DESIGN PHILOSOPHY
AND
ISSUED FOR CONSTRUCTION (IFC)
STRUCTURAL CALCULATIONS
FOR THE
DATE: APRIL2011
JEDDAH
ENGINEERING DEPT.
SMS
SMS
WESTERN OPERATING AREA
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED Prepared by:
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
TABLE OF CONTENTS
JTC
2. Design Assumptions 3
3. General Notes 3
REVISIONS
4.1 Dead Loads 4
4.2 Live Loads 7
DESIGNED BY: HMR
4.3 Wind Loads 7
DATE: APRIL2011 4.4 Seismic loads 10
CHK’D BY: JTC
5. Loading Combination 10
APPROVED
5.1 Service Load combinations 11
ENGINEERING DEPT.
5.2 Factored Loads combinations 11
SMS
6. Figures
6.1 Region 2 12
OPERATING DEPT. 6.2 Region 3 (and region 1) 29
6.3 Region 4 43
SMS
7. Calculations
THIS DRAWING IS
7.1 Stair Design 57
NOT 7.2 Slab Design 62
TO BE USED FOR 7.3 Cantilever Slab Design 91
CONSTRUCTION 7.4 Corbel / Nib Design 97
OR FOR 7.5 Pile Design 109
ORDERING
MATERIALS
UNTIL CERTIFIED 8. Appendix STAAD Input / Output
AND
DATED
8.1 Region 2
CERTIFIED 8.2 Region 3 (and Region 1)
8.3 Region 4
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
This document provides structural calculations for the safe construction of SEC
JTC
while the two upper stories (4th and 5th storeys) will be used as offices. The total height
of the building up to the roof pitch line is 30.20 meters .The building will be constructed
with concrete beam and column framing system with R.C. roof slab.
The objective of this calculation is to provide structural design for the concrete
superstructure and the foundations of the building. The building’s structure is designed
for the static loads: dead, live load, seismic and wind loads. The static design analysis is
carried out by using the Structural Analysis and Design Program “STAAD PRO 2007” by
Research Engineers, Inc. and verified by the user. The 3-D model is formed utilizing the
geometry of all pertinent structural members.
The design and detailing is carried out in accordance with following standards, ACI
318 – 08 and IBC 2006. Design loadings will be derived based from ASCE 7-05.
0
APPROVED 2.3 Ultimate Strength Design (USD) method will be used in the design of concrete.
ENGINEERING DEPT. 2.4 The space framing system will resist the lateral wind and seismic loads in both
SMS
directions.
2.5 Wind forces will be distributed at every floor level including loads that will be
transferred to soil through the walls and grade beams.
OPERATING DEPT.
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
Structural Concrete:
Specified Compressive Strength, f’c = 31.00 MPa after 28 days, Ec = 26335 MPa
f’c = 4500 psi
Reinforcing Steel:
Minimum Specified Yield Strength, fy = 415 MPa (60ksi) Deformed bars
ISSUED FOR CONSTRUCTION (IFC)
Es = 200,000 MPa
CHK’D BY: JTC From the soil report conducted by Soil and Foundation Co. Ltd., the following are the
APPROVED foundation recommendations:
ENGINEERING DEPT. 1. Type of Foundation – Based from the in-situ conditions of the soils encountered,
SMS
and the type of the proposed structure, it is recommended to use mat foundation
to support the proposed multi-storey building. This type of foundation is the most
suitable type of foundation to support the proposed building safely.
2. Depth of Foundations – The recommended foundation shall not be less than 1.0m
below the site present surface.
OPERATING DEPT.
3. Allowable Bearing Capacity – Net Allowable Bearing Capacity for the
SMS recommended foundation at the recommended depth shall not exceed 1.5kg/cm2.
4. Soil Parameter below Foundation level:
a. Bulk Unit Weight – 18.0 kN/m3
b. Angle of Internal Friction – 33o
THIS DRAWING IS 5. Earth Pressure Coefficient:
NOT
TO BE USED FOR a. Active Earth Pressure Coefficient – Ka = 0.30
b. Passive Earth Pressure Coefficient – Kp = 3.50
CONSTRUCTION
OR FOR
c. At-rest Earth Pressure Coefficient – Ko = 0.47
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
Unit Weight
Component
(KN/m2)
80mm (max) Thk Sand Cement Screed 1.60
Mechanical ducts allowance 0.20
ISSUED FOR CONSTRUCTION (IFC)
Unit Weight
Component
(KN/m2)
REVISIONS
100 mm (max) screed and finishes 2.00
DESIGNED BY: HMR Mechanical ducts allowance 0.20
DATE: APRIL2011 Lighting fixtures & miscellaneous allowance 0.10
CHK’D BY: JTC
500mm HCS (INSHAA Precast) 6.82
Others 0.15
APPROVED
Total 9.27
ENGINEERING DEPT.
Say 9.30
SMS
Unit Weight
Component
OPERATING DEPT.
(KN/m2)
SMS 100 mm (max) screed and finishes 2.00
Mechanical ducts allowance 0.20
Lighting fixtures & miscellaneous allowance 0.10
Floor Finishes 0.60
THIS DRAWING IS 200mm Slab 4.80
NOT
TO BE USED FOR Others 0.15
CONSTRUCTION
Total 7.85
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED e. SUPERIMPOSED DEAD LOAD ON ROOF BEAMS
AND
DATED
CERTIFIED Concrete Parapet Wall Weight = 0.20 x 1.50 x 22.6 = 6.78 KN/m
DATE:
_________________
Concrete Masonry Wall Clear Height = 1.20m
Concrete Masonry Wall Weight (300mm) = 1.20 x 0.30 x 22.6 = 8.136 KN/m
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
Live loads are uniformly distributed over the specified area as specified below:
(REF. ASCE 07 Table 4-1 & C4-1 and IBC 2006 Table 1607).
REVISIONS
Live Load
DESIGNED BY: HMR Use or Occupancy
(KN/m2)
DATE: APRIL2011
Office Use 2.40
Access Floor Systems
CHK’D BY: JTC Computer Use 5.00
APPROVED Stairs and Exit Ways 5.00
Toilet Rooms 1.92
ENGINEERING DEPT.
Parking Area 2.50
SMS
OPERATING DEPT. Minimum live load on flat roof with access for maintenance only
= 1.0 KN/m2 (Ref. IBC-2006Table 1607.1)
SMS
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
0.687 6.10
0.707 7.62
0.724 9.14
0.739 10.67
0.753 12.19
0.765 13.72
0.777 15.24
0.788 16.76
0.798 18.29
0.808 19.81
0
0.817 21.34
0.825 22.86
0.833 24.38
REVISIONS
APPROVED 30
ENGINEERING DEPT.
25
SMS
20
Height (m )
15
OPERATING DEPT.
SMS 10
THIS DRAWING IS 0
NOT 0.6 0.65 0.7 0.75 0.8 0.85
TO BE USED FOR
CONSTRUCTION
Intensity (KPa)
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED Figure 1. Wind Intensity vs Height
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
0.85
0.8
y = 0.5352x 0.1375
ISSUED FOR CONSTRUCTION (IFC)
Intensity (KPa)
R2 = 0.9988
0.75
0.7
0.65
0.6
0 5 10 15 20 25 30
0
Height (m)
Applied Line
Line Load on
Local height of Load on
Storey Level Elevation (m) Intensity (KPa) Beam
OPERATING DEPT. application Beam
(KN/m)
SMS
(KN/m)
Ground 0.60 0.504 0.60 + 2.00 = 2.60 1.31 1.35
1st 4.60 0.660 4.000 2.64 2.65
2nd 8.60 0.719 4.000 2.88 2.90
THIS DRAWING IS 3rd 12.60 0.758 4.025 3.05 3.05
NOT 4th 16.65 0.788 4.125 3.25 3.25
TO BE USED FOR
5th 20.85 0.813 4.200 3.41 3.45
CONSTRUCTION Roof Deck 25.05 0.853 4.350 3.71 3.75
OR FOR
ORDERING Utilities Roof 29.55 0.853 2.250 1.92 1.95
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
The following parameters are used as input for STAAD PRO to generate Seismic load.
Location : Jeddah
Zone : 2
ISSUED FOR CONSTRUCTION (IFC)
REVISIONS
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
3 - DL + H + Lr
4 - DL + H + 0.75 LL + 0.75 Lr
5 - DL + H + (WL or 0.70E)
6 - DL + H + 0.75 (WL or 0.70E) + 0.75LL + 0.75Lr
7 - 0.60 DL + W + H
8 - 0.60 DL + 0.7E + H
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
PACKAGE-1
0
FIGURE 6.1
REVISIONS
DATE: APRIL2011
SMS
E-K/4-7
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
WHOLE STRUCTURE 1
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
WHOLE STRUCTURE 2
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
EARTHQUAKE LOAD EQX
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________ DEAD LOAD DL
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
WIND LOAD WL+X
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
WIND LOAD WL-X
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
MOMENT DIAGRAM LC 31: 1.2DL + 1.6LL + 0.5LR
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
AXIAL LOAD DIAGRAM LC 31: 1.2DL + 1.6LL + 0.5LR
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
MOMENT DIAGRAM LC 37: 1.2DL + LL + EQX
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
SHEAR DIAGRAM LC 37: 1.2DL + LL + EQX
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
AXIAL LOAD DIAGRAM LC 37: 1.2DL + LL + EQX
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
PACKAGE-1
FIGURE 6.2
0
REVISIONS
REGION 3
DESIGNED BY: HMR
DATE: APRIL2011
APPROVED
BETWEEN GRIDLINES
ENGINEERING DEPT.
L-P/4-7
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REGION 1
0
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
REGION 3
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
WHOLE STRUCTURE 1
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
WHOLE STRUCTURE 2
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
EARTHQUAKE LOAD EQZ
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
DEAD LOAD DL
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
FLOOR LIVE LOAD LL
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
WIND LOAD WL-X
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
WIND LOAD WL-Z
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
MOMENT DIAGRAM LC 31: 1.2DL + 1.6LL + 0.5LR
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
SHEAR DIAGRAM LC 31: 1.2DL + 1.6LL + 0.5LR
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
AXIAL LOAD DIAGRAM LC 31: 1.2DL + 1.6LL + 0.5LR
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
PACKAGE-1
FIGURE 6.3
0
REVISIONS
REGION 4
DESIGNED BY: HMR
DATE: APRIL2011
APPROVED
BETWEEN GRIDLINES
ENGINEERING DEPT.
L-J1/(13)1-3
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REGION 4
0
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
WHOLE STRUCTURE 1
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
WHOLE STRUCTURE 2
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
EARTHQUAKE LOAD EQX
CERTIFIED
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
EARTHQUAKE LOAD EQZ
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED DEAD LOAD DL
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED ROOF LIVE LOAD LL
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED WIND LOAD WX
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
WIND LOAD WZ
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED MOMENT DIAGRAM LC 37: 1.2DL + 1.6LL + 0.5LR
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
SHEAR DIAGRAM LC 37: 1.2DL + 1.6LL + 0.5LR
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CALCULATIONS
0
REVISIONS
DATE: APRIL2011
APPROVED
7.1 STAIR DESIGN
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
MATERIAL STRENGTH
fy := 415.00MPa
f'c := 31.00MPa
ISSUED FOR CONSTRUCTION (IFC)
Design Loadings:
STRIP Size = 1.0m x 4.7m one way (long direction)
DL:= (0.20+0.065) x 24 (unit wt of conc.) + 0.60(finishing)(1.0m) = 6.96 kPa
DL := ( 0.20 + 0.065) ⋅ 24kPa + 0.60 ⋅ ( 1.0)kPa = 6.96 ⋅ kPa
Length := 4.70m
LL := 5.0kPa
Width := 1.0 ⋅ m
Ultimate_load := 1.2 ⋅ DL + 1.6 ⋅ LL Ultimate_load = 16.352⋅ kPa
KN
0
Slab Reinforcement:
ΦL := 12 ⋅ mm
OPERATING DEPT. ΦT := 12 ⋅ mm
2
SMS
wu ⋅ Length
Mu := Mu = 36.12 ⋅ KN⋅ m
10
ΦL
THIS DRAWING IS d := t − 25 ⋅ mm − d = 169⋅ mm
NOT 2
TO BE USED FOR
Mu
CONSTRUCTION
Ru := Ru = 1.405 ⋅ MPa
2
OR FOR 0.90 ⋅ b ⋅ d
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
β1 := 0.85 if f'c ≤ 28 ⋅ MPa
DATED
CERTIFIED ( f'c − 28 ⋅ MPa )
0.85 − 0.05 ⋅ otherwise
7 ⋅ MPa
BY: ___________________ β1 = 0.829
DATE:
ρmax := 0.75 ⋅ ⎜
⎛ 0.85 ⋅ β1 ⋅ f'c ⋅ 600⋅ MPa ⎞
_________________ ⎟
⎝ fy 600⋅ MPa + fy ⎠
ρmax = 0.023
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
0.85 ⋅ f'c ⎛ 2 ⋅ Mu ⎞⎟
ρ := ⋅⎜ 1 − 1− ρ = 0.00348
fy ⎜⎝ 2⎟
0.85 ⋅ f'c⋅ 0.90 ⋅ b ⋅ d ⎠
JTC
"NG" otherwise
f'c
0.25 MPa
MPa
otherwise
0
fy
DATE: APRIL2011
use whichever is larger:
2
CHK’D BY: JTC Asuse := ρ ⋅ b ⋅ d if ρ > ρmin = 588.386⋅ mm
APPROVED ρmin ⋅ b ⋅ d otherwise
ENGINEERING DEPT.
Compute number of required bars & spacing along the Main Direction (long):
⎛ 4 ⋅ Asuse ⎞
SMS
nL := floor ⎜ 1 + ⎟=6
⎜ π ⋅ ΦL
2 ⎟
⎝ ⎠
1⋅m
OPERATING DEPT.
Spacing L := = 200⋅ mm say 150 mm
SMS
nL − 1
Compute number of required bars & spacing along the Transverse Direction:
⎛ 4 ⋅ ρmin ⋅ d ⋅ b ⎞
nT := floor ⎜ 1 + ⎟=6
⎜ π ⋅ ΦT
2 ⎟
THIS DRAWING IS
NOT ⎝ ⎠
TO BE USED FOR 1⋅m
Spacing S := = 200⋅ mm say 200 mm
CONSTRUCTION nT − 1
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
MATERIAL STRENGTH
fy := 415.00MPa f'c := 31.00MPa
Design Loadings:
ISSUED FOR CONSTRUCTION (IFC)
SMS
Slab Depth
t := 200⋅ mm
OPERATING DEPT.
Slab Reinforcement:
ΦL := 12 ⋅ mm
SMS
ΦT := 12 ⋅ mm
2
wu ⋅ Length
Mu := Mu = 51.28 ⋅ KN⋅ m
THIS DRAWING IS 10
NOT
TO BE USED FOR ΦL
d := t − 25 ⋅ mm − d = 169⋅ mm
CONSTRUCTION 2
OR FOR
Mu
ORDERING
MATERIALS
Ru := Ru = 1.995 ⋅ MPa
2
UNTIL CERTIFIED 0.90 ⋅ b ⋅ d
AND
DATED
β1 := 0.85 if f'c ≤ 28 ⋅ MPa
CERTIFIED
( f'c − 28 ⋅ MPa )
BY: ___________________ 0.85 − 0.05 ⋅ otherwise
DATE: 7 ⋅ MPa
_________________
β1 = 0.829
⎛ 0.85 ⋅ β1 ⋅ f'c ⋅ 600⋅ MPa ⎞
ρmax := 0.75 ⋅ ⎜ ⎟
⎝ fy 600⋅ MPa + fy ⎠
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
ρmax = 0.023
0.85 ⋅ f'c ⎛ 2 ⋅ Mu ⎞⎟
ρ := ⋅⎜ 1 − 1−
JTC
ρ = 0.005
ISSUED FOR CONSTRUCTION (IFC)
f'c
0
0.25 MPa
MPa
otherwise
REVISIONS fy
DESIGNED BY: HMR
ENGINEERING DEPT.
