Você está na página 1de 42

SUMA DE LAS CARGAS EN TON SOBRE CADA TABLERO

TABLERO 1

18.08 + 15.77 + 11.49 + 12.45 = 57.79 ton

TABLERO 2

11.49 + 12.45 + 11.23 + 11.91 = 47.08 ton

TABLERO 3

11.23 + 11.91 + 14.83 + 15.25 = 53.22 ton

TABLERO 4

15.77 + 7.28 + 9.99 + 12.45 = 45.49 ton

TABLERO 5

12.45 + 11.91 + 9.99 + 9.99 = 43.34 ton

TABLERO 6

11.91 + 9.99 + 15.24 + 7.28 = 44.42 ton

TABLERO 7

7.28 + 11.75 + 9.99 + 9.46 = 38.48 ton

TABLERO 8

9.99 + 9.99 + 9.46 + 9.46 = 38.90 ton

TABLERO 9

9.99 + 7.28 + 9.46 + 11.75 = 38.48 ton

TABLERO 10

11.75 + 9.46 + 11.70 + 13.35 = 46.26 ton

TABLERO 11

9.46 + 9.46 + 13.35 + 13.35 = 45.62 ton

TABLERO 12

9.46 + 11.75 + 13.35 + 11.70 = 46.26 ton


CARGAS KG/M2 EN CADA TABLERO

TABLERO 1

57.79 𝑇𝑂𝑁
= 3.003 TON/M2
4.23 𝑀 ∗ 4.55 𝑀
TABLERO 2

47.08 𝑇𝑂𝑁
= 2.271 TON/M2
4.23 𝑀 ∗ 4.9 𝑀
TABLERO 3

53.22 𝑇𝑂𝑁
= 2.765 TON/M2
4.23 𝑀 ∗ 4.55 𝑀
TABLERO 4

45.49 𝑇𝑂𝑁
= 2.564 TON/M2
3.9𝑀 ∗ 4.55 𝑀
TABLERO 5

43.34 𝑇𝑂𝑁
= 2.268 TON/M2
3.9 𝑀 ∗ 4.9 𝑀
TABLERO 6

44.42 𝑇𝑂𝑁
= 2.503 TON/M2
3.9 𝑀 ∗ 4.55 𝑀
TABLERO 7

38.48 𝑇𝑂𝑁
= 2.819 TON/M2
3 𝑀 ∗ 4.55 𝑀
TABLERO 8

38.90 𝑇𝑂𝑁
= 2.646 TON/M2
3 𝑀 ∗ 4.9 𝑀
TABLERO 9

38.48 𝑇𝑂𝑁
= 2.819 TON/M2
3 𝑀 ∗ 4.55 𝑀
TABLERO 10

46.26 𝑇𝑂𝑁
= 2.561 TON/M2
3.97 𝑀 ∗ 4.55 𝑀
TABLERO 11

45.62 𝑇𝑂𝑁
= 2.345 TON/M2
3.97 ∗ 4.9 𝑀
TABLERO 12

46.26 𝑇𝑂𝑁
= 2.561 TON/M2
3.97 𝑀 ∗ 4.55 𝑀

ANALISIS DE CARGA SOBRE TERRENO (WS/T)

Carga sobre cimentación

Carga de muros divisorios

Carga de firme de concreto

Cargas de contratabes +

Carga por relleno

Carga por losa de cimentación

Carga viva de acuerdo a la norma

CARGA SOBRE TERRENO (WS/T)


CARGA DE MUROS DIVISORIOS

ZONA DE MUROS DIVISORIOS EN EL TABLERO 4

Muro de tabique aplanado dos lados con azulejo de un lado. = 318 kg/m2

 Muro Paralelo a lado corto:

Peso muro = (318 kg/m2)(3.9x2.70) = 3348.54 kg

∑carga Total= 3348.54 kg

Relación del lado corto y lado largo es

Tablero 4
3.9 m
= 0.86
4.55 m

CALCÚLO DEL FACTOR POR INTERPOLACIÓN LINEAL.

X Y
m=a1/a2 muro paralelo a lado corto
X0 =0.8 y0= 1.5
X=0.86 yx=?
X1=1 y1= 1.6

Aplicando la formula tenemos

Yx = 1.5+(0.86-0.8/1-0.8)*(1.6-1.5)= 1.53

Área del tablero = 3.9x4.55 = 17.75 m2

Por lo tanto factor = 1.53

(3348.54 kg./ 17.75 m2)x(1.53) = 288.63kg/m2 paralelo al lado corto

=0.289 ton/m2
NOTA: ESTA MISMA CARGA ES LA MISMA PARA EL TABLERO 6

CARGA UNITARIA DE PISO

Espesor
Material Ɣ (kg/m3) w (kg/m2)
(m)
Loseta 10,0
Mortero 0,02 1.700,00 34,0
firme de
0,10 2.400,00 240,0
Concreto
Carga adicional Concreto y mortero 40
suma total (CM) 324
Carga Viva (CV) 170,0
CV + CM 494.00 kg/m2
CARGA GENERAL.

CARGA POR TODO EL AREA DE CONSTRUCCION

AREA= 15.10 M X 14 M =211.4 M2

CARGA = 494.00 kg/m2

= 211.4 M2 * 494.00 kg/m2= 104431.6 kg =104.43 ton

RIGIDEZ DE LAS CONTRATRABES

ANÁLISIS DE DIRECCIÓN LARGA

𝐸𝑐 ∗ 𝐼 ∗ 𝑛
≥ 0.5
𝐸𝑠 ∗ 𝑏 ∗ 𝐿3
Ec= módulo de elasticidad de concreto (kg/cm2)

I= momento de inercia cm4

n= número de contratrabes

Es =módulo de elasticidad del terreno

b= ancho cargado en cm

L= longitud de la cimentación

DATOS

Ec= 14000√𝐟′𝐜
F’c= 300 kg/cm2

Propuesta de sección de contratrabes

50 cm * 210 cm

Es= se propondrá un tipo de suelo “arcilla blanda” de la tabla 4.2 de Gallo Espino

Es= 15 kg/cm2

n= 4 contratrabes

L= 1510 cm

b= 1400 cm

Ec= 14000√300 kg/cm2 = 242487.1131 kg/cm2

𝑏∗ℎ3 (50 𝑐𝑚)∗(210 𝑐𝑚) 3


I= = = 38587500 cm4
12 12

𝐤𝐠
(𝟐𝟒𝟐𝟒𝟖𝟕. 𝟏𝟏𝟑𝟏 ) ∗ 𝟑𝟖𝟓𝟖𝟕𝟓𝟎𝟎 𝐜𝐦𝟒 ∗ 4
𝐜𝐦𝟐 = 0.52
(15 𝑘𝑔/𝑐𝑚2) ∗ (1400 𝑐𝑚) ∗ (1510 𝑐𝑚)3

0.52 ≤ 0.5 si cumple

ANÁLISIS DE DIRECCIÓN CORTO

𝐸𝑐 ∗ 𝐼 ∗ 𝑛
≥ 0.5
𝐸𝑠 ∗ 𝑏 ∗ 𝐿3
DATOS

Ec= 14000√𝐟′𝐜

F’c= 300 kg/cm2

Propuesta de sección de contratrabes

40 cm * 210 cm
Es= se propondrá un tipo de suelo “arcilla blanda” de la tabla 4.2 de Gallo Espino

