SOFTWARE APPLICATION FOR QUANTITY SURVEYING

ASSIGNMENT 1
GROUP MEMBERS

JUAN ROY COLLIE 0329004


LIM XIAO SHI 0324410
NUR FIRZANA HASMI 0324838
SAHIL GUNESH 0328569
TEOW KAH YAN 0327201
YAP FOONG MEI 0324867
YEO GIN FAYE 0330001

JUAN ROY COLLIE 0329004 | LIM XIAO SHI 0324410 | NUR FIRZANA HASMI 0324838 | SAHIL GUNESH 0328569 | TEOW KAH YAN 0327201 | YAP FOONG MEI 0324867 | YEO GIN FAYE 0330001
AGENDA

01 INTRODUCTION

FUNCTION & LIMITATION OF BIM SOFTWARE


02 AUTODESK NAVISWORK | AUTODESK REVIT | 3D REPO | AUTODESK BIM 360

03 COMPARISON & RECOMMENDATION OF BIM SOFTWARE

BENEFITS & CONSTRAINTS ON BIM MEASUREMENT,


04 CAD MEASUREMENT & MANUAL MEASUREMENT
INTRODUCTION

BENEFITS & CONSTRAINTS ON BIM


05 MEASUREMENT, CAD MEASUREMENT &
MANUAL MEASUREMENT AT VARIOUS
STAGES

JUAN ROY COLLIE 0329004 | LIM XIAO SHI 0324410 | NUR FIRZANA HASMI 0324838 | SAHIL GUNESH 0328569 | TEOW KAH YAN 0327201 | YAP FOONG MEI 0324867 | YEO GIN FAYE 0330001
INTRODUCTION

What is BIM?

Constructs digital, virtual models of


Creating and managing of information
a building from the data input of
on a construction project
various construction parties

Brings together all the information of a


Represents an evolution from traditional
building, allowing relevant parties to access
two-dimensional practices to combination
the information, enhancing the integration
of 3D graphical modelling, 4D time
of design and workability
modelling and 5D cost modelling

Allows better analysis and control,


optimizing each digital description of the
built asset

JUAN ROY COLLIE 0329004 | LIM XIAO SHI 0324410 | NUR FIRZANA HASMI 0324838 | SAHIL GUNESH 0328569 | TEOW KAH YAN 0327201 | YAP FOONG MEI 0324867 | YEO GIN FAYE 0330001
FUNCTION & LIMITATION OF BIM SOFTWARE

BIM

JUAN ROY COLLIE 0329004 | LIM XIAO SHI 0324410 | NUR FIRZANA HASMI 0324838 | SAHIL GUNESH 0328569 | TEOW KAH YAN 0327201 | YAP FOONG MEI 0324867 | YEO GIN FAYE 0330001
AUTODESK NAVISWORKS

Introduction
It is an efficient tool to review and resolve differences between multiple consultant models. It can
combine the data from structural, architectural and mechanical into a single and integrated project
model.
03
ADVANTAGES DISADVANTAGES

04
❏ Clash detection ❏ Requires a good rendering engines to gain

❏ Realistic navigation features better results


❏ Free Navisworks file viewer ❏ Clash detection does not give warning for
❏ Interference management tools objects completely enclosed by other objects.
❏ Accurate measurement

JUAN ROY COLLIE 0329004 | LIM XIAO SHI 0324410 | NUR FIRZANA HASMI 0324838 | SAHIL GUNESH 0328569 | TEOW KAH YAN 0327201 | YAP FOONG MEI 0324867 | YEO GIN FAYE 0330001
AUTODESK REVIT

Introduction
It is a BIM software developed by Autodesk and allows users to create models and drawings in 3D and
annotate the model with 2D drafting elements. The key element in Revit is its relationship between our
2D and 3D drawings unlike other design software where the user has to produce the 2D and 3D drawings
separately. 03

ADVANTAGES 04
DISADVANTAGES

❏ Parametric Components
❏ Heavy focus on structural design
❏ No repetition
❏ Popularity level
❏ Landscape design
❏ Energy efficient design
❏ Huge library

JUAN ROY COLLIE 0329004 | LIM XIAO SHI 0324410 | NUR FIRZANA HASMI 0324838 | SAHIL GUNESH 0328569 | TEOW KAH YAN 0327201 | YAP FOONG MEI 0324867 | YEO GIN FAYE 0330001
3D REPO

What is 3D REPO?
3D Repo is an open source version control Software for large-scale 3D architectural models in the cloud. It is a
cloud based open source building information modelling (BIM) version control system.

