AC2.1 ENLARGED SITE PLANS & SITE DETAILS A1.2 BLDG C NORTH MAIN LEVEL FLOOR PLAN, SCHEDULES, DETAILS & NOTES
Sheet Number BSMT.
B.U.R.
BASEMENT
BUILT UP ROOF
MISC.
MM.
MTL.
MISCELLANEOUS
MILLIMETER(S)
METAL
AC2.2 COMMUNITY GARDEN ENLARGED SITE PLAN A1.3
A1.4
BLDG C SOUTH MAIN LEVEL FLOOR PLAN, SCHEDULES, DETAILS & NOTES
BLDG D WEST MAIN LEVEL FLOOR PLAN, SCHEDULES, DETAILS & NOTES
Swinerton Builders Eidos Architects, PC
Detail Number View Number View Name
CTR.
CIR.
CENTER, CENTERED
CIRCLE N. NORTH Civil A1.5 BLDG A UPPER LEVEL FLOOR PLAN & NOTES 6890 West 52nd Avenue 5400 Greenwood Plaza Boulevard
DETAIL SIM CIRC.
C.J.
CIRCUMFERENCE
CONTROL JOINT
NEC.
N.I.C.
NECESSARY
NOT IN CONTRACT C0.0 EXISTING SURVEY A1.6 BLDG B SOUTH UPPER LEVEL FLOOR PLAN, SCHEDULES & NOTES Suite 100 Greenwood Village, Colorado 80111
1
A 5.0x DETAIL
1. View Name CLG.
CMU
CEILING
CONCRETE MASONRY UNITS
NO., #
NOM.
NUMBER
NOMINAL C1.0 HORIZONTAL CONTROL PLAN A1.7 BLDG C NORTH UPPER LEVEL FLOOR PLAN, SCHEDULES, DETAILS & NOTES E 49th Ave Arvada, Colorado 80002 720-200-0630
TAG 1/8" = 1'-0"
COL.
COMB.
COLUMN
COMBINATION
N.T.S. NOT TO SCALE C1.1 LINE AND CURVE TABLES A1.8 BLDG C SOUTH UPPER LEVEL FLOOR PLAN, SCHEDULES, DETAILS & NOTES 303-418-5337
Sheet Number COMP. COMPACT, COMPACTED O.D. OUTSIDE DIAMETER C1.2 SIGNAGE PLAN A2.0 BLDG C EXTERIOR ELEVATIONS
Telluride St
CONC. CONCRETE O.C. ON CENTER
C2.0 CASMP COVER A2.1 EXTERIOR DETAILS
Yampa Street
CONT. CONTINUOUS OH. OVERHEAD
CONSTR. CONSTRUCTION O.H. OPPOSITE HAND
C2.1 NOTES A2.2 BLDGS B & D EXTERIOR ELEVATIONS Evie G. Dennis
Tower Rd
COORD. COORDINATE OPN’G. OPENING
CORR. CORRIDOR OPP. OPPOSITE
C2.2 INITIAL EROSION CONTROL PLAN A2.3 BLDGS B & D EXTERIOR ELEVATIONS Campus Civil Engineers: Mechanical Engineers:
Walden St
NEW COLUMN C. TILE CERAMIC TILE O.S.B. ORIENTED STRAND BOARD
CENTER LINE 0 ELEVATION D. DEEP, DRYER PART. PARTITION
C2.3 INTERIM EROSION CONTROL PLAN A3.0 BUILDING B BUILDING SECTIONS HCL Engineering MKK Consulting Engineers
LEVEL DBL. DOUBLE PER. PERIMETER C2.4 FINAL EROSION CONTROL PLAN A3.1 BUILDING SECTIONS & DETAILS 9570 Kingston Court 7600 East Orchard Road
DEMO. DEMOLITION P-LAM. PLASTIC LAMINATE
DEPT. DEPARTMENT PLBG. PLUMBING C2.5 EROSION CONTROL DETAILS A3.2 BUILDING D BUILDING SECTIONS Suite 310 Greenwood Village, Colorado 80111
D.F. DRINKING FOUNTAIN PROP. PROPERTY
Room Name DTL. DETAIL PS PROJECTION SCREEN C2.6 EROSION CONTROL DETAILS A4.0 WALL SECTIONS & DETAILS Englewood, Colorado 80112 303-796-6000
Partition Type 303-773-1605
Partition Width Reference
ROOM ROOM NAME
DIAG.
DIA.
DIAGONAL
DIAMETER
P.T.
PT.
PRESSURE TREATED
PAINT
C3.1 OVERALL GRADING PLAN A4.1 WALL SECTIONS & DETAILS Green Valley Ranch Blvd
(See Type For Actual Width) DESIGNATION 100 Room Number
DIM. DIMENSION P. TILE PORCELAIN TILE C3.2 NORTHERN PARKING AREA GRADING PLAN A4.2 WALL SECTIONS & DETAILS
WALL TYPE
DISP. DISPENSER
C3.3 SOUTHERN PARKING AREA GRADING PLAN A4.3 WALL SECTIONS & DETAILS Structural Engineers: Electrical Engineers:
Optional Suffix
Room Name
DISPL.
DIV.
DISPOSAL
DIVISION
Q. TILE QUARRY TILE
N
INDICATOR C4.0 WASTE WATER COVER SHEET A4.4 WALL SECTIONS & DETAILS
3A12 X PARTITION
DN.
DR.
DOWN
DOOR
R.
RB.
RISER, RADIUS
RUBBER BASE
The Vertex Companies, Inc. MKK Consulting Engineers
ROOM NAME C4.1 WASTE WATER NOTE SHEET A4.5 ELEVATOR SECTIONS
ROOM D.S. DOWN SPOUT RE. REFER TO
3734 Osage Street 7600 East Orchard Road
DESIGNATION 100 Room Number DWG. DRAWING REC. RECESSED C4.2 SANITARY PLAN & PROFILE A4.6 STAIR SECTIONS
150 SF REF. REFERENCE Denver, Colorado 80211 Greenwood Village, Colorado 80111
W/ AREA E. EAST REFL. REFLECTED C4.3 NORTHERN ROOF DRAIN PLAN & PROFILE A4.7 STAIR SECTIONS 303-623-9116 303-796-6000
Room SF EA. EACH REM. REMOVE, REMOVABLE
ELEC. ELECTRIC REQ’D. REQUIRED C4.4 SOUTHERN ROOF DRAIN PLAN & PROFILE A4.8 STAIR SECTIONS & DETAILS
ELEV. ELEVATOR RET. RETURN
EQ. EQUAL REV. REVISION C4.5 PARKING AREA INLET PLAN & PROFILE A4.9 ENTRY CANOPY RCP & EXTERIOR DETAILS
.
H1 W1 .
A1
WINDOW TAGS
EQMT.
E.W.C.
EQUIPMENT
ELECTRIC WATER COOLER
RF
RM.
RUBBER FLOOR
ROOM
C5.0 FIRE ACCESS PLAN, PROFILE & TYPICAL SECTION A5.0 PARTITION DETAILS, DETAILS, NOTES & TYPICAL MOUNTING HEIGHTS Landscape Architects: Building Envelope Consultant:
DOOR
DESIGNATION
EXH. EXHAUST C5.1 FIRE ACCESS CROSS SECTIONS (1 OF 3) A5.1 BLDG C INTERIOR ELEVATIONS AND DETAILS
HOLLOW WINDOW
ALUM. 101 Room Number EXIST., (E)
ETR.
EXISTING
EXISTING TO REMAIN
S.
S.B.
SOUTH
SPLASH BLOCK C5.2 FIRE ACCESS CROSS SECTIONS (2 OF 3) A5.2 BLDG C ENLARGED FLOOR PLANS AND INTERIOR ELEVATIONS
Studio CPG Pie Consultanting & Engineering
METAL WALL EXT. EXTERIOR SC. SEALED CONCRETE
C5.3 FIRE ACCESS CROSS SECTIONS (3 OF 3) A5.3 BLDG B ENLARGED FLOOR PLANS, INTERIOR ELEVATIONS AND DETAILS 4309 W. 44th Ave. 6275 Joyce Drive
N
INDICATES TRUE NORTH
EXP.
E.J.
F.D.
EXPANSION
EXPANSION JOINT
FLOOR DRAIN
SCHED.
SECT.
S.F.
SHWR
SCHEDULE
SECTION
SQUARE FOOT
SHOWER
C6.0 COVER SHEET A5.4 BLDG B INTERIOR ELEVATIONS SITE INFORMATION Denver, Colorado 80212
303-455-3779
Suite 200
Arvada, Colorado 80403
F.E. FIRE EXTINGUISHER SHT. SHEET
C6.1 GENERAL NOTES A5.5 BLDG B & D INTERIOR ELEVATIONS 303-552-0177
NORTH N F.F.E. FINISH FLOOR ELEVATION SIM. SIMILAR C6.2 TYPICAL SECTIONS AND DETAILS A5.6 BLDG B INTERIOR ELEVATIONS Project 18250 E 51st Ave
ARROW
FIN. FINISH(ED) SOG. SLAB-ON-GRADE Address: Denver, Colorado 80249
FIXT. FIXTURE SPEC. SPECIFICATION C6.3 PLAN AND PROFILE A5.7 BLDG B INTERIOR ELEVATION Roof consultant : Performance/Acoustical Consultant:
FLR. FLOOR SPECS. SPECIFICATIONS
FND. FOUNDATION SPK. SPEAKER C6.4 SIGNAGE PLAN AND DETAILS A5.8 BLDG D INTERIOR ELEVATIONS Legal A PARCEL OF LAND LOCATED IN THE SOUTHEAST
Revision Number
F.R. FIRE RATED SQ. SQUARE
C6.5 CROSS SECTIONS (1 OF 4) A5.9 BLDG C ENLARGED FLOOR PLANS AND INTERIOR ELEVATIONS Description: 1/4 OF SECTION 16 TOWNSHIP 3 SOUTH, RANGE 66 Wiss, Janney, Elstner Associates, Inc. D.L. Adams
FRMG. FRAMING STD. STANDARD
1 100'-0" FRZ. FREEZER STL. STEEL C6.6 CROSS SECTIONS (2 OF 4) A5.10 BLDG C INTERIOR ELEVATIONS WEST OF THE 6TH PRINCIPAL MERIDIAN 3609 South Wadsworth Boulevard 1536 Ogden Street
REVISION TAG SPOT ELEVATION . FTG. FOOTING STR. STAIR
Optional Note FUT. FUTURE STRUC. STRUCTURE, STRUCTURAL C6.7 CROSS SECTIONS (3 OF 4) A5.11 BLDG C INTERIOR ELEVATIONS CITY AND COUNTY OF DENVER, STATE OF COLORADO Suite 400 Denver, Colorado 80218
SUSP. SUSPENDED
C6.8 CROSS SECTIONS (4 OF 4) A5.12 BLDG D INTERIOR ELEVATIONS Lakewood, Colorado 80235 303-455-1900
GA. GAUGE SYM. SYMMETRICAL
GALV. GALVANIZED SYS. SYSTEM Site Area: Approx. 16.2 Acre (303) 914-4300
G.B. GRAB BAR C7.0 FIRE HYDRANT COVER A6.0 DOOR AND FRAME TYPES
FLR FLR
Flooring Transition PT GRND. GROUND T. THICK, TREAD
C7.1 FIRE HYDRANT NOTES A6.1 DOOR AND FRAME TYPES Zone: C-MU-20
Wall Accent Paint or Finish G.C. GENERAL CONTRACTOR T.B.D. TO BE DETERMINED
GFCMU GROUND FACE CMU TEMP. TEMPORARY, TEMPERED C7.2 FIRE HYDRANT OVERALL UTILITY PLAN A6.2 HEAD, JAMB AND SILL DETAILS
GYP. BD. GYPSUM BOARD T&G TONGUE AND GROOVE
T.O.__ TOP OF _____ (E.G. STEEL) C7.3 FIRE HYDRANT WATER ONLY PLAN A6.3 HEAD, JAMB AND SILL DETAILS
BUILDING
H. HIGH TLT. / TOIL. TOILET
H.B. HOSE BIB T.P. TOILET PAPER A6.4 HEAD, JAMB AND SILL DETAILS
HC. HANDICAPPED T.S. TUBE STEEL
H.D. HEAVY DUTY TYP. TYPICAL Landscape A7.0 BLDG A MAIN LEVEL REFLECTED CEILING PLAN
INFORMATION
HDWR. HARDWARE L1 LANDSCAPE PLAN A7.1 BLDG B MAIN LEVEL REFLECTED CEILING PLAN
H.W. HOLLOW METAL UC. UNDERCUT
H.O. HOLD OPEN(S) U.N.O. UNLESS NOTED OTHERWISE L2 LANDSCAPE PLAN ENLARGEMENTS A7.2 BLDG C NORTH MAIN LEVEL REFLECTED CEILING PLANS
HORZ. HORIZONTAL
15064
W.W.F. WELDED WIRE FABRIC S1.0 GENERAL NOTES A8.3 ROOFING DETAILS Building 'A' & 'C' Building 'D'
S2.0 OVERALL FOUNDATION PLAN - BUILDING C A8.4 ROOFING DETAILS Learning Community Buildings Performance
S2.1 OVERALL UPPER LEVEL & LOW ROOF FRAMING PLAN A9.1 BLDG B MAIN LEVEL FINISH PLAN
BRICK GYPSUM BOARD TILE Occupancy Occupancy
S2.2 OVERALL UPPER ROOF FRAMING PLAN - BUILDING C A9.2 BLDG C NORTH MAIN LEVEL FINISH PLAN Classification: E Classification: A-3
C:\Users\rortiz\Desktop\Revit Local\15064 DPS Groff HS Ph 2 A15_BO.rvt
S2.3 OVERALL FOUNDATION PLAN - BUILDING B & D A9.3 BLDG C SOUTH MAIN LEVEL FINISH PLAN 10/25/17 Record Drawings
S3.0 FOUNDATION PLAN - BUILDING C (NORTH) A9.4 BLDG D WEST MAIN LEVEL FINISH PLAN Construction Type IIB, Construction Type IIB,
CONCRETE METAL STUD TERRAZZO S3.1 FOUNDATION PLAN - BUILDING C (SOUTH) A9.6 BLDG B UPPER LEVEL FINISH PLAN Type: Fully Sprinklered Type: Fully Sprinklered 09/30/16 For Construction Set
PARTITION 08/12/16 100% CD's - Bldgs. B & D
S3.2 UPPER FLOOR FRAMING PLAN - BUILDING C (NORTH) A9.7 BLDG C NORTH UPPER LEVEL FINISH PLAN
Building. Height.: 35'-0" Building. Height.: 35'-0"
S3.3 UPPER FLOOR FRAMING PLAN - BUILDING C (SOUTH) A9.8 BLDG C SOUTH UPPER LEVEL FINISH PLAN 07/29/16 95% CD's
CMU PLYWOOD WOOD BLOCKING S3.4 HIGH ROOF FRAMING PLAN - BUILDING C (NORTH) Number of Stories: 2 Number of Stories: 1
S3.5 HIGH ROOF FRAMING PLAN - BUILDING C (SOUTH)
06/17/16 Bldgs. B & D Design Development Package
S3.6 HIGH ROOF FRAMING PLAN - SHARED SPACES Approximate Size (each building): Approximate Size: 05/27/16 Footings and Foundations Package - Bldg. D
S3.7 BUILDING B - FOUNDATION PLAN Main Level: 23,215 S.F. Main Level: 9,486 S.F.
DRAINAGE FILL RIGID INSULATION WOOD STUD
Upper Level: 22,221 S.F. Total: 9,486 S.F. 04/29/16 100% CD's - Bldg. C
PARTITION S3.8 BUILDING B - FLOOR FRAMING PLAN
DATE:
JT
October 25, 2017
COVER SHEET - VOLUME 1
10/13/2017 2:19:45 PM
DATE:
A0.0A OF:
272
Record Drawings
Volume 2
DPS Project No.: PP2618
Eidos Project No.: 15064
October 25, 2017
MAS.
POUND
LOUVER
MASONRY
Mechanical
Electrical
PROJECT Denver, Colorado 80223
M0.0 MECHANICAL/PLUMBING/FIRE PROTECTION COVER SHEET 720-312-9640
Detail Number View Name BD.
BLDG.
BLK.
BOARD
BUILDING
BLOCK
M.O.
MAT’L.
MAX.
MECH.
MASONRY OPENING
MATERIAL
MAXIMUM
MECHANICAL
MD1.0
MD1.1
BLDG A MAIN LEVEL MECHANICAL DEMOLITION PLAN
BUILDING B SOUTH MAIN LEVEL MECHANICAL DEMOLITION PLAN
E0.0
E1.0
ELECTRICAL COVER SHEET
ELECTRICAL SITE PLAN
SITE
SIM
BUILDING AND 1 View Name BLKG.
B.M.
BLOCKING
BENCH MARK
MED.
MFR.
MEDIUM
MANUFACTURER MD1.2 BLDG A UPPER LEVEL MECHANICAL DEMO PLAN ED2.0 BLDG A MAIN LEVEL LIGHTING DEMO PLAN
WALL SECTION A 5.0x PLAN
1/8" = 1'-0"
BOT.
B.O.
BOTTOM
BOTTOM OF
MH.
MIN.
MANHOLE
MINIMUM
MD2.1 BLDG B SOUTH MAIN LEVEL MECHANICAL PIPING DEMO PLAN ED3.0 BLDG A MAIN LEVEL POWER AND SYSTEMS DEMO PLAN E 50th Ave Design / Build Contractor: Architects:
Sheet Number BSMT. BASEMENT MISC. MISCELLANEOUS M1.0 BLDG A MAIN LEVEL MECHANICAL PLAN ED3.1 BLDG B MAIN LEVEL ELECTRICAL DEMO PLAN
B.U.R.
CTR.
BUILT UP ROOF
CENTER, CENTERED
MM.
MTL.
MILLIMETER(S)
METAL M1.1 BLDG B SOUTH MAIN LEVEL MECHANICAL NEW DUCT PLAN E2.1 BLDG B SOUTH MAIN LEVEL LIGHTING PLAN Swinerton Builders Eidos Architects, PC
Detail Number View Number View Name CIR. CIRCLE N. NORTH M1.2 BLDG C NORTH MAIN LEVEL MECHANICAL NEW DUCT PLAN E2.4 BLDG D WEST MAIN LEVEL LIGHTING PLAN
CIRC. CIRCUMFERENCE NEC. NECESSARY E2.6 BLDG B SOUTH UPPER LEVEL LIGHTING PLAN
6890 West 52nd Avenue 5400 Greenwood Plaza Boulevard
DETAIL SIM C.J. CONTROL JOINT N.I.C. NOT IN CONTRACT
M1.3 BLDG C SOUTH MAIN LEVEL MECHANICAL NEW DUCT PLAN
1 Suite 100 Greenwood Village, Colorado 80111
A 5.0x DETAIL
1. View Name CLG.
CMU
COL.
CEILING
CONCRETE MASONRY UNITS
COLUMN
NO., #
NOM.
N.T.S.
NUMBER
NOMINAL
NOT TO SCALE
M1.4
M1.5
BLDG D WEST MAIN LEVEL MECHANICAL PLAN
BLDG A UPPER LEVEL MECHANICAL PLAN
E2.7
E2.8
BLDG C NORTH UPPER LEVEL LIGHTING PLAN
BLDG C SOUTH UPPER LEVEL LIGHTING PLAN E 49th Ave Arvada, Colorado 80002 720-200-0630
TAG 1/8" = 1'-0" COMB. COMBINATION
E3.1 BLDG B SOUTH MAIN LEVEL POWER PLAN 303-418-5337
Sheet Number COMP. COMPACT, COMPACTED O.D. OUTSIDE DIAMETER M1.6 BLDG B SOUTH UPPER LEVEL MECHANICAL NEW DUCT PLAN
CONC. CONCRETE O.C. ON CENTER
CONT. CONTINUOUS OH. OVERHEAD M1.7 BLDG C NORTH UPPER LEVEL MECHANICAL NEW DUCT PLAN E3.4 BLDG D WEST MAIN LEVEL POWER PLAN
Telluride St
E3.6 BLDG B SOUTH UPPER LEVEL POWER PLAN
Yampa Street
CONSTR. CONSTRUCTION O.H. OPPOSITE HAND
COORD. COORDINATE OPN’G. OPENING
M1.8 BLDG C SOUTH UPPER LEVEL MECHANICAL NEW DUCT PLAN
E3.7 BLDG C NORTH UPPER LEVEL POWER PLAN Evie Dennis
Tower Rd
CORR. CORRIDOR OPP. OPPOSITE M1.9 BLDG B NORTH & BLDG D EAST MAIN LEVEL MECHANICAL NEW DUCT PLAN Civil Engineers: Mechanical Engineers:
NEW COLUMN C. TILE CERAMIC TILE O.S.B. ORIENTED STRAND BOARD
E3.8 BLDG C SOUTH UPPER LEVEL POWER PLAN Elementary School
Walden St
0 M2.0 BLDG A MAIN LEVEL PIPING PLAN
CENTER LINE ELEVATION
LEVEL
D.
DBL.
DEEP, DRYER
DOUBLE
PART.
PER.
PARTITION
PERIMETER M2.1 BLDG B SOUTH MAIN LEVEL MECHANICAL NEW PIPING PLAN E4.1 BLDG B SOUTH MAIN LEVEL SYSTEMS PLAN HCL Engineering MKK Consulting Engineers
DEMO. DEMOLITION P-LAM. PLASTIC LAMINATE E4.2 BLDG C NORTH MAIN LEVEL SYSTEMS PLAN
DEPT. DEPARTMENT PLBG. PLUMBING M2.2 BLDG C NORTH MAIN LEVEL PIPING PLAN 9570 Kingston Court 7600 East Orchard Road
D.F. DRINKING FOUNTAIN PROP. PROPERTY M2.3 BLDG C SOUTH MAIN LEVEL PIPING PLAN E4.4 BLDG D WEST MAIN LEVEL SYSTEMS PLAN Suite 310 Greenwood Village, Colorado 80111
Room Name DTL. DETAIL PS PROJECTION SCREEN
Partition Type DIAG. DIAGONAL P.T. PRESSURE TREATED M2.4 BLDG D WEST MAIN LEVEL PIPING PLAN E4.6 BLDG B SOUTH UPPER LEVEL SYSTEMS PLAN Englewood, Colorado 80112 303-796-6000
ROOM ROOM NAME DIA. DIAMETER PT. PAINT 303-773-1605
Partition Width Reference
DESIGNATION DIM. DIMENSION P. TILE PORCELAIN TILE M2.5 BLDG A UPPER LEVEL PIPING PLAN E4.7 BLDG C NORTH UPPER LEVEL SYSTEMS PLAN Green Valley Ranch Blvd
(See Type For Actual Width) 100 Room Number DISP. DISPENSER
M2.6 BLDG B SOUTH UPPER LEVEL MECHANICAL NEW PIPING PLAN E4.8 BLDG C SOUTH UPPER LEVEL SYSTEMS PLAN
WALL TYPE Optional Suffix DISPL.
DIV.
DISPOSAL
DIVISION
Q. TILE QUARRY TILE
E6.1 ELECTRICAL ONE-LINE DIAGRAM
Structural Engineers: Electrical Engineers:
INDICATOR Room Name DN. DOWN R. RISER, RADIUS
M2.7 BLDG C NORTH UPPER LEVEL PIPING PLAN N
3A12 X PARTITION DR. DOOR RB. RUBBER BASE M2.8 BLDG C SOUTH UPPER LEVEL PIPING PLAN E8.0 PANELBOARD SCHEDULES The Vertex Companies, Inc. MKK Consulting Engineers
ROOM ROOM NAME D.S. DOWN SPOUT RE. REFER TO
100 Room Number DWG. DRAWING REC. RECESSED M2.9 BLDG B NORTH & BLDG D EAST MAIN LEVEL MECH. NEW PIPING PLAN E8.2 PANELBOARD SCHEDULES
DESIGNATION REF. REFERENCE 3734 Osage Street 7600 East Orchard Road
150 SF E. EAST REFL. REFLECTED M3.1 BLDG B ROOF LEVEL MECHANICAL NEW PLAN E9.0 COMCHECK BLDG C Denver, Colorado 80211 Greenwood Village, Colorado 80111
W/ AREA EA. EACH REM. REMOVE, REMOVABLE
Room SF
ELEC. ELECTRIC REQ’D. REQUIRED M3.2 BLDG C NORTH ROOF LEVEL MECHANICAL NEW PLAN E9.1 COMCHECK - BLDG B, D 303-623-9116 303-796-6000
ELEV. ELEVATOR RET. RETURN
EQ. EQUAL REV. REVISION
M3.3 BLDG C SOUTH ROOF LEVEL MECHANICAL NEW PLAN
.
H1 W1 .
A1 EQMT. EQUIPMENT RF RUBBER FLOOR M3.8 BLDG D WEST ROOF MECHANICAL PLAN
WINDOW TAGS DOOR E.W.C. ELECTRIC WATER COOLER RM. ROOM
Landscape Architects: Building Envelope Consultant:
EXH. EXHAUST M3.9 BLDG B NORTH & BLDG D EAST ROOF LEVEL MECHANICAL NEW PLAN
ALUM. DESIGNATION 101 Room Number EXIST., (E) EXISTING S. SOUTH
HOLLOW M4.0 MECHANICAL ENLARGED PLANS
METAL
WINDOW ETR. EXISTING TO REMAIN S.B. SPLASH BLOCK Studio CPG Pie Consultanting & Engineering
WALL EXT. EXTERIOR SC. SEALED CONCRETE
M5.1 MECHANICAL CONTROL DIAGRAMS
EXP. EXPANSION SCHED. SCHEDULE
E.J. EXPANSION JOINT SECT. SECTION 4309 W. 44th Ave. 6275 Joyce Drive
M5.2 MECHANICAL CONTROL DIAGRAMS
N
INDICATES TRUE NORTH F.D.
F.E.
F.F.E.
FLOOR DRAIN
FIRE EXTINGUISHER
FINISH FLOOR ELEVATION
S.F.
SHWR
SHT.
SIM.
SQUARE FOOT
SHOWER
SHEET
SIMILAR
M6.1
M7.1
MECHANICAL DETAILS
MECHANICAL SCHEDULES
SITE INFORMATION Denver, Colorado 80212
303-455-3779
Suite 200
Arvada, Colorado 80403
303-552-0177
NORTH N
FIN. FINISH(ED) SOG. SLAB-ON-GRADE
ARROW FIXT. FIXTURE SPEC. SPECIFICATION M7.2 VENTILATION SCHEDULES BUILDINGS A, B, AND D Project 18250 E 51st Ave
FLR. FLOOR SPECS. SPECIFICATIONS
M7.3 VENTILATION SCHEDULES BUILDING C Address: Denver, Colorado 80249 Roof consultant : Performance/Acoustical Consultant:
FND. FOUNDATION SPK. SPEAKER
F.R. FIRE RATED SQ. SQUARE M7.4 MECHANICAL COMCHECK
Revision Number
100'-0"
FRMG.
FRZ.
FRAMING
FREEZER
STD.
STL.
STANDARD
STEEL
Legal A PARCEL OF LAND LOCATED IN THE SOUTHEAST Wiss, Janney, Elstner Associates, Inc. D.L. Adams
1 Description: 1/4 OF SECTION 16 TOWNSHIP 3 SOUTH, RANGE 66
REVISION TAG SPOT ELEVATION . FTG. FOOTING STR. STAIR Plumbing 3609 South Wadsworth Boulevard 1536 Ogden Street
Optional Note FUT. FUTURE STRUC. STRUCTURE, STRUCTURAL WEST OF THE 6TH PRINCIPAL MERIDIAN
SUSP. SUSPENDED Suite 400 Denver, Colorado 80218
GA. GAUGE SYM. SYMMETRICAL
PD1.0 BLDG A MAIN LEVEL PIPING DEMO PLAN CITY AND COUNTY OF DENVER, STATE OF COLORADO
Lakewood, Colorado 80235 303-455-1900
GALV. GALVANIZED SYS. SYSTEM P1.1 BLDG B SOUTH MAIN LEVEL NEW SANITARY & STORM PIPING PLAN (303) 914-4300
G.B. GRAB BAR
FLR FLR GRND. GROUND T. THICK, TREAD P1.2 BLDG C NORTH MAIN LEVEL SANITARY AND STORM PIPING PLAN Site Area: Approx. 16.2 Acre
Flooring Transition PT
Wall Accent Paint or Finish G.C. GENERAL CONTRACTOR T.B.D. TO BE DETERMINED
P1.3 BLDG C SOUTH MAIN LEVEL SANITARY AND STORM PIPING PLAN Audio / Visual
GFCMU GROUND FACE CMU TEMP. TEMPORARY, TEMPERED
GYP. BD. GYPSUM BOARD T&G TONGUE AND GROOVE
Zone: C-MU-20
T.O.__ TOP OF _____ (E.G. STEEL) P1.4 BLDG D WEST MAIN LEVEL SANITARY & STORM PIPING PLAN PAV000 LEGEND
H. HIGH TLT. / TOIL. TOILET P1.6 BLDG B SOUTH UPPER LEVEL NEW SANITARY PIPING PLAN PAV101 LECTURE HALL/CAREER CENTER FLOOR PLAN
H.B. HOSE BIB T.P. TOILET PAPER
HC.
H.D.
HDWR.
H.W.
HANDICAPPED
HEAVY DUTY
HARDWARE
HOLLOW METAL
T.S.
TYP.
UC.
TUBE STEEL
TYPICAL
UNDERCUT
P1.7
P1.8
BLDG C NORTH UPPER LEVEL NEW SANITARY PIPING PLAN
BLDG C SOUTH UPPER LEVEL NEW SANITARY PIPING PLAN
PAV102
PAV301
COMMUNITY ROOM AV FLOOR PLAN
LECTURE HALL/CAREER CENTER RCP BUILDING
P1.9 BLDG B NORTH & BLDG D EAST MAIN LEVEL NEW SANITARY PIPING PLAN PAV501 ALTERNATE 1 DETAILS
H.O.
HORZ.
HT.
HOLD OPEN(S)
HORIZONTAL
HEIGHT
U.N.O.
V.B.
UNLESS NOTED OTHERWISE
VAPOR BARRIER
P2.0 BLDG A MAIN LEVEL DOMESTIC WATER PIPING PLAN PAV502 ALTERNATE 2 DETAILS INFORMATION
W.
VINYL
15064
P3.0 BLDG A ROOF PLUMBING PLAN Building 'A' & 'C' Building 'D'
P3.1 BLDG B SOUTH ROOF PLUMBING PLAN RS301 RIGGING LECTURE HALL/CAREER CENTER RCP & SECTION Learning Community Buildings Performance
P3.2 BLDG C NORTH ROOF PLUMBING PLAN
BRICK GYPSUM BOARD TILE Occupancy Occupancy
P3.3 BLDG C SOUTH ROOF PLUMBING PLAN
C:\Users\rortiz\Desktop\Revit Local\15064 DPS Groff HS Ph 2 A15_BO.rvt
DATE:
JT
October 25, 2017
COVER SHEET - VOLUME 2
10/13/2017 2:19:45 PM
DATE:
A0.0B OF:
272
PT. INTERIOR SIDE OF
BRICK VENEER W/ ANCHORS @
CMU - TYP. - SEE SCHED.
51st Avenue 51st Avenue 16" O.C. VERT. & HORIZ.,
2-1/4" AIR SPACE, 2-1/2" XPS
BARRACADE - RE: CIVIL Expansion BARRACADE - RE: CIVIL
MORTAR NET - FULL DEPTH
OF CAVITY
INSUL. (R-12.5 MIN.), AIR
BARRIER ON 8" CMU W/ JOINT
BASE - RE: SCHED. REINF. @ 16" O.C. VERT. - RE:
RELOCATE (E) FIRE HYDRANT (E) FIRE HYDRANT
STRUCT.
- RE: CIVIL - RE: CIVIL
CONC. SLAB ON
15 MIL. V.B.-
RE: STRUCT.
THRU-WALL FLASHING
1/2" EXP. JOINT W/ WEEPS @ 24" O.C.
N 89°59'55" W 797.90'
GROUT SOLID
CHAIN & BOLLARDS BELOW FLASHING
(E) FIRE HYDRANT 2 FT. D. MIN. OF
MIN.
STRUCTURAL FILL
6"
- RE: CIVIL
- RE: STRUCT. & FINISH GRADE
GEOTECHNICAL VARIES - RE: CIVIL
REPORT
6" MIN.
