Unit Cost Analysis for Schedule of Rates

Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Chapter - 2 : Earth Works in Road Embankment

2.01.1 C&G: Clearing and grubbing by removal and disposal of everything sqm
above ground level including overhanging branches, removing of all
foundation stumps, embedded logs, tree roots and other material either
to a depth of 0.3m below the proposed surface elevation or to the level
as shown on the drawing, disposing of all materials resulting from
clearing and grubbing at a safe distance, etc. all complete as per
direction of the E-I-C.
Sardar 0.0010 day 800.00 0.80
Ordinary Labour 0.0200 day 370.00 7.40

Subtotal-A: 8.20

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 8.36

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 9.20


VAT 6% of Total 0.61
IT 4% of Total 0.41
Total: 10.22

2.01.2 G&RS: Grubbing by removal of all foundation, stumps, embedded logs, LS


trees, roots and other materials up to a depth of 1m or as per drawing,
etc. all complete as per direction of the E-I-C.

2.01.2. Unknown...

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

2.02.1 EFW: Earth filling work by manual labour with specified soil in any type
of embankment and bridge approaches including cutting, carrying,
filling, and compacting to 85% maximum dry density at optimum
moisture content, with reference to laboratory density test AAHSTO
standard hammer by throwing earth in layers not more than 150mm in
each layer in proper alignment, grade, camber and side slope in all
types of soil other than rocky, gravelly and slushy including clod
breaking to a maximum size of 100mm, benching not more than
300mm vertical and 600mm horizontal steps along the sides while
widening any embankment, etc. all complete as per direction of the E-I-
C. Earth is to be borrowed from the road side for all lead. Payment will
be made on compacted volume. (compaction will be done by the
contractor/LCS worker with approved equipment, including all ancillary
charges for compaction and testing)

2.02.1.1 Initial lift up to 1.50 m from the toe of embankment cum


Sardar 0.0300 day 800.00 24.00
Ordinary Labour 0.2500 day 370.00 92.50

Subtotal-A: 116.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 118.83

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 130.71


VAT 6% of Total 8.71
IT 4% of Total 5.81
Total: 145.24

Note : Rates of all items should be inclusive of all supply and carriage. Page: 2 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

2.02.1.2 Up to 2.50m lift from the toe of embankment cum


Sardar 0.0300 day 800.00 24.00
Ordinary Labour 0.3000 day 370.00 111.00

Subtotal-A: 135.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 137.70

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 151.47


VAT 6% of Total 10.10
IT 4% of Total 6.73
Total: 168.30

2.02.1.3 Up to 3.50m lift from the toe of embankment cum


Sardar 0.0300 day 800.00 24.00
Ordinary Labour 0.3500 day 370.00 129.50

Subtotal-A: 153.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 156.57

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 172.23


VAT 6% of Total 11.48
IT 4% of Total 7.65
Total: 191.36

Note : Rates of all items should be inclusive of all supply and carriage. Page: 3 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

2.02.1.4 Up to 4.50m lift from the toe of embankment cum


Sardar 0.0300 day 800.00 24.00
Ordinary Labour 0.4100 day 370.00 151.70

Subtotal-A: 175.70

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 179.21

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 197.14


VAT 6% of Total 13.14
IT 4% of Total 8.76
Total: 219.04

2.02.1.5 Up to 5.50m lift from the toe of embankment cum


Sardar 0.0300 day 800.00 24.00
Ordinary Labour 0.4800 day 370.00 177.60

Subtotal-A: 201.60

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 205.63

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 226.20


VAT 6% of Total 15.08
IT 4% of Total 10.05
Total: 251.33

Note : Rates of all items should be inclusive of all supply and carriage. Page: 4 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

2.02.1.6 Up to 6.50m lift from the toe of embankment cum


Sardar 0.0300 day 800.00 24.00
Ordinary Labour 0.5400 day 370.00 199.80

Subtotal-A: 223.80

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 228.28

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 251.10


VAT 6% of Total 16.74
IT 4% of Total 11.16
Total: 279.00

2.02.1.7 Up to 7.50m lift from the toe of embankment cum


Sardar 0.0300 day 800.00 24.00
Ordinary Labour 0.6100 day 370.00 225.70

Subtotal-A: 249.70

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 254.69

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 280.16


VAT 6% of Total 18.68
IT 4% of Total 12.45
Total: 311.29

Note : Rates of all items should be inclusive of all supply and carriage. Page: 5 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

2.02.2 EFW(AE): Earth filling work with specified soil in any type of
embankment, Earth shall be arranged by the contractor's own cost
including royalty, cutting, carrying, filling and compacting to
85%/95%/98% maximum dry density at optimum moisture content,
with reference to laboratory density test AAHSTO standard hammer by
throwing earth in layers not more than 150mm in each layer in proper
alignment, grade, camber and side slope in all types of soil except
rocky, gravelly and slushy including benching not more than 300mm in
vertical and 600mm in horizontal steps along the sides while widening
any embankment with clod breaking to maximum size of 100mm,
benching the side slopes, removing roots and stumps of trees of girth
upto 200mm, stripping/ ploughing the base of embankment and borrow
pit area, dug bailing, clearing jungles, bail out of water, rough dressing
including 150mm cambering at the centre of crest with all leads and
lifts complete (compaction will be done by the contractor with
approved equipment including all ancillary charges for compaction and
testing) as per direction of Engineer in charge. Payment will be made on
compacted volume.

2.02.2.01 85% Compaction cum


Royalty of Earth 1.1200 m3 25.00 28.00
Sardar 0.0040 day 800.00 3.20
Ordinary Labour 0.3500 day 370.00 129.50

Subtotal-A: 160.70

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 163.91

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 180.31


VAT 6% of Total 12.02
IT 4% of Total 8.01
Total: 200.34

Note : Rates of all items should be inclusive of all supply and carriage. Page: 6 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

2.02.2.02 95% Compaction cum


Royalty of Earth 1.1800 m3 25.00 29.50
Sardar 0.0040 day 800.00 3.20
Ordinary Labour 0.3200 day 370.00 118.40
H.C. of Vibratory Road Roller (8-10 ton) 0.0070 day 3000.00 21.00
Diesel 0.3000 liter 68.00 20.40
Lubricant 0.0150 liter 220.00 3.30

Subtotal-A: 195.80

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 199.72

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 219.69


VAT 6% of Total 14.65
IT 4% of Total 9.76
Total: 244.10

Note : Rates of all items should be inclusive of all supply and carriage. Page: 7 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

2.02.2.03 98% Compaction cum


Royalty of Earth 1.2500 m3 25.00 31.25
Sardar 0.0040 day 800.00 3.20
Ordinary Labour 0.3200 day 370.00 118.40
H.C. of Vibratory Road Roller (8-10 ton) 0.0090 day 3000.00 27.00
Diesel 0.4000 liter 68.00 27.20
Lubricant 0.0200 liter 220.00 4.40

Subtotal-A: 211.45

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 215.68

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 237.25


VAT 6% of Total 15.82
IT 4% of Total 10.54
Total: 263.61

Note : Rates of all items should be inclusive of all supply and carriage. Page: 8 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

2.02.3 EFW(CE): Earth filling work with specified soil in any type of
embankment, Earth shall be carried by truck/boat or any other means,
supplied at contractor's own cost including royalty, cutting, carrying,
filling and compacting to 85%/95%/98% maximum dry density at
optimum moisture content, with reference to laboratory density test
AAHSTO standard hammer by throwing earth in layers not more
than150mm in proper alignment, grade, camber and side slope in all
types of soil except rocky, gravelly and slushy including benching not
more than 300mm in vertical and 600mm in horizontal steps along the
sides while widening any embankment, with clod breaking to maximum
size of 100mm, benching the side slopes, removing roots and stumps of
trees of girth upto 200mm, stripping/ ploughing the base of
embankment and borrow pit area, dug bailing, clearing jungles, bail out
of water, rough dressing including 150mm cambering at the centre of
crest with all leads and lifts complete (compaction will be done by
the contractor with approved equipment including all ancillary charges
for compaction and testing) as per direction of Engineer in charge.
Payment will be made on compacted volume. The item is applicable
when earth is supplied and arranged by the contractor from a distance
beyond 200m from the end of right of way.

2.02.3.01 Outside municipal area, 85% Compaction cum


Royalty of Earth (Outside Municipal Area) 1.1200 m3 35.00 39.20
Ordinary Labour 0.3500 day 370.00 129.50
Sardar 0.0040 day 800.00 3.20
H.C. of Flat Body Truck (3 tons) 0.0200 day 2000.00 40.00

Subtotal-A: 211.90

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 216.14

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 237.75


VAT 6% of Total 15.85
IT 4% of Total 10.57
Total: 264.17

Note : Rates of all items should be inclusive of all supply and carriage. Page: 9 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

2.02.3.02 Outside municipal area, 95% Compaction cum


Royalty of Earth (Outside Municipal Area) 1.1800 m3 35.00 41.30
Ordinary Labour 0.3200 day 370.00 118.40
Sardar 0.0040 day 800.00 3.20
H.C. of Flat Body Truck (3 tons) 0.0200 day 2000.00 40.00
Diesel 0.3000 liter 68.00 20.40
Lubricant 0.0150 liter 220.00 3.30
H.C. of Vibratory Road Roller (8-10 ton) 0.0070 day 3000.00 21.00

Subtotal-A: 247.60

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 252.55

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 277.81


VAT 6% of Total 18.52
IT 4% of Total 12.35
Total: 308.67

Note : Rates of all items should be inclusive of all supply and carriage. Page: 10 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

2.02.3.03 Outside municipal area, 98% Compaction cum


Royalty of Earth (Outside Municipal Area) 1.2500 m3 35.00 43.75
Ordinary Labour 0.3200 day 370.00 118.40
Sardar 0.0040 day 800.00 3.20
H.C. of Flat Body Truck (3 tons) 0.0200 day 2000.00 40.00
Diesel 0.3500 liter 68.00 23.80
Lubricant 0.0200 liter 220.00 4.40
H.C. of Vibratory Road Roller (8-10 ton) 0.0090 day 3000.00 27.00

Subtotal-A: 260.55

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 265.76

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 292.34


VAT 6% of Total 19.49
IT 4% of Total 12.99
Total: 324.82

2.02.3.04 Within municipal area, 85% Compaction cum


Royalty of Earth (Within Municipal Area) 1.1200 m3 50.00 56.00
Ordinary Labour 0.3500 day 370.00 129.50
Sardar 0.0040 day 800.00 3.20
H.C. of Flat Body Truck (3 tons) 0.0200 day 2000.00 40.00

Subtotal-A: 228.70

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 233.27

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 256.60


VAT 6% of Total 17.11
IT 4% of Total 11.40
Total: 285.11

Note : Rates of all items should be inclusive of all supply and carriage. Page: 11 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

2.02.3.05 Within municipal area, 95% Compaction cum


Royalty of Earth (Within Municipal Area) 1.1800 m3 50.00 59.00
Ordinary Labour 0.3200 day 370.00 118.40
Sardar 0.0040 day 800.00 3.20
H.C. of Flat Body Truck (3 tons) 0.0200 day 2000.00 40.00
Diesel 0.3000 liter 68.00 20.40
Lubricant 0.0150 liter 220.00 3.30
H.C. of Vibratory Road Roller (8-10 ton) 0.0070 day 3000.00 21.00

Subtotal-A: 265.30

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 270.61

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 297.67


VAT 6% of Total 19.84
IT 4% of Total 13.23
Total: 330.74

Note : Rates of all items should be inclusive of all supply and carriage. Page: 12 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

2.02.3.06 Within municipal area, 98% Compaction cum


Royalty of Earth (Within Municipal Area) 1.2500 m3 50.00 62.50
Ordinary Labour 0.3200 day 370.00 118.40
Sardar 0.0040 day 800.00 3.20
H.C. of Flat Body Truck (3 tons) 0.0200 day 2000.00 40.00
Diesel 0.3500 liter 68.00 23.80
Lubricant 0.0200 liter 220.00 4.40
H.C. of Vibratory Road Roller (8-10 ton) 0.0090 day 3000.00 27.00

Subtotal-A: 279.30

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 284.89

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 313.37


VAT 6% of Total 20.89
IT 4% of Total 13.93
Total: 348.19

Note : Rates of all items should be inclusive of all supply and carriage. Page: 13 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

2.02.4 EFW(DrS): Earth filling work in any type of embankment/pond/low lands


with suitable dredged soil (sandy clay/silty clay/silt but excluding
organic material), collected from silt-up river/canal bed by dredging with
appropriate local dredger, including carrying through pipe or any other
suitable means, loading, unloading and filling gradually at the right
place of filling area in an artificial silt up manner at a suitable height and
distance, including leveling, dressing and all necessary arrangements to
fill-up soil and compacting to 95% minimum dry density at optimum
moisture content with reference to laboratory density test AASHTO
modified hammer with suitable equipment dressing etc. complete in all
respect as per direction of the Engineer-in-charge. Rate is inclusive of
cost of all materials, their carriages, hire charges of dredger and all
other machines, equipment for filling soil as per specification, fuels,
lubricants, wages of operational staff and all incidental charges in this
connection, etc. Location of river bed from where earth will be collected
and quality of borrow soil must have prior approval from the Engineer-
in-charge. In no circumstances, earth shall be borrowed from
agricultural/homestead land. The borrow earth have to be collected
from river bed by avoiding any detrimental impact on the river channel.
Payment will be made on compacted volume.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 14 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

2.02.4.01 Initial distance within 300m cum


Dredging & Carrying Cost of Earth 0.0420 hr. 2000.00 84.00
Skilled Labour 0.0060 day 450.00 2.70
Ordinary Labour 0.0110 day 370.00 4.07
H.C. of Vibratory Road Roller (8-10 ton) 0.0090 day 3000.00 27.00
Diesel 0.4000 liter 68.00 27.20
Lubricant 0.0200 liter 220.00 4.40

Subtotal-A: 149.37

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 152.36

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 167.59


VAT 6% of Total 11.17
IT 4% of Total 7.45
Total: 186.21

Note : Rates of all items should be inclusive of all supply and carriage. Page: 15 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

2.02.4.02 Distance 300m to 600m cum


Dredging & Carrying Cost of Earth 0.0520 hr. 2000.00 104.00
Skilled Labour 0.0060 day 450.00 2.70
Ordinary Labour 0.0110 day 370.00 4.07
H.C. of Vibratory Road Roller (8-10 ton) 0.0090 day 3000.00 27.00
Diesel 0.4000 liter 68.00 27.20
Lubricant 0.0200 liter 220.00 4.40

Subtotal-A: 169.37

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 172.76

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 190.03


VAT 6% of Total 12.67
IT 4% of Total 8.45
Total: 211.15

Note : Rates of all items should be inclusive of all supply and carriage. Page: 16 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

2.02.4.03 Distance 600m to 1.0km cum


Dredging & Carrying Cost of Earth 0.0700 hr. 2000.00 140.00
Skilled Labour 0.0060 day 450.00 2.70
Ordinary Labour 0.0110 day 370.00 4.07
H.C. of Vibratory Road Roller (8-10 ton) 0.0090 day 3000.00 27.00
Diesel 0.4000 liter 68.00 27.20
Lubricant 0.0200 liter 220.00 4.40

Subtotal-A: 205.37

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 209.48

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 230.43


VAT 6% of Total 15.36
IT 4% of Total 10.24
Total: 256.03

Note : Rates of all items should be inclusive of all supply and carriage. Page: 17 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

2.02.4.04 Distance 1.0km to 2.0km cum


Dredging & Carrying Cost of Earth 0.0900 hr. 2000.00 180.00
Skilled Labour 0.0060 day 450.00 2.70
Ordinary Labour 0.0110 day 370.00 4.07
H.C. of Vibratory Road Roller (8-10 ton) 0.0090 day 3000.00 27.00
Diesel 0.4000 liter 68.00 27.20
Lubricant 0.0200 liter 220.00 4.40

Subtotal-A: 245.37

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 250.28

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 275.31


VAT 6% of Total 18.35
IT 4% of Total 12.24
Total: 305.89

Note : Rates of all items should be inclusive of all supply and carriage. Page: 18 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

2.02.4.05 Distance 2.0km to 3.0km cum


Dredging & Carrying Cost of Earth 0.1100 hr. 2000.00 220.00
Skilled Labour 0.0060 day 450.00 2.70
Ordinary Labour 0.0110 day 370.00 4.07
H.C. of Vibratory Road Roller (8-10 ton) 0.0090 day 3000.00 27.00
Diesel 0.4000 liter 68.00 27.20
Lubricant 0.0200 liter 220.00 4.40

Subtotal-A: 285.37

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 291.08

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 320.19


VAT 6% of Total 21.35
IT 4% of Total 14.23
Total: 355.76

Note : Rates of all items should be inclusive of all supply and carriage. Page: 19 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

2.02.4.06 Distance 3.0km to 4.0km cum


Dredging & Carrying Cost of Earth 0.1300 hr. 2000.00 260.00
Skilled Labour 0.0060 day 450.00 2.70
Ordinary Labour 0.0110 day 370.00 4.07
H.C. of Vibratory Road Roller (8-10 ton) 0.0090 day 3000.00 27.00
Diesel 0.4000 liter 68.00 27.20
Lubricant 0.0200 liter 220.00 4.40

Subtotal-A: 325.37

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 331.88

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 365.07


VAT 6% of Total 24.34
IT 4% of Total 16.23
Total: 405.63

Note : Rates of all items should be inclusive of all supply and carriage. Page: 20 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

2.02.4.07 Distance 4.0km and above cum


Dredging & Carrying Cost of Earth 0.1600 hr. 2000.00 320.00
Skilled Labour 0.0060 day 450.00 2.70
Ordinary Labour 0.0110 day 370.00 4.07
H.C. of Vibratory Road Roller (8-10 ton) 0.0090 day 3000.00 27.00
Diesel 0.4000 liter 68.00 27.20
Lubricant 0.0200 liter 220.00 4.40

Subtotal-A: 385.37

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 393.08

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 432.39


VAT 6% of Total 28.83
IT 4% of Total 19.22
Total: 480.43

Note : Rates of all items should be inclusive of all supply and carriage. Page: 21 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

2.03.1 CB: Providing clay blanket/clay cover by carried earth supplied at cum
contractor's own cost including royalty in different thickness over the
side slopes or crest of the road embankment with selected soil (clay
content minimum 80% and silt content 0-20%) including throwing clay
in layers not exceeding 150 mm in thickness, clod breaking, benching
the side slopes and compacting to 95% minimum dry density at
optimum moisture content with reference to laboratory density test
AASHTO standard hammer with suitable equipment dressing etc.
complete as per direction of Engineer-in-charge. Composition of
specified soil must be confirmed by laboratory test before use.
(compaction will be done by the contractor with approved equipment
including all ancillary charges for compaction and testing) as per
direction of Engineer in charge. Payment will be made on compacted
volume.
Royalty of Earth (Outside Municipal Area) 1.1800 m3 35.00 41.30
H.C. of Flat Body Truck (3 tons) 0.0200 day 2000.00 40.00
Sardar 0.0040 day 800.00 3.20
Ordinary Labour 0.3200 day 370.00 118.40
H.C. of Vibratory Road Roller (8-10 ton) 0.0070 day 3000.00 21.00
Diesel 0.3000 liter 68.00 20.40
Lubricant 0.0150 liter 220.00 3.30

Subtotal-A: 247.60

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 252.55

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 277.81


VAT 6% of Total 18.52
IT 4% of Total 12.35
Total: 308.67

Note : Rates of all items should be inclusive of all supply and carriage. Page: 22 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

2.04.1 EWEx(Rd/C/P): Excavation for roadway/canals/ponds, etc. in soil by


manual means, including cutting and disposing of all excavated
materials at a safe distance designated by the E-I-C, trimming bottom
and side slopes, in accordance with requirements of lines, grades and
cross sections, leveling, dressing, etc. all complete for an initial
excavation depth of 2m and lead upto 20m. including arranging and
supplying all necessary tools and equipment at work site, etc. complete
as per direction of the E-I-C.