Es= 15 kg/cm2

n= 5 contratrabes

L= 1400 cm

b= 1510 cm

Ec= 14000√300 kg/cm2 = 242487.1131 kg/cm2

𝑏∗ℎ3 (40 𝑐𝑚)∗(210 𝑐𝑚) 3


I= = = 30870000 cm4
12 12

𝐤𝐠
(𝟐𝟒𝟐𝟒𝟖𝟕. 𝟏𝟏𝟑𝟏 𝐜𝐦𝟐) ∗ 𝟑𝟎𝟖𝟕𝟎𝟎𝟎𝟎 𝐜𝐦𝟒 ∗ 5
= 0.60
(15 𝑘𝑔/𝑐𝑚2) ∗ (1510 𝑐𝑚) ∗ (1400 𝑐𝑚)3

0.60 ≤ 0.5 si cumple

PESO DE TODAS LAS CONTRATRABES

Contratrabes del lado largo

N° Contratrabes = 5

Longitud de la contratrabe = 15.10 M

El alto de la contratrabe = 2.10 m

Ancho de la contratrabe = 0.5 m

N° Contratrabes = 4

Longitud de la contratrabe = 15.10 M

El alto de la contratrabe = 2.10 m

Ancho de la contratrabe = 0.5 m

4 * 15.10m * 2.10m * 0.5 m* 2400 kg/m3 = 152208 kg = 152.208 ton

Contratrabes del lado corto

N° Contratrabes = 5
Longitud de la contratrabe = 14 M

El alto de la contratrabe = 2.1 m

Ancho de la contratrabe = 0.4 m

Se le restara (4*0.5 m) de las contratrabes que se traslapan = 2 m

5 * m * (14 m – 2m) * 0.4 m* 2.1 m* 2400 kg/m3 = 120960 kg = 120.96 ton

Σ total del peso de las contratrabes = 273168 kg = 273.168 ton

TODO EL PESO SERA DIVIDIDA EN TODA EL AREA DEL TERRENO

DONDE EL AREA DEL TERRENO = 15.10 M * 14 M = 211.4 M2

273168 kg / 211.4 M2 = 1292.19 kg/m2 = 1.292 ton/m2

CARGA POR RELLENO

VOLUMEN DE TODO EL TERRENO

15.10 M * 14 M *2.1 M = 443.94 M3

CONTRATRABES DEL LADO LARGO

4 * 15.10m * 2.10m * 0.5 m = 63.42 M3

Contratrabes del lado corto

5 * m * (14 m – 2m) * 0.4 m* 2.1 m = 50.4 M3

EL PESO DEL TERRENO 1600 KG/M3 (arcilla blanda)

VOLUMENDEL TERRENO = (443.94 M3 -63.42 M3 -50.4 M3)*1600 KG/M3

= 528192 KG =528.192 TON

TODA EL PESO DE RELLENO SERA DIVIDIDA EN TODA EL AREA DEL


TERRENO

DONDE EL AREA DEL TERRENO = 15.10 M * 14 M = 211.4 M2

528192 KG / 211.4 M2 = 2498.54 kg/m2 =2.499 ton/m2


ANALISIS DE CARGA SOBRE TERRENO (Ws/t) TABLERO 1

TIPO DE CARGA CARGA (ton/m²)


CARGA SOBRE CIMENTACION POR BAJADA DE CARGAS 3.003
PISO FIRME DE CONCRETO + CV 0.494
PESO POR CONTRATRABES 1.292
PESO POR RELLENO 2.499
CARGA SOBRE CIMENTACIÓN (Ws/c) 7.288
PESO DE LOSA DE CIMENTACION= 15% (Ws/c) 1.093
CARGA SOBRE TERRENO (Ws/t) 8.381

ANALISIS DE CARGA SOBRE TERRENO (Ws/t) TABLERO 2

TIPO DE CARGA CARGA (ton/m²)


CARGA SOBRE CIMENTACION POR BAJADA DE CARGAS 2.271
PISO FIRME DE CONCRETO + CV 0.494
PESO POR CONTRATRABES 1.292
PESO POR RELLENO 2.499
CARGA SOBRE CIMENTACIÓN (Ws/c) 6.556
PESO DE LOSA DE CIMENTACION= 15% (Ws/c) 0.983
CARGA SOBRE TERRENO (Ws/t) 7.539

ANALISIS DE CARGA SOBRE TERRENO (Ws/t) TABLERO 3

TIPO DE CARGA CARGA (ton/m²)


CARGA SOBRE CIMENTACION POR BAJADA DE CARGAS 2.765
PISO FIRME DE CONCRETO + CV 0.494
PESO POR CONTRATRABES 1.292
PESO POR RELLENO 2.499
CARGA SOBRE CIMENTACIÓN (Ws/c) 7.050
PESO DE LOSA DE CIMENTACION= 15% (Ws/c) 1.058
CARGA SOBRE TERRENO (Ws/t) 8.108
ANALISIS DE CARGA SOBRE TERRENO (Ws/t) TABLERO 4

TIPO DE CARGA CARGA (ton/m²)


CARGA SOBRE CIMENTACION POR BAJADA DE CARGAS 2.564
PESO MURO DIVISORIO TABLERO 4 0.289
PISO FIRME DE CONCRETO + CV 0.494
PESO POR CONTRATRABES 1.292
PESO POR RELLENO 2.499
CARGA SOBRE CIMENTACIÓN (Ws/c) 7.138
PESO DE LOSA DE CIMENTACION= 15% (Ws/c) 1.071
CARGA SOBRE TERRENO (Ws/t) 8.209

ANALISIS DE CARGA SOBRE TERRENO (Ws/t) TABLERO 5

TIPO DE CARGA CARGA (ton/m²)


CARGA SOBRE CIMENTACION POR BAJADA DE CARGAS 2.268
PISO FIRME DE CONCRETO + CV 0.494
PESO POR CONTRATRABES 1.292
PESO POR RELLENO 2.499
CARGA SOBRE CIMENTACIÓN (Ws/c) 6.553
PESO DE LOSA DE CIMENTACION= 15% (Ws/c) 0.983
CARGA SOBRE TERRENO (Ws/t) 7.536

ANALISIS DE CARGA SOBRE TERRENO (Ws/t) TABLERO 6

TIPO DE CARGA CARGA (ton/m²)


CARGA SOBRE CIMENTACION POR BAJADA DE CARGAS 2.503
PESO MURO DIVISORIO TABLERO 26 0.289
PISO FIRME DE CONCRETO + CV 0.494
PESO POR CONTRATRABES 1.292
PESO POR RELLENO 2.499
CARGA SOBRE CIMENTACIÓN (Ws/c) 7.077
PESO DE LOSA DE CIMENTACION= 15% (Ws/c) 1.062
CARGA SOBRE TERRENO (Ws/t) 8.139
ANALISIS DE CARGA SOBRE TERRENO (Ws/t) TABLERO 7

TIPO DE CARGA CARGA (ton/m²)


CARGA SOBRE CIMENTACION POR BAJADA DE CARGAS 2.819
PISO FIRME DE CONCRETO + CV 0.494
PESO POR CONTRATRABES 1.292
PESO POR RELLENO 2.499
CARGA SOBRE CIMENTACIÓN (Ws/c) 7.104
PESO DE LOSA DE CIMENTACION= 15% (Ws/c) 1.066
CARGA SOBRE TERRENO (Ws/t) 8.170

