2000 394.1
2001 394.3
2002 395.6
2003 402
2004 444.2
2005 468.2
2006 499.6
2007 525.4
2008 575.4
2009 521.9
2010 550.8
2011 585.7
2012 584.6
2013 567.3
2014 576.1
2015 556.8
300
200
100
0
1998 2000 2002 2004 2006 2008 2010 2012 2014 2016
tahun
y 14.495 x
757.375
index 1.3602280891
b. Biaya Pemasangan Alat (Equipment Installation Cost) (Tabel 16. Aries & Newtol Hal 77)
Biaya instalasi %EC biaya
Material 11% $ 305,454.25
Pekerja 32% $ 888,594.18
c. biaya pemipaan (piping cost) (tabel 17. aries & newton hal 78)
biaya instalasi % EC biaya
material 49% $ 1,360,659.83
pekerja 37% $ 1,027,437.02
total biaya pemipan $ 2,388,096.85
d. biaya instrumentasi (instrumentation cost) (tabel 19. aries & newton hal 97)
biaya instalasi %EC biaya
material 24% $ 666,445.63
pekerja 6% $ 166,611.41
e. biaya isolasi (insulation cost) (tabel 21. aries & newton hal 98)
biaya instalasi %EC biaya
material 3% $ 83,305.70
pekerja 5% $ 138,842.84
total biaya solasi $ 222,148.54
f. biaya listrik (electrical cost) (Tabel 22. Aries & Newtol Hal 102)
biaya instalasi %EC biaya
material 10% $ 277,685.68
pekerja 5% $ 138,842.84
total biaya listrik $ 416,528.52
g. bangunan (building)
luas bangunan diperkirakan 7620 m^2
harga bangunan diperkirakan 5000000
total biaya bangunan Rp 38,100,000,000.00
$ 2,819,400.00
biaya perbaikan 10-15% PEC (aries % newton hal 108) karena alat nya termasuk sederhana
biaya perbaikan 10% $ 277,685.68
total biaya tanah dan perbaikan $ 1,512,005.68
j. Lingkungan (Environmental)
Biaya estimasi untuk lingkungan 6-25% PEC 20% $ 555,371.36
Biaya lingkungan
Silver
Kebutuhan 30 hari
Di 1.2065 m
Z 8.5 m
rho katalis 1950 kg/m^3
Kebutuhan katalis 4746.3052 kg
2.4340026667 m^3
Harga katalis $ 59.07 /kg
Total Harga $ 280,364.25
Total Raw Material Inventory $ 2,550,144.07
b. persediaan dalam proses (in process inventory) (aries & Newton, hal 12)
waktu operasi 1 jam
biaya persediaan dalam proses $ 767.95
c. persediaan produk (product inventory) (aries & Newton, hal 12)
biaya persediaan produk $ 1,013,693.62
harga alat
2014 2022 harga total
$ 232,900.00 $ 316,797.12 $ 316,797.12
$ 225,400.00 $ 306,595.41 $ 306,595.41
$ 42,400.00 $ 57,673.67 $ 57,673.67
$ 14,900.00 $ 20,267.40 $ 20,267.40
$ 33,200.00 $ 45,159.57 $ 45,159.57
$ 20,300.00 $ 27,612.63 $ 27,612.63
$ 52,700.00 $ 71,684.02 $ 71,684.02
$ 5,400.00 $ 7,345.23 $ 7,345.23
$ 90,900.00 $ 123,644.73 $ 123,644.73
$ 71,700.00 $ 97,528.35 $ 97,528.35
$ 52,700.00 $ 71,684.02 $ 71,684.02
$ 36,800.00 $ 50,056.39 $ 50,056.39
$ 2,700.00 $ 3,672.62 $ 3,672.62
$ 1,300.00 $ 1,768.30 $ 1,768.30
$ 54,000.00 $ 73,452.32 $ 73,452.32
