Você está na página 1de 1

* GENERAL NOTES TYPICAL DETAILS OF COLUMN & FOOTINGS PROJECT NAME :- -

ADVANCE COPY ONLY FOR

LD
1] FOR CANTILEVER BEAMS TOP REINFORCEMENT TO BE ANCHORED TITLE :- TYPICAL DETAILS OF COLUMN
BEHIND FROM EXTERNAL FACE OF SUPPORT FOR ANCHORAGE
STUDY PURPOSE & FOOTINGS
DRAWING NO. BGA / AKH / STR -002

LD
LENGTH (Ld) OR SPAN OF CANTILEVER WHICHEVER IS GREATER. R.C.C.
R.C.C. COLUMN
KEY PLAN

H/2
2] ALL COLUMNS OF FRAME SHOULD BE TIED IN BOTH DIRECTIONS BY COLUMN
GROUND GROUND
LEVEL LEVEL
TIE BEAMS/PLINTH BEAMS AT GROUND LEVEL/PLINTH LEVEL, EVEN IF PROVIDE LINKS @
100C/C AT JUNCTION OF
COLUMN AND BEAMS
HEIGHT OF COLUMNS IS WITHIN MAXIMUM ALLOWABLE HEIGHT LIMITS. FIRST SLAB LEVEL
FOOTING

3] AT ANY LEVEL WHERE COLUMN SIZE GETS REDUCED IN EITHER P.C.C.

DIMENSIONS, TIE BEAMS ARE REQUIRED.


SHADU STRATA
Z1- H/4 FOOTING KEY ELEVATION

H = [HEIGHT FROM RAFT LEVEL


4] IF FOOTINGS OVERLAP EACH OTHER, NECESSARY REVISION SHOULD

TO SLAB BEAM BOTTOM]


P.C.C.
BE OBTAINED FROM OUR OFFICE.
EXTRA P.C.C.
TERRACE FLOOR 5th (ROOF) SLAB

LD
5] FIRE RATINGS = 1.5 HOURS
SHADU STRATA
Z2- H/2
6] DO NOT CAST ANY R.C.C. WORK UNLESS REINFORCEMENT IS FOURTH FL. 4TH SLAB

H =[HEIGHT FROM 1ST SLAB LEVEL


TO 2ND SLAB BEAM BOTTOM]
LD
CHECKED AND VERIFIED BY US. THIRD FL. 3rd SLAB

H/2
7] MIN. CLEAR SPACING BETWEEN ANY TWO LONGITUDINAL BARS IN SECOND FL. 2nd SLAB
Z1- H/4
BEAM = 50 MM.
FIRST FL. 1st SLAB
PLINTH LEVEL
8] FIRST STIRRUPS IN BEAM SHOULD START FROM ITS FACE OF SUPPORT
GROUND PLINTH
TIE BEAM TIE BEAM G.L. G.L.
[ i.e. FROM COLUMN OR BEAM FACE.]
Z1- H/4

H/2
9] DESHUTTERING PERIOD SHALL NOT BE LESS THAN SPECIFIED BELOW

SITE CONDITION
HEIGHT AS PER
a) VERTICAL FACES OF COLUMN BEAMS & WALLS = 48 HOURS. KEY ELEVATION
Z2- H/2
b) SLAB SPANNING UPTO 3.50 M. = 7 DAYS

c) SLAB SPANNING OVER 3.50 M. = 14 DAYS


Z1- H/4
d) BEAMS = 21 DAYS NOTES
1] FOR GENERAL NOTES PLEASE REFER OUR DRAWING NO. BGA / - / STR - 01 / R0
1]

FOOTING
EXPOSURE CONDITION-MILD
BEFORE DESHUTTERING, DUE CARE SHOULD BE TAKEN TO ASCERTAIN

DEPTH
2] EARTHQUAKE ZONE-III (AS PER IS 1893-2002)
FOOTING
3] FOUNDATION TO REST ON STRATA
THAT REQUISITE STRENGTH OF CONCRETE IS GAINED.
300 300 S.B.C. OF SOIL ASSUMED T / SQ. MT.
FOUNDATION STRATA SHOULD BE APPROVED FROM OUR OFFICE BEFORE
10] PROPER CHAIRS TO BE PROVIDED TO ENSURE SPECIFIED THICKNESS LAYING OF P.C.C.
4] BUILDING IS DESIGNED FOR GROUND + 4 UPPER FLOORS ONLY.
OF SLAB TO RETAIN THE TOP BARS IN PROPER POSITION & ALSO

COVER
5] BASIC REFERENCE CODE IS

50
6] REINFORCEMENT TOR STEEL
PROVIDE PROPER COVERING & PINS FOR BEAM REINFORCEMENT.
5] GRADE OF CONCRETE

11] PROVIDE LINKS FOR COLUMN REINFORCEMENT IN JUNCTION OF TYPICAL SECTION OF COLUMN i] FOOTING , BASEMENT RAFT, LIFT RAFT = M25

COLUMN, BEAMS & SLABS AS PER LINKS SPACING MENTIONED IN ii] COLUMN / SHEAR WALL & LIFT PARDI = AS PER SCHEDULE
TYPICAL DETAILS OF BEAMS & SLAB
ii] BEAMS = M35 / M30
OUR DRAWING.
iii] SLABS = M35 / M30