2.04.1.1 Upto 20m lead from center line of the embankment cum
Ordinary Labour 0.2000 day 370.00 74.00
Skilled Labour 0.0040 day 450.00 1.80

Subtotal-A: 75.80

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 77.32

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 85.05


VAT 6% of Total 5.67
IT 4% of Total 3.78
Total: 94.50

2.04.1.2 Lead more than 20m from center line of the embankment cum
Ordinary Labour 0.2500 day 370.00 92.50
Skilled Labour 0.0040 day 450.00 1.80

Subtotal-A: 94.30

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 96.19

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 105.80


VAT 6% of Total 7.05
IT 4% of Total 4.70
Total: 117.56

Note : Rates of all items should be inclusive of all supply and carriage. Page: 23 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

2.04.2 EWEx(C/P/D): Earthwork in excavation of canals, ponds, drains, etc. by cum


excavating earth to the lines, grades and elevation as shown in the
drawing, filling baskets, carrying and disposing of all excavated
materials at a safe distance designated by the E-I-C in all types of rocky,
gravelly, slushy or organic soil, leveling, dressing, etc. all complete for
an initial excavation depth of 2m and an initial lead not exceeding 20m,
including arranging for and supplying all necessary tools and equipment
at work site, etc. complete as per direction of the E-I-C.
Ordinary Labour 0.3000 day 370.00 111.00
Mason 0.0250 day 550.00 13.75

Subtotal-A: 124.75

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 127.25

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 139.97


VAT 6% of Total 9.33
IT 4% of Total 6.22
Total: 155.52

Note : Rates of all items should be inclusive of all supply and carriage. Page: 24 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

2.04.3 EWEx(Dr): Earth work in re-excavation of Beel, River & Beel connectivity cum
(Canal) etc. by small dredging unit according to the lines, grades and
elevation as shown in the drawing, fitting of cutter machine, delivery
pipe fitting, soil management, filling chamber, village platform and
disposing of all excavated materials at a safe distance designated by the
E-I-C in all types of clay/slurry/organic soils except rocky, gravelly,
slushy soil, levelling, dressing, etc. all complete for an initial soil
dumping lead upto 100m including arranging for and supplying all
necessary tools and equipment at work site etc. complete as per
direction of the E-I-C.
H.C. of Excavator (Medium Size) 0.0040 day 8880.00 35.52
Ordinary Labour 0.0060 day 370.00 2.22
Diesel 0.3700 liter 68.00 25.16
Lubricant 0.0109 liter 220.00 2.40
Operator 0.0030 day 570.00 1.71

Subtotal-A: 67.01

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 68.35

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 75.18


VAT 6% of Total 5.01
IT 4% of Total 3.34
Total: 83.54

Note : Rates of all items should be inclusive of all supply and carriage. Page: 25 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

2.04.4 EWEx(M): Earth Excavation by Mechanical hydraulic Excavator (Long cum


Boon) in roadway/canals/ponds, etc. with 0.90 cum bucket capacity,
including cutting and loading in tippers or disposing of all excavated
materials at a safe distance designated by the E-I-C, trimming bottom
and side slopes, in accordance with requirements of lines, grades and
cross sections, leveling, dressing, etc. all complete for an initial
excavation depth of 3m and lead upto 20m. including cost of hire
charges of Excavator and all other machines, equipment, fuels,
lubricants and wages of operational staff etc. all complete as per the
direction of the E-I-C
H.C. of Excavator (Medium Size) 0.0030 day 8880.00 26.64
Ordinary Labour 0.0052 day 370.00 1.92
Diesel 0.3700 liter 68.00 25.16
Lubricant 0.0100 liter 220.00 2.20
Operator 0.0030 day 570.00 1.71

Subtotal-A: 57.63

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 58.79

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 64.67


VAT 6% of Total 4.31
IT 4% of Total 2.87
Total: 71.85

Note : Rates of all items should be inclusive of all supply and carriage. Page: 26 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

2.05.1 Leveling and dressing the embankment crown, road flanks, etc. in sqm
maintenance work by earth cutting and filling as necessary with
maintaining proper slope and camber including compaction etc. all
complete as per direction of the E-I-C.
Ordinary Labour 0.0200 day 370.00 7.40
Sardar 0.0020 day 800.00 1.60

Subtotal-A: 9.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9.18

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 10.10


VAT 6% of Total 0.67
IT 4% of Total 0.45
Total: 11.22

2.06.1 Turfing on embankment top and slope, building compound with good sqm
quality turf supplied by the contractor of not less than 225mm square in
dimension including placing and watering till grass is fully grown, etc. all
complete as per direction of the E-I-C (payment to be made only when
grass is fully grown).
Turf 1.0000 m2 5.00 5.00
Ordinary Labour 0.0450 day 370.00 16.65

Subtotal-A: 21.65

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 22.08

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 24.29


VAT 6% of Total 1.62
IT 4% of Total 1.08
Total: 26.99

Note : Rates of all items should be inclusive of all supply and carriage. Page: 27 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

2.06.2 Supplying and planting vertiver (Binna) grass in a bunch of 2 to 3 stem sqm
@of 225mm c/c all over the side slope starting from 225mm beyond the
edge of the shoulder and watering till the grasses are fully grown etc. all
complete as per direction of E-I-C. The stem should be 125mm to
150mm long with roots. (The payment is to be made only when grasses
are fully grown)
Ordinary Labour 0.0650 day 370.00 24.05
Vertiver (binna) Grass 1.0000 m2 11.00 11.00

Subtotal-A: 35.05

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 35.75

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 39.33


VAT 6% of Total 2.62
IT 4% of Total 1.75
Total: 43.70

Note : Rates of all items should be inclusive of all supply and carriage. Page: 28 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Chapter - 3 : Road Works

3.01.1 BP: Preparation of bed by cutting and filling including watering to bring sqm
moisture content ± 2% of OMC & compacting by appropriate
mechanical means etc. to obtain design CBR at minimum compaction
98% of MDD etc. all complete as per direction of the E-I-C
Mason 0.0050 day 550.00 2.75
Ordinary Labour 0.0080 day 370.00 2.96
H.C. of Water Tanker (Towed by Tractor) 0.0004 day 1500.00 0.60
H.C. of Water Pump 0.0004 day 500.00 0.20
H.C. of 3 Wheel Static Road roller (8-10 ton) 0.0008 day 3500.00 2.80
Diesel 0.0060 liter 68.00 0.41
Lubricant 0.0006 liter 220.00 0.13

Subtotal-A: 9.85

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10.05

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 11.05


VAT 6% of Total 0.74
IT 4% of Total 0.49
Total: 12.28

Note : Rates of all items should be inclusive of all supply and carriage. Page: 29 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.01.2 BC(150mm): Earth work in box cutting on road crest up to 150mm sqm
depth, maintaining proper grade, camber and alignment, super
elevation on curves, removing soil to a safe distance, watering, if
necessary, spreading the excavated earth on road flanks and slopes
uniformly including leveling, dressing, manual compacting, etc. all
complete as per direction of the E-I-C.
Ordinary Labour 0.0500 day 370.00 18.50

Subtotal-A: 18.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 18.87

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 20.76


VAT 6% of Total 1.38
IT 4% of Total 0.92
Total: 23.06

3.01.3.1 BC(300mm): Earth work in box cutting on road crest up to 300mm sqm
depth, maintaining proper grade, camber and alignment, super
elevation on curves, removing soil to a safe distance, watering, if
necessary, spreading the excavated earth on road flanks and slopes
uniformly including leveling, dressing, compacting the sub-grade by
manual labour, etc. all complete as per direction of the E-I-C.
Mason 0.0050 day 550.00 2.75
Ordinary Labour 0.0950 day 370.00 35.15

Subtotal-A: 37.90

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 38.66

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 42.52


VAT 6% of Total 2.83
IT 4% of Total 1.89
Total: 47.25

Note : Rates of all items should be inclusive of all supply and carriage. Page: 30 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.01.3.2 BC&SGC(300mm): Earth work in box cutting on road crest up to 300mm sqm
depth, maintaining proper grade, camber and alignment, super
elevation on curves, removing soils to a safe distance or if necessary,
spreading the excavated earth on road flanks and slopes uniformly
including leveling, dressing, watering to bring moisture content ± 2% of
OMC & compacting the sub-grade by appropriate mechanical means to
attain design CBR at minimum compaction 98% of MDD (Standard) etc.
all complete as per direction of the E-I-C.
Mason 0.0100 day 550.00 5.50
Ordinary Labour 0.0900 day 370.00 33.30
H.C. of Water Tanker (Towed by Tractor) 0.0005 day 1500.00 0.75
H.C. of Water Pump 0.0005 day 500.00 0.25
H.C. of 3 Wheel Static Road roller (8-10 ton) 0.0009 day 3500.00 3.15
Diesel 0.0090 liter 68.00 0.61
Lubricant 0.0008 liter 220.00 0.18

Subtotal-A: 43.74

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 44.61

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 49.07


VAT 6% of Total 3.27
IT 4% of Total 2.18
Total: 54.53

Note : Rates of all items should be inclusive of all supply and carriage. Page: 31 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.01.3.3 BC&SGP(300mm): Earth work in box cutting up to 300mm depth & sqm
Preparation of sub-grade by excavating road crest up to 300mm depth,
removing soils to a safe distance or spreading it on road flanks, slopes.
In preparing 300mm sub-grade below the box, excavating top 150mm
layer and excavated earth set aside to reuse, then scarifying the bottom
150 mm layer, breaking clods to 40mm maximum in size, leveling,
dressing, watering to OMC ± 2% & compacting the 1st layer by
appropriate mechanical means to attain design CBR at minimum
compaction 98% of Standard proctor, subsequently prepare 2nd layer
by spreading aside materials on top of prepared 1st layer, removing all
deleterious material breaking clods, leveling, dressing, watering to OMC
± 2% and compacting the layer following the same procedure as 1st
layer including maintaining proper grade, camber and alignment, super
elevation on curves etc. all complete as per direction of the E-I-C.
(When in-situ sub grade materials is suitable but very loose)
Mason 0.0150 day 550.00 8.25
Ordinary Labour 0.1800 day 370.00 66.60
H.C. of Water Tanker (Towed by Tractor) 0.0008 day 1500.00 1.25
H.C. of Water Pump 0.0008 day 500.00 0.42
H.C. of 3 Wheel Static Road roller (8-10 ton) 0.0017 day 3500.00 5.78
Diesel 0.0165 liter 68.00 1.12
Lubricant 0.0016 liter 220.00 0.35

Subtotal-A: 83.76

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 85.43

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 93.98


VAT 6% of Total 6.27
IT 4% of Total 4.18
Total: 104.42

Note : Rates of all items should be inclusive of all supply and carriage. Page: 32 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.01.4.1 BC(450mm): Earth work in box cutting on road crest up to 450mm sqm
depth, maintaining proper grade, camber and alignment, super
elevation on curves, removing soil to a safe distance, spreading the
excavated earth on road flanks and slopes uniformly including leveling,
dressing, watering, compacting the sub-grade by manual labour, etc. all
complete as per direction of the E-I-C.
Mason 0.0100 day 550.00 5.50
Ordinary Labour 0.1340 day 370.00 49.58

Subtotal-A: 55.08

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 56.18

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 61.80


VAT 6% of Total 4.12
IT 4% of Total 2.75
Total: 68.67

Note : Rates of all items should be inclusive of all supply and carriage. Page: 33 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.01.4.2 BC&SGC(450mm): Earth work in box cutting on road crest up to 450mm sqm
depth, maintaining proper grade, camber and alignment, super
elevation on curves, removing soils to a safe distance or if necessary,
spreading the excavated earth on road flanks and slopes uniformly
including leveling, dressing, watering to bring moisture content ± 2% of
OMC & compacting the sub-grade by appropriate mechanical means to
attain design CBR at minimum compaction 98% of MDD (Standard) etc.
all complete as per direction of the E-I-C.
Mason 0.0100 day 550.00 5.50
Ordinary Labour 0.1340 day 370.00 49.58
H.C. of Water Tanker (Towed by Tractor) 0.0005 day 1500.00 0.75
H.C. of Water Pump 0.0005 day 500.00 0.25
H.C. of 3 Wheel Static Road roller (8-10 ton) 0.0009 day 3500.00 3.15
Diesel 0.0090 liter 68.00 0.61
Lubricant 0.0008 liter 220.00 0.18

Subtotal-A: 60.02

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 61.22

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 67.34


VAT 6% of Total 4.49
IT 4% of Total 2.99
Total: 74.82

Note : Rates of all items should be inclusive of all supply and carriage. Page: 34 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.01.4.3 BC&SGP(450mm): Earth work in box cutting up to 450mm depth & sqm
Preparation of sub-grade by excavating road crest up to 450mm depth,
removing soils to a safe distance or spreading it on road flanks, slopes.
In preparing 300mm sub-grade below the box, excavating top 150mm
layer and excavated earth set aside to reuse, then scarifying the bottom
150 mm layer, breaking clods to 40mm maximum in size, leveling,
dressing, watering to OMC ± 2% & compacting the 1st layer by
appropriate mechanical means to attain design CBR at minimum
compaction 98% of Standard proctor, subsequently prepare 2nd layer
by spreading aside materials on top of prepared 1st layer, removing all
deleterious material breaking clods, leveling, dressing, watering to OMC
± 2% and compacting the layer following the same procedure as 1st
layer including maintaining proper grade, camber and alignment, super
elevation on curves etc. all complete as per direction of the E-I-C.
(When in-situ sub grade materials is suitable but very loose)
Mason 0.0200 day 550.00 11.00
Ordinary Labour 0.2200 day 370.00 81.40
H.C. of Water Tanker (Towed by Tractor) 0.0008 day 1500.00 1.25
H.C. of Water Pump 0.0008 day 500.00 0.42
H.C. of 3 Wheel Static Road roller (8-10 ton) 0.0017 day 3500.00 5.78
Diesel 0.0165 liter 68.00 1.12
Lubricant 0.0016 liter 220.00 0.35

Subtotal-A: 101.31

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 103.34

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 113.67


VAT 6% of Total 7.58
IT 4% of Total 5.05
Total: 126.30

Note : Rates of all items should be inclusive of all supply and carriage. Page: 35 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.02.1.1 Sand (FM 0.50) filling on the road bed in the improved sub-grade with cum
sand free from dust, earth, other vegetable growth and foreign
materials including supplying all materials, spreading, watering,
compacting by appropriate mechanical means to obtain a minimum
Soaked CBR 8% or Design CBR at minimum compaction 98% of MDD
(Modified), etc. all complete as per direction of the E-I-C.
Sand (FM - 0.5) 1.1500 m3 420.00 483.00
Ordinary Labour 0.1000 day 370.00 37.00
H.C. of Vibratory Road Roller (8-10 ton) 0.0080 day 3000.00 24.00
Diesel 0.0400 liter 68.00 2.72
Lubricant 0.0035 liter 220.00 0.77

Subtotal-A: 547.49

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 558.44

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 614.28


VAT 6% of Total 40.95
IT 4% of Total 27.30
Total: 682.54

Note : Rates of all items should be inclusive of all supply and carriage. Page: 36 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.02.1.2 Sand (FM 0.80) filling on the road bed in the improved sub-grade with cum
sand free from dust, earth, other vegetable growth and foreign
materials including supplying all materials, spreading, watering,
compacting by appropriate mechanical means to obtain a minimum
Design Soaked CBR but not less than 8% at minimum compaction 98%
of MDD (Modified), etc. all complete as per direction of the E-I-C.
Sand (FM - 0.8) 1.1500 m3 480.00 552.00
Ordinary Labour 0.1000 day 370.00 37.00
H.C. of Vibratory Road Roller (8-10 ton) 0.0080 day 3000.00 24.00
Diesel 0.0400 liter 68.00 2.72
Lubricant 0.0035 liter 220.00 0.77

Subtotal-A: 616.49

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 628.82

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 691.70


VAT 6% of Total 46.11
IT 4% of Total 30.74
Total: 768.56

Note : Rates of all items should be inclusive of all supply and carriage. Page: 37 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.02.1.3 Filling the road bed in the improved sub-grade with locally available cum
sand (passing <=15% through #200 sieve) free from dust, earth clod,
other vegetable growth and foreign materials including supplying all
materials, spreading, watering, compacting by appropriate mechanical
means to obtain a minimum Soaked CBR 8% or Design CBR at minimum
compaction 98% of MDD (Modified), etc. all complete as per direction of
the E-I-C.
Local Sand (Sieve # 200 passing not more than 15%) 1.1500 m3 350.00 402.50
Ordinary Labour 0.1000 day 370.00 37.00
H.C. of Vibratory Road Roller (8-10 ton) 0.0080 day 3000.00 24.00
Diesel 0.0400 liter 68.00 2.72
Lubricant 0.0035 liter 220.00 0.77

Subtotal-A: 466.99

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 476.33

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 523.96


VAT 6% of Total 34.93
IT 4% of Total 23.29
Total: 582.18

3.02.2 PiISG: Labour charge for taking out the existing sand from road bed of cum
any thickness and removing the debris including staking the materials at
a specified distance, etc. all complete as per direction of the E-I-C.
Ordinary Labour 0.1500 day 370.00 55.50

Subtotal-A: 55.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 56.61

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 62.27


VAT 6% of Total 4.15
IT 4% of Total 2.77
Total: 69.19

Note : Rates of all items should be inclusive of all supply and carriage. Page: 38 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.02.3 CISG: Labour for spreading & compaction of Improved Subgrade cum
consisting of sand having compacted thickness as per specifications
including local handling, hand packing, watering, dry rolling followed by
wet rolling in layers of specified loose thickness with 8~10 tonne road
roller to achieve Design Soaked CBR but not less than 8% at a degree
of compaction to minimum 98% (Modified Proctor ) etc all complete as
per direction of the Engineering-in-charge. Thickness of each layer
should not be more than 125mm loose and Payment will be made on
compacted thickness. (The rate excludes the cost of sand)
Ordinary Labour 0.1000 day 370.00 37.00
H.C. of Vibratory Road Roller (8-10 ton) 0.0080 day 3000.00 24.00
Diesel 0.0400 liter 68.00 2.72
Lubricant 0.0035 liter 220.00 0.77

Subtotal-A: 64.49

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 65.78

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 72.36


VAT 6% of Total 4.82
IT 4% of Total 3.22
Total: 80.40

Note : Rates of all items should be inclusive of all supply and carriage. Page: 39 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.03.1 Dis(SB/BC): Dismantling of damaged sub-base and Base course works cum
in flexible paved road of any thickness by appropriate mechanical means
and removing the debris to a safe distance, stacking properly including
all tools and plants, etc. all complete as per direction of the E-I-C.
Ordinary Labour 0.1500 day 370.00 55.50
H.C. of Excavator (Medium Size) 0.0055 day 8880.00 48.84
Diesel 0.0600 liter 68.00 4.08
Lubricant 0.0070 liter 220.00 1.54

Subtotal-A: 109.96

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 112.16

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 123.38


VAT 6% of Total 8.23
IT 4% of Total 5.48
Total: 137.08

Note : Rates of all items should be inclusive of all supply and carriage. Page: 40 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.03.2 S&C(SB): Labour for mixing, spreading & compacting of Sub-base cum
consisting of sand and crusher run aggregate made of well burnt picked
1st class bricks or stone having compacted thickness as per
specifications including local handling, hand packing, watering, dry
rolling followed by wet rolling in layers of specified loose thickness with
8~10 tonne road roller to achieve Design soaked CBR but not less than
30% at a degree of compaction to minimum 98% (Modified Proctor)
etc. all complete as per direction of the Engineering-in-charge.
Thickness of each layer should not be more than 100mm loose and
Payment will be made on compacted thickness. (The rate excludes the
cost of sand, brick/stone aggregates)
Mason 0.0100 day 550.00 5.50
Skilled Labour 0.1000 day 450.00 45.00
Ordinary Labour 0.2500 day 370.00 92.50
H.C. of Water Tanker (Towed by Tractor) 0.0100 day 1500.00 15.00
H.C. of Water Pump 0.0100 day 500.00 5.00
H.C. of Vibratory Road Roller (8-10 ton) 0.0100 day 3000.00 30.00
Diesel 0.1200 liter 68.00 8.16
Lubricant 0.0100 liter 220.00 2.20

Subtotal-A: 203.36

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 207.43

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 228.17


VAT 6% of Total 15.21
IT 4% of Total 10.14
Total: 253.52

Note : Rates of all items should be inclusive of all supply and carriage. Page: 41 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.03.3.1 SBBC(FM-0.5): Providing compacted aggregate sand sub-base course cum


with 38mm down Crusher run 1st class bricks/picked chips of LAA value
not exceeding 40 & sand of minimum FM 0.50 mixed in proportion 1:1
by volume placed in layer(s), mixing properly, watering, compacting
with 8~10 tonne road roller to attain minimum soaked CBR 30% or
Design CBR at minimum compaction 98% of MDD (modified) including
supplying of all materials, labourers, tools and equipment etc. all
complete as per direction of the E-I-C.
1st Class/ Picked Brick chips (40mm down graded) 0.6650 m3 2786.00 1852.69
Sand (FM - 0.5) 0.6650 m3 420.00 279.30
Mason 0.0100 day 550.00 5.50
Skilled Labour 0.2000 day 450.00 90.00
Ordinary Labour 0.4000 day 370.00 148.00
H.C. of Water Tanker (Towed by Tractor) 0.0100 day 1500.00 15.00
H.C. of Water Pump 0.0100 day 500.00 5.00
H.C. of Vibratory Road Roller (8-10 ton) 0.0100 day 3000.00 30.00
Diesel 0.1200 liter 68.00 8.16
Lubricant 0.0100 liter 220.00 2.20