$ 9,600.00 $ 13,058.19 $ 13,058.19
$ 14,100.00 $ 19,179.22 $ 19,179.22
$ 30,400.00 $ 41,350.93 $ 41,350.93
$ 4,200.00 $ 5,712.96 $ 5,712.96
$ 4,200.00 $ 5,712.96 $ 5,712.96
$ 4,200.00 $ 5,712.96 $ 5,712.96
$ 4,200.00 $ 5,712.96 $ 5,712.96
$ 4,200.00 $ 5,712.96 $ 5,712.96
$ 4,200.00 $ 5,712.96 $ 5,712.96
$ 63,200.00 $ 85,966.42 $ 85,966.42
$ 4,200.00 $ 5,712.96 $ 5,712.96
$ 4,500.00 $ 6,121.03 $ 6,121.03
$ 4,200.00 $ 5,712.96 $ 5,712.96
$ 1,486,321.23
1 man hour
$ 20.00
Rp 25,000.00
Rp 13,756.00
Rp 14,379,574.96
$ 143,795.75
$ 758,163.09
$ 1,207,413.09
1 man hour
$ 20.00
25000
13756
2696170.31
$ 26,961.70
$ 142,155.58
$ 835,562.91
Manufacturing Cost
B.1 direct manufacturing cost
a. bahan baku
Etanol
kebutuhan
(PT Indo Lampung Distilerry) kebutuhan etanol 30 hari
harga etanol
total harga
udara
Silver
kebutuhan
Di
Z
rho katalis
kebutuhan katalis
Harga katalis
Total Harga
Total Raw Material Inventory
b. Labor Cost
jabatan
karyawan proses
karyawan utilitas
total
gaji pegawai 1 tahun
& Newton, hal 12)
c. supervisi
jabatan
Newton, hal 13) kepala bagian
kepala seksi
total
gaji pegawai 1 tahun
d. maintenance
Biaya maintenance 6-7% FCI
e. plant supplies
Biaya power supplies15% biaya maintenance
Biaya power supplies
g. utilitas
Dalam perkiraan ini diambil besarnya 25-50% terhadap nilai bangunan + contingency
Biaya Utilitas
b. Laboratorium
Biaya Laboratorium besarnya 15-20% dari labour cost
Biaya Laboratorium
c. Plant Overhead
Plant Overhead besarnya 50-100% dari labour cost
Plant Overhead
b. Property Taxes
Luas Tanah
Luas Bangunan
Nilai jual permukaan tanah
Nilai jual permukaan bangunan
Nilai jual tanah (/m^2)
Nilai jual bangunan (/m^2)
Jumlah NJOP bumi
Jumlah NJOP bangunan
Total NJOP dasar pengenaan
NJOPTKP
NJOP perhitungan PBB
NJKP 40%
PBB yang terutang 0.5% NJKP
c. asuransi
Asuransi besarnya 1% dari FCI
Biaya Asuransi
Manufacturing Cost
Direct Manufacturing Cost
Indirect Manufacturing Cost
Fixed Manufacturing Cost
Total Manufacturing Cost
nama alat utilitas jumlah indeks 2014 2022
pompa boiler feed 4 1.3602280891 $ 4,200.00 $ 5,712.96
pompa kondensat 2 1.3602280891 $ 4,200.00 $ 5,712.96
pompa air sanitasi 2 1.3602280891 $ 6,100.00 $ 8,297.39
pompa air demin 1 1.3602280891 $ 6,100.00 $ 8,297.39
pompa hidran 1 1.3602280891 $ 6,100.00 $ 8,297.39
pompa pendingin 8 1.3602280891 $ 6,100.00 $ 8,297.39
pompa pemanas 6 1.3602280891 $ 6,100.00 $ 8,297.39
pompa cooling tower 1 1.3602280891 $ 4,200.00 $ 5,712.96
pompa air konsumsi 2 1.3602280891 $ 4,200.00 $ 5,712.96
fan 1 1.3602280891 $ 5,500.00 $ 7,481.25
pompa pengolahan limbah 5 1.3602280891 $ 6,100.00 $ 8,297.39
