NOMOR : . . . . . . . . TAHUN . . . . . . . . .
TANGGAL : ......................
TENAGA
Bahan - 1
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)
CAT
1 Cat kayu se kualitas Patna kg 10,450.00
2 Cat kayu se kualitas Emco biasa kg 32,000.00
3 Cat kayu se kualitas Emco Bintang kg 42,000.00
4 Cat kayu se kualitas Par kg 29,000.00
5 Cat besi se kualitas Patna kg 10,450.00
6 Cat besi se kualitas Emco biasa kg 32,000.00
7 Cat besi se kualitas Emco Bintang kg 42,000.00
8 Cat kayu se kualitas Avian kg 24,750.00
9 Cat tembok/cat semen Maxilite kg 7,600.00
10 Cat tembok/cat emulsi dasar minyak Express kg 8,250.00
11 Cat tembok/cat polivynyl asetat Dulux kg 25,000.00
12 Cat tembok/cat kilap/cat acrilyc Dulux kg 35,000.00
13 Cat ICI Catylac kg 12,000.00
14 Cat tembok se kualitas Decolith kg 9,500.00
15 Cat Sintex kg 7,500.00
16 Cat dasar meni besi type A (cepat kering) Jago kg 12,000.00
17 Cat dasar meni besi type A (cepat kering) Par kg 22,500.00
18 Cat dasar meni kayu Jago kg 12,000.00
19 Cat duco kg 60,000.00
20 Cat genteng air ICI weathershield kg 42,000.00
21 Cat dasar undercoat / alkali resisiting primer kg 27,200.00
22 Cat dinding weathershield Dulux kg 50,000.00
23 Dempul kayu typa A (putih) Jago kg 10,000.00
24 Dempul lilin / kayu bj 9,000.00
25 Plamur Fuji kg 8,500.00
26 Plamur kayu Jago kg 12,000.00
27 Plamur tembok acrilyc kg 17,500.00
28 Plamur jenis sirlak kuning ltr 17,500.00
29 Sirlak putih batangan kg 65,000.00
30 Sirlak kuning serbuk kg 65,000.00
31 Oker kuning kg 12,000.00
32 Oker hitam kg 9,500.00
33 Oker pewarna politur merah / coklat bks 1,200.00
34 Kalkarium kg 5,000.00
35 Politur jadi ltr 20,000.00
36 Teak oil Fuji ltr 27,500.00
37 Pernis ltr 12,500.00
38 Glass bit ltr 12,000.00
39 Thermo plastik / cat marka kg 49,000.00
40 Cat rettar kg 49,000.00
41 Terpentin ltr 11,500.00
42 Minyak cat ltr 10,000.00
43 Thinner ltr 13,000.00
44 Spiritus ltr 6,500.00
45 Batu kambang kg 7,700.00
46 Kuas roll bh 8,500.00
47 Kuas ukuran 3,5" bh 8,000.00
48 Kuas ukuran 2,5" bh 5,000.00
49 Kuas ukuran kecil 1" bh 2,000.00
50 Soda api kg 15,000.00
51 Sabun deterjen kg 12,000.00
52 Amplas lbr 2,500.00
53 Prodo Mas m2 3,000,000.00
54 Kertas 100 x 100 cm lbr 2,000.00
55 Karbon lbr 3,500.00
Bahan - 2
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)
PIPA
1 Pipa beton 20 x 30 0anjang 1 m m 28,000.00
2 Pipa beton tanpa tulangan dia. 20 cm panjang 1 m m 24,000.00
3 Pipa beton tanpa tulangan dia. 30 cm panjang 1 m m 25,000.00
4 Pipa beton tanpa tulangan dia. 60 cm panjang 0,5 m m 28,000.00
5 Pipa beton tanpa tulangan dia. 80 cm panjang 0,5 m m 32,000.00
6 Pipa beton tanpa tulangan 1/2 dia. 20 cm m 12,000.00
PERALATAN SANITASI
BAK MANDI
1 Bak mandi teraso uk. 50x50x50 cm bh 150,000.00
2 Bak mandi teraso uk. 60x60x60 cm bh 175,000.00
3 Bak mandi teraso uk. 90x80x80 cm bh 220,000.00
4 Bak mandi (bathtube) dengan shower lux bh 3,250,000.00
5 Bak mandi (bathtube) standar bh 2,475,000.00
6 Bak mandi fiber glass 0,30 m3 bh 275,000.00
7 Bak mandi fiber glass 0,50 m3 bh 825,000.00
KLOSET
1 Kloset jongkok porselin type CE7 standar bh 75,000.00
2 Kloset jongkok porselin type CE8 standar bh 85,000.00
3 Kloset jongkok putih INA bh 65,000.00
4 Kloset jongkok warna INA bh 75,000.00
5 Kloset duduk standar / porselin ( dengan tangki KIA standart) "Lolo" bh 950,000.00
6 Kloset duduk porselin lux ( dengan tangki "Toto" ) bh 1,250,000.00
7 Kloset duduk putih dengan tangki "Toto" set 1,250,000.00
8 Kloset duduk warna dengan tangki "Toto" set 1,350,000.00
9 Kloset duduk putih dengan tangki "KIA" set 700,000.00
10 Kloset duduk warna dengan tangki "KIA" set 925,000.00
11 Kloset jongkok standar / keramik bh 55,600.00
12 Kloset jongkok teraso bh 25,000.00
Bahan - 3
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)
WASTAFEL
1 Wastafel standar INA bh 255,000.00
2 Wastafel lux INA bh 265,000.00
3 Wastafel putih (KIA) set 139,150.00
4 Wastafel warna (KIA) set 271,340.00
5 Badkip bh 150,000.00
6 Bak cuci stainless steel bh 500,000.00
7 Water drain + asesories set 75,000.00
URINOIR
1 Urinoir standar TOTO U 57 set 785,000.00
2 Urinoir putih set 1,050,000.00
4 Urinoir warna (KIA) set 379,500.00
5 Meja cuci dapur 125 x 50 cm bh 175,000.00
6 Tempat sabun tunggal bh 22,500.00
7 Kran air diameter 3/4" atau 1/2" bh 25,000.00
8 Seal tape bh 2,500.00
9 Floordrain bh 55,000.00
Bahan - 4
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)
ASBES
1 Asbes plat ( 100 x 100 x 0,3 ) lbr 10,000.00
2 Asbes plat ( 200 x 100 x 0,3 ) lbr 19,000.00
3 Asbes plat ( 100 x 100 x 0,6 ) lbr 17,500.00
4 Asbes plat ( 100 x 100 x 0,5 ) lbr 15,000.00
5 Asbes plat ( 100 x 100 x 0,4 ) lbr 12,500.00
6 Asbes plat ( 100 x 100 x 0,35 ) lbr 11,000.00
7 Asbes plat ( 100 x 100 x 0,32 ) lbr 10,000.00
GENTENG
1 Genteng beton besar natural 1m 9 biji bh 2,750.00
2 Genteng beton besar warna 1m 9 biji bh 4,420.00
3 Genteng beton kecil natural 1m 11 biji bh 2,350.00
4 Genteng beton kecil warna 1m 11 biji bh 3,950.00
5 Genteng beton kecil natural 1m 20 biji bh 2,000.00
6 Genteng beton kecil warna 1m 20 biji bh 2,640.00
7 Genteng bubungan beton bh 2,460.00
8 Genteng Wuwung warna bh 4,260.00
9 Nok press beton bh 37,000.00
BAHAN KERAMIK
PIPA
1 Pipa tanah liat dia. 10 cm bh 7,500.00
2 Pipa tanah dia. 15 cm bh 25,000.00
3 Pipa tanah dia. 20 cm bh 35,000.00
4 Pipa tanah liat leher angsa bh 8,500.00
Bahan - 5
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)
KERAMIK BERMOTIF
1 Tegel keramik Roman Bella (25 x 25) dos 47,500.00
2 Tegel keramik Roman Bella (10 x 25) dos 38,000.00
3 Tegel keramik Roman Alice (20 x 20) dos 38,500.00
4 Tegel keramik Roman Latanza (20 x 25) dos 38,000.00
5 Tegel keramik Roman Latanza (8 x 20) bj 20,000.00
6 Tegel keramik Roman Tulip (20 x 25) dos 37,500.00
7 Tegel keramik Roman Tulip (8 x 20) bj 14,000.00
8 Tegel keramik Roman Milano (20 x 25) dos 38,000.00
9 Tegel keramik Roman Milano (8 x 20) bj 20,000.00
ISOLATOR
1 Isolator keramik bentuk rol bh 6,600.00
2 Isolator keramik bentuk T - I bh 1,650.00
3 Isolator keramik bentuk sungkup bh 1,650.00
TEGEL / KERAMIK
1 Tegel teraso 30/30 m2 32,000.00
2 Tegel abu-abu 20/20 m2 20,000.00
3 Tegel warna 20/20 m 2
26,000.00
4 Tegel abu-abu 30/30 m 2
28,000.00
5 Plint tegel abu-abu 15/20 bh 525.00
6 Tegel warna 20/20 m2 26,000.00
7 Tegel warna 30/30 m2 37,600.00
8 Plint tegel abu-abu 10/20 bh 350.00
9 Plint tegel abu-abu 10/30 bh 750.00
10 Plint tegel warna 10/20 bh 400.00
11 Plint tegel warna 10/30 bh 825.00
Bahan - 6
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)
KERB TAMAN
1 Devider Mutiara m 66,000.00
2 Devider /kans teen tebal 30 Mutiara m 22,000.00
3 Devider /kans teen tebal 25 Mutiara m 18,800.00
4 Devider /kans teen tebal 20 Mutiara bh 15,300.00
5 Devider /kans teen tebal 15 Mutiara bh 11,250.00
6 Ramp ( terpasang ) bh 26,000.00
7 Devider terpasang bh 30,000.00
8 Kerb terpasang bh 28,000.00
KAYU
1 KAYU JATI
2 Kayu jati balok 8/12 ( klas plitur ) m3 20,000,000.00
3 Kayu jati papan m 3
22,000,000.00
4 Balok kayu kelas I ukuran 8/12 m 1
192,000.00
5 Balok kayu kelas I ukuran 8/10 m 1
160,000.00
6 Balok kayu kelas I ukuran 6/12 m1 144,000.00
7 Balok kayu kelas I ukuran 6/10 m 1
120,000.00
8 Balok kayu kelas I ukuran 6/8 m 1
96,000.00
9 Bingkai kayu kelas I ukuran 5/7 m 1
70,000.00
10 Bingkai kayu kelas I ukuran 4/6 m 1
48,000.00
11 Bingkai kayu kelas I ukuran 3/4, 3/5 m 1
24,000.00
12 Bingkai kayu kelas I ukuran 2/3 m 1
12,000.00
13 Papan kayu kelas I ukuran 3/20 m1 132,000.00
14 Papan kayu kelas I ukuran 3/18 m1 118,800.00
15 Papan kayu kelas I ukuran 2/25 m 1
110,000.00
16 Papan kayu kelas I ukuran 2/20 m 1
88,000.00
17 Papan kayu kelas I ukuran 2/15 m1 66,000.00
18 Lis Dan jalusi kayu kelas I ukuran 2/6 m 1
24,000.00
19 Lis Dan jalusi kayu kelas I ukuran 2/4 m 1
16,000.00
20 Lis Dan jalusi kayu kelas I ukuran 1/5 m 1
10,000.00
21 Lis Dan jalusi kayu kelas I ukuran 1/3 m1 6,000.00
22 Kayu jati balok 8/12 (lokal) m 3
10,000,000.00
23 Kayu jati papan (lokal) m 3
11,000,000.00
24 Kaui jati lokal ukuran 5/7 m 1
35,000.00
25 Kayu jati lokal ukuran 2/3 m1 6,000.00
26 Kayu jati lokal ukuran 3/4 m 1
12,000.00
KAYU KAMPER
1 Kayu kamper balok m3 4,750,000.00
2 Kayu kamper papan m 3
5,500,000.00
3 Balok kayu kelas I ukuran 8/12 m 1
45,600.00
Bahan - 7
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)
KAYU BENGKIRAI
1 Kayu bengkirai balok m3 5,750,000.00
2 Kayu bengkirai papan m 3
6,000,000.00
3 Balok kayu kelas I ukuran 8/12 m1 55,200.00
4 Balok kayu kelas I ukuran 8/10 m 1
46,000.00
5 Balok kayu kelas I ukuran 6/12 m 1
41,400.00
6 Balok kayu kelas I ukuran 6/10 m 1
34,500.00
7 Balok kayu kelas I ukuran 6/8 m1 27,600.00
8 Bingkai reng & kaso kayu kelas I ukuran 5/7 m 1
20,125.00
9 Bingkai reng & kaso kayu kelas I ukuran 4/6 m 1
13,800.00
10 Bingkai reng & kaso kayu kelas I ukuran 3/4 m 1
6,900.00
11 Bingkai reng & kaso kayu kelas I ukuran 2/3 m1 3,450.00
12 Papan kayu kelas I ukuran 2/15 m 1
18,000.00
13 Papan kayu kelas I ukuran 2/20 m 1
24,000.00
14 Papan kayu kelas I ukuran 2/25 m 1
30,000.00
15 Papan kayu kelas I ukuran 3/18 m1 32,400.00
16 Papan kayu kelas I ukuran 3/20 m 1
36,000.00
17 Papan kayu kelas I ukuran 3/30 m 1
54,000.00
18 Lis Dan jalusi kayu kelas I ukuran 1/3 m 1
1,725.00
19 Lis Dan jalusi kayu kelas I ukuran 1/5 m1 2,875.00
20 Lis Dan jalusi kayu kelas I ukuran 2/4 m 1
4,600.00
KAYU KRUING
1 Kayu kruing balok m3 4,350,000.00
2 Kayu kruing papan m 3
4,750,000.00
3 Balok kayu kelas I ukuran 8/12 m 1
41,760.00
4 Balok kayu kelas I ukuran 8/10 m1 34,800.00
5 Balok kayu kelas I ukuran 6/12 m 1
31,320.00
6 Balok kayu kelas I ukuran 6/10 m 1
26,100.00
7 Balok kayu kelas I ukuran 6/8 m 1
20,880.00
Bahan - 8
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)
KAYU LAPIS
1 Kayu lapis mutu I AA 3 lapis uk. 122x244x0,3 cm lbr 31,900.00
2 Kayu lapis mutu I AA 3 lapis uk. 122x244x0,4 cm lbr 41,250.00
3 Kayu lapis mutu I AA 3 lapis uk. 122x244x0,9 cm lbr 90,000.00
4 Kayu lapis mutu I AA 3 lapis uk. 122x244x1,2 cm lbr 101,750.00
5 Akustik soft board 60 x 120 lbr 125,000.00
6 Akustik soft board 40 x 60 lbr 73,000.00
7 Akustik soft board 30 x 60 lbr 55,000.00
8 Melamin wood 90 x 120 cm lbr 50,000.00
9 Melamin wood 120 x 240 cm lbr 65,000.00
10 Formika 4" x 8" x 0,3 cm lbr 65,000.00
11 Teak wood ( 90 x 240 ) lbr 69,500.00
BAHAN TUMBUHAN
1 Bambu petung btg 48,500.00
2 Bambu wulung btg 9,500.00
3 Bambu apus btg 7,000.00
4 Gedek bambu kulit m2 65,000.00
5 Gedek bambu daging m2 27,000.00
6 Ijuk m 3
75,000.00
7 Ijuk kg 9,000.00
8 Alang-alang ikat 500.00
Bahan - 9
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)
LISTRIK
1 Tusuk kontak 2 kutup tanpa pembumian/arde buah 3,900.00
2 Tusuk kontak 2 kutup dengan pembumian/arde buah 6,500.00
3 Tusuk kontak 2 kutup tanpa pembumian (timbul) buah 6,175.00
4 Tusuk kontak 2 kutup dengan pembumian (timbul) buah 6,500.00
5 Tusuk kontak 2 kutup tanpa pembumian (tanam) buah 7,800.00
6 Tusuk kontak 2 kutup dengan pembumian (tanam) buah 12,000.00
7 Kontak hubungan bagi dengan selungkup isolasi
- 1 fasa 250 V/ 6 A (timbul) buah 23,200.00
- 1 fasa 250 V/ 10 A (timbul) buah 30,000.00
- 1 fasa 250 V/ 6 A (tanam)/MCB buah 37,500.00
- 1 fasa 250 V/ 10 A (tanam)/MCB buah 39,000.00
8 Fitting duduk buah 5,000.00
9 Pasang instalasi / titik titik 85,000.00
10 Lampu pijar 5 watt "Phillips" buah 2,275.00
11 Lampu pijar 10 watt "Phillips" buah 3,705.00
12 Lampu pijar 25 watt/ 40 watt "Phillips" buah 3,900.00
13 Lampu pijar 60 watt / 75 watt "Phillips" buah 4,550.00
14 Lampu pijar 100 watt "Phillips" buah 5,200.00
15 Lampu softone 100 watt "Phillips" buah 6,500.00
16 Lampu pijar 150 watt "Phillips" buah 10,400.00
17 Lampu pijar 200 watt "Phillips" buah 11,700.00
18 Lampu TL 10 watt "Phillips" buah 7,150.00
19 Lampu TL 15 watt "Phillips" buah 7,500.00
20 Lampu TL 18 watt "Phillips" buah 11,050.00
21 Lampu TL 36 watt "Phillips" buah 13,650.00
22 Lampu SLE 11 watt "Phillips" buah 71,500.00
23 Lampu SLE 15 watt "Phillips" buah 71,500.00
24 Lampu SLE 20 watt "Phillips" buah 74,750.00
25 Lampu Slang 2 jalur (sekualitas sinyoku) roll 2,400,000.00
26 Lampu Slang 3 jalur (sekualitas sinyoku) roll 2,795,000.00
27 Lampu Rice Light isi 100 "Phillips" pcs 60,000.00
28 Lampu Rice Light isi 140 "Phillips" pcs 72,000.00
29 Lampu Capsul isi 100 "Phillips" pcs 210,000.00
30 Lampu Capsul isi 140 "Phillips" pcs 222,000.00
31 Lampu Anggur isi 100 "Phillips" pcs 65,000.00
32 Lampu Anggur isi 140 "Phillips" pcs 78,000.00
33 Lampu Natal isi 50 "Phillips" pcs 23,000.00
34 Lampu Natal isi 100 "Phillips" pcs 103,500.00
35 Lampu Jenis H.PIT 400 watt "Phillips" buah 1,023,750.00
36 Lampu Jenis H.PIT 250 watt "Phillips" buah 700,000.00
37 Bolam Mercury 80 watt "Phillips" buah 45,500.00
38 Bolam Mercury 125 watt "Phillips" buah 96,000.00
39 Bolam Mercury 250 watt "Phillips" buah 97,500.00
40 Bolam Mercury 400 watt "Phillips" buah 123,500.00
41 Bolam Natrium 250 watt "Phillips" buah 208,000.00
42 Bolam Natrium 400 watt "Phillips" buah 221,000.00
43 Bolam SON 250 watt buah 227,500.00
44 Bolam SON 150 watt buah 215,800.00
45 Bolam SON 70 watt buah 137,150.00
46 Bolam SON-T 250 watt buah 241,000.00
47 Bolam SON-T 150 watt buah 155,000.00
48 Bolam SON-T 70 watt buah 96,000.00
49 Bolam Halogin 500 watt buah 39,000.00
50 Bolam Halogin 1000 watt buah 65,000.00
51 Bolam HPIT 150 watt buah 260,000.00
52 Bolam HPIT 250 watt buah 292,500.00
53 Bolam HPIT 400 watt buah 296,500.00
Bahan - 10
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)
Bahan - 11
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)
Bahan - 12
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)
Bahan - 14
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)
KAWAT
1 Kawat beton / bindrat kg 9,400.00
2 Kawat ayakan m 2
10,000.00
3 Kawat bronjong kg 30,250.00
4 Kawat nyamuk m2 8,250.00
5 Kawat las kg 6,500.00
6 Kawat galvanis kg 7,755.00
7 Kawat duri kg 9,500.00
8 Besi jaring kawat baja kg 9,500.00
9 Kawat seng polos kg 9,500.00
10 Kawat kassa m2 10,000.00
11 Kawat burung m2 15,000.00
12 Kawat jaring lbr 35,000.00
13 Kawat harmonika m2 25,000.00
14 Kawat penggantung rangka hollow m 1
500.00
15 Profil Alumunium "T" m 1
20,000.00
16 Ramset / dina bolt bh 2,500.00
17 Pipa galvanis dia. 1/2" m1 15,000.00
18 Pipa galvanis dia. 3/4" m1 25,000.00
19 Pipa galvanis dia. 1" m 1
37,500.00
20 Pipa galvanis dia. 1 1/2" m 1
50,000.00
21 Pipa galvanis dia. 3" m 1
85,000.00
22 Pipa galvanis dia. 4" m1 90,000.00
23 Pipa hollow 4 x 4 cm tebal 1.2 mm m 1
9,500.00
24 Kusen alumunium uk 2"x4" tebal 1.2 mm sekualitas YKK putih m 1
55,000.00
25 Jendela nako bh 20,000.00
26 Pintu besi baja m2 750,000.00
27 Jendela besi baja m2 750,000.00
28 Jendela besi tahan api m 2
1,500,000.00
29 Pintu gulung besi m 2
250,000.00
30 Pintu lipat besi m 2
500,000.00
31 Sunscreen alumunium m2 250,000.00
32 Roll door m 2
200,000.00
33 Pintu alumunium m 2
400,000.00
34 Vertikal blind m 2
250,000.00
35 Wall paper m2 40,000.00
36 Alumunium composite panel tebal 2.1 mm (1.22x2.44 M) lbr 190,000.00
Bahan - 15
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)
SENG BJLS
1 Seng BJLS 0,20 gelombang P = 180 cm lbr 38,500.00
2 Seng BJLS 0,20 gelombang P = 200 cm (merk Fumira) lbr 42,000.00
3 Seng BJLS 0,20 gelombang P = 240 cm lbr 60,000.00
4 Seng BJLS 0,20 gelombang P = 300 cm lbr 70,000.00
5 Seng BJLS 0,28 lembaran 40 cm lebar m1 12,500.00
6 Seng BJLS 0,28 lembaran 50 cm lebar m1 16,000.00
7 Seng BJLS 0,20 lembaran 90 cm lebar m 1
25,000.00
8 Seng BJLS 0,30 lembaran 40 cm lebar m 1
20,000.00
9 Seng BJLS 0,30 lembaran 50 cm lebar m 1
18,000.00
10 Seng BJLS 0,30 lembaran 60 cm lebar m1 20,000.00
11 Seng BJLS 0,30 lembaran 90 cm lebar m 1
28,000.00
12 Seng plat 3" x 6" BJLS 28 lbr 44,000.00
13 Seng plat 3" x 6" BJLS 24 lbr 38,500.00
14 Seng gelombang 2" - 5" BJLS 24 lbr 25,000.00
15 Alumunium gelombang tebal 0,55 m2 75,000.00
16 Alumunium foil m 2
25,000.00
17 Nok alumunium standar 40 cm 18 SWG 22 m 1
25,000.00
PAKU
1 Paku gording 125 x 5,1 mm kg 8,000.00
2 Paku gording 100 x 4,2 mm kg 8,000.00
3 Paku usuk 80 x 3,8 mm kg 8,000.00
4 Paku reng 55 x 3,1 mm kg 8,000.00
5 Paku plepet 40 x 2,1 mm kg 10,000.00
6 Paku eternit 20 x 1,5 mm kg 11,500.00
7 Angkur / baut bh 10,000.00
8 Paku kait bh 8,500.00
9 Paku pancing bh 500.00
10 Paku pancing kg 9,350.00
11 Paku asbes bh 400.00
12 Paku sumbat bh 400.00
13 Paku sekrup 3.5" bh 750.00
14 Paku skrup kg 10,000.00
15 Paku gypsum kg 20,000.00
16 Paku hak panjang 15 cm kg 9,500.00
PENGGANTUNG / PENGUNCI
1 Engsel pintu bh 11,000.00
2 Engsel jendela bh 7,500.00
3 Grendel bh 2,500.00
4 Hak angin bh 5,500.00
5 Selot pintu Union kecil bh 37,500.00
6 Selot pintu Union besar bh 47,500.00
7 Engsel angin bh 3,000.00
8 Kait angin bh 3,000.00
9 Door holder bh 15,000.00
10 Door stop bh 15,000.00
11 Penggantung + rel pintu dorong bh 200,000.00
12 Kunci tanam bh 35,000.00
13 Kunci tanam antik bh 250,000.00
14 Kunci tanam biasa bh 125,000.00
15 Kunci kamar mandi bh 50,000.00
16 Kunci selot bh 50,000.00
17 Kunci silinder bh 75,000.00
18 Kunci lemari bh 12,000.00
19 Spring knip bh 7,500.00
20 Door closer bh 150,000.00
Bahan - 16
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)
ASPAL
1 Aspal curah kg 9,500.00
2 Aspal drum kg 10,650.00
3 Aspal modifer / asphalt joint kg 60,000.00
4 Drum aspal bekas bh 8,250.00
5 Rubber Filler m1 9,000.00
6 Mata Kucing bh 215,000.00
7 Filler kg 750.00
AGREGAT
1 Agregat hakus/pasir klas A ( Uk. butir 5 mm ) m3 79,750.00
2 Agregat kasar/krikil/pasir klas B ( Uk. 20 - 40 ) m 3
126,500.00
3 Agregat kasar/krikil/pasir klas B ( Uk. 4½ - 19 ) m3 132,000.00
4 Batu pecah 2/3 ( split ) m 3
138,000.00
5 Batu pecah 3/4 m 3
130,000.00
6 Batu pecah 4/6 m 3
126,500.00
7 Batu pecah 5/7 m3 132,000.00
8 Batu pecah 1/2 m 3
190,000.00
9 Batu belah hitam m 3
80,000.00
10 Batu belah putih m 3
70,000.00
11 Sirtu Klas A lewat ayakan 1" m3 66,000.00
12 Sirtu klas B lewat ayakan 2½" m 3
66,000.00
13 Pasir urug darat m 3
55,000.00
14 Pasir pasang ( progo ) m 3
73,000.00
15 Pasir pasang ( krasak ) m3 76,000.00
16 Krikil beton m 3
78,650.00
17 Kerikil tidak tersaring m 3
55,000.00
18 Split D 30 - 40 mm m 3
120,000.00
19 Split D 10 - 20 mm m3 120,000.00
20 Split D 1 - 2 cm m 3
125,000.00
21 Batu merah ( 5x11x23 ) bj 350.00
22 Batu merah ( 4x9x19 ) bj 250.00
23 Krokos 0,2/0,4 m3 70,000.00
24 Tanah urug m 3
35,000.00
25 Sirtu m 3
66,000.00
26 Batako bh 1,500.00
27 Roster 25/25 bh 2,000.00
Bahan - 17
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)
BAHAN KACA
1 Genteng kaca lengkung cekung 3 mm bh 5,500.00
2 Genteng kaca lengkung cekung 5 mm bh 7,000.00
3 Genteng kaca lengkung rata 3 mm bh 5,500.00
4 Genteng kaca lengkung rata 5 mm bh 6,850.00
5 Genteng kaca 3 mm bh 4,000.00
6 Genteng kaca 5 mm bh 6,850.00
7 Kaca buram/kaca es 3 mm m2 53,900.00
8 Kaca buram/kaca es 5 mm m2
66,000.00
Bahan - 18
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)
BAHAN PLASTIK
1 Pipa PVC abu-abu dia. 1/2" Wavin btg 12,650.00
2 Pipa PVC abu-abu dia. 3/4" Wavin btg 17,000.00
3 Pipa PVC abu-abu dia. 1" Wavin btg 20,500.00
4 Pipa PVC abu-abu dia. 1 1/2" Wavin btg 45,000.00
5 Pipa PVC abu-abu dia. 2" Wavin btg 60,000.00
6 Pipa PVC abu-abu dia. 2 1/2" Wavin btg 82,000.00
7 Pipa PVC abu-abu dia. 3" Wavin btg 82,000.00
8 Pipa PVC abu-abu dia. 4" Wavin btg 135,000.00
9 Pipa PVC putih dia. 1/2" Wavin btg 12,000.00
10 Pipa PVC putih dia. 3/4" Wavin btg 15,000.00
11 Pipa PVC putih dia. 1" Wavin btg 21,000.00
12 Pipa PVC putih medium dia. 3" Wavin btg 48,000.00
13 Pipa PVC putih tebal dia. 3" Wavin btg 80,000.00
14 Pipa PVC putih medium dia. 4" Wavin btg 135,000.00
15 Pipa PVC putih tebal dia. 4" Wavin btg 157,000.00
16 Atap plastik gelombang PVC lbr 67,500.00
TANAMAN HIAS
RUMPUT
1 Rumput Gajah (tanam) m2 12,000.00
2 Rumput Gajah (gebalan) m 2
15,000.00
3 Rumput Manila (gebalan) m2 10,000.00
4 Rumput golf m 2
11,000.00
5 Rumput gebalan m 2
5,000.00
Bahan - 19
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)
PERDU
1 Bougenville, tinggi +/- 0, 5 m batang 40,000.00
2 Bougenville, tinggi +/- 0, 7 m batang 70,000.00
3 Bougenville, tinggi +/- 1, 0 m batang 100,000.00
4 Bougenville varigata, tinggi +/- 0, 8 m batang 150,000.00
5 Classia planisicua, tinggi +/- 0,5 m batang 15,000.00
6 Kembang Sepatu (Bangkok), tinggi +/- 0,2 m batang 10,000.00
7 Kembang Sepatu (lokal), tinggi +/- 0,4 m batang 5,000.00
8 Mawar, tinggi +/- 0,25 m batang 7,500.00
9 Palem botol, tinggi +/- 0,8 m kecil 15 cm rumpun 150,000.00
10 Palem kuning, tinggi +/- 0,6 m rumpun 12,500.00
11 Palem kuning, tinggi +/- 1 m rumpun 20,000.00
12 Palem kuning, tinggi +/- 1,5 - 2 m rumpun 125,000.00
13 Palem kuning, tinggi +/- 2 - 3 m rumpun 175,000.00
14 Palem merah, tinggi +/- 2 - 3 m rumpun 150,000.00
15 Palem wregu, tinggi +/- 0,6 m rumpun 15,000.00
16 Palem putri, tinggi +/- 1 m rumpun 75,000.00
17 Soka pagar, 0,3 m batang 5,000.00
18 Serut, tinggi +/- 1 - 1,5 m batang 450,000.00
19 Puring bangkok, tinggi +/- 0,6 m batang 12,500.00
20 Phonik, tinggi +/- 1 m batang 150,000.00
21 Batavia / Jatropa, tinggi +/- 0,5 m batang 15,000.00
22 Serut, tinggi +/- 1,5 m batang 750,000.00
POHON
1 Cemara kipas, tinggi +/- 0,5 m batang 20,000.00
2 Cemara kipas, tinggi +/- 1,5 m batang 75,000.00
3 Cemara lilin, tinggi +/- 1,5 m batang 40,000.00
4 Cemara rantes, tinggi +/- 1 m batang 40,000.00
5 Cemara udang, tinggi +/- 1 - 1,5 m batang 600,000.00
6 Cemara norvox, tinggi +/- 0,6 m batang 50,000.00
7 Cemara norvox, tinggi +/- 1,5 m batang 80,000.00
8 Cempokok mulyo, tinggi +/- 0,5 m batang 15,000.00
9 Cempokok mulyo, tinggi +/- 1 m batang 40,000.00
10 Ceplok Piring, tinggi +/- 0,5 m batang 7,500.00