FEATURES

Online Collaboration Management and Control 04


3D Diff

Specialists are able to This feature ensures that Real time change
communicate online only people with the correct detection software for 3D
while exploring 3D authority can close a specific construction models
models task providing good
management of activities.

JUAN ROY COLLIE 0329004 | LIM XIAO SHI 0324410 | NUR FIRZANA HASMI 0324838 | SAHIL GUNESH 0328569 | TEOW KAH YAN 0327201 | YAP FOONG MEI 0324867 | YEO GIN FAYE 0330001
3D REPO

What is 3D REPO?
3D Repo is an open source version control Software for large-scale 3D architectural models in the cloud. It is a cloud based
open source building information modelling (BIM) version control system.

03 DISADVANTAGES
ADVANTAGES

❏ Affordable for smaller companies as it is an open source ❏


04
In the event of internet service interruptions or
web-based system therefore no expensive property interruptions in 3D repo’s services, users will not
licenses have to be purchased be able to access projects
❏ Members of the construction team do not have to share ❏ 3D repo will not be held accountable for such
large files as the software allows the members to view interruptions as stated in their agreements
the project virtually via an encrypted online repository
❏ Projects can be viewed on mobile devices
❏ 3D repo supports over 40 of the most commonly used
3D file formats so companies can host projects in any
file format
JUAN ROY COLLIE 0329004 | LIM XIAO SHI 0324410 | NUR FIRZANA HASMI 0324838 | SAHIL GUNESH 0328569 | TEOW KAH YAN 0327201 | YAP FOONG MEI 0324867 | YEO GIN FAYE 0330001
AUTODESK BIM 360

Introduction
It is a cloud base software which designed as construction tool. It delivers project faster by providing first
hand information. It also ensure the accuracy and availability of information and reduce data loss across
phases.
03
ADVANTAGES DISADVANTAGES

04
❏ It supports 2D plans or 3D workflow ❏ Privacy of project might be an issue
❏ Minimise paper-based process which can save time and ❏ Training is required
reduce risk of losing information ❏ Software must always up to date
❏ Has the ability of online and offline access
❏ Enables one-time data entry and better instructions are
provided at the building site

JUAN ROY COLLIE 0329004 | LIM XIAO SHI 0324410 | NUR FIRZANA HASMI 0324838 | SAHIL GUNESH 0328569 | TEOW KAH YAN 0327201 | YAP FOONG MEI 0324867 | YEO GIN FAYE 0330001
COMPARISON & RECOMMENDATION

COMPARISON OF BIM SOFTWARE

Autodesk Revit 03 2014


Autodesk Naviswork 3D Repo Autodesk BIM 360

Cost High High Affordable Affordable


04

Offline Access No No No Yes

Cloud Base No No Yes Yes

Mobility Moderate Moderate Moderate Good

JUAN ROY COLLIE 0329004 | LIM XIAO SHI 0324410 | NUR FIRZANA HASMI 0324838 | SAHIL GUNESH 0328569 | TEOW KAH YAN 0327201 | YAP FOONG MEI 0324867 | YEO GIN FAYE 0330001
COMPARISON & RECOMMENDATION

RECOMMENDATION AUTODESK BIM 360

03
Cheaper than Autodesk
Navisworks 2014 and Ability of offline access
WHY?
Autodesk Revit

Have more feature such as standardised checklist


Own application on both template, view field data, identify trends and
AppStore and google store minimised contractor risk, quality control, streamline
job site and safety inspection, pushpin construction
issues and track key performance indicators.

