Escolar Documentos
Profissional Documentos
Cultura Documentos
Elbow
E1 12 28.02 27.87 28.45 28.66 0.00 PNT
E2 12 - 28.75 29.15 28.26 0.00 PNT High access
E3 12 - 29.61 28.06 - 0.00 PNT High access
Point of Measurement
12
Inspector, Client Representative,
9 3 3
Ins : Insulated MIC : Med. Int. Corr MEC : Medium Ext. Corr ( Bambang AI/ Firda MF ) ( DWI O SETIADI )
Pnt : Painted HIC : Heavy. Int. Corr HEC : Heavy Ext. Corr
VISUAL INSPECTION RESULT
0
Leaks
G Flange Joint / Bolts
G Packing Glands
G Bonnets of Valves
G Expansion Joint
Misalignment
G Piping Misalignment
G Expansion Joint Misalignment
Vibration
G Small-Bore Pipe
N Screwed Connection
N Threaded Connection
External Corrosion
G Bolting Support Points Under Clamps
G Coating/Painting deterioration
G Interfaces at soil or water
Insulation
N Missing jacketing/insulation
N Insulation Condition
Remark :
(G) Good (F) Fair (P) Poor (B) Bad (N) None
Detail by Photograph :
Detail by Photograph :
Detail by Photograph :
S4
S3
E3
HIGH ACCESS CONT.
TO PLATFORM BRIDGE
(TO PQP SEPARATOR)
S12
S13
S14
E14
E13
S16
S15
R01 E15
Note
S = Straight Pipe E = Elbow T = Tee R = Reducer
Note
S = Straight Pipe E = Elbow T = Tee R = Reducer
Note
S = Straight Pipe E = Elbow T = Tee R = Reducer