LEARNING AREA 2 FT. D. MIN. OF
45 15
STRUCTURAL FILL
FINISH GRADE
FU
(E) FIRE DEPARTMENT - RE: STRUCT. &
TU
CONNECTION & GEOTECHNICAL VARIES - RE: CIVIL
RE
AD
WATER ENTRY REPORT
DI
(E) PARKING
TI
O
(8 SPACES) 2" PERIMETER
N
(N) PUBLIC RIGID INSUL. 8" BRICK LEDGE
1' - 2" 1/2" - TYP.
PARKING LOT
PROJECT @ STUD WALLS
BUILDING C: EXPANSION
WORK
LEARNING COMMUNITY
BUILDING HEIGHT: 132'-0"
POINT CONC. GRADE
STOP SHEATHING ABV. LEDGE -
UPPER LEVEL F.F.E.: 114'-0" = 5387' LAP & SEAL WEATHER BARRIER BEAM - RE: STRUCT
120 PARKING SPACES TO BE
MAIN LEVEL F.F.E.: 100'-0" = 5373'
BUILT W/ BLDG. B EXPANSION (E) FIRE HYDRANT MEMBRANE ONTO VERITCAL
- RE: CIVIL CONC. SURFACE 3" MIN.
BUILDING B:
SHARED SPACES
(E) MASONRY
SCREEN WALL
(E) FIRE HYDRANT
- RE: CIVIL
(E) MAIN ENTRY
PLAZA
CHAIN & BOLLARDS (N) PUBLIC
PARKING LOT
N 00°03'23" W 846.73'
S 00°07'05" W 993.88'
12 PARKING SPACES TO BE BUILT 6
W/ BLDG. B EXPANSION
(E) ELEC.
TRANSFORMER & PAD
6 HC
lc h PARKING LOT
75 SPACES 6
BUILDING A:
LEARNING COMMUNITY
BUILDING HEIGHT: 132'-0"
UPPER LEVEL F.F.E.: 114'-0" = 5387' (N) CHAIN &
MAIN LEVEL F.F.E.: 100'-0" = 5373' BOLLARDS
(E) PARENT
DROP OFF
S 89°52'55" W 313.97'
N 00°07'05" W 110.30'
PARKING LOT
N6
2°4 PROPOSED COMMUNITY GARDEN
6 '37
" W
73
9.0
0 '
SITE LEGEND
S 00°07'05" E 115.78'
C:\Users\rortiz\Desktop\Revit Local\15064 DPS Groff HS Ph 2 A15_BO.rvt
EXISTING CONSTRUCTION TO
Yampa REMAIN 10/25/17 Record Drawings
Street 09/30/16 For Construction Set
NEW CONSTRUCTION 08/12/16 100% CD's - Bldgs. B & D
Evie G 07/29/16 95% CD's
Dennis NEW ASPHALT PARKING/DRIVES 06/21/16 Response to State Review Comments
Campus S 86°50'02" W 230.77'
05/27/16 Footings and Foundations Package - Bldg. D
04/29/16 100% CD's - Bldg. C
04/22/16 Footings and Foundations Package - Bldg. B
Bldg. D 03/25/16 Footings and Foundations Package - Bldg. C
NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D
DATE:
A0.1 OF:
272
CODE ANALYSIS
* AREA OF SPACES BELOW = 1,180 SF
MECH. EQUIP. PLATFORM IS LESS THAN 2/3 THE AREA Codes Used: 2015 International Building Code
OF THE SPACES BELOW. (IBC SECTION 505.3.1) 2015 International Fire Code
2015 International Mechanical Code Building 'B'
2015 International Existing Building Code Shared Spaces
2015 International Energy Conservation Code
0.7 2014 National Electric Code Occupancy Classification:
NFPA 72 Main Level: A-2, A-4, E, S-2, B - Separated Occupancies With B
ICC/ANSI A117.1 – 2009 Accessibility Standards Accessory
E UpperLevel: E, B Non-Separated
H AC 0.8
T S P
PA Y Building 'A' & 'C' Construction Type: Type IIB, Fully Sprinklered
N I LIT H.9 0.9
O
M UT Learning Community Buildings
M R Approximate Size: A-2,A-4 B E S-2
CO FO K Occupancy Classification: E Main Level: 37,319 S.F. 19,916 sf 2,435 sf 10,708 sf 2,715 sf
0" LE
- B Upper Level: 8,693 S.F. 2,344 sf 6,349 sf
0' A
8 OW Construction Type: Type IIB, Fully Sprinklered Total: 46,012 S.F.
LL
Equip. Platform
0 'A
Factor Area Occ. 1
0 K.5 E.9 Approximate Size (each building): Bldg. Ht. Per IBC: 75'-0"
300G 677 SF 3 Main Level: 23,215 S.F. Actual Bldg. Ht.: 35'-0"
Rm. No. F
3 168
Platform 0.3 Upper Level: 22,221 S.F.
Factor Area Occ.
Total: 45,436 S.F. Allowable # of Stories: 3
15N 2414 SF 162 Actual # of Stories: 2 @ E (1story @ A-4, A-2 and S-2)
M.1 Rm. No.
168A
Elec.
0.4 (E) MASONRY, Bldg. Ht. Per IBC: 75'-0" Allowable Area Per Floor: (Tbl. 506.2)
Factor Area Occ. OUTDOOR Actual Bldg. Ht.: 35'-0" A-2, A-4 (S1) 38,000 S.F.
LADDER ACCESS TO 300G 72 SF 1 0.5 STOR. BLDG. B (SM) 69,000 S.F.
EQUIP. PLATFORM - Allowable # of Stories: 3 S-2 (S1) 104,000 S.F.
CONTINUES TO ROOF H.9 Actual # of Stories: 2 E (SM) 43,500 S.F.
0.6
K Allowable Area Per Floor: (Tbl. 506.2) Frontage Increase: (with Future Gym Addition Assumed)
Rm. No.
Dressing
E (SM) 43,500 S.F. = [F/P-0.25] x (W/30)
166C = [475/1165-0.25] x (30/30)
FU
0.7
TU
Rm. No. Lecture Hall / Factor Area Occ.
Frontage Increase: = [0.41-0.25] x (30/30)
RE
167 Career Center
K.5 50G 172 SF 4
= 0.16
AD
163 = [F/P-0.25] x (W/30)
Factor Area Occ.
0.8
DI
55 = [740/928-0.25] x (30/30)
TI
7N 3430 SF 490
O
p 108
N
m IBC 1014.9 - MONUMENTAL STAIR W/ HANDRAILS AT BOTH SIDES = [0.80-0.25] x (30/30)
Ra 0.9 = 0.55 Allowable Area Per Floor: A-2, A-4 (1 Story)
Rm. No. IBC 1014.9 - MONUMENTAL STAIR W/ HANDRAILS - WIDTH OF STAIR WITHIN 30" OF HANDRAIL IS 60"
Rm. No. 164
Classroom AT BOTH SIDES OF PATH OF EGRESS - REQ'D. WIDTH WITHIN 30" OF HANDRAIL IS 15" = 38,000 + (9,500 x 0.16)
Stor. = 38,000 + 1,520
162B - WIDTH OF STAIR WITHIN 30" OF HANDRAIL IS 90" 1 -ADDITIONAL INTERMEDIATE HANDRAILS ARE NOT REQ'D. PER SECTION
23
Factor Area Occ.
M.1
5
45
Factor Area Occ. 20N 919 SF 46 - REQ'D. WIDTH IS 68" A-3 Lecture / Library 4 1014.9 OF THE IBC. Allowable Area Per Floor: = 39,520 S.F.
3
300G 102 SF 1 -ADDITIONAL INTERMEDIATE HANDRAILS ARE NOT Factor Area Occ. 1.1 (ADDITIONAL ACCESSIBLE EGRESS PROVIDED AT ADJACENT RAMP) = 43,500 + (14,500 x 0.55)
Rm. No. Rm. No. Sp. Ed.
Classroom REQ'D. PER SECTION 1014.9 OF THE IBC. 9782 SF = 43,500 + 7,975 Allowable Area Per Floor: B (2 Story)
Rm. No. 163 165 Severely
= 69,000 + (23,000 x 0.16)
Stor. = 51,475 S.F. > 23,215 S.F.
162A Factor Area Occ. Factor Area Occ.
1.2
mp
Factor Area Occ. 20N 875 SF 44 20N 636 SF 32 = 69,000 + 3,680
203 4
M.9
Ra
300G 103 SF 1 608 202 = 72,680 S.F.
Building 'D'
Performance Area / Library
DK DJ DH DG DF DE Rm. No.
Allowable Area Per Floor: E (2 Story)
166B
Dressing 1.3 = 43,500 + (14,500 x 0.16)
DD DC
20
" Occupancy Classification: A-3
3
= 43,500 + 2,320
45
-0 .
Rm. No. Teacher Factor Area Occ.
3
162 Planning P '
4 IN 50G 154 SF 4 = 45,820 S.F.
Factor Area Occ. Rm. No. M Construction Type: Type IIB, Fully Sprinklered
Elec
100G 589 SF 7 158A Allowable Area Per Floor: S-2 (1 Story)
1 HR. FIRE 1.4
IM LOT
Factor Area Occ. P.2 1F
Approximate Size: = 104,000 + (26,000 x 0.16)
AG L
300G 76 SF 1 2 4 RATING PER
Main Level: 9,782 S.F.
28
D7
IN INE
SECTION 706.5.1 = 104,000 + 4,160
4
1F
2F
AR
45
Total: 9,782 S.F.
3
D7 = 108,160 S.F.
Y
1
D6 D6 E - Classroom Area 4
469 2F Rm. No.
Work Rm.
1.5 Bldg. Ht. Per IBC: 75'-0"
167C Building B Main Level - Area Calculation
Actual Bldg. Ht.: 35'-0"
0"
Factor Area Occ.
2F
Factor Area Occ.
203 Separated Occupancies - A-2, A-4, E, S-2 B Accessory
10724 SF '- 100G 339 SF 4
1 DB 10 Allowable # of Stories: 3 A Actual + E Actual (incl. B) + S-2 Actual B Actual
1 HR. FIRE 2F 1.6 (E) DELIVERY / Actual # of Stories: 1 A Allow. E Allow. S-2 Allow.
< 1
Total Area
< 0.1 (10%)
Rm. No.
RATING PER IDF 3 MAINTENANCE
1F
166A
D5 D5 SECTION 706.5.1 3" 2F 2F Factor Area Occ. ACCESS Allowable Area Per Floor: (Tbl. 506.2) 19,916 + 13,143 + 2,715 < 1 2,435 < 0.1
'- 4 39,520 45,820 108,160 37,319
2F
100G 80 SF 1 A-3 (S1) 38,000 S.F.
44 46 11 1F 234
2F 2
57
2 HR. FIRE
3
DA
90
2F
1 32 Rm. No.
453
190
6
9 Office Frontage Increase: (with Future Addition Assumed)
"
2F
167B
2.1 A
BUILDINGS -0 .
2F
' Factor Area Occ. = [F/P-0.25] x (W/30)
1 0.816 < 1 0.065 < 0.1
4 IN 0 "
1F 100G 108 SF 2 6
1
= [274/410-0.25] x (30/30)
D4 D4 M - .
22
6
' 6.4 = [0.67-0.25] x (30/30)
4 IN M.5 2.2
M Rm. No.
B = 0.42
7
453
347
Stor.
282 90 MIN. (MIN.) 167A Building B Upper Level - Area Calculation
FIRE RATED Factor Area Occ. A-4 Gymnasium Non-Separated Occupancies - E, B (E most Restrictive)
D3 DOOR & FRAME P.3 300G 234 SF 1 Factor Area Occ. 1 S
8
285 8935 SF Allowable Area Per Floor: E Allow. > Total Area
ASSEMBLY 2.3 C
23
New Classroom Wing S = 38,000 + (9,500 x 0.42)
22
P.4
6
206 34 Factor Area Occ. S S = 38,000 + 3,990 45,820 S.F. > 8,693 S.F.
45 43 23
23215 SF P.5 S
S
BLEACHERS = 41,990 S.F. > 9,703 S.F.
28
13
D
5
W/ FLEX ROW
45
34 P.7 S
3
339
CODE NOTES
TO PROVIDE
S
D2 ADA SEATING
D
2
P.8 S 1139
W
E 9
S
280 1 S
IN "
M -0
S S S-2 FM Area
Rm. No.
Office Total occupant load at main level: 3,687 The raised floor area adjacent to the Lecture Hall shall be considered a Platform per Chapter
S
.
S 113B
'
4
Rm. No.
H S Total occupant load at upper level: 1,387 2 of the IBC, as there are no overhead hanging curtains, drops, scenery of stage effects
S
Bleachers
1F
20
S other than lighting, sound and horizontal sliding curtains.
S
R 1 2715 SF 23 100G 73 SF 1
0
Factor Area Occ.
4' - 0"
45
MIN.
3
Class III standpipe system is not required because the lowest and highest floor level is
S
(2) 45 MIN. (MIN.) 39 18"PP 1661 SF 515
S
2F
S
S
S S
Rm. No.
S
FIRE RATED DOORS Classroom less than 30 feet below/ above the highest/ lowest level of fire department vehicle access. The mechanical access platform at the lecture area shall be considered an Equipment
DK DJ DH DG DF DE DD 147 10 2
7
S (Section 905.3.1) Platform per Chapter 2 of the IBC, as it is an unoccupied space used exclusively to access
45
S
& FRAME ASSEMBLY
3
S Factor Area Occ.
S
Rm. No.
A
S
S the VAV equipment that is high in the ceiling space. The equipment platform shall be less
2F
149A
Cust.
20N 779 SF 39 1
S
Rm. No.
Classroom S
S
Construction capable of resisting the passage of smoke are required for the mechanical than 2/3 the area of the spaces below in which the equipment platform is located, shall be
S
159 Factor Area Occ. Rm. No. 7
S
Rm. No. Rm. No. Factor Area Occ. 300G 83 SF 1 3D Art
S 2 room and science laboratories. The doors to these rooms shall be equipped with fully sprinklered and shall not contribute to the building fire area (IBC Section 505.3) .
Classroom Classroom 189 146
S
S
2F
161 160
S
20N 1358 SF 68 closers, smoke seals, and self latching hardware. (Section 509) Storage rooms over
S
453 1 Factor Area Occ.
Factor Area Occ. Factor Area Occ.
50N 768 SF 16 S S B 100 square feet in size do not need this construction, per the 2015 IBC. The GC shall provide written documentation to the Building Official demostrating
20N 896 SF 45 20N 851 SF 43
1F
S
S
S
competence and relevant experience or training of the specific special inspectors who will
2F
CD
1F
BUILDINGS
S
Rm. No.
S
148BB
Elec
1F 1 A-4 Locker Area 187 C
2F
S
300G 153 SF 1 14
CE 3237 SF 24
Vertical Shaft Enclosures are not required for penetrations by pipe, tube, conduit, wire, The GC shall provide cut sheets/ shop drawings for the telescoping bleacher seating in the
2F
1F
399 D cable, vents and ducts where the annular space is filled with an approved material to Lecture/Library, showing compliance with ICC 300, prior to installation of the seating system.
1F
1F
Rm. No.
Classroom CF 1.3 S Rm. No.
A -2 Cafeteria Area Rm. No.
Kitchen
resist the free passage of flame and the products of combustion. (IBC Section 1029.1.1)
157 Comm. Rm.
113
Factor Area Occ. -0
" 145 1F Factor Area Occ. (Section 714 and Section 717)
4 ' IN. 7744 SF
1F
Factor Area Occ. Factor Area Occ.
2
Rm. No.
Classroom
20N 1349 SF 68
M 20N 835 SF 42 42 E 200G 899 SF 5
156 34 CA 10 Interior egress stairways do not require a shaft enclosure (Section 1019) Compliance with the IECC for the Thermal Envelope is based on the assembly U-factor
Factor Area Occ. C4 1.4 S 102' - 10" DIAGONAL method outlined in section C402.1.4. The Chart below shows compliance with the U-
20N 851 SF 43 CG An Elevator Lobby is not required. The Elevator connects only 2 stories (Section 3006) Factors, with R-Values for reference. For the purposes of this evaluation, only wall
S
Rm. No. 1 HR. FIRE structure, sheathing and continuous insulation were considered in the R/U-Values;
155
Classroom
RATING PER 74 S 188 Interior wall and ceiling finishes shall be a minimum of Class B at exit enclosures and Drainage/Air space and Veneer Materials are not considered.
19
S
2
CH
45
0
20N 895 SF 45 C5 S G
S
34 B Accessory UP 199 2 Metal Framed Walls R-Value includes Sheathing (Dens-Glass Gold: R-0.56) and Foam
S Interior floor finishes shall be a minimum of Class II. (Section 804)
CJ 43 Rm. No.
Stor
Factor Area Occ. 340 H Insulation (R-12.5 min.) for a combined continuous R-Value of 13.06. U-Value is from
20 146B 100G 2435 SF 25 Ashrae 90.1 Table 3.3 for Metal Framed Walls @ 16" O.C.
Factor 1.5
Area Occ. S A total of 269 parking spaces are provided for the facility of which 7 spaces are
CK 300G 155 SF 1
Rm. No.
112
Cafetorium required to be H.C. accessible and 2 are required to be van accessible. (Table
RELOCATED FACP - S 188 Factor Area Occ. 1106.1) 8 H.C. Spaces provide - 4 adjacent to van accessible loading area.
Rm. No.
Kiln COORD. W/ DENVER FIRE 7N 3924 SF 561 Accessible parking is provided in both the general parking area and the staff parking IECC 2015 R Value U Value
20 146A 25 22
45 DEPT. & FIRE ALARM area. Required: Provided Required: Provided:
29
C6
Factor Area Occ.
1.6
FA
C1 300G 81 SF 1 8 Walls:
7
SUBCONTRACTOR LOCATION OF
P
Required exits, existing structural elements, fire protection devices and sanitary
18
S Mass: R-11.4c.i. R-12.5c.i. U-0.090 U-0.067
8
45
CB (E) 1 HR. Rm. No. Table & Chair PORTABLE safeguards shall be maintained at all times during construction. (Section 3302)
3
FIRE RATING 2.2 10 112A Storage STAGE
Metal Framed: R-13 + 7.5c.i. R-13.06c.i. U-0.064 U-0.063
46 Roof: R-30 c.i. R-30 c.i. U-0.032 U-0.032
RE
61
Rm. No. 1 Entrance Door: U-0.77 U-0.75
3
90
150A
Elec
BC B6 3 normally kept closed. Required egress paths within one-fourth the height of construction
6
44 Rm. No. Sp. Ed. Mild /
B4 Operable: U-0.45 U-0.45
2.3 Rm. No.
1F
8 Elec
2F existing means of egress cannot be maintained, the contractor shall provide a temporary
N
3
Rm. No. Teacher 20N 920 SF 46 118 Mild/Moderate 100N 591 SF 6 required by the IFC and by the Denver Fire Department. Increased width factors allowed floor area and provide a Skylight Effective Aperture of 3.06% (Section C402.4.2 Option 2).
154 Planning
Factor Area Occ.
A6 by 1005.3.1 and 1005.3.2 have not been taken in the egress width calculations. The Skylights also preserve the daylight zone for the existing clerestory at the
Factor Area Occ.
CG 20N 328 SF 17 BF gymnasium.
100G 655 SF 7
18
AB
Rm. No. Rm. No. Sp. Ed. Compliance with the IECC for the Mechanical and Lighting systems are shown in the
Rm. No.
Classroom C6 CH 119
Sp. Ed. 1 1/2" HR. FIRE 108 Severely drawings. See sheets M7.3 & E9.0 for COMcheck Compliance Certificates.
153 Factor Area Occ. RATED DOOR &
245
Factor Area Occ.
Factor Area Occ. 453
20N 348 SF 18 FRAME ASSEMBLY 20N 680 SF 34
20N 867 SF 44
C7 CJ 36 AC
47
Rm. No.
154B
Stor. CK BD AD
Factor Area Occ. BG AD
300G 101 SF 1 Rm. No. 6 A7 Rm. No.
120
Classroom 35 Rm. No. Classroom
Cust. 107
29 100G 10/25/17 Record Drawings
C:\Users\rortiz\Desktop\Revit Local\15064 DPS Groff HS Ph 2 A15_BO.rvt
Classroom
9 101C 44
Rm. No.
Classroom AREA AS REQ'D PER CODE
Rm. No. Teacher Factor Area Occ. 106 04/29/16 100% CD's - Bldg. C
122 Planning ROOM / AREA USE FACTOR
Existing 20N 770 SF 39 270
Factor Area Occ.
Factor Area Occ.
B7
20N 866 SF 44 04/22/16 Footings and Foundations Package - Bldg. B
Bldg. D EGRESS COMPONENT CAPACITY
Rm. No.
100G 654 SF 7
BG 124
Classroom
Rm. No.
Stor. 03/25/16 Footings and Foundations Package - Bldg. C
B6 Factor Area Occ. 105 A
20N 865 SF 44 Factor Area Occ.
Rm. No.
122B
Stor. E - Classroom Wings
300G 102 SF 1 X1 OCCUPANT LOAD OF ROOM EXIT NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D
CHECKED BY:
JG/BS/BO/AMJ
JT
MAIN LEVEL CODE PLAN & OVERALL
FLOOR PLAN
Rm. No.
Bldg. A
Stor. DATE:
105 B 342 Rm. No. Teacher October 25, 2017
10/10/2017 4:32:29 PM
F 0.3
K.5 0.7
0.8
0.9
M.1
ROOF BELOW 1
UP
UP 1.1
Rm. No.
Rm. No.
244A
IDF M.5
Classroom Rm. No.
250 Factor Area Occ. Prep. 1.2
Factor Area Occ. 300G 95 SF 1 251A
20N 719 SF 36 Factor Area Occ. M.9
Rm. No. Science Lab
100G 186 SF 2 E.9
Rm. No.
251 (Wet) N
249
Classroom Rm. No. 0.2
Factor Area Occ.
Factor Area Occ.
251AA
Stor. N.1 ROOF BELOW 1.3
50N 964 SF 20
20N 725 SF 37 Factor Area Occ. P "
300G 98 SF 1 ' -0 .
0.3 4 IN
M
P.2
4'
DK DJ DH DG DF DE DD Rm. No. 1.4
-0 .
1F
Classroom
M
252
D7
IN
"
DC Factor Area Occ.
2F
1F
D7 20N 875 SF 44 0.4 H.9
D6 D6 E 0.5 2F 1.5
S
6349 SF
S
-0 .
S
4'
D5 D5
S
SECTION 706.5.1 M
-0 .
2F
M
IN
"
1F
11 1
37 2F
S
12 44 1F 2 4
2F
S DA
S
36
2F - 0" 2.1 A
S
2F
S S S S 1 ' N.
D4 D4 1F 4 M I
2.2 6
B 6.4
7
D3
330
206
P.3
C 8
2.3
45 46
P.4 S
31 45 P.5
ROOF BELOW D
P.7
D2
330
280
P.8
R 0" E 9
' - IN.
4 Rm. No.
H
1F
M IDF
D1 1F 220C
Factor Area Occ.
(2) 45 MIN. (MIN.)
4' - 0"
MIN.
Rm. No.
Cust. 231
234A 617 Factor Area Occ.
Rm. No. Factor Area Occ.
248
Classroom Rm. No.
Classroom
Rm. No.
Classroom 20N 777 SF 39
246 245 300G 89 SF 1 A
2F
BETWEEN 1
1F
243
Factor Area Occ. 1F
2F
Rm. No.
1F
Classroom
242
1F
1F
Factor Area Occ. CF 1.3
20N 891 SF 45 " S 1F MECHANICAL 10
-0 D
Rm. No.
4 ' IN. 3 ROOF BELOW
1F
Classroom SCREEN WALL
241 M
Factor Area Occ. C4 CA 3
20N 889 SF 45 1 HR. FIRE 1.4
CG E
74 0
RATING PER
33
Rm. No. SECTION 706.5.1
Classroom
CH
46
240
Uni sex
Uni sex
CB 50N 132 SF 3 W.C.s Req'd. Women's Lavs Req'd. Men's Women's DF Drinking Service
24
Men's WC WC Lavs Lavs Req'd. Fount. Sink
Rm. No.
Req. Pro'd. Req. Pro'd. Req. Pro'd. Req. Pro'd. Req. Pro'd. Req. Pro'd.
1
C1 S S C6 232AA
45
S (E) 1 HR. FIRE RATING 10 A-3 672 336 336 125 65 3 0 0 6 0 200 150 2 0 0 3 0 500 2 2 1 0
12
RE
2.2
S F.
CC
31
237 (Wet)
B6 2.3 Total A 2372 15 4 1 25 4 7 3 1 9 3 6 6 3 2
20
BC BB B4
33
1F
2 A4 N.1
1 F
RATING
C4 B7 2F P Total E,B 2702 28 36 4 28 36 28 28 4 28 28 28 28 2 4
1F
S
IDF
235A BE
CF 207
P.2 M.5
Factor
300G 95 SF
Area Occ.
1
Rm. No.
Prep
1F 330
A5
Total Fixtures 40 5 40 31 5 31 34 6
1F
237A
C5
PLUMBING FIXTURE ANALYSIS NOTES
Factor Area Occ.
1F
1F
Rm. No.
Classroom
100G 186 SF 2
S
5 M.9
239 BF ROOF BELOW
Factor Area Occ. 2
CG RES
Rm. No.
1. Required plumbing fixtures for the building are located within 500 feet of all areas of the building, per IBC Section 2902.3.2 and 2902.5.
20N 723 SF 37 211
Classroom F. 44 AB Rm. No.
209
Classroom
Factor Area Occ. S (E) 2 HR. FIRE WALL Factor Area Occ.
2. Plumbing fixtures are being provided for fully loaded 'E' & 'B' occupancies as well as for the fully loaded 'A' occupancies. The 'A' occupancies operate independently from
Rm. No.
Classroom
C6 CH 20N 875 SF 44 1 621 BETWEEN BUILDINGS A6 20N 875 SF 44 the 'E' & 'B' occupancies and are not fully loaded at the same time; therefore:
238
S
G 98 SF 1 BG 212 (Wet)
3. The 'B' occupancy shall have access to the required plumbing fixtures in the adjacent 'A' & 'E' occupancies; However, the 'B' areas have been provided with four (4) uni-sex
Rm. No. Factor Area Occ. Rm. No.
200E
Cust. AD water closets and lavatories for convenience.
Stor. S 50N 965 SF 20
S
S
11 300G 97 SF 1
CODE LEGEND 09/30/16 For Construction Set
S
Rm. No.
Classroom 46 44
218 AE S S S AE 09/22/16 Response to State Review Comments
Factor Area Occ.
45
REF. ROOM USE OCCUPANCY LOAD
BF 20N 918 SF 46 Rm. No. 08/12/16 100% CD's - Bldgs. B & D
BJ 1 1 2 Prep.
S
37 Classroom
208
B6
203
Factor Area Occ. Factor
(Wet)
Area Occ.
03/25/16 Footings and Foundations Package - Bldg. C
Rm. No.
32 20N 891 SF 45 50N 965 SF 20
Classroom
NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D
S
20
Rm. No. 7 216 11 X1 OCCUPANT LOAD OF ROOM EXIT
Bldg. C
33
S S S S
AK
37
AK
1F 1F 1F 1 - HOUR FIRE BARRIER DEPARTMENT OF
FACILITY MANAGEMENT
DRAWN BY:
CHECKED BY:
JG/BS/BO/AMJ
JT
UPPER LEVEL CODE PLAN, OVERALL
Rm. No.
206
Classroom
Bldg. A DATE:
October 25, 2017 FLOOR PLAN & CODE ANALYSIS
10/10/2017 4:33:14 PM
GRADE PLANE
6"
Main Level Main Level
100' - 0" 100' - 0"
East Elevation
1/16" = 1'-0"
South Elevation
1/16" = 1'-0"
Upper Level
114' - 0"
GRADE PLANE
Main Level Main Level
100' - 0" 100' - 0"
6"
West Elevation
1/16" = 1'-0"
GRADE PLANE
6"
North Elevation
1/16" = 1'-0"
C:\Users\rortiz\Desktop\Revit Local\15064 DPS Groff HS Ph 2 A15_BO.rvt
CHECKED BY:
JG/BS/BO/AMJ
JT
OVERALL EXTERIOR ELEVATIONS &
DATE:
October 25, 2017 BUILDING ENVELOPE COMCHECK
10/10/2017 4:43:11 PM
DATE:
A0.4 OF:
272
SITE DEMO NOTES
1. The drawings are diagrammatic and may not show all
demolition that is required. The contractor must visit the site to
document all site conditions and determine the extent of
demolition that will be required to construct the project as it is
documented. All fixtures that can be reused and are not
required for the project shall be rendered to the owner.
(E) MONUMENT SIGN 5. Refer to Landscape, civil, structural, mechanical, electrical and
plumbing drawings for additional demolition information. The
contractor is responsible for the removal of all supports,
accessories and conveyances related to equipment and fixtures
shown on the construction documents to be removed, relocated
or salvaged. Do not scale drawings to establish quantities.
(E) BASEBALL FIELD 6. The Contractor shall coordinate and implement a safety and
evacuation plan which all safety measures requested and required
(E) ASPHALT
by the local fire marshal, health department, building officials and
BASKETBALL
other governing agencies having jurisdiction on the project.
COURT
7. The Contractor shall maintain the security of the building
throughout the entire construction schedule.
(E) MULTI-PURPOSE FIELD (E) FIRE HYDRANT 8. The contractor shall maintain all existing exit ways and shall not
(TYP) - RE: CIVIL block exit paths. If an exit path must be blocked, an alternative
means of egress shall be provided as approved by the local
governing authorities having jurisdiction over the project.
9. The Contractor shall keep all exit ways free of stored materials
and construction debris at all times in order to give occupants
(E) OUTDOOR EQUIPMENT clear access to exit ways.
STORAGE BUILDING
10. The contractor shall inform the owner of the demolition
schedule prior to any demolition and shall schedule demolition
so as not to interfere with facility operations. Disruption of
utilities to the existing building shall be coordinated with the
Owner at least 72 hours prior to the planned disruption.
RELOCATE 5 BENCHES
RE: LANDSCAPE PLANS
EDGE OF (E)
ASPHALT
LC
H
PRIVATE DRIVE
YAMPA STREET
10/25/17 Record Drawings
Future Community Garden 09/30/16 For Construction Set
08/12/16 100% CD's - Bldgs. B & D
05/27/16 Footings and Foundations Package - Bldg. D
05/11/16 Response to State Review Comments
DATE:
JT
October 25, 2017
SITE DEMO PLAN & NOTES
10/10/2017 5:36:05 PM
1' - 6"
1' - 6"
CHAIN & 36" H. x 6" STL. EXTEND 51 ST AVE. "HANDICAPPED PARKING" STEEL TUBE WITH 3/8" ANY TIME
HANDICAP FIRE LANE
PIPE BOLLARDS - FOR FIRE SIGN WITH IDENTIFICATION CADMIUM PLATED BOLTS,
(E) FIRE HYDRANT PARKING
ACCESS SYMBOL. BOLT TO STL. PIPE ONLY NUTS & WASHERS.
(TYP) - RE: CIVIL
TOW AWAY ZONE
BARRICADE - SEE CIVIL
WITH 3/8" CADMIUM PLATED
BOLTS, NUTS & WASHERS. VAN
RELOCATE (E) FIRE ACCESSIBLE 2"X2" 12 GAUGE GALV. STL.
HYDRANT (TYP) - RE: CIVIL 51ST AVENUE EXTENSION 51ST AVENUE PIPE, PERFORATED ON 4
SIDES W/ 3/8" HOLES 1" O.C.
5'-0"
5'-0"
MIN.
MIN.
ADD "VAN ACCESIBLE"
N 89°59'55" W 797.90' SUPPLEMENTARY SIGN, AT
Typ.
2 8" DIA. CONC. BASE
VAN SPACE.
AC2.0
CONC. OR PAVING
4" T. 5'-0" W.
2'-0" MIN.
C1.0
6"
439' - 0" TO WORK POINT
(E) ASPHALT
PAVEMENT (TYP.)
1. Handicap Parking & Fire Lane Signs
1/2" = 1'-0"
(E) BASEBALL FIELD
(E) BASKETBALL
COURT (E) CONC.
SIDEWALK (TYP.) SMOOTH ROUND
(E) MULTI-PURPOSE FIELD CONC. DOME @ TOP
CONC. CURB &
GUTTER (TYP) -
RE: CIVIL GALV. CHAIN W/
PADLOCKABLE WELD 3/16" T. STL. CAP TO
(E) FIRE HYDRANT CONNECTION IN THE
(TYP) - RE: CIVIL TOP OF TUBE PT. - GRIND
CENTER, SPANNING ALL EDGES SMOOTH - TYP.
(N) 8' CRUSHER FINES FROM BOLLARD TO
BOLLARD
3' - 6"
PATH - RE: LANDSCAPE
R 30'
CONC. & MATCH ELEV.
