CLIENT‐ORGANIZATION (NAME):    Mashin Sazi Najafi co.

PHYSICAL LOCATION(s):   No. 875 – Tak Alley - Chenar Avenue –


Khayam Blvd - Abbas Abad industrial town -
Tehran
Phase II Audit Date(s):    6, 7 July 2015 

Phase I Audit Date(s):    22 Jun 15 

NAICS (or NACE) CODE 28.12 

ISO 9001 EXCLUSIONS:    7.5.4 customer properties 

 
Assessment objectives: Third party assessment , Attesting requirements 
of ISO 9001 in management system of the client 
company 
 
 
ASSESSMENT TEAM INFORMATION 
Assessment Team Leader, ATL Mojtaba Ramezani 
Assessor 2  
Assessor 3  
Assessor 4
Assessor 5
Assessor 6
 
 
 
Note: Adjusting the language within this form to the type of activity and nature of the organization is acceptable.
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

We pursuit to assure that client‐organization adheres to the protection of communities and consumers. This is to 
1  follow the intent to the substitution of the word “identify” to the word “determine” as part of the importance to 
the processes being capable of achieving desired outputs (including consumer’s well‐being). 
Design and manufacturing hydraulic press machinery
2  Scope of activities  Customer property has been excluded as the company does not receive any
physical property , the data is recorded in own forms
BRSM requires that the organization’s legal obligations and regulatory 
3  Legal status  are met as part of granting certification. The Company is registered to   
operate under valid license by ministry of industry and mines 
4  Quality Management System 
General 
Requirements – 
the quality management system includes Manual, procedures and work 
4.1  What is the  
instructions as well as forms and external instructions and standards if applicable  
implementation / 
transition date? 
Documentation  the documents of the company have been reviewed in phase one assessment and 
4.2  Requirements  all 6 mandatory procedures have been in place  
(includes records)  Quality Manual  QM‐101
Documents are established/recommended by any member of the organization, 
then the management representative reviews and approves it initially and with 
4.2.2  Quality Manual signature of the management the document is valid to be used  

Control of 
4.2.3  Control of documents and records P01 addresses the document and record  
Documents 
control, all records are subject to be kept up to 2 years after sale. 
Control of   
4.2.4  Records – Are  List of valid documents shows the updated documents  
records… 
Management commitment observed through checking of the process within the 
Management 

Commitment 
company, such as resource provision, policy, management review meeting, and  
the opening and closing meeting 

Customer  Focus  – 
The company communicates with customers the requirements needed for 
5.2  (may  relate  to 
products ordered, the order by client No. 2347 dated 8 June 2015 observed,   
7.2.1 and 8.2.1) 
Quality Policy QP0121 
1‐To increase customer satisfaction 2‐ to enhancing product development process 
5.3  Quality Policy and 3‐improve the quality of human resources training   
Policy was understood Mr. Jamily who was working with milling machine was 
asked about the policy 
Planning; 5.4.1 Objectives: human resources training aims to increase per capita training hours 
Quality per year to 5 people 93 defined so far 80% target is achieved. 
Objectives/5.4.2 Reducing the number of customer complaints to 2 cases per year have been 
5.4 
quality defined so far, no complaints have been found in 2014‐2015.  
management to increased level of customer satisfaction survey score improvement was seen in 
system planning 85% of the index of 86% is achieved. 

FORM‐009_V4_QMS                                      Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 2 of 8 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

5.5  Responsibility
Job Description (JD0110) addresses the duties of each staff 
Job description of Saeed Najafi the technical manager observed 
Responsibility, 
5.5.1 
Authority  
He is responsible to review the orders by clients, respond if it is feasible for  
company to proceed with the order and to control and monitor design and 
production process,  
Mr. Hamid Atashbaz is management representative 
Ensuring that processes needed for the quality management system are 
established, implemented and maintained,  
Management 
5.5.2 
Representative 
b) Reporting to top management on the performance of the quality management  
system and any need for improvement 
Ensuring the promotion of awareness of regulatory and customer requirements 
throughout the organization.
Due to small size almost all communications are done verbally,  
Internal
5.5.3 
Communication
But the changes requested by customer is usually in written to prevent any  
problem 
5.6  Management review
5.6.1  General  the procedure p12 explains the method to conduct management review all inputs  
in the management review meeting dated Nov 2014 has been recorded and 
5.6.2  Review Inputs  proportional output is defined for the purpose of certification Samta and  
5.6.3  Review Output cooperation with the defense and steps were planned  
6  Resource Management
6.1  Refer to 6.2, 6.3, 7.4, 8.2.1
6.2  Human Resources 
Training Procedure P03 addresses the method used by company in provision of 
training and enhancing staff capabilities, 
The plan F01‐P03 for year 2015 observed, trainings on milling and welding was 
6.2.1  General 
considered for Mr. Atashbaz and Mr. Ali Najafi, Mr. 'Ali Davoodi  "in the form 