ANALISIS DE CARGA SOBRE TERRENO (Ws/t) TABLERO 8

TIPO DE CARGA CARGA (ton/m²)


CARGA SOBRE CIMENTACION POR BAJADA DE CARGAS 2.646
PISO FIRME DE CONCRETO + CV 0.494
PESO POR CONTRATRABES 1.292
PESO POR RELLENO 2.499
CARGA SOBRE CIMENTACIÓN (Ws/c) 6.931
PESO DE LOSA DE CIMENTACION= 15% (Ws/c) 1.040
CARGA SOBRE TERRENO (Ws/t) 7.971

ANALISIS DE CARGA SOBRE TERRENO (Ws/t) TABLERO 9

TIPO DE CARGA CARGA (ton/m²)


CARGA SOBRE CIMENTACION POR BAJADA DE CARGAS 2.819
PISO FIRME DE CONCRETO + CV 0.494
PESO POR CONTRATRABES 1.292
PESO POR RELLENO 2.499
CARGA SOBRE CIMENTACIÓN (Ws/c) 7.104
PESO DE LOSA DE CIMENTACION= 15% (Ws/c) 1.066
CARGA SOBRE TERRENO (Ws/t) 8.170
ANALISIS DE CARGA SOBRE TERRENO (Ws/t) TABLERO 10

TIPO DE CARGA CARGA (ton/m²)


CARGA SOBRE CIMENTACION POR BAJADA DE CARGAS 2.561
PISO FIRME DE CONCRETO + CV 0.494
PESO POR CONTRATRABES 1.292
PESO POR RELLENO 2.499
CARGA SOBRE CIMENTACIÓN (Ws/c) 6.846
PESO DE LOSA DE CIMENTACION= 15% (Ws/c) 1.027
CARGA SOBRE TERRENO (Ws/t) 7.873

ANALISIS DE CARGA SOBRE TERRENO (Ws/t) TABLERO 11

TIPO DE CARGA CARGA (ton/m²)


CARGA SOBRE CIMENTACION POR BAJADA DE CARGAS 2.345
PISO FIRME DE CONCRETO + CV 0.494
PESO POR CONTRATRABES 1.292
PESO POR RELLENO 2.499
CARGA SOBRE CIMENTACIÓN (Ws/c) 6.630
PESO DE LOSA DE CIMENTACION= 15% (Ws/c) 0.995
CARGA SOBRE TERRENO (Ws/t) 7.625

ANALISIS DE CARGA SOBRE TERRENO (Ws/t) TABLERO 12

TIPO DE CARGA CARGA (ton/m²)


CARGA SOBRE CIMENTACION POR BAJADA DE CARGAS 2.561
PISO FIRME DE CONCRETO + CV 0.494
PESO POR CONTRATRABES 1.292
PESO POR RELLENO 2.499
CARGA SOBRE CIMENTACIÓN (Ws/c) 6.846
PESO DE LOSA DE CIMENTACION= 15% (Ws/c) 1.027
CARGA SOBRE TERRENO (Ws/t) 7.873
CALCULO DE LAS CARGAS EN TON SOBRE CADA UNO DE LOS TABLEROS

TABLERO 1

𝑇𝑂𝑁
(8.381 ) ∗ (4.23 𝑀 ∗ 4.55 𝑀 ) = 161.30 TON
𝑀2
TABLERO 2

𝑇𝑂𝑁
(7.539 ) ∗ (4.23 𝑀 ∗ 4.9 𝑀 ) = 156.26 TON
𝑀2
TABLERO 3

𝑇𝑂𝑁
(8.108 ) ∗ (4.23 𝑀 ∗ 4.55 𝑀 ) = 156.02 TON
𝑀2
TABLERO 4

𝑇𝑂𝑁
(8.209 ) ∗ (3.9 𝑀 ∗ 4.55 𝑀 ) = 145.67 TON
𝑀2
TABLERO 5

𝑇𝑂𝑁
(7.536 ) ∗ (3.9 𝑀 ∗ 4.9 𝑀 ) = 144.01 TON
𝑀2
TABLERO 6

𝑇𝑂𝑁
(8.139 ) ∗ (3.9 𝑀 ∗ 4.55 𝑀 ) = 144.43 TON
𝑀2
TABLERO 7

𝑇𝑂𝑁
(8.170 ) ∗ (3 𝑀 ∗ 4.55 𝑀 ) = 111.52 TON
𝑀2
TABLERO 8

𝑇𝑂𝑁
(7.971 ) ∗ (3 𝑀 ∗ 4.9 𝑀 ) = 117.17 TON
𝑀2
TABLERO 9

𝑇𝑂𝑁
(8.170 ) ∗ (3 𝑀 ∗ 4.55 𝑀 ) = 111.52 TON
𝑀2
TABLERO 10

𝑇𝑂𝑁
(7.873 ) ∗ (3.97 𝑀 ∗ 4.55 𝑀 ) = 142.21 TON
𝑀2
TABLERO 11

𝑇𝑂𝑁
(7.625 ) ∗ (3.97 𝑀 ∗ 4.9 𝑀 ) = 148.33 TON
𝑀2
TABLERO 12

𝑇𝑂𝑁
(7.873 ) ∗ (3.97 𝑀 ∗ 4.55 𝑀 ) = 142.21 TON
𝑀2
Suma de todas las cargas puntuales

161.30 TON + 156.26 TON + 156.02 TON + 145.67 TON + 144.01 TON + 144.43 TON
+ 111.52 TON + 117.17 TON + 111.52 TON + 142.21 TON + 148.33 TON +
142.21 TON = 1680.65 TON CARGA SOBRE TERRENO

DETERMINACIÓN DE RESISTENCIA DE SUELO (qr)

Obteniendo una carga ultima sobre terreno 1680.65 ton* 1.4 =2352.91 ton

Area de toda la construcción

15.10 M * 14 M = 211.4 M2

2352.91 TON / 211.4 M2 = 11.13 TON/M2

Proponiendo un qr =12 ton/m2

AREA NECESARIA PARA LA CIMENTACION

1680.65 𝑡𝑜𝑛
= 140.05 𝑚2
12 𝑡𝑜𝑛/𝑚2

RELACION DE AREAS

140.05 𝑚2
= 0.662 > 0.5
211.4 𝑚2
Nota: por lo tanto se requiere losa de cimentacion
DISEÑO ESTRUCTURAL POR LOSA DE CIMENTACION.

