RISK RATING RISK LEVEL TOLERANCE LEVELS FOR TECHNICAL RISK ASSESSMENTS
19 to 25 (H) - High Escalate to a higher level and implement specific
8 to 18 (M) - Medium Proactively manage via appropriate management system
1 to 7 (L) - Low Monitor and manage as appropriate via management system
Pre-Evento Post-Evento
Tipo Descripción del Control
(x2) (x1)
Pre-Event Post-Event
Type Control Description
(x2) (x1)
Control conocido por el 80% del personal, confiable y usado con frecuencia,
4 Muy Bueno
disponible para un gran porcentaje de situaciones, probado ocasionalmente.
Control Effectiveness
1 Very poor Not used, not known, not reliable, not readily available, waste of time using.
Used occasionally, doesn´t work all the time, normal expectation that control is
2 Poor
available, used regularly.
Control knownof, works majority of the time, normal expectation that control is
3 Good
available, used regularly.
Control known by 80% of personnel, realiable and used frequently, available for
4 Very Good
large percentage of situations, tested occasionally.
Best practice, difficult to improve, well supported by all personnel, works every
5 Excellent time, backups available, not subject to being overridden, tested independently
frequently.
Consequence
Maximum
Likelihood
Likelihood
RAW Identify material Foresseable
Preventative
Mitigating
Controls
Controls
Controls Considered
(MUEs)
1 1
2 2
EXISTING PREVENTATIVE
EXISTING MITIGATING
3 3
CONTROLS
CONTROLS
4 4
Total Preventative Total Mitigating Control
5 5
Control Score Score
6 6
7 7
8 8
Improvement
Improvement
Control
9 Total Control 9
Control
10 Effectiveness Score 10
11 11
12 12