Você está na página 1de 14

UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO

FACULTAD DE INGENIERÍA CIVIL, SISTEMAS Y ARQUITECTURA

Escuela de INGENIERÍA CIVIL

TRABAJO GRUPAL

DISEÑO DE ZAPATA AISLADA

CURSO:

CONCRETO ARMADO II

DOCENTE:

ING. SERRANO ZELADA, OVIDIO

CICLO:

CICLO EXTRAORDINARIO VERANO 2018 - E

ALUMNOS:

CANCINO CASTRO, ROGER EDUARDO


CHAPOÑAN VIDAURRE, WALTER
DELGADO DELGADO, GILMER
ROMÁN NÚÑEZ, JOSÉ ARTURO
TARRILLO SEMINARIO, LUIS

LAMBAYEQUE - ENERO DE 2018

CONCRETO ARMADO II ING. SERRANO ZELADA, OVIDIO


CONCRETO ARMADO II ING. SERRANO ZELADA, OVIDIO
UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO
FACULTAD DE INGENIERÍA CIVIL, SISTEMAS Y ARQUITECTURA
ESCUELA PROFESIONAL DE INGENIERÍA CIVIL

CARGA MUERTA EN ETABS

Load Station P V2 V3 T M2 M3
Unique
Story Column C.
Name m tonf tonf tonf tonf-m tonf-m tonf-m
/Comb.
piso 1 C1 47 Comb10 0 -74.5259 1.1025 0.4239 0.0127 0.3583 0.7543
piso 1 C1 47 Comb10 1.175 -73.8209 1.1025 0.4239 0.0127 -0.1398 -0.5411
piso 1 C1 47 Comb10 2.35 -73.1159 1.1025 0.4239 0.0127 -0.6379 -1.8365
piso 1 C4 50 Comb10 0 -81.5137 1.3521 0.0277 0.0127 0.0158 1.128
piso 1 C4 50 Comb10 1.175 -80.8087 1.3521 0.0277 0.0127 -0.0167 -0.4606
piso 1 C4 50 Comb10 2.35 -80.1037 1.3521 0.0277 0.0127 -0.0492 -2.0493
piso 1 C6 55 Comb10 0 -23.2052 0.0807 0.4272 0.0127 0.4084 -0.1731
piso 1 C6 55 Comb10 1.175 -22.5002 0.0807 0.4272 0.0127 -0.0936 -0.2679
piso 1 C6 55 Comb10 2.35 -21.7952 0.0807 0.4272 0.0127 -0.5956 -0.3626
piso 1 C8 57 Comb10 0 -41.4405 -1.1468 -0.8625 0.0127 -0.8303 -0.9802
piso 1 C8 57 Comb10 1.175 -40.7355 -1.1468 -0.8625 0.0127 0.1832 0.3673
piso 1 C8 57 Comb10 2.35 -40.0305 -1.1468 -0.8625 0.0127 1.1967 1.7149
piso 1 C9 58 Comb10 0 -43.3216 0.6839 0.7707 0.0185 0.6485 0.2281
piso 1 C9 58 Comb10 1.175 -42.4686 0.6839 0.7707 0.0185 -0.2571 -0.5754
piso 1 C9 58 Comb10 2.35 -41.6155 0.6839 0.7707 0.0185 -1.1627 -1.379
piso 1 C10 59 Comb10 0 -51.2155 -1.9345 0.4518 0.0185 0.2837 -2.0214
piso 1 C10 59 Comb10 1.425 -50.181 -1.9345 0.4518 0.0185 -0.3601 0.7353
piso 1 C10 59 Comb10 2.85 -49.1464 -1.9345 0.4518 0.0185 -1.0038 3.492
piso 1 C11 63 Comb10 0 -46.3163 0.782 0.2948 0.0185 0.3122 0.3792
piso 1 C11 63 Comb10 1.175 -45.4632 0.782 0.2948 0.0185 -0.0342 -0.5397
piso 1 C11 63 Comb10 2.35 -44.6102 0.782 0.2948 0.0185 -0.3805 -1.4586
piso 1 C13 64 Comb10 0 -40.8182 0.638 0.5387 0.0185 0.5212 0.4058
piso 1 C13 64 Comb10 1.175 -39.9652 0.638 0.5387 0.0185 -0.1118 -0.3438
piso 1 C13 64 Comb10 2.35 -39.1121 0.638 0.5387 0.0185 -0.7448 -1.0934
piso 1 C14 65 Comb10 0 -38.893 -1.0209 -0.9396 0.0185 -0.9315 -1.0845
piso 1 C14 65 Comb10 1.175 -38.0399 -1.0209 -0.9396 0.0185 0.1725 0.115
piso 1 C14 65 Comb10 2.35 -37.1869 -1.0209 -0.9396 0.0185 1.2765 1.3145
piso 1 C15 66 Comb10 0 -38.5739 -0.9612 0.7598 0.0185 0.5247 -0.9646
piso 1 C15 66 Comb10 1.175 -37.7208 -0.9612 0.7598 0.0185 -0.368 0.1649
piso 1 C15 66 Comb10 2.35 -36.8678 -0.9612 0.7598 0.0185 -1.2608 1.2943
piso 1 C16 67 Comb10 0 -70.7259 -2.7119 0.0247 0.0185 -0.1052 -2.3835
piso 1 C16 67 Comb10 1.175 -69.8728 -2.7119 0.0247 0.0185 -0.1342 0.803
piso 1 C16 67 Comb10 2.35 -69.0198 -2.7119 0.0247 0.0185 -0.1632 3.9895
piso 1 C17 68 Comb10 0 -44.7088 0.9899 -0.5444 0.0185 -0.4069 0.7886
piso 1 C17 68 Comb10 1.175 -43.8558 0.9899 -0.5444 0.0185 0.2327 -0.3745
piso 1 C17 68 Comb10 2.35 -43.0027 0.9899 -0.5444 0.0185 0.8724 -1.5376
piso 1 C18 72 Comb10 0 -54.9058 0.7515 -1.2616 0.0185 -1.093 0.6627
piso 1 C18 72 Comb10 1.175 -54.0528 0.7515 -1.2616 0.0185 0.3894 -0.2203
piso 1 C18 72 Comb10 2.35 -53.1997 0.7515 -1.2616 0.0185 1.8718 -1.1033
piso 1 C12 126 Comb10 0 -39.6677 0.3877 -0.293 0.0185 -0.2057 0.1453
piso 1 C12 126 Comb10 1.175 -38.8146 0.3877 -0.293 0.0185 0.1386 -0.3102
piso 1 C12 126 Comb10 2.35 -37.9616 0.3877 -0.293 0.0185 0.4829 -0.7657