3' - 6"
R 10
CONC. - PT. BOLLARD - PT.
R 43'
'
SLOPE CONC. @
N 00°03'23" W 846.73'
BASE
R 20'
R5 E.J. - TYP
R 41
R1
'
8" T. CONC. RE: PLAN FOR BASE
R2
FINES PATH
RETAINING WALL - ' ADJACENT
7'
(E) FIRE 5' 10
3' - 0"
RE 2/AC2.1 R (N) 4" T. 8'-0" W. R SURFACE.
HYDRANT (TYP)
2'-0" MIN.
8 CONC. WALK RE: PLAN FOR
R2
- RE: CIVIL 3'
4" T. CONC 3 - 1
15' - 0"
ADJACENT
5'
8" 4'
OUTDOOR PATIO AC2.1 -
0" 8" 1/2" EXP. JT. & SURFACE.
' -
SEALANT, TYP.
8" T. 12'-0" W. 69
1/2" EXP. JT. &
19' - 10"
60 PARKING SPACES
CURB - RE: CIVIL
6"
'
6"
8 '- EQUIPMENT
9-'0' W X 18'-0" D.
399' - 4" TO WORK POINT 10 4" T. CONC.
STORAGE
4" 4"
CONC. CURB & GUTTER
135' - 0"
BUILDING
E.J. - TYP STOOP TYP - RE: CIVIL
5'-0" W. (E) CRUSHER 4" 4"
4" T. 8'-0" W.
PEAGRAVEL FINES PATH
CONC. WALK 90° 2"
MULCH
REMAIN
BUILDING
9' - 0"
4" T. CONC. WORK POINT
24' - 0"
(E) FIRE HYDRANT
SIDEWALK CENTER
(TYP) - RE: CIVIL
ON DOORS LINE OF FUTURE
BUILDING (TYP)
BENCHES, MAIN LEVEL F.F.E.: 100'-0" = 5373'
TABLES & (E) GAS METER
4" T. CONC
TRASH OUTDOOR PATIO
RECEPTACLES RELOCATED 3
8' - 0"
RE: LANDSCAPE BENCHES RE:
LANDSCAPE PLANS
RELOCATED 2 TRASH
4" T. CONC
RECEPTACLES RE: 6" T. FULL DEPTH ASPHALT
OUTDOOR
' LANDSCAPE @ PARKING SPACES - 6
R 454
60 PARKING SPACES
PATIOS PLANTING
1/2" T. FULL DEPTH
9-'0' W X 18'-0" D.
2 MAIN LEVEL F.F.E.: 100'-0" = 5373' BEDS RE:
LANDSCAPE ASPHALT @ ALL DRIVEWAY
CONC. CURB & AC2.1
- SEE GEOTECH REPORT
135' - 0"
GUTTER (TYP) - PLANS
RE: CIVIL
4" T. 5'-0" W.
CONC. WALK RELOCATED 2 (E)
TRASH RECEPTACLES
4 RE: LANDSCAPE PLANS 10' - 0" 18' - 0" 8' - 0" 18' - 0"
AC2.1
S 00°07'05" W 993.88'
(E) FIRE HYDRANT RELOCATED (E) FLAG POLE 30' - 0" 24' - 0" 30' - 0"
R 5'
TYP
4"
Typ. R5
'
'
10
2 PLANTING
R
8' - 0"
AC2.0 BED MAIN LEVEL F.F.E.: 100'-0" = 5373' RELOCATED (E) LIGHT POLE RE:
35' - 0"
LANDSCAPE & ELECT. PLANS
1
4" T. CONC. ' (E) ELEC
54 AC2.1
SIDEWALK CENTER R4 TRANSFORMER & 4" T. CONC
ON DOORS PAD TO REMAIN PATIO 6 PARKING SPACES
9-'0' W X 18'-0" D.
4" T. 8'-0" W.
CONC. WALK LIGHT POLE RE: LANDSCAPE
E.J. - TYP & ELECT. PLANS
R 12
'
(E) CONC. PATIO
1"
RECEPTACLE RE:
R 12
117' - 0"
9' - 0"
R2
CONC. CURB & GUTTER
0'
E.J. - TYP
R5
(E) FIRE
C:\Users\rortiz\Desktop\Revit Local\15064 DPS Groff HS Ph 2 A15_BO.rvt
24' - 0"
18' - 0"
N 00°07'05" W 110.30'
ND 08/12/16 100% CD's - Bldgs. B & D
N6 AL
2°4 E GU 05/27/16 Footings and Foundations Package - Bldg. D
6 '37 LC
" W H Future Community Garden 05/11/16 Response to State Review Comments
73
1. Provide control joints at 5' O.C. And expansion joints at 30' O.C.,
maximum at all new sidewalks.
DATE:
JT
October 25, 2017
SITE PLAN
10/10/2017 5:36:19 PM
72
± SL 2%
-SEE LANDSCAPE
BUILDING WORK POINT TYP - 3 /4 Conc. Walk
'-1
'-11
LANDSCAPE PLAN
13
SEE OVER ALL PLAN - (TYP.)
2'-0" MAX
72
/4
Varies - Re: Civil
DWGS.
VARIES- SEE
4" T. CONC. PATIO PLANTING BEDS W/ APPROX. 4" T. (E) CONC. PATIO
5' - 0"
EJ AREA DRAIN W/ PEDESTRIAN
3'-0" W. COBBLE ROCK AT GRADE GRATE ON TOP - TIE #5 HORIZ. @
RELOCATED 2 (E) BENCHES RE: PERIMETER - ADJUST TO 12" O.C.
SLOPE
TO UNDERGROUND STORM
1.8%
SL 2%
GEOTECHNICAL
OP
RELOCATE RELOCATED #5 VERT @ 12" 0.C.
REPORT - TYP.
E
RELOCATED (E) TRASH
(E) TRASH RECEPTACLES 1 1/2" CONC. FND. WALL & FTG. - RE:
RECEPTACLES RE: LANDSCAPE
RE: LANDSCAPE #5 @ 12" O.C. TOP CLR STRUCT
4" T. CONC FFE = 100'-0" = 73.0' T.O. FDN.
OUTDOOR PATIO EJ EJ
72.96± 95'-0"
1' - 0"
1 1/2"
4" T. CONC. REINSTALL 3 (E) BENCHES RE:
CLR
PATIO LANDSCAPE PLANS
MODIFY (E)
EJ 6 #5 BARS
72
R 265
PLANTING BED TO
CLR
R 45' - 4"
'-11
1' - 6
3"
INCL.APPROX. 3'-0" " DOWEL (E) & (N) CONC. W/ 1' - 0" 8" 2' - 0"
(TYP.)
3 /4
P.
" TY
' - 2"
W. COBBLE ROCK REBAR @ 12" O.C. (TYP.) AREA DRAIN W/ PEDESTRIAN
2' - 0
±
AT PERIMETER - R 31' - 6" EJ GRADE GRATE ON TOP - TIE TO 3' - 8"
VERIFY SLOPE TO 2"X2"X3 1/2' STL TUBE EJ UNDERGROUND STORM SEWER
RELOCATED (E) FLAG POLE
2' - 0
(E) AREA DRAIN - 3 EJ BOLLARD - PT. TYP. @ SIDE SYSTEM - RE: CIVIL &
TYP.
EJ RE: LANDSCAPE PLAN
RE: LANDSCAPE 8'
-
9"
EA. OF EXT. DOORS- TYP. LANDSCAPE FOR COORD. 5. Site Wall Section
"
1' - .
PLANS NEW ADA BENCH - 'VICTOR STANLEY
2"
TYP
1/2" = 1'-0"
72.96± EJ 1/ FS-50' - RE: LANDSCAPE PLANS
6"
PLANTING BED - RE: 4" T. CONC
1' - .
SL 0 "
-4
TYP
1 . OP '- LANDSCAPE PLAN
7'
OUTDOOR PATIO
6"
8% E (4) NEW SEATS RE: 22 PLANTING BEDS W/ APPROX. 3'-0" 18
EJ
EJ R RELOCATED (E) TRASH RECEPTACLES
LANDSCAPE PLANS W. COBBLE ROCK AT PERIMETER
14
RE: LANDSCAPE PLANS RE: LANDSCAPE PLANS
'-
2"X2"X3 1/2' STL 37° 0" EJ 4" EJ
0"
TUBE BOLLARD - PT. IN-GRADE LIGHT 2' - RELOCATED (E) STORM INLET
SL 9'
-
2"X2"X3 1/2' STL TUBE
25° 4" TO NEW PLANTING BED - RE: O 19
TYP. @ SIDE EA. OF FIXTURES @ FLAG 5' - 3 ' - 0" 2 % PE R BOLLARD - PT. TYP. @ SIDE
EXT. DOORS- TYP. POLE & COLS - R4 CIVIL & LANDSCAPE - ENSURE
EJ EA. OF EXT. DOORS- TYP.
RE: ELEC. GRADES AT PLANTING AREA
EJ SLOPE TO DRAIN ±
0 " .) EJ 72
'-
' - 6"
DOWEL (E) & (N)
EJ RELOCATED (E) LIGHT POLE - RE: 8 TY P '-1
13 1 1/2" DIA. STL.
(
17
2% PE
CONC. W/ REBAR LANDSCAPE & ELEC. PLANS - /4
R 31
R 1' - PIPE RAILING - PT.
'-
O
@ 12" O.C. (TYP.) 6" EJ ± 1' - 0"
LOCATE AT 45° FROM NEW
SL
EJ
2"
20° (TYP.) MIN.
EJ SOUTH LIGHT 0"
±
EJ (E) EJ '- EXTEND ONE TREAD
3 /4
(E) BIKE RACKS TO REMAIN 12 BEYOND STAIR 3"
'-11
3"
20° (12" MIN.) 15°
72
EJ
72.5± 5°
(E) BENCHES NEW BIKE RACKS EQ EQ 1/2" EXP. JT.
TO REMAIN 3"
4" T. CONC EJ 1' - 2" 9"
RELOCATED 3 (E) BENCHES
RE: LANDSCAPE PLANS OUTDOOR PATIO 3 EQ. TREADS 3"
PE 30
O % '- SL @ 1'-6" = 4' - 6" SLOPE
L
S .5 5" O
3' - 0"
1 2% PE 2% (MAX.) T.O. Conc.
11 4" TH. CONC. Re: Civil
EJ EJ '- SIDEWALK
9" 3"
EJ SLOPE
72.96± 45° 2% (MAX.)
T.O. Conc.
PE 72
LO % REPLACE (E) CONC. Re: Civil
S .5 '-11
1 3 /4 WALKS AND PATIO
± DAMAGED FROM
CONSTRUCTION
EJ EJ 4" T. (E) CONC. PATIO -
ACTIVITIES (TYP.)
REPAIR / REPLACE IF DAMAGED
3' - 0"
R
4" T. CONC. PATIO - MEET
(E) CONC. ON THREE SIDES
AND SLOPE TO SOUTH
MODIFY (E) PLANTING AREA & SOD
FOR CONC. INSTALL - RECONFIGURE REMOVE (E) TREE
IRRIGATION AS REQ'D.
NEW AND RELOCATED (E)
BIKE RACKS - TOUCH-UP
PAINT AS REQ'D.
N
1. Enlarged Front Entry Plaza Plan
1" = 10'-0"
6' - 5" ±
6' - 6" ±
R4
3' 5' W. PEA GRAVEL MULCH BORDER
- 2"
AROUND BUILDING (TYP.) 2"X2"X3 1/2' STL TUBE
0"
1 0' - BOLLARD - PT. TYP. @ SIDE
"
SOD - RE:
'-3
LANDSCAPE PLAN EA. OF EXT. DOORS- TYP.
EJ
R 15' - 0"
R 55
5 R4
'-4
R1
AC2.1 "
'-5
R5
"
R9
7'
1 2' -
5' -
EJ
-
4"
EJ R 73' -
9" 5'
0
R
3'
"
72'-1
8" T. 12'-0" W.
0"
EJ
-4
8" EJ EJ
R 3'
CONC. WALK
"
R 60
1-3/4
8'
-8 EJ
R 5'
6"
'-3
CHAMFER OUTSIDE "
"±
8" MONUMENTAL STAIR W/ HANDRAILS AT BOTH SIDES
CORNERS -TYP.
"
OF PATH OF EGRESS SOD - RE: R 3'
5
85° 130° 1/ - WIDTH OF STAIR WITHIN 30" OF HANDRAIL IS 90" LANDSCAPE PLAN
EJ 2" 4' - REQ'D. WIDTH OF STAIR WITHIN 30" OF HANDRAIL IS 68" TRASH RECEPTACLE
R 53'
-
10
- 0" "
-ADDITIONAL INTERMEDIATE HANDRAILS ARE NOT REQ'D. R RE: LANDSCAPE
. 5'
1' IN 13 PER SECTION 1014.9 OF THE IBC. PLANS
3'
1' - 0"
M '- 4" T. CONC
R
MIN. R 39' - 3"
10' - 0"
2 OUTDOOR PATIOS
1/
2" EJ
CURVED CONCRETE STEPS - RE: EJ
6
CONC. STAIR LANDSCAPE PLAN SOD - RE:
ON GRADE - AC2.1
LANDSCAPE PLAN
RE: STRUCT. 1' - 0" 11 5'-0" ±
0"
'- TYP.
1' - 4" "
20' - 1 1/2"
" 3"
1"
9
8' -
6'
R3
STL. PIPE HAND
RAILS - PT. W/ HIGH EJ
16
PERFORMANCE PT. '-
1" 2"X2"X3 1/2' STL TUBE
' - 1"
C:\Users\rortiz\Desktop\Revit Local\15064 DPS Groff HS Ph 2 A15_BO.rvt
EJ
BOLLARD - PT. TYP. @ SIDE R 454
15
'-
9"
61
0"
09/20/17 PR#008
4' -
08/28/17 PR#007
R 8' - 0"
65
-
'- 2' - 5' 08/17/17 PR#006
3"
2"
'-
R EJ
±
CHECKED BY:
JG/BS/BO/AMJ
JT
ENLARGED SITE PLANS & SITE
*COORD. W/ CIVIL & LANDSCAPE DRAWING FOR SPOT 4. Contractor shall verify exact quantities and dimensions in the
field. Do not scale the drawings.
DATE:
October 25, 2017 DETAILS
10/10/2017 5:36:36 PM
ELEVS. AND AREA DRAIN LOCATIONS. (TYP.) APPROVED CONTRACT DOCUMENT SCALE:
AS NOTED
5. Contractor shall adhere to all City and County of Denver SHEET:
N N guidelines with respect to hours of work and disturbances to the c 2017 Eidos Architects DWG. NO.
surrounding neighborhoods. 8
3. Enlarged Back Entry Plaza Plan
1" = 10'-0"
4. Enlarged Outdoor Collaborative Area North Plan
1" = 10'-0"
6. Refer to soils report for perimeter drain tile requirements. Field
verify footing depths and install perimeter drain tile per soils report.
DATE:
AC2.1 OF:
272
ALTERNATE 1b: INSTALL NEW 3" PVC PIPE
MAIN LEVEL F.F.E.: 100'-0" = 5373'
FROM NEW GARDEN AREA TO EXISTING
LANDSCAPE AREA AROUND BUILDING A
FOR OWNER TO RUN MANUAL HOSE FOR
WATERING
WATER LINE BACK TO
BUILDING - SEE AC2.0
"
-0
"
"
-0
-0
COMMUNITY GARDEN WATER
6'
LINE ALONG EXISTING
3'
3'
LANDSCAPE AREA @ 4'-0"
DEEP
"
-0
"
-0
1
3'
5'
3'
-0 AC2.2
TYP "
CHAIN LINK FENCE (TYP.) "
-0
.
3'
DOUBLE CHAIN LINK GATE FUTURE SHED
"
-0
3'
4' X 10' RAISED GARDEN 5' 8'
-0 -0
BOXES (TYP) " TYP " FUTURE RAMP
ROUTE NEW 1-1/4"
. COMMUNITY GARDEN WATER
(E) LIGHT POLE TO REMAIN (V.I.F.) TO HYDRANT LOCS. - SEE
1/AC2.2 & 6/L4
5'
-0
" FUTURE SHADE STRUCTURE
10' X 10' AT-GRADE CO
MM
GARDEN BEDS (TYP) UN
IT Y FUTURE PICNIC TABLES (TYP.)
GA
RD
EN
2. Partial Site Plan - Building A
ST 1" = 40'-0"
R
GA IVE FUTURE RAISED WALK AREA
RD
EN
KI
GA PP
RD
EN
FUTURE RAMP
N
Community Garden Enlarged Site Plan 3. Garden Shed - Prefabricated Building
1" = 10'-0" 12" = 1'-0"
CHECKED BY:
JG/BS/BO/AMJ
JT
COMMUNITY GARDEN ENLARGED
DATE:
October 25, 2017 SITE PLAN
10/10/2017 5:36:49 PM
DATE:
AC2.2 OF:
272
DEMOLITION LEGEND
EXISTING CONSTRUCTION TO
BE REMOVED
EXISTING BUILDING TO
REMAIN
3 5 A5 A6 A7
AA
A4
A3 AB
DEMOLITION NOTES
R REM
O
IN (E VE VCT P.7 1. The drawings are diagrammatic and may not show all
) CO F
RRID LOORING demolition that is required. The contractor must visit the site to
OR E
NTIR & BASE
ELY A2 document all site conditions and determine the extent of
AC demolition that will be required to construct the project as it is
REMOVE (E) CARD documented. All fixtures that can be reused and are not required
.1
AD1 Girls ACCESS READER & A1 for the project shall be rendered to the owner.
t PHONE & RELOCATE
P.8 ee .0
100C
AD
Sh D1 ELSEWHERE IN THE 2. Disconnect existing equipment which is to be removed and
A1 t A PROJECT. PATCH & relocated. Coordinate with owner temporary storage of such
ee
Sh Boys REPAIR (E) FINISHES items. Protect existing equipment which is to remain in place.
R 100D FROM REMOVAL
Mech 3. The Contractor shall coordinate the salvage of existing
110H materials and equipment with the Owner. Before removal,
Stair document the condition of all existing items scheduled to be
B Alcove salvaged and/or relocated. After removal, store items as directed
100CA by the owner. Any items damaged by the contractor shall be
3
B7 B6 B5 B4 Sheet AD1.1 B3 Elec B2 B1 replaced at no cost to the owner. The Owner retains salvage
110HA Alcove Vestibule rights to materials and equipment removed from the building as
100M 100B part of the project.
Sheet AD1.0
4. On site sale and/or disposal of and/or burning of demolished
BA 5 items is not permitted.
Women Alcove
Cust. 100E 100DA DISCONNECT & RELOCATE 5. Refer to civil, structural, mechanical, electrical and plumbing
(E) FACP - MAP TO REMAIN Restroom
Boys 100G
Girls 100H BA 108A AE drawings for additional demolition information. The contractor is
responsible for the removal of all supports, accessories and
100J
conveyances related to equipment and fixtures shown on the
Men construction documents to be removed, relocated or salvaged.
Sp. Ed. Severely Do not scale drawings to establish quantities.
100F 108
REMOVE (E) DESK MILLWORK AS REMOVE (E) REF., COTS & CLG. 6. Remove all doors, frames and hardware in partitions shown to
REQ'D - PATCH, REPAIR & REPAINT CURTAIN W/ TRACKS - SALVAGE be demolished. All items shall be made available to the owner if
(E) WALLS & FINISHES DAMAGED FOR REUSE IN PROJECT. not indicated on the drawings for relocation or reinstallation. Items
RELOCATE FROM CONST. ACTIVITIES RELOCATED REF. TO BUILDING B, which the owner does not wish to keep shall become the
DESK TO RM. 131 property of the contractor.
Alcove BUILDING B, AF
Alcove 100HA Elev. RM. 130A 7. Existing finishes to remain, unless noted otherwise. Protect
100JA CAP (E) FLR. DRAIN AS REQ'D from damage.
BB BB
8. The Contractor shall coordinate and implement a safety and
AB REMOVE (E) evacuation plan which all safety measures requested and
RE
CARPETING AND
F.
required by the local fire marshal, health department, building
REPLACE W/ VCT officials and other governing agencies having jurisdiction on the
REMOVE (E) FLOORING AT project.
16
AREA OF DEMOLITION AS
Corridor
'-
REQ'D IN PREPARATION REMOVE (E) PLUMBING FIXTURES, GRAB BARS & TOILET ACCESSORIES 9. The Contractor shall maintain the security of the building
Vestibule
10
100 AS REQ'D (SALVAGE FOR OWNER) - PATCH, REPAIR & REPAINT (E) WALLS throughout the entire construction schedule.
100K FOR NEW FLOORING
"
& FINISHES DAMAGED FROM CONST. ACTIVITIES
10. The contractor shall maintain all existing exit ways and shall
Classroom
BC REMOVE (E) 107 not block exit paths. If an exit path must be blocked, an alternative
MILLWORK AS means of egress shall be provided as approved by the local
Reception
REMOVE (E) DRS., WDWS., REQ'D governing authorities having jurisdiction over the project.
HDWR. & FRAMES - SALVAGE
FOR REUSE IN PROJECT 11. The Contractor shall keep all exit ways free of stored
BD materials and construction debris at all times in order to give
MILLWORK TO BE REUSED IN occupants clear access to exit ways.
NEW OFFICE, RM 132
AG 12. The contractor shall inform the owner of the demolition
REMOVE (E) INT. WALL AS REQ'D - REMOVE (E) schedule prior to any demolition and shall schedule demolition so
PATCH, REPAIR & REPAINT (E) WHITEBOARDS - as not to interfere with facility operations. Disruption of utilities to
24
PATCH & REPAIR WALLS, CEILINGS WALLS & FINISHES DAMAGED SALVAGE FOR REUSE the existing building shall be coordinated with the Owner at least
'-
AND FLOORS AS REQ'D. FROM CONST. ACTIVITIES, TYP. 1" IN PROJECT, TYP.
'- 72 hours prior to the planned disruption.
9"
13 Corridor
Classroom ±
" 102 13. The Contractor shall construct dust partitions as required to
125 5/8
8 protect the existing building and contents during construction
'-
13 Breakout Classroom activities. Temporary dust partitions shall be insulated and
±
102C 106 constructed of metal studs at 24" oc. Partition shall seal off area
AH of demolition from the passage of dust. Partition cover shall be of
finished and painted type "x" gypsum board on visible side.
"
5/8
AE '-
8
19
±
BE BE
Stor.
105 A
Elec
102A
Classroom
103 AJ
AF
Stor.
BF BF 105 B
Classroom AK
120
Teacher Planning
Corridor 105
117
Classroom
104
Breakout
117C
A7
A6
Classroom AG
124
Alcove
Classroom 102B Entry CPT
121
118B A5
BG BG
Elec AH Stair
117A
A
A4
C:\Users\rortiz\Desktop\Revit Local\15064 DPS Groff HS Ph 2 A15_BO.rvt
Classroom
123 A3
BH BH
Stor. Stor.
122A 122B
AJ
A2
10/25/17 Record Drawings
09/30/16 For Construction Set
08/12/16 100% CD's - Bldgs. B & D
Teacher Planning 07/29/16 95% CD's
122 AK A1
CHECKED BY:
JG/BS/BO/AMJ
JT
BLDG A MAIN LEVEL DEMO PLAN &
B7 B6 B5 B4 B3 B2 B1
DATE:
October 25, 2017 NOTES
10/10/2017 5:37:36 PM
DATE:
AD1.0 OF:
272
1 2 3 4 5 6 7 8 9
M M
Boys Shower
116BB Restroom
Restroom 116BA1
116AA1 Boys Restroom
116BC
Coach Unisex RR
116BA 110F
Boys Locker Room
Alcove 116B REMOVE VCT TILE 12" PLUS ONE
116BD FULL TILE FROM CUT CONCRETE
Staff Resource
111
1
AD1.1 Bleachers ALIGN CORRIDOR EXTENT OF CONCRETE
BL1 Security REMOVAL W/ NEW STRUCTURAL
110G FOOTING. RE: STRUCT.
M.9 M.9
N N
REMOVE (E) INT. WALL AS REQ'D - PATCH,
REMOVE (E) LOCKERS - SALVAGE
REPAIR & REPAINT (E) WALLS & FINISHES
FOR REUSE IN PROJECT
DAMAGED FROM CONST. ACTIVITIES, TYP.
12' - 2 1/2"
Gym Stor. Gym Stor. REMOVE (E) DRS., HDWR. & FRAMES STL. COLS. & STRUCT. TO
116D 116C - SALVAGE FOR REUSE IN PROJECT BE REMOVED - RE: STRUCT. REMOVE (E) DRS., HDWR. & FRAMES -
SALVAGE FOR REUSE IN PROJECT
9' - 8 1/2"
REPAIR AND REPLACE (E) SUNSHADES TO REMAIN - MODIFIED REPAIR AND REPLACE SAWCUT AND REMOVE REMOVE (E) FLOOR FINISHES AS REQ'D FOR
9' - 11" AREA SHALL BE BLOCKED OFF, WITH ACCESS TO
THRESHOLDS AS REQ'D. 2 TO ACCOMODATE (E) STRUCT. AS REQ'D. THRESHOLDS AS REQ'D. FLOORING, CONCRETE INSTALLATION OF STRUCTURAL THE VARIOUS AREAS OF THE BUILDING FROM THE
- SEE SHT. A7.6 SLAB AND FINISH BASE FOUNDATIONS AND (N) INTERIOR EXTERIOR WALKS.
AD1.1 AS REQ'D. FOR ARCHITECTURAL ELEMENTS.
INSTALLATION OF (N)
CONC. FTGS. - RE: **DURING CONSTRUCTION, THE CONTRACTOR
STRUCT. SHALL CONSTRUCT AND MAINTAIN A 6'-0" WIDE
1 2 6 7 8 (MIN.) PROTECTIVE TUNNEL UNDER THE EXISTING 9
DECK TO REMAIN FOR STUDENT ACCESS AND
EGRESS FROM THE BUILDING B AREAS.
REMOVE (E) EXT. WALL AS REQ'D (BRICK, MTL. PANEL & APPROX. LOCATION OF
ALUM. WDWS. ON 6" MTL. STUDS W/ GYP. BD. INT. TEMPORARY PROTECTIVE
FACE) - PATCH, REPAIR & REPAINT (E) WALLS & FINISHES TUNNEL, G.C. TO COORD. WITH
DAMAGED FROM CONST. ACTIVITIES, TYP. THE AHJ FOR APPROVED EGRESS
AA
PLAN
± 49' - 10 5/8"
STL. COLS. & (E) MECH, ELEC, &
STRUCT. TO REMAIN - PLUMBING PIPES,
RE: STRUCT. CONDUITS & DUCT WORK
TO REMAIN - COORD. W/
CONTRACTORS & PROVIDE
PROTECTION OF (E)
DEMOLITION NOTES
UTILITIES TO RELOCATE
DURING DEMOLITION & Girls 1. The drawings are diagrammatic and may not show all
100C demolition that is required. The contractor must visit the site to
RECONSTRUCTION WORK
document all site conditions and determine the extent of
demolition that will be required to construct the project as it is
1
1.
documented. All fixtures that can be reused and are not required
AD
for the project shall be rendered to the owner.
0
1.
Boys
t
ee
AD
B3 100D
Sh
2. Disconnect existing equipment which is to be removed and
t
ee
relocated. Coordinate with owner temporary storage of such
Sh
items. Protect existing equipment which is to remain in place.
REMOVE VCT FLOORING & BASE 3. The Contractor shall coordinate the salvage of existing
IN (E) CORRIDOR ENTIRELY Stair
materials and equipment with the Owner. Before removal,
B
document the condition of all existing items scheduled to be
R R salvaged and/or relocated. After removal, store items as directed
by the owner. Any items damaged by the contractor shall be
replaced at no cost to the owner. The Owner retains salvage
Alcove rights to materials and equipment removed from the building as
Mech 100M part of the project.
110H
4. On site sale and/or disposal of and/or burning of demolished
items is not permitted.
3 5 DEMOLITION LEGEND 5. Refer to civil, structural, mechanical, electrical and plumbing
drawings for additional demolition information. The contractor is
responsible for the removal of all supports, accessories and
conveyances related to equipment and fixtures shown on the
Elec EXISTING CONSTRUCTION TO construction documents to be removed, relocated or salvaged.
110HA BE REMOVED
Cust. Do not scale drawings to establish quantities.
.1 100G
t A D1
Shee
6. Remove all doors, frames and hardware in partitions shown to
EXISTING WALL TO REMAIN be demolished. All items shall be made available to the owner if
1.0 Boys
t AD not indicated on the drawings for relocation or reinstallation. Items
Shee
100H
which the owner does not wish to keep shall become the
EXISTING BUILDING TO property of the contractor.
REMAIN
Girls 7. Existing finishes to remain, unless noted otherwise. Protect
100J from damage.
BA
8. The Contractor shall coordinate and implement a safety and
evacuation plan which all safety measures requested and
required by the local fire marshal, health department, building
officials and other governing agencies having jurisdiction on the
project.
Building B Main Level Demolition Floor Plan Finish Floor Elevation:100' - 0" 10. The contractor shall maintain all existing exit ways and shall
1/8" = 1'-0" not block exit paths. If an exit path must be blocked, an alternative
means of egress shall be provided as approved by the local
governing authorities having jurisdiction over the project.
11. The Contractor shall keep all exit ways free of stored
materials and construction debris at all times in order to give
occupants clear access to exit ways.
± 1' - 8"
V.I.F.
± 1' - 8"
APPROX. LOCATION TO
REMOVE (E) MTL. PANEL AS
REQ'D TO ACCOMMODATE
(N) ROOFING & BLDG. EXP.
JT. (COORD. W/ ALL
Denver Public Schools
REQ'D TO ACCOMMODATE (N) APPLICABLE DEPARTMENT OF FACILITY MANAGEMENT
± 32' - 0"
± 29' - 9"
(COORD. W/ ALL APPLICABLE SHT. A4.0 SCHOOL DISTRICT NO. 1 SCHOOL NO. 1103 SITE NO. 1103 DENVER, CO
V.I.F.
V.I.F.
SUBCONTRACTORS) - SEE
SHT. A4.0
24' - 8"
CHECKED BY:
JG/BS/BO/AMJ
JT
BLDG B MAIN LEVEL DEMO PLAN &
DATE:
October 25, 2017 NOTES
10/10/2017 5:37:52 PM
EXISTING BUILDING TO
REMAIN
3 5 A5 A6 A7
AA
A4
ROOF BELOW A3 AB
DEMOLITION NOTES
R
1. The drawings are diagrammatic and may not show all
demolition that is required. The contractor must visit the site to
A2 document all site conditions and determine the extent of
AC demolition that will be required to construct the project as it is
documented. All fixtures that can be reused and are not required
.0
AD2 for the project shall be rendered to the owner.
t
ee .2 AD
Sh D1 Girls 2. Disconnect existing equipment which is to be removed and
A1 t A relocated. Coordinate with owner temporary storage of such
ee 200A
Sh items. Protect existing equipment which is to remain in place.
11. The Contractor shall keep all exit ways free of stored
BD BD materials and construction debris at all times in order to give
Science Lab (Wet) occupants clear access to exit ways.
208
AG 12. The contractor shall inform the owner of the demolition
schedule prior to any demolition and shall schedule demolition so
as not to interfere with facility operations. Disruption of utilities to
the existing building shall be coordinated with the Owner at least
Breakout 72 hours prior to the planned disruption.
Classroom 201B
Classroom
218 13. The Contractor shall construct dust partitions as required to
211 Corridor protect the existing building and contents during construction
201 activities. Temporary dust partitions shall be insulated and
Classroom
AE 203 constructed of metal studs at 24" oc. Partition shall seal off area
AH of demolition from the passage of dust. Partition cover shall be of
finished and painted type "x" gypsum board on visible side.
Classroom
217
Classroom
BF BF 204
AK
Classroom
206
Corridor
210 AG
A7
Classroom
205 A6
Classroom
216 AH A5
BG BG
A4
Stair
A
Classroom
213
C:\Users\rortiz\Desktop\Revit Local\15064 DPS Groff HS Ph 2 A15_BO.rvt
A3
AJ
BH BH
A2
Classroom
215 10/25/17 Record Drawings
AK
09/30/16 For Construction Set
08/12/16 100% CD's - Bldgs. B & D
A1 07/29/16 95% CD's
CHECKED BY:
JG/BS/BO/AMJ
JT
BLDG A UPPER LEVEL DEMO PLAN &
B7 B6 B5 B4 B3 B2 B1
DATE:
October 25, 2017 NOTES
10/10/2017 5:38:30 PM
DATE:
AD1.2 OF:
272
SLOP T
1 /2"/
SAW CUT AND REMOVE PORTION OF (E)
F
E
UPPER METAL PANEL SYSTEM, FURRING R.D.