11 Ceplok Piring, tinggi +/- 1 m batang 20,000.00
12 Glodogan Pecut, tinggi +/- 1 m batang 14,000.00
13 Glodogan Pecut, tinggi +/- 2 m batang 25,000.00
14 Kelapa gading, tinggi +/- 3 m batang 200,000.00
15 Nusa indah, tinggi +/- 0,5 m batang 10,000.00
16 Nusa indah, tinggi +/- 1 m batang 30,000.00
17 Palem ekor tupai, tinggi +/- 1 m batang 75,000.00
18 Palem ekor tupai, tinggi +/- 2 m batang 150,000.00
19 Palem jepang, tinggi +/- 1 m rumpun 50,000.00
20 Palem jepang, tinggi +/- 2 m rumpun 100,000.00
21 Palem raja, tinggi +/- 4 m batang 150,000.00
22 Palem raja, tinggi +/- 6 m batang 250,000.00
23 Palem raja, tinggi +/- 7 m batang 1,500,000.00
SEMAK
1 Alamanda, tinggi +/- 0,2 m rumpun 5,000.00
2 Canna holland, tinggi +/- 0,3 m rumpun 15,000.00
3 Canna lokal, tinggi +/- 0,5 m rumpun 7,500.00
4 Cendrawasih, tinggi +/- 0,2 m batang 5,000.00
5 Cantik manis, tinggi +/- 0,2 m batang 3,000.00
6 Dieffenbachia, tinggi +/- 0,2 m batang 10,000.00
7 Dieffenbachia, tinggi +/- 0,5 m batang 20,000.00
8 Hanjuang, tinggi +/- 0,3 m batang 3,000.00
9 Helogenia, tinggi +/- 0,4 m rumpun 4,000.00
10 Kayu besi, tinggi +/- 0,5 m batang 7,500.00
Bahan - 20
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)
Bahan - 21
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)
PERALATAN KEBERSIHAN
1 Sapu lidi bh 3,000.00
2 Tangkai Sapu bh 5,000.00
3 Tomblok bh 3,500.00
4 Hareg bh 3,000.00
5 Kerug bh 5,000.00
6 Seragam bh 75,000.00
7 Sarung tangan bh 7,500.00
8 Masker bh 7,500.00
9 Gerobak (alat baru) bh 1,500,000.00
10 Gerobak (sewa) bh 1,500.00
11 Serok bh 5,000.00
12 Gunting pangkas bh 35,000.00
13 Mesin potong rumput bh 3,000,000.00
14 Gathul bh 10,000.00
15 Garpu tanah bh 15,000.00
16 Arit bh 20,000.00
17 Gerobak celeng bh 400,000.00
18 Sepatu ps 75,000.00
19 Ember bh 5,000.00
20 Bagor bh 600.00
21 Irus bh 10,000.00
22 Cetok bh 10,000.00
23 Linggis bh 35,000.00
24 Martil bh 10,000.00
25 Betel bh 12,000.00
26 Pacul bh 30,000.00
27 Sewa kendaraan untuk membuang lumpur hr 118,000.00
28 Gas oksigen 5 kg tb 15,000.00
29 Nipel bh 10,000.00
30 Pipa dia. 3/8" - 15 cm bh 1,500.00
31 Nitobond EC kg 100,000.00
32 Conbextra EP kg 200,000.00
33 Cebex 100 kg 150,000.00
34 Sewa Compressor untuk pekerjaan grouting hr 250,000.00
35 Sewa Mesin Grouting hr 150,000.00
36 Sewa mesin gerinda untuk pekerjaan grouting hr 100,000.00
37 Sewa mixer ubtuk pekerjaan grouting hr 6,000.00
38 Alat bantu pekerjaan grouting ls 5,000.00
39 Alat bantu pekerjaan pekerjaan marka ls 130,000.00
40 Alat bantu pekerjaan pekerjaan expantion joint ls 130,000.00
Bahan - 22
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)
LAIN-LAIN
1 Tiang bendera
-Pondasi umpak buah 31,000.00
-Ompak ornamen buah 65,800.00
-Tiang galvanis 3" m' 23,375.00
-Bendera 120 x 180 buah 39,825.00
2 Rambu lalu lintas (terpasang) buah 150,000.00
3 Papan nama jalan (terpasang) buah 250,000.00
4 Sumur peresapan 5 m buah 495,000.00
5 Air minum, instalasi dalam dengan pipa pralon 1" medium, acesories m1 17,250.00
dihitung sendiri
6 Air minum, instalasi luar dengan pipa pralon 1" medium, acesoris m1 16,500.00
dihitung sendiri
7 Minyak Flux liter 12,000.00
8 Asbuton kg 2,350.00
9 Tumpuan konstruksi m 66,700.00
10 Kerikil sungai - royalty m3 5,750.00
11 Batu gunung - royalty m3 5,750.00
12 Uji test besi ( 3 sampel tiap jenis diameter benda uji ) set 150,000.00
13 Uji test aspal ttk 100,000.00
14 Sewa alat sondir hr 100,000.00
15 Sewa Scaffolding unit 20,000.00
16 Benda uji silinder beton bh 3,000.00
17 Biaya tes beton per benda uji bh 5,000.00
18 Biaya analisis tes beton perbeda uji bh 15,000.00
Bahan - 23
HARGA ALAT UNTUK PEKERJAAN ANALISA - E
PEKERJAAN PERSIAPAN
AK 100.000 m2 Pekerjaan Pengukuran Gedung
8.000 org Pekerja @ Rp. 45,000.00 360,000.00 -
2.000 org Mandor @ Rp. 80,000.00 160,000.00 -
0.500 org Pengawas @ Rp. 37,200.00 18,600.00 -
2.000 org Asisten Ahli Ukur @ Rp. 87,200.00 174,400.00 -
1.000 hr Sewa alat ukur @ Rp. 75,000.00 75,000.00 -
JUMLAH ( BELUM PPN ) 788,000.00 - 788,000.00
JASA 10 % 78,800.00
JUMLAH 866,800.00
DIBULATKAN 866,800.00
SNI 1.000 m1 Pengukuran dan pemasangan bouwplank untuk gedung dan saluran
6.4 0.012 m3 Kayu meranti 5/7 @ Rp. 2,750,000.00 33,000.00
03-2835-2002 0.020 kg Paku reng @ Rp. 8,000.00 160.00
0.007 m3 Kayu meranti papan 3/20 @ Rp. 2,750,000.00 19,250.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kepala tukang kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.005 org Mandor @ Rp. 80,000.00 400.00
JUMLAH ( BELUM PPN ) 8,225.00 52,410.00 60,635.00
JASA 10 % 6,063.50
JUMLAH 66,698.50
DIBULATKAN 66,698.00
Analisa Gedung - 25
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
DIBULATKAN 476,985.00
Analisa Gedung - 26
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
Analisa Gedung - 27
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
SNI 1.000 m1 Pembuatan pagar sementara dari seng gelombang tinggi 2 meter
6.2 1.250 btg Dolken kayu Ø 8 - 10/400 cm @ Rp. 10,000.00 12,500.00
03-2835-2002 2.500 kg PC @ Rp. 764.00 1,910.00
1.200 lbr Seng gelombang 2"-5" BJLS 24 @ Rp. 25,000.00 30,000.00
0.005 m3 Pasir beton @ Rp. 73,000.00 365.00
0.009 m 3
Kerikil beton @ Rp. 78,650.00 707.85
0.025 m3 Kaso 5/7 kayu meranti @ Rp. 2,750,000.00 68,750.00
0.060 kg Paku biasa 2" - 5" @ Rp. 8,000.00 480.00
0.400 kg Meni besi @ Rp. 12,000.00 4,800.00
0.200 org Tukang kayu @ Rp. 30,000.00 6,000.00
0.020 org Kepala tukang kayu @ Rp. 32,500.00 650.00
0.400 org Pekerja @ Rp. 45,000.00 18,000.00
0.020 org Mandor @ Rp. 80,000.00 1,600.00
JUMLAH ( BELUM PPN ) 26,250.00 119,512.85 145,762.85
JASA 10 % 14,576.29
JUMLAH 160,339.14
DIBULATKAN 160,339.00
SNI 1.000 m1 Pembuatan pagar sementara dari kawat duri tinggi 1,80 meter
6.3 1.000 btg Dolken kayu Ø 8 - 10/400 cm @ Rp. 10,000.00 10,000.00
03-2835-2002 2.000 kg PC @ Rp. 764.00 1,528.00
25.000 kg Kawat duri @ Rp. 9,500.00 237,500.00
0.005 m3 Pasir beton @ Rp. 73,000.00 365.00
0.009 m3 Kerikil beton @ Rp. 78,650.00 707.85
0.060 kg Paku biasa 2" - 5" @ Rp. 8,000.00 480.00
0.200 org Tukang kayu @ Rp. 30,000.00 6,000.00
0.020 org Kepala tukang kayu @ Rp. 32,500.00 650.00
0.300 org Pekerja @ Rp. 45,000.00 13,500.00
Analisa Gedung - 28
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
0.020 org Mandor @ Rp. 80,000.00 1,600.00
JUMLAH ( BELUM PPN ) 21,750.00 250,580.85 272,330.85
JASA 10 % 27,233.09
JUMLAH 299,563.94
DIBULATKAN 299,563.00
Analisa Gedung - 29
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
Analisa Gedung - 31
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
PEKERJAAN TANAH
SNI 1.000 m3 Galian tanah biasa sedalam sampai 1 meter
6.1 0.400 org Pekerja @ Rp. 45,000.00 18,000.00
0.040 org Mandor @ Rp. 80,000.00 3,200.00
JUMLAH ( BELUM PPN ) 21,200.00 - 21,200.00
JASA 10 % 2,120.00
JUMLAH 23,320.00
DIBULATKAN 23,320.00
Analisa Gedung - 33
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
Analisa Gedung - 35
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
Analisa Gedung - 36
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
PEKERJAAN PASANGAN
Analisa Gedung - 37
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
JASA 10 % 30,633.54
JUMLAH 336,968.92
DIBULATKAN 336,968.00
Analisa Gedung - 38
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
Analisa Gedung - 39
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
SNI 1.000 m3 Pasangan pondasi 1 Pc : 2 Ps
6.2 1.100 m3 Batu belah 15/20 cm @ Rp. 80,000.00 88,000.00
03-2835-2002 267.000 kg PC @ Rp. 764.00 203,988.00
0.427 m3 Pasir pasang @ Rp. 76,000.00 32,452.00
0.600 org Tukang batu @ Rp. 27,500.00 16,500.00
0.060 org Kepala tukang batu @ Rp. 30,000.00 1,800.00
1.500 org Pekerja @ Rp. 45,000.00 67,500.00
0.075 org Mandor @ Rp. 80,000.00 6,000.00
JUMLAH ( BELUM PPN ) 91,800.00 324,440.00 416,240.00
JASA 10 % 41,624.00
JUMLAH 457,864.00
DIBULATKAN 457,864.00
Analisa Gedung - 40
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
Analisa Gedung - 42
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
Analisa Gedung - 43
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
SNI 1.000 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps
6.2 140.000 bh Bata merah 5 x 11 x 22 cm @ Rp. 350.00 49,000.00
03-2837-2002 43.500 kg PC @ Rp. 764.00 33,234.00
0.080 m3 Pasir pasang @ Rp. 76,000.00 6,080.00
0.200 org Tukang batu @ Rp. 27,500.00 5,500.00
0.020 org Kepala tukang batu @ Rp. 30,000.00 600.00
0.650 org Pekerja @ Rp. 45,000.00 29,250.00
0.030 org Mandor @ Rp. 80,000.00 2,400.00
JUMLAH ( BELUM TERMASUK PPN ) 37,750.00 88,314.00 126,064.00
JASA 10 % 12,606.40
JUMLAH 138,670.40
DIBULATKAN 138,670.00
Analisa Gedung - 44
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
PEKERJAAN BETON
SNI 1.000 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr
6.13 336.000 kg PC @ Rp. 764.00 256,704.00
0.540 m3 Pasir beton @ Rp. 73,000.00 39,420.00
0.810 m 3
Kerikil beton @ Rp. 78,650.00 63,706.50
0.350 org Tukang batu @ Rp. 27,500.00 9,625.00
0.035 org Kepala tukang batu @ Rp. 30,000.00 1,050.00
2.000 org Pekerja @ Rp. 45,000.00 90,000.00
0.100 org Mandor @ Rp. 80,000.00 8,000.00
JUMLAH ( BELUM PPN ) 108,675.00 359,830.50 468,505.50
JASA 10 % 46,850.55
JUMLAH 515,356.05
DIBULATKAN 515,356.00
Analisa Gedung - 45
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
AK 1.000 m3 Beton cyclope 1pc:3ps:5kr
0.700 m3 Batu kali (hitam) @ Rp. 80,000.00 56,000.00
61.250 kg PC @ Rp. 764.00 46,795.00
0.400 m3 Pasir pasang @ Rp. 76,000.00 30,400.00
0.650 m 3
Kerikil beton @ Rp. 78,650.00 51,122.50
1.000 org Tukang batu @ Rp. 27,500.00 27,500.00
0.100 org Kep. Tk. Batu @ Rp. 30,000.00 3,000.00
6.000 org Pekerja @ Rp. 45,000.00 270,000.00
0.300 org Mandor @ Rp. 80,000.00 24,000.00
JUMLAH ( BELUM PPN ) 324,500.00 184,317.50 508,817.50
JASA 10 % 50,881.75
JUMLAH 559,699.25
DIBULATKAN 559,699.00
Analisa Gedung - 46
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
Analisa Gedung - 48
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
Analisa Gedung - 49
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
JUMLAH 1,342,687.50
DIBULATKAN 1,342,687.00
Analisa Gedung - 50
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
Analisa Gedung - 51
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
B. Tulangan 100 kg 986,579.00
C. Cetakan memakai papan ( 10 m2 ) 1,104,125.00
D. Stut werk / perancah 1,342,687.50
E. Membongkar cetakan 198,000.00
JUMLAH 4,146,747.55 4,146,747.55
DIBULATKAN 4,146,747.00
Analisa Gedung - 52
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
Analisa Gedung - 53
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
Analisa Gedung - 54
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
SNI 1.000 m1 Pembuatan tiang pancang (40 x 40) cm, beton bertulang
6.17 0.019 m3 Pasir urug @ Rp. 55,000.00 1,045.00
03-2836-2002 0.094 m3 Pasir beton @ Rp. 73,000.00 6,862.00
0.150 m 3
Batu pecah 2/3 @ Rp. 138,000.00 20,700.00
60.500 kg PC @ Rp. 764.00 46,222.00
45.000 kg Besi beton @ Rp. 7,900.00 355,500.00
0.900 kg Kawat beton @ Rp. 9,400.00 8,460.00
0.032 m3 Kayu kruing 5/7 @ Rp. 4,350,000.00 139,200.00
0.120 kg Paku reng @ Rp. 8,000.00 960.00
0.090 ltr Minyak bekisting @ Rp. 5,000.00 450.00
0.240 kg Plamur tembok @ Rp. 17,500.00 4,200.00
0.670 org Tukang batu @ Rp. 27,500.00 18,425.00
0.067 org Kepala tukang batu @ Rp. 30,000.00 2,010.00
1.000 org Pekerja @ Rp. 45,000.00 45,000.00
0.050 org Mandor @ Rp. 80,000.00 4,000.00
JUMLAH ( BELUM PPN ) 69,435.00 583,599.00 653,034.00
JASA 10 % 65,303.40
JUMLAH 718,337.40
DIBULATKAN 718,337.00
Analisa Gedung - 55
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
SNI 1.000 m1 Pembuatan tiang pancang (35 x 35) cm, beton bertulang
6.18 0.016 m3 Pasir urug @ Rp. 55,000.00 880.00
03-2836-2002 0.080 m3 Pasir beton @ Rp. 73,000.00 5,840.00
0.125 m3 Batu pecah 2/3 @ Rp. 138,000.00 17,250.00
49.000 kg PC @ Rp. 764.00 37,436.00
34.500 kg Besi beton @ Rp. 7,900.00 272,550.00
0.700 kg Kawat beton @ Rp. 9,400.00 6,580.00
0.027 m3 Kayu kruing 5/7 @ Rp. 4,350,000.00 117,450.00
0.120 kg Paku @ Rp. 8,000.00 960.00
0.090 ltr Minyak bekisting @ Rp. 5,000.00 450.00
0.200 kg Plamur tembok @ Rp. 17,500.00 3,500.00
0.500 org Tukang batu @ Rp. 27,500.00 13,750.00
0.050 org Kepala tukang batu @ Rp. 30,000.00 1,500.00
0.800 org Pekerja @ Rp. 45,000.00 36,000.00
0.040 org Mandor @ Rp. 80,000.00 3,200.00
JUMLAH ( BELUM PPN ) 54,450.00 462,896.00 517,346.00
JASA 10 % 51,734.60
JUMLAH 569,080.60
DIBULATKAN 569,080.00
PEKERJAAN PELESTERAN
Analisa Gedung - 57
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
Analisa Gedung - 59
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
Analisa Gedung - 60
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
0.250 org Pekerja @ Rp. 45,000.00 11,250.00
0.015 org Mandor @ Rp. 80,000.00 1,200.00
JUMLAH ( BELUM PPN ) 15,500.00 4,180.48 19,680.48
JASA 10 % 1,968.05
JUMLAH 21,648.53
DIBULATKAN 21,648.00
Analisa Gedung - 61
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
Analisa Gedung - 63
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
Analisa Gedung - 64
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
JUMLAH 7,842.82
DIBULATKAN 7,842.00
Analisa Gedung - 65
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
PEKERJAAN KERAMIK
An. 1.000 m2 Pasang ubin porselin
G.69.c 1.000 m2 Tegel porselin @ Rp. 40,500.00 40,500.00
4.680 kg PC @ Rp. 764.00 3,575.52
0.009 m3 Pasir pasang @ Rp. 76,000.00 684.00
1.000 kg Semen putih @ Rp. 1,312.50 1,312.50
0.500 org Tukang batu @ Rp. 27,500.00 13,750.00
0.050 org Kep. Tk. Batu @ Rp. 30,000.00 1,500.00
0.250 org Pekerja @ Rp. 45,000.00 11,250.00
0.013 org Mandor @ Rp. 80,000.00 1,000.00
JUMLAH ( BELUM PPN ) 27,500.00 46,072.02 73,572.02
JASA 10 % 7,357.20
Analisa Gedung - 66
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
JUMLAH 80,929.22
DIBULATKAN 80,929.00
Analisa Gedung - 67
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
Analisa Gedung - 69
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
Analisa Gedung - 70
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
JUMLAH 97,291.65
DIBULATKAN 97,291.00
Analisa Gedung - 71
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
PEKERJAAN CONBLOCK
AK 1.000 m2 Pasang conblock tipe segi-empat, uni, segi-enam abu-abu 8 cm, K-400
1.000 m2 Conblock @ Rp. 55,000.00 55,000.00
0.050 m3 Pasir urug @ Rp. 55,000.00 2,750.00
0.250 org Tukang batu @ Rp. 27,500.00 6,875.00
0.025 org Kep. Tk. Batu @ Rp. 30,000.00 750.00
0.500 org Pekerja @ Rp. 45,000.00 22,500.00
0.025 org Mandor @ Rp. 80,000.00 2,000.00
JUMLAH ( BELUM PPN ) 32,125.00 57,750.00 89,875.00
JASA 10 % 8,987.50
JUMLAH 98,862.50
DIBULATKAN 98,862.00
Analisa Gedung - 72
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
0.250 org Tukang batu @ Rp. 27,500.00 6,875.00
0.025 org Kep. Tk. Batu @ Rp. 30,000.00 750.00
0.500 org Pekerja @ Rp. 45,000.00 22,500.00
0.025 org Mandor @ Rp. 80,000.00 2,000.00
JUMLAH ( BELUM PPN ) 32,125.00 40,850.00 72,975.00
JASA 10 % 7,297.50
JUMLAH 80,272.50
DIBULATKAN 80,272.00
Analisa Gedung - 73
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
AK 1.000 m2 Pasang conblock tipe segi-empat, uni, segi-enam rawna 8 cm, K-400
1.000 m2 Conblock @ Rp. 61,700.00 61,700.00
0.050 m3 Pasir urug @ Rp. 55,000.00 2,750.00
0.250 org Tukang batu @ Rp. 27,500.00 6,875.00
0.025 org Kep. Tk. Batu @ Rp. 30,000.00 750.00
0.500 org Pekerja @ Rp. 45,000.00 22,500.00
0.025 org Mandor @ Rp. 80,000.00 2,000.00
JUMLAH ( BELUM PPN ) 32,125.00 64,450.00 96,575.00
JASA 10 % 9,657.50
JUMLAH 106,232.50
DIBULATKAN 106,232.00
Analisa Gedung - 74
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
0.025 org Kep. Tk. Batu @ Rp. 30,000.00 750.00
0.500 org Pekerja @ Rp. 45,000.00 22,500.00
0.025 org Mandor @ Rp. 80,000.00 2,000.00
JUMLAH ( BELUM PPN ) 32,125.00 54,750.00 86,875.00
JASA 10 % 8,687.50
JUMLAH 95,562.50
DIBULATKAN 95,562.00
Analisa Gedung - 75
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
Analisa Gedung - 77
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
PEKERJAAN KAYU
SNI 1.000 m3 Pasang konstruksi kuda-kuda kayu jati
6.27 1.100 m3 Kayu jati balok @ Rp. 20,000,000.00 22,000,000.00
03-3434-2002 15.000 kg Besi strip @ Rp. 7,500.00 112,500.00
0.800 kg Paku biasa 2" - 5" @ Rp. 8,000.00 6,400.00
12.000 org Tukang kayu @ Rp. 30,000.00 360,000.00
1.200 org Kepala tukang kayu @ Rp. 32,500.00 39,000.00
4.000 org Pekerja @ Rp. 45,000.00 180,000.00
0.200 org Mandor @ Rp. 80,000.00 16,000.00
JUMLAH ( BELUM PPN ) 595,000.00 22,118,900.00 22,713,900.00
JASA 10 % 2,271,390.00
JUMLAH 24,985,290.00
DIBULATKAN 24,985,290.00
Analisa Gedung - 79
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
Analisa Gedung - 80
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
2.200 m1 Usuk kayu jati 5/7 @ Rp. 70,000.00 154,000.00
5.000 m1 Reng jati 2/3 @ Rp. 12,000.00 60,000.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 216,000.00 224,025.00
JASA 10 % 22,402.50
JUMLAH 246,427.50
DIBULATKAN 246,427.00
Analisa Gedung - 81
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
AK 1.000 m2 Pasang usuk 5/7 kayu jati, reng 2/3 kayu jati (lokal)
2.200 m1 Usuk kayu jati 5/7 @ Rp. 70,000.00 154,000.00
5.000 m1 Reng kayu jati 2/3 (lokal) @ Rp. 6,000.00 30,000.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 186,000.00 194,025.00
JASA 10 % 19,402.50
JUMLAH 213,427.50
DIBULATKAN 213,427.00
AK 1.000 m2 Pasang usuk 5/7 kayu jati, reng 2/3 kayu kamper
2.200 m1 Usuk kayu jati 5/7 @ Rp. 70,000.00 154,000.00
5.000 m 1
Reng kayu kamper 2/3 @ Rp. 2,850.00 14,250.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 170,250.00 178,275.00
JASA 10 % 17,827.50
JUMLAH 196,102.50
DIBULATKAN 196,102.00
AK 1.000 m2 Pasang usuk 5/7 kayu jati, reng 2/3 kayu kruing
2.200 m1 Usuk kayu jati 5/7 @ Rp. 70,000.00 154,000.00
5.000 m 1
Reng kayu kruing 2/3 @ Rp. 2,610.00 13,050.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 169,050.00 177,075.00
JASA 10 % 17,707.50
JUMLAH 194,782.50
DIBULATKAN 194,782.00
AK 1.000 m2 Pasang usuk 5/7 kayu jati, reng 2/3 kayu bengkirai
2.200 m1 Usuk kayu jati 5/7 @ Rp. 70,000.00 154,000.00
5.000 m1 Reng kayu bengkirai 2/3 @ Rp. 3,450.00 17,250.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 173,250.00 181,275.00
JASA 10 % 18,127.50
Analisa Gedung - 82
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
JUMLAH 199,402.50
DIBULATKAN 199,402.00
Analisa Gedung - 83
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
AK 1.000 m2 Pasang usuk 5/7 kayu jati lokal, reng 2/3 kayu jati
2.200 m1 Usuk kayu jati 5/7 (lokal) @ Rp. 35,000.00 77,000.00
5.000 m1 Reng kayu jati 2/3 @ Rp. 12,000.00 60,000.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 139,000.00 147,025.00
JASA 10 % 14,702.50
JUMLAH 161,727.50
DIBULATKAN 161,727.00
AK 1.000 m2 Pasang usuk 5/7 kayu jati lokal, reng 2/3 kayu jati lokal
2.200 m1 Usuk kayu jati 5/7 (lokal) @ Rp. 35,000.00 77,000.00
5.000 m 1
Reng kayu jati 2/3 lokal @ Rp. 6,000.00 30,000.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 109,000.00 117,025.00
JASA 10 % 11,702.50
JUMLAH 128,727.50
DIBULATKAN 128,727.00
AK 1.000 m2 Pasang usuk 5/7 kayu jati lokal, reng 2/3 kayu kamper
2.200 m1 Usuk kayu jati 5/7 (lokal) @ Rp. 35,000.00 77,000.00
5.000 m 1
Reng kayu kamper 2/3 @ Rp. 2,850.00 14,250.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 93,250.00 101,275.00
JASA 10 % 10,127.50
JUMLAH 111,402.50
DIBULATKAN 111,402.00
AK 1.000 m2 Pasang usuk 5/7 kayu jati lokal, reng 2/3 kayu kruing
2.200 m1 Usuk kayu jati 5/7 (lokal) @ Rp. 35,000.00 77,000.00
5.000 m1 Reng kayu kruing 2/3 @ Rp. 2,610.00 13,050.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 92,050.00 100,075.00
JASA 10 % 10,007.50
Analisa Gedung - 84
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
JUMLAH 110,082.50
DIBULATKAN 110,082.00
Analisa Gedung - 85
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
AK 1.000 m2 Pasang usuk 5/7 kayu jati lokal, reng 2/3 kayu bengkirai
2.200 m1 Usuk kayu jati 5/7 (lokal) @ Rp. 35,000.00 77,000.00
5.000 m1 Reng kayu bengkirai 2/3 @ Rp. 3,450.00 17,250.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 96,250.00 104,275.00
JASA 10 % 10,427.50
JUMLAH 114,702.50
DIBULATKAN 114,702.00
AK 1.000 m2 Pasang usuk 5/7 kayu kamper, reng 2/3 reng kayu jati
2.200 m1 Usuk kayu kamper 5/7 @ Rp. 16,625.00 36,575.00
5.000 m 1
Reng jati 2/3 @ Rp. 12,000.00 60,000.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 98,575.00 106,600.00
JASA 10 % 10,660.00
JUMLAH 117,260.00
DIBULATKAN 117,260.00
AK 1.000 m2 Pasang usuk 5/7 kayu kamper, reng 2/3 kayu jati lokal
2.200 m1 Usuk kayu kamper 5/7 @ Rp. 16,625.00 36,575.00
5.000 m 1
Reng kayu jati 2/3 lokal @ Rp. 6,000.00 30,000.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 68,575.00 76,600.00
JASA 10 % 7,660.00
JUMLAH 84,260.00
DIBULATKAN 84,260.00
AK 1.000 m2 Pasang usuk 5/7 kayu kamper, reng 2/3 kayu kamper
2.200 m1 Usuk kayu kamper 5/7 @ Rp. 16,625.00 36,575.00
5.000 m1 Reng kayu kamper 2/3 @ Rp. 2,850.00 14,250.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 52,825.00 60,850.00
JASA 10 % 6,085.00
Analisa Gedung - 86
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
JUMLAH 66,935.00
DIBULATKAN 66,935.00
Analisa Gedung - 87
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
AK 1.000 m2 Pasang usuk 5/7 kayu kamper, reng 2/3 kayu kruing
2.200 m1 Usuk kayu kamper 5/7 @ Rp. 16,625.00 36,575.00
5.000 m1 Reng kayu kruing 2/3 @ Rp. 2,610.00 13,050.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 51,625.00 59,650.00
JASA 10 % 5,965.00
JUMLAH 65,615.00
DIBULATKAN 65,615.00
AK 1.000 m2 Pasang usuk 5/7 kayu kamper, reng 2/3 kayu bengkirai
2.200 m1 Usuk kayu kamper 5/7 @ Rp. 16,625.00 36,575.00
