QRQC # :
01
The PSW was produced in the means of current production , because no change of
cover position was communicated by EDS team in the design freeze of train 11
8D - 5 Why Analysis (4D)
QRQC # :
01
No
Design issue
NUMBER OF CASES
Care point in Audit and tape station Amal 31/10/2017 done 1
0.8
0.6
0.4
Raise a DFC to indicate the change of cover and 0.2
L.Bouh 01/11/2017 done
connector orientation in train 11-17 0
WEEK(S)
CAPITALISATION
MANIFACTURING LINE RESPONSIBLE DUE DATE STATUS