COMPANY DOC. No. L290-AX-PRC-0005 REV.

JKC DOC. No. S-0290-1131-0101 1


COMPANY CONTRACT No. HOLD Review Class. 1
JGC JOB No. HOLD KBR JOB No. HOLD CHIYODA JOB No. HOLD

SHEET 1 OF 29

ICHTHYS ONSHORE LNG FACILITIES

3D MODELLING PROCEDURE

REV. DATE ISSUE PURPOSE PREPARED CHECKED APPROVED


A 26-Aug-11 IFA K.Morimoto B.Dartnell I. Maeda

0 02-Nov-11 IFC K.Morimoto B.Dartnell I. Maeda

1 12-Dec-11 IFC K.Morimoto B.Dartnell I. Maeda

FORM EPC-0 1
PEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AX-PRC-0005
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1131-0101 Rev.1
3D MODELLING PROCEDURE Sheet No. 2 of 29

Hold List
Company contract number

Contents

1. INTRODUCTION............................................................................................................. 4
1.1 Scope of Specification.................................................................................................. 4
1.2 Definition ...................................................................................................................... 4
1.3 Applicable Specification and Standards........................................................................ 5
1.4 Abbreviations ............................................................................................................... 5

2. GENERAL REQUIREMENTS ......................................................................................... 6

3. ORGANISATION AND WORK FLOW ............................................................................ 6


3.1 Organisation................................................................................................................. 6
3.2 Work Flow .................................................................................................................... 7
3.3 Weight Management .................................................................................................... 7

4. 3D MODEL CONTENT ................................................................................................... 7

5. PDMS SET UP................................................................................................................ 8


5.1 3D Environment ........................................................................................................... 8
5.2 3D CAD Model Units .................................................................................................... 8
5.3 Coordinates System ..................................................................................................... 8
5.4 Colour Coding (Reference Only) .................................................................................. 9
5.5 Design Database Hierarchy.......................................................................................... 9

6. PDMS CATALOGUES AND SPECIFICATIONS........................................................... 10


6.1 Piping and In-line Instrument Catalogues and Specifications...................................... 10
6.2 Piping Insulation Specs .............................................................................................. 11
6.3 Pipe Support Catalogue ............................................................................................. 11
6.4 Structural Cats and Specs.......................................................................................... 11
6.5 Instrument and Electrical Material Cats and Specs..................................................... 11

7. MODEL QUALITY CONTROL ...................................................................................... 11


7.1 Model Quality Management........................................................................................ 11
7.2 Model consistency with P&IDs.................................................................................... 12
7.3 Clash Management .................................................................................................... 12

8. PDMS MODEL PROGRESS MONITORING ................................................................. 12

9. DOCUMENT PRODUCTION......................................................................................... 12
9.1 Piping Design Drawings ............................................................................................. 12
9.2 Civil Design Drawings ................................................................................................ 13
9.3 Structural.................................................................................................................... 13
9.4 Electrical Design Drawings......................................................................................... 13
9.5 Instrument Design Drawings ...................................................................................... 13

10. MATERIAL MANAGEMENT ..................................................................................... 13


PEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AX-PRC-0005
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1131-0101 Rev.1
3D MODELLING PROCEDURE Sheet No. 3 of 29

Attachment-1: Extent of 3D Modeling................................................................................... 14


Attachment-2: Organization for 3D CAD Execution.............................................................. 15
Attachment-3: PDMS Modelling Item ................................................................................... 16
Attachment-4: Colour Coding in 3D Model ........................................................................... 19
Attachment-5: Naming Convention for Zone ........................................................................ 21
Attachment-6: Naming of Item Level .................................................................................... 24
Attachment-7: Work Flow related with SPEC/Catalogue revision......................................... 26
Attachment-8: Work Flow related with Model Quality Management...................................... 27
Attachment-9: Work Flow related with Line Condition Data Management ............................ 28
Attachment-10: Work Flow related with 3D Model Clash Management ................................ 29
Attachment-10: Work Flow related with 3D Model Clash Management ................................ 29
PEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AX-PRC-0005
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1131-0101 Rev.1
3D MODELLING PROCEDURE Sheet No. 4 of 29

1. INTRODUCTION

1.1 Scope of Specification

In order to achieve quality, efficient plant layouts and an effective modular design in the EPC
execution, the Plant Design Management System (PDMS) is utilised for the space management of the
multi-discipline contents of the modules, reviews, (constructability, operability, maintainability, and
module/plant layout, mechanical handling studies), and the generation of weight data..
3D modelling will be applied for geometrical boundary shown on Attachment-1 and is implemented at
YOC and TOC. Scope of work for each operating centre is described below:
• YOC : LNG trains & Inlet facilities
• TOC : Interconnecting piperacks, Combined Cycle Power Plant, Utility, Flare, Jetty
topsides and the Offsite and Utilities Annex.
POC will not have PDMS capability and therefore all work performed in POC, GEP etc. will be
produced in 2D CAD. These drawings shall be used for input to PDMS model by YOC
POC scope of work includes; Operation Complex, MOF, Jetty substructures and GEP pipeline
downstream of beach valve (outside of plant boundary).
In order to maintain the uniformity of data and control physical interfaces of modelling activities of both
models between YOC, and TOC, a common data base has been established and all modeled data at
each location will be transferred to each other via the PDMS global link on a daily basis. Therefore,
the latest model can be monitored in both locations. This procedure covers the extent of modelling,
workflow, scope of work and content for PDMS modelling and 3D Model set up in the EPC execution.
This Procedure also describes the following:
y Multi discipline interface roles and responsibilities;
y Administrative and operating procedures;
y Quality control activities to ensure the quality level of the 3D model;
This Procedure applies to the PDMS Administrators, Designers and all personnel involved in the
development of the PDMS model content including Material Specification and component Catalogues
and Specifications.