5.000 m 1
Reng kayu bengkirai 2/3 @ Rp. 3,450.00 17,250.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 55,825.00 63,850.00
JASA 10 % 6,385.00
JUMLAH 70,235.00
DIBULATKAN 70,235.00
AK 1.000 m2 Pasang usuk 5/7 kayu kruing, reng 2/3 kayu jati
2.200 m1 Usuk kayu kruing 5/7 @ Rp. 15,225.00 33,495.00
5.000 m 1
Reng jati 2/3 @ Rp. 12,000.00 60,000.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 95,495.00 103,520.00
JASA 10 % 10,352.00
JUMLAH 113,872.00
DIBULATKAN 113,872.00
AK 1.000 m2 Pasang usuk 5/7 kayu kruing, reng 2/3 kayu jati lokal
2.200 m1 Usuk kayu kruing 5/7 @ Rp. 15,225.00 33,495.00
5.000 m1 Reng kayu jati 2/3 lokal @ Rp. 6,000.00 30,000.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 65,495.00 73,520.00
JASA 10 % 7,352.00
Analisa Gedung - 88
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
JUMLAH 80,872.00
DIBULATKAN 80,872.00
Analisa Gedung - 89
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
AK 1.000 m2 Pasang usuk 5/7 kayu kruing, reng 2/3 kayu kamper
2.200 m1 Usuk kayu kruing 5/7 @ Rp. 15,225.00 33,495.00
5.000 m1 Reng kayu kamper 2/3 @ Rp. 2,850.00 14,250.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 49,745.00 57,770.00
JASA 10 % 5,777.00
JUMLAH 63,547.00
DIBULATKAN 63,547.00
AK 1.000 m2 Pasang usuk 5/7 kayu kruing, reng 2/3 kayu kruing
2.200 m1 Usuk kayu kruing 5/7 @ Rp. 15,225.00 33,495.00
5.000 m 1
Reng kayu kruing 2/3 @ Rp. 2,610.00 13,050.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 48,545.00 56,570.00
JASA 10 % 5,657.00
JUMLAH 62,227.00
DIBULATKAN 62,227.00
AK 1.000 m2 Pasang usuk 5/7 kayu kruing, reng 2/3 kayu bengkirai
2.200 m1 Usuk kayu kruing 5/7 @ Rp. 15,225.00 33,495.00
5.000 m 1
Reng kayu bengkirai 2/3 @ Rp. 3,450.00 17,250.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 52,745.00 60,770.00
JASA 10 % 6,077.00
JUMLAH 66,847.00
DIBULATKAN 66,847.00
AK 1.000 m2 Pasang usuk 5/7 kayu bengkirai, reng 2/3 kayu jati
2.200 m1 Usuk kayu bengkirai 5/7 @ Rp. 20,125.00 44,275.00
5.000 m1 Reng jati 2/3 @ Rp. 12,000.00 60,000.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 106,275.00 114,300.00
JASA 10 % 11,430.00
Analisa Gedung - 90
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
JUMLAH 125,730.00
DIBULATKAN 125,730.00
Analisa Gedung - 91
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
AK 1.000 m2 Pasang usuk 5/7 kayu bengkirai, reng 2/3 kayu jati lokal
2.200 m1 Usuk kayu bengkirai 5/7 @ Rp. 20,125.00 44,275.00
5.000 m1 Reng kayu jati 2/3 lokal @ Rp. 6,000.00 30,000.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 76,275.00 84,300.00
JASA 10 % 8,430.00
JUMLAH 92,730.00
DIBULATKAN 92,730.00
AK 1.000 m2 Pasang usuk 5/7 kayu bengkirai, reng 2/3 kayu kamper
2.200 m1 Usuk kayu bengkirai 5/7 @ Rp. 20,125.00 44,275.00
5.000 m 1
Reng kayu kamper 2/3 @ Rp. 2,850.00 14,250.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 60,525.00 68,550.00
JASA 10 % 6,855.00
JUMLAH 75,405.00
DIBULATKAN 75,405.00
AK 1.000 m2 Pasang usuk 5/7 kayu bengkirai, reng 2/3 kayu kruing
2.200 m1 Usuk kayu bengkirai 5/7 @ Rp. 20,125.00 44,275.00
5.000 m 1
Reng kayu kruing 2/3 @ Rp. 2,610.00 13,050.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 59,325.00 67,350.00
JASA 10 % 6,735.00
JUMLAH 74,085.00
DIBULATKAN 74,085.00
AK 1.000 m2 Pasang usuk 5/7 kayu bengkirai, reng 2/3 kayu bengkirai
2.200 m1 Usuk kayu bengkirai 5/7 @ Rp. 20,125.00 44,275.00
5.000 m1 Reng kayu bengkirai 2/3 @ Rp. 3,450.00 17,250.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 63,525.00 71,550.00
JASA 10 % 7,155.00
Analisa Gedung - 92
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
JUMLAH 78,705.00
DIBULATKAN 78,705.00
Analisa Gedung - 93
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
AK 1.000 m2 Pasang usuk 5/7 glugu, reng 2/3 kayu jati lokal
2.200 m1 Usuk glugu 5/7 @ Rp. 6,300.00 13,860.00
5.000 m 1
Reng kayu jati 2/3 lokal @ Rp. 6,000.00 30,000.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 45,860.00 53,885.00
JASA 10 % 5,388.50
JUMLAH 59,273.50
DIBULATKAN 59,273.00
Analisa Gedung - 95
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
AK 1.000 m2 Pasang usuk 5/7 kayu jati, reng 3/4 kayu jati (lokal)
2.200 m1 Usuk kayu jati 5/7 @ Rp. 70,000.00 154,000.00
4.000 m 1
Reng kayu jati 3/4 (lokal) @ Rp. 12,000.00 48,000.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 204,000.00 212,025.00
JASA 10 % 21,202.50
JUMLAH 233,227.50
DIBULATKAN 233,227.00
AK 1.000 m2 Pasang usuk 5/7 kayu jati, reng 3/4 kayu kamper
2.200 m1 Usuk kayu jati 5/7 @ Rp. 70,000.00 154,000.00
4.000 m1 Reng kayu kamper 3/4 @ Rp. 5,700.00 22,800.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 178,800.00 186,825.00
JASA 10 % 18,682.50
Analisa Gedung - 96
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
JUMLAH 205,507.50
DIBULATKAN 205,507.00
Analisa Gedung - 97
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
AK 1.000 m2 Pasang usuk 5/7 kayu jati, reng 3/4 kayu kruing
2.200 m1 Usuk kayu jati 5/7 @ Rp. 70,000.00 154,000.00
4.000 m1 Reng kayu kruing 3/4 @ Rp. 5,220.00 20,880.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 176,880.00 184,905.00
JASA 10 % 18,490.50
JUMLAH 203,395.50
DIBULATKAN 203,395.00
AK 1.000 m2 Pasang usuk 5/7 kayu jati, reng 3/4 kayu bengkirai
2.200 m1 Usuk kayu jati 5/7 @ Rp. 70,000.00 154,000.00
4.000 m 1
Reng kayu bengkirai 3/4 @ Rp. 6,900.00 27,600.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 183,600.00 191,625.00
JASA 10 % 19,162.50
JUMLAH 210,787.50
DIBULATKAN 210,787.00
AK 1.000 m2 Pasang usuk 5/7 kayu jati lokal, reng 3/4 kayu jati
2.200 m1 Usuk kayu jati 5/7 (lokal) @ Rp. 35,000.00 77,000.00
4.000 m 1
Reng kayu jati 3/4 @ Rp. 24,000.00 96,000.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 175,000.00 183,025.00
JASA 10 % 18,302.50
JUMLAH 201,327.50
DIBULATKAN 201,327.00
AK 1.000 m2 Pasang usuk 5/7 kayu jati lokal, reng 3/4 kayu jati lokal
2.200 m1 Usuk kayu jati 5/7 (lokal) @ Rp. 35,000.00 77,000.00
4.000 m1 Reng kayu jati 3/4 lokal @ Rp. 12,000.00 48,000.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 127,000.00 135,025.00
JASA 10 % 13,502.50
Analisa Gedung - 98
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
JUMLAH 148,527.50
DIBULATKAN 148,527.00
Analisa Gedung - 99
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
AK 1.000 m2 Pasang usuk 5/7 kayu jati lokal, reng 3/4 kayu kamper
2.200 m1 Usuk kayu jati 5/7 (lokal) @ Rp. 35,000.00 77,000.00
4.000 m1 Reng kayu kamper 3/4 @ Rp. 5,700.00 22,800.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 101,800.00 109,825.00
JASA 10 % 10,982.50
JUMLAH 120,807.50
DIBULATKAN 120,807.00
AK 1.000 m2 Pasang usuk 5/7 kayu jati lokal, reng 3/4 kayu kruing
2.200 m1 Usuk kayu jati 5/7 (lokal) @ Rp. 35,000.00 77,000.00
4.000 m 1
Reng kayu kruing 3/4 @ Rp. 5,220.00 20,880.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 99,880.00 107,905.00
JASA 10 % 10,790.50
JUMLAH 118,695.50
DIBULATKAN 118,695.00
AK 1.000 m2 Pasang usuk 5/7 kayu jati lokal, reng 3/4 kayu bengkirai
2.200 m1 Usuk kayu jati 5/7 (lokal) @ Rp. 35,000.00 77,000.00
4.000 m 1
Reng kayu bengkirai 3/4 @ Rp. 6,900.00 27,600.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 106,600.00 114,625.00
JASA 10 % 11,462.50
JUMLAH 126,087.50
DIBULATKAN 126,087.00
AK 1.000 m2 Pasang usuk 5/7 kayu kamper, reng 3/4 reng kayu jati
2.200 m1 Usuk kayu kamper 5/7 @ Rp. 16,625.00 36,575.00
4.000 m1 Reng jati 3/4 @ Rp. 24,000.00 96,000.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 134,575.00 142,600.00
JASA 10 % 14,260.00
Analisa Gedung - 100
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
JUMLAH 156,860.00
DIBULATKAN 156,860.00
AK 1.000 m2 Pasang usuk 5/7 kayu kamper, reng 3/4 kayu jati lokal
2.200 m1 Usuk kayu kamper 5/7 @ Rp. 16,625.00 36,575.00
4.000 m1 Reng kayu jati 3/4 lokal @ Rp. 12,000.00 48,000.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 86,575.00 94,600.00
JASA 10 % 9,460.00
JUMLAH 104,060.00
DIBULATKAN 104,060.00
AK 1.000 m2 Pasang usuk 5/7 kayu kamper, reng 3/4 kayu kamper
2.200 m1 Usuk kayu kamper 5/7 @ Rp. 16,625.00 36,575.00
4.000 m 1
Reng kayu kamper 3/4 @ Rp. 5,700.00 22,800.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 61,375.00 69,400.00
JASA 10 % 6,940.00
JUMLAH 76,340.00
DIBULATKAN 76,340.00
AK 1.000 m2 Pasang usuk 5/7 kayu kamper, reng 3/4 kayu kruing
2.200 m1 Usuk kayu kamper 5/7 @ Rp. 16,625.00 36,575.00
4.000 m 1
Reng kayu kruing 3/4 @ Rp. 5,220.00 20,880.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 59,455.00 67,480.00
JASA 10 % 6,748.00
JUMLAH 74,228.00
DIBULATKAN 74,228.00
AK 1.000 m2 Pasang usuk 5/7 kayu kamper, reng 3/4 kayu bengkirai
2.200 m1 Usuk kayu kamper 5/7 @ Rp. 16,625.00 36,575.00
4.000 m1 Reng kayu bengkirai 3/4 @ Rp. 6,900.00 27,600.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 66,175.00 74,200.00
JASA 10 % 7,420.00
Analisa Gedung - 102
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
JUMLAH 81,620.00
DIBULATKAN 81,620.00
AK 1.000 m2 Pasang usuk 5/7 kayu kruing, reng 3/4 kayu jati
2.200 m1 Usuk kayu kruing 5/7 @ Rp. 15,225.00 33,495.00
4.000 m1 Reng jati 3/4 @ Rp. 24,000.00 96,000.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 131,495.00 139,520.00
JASA 10 % 13,952.00
JUMLAH 153,472.00
DIBULATKAN 153,472.00
AK 1.000 m2 Pasang usuk 5/7 kayu kruing, reng 3/4 kayu jati lokal
2.200 m1 Usuk kayu kruing 5/7 @ Rp. 15,225.00 33,495.00
4.000 m 1
Reng kayu jati 3/4 lokal @ Rp. 12,000.00 48,000.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 83,495.00 91,520.00
JASA 10 % 9,152.00
JUMLAH 100,672.00
DIBULATKAN 100,672.00
AK 1.000 m2 Pasang usuk 5/7 kayu kruing, reng 3/4 kayu kamper
2.200 m1 Usuk kayu kruing 5/7 @ Rp. 15,225.00 33,495.00
4.000 m 1
Reng kayu kamper 3/4 @ Rp. 5,700.00 22,800.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 58,295.00 66,320.00
JASA 10 % 6,632.00
JUMLAH 72,952.00
DIBULATKAN 72,952.00
AK 1.000 m2 Pasang usuk 5/7 kayu kruing, reng 3/4 kayu kruing
2.200 m1 Usuk kayu kruing 5/7 @ Rp. 15,225.00 33,495.00
4.000 m1 Reng kayu kruing 3/4 @ Rp. 5,220.00 20,880.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 56,375.00 64,400.00
JASA 10 % 6,440.00
Analisa Gedung - 104
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
JUMLAH 70,840.00
DIBULATKAN 70,840.00
AK 1.000 m2 Pasang usuk 5/7 kayu kruing, reng 3/4 kayu bengkirai
2.200 m1 Usuk kayu kruing 5/7 @ Rp. 15,225.00 33,495.00
4.000 m1 Reng kayu bengkirai 3/4 @ Rp. 6,900.00 27,600.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 63,095.00 71,120.00
JASA 10 % 7,112.00
JUMLAH 78,232.00
DIBULATKAN 78,232.00
AK 1.000 m2 Pasang usuk 5/7 kayu bengkirai, reng 3/4 kayu jati
2.200 m1 Usuk kayu bengkirai 5/7 @ Rp. 20,125.00 44,275.00
4.000 m 1
Reng jati 3/4 @ Rp. 24,000.00 96,000.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 142,275.00 150,300.00
JASA 10 % 15,030.00
JUMLAH 165,330.00
DIBULATKAN 165,330.00
AK 1.000 m2 Pasang usuk 5/7 kayu bengkirai, reng 3/4 kayu jati lokal
2.200 m1 Usuk kayu bengkirai 5/7 @ Rp. 20,125.00 44,275.00
4.000 m 1
Reng kayu jati 3/4 lokal @ Rp. 12,000.00 48,000.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 94,275.00 102,300.00
JASA 10 % 10,230.00
JUMLAH 112,530.00
DIBULATKAN 112,530.00
AK 1.000 m2 Pasang usuk 5/7 kayu bengkirai, reng 3/4 kayu kamper
2.200 m1 Usuk kayu bengkirai 5/7 @ Rp. 20,125.00 44,275.00
4.000 m1 Reng kayu kamper 3/4 @ Rp. 5,700.00 22,800.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 69,075.00 77,100.00
JASA 10 % 7,710.00
Analisa Gedung - 106
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
JUMLAH 84,810.00
DIBULATKAN 84,810.00
AK 1.000 m2 Pasang usuk 5/7 kayu bengkirai, reng 3/4 kayu kruing
2.200 m1 Usuk kayu bengkirai 5/7 @ Rp. 20,125.00 44,275.00
4.000 m1 Reng kayu kruing 3/4 @ Rp. 5,220.00 20,880.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 67,155.00 75,180.00
JASA 10 % 7,518.00
JUMLAH 82,698.00
DIBULATKAN 82,698.00
AK 1.000 m2 Pasang usuk 5/7 kayu bengkirai, reng 3/4 kayu bengkirai
2.200 m1 Usuk kayu bengkirai 5/7 @ Rp. 20,125.00 44,275.00
4.000 m 1
Reng kayu bengkirai 3/4 @ Rp. 6,900.00 27,600.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 73,875.00 81,900.00
JASA 10 % 8,190.00
JUMLAH 90,090.00
DIBULATKAN 90,090.00
AK 1.000 m2 Pasang usuk 5/7 glugu, reng 3/4 kayu jati lokal
2.200 m1 Usuk glugu 5/7 @ Rp. 6,300.00 13,860.00
4.000 m1 Reng kayu jati 3/4 lokal @ Rp. 12,000.00 48,000.00
0.150 kg Paku usuk @ Rp. 8,000.00 1,200.00
0.100 kg Paku reng @ Rp. 8,000.00 800.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 8,025.00 63,860.00 71,885.00
JASA 10 % 7,188.50
Analisa Gedung - 108
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
JUMLAH 79,073.50
DIBULATKAN 79,073.00
SNI 1.000 m3 Membuat kusen pintu / jendela kayu jati (klas plitur)
6.1 1.100 m3 Kayu jati (klas plitur) @ Rp. 20,000,000.00 22,000,000.00
03-3434-2002 20.000 org Tukang kayu @ Rp. 30,000.00 600,000.00
2.000 org Kepala tukang kayu @ Rp. 32,500.00 65,000.00
6.000 org Pekerja @ Rp. 45,000.00 270,000.00
0.300 org Mandor @ Rp. 80,000.00 24,000.00
JUMLAH ( BELUM PPN ) 959,000.00 22,000,000.00 22,959,000.00
JASA 10 % 2,295,900.00
JUMLAH 25,254,900.00
DIBULATKAN 25,254,900.00
SNI 1.000 m2 Pasang pintu teakwood rangkap, rangka kayu jati lokal
6.19 0.020 m3 Papan kayu jati lokal @ Rp. 11,000,000.00 215,600.00
03-3434-2002 0.030 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00 240.00
0.300 kg Lem kayu @ Rp. 11,000.00 3,300.00
1.000 lbr Teakwood 4' x 8' x 4 mm @ Rp. 69,500.00 69,500.00
2.000 org Tukang kayu @ Rp. 30,000.00 60,000.00
SNI 1.000 m2 Mengerjakan daun pintu / jendela panil kayu jati lokal
6.7 0.040 m3 Kayu jati papan lokal @ Rp. 11,000,000.00 440,000.00
03-3434-2002 2.500 org Tukang kayu @ Rp. 30,000.00 75,000.00
0.250 org Kepala tukang kayu @ Rp. 32,500.00 8,125.00
1.000 org Pekerja @ Rp. 45,000.00 45,000.00
0.050 org Mandor @ Rp. 80,000.00 4,000.00
JUMLAH ( BELUM PPN ) 132,125.00 440,000.00 572,125.00
JASA 10 % 57,212.50
JUMLAH 629,337.50
SNI 1.000 m2 Pasang rangka langit-langit (1,00 x 1,00) m, kayu jati lokal
6.38 0.012 m3 Kayu jati balok lokal @ Rp. 10,000,000.00 120,000.00
03-3434-2002 0.100 kg Paku biasa 2" - 5" @ Rp. 8,000.00 800.00
0.250 org Tukang kayu @ Rp. 30,000.00 7,500.00
0.025 org Kepala tukang kayu @ Rp. 32,500.00 812.50
0.150 org Pekerja @ Rp. 45,000.00 6,750.00
0.008 org Mandor @ Rp. 80,000.00 600.00
JUMLAH ( BELUM PPN ) 15,662.50 120,800.00 136,462.50
JASA 10 % 13,646.25
JUMLAH 150,108.75
DIBULATKAN 150,108.00
SNI 1.000 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu jati tanpa plepet
0.012 m3 Kayu jati balok @ Rp. 20,000,000.00 240,000.00
03-2838-2002 0.060 kg Paku biasa @ Rp. 10,000.00 600.00
1.100 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00 11,000.00
0.320 org Tukang kayu @ Rp. 30,000.00 9,600.00
0.032 org Kepala tukang kayu @ Rp. 32,500.00 1,040.00
0.180 org Pekerja @ Rp. 45,000.00 8,100.00
0.009 org Mandor @ Rp. 80,000.00 720.00
JUMLAH ( BELUM PPN ) 19,460.00 251,600.00 271,060.00
JASA 10 % 27,106.00
JUMLAH 298,166.00
DIBULATKAN 298,166.00
SNI 1.000 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu jati lokal tanpa plepet
0.012 m3 Kayu jati balok lokal @ Rp. 10,000,000.00 120,000.00
SNI 1.000 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kamper tanpa plepet
0.012 m3 Kayu kamper balok @ Rp. 4,750,000.00 57,000.00
03-2838-2002 0.060 kg Paku biasa @ Rp. 10,000.00 600.00
1.100 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00 11,000.00
0.320 org Tukang kayu @ Rp. 30,000.00 9,600.00
0.032 org Kepala tukang kayu @ Rp. 32,500.00 1,040.00
0.180 org Pekerja @ Rp. 45,000.00 8,100.00
0.009 org Mandor @ Rp. 80,000.00 720.00
JUMLAH ( BELUM PPN ) 19,460.00 68,600.00 88,060.00
JASA 10 % 8,806.00
JUMLAH 96,866.00
DIBULATKAN 96,866.00
SNI 1.000 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kruing tanpa plepet
0.012 m3 Kayu kruing balok @ Rp. 4,350,000.00 52,200.00
03-2838-2002 0.060 kg Paku biasa @ Rp. 10,000.00 600.00
1.100 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00 11,000.00
0.320 org Tukang kayu @ Rp. 30,000.00 9,600.00
0.032 org Kepala tukang kayu @ Rp. 32,500.00 1,040.00
0.180 org Pekerja @ Rp. 45,000.00 8,100.00
0.009 org Mandor @ Rp. 80,000.00 720.00
JUMLAH ( BELUM PPN ) 19,460.00 63,800.00 83,260.00
JASA 10 % 8,326.00
JUMLAH 91,586.00
DIBULATKAN 91,586.00
SNI 1.000 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu bengkirai tanpa plepet
0.012 m3 Kayu bengkirai balok @ Rp. 5,750,000.00 69,000.00
03-2838-2002 0.060 kg Paku biasa @ Rp. 10,000.00 600.00
1.100 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00 11,000.00
0.320 org Tukang kayu @ Rp. 30,000.00 9,600.00
0.032 org Kepala tukang kayu @ Rp. 32,500.00 1,040.00
0.180 org Pekerja @ Rp. 45,000.00 8,100.00
0.009 org Mandor @ Rp. 80,000.00 720.00
JUMLAH ( BELUM PPN ) 19,460.00 80,600.00 100,060.00
JASA 10 % 10,006.00
JUMLAH 110,066.00
DIBULATKAN 110,066.00
SNI 1.000 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu jati memakai plepet
0.012 m3 Kayu jati balok @ Rp. 20,000,000.00 240,000.00
03-2838-2002 0.060 kg Paku biasa @ Rp. 10,000.00 600.00
1.100 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00 11,000.00
2.600 m1 Plepet kayu @ Rp. 2,000.00 5,200.00
0.010 kg Paku eternit @ Rp. 11,500.00 115.00
0.010 kg Paku plepet @ Rp. 10,000.00 100.00
0.320 org Tukang kayu @ Rp. 30,000.00 9,600.00
0.032 org Kepala tukang kayu @ Rp. 32,500.00 1,040.00
0.180 org Pekerja @ Rp. 45,000.00 8,100.00
0.009 org Mandor @ Rp. 80,000.00 720.00
JUMLAH ( BELUM PPN ) 19,460.00 257,015.00 276,475.00
JASA 10 % 27,647.50
JUMLAH 304,122.50
SNI 1.000 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu jati lokal memakai plepet
0.012 m3 Kayu jati balok lokal @ Rp. 10,000,000.00 120,000.00
03-2838-2002 0.060 kg Paku biasa @ Rp. 10,000.00 600.00
1.100 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00 11,000.00
2.600 m1 Plepet kayu @ Rp. 2,000.00 5,200.00
0.010 kg Paku eternit @ Rp. 11,500.00 115.00
0.010 kg Paku plepet @ Rp. 10,000.00 100.00
0.320 org Tukang kayu @ Rp. 30,000.00 9,600.00
0.032 org Kepala tukang kayu @ Rp. 32,500.00 1,040.00
0.180 org Pekerja @ Rp. 45,000.00 8,100.00
0.009 org Mandor @ Rp. 80,000.00 720.00
JUMLAH ( BELUM PPN ) 19,460.00 137,015.00 156,475.00
JASA 10 % 15,647.50
JUMLAH 172,122.50
DIBULATKAN 172,122.00
SNI 1.000 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kamper memakai plepet
0.012 m3 Kayu kamper balok @ Rp. 4,750,000.00 57,000.00
03-2838-2002 0.060 kg Paku biasa @ Rp. 10,000.00 600.00
1.100 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00 11,000.00
2.600 m1 Plepet kayu @ Rp. 2,000.00 5,200.00
0.010 kg Paku eternit @ Rp. 11,500.00 115.00
0.010 kg Paku plepet @ Rp. 10,000.00 100.00
0.320 org Tukang kayu @ Rp. 30,000.00 9,600.00
0.032 org Kepala tukang kayu @ Rp. 32,500.00 1,040.00
0.180 org Pekerja @ Rp. 45,000.00 8,100.00
0.009 org Mandor @ Rp. 80,000.00 720.00
JUMLAH ( BELUM PPN ) 19,460.00 74,015.00 93,475.00
JASA 10 % 9,347.50
JUMLAH 102,822.50
DIBULATKAN 102,822.00
SNI 1.000 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kruing memakai plepet
0.012 m3 Kayu kruing balok @ Rp. 4,350,000.00 52,200.00
03-2838-2002 0.060 kg Paku biasa @ Rp. 10,000.00 600.00
1.100 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00 11,000.00
2.600 m1 Plepet kayu @ Rp. 2,000.00 5,200.00
0.010 kg Paku eternit @ Rp. 11,500.00 115.00
0.010 kg Paku plepet @ Rp. 10,000.00 100.00
0.320 org Tukang kayu @ Rp. 30,000.00 9,600.00
0.032 org Kepala tukang kayu @ Rp. 32,500.00 1,040.00
0.180 org Pekerja @ Rp. 45,000.00 8,100.00
0.009 org Mandor @ Rp. 80,000.00 720.00
JUMLAH ( BELUM PPN ) 19,460.00 69,215.00 88,675.00
JASA 10 % 8,867.50
JUMLAH 97,542.50
DIBULATKAN 97,542.00
SNI 1.000 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu bengkirai memakai plepet
0.012 m3 Kayu bengkirai balok @ Rp. 5,750,000.00 69,000.00
03-2838-2002 0.060 kg Paku biasa @ Rp. 10,000.00 600.00
1.100 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00 11,000.00
2.600 m1 Plepet kayu @ Rp. 2,000.00 5,200.00
Analisa Gedung - 128
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
0.010 kg Paku eternit @ Rp. 11,500.00 115.00
0.010 kg Paku plepet @ Rp. 10,000.00 100.00
0.320 org Tukang kayu @ Rp. 30,000.00 9,600.00
0.032 org Kepala tukang kayu @ Rp. 32,500.00 1,040.00
0.180 org Pekerja @ Rp. 45,000.00 8,100.00
0.009 org Mandor @ Rp. 80,000.00 720.00
JUMLAH ( BELUM PPN ) 19,460.00 86,015.00 105,475.00
JASA 10 % 10,547.50
JUMLAH 116,022.50
DIBULATKAN 116,022.00
6.13 1.000 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu jati
0.013 m3 Kayu jati @ Rp. 20,000,000.00 260,000.00
0.360 lbr Gypsum board 9 mm @ Rp. 42,000.00 15,120.00
0.050 roll Kasa gypsum @ Rp. 10,000.00 500.00
0.450 kg Tepung gypsum @ Rp. 3,500.00 1,575.00
0.003 kg Alkasit @ Rp. 300,000.00 900.00
0.050 kg Paku gypsum @ Rp. 20,000.00 1,000.00
0.120 kg Paku usuk @ Rp. 8,000.00 960.00
0.370 org Tukang kayu @ Rp. 30,000.00 11,100.00
0.037 org Kepala tukang kayu @ Rp. 32,500.00 1,202.50
0.240 org Pekerja @ Rp. 45,000.00 10,800.00
0.012 org Mandor @ Rp. 80,000.00 960.00
JUMLAH ( BELUM PPN ) 24,062.50 280,055.00 304,117.50
JASA 10 % 30,411.75
JUMLAH 334,529.25
DIBULATKAN 334,529.00
6.13 1.000 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu jati lokal
0.013 m3 Kayu jati lokal @ Rp. 10,000,000.00 130,000.00
0.360 lbr Gypsum board 9 mm @ Rp. 42,000.00 15,120.00
0.050 roll Kasa gypsum @ Rp. 10,000.00 500.00
0.450 kg Tepung gypsum @ Rp. 3,500.00 1,575.00
0.003 kg Alkasit @ Rp. 300,000.00 900.00
0.050 kg Paku gypsum @ Rp. 20,000.00 1,000.00
0.120 kg Paku usuk @ Rp. 8,000.00 960.00
0.370 org Tukang kayu @ Rp. 30,000.00 11,100.00