JUAN ROY COLLIE 0329004 | LIM XIAO SHI 0324410 | NUR FIRZANA HASMI 0324838 | SAHIL GUNESH 0328569 | TEOW KAH YAN 0327201 | YAP FOONG MEI 0324867 | YEO GIN FAYE 0330001
BENEFITS & CONSTRAINTS ON BIM MEASUREMENT, CAD MEASUREMENT & MANUAL MEASUREMENT

INTRODUCTION

BIM MEASUREMENT 03
According to CIDB, BIM is
where a new emerging
technology to be deployed in
design, construction and
facility management, where QUANTITY
a digital representation of ENGINEER SURVEYOR
the building is created to
facilitate the exchange and
interoperability of
information in digital format.

ARCHITECT

JUAN ROY COLLIE 0329004 | LIM XIAO SHI 0324410 | NUR FIRZANA HASMI 0324838 | SAHIL GUNESH 0328569 | TEOW KAH YAN 0327201 | YAP FOONG MEI 0324867 | YEO GIN FAYE 0330001
BENEFITS & CONSTRAINTS ON BIM MEASUREMENT, CAD MEASUREMENT & MANUAL MEASUREMENT

INTRODUCTION

03
CAD MEASUREMENT
Computer-Aided Design or
CAD is a technology revolving
around the use of computer
systems in the creation,
alteration, analysis and
development of a design

SOURCE: CAD/ CAM: Computer-Aided


Design and Manufacturing.

JUAN ROY COLLIE 0329004 | LIM XIAO SHI 0324410 | NUR FIRZANA HASMI 0324838 | SAHIL GUNESH 0328569 | TEOW KAH YAN 0327201 | YAP FOONG MEI 0324867 | YEO GIN FAYE 0330001
BENEFITS & CONSTRAINTS ON BIM MEASUREMENT, CAD MEASUREMENT & MANUAL MEASUREMENT

INTRODUCTION

MANUAL MEASUREMENT
Manual measurement
can be defined as the
04 of taking off a
technique
said building or structure
or element without the
help of any advanced
technology. It is
considered the
traditional method of
measurement.

JUAN ROY COLLIE 0329004 | LIM XIAO SHI 0324410 | NUR FIRZANA HASMI 0324838 | SAHIL GUNESH 0328569 | TEOW KAH YAN 0327201 | YAP FOONG MEI 0324867 | YEO GIN FAYE 0330001
BENEFITS & CONSTRAINTS ON BIM MEASUREMENT, CAD MEASUREMENT & MANUAL MEASUREMENT AT
VARIOUS STAGES

Preparation Stage Pre-construction Stage Other stage

Source: competitivechoice Source: hatchthefuture


Source: Hydrique

Design Stage Source: Pinterest Source: Freepik Construction Stage

JUAN ROY COLLIE 0329004 | LIM XIAO SHI 0324410 | NUR FIRZANA HASMI 0324838 | SAHIL GUNESH 0328569 | TEOW KAH YAN 0327201 | YAP FOONG MEI 0324867 | YEO GIN FAYE 0330001
PREPARATION/ BRIEFING STAGE

What happens during preparation/ briefing stage?

PREPARATION STAGE
Developing an initial project Quantify budget for the client as
brief, carrying out feasibility well as undertake the risk
studies and review of site assessment of a project including
information in accordance to suggesting the most appropriate
drawing, uniting project team procurement strategy.
and defining their roles

JUAN ROY COLLIE 0329004 | LIM XIAO SHI 0324410 | NUR FIRZANA HASMI 0324838 | SAHIL GUNESH 0328569 | TEOW KAH YAN 0327201 | YAP FOONG MEI 0324867 | YEO GIN FAYE 0330001
PREPARATION/ BRIEFING STAGE