Subtotal-A: 2435.85

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2484.57

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2733.02


VAT 6% of Total 182.20
IT 4% of Total 121.47
Total: 3036.69

Note : Rates of all items should be inclusive of all supply and carriage. Page: 42 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.03.3.2 SBBC(FM<0.5): Providing compacted aggregate sand sub-base course cum


with 38mm down Crusher run 1st class bricks/picked chips of LAA value
not exceeding 40 & locally available sand (Passing <=15% through
#200 sieve) mixed in proportion 1:1 by volume placed in layer(s) to
give a maximum compacted thickness of 100mm in a single appropriate
layer, mixing properly, watering, compacting with 8~10 tonne road
roller to attain minimum soaked CBR 30% or Design CBR at minimum
compaction 98% of MDD (modified) including supplying of all materials,
labourers, tools and equipment etc. all complete as per direction of the
E-I-C.
1st Class/ Picked Brick chips (40mm down graded) 0.6650 m3 2786.00 1852.69
Local Sand (Sieve # 200 passing not more than 15%) 0.6650 m3 350.00 232.75
Mason 0.0100 day 550.00 5.50
Skilled Labour 0.2000 day 450.00 90.00
Ordinary Labour 0.4000 day 370.00 148.00
H.C. of Vibratory Road Roller (8-10 ton) 0.0100 day 3000.00 30.00
Diesel 0.1200 liter 68.00 8.16
Lubricant 0.0100 liter 220.00 2.20
H.C. of Water Tanker (Towed by Tractor) 0.0100 day 1500.00 15.00
H.C. of Water Pump 0.0100 day 500.00 5.00

Subtotal-A: 2389.30

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2437.09

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2680.79


VAT 6% of Total 178.72
IT 4% of Total 119.15
Total: 2978.66

Note : Rates of all items should be inclusive of all supply and carriage. Page: 43 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.03.3.3 SBSL(FM-0.5): Providing compacted aggregate sand sub-base course cum


with 38mm down local Crushed stone (Louva) chips mixed with
Bholaganj crushed stone chips, as necessary, having LAA value not
exceeding 40 & sand of minimum FM 0.50 mixed in proportion 1:1 by
volume placed in layer(s), mixing properly, watering, compacting with
8~10 tonne road roller to attain minimum soaked CBR 30% or Design
CBR at minimum compaction 98% of MDD (modified) including
supplying of all materials, labourers, tools and equipment etc. all
complete as per direction of the E-I-C.
Crushed stone (Louva) chips (38mm down graded) 0.6650 cum 2300.00 1529.50
Sand (FM - 0.5) 0.6650 m3 420.00 279.30
Mason 0.0100 day 550.00 5.50
Skilled Labour 0.2000 day 450.00 90.00
Ordinary Labour 0.4000 day 370.00 148.00
H.C. of Vibratory Road Roller (8-10 ton) 0.0100 day 3000.00 30.00
H.C. of Water Tanker (Towed by Tractor) 0.0100 day 1500.00 15.00
H.C. of Water Pump 0.0100 day 500.00 5.00
Diesel 0.1200 liter 68.00 8.16
Lubricant 0.0100 liter 220.00 2.20

Subtotal-A: 2112.66

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2154.91

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2370.40


VAT 6% of Total 158.03
IT 4% of Total 105.35
Total: 2633.78

Note : Rates of all items should be inclusive of all supply and carriage. Page: 44 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.03.3.4 SBBC(FM-0.8): Providing compacted aggregate sand sub-base course cum


with 38mm down Crusher run 1st class bricks/picked chips of LAA value
not exceeding 40 & sand of minimum FM 0.80 mixed in proportion 1:1
by volume placed in layer(s), mixing properly, watering, compacting
with 8~10 tonne road roller to attain minimum soaked CBR 35% or
Design CBR at minimum compaction 98% of MDD (modified) including
supplying of all materials, labourers, tools and equipment etc. all
complete as per direction of the E-I-C.
1st Class/ Picked Brick chips (40mm down graded) 0.6650 m3 2786.00 1852.69
Sand (FM - 0.8) 0.6650 m3 480.00 319.20
Mason 0.0100 day 550.00 5.50
Skilled Labour 0.2000 day 450.00 90.00
Ordinary Labour 0.4000 day 370.00 148.00
H.C. of Vibratory Road Roller (8-10 ton) 0.0100 day 3000.00 30.00
H.C. of Water Tanker (Towed by Tractor) 0.0100 day 1500.00 15.00
H.C. of Water Pump 0.0100 day 500.00 5.00
Diesel 0.1200 liter 68.00 8.16
Lubricant 0.0100 liter 220.00 2.20

Subtotal-A: 2475.75

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2525.27

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2777.79


VAT 6% of Total 185.19
IT 4% of Total 123.46
Total: 3086.44

Note : Rates of all items should be inclusive of all supply and carriage. Page: 45 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.03.4.1 SBBC(70:30): Providing compacted aggregate sand sub-base course cum


with 38mm down brick chips made of 1st class /picked brick (LAA value
not exceeding 40) mixed thoroughly with sand of requisite FM (FM not
less than 0.8) to obtain a homogeneous mix complying with the
specified grading requirement of the relevant item of Road Design
standards – 2005, (Suggested mixing ratio Brick Chips 38mm down
graded 25% and 20mm down graded 45% with 30% sand) including
mixing, carrying, placing and spreading uniformly in appropriate layer to
give specified compacted thickness not more than 100mm in a single
layer, watering, compacting by 8~10 tonne road roller at OMC±3% to
obtain a minimum soaked CBR 50% or Design CBR at minimum
compaction 98% of MDD (Modified), including supplying of all materials,
their carriage, labourers tools and equipment etc. all complete as per
direction of the E-I-C.
1st Class/ Picked Brick chips (40mm down graded) 0.3300 m3 2786.00 919.38
1st Class Brick Chips (20mm down graded) 0.6000 m3 2940.00 1764.00
Sand (FM - 0.8) 0.4000 m3 480.00 192.00
Ordinary Labour 0.5000 day 370.00 185.00
Skilled Labour 0.2200 day 450.00 99.00
Mason 0.0100 day 550.00 5.50
Diesel 0.1200 liter 68.00 8.16
Lubricant 0.0100 liter 220.00 2.20
H.C. of Vibratory Road Roller (8-10 ton) 0.0100 day 3000.00 30.00
H.C. of Water Tanker (Towed by Tractor) 0.0100 day 1500.00 15.00
H.C. of Water Pump 0.0100 day 500.00 5.00

Subtotal-A: 3225.24

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 3289.74

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 3618.72


VAT 6% of Total 241.25
IT 4% of Total 160.83
Total: 4020.80

Note : Rates of all items should be inclusive of all supply and carriage. Page: 46 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Note : Rates of all items should be inclusive of all supply and carriage. Page: 47 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.03.4.2 SBSC(50:50): Providing compacted aggregate sand sub-base course cum


with 38mm down chips made of Crushed Stone (LAA value not
exceeding 35) mixed thoroughly with sand of requisite FM (FM not less
than 0.8) to obtain a homogeneous mix complying with the specified
grading requirement of the relevant item of Road Design standards –
2005, (Suggested mixing ratio Crushed Stone 38mm down graded 25%
and 20mm down graded 25% with 50% sand of total mix) including
mixing, carrying, placing and spreading uniformly in appropriate layer to
give specified compacted thickness not more than 100mm in a single
layer, watering, compacting with 8~10 tonne road roller at OMC±3% to
obtain a minimum soaked CBR 50% or Design CBR at minimum
compaction 98% of MDD (Modified), including supplying of all materials,
their carriage, labourers tools and equipment etc. all complete as per
direction of the E-I-C.
Stone Chips (38mm down graded) [LAA≤35] 0.2650 cum 4850.00 1285.25
Stone Chips (20mm down graded) [LAA≤35] 0.4000 cum 4930.00 1972.00
Sand (FM - 0.8) 0.6650 m3 480.00 319.20
Ordinary Labour 0.5000 day 370.00 185.00
Skilled Labour 0.2200 day 450.00 99.00
Mason 0.0100 day 550.00 5.50
Diesel 0.1200 liter 68.00 8.16
Lubricant 0.0100 liter 220.00 2.20
H.C. of Vibratory Road Roller (8-10 ton) 0.0100 day 3000.00 30.00
H.C. of Water Tanker (Towed by Tractor) 0.0100 day 1500.00 15.00
H.C. of Water Pump 0.0100 day 500.00 5.00

Subtotal-A: 3926.31

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4004.84

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 4405.32


VAT 6% of Total 293.69
IT 4% of Total 195.79
Total: 4894.80

Note : Rates of all items should be inclusive of all supply and carriage. Page: 48 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.03.5.1 SBbySM(FM-0.5): Providing compacted aggregate sand sub-base course cum


with 38mm down crusher run 1st class bricks/picked chips from suitable
salvage materials and supplying sand of minimum FM 0.50 mixed in
proportion of 1:1 by volume placed in layer(s), mixing properly,
watering, compacting with 8~10 tonne road roller to attain minimum
soaked CBR 30% or Design CBR at minimum compaction 98% of MDD
(modified) including supplying of all materials, labourers, tools and
equipment etc. all complete as per direction of the E-I-C. (Excluding
cost of 0.6650cum brick chips per cum work).
Sand (FM - 0.5) 0.6650 m3 420.00 279.30
Mason 0.0100 day 550.00 5.50
Skilled Labour 0.2000 day 450.00 90.00
Ordinary Labour 0.4000 day 370.00 148.00
H.C. of Water Tanker (Towed by Tractor) 0.0100 day 1500.00 15.00
H.C. of Water Pump 0.0100 day 500.00 5.00
H.C. of Vibratory Road Roller (8-10 ton) 0.0100 day 3000.00 30.00
Diesel 0.1200 liter 68.00 8.16
Lubricant 0.0100 liter 220.00 2.20

Subtotal-A: 583.16

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 594.82

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 654.31


VAT 6% of Total 43.62
IT 4% of Total 29.08
Total: 727.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 49 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.03.5.2 SBbySM(FM-0.8): Providing compacted aggregate sand sub-base course cum


with 38mm down crusher run 1st class bricks/picked chips from suitable
salvage materials and supplying sand of minimum FM 0.80 mixed in
proportion of 1:1 by volume placed in layer(s), mixing properly,
watering, compacting with 8~10 tonne road roller to attain minimum
soaked CBR 35% or Design CBR at minimum compaction 98% of MDD
(modified) including supplying of all materials, labourers, tools and
equipment etc. all complete as per direction of the E-I-C. (Excluding
cost of 0.6650cum brick chips per cum work).
Sand (FM - 0.8) 0.6650 m3 480.00 319.20
Mason 0.0100 day 550.00 5.50
Skilled Labour 0.2000 day 450.00 90.00
Ordinary Labour 0.4000 day 370.00 148.00
H.C. of Water Tanker (Towed by Tractor) 0.0100 day 1500.00 15.00
H.C. of Water Pump 0.0100 day 500.00 5.00
H.C. of Vibratory Road Roller (8-10 ton) 0.0100 day 3000.00 30.00
Diesel 0.1200 liter 68.00 8.16
Lubricant 0.0100 liter 220.00 2.20

Subtotal-A: 623.06

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 635.52

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 699.07


VAT 6% of Total 46.60
IT 4% of Total 31.07
Total: 776.75

Note : Rates of all items should be inclusive of all supply and carriage. Page: 50 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.04.1.1 PiEE(75mm): Labour charge for picking up the existing brick on end m
edging (75mm across) including staking the materials at a specified
distance, etc. all complete as per direction of the E-I-C.
Ordinary Labour 0.0140 day 370.00 5.18

Subtotal-A: 5.18

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 5.28

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 5.81


VAT 6% of Total 0.39
IT 4% of Total 0.26
Total: 6.46

3.04.1.2 PiEE(125mm): Labour charge for picking up the existing brick on end m
edging (125mm across) including staking the materials at a specified
distance, etc. all complete as per direction of the E-I-C.
Ordinary Labour 0.0270 day 370.00 9.99

Subtotal-A: 9.99

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10.19

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 11.21


VAT 6% of Total 0.75
IT 4% of Total 0.50
Total: 12.45

Note : Rates of all items should be inclusive of all supply and carriage. Page: 51 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.04.2.1 ReEE(75mm): Labour charge for Resetting the brick on end edging m
(75mm across) with 1st class/picked bricks, including cutting trenches
true to level & grade, removing earth, re-filling & ramming the sides
properly, including supplying and filling the gaps with local sand, etc. all
complete as per direction of the E-I-C.
Sand (FM - 0.5) 0.0020 m3 420.00 0.84
Mason 0.0030 day 550.00 1.65
Ordinary Labour 0.0200 day 370.00 7.40

Subtotal-A: 9.89

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10.09

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 11.10


VAT 6% of Total 0.74
IT 4% of Total 0.49
Total: 12.33

3.04.2.2 ReEE(125mm): Labour charge for Resetting the brick on end edging m
(125mm across) with 1st class/picked bricks including cutting trenches
true to level & grade, removing earth, re-filling & ramming the sides
properly, including supplying and filling the gaps with local sand, etc. all
complete as per direction of the E-I-C.
Sand (FM - 0.5) 0.0050 m3 420.00 2.10
Mason 0.0040 day 550.00 2.20
Ordinary Labour 0.0330 day 370.00 12.21

Subtotal-A: 16.51

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 16.84

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 18.52


VAT 6% of Total 1.23
IT 4% of Total 0.82
Total: 20.58

Note : Rates of all items should be inclusive of all supply and carriage. Page: 52 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.04.3.1 EE(75mm): Brick on end edging (75mm across) with 1st class/picked m
bricks including cutting trenches true to level & grade, removing earth,
re-filling & ramming the sides properly, including supplying and filling
the gaps with local sand, etc. all complete as per direction of the E-I-C.
1st Class Brick 8.0000 each 9.00 72.00
Sand (FM - 0.5) 0.0020 m3 420.00 0.84
Mason 0.0030 day 550.00 1.65
Ordinary Labour 0.0150 day 370.00 5.55

Subtotal-A: 80.04

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 81.64

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 89.80


VAT 6% of Total 5.99
IT 4% of Total 3.99
Total: 99.78

Note : Rates of all items should be inclusive of all supply and carriage. Page: 53 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.04.3.2 EE(125mm): Brick on end edging (125mm across) with 1st class/picked m
bricks including cutting trenches true to level & grade, removing earth,
re-filling & ramming the sides properly, including supplying and filling
the gaps with local sand, etc. all complete as per direction of the E-I-C.
1st Class Brick 14.0000 each 9.00 126.00
Sand (FM - 0.5) 0.0050 m3 420.00 2.10
Mason 0.0040 day 550.00 2.20
Ordinary Labour 0.0300 day 370.00 11.10

Subtotal-A: 141.40

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 144.23

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 158.65


VAT 6% of Total 10.58
IT 4% of Total 7.05
Total: 176.28

3.05.1 S&SBC: Supplying and spreading 1st class and picked brick chips (LAA
value not exceeding 40) including cost of bricks carrying breaking into
specified sizes including screening & specified sizes spreading uniformly
on the road surface maintaining grade, camber and super elevation, etc.
all complete as per direction of the E-I-C.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 54 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.05.1.1 20mm down graded cum


Skilled Labour 0.7000 day 450.00 315.00
1st Class Brick 300.0000 each 9.00 2700.00

Subtotal-A: 3015.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 3075.30

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 3382.83


VAT 6% of Total 225.52
IT 4% of Total 150.35
Total: 3758.70

3.05.1.2 40mm down graded cum


Skilled Labour 0.6000 day 450.00 270.00
1st Class Brick 294.0000 each 9.00 2646.00

Subtotal-A: 2916.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2974.32

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 3271.75


VAT 6% of Total 218.12
IT 4% of Total 145.41
Total: 3635.28

Note : Rates of all items should be inclusive of all supply and carriage. Page: 55 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.05.1.3 50mm down graded cum


Skilled Labour 0.5000 day 450.00 225.00
1st Class Brick 289.0000 each 9.00 2601.00

Subtotal-A: 2826.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2882.52

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 3170.77


VAT 6% of Total 211.38
IT 4% of Total 140.92
Total: 3523.08

3.05.1.4 63mm down graded cum


Skilled Labour 0.4500 day 450.00 202.50
1st Class Brick 285.0000 each 9.00 2565.00

Subtotal-A: 2767.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2822.85

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 3105.14


VAT 6% of Total 207.01
IT 4% of Total 138.01
Total: 3450.15

Note : Rates of all items should be inclusive of all supply and carriage. Page: 56 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.05.1.5 80mm down graded cum


Skilled Labour 0.4000 day 450.00 180.00
1st Class Brick 282.0000 each 9.00 2538.00

Subtotal-A: 2718.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2772.36

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 3049.60


VAT 6% of Total 203.31
IT 4% of Total 135.54
Total: 3388.44

3.05.2 B&SBC: Labour charge for breaking and spreading 1st class & picked
brick chips including cost of bricks carrying, breaking into specified sizes
including screening & spreading uniformly on the road surface
maintaining grade, camber and super elevation, etc. all complete as per
direction of the E-I-C.

3.05.2.1 20mm down graded cum


Skilled Labour 0.7500 day 450.00 337.50

Subtotal-A: 337.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 344.25

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 378.68


VAT 6% of Total 25.25
IT 4% of Total 16.83
Total: 420.75

Note : Rates of all items should be inclusive of all supply and carriage. Page: 57 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.05.2.2 40mm down graded cum


Skilled Labour 0.6000 day 450.00 270.00

Subtotal-A: 270.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 275.40

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 302.94


VAT 6% of Total 20.20
IT 4% of Total 13.46
Total: 336.60

3.05.2.3 50mm down graded cum


Skilled Labour 0.5000 day 450.00 225.00

Subtotal-A: 225.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 229.50

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 252.45


VAT 6% of Total 16.83
IT 4% of Total 11.22
Total: 280.50

3.05.2.4 63mm down graded cum


Skilled Labour 0.4500 day 450.00 202.50

Subtotal-A: 202.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 206.55

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 227.21


VAT 6% of Total 15.15
IT 4% of Total 10.10
Total: 252.45

Note : Rates of all items should be inclusive of all supply and carriage. Page: 58 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.05.2.5 80mm down graded cum


Skilled Labour 0.4000 day 450.00 180.00

Subtotal-A: 180.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 183.60

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 201.96


VAT 6% of Total 13.46
IT 4% of Total 8.98
Total: 224.40

3.05.3 S&SSC: Supplying and spreading stone chips of LAA value not exceeding
35% [Preferably stone chips from Madhyapara, Dinajpur], to be
obtained from boulders including cost of boulders carrying breaking into
specified sizes including screening & specified sizes & spreading
uniformly on the road surface maintaining grade, camber and super
elevation, etc. all complete as per direction of the E-I-C.