0.037 org Kepala tukang kayu @ Rp. 32,500.00 1,202.50
0.240 org Pekerja @ Rp. 45,000.00 10,800.00
0.012 org Mandor @ Rp. 80,000.00 960.00
JUMLAH ( BELUM PPN ) 24,062.50 150,055.00 174,117.50
JASA 10 % 17,411.75
JUMLAH 191,529.25
DIBULATKAN 191,529.00
6.13 1.000 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu kamper
0.013 m3 Kayu kamper @ Rp. 4,750,000.00 61,750.00
0.360 lbr Gypsum board 9 mm @ Rp. 42,000.00 15,120.00
0.050 roll Kasa gypsum @ Rp. 10,000.00 500.00
0.450 kg Tepung gypsum @ Rp. 3,500.00 1,575.00
0.003 kg Alkasit @ Rp. 300,000.00 900.00
0.050 kg Paku gypsum @ Rp. 20,000.00 1,000.00
0.120 kg Paku usuk @ Rp. 8,000.00 960.00
0.370 org Tukang kayu @ Rp. 30,000.00 11,100.00
0.037 org Kepala tukang kayu @ Rp. 32,500.00 1,202.50
0.240 org Pekerja @ Rp. 45,000.00 10,800.00
0.012 org Mandor @ Rp. 80,000.00 960.00
JUMLAH ( BELUM PPN ) 24,062.50 81,805.00 105,867.50
JASA 10 % 10,586.75
JUMLAH 116,454.25
DIBULATKAN 116,454.00
6.13 1.000 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu kruing
0.013 m3 Kayu kruing @ Rp. 4,350,000.00 56,550.00
1.000 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu bengkirai
0.013 m3 Kayu bengkirai @ Rp. 5,750,000.00 74,750.00
0.360 lbr Gypsum board 9 mm @ Rp. 42,000.00 15,120.00
0.050 roll Kasa gypsum @ Rp. 10,000.00 500.00
0.450 kg Tepung gypsum @ Rp. 3,500.00 1,575.00
0.003 kg Alkasit @ Rp. 300,000.00 900.00
0.050 kg Paku gypsum @ Rp. 20,000.00 1,000.00
0.120 kg Paku usuk @ Rp. 8,000.00 960.00
0.370 org Tukang kayu @ Rp. 30,000.00 11,100.00
0.037 org Kepala tukang kayu @ Rp. 32,500.00 1,202.50
0.240 org Pekerja @ Rp. 45,000.00 10,800.00
0.012 org Mandor @ Rp. 80,000.00 960.00
JUMLAH ( BELUM PPN ) 24,062.50 94,805.00 118,867.50
JASA 10 % 11,886.75
JUMLAH 130,754.25
DIBULATKAN 130,754.00
6.13 1.000 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu jati
0.013 m3 Kayu jati @ Rp. 20,000,000.00 260,000.00
0.360 lbr Kalsiboard 3.5 mm @ Rp. 46,200.00 16,632.00
0.050 roll Kasa gypsum @ Rp. 10,000.00 500.00
0.450 kg Tepung gypsum @ Rp. 3,500.00 1,575.00
0.003 kg Alkasit @ Rp. 300,000.00 900.00
0.050 kg Paku gypsum @ Rp. 20,000.00 1,000.00
0.120 kg Paku usuk @ Rp. 8,000.00 960.00
0.370 org Tukang kayu @ Rp. 30,000.00 11,100.00
0.037 org Kepala tukang kayu @ Rp. 32,500.00 1,202.50
0.240 org Pekerja @ Rp. 45,000.00 10,800.00
0.012 org Mandor @ Rp. 80,000.00 960.00
JUMLAH ( BELUM PPN ) 24,062.50 281,567.00 305,629.50
JASA 10 % 30,562.95
JUMLAH 336,192.45
DIBULATKAN 336,192.00
6.13 1.000 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu jati lokal
0.013 m3 Kayu jati lokal @ Rp. 10,000,000.00 130,000.00
6.13 1.000 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu kamper
0.013 m3 Kayu kamper @ Rp. 4,750,000.00 61,750.00
0.360 lbr Kalsiboard 3.5 mm @ Rp. 46,200.00 16,632.00
0.050 roll Kasa gypsum @ Rp. 10,000.00 500.00
0.450 kg Tepung gypsum @ Rp. 3,500.00 1,575.00
0.003 kg Alkasit @ Rp. 300,000.00 900.00
0.050 kg Paku gypsum @ Rp. 20,000.00 1,000.00
0.120 kg Paku usuk @ Rp. 8,000.00 960.00
0.370 org Tukang kayu @ Rp. 30,000.00 11,100.00
0.037 org Kepala tukang kayu @ Rp. 32,500.00 1,202.50
0.240 org Pekerja @ Rp. 45,000.00 10,800.00
0.012 org Mandor @ Rp. 80,000.00 960.00
JUMLAH ( BELUM PPN ) 24,062.50 83,317.00 107,379.50
JASA 10 % 10,737.95
JUMLAH 118,117.45
DIBULATKAN 118,117.00
6.13 1.000 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu kruing
0.013 m3 Kayu kruing @ Rp. 4,350,000.00 56,550.00
0.360 lbr Kalsiboard 3.5 mm @ Rp. 46,200.00 16,632.00
0.050 roll Kasa gypsum @ Rp. 10,000.00 500.00
0.450 kg Tepung gypsum @ Rp. 3,500.00 1,575.00
0.003 kg Alkasit @ Rp. 300,000.00 900.00
0.050 kg Paku gypsum @ Rp. 20,000.00 1,000.00
0.120 kg Paku usuk @ Rp. 8,000.00 960.00
0.370 org Tukang kayu @ Rp. 30,000.00 11,100.00
0.037 org Kepala tukang kayu @ Rp. 32,500.00 1,202.50
0.240 org Pekerja @ Rp. 45,000.00 10,800.00
0.012 org Mandor @ Rp. 80,000.00 960.00
JUMLAH ( BELUM PPN ) 24,062.50 78,117.00 102,179.50
JASA 10 % 10,217.95
JUMLAH 112,397.45
DIBULATKAN 112,397.00
1.000 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu bengkirai
0.013 m3 Kayu bengkirai @ Rp. 5,750,000.00 74,750.00
0.360 lbr Kalsiboard 3.5 mm @ Rp. 46,200.00 16,632.00
0.050 roll Kasa gypsum @ Rp. 10,000.00 500.00
0.450 kg Tepung gypsum @ Rp. 3,500.00 1,575.00
0.003 kg Alkasit @ Rp. 300,000.00 900.00
0.050 kg Paku gypsum @ Rp. 20,000.00 1,000.00
0.120 kg Paku usuk @ Rp. 8,000.00 960.00
0.370 org Tukang kayu @ Rp. 30,000.00 11,100.00
0.037 org Kepala tukang kayu @ Rp. 32,500.00 1,202.50
0.240 org Pekerja @ Rp. 45,000.00 10,800.00
0.012 org Mandor @ Rp. 80,000.00 960.00
JUMLAH ( BELUM PPN ) 24,062.50 96,317.00 120,379.50
JASA 10 % 12,037.95
JUMLAH 132,417.45
DIBULATKAN 132,417.00
SNI 1.000 m1 Pasang lisplank ukuran (3 x 20) cm, kayu jati lokal
6.47 0.007 m3 Papan kayu jati lokal @ Rp. 11,000,000.00 79,200.00
03-3434-2002 0.050 kg Paku biasa 2" - 5" @ Rp. 8,000.00 400.00
0.200 org Tukang kayu @ Rp. 30,000.00 6,000.00
0.025 org Kepala tukang kayu @ Rp. 32,500.00 812.50
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.005 org Mandor @ Rp. 80,000.00 400.00
JUMLAH ( BELUM PPN ) 11,712.50 79,600.00 91,312.50
JASA 10 % 9,131.25
JUMLAH 100,443.75
DIBULATKAN 100,443.00
SNI 1.000 m1 Pasang lisplank ukuran (3 x 30) cm, kayu jati lokal
6.49 0.011 m3 Papan kayu jati lokal @ Rp. 11,000,000.00 121,000.00
03-3434-2002 0.050 kg Paku biasa 2" - 5" @ Rp. 8,000.00 400.00
0.220 org Tukang kayu @ Rp. 30,000.00 6,600.00
0.022 org Kepala tukang kayu @ Rp. 32,500.00 715.00
SNI 1.000 m1 Pasang lisplank ukuran 2 x (3 x 20) cm, kayu jati lokal
0.015 m3 Papan kayu jati lokal @ Rp. 11,000,000.00 159,500.00
03-3434-2002 0.060 kg Paku biasa 2" - 5" @ Rp. 8,000.00 480.00
0.250 org Tukang kayu @ Rp. 30,000.00 7,500.00
0.025 org Kepala tukang kayu @ Rp. 32,500.00 812.50
0.150 org Pekerja @ Rp. 45,000.00 6,750.00
0.008 org Mandor @ Rp. 80,000.00 600.00
JUMLAH ( BELUM PPN ) 15,662.50 159,980.00 175,642.50
JASA 10 % 17,564.25
JUMLAH 193,206.75
DIBULATKAN 193,206.00
SNI 1.000 m1 Pasang lisplank ukuran 2 x (2 x 20) cm, kayu jati lokal
0.009 m3 Papan kayu jati lokal @ Rp. 11,000,000.00 94,600.00
03-3434-2002 0.060 kg Paku biasa 2" - 5" @ Rp. 8,000.00 480.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kepala tukang kayu @ Rp. 32,500.00 325.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.005 org Mandor @ Rp. 80,000.00 400.00
JUMLAH ( BELUM PPN ) 8,225.00 95,080.00 103,305.00
JASA 10 % 10,330.50
JUMLAH 113,635.50
DIBULATKAN 113,635.00
SNI 1.000 m1 Pasang talang datar, seng BJLS 28, papan kayu jati
6.18 0.500 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00 22,000.00
0.015 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00 120.00
0.010 m3 Kayu jati papan @ Rp. 22,000,000.00 211,200.00
0.250 kg Flincoat @ Rp. 35,000.00 8,750.00
0.400 org Tukang kayu @ Rp. 30,000.00 12,000.00
0.025 org Kepala tukang kayu @ Rp. 32,500.00 812.50
0.150 org Pekerja @ Rp. 45,000.00 6,750.00
0.001 org Mandor @ Rp. 80,000.00 100.00
JUMLAH ( BELUM PPN ) 19,662.50 242,070.00 261,732.50
JASA 10 % 26,173.25
JUMLAH 287,905.75
DIBULATKAN 287,905.00
SNI 1.000 m1 Pasang talang datar, seng BJLS 28, papan kayu jati lokal
6.18 0.500 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00 22,000.00
0.015 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00 120.00
0.010 m3 Kayu jati lokal papan @ Rp. 11,000,000.00 105,600.00
0.250 kg Flincoat @ Rp. 35,000.00 8,750.00
0.400 org Tukang kayu @ Rp. 30,000.00 12,000.00
0.025 org Kepala tukang kayu @ Rp. 32,500.00 812.50
0.150 org Pekerja @ Rp. 45,000.00 6,750.00
0.001 org Mandor @ Rp. 80,000.00 100.00
JUMLAH ( BELUM PPN ) 19,662.50 136,470.00 156,132.50
JASA 10 % 15,613.25
JUMLAH 171,745.75
DIBULATKAN 171,745.00
SNI 1.000 m1 Pasang talang datar, seng BJLS 28, papan kayu kamper
6.18 0.500 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00 22,000.00
0.015 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00 120.00
0.010 m3 Kayu kamper papan @ Rp. 5,500,000.00 52,800.00
0.250 kg Flincoat @ Rp. 35,000.00 8,750.00
0.400 org Tukang kayu @ Rp. 30,000.00 12,000.00
0.025 org Kepala tukang kayu @ Rp. 32,500.00 812.50
0.150 org Pekerja @ Rp. 45,000.00 6,750.00
0.001 org Mandor @ Rp. 80,000.00 100.00
JUMLAH ( BELUM PPN ) 19,662.50 83,670.00 103,332.50
JASA 10 % 10,333.25
JUMLAH 113,665.75
DIBULATKAN 113,665.00
SNI 1.000 m1 Pasang talang datar, seng BJLS 28, papan kayu kruing
6.18 0.500 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00 22,000.00
0.015 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00 120.00
0.010 m3 Kayu kruing papan @ Rp. 4,750,000.00 45,600.00
0.250 kg Flincoat @ Rp. 35,000.00 8,750.00
0.400 org Tukang kayu @ Rp. 30,000.00 12,000.00
0.025 org Kepala tukang kayu @ Rp. 32,500.00 812.50
0.150 org Pekerja @ Rp. 45,000.00 6,750.00
0.001 org Mandor @ Rp. 80,000.00 100.00
JUMLAH ( BELUM PPN ) 19,662.50 76,470.00 96,132.50
JASA 10 % 9,613.25
SNI 1.000 m1 Pasang talang datar, seng BJLS 28, papan kayu bengkirai
6.18 0.500 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00 22,000.00
0.015 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00 120.00
0.010 m3 Kayui bengkirai papan @ Rp. 6,000,000.00 57,600.00
0.250 kg Flincoat @ Rp. 35,000.00 8,750.00
0.400 org Tukang kayu @ Rp. 30,000.00 12,000.00
0.025 org Kepala tukang kayu @ Rp. 32,500.00 812.50
0.150 org Pekerja @ Rp. 45,000.00 6,750.00
0.001 org Mandor @ Rp. 80,000.00 100.00
JUMLAH ( BELUM PPN ) 19,662.50 88,470.00 108,132.50
JASA 10 % 10,813.25
JUMLAH 118,945.75
DIBULATKAN 118,945.00
SNI 1.000 m1 Pasang talang miring, seng BJLS 28 papan kayu jati
6.19 0.500 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00 22,000.00
0.015 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00 120.00
0.019 m3 Kayu jati papan @ Rp. 22,000,000.00 418,000.00
0.300 kg Flincoat @ Rp. 35,000.00 10,500.00
0.400 org Tukang kayu @ Rp. 30,000.00 12,000.00
0.025 org Kepala tukang kayu @ Rp. 32,500.00 812.50
0.040 org Pekerja @ Rp. 45,000.00 1,800.00
0.001 org Mandor @ Rp. 80,000.00 100.00
JUMLAH ( BELUM PPN ) 14,712.50 450,620.00 465,332.50
JASA 10 % 46,533.25
JUMLAH 511,865.75
DIBULATKAN 511,865.00
SNI 1.000 m1 Pasang talang miring, seng BJLS 28, papan kayu jati lokal
6.19 0.500 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00 22,000.00
0.015 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00 120.00
0.019 m3 Kayu jati lokal papan @ Rp. 11,000,000.00 209,000.00
0.250 kg Flincoat @ Rp. 35,000.00 8,750.00
0.400 org Tukang kayu @ Rp. 30,000.00 12,000.00
0.025 org Kepala tukang kayu @ Rp. 32,500.00 812.50
0.040 org Pekerja @ Rp. 45,000.00 1,800.00
0.001 org Mandor @ Rp. 80,000.00 100.00
JUMLAH ( BELUM PPN ) 14,712.50 239,870.00 254,582.50
JASA 10 % 25,458.25
JUMLAH 280,040.75
DIBULATKAN 280,040.00
SNI 1.000 m1 Pasang talang miring, seng BJLS 28, papan kayu kamper
6.19 0.500 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00 22,000.00
0.015 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00 120.00
0.019 m3 Kayu kamper papan @ Rp. 5,500,000.00 104,500.00
0.250 kg Flincoat @ Rp. 35,000.00 8,750.00
0.400 org Tukang kayu @ Rp. 30,000.00 12,000.00
0.025 org Kepala tukang kayu @ Rp. 32,500.00 812.50
0.040 org Pekerja @ Rp. 45,000.00 1,800.00
0.001 org Mandor @ Rp. 80,000.00 100.00
JUMLAH ( BELUM PPN ) 14,712.50 135,370.00 150,082.50
JASA 10 % 15,008.25
SNI 1.000 m1 Pasang talang miring, seng BJLS 28, papan kayu kruing
6.19 0.500 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00 22,000.00
0.015 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00 120.00
0.019 m3 Kayu kruing papan @ Rp. 4,750,000.00 90,250.00
0.250 kg Flincoat @ Rp. 35,000.00 8,750.00
0.400 org Tukang kayu @ Rp. 30,000.00 12,000.00
0.025 org Kepala tukang kayu @ Rp. 32,500.00 812.50
0.040 org Pekerja @ Rp. 45,000.00 1,800.00
0.001 org Mandor @ Rp. 80,000.00 100.00
JUMLAH ( BELUM PPN ) 14,712.50 121,120.00 135,832.50
JASA 10 % 13,583.25
JUMLAH 149,415.75
DIBULATKAN 149,415.00
SNI 1.000 m1 Pasang talang miring, seng BJLS 28, papan kayu bengkirai
6.19 0.500 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00 22,000.00
0.015 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00 120.00
0.019 m3 Kayu bengkirai papan @ Rp. 6,000,000.00 114,000.00
0.250 kg Flincoat @ Rp. 35,000.00 8,750.00
0.400 org Tukang kayu @ Rp. 30,000.00 12,000.00
0.025 org Kepala tukang kayu @ Rp. 32,500.00 812.50
0.040 org Pekerja @ Rp. 45,000.00 1,800.00
0.001 org Mandor @ Rp. 80,000.00 100.00
JUMLAH ( BELUM PPN ) 14,712.50 144,870.00 159,582.50
JASA 10 % 15,958.25
JUMLAH 175,540.75
DIBULATKAN 175,540.00
SNI 1.000 m2 Pasang dinding pemisah teakwood rangkap, rangka kayu kamper
03-3434-2002 0.020 m3 Kayu kamper balok @ Rp. 4,750,000.00 92,625.00
6.56 0.007 m 3
Kayu kamper papan @ Rp. 5,500,000.00 38,500.00
0.100 kg Paku biasa 2" - 5" @ Rp. 8,000.00 800.00
0.560 kg Lem kayu @ Rp. 11,000.00 6,160.00
1.000 lbr Teakwood 4' x 8' x 4 mm @ Rp. 69,500.00
0.450 org Tukang kayu @ Rp. 30,000.00 13,500.00
0.045 org Kepala tukang kayu @ Rp. 32,500.00 1,462.50
0.150 org Pekerja @ Rp. 45,000.00 6,750.00
0.075 org Mandor @ Rp. 80,000.00 6,000.00
JUMLAH ( BELUM PPN ) 27,712.50 138,085.00 165,797.50
JASA 10 % 16,579.75
JUMLAH 182,377.25
DIBULATKAN 182,377.00
SNI 1.000 m2 Pasang dinding pemisah plywoodwood rangkap, rangka kayu kamper
03-3434-2002 0.020 m3 Kayu kamper balok @ Rp. 4,750,000.00 92,625.00
6.57 0.007 m 3
Kayu kamper papan @ Rp. 5,500,000.00 38,500.00
0.100 kg Paku biasa 2" - 5" @ Rp. 8,000.00 800.00
0.560 kg Lem kayu @ Rp. 11,000.00 6,160.00
1.000 lbr Plywood 4' x 8' x 4 mm @ Rp. 41,250.00 41,250.00
0.600 org Tukang kayu @ Rp. 30,000.00 18,000.00
0.060 org Kepala tukang kayu @ Rp. 32,500.00 1,950.00
0.200 org Pekerja @ Rp. 45,000.00 9,000.00
0.010 org Mandor @ Rp. 80,000.00 800.00
JUMLAH ( BELUM PPN ) 29,750.00 179,335.00 209,085.00
JASA 10 % 20,908.50
JUMLAH 229,993.50
DIBULATKAN 229,993.00
PEKERJAAN ATAP
H.2A 1.000 m2 Pasang genteng beton besar Natural ( isi 9 / m2 ) untuk rumah tingkat
9.000 bh Genteng beton natural @ Rp. 2,750.00 24,750.00
0.100 org Tukang batu @ Rp. 27,500.00 2,750.00
0.010 org Kep. Tk. Batu @ Rp. 30,000.00 300.00
H.2A 1.000 m2 Pasang genteng beton besar Warna ( isi 9 / m2 ) untuk rumah tingkat
9.000 bh Genteng beton Warna @ Rp. 4,420.00 39,780.00
0.100 org Tukang batu @ Rp. 27,500.00 2,750.00
0.010 org Kep. Tk. Batu @ Rp. 30,000.00 300.00
0.300 org Pekerja @ Rp. 45,000.00 13,500.00
0.015 org Mandor @ Rp. 80,000.00 1,200.00
JUMLAH ( BELUM PPN ) 17,750.00 39,780.00 57,530.00
JASA 10 % 5,753.00
JUMLAH 63,283.00
DIBULATKAN 63,283.00
H.2A 1.000 m2 Pasang genteng keramik berglasir KIA, Kanmuri Natural untuk rumah tingkat
14.500 bh Genteng beton natural @ Rp. 4,500.00 65,250.00
0.100 org Tukang batu @ Rp. 27,500.00 2,750.00
0.010 org Kep. Tk. Batu @ Rp. 30,000.00 300.00
0.300 org Pekerja @ Rp. 45,000.00 13,500.00
0.015 org Mandor @ Rp. 80,000.00 1,200.00
JUMLAH ( BELUM PPN ) 17,750.00 65,250.00 83,000.00
JASA 10 % 8,300.00
JUMLAH 91,300.00
DIBULATKAN 91,300.00
H.6 1.000 m1 Pasang bubungan genteng keramik berglasir KIA, Kanmuri Natural
4.000 bh Bubungan gent.krmk KIA natura@ Rp. 13,500.00 54,000.00
0.015 m3 Kapur pasang @ Rp. 72,500.00 1,102.00
0.015 m 3
Pasir pasang @ Rp. 76,000.00 1,155.20
1.524 kg PC @ Rp. 764.00 1,164.34
0.200 org Tukang batu @ Rp. 27,500.00 5,500.00
0.020 org Kep. Tk. Batu @ Rp. 30,000.00 600.00
0.400 org Pekerja @ Rp. 45,000.00 18,000.00
0.020 org Mandor @ Rp. 80,000.00 1,600.00
JUMLAH ( BELUM PPN ) 25,700.00 57,421.54 83,121.54
JASA 10 % 8,312.15
JUMLAH 91,433.69
DIBULATKAN 91,433.00
SNI 1.000 m2 Pasang atap genteng metal zinc alume type prima roof
03-3436-2002 1.020 m2 Genteng metal @ Rp. 95,400.00 97,308.00
6.32 0.200 kg Paku anti karat @ Rp. 20,000.00 4,000.00
0.100 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.010 org Kepala tukang kayu @ Rp. 32,500.00 325.00
0.200 org Pekerja @ Rp. 45,000.00 9,000.00
0.001 org Mandor @ Rp. 80,000.00 80.00
JUMLAH ( BELUM PPN ) 12,405.00 101,308.00 113,713.00
JASA 10 % 11,371.30
JUMLAH 125,084.30
DIBULATKAN 125,084.00
PEKERJAAN CAT-CATAN
SNI 1.000 m2 Mengerok karat cat lama permukaan baja dengan cara manual
6.3 0.050 kg Sabun @ Rp. 12,000.00 600.00
0.150 org Pekerja @ Rp. 45,000.00 6,750.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 6,950.00 600.00 7,550.00
JASA 10 % 755.00
JUMLAH 8,305.00
DIBULATKAN 8,305.00
SNI 1.000 m2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup
6.8 0.200 kg Cat meni @ Rp. 12,000.00 2,400.00
0.150 kg Plamir @ Rp. 12,000.00 1,800.00
0.170 kg Cat dasar @ Rp. 32,000.00 5,440.00
0.260 kg Cat penutup @ Rp. 32,000.00 8,320.00
0.090 org Tukang cat @ Rp. 25,000.00 2,250.00
0.006 org Kepala tukang cat @ Rp. 27,000.00 162.00
0.070 org Pekerja @ Rp. 45,000.00 3,150.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 5,762.00 17,960.00 23,722.00
SNI 1.000 m2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 3 lapis cat penutup
6.9 0.200 kg Cat meni @ Rp. 12,000.00 2,400.00
0.150 kg Plamir @ Rp. 12,000.00 1,800.00
0.170 kg Cat dasar @ Rp. 32,000.00 5,440.00
0.350 kg Cat penutup @ Rp. 32,000.00 11,200.00
0.105 org Tukang cat @ Rp. 25,000.00 2,625.00
0.004 org Kepala tukang cat @ Rp. 27,000.00 108.00
0.070 org Pekerja @ Rp. 45,000.00 3,150.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 6,083.00 20,840.00 26,923.00
JASA 10 % 2,692.30
JUMLAH 29,615.30
DIBULATKAN 29,615.00
SNI 1.000 m2 Pelaburan bidang kayu dengan cat residu atau ter
6.12 0.350 ltr Residu atau ter @ Rp. 3,500.00 1,225.00
0.100 org Pekerja @ Rp. 45,000.00 4,500.00
0.006 org Mandor @ Rp. 80,000.00 480.00
JUMLAH ( BELUM PPN ) 4,980.00 1,225.00 6,205.00
JASA 10 % 620.50
JUMLAH 6,825.50
DIBULATKAN 6,825.00
SNI 1.000 m2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
6.14 0.100 kg Plamir tembok @ Rp. 8,500.00 850.00
0.100 kg Cat dasar @ Rp. 9,500.00 950.00
0.260 kg Cat penutup 2 x @ Rp. 9,500.00 2,470.00
0.063 org Tukang cat @ Rp. 25,000.00 1,575.00
0.006 org Kepala tukang cat @ Rp. 27,000.00 170.10
0.020 org Pekerja @ Rp. 45,000.00 900.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 2,845.10 4,270.00 7,115.10
JASA 10 % 711.51
JUMLAH 7,826.61
DIBULATKAN 7,826.00
SNI 1.000 m2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
6.15 0.120 kg Cat dasar @ Rp. 9,500.00 1,140.00
0.180 kg Cat penutup 2 x @ Rp. 9,500.00 1,710.00
0.042 org Tukang cat @ Rp. 25,000.00 1,050.00
0.004 org Kepala tukang cat @ Rp. 27,000.00 113.40
0.028 org Pekerja @ Rp. 45,000.00 1,260.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 2,623.40 2,850.00 5,473.40
JASA 10 % 547.34
JUMLAH 6,020.74
DIBULATKAN 6,020.00
SNI 1.000 m2 Pengecatan tembok tidak terlindung dari panas dan hujan
6.14 0.100 kg Cat alkali resisting primer @ Rp. 27,200.00 2,720.00
0.360 kg Cat ICI Weathershield @ Rp. 50,000.00 18,000.00
0.063 org Tukang cat @ Rp. 25,000.00 1,575.00
0.006 org Kepala tukang cat @ Rp. 27,000.00 170.10
0.020 org Pekerja @ Rp. 45,000.00 900.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 2,845.10 20,720.00 23,565.10
JASA 10 % 2,356.51
JUMLAH 25,921.61
DIBULATKAN 25,921.00
SNI 1.000 m2 Melabur tembok tembok lama dengan kapur sirih (untuk pemeliharaan)
6.18 0.002 m3 Perancah kayu @ Rp. 1,000,000.00 2,000.00
0.300 kg Kapur sirih @ Rp. 500.00 150.00
0.005 org Tukang cat @ Rp. 25,000.00 125.00
0.001 org Kepala tukang cat @ Rp. 27,000.00 13.50
0.040 org Pekerja @ Rp. 45,000.00 1,800.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 2,138.50 2,150.00 4,288.50
JASA 10 % 428.85
JUMLAH 4,717.35
DIBULATKAN 4,717.00
SNI 1.000 m2 Pengecacatan permukaan baja dengan meni besi memakai perancah
6.21 0.100 kg Meni besi sinkromat @ Rp. 22,500.00 2,250.00
0.010 bh Kuas @ Rp. 8,000.00 80.00
0.002 m3 Perancah kayu @ Rp. 1,000,000.00 2,000.00
PEKERJAAN BONGKARAN
L.12 1.000 m3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan untuk digunakan lagi
6.000 org Tukang kayu @ Rp. 30,000.00 180,000.00
0.600 org Kep. Tk. Kayu @ Rp. 32,500.00 19,500.00
4.000 org Pekerja @ Rp. 45,000.00 180,000.00
0.200 org Mandor @ Rp. 80,000.00 16,000.00
JUMLAH ( BELUM PPN ) 395,500.00 - 395,500.00
JASA 10 % 39,550.00
JUMLAH 435,050.00
DIBULATKAN 435,050.00
1.000 m3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan tidak digunakan lagi
1.000 org Pekerja @ Rp. 45,000.00 45,000.00
0.200 org Mandor @ Rp. 80,000.00 16,000.00
JUMLAH ( BELUM PPN ) 61,000.00 - 61,000.00
JASA 10 % 6,100.00
JUMLAH 67,100.00
DIBULATKAN 67,100.00
ANALISA SUPLEMEN
1 1.000 m1 Pasang pipa beton oval dia. 25/37,5 dalam 0 - 1 m
1.000 bh Pipa beton oval @ Rp. 35,000.00 35,000.00
0.750 org Pekerja @ Rp. 45,000.00 33,750.00
0.150 org Tukang batu @ Rp. 27,500.00 4,125.00
0.015 Org Mandor @ Rp. 80,000.00 1,200.00
JUMLAH ( BELUM PPN ) 39,075.00 35,000.00 74,075.00
JASA 10 % 7,407.50
JUMLAH 81,482.50
DIBULATKAN 81,482.00
PEKERJAAN SANITASI
SNI 1.000 bh Memasang kloset duduk/monoblock
1.000 bh Kloset duduk / monoblock @ Rp. 1,250,000.00 1,250,000.00
6.1 0.060 x Harga kloset (Perlengkapan) @ Rp. 1,250,000.00 75,000.00
1.100 org Tukang batu @ Rp. 27,500.00 30,250.00
0.001 org Kepala tukang batu @ Rp. 30,000.00 30.00
3.300 org Pekerja @ Rp. 45,000.00 148,500.00
0.160 org Mandor @ Rp. 80,000.00 12,800.00
JUMLAH ( BELUM PPN ) 191,580.00 1,325,000.00 1,516,580.00
JASA 10 % 151,658.00
JUMLAH 1,668,238.00
DIBULATKAN 1,668,238.00
SNI 1.000 m1 Memasang pipa penyalur air limbah jenis pipa tanah, diameter 15 cm
1.600 bh Pipa tanah @ Rp. 25,000.00 40,000.00
6.12 0.680 kg PC @ Rp. 764.00 519.52
0.013 m3 Pasir pasang @ Rp. 76,000.00 988.00
0.011 m3 Pasir urug @ Rp. 55,000.00 605.00
0.030 org Tukang batu @ Rp. 27,500.00 825.00
0.003 org Kepala tukang batu @ Rp. 30,000.00 90.00