1.2 Definition
- COMPANY : INPEX Browse, Ltd.

- CONTRACTOR : EPC Contractor

- SUBCONTRACTOR : Subcontractor

- MODULE FABRICATOR : Subcontractor for Module Fabrication

- PURCHASER : COMPANY or EPC Contractor. Used for Requisitioning


and Purchasing related work.

- SUPPLIER : Equipment Supplier, i.e. Vendor.


PEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AX-PRC-0005
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1131-0101 Rev.1
3D MODELLING PROCEDURE Sheet No. 5 of 29

- INSPECTOR : Nominated third party agency.

1.3 Applicable Specification and Standards

1.3.1 Project General Specifications

Company Doc No. Doc Title


L290-AG-SPC-0001 Technical Coding and Numbering
Specification
L290-AG-PRC-0004 3D Model Review Procedure
L290-AX-PRC-0003 Weight Management Procedure
L290-AH-PHI-0006 Mechanical Handling Philosophy
L290-AH-PHI-0003 Human Factor Engineering Philosophy
L290-AH-PHI-0004 Design Philosophy for Means of Escape
L290-AX-SPC-0001 Specification for Piping Material Classes
L290-DP-PID-0004 P&ID System 500 Legend Sheets – Line
Identification
L290-AL-SPC-0002 Specification for High Temperature
Insulation
L290-AL-SPC-0003 Specification for Low Temperature
Insulation
L290-DS-STD-0002 Standard Drawing for Steel Structure
Member List
L290-AB-PRC-0054 Progress Measurement Procedure /
Engineering
L290-AG-LIS-0003 Work Breakdown Structure

1.3.2 Reference drawings

L290-DP-PPN-0002.001 Site Plan Sheet 1/2


L290-DP-PPN-0002.002 Site Plan Sheet 2/2

1.4 Abbreviations

CAD Computer-aided Design


IDP The Interference Detection Process
INDRA Integrated Document Management System for Global Collaboration
MACS3 Bulk Material Take-off and Control System
PDMS Plant Design Management System
POC Perth Operation Centre
SPPID Smart Plant P&ID
TOC Tsurumi Operation Centre
PEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AX-PRC-0005
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1131-0101 Rev.1
3D MODELLING PROCEDURE Sheet No. 6 of 29

YOC Yokohama Operation Centre

2. GENERAL REQUIREMENTS

The purpose of this procedure is to describe the 3D Modelling process for the Ichthys
Onshore LNG Facilities and define the minimum activities and actions required from Design
personnel for modelling within the PDMS system by CONTRACTOR to ensure consistency,
accuracy and to maintain quality.

3. ORGANISATION AND WORK FLOW

3.1 Organisation

The 3D CAD engineering execution group leads the 3D Model development, this group
consists of a 3D Model Coordinator, PDMS administrator and 3D Model Key Personnel. For
organisation of 3D CAD engineering execution group, refer to Attachment-2.
The Plant Design Management System (PDMS) is used on the project as the multi-discipline
3D design tool. Piping, Civil, Structural, Buildings, Electrical and Instrument disciplines are
responsible for building their respective portions of 3D Model, resolving any interference
identified, and preparing drawings from the 3D Model as required, however, Piping discipline
shall have the primary responsibility for overall management, space management and
maintenance of the Model. This includes, but is not limited to the following:
y Piping layout; ( including update of model to incorporate stress analysis results )
y Module Structures;
y Stick built structures
y Pipe supports;
y Insulation and fireproofing
y Equipment
y Soft volumes for mechanical handling/maintenance access areas,
y Soft volumes for access/egress routes.
y LER/LIR and HVAC
A 3D Model Coordinator is assigned from the project engineering management team, and is
responsible for:
• Coordination matters relating to model development among joint venture partners
• Coordination matters relating to inter-discipline model development
• Organisation of the CONTRACTOR and COMPANY model review meetings
• Liaising with COMPANY on all matters relating to the 3D model
PEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AX-PRC-0005
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1131-0101 Rev.1
3D MODELLING PROCEDURE Sheet No. 7 of 29

• Producing and maintaining 3D Modelling procedure.


Model reviews
The PDMS administrator is responsible for assistance with system set-up and maintenance
of PDMS and shall also be responsible for the following;
y Ensuring accuracy and integrity levels are maintained within the model;
y Catalogues and Specification maintenance and updates;
y Clash checking and reporting as required and prior to each review stage;
y Data consistency check summary reporting and modelled item reporting to ensure 3D
model quality
y Consistency check of line number & classes with P&IDs
3D Model Key Persons shall be assigned for each discipline in each operation centre who
will assist in the 3D Model development. The main functions and responsibilities of the 3D
Model Key Persons are as follows:
y Ensuring that 3D model has reached the appropriate stage of development prior to
commencement of each model review.
y Coordination and planning within discipline and with other disciplines as required.
y Participating in CONTRACTOR and COMPANY model review meetings
y Establishing follow up on model review comments.
y Resolution of model review comments.

