Presentation By :
Zain Saeed
PRESTRESSING METHODS
Although many methods have been used to produce the desired
state of pre-compression in concrete members, all prestressed
concrete members can be placed in one of two categories:
pretensioned or post-tensioned.
Pretensioned prestressed concrete members are produced by
stretching the tendons between external anchorages before the
concrete is placed. As the fresh concrete hardens it bonds to the
steel. When the concrete has reached the required strength, the
jacking force is released, and the force is transferred by bond from
steel to concrete. In the case of post-tensioned prestressed concrete
members, the tendons are stressed after the concrete has hardened
and achieved sufficient strength, by jacking against the concrete
member itself.
PRETENSIONING
The greater part of prestressed concrete
construction in the United States pretensioned.
The tendons, usually in the form of multiple-
wire stranded cables are stretched between
abutments that are a permanent part of the
facility as shown in Fig. 1.10 a. The extension of
the strands is measured, as well as the jacking
force.
Uses:
This method is Particularly well suited for
mass production because the casting beds
can be constructed several hundred feet
along.
“Principles”
Tension is applied to the steel wires first,
then concrete in poured, when concrete attains the
sufficient strength, wires are cut. Pre-stress is
transferred to the concrete through bond between
steel and concrete.
Steel wire is
i) T tensioned
c
POST-TENSIONING
FIGURE 1.14
Post-
tensioned
beam under
construction,
showing
draped tendon
conduits and
anchorages in
position prior
to placing side
forms and
pouring
concrete
POST-TENSIONING
FIGURE 1.15
Post-
tensioning a
beam using
multiple-
strand
tendons
POST-TENSIONING
FIGURE 1.16
Two-way
prestressed
slab, using
unbonded
wrapped
tendons, un-
der
construction.
Courtesy of
the Post-
Tensioning
Institute
POST-TENSIONING
End blocks
(Anchorages)
Estimated
weight of
seasonal
snowpack
(psf) equaled
or exceeded
one year in
ten
LOADS
Much progress has been made in recent years in developing rational
methods for predicting horizontal forces on structures due to wind
and seismic action. Reference 1.1 summarizes current thinking
regarding wind forces and has much information pertaining to
earthquake loads as well.
The sum of the calculated dead load and the specified or
calculated live and environmental loads is called the service
load, because this is the best estimate of the maximum load that
can be expected to act during the service life of the structure.
The factored load, or failure load, that a structure must be capable
of resisting to ensure an adequate margin of safety against
collapse, is a multiple of the service load, as explained in the
following section.
33