3.05.3.1 20mm down graded cum


Stone Boulder 0.9500 m3 3700.00 3515.00
Skilled Labour 1.4000 day 450.00 630.00

Subtotal-A: 4145.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4227.90

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 4650.69


VAT 6% of Total 310.05
IT 4% of Total 206.70
Total: 5167.43

Note : Rates of all items should be inclusive of all supply and carriage. Page: 59 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.05.3.2 40mm down graded cum


Stone Boulder 0.9500 m3 3700.00 3515.00
Skilled Labour 1.2000 day 450.00 540.00

Subtotal-A: 4055.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4136.10

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 4549.71


VAT 6% of Total 303.31
IT 4% of Total 202.21
Total: 5055.23

3.05.3.3 50mm down graded cum


Stone Boulder 0.9500 m3 3700.00 3515.00
Skilled Labour 1.0000 day 450.00 450.00

Subtotal-A: 3965.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4044.30

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 4448.73


VAT 6% of Total 296.58
IT 4% of Total 197.72
Total: 4943.03

Note : Rates of all items should be inclusive of all supply and carriage. Page: 60 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.05.3.4 63mm down graded cum


Stone Boulder 0.9500 m3 3700.00 3515.00
Skilled Labour 0.7500 day 450.00 337.50

Subtotal-A: 3852.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 3929.55

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 4322.51


VAT 6% of Total 288.17
IT 4% of Total 192.11
Total: 4802.78

3.05.3.5 80mm down graded cum


Stone Boulder 0.9500 m3 3700.00 3515.00
Skilled Labour 0.5000 day 450.00 225.00

Subtotal-A: 3740.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 3814.80

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 4196.28


VAT 6% of Total 279.75
IT 4% of Total 186.50
Total: 4662.53

Note : Rates of all items should be inclusive of all supply and carriage. Page: 61 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.05.4.1 S&SBC(WG): Supplying and spreading 50mm down graded crusher run cum
1st class and Picked brick chips of LAA value not exceeding 40%
including supplying of required amount of 12mm down graded chips
made of same quality bricks to fill the voids including cost of materials,
spreading uniformly in layers of specified loose thickness on road
surface maintaining grade, camber and super elevation, etc. all
complete as per direction of the E-I- C. Measurement will be made on
loose volume.
1st Class/ Picked Brick chips (50mm down graded) 0.9000 m3 2730.00 2457.00
1st Class Brick Chips (10mm down graded) 0.1000 m3 3049.00 304.90
Skilled Labour 0.0400 day 450.00 18.00
Ordinary Labour 0.2000 day 370.00 74.00

Subtotal-A: 2853.90

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2910.98

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 3202.08


VAT 6% of Total 213.47
IT 4% of Total 142.31
Total: 3557.86

Note : Rates of all items should be inclusive of all supply and carriage. Page: 62 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.05.4.2 S&SSC(WG): Supplying and spreading 50mm down graded crusher run cum
stone chips of LAA value not exceeding 35% including supplying of
required amount of 12mm down graded chips made of same quality
stone to fill the voids including cost of materials, spreading uniformly in
layers of specified loose thickness on road surface maintaining grade,
camber and super elevation, etc. all complete as per direction of the E-I-
C. Measurement will be made on loose volume.
Stone Chips (50mm down graded) [LAA≤35] 0.6000 cum 4730.00 2838.00
Stone Chips (12mm down graded) [LAA≤35] 0.4000 cum 4320.00 1728.00
Skilled Labour 0.0400 day 450.00 18.00
Ordinary Labour 0.2000 day 370.00 74.00

Subtotal-A: 4658.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4751.16

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 5226.28


VAT 6% of Total 348.42
IT 4% of Total 232.28
Total: 5806.97

3.05.5 B&SCS: Labour charge for breaking and spreading the concrete slab into
pieces, salvaged from existing RCC pavement, breaking into specified
sizes including screening & stacking properly in measurable stacks (max
stack height 0.5m) at site, etc. all complete including dismantling
existing concrete pavement as per direction of the E-I-C.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 63 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.05.5.1 20mm down graded cum


Skilled Labour 2.7500 day 450.00 1237.50

Subtotal-A: 1237.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1262.25

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1388.48


VAT 6% of Total 92.57
IT 4% of Total 61.71
Total: 1542.75

3.05.5.2 40mm down graded cum


Skilled Labour 2.5000 day 450.00 1125.00

Subtotal-A: 1125.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1147.50

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1262.25


VAT 6% of Total 84.15
IT 4% of Total 56.10
Total: 1402.50

3.05.5.3 50mm down graded cum


Skilled Labour 2.0000 day 450.00 900.00

Subtotal-A: 900.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 918.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1009.80


VAT 6% of Total 67.32
IT 4% of Total 44.88
Total: 1122.00

Note : Rates of all items should be inclusive of all supply and carriage. Page: 64 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.05.5.4 63mm down graded cum


Skilled Labour 1.7500 day 450.00 787.50

Subtotal-A: 787.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 803.25

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 883.58


VAT 6% of Total 58.91
IT 4% of Total 39.27
Total: 981.75

3.05.5.5 75mm down graded cum


Skilled Labour 1.5000 day 450.00 675.00

Subtotal-A: 675.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 688.50

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 757.35


VAT 6% of Total 50.49
IT 4% of Total 33.66
Total: 841.50

Note : Rates of all items should be inclusive of all supply and carriage. Page: 65 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.05.6 CWBM(iSSM): Labour charge for compacted WBM base course with cum
crusher run aggregate made of well burnt picked and 1st class bricks or
stone having compacted thickness as per specifications including local
handling, hand packing, watering, dry rolling followed by wet rolling in
layers of specified loose thickness with 8~10 tonne road roller to attain
minimum soaked CBR 80% or Design CBR at minimum degree of
compaction 98% of MDD (Modified Proctor) including supplying
choking/screening material as filler material @0.012cum/sqm or as
required etc. all complete as per direction of the Engineering-in-charge.
After adequate dry rolling, spreading of choking/screening material on
the surface, sprinkling of water and rolling is to be continued until all the
voids are filled, wave of grout/slurry flushes ahead of the roller.
Thickness of each layer should not be more than 100mm loose and
Payment will be made on compacted thickness. The rate excludes the
cost of brick aggregates.
Sand (FM - 0.8) 0.1000 m3 480.00 48.00
Head Mason 0.0010 day 650.00 0.65
Skilled Labour 0.0100 day 450.00 4.50
Ordinary Labour 0.1800 day 370.00 66.60
H.C. of Vibratory Road Roller (8-10 ton) 0.0220 day 3000.00 66.00
H.C. of Water Tanker (Truck Mounted) 0.0180 day 2500.00 45.00
Diesel 0.1500 liter 68.00 10.20
Lubricant 0.0100 liter 220.00 2.20

Subtotal-A: 243.15

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 248.01

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 272.81


VAT 6% of Total 18.19
IT 4% of Total 12.13
Total: 303.13

Note : Rates of all items should be inclusive of all supply and carriage. Page: 66 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.05.7.1 WBMBC: Providing compacted brick aggregate base course, including cum
supplying, spreading and compacting 50mm down graded crusher run
1st class and Picked brick chips (LAA value not exceeding 40%)
including supplying of required amount of 12mm down graded chips
made of same quality bricks, including spreading uniformly in layers of
specified loose thickness on road surface maintaining grade, camber
and super elevation including local handling, hand packing, booming,
watering, dry rolling followed by wet rolling in layers with 8~10 tonne
road roller to attain minimum soaked CBR 80% or Design CBR at
minimum degree of compaction 98% of MDD (Modified Proctor),
including supplying choking/screening material as filler material
@0.018cum/sqm or as required including cost of materials, labours etc.
all complete as per direction of the E-I-C. After adequate dry rolling
spreading of choking/screening material on the surface, sprinkling water
and rolling is to be continued until all the voids are filled, wave of
grout/slurry flushes ahead of the roller. Thickness of each layer should
not be more than 100mm loose and measurement for Payment will be
made on compacted thickness.
1st Class/ Picked Brick chips (50mm down graded) 1.0900 m3 2730.00 2975.70
1st Class Brick Chips (10mm down graded) 0.1400 m3 3049.00 426.86
Skilled Labour 0.2000 day 450.00 90.00
Ordinary Labour 0.4500 day 370.00 166.50
Sand (FM - 0.5) 0.1200 m3 420.00 50.40
Head Mason 0.0020 day 650.00 1.30
H.C. of Vibratory Road Roller (8-10 ton) 0.0220 day 3000.00 66.00
H.C. of Water Tanker (Truck Mounted) 0.0180 day 2500.00 45.00
Diesel 0.1500 liter 68.00 10.20
Lubricant 0.0100 liter 220.00 2.20

Subtotal-A: 3834.16

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 3910.84

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 4301.93


VAT 6% of Total 286.80

Note : Rates of all items should be inclusive of all supply and carriage. Page: 67 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

IT 4% of Total 191.20
Total: 4779.92

Note : Rates of all items should be inclusive of all supply and carriage. Page: 68 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.05.7.2 WMMBC: Providing compacted brick aggregate WMM base course, cum
including supplying, spreading and compacting 38mm down graded
aggregates as specified in the relevant item of LGED road design
standard or wet mix macadam specification (LAA value not exceeding
40% ) made of 1st class and Picked bricks, combining brick chips of
different sizes to provide requisite grading and premixing the material
with water at OMC in mechanical mix plant at stack yard including
carriage of mixed material by tipper with proper covering to site, laying
in uniform layers of specified loose thickness not more than 100mm
with Grader in base course on well prepared surface and compacting
with 8~10 tonne Vibratory road roller to attain minimum soaked CBR
80% or Design CBR at a degree of minimum compaction 98% (Modified
Proctor) including supplying all materials, carriage, labors, tools &
equipment etc. all complete as per direction of the E-I-C
1st Class/ Picked Brick chips (40mm down graded) 0.4500 m3 2786.00 1253.70
1st Class Picked Brick Chips (20mm down graded) 0.7500 m3 2940.00 2205.00
Sand (FM - 0.5) 0.1500 m3 420.00 63.00
Ordinary Labour 0.3000 day 370.00 111.00
Skilled Labour 0.2000 day 450.00 90.00
Head Mason 0.0050 day 650.00 3.25
H.C. of Mixing Machine for Aggregate 0.0040 day 8000.00 32.00
H.C. of Dump Truck/ Tripping Trucks 0.0300 day 4500.00 135.00
H.C. of Motor Graders (14 tons) 0.0020 day 6000.00 12.00
H.C. of Vibratory Road Roller (8-10 ton) 0.0300 day 3000.00 90.00
H.C. of Water Tanker (Truck Mounted) 0.0020 day 2500.00 5.00
Stackyard Rent 1.0000 m3 6.48 6.48
Diesel 0.8000 liter 68.00 54.40
Lubricant 0.0600 liter 220.00 13.20

Subtotal-A: 4074.03

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4155.51

Note : Rates of all items should be inclusive of all supply and carriage. Page: 69 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 4571.06


VAT 6% of Total 304.74
IT 4% of Total 203.16
Total: 5078.96

Note : Rates of all items should be inclusive of all supply and carriage. Page: 70 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.05.8.1 WBMSC: Providing compacted Stone Aggregate Base Course by cum


supplying, spreading and compacting 50mm down graded crusher run
stone chips as specified in the relevant item of LGED road design
standard (LAA value not exceeding 35%), including supplying of
required amount of 12mm down graded chips made of same quality
stone and Sand of minimum FM=0.80, including spreading uniformly in
layers of specified loose thickness on road surface maintaining grade,
camber and super elevation including local handling, hand packing,
booming, watering, dry rolling followed by wet rolling in layers with
8~10 tonne road roller to attain minimum soaked CBR 90% or Design
CBR at minimum degree of compaction 98% of MDD (Modified Proctor
), blinding withchoking material as filler material @0.018cum/sqm or as
required including cost of materials, labours etc. all complete as per
direction of the E-I-C. After adequate dry rolling spreading choking
material on the surface, sprinkling water and rolling is to be continued
until all the voids are filled, wave of grout/slurry flushes ahead of the
roller. Thickness of each layer should not be more than 100mm loose
and measurement for Payment will be made on compacted thickness.
Stone Chips (50mm down graded) [LAA≤35] 0.5300 cum 4730.00 2506.90
Stone Chips (12mm down graded) [LAA≤35] 0.4000 cum 4320.00 1728.00
Skilled Labour 0.2000 day 450.00 90.00
Ordinary Labour 0.4500 day 370.00 166.50
Sand (FM - 0.8) 0.4000 m3 480.00 192.00
Head Mason 0.0020 day 650.00 1.30
H.C. of Vibratory Road Roller (8-10 ton) 0.0220 day 3000.00 66.00
H.C. of Water Tanker (Truck Mounted) 0.0180 day 2500.00 45.00
Diesel 0.1500 liter 68.00 10.20
Lubricant 0.0100 liter 220.00 2.20

Subtotal-A: 4808.10

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4904.26

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 5394.69


VAT 6% of Total 359.65

Note : Rates of all items should be inclusive of all supply and carriage. Page: 71 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

IT 4% of Total 239.76
Total: 5994.10

Note : Rates of all items should be inclusive of all supply and carriage. Page: 72 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.05.8.2 WMMSC: Providing compacted Stone aggregate base course by cum


supplying, spreading and compacting 38mm down graded stone chips
as specified in the relevant item of LGED road design standard or wet
mix macadam specification (LAA value not exceeding 35% made of
Crushed stone combining aggregates of different sizes to provide
required grading and premixing with water at OMC in mechanical mix
plant at stack yard including carriage of mixed material by tipper with
proper covering to site, laying in uniform layers of specified loose
thickness not more than 100mm with Grader in base course on well
prepared surface and compacting with 8~10 tonne vibratory road roller
to attain minimum soaked CBR 90% or Design CBR at minimum degree
of compaction 98% of MDD (Modified Proctor ) including supplying all
materials, carriage, labors, tools & equipment etc. all complete as per
direction of the E-I-C.
Stone Chips (38mm down graded) [LAA≤35] 0.4500 cum 4850.00 2182.50
Stone Chips (20mm down graded) [LAA≤35] 0.2500 cum 4930.00 1232.50
Stone Chips (12mm down graded) [LAA≤35] 0.2400 cum 4320.00 1036.80
Sand (FM - 0.8) 0.4000 m3 480.00 192.00
Ordinary Labour 0.3000 day 370.00 111.00
Skilled Labour 0.2000 day 450.00 90.00
Head Mason 0.0050 day 650.00 3.25
H.C. of Mixing Machine for Aggregate 0.0040 day 8000.00 32.00
H.C. of Dump Truck/ Tripping Trucks 0.0300 day 4500.00 135.00
H.C. of Motor Graders (14 tons) 0.0020 day 6000.00 12.00
H.C. of Vibratory Road Roller (8-10 ton) 0.0300 day 3000.00 90.00
H.C. of Water Tanker (Truck Mounted) 0.0020 day 2500.00 5.00
Stackyard Rent 1.0000 m3 6.48 6.48
Diesel 0.8000 liter 68.00 54.40
Lubricant 0.0600 liter 220.00 13.20

Subtotal-A: 5196.13

Note : Rates of all items should be inclusive of all supply and carriage. Page: 73 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 5300.05

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 5830.06


VAT 6% of Total 388.67
IT 4% of Total 259.11
Total: 6477.84

3.06.1.1 PCHD@1.2: Providing Prime coat @1.2 liter/sqm with cut back bitumen sqm
to be prepared by cutting back 60/70 or 80/100 penetration grade
straight run bitumen (conforming to the requirements of ASTM/
AASHTO in the ratio of 100 parts by volume of bitumen to 40-60 parts
by volume of kerosene depending on the porosity of the surface and will
be decided by field trials, the correct quantity that is completely
absorbed within 24 hours including carefully cleaning of the surface of
the granular base material to be primed and spraying cut back bitumen
at a temperature from 100°C to 120°C by appropriate hand device, etc.
complete as per direction of the E-I-C.
Bitumen [Grade 80/100] 0.8000 kg 49.00 39.20
Kerosene 0.4000 litre 72.00 28.80
Fire wood 0.6400 kg 7.75 4.96
Mason 0.0001 day 550.00 0.06
Skilled Labour 0.0010 day 450.00 0.45
Ordinary Labour 0.0070 day 370.00 2.59

Subtotal-A: 76.06

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 77.58

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 85.33


VAT 6% of Total 5.69
IT 4% of Total 3.79
Total: 94.82

Note : Rates of all items should be inclusive of all supply and carriage. Page: 74 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.06.1.2 PCMD@1.2: Providing Prime coat @1.2 liter/sqm with cut back bitumen sqm
to be prepared by cutting back 60/70 or 80/100 penetration grade
straight run bitumen (conforming to the requirements of ASTM/
AASHTO in the ratio of 100 parts by volume of bitumen to 40-60 parts
by volume of kerosene depending on the porosity of the surface and will
be decided by field trials, the correct quantity that is completely
absorbed within 24 hours including carefully cleaning of the surface of
the granular base material to be primed and spraying cut back bitumen
at a temperature from 100°C to 120°C by mechanical distributor, etc.
complete as per direction of the E-I-C.
Bitumen [Grade 80/100] 0.8000 kg 49.00 39.20
Fire wood 0.6400 kg 7.75 4.96
Kerosene 0.4000 litre 72.00 28.80
Mason 0.0001 day 550.00 0.06
Skilled Labour 0.0010 day 450.00 0.45
Ordinary Labour 0.0060 day 370.00 2.22
H.C. of Distributor 0.0003 day 3750.00 1.01
Diesel 0.0025 liter 68.00 0.17
Lubricant 0.0003 liter 220.00 0.06

Subtotal-A: 76.92

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 78.46

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 86.31


VAT 6% of Total 5.75
IT 4% of Total 3.84
Total: 95.90

Note : Rates of all items should be inclusive of all supply and carriage. Page: 75 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.06.2.1 TCHD@0.5: Providing tack coat @0.50kg/sqm with 60/70 or 80/100 sqm
penetration grade straight run bitumen complying with the requirements
of ASTM/AASHTO applied by appropriate hand device at a temperature
between 175°C and 185°C including heating bitumen, surface cleaning,
etc. all complete as per direction of the E-I-C.
Bitumen [Grade 80/100] 0.5000 kg 49.00 24.50
Fire wood 0.4000 kg 7.75 3.10
Mason 0.0001 day 550.00 0.06
Skilled Labour 0.0010 day 450.00 0.45
Ordinary Labour 0.0070 day 370.00 2.59

Subtotal-A: 30.70

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 31.31

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 34.44


VAT 6% of Total 2.30
IT 4% of Total 1.53
Total: 38.27

Note : Rates of all items should be inclusive of all supply and carriage. Page: 76 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.06.2.2 TCHD@0.75: Providing tack coat @0.75kg/sqm with 60/70 or 80/100 sqm
penetration grade straight run bitumen complying with the requirements
of ASTM/AASHTO applied by appropriate hand device at a temperature
between 175°C and 185°C including heating bitumen, surface cleaning,
etc. all complete as per direction of the E-I-C.
Bitumen [Grade 80/100] 0.7500 kg 49.00 36.75
Fire wood 0.6000 kg 7.75 4.65
Mason 0.0001 day 550.00 0.06
Skilled Labour 0.0010 day 450.00 0.45
Ordinary Labour 0.0070 day 370.00 2.59

Subtotal-A: 44.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 45.38

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 49.92


VAT 6% of Total 3.33
IT 4% of Total 2.22
Total: 55.47

Note : Rates of all items should be inclusive of all supply and carriage. Page: 77 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.06.2.3 TCMD@0.5: Providing tack coat @0.50kg/sqm with 60/70 or 80/100 sqm
penetration grade straight run bitumen complying with the requirements
of ASTM/AASHTO applied by mechanical distributor at a temperature
between 175°C and 185°C including heating bitumen, surface cleaning,
etc. all complete as per direction of the E-I-C.
Bitumen [Grade 80/100] 0.5000 kg 49.00 24.50
Fire wood 0.4000 kg 7.75 3.10
Mason 0.0010 day 550.00 0.55
Skilled Labour 0.0020 day 450.00 0.90
Ordinary Labour 0.0050 day 370.00 1.85
H.C. of Distributor 0.0003 day 3750.00 1.13
Diesel 0.0030 liter 68.00 0.20
Lubricant 0.0003 liter 220.00 0.07

Subtotal-A: 32.30

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 32.94

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 36.23


VAT 6% of Total 2.42
IT 4% of Total 1.61
Total: 40.26

Note : Rates of all items should be inclusive of all supply and carriage. Page: 78 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.06.2.4 TCMD@0.75: Providing tack coat @0.75kg/sqm with 60/70 or 80/100 sqm
penetration grade straight run bitumen complying with the requirements
of ASTM/AASHTO applied by mechanical distributor at a temperature
between 175°C and 185°C including heating bitumen, surface cleaning,
etc. all complete as per direction of the E-I-C.
Bitumen [Grade 80/100] 0.7500 kg 49.00 36.75
Fire wood 0.6000 kg 7.75 4.65
Mason 0.0010 day 550.00 0.55
Skilled Labour 0.0020 day 450.00 0.90
Ordinary Labour 0.0050 day 370.00 1.85
H.C. of Distributor 0.0003 day 3750.00 1.13
Diesel 0.0030 liter 68.00 0.20
Lubricant 0.0003 liter 220.00 0.07

Subtotal-A: 46.10

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 47.02

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 51.72


VAT 6% of Total 3.45
IT 4% of Total 2.30
Total: 57.47

Note : Rates of all items should be inclusive of all supply and carriage. Page: 79 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.06.3 7mmSC: Providing 7mm thick (minimum) compacted pre-mixed sqm


bituminous seal coat to be prepared using 6.33mm down crushed stone
chips & stone dust blended together to comply the gradation as
specified in the relevant item of Road Design Standards – 2005, mixed
with 80/100 or 60/70 (Preferable) penetration grade minimum @5.0%
by weight of total mix or as determined by job mix design. The bitumen
and chips shall be separately heated to a temperature 140°C – 155°C
and 150°C – 170°C respectively. The mixing shall be done at
temperature between 140°C – 160°C at a separate place away from the
fire. The mixture of bitumen and chips shall be laid uniformly on the
road surface in appropriate layer so as to produce the specified
compacted thickness, rolling at a temperature not bellow 90°C with
appropriate Steel Drum Roller (3-5 tons) & pneumatic multiple tire roller
(8-10 tons) to the desired compaction, including supplying of all
materials, their carriage, labourers tools and equipment etc. all complete
as per direction of the E-I-C [Excluding the cost of applying Prime/Tack
coat].
Stone Chips (6mm down graded) [LAA≤35] 0.0049 cum 3690.00 18.08
Stone Dust (2.38mm down) 0.0049 cum 1500.00 7.35
Bitumen [Grade 80/100] 0.9210 kg 49.00 45.13
Fire wood 0.9210 kg 7.75 7.14
Mason 0.0008 day 550.00 0.44
Skilled Labour 0.0050 day 450.00 2.25
Ordinary Labour 0.0190 day 370.00 7.03
H.C. of Vibratory (Ride On) Roller 2 Steel Drum Compactor (3- 0.0005 day 3000.00 1.50
5 tons)
Diesel 0.0008 liter 68.00 0.05
Lubricant 0.0008 liter 220.00 0.18
H.C. of Pneumatic Multiple Tired Roller (7 tires, 8-10 tons) 0.0005 day 3000.00 1.50