CONCRETO ARMADO II ING. SERRANO ZELDA, OVIDIO


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO
FACULTAD DE INGENIERÍA CIVIL, SISTEMAS Y ARQUITECTURA
ESCUELA PROFESIONAL DE INGENIERÍA CIVIL

CARGA VIVA EN ETABS

Load Station P V2 V3 T M2 M3
Unique
Story Column C.
Name m tonf tonf tonf tonf-m tonf-m tonf-m
/Comb.
piso 1 C1 47 Live 0 -13.2595 0.3347 0.1258 0.0026 0.1112 0.2814
piso 1 C1 47 Live 1.175 -13.2595 0.3347 0.1258 0.0026 -0.0365 -0.1118
piso 1 C1 47 Live 2.35 -13.2595 0.3347 0.1258 0.0026 -0.1843 -0.5051
piso 1 C4 50 Live 0 -14.0342 0.3868 -0.037 0.0026 -0.0295 0.3586
piso 1 C4 50 Live 1.175 -14.0342 0.3868 -0.037 0.0026 0.014 -0.0959
piso 1 C4 50 Live 2.35 -14.0342 0.3868 -0.037 0.0026 0.0575 -0.5504
piso 1 C6 55 Live 0 -2.2494 0.0453 0.0688 0.0026 0.0716 0.0223
piso 1 C6 55 Live 1.175 -2.2494 0.0453 0.0688 0.0026 -0.0093 -0.0309
piso 1 C6 55 Live 2.35 -2.2494 0.0453 0.0688 0.0026 -0.0901 -0.0841
piso 1 C8 57 Live 0 -4.1014 -0.2252 -0.1307 0.0026 -0.126 -0.1599
piso 1 C8 57 Live 1.175 -4.1014 -0.2252 -0.1307 0.0026 0.0276 0.1047
piso 1 C8 57 Live 2.35 -4.1014 -0.2252 -0.1307 0.0026 0.1812 0.3693
piso 1 C9 58 Live 0 -6.3481 0.1776 0.2077 0.0038 0.1817 0.1271
piso 1 C9 58 Live 1.175 -6.3481 0.1776 0.2077 0.0038 -0.0624 -0.0816
piso 1 C9 58 Live 2.35 -6.3481 0.1776 0.2077 0.0038 -0.3064 -0.2903
piso 1 C10 59 Live 0 -6.4837 -0.4283 0.0493 0.0038 0.0254 -0.3963
piso 1 C10 59 Live 1.425 -6.4837 -0.4283 0.0493 0.0038 -0.0449 0.214
piso 1 C10 59 Live 2.85 -6.4837 -0.4283 0.0493 0.0038 -0.1152 0.8244
piso 1 C11 63 Live 0 -5.2665 0.1887 0.0607 0.0038 0.0702 0.1501
piso 1 C11 63 Live 1.175 -5.2665 0.1887 0.0607 0.0038 -0.0011 -0.0716
piso 1 C11 63 Live 2.35 -5.2665 0.1887 0.0607 0.0038 -0.0724 -0.2932
piso 1 C13 64 Live 0 -5.2889 0.2206 0.0515 0.0038 0.0623 0.2079
piso 1 C13 64 Live 1.175 -5.2889 0.2206 0.0515 0.0038 0.0018 -0.0512
piso 1 C13 64 Live 2.35 -5.2889 0.2206 0.0515 0.0038 -0.0587 -0.3104
piso 1 C14 65 Live 0 -3.2329 -0.1553 -0.1745 0.0038 -0.1691 -0.1282
piso 1 C14 65 Live 1.175 -3.2329 -0.1553 -0.1745 0.0038 0.0359 0.0544
piso 1 C14 65 Live 2.35 -3.2329 -0.1553 -0.1745 0.0038 0.2409 0.2369
piso 1 C15 66 Live 0 -3.2065 -0.1409 0.1468 0.0038 0.1062 -0.1018
piso 1 C15 66 Live 1.175 -3.2065 -0.1409 0.1468 0.0038 -0.0663 0.0638
piso 1 C15 66 Live 2.35 -3.2065 -0.1409 0.1468 0.0038 -0.2387 0.2293
piso 1 C16 67 Live 0 -9.0212 -0.6309 -0.0188 0.0038 -0.0357 -0.5052
piso 1 C16 67 Live 1.175 -9.0212 -0.6309 -0.0188 0.0038 -0.0136 0.2361
piso 1 C16 67 Live 2.35 -9.0212 -0.6309 -0.0188 0.0038 0.0086 0.9774
piso 1 C17 68 Live 0 -4.9511 0.2285 -0.0572 0.0038 -0.0308 0.2312
piso 1 C17 68 Live 1.175 -4.9511 0.2285 -0.0572 0.0038 0.0364 -0.0372
piso 1 C17 68 Live 2.35 -4.9511 0.2285 -0.0572 0.0038 0.1036 -0.3057
piso 1 C18 72 Live 0 -7.1357 0.2048 -0.2952 0.0038 -0.2493 0.2268
piso 1 C18 72 Live 1.175 -7.1357 0.2048 -0.2952 0.0038 0.0976 -0.0138
piso 1 C18 72 Live 2.35 -7.1357 0.2048 -0.2952 0.0038 0.4444 -0.2544
piso 1 C12 126 Live 0 -5.113 0.1435 -0.025 0.0038 -0.0048 0.1339
piso 1 C12 126 Live 1.175 -5.113 0.1435 -0.025 0.0038 0.0245 -0.0348
piso 1 C12 126 Live 2.35 -5.113 0.1435 -0.025 0.0038 0.0539 -0.2035

