AFCONS INFRASTRUCTURE LTD

PROJECT : CONSTRUCTION OF BRIDGE.34,38,39,40,41,42,43,53,55,56,57,58,59,8


LINK
REFERENCE SPECIFICATION: JIS K 5659:2008

CLIENT: KONKAN RAILWAY CORPORATION LIMITED


PROJECT -2629 CONTRACTOR: AFCONS INFRASTRUCTURE LTD

INSPECTION AND TE

ACCEPTANCE CRITERIA
Sl.no. ACTIVITIES
Inorganic Zinc slicate
Epoxy Mist Coat Epoxy Full Coat
Primer

Epomarine Primer for


Kansai Product Description SD Zinc 1500 A Epomarine HB(K)
Mist Coat

1 Drying Time

a). Surface Dry, Max at 30°C 30 minuts 2 hours 2 hours

b). Hard Dry, Max at 30°C 48 hours 16 hours 10 hours

2 Consistency Free Flowing 2000-4000 cps 80+ / -20 KU

3 Finish Smooth Smooth Smooth

Page 1 of 27
AFCONS INFRASTRUCTURE LTD

PROJECT : CONSTRUCTION OF BRIDGE.34,38,39,40,41,42,43,53,55,56,57,58,59,8


LINK
REFERENCE SPECIFICATION: JIS K 5659:2008

CLIENT: KONKAN RAILWAY CORPORATION LIMITED


PROJECT -2629 CONTRACTOR: AFCONS INFRASTRUCTURE LTD

INSPECTION AND TE

ACCEPTANCE CRITERIA
Sl.no. ACTIVITIES
Inorganic Zinc slicate
Epoxy Mist Coat Epoxy Full Coat
Primer

4 Colour Grey Red- Brown Red- Oxide

5 Dry Film Thickness/ Per Coat Min 75-85 Microns 25-30 Microns 100-120 Microns

6 Volume Solids, % min 62% +/-3 41% +/-3 52% +/-3

7 Scratch Hardness(1.5 Kg Load) NA NA Should Pass

Page 2 of 27
AFCONS INFRASTRUCTURE LTD

PROJECT : CONSTRUCTION OF BRIDGE.34,38,39,40,41,42,43,53,55,56,57,58,59,8


LINK
REFERENCE SPECIFICATION: JIS K 5659:2008

CLIENT: KONKAN RAILWAY CORPORATION LIMITED


PROJECT -2629 CONTRACTOR: AFCONS INFRASTRUCTURE LTD

INSPECTION AND TE

ACCEPTANCE CRITERIA
Sl.no. ACTIVITIES
Inorganic Zinc slicate
Epoxy Mist Coat Epoxy Full Coat
Primer

Should pass, Testing Should pass, Testing Should pass, Testing after
8 Flexibility & Adhesion (10.00mm Mandrel)
after 24 hrs after 24 hrs 24 hrs

Flash Point
9 not included in the Japane

10 Resistance to Salt Spray as full system** NA NA NA

Page 3 of 27
AFCONS INFRASTRUCTURE LTD

PROJECT : CONSTRUCTION OF BRIDGE.34,38,39,40,41,42,43,53,55,56,57,58,59,8


LINK
REFERENCE SPECIFICATION: JIS K 5659:2008

CLIENT: KONKAN RAILWAY CORPORATION LIMITED


PROJECT -2629 CONTRACTOR: AFCONS INFRASTRUCTURE LTD

INSPECTION AND TE

ACCEPTANCE CRITERIA
Sl.no. ACTIVITIES
Inorganic Zinc slicate
Epoxy Mist Coat Epoxy Full Coat
Primer

Protection Against Corrosion Under


11 NA NA NA
Condition of Condensation as full system**

12 Keeping Properties not included in the Japane

12 Mass in Kg / Ltr. 2.90 +/-0.3 1.37 +/-0.3 1.35 +/-0.3

13 Pot Life minimum at 30°C 6 hours 3 hours 3 hours

14 Fineness of Grind NA 50 > = 50 > =

Page 4 of 27
AFCONS INFRASTRUCTURE LTD

PROJECT : CONSTRUCTION OF BRIDGE.34,38,39,40,41,42,43,53,55,56,57,58,59,8


LINK
REFERENCE SPECIFICATION: JIS K 5659:2008

CLIENT: KONKAN RAILWAY CORPORATION LIMITED


PROJECT -2629 CONTRACTOR: AFCONS INFRASTRUCTURE LTD

INSPECTION AND TE

ACCEPTANCE CRITERIA
Sl.no. ACTIVITIES
Inorganic Zinc slicate
Epoxy Mist Coat Epoxy Full Coat
Primer