Concreto F’c=300 kg/cm2

Acero Fy= 4200 kg/cm2

Recubrimiento r= 5 cm

COLADO MONOLITICO

FR=0.8

F*C=240 kg/cm2

F’’C=204 kg/cm2

F’’C=204 kg/cm2

Area de construccion = 211.4 m2

𝑊𝑢𝑠/𝑡 = 2352.91 ton


2352.91 𝑡𝑜𝑛
Carga por m2= = 11.13 ton/m2
211.4 𝑚2

qr= 12 ton/m2

CALCULO DEL PERALTE POR DEFLEXION (d) PARA CADA UNO DE LOS
TABLEROS

Tablero 1
𝑝𝑒𝑟𝑖𝑚𝑒𝑡𝑟𝑜 𝑑𝑒𝑙 𝑡𝑎𝑏𝑙𝑒𝑟𝑜 +(25∗ 𝑙𝑎𝑑𝑜𝑠 𝑑𝑖𝑠𝑐𝑜𝑛𝑡𝑖𝑛𝑢𝑜𝑠)
d= *k
250

k = 0.032 4√0.6 ∗ 𝑤𝑠 ∗ 𝑓𝑦
𝑡

4 𝑡𝑜𝑛 𝑘𝑔
k = 0.032√0.6 ∗ 8381 𝑚2 ∗ 4200 = 2.17
𝑚2

17.56 𝑚 +(0.25∗ 8.78)


d1 = *2.17 = 0.171 m
250
Tablero 2

4 𝑡𝑜𝑛 𝑘𝑔
k = 0.032√0.6 ∗ 7539 𝑚2 ∗ 4200 = 2.11
𝑚2

18.26 𝑚 +(0.25∗ 4.9)


d2 = *2.11 = 0.164 m
250

Tablero 3

4 𝑡𝑜𝑛 𝑘𝑔
k = 0.032√0.6 ∗ 8108 𝑚2 ∗ 4200 = 2.15
𝑚2

17.56 𝑚 +(0.25∗ 8.78)


d2 = *2.15 = 0.169 m
250

Tablero 4

4 𝑡𝑜𝑛 𝑘𝑔
k = 0.032√0.6 ∗ 8209 𝑚2 ∗ 4200 = 2.158
𝑚2

16.9 𝑚 +(0.25∗ 3.9)


d2 = *2.158 = 0.154 m
250

Tablero 5

4 𝑘𝑔 𝑘𝑔
k = 0.032√0.6 ∗ 7536 𝑚2 ∗ 4200 = 2.11
𝑚2

17.6 𝑚
d2 = *2.11 = 0.149 m
250

Tablero 6

4 𝑘𝑔 𝑘𝑔
k = 0.032√0.6 ∗ 8139 𝑚2 ∗ 4200 = 2.153
𝑚2

16.9 𝑚 +(0.25∗ 3.9)


d2 = *2.153 = 0.154 m
250

Tablero 7

4 𝑡𝑜 𝑘𝑔
k = 0.032√0.6 ∗ 8170 𝑚2 ∗ 4200 = 2.156
𝑚2

15.1 𝑚 +(0.25∗ 3)
d2 = *2.156 = 0.137 m
250
Tablero 8

4 𝑡𝑜𝑛 𝑘𝑔
k = 0.032√0.6 ∗ 7971 𝑚2 ∗ 4200 = 2.142
𝑚2

15.8 𝑚
d2 = *2.142 = 0.135 m
250

Tablero 9

4 𝑡𝑜𝑛 𝑘𝑔
k = 0.032√0.6 ∗ 8170 𝑚2 ∗ 4200 = 2.156
𝑚2

15.1 𝑚 +(0.25∗ 3)
d2 = *2.156 = 0.137 m
250

Tablero 10

4 𝑡𝑜𝑛 𝑘𝑔
k = 0.032√0.6 ∗ 7873 𝑚2 ∗ 4200 = 2.136
𝑚2

17.04 𝑚 +(0.25∗ 8.52)


d2 = *2.136 = 0.164 m
250

Tablero 11

4 𝑡𝑜𝑛 𝑘𝑔
k = 0.032√0.6 ∗ 7625 𝑚2 ∗ 4200 = 2.119
𝑚2

17.74 𝑚 +(0.25∗ 4.9)


d2 = *2.119 = 0.161 m
250

Tablero 12

4 𝑡𝑜𝑛 𝑘𝑔
k = 0.032√0.6 ∗ 7873 𝑚2 ∗ 4200 = 2.136
𝑚2

17.04 𝑚 +(0.25∗ 8.52)


d2 = *2.136 = 0.164 m
250

Tomamos es espesor más crítico que se encuentra en el tablero 1

d = 0.172 m ≈ 25 cm

Entonces h = 25 cm+ 5 cm =30 cm


REVISIÓN DE LA RESISTENCIA A FUERZA CORTANTE
𝑎1 𝑎1
V=( 2 − 𝑑)(0.95-0.5*𝑎2)*w

Nota:

a1 y a2 se obtienen del perímetro crítico

Cuando hay bordes continuos y discontinuos V se incrementa un 15 %

TABLERO 1

Obtención del cortante ultimo

a1= 4.23 m

a2= 4.55 m

d= 25 cm

w= 8.381 ton/m2
4.23𝑚 4.23 𝑚
Vu=1.4 ( − 0.25𝑚)(0.95-0.5*4.55 𝑚) * 8381kg/m2= 10616.76 kg
2

Vu=10616.76 kg * 1.15 = 12209.27 kg

Obtencion del cortante (VR)

𝑉𝑅 = 0.5 ∗ 𝐹𝑅 ∗ 𝑏 ∗ 𝑑 ∗ √𝑓 ∗ 𝑐

𝑉𝑅 = 0.5 ∗ 0.8 ∗ 100 𝑐𝑚 ∗ 25 𝑐𝑚 ∗ √240 𝑘𝑔/𝑐𝑚2 =15491.93 kg

𝑉𝑅 > Vu

15491.93 kg kg >10616.76 kg SI CUMPLE

EL CORTANTE OBTENIDO ES CAPAZ DE SOPORTAR LA FUERZA


CORTANTE

TABLERO 2

Obtención del cortante ultimo

a1= 4.23 m

a2= 4.9 m
d= 25 cm

w= 7.539 ton/m2
4.23𝑚 4.23 𝑚
Vu=1.4 ( − 0.25𝑚)(0.95-0.5* 4.9 𝑚 ) * 7539kg/m2= 10203.71 kg
2

Vu=10203.71 kg * 1.15 = 11734.27 kg

Obtencion del cortante (VR)

𝑉𝑅 =12393.55 kg

𝑉𝑅 > Vu

15491.93 kg kg >11734.27 kg SI CUMPLE

EL CORTANTE OBTENIDO ES CAPAZ DE SOPORTAR LA FUERZA


CORTANTE

TABLERO 3

Obtención del cortante ultimo

a1= 4.23 m

a2= 4.55 m

d= 25 cm

w= 8.108 ton/m2
4.23𝑚 4.23 𝑚
Vu=1.4 ( − 0.25𝑚)(0.95-0.5*4.55 𝑚) * 8108kg/m2= 10270.93 kg
2

Vu= 10270.93 kg * 1.15 = 11811.57 kg

Obtencion del cortante (VR)

𝑉𝑅 =12393.55 kg

𝑉𝑅 > Vu

15491.93 kg kg >11811.57 kg SI CUMPLE

EL CORTANTE OBTENIDO ES CAPAZ DE SOPORTAR LA FUERZA


CORTANTE
TABLERO 4

Obtención del cortante ultimo

a1= 3.9 m

a2= 4.55 m

d= 25 cm

w= 8.209 ton/m2
3.9𝑚 3.9 𝑚
Vu=1.4 ( − 0.25𝑚)(0.95-0.5*4.55 𝑚) * 8209kg/m2= 10187.37 kg
2

Vu= 10187.37 kg * 1.15 = 11715.48 kg

Obtencion del cortante (VR)