SYSTEM AND INSULATION TO A HEIGHT OF
128'-0" (+/-), FOR INSTALLATION OF (N)
ROOF AND STRUCT. WALL PANEL ABOVE
SLOP TYP.
128'-0" AND COPING TO REMAIN. E
1/2"/F
T
SLOP
1/2"/
FT
E
R.D. 32' - 10 1/2"+/- 1/
4"
/1
REMOVE PORTION OF (E) UPPER METAL 2"
PANEL SYSTEM, FURRING SYSTEM AND SLOP
E
S INSULATION AND COPING, FOR 1/2"/F
T
INSTALLATION OF (N) ROOF AND STRUCT. 33' - 9 1/2"+/-
SLOP
1/ SLOP 1/2"/F E
4" E T
1/2"/F
/ 1 32' - 10 1/2"+/- T
2"
SLOP T
(E) SUNSHADES & STRUCT. - 16' - 4"+/-
1/2"/
STRUCT. REMOVE (E) UPPER METAL PANEL SYSTEM, 1/
MODIFY AS REQ'D. FOR INSTALL. 4"
1/2 "/F E
T
FURRING SYSTEM AND COPING, FOR
F
E
SLOP
OF (N) COLS. - RE: STRUCT. /1
INSTALLATION OF (N) WALL AND STRUCT. 2"
(SEE DTL 2/A7.6) SLOP
1/2"/F E
T R.D.
TYP.
S
SLOP T
2" E
1 /2"/
1/2"/F
(E) MECH., PLUMB., ELEC., FIRE ALARM, FIRE INSULATION AND COPING, FOR T 4" R.D.
SPRINKLER & DATA IN CORRIDOR TO BE 1/
F
E
S INSTALLATION OF (N) ROOF AND STRUCT.
1/2 "/F E
S
T
SLOP
REROUTED TO ADJACENT LOCKER ROOM AREA.
SLOP T
1/2"/
COORD. WITH MECH., ELEC., PLUMB.
F
E
R.D.
PATCH / REPAIR CEILING AS REQ'D. FROM REMOVAL S 15' - 3 1/2"+/- 1/
S REMOVE (E) ROOFING, STRUCT AND 4"
OF (E) WALL - SEE MECH./ELEC. FOR MODIFICATIONS /1 "
TO THE CEILING FIXTS. IN THIS AREA. UTILITIES IN THIS AREA. SEE STRUCT. 2" O.D. / 12
E
" SLOP T
S S
MECH, PLUMB. & ELEC. DWGS. R.D. /4
1 " /F
S
S
REMOVE (E) ROOFING @ COORIDOR - (E) 1/2
REMOVE (E) SOFFITS, CEILINGS, FIXTS., MECH., ROOF DECK AND UTILITIES TO REMAIN -
SLOP T
S
2027
1/2"/
PLUMB. AND ROOF STRUCT. IN THIS AREA. - PATCH / SHORE AS REQ'D. FOR INSTALL OF (N) STRUCT.
21' - 8 1/2"+/-
SLOP T
1/2"/
REPAIR (E) CMU WALL TO REMAIN AS REQ'D. - RE: STRUCT.
F
E
REMOVE APPROX. 2'-0" OF (E) ROOFING AND
F
E
REMOVE PORTION OF (E) GYP. BD. SOFFIT, AS REQ'D. FOR DECK FOR INSTALL OF (N) BEAM AND R.D.
INSTALL. OF (N) STRUCT. - RE: STRUCT. BRACING - RE: STRUCT. O.D.
S 1/
REMOVE (E) PARAPET & SCUPPERS FOR 4"
PROTECT (E) UTILITIES AND PAINTED STRUCT. ELEMENTS S /1
IN CORRIDOR CEILING - SHORE AS REQ'D. FOR INSTALL. OF (N) UPPER LEVEL WALLS - SEE 2"
INSTALLATION OF (N) STRUCT. - RE: STRUCT. STRUCT.
SLOP T
1/2"/
SPRINKLER & DATA IN CORRIDOR TO REMAIN, PULL BACK ROOFING AS REQ'D. FOR
1/2 "/F E
T
F
PROTECT EXISTING UTLITIES IN PLACE SAWCUT OPENING IN PARAPET
E
SLOP
S R.D. INSTALL OF RELOC. DRAIN, SUMP AND REMOVE METAL
APPROX. LINE OF TEMPORARY PROTECTIVE FOR INSTALL. OF (N) SCUPPER
OVERFLOW. REPAIR / REPLACE ROOF PANEL SYSTEM AND
TUNNEL, G.C. TO COORD. WITH THE AHJ FOR
DEMOLITION NOTES
R.D. INSULATION AND MEMBRANE AS REQ'D. SHEATHING AS
APPROVED EGRESS PLAN SLOP REQ'D. FOR
REMOVE (E) GYP. BD. CEILING AND LIGHT FIXT. - SLOP T
E 1/2"/F E REMOVE (E) ROOF DRAIN, OVERFLOW &
ATTACHMENT OF
" /F T SUMP FOR RELOCATION - SEE ROOF PLAN
COORD. W/ ELEC. FOR FIXTS. TO BE REUSED IN 1 /2 (N) CANOPY TO (E)
AND PLUMB. DWGS.
S PROJECT. STL. COL. - PATCH 1. The drawings are diagrammatic and may not show all
(E) CLOUD CEILINGS AND FIXTS. TO REMAIN - PROTECT IN REMOVE (E) PARAPETS AND AND REPAIR WITH demolition that is required. The contractor must visit the site to
28' - 7"+/-
PLACE OR REMOVE FOR REINSTALLATION IN PROJECT. ROOFING FOR INSTALL. OF (N) INSTALL. OF (N) document all site conditions and determine the extent of
SLOPE
EXPANDED VESTIBULE CANOPY. demolition that will be required to construct the project as it is
SL "/FT
1/2"/FT
1/2
OP
(E) CLOUD CEILINGS AND FIXTS. TO REMOVED FOR documented. All fixtures that can be reused and are not required
SL "/F T
SL
1/2
SAWCUT OPENING IN PARAPET
E
MODIFICATIONS AND REINSTALLED IN PROJECT - SEE RCP O for the project shall be rendered to the owner.
OP
P E 1/2 PE FOR INSTALL. OF (N) SCUPPER
O T "
E
L
S "/F /F T
*THE DEMOLITION FOR THIS AREA IS TO BE O.
CONDUCTED WHILE THE BUILDING IS NOT FULLY
1/4 D. 1/2 28' - 9 1/2"+/- 2. Disconnect existing equipment which is to be removed and
"/ 28' - 0"+/- relocated. Coordinate with owner temporary storage of such
OCCUPIED BY STUDENTS AND THE ENTIRE WORK 27' - 11 1/2"+/- 12 R.D SL
" 28' - 0"+/- . 1/4" / 12" items. Protect existing equipment which is to remain in place.
AREA SHALL BE BLOCKED OFF, WITH ACCESS TO
R.D
. 1/4 OPE 1/4" / 12"
DW "/F SLOPE
RE THE VARIOUS AREAS OF THE BUILDING FROM THE T O.D.
F. 1/4"/FT 3. The Contractor shall coordinate the salvage of existing
1/4" / 12"
EXTERIOR WALKS. SIM. 28' - 8 1/2"+/- R.D. 19' - 6"
PE materials and equipment with the Owner. Before removal,
SL "/F T
16' - 10"
SLO "/F T
1/2
document the condition of all existing items scheduled to be
OP
**DURING CONSTRUCTION, THE 1/2
SL 2"/F T
28' - 8 1/2"+/- salvaged and/or relocated. After removal, store items as directed
1/
CONTRACTOR SHALL CONSTRUCT AND
OP
SLOPE SLOPE by the owner. Any items damaged by the contractor shall be
E
MAINTAIN A 6'-0" WIDE (MIN.) PROTECTIVE 1/2"/FT 1/2"/FT
1/4 E 4' - 0" replaced at no cost to the owner. The Owner retains salvage
TUNNEL UNDER THE EXISTING DECK TO "/ OP
12 SIM. SL "/F T rights to materials and equipment removed from the building as
REMAIN FOR STUDENT ACCESS AND EGRESS
FROM THE BUILDING B AREAS.
" 1/2 E
part of the project.
SL "/FT
OP
1/2
SL "/F T
OP
4. On site sale and/or disposal of and/or burning of demolished
1/2
E
R.D SL items is not permitted.
TYP. . 1/2 OPE
28' - 1"+/- "/F
T 5. Refer to civil, structural, mechanical, electrical and plumbing
R.D
. SIM. drawings for additional demolition information. The contractor is
SL "/FT
SIM.
1/2
responsible for the removal of all supports, accessories and
OP
27' - 11 1/2"+/- conveyances related to equipment and fixtures shown on the
E
REF.DW
27' - 11 1/2"+/-
R.D. R.D. construction documents to be removed, relocated or salvaged.
28' - 1"+/-
Do not scale drawings to establish quantities.
SIM. SLOPE 6. Remove all doors, frames and hardware in partitions shown to
E 1/4" / 12"
1/4 1/2"/FT OP be demolished. All items shall be made available to the owner if
"/ SL "/F T
12 SL
1/2 not indicated on the drawings for relocation or reinstallation. Items
SLOPE " 1/2 OPE which the owner does not wish to keep shall become the
1/2"/FT "/F
28' - 1"+/- T property of the contractor.
REMOVE (E) SOFFITS, CEILINGS, 28' - 8 1/2"+/- R.D
LIGHT FIXTS. AND DIFFUSERS - SEE . 7. Existing finishes to remain, unless noted otherwise. Protect
MECH./ELEC. FOR MODIFICATIONS SL 1/4" / 12" E from damage.
OP
TO THE CEILING FIXTS. IN THIS 1/2 OPE SL "/F T
SL "/FT
1/2
1/2
"/F
OP
AREA. - PATCH / REPAIR PERIMETER T 8. The Contractor shall coordinate and implement a safety and
E
WALLS AS REQ'D. FROM REMOVAL evacuation plan which all safety measures requested and
OF CEILINGS & WALLS 28' - 1"+/- required by the local fire marshal, health department, building
officials and other governing agencies having jurisdiction on the
27' - 11 1/2"+/- project.
R.D.
R.D. 9. The Contractor shall maintain the security of the building
throughout the entire construction schedule.
SIM.
10. The contractor shall maintain all existing exit ways and shall
E
OP SL not block exit paths. If an exit path must be blocked, an alternative
SL "/F T 1/2 OPE means of egress shall be provided as approved by the local
1/2 28' - 8 1/2"+/- "/F
T governing authorities having jurisdiction over the project.
11. The Contractor shall keep all exit ways free of stored
materials and construction debris at all times in order to give
occupants clear access to exit ways.
Main Level RCP Demo Overall Roof Demolition Plan of demolition from the passage of dust. Partition cover shall be of
finished and painted type "x" gypsum board on visible side.
1" = 20'-0" 1" = 20'-0"
C:\Users\rortiz\Desktop\Revit Local\15064 DPS Groff HS Ph 2 A15_BO.rvt
CHECKED BY:
JG/BS/BO/AMJ
JT
MAIN LEVEL DEMO REFLECTED
Bldg. A
DATE:
October 25, 2017 CEILING PLAN & ROOF DEMO PLAN
10/10/2017 5:41:57 PM
DATE:
AD2.0 OF:
272
2
CPT-1
WALL (BOTH SIDES)
Nurse SL3
Restroom 131 REMOVE (E) SIDELITE
133 R EF. AND INFILL CMU WALL
(V.I.F.)
1' - 7"
A2.2 - TOOTH INTO (E) Alcove
P.8 116AD
Stor. H1 MASONRY - PAINT
135A
Restroom H1 P.7 5 ENTIRE WALL(S)
5 131AA NEW H.M. DOOR AND
A2.3 Cots
3' - 4"
R AC FRAME - PT. -
±(V.I.F.)
H10 131A 1095A
3 1/4"
HARDWARE TO MATCH
1
.1 (E) DOOR 1095 (SIM.)
A5.3
t A1 Girls
ee 100C (E)
P.8 Sh 1.0 Gymnasium 1094
e tA 116
e
Sh
Mech REPLACE (E)
R DOOR IN NEW
110H
(E) H.M. FRAME - PT. 3' - 4" 3' - 0"
VCT-1
Alcove 4 1/2" (V.I.F.)
3 A1 Stair
100CA (V.I.F.)
B M
Elec Boys
Sheet A1.1 110HA Alcove 100D Vestibule
100M 100B
Sheet A1.0
N
BA
(E)
IG
Alcove AL
100DA Coach
Cust. DISCONNECT (E) FIRE ALARM Restroom 116AA
100G Women PANEL & RELOCATE. TACKABLE AE
5 100E WALL MAP TO REMAIN
108A
Girls Men
100J 100F
Sp. Ed. Severely
Boys
108
100H
DW
(E)CPT
Alcove
5A
3
18
AF
100HA Elev.
VC
Alcove 17
T-1
100JA A5.3
BB MB 8'
CP
NEW VCT
T -1
Corridor
100 1. Building B Main Level - Girls Locker Room Modifications
1/4" = 1'-0"
VC
Teacher Lounge CC
1"
T-1
101A -
2' A3.1
"
CP
Corridor -5
5'
T -1
Vestibule 100 3
5A
100K TB 4' xA2.4
EQ
MB 8' Classroom 4
BC 5" 5A
3 TB 4' 107
'-
18
IWB
EQ
NEW VCT PATCH & PAINT ENTIRE 3
(E)CPT VCT-1
7' - 10" WALL CORNER TO 5A
BD CORNER, FLOOR TO
CEILING MB 8'
5'
3' - 0"
-6
11
BD 10 AG
" 1
1/8
"
A5.4 5A3 -6
" (E)
'
TB 4' 2'
-1
-4 T-1
4' 18
CP
"
8' - 0"
MB 8'
PATCH & REPAIR (E) FINISHES DAMAGED FROM
Classroom RELOCATION OF THE OFFICE TO (N) BLDG. ADDITION Corridor
14' - 0"
125 - REPAINT ALL INT. WALLS W/ PT-1 & EXT. WALL W/ 102
Sp. Ed. ACCENT COLOR
6"
MB 8'
Classroom
AH
101C
MB 8'
TB 4'
AE
BB
A3.1
BE BE
Elec
General Plan Notes
102A Stor.
Classroom
103
105 A AJ 1. The Contractor shall field verify all dimensions before construction.
If there are any discrepancies, the Contractor shall notify the Architect
AF before proceeding with the construction.
13. At exterior metal stud walls w/ Brick Veneer, the face of the Brick
Classroom
Veneer overhangs the foundation by 1/2".
123 A3
14. Interactive white boards, projectors & projection screens are
BH BH furnished by owner. Contractor shall provide wood blocking in walls
Stor.
Stor. and ceilings for support.
122A
122B
AJ 15. Shaded areas of the floor plan are existing building to remain.
C:\Users\rortiz\Desktop\Revit Local\15064 DPS Groff HS Ph 2 A15_BO.rvt
A2
BB BB
A3.1 A3.1
Teacher Planning
122 AK A1 3 10/25/17 Record Drawings
A0.4 07/10/17 ASI #013
BJ BJ 04/25/17 PR #004
Alcove 09/30/16 For Construction Set
117B
08/12/16 100% CD's - Bldgs. B & D
07/29/16 95% CD's
Stair NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D
C
CHECKED BY:
JG/BS/BO/AMJ
JT
BLDG A MAIN LEVEL FLOOR PLAN,
DATE:
October 25, 2017 SCHEDULES, DETAILS & NOTES
10/10/2017 4:43:59 PM
DATE:
A1.0 OF:
272
0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 2 2.1 2.2 2.3 3 4 5 6 6.4 7 9
12' - 4 1/2" 5' - 3 1/2" 11' - 4" 106' - 0" 56' - 8"
M M
BB CC
A3.0 A3.0
12' - 10 3/8"
1199 27' - 11 1/2"
5 A 6 SP
EWCS - 15' - 5 7/8" 12' - 5 5/8" 11' - 5"
RE MECH
4A12
3' - 5"
E Unisex RR Table & Chair
A4.1 110E Storage 30.5° ±
2' - 10" 112A
Restroom Boys Shower
116AA1 116BB Restroom
SC-2 VCT-1
Boys Restroom 116BA1
116BC
I
5 A6 S
1198 11 5/8" 2 3/8"
14' - 4"
40' - 8"
40' - 8"
Unisex RR
5' - 4" 110F 9
20' - 5 1/2"
3' - 8"
PATCH, REPAIR & PT. (E)
WALL AFTER DEMOLITION
M.5 1197 M.5
3 Coach
A7.4 Alcove
116BA
116BD Staff Resource
2' - 0"
B C 6 5/8" 111
Sheet A1.4
2' - 8"
62' - 10 1/2"
13' - 4"
A4.9 A4.4
5' - 0"
3' - 7 1/2"
Sheet A1.1 F
W41
Boys Locker Room 12
A4.1 Bleachers 116B 24.1° ±
13
BL1 FEC SIM A5.5
1/2" A E D Security
10' - 7 1/2" 2' - 8"
1/2"
VCT-1
TOOTH-IN (N) CMU A4.5 A4.0 A4.0 110G REFER TO SHT. A8.0 FOR
M.9 14 BOLLARD - PT. TYP. @ SIDE
4 1/2"
WORK POINTS FOR RADII OF
7 5/8"
Typ. WALL INFILL
1' - 0" EA. OF EXT. DOORS- TYP.
4' - 6 1/2"
5A6 SI
1/2"
(E)
VCT-2
AC2.0 W37 10" 6' - 0" 10" COLUMNS TANGENT TO THE
N N
3' - 9 1/2"
CANOPY
VCT-2
FEC
6"
6' - 4" (V.I.F.)
4' - 1 1/2"
RBF-1 VCT-2
6"
10' - 2 1/2"
3' - 0"
1196
11 1/4"
Stair A2.3
9' - 8 1/2"
9' - 8 1/2"
3 Gym Stor. G Gym Stor. F 6 PRE-ENG. MTL. STAIRS W/ CONC. TREADS,
1' - 8 1/2"
Waiting G
4' - 7 1/2"
116D A4.0 116C A4.0 UP 1 1/2" DIA. STL. PIPE HANDRAIL (PT.) - &
2' - 0"
1159 1161 CUH W/ CONCEALED 110C A 1192 1194
2 FEC A5.12 3'-6" H. STL. SQ. PIPE GUARDRAIL W/ 1/2" 2
A4.8
4A8
A2.2 PIPING IN ADJACENT X 1/2" STL. PICKETS (PT.) - PT. ALL C P.3
16' - 1"
(E)
(E)
CPT-1
W35 W51 LOW WALL (TYP.) - EXPOSED STL. FRMG AT STAIR AND FLOOR A5.6 A4.0
W49 W28
RE: MECH. EDGE (TYP)
1' - 0"
P P
VCT-2
VCT-6
7 5/8"
Vestibule 1195 2
VCT-2
1' - 0"
1158 1160 EXISTING DESK TO BE MODIFIED
AA 148A 8" 1 2' - 5" A5.5
& REPAIRED FOR RELOCATION
P.4 AA
5C3 6 1/2"
A3.0 5C3 16' - 0" 3' - 4" 5' - 6" TO NEW RECEPTION AREA A3.0
CPT-2A VCT-2 A5.6 1191 1193
11' - 8"
12' - 0"
12' - 0"
1' - 0" 1' - 9 1/2" Vestibule
CLR.
PROVIDE HORIZ. LOUVER BLINDS @ 1' - 0" 3 3/4" 7 5/8" Corridor 75.6° ±
12' - 0"
Corridor VCT-2 VCT-6
VCT-6
4' - 10 5/8"
INT. GLAZING - INDICATED BY VCT-6 VCT-2 5 1/8" 130 A5.4 DEDICATION PLAQUE LOCATION - 110A P.5
5A6 SI
130
1' - 6 3/8"
5A6 SI
3' - 1 3/8"
SEE 2/A5.6
1' - 8 3/4"
DASHED LINE (TYP. @ ART ROOMS) A5.7 A2.2
11 1/2"
3' - 1 3/8"
3 5/8"
13 1
3' - 3 7/8"
4' - 7 5/8"
1' - 6"
6' - 4"
CPT-1 VCT-2
VCT-2
A5.7
CPT-1
VCT-2
4' - 10 3/8"
4' - 0"
5C3 W39 2 VCT-6 CPT-1 5C3
5A6 SI H5 6 SI
H5 5A
FINISH ABBREVIATIONS
1
5A6 I
P.2 H5 P.2
1' - 4"
5' - 10"
VCT-1
7' - 0 1/2" 3' - 8" 1' - 0 3/4"
CPT-1
5A6 SI
1' - 3 1/8"
1168 EWCS -
3"
5A6 SI
5A6 SI 1 1/2" H6
2' - 7"
H5
11 1/2"
1/2" 5A6 SI RE MECH H5 5A6 SI H5 8' - 0" 8' - 8" 5' - 2 1/2" 12' - 5 1/2" 4' - 0"
9"
9' - 3 1/2" 5A6 SI 5A6 SI H5
VCT-2
4' - 0" H5 ATC ACOUSTICAL TILE CEILING
5A6 SI
2" H5 8 7/8"
VCT-2
5A6 SI
4' - 3 1/2" CPT CARPET
VCT-2
1163 4' - 0" 12 23 W30
5A6 SI
4' - 0" Corridor 4' - 8 1/2" A 3
2"X2"X3 1/2' STL TUBE 1' - 0" 4' - 0" 1' - 0 7/8" CMT CERAMIC MOSAIC TILE
VCT-2
A6.2
5A3 SI
31 8" ALIGN WALLS AT 4' - 2" A5.4
5A6 SI
- 0" 2' - 0" 110 A4.9 A2.3
BOLLARD - PT. TYP. @ P.3 H5 5A3 SP 4' - 1 3/4" 4' 2' - 0" CWT CERAMIC WALL TILE
VCT-1
SIDE EA. OF EXT. A5.3 TB 4' 4' - 8 1/2" 9' - 6" 1' - 0" 9' - 6" 12' - 3 1/2" 6' - 11" 12' - 9" 10' - 0" 7' - 1" 7' - 4" 4' - 0" 14' - 8" EXP EXPOSED TO STRUCTURE
4' - 4"
4' - 6"
POCKET DIMS. W/
5' - 5 1/4"
24' - 0"
5A6 SI 4' - 0" 27
CPT-1
DOORS- TYP. 4' - 0" PART. MANURF. Office Office Office 20 SL3 11" FAB FABRIC
5A3 S
5A3 S
A5.3 2' - 1" CUH W/ CONCEALED
5A3 S
11' - 8 1/8"
8" 4' - 0" 3' - 6"
S
FE FINISHED END
2' - 2"
4' - 4" 1' - 0" 1164A 5C3 138 137 136 Work Room PIPING IN ADJACENT LOW
H7 1' - 5 1/2" A5.5 A2.2
5A3
77' - 9 1/2"
24' - 0"
P.4 4' - 0" 4' - 0" 3' - 9 1/2" A5.3 134 1 GYP BD GYPSUM BOARD
4' - 0" Kiln WALL (TYP.) - RE: MECH.
4' - 7 1/4"
4' - 7 1/2"
74' - 0"
1' - 6" 1' - 5 3/8" MB 8' MB 8'
P.LAM.
Hall
1' - 7 7/8" MB 8' CPT-1 VCT-1 PROVIDE HORIZ. DPS PLAQUE & TIME
5A3 144 Reception RB RUBBER BASE
SL3 SL3
13' - 2 1/2"
2' - 10"
VCT VINYL COMPOSITION TILE
4' - 10 5/8"
34' - 7"
148 105° 6' - 4" 3' - 8" 6' - 4" 2' - 6" 6' - 4" 3' - 4" 9' - 0" BY DASHED LINE (TYP.
5' - 3 3/4"
Classroom MB 8'
8' - 2"
VCT-6 CPT-1
5A6 SI
W40 3D Art 5A3 SI SC SEALED CONCRETE
MB 8' 2' - 4" 8" Hall 8" 2' - 6" @ OFFICE AREAS)
1' - 10"
147 11"6' - 4"
1' - 7"
SOS SOLID SURFACE
CPT-1
146 3" 6' - 4" 132
5A6 SI
CPT-1
A5.3
5A6 SI
5C3 1186 SS STAINLESS STEEL
2 1/2"
5A3 S
28 2' - 0" 26 3" REPLACE VCT
IWB IWB 4' - 7 TS TACK SURFACE
Sh A5.3 6' - 1" 1' - 5" 25 MB 8' 1/4" 24 1 FLOORING & BASE
CMT 1
TB 4'
3"
3"
Sh ee 30 SL3 SL3 SL3 A5.3
VCT-1
1185 SL3 AT CORRIDOR
P.7 P.7
ee t A1
3' - 3 1/4"
29 Nurse
General Plan Notes
.1
5A3 S
5A3 S
3' - 0"
2' - 3 1/2"
5A3 S
TB 4'
A1
131
2 1/2"
t A .1
4 1/2"
5A3 S 12' - 3 3/4" 12' - 4 3/8"
7' - 11 1/2"
7' - 11 1/2"
7' - 11 1/2"
7' - 11 1/2"
H1 0
1.
1' - 10"
2"
1. H1
7' - 4"
Stor
t
5A3 S
ee
10"
15' - 2"
2 D MB 8' TB 4' Restroom REF.
A
5A3 S
146B
et
1169
Sh
MB 8' MB 8' 5A6
5A3
Conf.
1' - 4"
1' - 4"
A4.1 A5.4 A5.3 MARKER SURF & 133 1189 Cots
1166
5C3 PROJ. SCREEN
4' - 7 3/4" 5C3 Office 135 Restroom 131A W19 he 1. The Contractor shall field verify all dimensions before construction.
1170 1175 Elec 139 MB 8' 131AA S If there are any discrepancies, the Contractor shall notify the Architect
S
IWB-2
8"
2' - 4"
1 32 1' - 6 1/2" 132A Stor.
P.8 P.8
5C3
before proceeding with the construction.
3' - 4"
1182 135A
3' - 4" 5C6 105°
4' - 8"
12' - 1 1/2" 26' - 0 1/2" 10' - 11 1/2" 17' - 1" 8' - 1" 3' - 4" 31' - 3" 7' - 4" 6' - 10" 6' - 8" 14' - 5" 12' - 6 7/8"
4' - 8"
5C6 S 27' - 5 1/2"
3"
4' - 8"
Stair 10 1
4' - 8"
4' - 8"
/2" 5A6 S Hall 5C6 S 2' - 0 1/2" V.I.F. 2. All dimensions on the drawings are to the face of studs and
5C3
4' - 8"
2' - 8"
1' - 3"
D TB 4' 11" 3' - 10" 5 CMT 1 VCT-1 1190
5A6 S 132 foundation walls, unless noted otherwise.
4 1/2"
A2.3
R I R
3 1165 1171 1172 1181
1173
5C 1 3. See Reflected Ceiling Plans and Code Plans for locations of fire-
1' - 3"
A7.1 1 5' - A5 5A6 S SL3 SL3 SL3 5A6 S
1 1/ rated walls.
5A3 S
F 2" 4A8 A5 75°
1' - 6"
" 141 4. The Contractor shall coordinate and implement all safety measures
149E Mech 100M
14' - 0"
14' - 0"
Mech Office requested and required by the local Fire Marshal, Health Department,
SC
15' - 0"
1147 110H
15' - 2"
15' - 2"
1 2' - 2"X2"X3 1/2' STL TUBE CC A H
148B 140 Building Officials and other governing agencies.
5A3 S
-1
1157
5A3 S
Sh 0" Office Office
VCT-1
BOLLARD - PT. TYP. @ A3.0 A4.1 A4.0
CA eet 1148 4A 8 SIDE EA. OF EXT. 143 142
A1
4A8
Shee t A1.1
W27
1' - 0"
1149
(E)
19' - 6" 11' - 0" 11' - 0" 11' - 2"
8" ±
CHASE FOR ROOF MECH. level shall be provided with 2" slip joint (minimum), unless noted
DRAIN LEADER- TYP.
S 1150 Elec S otherwise.
2 1' -
110HA
4' - 4
1' - 0
1' - 0"
1111 AND LOCATION W/ Cust. 7. Slope the concrete floor slab to all floor drains at a minimum of 1/8”
Cust. MECH. A5 100G
1
t A1.
3 per foot.
Shee PROVIDE HORIZ. LOUVER BLINDS
Shee
149A
t BB
She A1.1
10 1 C B @ INT. GLAZING - INDICATED BY
A2.2
/2" 1 3' -
et A1 A4.1 A3.0 A4.1 DASHED LINE (TYP. @ OFFICE 1.0 8. The Contractor shall coordinate all items provided and/or installed by
et A
4"
4"
E .3 AREAS)
S he the Owner and/or Owner's subcontractors during construction.
0"
2' - 0"
C1 2 0' -
5 1/
149C to review all of the drawings, including the architectural drawings for
2" 2' - 8" 6' - 0" 2' - 8" 6' - 0" 2' - 8"2' - 8" 6' - 0" 4' - 8" 30' - 0" 6' - 0" 3' - 4" 6' - 0"
work under their respective contracts. No extras will be allowed for
6' - 0" 4"
1' - 4" work shown in any part of these drawings, or described in any part of
C2 the specifications.
12' - 4 1/2" 16' - 7 1/2" 1' - 8" 17' - 4" 18' - 0" 17' - 4" 17' - 4" 17' - 4" 17' - 0" 18' - 0" 18' - 0" 19' - 8" 17' - 1" 8' - 8" 4' - 8 1/2" 5' - 3"
10. Provide blocking at all wall hung accessories, hardware and wall-
223' - 0 1/2" 1' - 0" 11" hung cabinets where required.
C3
11. Provide a transition strip at all dissimilar floor materials.
0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 2 2.1 2.2 2.3 3 4 5 6 6.4 7
N 12. Do not scale drawings.
Building B Main Level Floor Plan Office Wing Finish Floor Elevation:100' - 0" 13. At exterior metal stud walls w/ Brick Veneer, the face of the Brick
Veneer overhangs the foundation by 1/2".
1/8" = 1'-0"
MAIN LEVEL DOOR AND FRAME SCHEDULE - BUILDING B ROOM FINISH SCHEDULE MAIN LEVEL - BUILDING B
14. Interactive white boards, projectors & projection screens are
furnished by owner. Contractor shall provide wood blocking in walls
and ceilings for support.
DOOR DOOR FRAME DETAIL FIRE HDWR ROOM FLOOR WALL FINISH
NO. S /PR WIDTH HEIGHT THICKNESS TYPE MAT'L TYPE MAT'L HEAD JAMB SILL RATING GROUP REMARKS NO. ROOM NAME MAT'L BASE MAT'L NORTH EAST SOUTH WEST CEILING MAT'L / FINISH CEILING HEIGHT REMARKS 15. Shaded areas of the floor plan are existing building to remain.
1147 PR 6' - 0" 7' - 0" 1 3/4" F HM S4 HM 4/A6.2 5/A6.2 - - 325 110 Corridor VCT RB (E)GYP BD/PT (N)GYP BD/PT --- (N)GYP BD/PT EXP/PT; SUSP 2x2 ATC Varies see RCP Install 4' high high impact gyp. bd. and SS corner guards at gyp. bd. walls
1148 S 3' - 0" 7' - 0" 1 3/4" F HM S4 HM 4/A6.2 5/A6.2 - - 320 110A Vestibule CPT-2 RB (E)MAS&GYP BD/PT (N)GYP BD/PT (N)GYP BD/PT (N)GYP BD/PT GYP BD/PT - Paint Gyp. Bd. Only
1149
1150
S
S
4' - 0"
4' - 0"
7' - 0"
7' - 0"
1 3/4"
1 3/4"
F
F
HM
HM
S4
S4
HM
HM
6/A6.2
6/A6.2
7/A6.2
7/A6.2
8/A6.2
8/A6.2
-
-
240.1
240
110C
130
Waiting
Corridor
CPT, VCT
VCT
RB
RB
(E)MAS&GYP BD/PT
(E)MAS
-
---
-
GYP BD/ PT
(N) CMU/PT
---
EXP TO STAIR
EXP/PT, GYP BD/PT, 2x2 ATC
-
Varies see RCP Install 4' high high impact gyp. bd. and SS corner guards at gyp. bd. walls
LEGEND
1156 S 6' - 4" 9' - 4" 1' - 2" FD STL F/A4.2 1/A7.1 F/A4.2 45 MIN 900 Accordion fire door with std. manuf. trim, track, hardware, panic egress & battery back-up power 130A Reception CPT RB --- --- GYP BD /PT GYP BD/PT 2x2 ATC 10'-8" Install 4' high high impact gyp. bd. and SS corner guards at gyp. bd. walls.