7.86 m²/liter at 75 12.66 m²/liter at 30


15 Theorotical Spreading Capacity minimum 4.90 m²/liter at 100 microns
microns microns

Viscosity (Efflux time by Ford cup no. 4 of


17 Paint i.e.. Mixture of two components at not included in the Japane
27±2°C (with 10% thinner).

Adhesion & Compatibility with Primer &


16 Passes 4B-5B Passes 4B-5B Passes 4A-5A
Finish Coat

17 Gloss Value at 60° Angle of Incidence, min NA NA NA

18 Acclerated Tests on full system**

Page 5 of 27
AFCONS INFRASTRUCTURE LTD

PROJECT : CONSTRUCTION OF BRIDGE.34,38,39,40,41,42,43,53,55,56,57,58,59,8


LINK
REFERENCE SPECIFICATION: JIS K 5659:2008

CLIENT: KONKAN RAILWAY CORPORATION LIMITED


PROJECT -2629 CONTRACTOR: AFCONS INFRASTRUCTURE LTD

INSPECTION AND TE

ACCEPTANCE CRITERIA
Sl.no. ACTIVITIES
Inorganic Zinc slicate
Epoxy Mist Coat Epoxy Full Coat
Primer

a) Resistance to 0.5% Sulphuric acid


19 NA NA NA
(Weight by Volume)

b) Resistance to 0.5% Calcium hydroxide


20 (Weight by Volume) NA NA NA

21 Durability Tests**

22 Accelerated weathering test.QUV A NA NA NA

23 Accelerated weathering test.QUV A NA NA NA

Page 6 of 27
AFCONS INFRASTRUCTURE LTD

PROJECT : CONSTRUCTION OF BRIDGE.34,38,39,40,41,42,43,53,55,56,57,58,59,8


LINK
REFERENCE SPECIFICATION: JIS K 5659:2008

CLIENT: KONKAN RAILWAY CORPORATION LIMITED


PROJECT -2629 CONTRACTOR: AFCONS INFRASTRUCTURE LTD

INSPECTION AND TE

ACCEPTANCE CRITERIA
Sl.no. ACTIVITIES
Inorganic Zinc slicate
Epoxy Mist Coat Epoxy Full Coat
Primer

24 Outdoor Exposure** NA NA NA

Resistance to Sulphur Dioxide (Tested at


22 not included in the Japane
complete systems)

25 Humidity Test (On full System) NA NA NA

24 % Silicon on Non-Volatile Binder Basis not included in the Japane

25 Gloss Retention Gloss retention property has been covered und

Page 7 of 27
AFCONS INFRASTRUCTURE LTD

PROJECT : CONSTRUCTION OF BRIDGE.34,38,39,40,41,42,43,53,55,56,57,58,59,8


LINK
REFERENCE SPECIFICATION: JIS K 5659:2008

CLIENT: KONKAN RAILWAY CORPORATION LIMITED


PROJECT -2629 CONTRACTOR: AFCONS INFRASTRUCTURE LTD

INSPECTION AND TE

ACCEPTANCE CRITERIA
Sl.no. ACTIVITIES
Inorganic Zinc slicate
Epoxy Mist Coat Epoxy Full Coat
Primer

No peel off or cracks in


No peel off in film when No peel off in film when
film when 500g weight
26 Direct Impact Resistance 300g weight is dropped 300g weight is dropped
is dropped from
from 500mm from 500mm
500mm

27 Zinc on dry Film More than 80 % NA NA

** These are Long Term Tests


a) Long term Performance test are required for product Qualification
b) Periodicity of conducting the long term test can be mutually agreed.