ρmin ⋅ b ⋅ d otherwise
SMS
Compute number of required bars & spacing along the Main Direction (long):
⎛ 4 ⋅ Asuse ⎞
nL := floor ⎜ 1 + ⎟=8
⎜ π ⋅ ΦL
2 ⎟
OPERATING DEPT. ⎝ ⎠
1⋅m
SMS Spacing L := = 143⋅ mm say 125 mm
nL − 1
Compute number of required bars & spacing along the Transverse Direction:
THIS DRAWING IS
⎛ 4 ⋅ ρmin ⋅ d ⋅ b ⎞
nT := floor ⎜ 1 + ⎟=6
NOT
TO BE USED FOR
⎜ π ⋅ ΦT
2 ⎟
CONSTRUCTION ⎝ ⎠
OR FOR 1⋅m
ORDERING Spacing S := = 200⋅ mm say 200 mm
MATERIALS nT − 1
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CALCULATIONS
0
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
SLAB NOTATION: S1
JTC
MATERIAL STRENGTH:
fy := 415⋅ MPa
ISSUED FOR CONSTRUCTION (IFC)
DESIGN LOADS:
KN
Dead_Load := 7.80 ⋅
0
2
m
REVISIONS KN
Live_Load := 5.0 ⋅
DESIGNED BY: HMR 2
m
DATE: APRIL2011
db := 12 ⋅ mm
CHK’D BY: JTC
cover := 40mm
APPROVED
ENGINEERING DEPT.
Consider Short Direction Using Grashoff Load Distribution:
SMS
PARAMETERS :
Length
Ratio :=
Width
OPERATING DEPT. Ratio = 1.656
SMS bslab := 1m
From Grashoff Load Distribution, the Ultimate Load will be distributed by the
following ratio.
THIS DRAWING IS
4
NOT Ratio
TO BE USED FOR αg := αg = 0.883
4
CONSTRUCTION 1 + Ratio
OR FOR
ORDERING
MATERIALS Ratio of load that will be carried by Short Direction
UNTIL CERTIFIED
AND 1
DATED βg := βg = 0.117
CERTIFIED 4
1 + Ratio
BY: ___________________
Ratio of load that will be carried by Long Direction
DATE:
_________________
Ultimate_load := 1.2 ⋅ Dead_Load + 1.6 ⋅ Live_Load
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
KN
Ultimate_load = 17.36 ⋅
2
m
JTC
KN
Wαg := αg ⋅ Ultimate_load Wαg = 15.32 ⋅
2
m
KN
ISSUED FOR CONSTRUCTION (IFC)
GIVEN :
Beam Width b := 1000⋅ mm
Beam Depth t = 170⋅ mm
fy = 415⋅ MPa
f'c = 31 ⋅ MPa
0
2
wαg ⋅ Width
REVISIONS MuS := MuS = 28.33 ⋅ KN⋅ m
10
DESIGNED BY: HMR
deS := t − cover − 0.5db deS = 124⋅ mm
DATE: APRIL2011
fy
CHK’D BY: JTC MS := MS = 15.75
0.85 ⋅ f'c
APPROVED
MuS
RuS := RuS = 2.047 ⋅ MPa
ENGINEERING DEPT. 2
0.9 ⋅ bslab ⋅ deS
SMS
β1 := 0.85 if f'c ≤ 4000⋅ psi β1 = 0.825
f'c − 4000⋅ psi
0.85 − 0.05 ⋅ otherwise
1000⋅ psi
OPERATING DEPT.
SMS
⎛ 0.85 ⋅ β1 ⋅ f'c ⋅ 87000⋅ psi ⎞
ρ maxS := 0.75 ⋅ ⎜ ⎟ ρ maxS = 0.023
⎝ fy 87000⋅ psi + fy ⎠
1 ⎛ 2 ⋅ MS ⋅ RuS ⎞
THIS DRAWING IS
ρ S := ⋅⎜ 1 − 1 − ⎟ ρ S = 0.005141
NOT
TO BE USED FOR
MS ⎝ fy ⎠
CONSTRUCTION
OR FOR
ORDERING
MATERIALS ReportρS := "OK" if (ρ S < ρ maxS )
UNTIL CERTIFIED
AND "NG" otherwise
DATED
CERTIFIED ReportρS = "OK"
f'c
BY: ___________________ 0.25
MPa 2
DATE: A1S := bslab ⋅ deS A1S = 415.905⋅ mm Ref. ACI318M 2005 Sect 10.5.1
_________________ fy
MPa
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
MPa
2
A3S := ρ S ⋅ bslab ⋅ deS A3S = 637.501⋅ mm
ISSUED FOR CONSTRUCTION (IFC)
(
AsS := max A1S , A2S , A3S ) AsS = 637.501⋅ mm
2
No. of bars
⎛ 4 ⋅ AsS ⎞⎟
nS := floor ⎜ 1 + nS = 6
⎜ π ⋅ db ⎟⎠
2
⎝
bslab
Spacing S := Spacing S = 167⋅ mm
nS
SS := Spacing S if Spacing S < min ( 3 ⋅ t , 450mm ) Ref. ACI318M 2005 Sec 10.5.4
0
CHK’D BY: JTC Consider Long Direction Using Grashoff Load Distribution:
APPROVED βg = 0.117
KN
ENGINEERING DEPT. Ultimate_load = 17.36 ⋅
2
SMS
m
KN
Wβg := βg ⋅ Ultimate_load Wβg = 2.04 ⋅
2
m
KN
OPERATING DEPT. wβg := Wβg ⋅ bslab wβg = 2.04 ⋅
SMS
m
2
wβg ⋅ Length
MuL := MuL = 10.33 ⋅ KN⋅ m
10
THIS DRAWING IS deL := t − cover − 1.5 ⋅ db deL = 112⋅ mm
NOT
TO BE USED FOR fy
ML := ML = 15.75
CONSTRUCTION 0.85 ⋅ f'c
OR FOR
ORDERING
MuL
MATERIALS RuL := RuL = 0.915 ⋅ MPa
2
UNTIL CERTIFIED 0.9 ⋅ b ⋅ deL
AND
DATED
⎛ 0.85 ⋅ β1 ⋅ f'c ⋅ 87000⋅ psi ⎞
CERTIFIED ρ maxL := 0.75 ⋅ ⎜ ⎟
⎝ fy 87000⋅ psi + fy ⎠
BY: ___________________ ρ maxL = 0.023
DATE:
1 ⎛ 2 ⋅ ML ⋅ RuL ⎞
_________________
ρ L := ⋅⎜ 1 − 1− ⎟ ρ L = 0.002245
ML ⎝ fy ⎠
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
ReportρL = "OK"
f'c
0.25
MPa 2
ISSUED FOR CONSTRUCTION (IFC)
As1L := bslab ⋅ deL As1L = 375.656⋅ mm Ref. ACI318M 2005 Sec 10.5.1
fy
MPa
1.4 ⋅ bslab ⋅ deL 2
As2L := As2L = 377.831⋅ mm Ref. ACI318M 2005v Sec 10.5.1
fy
MPa
This condition of AsL will determine the minimum reinforcement along the
REVISIONS Long Direction if the aspect ratio is more than 2.0
( ) 2
DESIGNED BY: HMR
AsL := max As1L , As2L , As3L if Ratio ≤ 2.0 AsL = 377.831⋅ mm
DATE: APRIL2011
SMS
⎛ 4 ⋅ AsL ⎞
nL := floor ⎜ 1 + ⎟
⎜ π ⋅ db
2⎟
⎝ ⎠
OPERATING DEPT. nL = 4
SMS bslab
Spacing L :=
nL
SL := Spacing L if Spacing L < min ( 3 ⋅ t , 450mm ) SL = 250⋅ mm Ref. ACI318M 2005
THIS DRAWING IS
NOT min ( 3 ⋅ t , 450mm ) otherwise
TO BE USED FOR
Section 10.5.4
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED Check Minimum Slab Thickness
AND
DATED
CERTIFIED Ln := Length − width beam
Length − width beam
BY: ___________________ β :=
Width − width beam
DATE:
_________________ β = 1.723
Ln = 6.72 m
bbeam := 300mm hbeam := 460mm
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
1 3 9 4
Ibeam := bbeam ⋅ hbeam Ibeam = 2.433 × 10 ⋅ mm
12
JTC
f'c
Ebeam := 4700⋅ MPa Ebeam = 26168.49⋅ MPa
MPa
bslab = 1000⋅ mm
ISSUED FOR CONSTRUCTION (IFC)
hslab := t
1 3 8 4
Islab := bslab ⋅ hslab Islab = 4.094 × 10 ⋅ mm
12
Eslab := Ebeam
Ibeam ⋅ Ebeam
α fm := α fm = 5.944
Islab ⋅ Eslab
Ref. ACI318M 2005 Section 9.5.3.3 (b) and Section 9.5.3.3 (c), respectively
0
⎡ ⎛
Ln ⋅ ⎜ 0.80 +
fy ⎞⎤
⎢ ⎟⎥
h := max ⎢125mm ,
⎝ 1400 ⋅ MPa ⎠ if α > 0.20 ∧ α ≤ 2.0
⎥
( )
REVISIONS
fm fm
DESIGNED BY: HMR ⎣ 36 + 5 ⋅ β ⋅ α fm − 0.20 ⎦
DATE: APRIL2011 ⎡ ⎛
Ln ⋅ ⎜ 0.80 +
fy ⎞⎤
⎢ ⎟⎥
CHK’D BY: JTC
max ⎢90mm ,
⎝ 1400 ⋅ MPa ⎠ ⎥ if α > 2.0
fm
APPROVED
⎣ 36 + 9 ⋅ β ⎦
ENGINEERING DEPT.
h = 143.047⋅ mm
SMS
DATE:
_________________ Note :- the distance indicates that shear is measured as
"effective distance", deS from face of supporting
beam.
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
VuS = 31.042⋅ KN
JTC
KN
Wβg = 2.038 ⋅
2
m
LeL := LL − 2 ⋅ deL
1
VuL := ⋅ Wβg ⋅ LeL ⋅ bslab
2
VuL = 7.028 ⋅ KN
Allowable Shear
φ shear := 0.75 Ref. ACI318M 2005 Section 11.3.1.1
0
Check Deflection
2
3 ML 1 2
OPERATING DEPT.
Δ where : M wL Ref. Design of Concrete
SMS
32 EI 12
Structures Arthur Nilson 11 Edition, Eq 12.3
4
1 wL
Δ
THIS DRAWING IS 128 EI
NOT
TO BE USED FOR
Service_Load := Dead_Load + Live_Load
CONSTRUCTION
OR FOR
ORDERING
(
1αg ⋅ Service_Load ⋅ bslab ⋅ Width − width beam )4
MATERIALS δ actualS :=
UNTIL CERTIFIED 128Eslab ⋅ Islab
AND
DATED δ actualS = 1.906 ⋅ mm
CERTIFIED
(
1βg ⋅ Service_Load ⋅ bslab Length − width beam )4
δ actualL :=
BY: ___________________ 128Eslab ⋅ Islab
DATE:
_________________
δ actualL = 2.235 ⋅ mm
Width − width beam
δ allowable := Ref. ACI318M 2005 Table 9.5 (b)
360
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
δ allowable = 10.833⋅ mm
JTC
"Unsafe" otherwise
ISSUED FOR CONSTRUCTION (IFC)
Reportdeflection = "Safe"
SMS
say: db = 12mm @ 125mm C/C T&B
THIS DRAWING IS
NOT SLAB NOTATION: S2
TO BE USED FOR
BY: ___________________
SLAB DIMENSION: Length and width are measured C/C distances
DATE:
Length := 7.12m
_________________ Width := 4.30m
t := 170mm
width beam := 400mm
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
DESIGN LOADS:
KN
JTC
Dead_Load := 7.80 ⋅
2
m
KN
Live_Load := 5.0 ⋅
2
ISSUED FOR CONSTRUCTION (IFC)
m
db := 12 ⋅ mm
cover := 40mm
PARAMETERS :
Length
Ratio := Ratio = 1.656
Width
bslab := 1m
0
REVISIONS
From Grashoff Load Distribution, the Ultimate Load will be distributed by the
following ratio.
DESIGNED BY: HMR
4
Ratio
DATE: APRIL2011
αg := αg = 0.883
4
CHK’D BY: JTC 1 + Ratio
APPROVED
Ratio of load that will be carried by Short Direction
ENGINEERING DEPT.
1
SMS βg := βg = 0.117
4
1 + Ratio
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
2
wαg ⋅ Width
MuS := MuS = 28.33 ⋅ KN⋅ m
10
JTC
MuS
RuS := RuS = 2.047 ⋅ MPa
2
0.9 ⋅ bslab ⋅ deS
β1 := 0.85 if f'c ≤ 4000⋅ psi β1 = 0.825
f'c − 4000⋅ psi
0.85 − 0.05 ⋅ otherwise
1000⋅ psi
⎛ 0.85 ⋅ β1 ⋅ f'c ⋅ 87000⋅ psi ⎞
:= 0.75 ⋅ ⎜
ρ maxS ⎟ ρ maxS = 0.023
⎝ fy 87000⋅ psi + fy ⎠
1 ⎛ 2 ⋅ MS ⋅ RuS ⎞
0
ρ S := ⋅⎜ 1 − 1− ⎟ ρ S = 0.005141
MS ⎝ fy ⎠
REVISIONS
DATE:
_________________ bslab
Spacing S := Spacing S = 167⋅ mm
nS
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
2
REVISIONS wβg ⋅ Length
MuL := MuL = 10.33 ⋅ KN⋅ m
DESIGNED BY: HMR 10
DATE: APRIL2011 deL := t − cover − 1.5 ⋅ db deL = 112⋅ mm
CHK’D BY: JTC fy
ML := ML = 15.75
APPROVED 0.85 ⋅ f'c
MuL
ENGINEERING DEPT.
RuL := RuL = 0.915 ⋅ MPa
2
SMS 0.9 ⋅ b ⋅ deL
⎛ 0.85 ⋅ β1 ⋅ f'c ⋅ 87000⋅ psi ⎞
ρ maxL := 0.75 ⋅ ⎜ ⎟ ρ maxL = 0.023
⎝ fy 87000⋅ psi + fy ⎠
OPERATING DEPT.
1 ⎛ 2 ⋅ ML ⋅ RuL ⎞
ρ L := ⋅⎜ 1 − 1 − ⎟ ρ L = 0.002245
SMS ML ⎝ fy ⎠
THIS DRAWING IS
NOT
ReportρL := "OK" if (ρ L < ρ maxL ) ReportρL = "OK"
TO BE USED FOR
"NG" otherwise
CONSTRUCTION
OR FOR
ORDERING Ref. ACI318M 2005 Section 10.5.1
MATERIALS
UNTIL CERTIFIED f'c
AND 0.25
DATED MPa 2
CERTIFIED As1L := bslab ⋅ deL As1L = 375.656⋅ mm
fy
MPa
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
fy
MPa
2
As3L := ρ L ⋅ bslab ⋅ deL As3L = 251.455⋅ mm
ISSUED FOR CONSTRUCTION (IFC)
This condition of AsL will determine the minimum reinforcement along the Long
Direction if the aspect ratio is more than 2.0
AsL := (
max As1L , As2L , As3L ) if Ratio ≤ 2.0 AsL = 377.831⋅ mm
2
bslab
Spacing L :=
REVISIONS nL
DESIGNED BY: HMR
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
Islab ⋅ Eslab
fy
⎢ Ln ⋅ ⎜ 0.80 + ⎟
⎝ 1400⋅ MPa ⎠ ⎥
h := max ⎢125mm , ⎥ if α fm > 0.20 ∧ α fm ≤ 2.0
⎣ 36 + 5 ⋅ β ⋅ ( α fm − 0.20) ⎦
⎡ ⎛ fy ⎞⎤
⎢ Ln ⋅ ⎜ 0.80 + ⎟⎥
⎝ 1400⋅ MPa ⎠
max ⎢90mm , ⎥ if α fm > 2.0
⎣ 36 + 9 ⋅ β ⎦
h = 143.047⋅ mm
0
SMS
LeS := LS − 2 ⋅ deS
1
VuS := ⋅ Wαg ⋅ LeS ⋅ bslab
2
THIS DRAWING IS
NOT Note :- the distance indicates that shear is measured as
TO BE USED FOR
"effective distance", deS from face of supporting beam.
CONSTRUCTION
OR FOR VuS = 31.042⋅ KN
ORDERING
MATERIALS
UNTIL CERTIFIED Shear along Long direction
AND
DATED LL := Length
CERTIFIED
deL = 112⋅ mm
KN
BY: ___________________ Wβg = 2.038 ⋅
2
DATE:
_________________
m
LeL := LL − 2 ⋅ deL
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
1
VuL := ⋅ Wβg ⋅ LeL ⋅ bslab
2
JTC
VuL = 7.028 ⋅ KN
Allowable Shear
Ref. ACI318M 2005 Section 11.3.1.1
ISSUED FOR CONSTRUCTION (IFC)
φ shear := 0.75
VuSallowable := φ shear ⋅ 0.17 ⋅ f'c⋅ MPa ⋅ bslab ⋅ deS
VuSallowable = 88.026⋅ KN
"Fail" otherwise
REVISIONS
Reportshear = "Safe"
DESIGNED BY: HMR
DATE: APRIL2011
Check Deflection
CHK’D BY: JTC
Ref. Design of Concrete Structures
APPROVED Arthur Nilson 11 Edition Eq 12.3
2
ENGINEERING DEPT. 3 ML
Δ
SMS 32 EI
where :
1 2
M wL
12
OPERATING DEPT.