Subtotal-A: 90.65

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 92.46

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 101.71

Note : Rates of all items should be inclusive of all supply and carriage. Page: 80 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

VAT 6% of Total 6.78


IT 4% of Total 4.52
Total: 113.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 81 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.06.3.1 Providing 15mm thick (minimum) compacted pre-mixed bituminous sqm


surfacing - wearing course to be prepared using 12mm down, 6mm
down graded crushed stone chips & Stone Dust to comply the gradation
as specified in the relevant item of Road Design Standards – 2005,
mixed with 80/100 or 60/70 (Preferable) penetration grade minimum
@5.0% by weight of total mix or as determined by job mix design. The
bitumen and chips shall be separately heated to a temperature 140°C –
155°C and 150°C – 170°C respectively. The mixing shall be done at
temperature between 140°C – 160°C at a separate place away from the
fire. The mixture of bitumen and chips shall be laid uniformly on the
road surface in appropriate layer so as to produce the specified
compacted thickness, rolling at a temperature not bellow 90°C with
appropriate Steel Drum Roller (3-5 tons) & pneumatic multiple tire roller
(8-10 tons) to the desired compaction, including supplying of all
materials, their carriage, labours, tools and equipment etc. all complete
in all respect as per direction of the Engineer-in-charge. [Excluding the
cost of applying Prime/Tack coat].
Stone Chips (12mm down graded) [LAA≤35] 0.0042 cum 4320.00 18.14
Stone Chips (6mm down graded) [LAA≤35] 0.0095 cum 3690.00 35.06
Stone Dust (2.38mm down) 0.0074 cum 1500.00 11.10
Bitumen [Grade 80/100] 1.7625 kg 49.00 86.36
Fire wood 1.7625 kg 7.75 13.66
Mason 0.0011 day 550.00 0.61
Skilled Labour 0.0060 day 450.00 2.70
Ordinary Labour 0.0300 day 370.00 11.10
H.C. of Pneumatic Multiple Tired Roller (7 tires, 8-10 tons) 0.0007 day 3000.00 2.10
H.C. of Vibratory (Ride On) Roller 2 Steel Drum Compactor (3- 0.0007 day 3000.00 2.10
5 tons)
Diesel 0.0110 liter 68.00 0.75
Lubricant 0.0011 liter 220.00 0.24

Subtotal-A: 183.92

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 187.59

Note : Rates of all items should be inclusive of all supply and carriage. Page: 82 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 206.35


VAT 6% of Total 13.76
IT 4% of Total 9.17
Total: 229.28

Note : Rates of all items should be inclusive of all supply and carriage. Page: 83 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.06.4.1 25mmBC: Providing 25mm thick (minimum) compacted pre-mixed sqm


bituminous carpeting to be prepared using 16mm down graded stone-
chips (LAA value not exceeding 35%) to comply the gradation as
specified, mixed with heated bitumen of 60/70 (Preferable) or 80/100
penetration grade heated straight run bitumen satisfying the
requirements of ASTM/AASHTO. The bitumen and stone-chips shall be
separately heated to a temperature 140°C – 155°C and 150°C – 170°C
respectively before mixing. The mixing shall be done at temperature
between 140°C – 160°C at a separate place away from the fire. The
bitumen and stone-chips mixture shall be laid uniformly in proper
camber, grade and super-elevation, only on the prepared and accepted
base or surface in a single appropriate layer to give the specified
compacted thickness. The mixture should be rolled with appropriate by
Steel Drum Roller (3-5 tons) & pneumatic multiple tire roller (8-10 tons)
to full compaction. The rolling temperature shall be maintained not
below 90°C including supplying of all materials, their carriage,
labourers, tools and equipment etc. all complete as per direction of the
E-I-C. The bitumen in the mix shall be @4.5% to 5.5% by weight of
total mix or as determined by job mix design. (In order to achieve the
specified grading a blending of nominal maximum size of 16mm, 12mm,
6mm crushed stone chips and stone dust is suggested and proportion
will have to determine by the laboratory analysis)
Stone Chips (16mm down graded) [LAA≤35] 0.0068 cum 4720.00 32.10
Stone Chips (12mm down graded) [LAA≤35] 0.0118 cum 4320.00 50.98
Stone Chips (6mm down graded) [LAA≤35] 0.0118 cum 3690.00 43.54
Stone Dust (2.38mm down) 0.0034 cum 1500.00 5.10
Bitumen [Grade 80/100] 2.3128 kg 49.00 113.33
Fire wood 2.3128 kg 7.75 17.92
Mason 0.0020 day 550.00 1.10
Skilled Labour 0.0110 day 450.00 4.95
Ordinary Labour 0.0450 day 370.00 16.65
H.C. of Pneumatic Multiple Tired Roller (7 tires, 8-10 tons) 0.0010 day 3000.00 3.00
H.C. of Vibratory (Ride On) Roller 2 Steel Drum Compactor (3- 0.0010 day 3000.00 3.00
5 tons)

Note : Rates of all items should be inclusive of all supply and carriage. Page: 84 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Diesel 0.0160 liter 68.00 1.09


Lubricant 0.0016 liter 220.00 0.35

Subtotal-A: 293.11

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 298.97

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 328.86


VAT 6% of Total 21.92
IT 4% of Total 14.62
Total: 365.40

Note : Rates of all items should be inclusive of all supply and carriage. Page: 85 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.06.4.2 25mmDC: Providing 25mm thick (minimum) compacted pre-mixed sqm


bituminous surfacing - wearing course with 16mm down graded
crushed stone chips complying with the specified grading requirement of
the relevant item of Road Design standards – 2005, of LAA value
<=35%, water absorption not >2%, flakiness index not >35% mixed
with 60/70 (Preferable) or 80/100 penetration grade heated straight
run bitumen satisfying the requirements of ASTM/AASHTO. The bitumen
and stone-chips shall be separately heated to a temperature 140oC –
155oC and 150oC – 170oC respectively before mixing. The mixing shall
be done at temperature between 140oC – 160oC at a separate place
away from the fire. The bitumen and stone-chips mixture shall be laid
uniformly on the road surface in single appropriate layer to give
specified compacted thickness in proper camber, grade and super-
elevation. The mixture should be rolled at a temperature not below
90oC with Steel Drum Roller (3-5 tons) & pneumatic multiple tire roller
(8-10 tons) to full compaction, including supplying of all materials, their
carriage, labourers tools and equipment etc. all complete as per the
direction of the E-I-C. The bitumen in the mix shall be between 5.0% by
weight of total mix or as determined by job mix design. (In order to
achieve the specified grading a blending of nominal maximum size of
16mm, 12mm, 6mm crushed stone chips and stone dust is suggested
and proportion will have to determine by the laboratory analysis) .
Stone Chips (16mm down graded) [LAA≤35] 0.0070 cum 4720.00 33.04
Stone Chips (12mm down graded) [LAA≤35] 0.0105 cum 4320.00 45.36
Stone Chips (6mm down graded) [LAA≤35] 0.0088 cum 3690.00 32.47
Stone Dust (2.38mm down) 0.0088 cum 1500.00 13.20
Bitumen [Grade 80/100] 2.9500 kg 49.00 144.55
Fire wood 2.9500 kg 7.75 22.86
Mason 0.0020 day 550.00 1.10
Skilled Labour 0.0120 day 450.00 5.40
Ordinary Labour 0.0500 day 370.00 18.50
H.C. of Pneumatic Multiple Tired Roller (7 tires, 8-10 tons) 0.0010 day 3000.00 3.00
H.C. of Vibratory (Ride On) Roller 2 Steel Drum Compactor (3- 0.0010 day 3000.00 3.00
5 tons)

Note : Rates of all items should be inclusive of all supply and carriage. Page: 86 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Diesel 0.0160 liter 68.00 1.09


Lubricant 0.0016 liter 220.00 0.35

Subtotal-A: 323.92

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 330.40

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 363.44


VAT 6% of Total 24.23
IT 4% of Total 16.15
Total: 403.83

Note : Rates of all items should be inclusive of all supply and carriage. Page: 87 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.06.5.1 40mmBC: Providing 40mm thick (minimum) compacted pre-mixed sqm


bituminous carpeting to be prepared using 25mm down graded crushed
stone chips (LAA value <= 35%) to comply the gradation as specified,
mixed with heated bitumen of 60/70 (Preferable) or 80/100 penetration
grade heated straight run bitumen satisfying the requirements of
ASTM/AASHTO. The bitumen and stone-chips shall be separately heated
to a temperature 140°C – 155°C and 150°C – 170°C respectively before
mixing. The mixing shall be done at temperature between 140°C –
160°C at a separate place away from the fire. The bitumen and stone-
chips mixture shall be laid uniformly in proper camber, grade and super-
elevation only on the prepared and accepted base or surface in a single
appropriate layer to give the specified compacted thickness. The
mixture should be rolled with appropriate Steel Drum Roller (3-5 tons) &
pneumatic multiple tire roller (8-10 tons) to full compaction. The rolling
temperature shall be maintained not below 90°C. including supplying of
all materials, their carriage, labourers, tools and equipment etc. all
complete as per direction of the E-I-C. The bitumen in the mix shall be
@4.5% to 5.5% by weight of total mix or as determined by job mix
design. (In order to achieve the specified grading a blending of nominal
maximum size of 25mm, 12mm, 6mm crushed stone chips and stone
dust is suggested and proportion will have to determine by the
laboratory analysis)
Stone Chips (25mm down graded) [LAA≤35] 0.0135 cum 4920.00 66.42
Stone Chips (12mm down graded) [LAA≤35] 0.0162 cum 4320.00 69.98
Stone Chips (6mm down graded) [LAA≤35] 0.0162 cum 3690.00 59.78
Stone Dust (2.38mm down) 0.0081 cum 1500.00 12.15
Bitumen [Grade 80/100] 3.6816 kg 49.00 180.40
Fire wood 3.6816 kg 7.75 28.53
Mason 0.0028 day 550.00 1.54
Skilled Labour 0.0170 day 450.00 7.65
Ordinary Labour 0.0700 day 370.00 25.90
H.C. of Pneumatic Multiple Tired Roller (7 tires, 8-10 tons) 0.0016 day 3000.00 4.80
H.C. of Vibratory (Ride On) Roller 2 Steel Drum Compactor (3- 0.0016 day 3000.00 4.80
5 tons)

Note : Rates of all items should be inclusive of all supply and carriage. Page: 88 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Diesel 0.0270 liter 68.00 1.84


Lubricant 0.0027 liter 220.00 0.59

Subtotal-A: 464.38

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 473.67

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 521.04


VAT 6% of Total 34.74
IT 4% of Total 23.16
Total: 578.93

Note : Rates of all items should be inclusive of all supply and carriage. Page: 89 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.06.5.2 40mmDC: Providing 40mm thick (minimum) compacted pre-mixed sqm


bituminous surfacing - wearing course with 25mm down graded
crushed stone chips (LAA value <= 35%) complying with the specified
grading requirement of the relevant item of Road Design standards –
2005, water absorption not >2%, flakiness index not >35% mixed with
60/70 (Preferable) or 80/100 penetration grade heated straight run
bitumen satisfying the requirements of ASTM/AASHTO. The bitumen
and stone-chips shall be separately heated to a temperature 140oC –
155oC and 150oC – 170oC respectively before mixing. The mixing shall
be done at temperature between 140oC – 160oC at separate place
away from the fire. The bitumen and stone-chips mixture shall be laid
uniformly on the road surface in single appropriate layer to give
specified compacted thickness in proper camber, grade and super-
elevation. The mixture should be rolled at a temperature not below
90oC with appropriate Steel Drum Roller (3-5 tons) & pneumatic
multiple tire roller (8-10 tons) to full compaction, including supplying of
all materials, their carriage, labourers tools and equipment etc. all
complete as per the direction of the E-I-C. The bitumen in the mix shall
be @ 5.0% to 5.5% by weight of total mix or as determined by job mix
design. (In order to achieve the specified grading a blending of nominal
maximum size of 25mm, 12mm, 6mm crushed stone chips and stone
dust is suggested and proportion will have to determine by the
laboratory analysis)
Stone Chips (25mm down graded) [LAA≤35] 0.0140 cum 4920.00 68.88
Stone Chips (12mm down graded) [LAA≤35] 0.0140 cum 4320.00 60.48
Stone Chips (6mm down graded) [LAA≤35] 0.0140 cum 3690.00 51.66
Stone Dust (2.38mm down) 0.0140 cum 1500.00 21.00
Bitumen [Grade 80/100] 4.5312 kg 49.00 222.03
Fire wood 4.5312 kg 7.75 35.12
Mason 0.0028 day 550.00 1.54
Skilled Labour 0.0170 day 450.00 7.65
Ordinary Labour 0.0800 day 370.00 29.60
H.C. of Pneumatic Multiple Tired Roller (7 tires, 8-10 tons) 0.0016 day 3000.00 4.80
H.C. of Vibratory (Ride On) Roller 2 Steel Drum Compactor (3- 0.0016 day 3000.00 4.80

Note : Rates of all items should be inclusive of all supply and carriage. Page: 90 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5 tons)
Diesel 0.0280 liter 68.00 1.90
Lubricant 0.0028 liter 220.00 0.62

Subtotal-A: 510.08

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 520.28

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 572.30


VAT 6% of Total 38.15
IT 4% of Total 25.44
Total: 635.89

Note : Rates of all items should be inclusive of all supply and carriage. Page: 91 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.06.6 50mmBC: Providing 50mm thick (minimum) compacted pre-mixed sqm


bituminous carpeting to be prepared using 25mm down graded stone-
chips (LAA value <= 35%) of gradation as specified, mixed with heated
bitumen of 60/70 (Preferable) or 80/100 penetration grade heated
straight run bitumen satisfying the requirements of ASTM/AASHTO. The
bitumen and stone-chips shall be separately heated to a temperature
140°C – 155°C and 150°C – 170°C respectively before mixing. The
mixing shall be done at temperature between 140°C – 160°C at a
separate place away from the fire. The bitumen and stone-chips mixture
shall be laid uniformly in proper camber, grade and super-elevation only
on the prepared and accepted base or surface in a single appropriate
layer to give the specified compacted thickness. The mixture should be
rolled with appropriate Steel Drum Roller (3-5 tons) & pneumatic
multiple tire roller (8-10 tons) to full compaction. The rolling
temperature shall be maintained not below 90°C including supplying of
all materials, their carriage, labourers, tools and equipment etc. all
complete as per direction of the E-I-C. The bitumen in the mix shall be
@4.5% to 5.5% by weight of total mix or as determined by job mix
design. (In order to achieve the specified grading a blending of nominal
maximum size of 25mm, 12mm, 6mm crushed stone chips and stone
dust is suggested and proportion will have to determine by the
laboratory analysis).
Stone Chips (25mm down graded) [LAA≤35] 0.0203 cum 4920.00 99.88
Stone Chips (12mm down graded) [LAA≤35] 0.0169 cum 4320.00 73.01
Stone Chips (6mm down graded) [LAA≤35] 0.0169 cum 3690.00 62.36
Stone Dust (2.38mm down) 0.0135 cum 1500.00 20.25
Bitumen [Grade 80/100] 4.6020 kg 49.00 225.50
Fire wood 4.6020 kg 7.75 35.67
Mason 0.0033 day 550.00 1.82
Skilled Labour 0.0200 day 450.00 9.00
Ordinary Labour 0.1000 day 370.00 37.00
H.C. of Vibratory (Ride On) Roller 2 Steel Drum Compactor (3- 0.0020 day 3000.00 6.00
5 tons)
H.C. of Pneumatic Multiple Tired Roller (7 tires, 8-10 tons) 0.0020 day 3000.00 6.00

Note : Rates of all items should be inclusive of all supply and carriage. Page: 92 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Diesel 0.0320 liter 68.00 2.18


Lubricant 0.0032 liter 220.00 0.70

Subtotal-A: 579.35

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 590.94

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 650.03


VAT 6% of Total 43.34
IT 4% of Total 28.89
Total: 722.26

3.06.7 DCPM: Providing and Laying pre-mixed dense bituminous surfacing -


wearing course with hot mix plant using coarse aggregate, fine
aggregate, filler and bituminous binder as per design Job Mix Formula
conforming Marshall Method as per specification, LAA value of
aggregate should be <=35%, water absorption not >2%, flakiness
index not >35% mixed with (60/70 or 80/100) penetration grade
straight run bitumen satisfying the requirements of ASTM/AASHTO.
including screening, cleaning of chips and preparing a uniform and
quality mix in Hot Mix Plant and ensuring a homogenous mix, in which
all particles of the mineral aggregates are coated uniformly, carrying the
hot premixed materials by means of Dump/tipper truck, spreading the
mixed materials at specified laying temperature with a hydrostatic paver
finisher with sensor control to the required grade, level and alignment
over the prepared surface tamping and finishing the mix at specified
compacted thickness, maintaining specified camber, grade, super-
elevation and cross section, through rolling with appropriate Steel Drum
Roller & pneumatic multiple tire roller (8-10 tons) to full compaction, for
break down, inter - mediate and finished rolling to achieve the desired
density of at least 98% of that of Laboratory Marshall specimen,
hand packing and pinning to give an even surface, including cost of all
materials, their carriages, hire charges of Hot Mix Plant and all other
machines, equipments for construction and quality control as per
specification, fuels, lubricants and wages of operational staff etc. all
complete as per the direction of the E-I-C

Note : Rates of all items should be inclusive of all supply and carriage. Page: 93 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.06.7.1 [Bitumen Grade 80/100] cum


Stone Chips (16mm down graded) [LAA≤35] 0.3500 cum 4720.00 1652.00
Stone Chips (12mm down graded) [LAA≤35] 0.3500 cum 4320.00 1512.00
Stone Chips (6mm down graded) [LAA≤35] 0.3500 cum 3690.00 1291.50
Stone Dust (2.38mm down) 0.3500 cum 1500.00 525.00
Bitumen [Grade 80/100] 113.2800 kg 49.00 5550.72
Mason 0.1600 day 550.00 88.00
Skilled Labour 0.2500 day 450.00 112.50
Ordinary Labour 0.4000 day 370.00 148.00
H.C. of Pneumatic Multiple Tired Roller (7 tires, 8-10 tons) 0.0600 day 3000.00 180.00
H.C. of Vibratory (Ride On) Roller 2 Steel Drum Compactor (3- 0.0600 day 3000.00 180.00
5 tons)
Diesel 5.5000 liter 68.00 374.00
Lubricant 0.6000 liter 220.00 132.00
Foreman 0.0400 day 800.00 32.00
Asphalt Plant 0.0600 day 10000.00 600.00
AC Paver 0.0600 day 6000.00 360.00
H.C. of Dump Truck/ Tripping Trucks 0.1000 day 4500.00 450.00

Subtotal-A: 13187.72

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 13451.47

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 14796.62


VAT 6% of Total 986.44
IT 4% of Total 657.63
Total: 16440.69

Note : Rates of all items should be inclusive of all supply and carriage. Page: 94 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.06.7.2 [Bitumen Grade 60/70] cum


Stone Chips (16mm down graded) [LAA≤35] 0.3500 cum 4720.00 1652.00
Stone Chips (12mm down graded) [LAA≤35] 0.3500 cum 4320.00 1512.00
Stone Chips (6mm down graded) [LAA≤35] 0.3500 cum 3690.00 1291.50
Stone Dust (2.38mm down) 0.3500 cum 1500.00 525.00
Bitumen [Grade 60/70] 113.2800 kg 51.00 5777.28
Mason 0.1600 day 550.00 88.00
Skilled Labour 0.2500 day 450.00 112.50
Ordinary Labour 0.4000 day 370.00 148.00
H.C. of Pneumatic Multiple Tired Roller (7 tires, 8-10 tons) 0.0600 day 3000.00 180.00
H.C. of Vibratory (Ride On) Roller 2 Steel Drum Compactor (3- 0.0600 day 3000.00 180.00
5 tons)
Diesel 5.5000 liter 68.00 374.00
Lubricant 0.6000 liter 220.00 132.00
Foreman 0.0400 day 800.00 32.00
Asphalt Plant 0.0600 day 10000.00 600.00
AC Paver 0.0600 day 6000.00 360.00
H.C. of Dump Truck/ Tripping Trucks 0.1000 day 4500.00 450.00