PREPARED BY

Page 8 of 27
AFCONS INFRASTRUCTURE LTD

PROJECT : CONSTRUCTION OF BRIDGE.34,38,39,40,41,42,43,53,55,56,57,58,59,8


LINK
REFERENCE SPECIFICATION: JIS K 5659:2008

CLIENT: KONKAN RAILWAY CORPORATION LIMITED


PROJECT -2629 CONTRACTOR: AFCONS INFRASTRUCTURE LTD

INSPECTION AND TE

ACCEPTANCE CRITERIA
Sl.no. ACTIVITIES
Inorganic Zinc slicate
Epoxy Mist Coat Epoxy Full Coat
Primer

Signature
Name

Designation
Date

Page 9 of 27
DOCUMENT No: ITP/2629/PAIN

55,56,57,58,59,85,87 & 88 ON KATRA-DHARAM SECTION OF UDHAMPUR SRINAGAR-BARAMULLA RAIL

REV-00, Date:- 03/05/18


CTION AND TESTING PLAN (BR.NO 39 & 43) FOR PAINTS AT MANUFACTURER'S PREMISES

CRITERIA
Tets Method
PERFOMER AFCON (QA/QC)
Undercoat For Fluoro Guidline
Fluoro Resin Topcoat
resin paint

Celatect F Undercoat Celatect F Topcoat

2 hours 10 minuts
IS:101-86
100% Witness
(part-3/Sec 1)
10 hours 24 hours

IS:101-89
80+ / -20 KU 80+ / -20 KU 100% Witness
(Part1 / Sec 5)

IS:101-87
Smooth Smooth 100% Witness
(Part3 / Sec 4)

Page 10 of 27
DOCUMENT No: ITP/2629/PAIN

55,56,57,58,59,85,87 & 88 ON KATRA-DHARAM SECTION OF UDHAMPUR SRINAGAR-BARAMULLA RAIL

REV-00, Date:- 03/05/18


CTION AND TESTING PLAN (BR.NO 39 & 43) FOR PAINTS AT MANUFACTURER'S PREMISES

CRITERIA
Tets Method
PERFOMER AFCON (QA/QC)
Undercoat For Fluoro Guidline
Fluoro Resin Topcoat
resin paint

IS:101-89
Light Olive Green RAL 6003 100% Witness
(Part4 / Sec 2)

IS:101-89
25-30 Microns 25-30 Microns (Part 3 / Sec 2) 100% Witness
By Elcometer

53% +/-3 42% +/-3 ASTM- D2697 100% Witness

IS:101-88
(Part 5 / Sec 2) Blast clean
Should Pass Should Pass 100% Witness
MS panel to be used for
testing

Page 11 of 27
DOCUMENT No: ITP/2629/PAIN

55,56,57,58,59,85,87 & 88 ON KATRA-DHARAM SECTION OF UDHAMPUR SRINAGAR-BARAMULLA RAIL

REV-00, Date:- 03/05/18


CTION AND TESTING PLAN (BR.NO 39 & 43) FOR PAINTS AT MANUFACTURER'S PREMISES

CRITERIA
Tets Method
PERFOMER AFCON (QA/QC)
Undercoat For Fluoro Guidline
Fluoro Resin Topcoat
resin paint

IS:101-88
Should pass, Testing Should pass, Testing after 7 (Part5 / Sec 2) Blast clean
100% Witness
after 7 days days MS panel to be used for
testing

ed in the Japanese Specification 100% Witness

To be tested as system.
Should pass 4000 hrs, No sign
IS:101-88
NA of corrosion. Creep age of total 100% Witness
(Part 6 / Sec1)
5 mm max, either side of the X
cut is allowed.

Page 12 of 27
DOCUMENT No: ITP/2629/PAIN

55,56,57,58,59,85,87 & 88 ON KATRA-DHARAM SECTION OF UDHAMPUR SRINAGAR-BARAMULLA RAIL

REV-00, Date:- 03/05/18


CTION AND TESTING PLAN (BR.NO 39 & 43) FOR PAINTS AT MANUFACTURER'S PREMISES

CRITERIA
Tets Method
PERFOMER AFCON (QA/QC)
Undercoat For Fluoro Guidline
Fluoro Resin Topcoat
resin paint

To be tested as system, Should IS:101-88


NA 100% Witness
pass 4000 hrs. (Part 6 / Sec1)

ed in the Japanese Specification 100% Witness

IS:101-87
1.34 +/-0.3 1.22 +/-0.3 100% Witness
(Part1 / Sec7)

6 hours 2 hours IS:13213:1991 Annexure E 100% Witness

40 > = IS:101-87
10 > = 100% Witness
(Part1 / Sec7)