CONCRETO ARMADO II ING. SERRANO ZELADA, OVIDIO


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO
FACULTAD DE INGENIERÍA CIVIL, SISTEMAS Y ARQUITECTURA
ESCUELA PROFESIONAL DE INGENIERÍA CIVIL

CARGA POR SISMO EN X EN ETABS

Load Station P V2 V3 T M2 M3
Unique
Story Column C.
Name m tonf tonf tonf tonf-m tonf-m tonf-m
/Comb.
piso 1 C1 47 EQX 3 0 9.165 4.4437 0.4066 0.1713 0.6247 8.0301
piso 1 C1 47 EQX 3 1.175 9.165 4.4437 0.4066 0.1713 0.147 2.8088
piso 1 C1 47 EQX 3 2.35 9.165 4.4437 0.4066 0.1713 -0.3308 -2.4126
piso 1 C4 50 EQX 3 0 12.5536 6.8887 0.0129 0.1713 0.2844 12.2804
piso 1 C4 50 EQX 3 1.175 12.5536 6.8887 0.0129 0.1713 0.2692 4.1861
piso 1 C4 50 EQX 3 2.35 12.5536 6.8887 0.0129 0.1713 0.2541 -3.9081
piso 1 C6 55 EQX 3 0 -14.7314 2.4998 0.4625 0.1713 1.3116 5.7535
piso 1 C6 55 EQX 3 1.175 -14.7314 2.4998 0.4625 0.1713 0.7681 2.8162
piso 1 C6 55 EQX 3 2.35 -14.7314 2.4998 0.4625 0.1713 0.2247 -0.121
piso 1 C8 57 EQX 3 0 9.2479 4.2612 -0.4914 0.1713 -1.1864 10.711
piso 1 C8 57 EQX 3 1.175 9.2479 4.2612 -0.4914 0.1713 -0.609 5.7041
piso 1 C8 57 EQX 3 2.35 9.2479 4.2612 -0.4914 0.1713 -0.0316 0.6972
piso 1 C9 58 EQX 3 0 9.4714 3.7933 0.2329 0.2508 0.5996 8.4782
piso 1 C9 58 EQX 3 1.175 9.4714 3.7933 0.2329 0.2508 0.326 4.0211
piso 1 C9 58 EQX 3 2.35 9.4714 3.7933 0.2329 0.2508 0.0523 -0.4361
piso 1 C10 59 EQX 3 0 2.2845 3.2768 -0.8277 0.2508 -1.8562 8.8876
piso 1 C10 59 EQX 3 1.425 2.2845 3.2768 -0.8277 0.2508 -0.6767 4.2183
piso 1 C10 59 EQX 3 2.85 2.2845 3.2768 -0.8277 0.2508 0.5027 -0.4511
piso 1 C11 63 EQX 3 0 -17.7388 3.9887 0.9298 0.2508 2.1639 9.5509
piso 1 C11 63 EQX 3 1.175 -17.7388 3.9887 0.9298 0.2508 1.0714 4.8641
piso 1 C11 63 EQX 3 2.35 -17.7388 3.9887 0.9298 0.2508 -0.0211 0.1774
piso 1 C13 64 EQX 3 0 -31.4519 6.5148 0.8439 0.2508 2.0904 13.7452
piso 1 C13 64 EQX 3 1.175 -31.4519 6.5148 0.8439 0.2508 1.0987 6.0903
piso 1 C13 64 EQX 3 2.35 -31.4519 6.5148 0.8439 0.2508 0.1071 -1.5646
piso 1 C14 65 EQX 3 0 16.9272 4.4229 -0.6375 0.2508 -1.6936 11.0216
piso 1 C14 65 EQX 3 1.175 16.9272 4.4229 -0.6375 0.2508 -0.9446 5.8247
piso 1 C14 65 EQX 3 2.35 16.9272 4.4229 -0.6375 0.2508 -0.1955 0.6278
piso 1 C15 66 EQX 3 0 18.5806 5.0564 -0.6648 0.2508 -1.717 12.4955
piso 1 C15 66 EQX 3 1.175 18.5806 5.0564 -0.6648 0.2508 -0.9359 6.5542
piso 1 C15 66 EQX 3 2.35 18.5806 5.0564 -0.6648 0.2508 -0.1548 0.6129
piso 1 C16 67 EQX 3 0 12.3144 5.1711 -0.6867 0.2508 -1.7358 13.6924
piso 1 C16 67 EQX 3 1.175 12.3144 5.1711 -0.6867 0.2508 -0.9289 7.6164
piso 1 C16 67 EQX 3 2.35 12.3144 5.1711 -0.6867 0.2508 -0.1221 1.5404
piso 1 C17 68 EQX 3 0 -26.7977 6.1542 0.9687 0.2508 2.1973 14.5348
piso 1 C17 68 EQX 3 1.175 -26.7977 6.1542 0.9687 0.2508 1.059 7.3037
piso 1 C17 68 EQX 3 2.35 -26.7977 6.1542 0.9687 0.2508 -0.0792 0.0725
piso 1 C18 72 EQX 3 0 5.2295 7.664 0.3408 0.2508 0.6921 16.8886
piso 1 C18 72 EQX 3 1.175 5.2295 7.664 0.3408 0.2508 0.2917 7.8834
piso 1 C18 72 EQX 3 2.35 5.2295 7.664 0.3408 0.2508 -0.1088 -1.1219
piso 1 C12 126 EQX 3 0 -22.3708 4.8646 0.8989 0.2508 2.1332 11.3826
piso 1 C12 126 EQX 3 1.175 -22.3708 4.8646 0.8989 0.2508 1.0771 5.6666
piso 1 C12 126 EQX 3 2.35 -22.3708 4.8646 0.8989 0.2508 0.0209 -0.0493