SMS
4
1 wL
Δ
128 EI
THIS DRAWING IS
NOT Service_Load := Dead_Load + Live_Load
TO BE USED FOR
(
1αg ⋅ Service_Load ⋅ bslab ⋅ Width − width beam )4
CONSTRUCTION
δ actualS :=
OR FOR
ORDERING
128Eslab ⋅ Islab
MATERIALS
UNTIL CERTIFIED
δ actualS = 1.906 ⋅ mm
( )4
AND
DATED 1βg ⋅ Service_Load ⋅ bslab Length − width beam
CERTIFIED
δ actualL :=
128Eslab ⋅ Islab
BY: ___________________ δ actualL = 2.235 ⋅ mm
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
"Unsafe" otherwise
Reportdeflection = "Safe"
2
AstS = 223.2 ⋅ mm
AstL := 0.0018bslab ⋅ deL
REVISIONS
2
DESIGNED BY: HMR AstL = 201.6 ⋅ mm
DATE: APRIL2011 ReportAst := "Within Limit" if AsS ≥ AstS ∧ AsL ≥ AstL
CHK’D BY: JTC
"NG Increase Reinforcement" otherwise
APPROVED
ReportAst = "Within Limit"
ENGINEERING DEPT.
SMS Summary
Slab thickness, t = 170⋅ mm
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
Width := 3.00m
t := 170mm
JTC
DESIGN LOADS:
KN
ISSUED FOR CONSTRUCTION (IFC)
Dead_Load := 7.80 ⋅
2
m
KN
Live_Load := 5.0 ⋅
2
m
db := 12 ⋅ mm
cover := 40mm
PARAMETERS :
Length
Ratio := Ratio = 2.373
REVISIONS Width
DESIGNED BY: HMR bslab := 1m
DATE: APRIL2011
CHK’D BY: JTC From Grashoff Load Distribution, the Ultimate Load will be distributed by the
APPROVED following ratio.
4
Ratio
ENGINEERING DEPT. αg := αg = 0.969
4
SMS 1 + Ratio
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
GIVEN :
2
wαg ⋅ Width
MuS := MuS = 15.15 ⋅ KN⋅ m
10
deS := t − cover − 0.5db deS = 124⋅ mm
fy
MS := MS = 15.75
0.85 ⋅ f'c
MuS
RuS := RuS = 1.095 ⋅ MPa
2
0
ρ S := ⋅⎜ 1 − 1 − ⎟ ρ S = 0.002695
MS ⎝ fy ⎠
ReportρS := "OK" if (ρ S < ρ maxS ) ReportρS = "OK"
OPERATING DEPT.
"NG" otherwise
SMS
DATE:
2
_________________
A3S := ρ S ⋅ bslab ⋅ deS A3S = 334.132⋅ mm
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
(
AsS := max A1S , A2S , A3S ) AsS = 418.313⋅ mm
2
JTC
No. of bars
⎛ 4 ⋅ AsS ⎞⎟
nS := floor ⎜ 1 +
⎜ π ⋅ db ⎟⎠
2
⎝
ISSUED FOR CONSTRUCTION (IFC)
nS = 4
bslab
Spacing S := Spacing S = 250⋅ mm
nS
SS = 250⋅ mm
REVISIONS
Consider Long Direction Using Grashoff Load Distribution:
DESIGNED BY: HMR βg = 0.031
DATE: APRIL2011 KN
Ultimate_load = 17.36 ⋅
CHK’D BY: JTC 2
m
APPROVED
KN
Wβg := βg ⋅ Ultimate_load Wβg = 0.53 ⋅
ENGINEERING DEPT. 2
m
SMS
KN
wβg := Wβg ⋅ bslab wβg = 0.53 ⋅
m
2
wβg ⋅ Length
OPERATING DEPT. MuL := MuL = 2.69 ⋅ KN⋅ m
10
SMS
deL := t − cover − 1.5 ⋅ db deL = 112⋅ mm
fy
ML := ML = 15.75
0.85 ⋅ f'c
THIS DRAWING IS
NOT MuL
TO BE USED FOR RuL := RuL = 0.238 ⋅ MPa
2
CONSTRUCTION
0.9 ⋅ b ⋅ deL
OR FOR
⎛ 0.85 ⋅ β1 ⋅ f'c ⋅ 87000⋅ psi ⎞
ρ maxL := 0.75 ⋅ ⎜
ORDERING
⎟ ρ maxL = 0.023
MATERIALS
UNTIL CERTIFIED ⎝ fy 87000⋅ psi + fy ⎠
1 ⎛ 2 ⋅ ML ⋅ RuL ⎞
AND
DATED
CERTIFIED ρ L := ⋅⎜ 1 − 1 − ⎟ ρ L = 0.000577
ML ⎝ fy ⎠
BY: ___________________
DATE:
_________________ ReportρL := "OK" if (ρ L < ρ maxL ) ReportρL = "OK"
"NG" otherwise
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
0.25
MPa 2
As1L := bslab ⋅ deL As1L = 375.656⋅ mm
fy
MPa
ISSUED FOR CONSTRUCTION (IFC)
This condition of AsL will determine the minimum reinforcement along the Long
Direction if the aspect ratio is more than 2.0
0
AsL := (
max As1L , As2L , As3L ) if Ratio ≤ 2.0 AsL = 201.6 ⋅ mm
2
SMS SL = 450⋅ mm
CONSTRUCTION
Length − width beam
OR FOR β := β = 2.585
ORDERING Width − width beam
MATERIALS
UNTIL CERTIFIED
AND bbeam := 300mm
DATED
CERTIFIED
hbeam := 460mm
1 3
BY: ___________________ Ibeam := bbeam ⋅ hbeam
12
DATE:
9 4
Ibeam = 2.433 × 10 ⋅ mm
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
f'c
Ebeam := 4700⋅ MPa Ebeam = 26168.49⋅ MPa
MPa
JTC
1 3
Islab := bslab ⋅ hslab
12
ISSUED FOR CONSTRUCTION (IFC)
8 4
Islab = 4.094 × 10 ⋅ mm
Eslab := Ebeam
Ibeam ⋅ Ebeam
α fm := α fm = 5.944
Islab ⋅ Eslab
Ref. ACI318M 2005 Section 9.5.3.3 (b) and Section 9.5.3.3 (c), respectively
⎡ ⎛ fy ⎞⎤
Ln ⋅ ⎜ 0.80 + ⎟
0
⎢ ⎝ 1400⋅ MPa ⎠ ⎥
h := max ⎢125mm , ⎥ if α fm > 0.20 ∧ α fm ≤ 2.0
REVISIONS ⎣ 36 + 5 ⋅ β ⋅ ( α fm − 0.20) ⎦
DESIGNED BY: HMR
⎡ ⎛ fy ⎞⎤
⎢ Ln ⋅ ⎜ 0.80 + ⎟⎥
DATE: APRIL2011
⎝ 1400⋅ MPa ⎠
max ⎢90mm , ⎥ if α fm > 2.0
⎣ 36 + 9 ⋅ β ⎦
CHK’D BY: JTC
APPROVED
ENGINEERING DEPT.
h = 124.33⋅ mm
SMS
VuS = 23.157⋅ KN
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
deL = 112⋅ mm
KN
Wβg = 0.53 ⋅
2
m
ISSUED FOR CONSTRUCTION (IFC)
LeL := LL − 2 ⋅ deL
1
VuL := ⋅ Wβg ⋅ LeL ⋅ bslab
2
VuL = 1.829 ⋅ KN
Allowable Shear
φ shear := 0.75
ENGINEERING DEPT. Reportshear := "Safe" if VuS < VuSallowable ∧ VuL < VuLallowable
SMS
"Fail" otherwise
Reportshear = "Safe"
δ allowable = 7.222 ⋅ mm
ISSUED FOR CONSTRUCTION (IFC)
"Unsafe" otherwise
Reportdeflection = "Safe"
AstL = 201.6 ⋅ mm
ReportAst := "Within Limit" if AsS ≥ AstS ∧ AsL ≥ AstL
REVISIONS
APPROVED
Summary
S4
THIS DRAWING IS
NOT SLAB NOTATION:
TO BE USED FOR
BY: ___________________
SLAB DIMENSION: Length and width are measured C/C distances
Length := 3.20m
DATE:
_________________ Width := 3.05m
t := 150mm
width beam := 400mm
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
DESIGN LOAD
KN
JTC
Dead_Load := 7.80 ⋅
2
m
KN
Live_Load := 5.0 ⋅
2
ISSUED FOR CONSTRUCTION (IFC)
m
db := 12 ⋅ mm
cover := 40mm
PARAMETERS :
Length
Ratio := Ratio = 1.049
Width
0
From Grashoff Load Distribution, the Ultimate Load will be distributed by the
following ratio.
REVISIONS
4
Ratio
DESIGNED BY: HMR
αg := αg = 0.548
4
DATE: APRIL2011 1 + Ratio
CHK’D BY: JTC
DATE:
_________________
Beam Width b := 1000⋅ mm
Beam Depth t = 150⋅ mm
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
2
wαg ⋅ Width
JTC
0.85 ⋅ f'c
MuS
RuS := RuS = 0.909 ⋅ MPa
2
0.9 ⋅ bslab ⋅ deS
β1 := 0.85 if f'c ≤ 4000⋅ psi
f'c − 4000⋅ psi
0.85 − 0.05 ⋅ otherwise
1000⋅ psi
β1 = 0.825
0
(ρ S < ρ maxS )
APPROVED
ReportρS := "OK" if ReportρS = "OK"
ENGINEERING DEPT.
"NG" otherwise
SMS
f'c
0.25
MPa 2
A1S := bslab ⋅ deS A1S = 348.824⋅ mm
fy
OPERATING DEPT.
MPa
SMS
( )
AND 2
DATED AsS := max A1S , A2S , A3S AsS = 350.843⋅ mm
CERTIFIED
BY: ___________________
No. of bars
⎛ 4 ⋅ AsS ⎞⎟
DATE:
nS := floor ⎜ 1 + nS = 4
⎜ π ⋅ db ⎟⎠
_________________
2
⎝
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
bslab
Spacing S := Spacing S = 250⋅ mm
nS
JTC
m
2
wβg ⋅ Length
REVISIONS MuL := MuL = 8.04 ⋅ KN⋅ m
10
DESIGNED BY: HMR
deL := t − cover − 1.5 ⋅ db deL = 92 ⋅ mm
DATE: APRIL2011
fy
CHK’D BY: JTC ML := ML = 15.75
0.85 ⋅ f'c
APPROVED
MuL
RuL := RuL = 1.055 ⋅ MPa
ENGINEERING DEPT.
2
0.9 ⋅ b ⋅ deL
SMS
ρ maxL := 0.75 ⋅ ⎜
⎛ 0.85 ⋅ β1 ⋅ f'c ⋅ 87000⋅ psi ⎞
⎟
⎝ fy 87000⋅ psi + fy ⎠
ρ maxL = 0.023
OPERATING DEPT.
1 ⎛ 2 ⋅ ML ⋅ RuL ⎞
SMS ρ L := ⋅⎜ 1 − 1− ⎟ ρ L = 0.002596
ML ⎝ fy ⎠
(ρ L < ρ maxL )
THIS DRAWING IS
NOT ReportρL := "OK" if ReportρL = "OK"
TO BE USED FOR
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
fy
MPa
2
As3L := ρ L ⋅ bslab ⋅ deL As3L = 238.787⋅ mm
ISSUED FOR CONSTRUCTION (IFC)
This condition of AsL will determine the minimum reinforcement along the Long
Direction if the aspect ratio is more than 2.0
AsL := (
max As1L , As2L , As3L ) if Ratio ≤ 2.0
No. of bars
⎛ 4 ⋅ AsL ⎞
0
nL := floor ⎜ 1 + ⎟ nL = 3
⎜ π ⋅ db
2⎟
REVISIONS ⎝ ⎠
DESIGNED BY: HMR
bslab
Spacing L :=
DATE: APRIL2011 nL
CHK’D BY: JTC
SMS
min ( 3 ⋅ t , 450mm ) otherwise
SL = 333⋅ mm
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
1 3
Islab := bslab ⋅ hslab
12
JTC
8 4
Islab = 2.813 × 10 ⋅ mm
Eslab := Ebeam
Ibeam ⋅ Ebeam
ISSUED FOR CONSTRUCTION (IFC)
α fm :=
Islab ⋅ Eslab
α fm = 8.652
Ref. ACI318M 2005 Section 9.5.3.3 (b) and Section 9.5.3.3 (c)
⎡ ⎛
Ln ⋅ ⎜ 0.80 +
fy ⎞⎤
⎢ ⎟⎥
h := max ⎢125mm ,
⎝ 1400 ⋅ MPa ⎠ if α > 0.20 ∧ α ≤ 2.0
⎥
⎣ 36 + 5 ⋅ β ⋅ ( fm
α − 0.20) ⎦ fm fm
0
⎡ ⎛
Ln ⋅ ⎜ 0.80 +
fy ⎞⎤
⎢ ⎟⎥
max ⎢90mm ,
⎝ 1400 ⋅ MPa ⎠ ⎥ if α > 2.0
REVISIONS fm
⎣ 36 + 9 ⋅ β ⎦
DESIGNED BY: HMR
h = 90 ⋅ mm
DATE: APRIL2011
ENGINEERING DEPT.
"NG increase slab thickness" otherwise
ReportSlabthickness = "OK"
SMS
Check shear:
Shear along Short direction
OPERATING DEPT. LS := Width
SMS deS = 104⋅ mm
KN
Wαg = 9.511 ⋅
2
m
THIS DRAWING IS
NOT bslab = 1 m
TO BE USED FOR
LeS := LS − 2 ⋅ deS
CONSTRUCTION
1
OR FOR
ORDERING
VuS := ⋅ Wαg ⋅ LeS ⋅ bslab VuS = 13.515⋅ KN
MATERIALS
2
UNTIL CERTIFIED Note :- the distance indicates that shear is measured as
AND
DATED "effective distance", deS from face of supporting
CERTIFIED
beam.
BY: ___________________
Shear along Long direction
DATE:
_________________
LL := Length
deL = 92 ⋅ mm
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
KN
Wβg = 7.849 ⋅
2
m
JTC
LeL := LL − 2 ⋅ deL
1
VuL := ⋅ Wβg ⋅ LeL ⋅ bslab
2
ISSUED FOR CONSTRUCTION (IFC)
VuL = 11.836⋅ KN
Allowable Shear
φ shear := 0.75
VuSallowable := φ shear ⋅ 0.17 ⋅ f'c⋅ MPa ⋅ bslab ⋅ deS Ref. ACI318M 2005 Sec 11.3.1.1
VuSallowable = 73.829⋅ KN
(
1αg ⋅ Service_Load ⋅ bslab ⋅ Width − width beam )4
δ actualS :=
128Eslab ⋅ Islab
THIS DRAWING IS
NOT
δ actualS = 0.367 ⋅ mm
( )4
TO BE USED FOR
1βg ⋅ Service_Load ⋅ bslab Length − width beam
CONSTRUCTION δ actualL :=
OR FOR 128Eslab ⋅ Islab
ORDERING
MATERIALS δ actualL = 0.378 ⋅ mm
UNTIL CERTIFIED
AND Width − width beam
DATED
CERTIFIED δ allowable := Ref. ACI318M 2005 Table 9.5 (b)
360
BY: ___________________
δ allowable = 7.361 ⋅ mm
DATE:
_________________ Reportdeflection := "Safe" if δ allowable > δ actualS ∧ δ allowable > δ actualL
"Unsafe" otherwise
Reportdeflection = "Safe"
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
2
AstS = 187.2 ⋅ mm
AstL := 0.0018bslab ⋅ deL
2
AstL = 165.6 ⋅ mm
ISSUED FOR CONSTRUCTION (IFC)
Summary
Slab thickness, t = 150⋅ mm
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CALCULATIONS
0
REVISIONS
DATE: APRIL2011
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
MATERIAL STRENGTH:
fy := 415⋅ MPa
ISSUED FOR CONSTRUCTION (IFC)
f'c := 31 ⋅ MPa
0
REVISIONS
DATE: APRIL2011
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
KN KN
w DL2 := 2.20 w LL := 2.5
m m
JTC
P := 15.60kN + 1.62kN
Service Moment:
2
Lslab
MDL1 :=
6
(w DL1a + 2 ⋅ w DL1b) = 134.56⋅ KN⋅ m
2
Lslab
MDL2 := w DL2 = 37.00 ⋅ KN⋅ m
0
2
2
Lslab
REVISIONS MLL := w LL = 42.05 ⋅ KN⋅ m
DESIGNED BY: HMR
2
Mp := P ⋅ Lslab
DATE: APRIL2011
APPROVED
Design Service Moment (Dead Load):
ENGINEERING DEPT. MDL := MDL1 + MDL2 + Mp = 271.44⋅ KN⋅ m
SMS
Design Service Moment (Live Load):
MLL = 42.05 ⋅ KN⋅ m
OPERATING DEPT.