12] ALL STRUCTURAL CONCRETE SHALL BE WEIGH BATCHED, MACHINE iv] COLUMN & BEAM JUNCTION = M35 / M30

AS PER DESIGN MIX


MIXED, MECHANICALLY VIBRATED AND AS PER DESIGN MIX.
6] NOMINAL COVERS
13] PROPER PRECAUTIONS SHOULD BE TAKEN BY SHORING, STRUTTING SR. NO. DESCRIPTION EXPOSURE MILD MODERATE SEVERE

i] FOOTING 50 50 50
ETC. TO MAINTAIN THE STABILITY OF ABUTTING STRUCTURES.
COLUMNS
ii ] 40 40 45
[ TO LINKS OF COLUMN ]
STRUCTURAL CONSULTANT SHOULD BE INFORMED IF ANY BEAMS
iii ] 20 30 45
[ TO STIRRUPS OF BEAM ]
GUIDANCE IS REQUIRED FOR THE SAME. iv ] SLABS 20 25 40
LIFT WALL / SHEAR WALL
v] 40 40 45
14] OUR RESPONSIBILITY SHALL REMAIN LIMITED TO SAFE AND SOUND [TO OUTERMOST REINFORCEMENT]

7] LAP LENGTH SHALL BE AS PER IS 456 : 2000. ALL LAPS (Ld) SHALL BE
STRUCTURAL DESIGN. WE SHALL NOT REMAIN RESPONSIBLE FOR STAGGERED & NOT MORE THAN 50% BARS TO BE LAPPED AT ANY GIVEN
SECTION.
a) CONCRETE MIX, QUALITY, SHUTTERING DESIGN ,
GRADE OF M20 M25 M30 M35 M40 AND
REINF. ABOVE
SCAFFOLDING/STAGING, CURING, SUBSTANDARD CONSTRUCTION
Fe 415 / 500 60 X D 56 X D 53 X D 46 X D 42 X D
MATERIAL, WORKMANSHIP & FAULTY CONSTRUCTION PROCEDURE.

b) SAFETY OF OLD STRUCTURE DURING DEMOLITION AND SAFETY OF REVISION


X DESCRIPTION
XX & DATE
ABUTTING STRUCTURE / BUILDING, ANY ACCIDENT OCCURRING DUE TO R1
07.03.2018 REVISED AS PER ARCH DWGS RECEIVED DATED 05.03.2018

CONSTRUCTION OF ELEMENT OF BUILDING NOT DESIGNED BY US.

c) THE WHOLE OR ANY PART OF THE WORK NOT DESIGNED BY US OR NOT

UNDER OUR RESPONSIBILITY OR WHICH HAS BEEN CONSTRUCTED DATE PRINTS ISSUED TO NOS
DETAILS OF STAIRCASE 18.12.2017 E - MAIL -
WITHOUT OR CONTRARY TO OUR SPECIFICATIONS.
SECTION THROUGH SECOND FLIGHT 07.03.2018 E - MAIL
d) ANY VIOLATION OF LEGAL OR STATUTORY PROVISIONS, RIGHTS OF

THIRD PARTIES, GOVERNMENTS ETC. UNLESS SUCH PROVISIONS OR


XX
X
RIGHTS HAVE BEEN SPECIFICALLY BROUGHT TO THE NOTICE WELL IN PARTICULARS-

ADVANCE BEFORE THE RELEVANT STAGE OF OUR SERVICES BY THE


CLIENT :- AKHIL BHARAT SADHU SANGAM TRUST.
CLIENT IN WRITING.

15] INSPECTION, IF SPECIFICALLY ASKED FOR, WILL BE PROVIDED TO THE ARCHITECT :- AR. VIMAL P. SAVLA

EXTENT OF VERIFICATION OF REINFORCEMENT ON SITE BUT CANTILEVER SPAN


DETAILS OF STAIRCASE DRAWN BY DESIGN BY CHECKED BY APPROVED BY
CANTILEVER SPAN OR
MAIN STEEL LD WHICHEVER IS SECTION THROUGH FIRST FLIGHT
RESPONSIBILITY REGARDING CORRECT & SOUND CONSTRUCTION MAXIMUM

SHALL SOLELY REST WITH CONTRACTOR / BUILDER / OWNER . SLAB


SLAB
CANTILEVER SPAN OR THK
LD WHICHEVER IS MAXIMUM SLAB ASHISH SHARWARI AJAY GAB
CANTILEVER SPAN
16] ANY DISCREPANCY BETWEEN OUR DRAWING & ARCHITECTS DRAWING DIST. STEEL MAIN STEEL JOB NO. BUILDING TYPE SHEET NOS REVISION
BEAM CANTILEVER SPAN
TOP BARS TOP BARS
SHALL BE BROUGHT TO OUR NOTICE BEFORE EXECUTION WORK. BEAM
1342/17 **** 1/3 R1
BEAM DEPTH

BEAM DEPTH

BEAM + +
17] BEFORE STARTING OF PROJECT CONFIRM EXISTING ADJACENT PLOT
300

MAIN STEEL MAIN STEEL

BOUNDARY LEVELS AND PROPOSED GROUND LEVELS TO DESIGN G. A. BHILARE CONSULTANTS PVT. LTD.
SLAB SLAB
THK THK
COMPOUND / RETAINING WALLS. IF ANY EXISTING COMPOUND / BOTTOM CURTAIL
BOTTOM BARS BARS BOTTOM BARS DIST. STEEL MAIN STEEL DIST. STEEL MAIN STEEL G A U R IN A N D A N , P L O T N O . 1 3 , S H A N T I S H E E L A S O C IE T Y , N E A R F T II, L A W C O L L E G E R O A D ,
COLUMN
RETAINING WALLS IS THERE SHOULD BE BROUGHT TO OUR NOTICE. ERANDAWANE, PUNE 411004 Telefax : +91 20 67215499, www.gabcpl.com, Email: info@gabcpl.com

TYPICAL DETAILS OF CANTILEVER BEAM TYPICAL SECTION OF CANTILEVER TYPICAL SECTION OF CANTILEVER
18] DO NOT SCALE THE DRAWING.
PROJECTION UP TO 600 MM PROJECTION > 600MM

Você também pode gostar