Você está na página 1de 23
Tira Soe 275/85 | BACK, SIVALLS 8 BRYSON, INCORPORATED ESTIMATING STANDARDS BUILDINGS 62110 PREFABRICATED 68120 SHOP FABRICATED BUILDING 63130 SHCP PABRICATED BUILDING (SKID MOUNTED) 5310 SHELTERS 632Xx SINGLE STORY BUILDINGS 635XX _MULTI-STORY BUILDINGS OPTIONAL FOR 632KX AND 633Xx ACCOUNTS 63x10 ‘Block/Masonry Work 63x20 Plumbing-Including Pixtures 69x30 HVAC 63X40 Lighting-Including Fixtures 63x50 Laboratory Equipment 2903 Rework SCOPE OF WORK ‘This account will include all buildings and building interiors (except ‘temporary construction structures) specified for the project. This ‘account DOES NOT include excavation, backfill, concrete, or anchor bolts for the bullding foundations. Buildings are normally a subcontracted item. Building interiors are normally estinated in-house, however, with the increasing number of building specialty contractors i.e. drywall, flooring, acoustical ceiling, ete., quoted prices may be obtained for all interior work, ACCOUNT CODE sou Taiwe @e275/95 [@LACK, SIVALLS 8 BRYSON, INCORPORATED seer: BuTLDINGS. AECOUNT CODE Evid ESTIMATING STANDARDS depending on the size of the project. Unit prices for individual components such as sheatrock, walls, floor coverings, types of cellinge, lab equipment and restroom requirements are estimated and compiled in accordance with a clients requirements and specifications. ‘There are savaral "Reference! publications which offer unit pricing land may be used as a guide for estimating. Listed below are a few cof these publications: 1) Means - Building Construction Cost Data - latest edition 2) Dodge, Pricing and Scheduling Manual, edition 6, used in conjunction with the composit lumber component list of ‘ieleon" coat index found in the latest edition of "The oil and Gas Journal” 3) Richardson's Estimating and Engineering Standards, Volumes 2 ard 3 ~ latest edition. 4) Means ~ Bullding Systems Cost Guide - latest edition. ‘The above publications should be used as a guide only and prices should be obtained fron written quotations whenever possible me 2/5/88 Pz, ZL | BLACK, SIVALLS 8 BRYSON, INCORPORATED | account cove ESTIMATING STANDARDS BUILDINGS - PREFABRICATED SCOPE ‘This account includes all labor, materials and subcontract cost to Install prefabricated buildings. These buildings are normally always subcontracted and are shipped to the jobsite in multiple pieces (girts, ppurlins, sheet metal etc,). These bulldings are erected on founda- tions, which are furnished by others, cither by the bullding manulacturer or a qualified metal building erector. Below are listed several items which the building manufacturer will require before a quotation can be submitted: 8) roof slope b) wind load ©) live roof load 4) eave height @) size/square foot paint requirements 9) wall coverings (interior & exterior) h) gutters, flashings, down spouts 1) doors, louvers, windows, vents ‘The following publication can be used for estimating assistance if time does nat permit a written quotation from manufacturers: Richardson's Construction Estimating Standards, latest edition Volume 2, Section 5. EXCLUDES: 1) Blectrical & Lighting 2) HVAC. 3) Interior Requirements 4) Plumbing

Você também pode gostar