1157 S 6' - 4" 9' - 4" 1' - 2" FD STL F/A4.2 1/A7.1 F/A4.2 45 MIN 900 Accordion fire door with std. manuf. trim, track, hardware, panic egress & battery back-up power 131 Nurse VCT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 11' - 6" Cabinets to be PL-2, Counter PL-3
EXISTING WALLS TO REMAIN
1158 PR 6' - 0" 7' - 2" 1 3/4" G HM S2 HM 21/A6.3 4/A6.3 8/A6.2 - 205 131A Cots VCT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 9' - 0" Relocate (E) curtains & track IF feasible
1159 PR 6' - 0" 7' - 2" 1 3/4" G HM S2 HM 21/A6.3 4/A6.3 8/A6.2 - 205.1 131AA Restroom CMT CMT GYP BD/PT, CWT GYP BD/PT GYP BD/PT, CWT GYP BD/PT, CWT GYP BD/PT 9' - 0"
1160 PR 6' - 0" 7' - 2" 1 3/4" G HM S2 HM 21/A6.3 4/A6.3 - - 245 132 Hall CPT RB GYP BD/PT GYP BD/PT GYP BD/ PT GYP BD/PT 2x2 ATC 9' - 0" Install 4' high high impact gyp. bd. and SS corner guards at gyp. bd. walls
1161 PR 6' - 0" 7' - 2" 1 3/4" G HM S2 HM 21/A6.3 4/A6.3 - - 245 132A Elec CPT RB GYP BD/PT CMU, GYP BD/PT CMU, GYP BD/PT CMU, GYP BD/PT EXP /PT-1 9' -6" N EXISTING BUILDING TO REMAIN
1162 S 4' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 - - 510 133 Restroom CMT CMT GYP BD/PT, CWT GYP BD/PT, CWT GYP BD/PT, CWT GYP BD/PT GYP BD/PT 9' - 0" KEY PLAN
1163 S 4' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 - - 510 134 Work Room CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 9' -6" Cabinets to be PL-1, Counter PL-3
1164 S 3' - 0" 7' - 0" 1 3/4" F HM S2 HM 18/A6.4 19/A6.4 - - 520.2 135 Conf. CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0"
1164A S 3' - 0" 7' - 0" 1 3/4" F HM S2 HM 18/A6.4 19/A6.4 - - 520.2 135A Stor. VCT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT EXP /PT-1 10' - 0"
10/25/17 Record Drawings
C:\Users\rortiz\Desktop\Revit Local\15064 DPS Groff HS Ph 2 A15_BO.rvt
1165 S 4' - 0" 7' - 0" 1 3/4" G HM H11 HM 9/A6.2 10/A6.2 8/A6.2 - 240 136 Office CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 9' -6"
1166 S 3' - 0" 7' - 0" 1 3/4" F HM S2 HM 18/A6.4 19/A6.4 - - 520.2 137 Office CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 9' -6" 09/20/17 PR#008
1167 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 - - 510.1 138 Office CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 9' - 6"
1168 S 34' - 0" 10' - 0" 4" MP-2 STL 2/A7.1 - - - 905 Folding partition w/ std. manuf. trim, track, hardware & egress door. See Sheet A5.0 (MP-2) 139 Office CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 9' - 6" 05/24/17 ASI #011
1169 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 - - 510.2 Provide horizontal louver blinds 140 Office CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 9' -6" 03/01/17 PR #003
1170 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 - - 510.1 141 Office CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 9' - 6" 02/27/17 ASI #010
1171 S 3' - 0" 7' - 0" 1 3/4" G WD SL3 HM 18/A6.4 19/A6.4 - - 510.3 Provide horizontal louver blinds 142 Office CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 9' -6"
1172 S 3' - 0" 7' - 0" 1 3/4" G WD SL3 HM 18/A6.4 19/A6.4 - - 510.3 Provide horizontal louver blinds 143 Office CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 9' -6"
12/02/16 ASI #008
1173 S 3' - 0" 7' - 0" 1 3/4" G WD SL3 HM 18/A6.4 19/A6.4 - - 510.3 Provide horizontal louver blinds 144 Hall VCT RB GYP BD/PT GYP BD/PT GYP BD/ PT CMU, GYP BD/PT 2x2 ATC 9' - 0" Install 4' high high impact gyp. bd. and SS corner guards at gyp. bd. walls. 09/30/16 For Construction Set
1174 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 - - 510.3 Provide horizontal louver blinds 145 Comm. Rm. CPT, VCT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x2 ATC 9' - 0" Ceiling Slopes; Cabinets to be PL-1, Counter PL-3 08/12/16 100% CD's - Bldgs. B & D
1175 S 3' - 0" 7' - 0" 1 3/4" F WD S2 HM 18/A6.4 19/A6.4 - - 520.2 146 3D Art VCT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0" Cabinets to be PL-1, Counter PL-3
1176 S 3' - 0" 7' - 0" 1 3/4" G WD SL3 HM 18/A6.4 19/A6.4 - - 510.3 Provide horizontal louver blinds 146A Kiln VCT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 8' - 6" Cabinets to be PL-2 (without sculpted finish)
07/29/16 95% CD's
1177 S 3' - 0" 7' - 0" 1 3/4" G WD SL3 HM 18/A6.4 19/A6.4 - - 510.3 Provide horizontal louver blinds 146B Stor VCT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 8' - 6" Cabinets to be PL-2 (without sculpted finish) 06/17/16 Bldgs. B & D Design Development Package
1178 S 3' - 0" 7' - 0" 1 3/4" G WD SL3 HM 18/A6.4 19/A6.4 - - 510.3 Provide horizontal louver blinds 147 Classroom VCT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0" Cabinets to be PL-2, Counter PL-3
NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D
1179 S 3' - 0" 7' - 0" 1 3/4" G WD SL3 HM 18/A6.4 19/A6.4 - - 510.4 Provide horizontal louver blinds 148 Corridor VCT RB --- MAS, GYP BD/PT MAS, GYP BD/PT MAS, GYP BD/PT EXP/PT; SUSP 2x2 ATC Varies see RCP Install 4' high high impact gyp. bd. and SS corner guards at gyp. bd. walls
1195 S 3' - 0" 7' - 0" 1 3/4" F HM S2 HM 4/A6.2 5/A6.2 - 60 MIN 615 APPROVED CONTRACT DOCUMENT SCALE:
AS NOTED
1196 S 3' - 0" 7' - 0" 1 3/4" F HM S4 HM 4/A6.2 5/A6.2 - - 605
SHEET:
Door Notes: c 2017 Eidos Architects DWG. NO.
5. Provide power to all doors with magnetic hold open devices, card readers, & AI Phones. Coordinate the work with Electrical.
1. All doors shall be provided with floor or wall stops. 6. Coordinate with mechanical for doors with louvers. 96
2. All doors that do not have smoke seals shall be provided with silencers.
3. Refer to section 087100 in the Project Manual for the door hardware schedule.
4. All door, frame types and details are shown on the sheets A5.0 & A6.0.
7. All exterior Hollow Metal doors and frames shall be prepped for card access. Coordinate w/ Electrical.
8. All door fire ratings are to be a minimum rating.
DATE:
A1.1 OF:
272
MAIN LEVEL DOOR AND FRAME SCHEDULE - BUILDING C (NORTH)
DOOR DOOR FRAME DETAIL FIRE HDWR
NO. S /PR WIDTH HEIGHT THICKNESS TYPE MATERIAL TYPE MATERIAL HEAD JAMB SILL RATING GROUP REMARKS
DK DJ BB DH DG CC DF DE DD DC DB DA
A3.1 A3.1 1113 PR 6' - 0" 7' - 2" 1 3/4" G HM S2 HM 21/A6.3 4/A6.3 8/A6.2 SIM. --- 205
152' - 7 1/2" 1127 S 3' - 0" 7' - 0" 1 3/4" F WD S4 HM 4/A6.2 5/A6.2 --- 545
8" 12' - 0" 17' - 4" 14' - 7" 29' - 10" 14' - 10" 24' - 0 1/2" 5' - 3 1/2" 13' - 4" 20' - 8 1/2" 1128 S 3' - 0" 7' - 0" 1 3/4" F WD S4 HM 4/A6.2 5/A6.2 --- 545
8" 3' - 1 1/2" 1129 S 3' - 0" 7' - 0" 1 3/4" F WD S4 HM 4/A6.2 5/A6.2 --- 800
6' - 7 1/2" 6' - 0" 4' - 0" 6' - 0" 6' - 8 1/2" 14' - 7" 26' - 8 1/2" 10' - 3" 3' - 11" 6' - 8 1/2" 6' - 0" 4' - 0" 6' - 0" 5' - 3 1/2" 13' - 4" 20' - 8 1/2"
1130 S 3' - 0" 7' - 0" 1 3/4" F WD S4 HM 4/A6.2 5/A6.2 --- 800
8" 1' - 4"
SIM SIM 1131 PR 6' - 0" 7' - 0" 1 3/4" G HM SL2 HM 23/A6.4 21/A6.4 --- 245
D C
A2.0 1132 PR 6' - 0" 7' - 2" 1 3/4" G HM S2 HM 21/A6.3 4/A6.3 8/A6.2 SIM. --- 205
4' - 1"
10"
SIM
10"
A4.2 A4.2 B
W5 1134 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 -- 510
O.H. 3 A4.2
D7 SIM
D7 1135 S 3' - 0" 7' - 0" 1 3/4" F WD S2 HM 18/A6.4 19/A6.4 -- 545
A 1136 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 -- 510
4' - 8"
4' - 8"
4' - 8"
4' - 8"
4' - 8"
4' - 8"
A5 A6 W6 5C3 A4.2 A6 A5 1137 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 -- 510
5C3
1138 S 3' - 0" 7' - 0" 1 3/4" F HM S2 HM 18/A6.4 19/A6.4 --- 615
D6 D6
1139 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 --- 510
3' - 8 1/2"
7' - 3 1/2"
12' - 0" 8' - 5" 2' - 8" 6' - 3" 13' - 5" 3" 9' - 9" 5' - 2" 5' - 9" 8' - 11" 5' - 7" 7' - 10" TB 4' 17' - 3" 3' - 1" 13' - 4" 1140 S 3' - 0" 7' - 0" 1 3/4" F WD S2 HM 18/A6.4 19/A6.4 S 520.2
5 OH 1' - 2" 3" 1141 S 3' - 0" 7' - 0" 1 3/4" F WD S2 HM 18/A6.4 19/A6.4 S 520.2
TB 4' 1' - 2"
1142 PR 6' - 0" 7' - 2" 1 3/4" G HM S2 HM 7/A6.4 8/A6.4 8/A6.2 SIM. --- 205
9' - 1"
5C3 MB 8' MB 8' 5' - 3 1/2"
A5.1 1143 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 -- 510
1141
MB 8'
18' - 0"
18' - 0"
18' - 0"
18' - 0"
18' - 0"
1144 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 -- 510
MB 8'
O.H.
5A3 S
1145 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM --- 400
6' - 0"
7' - 7"
Door Notes: 5. Provide power to all doors with magnetic hold open devices, card readers, & AI Phones. Coordinate the work with Electrical.
CPT-1 VCT-1 IWB Sp. Ed. Severely LINE OF 1. All doors shall be provided with floor or wall stops.
5A3 6. Coordinate with mechanical for doors with louvers.
Teacher Planning Classroom
1' - 4"
Classroom 165
4' - 0"
SUNSHADE 2. All doors that do not have smoke seals shall be provided with silencers.
5A3 S
162 A5.1 5A3 163 164 7. All exterior Hollow Metal doors and frames shall be prepped for card access. Coordinate w/ Electrical.
5' - 6"
MB 8' IWB W25 DEVICES 3. Refer to section 087100 in the Project Manual for the door hardware schedule.
4 CPT-1 CMT 1 1135 8. All door fire ratings are to be a minimum rating.
ABOVE TYP. 4. All door, frame types and details are shown on the sheets A5.0 & A6.0.
D5 Restroom D5
4' - 7 1/2"
MB 8' SIM
5' - 3 1/2"
2' - 11"
6' - 0"
5A3 S
A6 165A E
3' - 9 1/2"
A5.1
5' - 7 1/2"
A4.3
9' - 6 1/2"
9' - 6 1/2"
CUH - RE: MECH.,
5A3
5A3
CONCEAL PIPES
SIM TO UNIT
15' - 11 1/2"
A 13 5A3 MB 8'
1' - 11"
1140 MB 8' 2"X2"X3 1/2' STL
A6.4 A5.1 MB 8' 5A3
5A3
2' - 2"
A4.3
2' - 2"
CPT-2A CPT-2B
6' - 4"
TUBE BOLLARD -
15' - 11 1/2"
15' - 6" 6' - 5 1/2" 5A3 TB 4' TB 4' 5A3 5A3 1134 CPT-1 VCT-1 1132
8' - 5"
10' - 4"
SIM6 3' - 0"
4' - 2"
5C3 Vestibule EA. OF EXT.
ROOM FINISH SCHEDULE MAIN LEVEL - BUILDING C (NORTH)
3' - 5"
5 5C3 S 5A3
2' - 0"
70' - 5"
5A6 SI
TB 4'
CPT-1
TB 4'
2' - 3"
1' - 8"
MB 8' 1139 5A3 Elec 1
162A 5C3 S TB 4'
4' - 4"
4' - 3"
O.H. 5A6 SI 158A MB 8' W9
2' - 8"
1137 5A6 SI 1136 A5.9 WALL FINISH
CMT 1
VCT-1 CPT-2A
5A6 FLOOR BASE CEILING
VCT-1
5A6 SI 1131
8"
MAT'L MAT'L HEIGHT
VCT-1
5A6 SI TB 4' ROOM NO. ROOM NAME NORTH EAST SOUTH WEST CEILING MAT'L / FINISH REMARKS
D4 (7) 2 TIER LOCKERS D4
(18) 2 TIER 5A6 5C3 SI
VCT-1
3' - 0"
1' - 0"
5A6 SI
1' - 6"
(4) 2 TIER 5C3 P 5' - 4" 5A6 SI
4"
4"
4"
CUH, RE: MECH., LOCKERS 149 Corridor North CPT, VCT RB CMU, GYP BD/PT CMU/PT - CMU, GYP BD/PT EXP/PT; SUSP 2x2 Varies see Refer to plans for locations of carpet. Refer to Elevations for locations of
1142 1138
4A8
O.H. LOCKERS ECWS - RE: MECH. 5A3 SI O.H.
CPT-1
CONCEAL PIPES TO UNIT 5A3 SI CEILING RCP wall tile at EWC. Install 4' - 0" high hi-impact Gyp. Bd & SS Corner Guards
8' - 5"
AA 3 AA
@ Gyp. Bd. walls
8' - 5"
A3.1 A3.1
11' - 4"
8' - 9"
84' - 3"
8' - 5"
CPT-2A VCT-1 Corridor
1' - 6"
A5.10 149E Alcove VCT RB CMU/PT CMU/PT - CMU/PT EXP/PT -
10' - 6"
10' - 6"
3' - 0 1/2"
1' - 6"
VCT-5
158
4A8
10' - 6"
1130
1' - 6"
(19) 2 TIER
1' - 9"
1145 5A3 5C3 149F Men CMT CMT CMU/ PT&CWT CMU/ PT&CWT CMU/PT CMU/ PT&CWT GYP BD/PT 9' - 0"
OH
3"
VCT-1
Girls 149G Women CMT CMT CMU/PT CMU/ PT&CWT CMU/ PT&CWT CMU/ PT&CWT GYP BD/PT 9' - 0"
O.H. Min. 1144
CMT
B 149J
149H Boys CMT CMT CMU/ PT&CWT CMU/ PT&CWT CMU/ PT&CWT CMU/ PT&CWT GYP BD/PT 10' - 0" Flooring to have a pattern incorporating up to four colors and various tile
D3 D3
RBF CPT-2A
VCT-1
VCT-5
OH
CPT-1
FEC TB 4' TB 4' TB 4' TB 4' MB 8' IWB MB 8' 6
5' - 3 1/2"
4A8
VCT-1
2"
5A6 SI 149J Girls CMT CMT CMU/ PT&CWT CMU/ PT&CWT CMU/ PT&CWT CMU/ PT&CWT GYP BD/PT 10' - 0" Flooring to have a pattern incorporating up to four colors and various tile
5C3 SI 5C3 SI A5.10
2' - 7"
sizes
TACKABLE WALL
2' - 8"
5
4"
5A3 CPT-1
CPT-1
VCT-1
5A3
4A8
5A3 SI 1143 149K Vestibule CPT-2 RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 11' - 6" Install 4' - 0" high hi-impact Gyp. Bd. & SS Corner Guards @ Gyp. Bd.
5A6 SI
O.H. O.H.
14' - 0 1/2"
14' - 9 1/2"
A A 5A3 SI 4A8 walls
17 4B4 A2.0
1' - 7"
A4.6 A4.6 6 5/8" 5A3 SI 158 Corridor CPT, VCT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x2 ACT 10' - 0" Refer to plans for locations of carpet. Refer to Elevations for locations of
CMT 1
A5.1 2
11"
10' - 4A8
Boys
5A6 SI
5A6 SI
20' - 5 1/2"
20' - 5 1/2"
MB 8' wall tile at EWC. Install 4' - 0" high hi-impact Gyp. Bd & SS Corner Guards
W3 MB 8' MB 8' TB 4' 1129 149H
@ Gyp. Bd. walls
3' - 4" 1' - 5 1/2" 2' - 4 1/2" 158A Elec SC RB GYP BD/ TAPED GYP BD/ TAPED GYP BD/ TAPED GYP BD/ TAPED EXP - PT. - Coordinate locs. w/ Elec.for CDX plywood behind panels
15' - 10"
1' - 2" 4' - 4 1/2"
Sheet A1.1
Sheet A1.2
12' - 0" 8" 16' - 8" 5' - 2" 5' - 8" 15' - 8" 5' - 2" 5' - 8" 8' - 0" 6' - 4" 24' - 0 1/2" 11' - 10 1/2" 5' - 0" 7' - 0" 159 Classroom CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0" Cabinets to be PL-1
2' - 7" 6" 3" 8"
160 Classroom CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0" Cabinets to be PL-1
17' - 8 1/2"
4A8
RAIL FOR CANE 5A6 SI O.H. 161 Classroom CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 9' -6" Cabinets to be PL-1
Classroom Classroom
5' - 3"
Classroom 1146 1
5' - 11"
DETECTION UNDER
5A3 S
Stair IWB 161 IWB 160 1128 162 Teacher Planning CPT, VCT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0" Cabinets to be PL-2, Counter PL-3
0.8
1' - 2"
STAIR - PT. 5C6 159 CPT-1 VCT-1 A4.7
CMT 1 Women
5' - 4"
F VCT-1 162A Stor. CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0"
3' - 5"
149G 4A8 Stair
D D 162B Stor. CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0"
3' - 9"
D2 1128 D2
A4.1 163 Classroom CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0" Cabinets to be PL-1
MB 8' MB 8' 5C3 I
4' - 5"
4A8
5C6
W13 MB 8' Sim 4A8 Sim 164 Classroom CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0" Cabinets to be PL-1
A A 165 Sp. Ed. Severely CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0" Install 4'-0" high hi-impact gyp. bd. around room; Cabinets to be PL-2,
MB 8' A4.7 A4.7 Counter PL-3
2' - 1 1/2"
CHASE FOR ROOF
12' - 2"
5C3 I
11' - 2 1/2"
5A6 SI
13' - 4"
13' - 4"
DRAIN LEADER - TYP 165A Restroom CMT CMT CMU/ PT&CWT CMU/ PT&CWT CMU/ PT&CWT CMU/ PT&CWT W.R. GYP BD/PT 10' - 0" Tile Waincot shall be 6'-8" min. Ht.
13' - 4"
14' - 8"
LINE OF 45°
O.H. MB 8' COORDINATE SIZE AND Alcove D Stair RBF RB CMU/PT CMU/PT - CMU/PT 2x2 ATC @ upper Level 11' - 0" Exposed to underside of painted stair structure at lower level.
SUNSHADE B 4B4
4A8
LOCATION W/MECH.
5A3 S
149E
8' - 0"
DEVICES A4.6 EQ EQ EQ EQ Men F Stair RBF RB - GYP BD/PT GYP BD/PT GYP BD/PT 2x2 ATC @ upper Level 11' - 0" Exposed to painted underside of stair structure at lower level; Install 4'-0"
1' - 4"
1' - 4"
149F high hi-impact Gyp. Bd. & SS Corner Guards @ Gyp Bd walls
1' - 4"
ABOVE TYP. A5 5C3
5C3 TB 4' TB 4' VCT-1 CMT 1 Room Finish Notes:
5C3 A6 A5 A5 A6
1127 1. The Contractor shall verify the condition of the concrete floor slab and provide the appropriate floor preparation for the
Shee
5C3
D1 D1
CMT 1 RBF
installation of flooring materials.
75° 2. Install 4'-0" high hi-impact gyp. bd. in corridors where there are no lockers or plastic laminate wainscot (typ.).
t A1.
1' - 4"
1' - 4"
3. Install corner guards on the outside corners of all gyp. bd. walls (typ.) in corridors & high traffic areas.
1' - 4"
1' - 4"
BB LINE OF A5 4A8
1' - 4"
SIM 4. Corridor flooring shall have a pattern, incorporating six different colors.
TB 4'
2
SUNSHADE B SIM 5. Refer to Interior Elevations for details of tackable wall panels in the corridors.
1' - 2"
A3.1 8' - 10" 13' - 4" F
DEVICES A4.3 C CC 1157 6. Refer to A9 Drawing Sheets for Color and Finish information.
O.H. 1156 A4.2
ABOVE TYP. A4.3 A3.1 1' - 6 1/2"
B
DC DB
1 8' -
6' - 8" 5' - 4" 6' - 7 1/2" 6' - 0" 4' - 8 1/2" 7' - 3 1/2" 6' - 0" 4' - 8 1/2" 6' - 0" 8' - 8" 6' - 0" 6' - 0" 7' - 3 1/2" 7' - 4 1/2" 6' - 0" 10' - 8" A4.7 1
A7.1
12' - 0" 17' - 4" 14' - 7" 1' - 3 1/2" 29' - 10" 14' - 10" 24' - 0 1/2" C1
VC
8" 4' - 5 1/2"
6"
T-1
FINISH ABBREVIATIONS
8" 113' - 3 1/2"
" 6"
SC
LINE OF CMT 1
3' 1' R
-1
" A4.2
SUNSHADE -4
CPT-1
DG
CMT 1
DK DJ DH A2.0 DF DE DD 8
4A 3 ' 90°
ATC ACOUSTICAL TILE CEILING
DEVICES
10
1 0" CPT CARPET
2 75°
Sh et A
ABOVE TYP. A5.11 '- CMT CERAMIC MOSAIC TILE
1/2
5 1. The Contractor shall field verify all dimensions before construction.
SC-1
VCT-1
Sh
ee
A5.11 3 CWT CERAMIC WALL TILE
"
EWCS - If there are any discrepancies, the Contractor shall notify the Architect
4
e
EXP EXPOSED TO STRUCTURE
t A .3
4 RE: MECH. " before proceeding with the construction.
-4 FAB FABRIC
1.1
A2.0 1113 Corridor North 4A8
6' FE FINISHED END
1
149 CA 2. All dimensions on the drawings are to the face of studs and
1155
4A
8 0" GYP BD GYPSUM BOARD foundation walls, unless noted otherwise.
D 4 '- MAS MASONRY
1 8' -
A4.3 4A8 PT PAINT 3. See Reflected Ceiling Plans and Code Plans for locations of fire-
RB RUBBER BASE rated walls.
6"
W11 RBF RUBBER FLOOR
.2
t A1 VCT VINYL COMPOSITION TILE 4. The Contractor shall coordinate and implement all safety measures
ee 1.3 SC SEALED CONCRETE
Sh t A 75° SOS SOLID SURFACE
requested and required by the local Fire Marshal, Health Department,
Building Officials and other governing agencies.
ee
Sh
SS STAINLESS STEEL
8"
0'- TS TACK SURFACE 5. The Contractor shall maintain the security of the complex throughout
1
the entire construction schedule.
"
C1 1/2 6. All non-load bearing interior walls on slab on grade floor on the main
7
1 '- level shall be provided with 2" slip joint (minimum), unless noted
TB 4'
otherwise.
CD
7. Slope the concrete floor slab to all floor drains at a minimum of 1/8”
per foot.
N
Building C North Main Level Floor Plan Finish Floor Elevation:100' - 0"
8. The Contractor shall coordinate all items provided and/or installed by
the Owner and/or Owner's subcontractors during construction.
1/8" = 1'-0"
9. It is the responsibility of the mechanical and electrical subcontractors
to review all of the drawings, including the architectural drawings for
work under their respective contracts. No extras will be allowed for
work shown in any part of these drawings, or described in any part of
the specifications.
10. Provide blocking at all wall hung accessories, hardware and wall-
hung cabinets where required.
13. At exterior metal stud walls w/ Brick Veneer, the face of the Brick
Veneer overhangs the foundation by 1/2".
15. Shaded areas of the floor plan are existing building to remain.
C:\Users\rortiz\Desktop\Revit Local\15064 DPS Groff HS Ph 2 A15_BO.rvt
CHECKED BY:
JG/BS/BO/AMJ
JT
BLDG C NORTH MAIN LEVEL FLOOR
DATE:
October 25, 2017 PLAN, SCHEDULES, DETAILS & NOTES
10/10/2017 4:44:57 PM
DATE:
A1.2 OF:
272
MAIN LEVEL DOOR AND FRAME SCHEDULE - BUILDING C (SOUTH)
DOOR DOOR FRAME DETAIL FIRE HDWR
NO. S /PR WIDTH HEIGHT THICKNESS TYPE MATERIAL TYPE MATERIAL HEAD JAMB SILL RATING GROUP REMARKS
SIM
Shee
SIM
BB B C CC R 1107 PR 6' - 0" 7' - 2" 1 3/4" G HM S2 HM 21/A6.3 4/A6.3 8/A6.2 SIM. --- 205
CK CJ CH CG CF CE CD CC CB CA
A3.1 A4.3 A4.3 A3.1 Sheet A1.2 1108 PR 6' - 0" 7' - 0" 1 3/4" G HM SL2 HM 23/A6.4 21/A6.4 --- 245
t A1.2
1156 1109 S 3' - 0" 7' - 0" 1 3/4" F WD S4 HM 4/A6.2 5/A6.2 --- 800
113' - 3 1/2" Sheet A1.3
1157 1110 S 3' - 0" 7' - 0" 1 3/4" F WD S4 HM 4/A6.2 5/A6.2 --- 800
8" 12' - 0" 17' - 4" 14' - 7" 29' - 10" 14' - 10" 24' - 0 1/2"
SIM O.H. 1111 S 3' - 0" 7' - 0" 1 3/4" F HM S4 HM 4/A6.2 5/A6.2 --- 605
A 7
1' - 3 1/2" 4' - 5 1/2" 1' - 6 1/2" 18/A6.4 19/A6.4
A4.5 A5.9 1114 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM -- 400
8" 6' - 8 1/4" 5' - 3 3/4" 6' - 7 1/2" 6' - 0" 4' - 8 1/2" 7' - 3 1/2" 6' - 0" 4' - 8 1/2" 6' - 0" 8' - 8" 6' - 0" 6' - 0" 7' - 3 1/2" 7' - 4 1/2" 6' - 0" 10' - 8"
W11 4A8 3' - 4" 1115 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 30/A6.4 19/A6.4 --- 400
1' - 5 1/2" TB 4'
10 1/2"
7' - 10 1/2" 5' - 0" 3' - 4"
10 1/2"
1' - 4"
1' - 4"
1116 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 -- 510
A6 A5 A5 A6
CMT 1
A5 75°
A5 4A8 1155 4A8 1117 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 -- 510
1147 1118 PR 6' - 0" 7' - 2" 1 3/4" G HM S2 HM 7/A6.4 8/A6.4 8/A6.2 SIM. --- 205
C1 C1
VC
1119 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM --- 510
SC-1
18/A6.4 19/A6.4
T-1
5C3
5A3 S
4A8 1111
5A3 S
4A8
TB 4' TB 4' 4A8
1' - 4"
75° 1120 S 3' - 0" 7' - 0" 1 3/4" F WD S2 HM 18/A6.4 19/A6.4 S 520.2
1' - 4 5/8"
SC
1' - 4"
5C3 90° E
1' - 4 5/8"
5C6
8' - 0"
O.H. 5C3
-1
5' - 6" 5' - 6" " 1121 S 3' - 0" 7' - 0" 1 3/4" F WD S2 HM 18/A6.4 19/A6.4 S 520.2
B SIM Cust.
A4.2 1' - 6
14' - 8"
1122 S 3' - 0" 7' - 0" 1 3/4" F HM S2 HM --- 615
13' - 4"
9' - 11"
A4.6
15' - 1 1/2"
1' - 4" 149A
13' - 4"
13' - 4"
10' - 9 3/8"
5C3 5C3 A4.5 1123 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 -- 510
4A8
3" HIGH STL. PIPE 4A8 1124 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 -- 510
O.H.
MB 8' RAIL FOR CAINE MB 8' 1' - 2" 6 Mech 1125 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 -- 510
4A8
5A6 SI
5' - 4"
1' - 2"
W13 MB 8' 1' - 5 1/2" 5' - 10 1/2" 8' - 8" 1126 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 -- 510
4' - 0" 6' - 4"
4A8
5C6
STAIRS - PT. 4A8 1155 S 3' - 0" 7' - 0" 1 3/4" F HM S2 HM 4/A6.2 5/A6.2 60---
MIN 600
MB 8' 4A8 5' - 0"
C2 1110
C2 Door Notes: 5. Provide power to all doors with magnetic hold open devices, card readers, & AI Phones. Coordinate the work with Electrical.
MB 8' Boys
CMT 1
1114 1. All doors shall be provided with floor or wall stops. 6. Coordinate with mechanical for doors with louvers.
5' - 11"
Classroom 149B 4B4
4A8
5C6 SI Classroom ? VCT-1 2. All doors that do not have smoke seals shall be provided with silencers.
5' - 3"
Classroom IWB 156 157 7. All exterior Hollow Metal doors and frames shall be prepped for card access. Coordinate w/ Electrical.
3. Refer to section 087100 in the Project Manual for the door hardware schedule.
5A6 SI
8. All door fire ratings are to be a minimum rating.
VCT-1
155
8' - 9 1/2"
3' - 4"
4. All door, frame types and details are shown on the sheets A5.0 & A6.0.
1' - 7"
IWB O.H. 1148
1 3/8"
4A8
5' - 4
17' - 8 1/2"
17' - 8 1/2"
2' - 0"
CMT 1 VCT-1
A4.6 MB 8' MB 8'
14' - 9 1/2"
Stair 5A6 SI
14' - 0 1/2"
E 17
17' - 4"
MB 8'
TACKABLE WALL
W3
13' - 6"
MB 8' A5.1 4A8
O.H. O.H.
4A8
MB 8'
4A8
A A TB 4'
12' - 0"
5A6 SI 5A3 SI 3' - 4" 1109
A4.6 8" A4.6
1' - 2" 5' - 0"
20' - 5 1/2"
20' - 5 1/2"
12' - 0" 16' - 8" 2' - 7" 5' - 2" 5' - 8" 15' - 8" 5' - 2" 5' - 8" 8' - 0" 6' - 4" 24' - 0 1/2" 3" 8" 11' - 10 1/2" 6' - 0" 10' - 8"
6" WALL FINISH
CPT-1
FLOOR BASE
CPT-1
2' - 7" 75°
1' - 6"
10' - 0" Elec
2' - 8"
5A3 4' - 4 1/2"
2" 5A3 SI Girls ROOM NO. ROOM NAME MAT'L MAT'L NORTH EAST SOUTH WEST CEILING MAT'L / FINISH CEILING HEIGHT REMARKS
5A6 SI
FEC
4"
148BB
CPT-2A RF
5A6 SI 5A6 SI
4A8
149C
5C3 SI
CPT-1
5C3
5A3 SI
VCT-1
VCT-6
FEC TB 4' TB 4' TB 4' TB 4' MB 8' IWB MB 8' 149 Corridor South CPT, VCT RB - CMU, GYP BD/PT CMU, GYP BD/PT GYP BD/PT SUSP 2x2 CEILING, Varies see RCP Refer to plans for locations of carpet. Refer to Elevations for locations of wall tile
3"
C3 1117
EXP/PT at EWC. Install 4' - 0" high hi-impact Gyp. BD. & SS Corner Guards @ Gyp. Bd.