𝑉𝑅 =12393.55 kg

𝑉𝑅 > Vu

15491.93 kg kg >11715.48 kg SI CUMPLE

EL CORTANTE OBTENIDO ES CAPAZ DE SOPORTAR LA FUERZA


CORTANTE

TABLERO 5

Obtención del cortante ultimo

a1= 3.9 m

a2= 4.9 m

d= 25 cm

w= 7.536 ton/m2
3.9𝑚 3.9 𝑚
Vu=1.4 ( − 0.25𝑚)(0.95-0.5*4.9 𝑚) * 7536kg/m2= 9901.23 kg
2

Vu= 9901.23 kg * 1.15 = 11386.41 kg

Obtencion del cortante (VR)


𝑉𝑅 =12393.55 kg

𝑉𝑅 > Vu

15491.93 kg kg >11386.41 kg SI CUMPLE

EL CORTANTE OBTENIDO ES CAPAZ DE SOPORTAR LA FUERZA


CORTANTE

TABLERO 6

Obtención del cortante ultimo

a1= 3.9 m

a2= 4.55 m

d= 25 cm

w= 8.139 ton/m2
3.9𝑚 3.9 𝑚
Vu=1.4 ( − 0.25𝑚)(0.95-0.5*4.55 𝑚) * 8139kg/m2= 10100.50 kg
2

Vu= 10100.50 kg * 1.15 = 11615.58 kg

Obtencion del cortante (VR)

𝑉𝑅 =12393.55 kg

𝑉𝑅 > Vu

15491.93 kg kg >11615.58 kg SI CUMPLE

EL CORTANTE OBTENIDO ES CAPAZ DE SOPORTAR LA FUERZA


CORTANTE

TABLERO 7

Obtención del cortante ultimo

a1= 3 m

a2= 4.55 m

d= 25 cm

w= 8.170 ton/m2
3𝑚 3 𝑚
Vu=1.4 ( − 0.25𝑚)(0.95-0.5*4.55 𝑚) * 8170kg/m2= 8869.16 kg
2

Vu= 8869.16 kg * 1.15 = 10199.53 kg

Obtencion del cortante (VR)

𝑉𝑅 =12393.55 kg

𝑉𝑅 > Vu

15491.93 kg kg >10199.53 kg SI CUMPLE

EL CORTANTE OBTENIDO ES CAPAZ DE SOPORTAR LA FUERZA


CORTANTE

TABLERO 8

Obtención del cortante ultimo

a1= 3 m

a2= 4.9 m

d= 25 cm

w= 7.971 ton/m2
3𝑚 3 𝑚
Vu=1.4 ( − 0.25𝑚)(0.95-0.5*4.9 𝑚) * 7971kg/m2= 8981.61 kg
2

Vu= 8981.61 kg * 1.15 = 10328.85 kg

Obtencion del cortante (VR)

𝑉𝑅 =12393.55 kg

𝑉𝑅 > Vu

15491.93 kg kg >10328.85 kg SI CUMPLE

EL CORTANTE OBTENIDO ES CAPAZ DE SOPORTAR LA FUERZA


CORTANTE
TABLERO 9

Obtención del cortante ultimo

a1= 3 m

a2= 4.55 m

d= 25 cm

w= 8.170 ton/m2
3𝑚 3 𝑚
Vu=1.4 ( − 0.25𝑚)(0.95-0.5* ) * 8170kg/m2= 8869.16 kg
2 4.55 𝑚

Vu= 8869.16 kg * 1.15 = 10199.53 kg

Obtencion del cortante (VR)

𝑉𝑅 =12393.55 kg

𝑉𝑅 > Vu

15491.93 kg kg >10199.53 kg SI CUMPLE

EL CORTANTE OBTENIDO ES CAPAZ DE SOPORTAR LA FUERZA


CORTANTE

TABLERO 10

Obtención del cortante ultimo

a1= 3.97 m

a2= 4.55 m

d= 25 cm

w= 7.873 ton/m2
3.97 𝑚 3.97 𝑚
Vu=1.4 ( − 0.25𝑚)(0.95-0.5* 4.55 𝑚 ) * 7873kg/m2= 9824.44 kg
2

Vu= 9824.44 kg * 1.15 = 11298.11 kg

Obtencion del cortante (VR)

𝑉𝑅 =12393.55 kg

𝑉𝑅 > Vu
15491.93 kg kg >11298.11 kgSI CUMPLE

EL CORTANTE OBTENIDO ES CAPAZ DE SOPORTAR LA FUERZA


CORTANTE

TABLERO 11

Obtención del cortante ultimo

a1= 3.97 m

a2= 4.9 m

d= 25 cm

w= 7.625 ton/m2
3.97 𝑚 3.97 𝑚
Vu=1.4 ( − 0.25𝑚)(0.95-0.5* 4.9 𝑚 ) * 7625 kg/m2= 10092.12 kg
2

Vu= 10092.12 kg * 1.15 = 11605.94 kg

Obtencion del cortante (VR)

𝑉𝑅 =12393.55 kg

𝑉𝑅 > Vu

15491.93 kg kg >11605.94 kg SI CUMPLE

EL CORTANTE OBTENIDO ES CAPAZ DE SOPORTAR LA FUERZA


CORTANTE

TABLERO 12

Obtención del cortante ultimo

a1= 3.97 m

a2= 4.55 m

d= 25 cm

w= 7.873 ton/m2
3.97 𝑚 3.97 𝑚
Vu=1.4 ( − 0.25𝑚)(0.95-0.5* 4.55 𝑚 ) * 7873 kg/m2= 9824.44 kg
2
Vu= 9824.44 kg * 1.15 = 11298.11 kg

Obtencion del cortante (VR)

𝑉𝑅 =12393.55 kg

𝑉𝑅 > Vu

15491.93 kg kg >11298.11 kg SI CUMPLE

EL CORTANTE OBTENIDO ES CAPAZ DE SOPORTAR LA FUERZA


CORTANTE

CALCULO DE LOS MOMENTOS

Nota: todas las cargas w deben de estar ws/c entonces como la carga obtenida
ws/t sera dividida en 1.15 para obtener W s/c pero seria multiplicada por 1.4 para
obtener la carga ultima
ton
8.381 ∗1.4
m2
Wus/c = = 10.20 𝑡𝑜𝑛/𝑚2
1.15

ton
7.539 ∗1.4
m2
Wus/c = = 9.18 𝑡𝑜𝑛/𝑚2
1.15

ton
8.108 ∗1.4
m2
Wus/c = = 9.87 𝑡𝑜𝑛/𝑚2
1.15

ton
8.209 ∗1.4
m2
Wus/c = = 9.99 𝑡𝑜𝑛/𝑚2
1.15

ton
7.536 ∗1.4
m2
Wus/c = = 9.17 𝑡𝑜𝑛/𝑚2
1.15

ton
8.139 ∗1.4
m2
Wus/c = = 9.91 𝑡𝑜𝑛/𝑚2
1.15

ton
8.170 ∗1.4
m2
Wus/c = = 9.95 𝑡𝑜𝑛/𝑚2
1.15

ton
7.971 ∗1.4
m2
Wus/c = = 9.70 𝑡𝑜𝑛/𝑚2
1.15

ton
8.170 ∗1.4
m2
Wus/c = = 9.95 𝑡𝑜𝑛/𝑚2
1.15
ton
7.873 ∗1.4
m2
Wus/c = = 9.58 𝑡𝑜𝑛/𝑚
1.15