agitator pH pit 1 1.3602280891 $ 7,000.00 $ 9,521.60
blower 4 1.3602280891 $ 4,800.00 $ 6,529.09
kompresor 3 1.3602280891 $ 7,200.00 $ 9,793.64
generator 1 1.3602280891 $ 200,000.00 $ 272,045.62
tangki air demin 1 1.3602280891 $ 48,600.00 $ 66,107.09
tangki air hidran 1 1.3602280891 $ 42,300.00 $ 57,537.65
tangki bahan bakar generator 1 1.3602280891 $ 89,200.00 $ 121,332.35
tangki air boiler 1 1.3602280891 $ 20,800.00 $ 28,292.74
30 hari
2459133.071 kg
$ 0.923 /kg
$ 2,269,779.82
gratis
30 hari
1.2065 m
8.5 m
1950 kg/m^3
4746.3052 kg
2.4340026667 m^3
$ 59.07 /kg
$ 280,364.25
$ 2,550,144.07
$ 268,000.00
biaya
$ 2,550,144.07
$ 92,352.00
$ 131,868.00
$ 1,322,874.96
$ 158,744.99
$ 268,000.00
$ 3,275,292.89
$ 7,799,276.91
$ 105,290,238,267.50
sarnya 15-20% dari labour cost (Aries & Newton, hal 174)
20% $ 18,470.40
biaya
$ 18,470.40
$ 18,470.40
$ 46,176.00
$ 1,072,000.00
$ 1,155,116.80
$ 15,594,076,800.00
(Aries & Newton, hal. 180)
10% $ 2,204,791.59
5560 m^2
7620 m^2
$ 222.00
$ 370.00
$ 216.45 kelas A2
$ 357.05 kelas B13
$ 1,203,462.00
$ 2,720,721.00
$ 3,924,183.00
$ 888.00
$ 3,923,295.00
$ 1,569,318.00 NJKP untuk industri
$ 784,659.00
biaya
$ 2,204,791.59
$ 784,659.00
$ 220,479.16
$ 3,209,929.75
biaya
$ 7,799,276.91
$ 1,155,116.80
$ 3,209,929.75
$ 12,164,323.46
$ 164,218,366,715.01
harga total
$ 22,851.83
$ 11,425.92
$ 16,594.78
$ 8,297.39
$ 8,297.39
$ 66,379.13
$ 49,784.35
$ 5,712.96
$ 11,425.92
$ 7,481.25
$ 41,486.96
$ 9,521.60
$ 26,116.38
$ 29,380.93
$ 272,045.62
$ 66,107.09
$ 57,537.65
$ 121,332.35
$ 28,292.74
$ 860,072.22
C. General Expensive
C.1 Administrasi
C.1.1 Management Salaries
Jabatan Jumlah gaji total gaji
Direktur Utama 1 Rp 50,000,000.00 Rp 50,000,000.00
manager produksi 1 Rp 35,000,000.00 Rp 35,000,000.00
manajer keuangan dan umum 1 Rp 35,000,000.00 Rp 35,000,000.00
staf ahli 2 Rp 20,000,000.00 Rp 40,000,000.00
Sekretaris 2 Rp 5,500,000.00 Rp 11,000,000.00
Karyawan Keuangan 2 Rp 4,000,000.00 Rp 8,000,000.00
Karyawan Pemasaran 2 Rp 4,000,000.00 Rp 8,000,000.00
Karyawan Pembelian 2 Rp 4,000,000.00 Rp 8,000,000.00
Karyawan HSE 2 Rp 4,000,000.00 Rp 8,000,000.00
Karyawan Penjualan 2 Rp 4,000,000.00 Rp 8,000,000.00
Karyawan Kontrol 8 Rp 4,000,000.00 Rp 32,000,000.00
Karyawan Laboratorium 4 Rp 4,000,000.00 Rp 16,000,000.00
Karyawan Litbang 2 Rp 4,000,000.00 Rp 8,000,000.00
Karyawan Humas 2 Rp 4,000,000.00 Rp 8,000,000.00
Karyawan Administrasi 2 Rp 4,000,000.00 Rp 8,000,000.00
Karyawan Personalia 2 Rp 4,000,000.00 Rp 8,000,000.00
Karyawan Keamanan 8 Rp 4,000,000.00 Rp 32,000,000.00
Dokter 1 Rp 5,000,000.00 Rp 5,000,000.00
Sopir 2 Rp 3,500,000.00 Rp 7,000,000.00