BIM MEASUREMENT - BENEFITS

PREPARATION STAGE
ENHANCE PROJECT
FEASIBILITY STUDY SITE ANALYSIS PROCUREMENT SCHEDULE

The best suited building Aerial imagery and digital Information outlines what Better communication and
performance for the client elevation of site enabling materials, equipment as understanding of
can be decided in a faster easy access to site well as labour resources responsibilities from
and more accurate manner information such as the that is needed which in different experts
shape of existing location turn prevent wastage perspectives, enhancing
the projects schedule

JUAN ROY COLLIE 0329004 | LIM XIAO SHI 0324410 | NUR FIRZANA HASMI 0324838 | SAHIL GUNESH 0328569 | TEOW KAH YAN 0327201 | YAP FOONG MEI 0324867 | YEO GIN FAYE 0330001
PREPARATION/ BRIEFING STAGE

BIM MEASUREMENT - CONSTRAINTS

PREPARATION STAGE
HIGH INITIAL
LACK OF EXPERTS COST

High cost of training Initial installation and purchasing


programmes might occur as of BIM softwares are high and
market could be manipulated by smaller firms whom does not find
the limited number of expert the benefit of softwares will not
teachers choose to invest in such
softwares

JUAN ROY COLLIE 0329004 | LIM XIAO SHI 0324410 | NUR FIRZANA HASMI 0324838 | SAHIL GUNESH 0328569 | TEOW KAH YAN 0327201 | YAP FOONG MEI 0324867 | YEO GIN FAYE 0330001
PREPARATION/ BRIEFING STAGE

CAD MEASUREMENT - BENEFITS

IMPROVE
EFFECTIVE STORAGE VALUATION

PREPARATION STAGE
Easier storage method as a Improve in design quality as designers
database could be created to are able to provide a more accurate
save all relevant information analysis prior to design

CAD MEASUREMENT - CONSTRAINTS

LOSS OR CORRUPTED
HIGH INITIAL COST INFORMATION TRAINING

Incur a high initial cost of The breakdown of a software


A training course for a full usage of
installing could lead to frustration of its
CAD softwares shall be provided
users

JUAN ROY COLLIE 0329004 | LIM XIAO SHI 0324410 | NUR FIRZANA HASMI 0324838 | SAHIL GUNESH 0328569 | TEOW KAH YAN 0327201 | YAP FOONG MEI 0324867 | YEO GIN FAYE 0330001
PREPARATION/ BRIEFING STAGE

MANUAL MEASUREMENT - BENEFITS

NO SPECIFIC TRAINING COST EFFECTIVE

PREPARATION STAGE
Manual measurement Firms can save a great deal of money
does not need so on the costly softwares

MANUAL MEASUREMENT - CONSTRAINTS

TEDIOUS & TIME COST PLAN


CONSUMING
Without sufficient experience, it
Takes up more time compared would be difficult especially for a
to software measurement fresh graduate to prepare one

JUAN ROY COLLIE 0329004 | LIM XIAO SHI 0324410 | NUR FIRZANA HASMI 0324838 | SAHIL GUNESH 0328569 | TEOW KAH YAN 0327201 | YAP FOONG MEI 0324867 | YEO GIN FAYE 0330001
DESIGN STAGE

What happens during design stage?

In this stage, architects include measurement to their detailed drawing.

DESIGN STAGE
DEVELOPED TECHNICAL
EARLY DESIGN
DESIGN DESIGN

The consultant team Works like the coordination of


prepare the design The architectural, structural
proposals for structural design,
concept, outline and mechanical services
building services systems, cost
specification, preliminary design with specification,
information, outline specifications
and buildability and where all to subject of
and input from specialist
construction logistics approval from statutory.
suppliers and sub-contractors.

JUAN ROY COLLIE 0329004 | LIM XIAO SHI 0324410 | NUR FIRZANA HASMI 0324838 | SAHIL GUNESH 0328569 | TEOW KAH YAN 0327201 | YAP FOONG MEI 0324867 | YEO GIN FAYE 0330001
DESIGN STAGE

BIM MEASUREMENT - BENEFITS

BETTER EASY
VISUALIZATION CONSISTENCY AMENDMENTS
EFFECTIVENESS
Provides a better, enhanced Errors discovering in design Extraction from different
visualization to client through a leading to an effective project drawings of project with a

DESIGN STAGE
Changes made to drawings
full 3-D model with a 360 degree promise of consistency is are made easier as data are
rotation of model. guaranteed correlated.