Subtotal-A: 13414.28

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 13682.57

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 15050.82


VAT 6% of Total 1003.39
IT 4% of Total 668.93
Total: 16723.14

Note : Rates of all items should be inclusive of all supply and carriage. Page: 95 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.06.8 BMPM: Providing and Laying pre-mixed bituminous macadam with hot
mix plant using coarse aggregate, fine aggregate, filler and bituminous
binder as per design Job Mix Formula conforming Marshall Method as
per specification, LAA value of aggregate should be <=35%, water
absorption not >2%, flakiness index not >35% mixed with 60/70
penetration grade straight run bitumen satisfying the requirements of
ASTM/AASHTO. including screening, cleaning of chips and preparing
a uniform and quality mix in Hot Mix Plant and ensuring a homogenous
mix, in which all particles of the mineral aggregates are coated
uniformly, carrying the hot premixed materials by means of Dump/tipper
truck, spreading the mixed materials at specified laying temperature
with a hydrostatic paver finisher with sensor control to the required
grade, level and alignment over the prepared surface, tamping and
finishing the mix at specified compacted thickness, maintaining specified
camber, grade, super-elevation and cross section, through rolling with
appropriate Steel Drum Roller & pneumatic multiple tire roller (8-10
tons) to full compaction, for break down, inter - mediate and finished
rolling to achieve the desired density of at least 98% of that of
Laboratory Marshall specimen, hand packing and pinning to give an
even surface, including cost of all materials, their carriages, hire charges
of Hot Mix Plant and all other machines, equipments for construction
and quality control as per specification, fuels, lubricants and wages of
operational staff etc. all complete as per the direction of the E-I-C.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 96 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.06.8.1 A. For Grading -1, [Bitumen Grade 60/70] (25mm nominal size, 50- cum
75mm thick.)
Stone Chips (16mm down graded) [LAA≤35] 0.2025 cum 4720.00 955.80
Stone Chips (12mm down graded) [LAA≤35] 0.3375 cum 4320.00 1458.00
Stone Chips (6mm down graded) [LAA≤35] 0.3375 cum 3690.00 1245.38
Stone Dust (2.38mm down) 0.1350 cum 1500.00 202.50
Bitumen [Grade 60/70] 92.0400 kg 51.00 4694.04
Mason 0.1600 day 550.00 88.00
Skilled Labour 0.2500 day 450.00 112.50
Ordinary Labour 0.4000 day 370.00 148.00
H.C. of Pneumatic Multiple Tired Roller (7 tires, 8-10 tons) 0.0600 day 3000.00 180.00
H.C. of Vibratory (Ride On) Roller 2 Steel Drum Compactor (3- 0.0600 day 3000.00 180.00
5 tons)
Diesel 5.5000 liter 68.00 374.00
Lubricant 0.6000 liter 220.00 132.00
Foreman 0.0400 day 800.00 32.00
Asphalt Plant 0.0600 day 10000.00 600.00
AC Paver 0.0600 day 6000.00 360.00
H.C. of Dump Truck/ Tripping Trucks 0.1000 day 4500.00 450.00
Stone Chips (25mm down graded) [LAA≤35] 0.3375 cum 4920.00 1660.50

Subtotal-A: 12872.72

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 13130.17

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 14443.19


VAT 6% of Total 962.88
IT 4% of Total 641.92
Total: 16047.98

Note : Rates of all items should be inclusive of all supply and carriage. Page: 97 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.06.8.2 B. For Grading -2, [Bitumen Grade 60/70] (40mm nominal size, 75- cum
100mm thick.)
Stone Chips (20mm down graded) [LAA≤35] 0.2700 cum 4930.00 1331.10
Stone Chips (12mm down graded) [LAA≤35] 0.3375 cum 4320.00 1458.00
Stone Chips (6mm down graded) [LAA≤35] 0.3375 cum 3690.00 1245.38
Stone Dust (2.38mm down) 0.1350 cum 1500.00 202.50
Bitumen [Grade 60/70] 89.6800 kg 51.00 4573.68
Mason 0.1600 day 550.00 88.00
Skilled Labour 0.2500 day 450.00 112.50
Ordinary Labour 0.4000 day 370.00 148.00
H.C. of Pneumatic Multiple Tired Roller (7 tires, 8-10 tons) 0.0600 day 3000.00 180.00
H.C. of Vibratory (Ride On) Roller 2 Steel Drum Compactor (3- 0.0600 day 3000.00 180.00
5 tons)
Diesel 5.5000 liter 68.00 374.00
Lubricant 0.6000 liter 220.00 132.00
Foreman 0.0400 day 800.00 32.00
Asphalt Plant 0.0600 day 10000.00 600.00
AC Paver 0.0600 day 6000.00 360.00
H.C. of Dump Truck/ Tripping Trucks 0.1000 day 4500.00 450.00
Stone Chips (38mm down graded) [LAA≤35] 0.2700 cum 4850.00 1309.50

Subtotal-A: 12776.66

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 13032.19

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 14335.41


VAT 6% of Total 955.69
IT 4% of Total 637.13
Total: 15928.23

Note : Rates of all items should be inclusive of all supply and carriage. Page: 98 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.07.1 PS: Providing and laying polythene sheet (0.18mm thick) on prepared sqm
road surface underneath the cement concrete, etc. all complete as per
specifications and direction of the Engineering-in-Charge.
0.18mm thick polythene sheet 1.0000 m2 12.31 12.31
Ordinary Labour 0.0010 day 370.00 0.37

Subtotal-A: 12.68

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12.93

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 14.23


VAT 6% of Total 0.95
IT 4% of Total 0.63
Total: 15.81

Note : Rates of all items should be inclusive of all supply and carriage. Page: 99 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.07.2.1 RCC-17BCCM(RW): Providing and laying reinforced, dowel jointed, cum


cement concrete pavement over a prepared sub-base with picked brick
chips and minimum cement contents ralates to nominal mix ratio 1:2:4
and maximum water cement ratio 0.45 having minimum required
average strength f'cr = 24 MPa and satisfying specified minimum
compressive strength f'c = 17 MPa at 28 days on standard cylinders as
per standard practice of Code AASHTO/ ASTM and cement conforming
to BDS EN 197-1 : 2003 CEM-II/A-M 42.5N, best quality sand [50%
quantity of medium sand (FM. 1.2) and 50% quantity of coarse sand of
equivalent FM = 2.2] and 25mm down well graded picked brick chips
(LAA value & maximum water absorption not exceeding 38 & 15%
respectively) conforming ASTM C-33 including breaking chips and
screening, making, placing steel shutter in position and maintaining true
to the alignment, making shutter water-tight properly, placing
reinforcement in position, mixing in a batching and mixing plant as per
approved mix design unless other wise approved by the Engineer,
transported to site, laid with a fixed form, compacting by vibrator
machine and finished in a continuous operation including provision of
contraction, expansion and longitudinal joints, joint filler, joint sealant,
debonding strip, dowel bar, tie rod, admixtures as approved, curing for
28 days, finishing to lines and grades, removing centering-shuttering
after specified time approved, as per drawing complete, etc. all
complete approved and accepted by the E-I-C. Additional quantity of
cement to be added if required to attain the strength at the contractors
own cost. (Rate is excluding the cost of all reinforcement and its
fabrication, admixtures and joint sealant, etc.)
25mm down graded Brick Chips 0.8570 cum 2895.00 2481.02
Sand (FM - 2.5) 0.4290 m3 1500.00 643.50
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0480 bag 430.00 2600.64
Head Mason 0.0800 day 650.00 52.00
Mason 0.3500 day 550.00 192.50
Skilled Labour 0.4000 day 450.00 180.00
Ordinary Labour 1.5000 day 370.00 555.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Note : Rates of all items should be inclusive of all supply and carriage. Page: 100 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Subtotal-A: 6800.66
Form Work: ( +.75 % on Subtotal-A ) 51.00
Subtotal-A1: 6851.66

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 6988.69

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 7687.56


VAT 6% of Total 512.50
IT 4% of Total 341.67
Total: 8541.74

Note : Rates of all items should be inclusive of all supply and carriage. Page: 101 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.07.2.2 RCC-20BCCM(RW): Providing and laying reinforced, cement concrete cum


pavement over a prepared sub-base with picked brick chips and
minimum cement content relates to mix ratio 1:1.5:3 and maximum
water cement ratio 0.4 having minimum required average strength, f'cr
= 28.5 Mpa and satisfying a compressive strength f'c = 20 Mpa at 28
days on standard cylinders as per standard practice of Code AASHTO/
ASTM and cement conforming to BDS EN 197-1 : 2003 CEM-II/A-M
42.5N, with best quality coarse sand (FM. 2.2) and 25mm down well
graded picked brick chips (LAA value & maximum water absorption not
exceeding 38 & 15% respectively) conforming ASTM C-33 including
breaking chips and screening, making, placing steel shutter in position
and maintaining true to the alignment, making shutter water-tight
properly, placing reinforcement in position, mixing in a batching and
mixing plant as per approved mix design unless other wise approved by
the Engineer, transported to site, laid with a fixed form, compacting by
vibrator machine and finished in a continuous operation including
provision of contraction, expansion and longitudinal joints, joint filler,
joint sealant, de-bonding strip, dowel bar, tie rod, admixtures as
approved, curing for 28 days, finishing to lines and grades, removing
centering-shuttering after specified time approved, as per drawing
complete, etc. all complete approved and accepted by the E-I-C.
Additional quantity of cement to be added if required to attain the
specified strength at the contractors own cost. (Rate is excluding the
cost of all reinforcement and its fabrication, admixtures and joint
sealant, etc.)
25mm down graded Brick Chips 0.8180 cum 2895.00 2368.11
Sand (FM - 2.5) 0.2460 m3 1500.00 369.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.6970 bag 430.00 3309.71
Head Mason 0.0800 day 650.00 52.00
Mason 0.3500 day 550.00 192.50
Skilled Labour 0.4000 day 450.00 180.00
Ordinary Labour 1.5000 day 370.00 555.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Sand (FM - 1.8) 0.1640 m3 970.00 159.08
Note : Rates of all items should be inclusive of all supply and carriage. Page: 102 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Subtotal-A: 7281.40
Form Work: ( +.75 % on Subtotal-A ) 54.61
Subtotal-A1: 7336.01

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 7482.73

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 8231.00


VAT 6% of Total 548.73
IT 4% of Total 365.82
Total: 9145.56

Note : Rates of all items should be inclusive of all supply and carriage. Page: 103 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.07.3.1 RCC-20SCBP(RW): Providing and laying reinforced, cement concrete cum


pavement over a prepared sub-base with crushed stone chips and
minimum cement content relates to mix ratio 1:2:4 and maximum water
cement ratio 0.4 having minimum required average strength, f'cr = 28.5
Mpa and satisfying a compressive strength f'c = 20 Mpa at 28 days on
standard cylinders as per standard practice of Code AASHTO/ ASTM and
cement conforming to BDS EN 197-1 : 2003 CEM-II/A-M 42.5N, high
range water reducing admixture of complying type A or F under ASTM C
494 (Doses of admixture to be fixed by the mix design), best quality
coarse sand [FM: 2.2] and 25mm down well graded crushed stone chips
(Preferably stone chips from Madhyapara, Dinajpur), (LAA value not
exceeding 35) conforming ASTM C-33 including breaking chips and
screening, making, placing steel shutter in position and maintaining true
to the alignment, making shutter water-tight properly, placing
reinforcement in position, mixing in a batching and mixing plant as per
approved mix design unless other wise approved by the Engineer,
transported to site, laid with a fixed form, compacting by vibrator
machine and finished in a continuous operation including provision of
contraction, expansion and longitudinal joints, joint filler, joint sealant,
debonding strip, dowel bar, tie rod, admixtures as approved, curing for
28 days, finishing to lines and grades, removing centering-shuttering
after specified time approved, as per drawing complete, etc. all
complete approved and accepted by the E-I-C. Additional quantity of
cement to be added if required to attain the specified strength at the
contractors own cost. (Rate is excluding the cost of all reinforcement
and its fabrication, admixtures and joint sealant, etc.)
Stone Chips (25mm down graded) [LAA≤35] 0.5160 cum 4920.00 2538.72
Stone Chips (12mm down graded) [LAA≤35] 0.3440 cum 4320.00 1486.08
Sand (FM - 2.5) 0.2460 m3 1500.00 369.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0480 bag 430.00 2600.64
Head Mason 0.0800 day 650.00 52.00
Mason 0.3500 day 550.00 192.50
Skilled Labour 0.4000 day 450.00 180.00
Ordinary Labour 1.5000 day 370.00 555.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0083 day 23000.00 190.90

Note : Rates of all items should be inclusive of all supply and carriage. Page: 104 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

cum/hour
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
H.C. of Backhoe End Loader (6 tons) 0.0083 day 6000.00 49.80
Hire and running charges of Concrete Pump (30 & 45 cum 0.0083 day 5000.00 41.50
capacity)
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Diesel 0.7000 liter 68.00 47.60
Sand (FM - 1.8) 0.1640 m3 970.00 159.08

Subtotal-A: 8686.82
Form Work: ( +.75 % on Subtotal-A ) 65.15
Subtotal-A1: 8751.97

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 8927.01

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 9819.71


VAT 6% of Total 654.65
IT 4% of Total 436.43
Total: 10910.79

Note : Rates of all items should be inclusive of all supply and carriage. Page: 105 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.07.3.2 RCC-25SCBP(RW): Providing and laying reinforced, cement concrete cum


pavement over a prepared sub-base with crushed stone chips and
minimum cement content relates to mix ratio 1:1.5:3 and maximum
water cement ratio 0.4 having minimum required average strength, f'cr
= 33.5 Mpa and satisfying a compressive strength f'c = 25 Mpa at 28
days on standard cylinders as per standard practice of Code AASHTO/
ASTM and cement conforming to BDS EN 197-1 : 2003 CEM-II/A-M
42.5N, high range water reducing admixture of complying type A or F
under ASTM C 494 (Doses of admixture to be fixed by the mix design),
best quality coarse sand of equivalent FM = 2.5 and 25mm down well
graded crushed stone chips (Preferably stone chips from Madhyapara,
Dinajpur), (LAA value not exceeding 30) conforming ASTM C-33
including breaking chips and screening, making, placing steel shutter in
position and maintaining true to the alignment, making shutter water-
tight properly, placing reinforcement in position, mixing in a batching
and mixing plant as per approved mix design unless other wise
approved by the Engineer, transported to site, laid with a fixed form,
compacting by vibrator machine and finished in a continuous operation
including provision of contraction, expansion and longitudinal joints,
joint filler, joint sealant, debonding strip, dowel bar, tie rod, admixtures
as approved, curing for 28 days, finishing to lines and grades, removing
centering-shuttering after specified time approved, as per drawing
complete, etc. all complete approved and accepted by the E-I-C.
Additional quantity of cement to be added if required to attain the
specified strength at the contractors own cost. (Rate is excluding the
cost of all reinforcement and its fabrication, admixtures and joint
sealant, etc.)
Stone Chips (25mm down graded)[LAA≤30] 0.4910 cum 5220.00 2563.02
Stone Chips (12mm down graded) [LAA≤30] 0.3270 m3 4470.00 1461.69
Sand (FM - 2.5) 0.4290 m3 1500.00 643.50
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.6970 bag 430.00 3309.71
Head Mason 0.0800 day 650.00 52.00
Mason 0.3500 day 550.00 192.50
Skilled Labour 0.4000 day 450.00 180.00
Ordinary Labour 1.5000 day 370.00 555.00

Note : Rates of all items should be inclusive of all supply and carriage. Page: 106 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Hire and running charges of Batching and Mixing Plant @ 20 0.0083 day 23000.00 190.90
cum/hour
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
H.C. of Backhoe End Loader (6 tons) 0.0083 day 6000.00 49.80
Hire and running charges of Concrete Pump (30 & 45 cum 0.0083 day 5000.00 41.50
capacity)
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Diesel 0.7000 liter 68.00 47.60

Subtotal-A: 9511.22
Form Work: ( +.75 % on Subtotal-A ) 71.33
Subtotal-A1: 9582.55

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9774.21

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 10751.63


VAT 6% of Total 716.78
IT 4% of Total 477.85
Total: 11946.25

Note : Rates of all items should be inclusive of all supply and carriage. Page: 107 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.07.3.3 RCC-30SCBP(RW): Providing and laying reinforced, dowel jointed, cum


cement concrete pavement over a prepared base/sub-base with
minimum cement content and maximum water cement ratio as specified
by the laboratory through mix design having minimum required average
compressive strength, f'cr = 38.5 MPa and satisfying a specified
compressive strength, f'c = 30 MPa at 28 days on standard cylinder as
per standard practice of Code AASHTO/ ASTM and cement conforming
to BDS EN 197-1 : 2003 CEM-I 52.5N / ASTM C150 Type-1, high range
water reducing admixture of complying type F/ G under ASTM C-494
(Doses of admixture to be fixed by the mix design) for smart dynamic
concrete (i.e. Low fines self-compacting concrete), sand of minimum FM
2.50 and 20mm down well graded crushed stone chips broken from
boulders (Preferably stone chips from Madhyapara, Dinajpur, LAA value
not exceeding 30) conforming to ASTM C-33 including breaking chips,
screening through proper sieves, cleaning, placing steel shutter in
position and maintaining true to the alignment, making shutter water-
tight properly, placing reinforcement in position, mixing in a batching
and mixing in mechanized batch mix plant, transported to site, laid with
a fixed form (pumping using line pump or boom placer), maintaining
allowable slump of 75mm to 100mm, casting in forms, compacting by
mechanical vibrator machine and finished in a continuous operation
including provision of contraction, expansion and longitudinal joints,
joint filler, joint sealant, debonding strip, dowel bar, tie rod, admixtures
as approved, curing for 28 days, finishing to lines and grades, removing
centering-shuttering after specified time approved, other incidental
charges, etc. all complete as per drawing, specification & direction of
the E-I-C. The cost of reinforcement and its fabrication, placing, binding
and, dowel bar and joint sealant etc. is not included but the cost of
admixture is included in this unit rate. Additional quantity of cement to
be added if required to attain the required strength at the contractors
own cost. The Mix Design has to be approved by the Central Quality
Control Laboratory (CQCL), LGED or any other reputed laboratory
approved by the competent authority before execution of the work.
Stone Chips (25mm down graded)[LAA≤30] 0.3711 cum 5220.00 1937.14
Stone Chips (12mm down graded) [LAA≤30] 0.3711 m3 4470.00 1658.82
Sand (FM - 2.5) 0.4485 m3 1500.00 672.75
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 8.7000 bag 430.00 3741.00

Note : Rates of all items should be inclusive of all supply and carriage. Page: 108 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Head Mason 0.0800 day 650.00 52.00


Mason 0.3500 day 550.00 192.50
Skilled Labour 0.5000 day 450.00 225.00
Ordinary Labour 1.5000 day 370.00 555.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0083 day 23000.00 190.90
cum/hour
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
H.C. of Backhoe End Loader (6 tons) 0.0083 day 6000.00 49.80
Hire and running charges of Concrete Pump (30 & 45 cum 0.0083 day 5000.00 41.50
capacity)
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Diesel 0.7000 liter 68.00 47.60

Subtotal-A: 9588.01
Cost of Form Works/Shuttering, Prop/necessary ( +.75 % on Subtotal-A ) 71.91
supports, etc.
Subtotal-A1: 9659.92

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9853.12

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 10838.43


VAT 6% of Total 722.56
IT 4% of Total 481.71
Total: 12042.70

Note : Rates of all items should be inclusive of all supply and carriage. Page: 109 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.07.4 KS(RW): Manufacturing, Supplying and Fixing of cement concrete kerb m


stone with top and bottom thickness 120mm and 150mm respectively,
width 380mm and height 550mm as per approved drawing for side of
footpath/median/road island etc. using steel shutter, with 6mm
downgraded Stone Chips of LAA value ≤35%, sand (FM>=2.2) and
minimum cement conforming to BDS EN 197-1 : 2003 CEM-II/A-M
42.5N content relates to mix ratio 1:2:4 satisfying specified minimum
required average strength, f'cr = 28.5 MPa and satisfying a compressive
strength f'c = 20 MPa at 28 days on standard cylinders, including
grading, washings stone chips, mixing in standard mixture machine,
casting in forms, making shutter water-tight properly, compacting by
vibrator machine and curing for at least 28 days, including preparation
kerb foundation, true to level, maintaining alignment and height,
including carrying and placing kerb stone, filling interstices of kerb stone
tightly with cement mortar (1:4), raking out joints, cleaning and soaking
kerb stone at least for 24 hours before use, curing for requisite period,
etc. all complete as per drawing and direction of the E-I-C.
Stone Chips (6mm down graded) [LAA≤35] 0.0643 cum 3690.00 237.27
Sand (FM - 2.5) 0.0210 m3 1500.00 31.50
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.4740 bag 430.00 203.82
Head Mason 0.0010 day 650.00 0.65
Mason 0.0120 day 550.00 6.60
Skilled Labour 0.1100 day 450.00 49.50
Ordinary Labour 0.4000 day 370.00 148.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0054 day 1200.00 6.48
Hire and running charges of Concrete Vibrator 0.0054 day 400.00 2.16
Sand (FM - 1.8) 0.0140 m3 970.00 13.58