Support Reaction (DL):
SMS
( )
PDL1 := 0.50 ⋅ w DL1a + w DL1b ⋅ Lslab = 52.20 ⋅ KN
PDL2 := w DL2 ⋅ Lslab = 12.76 ⋅ KN
PP := P = 17.22 ⋅ KN
THIS DRAWING IS
NOT PDL := PDL1 + PDL2 + PP = 82.18 ⋅ KN
TO BE USED FOR
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
"NG" otherwise
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
ρ min otherwise
Steel area
ISSUED FOR CONSTRUCTION (IFC)
2
Asc := ρ use ⋅ w slab ⋅ d = 2552.400⋅ mm
⎛ Asc ⎞
n := ceil ⎜ ⎟ = 9.00
⎝ Abar ⎠
⎛ w slab ⎞
Ssc := ⎜ ⎟ = 111⋅ mm
⎜ ⎛ Asc ⎞ ⎟
⎜ ceil ⎜ Abar ⎟ ⎟
⎝ ⎝ ⎠⎠
DATE: APRIL2011
Actual Shear
Mu
CHK’D BY: JTC Vul := = 292.73⋅ KN
APPROVED
(
h + 2 ⋅ twall − cover )
ENGINEERING DEPT.
Allowable Shear
SMS Ref. ACI318M 2005, Section 11.3.1.1
(
Vulallowable := φ shear ⋅ 0.17 ⋅ f'c⋅ MPa ⋅ ⎡⎣ twall − cover 1m⎤⎦ )
Vulallowable = 319.45⋅ KN
OPERATING DEPT. ReportVul := "OK" if (Vul < Vulallowable ) = "OK"
SMS "NG" otherwise
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
9 4
Ie_slab = 3.65 × 10 ⋅ mm
3
JTC
Pservice ⋅ Lslab
Δ point_load :=
3 ⋅ Econc ⋅ Ie_slab
Δ point_load = 1.54 ⋅ mm
ISSUED FOR CONSTRUCTION (IFC)
Total Deflection:
REVISIONS
Δ total_service := Δ point_load + Δ uni_load
DESIGNED BY: HMR Δ total_service = 3.00 ⋅ mm
DATE: APRIL2011 Lslab
Δ allowable :=
CHK’D BY: JTC 480
APPROVED Δ allowable = 12.08 ⋅ mm
ENGINEERING DEPT.
Therefore the cantilever ramp is safe:
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CALCULATIONS
0
REVISIONS
DATE: APRIL2011
7.4 DESIGN OF CORBEL
(FOR BEAMS)
CHK’D BY: JTC
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
MATERIAL STRENGTH:
fy := 415⋅ MPa
f'c := 31 ⋅ MPa
CORBEL PROPERTIES:
0
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
1
Pu := ⋅ Lbm ⋅ w u ⋅ w cor
2
JTC
Pu = 143.58⋅ KN
Mu := Pu ⋅ a v = 21.54 ⋅ KN⋅ m
Allowable Shear
φ shear := 0.75
"NG" otherwise
0
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
⎡ ⎛ ρ act ⋅ fy ⎞ ⎤
root ⎢0.90ρ act ⋅ fy ⋅ ⎜ 1 − ⎟ − Ru , ρ act⎥ = 0.000472
⎣ ⎝ 1.7 ⋅ f'c ⎠ ⎦
JTC
ρ min otherwise
Steel area
2
Asc := ρ use ⋅ w cor ⋅ d = 1180.723⋅ mm
⎛ Asc ⎞
n := ceil ⎜ ⎟ = 11.00
⎝ Abar ⎠
⎛ w cor ⎞
Ssc := ⎜ ⎟ = 100⋅ mm
0
⎝ n − 1⎠
REVISIONS
ENGINEERING DEPT.
MATERIAL STRENGTH:
SMS fy := 415⋅ MPa
f'c := 31 ⋅ MPa
CORBEL PROPERTIES:
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
h := 400mm
cover := 50mm
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
d := h − cover = 350⋅ mm
w cor := 1000mm
JTC
2
m
KN
Live_Load := 2.50 ⋅
2
m
db := 12 ⋅ mm
KN
w u := 1.2Dead_Load + ( 1.25) ⋅ ( 1.6) ⋅ Live_Load = 16.16 ⋅
2
m
π 2 2
Abar := ⋅ db = 113⋅ mm
4
0
ENGINEERING DEPT.
Check concrete section due to shearing stress
Allowable Shear
SMS
φ shear := 0.75
"NG" otherwise
THIS DRAWING IS
NOT
TO BE USED FOR Required reinforcements subjected to simple bending
CONSTRUCTION
OR FOR
ORDERING
Beam Width, w cor = 1000⋅ mm
MATERIALS
UNTIL CERTIFIED
Beam Depth, d = 350.00⋅ mm
AND β 1 := 0.85 if f'c ≤ 28 ⋅ MPa
DATED
0.65 if f'c > 55MPa
CERTIFIED
f'c − 28 ⋅ MPa
BY: ___________________ 0.85 − 0.05 ⋅ otherwise
DATE: 7 ⋅ MPa
_________________
β 1 = 0.83
⎛ 0.85 ⋅ β 1 ⋅ f'c 600⋅ MPa ⎞
ρ max := 0.75 ⋅ ⎜ ⋅ ⎟ = 0.02332
⎝ fy 600⋅ MPa + fy ⎠
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
1.4 ⋅ MPa
ρ min2 := = 0.00337
fy
ISSUED FOR CONSTRUCTION (IFC)
ρ act := 0.000423
⎡ ⎛ ρ act ⋅ fy ⎞ ⎤
REVISIONS root ⎢0.90ρ act ⋅ fy ⋅ ⎜ 1 − ⎟ − Ru , ρ act⎥ = 0.000423
DESIGNED BY: HMR
⎣ ⎝ 1.7 ⋅ f'c ⎠ ⎦
Hence, ρ act , is the same as the computed root.
DATE: APRIL2011
SMS
ρ min otherwise
Steel area
2
Asc := ρ use ⋅ w cor ⋅ d = 1180.723⋅ mm
OPERATING DEPT.
⎛ Asc ⎞
SMS n := ceil ⎜ ⎟ = 11.00
⎝ Abar ⎠
⎛ w cor ⎞
Ssc := ⎜ ⎟ = 100⋅ mm
THIS DRAWING IS
NOT
⎝ n − 1⎠
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING CORBEL NOTATION: CO3
MATERIALS
UNTIL CERTIFIED
AND
DATED
CORBEL LOCATION: 4TH - 5TH FLOOR ALONG GRIDLINE 2 / 3
CERTIFIED
MATERIAL STRENGTH:
BY: ___________________ fy := 415⋅ MPa
DATE: f'c := 31 ⋅ MPa
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CORBEL PROPERTIES:
ISSUED FOR CONSTRUCTION (IFC)
0
REVISIONS
DATE: APRIL2011
h := 400mm
cover := 50mm
CHK’D BY: JTC
d := h − cover = 350⋅ mm
APPROVED
w cor := 1000mm
ENGINEERING DEPT. Lbm := 18.970m − 2 ⋅ ( 0.60) m = 17.77 m
SMS a v := 150mm
DESIGN LOAD:
KN
Dead_Load := 10.55 ⋅
OPERATING DEPT.
2
m
SMS
KN
Live_Load := 5.00 ⋅
2
m
THIS DRAWING IS db := 12 ⋅ mm
NOT
KN
TO BE USED FOR
w u := 1.2Dead_Load + 1.6 ⋅ Live_Load = 20.66 ⋅
2
CONSTRUCTION m
OR FOR
ORDERING π 2 2
MATERIALS Abar := ⋅ db = 113⋅ mm
UNTIL CERTIFIED 4
AND
DATED
CERTIFIED Consider 1-meter strip of beam:
1
Pu := ⋅ Lbm ⋅ w u ⋅ w cor
BY: ___________________
2
DATE:
_________________
Pu = 183.56⋅ KN
Mu := Pu ⋅ a v = 27.53 ⋅ KN⋅ m
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
Allowable Shear
φ shear := 0.75
"NG" otherwise
Required reinforcements subjected to simple bending
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
ρ min otherwise
ISSUED FOR CONSTRUCTION (IFC)
Steel area
2
Asc := ρ use ⋅ w cor ⋅ d = 1180.723⋅ mm
⎛ Asc ⎞
n := ceil ⎜ ⎟ = 11.00
⎝ Abar ⎠
⎛ w cor ⎞
Ssc := ⎜ ⎟ = 100⋅ mm
⎝ n − 1⎠
0
ENGINEERING DEPT.
CORBEL PROPERTIES:
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
h := 400mm
BY: ___________________
cover := 50mm
DATE:
d := h − cover = 350⋅ mm
_________________ w cor := 1000mm
Lbm := 16.850m − 0.60m − 0.35m = 15.90 m
a v := 150mm
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
DESIGN LOAD:
KN
Dead_Load := 10.55 ⋅
JTC
2
m
KN
Live_Load := 5.00 ⋅
2
m
ISSUED FOR CONSTRUCTION (IFC)
db := 12 ⋅ mm
KN
w u := 1.2Dead_Load + 1.6 ⋅ Live_Load = 20.66 ⋅
2
m
π 2 2
Abar := ⋅ db = 113⋅ mm
4
Pu = 164.25⋅ KN
REVISIONS Mu := Pu ⋅ a v = 24.64 ⋅ KN⋅ m
DESIGNED BY: HMR
Mu
Ru := = 0.201 ⋅ MPa
2
w cor ⋅ d
ISSUED FOR CONSTRUCTION (IFC)
DATE: APRIL2011
Steel area
CHK’D BY: JTC 2
Asc := ρ use ⋅ w cor ⋅ d = 1180.723⋅ mm
APPROVED
⎛ Asc ⎞
n := ceil ⎜ ⎟ = 11.00
⎝ Abar ⎠
ENGINEERING DEPT.
⎛ w cor ⎞
SMS
Ssc := ⎜ ⎟ = 100⋅ mm
⎝ n − 1⎠
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS CALCULATIONS
DESIGNED BY: HMR
DATE: APRIL2011
APPROVED
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
PILE NOTATION: P2
JTC
GIVEN :
ISSUED FOR CONSTRUCTION (IFC)
MATERIAL STRENGTH:
kN
fy := 420⋅ MPa f'c := 31.0 ⋅ MPa w conc := 24
3
m
COLUMN LOAD: Ps := 2575.00kN
FIGURE:
0
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
Pu := 1.6 ⋅ Ps = 4120⋅ kN
SMS
COLUMN DIMENSION:
b := 500mm
OPERATING DEPT. h := 1500mm
SMS
PILE PARAMETERS :
Pcapacity := 1864kN
THIS DRAWING IS
Pdia := 1000mm
NOT
TO BE USED FOR
Npile := 2
CONSTRUCTION
OR FOR PILE CAP DIMENSION:
ORDERING
MATERIALS
BX := 4.0m
UNTIL CERTIFIED
AND
BY := 1.5m
DATED
CERTIFIED TCAP := 1.4m
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
PTOTAL = 2776.6⋅ kN
PP := = 1388.3⋅ kN
Npile
DESIGN MOMENT:
dm := 0.5m dm - distance from face of column to the CL of pile
Mu := dm ⋅ Pup = 1110.64⋅ kN ⋅ m
DATE: APRIL2011
Mu
CHK’D BY: JTC
Ru := = 0.548 ⋅ MPa
2
APPROVED 0.90 ⋅ bw ⋅ deff
ENGINEERING DEPT.
SMS
0.85 ⋅ f'c ⎛ 2 ⋅ Ru ⎞
ρ := ⎜1 − 1 − ⎟ = 0.001319 ρ max := 0.0033
fy ⎝ 0.85 ⋅ f'c ⎠
OPERATING DEPT.
4 TCAP
SMS
⋅ ρ = 0.001759 ρ min := 0.0018⋅ = 0.002057
3 deff
THIS DRAWING IS ⎛ ⎛
ρ use := min ⎜ max ⎜ ρ , ρ min ,
4 ⎞ ⎞
⋅ ρ ⎟ , ρ max ⎟, ρ use = 0.002057
NOT
TO BE USED FOR ⎝ ⎝ 3 ⎠ ⎠
CONSTRUCTION
OR FOR DESIGN SHEAR:
ORDERING
MATERIALS Vud := Pup = 2221.28⋅ kN
UNTIL CERTIFIED
AND
DATED
CERTIFIED
CHECK ONE-WAY SHEAR:
w Mu Vud ⋅ deff
w := 0.50m = 0.408 = 0.408 = 2.45
BY: ___________________ deff Vud ⋅ deff Mu
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
⎛ Vud ⋅ deff ⎞
VC1A := ⎜ 0.16 ⋅ f'c⋅ MPa + 17 ⋅ ρ use ⋅ ⋅ MPa ⎟ ⋅ bw ⋅ deff
JTC
⎝ Mu ⎠
VC1A = 1794.36⋅ kN
ISSUED FOR CONSTRUCTION (IFC)
VC2B = 8491.54⋅ kN
w
REVISIONS VC := (
max VC1A , VC1B ) if
deff
≥1
DESIGNED BY: HMR
w Mu Vud ⋅ deff
DATE: APRIL2011
APPROVED VC = 8491.54⋅ kN
ENGINEERING DEPT.
SMS
Result1shear := "Safe" if VC ≥ Vud Result1shear = "Safe"
"Unsafe" otherwise
OPERATING DEPT.
CHECK PUNCHING SHEAR DUE COLUMN:
SMS Pnet := Pu = 4120⋅ kN
( ) ( )
Pperimeter1 := 2 ⋅ ⎡⎣ b + deff + h + deff ⎤⎦ = 8900⋅ mm
1
THIS DRAWING IS Vp_c_allow := ⋅ f'c⋅ MPa ⋅ Pperimeter1 ⋅ deff = 20234.18⋅ kN
NOT 3
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING Resultp_shear := "Safe" if Vp_c_allow ≥ Pnet = "Safe" Resultp_shear = "Safe"
MATERIALS
UNTIL CERTIFIED "Unsafe" otherwise
AND
DATED
CERTIFIED
CHECK PUNCHING SHEAR DUE PILE:
π ⎛ Pdia
deff ⎞ ⎛ Pdia ⎞
BY: ___________________ Pperimeter2 := ⎜ + ⎟ + 2⋅⎜ + 0.25m ⎟ = 3247.51⋅ mm
2⎝ 2 2 ⎠ ⎝ 2 ⎠
DATE:
_________________ 1
Vp_p_allow := ⋅ f'c⋅ MPa ⋅ Pperimeter2 ⋅ deff = 7383.23⋅ kN
3
Pup = 2221.28⋅ kN
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
"Unsafe" otherwise
JTC
Sbar_bot := = 214.286⋅ mm
Nbar_bot − 1
REVISIONS
DESIGNED BY: HMR Therefore : Use Ԅ 25mm at 120mm C/C along X - direction
DATE: APRIL2011
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
GIVEN :
ISSUED FOR CONSTRUCTION (IFC)
MATERIAL STRENGTH:
kN
fy := 420⋅ MPa f'c := 31.0 ⋅ MPa w conc := 24
3
m
COLUMN LOAD: Ps := 16862kN
FIGURE :
0
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
Pu := 1.6 ⋅ Ps = 26979.2⋅ kN
THIS DRAWING IS
NOT
TO BE USED FOR
COLUMN DIMENSION:
b := 2030mm
CONSTRUCTION
OR FOR h := 850mm
ORDERING
MATERIALS
UNTIL CERTIFIED PILE PARAMETERS :
AND
DATED Pcapacity := 1864kN
CERTIFIED
Pdia := 1000mm
BY: ___________________
Npile := 10
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
BY := 6.324m
TCAP := 1.7m
dmX2 := 2.321m
ISSUED FOR CONSTRUCTION (IFC)
dmY := 1.077m
dmX1 := 1.071m
PTOTAL = 19184.17⋅ kN
MuX := 2dmX1 ⋅ Pup + dmX2 ⋅ Pup the multiplier "2" means there are two piles
acting in the determination of moment.
THIS DRAWING IS
NOT MuX = 13699.03⋅ kN⋅ m
TO BE USED FOR
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
4
⋅ ρ x = 0.003353 ρ max := 0.0033
3
TCAP
ISSUED FOR CONSTRUCTION (IFC)
DESIGN SHEAR:
Vudx := 3Pup the multiplier "3" means there are three piles acting in the
determination of shear.