Page 13 of 27
DOCUMENT No: ITP/2629/PAIN

55,56,57,58,59,85,87 & 88 ON KATRA-DHARAM SECTION OF UDHAMPUR SRINAGAR-BARAMULLA RAIL

REV-00, Date:- 03/05/18


CTION AND TESTING PLAN (BR.NO 39 & 43) FOR PAINTS AT MANUFACTURER'S PREMISES

CRITERIA
Tets Method
PERFOMER AFCON (QA/QC)
Undercoat For Fluoro Guidline
Fluoro Resin Topcoat
resin paint

16.6 m²/liter at 30 Appendix I as per


15.6 m²/liter at 25 microns 100% Witness
microns M&C/PCN/129/2018

ed in the Japanese Specification 100% Witness

ASTM D-3359-97 &


Passes 4A-5A Passes 4A-5A 100% Witness
Appendix VII

IS:101-88
NA 70 units at 60° angle 100% Witness
(part 4/ Sec4)

Page 14 of 27
DOCUMENT No: ITP/2629/PAIN

55,56,57,58,59,85,87 & 88 ON KATRA-DHARAM SECTION OF UDHAMPUR SRINAGAR-BARAMULLA RAIL

REV-00, Date:- 03/05/18


CTION AND TESTING PLAN (BR.NO 39 & 43) FOR PAINTS AT MANUFACTURER'S PREMISES

CRITERIA
Tets Method
PERFOMER AFCON (QA/QC)
Undercoat For Fluoro Guidline
Fluoro Resin Topcoat
resin paint

NA Should pass after 168 hrs 100% Witness


IS: 13213-1991
Annexure F
NA Should pass after 168 hrs 100% Witness

NA 500h 60° gloss retention 90% ˂= 100% Witness

NA 200h 60° gloss retention 80% ˂= IS: 13213-1991 100% Witness


Annexure G

Page 15 of 27
DOCUMENT No: ITP/2629/PAIN

55,56,57,58,59,85,87 & 88 ON KATRA-DHARAM SECTION OF UDHAMPUR SRINAGAR-BARAMULLA RAIL

REV-00, Date:- 03/05/18


CTION AND TESTING PLAN (BR.NO 39 & 43) FOR PAINTS AT MANUFACTURER'S PREMISES

CRITERIA
Tets Method
PERFOMER AFCON (QA/QC)
Undercoat For Fluoro Guidline
Fluoro Resin Topcoat IS: 13213-1991
resin paint
Annexure G

No Cracking, Blistering,Peeling
NA in 24 months, Extent of gloss 100% Witness
retention 60% or more.

ed in the Japanese Specification 100% Witness

No sign of corrosion & no sign IS:101-87


NA 100% Witness
of deterioration up to 4000 hrs (Part 6 /Sec 1)

ed in the Japanese Specification 100% Witness

een covered under the Durability Tests ( Sr#.21 to 24 ) 100% Witness

Page 16 of 27
DOCUMENT No: ITP/2629/PAIN

55,56,57,58,59,85,87 & 88 ON KATRA-DHARAM SECTION OF UDHAMPUR SRINAGAR-BARAMULLA RAIL

REV-00, Date:- 03/05/18


CTION AND TESTING PLAN (BR.NO 39 & 43) FOR PAINTS AT MANUFACTURER'S PREMISES

CRITERIA
Tets Method
PERFOMER AFCON (QA/QC)
Undercoat For Fluoro Guidline
Fluoro Resin Topcoat
resin paint

No peel off in film when No Peel off in film when 300 g


300g weight is dropped weight is dropped from 500 IS:101-99 (Part 5 / Sec 3) 100% Witness
from 500 mm mm

IS 14946
NA NA 100% Witness
Annexure B

AFCONS
CHECKED BY TPAQA
CHECKED BY

Page 17 of 27
DOCUMENT No: ITP/2629/PAIN

55,56,57,58,59,85,87 & 88 ON KATRA-DHARAM SECTION OF UDHAMPUR SRINAGAR-BARAMULLA RAIL

REV-00, Date:- 03/05/18


CTION AND TESTING PLAN (BR.NO 39 & 43) FOR PAINTS AT MANUFACTURER'S PREMISES

CRITERIA
Tets Method
PERFOMER AFCON (QA/QC)
Undercoat For Fluoro Guidline
Fluoro Resin Topcoat
resin paint