ton
7.625 ∗1.4
m2
Wus/c = = 9.28 𝑡𝑜𝑛/𝑚
1.15

ton
7.873 ∗1.4
m2
Wus/c = = 9.58 𝑡𝑜𝑛/𝑚
1.15

INTERPOLACIONES PARA EL TABLERO 1

Lado cortó (negativo en bordes discontinuos)

m=a1/a2 = 4.23/4.55 = 0.93

219-190=29/10 =2.9

219 - (2.9*3) = 210.3

Lado largo (negativo en bordes discontinuos)

m= 0.93

206-190=16/10 =1.6

206 - (1.6*3) = 201.2

Lado corto (negativo en bordes interiores)

m= 0.93

371-324=47/10 =4.7

371 - (4.7*3) = 356.9

Lado largo (negativo en bordes interiores)

m= 0.93

360-324=36/10 =3.6

360 - (3.6*3) = 349.2

Lado corto (positivo)

m= 0.93

176-137=39/10 =3.9

176 - (3.9*3) = 164.3


Lado largo (positivo)

m= 0.93

138-137=1/10 =0.1

138 - (0.1*3) = 137.7 son iguales para el tablero 3

INTERPOLACIONES PARA EL TABLERO 2

Lado cortó (negativo en bordes discontinuos)

m=a1/a2 = 4.23/4.9 = 0.86

250-219=31/10 =3.1

250 - (3.1*6) = 231.4

Lado corto (negativo en bordes interiores)

m= 0.86

397-346=51/10 =5.1

397 - (5.1*6) = 366.4

Lado largo (negativo en bordes interiores)

m= 0.86

379-317=62/10 =6.2

379 - (6.2*6) = 341.8

Lado corto (positivo)

m= 0.86

202-164=38/10 =3.8

202 - (3.8*6) = 179.2

Lado largo (positivo)

m= 0.93

135-134=1/10 =0.1

135 - (0.1*6) = 134.4


INTERPOLACIONES PARA EL TABLERO 4 ES IGUAL PARA EL TABLERO 6

Lado largo (negativo en bordes discontinuos)

m=a1/a2 = 3.9/4.55 = 0.86

222-206=16/10 =1.6

222 - (1.6*6) = 212.4

Lado corto (negativo en bordes interiores)

m= 0.86

403-357=46/10 =4.6

403 - (4.6*6) = 375.4

Lado largo (negativo en bordes interiores)

m= 0.86

350-326=24/10 =2.4

350 - (2.4*6) = 335.6

Lado corto (positivo)

m= 0.86

202-167=35/10 =3.5

202 - (3.5*6) = 181

Lado largo (positivo)

m= 0.86

131-129=2/10 =0.2

131 - (0.2*6) = 129.8


INTERPOLACIONES PARA EL TABLERO 5

Lado corto (negativo en bordes interiores)

m= 0.80

381

Lado largo (negativo en bordes interiores)

m= 0.80

347

Lado corto (positivo)

m= 0.80

192

Lado largo (positivo)

m= 0.80

128
INTERPOLACIONES PARA EL TABLERO 7 ES IGUAL PARA EL TABLERO 9

Lado largo (negativo en bordes discontinuos)

m=a1/a2 = 3/4.55 = 0.66

248-236=12/10 =1.2

248 - (1.2*6) = 240.8

Lado corto (negativo en bordes interiores)

m= 0.66

506-451=55/10 =5.5

506 - (5.5*6) = 473

Lado largo (negativo en bordes interiores)

m= 0.66

391-372=19/10 =1.9

391 - (1.9*6) = 390.68

Lado corto (positivo)

m= 0.66

292-240=52/10 =5.2

292 - (5.2*6) = 260.8

Lado largo (positivo)

m= 0.66

137-133=4/10 =0.4

137 - (0.4*6) = 134.6


INTERPOLACIONES PARA EL TABLERO 8

Lado corto (negativo en bordes interiores)

m= 0.61

489-432=57/10 =5.7

489 - (5.7*1) = 483.3

Lado largo (negativo en bordes interiores)

m= 0.61

391-371=20/10 =2

391 - (2*1) = 389

Lado corto (positivo)

m= 0.61

268-228=40/10 =4

268 - (4*1) = 264

Lado largo (positivo)

m= 0.61

134-130=4/10 =0.4

134 - (0.4*1) = 133.6


INTERPOLACIONES PARA EL TABLERO 10

Lado cortó (negativo en bordes discontinuos)

m=a1/a2 = 3.97/4.55 = 0.87

250-219=31/10 =3.1

250 - (3.1*7) = 228.3

Lado largo (negativo en bordes discontinuos)

m= 0.87

222-206=16/10 =1.6

222 - (1.6*7) = 210.8

Lado corto (negativo en bordes interiores)

m= 0.87

419-371=48/10 =4.8

419 - (4.8*7) = 385.4

Lado largo (negativo en bordes interiores)

m= 0.87

394-360=34/10 =3.4

394 - (3.4*7) = 370.2

Lado corto (positivo)

m= 0.87

216-176=40/10 =4

216 - (4*7) = 188


Lado largo (positivo)

m= 0.87

140-138=2/10 =0.2

138 - (0.2*7) = 136.6 son iguales para el tablero 12

INTERPOLACIONES PARA EL TABLERO 11

Lado cortó (negativo en bordes discontinuos)

m=a1/a2 = 3.97/4.9 = 0.81

250-219=31/10 =3.1

250 - (3.1*1) = 246.9

Lado corto (negativo en bordes interiores)

m= 0.81

397-364=33/10 =3.3

397 - (3.3 *1) = 393.7

Lado largo (negativo en bordes interiores)

m= 0.81

379-317=62/10 =6.1

379 - (6.2*1) = 372.8

Lado corto (positivo)

m= 0.81

202-164=38/10 =3.8

202 - (3.8*1) = 198.2

Lado largo (positivo)