CONCRETO ARMADO II ING SERRANO ZELADA, OVIDIO


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO
FACULTAD DE INGENIERÍA CIVIL, SISTEMAS Y ARQUITECTURA
ESCUELA PROFESIONAL DE INGENIERÍA CIVIL

CARGA POR SISMO EN Y EN ETABS

Load Station P V2 V3 T M2 M3
Unique
Story Column C.
Name m tonf tonf tonf tonf-m tonf-m tonf-m
/Comb.
piso 1 C1 47 EQY 3 0 6.0077 0.1806 4.3119 -0.0306 9.1729 0.3091
piso 1 C1 47 EQY 3 1.175 6.0077 0.1806 4.3119 -0.0306 4.1065 0.0969
piso 1 C1 47 EQY 3 2.35 6.0077 0.1806 4.3119 -0.0306 -0.9599 -0.1153
piso 1 C4 50 EQY 3 0 -2.8351 -0.4286 4.2233 -0.0306 9.0964 -0.5986
piso 1 C4 50 EQY 3 1.175 -2.8351 -0.4286 4.2233 -0.0306 4.134 -0.095
piso 1 C4 50 EQY 3 2.35 -2.8351 -0.4286 4.2233 -0.0306 -0.8283 0.4085
piso 1 C6 55 EQY 3 0 -11.3725 0.1396 2.6792 -0.0306 7.6477 0.3801
piso 1 C6 55 EQY 3 1.175 -11.3725 0.1396 2.6792 -0.0306 4.4997 0.216
piso 1 C6 55 EQY 3 2.35 -11.3725 0.1396 2.6792 -0.0306 1.3516 0.0519
piso 1 C8 57 EQY 3 0 8.6604 -0.2851 2.8008 -0.0306 8.0513 -0.5998
piso 1 C8 57 EQY 3 1.175 8.6604 -0.2851 2.8008 -0.0306 4.7604 -0.2648
piso 1 C8 57 EQY 3 2.35 8.6604 -0.2851 2.8008 -0.0306 1.4695 0.0702
piso 1 C9 58 EQY 3 0 -15.4276 0.4671 3.9297 -0.0447 11.3404 0.7858
piso 1 C9 58 EQY 3 1.175 -15.4276 0.4671 3.9297 -0.0447 6.723 0.2369
piso 1 C9 58 EQY 3 2.35 -15.4276 0.4671 3.9297 -0.0447 2.1056 -0.3119
piso 1 C10 59 EQY 3 0 34.069 0.1856 5.7999 -0.0447 13.2095 0.3845
piso 1 C10 59 EQY 3 1.425 34.069 0.1856 5.7999 -0.0447 4.9447 0.1199
piso 1 C10 59 EQY 3 2.85 34.069 0.1856 5.7999 -0.0447 -3.3201 -0.1446
piso 1 C11 63 EQY 3 0 2.0956 0.0904 4.5491 -0.0447 11.6986 0.3015
piso 1 C11 63 EQY 3 1.175 2.0956 0.0904 4.5491 -0.0447 6.3534 0.1953
piso 1 C11 63 EQY 3 2.35 2.0956 0.0904 4.5491 -0.0447 1.0082 0.089
piso 1 C13 64 EQY 3 0 2.883 -0.306 4.2163 -0.0447 11.4134 -0.4002
piso 1 C13 64 EQY 3 1.175 2.883 -0.306 4.2163 -0.0447 6.4593 -0.0407
piso 1 C13 64 EQY 3 2.35 2.883 -0.306 4.2163 -0.0447 1.5052 0.3189
piso 1 C14 65 EQY 3 0 -1.7839 -0.0233 4.4056 -0.0447 12.0242 0.0081
piso 1 C14 65 EQY 3 1.175 -1.7839 -0.0233 4.4056 -0.0447 6.8476 0.0355
piso 1 C14 65 EQY 3 2.35 -1.7839 -0.0233 4.4056 -0.0447 1.6711 0.0629
piso 1 C15 66 EQY 3 0 1.5737 -0.1434 4.4673 -0.0447 12.0771 -0.2609
piso 1 C15 66 EQY 3 1.175 1.5737 -0.1434 4.4673 -0.0447 6.828 -0.0924
piso 1 C15 66 EQY 3 2.35 1.5737 -0.1434 4.4673 -0.0447 1.5789 0.0761
piso 1 C16 67 EQY 3 0 -0.282 -0.2316 4.7799 -0.0447 12.345 -0.5325
piso 1 C16 67 EQY 3 1.175 -0.282 -0.2316 4.7799 -0.0447 6.7285 -0.2603
piso 1 C16 67 EQY 3 2.35 -0.282 -0.2316 4.7799 -0.0447 1.1121 0.0118
piso 1 C17 68 EQY 3 0 -17.2147 -0.2486 5.064 -0.0447 12.1398 -0.547
piso 1 C17 68 EQY 3 1.175 -17.2147 -0.2486 5.064 -0.0447 6.1897 -0.2549
piso 1 C17 68 EQY 3 2.35 -17.2147 -0.2486 5.064 -0.0447 0.2395 0.0372
piso 1 C18 72 EQY 3 0 14.0926 -0.189 3.7227 -0.0447 11.163 -0.6851
piso 1 C18 72 EQY 3 1.175 14.0926 -0.189 3.7227 -0.0447 6.7888 -0.4629
piso 1 C18 72 EQY 3 2.35 14.0926 -0.189 3.7227 -0.0447 2.4147 -0.2408
piso 1 C12 126 EQY 3 0 -1.3884 0.0807 4.4865 -0.0447 11.594 0.0998
piso 1 C12 126 EQY 3 1.175 -1.3884 0.0807 4.4865 -0.0447 6.3223 0.0049
piso 1 C12 126 EQY 3 2.35 -1.3884 0.0807 4.4865 -0.0447 1.0507 -0.0899