4
VCT-1
1150 1149 walls
10' - 6"
10' - 6"
1' - 9"
1118 (19) 2 TIER
1' - 6"
5C3 SI 5A3 SI 2 1115 5A3 5 4' - 10" 149A Cust. SC RB CMU/PT CMU/PT CMU/PT CMU/PT EXP/PT - Install 4' high FRP on walls surrounding utility sinks.
O.H. LOCKERS 5C3 SI O.H.
AA AA 4' - 4" 4' - 4" 149B Boys CMT CMT CMU/ PT&CWT CMU/ PT&CWT CMU/ PT&CWT CMU/ PT&CWT Gyp. Bd.-Pt. 10' - 0"
A3.1 A5.10 A3.1
9' - 11"
Corridor South 20' - 8 1/2" 1' - 0" 149C Girls CMT CMT CMU/ PT&CWT CMU/ PT&CWT CMU/ PT&CWT CMU/ PT&CWT Gyp. Bd.-Pt. 10' - 0"
10' - 6"
10' - 6"
5' - 8"
84' - 3"
8' - 9"
O.H. 5C3 P 5A6 SI
VCT-6
B 7' - 1 1/2" 149 22 21' - 4 7/8" ± 149D Vestibule CPT2 RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT Gyp. Bd.-Pt. 11' - 6" Install 4' - 0" high hi-impact Gyp. Bd. % SS Corner Guards @ Gyp. Bd. walls
1 150 MECH 5A3 SI 5' - 2" 5' - 8" R
1' - 0"
1' - 6"
CPT-2A VCT-1
3' - 5"
A4.6 1119 1122 1123 5A6 SI 5A6 SI 150 Corridor VCT,CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0" Refer to plans for locations of carpet. Refer to Elevations for locations of wall tile
VCT-1
(7) 2 TIER 1125
4"
LOCKERS LOCKERS
5A6 at EWC. Install 4' - 0" high hi-impact Gyp. Bd. & SS Corner Guards @ Gyp. Bd.
CPT-1
LOCKERS
VCT-1
C4 1108 C4 walls
4' - 4"
VCT-1
1126
Sheet A1.3
TB 4'
5' - 2 1/2"
Sheet A1.1
TACKABLE WALL 1124 W1
4' - 3"
5A6 SI SIM
5A6 SI
SC-1
150A Elec SC RB GYP BD/ TAPED GYP BD/ TAPED GYP BD/ TAPED GYP BD/ TAPED EXP/PT -
8"
2' - 8"
5A6 SI E
5A6 SI
Elec Breakout
2' - 3"
VCT-1
6"
5A3 S
CPT-1
1' - 8"
6 SIM 150A 5C3 S 5C3 S A4.3 151 Sp. Ed. Mild / Moderate CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0" Cabinets to be PL-1
MB 8' 5A3 SI
CPT-1
3 152 Classroom CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0" Cabinets to be PL-1
15' - 6" 5A3 S 5A6 SI
1' - 11"
TB 4'
2' - 2"
A5.1 3
15' - 11 1/2"
TB 4'
8' - 5"
5A3 SI
CPT-1
6' - 5 1/2" CPT-2A CPT-2B 153 Classroom CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0" Cabinets to be PL-1
49' - 11 1/2"
10' - 4"
6' - 4"
SIM TB 4' TB 4' 5A3 5A3 A5.1
1107 154 Teacher Planning CPT, VCT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0" Cabinets to be PL-2, Counter PL-3
4' - 7 1/2"
10' - 9"
A
5A3 S
1120
5A3 S
A2.0
2' - 2"
9' - 6 1/2"
A5.1 5A3 SI
9' - 6 1/2"
2' - 2"
CUH - RE: MECH, CONCEAL Vestibule
A4.3 1 154A Stor. CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0"
5A3 S
15' - 11 1/2"
10' - 9"
5A3 Stor.
MB 8' MB 8' 154B Stor. CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0"
2' - 8" 154A
MB 8' 155 Classroom CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 9' -6" Cabinets to be PL-1
5' - 3 1/2"
5' - 3 1/2"
3" 3" 1' - 2" 1' - 2"
12' - 0 1/2" 8' - 5" 6' - 3" 13' - 5" 9' - 9" 5' - 2" 8' - 10" 5' - 7" 24' - 0 1/2" 13' - 4"
156 Classroom CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0" Cabinets to be PL-1
1' - 2" MB 8' 5' - 10" 7' - 10"
157 Classroom CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0" Cabinets to be PL-1
5A3
A6 4' - 1 1/2"
C5 MB 8'
C5 E Stair RF RB GYP BD/PT GYP BD/PT GYP BD/PT - 2x2 ATC @ upper Level 11' - 0" Install 4'-0" high hi-impact Gyp. Bd. & SS Corner Guards @ Gyp. Bd. walls
4 MB 8'
ALIGN
8 1/2"
W25
4' - 0"
A5.1 CUH RE: MECH 2"X2"X3 1/2' STL Room Finish Notes:
5A3
1' - 4"
Teacher Planning OH Classroom Classroom CONCEAL PIPES TUBE BOLLARD - 1. The Contractor shall verify the condition of the concrete floor slab and provide the appropriate floor preparation for the
IWB
7' - 7"
154 Stor. 153 IWB 152 TO UNIT PT. TYP. @ SIDE installation of flooring materials.
154B MB 8' IWB IWB EA. OF EXT. 2. Install 4'-0" high hi-impact gyp. bd. in corridors where there are no lockers or plastic laminate wainscot (typ.).
CPT-1 VCT-1
5 DOORS- TYP.
6' - 0"
3. Install corner guards on the outside corners of all gyp. bd. walls (typ.) in corridors & high traffic areas.
A2.0
18' - 0"
18' - 0"
18' - 0"
18' - 0"
18' - 0"
18' - 0"
MB 8' MB 8' Sp. Ed. Mild / 4. Corridor flooring shall have a pattern, incorporating six different colors.
A6 2' - 10 1/2" A5.1 Moderate LINE SUNSHADE
CHASE FOR ROOF DRAIN 5. Refer to Interior Elevations for details of tackable wall panels in the corridors.
151 DEVICESABOVE TYP.
5A3 5 LEADER - TYP. 6. Refer to A9 Drawing Sheets for Color and Finish information.
MB 8'
9' - 1"
1121
LOCATION WITH MECH.
5C3 1' - 4"
A5 A6 TB 4' A6 A5
TB 4' TB 4'
5C3
C6 C6
4' - 8"
4' - 8"
1' - 4"
5C3
4' - 8"
4' - 8"
4' - 8"
4' - 8"
W6 SIM SIM
B A LINE OF SUNSHADE
A4.2 A4.2 DEVICES ABOVE TYP.
C7 C7
W5 3' - 1 1/2"
10"
10"
8" 6' - 7 1/2" 5' - 4 1/2" 4' - 0" 6' - 0" 6' - 8 1/2" 14' - 7" 26' - 8 1/2" 10' - 3" 3' - 11" 6' - 8 1/2" 6' - 0" 4' - 0" 6' - 0" 5' - 3 1/2" 13' - 4" 20' - 8 1/2"
8" 12' - 0" 7 1/2" 17' - 4" 14' - 7" 29' - 10" 14' - 10" 8" 24' - 0 1/2" 1' - 4" 5' - 3 1/2" 13' - 4" 20' - 8 1/2"
3
152' - 7 1/2"
SIM A2.0
BB CC SIM
D C
CK CJ A3.1 CH A4.2
CG LINE OF SUNSHADE
A3.1 CF A4.2
CE CD CC CB CA
DEVICES ABOVE
TYP. N
Building C South Main Level Floor Plan Finish Floor Elevation:100' - 0"
General Plan Notes
1/8" = 1'-0"
1. The Contractor shall field verify all dimensions before construction.
If there are any discrepancies, the Contractor shall notify the Architect
before proceeding with the construction.
3. See Reflected Ceiling Plans and Code Plans for locations of fire-
rated walls.
6. All non-load bearing interior walls on slab on grade floor on the main
level shall be provided with 2" slip joint (minimum), unless noted
otherwise.
7. Slope the concrete floor slab to all floor drains at a minimum of 1/8”
per foot.
10. Provide blocking at all wall hung accessories, hardware and wall-
hung cabinets where required.
13. At exterior metal stud walls w/ Brick Veneer, the face of the Brick
Veneer overhangs the foundation by 1/2".
15. Shaded areas of the floor plan are existing building to remain.
C:\Users\rortiz\Desktop\Revit Local\15064 DPS Groff HS Ph 2 A15_BO.rvt
CHECKED BY:
JG/BS/BO/AMJ
JT
BLDG C SOUTH MAIN LEVEL FLOOR
DATE:
October 25, 2017 PLAN, SCHEDULES, DETAILS & NOTES
10/10/2017 4:45:21 PM
DATE:
A1.3 OF:
272
MAIN LEVEL DOOR AND FRAME SCHEDULE - BUILDING D General Plan Notes
DOOR DOOR FRAME DETAIL FIRE HDWR
NO. RATING GROUP 1. The Contractor shall field verify all dimensions before construction.
S /PR WIDTH HEIGHT THICKNESS TYPE MAT'L TYPE MAT'L HEAD JAMB SILL REMARKS
If there are any discrepancies, the Contractor shall notify the Architect
before proceeding with the construction.
1197 S 14' - 4" 9' - 4" 1' - 2" FD STL C/A4.4 3/A7.4 C/A4.4 90 MIN 900 Accordion fire door with std. manuf. trim, track, hardware, panic egress & battery back-up power
Sheet A1.4
1198 PR 6' - 0" 7' - 0" 1 3/4" N WD S2 HM 18/A6.4 19/A6.4 - - 405 2. All dimensions on the drawings are to the face of studs and
1199 S 4' - 0" 7' - 0" 1 3/4" F HM S2 HM 18/A6.4 19/A6.4 - - 630 foundation walls, unless noted otherwise.
1200 S 3' - 0" 7' - 2" 1 3/4" G HM S4 HM 21/A6.3 4/A6.3 8/A6.2 - 240
3. See Reflected Ceiling Plans and Code Plans for locations of fire-
1201 PR 6' - 0" 7' - 2" 1 3/4" G HM S2 HM 21/A6.3 4/A6.3 8/A6.2 - 205
rated walls.
1202 S 3' - 0" 7' - 0" 1 3/4" F WD S2 HM 18/A6.4 19/A6.4 - - 510.3
1203 S 3' - 0" 7' - 0" 1 3/4" F WD S2 HM 18/A6.4 19/A6.4 - - 510.2 4. The Contractor shall coordinate and implement all safety measures
1204 S 3' - 0" 7' - 0" 1 3/4" F HM S2 HM 18/A6.4 19/A6.4 - - 605 requested and required by the local Fire Marshal, Health Department,
1205 S 3' - 0" 7' - 0" 1 3/4" F WD S4 HM 4/A6.2 5/A6.2 - - 510.1 Building Officials and other governing agencies.
1206 S 3' - 0" 7' - 0" 1 3/4" N WD S2 HM 18/A6.4 19/A6.4 - - 400
5. The Contractor shall maintain the security of the complex throughout
1207 S 31' - 7 3/4" 16' - 0" 4" MP-1 STL 1/A7.4 - - - 905 Folding partition w/ std. manuf. trim, track, hardware & panic egress. See Sheet A5.0 (MP-1) the entire construction schedule.
1208 S 3' - 0" 7' - 0" 1 3/4" F HM S2 HM 18/A6.4 19/A6.4 - - 605
1209 S 6' - 0" 7' - 0" 1 3/4" N HM S2 HM 18/A6.4 19/A6.4 - - 405 6. All non-load bearing interior walls on slab on grade floor on the main
1210 S 3' - 0" 7' - 0" 1 3/4" F WD S2 HM 18/A6.4 19/A6.4 - - 510.1 level shall be provided with 2" slip joint (minimum), unless noted
otherwise.
1211 PR 6' - 0" 7' - 2" 1 3/4" G HM S2 HM 6/A6.2 SIM 7/A6.2 SIM 8/A6.2 - 205
Door Notes: 5. Provide power to all doors with magnetic hold open devices, card readers, & AI Phones. Coordinate the work with Electrical. 7. Slope the concrete floor slab to all floor drains at a minimum of 1/8”
1. All doors shall be provided with floor or wall stops. 6. Coordinate with mechanical for doors with louvers. per foot.
2. All doors that do not have smoke seals shall be provided with silencers. 7. All exterior Hollow Metal doors and frames shall be prepped for card access. Coordinate w/ Electrical.
3. Refer to section 087100 in the Project Manual for the door hardware schedule. 8. All door fire ratings are to be a minimum rating. 8. The Contractor shall coordinate all items provided and/or installed by
4. All door, frame types and details are shown on the sheets A5.0 & A6.0. the Owner and/or Owner's subcontractors during construction.
3' - 6"
12' - 4 1/2" 5' - 3 1/2"
1' - 8"
10° 4"
1 ' - 0" F F
4' - 0"
1209 E.9 E.9 ATC ACOUSTICAL TILE CEILING
6 1/2"
4 3/8" 10° CPT CARPET
5C3
6' - 4"
WD-2 RBF-1
10' - 0"
AREA TO PROVIDE PARTIAL 3" CASE FOR MECH. / CMT CERAMIC MOSAIC TILE
6' - 5 1/4"
2' - 5 1/2" 3' - 4" 1' - 0" 1' - 0" CWT CERAMIC WALL TILE
RBF-1
DEFLECTION STOP BLOCKS ELEC. - UP TO 116'-0"
5A6 S EXP EXPOSED TO STRUCTURE
18' - 8"
WD-2 1-1/2" DIA. STL. PIPE 10°
RBF-2
1 ' - 0"
RBF-2
30° CABINET UNIT HEATER ON 3/4" T&G PLYWD. FLOOR FAB FABRIC
2' - 2 3/4" HANDRAILS (PT.) - ATTACH
VCT-1
8' - 0" 5A6 SI 1' FRAMED PLATFORM FOR SCREWED TO MTL. DECK FE FINISHED END
9' - 5 1/2" -0 TO CMU WALL @ TOP
ON JOISTS - RE: STRUCT. GYP BD GYPSUM BOARD
26' - 0"
Sheet A1.4
1210 5 ' - 6" MECH. SUBCONTRACTOR RBF-1 VCT-1 A3.0 MAS MASONRY
40' - 8"
CC CC RB RUBBER BASE
5A6 SI
A3.2 A3.2 5
CONC. STAIRS - VCT VINYL COMPOSITION TILE
1 ' - 0"
CC CC A3.2
5 A6 S
RE: STRUCT. SC SEALED CONCRETE
5A6 S
1' - 0"
40' - 8"
A3.2 7' - 2" A5.5 A3.2 102'-6" SOS SOLID SURFACE
5' - 8" 9' - 4 1/4" 16' - 0" 16' - 0" 7' - 3 1/4"
5 A6 S
7
29' - 6 3/4"
11 CONC. STAIRS W/ RUBBER 30° SS STAINLESS STEEL
O.H. 1' - 8"
46' - 0"
D 10 1'
3 0' - 0
A5.8
TREADS & STL. HANDRAILS -0 TS TACK SURFACE
RAMP W48 "
11' - 4"
I
"
5A3 S Platform A4.1 50°
1'
168 -0
3" "
5A6 S 5'-6" W. X 30'-0" L. CONC. AFF
Sim. 5 ' - 6"
E W/ PART. MANUF.
W/ MANUF.
3"
9"
A4.4 LOCKABLE & SHALL HAVE PANIC Dressing (PT.) ON BOTH SIDES
WD-2
A4.4
5 A6 S
8 9"
5' - 10"
BASED ON INTERSECTION
WD-1
1' - 4"
5C3
7 3/8"
1 1/2"
7 3/8"
16' - 0"
168A 5C1 1' - 2 1/2" H.9
4A12 H.9 H.9 A3.2 SUPPORTS IN CONC.
3' - 0"
VCT-1
5 A6 S
5A6 SI
10 1/4"
5A3 S
5C3 1205 Upper Level
1 1/2" 1207 SOLID @ 4'-0" O.C.
H.9 5° H.9
5' - 5 1/2"
114' - 0"
1' - 8"
5' - 4"
5' - 4"
5' - 4"
I 2' - 0"
5C 3 2' - 0"
10' - 2 1/2"
1' - 5 1/2" ±
5' - 8" ±
CONC. STAIRS W/ 1 3 1/4" 2' - 3" K K
STL. HANDRAILS A3.0 CPT-1 VCT-1 1206 5' - 0" ±
WD-1
1' - 5 3/4" ±
1' - 0"
10°
/-
COORD. W/ STRUCT.
5/8" +
K K
3' - 4"
5A6 SI
4 1/4"
85°
RBF-1
14' - 0"
SCREWED TO MTL. DECK ON
3 0' - 0
1' - 1"
5" ±
RAMP
5' - 1
"
167C MECH. EQUIP. PLATFORM IS
8" 1 STAIR WORK IWB-2 LESS THAN 2/3 THE AREA
A3.2 POINT BELOW. (IBC SECTION 505.3.1) Main Level
1 3"
20' - 0"
7
16' - 2"
5A6 S
PIPE HANDRAILS (PT.) & 4 STRUCT. 1/8" = 1'-0"
2 TB 4' Gymnasium
3" 5 ' - 6"
"
116
RAMP
2
1203
6"
1' - 0"
5A6 S A3.2
3' - 4"
9"
5A6 S
45' - 4"
5A3 S
"
15' - 4
3' - 4"
PIPE HANDRAILS
65' - 4"
SC-2
RBF-1
PROVIDE ACCESS TO MECH. EQUIP.
BB BB 100'-0"
1 ' - 0"
ACCESS PLATFORM & ROOF.
7' - 8"
VCT-
5C3
7' - 4"
3' - 4" "
M
2' - 0
5A6 SI
5A6 SI
M.1 M.1
1
CHASE FOR ROOF DRAIN Stor.
6' - 0"
LEADER. SEE MECH. 167A 2 4 H.9 H.9
3' - 8" 3
5C
0.8 0.9
6' - 2 1/2"
1199
3"
P
6' - 0"
4' - 8" Lecture Hall / 10° 5A6 S WALL MOUNTED LADDER LOCKABLE
5 A6 S
27' - 2"
EWCS -
Career Center 2 SECURITY DOOR TO 8'-0" ABOVE
1. Enlarged Plan @ Conc. Ramp/Stairs
5 A6 S
RE MECH
167
4A12
4' - 1"
"
C:\Users\rortiz\Desktop\Revit Local\15064 DPS Groff HS Ph 2 A15_BO.rvt
15' - 4
W46
7' - 11 1/2"
7 1/2"
1' - 6"
I
5 A6 S
1198
1' - 7 1/8" ±
W43
4' - 0"
2' - 0"
3' - 8"
2 8' - 8" 15' - 4" 15' - 4" 8' - 8" 6' - 8" 7' - 4" 5' - 4"
A2.2 2' - 7 3/4"
C 6 5/8" 1/8" = 1'-0" 07/29/16 95% CD's
2' - 0" 2' - 0"
Sheet A1.4 1/2"
2' - 8"
A4.4
13' - 4"
13' - 4"
4 1/4" B
52° 06/17/16 Bldgs. B & D Design Development Package
8' - 7 1/4"
5' - 0"
3' - 7 1/2"
5A6 SI
1/2"
VCT-2
2' - 5"
W37 SCHOOL DISTRICT NO. 1 SCHOOL NO. 1103 SITE NO. 1103 DENVER, CO
N N
3' - 9 1/2"
3 Gym Stor.
116D
1159 1161 18250 East 51st Ave, Denver, Colorado
FEC A5.12
(E)
P P DEPARTMENT OF
DRAWN BY:
JG/BS/BO/AMJ
VCT-2
DATE:
A1.4 OF:
272
MAIN LEVEL DOOR AND FRAME SCHEDULE - BUILDING A
DOOR DOOR FRAME DETAIL FIRE HDWR
NO. S /PR WIDTH HEIGHT THICKNESS TYPE MATERIAL TYPE MATERIAL HEAD JAMB SILL RATING GROUP REMARKS
3 4 A5 A6 A7
A4
A3
Office
Office A2.2
225
227
5
Office
226
.6
t A1
ee
Sh A1
.5 Girls
t
ee 200A
Sh
Boys Alcove
Stair 200B 200AA
3 B
B7 B6 B5 B4 Sheet A1.6 B3 B2 B1
Sheet A1.5
BA BA Alcove
200BA Classroom
209
Women AE
200C
Girls Cust.
Boys 200E Men ER
200G RK D
200F 200D A
M AN
E)
TE ( ATCH
CA P ED
LO S. UIR
RE ARD REQ
BO A S
.
PT
AF
Elev.
General Plan Notes
Alcove Alcove
200GA 200FA Prep.
BB BB 2034 208A
4 RE
F.
Classroom 1. The Contractor shall field verify all dimensions before construction.
202
If there are any discrepancies, the Contractor shall notify the Architect
before proceeding with the construction.
Corridor Stor. 2. All dimensions on the drawings are to the face of studs and
200 208AA foundation walls, unless noted otherwise.
3. See Reflected Ceiling Plans and Code Plans for locations of fire-
IDF rated walls.
BC BC 201A
4. The Contractor shall coordinate and implement all safety measures
requested and required by the local Fire Marshal, Health Department,
Building Officials and other governing agencies.
BD BD 5. The Contractor shall maintain the security of the complex throughout
the entire construction schedule.
Classroom
218 AG 6. All non-load bearing interior walls on slab on grade floor on the main
Science Lab (Wet) level shall be provided with 2" slip joint (minimum), unless noted
208 otherwise.
Breakout 7. Slope the concrete floor slab to all floor drains at a minimum of 1/8”
201B per foot.
Classroom
Corridor 8. The Contractor shall coordinate all items provided and/or installed by
211
201 the Owner and/or Owner's subcontractors during construction.
Classroom
Science Lab (Wet) 217
212 Breakout
210B
Classroom
205
A7
Corridor
210 A6
Classroom
216
AG
A5
Classroom
BG 213 BG
AH Stair
A A4
Classroom
213
A3
Classroom
215
C:\Users\rortiz\Desktop\Revit Local\15064 DPS Groff HS Ph 2 A15_BO.rvt
BH BH
AJ
BK BK
Regis F. Groff HS Campus Phase 2
18250 East 51st Ave, Denver, Colorado
DESIGNED BY:
EIDOS
DENVER PUBLIC SCHOOLS
B7 B6 B5 B4 B3 B2 B1 DEPARTMENT OF
FACILITY MANAGEMENT
DRAWN BY:
CHECKED BY:
JG/BS/BO/AMJ
JT
BLDG A UPPER LEVEL FLOOR PLAN &
Bldg. A
DATE:
October 25, 2017 NOTES
10/10/2017 4:46:48 PM
DATE:
A1.5 OF:
272
0.7 0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 BB 1.6 2 2.1 CC 2.2 2.3 3 4 5 6 6.4 7 9
A3.0 A3.0
SIM
2
5A6 S A8.0
5 A6 S
C
A4.4
B 7
A5.6
13' - 4"
A4.9
Sheet A1.6 F OPEN TO BELOW
CLEAR, LAMINATED SKYLIGHT SYSTEM
A4.1 ON STL. TRELLIS STRUCTURE (PT.) -
A
E D A RE: SHT A4.09 FOR DTLS.
W38 A4.4
A4.0 A4.0 A4.0
M.9 16' - 0" 3' - 4" 16' - 0" 3' - 4" 22' - 0" 8' - 0" M.9
5" 1' - 7" W34 1' - 11" W33
W34
4 1/2"
N
OPEN TO BELOW
6"
4
4' - 0"
W33 N.1
4"
LOWERED AREA
PROVIDE HORIZ. (TO T.O. BEAM) OF A7.6
9' - 8 1/2"
G F
9' - 4 1/2"
S
14' - 0"
VCT-2
C
W36 W52 MUSIC ROOMS) IN WALL 10° FROM 3/4" T&G PLYWD. W50 P
W29 A4.0
RBF-1
VERT. FLOOR (PT.) SCREWED P.4
P 3
23' - 2"
VCT-6
TO (E) MTL. DECK -
4' - 7 1/2"
1' - 3" 3 A7.6
3 3/8"
OPEN TO BELOW GYP. BD. SOFFIT (PT.) OPEN TO BELOW RE: STRUCT. OPEN TO BELOW
1 A4.8
VCT-6
1' - 8 1/2"
AA 7' - 3 1/2" 4 1/2" AA
A3.0 1 A3.0
FLR. OPENING FOR PIPING IN 1
16' - 0" A5.6 8' - 9" 6" STUD WALL W/ GYP. P.5
12' - 0"
12' - 0"
4' - 10 5/8"
3' - 7 1/4"
SOFFIT (CONTINUE WDW. SOLID 1' - 0" 1' - 0" A4.8 1' - 9 1/2" BD. -PT. - ALL SIDES -
3 OPEN TO BELOW A4.8 VCT-2 VCT-6 VCT-2 VCT-6 OPEN TO BELOW
3" ALIGN T.O. WALL W/
2"6' - 4"
SURFACE SILL ON TOP OF
3' - 1 3/8"
1' - 8 3/4"
A7.1 2
6' - 9"
ADJ. WDW. SILLS
1' - 6 3/8"
7' - 4 1/8"
SOFFIT AT THIS AREA - RE: A5.7 2" Corridor EWCS - A4.0
3' - 1 3/8"
3' - 3 7/8"
6' - 4"
A4.8
4' - 7 5/8"
STRUCT & COORD. W/ MECH. 220 A5.7 RE MECH 2' - 0"
W39 2 10' - 8" 2' - 0" 1' - 6" 4' - 0"
5E6 SI 4' - 0"
H5 VCT-6 VCT-2 1 4' - 0"
2' - 5 3/4"
P.2 10' - 6" P.2
VCT-6
H5 2071 2072
4 1/8"
7' - 3" ± COORD.
H5 10' - 8"
W/ MECH & ELEC
5A6 I
7
5E6 SI
5E6 SI
9"
5A6 SI
8"
VCT-6
H8 W31 A
VCT-2
H5
H5 5E6 SI CMT 1 VCT-1 Cots H5
CPT-1
13' - 4" H8 A4.9
5A3
5E6 SI
Restroom 221
5A6 SI
9 2075 H5
5A6 S
VCT-2
VCT-6
5A3 SI
221A 2076 A5.3 4 6 9
5A3 S
VCT-1
SC-1
8" Reception
P.3 5E6 SI 1' - 6"
18' - 1 1/4"
0.7 H5 1' - 4 1/2"
5E6 SI
A5.4 2080 220A
8' - 11 5/8"
12 13' - 6 1/2"
1' - 0 1/8" ±
4' - 6"
11" 16' - 10 1/2" 8' - 4" 24' - 0" 10' - 4" 21' - 4"
CPT-1
VCT-1
H7 5E6 SI 4' - 0" 4' - 0"
5A3 SI
1' - 8" 4' - 0" 4' - 4" 8' - 1"
6' - 3 1/4"
5' - 10" MB 6'
8" 3' - 9" /2" 6" IDF 3 TB 4' VCT-1 CPT-1 Office Conference
2' - 6 1/2" 1
5A3
1' - 5
77' - 9 1/2"
24' - 0"
24' - 0"
P.4 4' - 0" 4' - 0" 1' - 0" 220C TB 4' 223 224
4' - 0" 4' - 4" MB 8' 1' - 8 1/2"
4' - 7 1/2"
232
5A3 S B
5' - 1 1/4"
5A3 SI INDICATED BY DASHED LINE
P.5 CMT 1 VCT-2 13 H9 SL3 SL3
4' - 10 5/8"
A4.4
10' - 4 3/4"
Flex/ Music (TYP. @ OFFICE AREAS)
VCT-2
IWB MB 8' 2077 A5.3 2086 2088
W40 233
MB 8' Digital Arts 20' - 6" 6' - 4" 3' - 4" 6' - 4"
5E6 SI
A5.4 Hall
3' - 4"
8"
7 231 222 2' - 4 1/2" 8" 1' - 4" 9"
CPT-1
4' - 11"
5E3 S 1' - 1 1/2" 1' - 1 1/2" 11" 11" 2089 W32
2070 MECH. CHASE - 11"
Corridor 6' - 4" 3' - 1" 6' - 4" 3' - 7 1/4" 6' - 4" 3' - 7 1/4" 6' - 4" 3' - 3"
Sh 220B SEE MECH. Prac.
P.7 Sh ee IWB 232AA
P.7
5E6 S
1' - 1 1/4"
2082 2083 2085 2087
ee t A1 TB 4'
General Plan Notes
.6
5A3 S Office
18' - 6 1/4"
A5.4 SL3 SL3 5A6 S SL3 SL3
A1
t A .6 2073 MB 8'
7' - 11 1/2"
7' - 11 1/2"
7' - 11 1/2"
7' - 11 1/2"
5A3 S
W/ PART. MANUF. Work Room
5A6 S
12' - 1 1/2" 2 225 ROOF BELOW
1.
.5
t
3' - 8" COORD.
ee
MB 6'
5A3 S
D
5A3 SP
7 5' - 9 3/4" COORD. 230
5A3 S
5A3 S
A1
et
Sh
3' - 1 1/2"
A4.1 3' - 4" W/ PART. MANUF. 4' - 0"
13' - 5"
13' - 5"
26' - 9 3/8" 24' - 10" ALIGN 9' - 9 1/2" 21' - 0" 11' - 0" 10' - 10 1/2" 10' - 6 1/2" 10' - 10 1/4" 10' - 10 1/4" 10' - 6" 12' - 11" e 1. The Contractor shall field verify all dimensions before construction.
Sh If there are any discrepancies, the Contractor shall notify the Architect
2' - 4 3/4"
CLR.
Hall 1' - 6" Office Office Office Office
2' - 2"
9' - 6"
1' - 1"
5E3 S
1' - 3"
6 5/8"
4' - 8"
4' - 8"
4' - 8"
IWB
5' - 2"
232A 3" 229 228 227 226
8"
8"
2. All dimensions on the drawings are to the face of studs and
5A6
5A6 S
5A6
14' - 0"
Prac. requested and required by the local Fire Marshal, Health Department,
5A3 SP
13' - 6"
E
5A3 S
15' - 2"
15' - 2"
232AB Office Building Officials and other governing agencies.
VCT-2 A4.2 CHASE FOR ROOF DRAIN 230B CC A
LEADER- TYP. COORD. SIZE A3.0 A4.1 H
2068 Shee Office 5. The Contractor shall maintain the security of the complex throughout
AND LOCATION W/ MECH. A4.0
t A1. 230A W27 the entire construction schedule.
1' - 0"
VCT-1
She 6 CHASE FOR ROOF
et A1 ROOF BELOW DRAIN LEADER- TYP. ROOF BELOW
2067 6. All non-load bearing interior walls on slab on grade floor on the main
.8 COORD. SIZE AND
level shall be provided with 2" slip joint (minimum), unless noted
LOCATION W/ MECH.
S 6' S
VCT-1
-4 otherwise.
CL " A6 W26
R. A5 6
t A1.
SC-1
e 7. Slope the concrete floor slab to all floor drains at a minimum of 1/8”
e
1/2"
3 S h per foot.
2' BB B LINE OF SUNSHADE
C
-7
A1.5
5' - 5
A2.2 A4.1
3/4 A4.1 A3.0 ABOVE - TYP.
ee t 8. The Contractor shall coordinate all items provided and/or installed by
"
PROVIDE HORIZ. LOUVER BLINDS @
Sh the Owner and/or Owner's subcontractors during construction.
INT. GLAZING - INDICATED BY DASHED
1' - 4" LINE (TYP. @ OFFICE AREAS) 9. It is the responsibility of the mechanical and electrical subcontractors
to review all of the drawings, including the architectural drawings for
6' - 0" 2' - 8" 6' - 0" 2' - 8" 6' - 0" 2' - 8"2' - 8" 6' - 0" 4' - 8" 30' - 0" 6' - 0" 3' - 4" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 6' - 0" 13' - 4" 27' - 5" 3' - 11 1/2" 1/2"
work under their respective contracts. No extras will be allowed for
2' - 0" work shown in any part of these drawings, or described in any part of
1' - 8" 1' - 0" the specifications.
12' - 4 1/2" 16' - 7 1/2" 17' - 4" 18' - 0" 17' - 4" 17' - 4" 17' - 4" 17' - 0" 18' - 0" 18' - 0" 19' - 8" 18' - 0" 13' - 4 1/2" 5' - 3"
V.I.F. 10. Provide blocking at all wall hung accessories, hardware and wall-
1' - 0"
0.8 0.9 1 1.1 1.2 1.3 1.4 1.5 1.6 2 2.1 2.2 2.3 3 5 6.4 7 hung cabinets where required.