REDUCE IN USAGE
OF MATERIALS EFFICIENCY BOQ
Resources planning provides Discussion and amendments can
users a detailed amount of The ability of BIM software to
be made noticeably quicker to
related construction materials produce the Bills of Quantity
more parties with lesser time
needed.
JUAN ROY COLLIE 0329004 | LIM XIAO SHI 0324410 | NUR FIRZANA HASMI 0324838 | SAHIL GUNESH 0328569 | TEOW KAH YAN 0327201 | YAP FOONG MEI 0324867 | YEO GIN FAYE 0330001
DESIGN STAGE

BIM MEASUREMENT - CONSTRAINTS

HIGH PERFORMANCE COST TO

DESIGN STAGE
RUNNING DEVICE OUT-OF-DATE BENEFIT RATIO INCOMPATIBILITY

The computer running Shall such software does not Due to BIM software’s high Construction parties which
capacity has to be high to offer upgrades of updates, initial cost, it possess as a do not practise the
operate and support BIM redundancy of software barrier to many small scale software would not be able
softwares occur over time. firms which might not to coordinate work
benefit from such costly corresponding to the
softwares software

JUAN ROY COLLIE 0329004 | LIM XIAO SHI 0324410 | NUR FIRZANA HASMI 0324838 | SAHIL GUNESH 0328569 | TEOW KAH YAN 0327201 | YAP FOONG MEI 0324867 | YEO GIN FAYE 0330001
DESIGN STAGE

CAD MEASUREMENT - BENEFITS

ACCURATE THOROUGH
MEASUREMENT VIEW

Drawing tools to create a more Enhance understanding of client


full and detail drawing who have difficulty visualizing an
architect’s design

DESIGN STAGE
CAD MEASUREMENT - CONSTRAINTS

CONTINUAL NEED RISK OF LOSS OF IMPROPER USE


OF UPDATES INFORMATION OF FUNCTION
Users has to be updated of the Possessed a higher risk The inability of the user to fully
changes and masters its of loss or corrupted operate the software could lead
operability information to another’s mistake

JUAN ROY COLLIE 0329004 | LIM XIAO SHI 0324410 | NUR FIRZANA HASMI 0324838 | SAHIL GUNESH 0328569 | TEOW KAH YAN 0327201 | YAP FOONG MEI 0324867 | YEO GIN FAYE 0330001
DESIGN STAGE

MANUAL MEASUREMENT - BENEFITS

RESOLVE
CLIENTS’ NEED NO HIGH COST
On the spot solution for Excludes high costing to
design conflicts purchase costly softwares.

DESIGN STAGE
MANUAL MEASUREMENT - CONSTRAINTS

DIFFICULTY IN
TIME CONSTRAINT HUMAN ERROR VISUALIZING
Error in measurement Restricts interpretation of
Human error affect the
would arise leading to a drawings in
accuracy of drawings
delay in project time two-dimensional manner

JUAN ROY COLLIE 0329004 | LIM XIAO SHI 0324410 | NUR FIRZANA HASMI 0324838 | SAHIL GUNESH 0328569 | TEOW KAH YAN 0327201 | YAP FOONG MEI 0324867 | YEO GIN FAYE 0330001
PRE-CONSTRUCTION STAGE

What happens during pre-construction stage?

Pre-construction stage is of utmost important to ensure that the construction stage can be carried out smoothly.
For example, preparing Bills of Quantities and to assisting the Client in choosing the most suitable tenderer.