CONCRETO ARMADO II ING SERRANO ZELADA, OVIDIO


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO
FACULTAD DE INGENIERÍA CIVIL, SISTEMAS Y ARQUITECTURA
ESCUELA PROFESIONAL DE INGENIERÍA CIVIL

ENVOLVENTE DE CARGAS EN ETABS

Load Station P V2 V3 T M2 M3
Unique
Story Column C.
Name m tonf tonf tonf tonf-m tonf-m tonf-m
/Comb.
ENVOLV
piso 1 C1 47 ENTE
ENVOLV 0 -57.4137 6.8519 4.1528 0.2964 7.9976 10.3517
piso 1 C1 47 Max
ENTE 1.175 -56.7792 6.8519 4.1528 0.2964 3.2209 2.6372
ENVOLV
piso 1 C1 47 Max
ENTE 2.35 -56.1447 6.8519 4.1528 0.2964 0.2317 1.1865
ENVOLV
piso 1 C4 50 Max
ENTE 0 -64.2622 6.9967 3.4337 0.2964 7.3755 10.4754
ENVOLV
piso 1 C4 50 Max
ENTE 1.175 -63.6277 6.9967 3.4337 0.2964 3.3611 2.5416
ENVOLV
piso 1 C4 50 Max
ENTE 2.35 -62.9932 6.9967 3.4337 0.2964 0.7433 0.8862
ENVOLV
piso 1 C6 55 Max
ENTE 0 -4.0345 4.0233 2.9019 0.2964 7.059 8.3629
ENVOLV
piso 1 C6 55 Max
ENTE 1.175 -3.4 4.0233 2.9019 0.2964 3.7079 3.7493
ENVOLV
piso 1 C6 55 Max
ENTE 2.35 -2.7655 4.0233 2.9019 0.2964 0.6555 0.4118
ENVOLV
piso 1 C8 57 Max
ENTE 0 -30.1194 1.9587 1.4224 0.2964 5.5843 6.6263
ENVOLV
piso 1 C8 57 Max
ENTE 1.175 -29.4849 1.9587 1.4224 0.2964 4.0269 4.5971
ENVOLV
piso 1 C8 57 Max
ENTE 2.35 -28.8504 1.9587 1.4224 0.2964 2.982 3.2657
ENVOLV
piso 1 C9 58 Max
ENTE 0 -24.4254 6.9778 4.3981 0.4339 10.2165 13.1119
ENVOLV
piso 1 C9 58 Max
ENTE 1.175 -23.6577 6.9778 4.3981 0.4339 5.2369 5.2351
ENVOLV
piso 1 C9 58 Max
ENTE 2.35 -22.8899 6.9778 4.3981 0.4339 0.7951 0.1264
ENVOLV
piso 1 C10 59 Max
ENTE 0 -19.3066 2.0211 5.1827 0.4339 10.7822 8.2135
ENVOLV
piso 1 C10 59 Max
ENTE 1.425 -18.3756 2.0211 5.1827 0.4339 3.5921 5.8753
ENVOLV
piso 1 C10 59 Max
ENTE 2.85 -17.4445 2.0211 5.1827 0.4339 1.7256 6.2903
ENVOLV
piso 1 C11 63 Max
ENTE 0 -21.5478 5.8156 4.2922 0.4339 10.3528 11.4625
ENVOLV
piso 1 C11 63 Max
ENTE 1.175 -20.7801 5.8156 4.2922 0.4339 5.3393 4.9255
ENVOLV
piso 1 C11 63 Max
ENTE 2.35 -20.0123 5.8156 4.2922 0.4339 0.6809 -0.6898
ENVOLV
piso 1 C13 64 Max
ENTE 0 -12.4706 5.9779 4.3014 0.4339 10.3599 11.1504
ENVOLV
piso 1 C13 64 Max
ENTE 1.175 -11.7028 5.9779 4.3014 0.4339 5.3601 4.322
ENVOLV
piso 1 C13 64 Max
ENTE 2.35 -10.9351 5.9779 4.3014 0.4339 0.7287 0.2474
ENVOLV
piso 1 C14 65 Max
ENTE 0 -20.3904 2.9489 2.6072 0.4339 8.6136 8.6276
ENVOLV
piso 1 C14 65 Max
ENTE 1.175 -19.6226 2.9489 2.6072 0.4339 5.6746 5.2862
ENVOLV
piso 1 C14 65 Max
ENTE 2.35 -18.8549 2.9489 2.6072 0.4339 3.3816 2.699
ENVOLV
piso 1 C15 66 Max
ENTE 0 -20.3772 2.926 4.6359 0.4339 10.283 8.5586
ENVOLV
piso 1 C15 66 Max
ENTE 1.175 -19.6094 2.926 4.6359 0.4339 5.0672 5.2723
ENVOLV
piso 1 C15 66 Max
ENTE 2.35 -18.8417 2.926 4.6359 0.4339 0.2868 2.648
ENVOLV
piso 1 C16 67 Max
ENTE 0 -54.8744 1.1645 3.7701 0.4339 9.611 7.4511
ENVOLV
piso 1 C16 67 Max
ENTE 1.175 -54.1066 1.1645 3.7701 0.4339 5.1991 6.6752
ENVOLV
piso 1 C16 67 Max
ENTE 2.35 -53.3389 1.1645 3.7701 0.4339 0.944 7.4779
ENVOLV
piso 1 C17 68 Max
ENTE 0 -21.6746 5.8169 3.7881 0.4339 9.8783 11.4624
ENVOLV
piso 1 C17 68 Max
ENTE 1.175 -20.9069 5.8169 3.7881 0.4339 5.5693 4.8199
ENVOLV
piso 1 C17 68 Max
ENTE 2.35 -20.1391 5.8169 3.7881 0.4339 1.8134 -0.8244
ENVOLV
piso 1 C18 72 Max
ENTE 0 -37.6515 6.5791 1.8683 0.4339 8.0474 12.9618
ENVOLV
piso 1 C18 72 Max
ENTE 1.175 -36.8837 6.5791 1.8683 0.4339 6.1318 5.3431
ENVOLV
piso 1 C18 72 Max
ENTE 2.35 -36.116 6.5791 1.8683 0.4339 4.9833 0.0216
ENVOLV
piso 1 C12 126 Max
ENTE 0 -16.0181 4.903 3.5259 0.4339 9.6006 10.2599
ENVOLV
piso 1 C12 126 Max
ENTE 1.175 -15.2503 4.903 3.5259 0.4339 5.5461 4.6585
ENVOLV
piso 1 C12 126 Max
ENTE 2.35 -14.4826 4.903 3.5259 0.4339 1.6572 -0.3018
Max