Vudx = 9208.4⋅ kN
0
⎛ ⎞
SMS
Vudx1 ⋅ deff
vC1Ax1 := ⎜ 0.16 ⋅ f'c⋅ MPa + 17 ⋅ ρ usex ⋅ ⋅ MPa ⎟
⎝ MuX1 ⎠
vC1Ax1 = 0.97 ⋅ MPa
OPERATING DEPT.
vC1Bx := 0.17 ⋅ f'c ⋅ MPa vC1Bx = 0.95 ⋅ MPa
SMS
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
deff
MuX2 Vudx2 ⋅ deff
= 1.522 = 0.657
Vudx2 ⋅ deff MuX2
⎛ Vudx2 ⋅ deff ⎞
vC1Ax2 := ⎜ 0.16 ⋅ f'c⋅ MPa + 17 ⋅ ρ usex ⋅ ⋅ MPa ⎟
⎝ MuX2 ⎠
vC1Ax2 = 0.93 ⋅ MPa
vC1Bx = 0.95 ⋅ MPa
0
SMS
w x2 MuX2 Vudx2 ⋅ deff
(
min vC2Ax2 , vC2Bx ) if
deff
<1∧
Vudx2 ⋅ deff
≤ 1.0 ∧
MuX2
> 1.0
"Unsafe" otherwise
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
2⎝ 2 2 ⎠ ⎝ 2 ⎠
Pperimeter2 = 3483.13⋅ mm
ISSUED FOR CONSTRUCTION (IFC)
1
Vp_p_allow := ⋅ f'c ⋅ MPa ⋅ Pperimeter2 ⋅ deff Vp_p_allow = 9858.23⋅ kN
3
Pup = 3069.47⋅ kN
"Unsafe" otherwise
0
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
Therefore :
Use Ԅ 25mm at 100mm C/C along X - direction
JTC
THIS DRAWING IS
0.85 ⋅ f'c ⎛ 2 ⋅ RuY ⎞
NOT
TO BE USED FOR
ρ y := ⎜1 − 1 − ⎟ ρ y = 0.001694
CONSTRUCTION fy ⎝ 0.85 ⋅ f'c ⎠
OR FOR 4
ORDERING ⋅ ρ y = 0.002259 ρ max = 0.0033 ρ min = 0.002007
MATERIALS 3
UNTIL CERTIFIED
AND
⎛ ⎛ ⎞ ⎞
DATED
CERTIFIED 4
ρ use_y := min ⎜ max ⎜ ρ y , ρ min , ⋅ ρ y⎟ , ρ max ⎟ ρ use_y = 0.002259
⎝ ⎝ 3 ⎠ ⎠
BY: ___________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
Vudy = 12277.87⋅ kN
JTC
deff
MuY Vudy⋅ deff
= 0.706 = 1.416
Vudy⋅ deff MuY
⎛ Vudy⋅ deff ⎞
VC1Ay := ⎜ 0.16 ⋅ f'c⋅ MPa + 17 ⋅ ρ use_y ⋅ ⋅ MPa ⎟ ⋅ bwX ⋅ deff
⎝ MuY ⎠
VC1Ay = 12973.13⋅ kN
0
ENGINEERING DEPT.
VC2By := 0.83 ⋅ f'c⋅ MPa ⋅ bwX ⋅ deff = 63426.58⋅ kN
SMS
wy
VCY := (
max VC1Ay , VC1By ) if
deff
≥1
THIS DRAWING IS
NOT
TO BE USED FOR Result1shear_y := "Safe" if VCY ≥ Vudy Result1shear_y = "Safe"
CONSTRUCTION "Unsafe" otherwise
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
PILE CAP BOTTOM REINFORCEMENT - ALONG Y-AXIS:
AND db25 = 25 ⋅ mm
DATED
CERTIFIED 2
Ab25 = 490⋅ mm
As_bot_y := ρ use_y ⋅ bwX ⋅ deff
BY: ___________________
2
DATE: As_bot_y = 31004.15⋅ mm
_________________
⎛ As_bot_y ⎞
Nbar_bot_y := ceil ⎜ ⎟ = 64
⎝ Ab25 ⎠
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
bwX
Sbot_y := = 142.857⋅ mm
Nbar_bot_y − 1
JTC
db20 = 20 ⋅ mm
2
Ab20 = 314⋅ mm
As_top_y := 0.50ρ min ⋅ bwX ⋅ deff
2
As_top_y = 13770⋅ mm
⎛ As_top_y ⎞
Nbar_top_y := ceil ⎜ ⎟ = 44
⎝ Ab20 ⎠
bwX
Stop_y := = 209.302⋅ mm
0
Nbar_top_y − 1
REVISIONS
Therefore : Use Ԅ 25mm at 200mm C/C along Y – direction
DESIGNED BY: HMR
DATE: APRIL2011
GIVEN :
MATERIAL STRENGTH:
OPERATING DEPT. fy := 420⋅ MPa
SMS f'c := 31.0 ⋅ MPa
kN
w conc := 24
3
m
THIS DRAWING IS
NOT
TO BE USED FOR COLUMN LOAD:
CONSTRUCTION
Ps := 15148kN
OR FOR
ORDERING
Pu := 1.6 ⋅ Ps = 24236.8⋅ kN
MATERIALS
UNTIL CERTIFIED
AND FIGURE :
DATED
CERTIFIED
BY: ___________________
COLUMN DIMENSION:
b := 2030mm
DATE:
_________________ h := 850mm
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
PILE PARAMETERS :
Pcapacity := 1864kN
JTC
DATE: APRIL2011
TOTAL LOAD ON PILES:
CHK’D BY: JTC PTOTAL := Ps + W CAP
APPROVED
PTOTAL = 17470.17⋅ kN
ENGINEERING DEPT.
SMS
LOAD PER PILE:
PTOTAL
PP :=
Npile
PP = 1747.02⋅ kN
OPERATING DEPT.
Pup := 1.6 ⋅ PP
SMS
Pup = 2795.23⋅ kN
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
4
⋅ ρ x = 0.003396 ρ max := 0.0033
3
TCAP
ISSUED FOR CONSTRUCTION (IFC)
DESIGN SHEAR:
Vudx := 4Pup
Vudx = 11180.91⋅ kN
0
⎛ Vudx1 ⋅ deff ⎞
vC1Ax1 := ⎜ 0.16 ⋅ f'c⋅ MPa + 17 ⋅ ρ usex ⋅ ⋅ MPa ⎟
OPERATING DEPT. ⎝ MuX1 ⎠
SMS vC1Ax1 = 1.02 ⋅ MPa
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
w x1
vCX1 := (
max vC1Ax1 , vC1Bx ) if
deff
≥1
JTC
= 1.245 = 0.803
Vudx2 ⋅ deff MuX2
REVISIONS
THIS DRAWING IS
w x2 MuX2 Vudx2 ⋅ deff
( )
NOT
TO BE USED FOR min vC2Ax2 , vC2Bx if <1∧ ≤ 1.0 ∧ > 1.0
deff Vudx2 ⋅ deff MuX2
CONSTRUCTION
OR FOR vCX2 = 0.95 ⋅ MPa
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
w x3
vCX3 := (
max vC1Ax3 , vC1Bx ) if
deff
≥1
REVISIONS
"Unsafe" otherwise
OPERATING DEPT.
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
Pup = 2795.23⋅ kN
Resultp_c_shear := "Safe" if Vp_p_allow ≥ Pup Resultp_c_shear = "Safe"
JTC
"Unsafe" otherwise
db25 = 25 ⋅ mm
2
Ab25 = 490⋅ mm
2
As_bot_x := ρ usex ⋅ bwY ⋅ deff As_bot_x = 31825.53⋅ mm
⎛ As_bot_x ⎞
Nbar_bot_x := ceil ⎜ ⎟ = 65
⎝ Ab25 ⎠
bwY
Sbot_x := = 98.813⋅ mm
Nbar_bot_x − 1
0
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
4
⋅ ρ y = 0.002398 ρ max = 0.0033
3
ρ min = 0.002007
ISSUED FOR CONSTRUCTION (IFC)
⎛ ⎛
ρ use_y := min ⎜ max ⎜ ρ y , ρ min ,
4 ⎞ ⎞
⋅ ρ y⎟ , ρ max ⎟ ρ use_y = 0.002398
⎝ ⎝ 3 ⎠ ⎠
DESIGN SHEAR:
Vudy := 7Pup − ( 1460 + 1518) ⋅ kN
Vudy = 16588.59⋅ kN
w y1 := dmY1 = 0.238 m
MuY1 := 4dmY1 ⋅ Pup MuY1 = 2661.06⋅ kN ⋅ m
REVISIONS
Vudy1 := 4Pup Vudy1 = 11180.91⋅ kN
DESIGNED BY: HMR
w y1
DATE: APRIL2011
= 0.156
CHK’D BY: JTC
deff
APPROVED MuY1 Vudy1 ⋅ deff
= 0.156 = 6.408
Vudy1 ⋅ deff MuY1
ENGINEERING DEPT.
SMS
⎛ Vudy1 ⋅ deff ⎞
vC1Ay1 := ⎜ 0.16 ⋅ f'c⋅ MPa + 17 ⋅ ρ use_y ⋅ ⋅ MPa ⎟
⎝ MuY1 ⎠
vC1Ay1 = 1.15 ⋅ MPa
OPERATING DEPT.
SMS
vC1By := 0.17 ⋅ f'c ⋅ MPa vC1By = 0.95 ⋅ MPa
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
= 1.576
deff
MuY2 Vudy2 ⋅ deff
= 1.576 = 0.635
Vudy2 ⋅ deff MuY2
⎛ Vudy2 ⋅ deff ⎞
vC1Ay2 := ⎜ 0.16 ⋅ f'c⋅ MPa + 17 ⋅ ρ use_y ⋅ ⋅ MPa ⎟
⎝ MuY2 ⎠
vC1Ay2 = 0.92 ⋅ MPa
vC1By = 0.95 ⋅ MPa
⎛ deff ⎞ ⎛ Vudy2 ⋅ deff ⎞⎛ MuY2 ⎞
0
"Unsafe" otherwise
THIS DRAWING IS
NOT Result1shear_y = "Safe"
TO BE USED FOR
bwX
Sbot_y := = 134.328⋅ mm
Nbar_bot_y − 1
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
Therefore :
REVISIONS
FIGURE :
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
COLUMN DIMENSION:
JTC
b := 1000mm
h := 1730mm
PILE PARAMETERS :
ISSUED FOR CONSTRUCTION (IFC)
Pcapacity := 1864kN
Pdia := 1000mm
Npile := 4
CALCULATIONS :
PILE CAP DIMENSION:
BX := 4.0m
BY := 4.0m
TCAP := 1.4m
0
DATE: APRIL2011
TOTAL LOAD ON PILES:
CHK’D BY: JTC PTOTAL := Ps + W CAP = 6755.6⋅ kN
APPROVED
DESIGN MOMENT:
OPERATING DEPT. dm := 1.00m
SMS Mu := 2dm ⋅ Pup = 5404.48⋅ kN ⋅ m
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
⎛ ⎛
ρ use := min ⎜ max ⎜ ρ , ρ min ,
4 ⎞ ⎞
⋅ ρ ⎟ , ρ max ⎟ ρ use = 0.003239
⎝ ⎝ 3 ⎠ ⎠
JTC
DESIGN SHEAR:
Vud := 2Pup = 5404.48⋅ kN
ISSUED FOR CONSTRUCTION (IFC)
⎛ Vud ⋅ deff ⎞
VC1A := ⎜ 0.16 ⋅ f'c ⋅ MPa + 17 ⋅ ρ use ⋅ ⋅ MPa ⎟ ⋅ bw ⋅ deff
⎝ Mu ⎠
0
VC1A = 4695.6⋅ kN
VC1B := 0.17 ⋅ f'c⋅ MPa ⋅ bw ⋅ deff = 4637.95⋅ kN
REVISIONS
⎛ deff ⎞ ⎛ Vud ⋅ deff ⎞⎛ Mu ⎞
VC2A := ⎜ ⎟ ⋅ ⎜ 0.16 ⋅ f'c⋅ MPa + 17 ⋅ ρ use ⋅
DESIGNED BY: HMR
⋅ MPa ⎟ ⋅ ⎜ 3.5 − 2.5 ⋅ ⎟ ⋅ bw ⋅ deff
DATE: APRIL2011 ⎝ w ⎠⎝ Mu ⎠⎝ Vud ⋅ deff ⎠
CHK’D BY: JTC VC2A = 8393.39⋅ kN
APPROVED VC2B := 0.83 ⋅ f'c⋅ MPa ⋅ bw ⋅ deff = 22644.1⋅ kN
w
ENGINEERING DEPT.
VC := (
max VC1A , VC1B ) if
deff
≥1
SMS
w Mu Vud ⋅ deff
(
min VC2A , VC2B ) if
deff
<1∧
Vud ⋅ deff
≤ 1.0 ∧
Mu
> 1.0
OPERATING DEPT.
VC = 8393.39⋅ kN
SMS
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
2⎝ 2 2 ⎠ ⎝ 2 ⎠
1
Vp_p_allow := ⋅ f'c⋅ MPa ⋅ Pperimeter2 ⋅ deff = 7383.23⋅ kN
3
ISSUED FOR CONSTRUCTION (IFC)
Pup = 2702.24⋅ kN
Resultp_c_shear := "Safe" if Vp_p_allow ≥ Pup = "Safe"
"Unsafe" otherwise
Resultp_c_shear = "Safe"
⎝ ⎝ 180 ⎠ ⎠
REVISIONS
Ledge_shear = 3771.32⋅ mm
DESIGNED BY: HMR Vedge := 0.16 ⋅ f'c⋅ MPa ⋅ Ledge_shear ⋅ deff
DATE: APRIL2011 Vedge = 4115.57⋅ kN
CHK’D BY: JTC Resultedge_shear := "Safe" if Vedge ≥ Pup Resultedge_shear = "Safe"
APPROVED
"Unsafe" otherwise
ENGINEERING DEPT.
CONSTRUCTION
OR FOR Therefore : Use Ԅ 25mm at 125mm C/C along X and Y - direction
ORDERING
MATERIALS
UNTIL CERTIFIED PILE CAP TOP REINFORCEMENT:
AND
DATED db20 = 20 ⋅ mm
CERTIFIED
2 2
As_top := 0.50ρ min ⋅ bw ⋅ deff = 5040⋅ mm As_top = 5040⋅ mm
BY: ___________________ ⎛ As_top ⎞ bw
Nbar_top := ceil ⎜ ⎟ = 17 Sbar_top := = 250⋅ mm
DATE:
_________________ ⎝ Ab20 ⎠ Nbar_top − 1
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
PILE NOTATION: P5
JTC
GIVEN :
ISSUED FOR CONSTRUCTION (IFC)
MATERIAL STRENGTH:
kN
fy := 420⋅ MPa f'c := 31.0 ⋅ MPa w conc := 24
3
m
COLUMN LOAD: Ps := 8052.00kN Pu := 1.6 ⋅ Ps = 12883.2⋅ kN
FIGURE :
0
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
BY: ___________________
PILE CAP DIMENSION:
DATE:
_________________ BX := 5.036m
BY := 5.036m
TCAP := 1.4m
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
W CAP = 852.14⋅ kN
PTOTAL = 8904.14⋅ kN
DESIGN MOMENT:
REVISIONS dm := 1.268m
DESIGNED BY: HMR
Mu := 2dm ⋅ Pup
DATE: APRIL2011
Mu = 7225.89⋅ kN ⋅ m
CHK’D BY: JTC
SMS
deff := TCAP − 175mm
deff = 1.225 ⋅ m
Mu
Ru := Ru = 1.062 ⋅ MPa
2
OPERATING DEPT. 0.90 ⋅ bw ⋅ deff
0.85 ⋅ f'c ⎛ 2 ⋅ Ru ⎞
SMS
ρ := ⎜1 − 1 − ⎟ ρ = 0.002583
fy ⎝ 0.85 ⋅ f'c ⎠
4
THIS DRAWING IS ⋅ ρ = 0.003444 ρ max := 0.0033
NOT 3
TO BE USED FOR
TCAP
CONSTRUCTION ρ min := 0.0018⋅ ρ min = 0.002057
OR FOR deff
ORDERING
MATERIALS ⎛ ⎛
ρ use := min ⎜ max ⎜ ρ , ρ min ,
4 ⎞ ⎞
⋅ ρ ⎟ , ρ max ⎟ ρ use = 0.0033
UNTIL CERTIFIED
AND ⎝ ⎝ 3 ⎠ ⎠
DATED
CERTIFIED
DESIGN SHEAR:
Vud := 2Pup
BY: ___________________
DATE:
Vud = 5698.65⋅ kN
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
w Mu Vud ⋅ deff
= 1.035 = 1.035 = 0.966
deff Vud ⋅ deff Mu
ISSUED FOR CONSTRUCTION (IFC)
⎛ Vud ⋅ deff ⎞
VC1A := ⎜ 0.16 ⋅ f'c⋅ MPa + 17 ⋅ ρ use ⋅ ⋅ MPa ⎟ ⋅ bw ⋅ deff
⎝ Mu ⎠
VC1A = 5830.05⋅ kN
VC1B := 0.17 ⋅ f'c⋅ MPa ⋅ bw ⋅ deff = 5839.18⋅ kN
⎛ deff ⎞ ⎛ Vud ⋅ deff ⎞⎛ Mu ⎞
VC2A := ⎜ ⎟ ⋅ ⎜ 0.16 ⋅ f'c⋅ MPa + 17 ⋅ ρ use ⋅ ⋅ MPa ⎟ ⋅ ⎜ 3.5 − 2.5 ⋅ ⎟ ⋅ bw ⋅ deff
⎝ w ⎠⎝ Mu ⎠⎝ Vud ⋅ deff ⎠
VC2A = 5138.07⋅ kN
VC2B := 0.83 ⋅ f'c⋅ MPa ⋅ bw ⋅ deff = 28508.92⋅ kN
0
w
VC := (
max VC1A , VC1B ) if
deff
≥1
REVISIONS
VC = 5839.18⋅ kN
CHK’D BY: JTC
APPROVED
ENGINEERING DEPT.