0.060 org Pekerja @ Rp. 45,000.00 2,700.00
0.003 org Mandor @ Rp. 80,000.00 200.00
JUMLAH ( BELUM PPN ) 3,815.00 42,112.52 45,927.52
JASA 10 % 4,592.75
JUMLAH 50,520.27
DIBULATKAN 50,520.00
SNI 1.000 m1 Memasang pipa penyalur air limbah jenis pipa tanah, diameter 20 cm
1.600 bh Pipa tanah @ Rp. 35,000.00 56,000.00
6.13 0.870 kg PC @ Rp. 764.00 664.68
0.014 m3 Pasir pasang @ Rp. 76,000.00 1,064.00
Analisa Gedung - 198
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
0.140 m3 Pasir urug @ Rp. 55,000.00 7,700.00
0.040 org Tukang batu @ Rp. 27,500.00 1,100.00
0.004 org Kepala tukang batu @ Rp. 30,000.00 120.00
0.080 org Pekerja @ Rp. 45,000.00 3,600.00
0.007 org Mandor @ Rp. 80,000.00 560.00
JUMLAH ( BELUM PPN ) 5,380.00 65,428.68 70,808.68
JASA 10 % 7,080.87
JUMLAH 77,889.55
DIBULATKAN 77,889.00
SNI 1.000 bh Memasang bak kontrol pasangan batu bata ukuran (30 x 30) cm, tinggi 35 cm
87.000 bh Batu bata @ Rp. 350.00 30,450.00
6.16 44.000 kg PC @ Rp. 764.00 33,616.00
0.070 m3 Pasir pasang @ Rp. 76,000.00 5,320.00
0.070 m Batu kerikil
3
@ Rp. 55,000.00 3,850.00
1.600 kg Besi beton @ Rp. 7,900.00 12,640.00
0.060 m3 Pasir beton @ Rp. 73,000.00 4,380.00
1.015 org Tukang batu @ Rp. 27,500.00 27,912.50
0.002 org Kepala tukang batu @ Rp. 30,000.00 45.00
3.200 org Pekerja @ Rp. 45,000.00 144,000.00
0.016 org Mandor @ Rp. 80,000.00 1,280.00
JUMLAH ( BELUM PPN ) 173,237.50 90,256.00 263,493.50
JASA 10 % 26,349.35
JUMLAH 289,842.85
DIBULATKAN 289,842.00
SNI 1.000 bh Memasang bak kontrol pasangan batu bata ukuran (45 x 45) cm, tinggi 50 cm
150.000 bh Batu bata @ Rp. 350.00 52,500.00
6.17 77.000 kg PC @ Rp. 764.00 58,828.00
0.130 m3 Pasir pasang @ Rp. 76,000.00 9,880.00
0.020 m Batu kerikil
3
@ Rp. 55,000.00 1,100.00
2.600 kg Besi beton @ Rp. 7,900.00 20,540.00
0.090 m3 Pasir beton @ Rp. 73,000.00 6,570.00
Analisa Gedung - 200
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
0.473 org Tukang batu @ Rp. 27,500.00 13,007.50
0.047 org Kepala tukang batu @ Rp. 30,000.00 1,410.00
1.420 org Pekerja @ Rp. 45,000.00 63,900.00
0.071 org Mandor @ Rp. 80,000.00 5,680.00
JUMLAH ( BELUM PPN ) 83,997.50 149,418.00 233,415.50
JASA 10 % 23,341.55
JUMLAH 256,757.05
DIBULATKAN 256,757.00
SNI 1.000 bh Memasang bak kontrol pasangan batu bata ukuran (60 x 60) cm, tingg 65 cm
222.000 bh Batu bata @ Rp. 350.00 77,700.00
6.18 114.000 kg PC @ Rp. 764.00 87,096.00
0.184 m3 Pasir pasang @ Rp. 76,000.00 13,984.00
0.033 m3 Batu kerikil @ Rp. 55,000.00 1,815.00
4.850 kg Besi beton @ Rp. 7,900.00 38,315.00
0.120 m3 Pasir beton @ Rp. 73,000.00 8,760.00
0.720 org Tukang batu @ Rp. 27,500.00 19,800.00
0.072 org Kepala tukang batu @ Rp. 30,000.00 2,160.00
2.160 org Pekerja @ Rp. 45,000.00 97,200.00
0.100 org Mandor @ Rp. 80,000.00 8,000.00
JUMLAH ( BELUM PPN ) 127,160.00 227,670.00 354,830.00
JASA 10 % 35,483.00
JUMLAH 390,313.00
DIBULATKAN 390,313.00
Empiris 1.000 m2 Mengerjakan Ukiran Gaya Yogyakarta dengan kedalaman 1 cm, tidak berlubang
Membuat pola ukir dan memindahkan pola
1.000 lb Kertas 100 x 100 cm @ Rp. 2,000.00 2,000.00
15.000 lbr Kerta karbon @ Rp. 3,500.00 52,500.00
2.000 org Tukang gambar @ Rp. 35,000.00 70,000.00
JUMLAH ( A ) 70,000.00 54,500.00 124,500.00
Mengukir
16.000 org Tukang Ukir @ Rp. 45,000.00 720,000.00
1.000 org Kepala Tk, Ukir @ Rp. 45,000.00 45,000.00
JUMLAH ( B ) 765,000.00 - 765,000.00
(A) / ( 1000 )
64,784.00 / 1,000.00 64.78
1.000 m1 Pekerjaan Grouting / Injeksi retakan dinding bata dengan Semen Slurry (Cebex 100)
3.000 bh Pipa @ Rp. 1,500.00 4,500.00
0.050 kg Nitobond EC @ Rp. 100,000.00 5,000.00
0.016 kg Cebex 100 @ Rp. 150,000.00 2,400.00
0.150 hr Sewa Mesin Grouting @ Rp. 150,000.00 22,500.00
0.075 hr Sewa mesin gerinda @ Rp. 100,000.00 7,500.00
1.000 ls Alat bantu @ Rp. 5,000.00 5,000.00
0.313 org Tukang grouting @ Rp. 30,000.00 9,375.00
0.031 org Kepala Tukang grouting @ Rp. 32,500.00 1,014.00
1.250 org Pekerja @ Rp. 45,000.00 56,250.00
0.156 org Mandor @ Rp. 80,000.00 12,496.00
JUMLAH ( BELUM PPN ) 79,135.00 46,900.00 126,035.00
JASA 10 % 12,603.50
JUMLAH 138,638.50
DIBULATKAN 138,638.00
25. 1.0000 set Pasang Stang Ornamen 2,2 meter + Lampu SRP 822/250 Watt Son + pengetesan dan penyalaan
0.5000 org Pekerja @ Rp. 45,000.00 22,500.00
0.5000 org Tukang Listrik @ Rp. 29,000.00 14,500.00
1.2500 org Pengawas @ Rp. 37,200.00 46,500.00
0.5000 org Mandor @ Rp. 80,000.00 40,000.00
JUMLAH (A) 123,500.00 - 123,500.00
27. 1.0000 set Pasang Stang Ornamen 6 meter + Lampu SRP 822/250 Watt Son
0.8750 org Pekerja @ Rp. 45,000.00 39,375.00
0.8750 org Tukang Listrik @ Rp. 29,000.00 25,375.00
1.8033 org Pengawas @ Rp. 37,200.00 67,082.76
0.7413 org Mandor @ Rp. 80,000.00 59,306.40
JUMLAH (C) 191,139.16 - 191,139.16
28. 1.0000 set Pasang Stang Ornamen 2,2 meter + Lampu SRP 822/250 Watt Son
0.5000 org Pekerja @ Rp. 45,000.00 22,500.00
0.5000 org Tukang Listrik @ Rp. 29,000.00 14,500.00
1.2500 org Pengawas @ Rp. 37,200.00 46,500.00
0.5000 org Mandor @ Rp. 80,000.00 40,000.00
JUMLAH (D) 123,500.00 - 123,500.00
29. 1.0000 set Pasang Tiang Octogonal Cabang 1, h= 7 meter+ lampu SRP 822/250 Watt Son
0.4200 m 3
Pondasi Tiang Beton bertulang 1:2:3 @ Rp. 4,886,681.80 2,052,406.36
2.8500 org Pekerja @ Rp. 45,000.00 128,250.00
2.8500 org Tukang Listrik @ Rp. 29,000.00 82,650.00
2.0075 org Pengawas @ Rp. 37,200.00 74,679.00
1.0000 org Mandor @ Rp. 80,000.00 80,000.00
JUMLAH (E) 365,579.00 2,052,406.36 2,417,985.36
30. 1.0000 set Pasang Tiang Octogonal Cabang 1, h= 9 meter + lampu SRP 822/250 Watt Son
0.4200 m 3
Pondasi Tiang Beton bertulang 1:2:3 @ Rp. 4,886,681.80 2,052,406.36
3.1000 org Pekerja @ Rp. 45,000.00 139,500.00
3.1000 org Tukang Listrik @ Rp. 29,000.00 89,900.00
2.5000 org Pengawas @ Rp. 37,200.00 93,000.00
1.2100 org Mandor @ Rp. 80,000.00 96,800.00
JUMLAH (F) 419,200.00 2,052,406.36 2,471,606.36
31. 1.0000 set Pasang Tiang Octogonal Cabang 2, h= 9 meter+ lampu SRP 822/250 Watt Son
0.4200 m 3
Pondasi Tiang Beton bertulang 1:2:3 @ Rp. 4,886,681.80 2,052,406.36
3.3000 org Pekerja @ Rp. 45,000.00 148,500.00
3.3000 org Tukang Listrik @ Rp. 29,000.00 95,700.00
2.5782 org Pengawas @ Rp. 37,200.00 95,909.04
1.2433 org Mandor @ Rp. 80,000.00 99,464.00
JUMLAH (G) 439,573.04 2,052,406.36 2,491,979.40
32. 1.0000 set Pasang Tiang Octogonal Cabang 3, h= 9 m+ lampu SRP 822/250 Watt Son
0.4200 m 3
Pondasi Tiang Beton bertulang 1:2:3 @ Rp. 4,886,681.80 2,052,406.36
3.8100 org Pekerja @ Rp. 45,000.00 171,450.00
3.8100 org Tukang Listrik @ Rp. 29,000.00 110,490.00
2.6626 org Pengawas @ Rp. 37,200.00 99,048.72
1.2650 org Mandor @ Rp. 80,000.00 101,200.00
JUMLAH (H) 482,188.72 2,052,406.36 2,534,595.08
33. 1.0000 set Pasang Tiang Octogonal Cabang 3, h= 11 m+ lampu SRP 822/250 Watt Son
0.4200 m 3
Pondasi Tiang Beton bertulang 1:2:3 @ Rp. 4,886,681.80 2,052,406.36
4.2500 org Pekerja @ Rp. 45,000.00 191,250.00
4.2500 org Tukang Listrik @ Rp. 29,000.00 123,250.00
2.9287 org Pengawas @ Rp. 37,200.00 108,947.64
1.2939 org Mandor @ Rp. 80,000.00 103,512.00
JUMLAH (I) 526,959.64 2,052,406.36 2,579,366.00
34. 1.0000 set Bongkar armatur pada stang ornamen existing + pasang lampu SRP 822/150 Watt Son + return
0.9000 org Pekerja @ Rp. 45,000.00 40,500.00
0.9000 org Tukang Listrik @ Rp. 29,000.00 26,100.00
2.1044 org Pengawas @ Rp. 37,200.00 78,283.68
0.8418 org Mandor @ Rp. 80,000.00 67,344.00
0.0500 unit Retur material existing @ Rp. 100,000.00 5,000.00
JUMLAH (J) 217,227.68 - 217,227.68
35. 1.0000 set Bongkar armatur pada stang ornamen existing + pasang Lampu SRP 822/250 Watt Son + retur
0.8750 org Pekerja @ Rp. 45,000.00 39,375.00
0.8750 org Tukang Listrik @ Rp. 29,000.00 25,375.00
1.6995 org Pengawas @ Rp. 37,200.00 63,221.40
0.6798 org Mandor @ Rp. 80,000.00 54,384.00
0.0500 unit Retur material existing @ Rp. 100,000.00 5,000.00
JUMLAH (K) 187,355.40 - 187,355.40
36. 1.0000 set Bongkar armatur pada tang existing + pasang Lampu SRP 822/250 Watt Son + retur
0.9000 org Pekerja @ Rp. 45,000.00 40,500.00
0.9000 org Tukang Listrik @ Rp. 29,000.00 26,100.00
2.1044 org Pengawas @ Rp. 37,200.00 78,283.68
0.8418 org Mandor @ Rp. 80,000.00 67,344.00
0.0500 unit Retur material existing @ Rp. 100,000.00 5,000.00
JUMLAH (L) 217,227.68 - 217,227.68
37. 1.0000 set Bongkar komponen lama existing + pasang komponen Lampu SRP 822/250 Watt Son + retur
0.8500 org Pekerja @ Rp. 45,000.00 38,250.00
0.8500 org Tukang Listrik @ Rp. 29,000.00 24,650.00
1.9554 org Pengawas @ Rp. 37,200.00 72,740.88
0.7822 org Mandor @ Rp. 80,000.00 62,576.00
0.0500 unit Retur material existing @ Rp. 100,000.00 5,000.00
JUMLAH (M) 203,216.88 - 203,216.88
KPUT 100.0000 m2 Perkerasan lapis pondasi bawah (sub base) tebal 20 cm padat
10.8 5.0000 m3 Pasair pasang @ Rp. 76,000.00 380,000.00
23.0000 m3 Batu belah 15/20 @ Rp. 80,000.00 1,840,000.00
3.0000 m3 Batu pecah 5/7 cm @ Rp. 132,000.00 396,000.00
6.5000 m3 Pasir urug @ Rp. 55,000.00 357,500.00
26.0000 m Isi batu berkerasan
3
@ Rp. 73,340.00 1,906,840.00
6.5000 Tng Menyawur pasir @ Rp. 45,000.00 292,500.00
JUMLAH ( BELUM TERMASUK PPN ) 2,199,340.00 2,973,500.00 5,172,840.00
DIBULATKAN 5,172,840.00
Tiap m2
1/100 x 2,199,340.00 + 2,973,500.00 21,993.40 29,735.00
Biaya menggilas
1/200 x 111,900.00 + 120,550.00 559.50 602.75
Sewa motor walls
1/200 x 150,000.00 750.00
JUMLAH ( BELUM TERMASUK PPN ) 23,302.90 30,337.75 53,640.65
JASA 10 % 5,364.07
JUMLAH 59,004.72
DIBULATKAN 59,004.00
Tiap m2
1/100 x 1,728,470.00 + 2,412,000.00 17,284.70 24,120.00
Biaya menggilas
1/200 x 111,900.00 + 120,550.00 559.50 602.75
Sewa motor walls
1/200 x 150,000.00 750.00
JUMLAH ( BELUM TERMASUK PPN ) 18,594.20 24,722.75 43,316.95
JASA 10 % 4,331.70
Tiap m2
1/100 x 1,099,670.00 + 1,896,750.00 10,996.70 18,967.50
Biaya menggilas
1/150 x 111,900.00 + 120,550.00 746.00 803.67
Sewa motor walls
1/150 x 150,000.00 1,000.00
JUMLAH ( BELUM TERMASUK PPN ) 12,742.70 19,771.17 32,513.87
JASA 10 % 3,251.39
JUMLAH 35,765.25
DIBULATKAN 35,765.00
Tiap m2
1/100 x 804,400.00 + 5,910,900.00 8,044.00 59,109.00
Biaya menggilas
4/12,5/200 x 111,900.00 + 120,550.00 179.04 192.88
Sewa motor walls
1/200 x 150,000.00 750.00
JUMLAH ( BELUM TERMASUK PPN ) 8,973.04 59,301.88 68,274.92
JASA 10 % 6,827.49
JUMLAH 75,102.41
DIBULATKAN 75,102.00
Tiap m2
Aspal sand sheet 2 cm jereng (1 cm padat)
2/100 x 401,500.00 + 1,488,250.00 8,030.00 29,765.00
Biaya menggilas
1/500 x 111,900.00 + 120,550.00 223.80 241.10
Sewa motor walls
1/500 x 150,000.00 300.00
Aspal untuk lem 0,5 kg
0.5000 x 10,650.00 5,325.00
JUMLAH ( BELUM TERMASUK PPN ) 8,553.80 35,331.10 43,884.90
JASA 10 % 4,388.49
JUMLAH 48,273.39
DIBULATKAN 48,273.00
Tiap m2
Aspal sand sheet 3 cm jereng (2 cm padat)
3/100 x 401,500.00 + 1,488,250.00 12,045.00 44,647.50
Biaya menggilas
1/500 x 111,900.00 + 120,550.00 223.80 241.10
Sewa motor walls
1/500 x 150,000.00 300.00
Aspal untuk lem 0,5 kg
0.5000 x 10,650.00 5,325.00
JUMLAH ( BELUM TERMASUK PPN ) 12,568.80 50,213.60 62,782.40
JASA 10 % 6,278.24
JUMLAH 69,060.64
DIBULATKAN 69,060.00
KPUT 100.0000 m2 Pengaspalan sand sheet (latasir) tanpa aspal, tebal 1 cm jereng
M.8 - kg Aspal 10,650.00 -
1.0000 m3 Pasair pasang @ Rp. 76,000.00 76,000.00
0.9000 m3 Kayu bakar @ Rp. 90,000.00 81,000.00
0.2500 org Juru godog aspal @ Rp. 20,000.00 5,000.00
8.1000 org Pekerja @ Rp. 45,000.00 364,500.00
0.4000 org Mandor @ Rp. 80,000.00 32,000.00
JUMLAH ( BELUM TERMASUK PPN ) 401,500.00 157,000.00 558,500.00
DIBULATKAN 558,500.00
Tiap m2
Aspal sand sheet 2 cm jereng (1 cm padat) tanpa aspal
2/100 x 401,500.00 + 157,000.00 8,030.00 3,140.00
Biaya menggilas
1/500 x 111,900.00 + 120,550.00 223.80 241.10
Sewa motor walls
1/500 x 150,000.00 300.00
Aspal untuk lem 0,5 kg
- x 10,650.00 -
JUMLAH ( BELUM TERMASUK PPN ) 8,553.80 3,381.10 11,934.90
JASA 10 % 1,193.49
JUMLAH 13,128.39
DIBULATKAN 13,128.00
Tiap m2
Aspal sand sheet 3 cm jereng (2 cm padat) tanpa aspal
3/100 x 401,500.00 + 157,000.00 12,045.00 4,710.00
Biaya menggilas
1/500 x 111,900.00 + 120,550.00 223.80 241.10
Sewa motor walls
1/500 x 150,000.00 300.00
Aspal untuk lem 0,5 kg
- x 10,650.00 -
JUMLAH ( BELUM TERMASUK PPN ) 12,568.80 4,951.10 17,519.90
JASA 10 % 1,751.99
JUMLAH 19,271.89
DIBULATKAN 19,271.00
I URAIAN PERALATAN
1 Jenis Peralatan ASPHALT MIXING PLANT E01
2 Tenaga Pw 150.00 HP
3 Kapasitas Cp 50.00 Ton/jam
4 Alat Baru : a. Umur Ekonomis A 10.00 Tahun
b. Jam Kerja dalam 1 Tahun W 1,500.00 Jam
c. Harga Alat B 7,500,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 10.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 1,500.00 Jam Alat Baru
c. Harga Alat B' 7,500,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan ASPHALT FINISHER E02
2 Tenaga Pw 47.00 HP
3 Kapasitas Cp 6.00 Ton
4 Alat Baru : a. Umur Ekonomis A 6.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000 Jam
c. Harga Alat B 715,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 6.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 715,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan ASPHALT SPRAYER E03
2 Tenaga Pw 15.00 HP
3 Kapasitas Cp 800.00 Liter
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000 Jam
c. Harga Alat B 145,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 145,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan BULLDOZER 100 -150 HP E04
2 Tenaga Pw 140.00 HP
3 Kapasitas Cp Ton
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000 Jam
c. Harga Alat B 700,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 700,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan COMPRESSOR 4000 - 6500 L/M E05
2 Tenaga Pw 80.00 HP
3 Kapasitas Cp Ton
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000 Jam
c. Harga Alat B 175,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 175,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan WHEEL LOADER 1,0 - 1,6 M3 E15
2 Tenaga Pw 105.00 HP
3 Kapasitas Cp 1.50 Ton
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 840,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 840,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan TANDEM ROLLER 6 - 8 T E17
2 Tenaga Pw 50.00 HP
3 Kapasitas Cp 8.00 Ton
4 Alat Baru a Umur Ekonomis A 5.00 Tahun
b Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c Harga Alat B 460,000,000.00 Rupiah
5 Alat yang dipakai a Umur Ekonomis A' 5.00 Tahun Alat Baru
b Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c Harga Alat B' 460,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan PNEUMATIC TYRE ROLLER 8 - 10 T E18
2 Tenaga Pw 60.00 HP
3 Kapasitas Cp 10.00 Ton
4 Alat Baru a Umur Ekonomis A 5.00 Tahun
b Jam Kerja dalam 1 Tahun W 1,800.00 Jam
c Harga Alat B 510,000,000.00 Rupiah
5 Alat yang dipakai a Umur Ekonomis A' 5.00 Tahun Alat Baru
b Jam Kerja dalam 1 Tahun W' 1,800.00 Jam Alat Baru
c Harga Alat B' 510,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan DUMP TRUCK E09
2 Tenaga Pw 125.00 HP
3 Kapasitas Cp 8.00 Ton
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 145,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 145,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan GENERATOR SET E12
2 Tenaga Pw 175.00 HP
3 Kapasitas Cp 125.00 KVA
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 440,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 440,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan MOTOR GRADER > 100 HP E12
2 Tenaga Pw 125.00 HP
3 Kapasitas Cp - -
4 Alat Baru a Umur Ekonomis A 5.00 Tahun
b Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c Harga Alat B 880,000,000.00 Rupiah
5 Alat yang dipakai a Umur Ekonomis A' 5.00 Tahun Alat Baru
b Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c Harga Alat B' 880,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan VIBRATORY ROLLER 5 - 8 T E19
2 Tenaga Pw 75.00 HP
3 Kapasitas Cp 7.00 Ton
4 Alat Baru Umur Ekonomis A 4.00 Tahun
Jam Kerja dalam 1 Tahun W 2,000.00 Jam
Harga Alat B 500,000,000.00 Rupiah
5 Alat yang dipakai a Umur Ekonomis A' 4.00 Tahun Alat Baru
b Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c Harga Alat B' 500,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan WATER TANK TRUCK 3000 - 4000 L E23
2 Tenaga Pw 100.00 HP
3 Kapasitas Cp 4,000.00 Liter
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 50,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 50,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan JACK HAMMER E26
2 Tenaga Pw 3.00 HP
3 Kapasitas Cp - Liter
4 Alat Baru : a. Umur Ekonomis A 4.00 Tahun
b. Jam Kerja dalam 1 Tahun W 1,000.00 Jam
c. Harga Alat B 3,500,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 4.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 1,000.00 Jam Alat Baru
c. Harga Alat B' 3,500,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan TAMPER E25
2 Tenaga Pw 5.00 HP
3 Kapasitas Cp 0.170 Ton
4 Alat Baru : a. Umur Ekonomis A 4.00 Tahun
b. Jam Kerja dalam 1 Tahun W 1,000.00 Jam
c. Harga Alat B 3,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 4.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 1,000.00 Jam Alat Baru
c. Harga Alat B' 3,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan STONE CRUSHER E21
2 Tenaga Pw 220.00 HP
3 Kapasitas Cp 50.00 Ton/Jam
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 491,500,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 491,500,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan THREE WHEEL ROLLER 6 - 8 T E16
2 Tenaga Pw 55.00 HP
3 Kapasitas Cp 8.00 Ton
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 125,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 125,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan CONCRETE VIBRATOR E20
2 Tenaga Pw 10.00 HP
3 Kapasitas Cp - -
4 Alat Baru : a. Umur Ekonomis A 4.00 Tahun
b. Jam Kerja dalam 1 Tahun W 1,000.00 Jam
c. Harga Alat B 12,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 4.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 1,000.00 Jam Alat Baru
c. Harga Alat B' 12,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan CONCRETE MIXER 0.3 - 0.6 M3 E06
2 Tenaga Pw 15.00 HP
3 Kapasitas Cp 500.00 Liter
4 Alat Baru : a. Umur Ekonomis A 4.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 45,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 4.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 45,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan CRANE 10 - 15 TON E07
2 Tenaga Pw 150.00 HP
3 Kapasitas Cp 15.00 Ton
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 300,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 300,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan DUMP TRUCK 3 - 4 M3 E08
2 Tenaga Pw 100.00 HP
3 Kapasitas Cp 6.00 Ton
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 100,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 100,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan EXCAVATOR 80 - 140 HP E10
2 Tenaga Pw 80.00 HP
3 Kapasitas Cp 0.50 M3
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 250,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 250,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan FLAT BED TRUCK 3 - 4 M3 E11
2 Tenaga Pw 100.00 HP
3 Kapasitas Cp 4.00 M3
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 250,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 250,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan WATER PUMP 70 - 100 mm E22
2 Tenaga Pw 6.00 HP
3 Kapasitas Cp - -
4 Alat Baru : a. Umur Ekonomis A 2.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 5,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 2.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 5,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan FULVI MIXER E27
2 Tenaga Pw 75.00 HP
3 Kapasitas Cp - -
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 100,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 100,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan TRACK LOADER 75 - 100 HP E14
2 Tenaga Pw 90.00 HP
3 Kapasitas Cp 1.60 M3
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 300,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 300,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
HARGA JUMLAH
NO KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A TENAGA
1 Pekerja ( L 01 ) Jam 0.0113 5,625.00 63.76
2 Mandor ( L 03 ) Jam 0.0016 10,000.00 16.19
B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.0121 126,500.00 1,532.51
2 Agregat Halus ( M 04 ) M3 0.0232 79,750.00 1,850.41
3 Filler ( M 05 ) Kg 4.8004 750.00 3,600.33
4 Aspal ( M 10 ) Kg 5.2962 10,650.00 56,404.89
C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0011 257,248.03 285.70
2 AMP ( E 01 ) Jam 0.0016 3,627,852.41 5,874.50
3 Genset ( E 12 ) Jam 0.0016 219,084.68 354.76
4 Dump Truck ( E 09 ) Jam 0.0143 122,088.28 1,750.42
5 Aspal Finisher ( E 02 ) Jam 0.0020 180,372.07 365.09
6 Tandem Roller ( E 17 ) Jam 0.0017 138,676.60 238.69
7 Pneumatic Tyre Roller ( E 18 ) Jam 0.0013 168,275.16 216.26
8 Alat Bantu Ls 1.0000 500.00 500.00
JUMLAH 73,053.50
JASA 10 % 7,305.35
JUMLAH ( BELUM TERMASUK PPN ) 80,358.85
DIBULATKAN 80,358.00
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
dan biaya biaya lainnya
Analisa - E 270
URAIAN ANALISA HARGA SATUAN LATASTON ( HRS )
SATUAN : M2 Analisa EI - 633
I ASUMSI
1 Menggunakan alat berat ( cara mekanik )
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0 Km
5 Tebal lapisan padat t 0.03 m
6 Jam kerja efektif 1 hari Tk 7.00 Jam
7 Faktor kehilangan material
- Agregat Fh 1 1.10 -
- Aspal Fh 2 1.05 -
II METODA KERJA
1 WHEEL LOADER memuat agregat dan aspal kedalam Coldbin AMP
2 Agregat dan aspal dicampur dan dipanaskan dengan AMP untuk dimuat
langsung ke dalam Dump Truck dan diangkut ke lokasi pekerjaan.