CONCRETO ARMADO II ING. SERRANO ZELADA, OVIDIO


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO
FACULTAD DE INGENIERÍA CIVIL, SISTEMAS Y ARQUITECTURA
ESCUELA PROFESIONAL DE INGENIERÍA CIVIL

-64.2622 MAS CRITICO EJE B-2 -21.6746

CONCRETO ARMADO II ING. SERRANO ZELADA, OVIDIO


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO
FACULTAD DE INGENIERÍA CIVIL, SISTEMAS Y ARQUITECTURA
ESCUELA PROFESIONAL DE INGENIERÍA CIVIL

DISEÑO DE ZAPATA AISLADA EJE B-2 (COLUMNA INTERIOR)


Columna:
b= 0.55 m
Refuerzo Columna= 8 de 5/8"
h= 0.55 m

PD= 81.5137 Tn 3--3 TRANS


PL= 14.0342 Tn 2--2 LONG.
Dirección Longitudinal.- Dirección Transversal.-
MD= 0.02 Tn-m MD= 1.13 Tn-m
ML= -0.03 Tn-m ML= 0.36 Tn-m
MS= 9.10 Tn-m MS= 12.28 Tn-m
Ps= 2.84 Tn Ps= -12.55 Tn

Gt= 2.00 Kg/cm2


K30= 4000.00 Tn/m3
f'c= 210.00 Kg/cm2
s/c= 200.00 Kg/m2
NPT= 0.15 m
NFZ= -1.30 m

Solución.-
1.- Esfuerzo Neto.-
�_𝑛= 16.9 Tn/m2 (Sin Sismo)
�_𝑛𝑠= 22.9 Tn/m2 Con Sismo

2.- Dimensionamiento en Planta - Cargas de Servicio.-


A.- Cargas de Gravedad.-
P= 95.5479 Tn
ML= -0.01 Tn-m
MT= 1.49 Tn-m 15.8533
�_𝑛= 16.90 Tn/m2 15.8638
Az= 5.65372 m2
L= 2.37776 m L= 2.50 m
B= 2.37776 m B= 2.50 m
Verificación de Esfuerzos.-
�_1= 15.2877 + -0.00526 + 0.5708544 = 15.85 Tn/m2
�_2= 15.2877 - -0.00526 + 0.5708544 = 15.86 Tn/m2
�_3= 15.2877 + -0.00526 - 0.5708544 = 14.71 Tn/m2
�_4= 15.2877 - -0.00526 - 0.5708544 = 14.72 Tn/m2

B.- Cargas de Gravedad + Sismo Longitudinal Horario.- (SISMO X)


P= 97.816 Tn
ML= 7.26 Tn-m
MT= 1.49 Tn-m
�_𝑛𝑠=

CONCRETO ARMADO II ING. SERRANO ZELADA, OVIDIO


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO
FACULTAD DE INGENIERÍA CIVIL, SISTEMAS Y ARQUITECTURA
ESCUELA PROFESIONAL DE INGENIERÍA CIVIL