F02‐P03  
As well as Mr. Ahmad Ghorbani for supervisory training as head of production 
Competence,  for 2 days in 2014 Administration participated in training courses in the 
curriculum. On 2014 December,  the effectiveness of the F01‐P03 form has 
6.2.2  Awareness and 
been completed and approved by senior management and the evaluation. 

Training 
Evaluate the effectiveness of the procedure done a month after each course.
In the list of plan for repairs F01‐P13‐ all machines listed company and for each 
of them the list and ID F02‐P13 was produced records of repair and services of 
6.3  Infrastructure     
Milling drill machine observed  
The 3‐system jaw was replaced 
Work  Work environment observed during site visit, staff use PPE properly, such as 
6.4     
Environment   safety glasses when machining something or welding 

7  Product Realization 

FORM‐009_V4_QMS                                      Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 3 of 8 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

When a product is ordered, the company compares the requirements by 
previously designed products and usually the main carecteristics are the same 
but the details might be different so in Production Plan Gantt F01‐P04 the 
Planning of 
Technical manager Mr Saeed Najafi plans the steps to produce the product as 
7.1  Product     
in a Gantt chart 
Realization  Record of a plan for order No.2347 observed, the steps from purchase of raw 
material, cables, hoses, metal parts and structure raw material, as well as 
electronic parts 
Determination of 
Requirements of the machines are considered based on design calculations and 
Requirements 
7.2.1  through contacts with clients.     
Related to the  Najafi co. produces machines with capacity from 120 to 1200 Tons 
Product  
7.2  Customer‐Related Processes 
Review of  Sales procedure P05 addresses the method to review product requirements 
Requirements  Through the review the technical manager accepts or rejects the orders, 
7.2.2  And discusses with client via phone or in person to resolve any discrepancies      
Related to the 
Product   Records of this communications observed in Order No. 2347. As the client had 
asked for a limited time that the company could not deliver the product and 
after talks the final time was fixed. 
No customer complaint has been received, as the process is in order base all 
problems are solved within the process
Customer   Requested repairs by the customer after sale shows the proper installation or 
7.2.3  repair of product is not in place. However after receipt of a customer survey    
Communication 
carried out by the customer service is  showing that the customers are satisfied
Instaling a press Machine with the serial number 12 on 01/23/15 observed. Mr. 
Ismaili is responsible for the installation and customer signature indicates 
approval of the installation and validation. 
7.3  Design and Development 
Design and 
Design and Quality control P06 procedure address all steps through 
7.3.1  Development     
development to validation of the new designed items
Planning 
Inputs for the No. 2347 order were following items
Capacity of the hydraulic press machine 
7.3.2  D & D Inputs     
Details of PLC device 
Size of the table and other items that are in consistent with capacity 
The outputs were the same items as considered in input, as well as the quality 
plan and the range to control the items 
Such as Piston diameter, course length, speed, cylinder cap, calculations, pump 
7.3.3  D & D Outputs     
selection, Pipe Connection, Operating Pressure‐Outlet 
Operating Pressure‐Inlet and so on, such as hydraulic valves and even viscosity 
of oil used 
D & D  The technical manager Mr. Saeed Najafi reviews the output and input and 
7.3.4     
Reviewing  recalculates the items to verify if the design is practical and the machine can 
7.3.5  Verification  fulfill the nominal press pressure      

FORM‐009_V4_QMS                                      Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 4 of 8 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