3 Campuran panas HRS dihampar dengan Finisher dan dipadatakan dengan
Tandem dan Peneumatic Tire Roller
4 Selama pemadatan sekelompok pekerja merapikan tepi hamparan dengan
menggunakan alat bantu
2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50 m3
Faktor bucket Fb 0.90 -
Faktor efisiensi alat Fa 0.83 -
Waktu siklus Ts 1
- Muat T1 1.50 menit
- Lain lain T2 0.50 menit
Ts 1 2.00 menit
Analisa - E 271
No URAIAN KODE KOEF. SATUAN KET.
d Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 8.00 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata rata bermuatan v1 40.00 km / jam
Kecepatan rata rata kosong v2 50.00 km / jam
Kapasitas AMP batch Q2 b 0.50 ton
Waktu menyiapkan 1 batch HRS Tb 1.00 menit
Waktu Siklus Ts2
- Mengisi bak = ( V : Q2b ) x Tb T1 16.00 menit
- Angkut = ( L : v1 ) x 60 menit T2 30.00 menit
- Tunggu + Dumping + Putar T3 15.00 menit
- Kembali = ( L : v2 ) x 60 menit T4 24.00 menit
Ts2 85.00 menit
e Finisher ( E 02 )
Kapasitas produksi V 40.00 km / jam
Faktor efisiensi alat Fa 0.83 -
f Tandem Roller ( E 17 )
Kecepatan rata rata alat v 3.50 km/jam
Lebar efektif pemadatan b 1.20 m
Jumlah lintasan n 6.00 lintasan
Faktor efisiensi alat Fa 0.83 -
Analisa - E 272
No URAIAN KODE KOEF. SATUAN KET.
h Alat Bantu
Diperlukan :
- Kereta dorong = 2 bh Lump sum
- Skop = 3 bh
- Garpu = 2 bh
- Tongkat kontrol ketebalan hamparan
3 TENAGA
Produksi menentukan : ASPALT MIXING PLANT ( AMP ) Q2 617.56 m2 / jam
Produksi HRS / hari = Tk x Q2 Qt 4,322.92 m2
Kebutuhan tenaga
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Rp 80,358.00 / M2
Analisa - E 273
FORMULIR STANDAR UNTUK PEREKAMAN ANALISA
MASING MASING HARGA SATUAN
HARGA JUMLAH
NO KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A TENAGA
1 Pekerja ( L 01 ) Jam 0.0217 5,625.00 121.99
2 Mandor ( L 03 ) Jam 0.0022 10,000.00 21.69
B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.0336 126,500.00 4,254.51
2 Agregat Halus ( M 04 ) M3 0.0149 79,750.00 1,184.29
3 Filler ( M 05 ) Kg 4.8015 750.00 3,601.13
4 Aspal ( M 10 ) Kg 6.6150 10,650.00 70,449.75
C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0015 257,248.03 382.64
2 AMP ( E 01 ) Jam 0.0022 3,627,852.41 7,867.63
3 Genset ( E 12 ) Jam 0.0022 219,084.68 475.12
4 Dump Truck ( E 09 ) Jam 0.0348 122,088.28 4,246.45
5 Aspal Finisher ( E 02 ) Jam 0.0027 180,372.07 488.96
6 Tandem Roller ( E 17 ) Jam 0.0016 138,676.60 222.77
7 Pneumatic Tyre Roller ( E 18 ) Jam 0.0023 168,275.16 386.17
8 Alat Bantu Ls 1.0000 500.00 500.00
JUMLAH 94,203.10
JASA 10 % 9,420.31
JUMLAH ( BELUM TERMASUK PPN ) 103,623.42
DIBULATKAN 103,623.00
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
dan biaya biaya lainnya
Analisa - E 274
URAIAN ANALISA HARGA SATUAN LASTON ( AC )
SATUAN : M2 Analisa EI - 634
I ASUMSI
1 Menggunakan alat berat
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0 Km
5 Tebal lapisan ( AC ) padat t 0.04 m
6 Jam kerja efektif 1 hari Tk 7.00 Jam
7 Faktor kehilangan material
- Agregat Fh 1 1.10 -
- Aspal Fh 2 1.05 -
II METODA KERJA
1 WHEEL LOADER memuat agregat dan aspal kedalam Coldbin AMP
2 Agregat dan aspal dicampur dan dipanaskan dengan AMP untuk dimuat
langsung ke dalam Dump Truck dan diangkut ke lapangan
3 Campuran panas AC dihampar dengan Finisher dan dipadatakan dengan
Tandem dan Tire Roller
4 Selama pemadatan sekelompok pekerja merapikan tepi hamparan dengan
menggunakan alat bantu
2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50 m3
Faktor bucket Fb 0.90 -
Faktor efisiensi alat Fa 0.83 -
Waktu siklus Ts 1
- Muat T1 1.50 menit
- Lain lain T2 0.50 menit
Ts 1 2.00 menit
Analisa - E 275
No URAIAN KODE KOEF. SATUAN KET.
d Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 4.00 m3
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata rata bermuatan v1 40.00 km / jam
Kecepatan rata rata kosong v2 50.00 km / jam
Kapasitas AMP batch Q2 b 0.50 ton
Waktu menyiapkan 1 batch AC Tb 1.00 menit
Waktu Siklus Ts2
- Mengisi bak = ( V : Q2b ) x Tb T1 8.00 menit
- Angkut = ( L : v1 ) x 60 menit T2 29.99 menit
- Tunggu + Dumping + Putar T3 15.00 menit
- Kembali = ( L : v2 ) x 60 menit T4 23.99 menit
Ts2 76.98 menit
e Finisher ( E 02 )
Kapasitas produksi V 40.00 ton / jam
Faktor efisiensi alat Fa 0.83 -
f Tandem Roller ( E 17 )
Kecepatan rata rata alat v 2.50 km / jam
Lebar efektif pemadatan b 1.20 m
Jumlah lintasan n 4.00 lintasan
Faktor efisiensi alat Fa 0.83 -
Analisa - E 276
No URAIAN KODE KOEF. SATUAN KET.
h Alat Bantu
Diperlukan :
- Rambu = 2 bh
- Kereta dorong = 2 bh Lump sum
- Skop = 3 bh
- Garpu = 2 bh
- Tongkat kontrol ketebalan hamparan
3 TENAGA
Produksi menentukan : ASPALT MIXING PLANT ( AMP ) Q2 461.11 m2 / jam
Produksi AC / hari = Tk x Q2 Qt 3,227.78 m2
Kebutuhan tenaga
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
Rp 103,623.00 / M2
Analisa - E 277
FORMULIR STANDAR UNTUK PEREKAMAN ANALISA
MASING MASING HARGA SATUAN
HARGA JUMLAH
NO KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A TENAGA
1 Pekerja ( L 01 ) Jam 0.3880 5,625.00 2,182.23
2 Mandor ( L 03 ) Jam 0.0554 10,000.00 554.22
B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.7028 126,500.00 88,901.39
2 Agregat Halus ( M 04 ) M3 0.5341 79,750.00 42,595.36
3 Filler ( M 05 ) Kg 139.2 750.00 104,399.98
4 Aspal ( M 10 ) Kg 157.0 10,650.00 1,672,049.95
C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0380 257,248.03 9,778.55
2 AMP ( E 01 ) Jam 0.0554 3,627,852.41 201,061.70
3 Genset ( E 12 ) Jam 0.0554 219,084.68 12,142.04
4 Dump Truck ( E 09 ) Jam 0.4906 122,088.28 59,900.77
5 Aspal Finisher ( E 02 ) Jam 0.0767 180,372.07 13,828.53
6 Tandem Roller ( E 17 ) Jam 0.0430 138,676.60 5,967.15
7 Pneumatic Tyre Roller ( E 18 ) Jam 0.0321 168,275.16 5,406.43
8 Alat Bantu Ls 1.0000 500.00 500.00
JUMLAH 2,219,268.29
JASA 10 % 221,926.83
JUMLAH ( BELUM TERMASUK PPN ) 2,441,195.12
DIBULATKAN 2,441,195.00
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
dan biaya biaya lainnya
Analisa - E 278
URAIAN ANALISA HARGA SATUAN ASPHALT TREATED BASE ( ATB )
I ASUMSI
1 Menggunakan alat berat ( Cara mekanik )
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0 Km
5 Tebal lapisan ( ATB ) padat t 0.04 m
6 Jam kerja efektif 1 hari Tk 7.00 Jam
7 Faktor kehilangan material
- Agregat Fh 1 1.10 -
- Aspal Fh 2 1.05 -
II METODA KERJA
1 WHEEL LOADER memuat agregat dan aspal kedalam Coldbin AMP
2 Agregat dan aspal dicampur dan dipanaskan dengan AMP untuk dimuat
langsung ke dalam Dump truck dan diangkut ke lokasi pekerjaan
3 Campuran panas ATB dihampar dengan Finisher dan dipadatakan dengan
Tandem dan Pneumatic Roller
4 Selama pemadatan sekelompok pekerja merapikan tepi hamparan dengan
menggunakan alat bantu
2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50 m3
Faktor bucket Fb 0.90 -
Faktor efisiensi alat Fa 0.83 -
Waktu siklus Ts 1
- Muat T1 1.50 menit
- Lain lain T2 0.50 menit
Ts 1 2.00 menit
Analisa - E 279
No URAIAN KODE KOEF. SATUAN KET.
d Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 8.00 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata rata bermuatan v1 40.00 km / jam
Kecepatan rata rata kosong v2 50.00 km / jam
Kapasitas AMP batch Q2 b 0.50 ton
Waktu menyiapkan 1 batch ATB Tb 1.00 menit
Waktu Siklus Ts2
- Mengisi bak = ( V : Q2b ) x Tb T1 16.00 menit
- Angkut = ( L : v1 ) x 60 menit T2 29.99 menit
- Tunggu + Dumping + Putar T3 15.00 menit
- Kembali = ( L : v2 ) x 60 menit T4 23.99 menit
Ts2 84.99 menit
e Finisher
Kapasitas produksi V 40.00 ton/jam
Faktor efisiensi alat Fa 0.75 -
f Tandem Roller ( E 17 )
Kecepatan rata rata alat v 3.50 km / jam
Lebar efektif pemadatan b 1.20 m
Jumlah lintasan n 6.00 lintasan
Faktor efisiensi alat Fa 0.83 -
Analisa - E 280
No URAIAN KODE KOEF. SATUAN KET.
h Alat Bantu
Diperlukan :
- Kereta dorong = 2 bh Lump sum
- Skop = 3 bh
- Garpu = 2 bh
- Tongkat kontrol ketebalan hamparan
3 TENAGA
Produksi menentukan : ASPALT MIXING PLANT ( AMP ) Q2 18.04 m3 / jam
Produksi ATB / hari = Tk x Q2 Qt 126.30 m3
Kebutuhan tenaga
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Rp 2,441,195.00 / M3
Analisa - E 281
FORMULIR STANDAR UNTUK PEREKAMAN ANALISA
MASING MASING HARGA SATUAN
HARGA JUMLAH
NO KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A TENAGA
1 Pekerja ( L 01 ) Jam 0.0301 5,625.00 169.43
2 Mandor ( L 03 ) Jam 0.0060 10,000.00 60.24
B BAHAN
1 Aspal ( M 10 ) ( M 10 ) Kg 0.6417 10,650.00 6,834.30
2 Karosene ( M 11 ) ( M 11 ) Liter 0.4889 1,000.00 488.90
C PERALATAN
1 Asphalt Sprayer ( E 03 ) Jam 0.0030 47,563.28 143.26
2 Compresor ( E 05 ) Jam 0.0031 98,019.90 306.31
3 Dump Truck ( E 08 ) Jam 0.0030 122,088.28 367.74
JUMLAH 8,370.17
JASA 10 % 837.02
JUMLAH ( BELUM TERMASUK PPN ) 9,207.19
DIBULATKAN 9,207.00
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
dan biaya biaya lainnya
Analisa - E 282
URAIAN ANALISA HARGA SATUAN LAPIS RESAP PENGIKAT
I ASUMSI
1 Menggunakan alat berat
2 Lokasi pekerjaan sepanjang jalan
3 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.00 Km
4 Jam kerja efektif 1 hari Tk 7.00 Jam
5 Faktor kehilangan material Fh 1.10 -
6 Komposisi campuran AC ( Spesifikasi )
- Aspal AC - 10 atau AC - 20 AS 56 % 100 Bagian
- Minyak Flux / pencair K 44 % 80 Bagian
8 Bahan dasar ( aspal dan minyak pencair ) semuanya diterima di Lokasi Pekerjaan
II METODA KERJA
1 Aspal dan minyak Flux dicampur dan dipanaskan sehingga menjadi campuran aspal cair
2 Permukaan yang akan dilapis dibersihkan dari debu dan kotoran dg air kompresor
3 Campuran aspal cair disemprotkan dg aspahalt sprayer ke atas permukaan yg akan dilapis
4 Angkutan aspal dan minyak Flux menggunakan Dump truck
2 ALAT
a Asphalt Sprayer ( E 03 )
Kapasitas alat V 800.00 liter
Faktor efisiensi alat Fa 0.83 -
Waktu siklus ( termasuk proses pemanasan ) Ts 2.00 jam
b Air Compresor ( E 05 )
Kapasitas alat -----------> Diambil V 400.00 m2 / jam
Aplikasi Lapis Resap Pengikat Rata rata ( Spesifikasi ) Ap 0.80 liter / m2
Analisa - E 283
No URAIAN KODE KOEF. SATUAN KET.
c Dump Truk ( DT ) ( E 08 )
Sebagai alat pengangkut bahan di lokasi pekerjaan Dump Truck melayani alat
Asphalt Sprayer
3 TENAGA
Produksi menentukan : ASPALT FINISHER Q4 332.00 Liter
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt 2,324.00 Liter
Kebutuhan tenaga
- Pekerja P 10.00 orang
- Mandor M 2.00 orang
Rp 9,207.00 / LITER
Analisa - E 284
FORMULIR STANDAR UNTUK PEREKAMAN ANALISA
MASING MASING HARGA SATUAN
HARGA JUMLAH
NO KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A TENAGA
1 Pekerja ( L 01 ) Jam 0.4373 5,625.00 2,459.84
2 Mandor ( L 03 ) Jam 0.0625 10,000.00 624.72
B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.7680 126,500.00 97,152.00
2 Agregat Halus ( M 04 ) M3 0.4320 79,750.00 34,452.00
C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0625 257,248.03 16,070.83
2 Dump Truck ( E 09 ) Jam 0.1994 122,088.28 24,341.98
3 Motor Grader ( E 13 ) Jam 0.0117 279,356.86 3,272.25
4 Vibratory Roller ( E 19 ) Jam 0.0178 175,852.55 3,138.82
5 Pneumatic Tyre Roller ( E 18 ) Jam 0.0043 168,275.16 720.86
6 Water Tank Truck ( E 23 ) Jam 0.0211 84,823.54 1,788.45
7 Alat Bantu Ls 1.0000 500.00 500.00
JUMLAH 184,521.75
JASA 10 % 18,452.18
JUMLAH ( BELUM TERMASUK PPN ) 202,973.93
DIBULATKAN 202,973.00
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
dan biaya biaya lainnya
Analisa - E 285
URAIAN ANALISA HARGA SATUAN LAPIS PONDASI AGREGAT KLAS A
I ASUMSI
1 Menggunakan alat berat Cara mekanik
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0 Km
5 Tebal Agregat padat t 0.15 m
6 Faktor kembang material ( padat - lepas ) Fk 1.20
7 Jam kerja efektif per hari Tk 7.00 Jam
8 Proporsi campuran
- Agregat Kasar Ak 64.00 % Tabel; 5.1.2 (a)
- Agregat halus Ah 36.00 %
II METODA KERJA
1 WHEEL LOADER mencampur dan memuat agregat ke dalam Dump Truck di
Base camp
2 Dump Truck mengangkut Agregat ke lokasi pekerjaan dan dihampar dg motor
Grader
3 Hamparan Agregat di basahi dengan Water Tank Truck sebelum dipadatkan
dengan Tandem Roller & PTR
4 Selama pemadatan sekelompok pekerja akan merapikan tepi hamparan dan
level permukaan dengan menggunakan alat bantu
2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50 m3
Faktor bucket Fb 0.90 -
Faktor efisiensi alat Fa 0.83 -
Waktu siklus Ts 1
- Mencampur T1 2.50 menit
- Memuat dan Lain lain T2 1.00 menit
Ts 1 3.50 menit
b Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 6.00 m3
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata rata bermuatan v1 45.00 km / jam
Kecepatan rata rata kosong v2 60.00 km / jam
Waktu Siklus Ts2
- Waktu tempuh isi = ( L : v1 ) x 60 menit T1 26.65 menit
- Waktu tempuh kosong = ( L : v2 ) x 60 menit T2 19.99 menit
- lain lain termasuk menurunkan Agregat T3 3.00 menit
Analisa - E 286
No URAIAN KODE KOEF. SATUAN KET.
c Motor Grader ( E 13 )
Panjang hamparan Lh 50.00 m
Lebar efektif kerja blade b 2.40 m
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata rata alat v 4.00 km / jam
Jumlah lintasan n 6.00 Lintas 3 x pp
Waktu siklus Ts 3
- Perataan 1 Lintasan = Lh : ( v x 1000 x 60 menit ) T1 0.75 menit
- Lain lain T2 1.00 menit
Ts 3 1.75 menit
d Vibratory Roller ( E 19 )
Kecepatan rata rata alat v 3.00 km / jam
Lebar efektif pemadatan b 1.20 m
Jumlah lintasan n 8.00 lintasan
Faktor efisiensi alat Fa 0.83 -
Analisa - E 287
No URAIAN KODE KOEF. SATUAN KET.
g Alat Bantu
Diperlukan :
3 TENAGA
Produksi menentukan : WHEEL LOADER Q1 16.01 m3 / jam
Produksi Agregat / hari = Tk x Q1 Qt 112.05 m3
Kebutuhan tenaga
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Rp 202,973.00 / M2
Analisa - E 288
FORMULIR STANDAR UNTUK PEREKAMAN ANALISA
MASING MASING HARGA SATUAN
HARGA JUMLAH
NO KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A TENAGA
1 Pekerja ( L 01 ) Jam 0.4373 5,625.00 2,459.84
2 Mandor ( L 03 ) Jam 0.0625 10,000.00 624.72
B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.7080 126,500.00 89,562.00
2 Agregat Halus ( M 04 ) M3 0.4920 79,750.00 39,237.00
C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0625 257,248.03 16,070.83
2 Dump Truck ( E 09 ) Jam 0.1994 122,088.28 24,341.98
3 Motor Grader ( E 13 ) Jam 0.0117 279,356.86 3,272.25
4 Vibratory Roller ( E 19 ) Jam 0.0178 175,852.55 3,138.82
5 Pneumatic Tyre Roller ( E 18 ) Jam 0.0043 168,275.16 720.86
6 Water Tank Truck ( E 23 ) Jam 0.0211 84,823.54 1,788.45
7 Alat Bantu Ls 1.0000 500.00 500.00
JUMLAH 181,716.75
JASA 10 % 18,171.68
JUMLAH ( BELUM TERMASUK PPN ) 199,888.43
DIBULATKAN 199,888.00
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
dan biaya biaya lainnya
Analisa - E 289
URAIAN ANALISA HARGA SATUAN LAPIS PONDASI AGREGAT KLAS B
I ASUMSI
1 Menggunakan alat berat
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0 Km
5 Tebal Agregat padat t 0.15 m
6 Faktor kembang material ( padat - lepas ) Fk 1.20
7 Jam kerja efektif per hari Tk 7.00 Jam
8 Proporsi campuran
- Agregat Kasar Ak 59.00 % Tabel; 5.1.2 (a)
- Agregat halus Ah 41.00 %
II METODA KERJA
1 WHEEL LOADER mencampur dan memuat agregat ke dalam Dump Truck di
Base camp
2 Dump Truck mengangkut Agregat ke lokasi pekerjaan dan dihampar dengan
motor Grader
3 Hamparan Agregat di basahi dengan Water Tank Truck sebelum dipadatkan
dengan Tandem Roller & PTR
4 Selama pemadatan sekelompok pekerja akan merapikan tepi hamparan dan
level permukaan dengan menggunakan alat bantu
2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50 m3
Faktor bucket Fb 0.90 -
Faktor efisiensi alat Fa 0.83 -
Waktu siklus Ts 1
- Mencampur T1 2.50 menit
- Memuat dan Lain lain T2 1.00 menit
Ts 1 3.50 menit
b Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 6.00 m3
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata rata bermuatan v1 45.00 km / jam
Kecepatan rata rata kosong v2 60.00 km / jam
Waktu Siklus Ts2
- Waktu tempuh isi = ( L : v1 ) x 60 menit T1 26.65 menit
- Waktu tempuh kosong = ( L : v2 ) x 60 menit T2 19.99 menit
- lain lain termasuk menurunkan Agregat T3 3.00 menit
Analisa - E 290
No URAIAN KODE KOEF. SATUAN KET.
c Motor Grader ( E 13 )
Panjang hamparan Lh 50.00 m
Lebar efektif kerja blade b 2.40 m
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata rata alat v 4.00 km / jam
Jumlah lintasan n 6.00 Lintas 3 x pp
Waktu siklus Ts 3
- Perataan 1 Lintasan = ( Lh x 60 ) : ( v x 1000 ) T1 0.75 menit
- Lain lain T2 1.00 menit
Ts 3 1.75 menit
d Vibratory Roller ( E 17 )
Kecepatan rata rata alat v 3.00 km / jam
Lebar efektif pemadatan b 1.20 m
Jumlah lintasan n 8.00 lintasan
Faktor efisiensi alat Fa 0.83 -
Analisa - E 291
No URAIAN KODE KOEF. SATUAN KET.
g Alat Bantu
Diperlukan :
3 TENAGA
Produksi menentukan : WHEEL LOADER Q1 16.01 m3 / jam
Produksi Agregat / hari = Tk x Q1 Qt 112.05 m3 / jam
Kebutuhan tenaga
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Rp 199,888.00 / M2
Analisa - E 292
FORMULIR STANDAR UNTUK PEREKAMAN ANALISA
MASING MASING HARGA SATUAN
HARGA JUMLAH
NO KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A TENAGA
1 Pekerja ( L 01 ) Jam 0.0301 5,625.00 169.43
2 Mandor ( L 03 ) Jam 0.0060 10,000.00 60.24
B BAHAN
1 Aspal ( M 10 ) Kg 0.8880 10,650.00 9,456.82
2 Kerosene ( M 11 ) Liter 0.2530 1,000.00 253.00
C PERALATAN
1 Asphalt Sprayer ( E 03 ) Jam 0.0030 47,563.28 143.26
2 Compresor ( E 05 ) Jam 0.0063 98,019.90 612.62
3 Dump Truck ( E 08 ) Jam 0.0030 122,088.28 367.74
JUMLAH 11,063.11
JASA 10 % 1,106.31
JUMLAH ( BELUM TERMASUK PPN ) 12,169.42
DIBULATKAN 12,169.00
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
dan biaya biaya lainnya
Analisa - E 293
URAIAN ANALISA HARGA SATUAN LAPIS PEREKAT
I ASUMSI
1 Menggunakan alat berat
2 Lokasi pekerjaan sepanjang jalan
3 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.00 Km
4 Jam kerja efektif 1 hari Tk 7.00 Jam
5 Faktor kehilangan material Fh 1.10 -
6 Komposisi campuran ( Spesifikasi )
- Aspal AC - 10 atau AC - 20 AS 77 % 100 Bagian
- Minyak Flux / pencair K 23 % 30 Bagian
II METODA KERJA
1 Aspal dan minyak Flux dicampur dan dipanaskan sehingga menjadi campuran
aspal cair
2 Permukaan yang akan dilapis dibersihkan dari debu dan kotoran dg air
kompresor
3 Campuran aspal cair disemprotkan dg aspahalt sprayer ke atas permukaan yg
akan dilapis
4 Angkutan aspal dan minyak Flux menggunakan Dump truck
2 ALAT
a Asphalt Sprayer ( E 03 )
Kapasitas alat V 800.00 Liter
Faktor efisiensi alat Fa 0.83 -
Waktu siklus ( termasuk proses pemanasan ) Ts 2.00 Jam
b Air Compresor ( E 05 )
Kapasitas alat . . . . . Diambil V 400.00 m2 / jam
Aplikasi Lapis Resap Pengikat Rata rata ( Spesifikasi ) Ap 0.40 Liter / m2
Analisa - E 294
No URAIAN KODE KOEF. SATUAN KET.
c Dump Truk ( DT ) ( E 08 )
Sebagai alat pengangkut bahan di lokasi pekerjaan Dump Truck melayani alat
Asphalt Sprayer
3 TENAGA
Produksi menentukan : ASPALT FINISHER Q4 332.00 Liter
Produksi Lapis Perekat / hari = Tk x Q4 Qt 2,324.00 Liter
Kebutuhan tenaga
- Pekerja P 10.00 orang
- Mandor M 2.00 orang
Rp 12,169.00 / Liter
Analisa - E 295
FORMULIR STANDAR UNTUK PEREKAMAN ANALISA
MASING MASING HARGA SATUAN
HARGA JUMLAH
NO KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A TENAGA
1 Pekerja ( L 01 ) Jam 0.0161 5,625.00 90.36
2 Mandor ( L 02 ) Jam 0.0040 10,000.00 40.16
B BAHAN
C PERALATAN
1 Motor Grader ( E 13 ) Jam 0.0025 279,356.86 701.20
2 Vibratory Roller ( E 19 ) Jam 0.0040 175,852.55 706.24
3 Water Tank Truck ( E 23 ) Jam 0.0105 84,823.54 894.22
4 Alat Bantu Ls 1.0000 500.00 500.00
JUMLAH 2,932.18
JASA 10 % 293.22
JUMLAH ( BELUM TERMASUK PPN ) 3,225.40
DIBULATKAN 3,225.00
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
dan biaya biaya lainnya
Analisa - E 296
URAIAN ANALISA HARGA SATUAN PENYIAPAN BADAN JALAN
( PEMADATAN DAN PERATAAN )
SATUAN : M2 Analisa EI - 33
I ASUMSI
1 Pekerjaan dilakukan pada hanya pada tanah galian
2 Pekerjaan dilakukan secara mekanis
3 Lokasi pekerjaan : sepanjang jalan
4 Kondisi jalan : jelek / belum padat
5 Jam kerja efektif per hari Tk 7.00 Jam
II URUTAN KERJA
1 Motor Grader meratakan permukaan hasil galian
2 Vibro Roller memadatkan permukaan jalan yang telah diratakan oleh Motor grader
3 Sekelompok pekerja akan membanru meratakan badan jalan dengan alat bantu
permukaan dengan menggunakan alat bantu
2 ALAT
a Motor Grader ( E 13 )
Panjang hamparan Lh 50.00 m
Lebar efektif kerja blade b 2.40 m
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata rata alat v 2.00 km / jam
Jumlah lintasan n 6.00 Lintas 3 x pp
Waktu siklus Ts 1
- Perataan 1 Lintasan = Lh : ( v x 1000 x 60 menit ) T1 1.50 menit
- Lain lain T2 1.00 menit
Ts 1 2.50 menit
b Vibratory Roller ( E 19 )
Kecepatan rata rata alat v 2.00 km / jam
Lebar efektif pemadatan b 1.20 m
Jumlah lintasan n 8.00 lintasan
Faktor efisiensi alat Fa 0.83 -
Analisa - E 297
No URAIAN KODE KOEF. SATUAN KET.