�_𝑛𝑠= 22.90 Tn/m2

L= 2.50 m 19.0106 13.4323


B= 2.50 m
Verificación de Esfuerzos.-
�_1= 15.6506 + 2.78915 + 0.5708544 = 19.01 Tn/m2
�_2= 15.6506 - 2.78915 + 0.5708544 = 13.43 Tn/m2
�_3= 15.6506 + 2.78915 - 0.5708544 = 17.87 Tn/m2
�_4= 15.6506 - 2.78915 - 0.5708544 = 12.29 Tn/m2

C.- Cargas de Gravedad + Sismo Longitudinal AntiHorario.- (SISMO X)


P= 93.2798 Tn
ML= -7.29 Tn-m
MT= 1.49 Tn-m
�_𝑛𝑠= 22.90 Tn/m2

L= 2.50 m
B= 2.50 m
Verificación de Esfuerzos.-
�_1= 14.9248 + -2.79967 + 0.5708544 = 12.70 Tn/m2
�_2= 14.9248 - -2.79967 + 0.5708544 = 18.30 Tn/m2
�_3= 14.9248 + -2.79967 - 0.5708544 = 11.55 Tn/m2
�_4= 14.9248 - -2.79967 - 0.5708544 = 17.15 Tn/m2

D.- Cargas de Gravedad + Sismo Transversal Horario.- (SISMO Y)


P= 85.505 Tn
ML= -0.01 Tn-m
MT= 11.31 Tn-m
�_𝑛𝑠= 22.90 Tn/m2

L= 2.50 m
B= 2.50 m
Verificación de Esfuerzos.-
�_1= 13.6808 + -0.00526 + 4.3433933 = 18.02 Tn/m2
�_2= 13.6808 - -0.00526 + 4.3433933 = 18.03 Tn/m2
�_3= 13.6808 + -0.00526 - 4.3433933 = 9.33 Tn/m2
�_4= 13.6808 - -0.00526 - 4.3433933 = 9.34 Tn/m2

E.- Cargas de Gravedad + Sismo Transversal AntiHorario.- (SISMO Y)


P= 105.591 Tn
ML= -0.01 Tn-m
MT= -8.34 Tn-m
�_𝑛𝑠= 22.90 Tn/m2

CONCRETO ARMADO II ING. SERRANO ZELADA, OVIDIO


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO
FACULTAD DE INGENIERÍA CIVIL, SISTEMAS Y ARQUITECTURA
ESCUELA PROFESIONAL DE INGENIERÍA CIVIL

L= 2.50 m
B= 2.50 m
Verificación de Esfuerzos.-
�_1= 16.8945 + -0.00526 + -3.2016845 = 13.69 Tn/m2
�_2= 16.8945 - -0.00526 + -3.2016845 = 13.70 Tn/m2
�_3= 16.8945 + -0.00526 - -3.2016845 = 20.09 Tn/m2
�_4= 16.8945 - -0.00526 - -3.2016845 = 20.10 Tn/m2

3.- Esfuerzo Ultimos en el Suelo y Esfuerzo Ultimo de Diseño.-

A.- Cargas de Gravedad.-


P= 137.977 Tn
ML= -0.03 Tn-m
MT= 2.19 Tn-m 22.9061
22.9276

L= 2.50 m
B= 2.50 m
Verificación de Esfuerzos.-
�_1= 22.0764 + -0.01076 + 0.8405069 = 22.91 Tn/m2
�_2= 22.0764 - -0.01076 + 0.8405069 = 22.93 Tn/m2
�_3= 22.0764 + -0.01076 - 0.8405069 = 21.23 Tn/m2
�_4= 22.0764 - -0.01076 - 0.8405069 = 21.25 Tn/m2

B.- Cargas de Gravedad + Sismo Longitudinal Horario.- (SISMO X)


P= 122.27 Tn
ML= 9.08 Tn-m
MT= 1.86 Tn-m

L= 2.50 m 23.7632 16.7903


B= 2.50 m
Verificación de Esfuerzos.-
�_1= 19.5632 + 3.48644 + 0.713568 = 23.76 Tn/m2
�_2= 19.5632 - 3.48644 + 0.713568 = 16.79 Tn/m2
�_3= 19.5632 + 3.48644 - 0.713568 = 22.34 Tn/m2
�_4= 19.5632 - 3.48644 - 0.713568 = 15.36 Tn/m2

C.- Cargas de Gravedad + Sismo Longitudinal AntiHorario.- (SISMO X)


P= 116.6 Tn
ML= -9.11 Tn-m
MT= 1.86 Tn-m

CONCRETO ARMADO II ING. SERRANO ZELADA, OVIDIO


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO
FACULTAD DE INGENIERÍA CIVIL, SISTEMAS Y ARQUITECTURA
ESCUELA PROFESIONAL DE INGENIERÍA CIVIL

L= 2.50 m
B= 2.50 m
Verificación de Esfuerzos.-
�_1= 18.656 + -3.49959 + 0.713568 = 15.87 Tn/m2
�_2= 18.656 - -3.49959 + 0.713568 = 22.87 Tn/m2
�_3= 18.656 + -3.49959 - 0.713568 = 14.44 Tn/m2
�_4= 18.656 - -3.49959 - 0.713568 = 21.44 Tn/m2

D.- Cargas de Gravedad + Sismo Transversal Horario.- (SISMO Y)


P= 106.881 Tn
ML= -0.02 Tn-m
MT= 14.14 Tn-m

L= 2.50 m
B= 2.50 m
Verificación de Esfuerzos.-
�_1= 17.101 + -0.00658 + 5.4292416 = 22.52 Tn/m2
�_2= 17.101 - -0.00658 + 5.4292416 = 22.54 Tn/m2
�_3= 17.101 + -0.00658 - 5.4292416 = 11.67 Tn/m2
�_4= 17.101 - -0.00658 - 5.4292416 = 11.68 Tn/m2