After the design is verified on paper, and the calculations proves the design is 
practical, the device is produced and at the end the device is tested by actual 
force in this project the order for ILIA STEEL was 1200 Tons, so the gauge for 
7.3.6  Validation     
measuring the pressure amount by the device was checked it was recorded at 
1201 which is the nominal amount. And with some adjustments the exact 
amount of 1200 tons was achieved. 
From time to time the previous designs are subject to change due to 
Control of (D & D)  advancement in new technologies as Mr. Najafi explained, and higher 
7.3.7     
Changes  capability of the company, as an example the  Qeff of the pump used in 
previous designs have been improved by experience
7.4  Purchasing 
Purchasing  Purchase order is done according to the list in accordance with the order of the 
7.4.1  necessary items a week before. Raw materials and items for which the forecast    
Process 
inflation at the beginning of the production can be purchased with a down 
Purchasing  payment. 
7.4.2    
Information   For consumer items and items that are common in most presses used and 
respected order point 
Year 2014 for Ilia Steel customer presses machine the needed parts for product 
1200 tons was purchased. Order on delivery deadlines defined. Order includes 
Verification of  construction and installation of hydraulic presses is 1200. Order on 2 of 2014 
7.4.3  
Purchases  and 1 of 2015 Delivery and installation is also no delay was acceptable  
Items purchased such as PLC device Brand Seamens the verification of the 
purchased product was recorded in form Purchasing Data F01‐P07 by Mr. 
Saeed Najafi 
7.5  Production and Service Provision 
Control of 
The company has all needed technical documents such as drawings, quality , 
7.5.1  Production and    
procedures for production control , the Calipers, Multi‐Meter, Torque Meter,  
Service Provision 
For validation of processes such as welding process the company has 
Validation of  considered criteria for operator and the device and measurement devices as 
Processes for  the outcome of the process is not measurable directly, so the welder is trained 
7.5.2    
Production and  to and certified as Mr. Davoodi, to reduce the risk of failure of the welded 
Service Provision  parts, and the pm checks the device from time to time to keep it in good 
condition, and the quality controller Mr. Saeed Najafi checks the welded parts 
(Final  inspection  05/5/15  PLC  license  plate  number  was  5643  product  has  a 
serial  number  65732135,  switchboard  number  is  1013240127)  Profile  of  the 
registration  form  F01‐P07,  which  creates  the  possibility  of  tracking  the  items 
Identification  and 
7.5.3  listed  traceable  to  and  from  raw  material  for  ultimate  control  check  and    
Traceability  control  in  accordance  to  list  of  approved  products.  With  the  label  "certified 
quality control" is determined to prevent the NC product inspected not to be 
sent to the next stage. 
Customer  This clause is excluded as no customer property is received from client, 
7.5.4    
Property  technical data are produced based on orders  

FORM‐009_V4_QMS                                      Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 5 of 8 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

According  to  Storage  of  product  P08  procedure  the  parts  needed  for 
production are in 2 types, expensive and cheap ones, the expensive parts are 
Preservation of  purchased  when  an  order  is  received  but  the  cheap  parts  such  as  bolts  and 
7.5.5    
Product  nuts  and  consumable  parts  are  purchased  and  stored  in  Storage  and  the 
numbers are recorded in List of inventory F01‐P08, as sample the inventory for 
Bearings were checked , there is an order point of 10, and the inventory was 14 
Control of 
Calibration  of  indicator  clock  observed,  certificate  number  QW987  657  433 
Monitoring and 
7.6  were  calibrated  in  2014  December  by  lascar  lab,  (approved  by  NACI)  and  20‐   
Measuring  inch caliper was also seen that was appropriately kept in suitable case
Devices 
8  Measurement, Analysis and Improvement 
the quality plan ensures that items need to be checked are monitored, and the 
8.1  General  process  plan  and  the  process  indicators    and  the  data  analysis  defined  are  to     
control the consistency of the system with requirements
8.2  Monitoring and Measuring 
Although  the  surveys Customer  satisfaction  F01‐P05 show  86%  satisfaction 
which is higher than rate considered by company but there is indications that 
Customer 
8.2.1  the  clients  might  be  unsatisfied  due  to  high  number  of  requests  for  repairs    
Satisfaction  after installation, there is no complaint , and the company provides the repairs 
in time,  
Internal  Audit  P11  addresses  the  procedure  to  do  internal  audit,  the  auditors 
were  Mr.  Saeed  Najafi  and  Mr.  Davoodi,  both  seem  competent  in  doing 
internal  audit,  and  impartial  to  each  other’s  area  of  work,  records  of  internal 
8.2.2  Internal Audits  audit done in March 2015 observed in form F01‐P11, next audit is planned in    
Audit Plan F02‐P11 for March 2016,  
5  NCs  have  been  raised  during  internal  audit,  such  as  the  calibration  records 
that were not in place and not acquired from  
Each  process  has  an  indicator  for  monitoring  and  comparing  its  fulfillment  , 
such  as  customer  satisfaction  that  was  85%  and  the  outcome  of  the  process 
Monitoring  and 
was  86%  the  method  to  monitor  the  process  of  after  sale  services  is  to  gain 
8.2.3  Measurement    
data from client through surveying, 
Process  And  the  indicators  for  quality  control  process  are  the  number  of  non 
conforming products and request of repairs after sale.
Design  Verification  and  Quality  Plan  F04‐P06  sets  controls  over  product 
specifications, records of controls are also recorded in same form such as the 
final  control  and  in  process  Inspections  as  sample  incoming  parts  were 
Monitoring and 
controlled based on Drawings attached to quality plan surface finish thickness 
8.2.4  Measurement of    
during the slide control. The pieces come from outside the company matched 
Product  the size of the actual value of the drawing. 
A  press  machine  300  tons  for  IDEH  company    records  controlled  .The  plaque 
attached on the product tracking and identification is possible 