m= 0.81

135-134=1/10 =0.1

138 - (0.1*1) = 137.9


CALCULO DE LOS MOMENTOS

M=1.4 coeficiente a1x104 w kg/m2

Tablero 1

Las cargas ya fueron multiplicadas por 1.4 para obtener la carga ultima

M= 357.2* (4.23 2 x10-4 w) kg/m2* 10200= 6519.17 kg.m

M= 210.3* (4.23 2 x10-4 w) kg/m2* 10200= 3838.13 kg.m

M= 164.3* (4.23 2 x10-4 w) kg/m2* 10200= 2998.60 kg.m

M= 349.2* (4.23 2 x10-4 w) kg/m2* 10200= 2998.60 kg.m

M= 201.2* (4.23 2 x10-4 w) kg/m2* 10200= 2998.60 kg.m

M= 137.7* (4.23 2 x10-4 w) kg/m2* 10200= 2998.60 kg.m

Tablero 2

M= 366.4* (4.23 2 x10-4 w) kg/m2* 9180= 6018.37 kg.m

M= 231.4* (4.23 2 x10-4 w) kg/m2* 9180= 3800.90 kg.m

M= 179.2* (4.23 2 x10-4 w) kg/m2* 9180= 2943.48 kg.m

M= 341.8* (4.23 2 x10-4 w) kg/m2* 9180= 5614.30 kg.m

M= 0* (4.23 2 x10-4 w) kg/m2* 9180= 0 kg.m

M= 134.4* (4.23 2 x10-4 w) kg/m2* 9180= 2207.61 kg.m

Tablero 3

M= 357.2* (4.23 2 x10-4 w) kg/m2* 9870= 6308.26 kg.m

M= 210.3* (4.23 2 x10-4 w) kg/m2* 9870= 3713.96 kg.m

M= 164.3* (4.23 2 x10-4 w) kg/m2* 9870= 2901.59 kg.m

M= 349.2* (4.23 2 x10-4 w) kg/m2* 9870= 6166.97 kg.m

M= 201.2* (4.23 2 x10-4 w) kg/m2* 9870= 3553.25 kg.m

M= 137.7* (4.23 2 x10-4 w) kg/m2* 9870= 2431.82 kg.m

Tablero 4
M= 375.4* (3.9 2 x10-4 w) kg/m2* 9990= 5704.12 kg.m

M= 0* (3.9 2 x10-4 w) kg/m2* 9990= 0 kg.m

M= 181* (3.9 2 x10-4 w) kg/m2* 9990= 2750.26 kg.m

M= 335.6* (3.9 2 x10-4 w) kg/m2* 9990= 5099.37 kg.m

M= 212.4* (3.9 2 x10-4 w) kg/m2* 9990= 3227.37 kg.m

M= 129.8* (3.9 2 x10-4 w) kg/m2* 9990= 1972.28 kg.m

Tablero 5

M= 381* (3.9 2 x10-4 w) kg/m2* 9170= 5314.02 kg.m

M= 192* (3.9 2 x10-4 w) kg/m2* 9170= 2677.93 kg.m

M= 347* (3.9 2 x10-4 w) kg/m2* 9170= 4839.81 kg.m

M= 128* (3.9 2 x10-4 w) kg/m2* 9170= 1785.29 kg.m

Tablero 6

M= 375.4* (3.9 2 x10-4 w) kg/m2* 9910= 5658.45 kg.m

M= 0* (3.9 2 x10-4 w) kg/m2* 9910= 0 kg.m

M= 181* (3.9 2 x10-4 w) kg/m2* 9910= 2728.23 kg.m

M= 335.6* (3.9 2 x10-4 w) kg/m2* 9910= 5058.54 kg.m

M= 212.4* (3.9 2 x10-4 w) kg/m2* 9910= 3201.53 kg.m

M= 129.8* (3.9 2 x10-4 w) kg/m2* 9910= 1956.49 kg.m

Tablero 7

M= 473* (3 2 x10-4 w) kg/m2* 9950= 4235.72 kg.m

M= 0* (3 2 x10-4 w) kg/m2* 9950= 0 kg.m

M= 260.8* (3 2 x10-4 w) kg/m2* 9950= 2335.46 kg.m

M= 390.7* (3 2 x10-4 w) kg/m2* 9950= 3498.72 kg.m

M= 240.8* (3 2 x10-4 w) kg/m2* 9950= 2156.36 kg.m

M= 134.6* (3 2 x10-4 w) kg/m2* 9950= 1205.34 kg.m


Tablero 8

M= 483.3* (3 2 x10-4 w) kg/m2* 9700= 4219.21 kg.m

M= 264* (3 2 x10-4 w) kg/m2* 9700= 2304.72 kg.m

M= 389* (3 2 x10-4 w) kg/m2* 9700= 3395.97 kg.m

M= 133.6* (3 2 x10-4 w) kg/m2* 9700= 1166.33 kg.m

Tablero 9

M= 473* (3 2 x10-4 w) kg/m2* 9950= 4235.72 kg.m

M= 0* (3 2 x10-4 w) kg/m2* 9950= 0 kg.m

M= 260.8* (3 2 x10-4 w) kg/m2* 9950= 2335.46 kg.m

M= 390.7* (3 2 x10-4 w) kg/m2* 9950= 3498.72 kg.m

M= 240.8* (3 2 x10-4 w) kg/m2* 9950= 2156.36 kg.m

M= 134.6* (3 2 x10-4 w) kg/m2* 9950= 1205.34 kg.m

Tablero 10

M= 385.4* (3.97 2 x10-4 w) kg/m2* 9580= 5819.13 kg.m

M= 228.3* (3.97 2 x10-4 w) kg/m2* 9580= 3447.09 kg.m

M= 188* (3.97 2 x10-4 w) kg/m2* 9580= 2838.60 kg.m

M= 370.2* (3.97 2 x10-4 w) kg/m2* 9580= 5589.63 kg.m

M= 210.8* (3.97 2 x10-4 w) kg/m2* 9580= 3182.82 kg.m

M= 136.6* (3.97 2 x10-4 w) kg/m2* 9580= 2062.52 kg.m

Tablero 11

M= 393.7* (3.97 2 x10-4 w) kg/m2* 9280= 5758.30 kg.m

M= 246.9* (3.97 2 x10-4 w) kg/m2* 9280= 3611.19 kg.m

M= 198.2* (3.97 2 x10-4 w) kg/m2* 9280= 2898.90 kg.m

M= 372.8* (3.97 2 x10-4 w) kg/m2* 9280= 5452.62 kg.m

M= 0* (3.97 2 x10-4 w) kg/m2* 9280= 0 kg.m


M= 137.9* (3.97 2 x10-4 w) kg/m2* 9280= 2016.94 kg.m

Tablero 10

M= 385.4* (3.97 2 x10-4 w) kg/m2* 9580= 5819.13 kg.m

M= 228.3* (3.97 2 x10-4 w) kg/m2* 9580= 3447.09 kg.m

M= 188* (3.97 2 x10-4 w) kg/m2* 9580= 2838.60 kg.m

M= 370.2* (3.97 2 x10-4 w) kg/m2* 9580= 5589.63 kg.m

M= 210.8* (3.97 2 x10-4 w) kg/m2* 9580= 3182.82 kg.m

M= 136.6* (3.97 2 x10-4 w) kg/m2* 9580= 2062.52 kg.m

CALCULO DE AREA DE ACERO

Tablero 1

Proponiendo d= 25 cm

a) Refuerzo

MU
𝐀𝐒 =
FR ∗ j ∗ Fy ∗ d

Dónde:

j=0.9

6519.67 𝑘𝑔. 𝑚 ∗ 100


𝐀𝐒 =
0.9 ∗ 0.9 ∗ 4200 kg/cm2 ∗ 25 cm

𝐀 𝐒 = 𝟕. 𝟔𝟕 𝒄𝒎𝟐

Si se refuerza con barras de #,3 𝐀 𝐛 = 0.71 cm2 la separación será

𝐀𝐀 𝐛
𝐬=
𝐀𝐒

100 cm ∗ 0.71 cm2


𝐬= = 9.25 cm
7.67 cm2
Cuantía mínima, área mínima

Para que no se agriete el concreto se diseña por temperatura


𝟎.𝟕√𝐟´𝐜
Pmin= 𝐟𝐲

0.7√250
pmin= = 𝟎. 𝟎𝟎𝟐𝟔35
4200

𝐀 𝐒 = 𝐏𝐦𝐢𝐧 ∗ 𝐛 ∗ 𝐝

Amín= 0.002635 * 100 cm * 25 cm = 6.59 cm2

Cuantía máxima, área máxima

Pmax=0.8 pvalanceada

𝐅 ∗ 𝐂 𝟔𝟎𝟎𝟎 ∗ 𝐁𝟏
𝐩 𝐛𝐚𝐥𝐚𝐛𝐜𝐞𝐚𝐝𝐚 = ∗
𝐅𝐲 𝟔𝟎𝟎𝟎 ∗ 𝐅𝐲

Donde:

