BHEL/JHA 09
NPCIL
TGPP for KAPP (3&4) Date: 27/08/2014
Rev No: 00
PS-WR
For
RADIOGRAPHY TEST
Bharat Heavy Electricals Limited Doc No. BHEL/JHA 09
NPCIL
TGPP for KAPP (3&4) Date: 27/08/2014
Rev No: 00
PS-WR
DATE:
PREPARED BY:
ENGINEER (BHEL)
REVIEWED BY:
SO (BHEL)
APPROVED BY:
CM (BHEL)
Bharat Heavy Electricals Limited Doc No. BHEL/JHA 09
NPCIL
TGPP for KAPP (3&4) Date: 27/08/2014
Rev No: 00
PS-WR
Tools and tackles required : Radiography source, RT caution tape, Manila rope
PPE required : Safety Helmet, Safety Shoes, Hand Gloves, dosimeter, etc.
Authorization required : Safe Work permit to radiographers
SL.
DESCRIPTION STATUS REMARKS
NO
Is the storage area properly barricaded with cautin tape
1 YES NO
whether all the workmen wearing required PPE’s
2 YES NO
Is experienced and qualified manpower is deployed
3 YES NO
Check whether leakage field should be measured to ensure that the
4 YES NO
same is within the prescribed limits
Check whether good quality manila rope/ slings are used for lifting/
5 YES NO
removing source.
Check whether working area is barricaded as per the survey meter
6 YES NO
reading; warning tag, danger board & flags placed
Check whether the radiographer is well conversant with the safety
7 YES NO
practices and had valid BARC certificate for source handling
Proper illumination- 100-150lux is available
8 YES NO
Is the survey meter calibrated
9 YES NO
Check whether unauthorized entry is not permitted at all possible
10 entry points of radiography area YES NO
Checked by Authorized by
Signature :
Name :
Date :