g Alat Bantu
Diperlukan :
3 TENAGA
Produksi menentukan : VIBRATORY ROLLER Q2 249.00 m3 / jam
Produksi Pekerjaan / hari = Tk x Q2 Qt 1,743.00 m3
Kebutuhan tenaga
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Rp 3,225.00 / M2
Analisa - E 298
REKAPITULASI ANALISA
PEKERJAAN PERSIAPAN
1 1M 2
Pekerjaan Pengukuran Gedung 8,668.00 Analisa Gedung - 1
2 1 M1 Pengukuran dan pemasangan bouwplank untuk gedung dan saluran 66,698.00 Analisa Gedung - 1
3 1M 2
Membersihkan lapangan dan perataan 9,350.00 Analisa Gedung - 1
4 1 buah Membuat Papan Nama Proyek 80x120 cm 476,985.00 Analisa Gedung - 1
5 1 M2 Pembuatan jalan sementara, tebal 25 cm 89,275.00 Analisa Gedung - 1
6 1M 2
Pembuatan kantor sementara, dengan lantai plesteran 929,673.00 Analisa Gedung - 2
7 1 M1 Pembuatan pagar sementara dari seng gelombang tinggi 2 meter 160,339.00 Analisa Gedung - 2
8 1M 1
Pembuatan pagar sementara dari kawat duri tinggi 1,80 meter 299,563.00 Analisa Gedung - 2
9 1 M2 Pembuatan gudang semen dan alat-alat 862,723.00 Analisa Gedung - 2
10 1M 2
Pembuatan rumah jaga/konstruksi kayu 1,046,347.00 Analisa Gedung - 3
11 1 M2 Pembuatan bedeng buruh 988,858.00 Analisa Gedung - 3
12 1M 2
Pembuatan bak adukan, uk. 40 x 50 x 20 cm 136,383.00 Analisa Gedung - 3
13 1 M2 Pembuatan stegger dari bambu, ukuran 40 x 50 x 20 cm 27,076.00 Analisa Gedung - 4
14 1M 1
Pasang pagar kawat jaring galvanis, tinggi 1,00 m 20,237.00 Analisa Gedung - 4
15 1 M1 Pasang pagar beton pracetak ( 5 x 50 x 213 ) cm 424,514.00 Analisa Gedung - 4
PEKERJAAN TANAH
16 1M 3
Galian tanah biasa sedalam sampai 1 meter 23,320.00 Analisa Gedung - 4
17 1 M3 Galian tanah biasa sedalam 1 - 2 meter 30,665.00 Analisa Gedung - 4
18 1M 3
Galian tanah biasa sedalam 2 - 3 meter 42,850.00 Analisa Gedung - 4
19 1 M3 Galian tanah keras sedalam sampai 1 meter 36,393.00 Analisa Gedung - 4
20 1M 3
Galian tanah cadas sedalam sampai 1 meter 72,875.00 Analisa Gedung - 4
21 1 M3 Galian tanah lumpur sedalam 1 meter 48,042.00 Analisa Gedung - 4
22 1M 1
Membuat sumur 151,640.00 Analisa Gedung - 4
23 1 M3 Mengangkut tanah sejauh 30 meter 17,215.00 Analisa Gedung - 4
24 1M 3
Pembuangan tanah sejauh 150 meter 29,942.00 Analisa Gedung - 4
25 1 M3 Membuang tanah dengan menghampar 13,255.00 Analisa Gedung - 4
26 1M 3
Urug kembali bekas galian 11,176.00 Analisa Gedung - 4
27 1 M2 Meratakan tanah ditumbuk halus 13,255.00 Analisa Gedung - 6
28 1M 3
Urug pasir 88,330.00 Analisa Gedung - 6
29 1 M3 Urug tanah mendatangkan 61,930.00 Analisa Gedung - 6
30 1M 3
Urugan sirtu 101,695.00 Analisa Gedung - 6
31 1 M3 Pemasangan lapisan ijuk 107,745.00 Analisa Gedung - 6
32 1M 2
Gebalan rumput 33,990.00 Analisa Gedung - 6
PEKERJAAN PASANGAN
33 1 M3 Pasangan pondasi batu kosong 178,876.00 Analisa Gedung - 7
34 1M 3
Pasangan pondasi 1 Kp : 1 Sm : 1 Ps 281,673.00 Analisa Gedung - 7
35 1 M3 Pasangan pondasi 1 Kp : 1 Sm : 2 Ps 254,721.00 Analisa Gedung - 7
36 1M 3
Pasangan pondasi 1 Pc : 3 Kp : 5 Ps 336,968.00 Analisa Gedung - 7
37 1 M3 Pasangan pondasi 1 Pc : 3 Kp : 10 Ps 301,898.00 Analisa Gedung - 7
38 1M 3
Pasangan pondasi 1 Pc : 4 Ps 378,237.00 Analisa Gedung - 7
39 1 M3 Pasangan pondasi 1 Pc : 3 Ps 408,086.00 Analisa Gedung - 7
40 1M 3
Pasangan pondasi 1 Pc : 1 Ps 553,467.00 Analisa Gedung - 7
41 1 M3 Pasangan pondasi 1 Pc : 2 Ps 457,864.00 Analisa Gedung - 8
42 1M 3
Pasangan pondasi 1 Pc : 5 Ps 357,552.00 Analisa Gedung - 9
43 1 M2 Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 1Ps 51,989.00 Analisa Gedung - 9
44 1M 2
Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps 56,623.00 Analisa Gedung - 9
45 1 M2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps 60,724.00 Analisa Gedung - 9
46 1M 2
Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps 62,885.00 Analisa Gedung - 9
47 1 M2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 2 Ps 66,567.00 Analisa Gedung - 10
Rekapitulasi - 299
NO. SATUAN MACAM PEKERJAAN HARGA SATUAN HALAMAN
PEKERJAAN BETON
54 1M 3
Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr 515,356.00 Analisa Gedung - 11
55 1 M3 Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr 397,333.00 Analisa Gedung - 11
56 1M 3
Beton cyclope 1pc:3ps:5kr 559,699.00 Analisa Gedung - 11
57 1 M3 Membuat beton bertulang, 1 Pc : 1,5 Ps : 2,5 Kr 642,658.00 Analisa Gedung - 12
58 1 M3 Membuat beton dengan mutu K 225 791,454.00 Analisa Gedung - 12
59 1 M3 Membuat beton dengan mutu K 275 796,172.00 Analisa Gedung - 12
60 1M 3
Membuat beton dengan mutu K 300 819,452.00 Analisa Gedung - 12
61 1 kg Pembesian dengan besi polos 9,865.00 Analisa Gedung - 12
62 1 kg Pembesian dengan besi ulir 9,981.00 Analisa Gedung - 14
63 1 M2 Cetakan beton / begisting memakai papan 110,412.00 Analisa Gedung - 14
64 1M 2
Cetakan beton / begisting memakai multiplek 118,365.00 Analisa Gedung - 14
65 1 M3 Membongkar cetakan 198,000.00 Analisa Gedung - 14
66 1M 3
Stutwerk untuk 1 m3 beton, tinggi 3 - 4 m ( memakai dolken ) 1,342,687.00 Analisa Gedung - 14
67 1 M3 Stutwerk untuk 1 m3 beton, tinggi 3 - 4 m ( memakai scafolding ) 951,472.00 Analisa Gedung - 13
68 1M 3
Pekerjaan beton bertulang 1:2:3 tanpa dolken, 100 kg besi 2,804,060.00 Analisa Gedung - 14
69 1 M3 Pekerjaan beton bertulang 1:2:3 tanpa dolken, 125 kg besi 3,050,704.00 Analisa Gedung - 14
70 1M 3
Pekerjaan beton bertulang 1:2:3 tanpa dolken, 150 kg besi 3,297,349.00 Analisa Gedung - 14
71 1 M3 Pekerjaan beton bertulang 1:2:3 tanpa dolken, 175 kg besi 3,543,994.00 Analisa Gedung - 14
72 1M 3
Pekerjaan beton bertulang 1:2:3 tanpa dolken, 200 kg besi 3,790,639.00 Analisa Gedung - 14
73 1 M3 Pekerjaan beton bertulang 1:2:3 dengan memakai dolken, 100 kg besi 4,146,747.00 Analisa Gedung - 14
74 1M 3
Pekerjaan beton bertulang 1:2:3 dengan memakai dolken, 125 kg besi 4,393,392.00 Analisa Gedung - 15
75 1 M3 Pekerjaan beton bertulang 1:2:3 dengan memakai dolken, 150 kg besi 4,640,037.00 Analisa Gedung - 15
76 1M 3
Pekerjaan beton bertulang 1:2:3 dengan memakai dolken, 175 kg besi 4,886,681.00 Analisa Gedung - 15
77 1 M3 Pekerjaan beton bertulang 1:2:3 dengan memakai dolken, 200 kg besi 5,133,326.00 Analisa Gedung - 15
78 1M 3
Pekerjaan beton bertulang 1:2:3 dengan memakai scaffolding, 100 kg besi 3,755,532.00 Analisa Gedung - 15
79 1 M3 Pekerjaan beton bertulang 1:2:3 dengan memakai scaffolding, 125 kg besi 4,002,177.00 Analisa Gedung - 15
80 1M 3
Pekerjaan beton bertulang 1:2:3 dengan memakai scaffolding, 150 kg besi 4,248,822.00 Analisa Gedung - 16
81 1 M3 Pekerjaan beton bertulang 1:2:3 dengan memakai scaffolding, 175 kg besi 4,495,466.00 Analisa Gedung - 16
82 1M 3
Pekerjaan beton bertulang 1:2:3 dengan memakai scaffolding, 200 kg besi 4,742,111.00 Analisa Gedung - 16
83 1 M3 Pembuatan tiang pancang (40 x 40) cm, beton bertulang 718,337.00 Analisa Gedung - 16
84 1 M3 Pembuatan tiang pancang (35 x 35) cm, beton bertulang 569,080.00 Analisa Gedung - 17
PEKERJAAN PELESTERAN
85 1 M2 Plesteran batu kali 1pc:1/2kp:5ps tebal 10 mm 33,804.00 Analisa Gedung - 17
86 1M 2
Plesteran batu kali 1pc:3ps 36,749.00 Analisa Gedung - 17
87 1 M2 Plesteran batu kali 1pc:4ps 35,489.00 Analisa Gedung - 17
88 1 M2 Plesteran 1 Kp : 1 Sm : 2 Ps, tebal 15 mm 18,240.00 Analisa Gedung - 18
89 1M 2
Plesteran 1 Pc : 3 Kp : 10 Ps, tebal 15 mm 19,007.00 Analisa Gedung - 18
90 1 M2 Plesteran 1 Pc : 2 Ps, tebal 15 mm 24,393.00 Analisa Gedung - 18
91 1M 2
Plesteran 1 Pc : 3 Ps, tebal 15 mm 22,846.00 Analisa Gedung - 18
92 1 M2 Plesteran 1 Pc : 4 Ps, tebal 15 mm 21,854.00 Analisa Gedung - 18
93 1M 2
Plesteran beton 1 Pc : 3 Ps, tebal 15 mm 28,421.00 Analisa Gedung - 19
94 1 M1 Plesteran skoneng 1 Pc : 2 Ps ( untuk gedung ) 5,988.00 Analisa Gedung - 19
95 1M 1
Sponengan (untuk saluran dan sejenisnya) 6,231.00 Analisa Gedung - 19
96 1 M2 Plesteran siar adukan 1 Pc : 2 Ps 15,445.00 Analisa Gedung - 19
97 1M 2
Plesteran Ciprat, 1 Pc : 2 Ps 21,648.00 Analisa Gedung - 19
98 1 M2 Acian dinding bata 7,821.00 Analisa Gedung - 20
99 1M 2
Plesteran K- 50, tebal 20 mm 37,296.00 Analisa Gedung - 20
100 1 M2 Pasang dinding batu hias tempel 128,658.00 Analisa Gedung - 20
Rekapitulasi - 300
NO. SATUAN MACAM PEKERJAAN HARGA SATUAN HALAMAN
Rekapitulasi - 301
NO. SATUAN MACAM PEKERJAAN HARGA SATUAN HALAMAN
PEKERJAAN KERAMIK
110 1 M2 Pasang ubin porselin 80,929.00 Analisa Gedung - 22
111 1M 2
Pasang tegel keramik 20/20 dan 30/30 99,922.00 Analisa Gedung - 23
112 1 M2 Pasang tegel keramik 10/20 berglasir 68,297.00 Analisa Gedung - 23
113 1M 2
Pasang tegel keramik 20/20 berglasir 70,497.00 Analisa Gedung - 23
114 1 M2 Pasang tegel keramik 30/30 berglasir 71,047.00 Analisa Gedung - 23
115 1M 1
Pasang plint keramik ukuran 10 x 40 cm 16,279.00 Analisa Gedung - 23
116 1 M1 Pasang plint keramik ukuran 10 x 30 cm 12,989.00 Analisa Gedung - 24
117 1M 1
Pasang keramik stepnosing granito 5/30 43,580.00 Analisa Gedung - 24
118 1 M1 Pasang list keramik dinding 5/20 34,054.00 Analisa Gedung - 24
119 1M 2
Pasang keramik dinding 20/25 97,291.00 Analisa Gedung - 24
PEKERJAAN CONBLOCK
120 1 M2 Pasang conblock tipe segi-empat, uni, segi-enam abu-abu 8 cm, K-400 98,862.00 Analisa Gedung - 25
121 1M 2
Pasang conblock tipe uni, segi-empat abu-abu 8 cm, K-300 93,802.00 Analisa Gedung - 25
122 1 M2 Pasang conblock tipe segi-empat abu-abu 6 cm, K-200 80,437.00 Analisa Gedung - 25
123 1M 2
Pasang conblock tipe segi-empat abu-abu 8 cm, K-200 89,732.00 Analisa Gedung - 25
124 1 M2 Pasang conblock tipe segi-enam abu-abu 6 cm, K-200 80,272.00 Analisa Gedung - 25
125 1M 2
Pasang conblock tipe segi-enam abu-abu 8 cm, K-200 89,732.00 Analisa Gedung - 26
126 1 M2 Pasang conblock tipe segi-empat, uni, segi-enam rawna 8 cm, K-400 106,232.00 Analisa Gedung - 26
127 1M 2
Pasang conblock tipe uni, segi-empat warna 8 cm, K-300 100,732.00 Analisa Gedung - 26
128 1 M2 Pasang conblock tipe segi-empat warna 6 cm, K-200 86,212.00 Analisa Gedung - 26
129 1M 2
Pasang conblock tipe segi-empat warna 8 cm, K-200 95,562.00 Analisa Gedung - 26
130 1 M2 Pasang conblock tipe segi-enam warna 6 cm, K-200 86,212.00 Analisa Gedung - 27
131 1M 2
Pasang conblock tipe segi-enam warna 8 cm, K-200 95,562.00 Analisa Gedung - 27
132 1 M2 Pasang grassblock bulat tebal 10 cm 83,902.00 Analisa Gedung - 27
133 1M 2
Pasang grassblock tebal 10 cm 83,902.00 Analisa Gedung - 27
134 1 M3 Bronjong kawat galvanis 421,758.00 Analisa Gedung - 27
135 1 bh Pasang buis beton dia. 80 cm 51,768.00 Analisa Gedung - 28
136 1 M3 Langsiran batu kali 13,310.00 Analisa Gedung - 28
137 1 M3 Langsiran kerikil 8,646.00 Analisa Gedung - 28
138 1M 3
Langsiran pasir 4,565.00 Analisa Gedung - 28
PEKERJAAN KAYU
139 1 M3 Pasang konstruksi kuda-kuda kayu jati 24,985,290.00 Analisa Gedung - 28
140 1M 3
Membuat kuda-kuda kayu jati (lokal) 12,885,290.00 Analisa Gedung - 28
141 1 M3 Membuat kuda-kuda kayu kamper 6,532,790.00 Analisa Gedung - 29
142 1M 3
Membuat kuda-kuda kayu kruing 6,048,790.00 Analisa Gedung - 29
143 1 M3 Membuat kuda-kuda kayu bengkirai 7,742,790.00 Analisa Gedung - 29
144 1M 3
Membuat kuda-kuda kayu glugu 2,549,470.00 Analisa Gedung - 29
145 1 M2 Pasang usuk 5/7, reng 2/3 kayu jati 246,427.00 Analisa Gedung - 29
146 1M 2
Pasang usuk 5/7 kayu jati, reng 2/3 kayu jati (lokal) 213,427.00 Analisa Gedung - 30
147 1 M2 Pasang usuk 5/7 kayu jati, reng 2/3 kayu kamper 196,102.00 Analisa Gedung - 30
148 1M 2
Pasang usuk 5/7 kayu jati, reng 2/3 kayu kruing 194,782.00 Analisa Gedung - 30
149 1 M2 Pasang usuk 5/7 kayu jati, reng 2/3 kayu bengkirai 199,402.00 Analisa Gedung - 30
Rekapitulasi - 302
NO. SATUAN MACAM PEKERJAAN HARGA SATUAN HALAMAN
Rekapitulasi - 303
NO. SATUAN MACAM PEKERJAAN HARGA SATUAN HALAMAN
150 1 M2 Pasang usuk 5/7 kayu jati lokal, reng 2/3 kayu jati 161,727.00 Analisa Gedung - 31
151 1 M2 Pasang usuk 5/7 kayu jati lokal, reng 2/3 kayu jati lokal 128,727.00 Analisa Gedung - 31
152 1M 2
Pasang usuk 5/7 kayu jati lokal, reng 2/3 kayu kamper 111,402.00 Analisa Gedung - 31
153 1 M2 Pasang usuk 5/7 kayu jati lokal, reng 2/3 kayu kruing 110,082.00 Analisa Gedung - 31
154 1M 2
Pasang usuk 5/7 kayu jati lokal, reng 2/3 kayu bengkirai 114,702.00 Analisa Gedung - 33
155 1 M2 Pasang usuk 5/7 kayu kamper, reng 2/3 reng kayu jati 117,260.00 Analisa Gedung - 33
156 1M 2
Pasang usuk 5/7 kayu kamper, reng 2/3 kayu jati lokal 84,260.00 Analisa Gedung - 33
157 1 M2 Pasang usuk 5/7 kayu kamper, reng 2/3 kayu kamper 66,935.00 Analisa Gedung - 32
158 1M 2
Pasang usuk 5/7 kayu kamper, reng 2/3 kayu kruing 65,615.00 Analisa Gedung - 33
159 1 M2 Pasang usuk 5/7 kayu kamper, reng 2/3 kayu bengkirai 70,235.00 Analisa Gedung - 33
160 1M 2
Pasang usuk 5/7 kayu kruing, reng 2/3 kayu jati 113,872.00 Analisa Gedung - 33
161 1 M2 Pasang usuk 5/7 kayu kruing, reng 2/3 kayu jati lokal 80,872.00 Analisa Gedung - 33
162 1M 2
Pasang usuk 5/7 kayu kruing, reng 2/3 kayu kamper 63,547.00 Analisa Gedung - 34
163 1 M2 Pasang usuk 5/7 kayu kruing, reng 2/3 kayu kruing 62,227.00 Analisa Gedung - 34
164 1M 2
Pasang usuk 5/7 kayu kruing, reng 2/3 kayu bengkirai 66,847.00 Analisa Gedung - 34
165 1 M2 Pasang usuk 5/7 kayu bengkirai, reng 2/3 kayu jati 125,730.00 Analisa Gedung - 34
166 1M 2
Pasang usuk 5/7 kayu bengkirai, reng 2/3 kayu jati lokal 92,730.00 Analisa Gedung - 35
167 1 M2 Pasang usuk 5/7 kayu bengkirai, reng 2/3 kayu kamper 75,405.00 Analisa Gedung - 35
168 1M 2
Pasang usuk 5/7 kayu bengkirai, reng 2/3 kayu kruing 74,085.00 Analisa Gedung - 35
169 1M 2
Pasang usuk 5/7 kayu bengkirai, reng 2/3 kayu bengkirai 78,705.00 Analisa Gedung - 35
170 1 M2 Pasang usuk 5/7 glugu, reng 2/3 kayu jati 92,273.00 Analisa Gedung - 36
171 1M 2
Pasang usuk 5/7 glugu, reng 2/3 kayu jati lokal 59,273.00 Analisa Gedung - 36
172 1 M2 Pasang usuk 5/7 glugu, reng 2/3 kayu kamper 41,948.00 Analisa Gedung - 36
173 1M 2
Pasang usuk 5/7 glugu, reng 2/3 kayu kruing 40,628.00 Analisa Gedung - 36
174 1 M2 Pasang usuk 5/7 glugu, reng 2/3 kayu bengkirai 45,248.00 Analisa Gedung - 37
175 1M 2
Pasang usuk 5/7, reng 3/4 kayu jati 286,027.00 Analisa Gedung - 37
176 1 M2 Pasang usuk 5/7 kayu jati, reng 3/4 kayu jati (lokal) 233,227.00 Analisa Gedung - 37
177 1M 2
Pasang usuk 5/7 kayu jati, reng 3/4 kayu kamper 205,507.00 Analisa Gedung - 37
178 1 M2 Pasang usuk 5/7 kayu jati, reng 3/4 kayu kruing 203,395.00 Analisa Gedung - 38
179 1M 2
Pasang usuk 5/7 kayu jati, reng 3/4 kayu bengkirai 210,787.00 Analisa Gedung - 38
180 1 M2 Pasang usuk 5/7 kayu jati lokal, reng 3/4 kayu jati 201,327.00 Analisa Gedung - 38
181 1M 2
Pasang usuk 5/7 kayu jati lokal, reng 3/4 kayu jati lokal 148,527.00 Analisa Gedung - 38
182 1 M2 Pasang usuk 5/7 kayu jati lokal, reng 3/4 kayu kamper 120,807.00 Analisa Gedung - 39
183 1M 2
Pasang usuk 5/7 kayu jati lokal, reng 3/4 kayu kruing 118,695.00 Analisa Gedung - 39
184 1 M2 Pasang usuk 5/7 kayu jati lokal, reng 3/4 kayu bengkirai 126,087.00 Analisa Gedung - 39
185 1M 2
Pasang usuk 5/7 kayu kamper, reng 3/4 reng kayu jati 156,860.00 Analisa Gedung - 39
186 1 M2 Pasang usuk 5/7 kayu kamper, reng 3/4 kayu jati lokal 104,060.00 Analisa Gedung - 40
187 1M 2
Pasang usuk 5/7 kayu kamper, reng 3/4 kayu kamper 76,340.00 Analisa Gedung - 40
188 1 M2 Pasang usuk 5/7 kayu kamper, reng 3/4 kayu kruing 74,228.00 Analisa Gedung - 40
189 1M 2
Pasang usuk 5/7 kayu kamper, reng 3/4 kayu bengkirai 81,620.00 Analisa Gedung - 40
190 1 M2 Pasang usuk 5/7 kayu kruing, reng 3/4 kayu jati 153,472.00 Analisa Gedung - 41
191 1M 2
Pasang usuk 5/7 kayu kruing, reng 3/4 kayu jati lokal 100,672.00 Analisa Gedung - 41
192 1 M2 Pasang usuk 5/7 kayu kruing, reng 3/4 kayu kamper 72,952.00 Analisa Gedung - 41
193 1M 2
Pasang usuk 5/7 kayu kruing, reng 3/4 kayu kruing 70,840.00 Analisa Gedung - 41
194 1 M2 Pasang usuk 5/7 kayu kruing, reng 3/4 kayu bengkirai 78,232.00 Analisa Gedung - 42
195 1M 2
Pasang usuk 5/7 kayu bengkirai, reng 3/4 kayu jati 165,330.00 Analisa Gedung - 42
196 1 M2 Pasang usuk 5/7 kayu bengkirai, reng 3/4 kayu jati lokal 112,530.00 Analisa Gedung - 42
197 1M 2
Pasang usuk 5/7 kayu bengkirai, reng 3/4 kayu kamper 84,810.00 Analisa Gedung - 42
198 1 M2 Pasang usuk 5/7 kayu bengkirai, reng 3/4 kayu kruing 82,698.00 Analisa Gedung - 43
199 1M 2
Pasang usuk 5/7 kayu bengkirai, reng 3/4 kayu bengkirai 90,090.00 Analisa Gedung - 43
200 1 M2 Pasang usuk 5/7 glugu, reng 3/4 kayu jati 131,873.00 Analisa Gedung - 43
201 1M 2
Pasang usuk 5/7 glugu, reng 3/4 kayu jati lokal 79,073.00 Analisa Gedung - 43
202 1 M2 Pasang usuk 5/7 glugu, reng 3/4 kayu kamper 51,353.00 Analisa Gedung - 44
203 1M 2
Pasang usuk 5/7 glugu, reng 3/4 kayu kruing 49,241.00 Analisa Gedung - 44
204 1 M2 Pasang usuk 5/7 glugu, reng 3/4 kayu bengkirai 56,633.00 Analisa Gedung - 44
Rekapitulasi - 304
NO. SATUAN MACAM PEKERJAAN HARGA SATUAN HALAMAN
Rekapitulasi - 305
NO. SATUAN MACAM PEKERJAAN HARGA SATUAN HALAMAN
205 1 M3 Membuat kusen pintu / jendela kayu jati (klas plitur) 25,254,900.00 Analisa Gedung - 44
206 1 M3 Membuat kusen pintu / jendela kayu jati (lokal) 13,154,900.00 Analisa Gedung - 44
207 1M 3
Membuat kusen pintu / jendela kayu kamper 7,258,900.00 Analisa Gedung - 45
208 1 M3 Membuat kusen pintu / jendela kayu kruing 6,730,900.00 Analisa Gedung - 45
209 1M 3
Membuat kusen pintu / jendela kayu bengkirai 8,578,900.00 Analisa Gedung - 45
210 1 M2 Pasang pintu teakwood rangkap, rangka kayu jati 660,154.00 Analisa Gedung - 45
211 1M 2
Pasang pintu teakwood rangkap, rangka kayu jati lokal 422,994.00 Analisa Gedung - 45
212 1 M2 Pasang pintu teakwood rangkap, rangka kayu kamper 304,414.00 Analisa Gedung - 46
213 1M 2
Pasang pintu teakwood rangkap, rangka kayu kruing 288,244.00 Analisa Gedung - 46
214 1 M2 Pasang pintu teakwood rangkap, rangka kayu bengkirai 315,194.00 Analisa Gedung - 46
215 1M 2
Pasang pintu dan jendela kaca kayu jati 963,270.00 Analisa Gedung - 46
216 1 M2 Pasang pintu dan jendela kaca kayu jati lokal 539,770.00 Analisa Gedung - 46
217 1M 2
Pasang pintu dan jendela kaca kayu kamper 328,020.00 Analisa Gedung - 47
218 1 M2 Pasang pintu dan jendela kaca kayu kruing 299,145.00 Analisa Gedung - 47
219 1M 2
Pasang pintu dan jendela kaca kayu bengkirai 347,270.00 Analisa Gedung - 47
220 1 M2 Mengerjakan daun pintu / jendela panil kayu jati 1,113,337.00 Analisa Gedung - 47
221 1M 2
Mengerjakan daun pintu / jendela panil kayu jati lokal 629,337.00 Analisa Gedung - 47
222 1 M2 Mengerjakan daun pintu / jendela panil kayu kamper 387,337.00 Analisa Gedung - 47
223 1M 2
Mengerjakan daun pintu / jendela panil kayu kruing 354,337.00 Analisa Gedung - 48
224 1M 2
Mengerjakan daun pintu / jendela panil kayu bengkirai 409,337.00 Analisa Gedung - 48
225 1 M2 Pasang pintu dan jendela jalusi kayu jati 1,734,425.00 Analisa Gedung - 48
226 1M 2
Pasang pintu dan jendela jalusi kayu jati 960,025.00 Analisa Gedung - 48
227 1 M2 Pasang pintu dan jendela jalusi kayu kamper 550,825.00 Analisa Gedung - 48
228 1M 2
Pasang pintu dan jendela jalusi kayu kruing 498,025.00 Analisa Gedung - 48
229 1 M2 Pasang pintu dan jendela jalusi kayu bengkirai 586,025.00 Analisa Gedung - 49
230 1M 2
Pasang rangka langit-langit (1,00 x 1,00) m, kayu jati 282,108.00 Analisa Gedung - 49
231 1 M2 Pasang rangka langit-langit (1,00 x 1,00) m, kayu jati lokal 150,108.00 Analisa Gedung - 49
232 1M 2
Pasang rangka langit-langit (1,00 x 1,00) m, kayu kamper 80,808.00 Analisa Gedung - 49
233 1 M2 Pasang rangka langit-langit (1,00 x 1,00) m, kayu kruing 75,528.00 Analisa Gedung - 49
234 1M 2
Pasang rangka langit-langit (1,00 x 1,00) m, kayu bengkirai 94,008.00 Analisa Gedung - 50
235 1 M2 Pasang rangka langit-langit (60 x 120) cm, kayu jati 306,094.00 Analisa Gedung - 50
236 1M 2
Pasang rangka langit-langit (60 x 120) m, kayu jati lokal 163,094.00 Analisa Gedung - 50
237 1 M2 Pasang rangka langit-langit (60 x 120) m, kayu kamper 88,019.00 Analisa Gedung - 50
238 1M 2
Pasang rangka langit-langit (60 x 120) m, kayu kruing 82,299.00 Analisa Gedung - 50
239 1 M2 Pasang rangka langit-langit (60 x 120) m, kayu bengkirai 102,319.00 Analisa Gedung - 51
240 1M 2
Langit-langit asbes (1,00 x 1,00) m tanpa plepet 16,403.00 Analisa Gedung - 51
241 1 M2 Langit-langit asbes (1,00 x 1,00) m memakai plepet 22,233.00 Analisa Gedung - 51
242 1M 2
Langit-langit asbes (1,00 x 1,00) m, rangka kayu jati tanpa plepet 298,166.00 Analisa Gedung - 51
243 1 M2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu jati lokal tanpa plepet 166,166.00 Analisa Gedung - 51
244 1M 2
Langit-langit asbes (1,00 x 1,00) m, rangka kayu kamper tanpa plepet 96,866.00 Analisa Gedung - 52
245 1 M2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kruing tanpa plepet 91,586.00 Analisa Gedung - 52
246 1M 2
Langit-langit asbes (1,00 x 1,00) m, rangka kayu bengkirai tanpa plepet 110,066.00 Analisa Gedung - 52
247 1 M2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu jati memakai plepet 304,122.00 Analisa Gedung - 52
248 1M 2
Langit-langit asbes (1,00 x 1,00) m, rangka kayu jati lokal memakai plepet 172,122.00 Analisa Gedung - 53
249 1 M2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kamper memakai plepet 102,822.00 Analisa Gedung - 53
250 1M 2
Langit-langit asbes (1,00 x 1,00) m, rangka kayu kruing memakai plepet 97,542.00 Analisa Gedung - 53
251 1 M2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu bengkirai memakai plepet 116,022.00 Analisa Gedung - 53
252 1M 2
Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu jati 334,529.00 Analisa Gedung - 54
253 1 M2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu jati lokal 191,529.00 Analisa Gedung - 54
254 1M 2
Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu kamper 116,454.00 Analisa Gedung - 54
255 1 M2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu kruing 110,734.00 Analisa Gedung - 54
256 1M 2
Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu bengkirai 130,754.00 Analisa Gedung - 55
257 1 M2 Langit-langit gypsum board tebal 9 mm, rangka hollow 97,798.00 Analisa Gedung - 55
258 1M 2
Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu jati 336,192.00 Analisa Gedung - 55
259 1 M2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu jati lokal 193,192.00 Analisa Gedung - 55
Rekapitulasi - 306