3.2 Work Flow

The 3D Model is developed based on the plot plans, equipment list and P&IDs and will
consist of three review phases as described below:

(1) 1st Phase: Preliminary Design


(2) 2nd Phase: Plant Layout
(3) 3rd Phase: Detail Design
Refer to 3D Model Review Procedure L290-AX-PRC-0004

3.3 Weight Management

The 3D PDMS model contains a significant portion of the weight data which is used to
populate the project Weight Report. The required information for weight control of the
modules is extracted from the 3D Model. For further information on weight management refer
to L290-AX-PRC-0003, “Weight Management Procedure”.

4. 3D MODEL CONTENT

In general all components such as Structural steel for Modules, piping, primary pipe
supports, pipe racks, underground cable routes, instrument and electrical cable trays, module
PEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AX-PRC-0005
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1131-0101 Rev.1
3D MODELLING PROCEDURE Sheet No. 8 of 29

structures, stick built structures, buildings, foundations, in-line instruments, equipment,


envelopes for access ways, maintenance spaces and emergency escape envelopes are
modelled by block, catalogue or detail depending on the design. Vendor data is also
modelled to provide interface locations, clash checks and visual checks that safety,
operability, maintainability and constructability requirements are met in full. The building
locations are also modelled. For a full description of the items to be modelled during EPC
execution refer to Attachment-3.

Where required for interface purpose and operability / maintainability review vendor
information shall be incorporated into Contractors PDMS Model to indicate equipment, piping
and structure for packaged equipment, furnace and rotating equipment.

For packaged equipment vendors that have PDMS capability all relevant data shall be made
available so as to conform with Contractor’s PDMS Model.

5. PDMS SET UP

PDMS Modelling is to be undertaken in several locations during the EPC execution. The Inlet
Facilities area and Process LNG Train areas of the project are designed and modelled in
YOC, the Power Generation, Utility and Offsite areas, including Tank Storage areas, BOG
Compressor, Flare KO Drum areas and the Jetty area of the project are designed and
modelled in TOC. Power Generation and Tank storage area will be modeled by
subcontractor and copied into PDMS Model. This procedure also covers the naming
conventions and procedures for the PDMS portfolio.

5.1 3D Environment

The following are the software main components to be used in the 3D modelling:
3D Modelling software AVEVA PDMS version 12.0 SP6
Support modelling software AVEVA MDS version 12.0 SP6
Review Software NavisWorks version 2010 or 2012
Drawing Annotation AVEVA PDMS version 12.0 SP6

5.2 3D CAD Model Units

For all project units to be used in the 3D modelling work refer to C050-AP-SPC-0001
Engineering Units.

5.3 Coordinates System

The coordinates system for 3D CAD model shall follow the plant coordinates of Site Plans,
L290-DP-PPN-0002.001 & L290-DP-PPN-0002.002.
PEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AX-PRC-0005
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1131-0101 Rev.1
3D MODELLING PROCEDURE Sheet No. 9 of 29

The following global origin/ plant monument shall be (0, 0, 0).


• North : 8,610,000,000 mm
• East : 708,000,000 mm
• Elevation : 0 mm AHD
Angular Rotation between True North and Plant North: φ= 28.0° Anti Clock Wise

5.4 Colour Coding (Reference Only)

For colour coding of modelled items, refer to Attachment-4.

5.5 Design Database Hierarchy

The PDMS design database is structured to allow efficient management and control of the
Model contents as a whole and on an individual Discipline basis.
The design database contains all information needed to create a full-scale three-dimensional
representation of the plant, and is structured in a very simple and logical form.
The first and highest level of the design hierarchy is the WORLD which contains all required
databases of the Project. The second level of the hierarchy is the SITE and the third level of
the hierarchy is the ZONE.

To store similar types of items for easy reference in a database, SITE and ZONE are defined
by category and the following naming format is applied for 3D Modelling.

Site Naming Convention


XYYYYZ (Example: PA1EA, CA1SAU)

X: Discipline Code (1 digit)


P = Piping
X = Pipe Supports
M = Equipment
S = Structure
C = Civil (U/G)
E = Electrical
I = Instrument
L = Safety
A = Architecture
H = HVAC
T = Telecommunications
Z = Misc. Items
YYYY: PCWBS Level 4 (4 digits)
Refer to L290-AG-LIS-0003 (S-290-1132-001), “Work Breakdown Structure”.
PEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AX-PRC-0005
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1131-0101 Rev.1
3D MODELLING PROCEDURE Sheet No. 10 of 29

Z: Underground Code (1 digit)


In case of underground piping, “U” is added at the end of Site Name.

Zone Naming Convention

For Zone naming in the 3D model, refer to Attachment-5.

Item Level Naming Convention

For naming of modelled items, refer to Attachment-6.

6. PDMS CATALOGUES AND SPECIFICATIONS

PDMS Catalogues and Specifications (hereinafter “Cats & Specs”) are produced and
maintained by the PDMS administrator in YOC.

For any new items required in the Cats & Specs a Fault Request sheet shall be issued to the
YOC PDMS Administrator. For the TOC scope of work, the TOC PDMS Administrator is
responsible to provide the PDMS Fault Request sheet to the YOC PDMS Administrator to
maintain the common Cats & Specs .
YOC informs TOC of any changes to the Specs by means of e-mail with attached
spreadsheet of revised items. Refer to Attachment 7 for Work Flow related with
SPEC/Catalogue revision.