Page 18 of 27
DOCUMENT No: ITP/2629/PAINT/C-5/FAB/001

REV-00, Date:- 03/05/18

TPAQA KRCL REMARKS

100% Inspection & 100% Inspection &


Record Review Record Review
Clerance from KRCL

100% Inspection & 100% Inspection &


Clerance from KRCL
Record Review Record Review

100% Inspection & 100% Inspection &


Clerance from KRCL
Record Review Record Review

Page 19 of 27
DOCUMENT No: ITP/2629/PAINT/C-5/FAB/001

REV-00, Date:- 03/05/18

TPAQA KRCL REMARKS

100% Inspection & 100% Inspection &


Clerance from KRCL
Record Review Record Review

100% Inspection & 100% Inspection & Clerance from


Record Review Record Review KRCL

100% Inspection & 100% Inspection &


Clerance from KRCL
Record Review Record Review

100% Inspection & 100% Inspection &


Clerance from KRCL
Record Review Record Review

Page 20 of 27
DOCUMENT No: ITP/2629/PAINT/C-5/FAB/001

REV-00, Date:- 03/05/18

TPAQA KRCL REMARKS

100% Inspection & 100% Inspection &


Clerance from KRCL
Record Review Record Review

100% Inspection & 100% Inspection &


Clerance from KRCL
Record Review Record Review

100% Inspection & 100% Inspection &


Clerance from KRCL
Record Review Record Review

Page 21 of 27
DOCUMENT No: ITP/2629/PAINT/C-5/FAB/001

REV-00, Date:- 03/05/18

TPAQA KRCL REMARKS

100% Inspection & 100% Inspection &


Clerance from KRCL
Record Review Record Review

100% Inspection & 100% Inspection &


Clerance from KRCL
Record Review Record Review

100% Inspection & 100% Inspection &


Clerance from KRCL
Record Review Record Review

100% Inspection & 100% Inspection &


Clerance from KRCL
Record Review Record Review

100% Inspection & 100% Inspection &


Clerance from KRCL
Record Review Record Review

Page 22 of 27
DOCUMENT No: ITP/2629/PAINT/C-5/FAB/001

REV-00, Date:- 03/05/18

TPAQA KRCL REMARKS

100% Inspection & 100% Inspection &


Clerance from KRCL
Record Review Record Review

100% Inspection & 100% Inspection &


Clerance from KRCL
Record Review Record Review

100% Inspection & 100% Inspection &


Clerance from KRCL
Record Review Record Review

100% Inspection & 100% Inspection &


Clerance from KRCL
Record Review Record Review

Page 23 of 27
DOCUMENT No: ITP/2629/PAINT/C-5/FAB/001

REV-00, Date:- 03/05/18

TPAQA KRCL REMARKS

100% Inspection & 100% Inspection &


Record Review Record Review

100% Inspection & 100% Inspection &


Clerance from KRCL
Record Review Record Review

100% Inspection & 100% Inspection &


Record Review Record Review

100% Inspection & 100% Inspection &


Record Review Record Review

Page 24 of 27
DOCUMENT No: ITP/2629/PAINT/C-5/FAB/001

REV-00, Date:- 03/05/18

TPAQA KRCL REMARKS

100% Inspection & 100% Inspection &


Record Review Record Review

100% Inspection & 100% Inspection &


Clerance from KRCL
Record Review Record Review

100% Inspection & 100% Inspection &


Clerance from KRCL
Record Review Record Review

100% Inspection & 100% Inspection &


Clerance from KRCL
Record Review Record Review

100% Inspection & 100% Inspection &


Clerance from KRCL
Record Review Record Review

Page 25 of 27
DOCUMENT No: ITP/2629/PAINT/C-5/FAB/001

REV-00, Date:- 03/05/18

TPAQA KRCL REMARKS

100% Inspection & 100% Inspection &


Clerance from KRCL
Record Review Record Review

100% Inspection & 100% Inspection &


Clerance from KRCL
Record Review Record Review

APPROVED BY KRCL

Page 26 of 27
DOCUMENT No: ITP/2629/PAINT/C-5/FAB/001

REV-00, Date:- 03/05/18

TPAQA KRCL REMARKS

Page 27 of 27