Production Schedule 2018

WEEK / MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY WEEKEND UP TO TO DO FOR


DATE DATE? NEXT WEEK
1. Created LO1 - Continued - Continued / Yes. Continue
19/03/1 and started developing ideas for developing ideas developing
8 generating magazine. for magazine. ideas.
ideas.
2. Continued - Completed - NO COLLEGE / Yes. Complete
26/03/1 developing development of LO1 mood board
8 ideas for Part A & started over half
magazine. mood board. term.
3. HALF TERM / / / / / / Complete
02/04/1 START mood board
8 over half
term.
4. / / / / HALF TERM END Completed Yes. -
09/04/1 mood board.
8
5. Started working - Continued working - Completed Reece On Sunday took Yes. Make sure
16/04/1 on Reece. on Reece & started and Risk images that are images were
8 Risk assessment Assessment going to be used taken at
document. documents. in magazine. weekend.
Started and
completed Legal
and Ethical issues
PowerPoint.
6. Reviewed - Started editing - Continued editing - Yes. -
23/04/1 images taken at images. images
8 the weekend. (screenshotting
edited images
showing before
and after).
Production Schedule 2018

7. Checked I had - NOT IN LESSON. - Continued Yes. -


30/04/1 completed developing
8 other tasks in images/ finished
LO1 & 2. editing certain
Continued to images
edit images. (screenshotting
edited images
showing before
and after).
8. Continued - Started making an - Go through - Yes. Make sure 1st
07/05/1 developing edit progress different tools and version of
8 images/ document for the uses of Adobe In- layout is
finished editing different images I Design with saved.
certain images have and make sure teacher and start
(screenshotting contact sheet different aspects
edited images images are put on of layout (double
showing before to blog. page spread).
and after).
9. NOT IN NOT IN Continued to edit - Continue to Make sure Yes. Complete
14/05/1 COLLEGE. COLLEGE. and develop 2nd develop 2nd contact sheet contact sheet
8 version of layout version of layout and analysis are and analysis.
and save as and ensure it is complete and
separate edition saved. Start uploaded to
(double page writing article that blog.
spread). will be featured on
double page
spread.
10. Start editing 3rd (Homework) – Put article into - Continued to Make sure Yes. -
21/05/1 version of Complete double page spread develop layout everything is on
8 layout (make article and layout and continue consisting of front blog (e.g. edit
sure it is saved make sure raw developing front cover and double log, written
as separate images are on cover and contents page spread. copy, contact
version) and blog). page. sheet/analysis).
Production Schedule 2018

start more
specifically on
front
cover/contents
page.
11. HALF TERM. HALF TERM. HALF TERM. HALF TERM. HALF TERM. - Yes. Make sure
28/05/1 everything is
8 on blog.
12. Started editing - Received feedback - Made sure - Yes. -
04/05/1 4th version of for other work everything is on
8 layout finishing (uploaded to blog) blog. Finished
off most of the and continued to contents page off.
components work on contents
that make up page.
the front cover Took screenshots of
and double different
page spread. developments of
Started to work layout. (Homework
on contents - put them into a
page. document and
completed
improvements from
feedback LO1/LO2).
13.
11/05/1
8