FORM‐009_V4_QMS                                      Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 6 of 8 
REFERENCE, AS
This Clause

APPLICABLE1 
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
  Reference Clause  ATTENTION WILL BE REQUIRE   please Tick
mark √ 
 

According  to  Control  of  non‐conforming  product  P10 procedure  the  semi‐
product of a part had some problems, some holes had been missed in casting 
stage, the quality control manager Mr.Saeed Najafi let the part to be reworked 
Control of Non‐ to add the holes by drilling the holes to the part, with delicate tolerance  
8.3  Conforming  There was one cylinder aside the wall in the storage room when asked about it  AR  
Product  Mr.  Alireza  Najafi  said  it’s  a  non‐conforming  product  that  is  useless,  the  part 
was not identified as non‐conforming product, when asked he said they were 
not going to use it, 
According to the P10 procedure such products must be identified and labeled 
All  processes  have  been  monitored  and  the  results  have  been  collected  in 
charts to be evaluated in management review  session,  
The  data  analysis  shows  that  the  customer  satisfaction  is  at  the  least  among 
8.4  Analysis of Data  

 
other processes, as it is emphasized by objectives, so a plan was considered to 
increase client satisfaction by reducing the needs to repair and more intensive 
controls  
8.5  Improvement 
Continual  The  objectives,  policies  and  management  review  ensures  that  the  system  is 
8.5.1 
Improvement  stepping forward towards improvement    
The  corrective  action  considered  in  form  F01‐P09  for  root  causes  for  the  NCs 
8.5.2  Corrective Action  from  internal  audit,  such  as  the  missing  records  for  calibration,  the    
management representative had expressed that he has had not enough time to 
control and do the duties related to quality assurance, so the manager talked 
8.5.3  Preventive Action  to  technical  manager  to  open  a  time  for  management  representative  Mr.    
Atashbaz to fulfill his job properly , no preventive action has been considered 
in the company 
 

FORM‐009_V4_QMS                                      Issued: July 9, 2003                                                               Revised: March 2013                                                       Page 7 of 8 
By exception, we indicate the specific Strengths and weakness of the organization in light of the management system, as we perceive and seen through
processes in reference to requirements of the criteria being ascribed as these apply and relate to the assessment plan and planning of the assessment.
This aspect relates to Accreditation Body as it does to the protection of consumers in the client-organization’s role within their respective supply – chain.

Disclaimers: (1) herein, we reiterate that any suggestion or opinion that the assessment team expresses does not construe to be a contractual
requirement. (2) The degree of certainty in conclusions increases by the competence of the assessment team as well as the attestation within the
assessment protocol, values, mission and vision under which we operate for the protection of consumers, still remains a certain level of uncertainty.

Strength Weakness

Knowledge and experience of staff Space – work environment 
 

action Request Type I Form-008 – as we indicate and that each of the RA addresses the basic four (4) questions
as seen in Form-008:

action Request Type II Form-008 – as we indicate and that each of the RA addresses the basic four (4) questions
as seen in Form-008:

According to the P10 procedure non‐conforming products must be identified and labeled

Observation Form-018 – with uniquely specific identification:

ATL: Mojtaba Ramezani DATE: 8-July 2015

END of REPORT
 

FORM-014 – Opening Meeting Checklist FORM-009 – MS Reporting,


FORM-017 – Closing Meeting Checklist FORM-008 – RA / AR, as requires
FORM-005 – Participants of opening & closing meetings FORM-018 – OBS, as requires
FORM-004 – Assessment Plan FORM-010 – As requires, recommendation for CoR
FORM-007 – Planning onto -004, as process determined FORM-026 – Assessment documents check-sheet, optional

Você também pode gostar