Subtotal-A: 699.56
Form Work: ( +2.50 % on Subtotal-A ) 17.49
Subtotal-A1: 717.05

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 731.39

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 804.53

Note : Rates of all items should be inclusive of all supply and carriage. Page: 110 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

VAT 6% of Total 53.64


IT 4% of Total 35.76
Total: 893.92

3.07.5 Admixture: Supplying and mixing specified type chemical admixture


delivered from an authorized local agent or manufacturer, comply with
the ASTM C 494 requirements, confirming the current compliance of the
admixture to specification requirements like physical properties,
unifomity and equivalence in composition etc., performance (water
content, fresh concrete setting time and compressive strength)
requirements, delivered in sealed water-tight containers having and
confirming plainly marked the proprietary name of the admixture, type
under this specification, net weight or volume, manufacturing and expiry
date, non aggressiveness to environment, aggregates and metals in
concrete etc. and mixing the admixture in non prestressed cement
concrete mixture in the field under the strict accordance with
manufacturers recommendation and instruction, providing safety
provisions in all respects etc. all complete as per instruction and
approved by the E-I-C. Dose (quantity in milliliters per 50 kg bag
cement) and brand/origin/manufacturer with respect to particular brand
of cement and particular stock of aggregates and method of use to be
determined by mix design/ trial mix at the cost borne by the Contractor
and shall be carried out prior to start the work.
Note: The minimum cement specified shall not be reduced on account
of the use of admixtures. Use of admixture (Type/Brand/Dosages, etc.)
is subject to prior approval of The Engineer supported by appropriate
test report from designated Material Testing Laboratory like
BUET/CQCL, LGED or equivalent.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 111 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.07.5.01 WRCA(T-A): Water Reducing Chemical Admixture in concrete, complying litre


to ASTM C 494 Type - A of approved brand/ origin/ manufacturer and
supplied by only manufacturer's authorised dealer with certificate of
origin. An admixture that reduces quantity of mixing water required to
produce concrete of a given consistency.
Water reducing chemical admixture : Type-A 1.0000 liter 130.00 130.00

Subtotal-A: 130.00
Carriage, safe storage, mixing & sundries etc. ( +4.00 % on Subtotal-A ) 5.20
Subtotal-A1: 135.20

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 137.90

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 151.69


VAT 6% of Total 10.11
IT 4% of Total 6.74
Total: 168.55

Note : Rates of all items should be inclusive of all supply and carriage. Page: 112 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.07.5.02 RCA(T-B): Retarding Chemical Admixture in concrete, complying to litre


ASTM C 494 Type B of approved brand/origin/ manufacturer and
supplied by only manufacturer's authorised dealer with certificate of
origin. An admixture that retards the setting of concrete, there by
reducing shrinkage in concrete specially for concrete laid in thick layers
and intended delayed construction for improved construction joints,
reconcreting etc.
Retrading chemical admixture : Type-B 1.0000 liter 125.00 125.00

Subtotal-A: 125.00
Carriage, safe storage, mixing & sundries etc. ( +4.00 % on Subtotal-A ) 5.00
Subtotal-A1: 130.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 132.60

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 145.86


VAT 6% of Total 9.72
IT 4% of Total 6.48
Total: 162.07

Note : Rates of all items should be inclusive of all supply and carriage. Page: 113 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.07.5.03 ACA(T-C): Accelerating Chemical Admixture in concrete, complying to litre


ASTM C 494 Type C of approved brand/origin/ manufacturer and
supplied by only manufacturer's authorised dealer with certificate of
origin. An admixture that accelerates the setting time and early strength
developmnet of concrete.
Accelerating chemical admixture : Type-C 1.0000 liter 135.00 135.00

Subtotal-A: 135.00
Carriage, safe storage, mixing & sundries etc. ( +4.00 % on Subtotal-A ) 5.40
Subtotal-A1: 140.40

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 143.21

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 157.53


VAT 6% of Total 10.50
IT 4% of Total 7.00
Total: 175.03

Note : Rates of all items should be inclusive of all supply and carriage. Page: 114 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.07.5.04 WRRCA(T-D): Water-Reducing and Retarding Chemical Admixture in litre


concrete, complying to ASTM C 494 Type D of approved brand/ origin/
manufacturer and supplied by only manufacturer's authorised dealer
with certificate of origin. An admixture that reduces the quantity of
mixing water required to produce concrete of a given consistency i.e.
low w/c ratio and retards the setting of concrete specially for layerd,
thick laid concrete etc.
Water-reducing and retrading chemical admixture : Type-D 1.0000 liter 125.00 125.00

Subtotal-A: 125.00
Carriage, safe storage, mixing & sundries etc. ( +4.00 % on Subtotal-A ) 5.00
Subtotal-A1: 130.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 132.60

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 145.86


VAT 6% of Total 9.72
IT 4% of Total 6.48
Total: 162.07

Note : Rates of all items should be inclusive of all supply and carriage. Page: 115 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.07.5.05 WRACA(T-E): Water-Reducing and Accelerating Chemical Admixture in litre


concrete, complying ASTM C 494 Type E of approved brand/origin/
manufacturer and supplied by only manufacturer's authorised dealer
with certificate of origin. An admixture that reduces the quantity of
mixing water required to produce concrete of a given consistency i.e.
low w/c ratio and accelerates setting and early strength development of
concrete.
Water-reducing and accelerating chemical admixture : Type-E 1.0000 liter 135.00 135.00

Subtotal-A: 135.00
Carriage, safe storage, mixing & sundries etc. ( +4.00 % on Subtotal-A ) 5.40
Subtotal-A1: 140.40

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 143.21

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 157.53


VAT 6% of Total 10.50
IT 4% of Total 7.00
Total: 175.03

Note : Rates of all items should be inclusive of all supply and carriage. Page: 116 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.07.5.06 WRACA(T-F): Supply and use of water-reducing high range chemical litre
admixture in concrete, complying to ASTM C 494 Type F of approved
brand/origin/ manufacturer and supplied by only manufacturer's
authorised dealer with certificate of origin. An admixture that reduces
the quantity of mixing water required to produce concrete of a given
consistency by 12 or greater (flowing concrete) and for higher strength
of concrete
Water-reducing high range chemical admixture : Type-F 1.0000 liter 160.00 160.00

Subtotal-A: 160.00
Carriage, safe storage, mixing & sundries etc. ( +4.00 % on Subtotal-A ) 6.40
Subtotal-A1: 166.40

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 169.73

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 186.70


VAT 6% of Total 12.45
IT 4% of Total 8.30
Total: 207.45

Note : Rates of all items should be inclusive of all supply and carriage. Page: 117 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.07.5.07 WRACA(T-G): Supply and use of water-reducing high range and litre
retarding chemical admixture in concrete, complying to ASTM C 494
Type G of approved brand/ origin/ manufacturer and supplied by only
manufacturer's authorised dealer with certificate of origin. An admixture
that reduces the quantity of mixing water required to produce concrete
of a given consistency by 12% or greater (flowing concrete) and retards
setting of concrete.
Water-reducing high range and retrading chemical admixture 1.0000 liter 160.00 160.00
: Type-G

Subtotal-A: 160.00
Carriage, safe storage, mixing & sundries etc. ( +4.00 % on Subtotal-A ) 6.40
Subtotal-A1: 166.40

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 169.73

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 186.70


VAT 6% of Total 12.45
IT 4% of Total 8.30
Total: 207.45

3.08.1.1 PiBFS: Labour charge for picking up the existing brick flat (BFS) soling sqm
and staking the materials at a specified distance, etc. all complete as
per direction of the E-I-C.
Ordinary Labour 0.0330 day 370.00 12.21

Subtotal-A: 12.21

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12.45

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 13.70


VAT 6% of Total 0.91
IT 4% of Total 0.61
Total: 15.22

Note : Rates of all items should be inclusive of all supply and carriage. Page: 118 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.08.1.2 PiHBB: Labour charge for picking up the existing HBB and staking the sqm
materials at a specified distance, etc. all complete as per direction of the
E-I-C.
Ordinary Labour 0.0500 day 370.00 18.50

Subtotal-A: 18.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 18.87

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 20.76


VAT 6% of Total 1.38
IT 4% of Total 0.92
Total: 23.06

3.08.2.1 ReBFS(FM-0.50): Labour charge for Resetting of Single layer brick flat sqm
soling (BFS) with 1st class or picked bricks, true to level, maintaining
camber/super elevation and grade including carrying bricks, supplying
and filling the interstices tightly with sand of minimum FM 0.50, etc. all
complete as per direction of the E-I-C.
Sand (FM - 0.5) 0.0120 m3 420.00 5.04
Mason 0.0100 day 550.00 5.50
Ordinary Labour 0.0500 day 370.00 18.50

Subtotal-A: 29.04

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 29.62

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 32.58


VAT 6% of Total 2.17
IT 4% of Total 1.45
Total: 36.20

Note : Rates of all items should be inclusive of all supply and carriage. Page: 119 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.08.2.2 ReBFS(FM-0.80): Labour charge for Resetting of Single layer brick flat sqm
soling (BFS) with 1st class or picked bricks, true to level, maintaining
camber/super elevation and grade including carrying bricks, supplying
and filling the interstices tightly with sand of minimum FM 0.80, etc. all
complete as per direction of the E-I-C.
Sand (FM - 0.8) 0.0120 m3 480.00 5.76
Mason 0.0100 day 550.00 5.50
Ordinary Labour 0.0500 day 370.00 18.50

Subtotal-A: 29.76

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 30.36

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 33.39


VAT 6% of Total 2.23
IT 4% of Total 1.48
Total: 37.10

Note : Rates of all items should be inclusive of all supply and carriage. Page: 120 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.08.2.3 ReBFS(FM<0.50): Labour charge for Resetting of Single layer brick flat sqm
soling (BFS) with 1st class or picked bricks, true to level, maintaining
camber/super elevation and grade including carrying bricks, supplying
and filling the interstices tightly with locally available sand (passing
<=15% through #200 sieve), etc. all complete as per direction of the E-
I-C.
Local Sand (Sieve # 200 passing not more than 15%) 0.0120 m3 350.00 4.20
Mason 0.0100 day 550.00 5.50
Ordinary Labour 0.0500 day 370.00 18.50

Subtotal-A: 28.20

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 28.76

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 31.64


VAT 6% of Total 2.11
IT 4% of Total 1.41
Total: 35.16

Note : Rates of all items should be inclusive of all supply and carriage. Page: 121 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.08.3.1 ReHBB(FM-0.50): Labour charge for Resetting of Brick on edge sqm


pavement in single layer of Herring Bone Bond (HBB) with 1st class or
picked bricks true to level, maintaining camber, super elevation and
grade over 25mm thick sand (minimum FM 0.50) cushion including
filling the interstices tightly with same type of sand, etc. including
supplying sand all complete as per direction of the E-I-C.
Sand (FM - 0.5) 0.0280 m3 420.00 11.76
Mason 0.0300 day 550.00 16.50
Ordinary Labour 0.0850 day 370.00 31.45

Subtotal-A: 59.71

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 60.90

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 66.99


VAT 6% of Total 4.47
IT 4% of Total 2.98
Total: 74.44

Note : Rates of all items should be inclusive of all supply and carriage. Page: 122 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.08.3.2 ReHBB(FM-0.80): Labour charge for Resetting of Brick on edge sqm


pavement in single layer of Herring Bone Bond (HBB) with 1st class or
picked bricks true to level, maintaining camber, super elevation and
grade over 25mm thick sand (minimum FM 0.80) cushion including
filling the interstices tightly with same type of sand, etc. including
supplying sand all complete as per direction of the E-I-C.
Sand (FM - 0.8) 0.0280 m3 480.00 13.44
Mason 0.0300 day 550.00 16.50
Ordinary Labour 0.0850 day 370.00 31.45

Subtotal-A: 61.39

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 62.62

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 68.88


VAT 6% of Total 4.59
IT 4% of Total 3.06
Total: 76.53

Note : Rates of all items should be inclusive of all supply and carriage. Page: 123 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.08.3.3 ReHBB(FM<0.50): Labour charge for Resetting of Brick on edge sqm


pavement in single layer of Herring Bone Bond (HBB) with 1st class or
picked bricks true to level, maintaining camber, super elevation and
grade over 25mm thick locally available sand (passing<=15% through
#200 sieve) cushion including filling the interstices tightly with same
type of sand, etc. including supplying sand all complete as per direction
of the E-I-C.
Local Sand (Sieve # 200 passing not more than 15%) 0.0280 m3 350.00 9.80
Mason 0.0300 day 550.00 16.50
Ordinary Labour 0.0850 day 370.00 31.45

Subtotal-A: 57.75

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 58.91

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 64.80


VAT 6% of Total 4.32
IT 4% of Total 2.88
Total: 72.00

Note : Rates of all items should be inclusive of all supply and carriage. Page: 124 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.08.4.1 SBFS(FM-0.50): Providing Single layer brick flat soling (BFS) with 1st sqm
class or picked bricks, true to level, maintaining camber/super elevation
and grade including carrying bricks, filling the interstices tightly with
sand of minimum FM 0.50, etc. all complete in all respect as per
approved drawing, specification and direction of the Engineer-in-charge.
1st Class Brick 31.0000 each 9.00 279.00
Sand (FM - 0.5) 0.0120 m3 420.00 5.04
Mason 0.0100 day 550.00 5.50
Ordinary Labour 0.0500 day 370.00 18.50

Subtotal-A: 308.04

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 314.20

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 345.62


VAT 6% of Total 23.04
IT 4% of Total 15.36
Total: 384.02

Note : Rates of all items should be inclusive of all supply and carriage. Page: 125 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.08.4.2 SBFS(FM-0.80): Providing Single layer brick flat soling (BFS) with 1st sqm
class or picked bricks, true to level, maintaining camber/super elevation
and grade including carrying bricks, filling the interstices tightly with
sand of minimum FM 0.80, etc. all complete in all respect as per
approved drawing, specification and direction of the Engineer-in-charge.
1st Class Brick 31.0000 each 9.00 279.00
Sand (FM - 0.8) 0.0120 m3 480.00 5.76
Mason 0.0100 day 550.00 5.50
Ordinary Labour 0.0500 day 370.00 18.50

Subtotal-A: 308.76

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 314.94

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 346.43


VAT 6% of Total 23.10
IT 4% of Total 15.40
Total: 384.92

Note : Rates of all items should be inclusive of all supply and carriage. Page: 126 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.08.4.3 SBFS(FM<0.50): Providing Single layer brick flat soling (BFS) with 1st sqm
class or picked bricks, true to level, maintaining camber/super elevation
and grade including carrying bricks, filling the interstices tightly with
locally available sand (passing <=15% through#200 sieve), etc. all
complete in all respect as per approved drawing, specification and
direction of the Engineer-in-charge.
1st Class Brick 31.0000 each 9.00 279.00
Local Sand (Sieve # 200 passing not more than 15%) 0.0120 m3 350.00 4.20
Mason 0.0100 day 550.00 5.50
Ordinary Labour 0.0500 day 370.00 18.50

Subtotal-A: 307.20

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 313.34

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 344.68


VAT 6% of Total 22.98
IT 4% of Total 15.32
Total: 382.98

Note : Rates of all items should be inclusive of all supply and carriage. Page: 127 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.08.5.1 SHBB(FM-0.50): Providing Brick on edge pavement in single layer of sqm


Herring Bone Bond (HBB) with 1st class or picked bricks true to level,
maintaining camber, super elevation and grade, including supplying and
laying 25mm thick sand (FM 0.50) cushion over the BFS, filling the
interstices tightly with same type of sand, etc. all complete in all respect
as per approved drawing, specification and direction of the Engineer-in-
charge.
1st Class Brick 52.0000 each 9.00 468.00
Sand (FM - 0.5) 0.0280 m3 420.00 11.76
Mason 0.0300 day 550.00 16.50
Ordinary Labour 0.0850 day 370.00 31.45

Subtotal-A: 527.71

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 538.26

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 592.09


VAT 6% of Total 39.47
IT 4% of Total 26.32
Total: 657.88

Note : Rates of all items should be inclusive of all supply and carriage. Page: 128 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.08.5.2 SHBB(FM-0.80): Providing Brick on edge pavement in single layer of sqm


Herring Bone Bond (HBB) with 1st class or picked bricks true to level,
maintaining camber, super elevation and grade, including supplying and
laying 25mm thick sand (FM 0.80) cushion over the BFS, filling the
interstices tightly with same type of sand, etc. all complete in all respect
as per approved drawing, specification and direction of the Engineer-in-
charge.
1st Class Brick 52.0000 each 9.00 468.00
Sand (FM - 0.8) 0.0280 m3 480.00 13.44
Mason 0.0300 day 550.00 16.50
Ordinary Labour 0.0850 day 370.00 31.45

Subtotal-A: 529.39

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 539.98

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 593.98


VAT 6% of Total 39.60
IT 4% of Total 26.40
Total: 659.97

Note : Rates of all items should be inclusive of all supply and carriage. Page: 129 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.08.5.3 SHBB(FM<0.50): Providing Brick on edge pavement in single layer of sqm


Herring Bone Bond (HBB) with 1st class or picked bricks true to level,
maintaining camber, super elevation and grade, including supplying and
laying 25mm thick sand (passing<=15% through #200 sieve) cushion
over the BFS, filling the interstices tightly with same type of sand, etc.
all complete in all respect as per approved drawing, specification and
direction of the Engineer-in-charge.
1st Class Brick 52.0000 each 9.00 468.00
Local Sand (Sieve # 200 passing not more than 15%) 0.0280 m3 350.00 9.80
Mason 0.0300 day 550.00 16.50
Ordinary Labour 0.0850 day 370.00 31.45

Subtotal-A: 525.75

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 536.27

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 589.89


VAT 6% of Total 39.33
IT 4% of Total 26.22
Total: 655.44

3.09.1.1 PiCCB: Labour charge for picking up the existing CC Block m


(375mmX100mmX225mm) on End Edging, including staking the
materials at a specified distance, etc. all complete as per direction of the
E-I-C.
Ordinary Labour 0.0670 day 370.00 24.79

Subtotal-A: 24.79

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 25.29

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 27.81


VAT 6% of Total 1.85
IT 4% of Total 1.24
Total: 30.90

Note : Rates of all items should be inclusive of all supply and carriage. Page: 130 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.09.1.2 PiCCB: Labour charge for picking up the existing CC Block m


L:1000mmXH:500mmXW:(100mm+150mm)] on End Edging, including
staking the materials at a specified distance, etc. all complete as per
direction of the E-I-C.
Ordinary Labour 0.2000 day 370.00 74.00

Subtotal-A: 74.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 75.48

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 83.03


VAT 6% of Total 5.54
IT 4% of Total 3.69
Total: 92.25

3.09.2 PiCCB(cum): Labour charge for picking up the existing CC Block of any cum
sizes on soling or slope of embankment, including staking the materials
at a specified distance, etc. all complete as per direction of the E-I-C.
Ordinary Labour 0.6700 day 370.00 247.90

Subtotal-A: 247.90

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 252.86

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 278.14


VAT 6% of Total 18.54
IT 4% of Total 12.36
Total: 309.05

Note : Rates of all items should be inclusive of all supply and carriage. Page: 131 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.09.3.1 ReCCB: Labour charge for Resetting the CC Block on End Edging m
(100mm across) with CC Block (375mmX100mmX225mm), including
cutting trenches true to level & grade, removing earth, re-filling &
ramming the sides properly, including supplying and filling the gaps with
local sand (FM - 0.5), etc. all complete in all respect as per approved
drawing, specification and direction of the Engineer-in-charge.
Mason 0.0083 day 550.00 4.57
Ordinary Labour 0.0833 day 370.00 30.82
Sand (FM - 0.5) 0.0010 m3 420.00 0.42

Subtotal-A: 35.81

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 36.52

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 40.17


VAT 6% of Total 2.68
IT 4% of Total 1.79
Total: 44.64

Note : Rates of all items should be inclusive of all supply and carriage. Page: 132 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.09.3.2 ReCCB: Labour charge for Resetting the CC Block on End Edging m
(Average 125mm across) with CC Block
[L:1000mmXH:500mmXW:(100mm+150mm)], including cutting
trenches true to level & grade, removing earth, re-filling & ramming the
sides properly, including supplying and filling the gaps with local sand
(FM - 0.5), etc. all complete in all respect as per approved drawing,
specification and direction of the Engineer-in-charge.
Mason 0.0030 day 550.00 1.65
Ordinary Labour 0.3000 day 370.00 111.00
Sand (FM - 0.5) 0.0010 m3 420.00 0.42

Subtotal-A: 113.07

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 115.33

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 126.86


VAT 6% of Total 8.46
IT 4% of Total 5.64
Total: 140.96

Note : Rates of all items should be inclusive of all supply and carriage. Page: 133 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.09.4 ReCCB(cum): Labour charge for Setting/Resetting of single layer CC cum