6.1 Piping and In-line Instrument Catalogues and Specifications

Piping Material Specifications are prepared and maintained by MACS3 in YOC according to
L290-AX-SPC-0001, “Specification for Piping Material Classes”.

In the case that new or additional components are required throughout the Project, the Piping
Material Engineer modifies the Specs in MACS3.

When any specifications in MACS3 are modified by the Piping Material Specification
Engineer, the PDMS administrator prepares a SPEC differential report indicating the
difference between MACS3 and PDMS, and prepares an Impact report to indicate
components to be modified in the PDMS model. Based on the Impact component report, the
Piping Layout Engineer confirms and judges whether the revision of Specs in MACS3 need
to be reflected in Cats & Specs in PDMS or not. According to instructions from the Piping
Layout Engineer, the PDMS administrator modifies Cats & Specs in PDMS at the requested
time, and informs the Piping Designer/PDMS Operator of the revision contents and status by
using the PDMS Fault Request sheet.

According to the Impact report and the PDMS Fault Request sheet, the PDMS designer shall
PEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AX-PRC-0005
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1131-0101 Rev.1
3D MODELLING PROCEDURE Sheet No. 11 of 29

modify the subject model and the Piping Layout Engineer confirms that the revision of Specs
is reflected into the 3D model.

Tagged item, such as piping specialty and In-line Instrument shall be registered in PDMS
Cats & Specs based on the vendor drawings by YOC and TOC as per area installed.

Changes/updates are communicated to TOC through the same procedure as and when
required.

For detailed work flow for Cats & Specs revisions, refer to Attachment-7.

6.2 Piping Insulation Specs

YOC is responsible for creating and maintaining the Piping Insulation specifications.
PDMS Insulation Specs are produced in accordance with L290-AL-SPC-0002/L290-AL-SPC-
0003, “Specification for High/Low Temperature Insulation”.

6.3 Pipe Support Catalogue

YOC is responsible for creating and maintaining the Pipe Support catalogue. PDMS Pipe
Support catalogue are produced in accordance with L290-DX-STD-0004.001 Standard Pipe
Supports.

6.4 Structural Cats and Specs

The Structural catalogues used on the project shall consist of YOC and TOC catalogues in
accordance with L290-DS-STD-0002, “Standard Drawing for Member List”. YOC is
responsible for maintaining the catalogues.

6.5 Instrument and Electrical Material Cats and Specs

YOC is responsible for creating and maintaining the Instrument and Electrical material
catalogues to be used on the Project in accordance with Project Standards for
Electrical/Instrument installation standards and components.

7. MODEL QUALITY CONTROL

The following activities are conducted continually to verify PDMS model quality.

7.1 Model Quality Management

In order to achieve Model quality, data consistency checks are carried out on a daily basis by
the PDMS Designers and any required corrections in PDMS are carried out using PDMS
data consistency tool on daily basis.
PEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AX-PRC-0005
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1131-0101 Rev.1
3D MODELLING PROCEDURE Sheet No. 12 of 29

In order to minimise errors within the PDMS model and monitor its status, a Data
Consistency Check Summary Report and Modelled Item Report are generated by the PDMS
administrator in YOC and TOC respectively on a weekly basis. After checking these reports
by the Piping Engineer, the required action is instructed to the PDMS designers. Model
quality monitoring and management continues throughout the Project execution. For detailed
work flow for Model Quality Management, refer to Attachment-8.

7.2 Model consistency with P&IDs

In order to ensure the consistency of PDMS model in relation to the Process design, checks
between SPPID and PDMS are periodically carried out by extracting a Process Line List from
SPPID and PDMS as an Excel database and a Comparison report is generated by the PDMS
administrator and reviewed by the Piping Engineer continually throughout the Project after
issuance of P&IDs.
Any inconsistencies are corrected upon instruction from the Piping Engineer to the
responsible parties for correction implementation.
For detailed work flow for Line Condition Data Management, refer to Attachment-9.

7.3 Clash Management

To ensure that the 3D model and the data extracted from the system is clash free such as
cable trays or piping hitting steel, IDP runs are made and reviewed for each area at specific
stages (basically before model review) of model development. Clash Management is carried
out on an as required basis and controlled by the PDMS administrator/Piping Engineer in
YOC.
Prior to Model Reviews clash report shall be made available to COMPANY.

For detailed work flow for 3D Model Clash Management, refer to Attachment-10.

8. PDMS MODEL PROGRESS MONITORING

Progress monitoring for PDMS Model shall be in accordance with Progress Measurement
Procedure / Engineering L290-AB-PRC-0054

9. DOCUMENT PRODUCTION

The following design drawings are extracted from the PDMS Model during the EPC
execution.

9.1 Piping Design Drawings

y Plot Plan Drawing


y Equipment Location Plans
PEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AX-PRC-0005
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1131-0101 Rev.1
3D MODELLING PROCEDURE Sheet No. 13 of 29

y Piping Plan Drawing


y Piping Isometric Drawing
y Pipe Support Location Plans (Requirement shall be discussed with Module Fabricator as
PDMS Model will be made available).