Petugas Kebersihan 5 Rp 3,500,000.00 Rp 17,500,000.00
total 53 Rp 352,500,000.00
Gaji Pegawai dalam 1 tahun Rp 4,230,000,000.00
$ 313,020.00
C.3 Research
Biaya Research 3,5-8% dari Sales Price
Biaya Research 8% $ 2,308,763.88
C.4 Finance
Biaya finance, besarnya adalah 0-10% dari total capital invesment
Biaya finance 8% $ 2,308,763.88
Biaya Produksi
Manufacturing Cost $ 12,164,323.46 `
General Expanse $ 7,668,060.61
Total Biaya Produksi $ 19,832,384.07
Rp 267,737,184,982.48
2. Analiasa Kelayakan
Total Penjualan $ 26,800,000.00
Total Biaya Produksi $ 19,832,384.07
Keuntungan sebelum pajak $ 6,967,615.93
Pajak 25% dari keuntungan $ 1,741,903.98 (UU 36 tahun 2008)
Keuntungan setelah pajak $ 5,225,711.95
Rp 70,547,111,263.14
A. Percent Profit Sales (POS)
Sebelum pajak 26.00%
Setelah pajak 19.50%
n 1/(1+i)^n
1 0.689096783
2 0.4748543763
3 0.3272206231
4 0.2254866787
5 0.1553821449
6 0.1070733362
7 0.0737838915
8 0.0508442423
9 0.0350366038
10 0.024143611
2.1629222909
$ 28,859,548.52 $ 28,969,182.20
Tingkat Produksi dan Cash flow
Kapasitas Produksi per tahun (%) Fix Cost (Fa)
0% $ 3,209,929.75
10% $ 3,209,929.75
20% $ 3,209,929.75
30% $ 3,209,929.75
40% $ 3,209,929.75
50% $ 3,209,929.75
60% $ 3,209,929.75
70% $ 3,209,929.75
80% $ 3,209,929.75
90% $ 3,209,929.75
100% $ 3,209,929.75
Chart T
$20,000,000.00
$18,000,000.00
$16,000,000.00
$14,000,000.00
$12,000,000.00
$10,000,000.00
$8,000,000.00
$6,000,000.00
$4,000,000.00
$2,000,000.00
$-
0% 10% 20% 30%
$6,000,000.00
$4,000,000.00
$2,000,000.00
$-
0% 10% 20% 30%
tahun ke -2 40.00%
tahun ke -1 30.00%
tahun ke 0 30.00%
rasio 1.4083784601
Df 0.2874761041
F. Discounted Cash Flow-Rate of Return (DCF-ROR)
Fixed Capital Invesment $ 22,047,915.92
Working Capital Invesment $ 6,811,632.60
Nilai sisa pabrik $ 1,102,395.80
Umur pabrik 10
Cash Flow $ 7,273,732.18
Discounted Cash Flow 39.57%
n 1/(1+i)^n
1 0.7165073474
2 0.5133827789
3 0.3678425331
4 0.2635618777
5 0.1888440218
6 0.1353081292
7 0.0969492687
8 0.0694648634
9 0.049772085
10 0.0356620646
2.4372949697
$ 28,859,548.52 $ 25,639,848.64
Variabel Cost (Va) Regulated Cost (Ra) Sales (Sa) Cash Flow (Ca)
$ 3,209,929.75 $ -
$ 2,680,000.00
$ 5,360,000.00
$ 8,040,000.00
$ 10,720,000.00
$ 13,400,000.00
$ 16,080,000.00
$ 18,760,000.00
$ 21,440,000.00
$ 24,120,000.00
$ 10,375,366.71 $ 19,832,384.07 $ 26,800,000.00 $ 12,949,197.17
Chart Title
sa
Ra
Va
Ca
sdp bep
tahun
12%
NPV
$ 5,701,215.31
$ 5,506,961.37
$ 5,288,885.65
$ 4,722,219.33
$ 4,216,267.26
$ 3,764,524.34
$ 3,361,182.44
$ 3,001,055.75
$ 2,679,514.07
$ 2,392,423.27
$ 43,750,347.50
7.000 8.000 9.000 10.000
100.00% 100.00% 100.00% 100.00%