L1/W1 = 3.38
>2; O.K!
JURUTERA PERUNDING TEGAP SDN. BHD. Sheet No.2
L2 = 42.8 m
V2 = 369 m3
> 340.5 m3
O.K!
At height increments of 250mm c/c, starting at the bottom of the pipe, put 4 rows
Assume: 1) riser pipe flow is orifice flow through the top of the pipe only
2) riser pipe head (H0) is 300mm
Qspillway = Q10 - Qriser
L1/W1 = 2.26
>2; O.K!
JURUTERA PERUNDING TEGAP SDN. BHD. Sheet No.2
L2 = 75.8 m
V2 = 1635 m3
> 1564 m3
O.K!
At height increments of 200mm c/c, starting at the bottom of the pipe, put 6 rows
Assume: 1) riser pipe flow is orifice flow through the top of the pipe only
2) riser pipe head (H0) is 300mm
Qspillway = Q10 - Qriser