9.2 Civil Design Drawings

y Underground Plan

9.3 Structural
• Primary, secondary and tertiary steel drawings for Modules

9.4 Electrical Design Drawings

Cable Trench Layout


Cable Tray Layout

9.5 Instrument Design Drawings

Cable Trench Layout


Cable Tray Layout
Instrument Plan Drawing

10. MATERIAL MANAGEMENT

MTO’s and bulk material estimates of the Project are produced with some level of
contingency from the PDMS model during EPC execution. The timing of Piping material
downloads from PDMS model to MACS3 shall be responsibility of the Piping lead engineer in
each operation centre. The downloading of piping material from PDMS shall be implemented
by Piping IT Key person in YOC.
PEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AX-PRC-0005
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1131-0101 Rev.1
3D MODELLING PROCEDURE Sheet No. 14 of 29

Attachment-1: Extent of 3D Modeling


PEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AX-PRC-0005
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1131-0101 Rev.1
3D MODELLING PROCEDURE Sheet No. 15 of 29

Attachment-2: Organization for 3D CAD Execution

YOC TOC
3D Model 3D Model
Coordinator Interface coordination / Uniformity Coordinator

PDMS PDMS
Administrator Administrator
PDMS set-up / Maintenance

PIPING STRUCTURAL ELECTROCAL PIPING STRUCTURAL ELECTROCAL


3D Model K/P 3D Model K/P 3D Model K/P 3D Model K/P 3D Model K/P 3D Model K/P

CIVUL INSTRUMENT Other CIVUL INSTRUMENT Other


3D Model K/P 3D Model K/P Engineering 3D Model K/P 3D Model K/P Engineering
Discipline Discipline
PEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AX-PRC-0005
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1131-0101 Rev.1
3D MODELLING PROCEDURE Sheet No. 16 of 29

Attachment-3: PDMS Modelling Item


Category Design Item Modeling Item SCOPE of MODELING REMARKS

Pip Inst. Elec. Stru Civ

A/G Piping A/G Piping Components All Piping ○ DN 15 and larger


Components(*)

Insulation ○

All Piping Supports ○ Actual physical size

Piping Specialty ○

Equipment Reactors / Columns Body ○

Vertical Drums Body & Skirt ○

Nozzle, MH ○

Horizontal Drums Body ○

Nozzle, MH ○

H/Exchangers Body ○

Nozzle, MH ○

Air Fin Coolers Body ○

Nozzle ○

Support structure ○ (

Tanks Equipment Body ○

Nozzle, MH ○

Equipment Platform Body ○

Handrail ○

Bracket ○

Ladder for Equipment All ○

Stair for Equipment All ○

Insulation on Equipment All ○

Rotary Rotating Machinery Body ○ To include all operator interface,


valves, instruments and
maintainable items.
Compressors, Turbines) Driver ○ To include all operator interface,
valves, instruments and
Electrical JB’s ○ maintainable items.

Package Packaged Equipment Body ○ To include all operator interface,


valves, instruments and
Electrical JB’s ○ maintainable items.

Furnace Furnace Body ○ To include all operator interface,


valves, instruments and
maintainable items.
Stack Nozzle ○

Platform, Handrail ○

Ladder ○

Stair ○

Duct ○ Simplified Model(Outline Only)

Fire Fighting Fire Fighting Equipment Body ○ Simplified Model(Outline Only)

Spray systems Hose Nozzle ○ Deluge spray cones shall be


Reels, Foam systems, modeled by soft volume.
Fire ring main routing,
Block valves, Fixed
Monitors, Hose boxes,
Deluge valve manifolds,
Fire Water Connections
PEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AX-PRC-0005
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1131-0101 Rev.1
3D MODELLING PROCEDURE Sheet No. 17 of 29

Category Design Item Modeling Item SCOPE of MODELING REMARKS

Pip Inst. Elec. Stru Civ

Hydrant / Monitor ALL ○

Civil Paving ALL ○ (*)Paving will be modeled as a


flat slab at high point level
Road ALL ○

Fence & Gate ALL ○

Site Grading ALL ○ If required

Earth Dike & Earth Pond ALL ○ If required

Concrete structure ALL ○ (*) ○ (*)Initial model

Table Top ALL ○ (*) ○ (*)Initial model

Foundations ALL ○ (*) ○ (*)Initial model

Structure Steel Piperack ALL ○ (*) ○ (*) Initial model

Steel Structure ALL ○ (*) ○ (*) Initial model

Shelter incl. Trolley beam ALL ○ (*) ○ (*) Initial model

LIR/LER All ○ (*) ○ (*)Initial model

Monorail ALL ○ (*) ○ (*) Initial model

Gusset Plate ALL ○

Platform ALL ○ (*) ○ (*) Initial model

Walkway ALL ○ (*) ○ (*) Initial model

Ladder ALL ○ (*) ○ (*) Initial model

Stair ALL ○ (*) ○ (*) Initial model

Stanchion ALL ○ (*) ○ (*) Initial model

With Fireproof, if any

Fireproof ALL ○

Off-Line Pressure Instruments ALL ○


Instruments

Flow Instruments ALL ○

Temperature Instruments ALL ○

Control Valves (*) ALL ○ (*) Actuator also

On-Off Valves (*) ALL ○ (*) Actuator also

Main A/G Cable Tray ALL ○ 300W and Larger

Junction Box ALL ○

Panel & Cabinet ALL ○

Air Volume Tank ALL ○ ○(**) (**) For tanks handled by Inst.
section.