Building B Upper Level Floor Plan Finish Floor Elevation:114' - 0" 13. At exterior metal stud walls w/ Brick Veneer, the face of the Brick
Veneer overhangs the foundation by 1/2".
1/8" = 1'-0"
14. Interactive white boards, projectors & projection screens are
furnished by owner. Contractor shall provide wood blocking in walls
UPPER LEVEL DOOR AND FRAME SCHEDULE - BUILDING B ROOM FINISH SCHEDULE UPPER LEVEL - BUILDING B and ceilings for support.
DOOR FRAME DETAIL WALL FINISH 15. Shaded areas of the floor plan are existing building to remain.
DOOR FIRE HDWR BASE CEILING
NO. S /PR WIDTH HEIGHT THICKNESS TYPE MAT'L TYPE MAT'L HEAD JAMB SILL RATING GROUP REMARKS ROOM NO. ROOM NAME FLOOR MAT'L MAT'L NORTH EAST SOUTH WEST CEILING MAT'L / FINISH HEIGHT REMARKS
2067
2068
S
S
6' - 4"
6' - 4"
9' - 4"
9' - 4"
1' - 2"
1' - 2"
FD
FD
STL
STL
F/A4.2
F/A4.2
1/A7.1
1/A7.1
F/A4.2
F/A4.2
45 MIN
45 MIN
900
900
Accordion fire door with std. manuf. trim, track, hardware, panic egress & battery back-up power
Accordion fire door with std. manuf. trim, track, hardware, panic egress & battery back-up power
220
220A
Corridor
Reception
VCT
CPT
RB
RB
(E) MAS
GYP BD/PT
---
GYP BD/PT
GYP BD/PT
GYP BD/PT
---
GYP BD/PT
EXP/PT
2x2 ACT
Varies see RCP
11' - 4"
Install 4' - 0" high hi-imapct Gyp. Bd. & SS Corner Guards @ Gyp. Bd. walls
Install 4' - 0" high hi-impact gyp. bd. and SS corner guards at gyp. bd. walls. LEGEND
2069 S 4' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 - - 400.1 220B Corridor VCT RB --- GYP BD/PT (N)CMU, GYP GYP BD/PT EXP/PT, CLOUDS Varies see RCP Install 4' - 0" high hi-impact gyp. bd. and SS corner guards at gyp. bd. walls.
2070 S 29' - 0" 9' - 0" 4" MP-3 STL 1/A7.6 - - - 905 Folding partition w/ std. manuf. trim, track & hardware. See Sheet A5.0 (MP-3) BD/PT
2071 S 4' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 - - 400.1 220C IDF SC RB GYP BD/TAPED GYP BD/TAPED GYP BD/TAPED GYP BD/TAPED EXP/PT - EXISTING WALLS TO REMAIN
2072 S 3' - 0" 7' - 0" 1 3/4" F WD S2 HM 18/A6.4 19/A6.4 - - 605 221 Cots VCT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 9' - 0"
2073 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 - - 700 221A Restroom CMT CMT GYP BD/PT GYP BD/PT, CWT GYP BD/PT, CWT GYP BD/PT, CWT GYP BD/PT 9' - 0"
2074 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 - - 700 222 Hall CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 9' - 6" Install 4' high hi-impact gyp. bd. and SS corner guards at gyp. bd. walls.
N EXISTING BUILDING TO REMAIN
223 Office CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 9' -6"
2075
2076
S
S
3' - 0"
3' - 0"
7' - 0"
7' - 0"
1 3/4"
1 3/4"
G
F
WD
WD
S2
S2
HM
HM
18/A6.4
18/A6.4
19/A6.4
19/A6.4
-
-
-
-
510.2
550 224 Conference CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0" KEY PLAN
2077 S 3' - 0" 7' - 0" 1 3/4" F WD S2 HM 18/A6.4 19/A6.4 - - 545 225 Office CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 9' -6"
2078 S 3' - 0" 7' - 0" 1 3/4" G WD SL3 HM 18/A6.4 19/A6.4 - - 510.3 Provide horizontal louver blinds 226 Office CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 9' -6"
2079 S 3' - 0" 7' - 0" 1 3/4" G WD SL3 HM 18/A6.4 19/A6.4 - - 510.3 Provide horizontal louver blinds 227 Office CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 9' -6"
C:\Users\rortiz\Desktop\Revit Local\15064 DPS Groff HS Ph 2 A15_BO.rvt
2080 S 3' - 0" 7' - 0" 1 3/4" G WD SL3 HM 18/A6.4 19/A6.4 - - 510.3 Provide horizontal louver blinds 228 Office CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 9' - 6"
2081 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 - - 510.1 229 Office CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 9' - 6" 10/25/17 Record Drawings
2082 S 3' - 0" 7' - 0" 1 3/4" G WD SL3 HM 18/A6.4 19/A6.4 - - 510.3 Provide horizontal louver blinds 230 Work Room CPT, VCT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 9' -6" Cabinets to be PL-1, Counter PL-3
09/20/17 PR#008
2083 S 3' - 0" 7' - 0" 1 3/4" G WD SL3 HM 18/A6.4 19/A6.4 - - 510.3 Provide horizontal louver blinds 230A Office CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 9' - 6"
2084 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 - - 510.1 230B Office CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 9' - 6" 05/24/17 ASI #011
2085 S 3' - 0" 7' - 0" 1 3/4" G WD SL3 HM 18/A6.4 19/A6.4 - - 510.3 Provide horizontal louver blinds 230C Restroom CMT CMT GYP BD/PT, CWT GYP BD/PT, CWT GYP BD/PT GYP BD/PT, CWT GYP BD/PT 9' - 0" 02/27/17 ASI #010
2086 S 3' - 0" 7' - 0" 1 3/4" G WD SL3 HM 18/A6.4 19/A6.4 - - 510.3 Provide horizontal louver blinds 231 Digital Arts CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0" Cabinets to be PL-1, Counter PL-3
11/15/16 ASI #005
2087 S 3' - 0" 7' - 0" 1 3/4" G WD SL3 HM 18/A6.4 19/A6.4 - - 510.3 Provide horizontal louver blinds 232 Flex/ Music VCT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0" Cabinets to be PL-1, Counter PL-3
2088 S 3' - 0" 7' - 0" 1 3/4" G WD SL3 HM 18/A6.4 19/A6.4 - - 510.2 Provide horizontal louver blinds 232A Hall VCT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 9' - 0" 09/30/16 For Construction Set
2089 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 - - 510.3 Provide horizontal louver blinds 232AA Prac. VCT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 8' - 0" Install Gyp. Bd. Ceiling at bottom of Ceiling deck & susp. ATL @ the Bottom 08/12/16 100% CD's - Bldgs. B & D
Ductwork
Door Notes: 5. Provide power to all doors with magnetic hold open devices, card readers, & AI Phones. Coordinate the work with Electrical.
232AB Prac. VCT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 9' - 0"
07/29/16 95% CD's
1. All doors shall be provided with floor or wall stops. 6. Coordinate with mechanical for doors with louvers.
2. All doors that do not have smoke seals shall be provided with silencers. 7. All exterior Hollow Metal doors and frames shall be prepped for card access. Coordinate w/ Electrical. 233 Flex/ Music VCT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0" Cabinets to be PL-2, Counter PL-3 06/17/16 Bldgs. B & D Design Development Package
3. Refer to section 087100 in the Project Manual for the door hardware schedule. 8. All door fire ratings are to be a minimum rating. NO. DATE DESCRIPTION OF REVISION AUTHORITY MADE APPR'D
4. All door, frame types and details are shown on the sheets A5.0 & A6.0. Room Finish Notes:
CHECKED BY:
JG/BS/BO/AMJ
JT
BLDG B SOUTH UPPER LEVEL FLOOR
GYP BD GYPSUM BOARD DATE:
October 25, 2017 PLAN, SCHEDULES & NOTES
10/10/2017 4:47:21 PM
10"
A5.2
W5 2058 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 --
S 510.1
D7 SIM SIM
D7 2059 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 -- 520.1
2060 S 3' - 0" 7' - 0" 1 3/4" F WD S2 HM -- 520.1
4' - 8"
B A 18/A6.4 19/A6.4
4' - 8"
4' - 8"
4' - 8"
4' - 8"
A4 A2 W6 5C3 A4.2 A2 A4.2 A4 2060A S 3' - 0" 7' - 0" 1 3/4" F WD S2 HM 18/A6.4 19/A6.4 --
S 520.2
2061 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 -- 510
D6 D6 2062 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM -- 510
18/A6.4 19/A6.4
5A6 S
CASEWORK ON THIS WALL TO BE 2059
4' - 8"
LINE OF
5C3
6"
5A3 S
7' - 3 1/2"
TB 4' TB 4' INSTALLED IN A FUTURE PHASE. CAP TB 4' 6" TB 4' 2063 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 -- 510
SUNSHADE
1' - 4"
DEVICES ALL PLUMBING, AIR & GAS LINES IN 2064 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 -- 510
ABOVE TYP. TB 4' THE WALL. PROVIDE AN ADDITIONAL
1' - 8" 2065 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 30/A6.4 19/A6.4 --- 510
Prep.
18' - 0"
(2) 8' MARKER BORDES & (1) 4'
251A 2066 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 -- 510
15' - 6"
MB 8' TACH BOARD.
18' - 0"
18' - 0"
18' - 0"
3' - 5" MB 8' Door Notes: 5. Provide power to all doors with magnetic hold open devices, card readers, & AI Phones. Coordinate the work with Electrical.
MB 8' 5' - 6" MB 8'
MB 8' 3' - 7" 5' - 3 1/2" 1. All doors shall be provided with floor or wall stops.
6' - 0"
8" 3" 4' - 7" 1' - 2" 6. Coordinate with mechanical for doors with louvers.
A2 12' - 0" 14' - 0" MB 8' 3' - 4" 13' - 8" 24' - 0 1/2" 2. All doors that do not have smoke seals shall be provided with silencers. 7. All exterior Hollow Metal doors and frames shall be prepped for card access. Coordinate w/ Electrical.
26' - 5" 3. Refer to section 087100 in the Project Manual for the door hardware schedule. 8. All door fire ratings are to be a minimum rating.
5A3 S
5A3
Classroom Classroom 4. All door, frame types and details are shown on the sheets A5.0 & A6.0.
Classroom
REF.
249 250 252
4' - 0"
IWB
8 1/2"
5A6
2060
2' - 6"
MB 8' Science Lab (Wet) IWB
IWB 2060A
251 5A3
D5 D5
5' - 3 1/2"
7' - 4 1/2"
ROOM FINISH SCHEDULE UPPER LEVEL - BUILDING C (NORTH)
A2 BARRIER FREE
MB 8' W8
1' - 0"
13' - 9 1/2"
EYEWASH/ SHOWER
4' - 4"
11' - 8 1/2"
Stor.
12' - 11 1/2"
TB 4'
5A6 SI
5' - 8" MB 8' STATION RE: MECH.
5' - 2" 251AA A5.2 WALL FINISH
15' - 11 1/2"
15' - 11 1/2"
MB 8' BASE CEILING MAT'L / CEILING
SIM MB 8'
A ROOM NO. ROOM NAME FLOOR MAT'L MAT'L NORTH EAST SOUTH WEST FINISH HEIGHT REMARKS
FE 5A3 SI 4 BARRIER FREE W10
A4.3 (7) 2 TIER LOCKERS
CPT-1
2' - 6"
2' - 1"
5A3 SI 5' - 6"
5A3
234 Corridor North CPT, VCT RB CMU/PT CMU, GYP BD/PT CMU/PT CMU, GYP BD/PT SUSP 2x2 ATC, EXP/PT Varies see Refer to plans for locations of carpet. Refer to Elevations for locations of
VCT-1
VCT-1
5C3 S
5' - 6"
2' - 6"
70' - 5"
IWB MB 8' O.H. RCP wall tile at EWC. Install 4' - 0" high hi-impact Gyp. Bd. & SS Corner
1' - 2"
5A6 SI
5A3 SI IDF
1' - 5"
5A3 1
CPT-1
5C6
VCT-1
CPT-1
5A6 SI
CPT-1
TB 4' TACKABLE WALL 2055
5A3
234D Men CMT CMT CMU/ PT&CWT CMU/ PT&CWT CMU/PT CMU/ PT&CWT GYP BD/PT 9' - 0"
4' - 3"
3' - 5"
3' - 0"
SC-1
2058 2056
4"
234E Women CMT CMT CMU, GYP BD/PT CMU/ PT&CWT CMU/ PT&CWT CMU/ PT&CWT GYP BD/PT 9' - 0"
VCT-1
5A3
CPT-1
D4 5C3 SI
D4 234F Boys CMT CMT CMU/ PT&CWT CMU/ PT&CWT CMU/ PT&CWT CMU/ PT&CWT GYP BD/PT 10' - 0" Flooring to have a pattern incorporating up to four colors and various tile
1' - 6"
(20) 2 TIER
1' - 0"
5A3
VCT-1
1' - 6"
4"
5A6 SI sizes
9"
5A3 SI
4"
8' - 5"
8' - 5" 4"
LOCKERS 2061 5A3 SI LOCKERS
5C3 P
4A8
234G Girls CMT CMT CMU/ PT&CWT CMU/ PT&CWT CMU/ PT&CWT CMU/ PT&CWT GYP BD/PT 10' - 0" Flooring to have a pattern incorporating up to four colors and various tile
VCT-5
O.H. 5C3 SI 5 OH O.H.
AA AA sizes
10' - 6"
9' - 11"
A3.1 A3.1
8' - 5"
Girls
10' - 6"
10' - 6"
3'-6" HIGH A5.11 Corridor 244 Corridor VCT, CPT RB GYP BD/ PT&CWT GYP BD/PT GYP BD/ PT&CWT GYP BD/PT 2x4 ATC 10' - 0" Refer to plans for locations of carpet. Refer to Elevations for locations of
83' - 7"
1' - 6"
234G
1' - 6"
1' - 6"
1' - 6"
STL. PIPE O.H. 2065 244 wall tile at EWC. Install 4' - 0" high hi-impact Gyp. Bd. & SS Corner
B 5A3 SI OH 2054
(11) 2 TIER LOCKERS TACKABLE WALL 6 Guards @ Gyp. Bd. walls
VCT-1
GUARD (18) 2 TIER LOCKERS
3"
A4.6 2063 5C3 SI 4A8
3"
CMT
244A IDF SC RB GYP BD/TAPED GYP BD/TAPED GYP BD/TAPED GYP BD/TAPED EXP/PT -
3"
5A6 SI
5A3 SI
RAIL- PT.
5A3 SI
5A3 SI
D3 D3 245 Classroom CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0" Cabinets to be PL-1
VCT-1
VCT-1
VCT-1
VCT-1
TB 4' TB 4'
CPT-1
TB 4' TB 4' TB 4' TB 4' 5A6 SI 246 Classroom CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0" Cabinets to be PL-1
VCT-1
5A3
11 1/2"
5A3
5A6 SI
5A6 SI 5A6 SI O.H.
2' - 7"
5' - 4"
5C3
4" 3"
4A8 247 Classroom CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0" Cabinets to be PL-1
2' - 10"
2' - 5"
4A8
4"
2' - 5"
5A3
CPT-1
CPT-1
RF
A5.11
CPT-1
248 Classroom CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 9' -6" Cabinets to be PL-1
VCT-1
5A3 SI 2066 8
O.H. O.H. 249 Classroom CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0" Cabinets to be PL-1
A A MB 8' A2.0
2064 5A3 SI 6 2 250 Classroom CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0"
A4.6 A4.6 A5.10 SIM 4B4
CMT
20' - 5 1/2"
20' - 5 1/2"
MB 8' MB 8' MB 8' MB 8' Boys 251 Science Lab (Wet) VCT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0" Cabinets to be PL-2, Counter PL-3
17' - 10 1/2"
17' - 8 1/2"
17' - 8 1/2"
5A6 SI
W4 234F 251A Prep. VCT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0" Cabinets to be PL-2, Counter PL-3
10' - 9"
2053
20' - 5 1/2"
4A8
Sheet A1.6
MB 8' 251AA Stor. VCT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0"
Sheet A1.7
8" 2' - 4 1/2"
11' - 10 1/2" 5' - 0" 7' - 0" 252 Classroom VCT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0" Cabinets to be PL-2, Counter PL-3
MB 8'
5' - 0" D Stair RBF RB CMU/PT CMU/PT - CMU/PT 2x2 ATC @ upper Level 11' - 0" Exposed to underside of painted stair structure at lower level.
4A8
Stair IWB 1' - 5 1/2"
F MB 8' 1' - 5 1/2" F Stair RBF RB - GYP BD/PT GYP BD/PT GYP BD/PT 2x2 ATC @ upper Level 11' - 0" Exposed to painted underside of stair structure at lower level; Install 4'-0"
5C6 1' - 2" IWB
8" IWB high hi-impact Gyp. Bd. & SS Corner Guards @ Gyp Bd walls
12' - 0" 6' - 4" 5' - 2" 5' - 2" 3' - 7" 5' - 10" 5' - 2" 16' - 4" 13' - 6" 2' - 10" 5' - 2" 5' - 8" 5' - 0" 5' - 2" 13' - 10 1/2" 8" 11' - 10 1/2" 7' - 4 1/2" Stair
MB 8' IWB 2052 VCT-1
Women
CMT 234E 4A8 12' - 0" D 0.8 Room Finish Notes:
8' - 2"
4' - 7 1/2"
D2 D2 1. The Contractor shall verify the condition of the concrete floor slab and provide the appropriate floor preparation for the
TACKABLE WALL
MB 8'
4A8
MB 8' installation of flooring materials.
4' - 8"
Classroom Classroom Classroom Classroom A A 2. Install 4'-0" high hi-impact gyp. bd. in corridors where there are no lockers or plastic laminate wainscot (typ.).
248 MB 8' CHASE FOR ROOF MB 8'
247 246 245 A4.7 A4.7 3. Install corner guards on the outside corners of all gyp. bd. walls (typ.) in corridors & high traffic areas.
MB 8' DRAIN LEADER, TYP.
1' - 5"
5A3 S
MB 8' 4. Corridor flooring shall have a pattern, incorporating six different colors.
13' - 4"
13' - 4"
13' - 4"
13' - 4"
COORDINATE SIZE AND
O.H. 5. Refer to Interior Elevations for details of tackable wall panels in the corridors.
B LOCATION W/ MECH. MB 8'
6. Refer to A9 Drawing Sheets for Color and Finish information.
5C3 I
LINE OF
8' - 8"
OVERHANG A4.6
7' - 2"
1' - 4" 5A6 SI 4B4
5A3 S
5A3 S
1' - 4"
5C3 A4
A4 A2 A4 A4 A2 ALIGN 2051 Men
TB 4' TB 4' 5C3 5C3
RF
VCT-1 CMT 234D
D1 D1
VCT-1
LINE OF
8"
8"
1' - 4"
SIM SIM SUNSHADE DA
4A8
BB
4' - 8 1/2"
B C CC
DEVICES B
O.H. 0.8
A3.1 A4.3 A4.3 A3.1 3'-6" HIGH
8" 1' - 3 1/2" 1' - 6 1/2" 5" ABOVE TYP. A4.7 9 VCT-2
STL. PIPE
7' - 4" 4' - 8" 6' - 7 1/2" 6' - 0" 6' - 7 1/2" 6' - 0" 4' - 8 1/2" 6' - 0" 8' - 8" 6' - 0" 6' - 0" 6' - 10 1/2" 7' - 4 1/2" 6' - 0" 10' - 8" GUARD RAIL- VCT-1
PT. A5.11
12' - 0" 17' - 4" 14' - 7" 29' - 10" 4' - 5 1/2" 14' - 10" 24' - 0 1/2"
6' - 4
2068
CLR.
112' - 7 1/2"
DC DB CPT-1 VCT-1 2067
"
DK DJ DH DG DF DE DD FINISH ABBREVIATIONS
General Plan Notes
6
E
VCT-1
A5.11 ATC ACOUSTICAL TILE CEILING
2' - 7
A2.0 D A4.2
A5.11 ECWS RE: 10 CPT CARPET
A4.3 MECH CMT CERAMIC MOSAIC TILE 1. The Contractor shall field verify all dimensions before construction.
3/4"
11
SC-1
CWT CERAMIC WALL TILE
Sh
O.H. 8 If there are any discrepancies, the Contractor shall notify the Architect
4
7 4A EXP EXPOSED TO STRUCTURE before proceeding with the construction.
eet
2037
A2.0 W12 Corridor North A5.9 FAB FABRIC
5'
Cust. FE FINISHED END
A
234 2. All dimensions on the drawings are to the face of studs and
-0
1.8
234A GYP BD GYPSUM BOARD foundation walls, unless noted otherwise.
LINE OF SUNSHADE FEC
3/4
MAS MASONRY
DEVICES ABOVE TYP. PT PAINT
"
3. See Reflected Ceiling Plans and Code Plans for locations of fire-
RB RUBBER BASE rated walls.
RBF RUBBER FLOOR
.7
t A1 VCT VINYL COMPOSITION TILE 4. The Contractor shall coordinate and implement all safety measures
ee 1.8 SC SEALED CONCRETE
Sh t A SOS SOLID SURFACE
requested and required by the local Fire Marshal, Health Department,
Building Officials and other governing agencies.
ee
Sh
SS STAINLESS STEEL
TS TACK SURFACE 5. The Contractor shall maintain the security of the complex throughout
the entire construction schedule.
6. All non-load bearing interior walls on slab on grade floor on the main
MB 8' level shall be provided with 2" slip joint (minimum), unless noted
otherwise.
N 7. Slope the concrete floor slab to all floor drains at a minimum of 1/8”
Building C North Upper Level Floor Plan Finish Floor Elevation:114' - 0"
per foot.
1/8" = 1'-0" 8. The Contractor shall coordinate all items provided and/or installed by
the Owner and/or Owner's subcontractors during construction.
10. Provide blocking at all wall hung accessories, hardware and wall-
hung cabinets where required.
13. At exterior metal stud walls w/ Brick Veneer, the face of the Brick
Veneer overhangs the foundation by 1/2".
15. Shaded areas of the floor plan are existing building to remain.
C:\Users\rortiz\Desktop\Revit Local\15064 DPS Groff HS Ph 2 A15_BO.rvt
CHECKED BY:
JG/BS/BO/AMJ
JT
BLDG C NORTH UPPER LEVEL FLOOR
DATE:
October 25, 2017 PLAN, SCHEDULES, DETAILS & NOTES
10/10/2017 4:47:39 PM
DATE:
A1.7 OF:
272
UPPER LEVEL DOOR AND FRAME SCHEDULE - BUILDING C (SOUTH)
DOOR DOOR FRAME DETAIL FIRE HDWR
NO. S /PR WIDTH HEIGHT THICKNESS TYPE MATERIAL TYPE MATERIAL HEAD JAMB SILL RATING GROUP REMARKS
CK CJ CH CG CF CE CD CC CB CA
2035 S 3' - 0" 7' - 0" 1 3/4" F WD S4 HM 4/A6.2 5/A6.2 --- 800
2036 S 3' - 0" 7' - 0" 1 3/4" F WD S4 HM 4/A6.2 5/A6.2 --- 800
112' - 7 1/2"
2037 S 3' - 0" 7' - 0" 1 3/4" F HM S4 HM 4/A6.2 5/A6.2 --- 605
Sheet A1.7 W12
CPT-1
2039 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 -- 510
"
6' - 4
1' - 3 1/2" VCT-1 VCT-1 VCT-2
12' - 0" 17' - 4" 14' - 7" 29' - 10" 38' - 10 1/2" Sheet A1.8 2040 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 30/A6.4 19/A6.4 --- 510
CLR.
4' - 5 1/2" 1' - 6 1/2"
12' - 0" 6' - 7 1/2" 6' - 0" 4' - 8 1/2" 7' - 3 1/2" 6' - 0" 4' - 8 1/2" 6' - 0" 8' - 8" 6' - 0" 6' - 0" 14' - 8" 6' - 0" 10' - 8" 2041 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 -- 510
O.H. 1
Corridor North 7 2067 A7.1 2042 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 -- 510
Shee
SIM 234 A5.9 2068 2043 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 -- 510
SIM C CC A5.11
B
3/4"
O.H. 2044 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 -- 510
10 1/2"
BB A4.3 A4.3 A3.1 6
t A1.7
4A8 10 2045 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 --
S 510.1
2' - 7
A3.1 A4 A4 A2 A5.9 FEC
VCT-1
A4 2046 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 --
S 510.1
5A6 SI
2047 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 -- 520.1
C1 Cust.
C1
SC-1
LINE OF OVERHANG 2037 2048 S 3' - 0" 7' - 0" 1 3/4" F HM S2 HM 18/A6.4 19/A6.4 --- 520.1
A2 234A
5' - 0 3/4"
5A3 S
O.H. 5C3 5C3 E 2048A S 3' - 0" 7' - 0" 1 3/4" F WD S2 HM 18/A6.4 19/A6.4 --
S 520.2
B A4 4A8
8' - 8"
Classroom CHASE FOR ROOF DRAIN A4.2 2049 S 3' - 0" 7' - 0" 1 3/4" F HM S2 HM 18/A6.4 19/A6.4 --- 615
A4.6 240 ALIGN 4A8
9' - 11"
LEADER - TYP.
4A8
5C3 2050 S 3' - 0" 7' - 0" 1 3/4" G WD S2 HM 18/A6.4 19/A6.4 -- 510
Sheet A1.8
Sheet A1.6
13' - 4"
13' - 4"
13' - 4"
13' - 4"
4A8
COORDINATE SIZE AND MB 8'
MB 8' LOCATION W/MECH. Door Notes: 5. Provide power to all doors with magnetic hold open devices, card readers, & AI Phones. Coordinate the work with Electrical.
4A8
5C6
1. All doors shall be provided with floor or wall stops. 6. Coordinate with mechanical for doors with louvers.
MB 8' MB 8' 2. All doors that do not have smoke seals shall be provided with silencers. 7. All exterior Hollow Metal doors and frames shall be prepped for card access. Coordinate w/ Electrical.
1' - 2" 1' - 5 1/2" 5' - 5 1/2"
8" 2' - 10" 1' - 2" 4' - 1 1/2" 1' - 4" 3. Refer to section 087100 in the Project Manual for the door hardware schedule. 8. All door fire ratings are to be a minimum rating.
11' - 10 1/2" 4' - 6 1/2"
6' - 4" 5' - 2" 5' - 2" 3' - 7" 5' - 10" 5' - 2" 16' - 4" 13' - 6" 5' - 2" 5' - 8" 5' - 0" 5' - 2" 13' - 10 1/2" 8' - 8" 4. All door, frame types and details are shown on the sheets A5.0 & A6.0.
C2 C2
TACKABLE WALL
MB 8' Boys
1' - 7"
MB 8' MB 8'
CMT
IWB 2036 234B
8"
5C6 SI MB 8'
5A3 S
IWB 4B4
W14 2 IWB IWB
Stair
VCT-1
5A3 S
A4.6 Classroom Classroom Classroom
E
241 242 243 4A8
4A8
17' - 10 1/2"
17' - 8 1/2"
17' - 8 1/2"
MB 8'
VCT-1
ROOM FINISH SCHEDULE UPPER LEVEL - BUILDING C (SOUTH)
1' - 7"
O.H. O.H. MB 8'
20' - 5 1/2"
A A
4A8
A4.6 A4.6
2' - 2"
CMT
MB 8' WALL FINISH CEILING MAT'L / CEILING
MB 8'
CPT-1 5A6 SI
ROOM NO. ROOM NAME FLOOR MAT'L BASE MAT'L NORTH EAST SOUTH WEST FINISH HEIGHT REMARKS
5A6 SI
W4
5A3 SI 5A3 SI
11' - 4"
5A3 SI 5A3 SI 5A3 SI 5A3 SI 2035
2' - 7"
(8) 2 TIER Girls 234. Corridor South VCT, CPT RB - CMU/PT GYP BD/PT GYP BD/PT SUSP 2x2 ATC, EXP/PT Varies see Install 4' - 0" high hi-impact Gyp. Bd. & SS Corner Guards @ Gyp. Bd. walls
2' - 5"
2' - 5"
CPT-1
5A3
CPT-1
5A3 5A3 EQ EQ LOCKERS 234C RCP
5C3
4"
5A3 5A3
VCT-1 RBF
4"
4A8
234A Cust. SC RB CMU/PT CMU/PT CMU/PT CMU/PT EXP/PT - Install 4' high FRP on walls surrounding utility sinks.
CPT-1
VCT-1
VCT-1
TB 4'
VCT-1
3" TB 4' TB 4' TB 4' 234B Boys CMT CMT CMU/ PT&CWT CMU/ PT&CWT CMU/ PT&CWT CMU/ PT&CWT GYP BD/PT 10' - 0" Flooring to have a pattern incorporating up to four colors and various tile sizes
TB 4' TB 4' TB 4' TB 4'
3"
C3 2041 C3 234C Girls CMT CMT CMU/ PT&CWT CMU/ PT&CWT CMU/ PT&CWT CMU/ PT&CWT GYP BD/PT 10' - 0" Flooring to have a pattern incorporating up to four colors and various tile sizes
VCT-1
5A6 SI
3"
5A6 SI 5C3 SI 235 Corridor CPT, VCT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0" Refer to plans for locations of carpet. Refer to Elevations for locations of wall
3"
2042
(11) 2 TIER TACKABLE WALL 6 (18) 2 TIER LOCKERS 7 tile at EWC. Install 4' - 0" high hi-impact Gyp. Bd. & SS Corner Guards @ Gyp.
8' - 5"
1' - 6"
Sheet A1.8
3'-6" HIGH STL. PIPE
Sheet A1.6
1' - 6"
1' - 6"
VCT-6
9' - 11"
10' - 6"
10' - 6"
10' - 6"
10' - 6"
5A6 SI 235
5"
AA A5.11 8 AA
82' - 11"
235A IDF SC RB GYP BD/TAPED GYP BD/TAPED GYP BD/TAPED GYP BD/TAPED EXP/PT -
-
A3.1 A3.1
8' - 4"
5A3 SI
8'
O.H. 2046 5 236 Classroom VCT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0" Cabinets to be PL-2, Counter PL-3
1' - 0"
CPT-1
9"
B
1' - 6"
5A6 SI 2049 237 Science Lab (Wet) VCT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0" Cabinets to be PL-2, Counter PL-3
2' - 6"
1' - 6"
VCT-1
(19) 2 TIER 2044 5C3 P 5C3 SI
5"
A4.6 2050
4"
5A3 LOCKERS
4"
FEC 5A3 SI 237A Prep VCT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0" Cabinets to be PL-2, Counter PL-3
4"
5A3 SI
(18) 2 TIER LOCKERS
VCT-1
C4 C4 237AA Stor. VCT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0"
3' - 0"
5A6 SI
5C3 SI
4' - 3"
3' - 5"
3' - 4"
5A3 SI
SC-1
2045 5A3 SI 238 Classroom CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0"
5C6
CPT-1
2043
5A6 SI
Corridor South
CPT-1
1' - 4 1/2"
TACKABLE WALL
CPT-1
TB 4' TB 4'
VCT-1
MB 8' 234. 239 Classroom CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0" Cabinets to be PL-1
1' - 2"
2' - 1"
MB 4' W2
1' - 5"
5C3 S
5A6 SI
IDF 5' - 6"
9' - 3 1/2"
5' - 2" BARRIER FREE 240 Classroom CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 9' -6" Cabinets to be PL-1
VCT-1
5C3 S IWB MB 8'
VCT-1
5A3 S
5A3 S
235A
15' - 11 1/2"
15' - 11 1/2"
15' - 11 1/2"
5A3 EYEWASH/ SHOWER 241 Classroom CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0" Cabinets to be PL-1
4' - 4"
5A3 SI
2' - 6"
CPT-1
12' - 11 1/2"
A 5A3 SI 242 Classroom CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0" Cabinets to be PL-1
11' - 8 1/2"
A2.0
A4.3 5' - 2" A5.2 1 243 Classroom CPT RB GYP BD/PT GYP BD/PT GYP BD/PT GYP BD/PT 2x4 ATC 10' - 0" Cabinets to be PL-1
5' - 8" MB 8'
MB 8'
7' - 4 1/2"
E Stair RF RB GYP BD/PT GYP BD/PT GYP BD/PT - 2x2 ATC @ upper Level 11' - 0" Install 4'-0" high hi-impact Gyp. Bd. & SS Corner Guards @ Gyp. Bd. walls
12' - 0" 14' - 0" 8" 13' - 8" 3' - 5" TB 4' 26' - 5" 3' - 7" 5' - 6" 5' - 9" MB 8' 24' - 0 1/2" 8"
Room Finish Notes:
6' - 0"
ALIGN
1' - 0"
2' - 6"
IWB 5A3
2D IWB W8 3. Install corner guards on the outside corners of all gyp. bd. walls (typ.) in corridors & high traffic areas.