PRE-CONSTRUCTION STAGE
BIM MEASUREMENT - BENEFITS

EASE IN
TIME SAVING ESTIMATING ACCURACY

Ability to auto-identify the length,


Collaborated with a set of Bills of Ability to auto computation and
width and height of the
Materials (BOM) function that aids to detect clashes had improve
component had made
material procurement the accuracy of measurement
measurement work easier thus
less time consuming

JUAN ROY COLLIE 0329004 | LIM XIAO SHI 0324410 | NUR FIRZANA HASMI 0324838 | SAHIL GUNESH 0328569 | TEOW KAH YAN 0327201 | YAP FOONG MEI 0324867 | YEO GIN FAYE 0330001
PRE-CONSTRUCTION STAGE

BIM MEASUREMENT - CONSTRAINTS

PRE-CONSTRUCTION STAGE
HIGH INITIAL
COST TRAINING
High costing to purchase the Provided to train workers on
license of the software the concept and the skills in
using BIM

CAD MEASUREMENT - BENEFITS CAD MEASUREMENT - CONSTRAINT

ABILITY TO
MEASURE LIMITATIONS IN
COMPLEX AREA ACCURACY MEASUREMENT
Automatic calculation of area Data input error can be reduced In the case for 2D drawings,
and angles enhance its ability by its ability to lock onto the measurement is limited to
to measure awkward area precision of CAD drawings perimeter and area only
JUAN ROY COLLIE 0329004 | LIM XIAO SHI 0324410 | NUR FIRZANA HASMI 0324838 | SAHIL GUNESH 0328569 | TEOW KAH YAN 0327201 | YAP FOONG MEI 0324867 | YEO GIN FAYE 0330001
PRE-CONSTRUCTION STAGE

MANUAL MEASUREMENT - BENEFITS

PRE-CONSTRUCTION STAGE
CLEARER IMAGE CHEAPER

Clearer visualization as having


Manual measurement does not need
hands on experience and to have
to set aside an amount of money to
manually written description
purchase for the software license

MANUAL MEASUREMENT - CONSTRAINTS

POSSIBILITY OF TIME FACTOR


HUMAN ERROR
Human error can be hardly This traditional method of
detected by using manual measurement is more time
measurement consuming

JUAN ROY COLLIE 0329004 | LIM XIAO SHI 0324410 | NUR FIRZANA HASMI 0324838 | SAHIL GUNESH 0328569 | TEOW KAH YAN 0327201 | YAP FOONG MEI 0324867 | YEO GIN FAYE 0330001
CONSTRUCTION STAGE

What happen during construction stage?

Quantity surveyor will be held busy by a list of activities during this stage. For example, managing the
document flow, preparation of variation order claims, verifying of sub-contractor claims & etc. All changes and
amendment should be brought to acknowledge.

CONSTRUCTION STAGE
BIM MEASUREMENT - BENEFITS

UP-TO-DATE
INFORMATION HIGHER ACCURACY SECURITY

Reduce possibility of Documents are protected as


BIM 360 provides a platform for accessibility are given based on
miscommunication and reduce
the parties to be kept updated certain rights
the risk of rework as the parties
with the latest information
are always kept update

JUAN ROY COLLIE 0329004 | LIM XIAO SHI 0324410 | NUR FIRZANA HASMI 0324838 | SAHIL GUNESH 0328569 | TEOW KAH YAN 0327201 | YAP FOONG MEI 0324867 | YEO GIN FAYE 0330001
CONSTRUCTION STAGE

BIM MEASUREMENT - CONSTRAINTS

CONSTRUCTION STAGE
LESS
LACK OF KNOWLEDGE PREFERABLE

Not all parties possess the Older generation will prefer to


knowledge and the skills on the have face-to-face discussion and
know-how the software works meeting

JUAN ROY COLLIE 0329004 | LIM XIAO SHI 0324410 | NUR FIRZANA HASMI 0324838 | SAHIL GUNESH 0328569 | TEOW KAH YAN 0327201 | YAP FOONG MEI 0324867 | YEO GIN FAYE 0330001
CONSTRUCTION STAGE

CAD MEASUREMENT - BENEFITS CAD MEASUREMENT - CONSTRAINTS

CONSTRUCTION STAGE
STANDARDIZED SOFTWARE
SYSTEM COMPLEXITY

CAD has a standard which act as a improvement in the CAD software make the
guideline to improve the interchange of software more complex and difficult
documents. With this, argument between especially for fresh users.
parties due to differential in each other’s
procedure could be avoided.