Analyser House / Local Outline ○(*) ○ (*) Initial model


Panel
Fire & Gas Devices Outline ○ In accordance with F&G layout
including beam volume. by fire fighting engineer.
Transmitter Stanchion Outline ○

Electrical A/G Cable Tray More than 300 mm ○ 300W and Larger. To be
discussed with module fabricator
to determine tray size and
supports to be modeled.
Local Control Station Outline ○

Local Panel Outline ○

Transformer (Outdoor) ALL ○ Simplified Model(Outline Only)

Switchgear ALL ○ Simplified Model(Outline Only)

(Located out door)


PEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AX-PRC-0005
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1131-0101 Rev.1
3D MODELLING PROCEDURE Sheet No. 18 of 29

Category Design Item Modeling Item SCOPE of MODELING REMARKS

Pip Inst. Elec. Stru Civ

Lighting Fixture and Outline ○


Flooding Light / Poles

Junction Box (except for Outline ○


JB for Lighting)
Tele communication Outline ○ Simplified Model(Outline Only)
Equipment (Outdoor)

Building Substation & Power Outline ○ Location of entrance to be


Station identified.

Control Building Outline ○ Simplified Model(Outline Only)

Laboratory Outline ○

Warehouse & Storage Outline ○


Building
Machine & Equip. Outline ○
Building
Office & Clinic Outline ○

Guard House Outline ○

Fire Station Outline ○

Others Laydown Area(*) / Drop ○ (*)Area Marking only


Down Area
Tube Bundle Extraction ○
Space
Escape Way ○

U/G Non-Pressure Oily Water Sewer/ U/G Piping ○


Piping components
Sanitary Drain

Catch Basin ○

Manhole ○

Vent Pipe ○ ○(*) (*) For self standing pipe

Pressure Piping Closed Drain, Amine U/G Piping ○


Drain etc.
Fire Water/Foam line U/G Piping ○

(FW / FF) Valve Pit(*) ○ (*)If any

Other Pressured Line Modeling (U/G ○


Piping)
(CW, DW, etc) Valve Pit(*) ○ (*)If any

Inst./Elec. Direct Buried Cable Outline ○ ○


Cables Trench
Concrete Cable Trench Outline ○ ○

Duct Bank Outline ○ ○

Concrete Foundation All O(*) ○ (*) Initial model for pedestal by


Piping.
Misc Foundation All Not Modeled

Concrete Pit & Open All ○


Ditch
PEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AX-PRC-0005
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1131-0101 Rev.1
3D MODELLING PROCEDURE Sheet No. 19 of 29

Attachment-4: Colour Coding in 3D Model

Piping Module
Process Gas Green
Process Liquid Dark Green
Steam/Condensate Orange
Flare Deep Blue
Fuel Gas/ Fuel Oil Yellow
Cooling Water Blue
Instrument Air/Plant Air White
Nitrogen Deep Pink
Fire Water Dark Red
Chemicals Pink
Open Drain (SW-COC) Violet
Open Drain (AOC) Yellow Green
Close Drain Cyan
Module Hook-up piping Light Pink
Insulation Light Yellow
Support Brown
Egress Pink
Crane Tan
Human Tan

Equipment Module
Body and Nozzle Tan
Platform, Ladder and Stair White

Civil Module
Structure Steel Steel Blue
Concrete Structure Grey
Road, Access way Midnight
Concrete Paving Brown
Foundation (Lock) Grey
Foundation (Unlock) Dark Green
Chambers, Pipe trench, Ditches Grey
Grating Cover Dark Brown

Electrical/Instrument Module
Electrical Cable Tray/ Trench Red
Instrument Cable Tray/ Trench Green
PEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AX-PRC-0005
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1131-0101 Rev.1
3D MODELLING PROCEDURE Sheet No. 20 of 29

Substation Equipment Green


Other electrical parts Green
RCU/ Safety SW Green
Lighting Fixture Orange
Junction Box, Stanchion for Electrical Green
Instrument items Red
Junction Box, Panel etc. for Instrument Yellow
Miscellaneous of instrument Violet
For all other items, the choice of the colour coding is at the discretion of the model builder.
PEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AX-PRC-0005
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1131-0101 Rev.1
3D MODELLING PROCEDURE Sheet No. 21 of 29

Attachment-5: Naming Convention for Zone

ZONE NAME
SITE LEVEL ZONE LEVEL ZONE NAME RULE
SAMPLE

"P"+PCWBS LV.4+"-"+System
A/G PIPING PIPING PA1EA-581-PG
Code+ "-" +Service Code

PIPE "X"+PCWBS LV.4+"-"+System


SUPPORT XA1EA-581-PG
SUPPORTS Code +"-" +Service Code

MISC. ITEM
(Construction "Z"+PCWBS LV.4+"-"+System
MISC. ZA1EA-581
Machine, Code
human etc)
"L"+PCWBS LV.4+"-"+System
SAFETY SOFT VOLUME LA1EA-581-EGRESS
Code+ "EGRESS"
"P"+PCWBS LV.4+"U"+"-
U/G PIPING PIPING "+System Code+ "-" +Service PA1SAU-581-PG
Code
MODULE
HOOK-UP PIPING
PIPING
"M"+PCWBS LV.4+"-"+System MA1EA-581-P
EQUIPMENT EQUIPMENT
Code +"-"+ EQP Type (pump)

STRUCTURE (for Module "S"+PCWBS LV.4+"-"+System


Area) Code.+"-"+Structure ID

Primary Steel (Trusses &


Structure ID = 101 SA1EA-581-101
Girders)