B1=0.85

0.8 ∗ 250 6000 ∗ 0.85


𝐩 𝐛𝐚𝐥𝐚𝐛𝐜𝐞𝐚𝐝𝐚 = ∗ = 𝟎. 𝟎𝟐𝟑𝟖𝟏
4200 6000 + 4200

𝐩𝐦𝐚𝐱 = 𝟎. 𝟖 ∗ 𝐩 𝐛𝐚𝐥𝐚𝐧𝐜𝐞𝐚𝐝𝐚𝐛

𝐩𝐦𝐚𝐱 = 0.8 ∗ 0.02381 ∗ 0.85 = 𝟎. 𝟎𝟏𝟔𝟏𝟗

Amax= 0.01619 *100 cm*25 cm =40.48 𝐜𝐦𝟐

𝐀𝐦𝐢𝐧 < 𝐀𝐧𝐞𝐜 < 𝐀𝐦𝐚𝐱

𝟔. 𝟓𝟗𝐜𝐦𝟐 < 𝟗. 𝟐𝟓 𝐜𝐦𝟐 < 𝟒𝟎. 𝟒𝟖 𝐜𝐦𝟐 SI CUMPLE

a) Refuerzo

2998.60 𝑘𝑔. 𝑚 ∗ 100


𝐀𝐒 =
0.9 ∗ 0.9 ∗ 4200 kg/cm2 ∗ 25 cm

𝐀 𝐒 = 𝟑. 𝟓𝟑 𝒄𝒎𝟐

Cuantía mínima, área mínima

Para que no se agriete el concreto se diseña por temperatura

Amín= 6.59 cm2


Si se refuerza con barras de #,3 𝐀 𝐛 = 0.71 cm2 la separación será

100 cm ∗ 0.71 cm2


𝐬= = 10.77 cm
6.59 cm2

Cuantía máxima, área máxima

Amax= 40.48 𝐜𝐦𝟐

𝐀𝐦𝐢𝐧 < 𝐀𝐧𝐞𝐜 < 𝐀𝐦𝐚𝐱

𝟔. 𝟓𝟗𝐜𝐦𝟐 < 𝟑. 𝟓𝟑 𝐜𝐦𝟐 < 𝟒𝟎. 𝟒𝟖 𝐜𝐦𝟐 NO CUMPLE SE DISEÑA CON EL AREA
MINIMA =6.59 CM2

a) Refuerzo

3838.13 𝑘𝑔. 𝑚 ∗ 100


𝐀𝐒 =
0.9 ∗ 0.9 ∗ 4200 kg/cm2 ∗ 25 cm

𝐀 𝐒 = 𝟒. 𝟓𝟏 𝒄𝒎𝟐

Cuantía mínima, área mínima

Para que no se agriete el concreto se diseña por temperatura

Amín= 6.59 cm2

Si se refuerza con barras de #,3 𝐀 𝐛 = 0.71 cm2 la separación será

100 cm ∗ 0.71 cm2


𝐬= = 10.77 cm
6.59 cm2
Cuantía máxima, área máxima

Amax= 40.48 𝐜𝐦𝟐

𝐀𝐦𝐢𝐧 < 𝐀𝐧𝐞𝐜 < 𝐀𝐦𝐚𝐱

𝟔. 𝟓𝟗𝐜𝐦𝟐 < 𝟒. 𝟓𝟏 𝐜𝐦𝟐 < 𝟒𝟎. 𝟒𝟖 𝐜𝐦𝟐 NO CUMPLE SE DISEÑA CON EL AREA
MINIMA =6.59 CM2
b) Refuerzo

6373.16 𝑘𝑔. 𝑚 ∗ 100


𝐀𝐒 =
0.9 ∗ 0.9 ∗ 4200 kg/cm2 ∗ 25 cm

𝐀 𝐒 = 𝟕. 𝟒𝟗 𝒄𝒎𝟐

Si se refuerza con barras de #,3 𝐀 𝐛 = 0.71 cm2 la separación será

100 cm ∗ 0.71 cm2


𝐬= = 9.47 cm
7.49 cm2
Cuantía mínima, área mínima

Para que no se agriete el concreto se diseña por temperatura

Amín= 6.59 cm2

Cuantía máxima, área máxima

Amax= 40.48 𝐜𝐦𝟐

𝐀𝐦𝐢𝐧 < 𝐀𝐧𝐞𝐜 < 𝐀𝐦𝐚𝐱

𝟔. 𝟓𝟗𝐜𝐦𝟐 < 𝟕. 𝟒𝟗 𝐜𝐦𝟐 < 𝟒𝟎. 𝟒𝟖 𝐜𝐦𝟐 SI CUMPLE

b) Refuerzo

3672.05 𝑘𝑔. 𝑚 ∗ 100


𝐀𝐒 =
0.9 ∗ 0.9 ∗ 4200 kg/cm2 ∗ 25 cm

𝐀 𝐒 = 𝟒. 𝟑𝟐 𝒄𝒎𝟐

Cuantía mínima, área mínima

Para que no se agriete el concreto se diseña por temperatura

Amín= 6.59 cm2

Si se refuerza con barras de #,3 𝐀 𝐛 = 0.71 cm2 la separación será

100 cm ∗ 0.71 cm2


𝐬= = 10.77 cm
6.59 cm2
Cuantía máxima, área máxima

Amax= 40.48 𝐜𝐦𝟐


𝐀𝐦𝐢𝐧 < 𝐀𝐧𝐞𝐜 < 𝐀𝐦𝐚𝐱

𝟔. 𝟓𝟗𝐜𝐦𝟐 < 𝟒. 𝟑𝟐 𝐜𝐦𝟐 < 𝟒𝟎. 𝟒𝟖 𝐜𝐦𝟐 NO CUMPLE SE DISEÑA CON EL AREA
MINIMA =6.59 CM2

b) Refuerzo

2513.13 𝑘𝑔. 𝑚 ∗ 100


𝐀𝐒 =
0.9 ∗ 0.9 ∗ 4200 kg/cm2 ∗ 25 cm

𝐀 𝐒 = 𝟐. 𝟗𝟓 𝒄𝒎𝟐

Cuantía mínima, área mínima

Para que no se agriete el concreto se diseña por temperatura

Amín= 6.59 cm2

Si se refuerza con barras de #,3 𝐀 𝐛 = 0.71 cm2 la separación será

100 cm ∗ 0.71 cm2


𝐬= = 10.77 cm = 10 cm
6.59 cm2

Cuantía máxima, área máxima

Amax= 40.48 𝐜𝐦𝟐

𝐀𝐦𝐢𝐧 < 𝐀𝐧𝐞𝐜 < 𝐀𝐦𝐚𝐱

𝟔. 𝟓𝟗𝐜𝐦𝟐 < 𝟐. 𝟗𝟓 𝐜𝐦𝟐 < 𝟒𝟎. 𝟒𝟖 𝐜𝐦𝟐 NO CUMPLE SE DISEÑA CON EL AREA
MINIMA =6.59 CM2

SE HACE EL MISMO PROCEDIMIENTO PARA CADA UNO DE LOS TABLEROS


PERO DONDE RESULTE EL AREA NECESARIA MENOR QUE EL MINIMO SE
UTILIZARA EL AREA DE ASERO MINIMO COMO SE MUESTRA EN LA TABLA

Você também pode gostar