JUAN ROY COLLIE 0329004 | LIM XIAO SHI 0324410 | NUR FIRZANA HASMI 0324838 | SAHIL GUNESH 0328569 | TEOW KAH YAN 0327201 | YAP FOONG MEI 0324867 | YEO GIN FAYE 0330001
CONSTRUCTION STAGE

MANUAL MEASUREMENT - BENEFITS

FLEXIBILITY

CONSTRUCTION STAGE
Any updates in the context of the
drawings and the documents can be
carried out anytime and anywhere

MANUAL MEASUREMENT - CONSTRAINTS

BARRIERS IN SHARING
TIME FACTOR
INFORMATION
any changes and amendments needed to It takes a longer time to make amendments
be inform manually to all the parties. manually as when there is even just a small
Miscommunication may occur too. changes

JUAN ROY COLLIE 0329004 | LIM XIAO SHI 0324410 | NUR FIRZANA HASMI 0324838 | SAHIL GUNESH 0328569 | TEOW KAH YAN 0327201 | YAP FOONG MEI 0324867 | YEO GIN FAYE 0330001
OTHERS STAGE

What happen during other stages?

After the construction stage has been completed, the ‘Handover & Close Out’ phase and ‘In Use’ phase will
follow through, according to RIBA (2013) Plan of Work. A quantity surveyor needs to prepare the assessment
of building and handover the building contract as the contract between client and contractor has ended.

BIM MEASUREMENT
1. Practicality - Being able to demonstrate the entire building lifecycle by allowing

OTHERS STAGE
informations of the drawings, procurement details and other specification easily
interrelate into the model
BENEFITS
2. Aids to various services - For example, fire department can locate potential
failures and collisions of the building as it can be illustrated on to BIM for forensic
analysis. Thus, creating a higher quality and more sustainable building.

1. Strains Relationships - The use of the modelling may affect the relationship
CONSTRAINTS between the contractor and architect. BIM allows the contractor to be more
actively participating in the design process and increasingly difficult for them to
claim as it relies upon errors and omissions in a drawing. Traditionally contractors
do not play a significant role in the design phase.

JUAN ROY COLLIE 0329004 | LIM XIAO SHI 0324410 | NUR FIRZANA HASMI 0324838 | SAHIL GUNESH 0328569 | TEOW KAH YAN 0327201 | YAP FOONG MEI 0324867 | YEO GIN FAYE 0330001
OTHERS STAGE

CAD MEASUREMENT

BENEFITS 1. Practicality - CAD Measurement will automatically learn the dimensions


and create specialized libraries from real projects to enhance for future
reference in estimating
CONSTRAINTS 1. Costly - The initial price of the software can be pricey and time-consuming
especially with new updates which means the operator needs to acquire
new skills. More so, computer hardware has to be updated in order to run
smoothly with the modelling as it consumes large amounts of processing
power program.

OTHERS STAGE
MANUAL MEASUREMENT

BENEFITS 1. Cost Effective - The traditional method is the most cost-effective way to go
as both BIM and CAD Measurement has to be purchased. It does not
require any use of technology and very little training is needed as
graduates have been utilizing manual work during their undergraduate
studies.
CONSTRAINTS 1. Human error - This method will take up a considerable amount of time and
energy. This includes overlooking at important elements that perhaps
could have been left out.
JUAN ROY COLLIE 0329004 | LIM XIAO SHI 0324410 | NUR FIRZANA HASMI 0324838 | SAHIL GUNESH 0328569 | TEOW KAH YAN 0327201 | YAP FOONG MEI 0324867 | YEO GIN FAYE 0330001
THE END

THANK YOU