Primary Steel (Joint & Shear


Structure ID = 102 SA1EA-581-102
Stiffening)

Primary Steel (TBA) Structure ID = 103 SA1EA-581-103


Secondary Steel (Deck
plating, Grating & Stringers, Structure ID = 201 SA1EA-581-201
etc)
ABOVE
GROUND
STRUCTURE Secondary Steel (In-deck
Structure ID = 202 SA1EA-581-202
equipment supports)

Secondary Steel (Trimmers


Structure ID = 203 SA1EA-581-203
at hatches, etc)

Secondary Steel (Permanent


Built-In & Free-Standing Structure ID = 204 SA1EA-581-204
Tankage)

EQP & Service


Supports(Steel Support Structure ID = 301 SA1EA-581-301
Structures)
PEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AX-PRC-0005
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1131-0101 Rev.1
3D MODELLING PROCEDURE Sheet No. 22 of 29

ZONE NAME
SITE LEVEL ZONE LEVEL ZONE NAME RULE
SAMPLE
EQP & Service
Supports(Runway beams, Structure ID = 302 SA1EA-581-302
lifting lugs, etc)

EQP & Service


Supports(Pipe Racks & Multi- Structure ID = 303 SA1EA-581-303
Discipline support steelwork)

EQP & Service


Supports(Above floor
Structure ID = 304 SA1EA-581-304
equipment, support
steelwork)

EQP & Service


Supports(Cladding, Firewall, Structure ID = 305 SA1EA-581-305
blastwall Supports)

EQP & Service


Structure ID = 306 SA1EA-581-306
Supports(TBA)

EQP & Service


Supports(Hose Handling Structure ID = 308 SA1EA-581-308
Platforms)

Access(Internal & External


Structure ID = 401 SA1EA-581-401
Stairs & Stair Towers)
Structure ID =
Other
501,502,503,504,505,901,903
STRUCTURE other than "S"+PCWBS LV.4+"-"+System
module (e.g stick-built) Code.+"-"+Structure/FWBS Code

"C"+PCWBS LV.4+"-"+System
CIVIL STRUCTURE CA1SA-581-SG
Code+"-"+"SG".
ROAD "C"+PCWBS LV.4+"-"+"RD" CA1SA-RD
PAVE "C"+PCWBS LV.4+"-"+"PV" CA1SA-PV
FOUNDATION "C"+PCWBS LV.4+"-"+"FD" CA1SA-FD
U/G CIVIL JETTY "C"+PCWBS LV.4+"-"+"JY" CA1SAU-JY
DIKE "C"+PCWBS LV.4+"-"+"DK" CA1SA-DK
MISC. "C"+PCWBS LV.4+"-"+"MISC" CA1SA-MISC
"I"+PCWBS LV.4+"-"+ System
CABLE TRAY IA1EA-581-TR
Code+ "-"+ “TR”
"I"+PCWBS LV.4+"-"+"EQUI"+"-
INST. EQP IA1EA-EQUI-01
"+Seq. NO.
INSTRUMENT MISC. "I"+PCWBS LV.4+"-"+"MISC" IA1EA-MISC
"E"+PCWBS LV.4+"-"+System
Control Station EA1EA-581-CS
Code+ "-"+ Function Code
CABLE TRAY "E"+PCWBS LV.4+"-"+"TR" EA1EA-581-TR
POWER OUTLET "E"+PCWBS LV.4+"-"+"PW" EA1EA-581-PW
ELECTRICAL RCU/Safety SW "E"+PCWBS LV.4+"-"+"SW" EA1EA-581-SW
Lighting Fixture "E"+PCWBS LV.4+"-"+"LT" EA1EA-581-LT
Control Panel "E"+PCWBS LV.4+"-"+"EC" EA1EA-581-EC
Speaker "E"+PCWBS LV.4+"-"+"LT" EA1EA-581-LT
PEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AX-PRC-0005
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1131-0101 Rev.1
3D MODELLING PROCEDURE Sheet No. 23 of 29

ZONE NAME
SITE LEVEL ZONE LEVEL ZONE NAME RULE
SAMPLE
"E"+PCWBS LV.4+"-"+System
Junction Box EA1EA-581-JB
Code+”-“JB"
PEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AX-PRC-0005
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1131-0101 Rev.1
3D MODELLING PROCEDURE Sheet No. 24 of 29