SMS
Result1shear := "Safe" if VC ≥ Vud Result1shear = "Safe"
"Unsafe" otherwise
CONSTRUCTION
"Unsafe" otherwise
OR FOR Resultp_shear = "Safe"
ORDERING
MATERIALS
UNTIL CERTIFIED
AND CHECK PUNCHING SHEAR DUE PILE:
DATED
π ⎛ Pdia
deff ⎞ ⎛ Pdia ⎞
CERTIFIED
Pperimeter2 := ⎜ + ⎟ + 2⋅⎜ + 0.25m ⎟
2⎝ 2 2 ⎠ ⎝ 2 ⎠
BY: ___________________ Pperimeter2 = 3247.51⋅ mm
DATE: 1
_________________ Vp_p_allow := ⋅ f'c⋅ MPa ⋅ Pperimeter2 ⋅ deff
3
Vp_p_allow = 7383.23⋅ kN
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
Pup = 2849.32⋅ kN
Resultp_c_shear := "Safe" if Vp_p_allow ≥ Pup Resultp_c_shear = "Safe"
JTC
"Unsafe" otherwise
BX − b
Dedge := − dm Dedge = 750⋅ mm
2
Pdia = 1000⋅ mm
⎛ Dedge Pdia ⎞
Ledge_shear := 2 ⋅ ⎜ + + 325mm ⎟ Ledge_shear = 3771.32⋅ mm
⎜ sin⎛⎜ 45 ⋅ π ⎞⎟ 2
⎟
⎝ ⎝ 180 ⎠ ⎠
Vedge := 0.16 ⋅ f'c⋅ MPa ⋅ Ledge_shear ⋅ deff Vedge = 4115.57⋅ kN
0
Nbar_bot := ceil ⎜ ⎟ = 42
⎝ Ab25 ⎠
bw
OPERATING DEPT. Sbar_bot := = 122.829⋅ mm
Nbar_bot − 1
SMS
bw
BY: ___________________ Sbar_top := = 251.8 ⋅ mm
DATE:
Nbar_top − 1
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
PILE NOTATION: P6
JTC
GIVEN :
ISSUED FOR CONSTRUCTION (IFC)
MATERIAL STRENGTH:
kN
fy := 420⋅ MPa f'c := 31.0 ⋅ MPa w conc := 24
3
m
COLUMN LOAD: Ps := 8943.00kN Pu := 1.6 ⋅ Ps = 14308.8⋅ kN
FIGURE :
0
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
THIS DRAWING IS
NOT PILE PARAMETERS :
TO BE USED FOR Pcapacity := 1864kN
CONSTRUCTION Pdia := 1000mm
OR FOR
ORDERING Npile := 6
MATERIALS
UNTIL CERTIFIED dmX := 1.5m
AND
DATED
CERTIFIED
PILE CAP DIMENSION:
BX := 6.5m
BY: ___________________
BY := 4.0m
DATE:
_________________ TCAP := 1.7m
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
DESIGN MOMENT:
dmX = 1.50 m
0
REVISIONS
REQUIRED STEEL RATIO:
DESIGNED BY: HMR
bwY := BY = 4 m
DATE: APRIL2011
deff := TCAP − 175mm
CHK’D BY: JTC
deff = 1.525 ⋅ m
APPROVED
MuX
ENGINEERING DEPT. RuX := RuX = 0.956 ⋅ MPa
2
SMS 0.90 ⋅ bwY ⋅ deff
SMS 3
TCAP
ρ min := 0.0018⋅ ρ min = 0.002007
deff
THIS DRAWING IS ⎛ ⎛
ρ usex := min ⎜ max ⎜ ρ x , ρ min ,
4 ⎞ ⎞
⋅ ρ x ⎟ , ρ max ⎟
NOT ρ usex = 0.003092
TO BE USED FOR ⎝ ⎝ 3 ⎠ ⎠
CONSTRUCTION
OR FOR DESIGN SHEAR:
ORDERING
MATERIALS Vudx := 2Pup
UNTIL CERTIFIED
AND Vudx = 5335.36⋅ kN
DATED
CERTIFIED
CHECK ONE-WAY SHEAR:
BY: ___________________ w x := dmX = 1.50 m
DATE: wx MuX Vudx ⋅ deff
_________________ = 0.984 = 0.984 = 1.017
deff Vudx ⋅ deff MuX
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
⎛ Vudx ⋅ deff ⎞
VC1Ax := ⎜ 0.16 ⋅ f'c⋅ MPa + 17 ⋅ ρ usex ⋅ ⋅ MPa ⎟ ⋅ bwY ⋅ deff
⎝ MuX ⎠
JTC
VC1Ax = 5760.1⋅ kN
VC1Bx := 0.17 ⋅ f'c⋅ MPa ⋅ bwY ⋅ deff
VC1Bx = 5773.77⋅ kN
ISSUED FOR CONSTRUCTION (IFC)
DATE: APRIL2011
Result1shear_x := "Safe" if VCX ≥ Vudx Result1shear_x = "Safe"
CHK’D BY: JTC
APPROVED
"Unsafe" otherwise
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
"Unsafe" otherwise
JTC
Resultp_c_shear = "Safe"
BX − b
Dedge := − dmX Dedge = 750⋅ mm
2
Pdia = 1000⋅ mm
⎛ Dedge Pdia ⎞
Ledge_shear := 2 ⋅ ⎜ + + 325mm ⎟
⎜ sin⎛⎜ 45 ⋅ π ⎞⎟ 2
⎟
⎝ ⎝ 180 ⎠ ⎠
Ledge_shear = 3771.32⋅ mm
REVISIONS
ENGINEERING DEPT.
PILE CAP BOTTOM REINFORCEMENT:
SMS
2
db25 = 25 ⋅ mm Ab25 = 490⋅ mm
2
As_bot_x := ρ usex ⋅ bwY ⋅ deff As_bot_x = 18859.62⋅ mm
OPERATING DEPT.
⎛ As_bot_x ⎞
SMS
Nbar_bot_x := ceil ⎜ ⎟ = 39
⎝ Ab25 ⎠
bwY
Sbot_x := = 105.263⋅ mm
THIS DRAWING IS Nbar_bot_x − 1
NOT
TO BE USED FOR
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
bwY
Stop_x := = 333.333⋅ mm
Nbar_top_x − 1
JTC
MuY
RuY := RuY = 0.485 ⋅ MPa
2
REVISIONS 0.90 ⋅ bwX ⋅ deff
OPERATING DEPT.
DESIGN SHEAR:
Vudy := 3Pup
SMS
Vudy = 8003.04⋅ kN
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
⎛ Vudy⋅ deff ⎞
VC1Ay := ⎜ 0.16 ⋅ f'c⋅ MPa + 17 ⋅ ρ use_y ⋅ ⋅ MPa ⎟ ⋅ bwX ⋅ deff
JTC
⎝ MuY ⎠
VC1Ay = 9455.5⋅ kN
VC1By := 0.17 ⋅ f'c⋅ MPa ⋅ bwX ⋅ deff
ISSUED FOR CONSTRUCTION (IFC)
VC1By = 9382.38⋅ kN
⎛ deff ⎞ ⎛ Vudy⋅ deff ⎞⎛ MuY ⎞
VC2Ay := ⎜ ⎟ ⋅ ⎜ 0.16 ⋅ f'c⋅ MPa + 17 ⋅ ρ use_y ⋅ ⋅ MPa ⎟ ⋅ ⎜ 3.5 − 2.5 ⋅ ⎟ ⋅ bwX ⋅ deff
⎝ wy ⎠ ⎝ MuY ⎠⎝ Vudy⋅ deff ⎠
VC2Ay = 37535.48⋅ kN
VC2By := 0.83 ⋅ f'c⋅ MPa ⋅ bwX ⋅ deff
VC2By = 45808.09⋅ kN
wy
VCY := (
max VC1Ay , VC1By ) if
deff
≥1
0
APPROVED
Result1shear_y := "Safe" if VCY ≥ Vudy Result1shear_y = "Safe"
ENGINEERING DEPT.
"Unsafe" otherwise
SMS
⎛ As_top_y ⎞
Nbar_top_y := ceil ⎜ ⎟ = 32
⎝ Ab20 ⎠
JTC
bwX
Stop_y := = 209.677⋅ mm
Nbar_top_y − 1
ISSUED FOR CONSTRUCTION (IFC)
PILE NOTATION: P7
PILE LOCATION: GRIDLINE B/ 5
GIVEN :
MATERIAL STRENGTH:
0
kN
fy := 420⋅ MPa f'c := 31.0 ⋅ MPa w conc := 24
3
REVISIONS m
DESIGNED BY: HMR COLUMN LOAD: Ps := 11678kN Pu := 1.6 ⋅ Ps = 18684.8⋅ kN
DATE: APRIL2011
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED COLUMN DIMENSION:
b := 1000mm
BY: ___________________ h := 850mm
DATE:
_________________
PILE PARAMETERS :
Pcapacity := 1864kN dmY := 1.740m
Pdia := 1000mm Npile := 7
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
BY := 4.0m
dmX1 := 0.75m
dmX2 := 2.00m
ISSUED FOR CONSTRUCTION (IFC)
TCAP := 1.7m
PTOTAL
PP := PP = 1819.83⋅ kN
Npile
REVISIONS
Pup := 1.6 ⋅ PP Pup = 2911.73⋅ kN
DESIGNED BY: HMR
DATE: APRIL2011
CONSIDER ALONG X - DIRECTION:
CHK’D BY: JTC
DESIGN MOMENT:
APPROVED dmX1 = 0.75 m dmX2 = 2.00 m
ENGINEERING DEPT.
MuX := 2dmX1 ⋅ Pup + dmX2 ⋅ Pup
SMS MuX = 10191.04⋅ kN⋅ m
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
DESIGN SHEAR:
Vudx := 3Pup
JTC
Vudx = 8735.18⋅ kN
⎛ Vudx1 ⋅ deff ⎞
0
CHK’D BY: JTC vC2Ax1 := ⎜ ⎟ ⋅ ⎜ 0.16 ⋅ f'c⋅ MPa + 17 ⋅ ρ usex ⋅ ⋅ MPa ⎟ ⋅ ⎜ 3.5 − 2.5 ⋅ ⎟
⎝ w x1 ⎠ ⎝ MuX1 ⎠⎝ Vudx1 ⋅ deff ⎠
APPROVED
vC2Ax1 = 4.64 ⋅ MPa
ENGINEERING DEPT.
vC2Bx := 0.83 ⋅ f'c⋅ MPa vC2Bx = 4.62 ⋅ MPa
SMS
w x1
vCX1 := (
max vC1Ax1 , vC1Bx ) if
deff
≥1
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
w x2
vCX2 := (
max vC1Ax2 , vC1Bx ) if
deff
≥1
VCX = 33963.36⋅ kN
Result1shear_x := "Safe" if VCX ≥ Vudx
REVISIONS
"Unsafe" otherwise
THIS DRAWING IS
NOT Resultp_shear = "Safe"
TO BE USED FOR
CONSTRUCTION
OR FOR
CHECK PUNCHING SHEAR DUE PILE:
ORDERING π ⎛ Pdia
deff ⎞ ⎛ Pdia ⎞
MATERIALS Pperimeter2 := ⎜ + ⎟ + 2⋅⎜ + 0.25m ⎟
UNTIL CERTIFIED 2⎝ 2 2 ⎠ ⎝ 2 ⎠
AND
DATED Pperimeter2 = 3483.13⋅ mm
CERTIFIED
1
Vp_p_allow := ⋅ f'c⋅ MPa ⋅ Pperimeter2 ⋅ deff
BY: ___________________ 3
DATE: Vp_p_allow = 9858.23⋅ kN
_________________
Pup = 2911.73⋅ kN
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
"Unsafe" otherwise
JTC
Resultp_c_shear = "Safe"
BX − b
Dedge := − dmX1
2
3
Dedge = 2 × 10 ⋅ mm
Pdia = 1000⋅ mm
⎛ Dedge Pdia ⎞
Ledge_shear := 2 ⋅ ⎜ + + 325mm ⎟ Ledge_shear = 7306.85⋅ mm
⎜ sin⎛⎜ 45 ⋅ π ⎞⎟ 2
⎟
⎝ ⎝ 180 ⎠ ⎠
Vedge := 0.16 ⋅ f'c⋅ MPa ⋅ Ledge_shear ⋅ deff Vedge = 9926.61⋅ kN
0
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
dmY = 1.740 m
MuY := 2dmY ⋅ Pup
MuY = 10132.81⋅ kN⋅ m
ISSUED FOR CONSTRUCTION (IFC)
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
wy
VCY := (
max VC1Ay , VC1By ) if
deff
≥1
JTC
VCY = 9382.38⋅ kN
ISSUED FOR CONSTRUCTION (IFC)
"Unsafe" otherwise
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
PILE NOTATION: P8
JTC
MATERIAL STRENGTH:
kN
ISSUED FOR CONSTRUCTION (IFC)
FIGURE :
0
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
w x1
= 1.311
deff
JTC
⎛ Vudx1 ⋅ deff ⎞
vC1Ax1 := ⎜ 0.16 ⋅ f'c⋅ MPa + 17 ⋅ ρ usex ⋅ ⋅ MPa ⎟
⎝ MuX1 ⎠
vC1Ax1 = 0.93 ⋅ MPa
vC1Bx := 0.17 ⋅ f'c⋅ MPa
vC1Bx = 0.95 ⋅ MPa
⎛ deff ⎞ ⎛ Vudx1 ⋅ deff ⎞⎛ MuX1 ⎞
vC2Ax1 := ⎜ ⎟ ⋅ ⎜ 0.16 ⋅ f'c⋅ MPa + 17 ⋅ ρ usex ⋅ ⋅ MPa ⎟ ⋅ ⎜ 3.5 − 2.5 ⋅ ⎟
⎝ w x1 ⎠ ⎝ MuX1 ⎠⎝ Vudx1 ⋅ deff ⎠
vC2Ax1 = 0.16 ⋅ MPa
0
w x2
vCX2 := (
max vC1Ax2 , vC1Bx ) if
deff
≥1
JTC
"Unsafe" otherwise
Pperimeter1 = 9800⋅ mm
REVISIONS
1
DESIGNED BY: HMR Vp_c_allow := ⋅ f'c⋅ MPa ⋅ Pperimeter1 ⋅ deff
3
DATE: APRIL2011
Vp_c_allow = 27736.75⋅ kN
CHK’D BY: JTC
Resultp_shear := "Safe" if Vp_c_allow ≥ Pnet
APPROVED
"Unsafe" otherwise
ENGINEERING DEPT.
