PROJECT MANAGEMENT TOOLS

Tool Proprietary/ Initiation Planning Execution Monitoring and Controlling Closing


Open Source
Prince2 Open source The project manager creates Project Initiation Documentation, The project manager The project manager When the project is
Type of software including a comprehensive project plan and baselines for 6 breaks down the project checks progress against the complete, the project
performance targets: time, cost, quality, scope, risk, and into smaller work project brief and make sure manager wraps up
benefits. packages and passes deliverables meet quality and loose threads,
Initiation documents are sent to the project board for approval. them off to team expectations. including
Once the board is confident in the project plan, they give their managers and teams to The project board documentation,
approval once again and work begins. complete. The PM evaluates completed work outcomes, and
oversees the progress of packages, and either reporting.
work packages during approves them or requests
each stage and steps in revisions/changes.
to help overcome between the project
roadblocks or correct any manager and individual
mistakes, if necessary. team members, helping to
Team managers make sure everything goes
coordinate detailed daily according to plan.
work and act as the link.

Six Sigma Open source Define who your Eliminate guesswork and Develop detailed design Insure that the process
Type of software customers are, and what assumptions about what customers for new process. improvements, once
their requirements are for need and expect and how well Determine and evaluate implemented, will “hold
your products and processes are working. Collect enabling elements. the gains” rather than
services – Their data from many sources to revert to the same
expectations. Define your determine speed in responding to problems again.
team goals, project customer requests, defect types
boundaries, what you will and how frequently they occur,
focus on and what you client feedback on how processes
won’t. Define the process fit their needs, how clients rate us
you are striving to over time, etc.
improve by mapping the
process.
PM2 Proprietary Type Define the desired Assign the project core team, Coordinate the execution of Throughout the projects
of sotfware outcomes, create a elaborate the project scope, the projects plans. The team duration, monitor and
business case, define the and plan the work. produces the project control all project work and
project scope, and get the deliverables management activities.
project off to a good start. Monitor project variables,
measure progress, manage
changes, address risks and
issues and identify
corrective actions as per
the project’s needs.

CISCO Open source The Prepare phase This phase involves identifying This phase involves designing The Operate phase involves
Prepare, Type of software involves establishing the the network requirements, the network according to the maintaining network health
Plan, Design, organizational which are based on the initial requirements through day-to-day
Implement, (business) requirements, goals for the network, where determined in the Plan phase, operations. The fault
Operate, and developing a network the network will be installed, incorporating any additional detection and
Optimize strategy, and who will require which data gathered during correction, and
(PPDIOO) proposing a high-level network services. The Plan network analysis and through performance monitoring
methodology. conceptual architecture, phase also involves assessing discussion with managers and that occur in daily
identifying the sites where the network users. The operations provide initial
technologies that can best network will be installed and network design specification data for the network
support the architecture. any existing networks, and that is produced is a lifecycle’s
performing a gap analysis comprehensive detailed Optimize phase.
to determine if the existing design
system infrastructure, sites, that meets current business
and operational and technical requirements
environment can support the and incorporates
proposed system. A project specifications to support
plan helps manage the availability, reliability,
tasks, responsibilities, critical security, scalability, and
milestones, and resources performance. This design
required to implement the specification provides the
changes to the network. The basis for the implementation
output of this phase is a set of activities.
network requirements.
Scrum There are some  Create Project  Create User Stories  Create Deliverables  Convene Scrum of  This phase
open-source Vision  Approve, Estimate,  Conduct Daily Standup Scrums emphasizes
and proprietary s  Identify Scrum and Commit User  Groom Prioritized  Demonstrate and on delivering
oftware packages Master and Stories Product Backlog Validate Sprint the Accepted
for Scrum Stakeholder(s)  Create Tasks  Retrospect Sprint Deliverables
 Form Scrum Team  Estimate Tasks to the
 Develop Epics  Create Sprint customer
(Development Backlog and
history) identifying,
 Create Prioritized documenting
Product Backlog , and
(Checklist) internalizing
 Conduct Release the lessons
Planning learned
during the
project.