NO. SATUAN MACAM PEKERJAAN HARGA SATUAN HALAMAN
Rekapitulasi - 307
NO. SATUAN MACAM PEKERJAAN HARGA SATUAN HALAMAN
260 1 M2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu kamper 118,117.00 Analisa Gedung - 56
261 1 M2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu kruing 112,397.00 Analisa Gedung - 56
262 1M 2
Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu bengkirai 132,417.00 Analisa Gedung - 56
263 1 M2 Langit-langit kalsiboard tebal 3.5 mm, rangka hollow 99,461.00 Analisa Gedung - 56
264 1M 2
Langit-langit akustik 60 x 120 cm + rangka alumunium 316,140.00 Analisa Gedung - 57
265 1 M1 Pasang list profil cornees gypsum lebar sampai 5 cm 16,200.00 Analisa Gedung - 57
266 1M 1
Pasang list profil cornees gypsum lebar 5 - 10 cm 22,011.00 Analisa Gedung - 57
267 1 M1 Pasang list profil cornees gypsum lebar lebih dari 10 cm 31,545.00 Analisa Gedung - 57
268 1M 1
List langit-langit kayu profil 11,332.00 Analisa Gedung - 57
269 1 M1 Pasang lisplank ukuran (2 x 20) cm, kayu jati 125,735.00 Analisa Gedung - 58
270 1M 1
Pasang lisplank ukuran (2 x 25) cm, kayu jati 154,775.00 Analisa Gedung - 58
271 1 M1 Pasang lisplank ukuran (3 x 20) cm, kayu jati 187,563.00 Analisa Gedung - 58
272 1M 1 Pasang lisplank ukuran (3 x 30) cm, kayu jati 280,571.00 Analisa Gedung - 58
273 1 M1 Pasang lisplank ukuran 2 x (3 x 20) cm, kayu jati 368,656.00 Analisa Gedung - 58
274 1M 1 Pasang lisplank ukuran 2 x (2 x 20) cm, kayu jati 217,695.00 Analisa Gedung - 59
275 1 M1 Pasang lisplank ukuran (2 x 20) cm, kayu jati lokal 67,655.00 Analisa Gedung - 59
276 1M 1 Pasang lisplank ukuran (2 x 25) cm, kayu jati lokal 82,175.00 Analisa Gedung - 59
277 1 M1 Pasang lisplank ukuran (3 x 20) cm, kayu jati lokal 100,443.00 Analisa Gedung - 59
278 1M 1 Pasang lisplank ukuran (3 x 30) cm, kayu jati lokal 147,471.00 Analisa Gedung - 59
279 1M 1
Pasang lisplank ukuran 2 x (3 x 20) cm, kayu jati lokal 193,206.00 Analisa Gedung - 60
280 1 M1 Pasang lisplank ukuran 2 x (2 x 20) cm, kayu jati lokal 113,635.00 Analisa Gedung - 60
281 1M 1
Pasang lisplank ukuran (2 x 20) cm, kayu kamper 38,615.00 Analisa Gedung - 60
282 1 M1 Pasang lisplank ukuran (2 x 25) cm, kayu kamper 45,875.00 Analisa Gedung - 60
283 1M 1
Pasang lisplank ukuran (3 x 20) cm, kayu kamper 56,705.00 Analisa Gedung - 60
284 1 M1 Pasang lisplank ukuran (3 x 30) cm, kayu kamper 80,921.00 Analisa Gedung - 61
285 1M 1
Pasang lisplank ukuran 2 x (3 x 20) cm, kayu kamper 105,481.00 Analisa Gedung - 61
286 1 M1 Pasang lisplank ukuran 2 x (2 x 20) cm, kayu kamper 61,605.00 Analisa Gedung - 61
287 1M 1
Pasang lisplank ukuran (2 x 20) cm, kayu kruing 34,655.00 Analisa Gedung - 61
288 1 M1 Pasang lisplank ukuran (2 x 25) cm, kayu kruing 40,925.00 Analisa Gedung - 61
289 1M 1
Pasang lisplank ukuran (3 x 20) cm, kayu kruing 50,765.00 Analisa Gedung - 62
290 1 M1 Pasang lisplank ukuran (3 x 30) cm, kayu kruing 71,846.00 Analisa Gedung - 62
291 1M 1
Pasang lisplank ukuran 2 x (3 x 20) cm, kayu kruing 93,519.00 Analisa Gedung - 62
292 1 M1 Pasang lisplank ukuran 2 x (2 x 20) cm, kayu kruing 54,510.00 Analisa Gedung - 62
293 1M 1
Pasang lisplank ukuran (2 x 20) cm, kayu bengkirai 41,255.00 Analisa Gedung - 62
294 1 M1 Pasang lisplank ukuran (2 x 25) cm, kayu bengkirai 49,175.00 Analisa Gedung - 63
295 1M 1
Pasang lisplank ukuran (3 x 20) cm, kayu bengkirai 60,665.00 Analisa Gedung - 63
296 1 M1 Pasang lisplank ukuran (3 x 30) cm, kayu bengkirai 86,971.00 Analisa Gedung - 63
297 1M 1
Pasang lisplank ukuran 2 x (3 x 20) cm, kayu bengkirai 113,456.00 Analisa Gedung - 63
298 1 M1 Pasang lisplank ukuran 2 x (2 x 20) cm, kayu bengkirai 66,335.00 Analisa Gedung - 63
299 1M 2
Membuat listplank asbes plat ram kayu jati 661,815.00 Analisa Gedung - 64
300 1 M2 Membuat listplank asbes plat ram kayu jati lokal 386,815.00 Analisa Gedung - 64
301 1M 2
Membuat listplank asbes plat ram kayu kamper 242,440.00 Analisa Gedung - 64
302 1 M2 Membuat listplank asbes plat ram kayu kruing 231,440.00 Analisa Gedung - 64
303 1M 2
Membuat listplank asbes plat ram kayu bengkirai 269,940.00 Analisa Gedung - 64
304 1 M1 Mengerjakan papan ruiter kayu jati 2/20 101,411.00 Analisa Gedung - 65
305 1M 1
Mengerjakan papan ruiter kayu jati lokal 2/20 53,011.00 Analisa Gedung - 65
306 1 M1 Mengerjakan papan ruiter kayu kamper 2/20 28,811.00 Analisa Gedung - 65
307 1M 1
Mengerjakan papan ruiter kayu kruing 2/20 25,511.00 Analisa Gedung - 65
308 1 M1 Mengerjakan papan ruiter kayu bengkirai 2/20 31,011.00 Analisa Gedung - 65
309 1M 1
Pasang talang datar, seng BJLS 28, papan kayu jati 287,905.00 Analisa Gedung - 66
310 1 M1 Pasang talang datar, seng BJLS 28, papan kayu jati lokal 171,745.00 Analisa Gedung - 66
311 1M 1
Pasang talang datar, seng BJLS 28, papan kayu kamper 113,665.00 Analisa Gedung - 66
312 1 M1 Pasang talang datar, seng BJLS 28, papan kayu kruing 105,745.00 Analisa Gedung - 66
313 1M 1
Pasang talang datar, seng BJLS 28, papan kayu bengkirai 118,945.00 Analisa Gedung - 67
Rekapitulasi - 308
NO. SATUAN MACAM PEKERJAAN HARGA SATUAN HALAMAN
314 1 M1 Pasang talang miring, seng BJLS 28 papan kayu jati 511,865.00 Analisa Gedung - 67
315 1 M1 Pasang talang miring, seng BJLS 28, papan kayu jati lokal 280,040.00 Analisa Gedung - 67
316 1M 1
Pasang talang miring, seng BJLS 28, papan kayu kamper 165,090.00 Analisa Gedung - 67
317 1 M1 Pasang talang miring, seng BJLS 28, papan kayu kruing 149,415.00 Analisa Gedung - 68
318 1M 1
Pasang talang miring, seng BJLS 28, papan kayu bengkirai 175,540.00 Analisa Gedung - 68
319 1 M1 Pasang talang torong 55,431.00 Analisa Gedung - 68
320 1M 1
Pasang talang ½ lingkaran D - 10 cm, seng BJLS 28 162,318.00 Analisa Gedung - 68
321 1 M1 Pasang talang ½ lingkaran D - 10 cm, seng BJLS 24 160,503.00 Analisa Gedung - 69
322 1M 2
Pasang rangka dinding pemisah, kayu kamper 175,601.00 Analisa Gedung - 69
323 1 M2 Pasang rangka dinding pemisah, kayu bengkirai 200,901.00 Analisa Gedung - 69
324 1M 2
Pasang rangka dinding pemisah, kayu jati 629,763.00 Analisa Gedung - 69
325 1 M2 Pasang rangka dinding pemisah, kayu jati lokal 330,563.00 Analisa Gedung - 69
326 1M 2
Pasang rangka dinding pemisah, kayu kruing 161,246.00 Analisa Gedung - 70
327 1 M2 Pasang dinding pemisah teakwood rangkap, rangka kayu kamper 182,377.00 Analisa Gedung - 70
328 1M 2
Pasang dinding pemisah plywoodwood rangkap, rangka kayu kamper 229,993.00 Analisa Gedung - 70
329 1 M2 Pasang plywood tebal 4 mm, untuk dinding 22,685.00 Analisa Gedung - 70
330 1M 2
Pasang dinding anyaman bambu, rangka kayu kruing 205,581.00 Analisa Gedung - 71
PEKERJAAN ATAP
331 1 M2 Pasang genteng paris 34,595.00 Analisa Gedung - 71
332 1M 2
Pasang genteng paris untuk rumah tingkat 36,025.00 Analisa Gedung - 71
333 1 M2 Pasang genteng beton besar Natural ( isi 9 / m2 ) 41,360.00 Analisa Gedung - 71
334 1M 2
Pasang genteng beton besar Natural ( isi 9 / m2 ) untuk rumah tingkat 46,750.00 Analisa Gedung - 71
335 1 M2 Pasang genteng beton besar Warna ( isi 9 / m2 ) 57,893.00 Analisa Gedung - 72
336 1M 2
Pasang genteng beton besar Warna ( isi 9 / m2 ) untuk rumah tingkat 63,283.00 Analisa Gedung - 72
337 1 M2 Pasang genteng keramik berglasir KIA, Kanmuri Natural 85,910.00 Analisa Gedung - 72
338 1M 2
Pasang genteng keramik berglasir KIA, Kanmuri Natural untuk rumah tingkat 91,300.00 Analisa Gedung - 72
339 1 M1 Pasang bubungan genteng paris 41,108.00 Analisa Gedung - 72
340 1 M1 Pasang bubungan genteng beton Natural 45,563.00 Analisa Gedung - 73
341 1M 1
Pasang bubungan genteng beton Warna 50,777.00 Analisa Gedung - 73
342 1 M1 Pasang bubungan genteng keramik berglasir KIA, Kanmuri Natural 91,433.00 Analisa Gedung - 73
343 1M 2
Pasang atap asbes gelombang (2,5 x 0,92 m) x 5 mm 46,257.00 Analisa Gedung - 73
344 1 M2 Pasang atap sbes gelombang (2,25 x 0,92 m) x 5 mm 48,998.00 Analisa Gedung - 73
345 1M 2
Pasang atap asbes gelombang (2,00 x 0,92 m) x 5 mm 44,558.00 Analisa Gedung - 74
346 1 M2 Pasang atap asbes gelombang (1,80 x 0,92 m) x 5 mm 48,704.00 Analisa Gedung - 74
347 1M 2
Pasang atap asbes gelombang (300 x 1,05 m) x 4 mm 38,810.00 Analisa Gedung - 74
348 1 M2 Pasang atap asbes gelombang (2,7 x 1,05 m) x 4 mm 43,333.00 Analisa Gedung - 74
349 1M 2
Pasang atap asbes gelombang (2,40 x 1,05 m) x 4 mm 40,765.00 Analisa Gedung - 74
350 1 M2 Pasang atap asbes gelombang (2,10 x 1,05 m) x 4 mm 43,498.00 Analisa Gedung - 75
351 1M 2
Pasang atap asbes gelombang (1,50 x 1,05 m) x 4 mm 42,877.00 Analisa Gedung - 75
352 1 M2 Pasang atap asbes gelombang (3,00 x 1,08 m) x 6 mm 57,163.00 Analisa Gedung - 75
353 1M 2
Pasang atap asbes gelombang (2,70 x 1,08 m) x 6 mm 53,668.00 Analisa Gedung - 75
354 1 M2 Pasang atap sbes gelombang (2,40 x 1,08 m) x 6 mm 56,915.00 Analisa Gedung - 75
355 1M 2
Pasang atap asbes gelombang (2,10 x 1,08 m) x 6 mm 53,811.00 Analisa Gedung - 76
356 1 M2 Pasang atap asbes gelombang (1,80 x 1,08 m) x 6 mm 53,683.00 Analisa Gedung - 76
357 1M 1
Pasang bubung stel gelombang 0,92 m 90,609.00 Analisa Gedung - 76
358 1 M1 Pasang nok stel gelombang 1,05 m 81,039.00 Analisa Gedung - 76
359 1M 1
Pasang nok stel gelombang 1,08 m 79,444.00 Analisa Gedung - 76
360 1 M1 Pasang nok paten 0,92 m 80,049.00 Analisa Gedung - 77
361 1M 1
Pasang nok paten 1,05 m 80,049.00 Analisa Gedung - 77
362 1 M1 Pasang nok paten 1,08 m 80,049.00 Analisa Gedung - 77
363 1M 1
Pasang nok stel rata 0,92 m 45,916.00 Analisa Gedung - 77
364 1 M1 Pasang nok stel rata 1,09 m 44,299.00 Analisa Gedung - 77
365 1M 1
Pasang nok atap seng 25,509.00 Analisa Gedung - 78
Rekapitulasi - 309
NO. SATUAN MACAM PEKERJAAN HARGA SATUAN HALAMAN
366 1 M1 Pasang atap genteng metal zinc alume type prima roof 125,084.00 Analisa Gedung - 78
367 1 M1 Pasang atap metal gelombanmg 86,245.00 Analisa Gedung - 78
368 1M 1
Pasang nok genteng metal U type prima roof 62,455.00 Analisa Gedung - 78
369 1 M1 Pasang atap alumunium 119,823.00 Analisa Gedung - 78
370 1M 1
Pasang nok alumunium 72,605.00 Analisa Gedung - 79
371 1 M2 Pasang alumunium foil / sisalation 38,832.00 Analisa Gedung - 79
372 1M 2
Pasang atap polikarbonat 379,720.00 Analisa Gedung - 79
PEKERJAAN CAT-CATAN
373 1 M2 Mengecat kerb 3 kali TIAP 1 M2 ( 3 kali ) 35,508.00 Analisa Gedung - 79
TIAP 1 M2 ( 2 kali ) 23,672.00 Analisa Gedung - 79
TIAP 1 M2 ( 1 kali ) 11,836.00 Analisa Gedung - 79
374 1 M2 Mengikis / mengerok permukaan cat tembok lama 8,470.00 Analisa Gedung - 80
375 1 M2 Mengerok karat cat lama permukaan baja dengan cara manual 8,305.00 Analisa Gedung - 80
376 1M 2
Mendempul dan menggosok kayu 4,603.00 Analisa Gedung - 80
377 1 M2 Pengecatan bidang kayu lama 19,918.00 Analisa Gedung - 80
378 1M 2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat 26,094.00 Analisa Gedung - 80
penutup
379 1 M2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 3 lapis cat 29,615.00 Analisa Gedung - 81
penutup
380 1 M2 Pelaburan bidang kayu dengan teak oil 16,693.00 Analisa Gedung - 81
381 1 M2 Pelaburan bidang kayu dengan politur 19,329.00 Analisa Gedung - 81
382 1M 2
Pelaburan bidang kayu dengan cat residu atau ter 6,825.00 Analisa Gedung - 81
383 1 M2 Pelaburan bidang kayu dengan vernis 15,990.00 Analisa Gedung - 81
384 1M 2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) 7,826.00 Analisa Gedung - 82
385 1 M2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup) 6,020.00 Analisa Gedung - 82
386 1M 2
Pengecatan tembok tidak terlindung dari panas dan hujan 25,921.00 Analisa Gedung - 82
387 1 M2 Melabur tembok dengan kalkarium 3,435.00 Analisa Gedung - 82
388 1M 2
Melabur tembok dengan kapur sirih 10,370.00 Analisa Gedung - 82
389 1 M2 Melabur tembok tembok lama dengan kapur sirih (untuk pemeliharaan) 4,717.00 Analisa Gedung - 83
390 1M 2
Pengecatan bidang besi ( 3 x ) 17,915.00 Analisa Gedung - 83
391 1 M2 Pemasangan wall paper 72,769.00 Analisa Gedung - 83
392 1M 2
Pengecacatan permukaan baja dengan meni besi 10,527.00 Analisa Gedung - 83
393 1 M2 Pengecacatan permukaan baja dengan meni besi memakai perancah 23,416.00 Analisa Gedung - 83
394 1M 2
Pengetiran kayu ( 2 x ) 8,470.00 Analisa Gedung - 84
395 1 M2 Pekerjaan cat duco 3 x 49,061.00 Analisa Gedung - 84
396 1M 2
Mengecat genteng 19,761.00 Analisa Gedung - 84
PEKERJAAN BONGKARAN
397 1 M3 Membongkar pasangan batu kali 140,800.00 Analisa Gedung - 84
398 1M 3
Membongkar pasangan batu merah dan membersihkan 65,450.00 Analisa Gedung - 84
399 1 M3 Membongkar beton bertulang dan membersihkan 410,850.00 Analisa Gedung - 85
400 1M 2
Pekerjaan bongkar lantai tegel untuk dipergunakan lagi 10,780.00 Analisa Gedung - 85
401 1 M2 Mengupas plesteran lama 7,287.00 Analisa Gedung - 85
402 1M 2
Membongkar genteng / sirap untuk dipergunakan lagi 10,780.00 Analisa Gedung - 85
403 1 M2 Membongkar atap seng 6,325.00 Analisa Gedung - 85
404 1M 2
Membongkar usuk / reng dipakai lagi 12,974.00 Analisa Gedung - 85
405 1 M2 Membongkar usuk / reng tidak dipakai lagi 10,780.00 Analisa Gedung - 85
406 1M 3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan untuk digunakan 435,050.00 Analisa Gedung - 86
lagi
407 1 M3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan tidak digunakan 67,100.00 Analisa Gedung - 86
lagi
408 1 M3 Mengerjakan kembali bangunan kayu yang telah dibongkar 654,500.00 Analisa Gedung - 86
Rekapitulasi - 310
NO. SATUAN MACAM PEKERJAAN HARGA SATUAN HALAMAN
ANALISA SUPLEMEN
409 1M 1
Pasang pipa beton oval dia. 25/37,5 dalam 0 - 1 m 81,482.00 Analisa Gedung - 86
410 1 M1 Pasang pipa beton oval dia. 25/37,5 dalam 1 - 2 m 118,607.00 Analisa Gedung - 86
411 1M 1
Pengelasan Single ( las listrik ) 238,920.00 Analisa Gedung - 86
PEKERJAAN SANITASI
412 1 bh Memasang kloset duduk/monoblock 1,668,238.00 Analisa Gedung - 87
413 1 bh Memasang kloset jongkok porselen 246,833.00 Analisa Gedung - 87
414 1 bh Memasang kloset jongkok teraso 150,528.00 Analisa Gedung - 87
415 1 bh Memasang urinoir 1,220,278.00 Analisa Gedung - 87
416 1 bh Memasang wastafel 457,181.00 Analisa Gedung - 87
417 1 bh Memasang bak mandi fiberglass volume 0,30 m3 555,225.00 Analisa Gedung - 88
418 1 bh Memasang badkip porselen 247,018.00 Analisa Gedung - 88
419 1 bh Memasang bak fiberglass volume 1 m3 air 1,409,925.00 Analisa Gedung - 88
420 1 M1 Memasang pipa penyalur air limbah jenis pipa tanah, diameter 15 cm 50,520.00 Analisa Gedung - 88
421 1 M1 Memasang pipa penyalur air limbah jenis pipa tanah, diameter 20 cm 77,889.00 Analisa Gedung - 88
422 1M 1
Memasang pipa beton, diameter 15 cm - 20 cm 54,522.00 Analisa Gedung - 89
423 1 M1 Memasang pipa beton, diameter 30 cm - 100 cm 202,086.00 Analisa Gedung - 89
424 1 bh Memasang bak kontrol pasangan batu bata ukuran (30 x 30) cm, tinggi 35 cm 289,842.00 Analisa Gedung - 89
425 1 bh Memasang bak kontrol pasangan batu bata ukuran (45 x 45) cm, tinggi 50 cm 256,757.00 Analisa Gedung - 89
426 1 bh Memasang bak kontrol pasangan batu bata ukuran (60 x 60) cm, tingg 65 cm 390,313.00 Analisa Gedung - 90
427 1 M1 Memasang pipa galvanis diameter 1/2" 33,643.00 Analisa Gedung - 90
428 1 M1 Memasang pipa galvanis diameter 3/4" 50,693.00 Analisa Gedung - 90
429 1M 1
Memasang pipa galvanis diameter 1" 72,006.00 Analisa Gedung - 90
430 1 M1 Memasang pipa galvanis diameter 1 1/2" 97,110.00 Analisa Gedung - 90
431 1M 1
Memasang pipa galvanis diameter 3" 156,785.00 Analisa Gedung - 91
432 1 M1 Memasang pipa galvanis diameter 4" 168,279.00 Analisa Gedung - 91
433 1M 1
Memasang pipa PVC tipe AW diameter 1/2" 9,345.00 Analisa Gedung - 91
434 1 M1 Memasang pipa PVC tipe AW diameter 3/4" 11,199.00 Analisa Gedung - 91
435 1M 1
Memasang pipa PVC tipe AW diameter 1" 12,691.00 Analisa Gedung - 91
436 1 M1 Memasang pipa PVC tipe AW diameter 1 1/2" 23,134.00 Analisa Gedung - 92
437 1M 1
Memasang pipa PVC tipe AW diameter 2" 31,524.00 Analisa Gedung - 92
438 1 M1 Memasang pipa PVC tipe AW diameter 2 1/2" 38,905.00 Analisa Gedung - 92
439 1M 1
Memasang pipa PVC tipe AW diameter 3" 47,099.00 Analisa Gedung - 92
440 1 M1 Memasang pipa PVC tipe AW diameter 4" 69,690.00 Analisa Gedung - 92
441 1 bh Memasang bak cuci piring stainless steel 644,182.00 Analisa Gedung - 93
442 1 bh Memasang bak cuci piring teraso 315,458.00 Analisa Gedung - 93
443 1 bh Memasang kran diameter 3/4" atau 1/2" 31,858.00 Analisa Gedung - 93
444 1 bh Memasang floor drain 64,790.00 Analisa Gedung - 93
Rekapitulasi - 311
NO. SATUAN MACAM PEKERJAAN HARGA SATUAN HALAMAN
Rekapitulasi - 312
NO. SATUAN MACAM PEKERJAAN HARGA SATUAN HALAMAN
Rekapitulasi - 313
NO. SATUAN MACAM PEKERJAAN HARGA SATUAN HALAMAN
ANALISA KPUT
1 1M 2
Menghampar dan mengisi bahan perkerasan 73,340.00 Analisa KPUT - 1
2 1 M3 Menyawur pasir 45,000.00 Analisa KPUT - 1
3 1M 2
Menggilas dengan motor walls 232,450.00 Analisa KPUT - 1
4 1 M2 Perkerasan lapis pondasi bawah (sub base) tebal 20 cm padat 59,004.00 Analisa KPUT - 1
5 1M 2
Pembuatan lapis pondasi bawah (sub base) tebal 15 cm padat 47,648.00 Analisa KPUT - 1
6 1 M2 Pembuatan lapis pondasi atas (base) tebal 10 cm padat 35,765.00 Analisa KPUT - 2
7 1M 2
Pembuatan lapis pondasi atas (base) tebal 8 cm padat 29,173.00 Analisa KPUT - 2
8 1 M2 Pembuatan lapis pondasi atas (base) tebal 7 cm padat 25,877.00 Analisa KPUT - 2
9 1M 2
Lapisan Penetrasi 4 cm padat 75,102.00
10 1 M2 Aspal sand sheet 2 cm jereng (1 cm padat) 48,273.00
11 1M 2
Aspal sand sheet 3 cm jereng (2 cm padat) 69,060.00 Analisa KPUT - 3
12 1 M2 Aspal sand sheet 2 cm jereng (1 cm padat) tanpa aspal 13,128.00 Analisa KPUT - 4
13 1M 2
Aspal sand sheet 3 cm jereng (2 cm padat) tanpa aspal 19,271.00 Analisa KPUT - 4
14 1 M2 Mengecat marka jalan dengan Rettar 40,305.00 Analisa KPUT - 4
15 1M 2
Mengecat marka jalan dengan Thermoplastic 172,370.00 Analisa KPUT - 4
16 1 M1 Pemotongan aspal dengan mesin potong (cutter), 2 sisi 9,756.00 Analisa KPUT - 5
17 1M 1
Pemotongan aspal dengan mesin potong (cutter), 1 sisi 4,878.00 Analisa KPUT - 5
18 1 M2 Pembongkaran aspal dengan Jack Hammer 80,082.00 Analisa KPUT - 5
19 1M 2
Expantion joint 2,085,346.00 Analisa KPUT - 5
ANALISA _ E
1 1 M2 LATASTON ( HRS ) 80,358.00 Analisa - E 1
2 1M 2
LASTON ( AC ) 103,623.00 Analisa - E 5
3 1 M3 ASPHALT TREATED BASE ( ATB ) 2,441,195.00 Analisa - E 9
4 1 liter LAPIS RESAP PENGIKAT (PRIME COAT) 9,207.00 Analisa - E 13
5 1 M3 LAPIS PONDASI AGREGAT KLAS A 202,973.00 Analisa - E 16
6 1 M3 LAPIS PONDASI AGREGAT KLAS B 199,888.00 Analisa - E 20
7 1 liter LAPIS PEREKAT (TACK COAT) 12,169.00 Analisa - E 24
8 1 M2 PENYIAPAN BADAN JALAN (PEMADATAN DAN PERATAAN) 3,225.00 Analisa - E 27
Rekapitulasi - 314
NO. SATUAN MACAM PEKERJAAN HARGA SATUAN HALAMAN
SEWA ALAT :
1 1 Jam ASPHALT MIXING PLANT 3,627,852.41 Analisa Alat - 1
2 1 Jam ASPHALT FINISHER 180,372.07 Analisa Alat - 2
3 1 Jam ASPHALT SPRAYER 47,563.28 Analisa Alat - 3
4 1 Jam BULLDOZER 100 -150 HP 251,004.61 Analisa Alat - 4
5 1 Jam COMPRESSOR 4000 - 6500 L/M 98,019.90 Analisa Alat - 5
6 1 Jam WHEEL LOADER 1,0 - 1,6 M3 257,248.03 Analisa Alat - 6
7 1 Jam TANDEM ROLLER 6 - 8 T 138,676.60 Analisa Alat - 7
8 1 Jam PNEUMATIC TYRE ROLLER 8 - 10 T 168,275.16 Analisa Alat - 8
9 1 Jam DUMP TRUCK 122,088.28 Analisa Alat - 9
10 1 Jam GENERATOR SET 219,084.68 Analisa Alat - 10
11 1 Jam MOTOR GRADER > 100 HP 279,356.86 Analisa Alat - 11
12 1 Jam VIBRATORY ROLLER 5 - 8 T 175,852.55 Analisa Alat - 12
13 1 Jam WATER TANK TRUCK 3000 - 4000 L 84,823.54 Analisa Alat - 13
14 1 Jam JACK HAMMER 10,068.81 Analisa Alat - 14
15 1 Jam TAMPER 11,186.48 Analisa Alat - 15
16 1 Jam STONE CRUSHER 263,341.68 Analisa Alat - 16
17 1 Jam THREE WHEEL ROLLER 6 - 8 T 70,383.86 Analisa Alat - 17
18 1 Jam CONCRETE VIBRATOR 18,845.92 Analisa Alat - 18
19 1 Jam CONCRETE MIXER 0.3 - 0.6 M3 27,217.35 Analisa Alat - 19
20 1 Jam CRANE 10 - 15 TON 172,191.26 Analisa Alat - 20
21 1 Jam DUMP TRUCK 3 - 4 M3 95,522.09 Analisa Alat - 21
22 1 Jam EXCAVATOR 80 - 140 HP 114,067.72 Analisa Alat - 22
23 1 Jam FLAT BED TRUCK 3 - 4 M3 127,617.72 Analisa Alat - 23
24 1 Jam WATER PUMP 70 - 100 mm 12,230.23 Analisa Alat - 24
25 1 Jam FULVI MIXER 78,584.59 Analisa Alat - 25
26 1 Jam TRACK LOADER 75 - 100 HP 131,541.26 Analisa Alat - 26
27 1 Jam MESIN PENYARING 8 HP 50,000.00
28 1 Jam CHIP SPREADER 50,000.00
29 1 Jam MESIN PENGHAMPAR 1820 MM 30 HP 181,000.00
30 1 Jam THRILLER GANDENG 1 TON 184,000.00
31 1 Jam DUMP TRUCK 3,5 TON 44 HP 118,000.00
32 1 Jam POMPA AIR ( D 5 CM ) 30 M3/JAM 11,000.00
33 1 Jam TRAKTOR 15,000.00
34 1 Jam THRILLER 1 TON 15,000.00
35 1 Jam ALAT BOR 150,000.00
36 1 Jam ALAT UKUR 75,000.00
37 1 Jam BETON MOLEN 25,000.00
38 1 Jam MESIN CUTTER 60,000.00
39 1 Jam MOTOR WALLS 20,000.00
40 1 Jam PERALATAN LAS 75,000.00
41 1 Jam SPRAYER 48,000.00
Rekapitulasi - 315
PT. KERETA API
DAERAH OPERASI I
Bagian :
Daerah :
Nomor :
RENCANA BIA
BANYAK
NO NYA SATUAN
1 2 3
1 1 Unit
2 32 m²
3 6 m²
4 20 m²
5 20 m²
6 6 m²
7 6 m²
8 6 m²
9 0.5 m3
10 25 m3
11 25 m3
12 25 m3
13 1 Unit
14 1 Unit
15 1 Unit
16 1 Unit
17 1 Unit
18 3 Unit
19 2 Unit
20 25 m3
21 3 Unit
22 3 Unit
23 3 m3
24 25 m3
25 1 Unit
26 1 Unit
Catatan :
*) PPN DTP =
PPN Ditanggung Pemerintah
Untuk barang yang PPN-nya
DTP harus dimintakan Surat
Keterangan Kepada KPP setempat
Mengetahui/Setuju
MANAGER ASET 3 CIREBON
EDI JOKO. P
NIPP. 35773
PT. KERETA API ( Persero )
DAERAH OPERASI III CIREBON
RENCANA BIAYA
HARGA SATUAN
URAIAN JASA /
PEKERJAAN UPAH
Rp.
4 5
Jumlah
PPN 10 %
Jumlah + PPN 10 %
Total nilai pekerjaan
Dibulatkan
Terbilang
Mengetahui/Setuju
MANAGER ASET 3 CIREBON
EDI JOKO. P
NIPP. 35773
Persero )
I CIREBON
YA
200,000.00 - - - 200,000.00
- - 480,000.00 - -
9,713.80 - 50,250.00 - 58,282.80
- - 139,000.00 - -
5,906.40 106,420.00 118,128.00
- 58,800.00 -
- - 39,750.00 - -
91,394.12 274,500.00 548,364.72
- 190,000.00 -
- 530,000.00 -
- - 278,000.00 - -
- 301,250.00 -
200,000.00 - - - 200,000.00
200,000.00 - - - 200,000.00
200,000.00 - - - 200,000.00
200,000.00 - - - 200,000.00
200,000.00 - - - 200,000.00
550,000.00 - - - 1,650,000.00
500,000.00 - - - 1,000,000.00
- 530,000.00 -
200,000.00 - - - 600,000.00
- - 75,000.00 - -
- - 33,360.00 - -
- 301,250.00 -
- - 100,000.00 - -
- - 100,000.00 - -
3,587,580.00 5,174,775.52
- -
- -
8,762,355.52
DWI HARTANTO
NIPP.41499