Resultp_shear = "Safe"
SMS
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
⎛ Dedge Pdia ⎞
Ledge_shear := 2 ⋅ ⎜ + + 325mm ⎟ Ledge_shear = 3771.32⋅ mm
⎜ sin⎛⎜ 45 ⋅ π ⎞⎟ 2
⎟
JTC
⎝ ⎝ 180 ⎠ ⎠
Vedge := 0.16 ⋅ f'c⋅ MPa ⋅ Ledge_shear ⋅ deff Vedge = 5123.47⋅ kN
ISSUED FOR CONSTRUCTION (IFC)
"Unsafe" otherwise
Resultedge_shear = "Safe"
⎛ As_bot_x ⎞
Nbar_bot_x := ceil ⎜ ⎟ = 60
REVISIONS ⎝ Ab25 ⎠
DESIGNED BY: HMR bwY
Sbot_x := = 98.814⋅ mm
DATE: APRIL2011 Nbar_bot_x − 1
CHK’D BY: JTC
Therefore : Use Ԅ 25mm at 90mm C/C along X - direction
APPROVED
PILE CAP TOP REINFORCEMENT:
ENGINEERING DEPT.
db20 = 20 ⋅ mm
SMS
2
Ab20 = 314⋅ mm
As_top_x := 0.50ρ min ⋅ bwY ⋅ deff
2
OPERATING DEPT. As_top_x = 8919.9⋅ mm
SMS ⎛ As_top_x ⎞
Nbar_top_x := ceil ⎜ ⎟ = 29
⎝ Ab20 ⎠
bwY
THIS DRAWING IS Stop_x := = 208.214⋅ mm
NOT Nbar_top_x − 1
TO BE USED FOR
CONSTRUCTION
OR FOR
Therefore : Use Ԅ 25mm at 200mm C/C along X - direction
ORDERING
MATERIALS
UNTIL CERTIFIED CONSIDER ALONG Y - DIRECTION:
AND DESIGN MOMENT:
DATED
CERTIFIED dmY = 1.740 m
MuY := 3dmY ⋅ Pup
BY: ___________________
MuY = 15061.91⋅ kN⋅ m
DATE:
_________________
REQUIRED STEEL RATIO:
bwX := BX = 6.5 m
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
deff = 1.525 ⋅ m
MuY
JTC
RuY :=
2
0.90 ⋅ bwX ⋅ deff
RuY = 1.107 ⋅ MPa
ρ y := ⎜1 − 1 − ⎟ ρ y = 0.002694
fy ⎝ 0.85 ⋅ f'c ⎠
4
⋅ ρ y = 0.003592 ρ max = 0.0033
3
ρ min = 0.002007
⎛ ⎛
ρ use_y := min ⎜ max ⎜ ρ y , ρ min ,
4 ⎞ ⎞
⋅ ρ y⎟ , ρ max ⎟
⎝ ⎝ 3 ⎠ ⎠
ρ use_y = 0.0033
0
DESIGN SHEAR:
Vudy := 3Pup
REVISIONS
Vudy = 8656.27⋅ kN
DESIGNED BY: HMR
DATE: APRIL2011
CHECK ONE-WAY SHEAR:
CHK’D BY: JTC w y := dmY
APPROVED w y = 1.74 m
ENGINEERING DEPT. wy
= 1.141
SMS deff
MuY
= 1.141
Vudy⋅ deff
OPERATING DEPT. Vudy⋅ deff
SMS
= 0.876
MuY
⎛ Vudy⋅ deff ⎞
VC1Ay := ⎜ 0.16 ⋅ f'c⋅ MPa + 17 ⋅ ρ use_y ⋅ ⋅ MPa ⎟ ⋅ bwX ⋅ deff
⎝ MuY ⎠
THIS DRAWING IS
NOT VC1Ay = 9317.85⋅ kN
TO BE USED FOR
VC1By := 0.17 ⋅ f'c⋅ MPa ⋅ bwX ⋅ deff
CONSTRUCTION
OR FOR VC1By = 9382.38⋅ kN
ORDERING
MATERIALS
⎛ deff ⎞ ⎛ Vudy⋅ deff ⎞⎛ MuY ⎞
UNTIL CERTIFIED
VC2Ay := ⎜ ⎟ ⋅ ⎜ 0.16 ⋅ f'c⋅ MPa + 17 ⋅ ρ use_y ⋅ ⋅ MPa ⎟ ⋅ ⎜ 3.5 − 2.5 ⋅ ⎟ ⋅ bwX ⋅ deff
AND
DATED ⎝ wy ⎠ ⎝ MuY ⎠⎝ Vudy⋅ deff ⎠
CERTIFIED
VC2Ay = 5288.15⋅ kN
BY: ___________________
VC2By := 0.83 ⋅ f'c⋅ MPa ⋅ bwX ⋅ deff = 45808.09⋅ kN
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
wy
VCY := (
max VC1Ay , VC1By ) if
deff
≥1
JTC
VCY = 9382.38⋅ kN
ISSUED FOR CONSTRUCTION (IFC)
"Unsafe" otherwise
Result1shear_y = "Safe"
2
As_bot_y = 32711.25⋅ mm
⎛ As_bot_y ⎞
REVISIONS
APPROVED Nbar_bot_y − 1
SMS
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
PILE NOTATION: P9
JTC
MATERIAL STRENGTH:
ISSUED FOR CONSTRUCTION (IFC)
kN
fy := 420⋅ MPa f'c := 31.0 ⋅ MPa w conc := 24
3
m
COLUMN LOAD: Ps := 14845.00kN Pu := 1.6 ⋅ Ps = 23752⋅ kN
FIGURE :
0
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
COLUMN DIMENSION:
THIS DRAWING IS b := 1000mm
NOT h := 1730mm
TO BE USED FOR
PILE PARAMETERS :
CONSTRUCTION
OR FOR
Pcapacity := 1864kN
ORDERING
MATERIALS
Pdia := 1000mm
UNTIL CERTIFIED
AND
Npile := 9
DATED
CERTIFIED dm := 2.0m
PILE CAP DIMENSION:
BY: ___________________ BX := 6.5m
DATE: BY := 6.5m
_________________
TCAP := 1.65m
WEIGHT OF PILE CAP:
W CAP := w conc ⋅ BX ⋅ BY ⋅ TCAP
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
W CAP = 1673.1⋅ kN
JTC
DESIGN MOMENT:
dm = 2 m
Mu := 3dm ⋅ Pup Mu = 17619.31⋅ kN ⋅ m
0
SMS
0.85 ⋅ f'c ⎛ 2 ⋅ Ru ⎞
ρ := ⎜1 − 1 − ⎟ ρ = 0.003388
fy ⎝ 0.85 ⋅ f'c ⎠
4
OPERATING DEPT. ⋅ ρ = 0.004517 ρ max := 0.0033
3
SMS
TCAP
ρ min := 0.0018⋅ ρ min = 0.002014
deff
THIS DRAWING IS
⎛ ⎛
ρ use := min ⎜ max ⎜ ρ , ρ min ,
4 ⎞ ⎞
⋅ ρ ⎟ , ρ max ⎟ ρ use = 0.0033
NOT
TO BE USED FOR
⎝ ⎝ 3 ⎠ ⎠
CONSTRUCTION
OR FOR
DESIGN SHEAR:
ORDERING Vud := 3Pup Vud = 8809.65⋅ kN
MATERIALS
UNTIL CERTIFIED
AND
DATED CHECK ONE-WAY SHEAR:
CERTIFIED w := dm w = 2m
w Mu Vud ⋅ deff
BY: ___________________ = 1.356 = 1.356 = 0.737
DATE:
deff Vud ⋅ deff Mu
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
⎛ Vud ⋅ deff ⎞
VC1A := ⎜ 0.16 ⋅ f'c⋅ MPa + 17 ⋅ ρ use ⋅ ⋅ MPa ⎟ ⋅ bw ⋅ deff
JTC
⎝ Mu ⎠
VC1A = 8937.62⋅ kN
VC1B := 0.17 ⋅ f'c⋅ MPa ⋅ bw ⋅ deff
ISSUED FOR CONSTRUCTION (IFC)
VC1B = 9074.76⋅ kN
⎛ deff ⎞ ⎛ Vud ⋅ deff ⎞⎛ Mu ⎞
VC2A := ⎜ ⎟ ⋅ ⎜ 0.16 ⋅ f'c⋅ MPa + 17 ⋅ ρ use ⋅ ⋅ MPa ⎟ ⋅ ⎜ 3.5 − 2.5 ⋅ ⎟ ⋅ bw ⋅ deff
⎝ w ⎠⎝ Mu ⎠⎝ Vud ⋅ deff ⎠
VC2A = 726.18⋅ kN
VC2B := 0.83 ⋅ f'c⋅ MPa ⋅ bw ⋅ deff
VC2B = 44306.18⋅ kN
w
VC := (
max VC1A , VC1B ) if
deff
≥1
0
w Mu Vud ⋅ deff
REVISIONS
(
min VC2A , VC2B ) if
deff
<1∧
Vud ⋅ deff
≤ 1.0 ∧
Mu
> 1.0
"Unsafe" otherwise
THIS DRAWING IS Resultp_shear = "Safe"
NOT
TO BE USED FOR
CHECK PUNCHING SHEAR DUE PILE:
CONSTRUCTION
OR FOR π ⎛ Pdia
deff ⎞ ⎛ Pdia ⎞
ORDERING Pperimeter2 := ⎜ + ⎟ + 2⋅⎜ + 0.25m ⎟ Pperimeter2 = 3443.86⋅ mm
MATERIALS 2⎝ 2 2 ⎠ ⎝ 2 ⎠
UNTIL CERTIFIED
AND 1
DATED Vp_p_allow := ⋅ f'c⋅ MPa ⋅ Pperimeter2 ⋅ deff Vp_p_allow = 9427.51⋅ kN
CERTIFIED 3
Pup = 2936.55⋅ kN
BY: ___________________ Resultp_c_shear := "Safe" if Vp_p_allow ≥ Pup Resultp_c_shear = "Safe"
DATE:
_________________ "Unsafe" otherwise
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
BX − b
Dedge := − dm Dedge = 750⋅ mm
2
Pdia = 1000⋅ mm
⎛ ⎞
ISSUED FOR CONSTRUCTION (IFC)
Dedge Pdia
Ledge_shear := 2 ⋅ ⎜ + + 325mm ⎟
⎜ sin⎛⎜ 45 ⋅ π ⎞⎟ 2
⎟
⎝ ⎝ 180 ⎠ ⎠
Ledge_shear = 3771.32⋅ mm
Vedge := 0.16 ⋅ f'c⋅ MPa ⋅ Ledge_shear ⋅ deff Vedge = 4955.49⋅ kN
"Unsafe" otherwise
0
REVISIONS
PILE CAP BOTTOM REINFORCEMENT:
db25 = 25 ⋅ mm
DESIGNED BY: HMR
2
DATE: APRIL2011 Ab25 = 490⋅ mm
CHK’D BY: JTC As_bot := ρ use ⋅ bw ⋅ deff
APPROVED 2
As_bot = 31638.75⋅ mm
ENGINEERING DEPT.
⎛ As_bot ⎞
SMS Nbar_bot := ceil ⎜ ⎟ = 65
⎝ Ab25 ⎠
bw
Sbot := = 101.563⋅ mm
Nbar_bot − 1
Use Ԅ 25mm at 100mm C/C along X and Y- direction
OPERATING DEPT.
Therefore :
SMS
PILE CAP TOP REINFORCEMENT:
2
db20 = 20 ⋅ mm Ab20 = 314⋅ mm
THIS DRAWING IS
NOT As_top := 0.50ρ min ⋅ bw ⋅ deff
TO BE USED FOR
2
As_top = 9652.5⋅ mm
CONSTRUCTION
OR FOR ⎛ As_top ⎞
ORDERING
Nbar_top := ceil ⎜ ⎟ = 31
⎝ Ab20 ⎠
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED bw
Stop := = 216.667⋅ mm
Nbar_top − 1
BY: ___________________
DATE:
_________________ Therefore : Use Ԅ 25mm at 200mm C/C along X and Y- direction
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
MATERIAL STRENGTH:
kN
ISSUED FOR CONSTRUCTION (IFC)
FIGURE :
0
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
COLUMN DIMENSION:
b := 21750mm
OPERATING DEPT. h := 500mm
SMS
PILE PARAMETERS :
Pcapacity := 1864kN
Pdia := 1000mm
THIS DRAWING IS
NOT Npile := 28
TO BE USED FOR
dmX := 0.75m
CONSTRUCTION
OR FOR dmY1 := 1.00m
ORDERING
MATERIALS dmY2 := 5.325m
UNTIL CERTIFIED
AND
DATED
CERTIFIED
PILE CAP DIMENSION:
BX := 24.75m
2
BY: ___________________ ACAP := 202.80m
DATE:
_________________ BY := 12.65m
TCAP := 1.5m
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
W CAP = 7300.8⋅ kN
TOTAL LOAD ON PILES:
PTOTAL := Ps + W CAP
ISSUED FOR CONSTRUCTION (IFC)
PTOTAL = 52102.8⋅ kN
SMS
MuX
RuX :=
2
0.90 ⋅ bwY ⋅ deff
RuX = 0.447 ⋅ MPa
SMS ρ x := ⎜1 − 1 − ⎟ ρ x = 0.001073
fy ⎝ 0.85 ⋅ f'c ⎠
4
⋅ ρ x = 0.001431 ρ max := 0.0033
3
THIS DRAWING IS
NOT TCAP
TO BE USED FOR ρ min := 0.0018⋅ ρ min = 0.002038
deff
CONSTRUCTION
OR FOR ⎛ ⎛
ρ use_x := min ⎜ max ⎜ ρ x , ρ min ,
4 ⎞ ⎞
⋅ ρ x ⎟ , ρ max ⎟ ρ use_x = 0.002038
ORDERING
MATERIALS ⎝ ⎝ 3 ⎠ ⎠
UNTIL CERTIFIED
AND
DATED DESIGN SHEAR:
CERTIFIED
Vudx := 4Pup
Vudx = 11909.21⋅ kN
BY: ___________________
DATE:
_________________ Determine 1-way Shearing Stress (consider 4 piles):
w x := dmX w x = 750⋅ mm
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
⎛ Vudx ⋅ deff ⎞
VC1Ax := ⎜ 0.16 ⋅ f'c⋅ MPa + 17 ⋅ ρ use_x ⋅ ⋅ MPa ⎟ ⋅ bwY ⋅ deff
⎝ MuX ⎠
ISSUED FOR CONSTRUCTION (IFC)
VC1Ax = 15957.42⋅ kN
VC1Bx := 0.17 ⋅ f'c⋅ MPa ⋅ bwY ⋅ deff
VC1Bx = 15864.86⋅ kN
⎛ deff ⎞ ⎛ Vudx ⋅ deff ⎞⎛ MuX ⎞
VC2Ax := ⎜ ⎟ ⋅ ⎜ 0.16 ⋅ f'c⋅ MPa + 17 ⋅ ρ use_x ⋅ ⋅ MPa ⎟ ⋅ ⎜ 3.5 − 2.5 ⋅ ⎟ ⋅ bwY ⋅ deff
⎝ wx ⎠ ⎝ MuX ⎠⎝ Vudx ⋅ deff ⎠
VC2Ax = 58776.49⋅ kN
VC2Bx := 0.83 ⋅ f'c⋅ MPa ⋅ bwY ⋅ deff
VC2Bx = 77457.83⋅ kN
0
wx
REVISIONS
VCX := (
max VC1Ax , VC1Bx ) if
deff
≥1
APPROVED
VCX = 58776.49⋅ kN
Result1shear_x := "Safe" if VCX ≥ Vudx
ENGINEERING DEPT.
SMS
"Unsafe" otherwise
Result1shear_x = "Safe"
BY: ___________________
CHECK PUNCHING SHEAR DUE PILE:
π ⎛ Pdia deff ⎞ ⎛ Pdia ⎞
DATE:
_________________ Pperimeter2 := ⎜ + ⎟ + 2⋅⎜ + 0.25m ⎟
2⎝ 2 2 ⎠ ⎝ 2 ⎠
Pperimeter2 = 3326.05⋅ mm
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
1
Vp_p_allow := ⋅ f'c⋅ MPa ⋅ Pperimeter2 ⋅ deff
3
JTC
Vp_p_allow = 8179.08⋅ kN
Pup = 2977.3⋅ kN
Resultp_c_shear := "Safe" if Vp_p_allow ≥ Pup
ISSUED FOR CONSTRUCTION (IFC)
"Unsafe" otherwise
Resultp_c_shear = "Safe"
⎟
⎝ ⎝ 180 ⎠ ⎠
REVISIONS Vedge := 0.16 ⋅ f'c⋅ MPa ⋅ Ledge_shear ⋅ deff
DESIGNED BY: HMR
Vedge = 4451.54⋅ kN
DATE: APRIL2011
BY: ___________________
PILE CAP TOP REINFORCEMENT (ALONG X-AXIS) :
2
DATE: db20 = 20 ⋅ mm Ab20 = 314⋅ mm
_________________
As_min_x := 0.50ρ min ⋅ bwY ⋅ deff
2
As_min_x = 17077.5⋅ mm
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
⎛ As_min_x ⎞
Nbar_x_min := ceil ⎜ ⎟ = 55
⎝ Ab20 ⎠
JTC
bwY
Smin_top_x := = 234.259⋅ mm
Nbar_x_min − 1
ISSUED FOR CONSTRUCTION (IFC)
deff = 1.325 ⋅ m
REVISIONS
MuY
DESIGNED BY: HMR RuY :=
2
DATE: APRIL2011 0.90 ⋅ bwX ⋅ deff
CHK’D BY: JTC RuY = 2.889 ⋅ MPa
APPROVED
0.85 ⋅ f'c ⎛ 2 ⋅ RuY ⎞
ρ y := ⎜1 − 1 − ⎟ ρ y = 0.007304
ENGINEERING DEPT. fy ⎝ 0.85 ⋅ f'c ⎠
SMS 4
⋅ ρ y = 0.009739 ρ max = 0.0033
3
ρ min = 0.002038
OPERATING DEPT.