E.- Cargas de Gravedad + Sismo Transversal AntiHorario.- (SISMO Y)


P= 131.988 Tn
ML= -0.02 Tn-m
MT= -10.42 Tn-m

L= 2.50 m
B= 2.50 m
Verificación de Esfuerzos.-
�_1= 21.1182 + -0.00658 + -4.0021056 = 17.11 Tn/m2
�_2= 21.1182 - -0.00658 + -4.0021056 = 17.12 Tn/m2
�_3= 21.1182 + -0.00658 - -4.0021056 = 25.11 Tn/m2
�_4= 21.1182 - -0.00658 - -4.0021056 = 25.13 Tn/m2

25.13

Cargas de Gravedad + Sismo Transversal Antihorario.-


Pu= 131.988 Tn
MuL= -0.02 Tn-m
MuT= -10.42 Tn-m 17.1095
L= 2.50 m
B= 2.50 m

CONCRETO ARMADO II ING. SERRANO ZELADA, OVIDIO


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO
FACULTAD DE INGENIERÍA CIVIL, SISTEMAS Y ARQUITECTURA
ESCUELA PROFESIONAL DE INGENIERÍA CIVIL

Verificación de Esfuerzos.-
�_𝑢1= 21.1182 + -0.00658 + -4.0021056 = 17.11 Tn/m2
�_𝑢2= 21.1182 - -0.00658 + -4.0021056 = 17.12 Tn/m2
�_𝑢3= 21.1182 + -0.00658 - -4.0021056 = 25.11 Tn/m2
�_𝑢4= 21.1182 - -0.00658 - -4.0021056 = 25.13 Tn/m2 (PRESION DE DISEÑO)

Esfuerzo Último de Diseño = 25.13 Tn/m2


Combinación de Diseño = 1.25D + 1.25L + 1SLH

4.- Altura de la Zapata.-


A.- Por Rigidez.-
Lm= 1.25 m
E= 2173707 Tn/m2
K30= 4000.00 Tn/m3
n= 1.000
s= 1 1.25 1.2513282
Ks= 4000 Tn/m3
B= 2.50 m
hz= 0.14 m
hz,min= 0.4 m
hz= 0.50 m

B.- Por Longitud de Desarrollo.-


Ld= 34.97 cm

C.- Verificacion por Fuerza Cortante por Flexion.-


Direccion Longitudinal.- Direccion Transversal.-
�_𝒖 ≤ �_𝒖 ≤ 42.365
∅�_�
hz= 50 cm ∅�_�
hz= 50 cm
d= 42.365 cm d= 41.095 cm
B= 2.50 cm B= 2.50 cm
X= 57.635 cm X= 58.905 cm
�_𝒖= 2.51 Kg/cm2 �_𝒖= 2.51 Kg/cm2
Vu= 0.36 Tn Vu= 0.37 Tn
〖∅�〗 _ 0.69 Tn 〖∅�〗 _ 0.67 Tn
�= �=
D.- Verificacion por Fuerza Cortante por Punzonamiento.-
�_𝒖𝒑 ≤
s=∅�_�𝒑 55.00 cm
t= 55.00 cm
dL= 42.365 cm
dT= 41.095 cm
m= 97.37 cm
n= 96.10 cm

CONCRETO ARMADO II ING. SERRANO ZELADA, OVIDIO


UNIVERSIDAD NACIONAL PEDRO RUIZ GALLO
FACULTAD DE INGENIERÍA CIVIL, SISTEMAS Y ARQUITECTURA
ESCUELA PROFESIONAL DE INGENIERÍA CIVIL

b0= 386.92 cm
A0= 9356.29 cm2
Pu= 131988 Kg
�_𝒖= 2.51 Kg/cm2
Vup= 108.48 Tn
〖∅�〗 _ 319.25 Tn
𝒖𝒑𝟏=
〖∅�〗 _ 215.44 Tn
𝒖𝒑𝟐=
5.- Diseño del Refuerzo por Flexión.-
Dirección Longitudinal.- Dirección Transversal.-
�_𝒖= 25.13 Tn/m2 �_𝒖= 25.13 Tn/m2 4.7625
B= 2.50 m B= 2.50 m 1.5875
Lv= 1.00 m Lv= 1.00 m
d= 42.365 cm d= 41.095 cm
Wu 62.8171 Tn/m Wu 62.8171 Tn/m
Mu= 31.41 Tn-m Mu= 31.41 Tn-m
a= 4.24 cm (asumido) a= 4.11 cm (asumido)
As= 20.65 cm2 As= 21.28 cm2
a= 1.94 cm a= 2.00 cm
As= 20.07 cm2 As= 20.72 cm2
a= 1.89 cm a= 1.95 cm
As= 20.06 cm2 As= 20.71 cm2
a= 1.89 cm a= 1.95 cm
As,min= 19.06 cm2 As,min= 18.49 cm2
As= 20.06 cm2 As= 20.71 cm2
barras 1/2" 1.29 cm2 barras 1/2" 1.29 cm2
s= 15.11 cm 15.1118 s= 14.64 cm
Usar Φ 1/2" cada 0.15m Usar Φ 1/2" cada 0.14m

6.- Verificacion por Aplastamiento.-


s= 55.00 cm
t= 55.00 cm
Pu= 131988 Kg
�_(𝒖, 43.6326 Kg/cm2
𝒂𝒑𝒍)=
�_(𝒖, 𝒂𝒑𝒍 147 Kg/cm2
−�𝒐𝒏�𝒓𝒆𝒕𝒐)=

CONCRETO ARMADO II ING. SERRANO ZELADA, OVIDIO