4' - 0"
A5.2 5. Refer to Interior Elevations for details of tackable wall panels in the corridors.
REF.
MB 8'
2C 6. Refer to A9 Drawing Sheets for Color and Finish information.
1' - 0"
5A3
Classroom MB 8' Classroom 2B 2048 Classroom
5
6' - 0"
18' - 0"
18' - 0"
18' - 0"
18' - 0"
MB 8'
15' - 6"
MB 8' CASEWORK ON THIS WALL TO BE
5A3 S
MB 8' INSTALLED IN A FUTURE PHASE.
CAP ALL PLUMBING, AIR & GAS
TB 4'
7' - 3 1/2"
2047
C6 C6
4' - 8"
4' - 8"
4' - 8"
4' - 8"
4' - 8"
W6
A4 A2 5C3 A2 A4
C7 C7
SIM SIM SIM LINE OF SUNSHADE
D W5 B A
LINE OF DEVICES ABOVE
SUNSHADE BB A4.2 A4.2 A4.2
1 TYP.
DEVICES A3.1 3
CC A5.2
ABOVE TYP. LINE OF OVERHANG A3.1 A2.0 1' - 4"
6' - 7 1/2" 6' - 0" 4' - 0" 6' - 0" 6' - 8 1/2" 14' - 7" 29' - 10" 10' - 3" 3' - 11" 7' - 4 1/2" 6' - 0" 4' - 0" 6' - 0" 5' - 3 1/2" 13' - 4" 20' - 8 1/2" FINISH ABBREVIATIONS
12' - 0" 17' - 4" 14' - 7" 29' - 10" 38' - 10 1/2" 5' - 3 1/2" 13' - 4" 20' - 8 1/2"
ATC ACOUSTICAL TILE CEILING
General Plan Notes
CPT CARPET
151' - 11 1/2"
CMT CERAMIC MOSAIC TILE 1. The Contractor shall field verify all dimensions before construction.
CWT CERAMIC WALL TILE If there are any discrepancies, the Contractor shall notify the Architect
CK CJ CH CG CF CE CD CC CB CA N EXP EXPOSED TO STRUCTURE before proceeding with the construction.
FAB FABRIC
Building C South Upper Level Floor Plan Finish Floor Elevation:114' - 0" FE FINISHED END 2. All dimensions on the drawings are to the face of studs and
1/8" = 1'-0" GYP BD GYPSUM BOARD foundation walls, unless noted otherwise.
MAS MASONRY
PT PAINT 3. See Reflected Ceiling Plans and Code Plans for locations of fire-
RB RUBBER BASE rated walls.
RBF RUBBER FLOOR
VCT VINYL COMPOSITION TILE 4. The Contractor shall coordinate and implement all safety measures
SC SEALED CONCRETE requested and required by the local Fire Marshal, Health Department,
SOS SOLID SURFACE Building Officials and other governing agencies.
SS STAINLESS STEEL
TS TACK SURFACE 5. The Contractor shall maintain the security of the complex throughout
the entire construction schedule.
6. All non-load bearing interior walls on slab on grade floor on the main
level shall be provided with 2" slip joint (minimum), unless noted
otherwise.
7. Slope the concrete floor slab to all floor drains at a minimum of 1/8”
per foot.
10. Provide blocking at all wall hung accessories, hardware and wall-
hung cabinets where required.
13. At exterior metal stud walls w/ Brick Veneer, the face of the Brick
Veneer overhangs the foundation by 1/2".
15. Shaded areas of the floor plan are existing building to remain.
C:\Users\rortiz\Desktop\Revit Local\15064 DPS Groff HS Ph 2 A15_BO.rvt
CHECKED BY:
JG/BS/BO/AMJ
JT
BLDG C SOUTH UPPER LEVEL FLOOR
DATE:
October 25, 2017 PLAN, SCHEDULES, DETAILS & NOTES
10/10/2017 4:47:55 PM
DATE:
A1.8 OF:
272
C7 C6 C5 C4 C3
PRE-ENG. PRE-FIN. ALUM. SIM D2 D3 D4
O.H. D5 D6 D7
SUNSHADE SYSTEM RE: PLANS OUTSIDE / INSIDE CORNER TRIM E ROOFTOP EQUIP. - RE: MECH AA
FOR LOCATIONS BY MTL. PANEL MANUF. - A4.3 A3.1 PRE-ENG. PRE-FIN. ALUM.
BACKERROD & SEALANT (TYP.) @ ROOFTOP EQUIP. - RE: MECH
PRE-FIN. MTL. COPING (TYP.) PRE-FIN. MTL. COPING (TYP.) SUNSHADE SYSTEM RE: PLANS
INSIDE CORNERS PRE-FIN. MTL. COPING (TYP.) OUTSIDE / INSIDE CORNER TRIM SIM FOR LOCATIONS
PRE-FIN. MTL. OVERFLOW BY MTL. PANEL MANUF. - E PRE-FIN. MTL. COPING (TYP.)
SCUPPER VERT. PRE-FIN. MTL. PANEL BACKERROD & SEALANT (TYP.) @ A4.3 VERT. PRE-FIN. MTL. PANEL
T.O. Wall @ Classroom SYSTEM T.O. Wall @ Classroom T.O. Wall @ Classroom INSIDE CORNERS SYSTEM T.O. Wall @ Classroom
132' - 6" 132' - 6" 132' - 6" PRE-FIN. MTL. SLOPED SILL 132' - 6"
T.O. Wall @ Classroom. T.O. Wall @ Classroom. T.O. Wall @ Classroom. T.O. Wall @ Classroom.
130' - 0" 130' - 0" 130' - 0" 130' - 0"
FLAT PRE-FIN. MTL. PANEL Typ. Sim.
9 2 Typ. PRE-FIN. MTL. OVERFLOW
SYSTEM W/ REVEALS 9
A2.0 A2.1 SCUPPER
C.J. A2.0
FLAT PRE-FIN. MTL. PANEL
BACKERROD & SEALANT @ SYSTEM W/ REVEALS
INSIDE CORNER (TYP.) PRE-ENG. PRE-FIN. ALUM.
SUNSHADE SYSTEM RE: PLANS STL. COL. BEYOND - PT.
CMU VENEER W/ ACCENT
W2 FOR LOCATIONS BANDING 7 W10
A2.0 PRE-ENG. PRE-FIN. ALUM.
SUNSHADE SYSTEM RE: PLANS
Sim.
2 FOR LOCATIONS
Upper Level A2.1 Upper Level Upper Level Upper Level
114' - 0" 114' - 0" 114' - 0" 114' - 0"
BACKERROD & SEALANT @
PRE-ENG. PRE-FIN. ALUM. INSIDE CORNER (TYP.)
SUNSHADE SYSTEM RE: PLANS VERT. PRE-FIN. MTL. PANEL
FOR LOCATIONS SYSTEM W9 PRECAST CONC. SILL
SIM
CK CJ CH CG D
SIM
C
SIM CF CE B CD CC CB CA
SIM SIM A4.2
A4.2 A4.2 C A PRE-FIN. MTL. COPING (TYP.) VERT. PRE-FIN. MTL. PANEL
BB FLAT PRE-FIN. MTL. PANEL
A4.2 SYSTEM
FLAT PRE-FIN. MTL. PANEL A3.1 ROOFTOP EQUIP. - RE: MECH A4.2
SYSTEM W/ REVEALS OUTSIDE / INSIDE CORNER TRIM
SYSTEM W/ REVEALS
PRE-FIN. MTL. COPING (TYP.) PRE-FIN. MTL. OVERFLOW BY MTL. PANEL MANUF. -
OUTSIDE / INSIDE CORNER TRIM BACKERROD & SEALANT (TYP.) @ D
PRE-FIN. MTL. OVERFLOW SCUPPER VERT. PRE-FIN. MTL. PANEL
BY MTL. PANEL MANUF. - INSIDE CORNERS A4.3
T.O. Wall @ Classroom SCUPPER T.O. Wall @ Classroom SYSTEM PRE-FIN. MTL. COPING (TYP.)
BACKERROD & SEALANT (TYP.) @
132' - 6" INSIDE CORNERS 132' - 6"
T.O. Wall @ Classroom. T.O. Wall @ Classroom. T.O. Wall @ Classroom. T.O. Wall @ Classroom.
130' - 0" 130' - 0" 130' - 0" 130' - 0"
CMU VENEER W/ ACCENT
FLAT PRE-FIN. MTL. PANEL Typ. BANDING OUTSIDE / INSIDE CORNER TRIM
SYSTEM W/ REVEALS C.J. C.J. C.J. C.J. 9 BY MTL. PANEL MANUF. - OUTSIDE / INSIDE CORNER TRIM
SIM A2.0 BACKERROD & SEALANT (TYP.) @ BY MTL. PANEL MANUF. -
11 FLAT PRE-FIN. MTL. PANEL INSIDE CORNERS BACKERROD & SEALANT (TYP.) @
A2.1 SYSTEM W/ REVEALS
PRE-ENG. PRE-FIN. ALUM. INSIDE CORNERS
SUNSHADE SYSTEM RE: PLANS
A4 A2 W5 Sim. A2 A4 PRE-ENG. PRE-FIN. ALUM.
FOR LOCATIONS 2 PRE-FIN. MTL. SLOPED SILL W12 PRE-ENG. PRE-FIN. ALUM.
W8 SUNSHADE SYSTEM RE: PLANS
A2.1 SUNSHADE SYSTEM RE: PLANS
T.O. Mas. Wall FOR LOCATIONS T.O. Mas. Wall
FOR LOCATIONS
116' - 0" 116' - 0"
Sim.
Upper Level 2 Upper Level Upper Level Upper Level
C.J. C.J. A2.1
114' - 0" 114' - 0" 114' - 0" 114' - 0"
BUILDING EXPANSION JT. &
COVER
BRICK VENEER #1 W11
ALUM. WDWS.
(2) COURSES OF 1" RECESSED
BRICK VENEER (BRICK #3) - TYP. A5 A6 W5 A6 A5 W25 2" X 2" X 3'6" CONC. FILLED STL. PRECAST CONC. SILL
TUBE BOLLARD DOOR STOP -PT.
2" X 2" X 3'6" CONC. FILLED STL. TYP @ ALL EXTERIOR DOORS
1150 1149
TUBE BOLLARD DOOR STOP -PT. BRICK VENEER #2 GRADE - RE: CIVIL
TYP @ ALL EXTERIOR DOORS
Main Level Main Level Main Level Main Level
100' - 0" 100' - 0" 100' - 0" 100' - 0"
B.O. Grade Beam - Re Struct. B.O. Grade Beam - Re Struct. B.O. Grade Beam - Re Struct. B.O. Grade Beam - Re Struct.
97' - 0" 97' - 0" 97' - 0" 97' - 0"
ALUM. WDWS. GRADE - RE: CIVIL CONC. FTGS. & GRADE BEAM
PRECAST CONC. SILL SOLID SLOPED SILL BLOCK (TYP. ALUM. WDWS. CMU VENEER W/ ACCENT H.M. DOOR & FRAME (PT.) H.M. DOOR & FRAME (PT.)
GRADE - RE: CIVIL @ CMU VENEER) - SEAL PRECAST CONC. SILL (DASHED FOR CLARITY) - RE:
CONC. FTGS. & GRADE BEAM BANDING CONC. FTGS. & GRADE BEAM STRUCT.
(DASHED FOR CLARITY) - RE: STL. COL. - PT. - RE: STRUCT. PRE-ENG. PRE-FIN. ALUM. 2" X 2" X 3'6" CONC. FILLED STL. (DASHED FOR CLARITY) - RE:
STRUCT. SUNSHADE SYSTEM RE: PLANS TUBE BOLLARD DOOR STOP -PT. STRUCT.
FOR LOCATIONS TYP @ ALL EXTERIOR DOORS
3. Building C South - SouthEast Elevation / Building C North - North Elevation (O.H.) 4. Building C - Midsection South West Elevation
1/8" = 1'-0" 1/8" = 1'-0"
DK DJ BB DH B
SIM DG C
SIM DF DE
O.H. O.H. SIM
A AA O.H.
C1 C2 C3 C4 A C5 C6 C7 B A3.1 A4.3 A4.3
A4.6 A3.1 A4.3
PRE-FIN. MTL. COPING (TYP.) A4.6 VERT. PRE-FIN. MTL. PANEL PRE-FIN. MTL. COPING (TYP.) OUTSIDE / INSIDE CORNER TRIM
OUTSIDE / INSIDE CORNER TRIM PRE-FIN. MTL. COPING (TYP.) 82' - 11" ROOFTOP EQUIP. - RE: MECH ROOFTOP EQUIP. - RE: MECH SYSTEM
PRE-FIN. MTL. OVERFLOW BY MTL. PANEL MANUF. -
BY MTL. PANEL MANUF. - OUTSIDE / INSIDE CORNER TRIM BACKERROD & SEALANT (TYP.) @
PRE-FIN. MTL. SLOPED SILL OUTSIDE / INSIDE CORNER TRIM SCUPPER
BACKERROD & SEALANT (TYP.) @ BY MTL. PANEL MANUF. - FLAT PRE-FIN. MTL. PANEL INSIDE CORNERS
BY MTL. PANEL MANUF. - C.J. EXTRUSIONS BY MTL.PANEL
INSIDE CORNERS BACKERROD & SEALANT (TYP.) @ SYSTEM W/ REVEALS
PRE-ENG. PRE-FIN. ALUM. BACKERROD & SEALANT (TYP.) @ MANUF.
T.O. Wall @ Classroom SUNSHADE SYSTEM RE: PLANS INSIDE CORNERS T.O. Wall @ Classroom T.O. Wall @ Classroom INSIDE CORNERS PRE-FIN. MTL. COPING (TYP.) T.O. Wall @ Classroom
132' - 6" FOR LOCATIONS PRE-FIN. MTL. COPING (TYP.) 132' - 6" 132' - 6" 132' - 6"
T.O. Wall @ Classroom. T.O. Wall @ Classroom. T.O. Wall @ Classroom. T.O. Wall @ Classroom.
130' - 0" 130' - 0" 130' - 0" 130' - 0"
SIM FLAT PRE-FIN. MTL. PANEL Typ.
11 9
C.J. C.J. ALUM. WDWS. SYSTEM W/ REVEALS C.J. C.J.
A2.1 A2.0
FLAT PRE-FIN. MTL. PANEL T.O. Masonry Wall T.O. Masonry Wall
SOLID SLOPED SILL BLOCK (TYP.
SYSTEM W/ REVEALS @ CMU VENEER) - SEAL 124' - 8" 124' - 8"
VERT. PRE-FIN. MTL. PANEL
Sim. CMU VENEER W/ ACCENT ALUM. WDWS.
SYSTEM 2 A2 A2 A4 A2 A4 A4 A2 A4
BANDING Sim.
W4 A2.1 W6 PRE-FIN. MTL. SLOPED SILL W14 2
PRE-ENG. PRE-FIN. ALUM. A2.1
SUNSHADE SYSTEM RE: PLANS (2) COURSES OF 1" RECESSED
PRECAST CONC. SILL Typ. FOR LOCATIONS BRICK VENEER (BRICK #3) - TYP.
9
Upper Level A2.0 Upper Level Upper Level Upper Level
114' - 0" 114' - 0" 114' - 0" 114' - 0"
8' - 8" 6' - 0" 7' - 5" PRE-ENG. PRE-FIN. ALUM.
STL. COL. BEYOND - PT. 7' - 5" 6' - 0"
ALUM. WDWS. SUNSHADE SYSTEM RE: PLANS
PRE-ENG. PRE-FIN. ALUM. FOR LOCATIONS
SUNSHADE SYSTEM RE: PLANS
ALUM. WDWS. FOR LOCATIONS ALUM. WDWS.
(2) COURSES OF 1" RECESSED A6 A6 A5 A6 A5 A5 A6 A5
BRICK VENEER (BRICK #3) - TYP. W3 W6 W13
SOLID SLOPED SILL BLOCK (TYP. 2" X 2" X 3'6" CONC. FILLED STL.
@ CMU VENEER) - SEAL TUBE BOLLARD DOOR STOP -PT.
BRICK VENEER #1 TYP @ ALL EXTERIOR DOORS
1118 GRADE - RE: CIVIL C.J. C.J. C.J. C.J.
Main Level Main Level Main Level Main Level
100' - 0" 100' - 0" 100' - 0" 100' - 0"
B.O. Grade Beam - Re Struct. B.O. Grade Beam - Re Struct. B.O. Grade Beam - Re Struct. B.O. Grade Beam - Re Struct.
97' - 0" 97' - 0" 97' - 0" 97' - 0"
BRICK VENEER #2 PRECAST CONC. SILL CMU VENEER W/ ACCENT BRICK VENEER #2 PRECAST CONC. SILL GRADE - RE: CIVIL PRECAST CONC. SILL
CONC. FTGS. & GRADE BEAM JG 01/24/17
2" X 2" X 3'6" CONC. FILLED STL. (2) COURSES OF 1" RECESSED BANDING ALUM. WDWS. (2) COURSES OF 1" RECESSED
(DASHED FOR CLARITY) - RE: PRECAST CONC. SILL BRICK VENEER #2
TUBE BOLLARD DOOR STOP -PT. BRICK VENEER (BRICK #3) - TYP. BRICK VENEER (BRICK #3) - TYP.
STRUCT. CONC. FTGS. & GRADE BEAM CONC. FTGS. & GRADE BEAM PRECAST CONC. SILL
TYP @ ALL EXTERIOR DOORS (DASHED FOR CLARITY) - RE: BRICK VENEER #1
H.M. DOOR & FRAME (PT.) BRICK VENEER #1 (DASHED FOR CLARITY) - RE:
STRUCT. STRUCT.
5. Building C South - SouthWest Elevation/ Building C North - West Elevation (O.H.) 6. Building C North - South Elevation / Building C South - North West Elevation (O.H.)
C:\Users\rortiz\Desktop\Revit Local\15064 DPS Groff HS Ph 2 A15_BO.rvt
DRAWN BY:
RAINSCREEN ON 2-1/2" MTL. STUDS @ 16" O.C. - MTL. PANEL MFR. 1" DEPARTMENT OF JG/BS/BO/AMJ
WALL PANEL SYSTEM W/
BLDG C EXTERIOR ELEVATIONS
2"
XPS INSUL. (R-12.5 RE: STRUCT. 3/8" MIN. RAINSCREEN ON FACILITY MANAGEMENT CHECKED BY:
JT
CLOSURE IN 5"
MIN.) ON AIR BARRIER 2-1/2" XPS INSUL. (R-12.5 DATE:
TRIM - BY MTL. TRIM - BY MTL. SEALANT - BY October 25, 2017
10/10/2017 4:49:21 PM
ON 8" CMU W/ JOINT MIN.) ON AIR BARRIER ON APPROVED CONTRACT DOCUMENT SCALE:
PANEL MFR. PANEL MFR. MTL. PANEL MFR.
REINF. @ 16" O.C. VERT. 8" CMU W/ JOINT REINF. @ AS NOTED
PANEL CLIP - BY MTL. PANEL MFR. - RE: STRUCT. PANEL CLIP - BY MTL. PANEL MFR. TRIM - BY MTL. 16" O.C. VERT. - RE: SHEET:
PANEL MFR. N c 2017 Eidos Architects DWG. NO.
STRUCT.
7. Brick Control Joint 8. Horz. Panel Outside Corner Detail 9. Vert. Panel Outside Corner Detail 10. Horiz. Panel Vertical Reveal Detail KEY PLAN 104
1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0"
DATE:
A2.0 OF:
272
SELF-ADHERING MEMBRANE
1 1/4"
5/8" TYPE 'X' GYP.
BD. - PT. PRE-FIN MTL. VERT. WALL
BACKER ROD & INTEGRAL PANEL SYSTEM W/ 3/8" MIN.
COLORED SEALANT RAINSCREEN ON 2-1/2" XPS
PANEL CLIP - BY INSUL. (R-12.5 MIN.) ON AIR
MTL. PANEL MFR. TURN ROOF BARRIER ON 8" CMU W/
MEMBRANE UP JOINT REINF. @ 16" O.C.
PRE-FIN MTL. VERTICAL VERT. - RE: STRUCT.
WALL PANEL SYSTEM W/ WALL & BEHIND
MTL. PANEL PRE-ENGINEERED ALUM.
3/8" MIN. RAINSCREEN ON BASE TERMINATION - BY
TERMINATION SUN SHADE SYSTEM
2-1/2" XPS INSUL. (R-12.5 MTL. PANEL MFR.
MIN.) ON AIR BARRIER ON 3 1/2"
1/2" DENSGLASS ON 6" 60 MIL. FULLY ADHERED EPDM 19' - 8"
30' - 2" 3 1/2"
2"
MTL. STUDS @ 16" O.C. ON 1/2" DENS DECK PRIME ON 4' - 0" PRE-ENGINEERED ALUM. SUN
MIN.
8"
MIN. 5.2" (R-30 MIN.) POLYISO SHADE SYSTEM 4' - 0"
CLOSURE IN SEALANT 2" SEE PLANS FOR LOCATIONS
CLOSURE IN SEALANT - BY MTL. PANEL MFR. INSUL. ON MTL. DECK & BEAMS -
2" INSTALL MAT'L.
4' - 0"
4' - 0"
- BY MTL. PANEL MFR. RE: STRUCT.
TRIM - BY MTL. PANEL MFR. 1' - 8" OR 2'-8" @ SIM. ISOLATION PAD BETWEEN
PT. EXPOSED 1' - 6" OR 2'-6" @ SIM. STL. PLATE ALUM. SUN
TRIM - BY MTL. PANEL BACKER ROD & INTEGRAL SHADE SYSTEM (TYP.)
CMU (TYP.) 2" PRE-ENGINEERED ALUM. SUN INSTALL MAT'L.
MFR. COLORED SEALANT
SHADE SYSTEM ISOLATION PAD BETWEEN
PRE-FIN MTL. HORIZONTAL WALL PANEL STL. PLATE ALUM. SUN
17' - 0"
BRICK VENEER 'TYPE 1' W/
17' - 0"
SYSTEM W/ 3/8" MIN. RAINSCREEN ON SHADE SYSTEM (TYP.)
ANCHORS @ 16" O.C. VERT. STL. CONNECTOR PLATE
2-1/2" XPS INSUL. (R-12.5 MIN.) ON & HORIZ., 2-1/4" AIR SPACE, ANCHORD TO STL.
7' - 4"
AIR BARRIER ON 8" CMU W/ JOINT 2-1/2" XPS INSUL. (R-12.5
REINF. @ 16" O.C. VERT. - RE: STRUCT. STRUCT. - TYP. - RE:
MIN.), AIR BARRIER ON 8" INSTALL MAT'L. ISOLATION PAD STL. CONNECTOR PLATE STRUCT.
CMU W/ JOINT REINF. @ 16" BETWEEN STL. PLATE ALUM. SUN ANCHORD TO STL. STRUCT.
PANEL CLIP - BY MTL. PANEL MFR.
3 1/2"
STL. ANGLE (PT.)
3 1/2"
O.C. VERT. - RE: STRUCT. SHADE SYSTEM (TYP.) - TYP. - RE: STRUCT.
- RE: STRUCT
BOND BEAM - RE: STL. CONNECTOR PLATE
STRUCT ANCHORD TO STL. STRUCT.
- TYP. - RE: STRUCT.
1. Metal Panel Inside Corner Detail 2. Metal Panel Inside Corner Detail @ Masonry 3. Roof Detail - Metal Panel 4. Sunshade @ Punched Openings 5. Sunshade Plan @ Building C Main Entry 6. Sunshade Plan @ Building C Secondary Entry
1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0" 1/8" = 1'-0" 1/8" = 1'-0" 1/8" = 1'-0"
8"
(V.I.F.)
2"
6' - 0"
/-
SHADE SYSTEM (TYP.)
STL. TUBES
2"
2"
ATTACHED TO
STRUCT. - TYP. -
3' - 0"
4 ' - 6"
RE: STRUCT.
3' - 0"
8' - 5" +/-
V.I.F.
2"
STL. COLS. W/ 2" PRE-FIN MTL. FLAT WALL PANEL
6' - 11" 2"
INVERTED ANGLES 6' - 11" 2" SYSTEM W/ 3/8" MIN. RAINSCREEN ON
6' - 11"
8 ' - 6"
- RE: STRUCT. 2" 35' - 7" STL. TUBES
84.3° 2" 2-1/2" XPS INSUL. (R-12.5 MIN.), AIR
2" ATTACHED TO
BARRIER ON DENSGLASS ON MTL.
STRUCT. - TYP. -
4 0' - 8"
PRE-ENGINEERED STUDS @ 16" O.C. - RE: STRUCT.
ALUM. SUN INSTALL MAT'L. ISOLATION PAD RE: STRUCT.
2"
PRE-CAST CONC. SILL
SHADE SYSTEM STL. TUBE CENTERED ON COL. BETWEEN STL. TUBE & ALUM. CONCEALED FASTENERS BLOCK BELOW (TYP.)
BETWEEN STL. SUN SHADE SYSTEM (TYP.) SECONDARY METAL SUBGIRT
FLASHING TAPE
TUBE SUPPORTS FRAMING AND MOUNTING
8 ' - 6"
CLIPS - PER PANEL MANUF. FLEXIBLE FLASHING
SEAMLESS PANEL ON
7. Sunshade Plan @ Stairs PRE-ENGINEERED 5/8" TYPE 'X'
CONT. STARTER CLEAT BY
WALL PANEL MANF. PANEL JOINT - 5/8" TYPE 'X'
PRIMARY WALL - SEE ELEVS.
2"
ALUM. SUN SHADE GYP. BD. (PT.) PRESSURE TREATED
1/8" = 1'-0" BY WALL PANEL GYP. BD. (PT.)
SYSTEM BETWEEN ON MTL STUDS WD. BLKG. AS REQ'D.
THRU-WALL FLASHING W/ DRIP MANF. (TYP.) ON MTL STUDS
STL. TUBE SUPPORTS
4"
3/8"
PRE-ENGINEERED ALUM. SUN
8 ' - 6"
PRECAST CONC. TRIM PRE-FIN MTL. FLAT WALL
1' - 0"
3 5/8"
3/8"
STL. TUBE SUPPORTS STL. TUBE CONC. SILL MIN. RAINSCREEN ON
6"
2"
STL. COL. (TYP.) (R-12.5 MIN.) ON AIR
DRIP
BARRIER ON 1/2"
7'-4" AFF
4"
4" DENSGLASS ON 6" MTL.
2" 2" 1"
5/8" 3/8" STUDS @ 16" O.C. -
RE: STRUCT.
3' - 0"
83.6° LINE OF ROOF BRICK VENEER 'TYPE 1' W/ PANEL JOINT - BY WALL
OVERHANG SEAMLESS PANEL ON PANEL MANF. (TYP.) PANEL JOINT - BY WALL
ANCHORS @ 16" O.C. VERT. &
ABOVE PRIMARY WALL - SEE PANEL MANF. (TYP.)
3' - 0"
5' - 4" +/- 9' - 8" 7' - 0" 9' - 8" 5' - 4" +/- HORIZ., 1-7/8" AIR SPACE, 2-1/2" CLOSURE IN SEALANT - BY
(V.I.F) 2" 2" 2" 2" (V.I.F) XPS INSUL. (R-12.5 MIN.), AIR ELEVS. PRE-FIN MTL. FLAT WALL PANEL MTL. PANEL MFR.
3' - 2" SYSTEM W/ 3/8" MIN.
37' - 8" (V.I.F.) BARRIER ON DENSGLASS ON MTL.
2" 2" STL. COLS. W/ STUDS @ 16" O.C. - RE: STRUCT. RAINSCREEN ON AIR BARRIER 4" CMU VENEER ANCHORED @ 16" O.C. VERT. & HORIZ.
STL. TUBES ATTACHED TO 3' - 6" 8' - 2" (V.I.F.) INVERTED ANGLES ON DENSGLASS ON MTL. W/ 2-1/4" AIR SPACE ON 2-1/2" XPS INSUL. (R-12.5
STRUCT. - TYP. - RE: STRUCT. - RE: STRUCT. STUDS @ 16" O.C. - RE: MIN.) ON AIR BARRIER ON 8" CMU - RE: STRUCT.
STRUCT.
INSTALL MAT'L. ISOLATION PAD BETWEEN STL.
TUBE & ALUM. SUN SHADE SYSTEM (TYP.)
8. Sunshade Plan @ Building C Midsection 9. Sunshade Plan @ Building C Classrooms 10. Typical Flat Panel System Base Detail 11. Typical Flat Panel Outside Corner Detail 12. Typical Flat Panel End Wall @ Masonry
1/8" = 1'-0" 1/8" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0" 1 1/2" = 1'-0"
1' - 0"
- TYP. - RE: STRUCT.
M.1
2"
STUDS @ 16" O.C. - RE: ALUM. SUN SHADE 3
STRUCT. SYSTEM BETWEEN STL. A4.0 TINTED, INSULATED & LAMINATED
INSTALL MAT'L. ISOLATION PAD 2' - 0" 5' - 11"
CLOSURE IN TUBE SUPPORTS 8' - 6" 2' - 6"
1/2"
"
2' - 10
MTL. PANEL MFR. SUN SHADE SYSTEM (TYP.) 3" VARIES 60 MIL. FULLY ADHERED EPDM
CONCEALED FASTENERS
4' - 8"
1 1/2"
4' - 8"
4' - 0"
2' - 8"
3' - 4"
2' - 0"
1 1/2"
TYP.
ON 1/2" DENS DECK PRIME ON
1' - 4"
2"
TYP.
SECONDARY METAL SUBGIRT
MIN. 5.2" (R-30 MIN.) POLYISO
1/2"
8"
FRAMING AND MOUNTING
INSUL. ON MTL. DECK & BEAMS -
RE: STRUCT.
CLIPS - PER PANEL MANUF.
S M.5 RE: STRUCT.
3' - 9"
3' - 0"
2' - 4"
TYP.
6"
1/4"
Varies
112' - 2 3/8" - RE: S S TL. B
6' - 11
(VARIES) 7' - 3" 10' - 11" 10' - 11" TRUCT 75° PRESSURE TREATED WD.
. A4.9 T.O. STL. Beam
1/2" 1/2" 1/2" 1/2" 2' - 11 3/4" BLKG. (TYP.) - PT.
VARIES 130' - 0" T.O. STL. Beam
PRE-FIN MTL. FLAT B CENTERLINE OF TRUSS
SOFFIT PANEL SEE RCP PANEL JOINT W/ THRU-WALL STL. PLATES (PT.) ATTACHED TO 1" 1" 1" 1" 1" 1" 7" Varies
A4.1 STRUCT. - TYP. - RE: STRUCT. TO LIE @ CENTER OF
SYSTEM, AIR BARRIER FLASHING & DRIP - BY WALL 4' - 3" 10' - 0" 8' - 6" 8' - 6" 8' - 6" 8' - 6" 8' - 6" 8' - 6" COL. - RE: STRUCT. 4
ON DENSGLASS ON PANEL MANF. (TYP.) 8' - 8 1/2" 2" 2" 2" 2" 2" 10X4 STL. TUBE BEAMS (PT.)
2" 2" 2" A4.0
MTL. FRMG. @ 16" STL. COLS. (PT.) - RE: H AA STL. BEAM (PT.) - RE: STRUCT. - RE: STRUCT.
PRE-ENGINEERED ALUM. SUN
O.C. - RE: STRUCT. SHADE SYSTEM BETWEEN
STRUCT. 0.2 A4.4 0.3 PRE-ENGINEERED 0.4 0.5 A3.2 0.6 0.7
STL. TUBE SUPPORTS ALUM. SUN SHADE STL. ANGLE (PT.) - RE: STRUCT
SYSTEM BETWEEN STL. INSTALL MAT'L. ISOLATION PAD STL. TUBES (PT.)
TUBE SUPPORTS BETWEEN STL. TUBE & ALUM. ATTACHED TO STRUCT.
13. Typical Flat Panel Soffit Detail 14. Sunshades Plan @ Admin. 15. Sunshade Plan @ Lecture Hall SUN SHADE SYSTEM (TYP.) - TYP. - RE: STRUCT.
16. Typical Skylight Detail
1 1/2" = 1'-0" 1/8" = 1'-0" 1/8" = 1'-0" 1/2" = 1'-0"
C:\Users\rortiz\Desktop\Revit Local\15064 DPS Groff HS Ph 2 A15_BO.rvt
A
1.2 1.3 1.5 1.6 2.2 2.3 6.4 7 8 A4.9
N N 10/25/17 Record Drawings
09/30/16 For Construction Set
3"
N.1