⎛ ⎛
ρ use_y := min ⎜ max ⎜ ρ y , ρ min ,
4 ⎞ ⎞
⋅ ρ y⎟ , ρ max ⎟
SMS ⎝ ⎝ 3 ⎠ ⎠
ρ use_y = 0.0033
DESIGN SHEAR:
THIS DRAWING IS
NOT Vudy := 12Pup Vudy = 35727.63⋅ kN
TO BE USED FOR
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
w y1
vcY1 := (
max vc1Ay1 , vc1By1 ) if
deff
≥1
⎝ MuY2 ⎠
vc1Ay2 = 0.9 ⋅ MPa
OPERATING DEPT. vc1By2 := 0.17 ⋅ f'c⋅ MPa vc1By2 = 0.95 ⋅ MPa
SMS ⎛ deff ⎞ ⎛ Vudy2 ⋅ deff ⎞⎛ MuY2 ⎞
vc2Ay2 := ⎜ ⎟ ⋅ ⎜ 0.16 ⋅ f'c⋅ MPa + 17 ⋅ ρ use_y ⋅ ⋅ MPa ⎟ ⋅ ⎜ 3.5 − 2.5 ⋅ ⎟
⎝ w y2 ⎠ ⎝ MuY2 ⎠⎝ Vudy2 ⋅ deff ⎠
vc2Ay2 = −1.47 ⋅ MPa
THIS DRAWING IS
NOT vc2By2 := 0.83 ⋅ f'c⋅ MPa vc2By2 = 4.62 ⋅ MPa
TO BE USED FOR
w y2
CONSTRUCTION vcY2 := (
max vc1Ay2 , vc1By2 ) if
deff
≥1
OR FOR
ORDERING
MATERIALS
w y2 MuY2 Vudy2 ⋅ deff
UNTIL CERTIFIED
AND (
min vc2Ay2 , vc2By2 ) if
deff
<1∧
Vudy2 ⋅ deff
≤ 1.0 ∧
MuY2
> 1.0
DATED
CERTIFIED
vcY2 = 0.95 ⋅ MPa
BY: ___________________
TOTAL ALLOWABLE SHEAR:
DATE:
_________________ ( )
VCY := vcY1 + vcY2 ⋅ bwX ⋅ deff
VCY = 98695.45⋅ kN
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
"Unsafe" otherwise
JTC
Result1shear_y = "Safe"
db25 = 25 ⋅ mm
( )
As_y := ρ use_y ⋅ bwX − 6.375 ⋅ 2m ⋅ deff As_y = 52470⋅ mm
2
⎛ As_y ⎞
Nbar_y := ceil ⎜ ⎟ = 108
⎝ Ab25 ⎠
bwX − 6.375 ⋅ 2m
Sbar_y := = 112.15⋅ mm
Nbar_y − 1
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
MATERIAL STRENGTH:
kN
ISSUED FOR CONSTRUCTION (IFC)
FIGURE :
0
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
W CAP = 1419.6⋅ kN
PTOTAL = 15566.6⋅ kN
DESIGN MOMENT:
dm = 0.75 m
0
0.85 ⋅ f'c ⎛ 2 ⋅ Ru ⎞
SMS
ρ := ⎜1 − 1 − ⎟ ρ = 0.001712
fy ⎝ 0.85 ⋅ f'c ⎠
4
⋅ ρ = 0.002283 ρ max := 0.0033
OPERATING DEPT.
3
SMS TCAP
ρ min := 0.0018⋅ ρ min = 0.002057
deff
⎛ ⎛
ρ use := min ⎜ max ⎜ ρ , ρ min ,
4 ⎞ ⎞
⋅ ρ ⎟ , ρ max ⎟ ρ use = 0.002283
THIS DRAWING IS
NOT ⎝ ⎝ 3 ⎠ ⎠
TO BE USED FOR
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
⎛ Vud ⋅ deff ⎞
VC1A := ⎜ 0.16 ⋅ f'c⋅ MPa + 17 ⋅ ρ use ⋅ ⋅ MPa ⎟ ⋅ bw ⋅ deff
JTC
⎝ Mu ⎠
VC1A = 7598.06⋅ kN
VC1B := 0.17 ⋅ f'c⋅ MPa ⋅ bw ⋅ deff
ISSUED FOR CONSTRUCTION (IFC)
VC1B = 7536.67⋅ kN
⎛ deff ⎞ ⎛ Vud ⋅ deff ⎞⎛ Mu ⎞
VC2A := ⎜ ⎟ ⋅ ⎜ 0.16 ⋅ f'c⋅ MPa + 17 ⋅ ρ use ⋅ ⋅ MPa ⎟ ⋅ ⎜ 3.5 − 2.5 ⋅ ⎟ ⋅ bw ⋅ deff
⎝ w ⎠⎝ Mu ⎠⎝ Vud ⋅ deff ⎠
VC2A = 24440.42⋅ kN
VC2B := 0.83 ⋅ f'c⋅ MPa ⋅ bw ⋅ deff
VC2B = 36796.66⋅ kN
w
VC := (
max VC1A , VC1B ) if
deff
≥1
0
w Mu Vud ⋅ deff
REVISIONS
(
min VC2A , VC2B ) if
deff
<1∧
Vud ⋅ deff
≤ 1.0 ∧
Mu
> 1.0
OPERATING DEPT.
( ) (
Pperimeter1 := 2 ⋅ ⎡⎣ b + deff + h + deff ⎤⎦ ) Pperimeter1 = 22300⋅ mm
1
SMS Vp_c_allow := ⋅ f'c⋅ MPa ⋅ Pperimeter1 ⋅ deff
3
Vp_c_allow = 50699.13⋅ kN
Resultp_shear := "Safe" if Vp_c_allow ≥ Pnet
THIS DRAWING IS
NOT
TO BE USED FOR "Unsafe" otherwise
Resultp_shear = "Safe"
CONSTRUCTION
OR FOR
ORDERING
MATERIALS CHECK PUNCHING SHEAR DUE PILE:
π ⎛ Pdia
deff ⎞ ⎛ Pdia ⎞
UNTIL CERTIFIED
AND
Pperimeter2 := ⎜ + ⎟ + 2⋅⎜ + 0.25m ⎟
2⎝ 2 2 ⎠ ⎝ 2 ⎠
DATED
CERTIFIED
Pperimeter2 = 3247.51⋅ mm
BY: ___________________ 1
Vp_p_allow := ⋅ f'c⋅ MPa ⋅ Pperimeter2 ⋅ deff
DATE:
_________________
3
Vp_p_allow = 7383.23⋅ kN
Pup = 2767.4⋅ kN
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
"Unsafe" otherwise
JTC
Resultp_c_shear = "Safe"
BX − b
Dedge := − dm Dedge = 750⋅ mm
2
Pdia = 1000⋅ mm
⎛ Dedge Pdia ⎞
Ledge_shear := 2 ⋅ ⎜ + + 325mm ⎟ Ledge_shear = 3771.32⋅ mm
⎜ sin⎛⎜ 45 ⋅ π ⎞⎟ 2
⎟
⎝ ⎝ 180 ⎠ ⎠
Vedge := 0.16 ⋅ f'c⋅ MPa ⋅ Ledge_shear ⋅ deff Vedge = 4115.57⋅ kN
Resultedge_shear := "Safe" if Vedge ≥ Pup Resultedge_shear = "Safe"
0
"Unsafe" otherwise
OPERATING DEPT.
Therefore : Use Ԅ 25mm at 150mm C/C along X and Y- direction
SMS
PILE CAP TOP REINFORCEMENT (TEMPERATURE BARS):
2
db20 = 20 ⋅ mm Ab20 = 314⋅ mm
As_min := 0.50ρ min ⋅ bw ⋅ deff
THIS DRAWING IS
NOT 2
TO BE USED FOR As_min = 8190⋅ mm
CONSTRUCTION ⎛ As_min ⎞
OR FOR Nbar_min := ceil ⎜ ⎟ = 27
ORDERING
MATERIALS
⎝ Ab20 ⎠
UNTIL CERTIFIED bw
AND Sbar_min := = 250⋅ mm
DATED
CERTIFIED
Nbar_min − 1
BY: ___________________
Therefore : Use Ԅ 20mm at 200mm C/C along X and Y- direction
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
MATERIAL STRENGTH:
kN
ISSUED FOR CONSTRUCTION (IFC)
FIGURE :
0
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
COLUMN DIMENSION:
SMS b := 6900mm
dm := 0.55m
h := 3900mm
THIS DRAWING IS
NOT PILE PARAMETERS :
TO BE USED FOR
Pcapacity := 1864kN
CONSTRUCTION
OR FOR Pdia := 1000mm
ORDERING
MATERIALS Npile := 9
UNTIL CERTIFIED
AND
DATED
CERTIFIED PILE CAP DIMENSION:
It is assumed that a total of 4T (40kN) will be the weight of Two Elevator cars, which
BY: ___________________
will be added to Ps.
BX := 8.10m
DATE:
_________________ BY := 6.50m
TCAP := 1.4m
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
DESIGN MOMENT:
dm = 0.55 m
Mu := 3dm ⋅ Pup Mu = 4613.85⋅ kN ⋅ m
0
0.85 ⋅ f'c ⎛ 2 ⋅ Ru ⎞
ENGINEERING DEPT.
SMS ρ := ⎜1 − 1 − ⎟ ρ = 0.001012
fy ⎝ 0.85 ⋅ f'c ⎠
4
⋅ ρ = 0.00135 ρ max := 0.0033
3
OPERATING DEPT. TCAP
SMS
ρ min := 0.0018⋅ ρ min = 0.002057
deff
⎛ ⎛
ρ use := min ⎜ max ⎜ ρ , ρ min ,
4 ⎞ ⎞
⋅ ρ ⎟ , ρ max ⎟ ρ use = 0.002057
⎝ ⎝ 3 ⎠ ⎠
THIS DRAWING IS
NOT
TO BE USED FOR DESIGN SHEAR:
CONSTRUCTION Vud := 3Pup
OR FOR
ORDERING Vud = 8388.82⋅ kN
MATERIALS
UNTIL CERTIFIED
AND CHECK ONE-WAY SHEAR:
DATED
CERTIFIED w := dm
w = 0.55 m
BY: ___________________ w
= 0.449
DATE:
_________________
deff
Mu Vud ⋅ deff
= 0.449 = 2.227
Vud ⋅ deff Mu
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
⎛ Vud ⋅ deff ⎞
VC1A := ⎜ 0.16 ⋅ f'c⋅ MPa + 17 ⋅ ρ use ⋅ ⋅ MPa ⎟ ⋅ bw ⋅ deff
⎝ Mu ⎠
JTC
VC1A = 9612.26⋅ kN
VC1B := 0.17 ⋅ f'c⋅ MPa ⋅ bw ⋅ deff
VC1B = 9391.84⋅ kN
ISSUED FOR CONSTRUCTION (IFC)
Mu Vud ⋅ deff
0
w
(
min VC2A , VC2B ) if
deff
<1∧
Vud ⋅ deff
≤ 1.0 ∧
Mu
> 1.0
REVISIONS
VC = 45854.3⋅ kN
DESIGNED BY: HMR
Result1shear := "Safe" if VC ≥ Vud
DATE: APRIL2011
ENGINEERING DEPT.
CHECK PUNCHING SHEAR DUE TO STAIR SHAFT:
SMS Pnet := Pu Pnet = 22336⋅ kN
( ) (
Pperimeter1 := 2 ⋅ ⎡⎣ b + deff + h + deff ⎤⎦ )
Pperimeter1 = 26500⋅ mm
OPERATING DEPT. 1
Vp_c_allow := ⋅ f'c⋅ MPa ⋅ Pperimeter1 ⋅ deff
SMS 3
Vp_c_allow = 60247.85⋅ kN
Resultp_shear := "Safe" if Vp_c_allow ≥ Pnet
THIS DRAWING IS
NOT "Unsafe" otherwise
TO BE USED FOR Resultp_shear = "Safe"
CONSTRUCTION
OR FOR
ORDERING CHECK PUNCHING SHEAR DUE PILE:
π ⎛ Pdia
deff ⎞ ⎛ Pdia ⎞
MATERIALS
UNTIL CERTIFIED
AND Pperimeter2 := ⎜ + ⎟ + 2⋅⎜ + 0.25m ⎟
DATED 2⎝ 2 2 ⎠ ⎝ 2 ⎠
CERTIFIED
Pperimeter2 = 3247.51⋅ mm
1
BY: ___________________ Vp_p_allow := ⋅ f'c⋅ MPa ⋅ Pperimeter2 ⋅ deff
3
DATE:
_________________ Vp_p_allow = 7383.23⋅ kN
Pup = 2796.27⋅ kN
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
"Unsafe" otherwise
JTC
Resultp_c_shear = "Safe"
BY − h
Dedge := − dm Dedge = 750⋅ mm
2
Pdia = 1000⋅ mm
⎛ Dedge Pdia ⎞
Ledge_shear := 2 ⋅ ⎜ + + 325mm ⎟ Ledge_shear = 3771.32⋅ mm
⎜ sin⎛⎜ 45 ⋅ π ⎞⎟ 2
⎟
⎝ ⎝ 180 ⎠ ⎠
Vedge := 0.16 ⋅ f'c⋅ MPa ⋅ Ledge_shear ⋅ deff Vedge = 4115.57⋅ kN
Resultedge_shear := "Safe" if Vedge ≥ Pup
0
"Unsafe" otherwise
Resultedge_shear = "Safe"
REVISIONS
SMS
Therefore : Use Ԅ 25mm at 150mm C/C along X and Y- direction
BY: ___________________
Therefore : Use Ԅ 20mm at 200mm C/C along X and Y- direction
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
CALCULATIONS
0
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT. (As per ACI 360R-92 Section 5.3 WRI Method)
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
DESIGN CONSIDERATIONS:
1. USE H20-44 LOADINGS:
ISSUED FOR CONSTRUCTION (IFC)
0
2. Distribution of load to the wheel base will be divided into, i.e., the two front
wheel will carry 22.25kN each while the other two succeeding wheels will carry
89kN each. Wheel load will be assumed as point load which will be spread to a
OPERATING DEPT.
tire area of 400mm by 200mm.
SMS
3. Sub-grade reaction is computed as Ks = 40*FS*qa where:
FS = 3.0 Factor of safety
qa = allowable soil bearing pressure, 150kPa
THIS DRAWING IS
NOT hence, Ks = 18000 kN/m3
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR Modulus of Sub-grade = 18000kN/m3 = 65.03 lb/in2/in
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
Distance between centers of wheel = 1.80m = 70.9in
BY: ___________________
Additional Moment = 30lb-in/in
Equivalent loaded diameter = 319.15 = 12.57in
DATE:
_________________ Design Moment = 262lb/-in/in
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
REVISIONS
DATE: APRIL2011
APPROVED
ENGINEERING DEPT.
SMS
OPERATING DEPT.
SMS
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
ATTACHMENT NO.1
0
REVISIONS
DATE: APRIL2011
APPROVED
SLAB-ON-GRADE
ENGINEERING DEPT. EXCEL SOLUTION
SMS
OPERATING DEPT.
SMS
THIS DRAWING IS
NOT
TO BE USED FOR
CONSTRUCTION
OR FOR
ORDERING
MATERIALS
UNTIL CERTIFIED
AND
DATED
CERTIFIED
BY: ___________________
DATE:
_________________
JOB ORDER NO. PLANT NO. INDEX DRAWING NO. PAGE NO. REV.
γc = 152.872 Pcf
= 4.18E+03 ksi
= 20000 Lbs
= 70.87 Inches
Unit moment per 1000 Lbs load = 262 lbs-inch/inch Fig. A2.2.2
Additional unit moment per 1000 lbs load = 30 lbs-inch/inch Fig. A2.2.2
= 5840 lbs-ft/ft
Factor of safety for stresses FOS(prov) = 1.38 (Range 1.40 to 2.0) Table 4.9.2
Safe
L= Distance between joints (Distance between the free ends of the slab that
w= Dead weight of slab (Assumed to be 12.5 Psf per inch of slab thk.)
fs = 60000 psi