Attachment-6: Naming of Item Level


DB
Category Naming Rule Naming Sample
Structure
SITE "P"+PCWBS LV.4 PA1EA
"P"+PCWBS LV.4 + "-" + System Code( Appendix-
ABOVE ZONE PA1EA-581-PG
2) + "-" + Service Code(Appendix-7)
PIPING A1EA-
PCWBS LV.4 + "-" + System Code + "_" + Line
ITEM 581_PG001-
NO + "-" + Line Class + ( /Suffix )
1CA1
SITE "X"+PCWBS LV.4 XA1EA
"X"+PCWBS LV.4 + "-" + System Code + "-" +
PIPE ZONE XA1EA-581-PG
Service Code
SUPPORT PCWBS LV.4 + "-" + System Code + "_" + Line A1EA-
ITEM NO + "-" + Line Class + ( /Suffix ) + "SUPT" + 581_PG001-
SEQ.NO 1CA1-SUPT01
SITE "M"+PCWBS LV.4 MA1EA
"M"+PCWBS LV.4 + "-" + System Code + "-" +
EQUIPMENT ZONE MA1EA-581-P
Mechanical/Function Code(Appendix-5)
ITEM EQP Item NO L-581-P-001A
SITE "S"+PCWBS LV.4 SA1EA
"S"+PCWBS LV.4 + "-" + System Code + "-" +
SA1EA-321-101
Structure/Group Code (*1) <-- in case of module
ZONE SA1SB-Sequence
area "S"+PCWBS LV.4 + "-" + Sequence No
No
STRUCTURE <-- other area
PCWBS LV.4 + "-" + Group Code + ("-" + Unique
ID) <-- in case of module area A1EA-101-01
ITEM
PCWBS LV.4 + Seq. NO + "-" + Item Type(*2) + A1SB01-FR
(Unique ID) <-- in case of other area
SITE "C"+PCWBS LV.3 or LV.4 CA1EA
"C"+PCWBS LV.3 or 4 + "-" + System Code + "-"
ZONE CA1EA-321-FD
CIVIL(U/G) + Civil Function Code(Appendix-13)
PCWBS LV.3 or 4 + "-" + Function Code +
ITEM A1EA-FD01
(Unique ID )
SITE "P"+PCWBS LV.4 + "U" PA1EAU
"P"+PCWBS LV.4 + "U" + "-" + System Code + "-"
ZONE PA1EAU-581-PG
U/G PIPING + Service Code
PCWBS LV.4 + "U" + "-" + System Code + "-" + A1EAU-581-
ITEM
Line NO + "-" + Line Class + ( /Suffix ) PG001-1CA1
SITE "I"+PCWBS LV.4 IA1EA
"I"+PCWBS LV.4 + "-" + System Code + "-" +
ZONE IA1EA-581-137X
Inst/FWBS Code(Appendix-3)

INSTRUMENT PCWBS LV.4 + "-" + System ID ( for Cable Tray) A1EA-CT01


PCWBS LV.4 + "-" + JB ID ( for Junction Box) A1EA-JB01
ITEM PCWBS LV.4 + "-" + Panel ID ( for Local Panel &
Cubicle)
Tag NO. ( for Remote Instrument)

ELECTRICAL SITE "E"+PCWBS LV.4 EA1EA


PEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AX-PRC-0005
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1131-0101 Rev.1
3D MODELLING PROCEDURE Sheet No. 25 of 29

DB
Category Naming Rule Naming Sample
Structure
"E"+PCWBS LV.4 + "-" + System Code + "-" +
ZONE EA1EA-581-1383
Elec/FWBS Code(Appendix-3)
PCWBS LV.4 + "-" + Function Code(Appendix-11)
ITEM A1EA-LT01
+ (Unique ID )
SITE "L"+PCWBS LV.4 LA1EA
"L"+PCWBS LV.4 + "-" + System Code + "-" + LA1EA-581-
SAFETY ZONE
"EGRESS" EGRESS
(Soft Volume) ES-1100 for
ITEM PCWBS LV.4 + "-" + "EGRESS" + (Unique ID) Escape
A1C01 for Access
SITE "A"+PCWBS LV.4 AA1EA
"A"+PCWBS LV.4 + "-" + System Code + "-" +
ZONE AA1EA-301-L1
Architectural Building & Area Code(Appendix-12)
PCWBS LV.4 + "-" + Building & Area Code +
ITEM A1EA-L101
(Unique ID)
SITE "H"+PCWBS LV.4 HA1EA
"H"+PCWBS LV.4 + "-" + System Code + "-" +
ZONE HA1EA-311-HH
HVAC HVAC Function Code(Appendix-15)
PCWBS LV.4 + "-" + HVAC Function Code +
ITEM A1EA-HH01
(Unique ID)
SITE "T"+PCWBS LV.4 TA1EA
"T"+PCWBS LV.4 + "-" + System Code + "-" +
Telecommunic ZONE TA1EA-840-CCC
Telecom/Function Code(Appendix-14)
ations
PCWBS LV.4 + "-" + Telecom. Function Code +
ITEM A1EA-CCC01
(Unique ID)
SITE "Z" +PCWBS LV.4 ZA1EA
ZONE "Z" +PCWBS LV.4 + "-" + System Code ZA1EA-581
MISC. ITEM
ITEM PCWBS LV.4 + "-" + Item Type(*3) + (Unique ID ) A1EA-HM01

(*1) Group Code means the KBR Code for Weight Management
(*2) Item Type means the following code
FR Structure Frame
LD Ladder, Cage
PF Platform
ST Stair
HR Handrail
(*3) Item Type means the following code
HM Human model
CR Crane Model
PEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AX-PRC-0005
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1131-0101 Rev.1
3D MODELLING PROCEDURE Sheet No. 26 of 29

Attachment-7: Work Flow related with SPEC/Catalogue revision


PEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AX-PRC-0005
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1131-0101 Rev.1
3D MODELLING PROCEDURE Sheet No. 27 of 29

Attachment-8: Work Flow related with Model Quality Management


PEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AX-PRC-0005
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1131-0101 Rev.1
3D MODELLING PROCEDURE Sheet No. 28 of 29

Attachment-9: Work Flow related with Line Condition Data Management


PEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AX-PRC-0005
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1131-0101 Rev.1
3D MODELLING PROCEDURE Sheet No. 29 of 29

Attachment-10: Work Flow related with 3D Model Clash Management