Block of different sizes on road top, including preparation base, true to
level, maintaining camber, super elevation, grade, watering and
ramming the base, including carrying CC blocks, supplying and filling the
interstices tightly with sand (FM - 0.5), etc. all complete in all respect as
per approved drawing, specification and direction of the Engineer-in-
charge.
Sand (FM - 0.5) 0.0427 m3 420.00 17.93
Mason 0.0200 day 550.00 11.00
Skilled Labour 0.3000 day 450.00 135.00
Ordinary Labour 1.3000 day 370.00 481.00

Subtotal-A: 644.93

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 657.83

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 723.62


VAT 6% of Total 48.24
IT 4% of Total 32.16
Total: 804.02

3.09.5 CCBSS-PW: Manufacturing and supplying Plain Cement Concrete (PCC)


Blocks with cement conforming to BDS EN 197-1 : 2003 CEM-II/A-M
42.5N, using steel shutter, with 40mm down graded Stone Shingles,
sand (FM>=1.5) and minimum cement content relates to mix ratio
1:3.6 satisfying specified minimum compressive strength 10.0Mpa at 28
days, including grading, washings shingles, mixing in standard mixture
machine, casting in forms, making shutter water-tight properly,
compacting by vibrator machine and curing for at least 28 days,
including preparation of platform, shuttering and stacking in measurable
stacks etc. all complete in all respect as per approved drawing,
specification and direction of the Engineer-in-charge.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 134 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.09.5.1 PCC Block Size: 400mmX200mmX150mm each


Stone Shingles (20mm down graded) 0.0108 m3 3500.00 37.80
Sand (FM - 1.5) 0.0054 m3 795.00 4.29
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.0508 bag 430.00 21.84
Mason 0.0010 day 550.00 0.55
Skilled Labour 0.0058 day 450.00 2.61
Ordinary Labour 0.0216 day 370.00 7.99
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0009 day 1200.00 1.08
Hire and running charges of Concrete Vibrator 0.0009 day 400.00 0.36

Subtotal-A: 76.53
Form Work: ( +2.50 % on Subtotal-A ) 1.91
Subtotal-A1: 78.44

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 80.01

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 88.01


VAT 6% of Total 5.87
IT 4% of Total 3.91
Total: 97.79

Note : Rates of all items should be inclusive of all supply and carriage. Page: 135 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.09.5.2 PCC Block Size: 375mmX100mmX225mm each


Stone Shingles (20mm down graded) 0.0076 m3 3500.00 26.60
Sand (FM - 1.5) 0.0038 m3 795.00 3.02
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.0357 bag 430.00 15.35
Mason 0.0010 day 550.00 0.55
Skilled Labour 0.0051 day 450.00 2.30
Ordinary Labour 0.0190 day 370.00 7.03
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0008 day 1200.00 0.96
Hire and running charges of Concrete Vibrator 0.0008 day 400.00 0.32

Subtotal-A: 56.13
Form Work: ( +2.50 % on Subtotal-A ) 1.40
Subtotal-A1: 57.53

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 58.68

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 64.55


VAT 6% of Total 4.30
IT 4% of Total 2.87
Total: 71.72

Note : Rates of all items should be inclusive of all supply and carriage. Page: 136 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.09.5.3 PCC Block Size: 1000mmX500mmX(100+150)mm each


Stone Shingles (20mm down graded) 0.0563 m3 3500.00 197.05
Sand (FM - 1.5) 0.0281 m3 795.00 22.34
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.2646 bag 430.00 113.78
Mason 0.0050 day 550.00 2.75
Skilled Labour 0.0300 day 450.00 13.50
Ordinary Labour 0.1125 day 370.00 41.63
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0045 day 1200.00 5.40
Hire and running charges of Concrete Vibrator 0.0045 day 400.00 1.80

Subtotal-A: 398.24
Form Work: ( +2.50 % on Subtotal-A ) 9.96
Subtotal-A1: 408.20

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 416.36

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 458.00


VAT 6% of Total 30.53
IT 4% of Total 20.36
Total: 508.89

Note : Rates of all items should be inclusive of all supply and carriage. Page: 137 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.09.6.1 CCBSS-EE: Providing PCC Block on End Edging (100mm across) of size m
(375mmX100mmX225mm), including manufacturing and supplying Plain
Cement Concrete (PCC) Blocks with cement conforming to BDS EN 197-
1 : 2003 CEM-II/A-M 42.5N, using steel shutter, with 40mm down
graded Stone Shingles, sand (FM>=1.5) and minimum cement content
relates to mix ratio 1:3.6 satisfying specified minimum compressive
strength 10.0Mpa at 28 days, including cutting trenches true to level &
grade, removing earth, re-filling & ramming the sides properly, including
supplying and filling the gaps with local sand (FM - 0.5), etc. all
complete in all respect as per approved drawing, specification and
direction of the Engineer-in-charge.
Manufacturing and supplying CC blocks Size 2.6500 each 57.53 152.45
375mmx100mmx225mm…..(3.09.5.2)
Sand (FM - 0.5) 0.0010 m3 420.00 0.42
Mason 0.0100 day 550.00 5.50
Ordinary Labour 0.1000 day 370.00 37.00

Subtotal-A: 195.37

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 199.28

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 219.21


VAT 6% of Total 14.61
IT 4% of Total 9.74
Total: 243.57

Note : Rates of all items should be inclusive of all supply and carriage. Page: 138 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.09.6.2 CCBSS-EE-SR: Providing CC Block on End Edging (average 125mm m


across) for submersible road of size [L: 1000mmXH:
500mmXW:(100mm+150mm)], including manufacturing and supplying
Plain Cement Concrete (PCC) Blocks with cement conforming to BDS EN
197-1 : 2003 CEM-II/A-M 42.5N, using steel shutter, with 40mm down
graded Stone Shingles, sand (FM>=1.5) and minimum cement content
relates to mix ratio 1:3.6 satisfying specified minimum compressive
strength 10.0Mpa at 28 days, including cutting trenches true to level &
grade, removing earth, re-filling & ramming the sides properly, including
supplying and filling the gaps with local sand (FM - 0.5), etc. all
complete in all respect as per approved drawing, specification and
direction of the Engineer-in-charge.
Manufacturing and supplying CC blocks with cement, sand 1.0000 each 408.20 408.20
(FM>=1.5) 1000mmx500mmx(100+150)mm
…………(3.09.5.3)
Sand (FM - 0.5) 0.0010 m3 420.00 0.42
Mason 0.0030 day 550.00 1.65
Ordinary Labour 0.3000 day 370.00 111.00

Subtotal-A: 521.27

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 531.69

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 584.86


VAT 6% of Total 38.99
IT 4% of Total 25.99
Total: 649.85

Note : Rates of all items should be inclusive of all supply and carriage. Page: 139 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.09.7 CCBSC-RW: Manufacturing and supplying Plain Cement Concrete (PCC)


Blocks with cement conforming to BDS EN 197-1 : 2003 CEM-II/A-M
42.5N, for road pavement works using steel shutter, with 40mm down
graded Stone Chips, sand (FM>=1.8) and minimum cement content
relates to mix ratio 1:2:4 satisfying specified minimum compressive
strength 20.0Mpa at 28 days, including grading, washings stone chips,
mixing in standard mixture machine, casting in forms, making shutter
water-tight properly, compacting by vibrator machine and curing for at
least 28 days, including preparation of platform, shuttering and stacking
in measurable stacks etc.all complete in all respect as per approved
drawing, specification and direction of the Engineer-in-charge.
[Excluding the cost of labour charge for block setting].

Note : Rates of all items should be inclusive of all supply and carriage. Page: 140 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.09.7.1 PCC Block Size: 375mmX225mmX150mm each


Stone Chips (38mm down graded) [LAA≤35] 0.0076 cum 4850.00 36.86
Stone Chips (16mm down graded) [LAA≤35] 0.0033 cum 4720.00 15.58
Sand (FM - 1.8) 0.0054 m3 970.00 5.24
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.0765 bag 430.00 32.90
Mason 0.0010 day 550.00 0.55
Skilled Labour 0.0061 day 450.00 2.75
Ordinary Labour 0.0228 day 370.00 8.44
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0009 day 1200.00 1.08
Hire and running charges of Concrete Vibrator 0.0009 day 400.00 0.36

Subtotal-A: 103.74
Form Work: ( +2.50 % on Subtotal-A ) 2.59
Subtotal-A1: 106.33

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 108.46

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 119.31


VAT 6% of Total 7.95
IT 4% of Total 5.30
Total: 132.56

Note : Rates of all items should be inclusive of all supply and carriage. Page: 141 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.09.8 CCBSC-RW: Providing single layer PCC Block on road top of size sqm
(375mmX225mmX150mm), including manufacturing and supplying Plain
Cement Concrete (PCC) Blocks with cement conforming to BDS EN 197-
1 : 2003 CEM-II/A-M 42.5N, using steel shutter, with 40mm down
graded Stone Chips, sand (FM>=1.8) and minimum cement content
relates to mix ratio 1:2.4 satisfying specified minimum compressive
strength 20.0Mpa at 28 days, including preparation of bed by cutting or
filling with ramming the filled up earth to the same profile as that of the
finished pavement, including carrying and placing PCC blocks, filling the
interstices tightly with sand (FM - 0.5), etc. all complete in all respect as
per approved drawing, specification and direction of the Engineer-in-
charge.
Sand (FM - 0.5) 0.0332 m3 420.00 13.94
Manufacturing and supplying CC Block for road pavement 11.0000 each 106.33 1169.67
works using steel shutter ….. (Size 375mmX225mmX150mm)
….. (3.09.7.1)
Skilled Labour 0.0200 day 450.00 9.00
Ordinary Labour 0.2500 day 370.00 92.50

Subtotal-A: 1285.11

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1310.81

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1441.90


VAT 6% of Total 96.13
IT 4% of Total 64.08
Total: 1602.11

Note : Rates of all items should be inclusive of all supply and carriage. Page: 142 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.09.9 LC-CCB: Labour charge for laying single layer CC Block of different sizes cum
for protective wall, including preparation trenches, true to level,
maintaining alignment, watering and ramming the base, including
carrying and placing CC blocks, filling minimum 65% interstices of CC
Block work tightly with cement mortar (1:6), raking out joints, cleaning
and soaking Block at least for 24 hours before use, washing of sand,
curing for requisite period, etc. all complete in all respect as per
approved drawing, specification and direction of the Engineer-in-charge.
[Excluding the cost of CC Blocks].
Sand (FM - 1.2) 0.0752 m3 584.00 43.92
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.3538 bag 430.00 152.13
Head Mason 0.0200 day 650.00 13.00
Mason 0.2500 day 550.00 137.50
Skilled Labour 0.8000 day 450.00 360.00
Ordinary Labour 1.5000 day 370.00 555.00

Subtotal-A: 1261.55

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1286.78

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1415.46


VAT 6% of Total 94.36
IT 4% of Total 62.91
Total: 1572.73

Note : Rates of all items should be inclusive of all supply and carriage. Page: 143 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.10.01.1 PPLM: Preparation of Pothole for small patch works (pothole, edge sqm
breaking, etc.) by cutting, scarifying and loosening of existing damaged
Base/sub- base Course materials up to the depth of 150mm at the
pothole areas in order to make regular shape of the pothole including
leveling, dressing and compacting manually where mechanical
compactors are not suitable to give a smooth surface including
brushing, removing & stacking all debris at a safe distance etc. all
complete in all respect as per direction of the Engineer-in-charge.
Ordinary Labour 0.0300 day 370.00 11.10
Skilled Labour 0.0050 day 450.00 2.25

Subtotal-A: 13.35

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 13.62

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 14.98


VAT 6% of Total 1.00
IT 4% of Total 0.67
Total: 16.64

Note : Rates of all items should be inclusive of all supply and carriage. Page: 144 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.10.01.2 HBPMM: Preparation of hard bed by scarifying and loosening of existing sqm
top (bituminous) surface, including base/sub-base course materials up
to the depth of 75mm (minimum) using mechanical means, breaking
dismantled material into specified sizes (less than 40mm), with
supplying of extra fresh base course materials of required specification
(if required) including spreading, leveling, dressing of loose material
uniformly for maintaining camber & grade, watering if needed, rolling
with 8 to 10 MT road roller to give compaction to 100% of MDD as
obtained by standard proctor test etc. all complete in all respect as per
direction of the Engineer-in-charge. (Rate is excluding the cost of
additional material supplied)
Skilled Labour 0.0055 day 450.00 2.48
Ordinary Labour 0.0280 day 370.00 10.36
H.C. of Excavator (Medium Size) 0.0006 day 8880.00 5.33
H.C. of 3 Wheel Static Road roller (8-10 ton) 0.0006 day 3500.00 2.10
Diesel 0.0150 liter 68.00 1.02
Lubricant 0.0010 liter 220.00 0.22

Subtotal-A: 21.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 21.93

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 24.13


VAT 6% of Total 1.61
IT 4% of Total 1.07
Total: 26.81

Note : Rates of all items should be inclusive of all supply and carriage. Page: 145 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.10.02 SB: Providing and applying sand blinding with sand of minimum FM 0.80 sqm
@0.005 cum per sqm on prepared road surface, including supplying of
all material, their carriage, labours, tools and equipment, etc. all
complete in all respect as per direction of the Engineer-in-charge.
Sand (FM - 0.8) 0.0050 m3 480.00 2.40
Ordinary Labour 0.0030 day 370.00 1.11

Subtotal-A: 3.51

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 3.58

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 3.94


VAT 6% of Total 0.26
IT 4% of Total 0.18
Total: 4.38

Note : Rates of all items should be inclusive of all supply and carriage. Page: 146 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.10.03 25mmSGSS: Providing 25mm thick (average) grouting with 20mm down sqm
graded broken stone shingles metal (LAA value not exceeding 35) and
using 60/70 or 80/100 penetration grade straight run bitumen
conforming to the requirements of ASTM/ AASHTO, spraying tack coat
@ 0.50kg per sqm over the cleaned road surface and laying, spreading
stone metal @0.028cum per sqm (loose) on the road surface,
maintaining proper camber, level, grade, super elevation and spraying
hot bitumen @1.50kg per sqm uniformly, including rolling hard to full
compaction with 8 to 10 MT road roller including cleaning the surface &
heating bitumen from 140°C to 160°C temperature and spreading
crushed stone chips/Sand (FM-1.80) @0.006cum per sqm road surface
etc. all complete in all respect as per direction of the Engineer-in-charge.
Stone Shingles (20mm down graded) 0.0280 m3 3500.00 98.00
Sand (FM - 1.8) 0.0060 m3 970.00 5.82
Bitumen [Grade 80/100] 2.0000 kg 49.00 98.00
Fire wood 1.5000 kg 7.75 11.63
Mason 0.0020 day 550.00 1.10
Skilled Labour 0.0250 day 450.00 11.25
Ordinary Labour 0.0400 day 370.00 14.80
H.C. of Vibratory Road Roller (8-10 ton) 0.0030 day 3000.00 9.00
Diesel 0.0200 liter 68.00 1.36
Lubricant 0.0020 liter 220.00 0.44

Subtotal-A: 251.40

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 256.42

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 282.07


VAT 6% of Total 18.80
IT 4% of Total 12.54
Total: 313.41

Note : Rates of all items should be inclusive of all supply and carriage. Page: 147 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.10.04.1 50mmSGBC: Providing 50mm thick (average) grouting with picked brick sqm
chips (LAA value not exceeding 40) and using 60/70 or 80/100
penetration grade straight run bitumen conforming to the requirements
of ASTM/ AASHTO, laying and spreading picked brick chips 60mm thick
(loose) in two layers, 1st layer of 35mm thick (loose) with 25mm to
16mm size and 2nd layer of 25mm thick (loose) mixing with 80% of
16mm to 12mm size and 20% of 12mm to 8mm size picked brick chips,
spraying tack coat @ 0.50kg per sqm over the cleaned road surface,
maintaining proper camber, level, grade, super elevation and spraying
hot bitumen @1.25kg per sqm uniformly on the 1st layer and @1.50kg
per sqm on 2nd layer, including rolling hard to full compaction with 8 to
10 MT road roller including cleaning the surface & heating bitumen from
140°C to 160°C temperature and spreading crushed stone chips/Sand
(FM-1.80) @0.006 cum per sqm on road surface etc. all complete in all
respect as per direction of the Engineer-in-charge.
1st Class/ Picked Brick chips (40mm down graded) 0.0600 m3 2786.00 167.16
Sand (FM - 1.8) 0.0060 m3 970.00 5.82
Bitumen [Grade 80/100] 3.2500 kg 49.00 159.25
Fire wood 2.6000 kg 7.75 20.15
Mason 0.0020 day 550.00 1.10
Skilled Labour 0.0300 day 450.00 13.50
Ordinary Labour 0.0600 day 370.00 22.20
H.C. of Vibratory Road Roller (8-10 ton) 0.0030 day 3000.00 9.00
Diesel 0.0280 liter 68.00 1.90
Lubricant 0.0028 liter 220.00 0.62

Subtotal-A: 400.70

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 408.71

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 449.59


VAT 6% of Total 29.97
IT 4% of Total 19.98
Total: 499.54

Note : Rates of all items should be inclusive of all supply and carriage. Page: 148 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.10.04.2 50mmSGSS: Providing 50mm thick (average) grouting with broken sqm
stone shingles (LAA value not exceeding 35) and using 60/70 or 80/100
penetration grade straight run bitumen conforming to the requirements
of ASTM/ AASHTO, laying and spreading stone shingles 60mm thick
(loose) in two layers, 1st layer of 35mm thick (loose) with 25mm to
16mm size and 2nd layer of 25mm thick (loose) mixing with 80% of
16mm to 12mm size and 20% of 12mm to 8mm size stone shingles,
spraying tack coat @ 0.50kg per sqm over the cleaned road surface,
maintaining proper camber, level, grade, super elevation and spraying
hot bitumen @1.25kg per sqm uniformly on the 1st layer and @1.50kg
per sqm on 2nd layer, including rolling hard to full compaction with 8 to
10 MT road roller including cleaning the surface & heating bitumen from
140°C to 160°C temperature and spreading crushed stone chips/Sand
(FM-1.80) @0.006 cum per sqm on road surface etc. all complete in all
respect as per direction of the Engineer-in-charge.
Stone Shingles (20mm down graded) 0.0600 m3 3500.00 210.00
Bitumen [Grade 80/100] 3.2500 kg 49.00 159.25
Fire wood 2.6000 kg 7.75 20.15
Mason 0.0020 day 550.00 1.10
Skilled Labour 0.0300 day 450.00 13.50
Ordinary Labour 0.0600 day 370.00 22.20
H.C. of Vibratory Road Roller (8-10 ton) 0.0030 day 3000.00 9.00
Diesel 0.0280 liter 68.00 1.90
Lubricant 0.0028 liter 220.00 0.62
Sand (FM - 1.8) 0.0060 m3 970.00 5.82

Subtotal-A: 443.54

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 452.41

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 497.65


VAT 6% of Total 33.18
IT 4% of Total 22.12
Total: 552.95

Note : Rates of all items should be inclusive of all supply and carriage. Page: 149 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.10.04.3 50mmSGSC: Providing 50mm thick (average) grouting with broken sqm
stone metal (LAA value not exceeding 35) and using 60/70 or 80/100
penetration grade straight run bitumen conforming to the requirements
of ASTM/ AASHTO, laying and spreading stone metal 60mm thick
(loose) in two layers, 1st layer of 35mm thick (loose) with 25mm to
16mm size and 2nd layer of 25mm thick (loose) mixing with 80% of
16mm to 12mm size and 20% of 12mm to 8mm size stone metal,
spraying tack coat @ 0.50kg per sqm over the cleaned road surface,
maintaining proper camber, level, grade, super elevation and spraying
hot bitumen @1.25kg per sqm uniformly on the 1st layer and @1.50kg
per sqm on 2nd layer, including rolling hard to full compaction with 8 to
10 MT road roller including cleaning the surface & heating bitumen from
140°C to 160°C temperature and spreading crushed stone chips/Sand
(FM-1.80) @0.006 cum per sqm on road surface etc. all complete in all
respect as per direction of the Engineer-in-charge.
Stone Boulder 0.0600 m3 3700.00 222.00
Bitumen [Grade 80/100] 3.2500 kg 49.00 159.25
Fire wood 2.6000 kg 7.75 20.15
Mason 0.0020 day 550.00 1.10
Skilled Labour 0.0300 day 450.00 13.50
Ordinary Labour 0.1000 day 370.00 37.00
H.C. of Vibratory Road Roller (8-10 ton) 0.0030 day 3000.00 9.00
Diesel 0.0280 liter 68.00 1.90
Lubricant 0.0028 liter 220.00 0.62
Sand (FM - 1.8) 0.0060 m3 970.00 5.82

Subtotal-A: 470.34

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 479.75

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 527.72


VAT 6% of Total 35.18
IT 4% of Total 23.45
Total: 586.36

Note : Rates of all items should be inclusive of all supply and carriage. Page: 150 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.10.05.1 75mmSGBC: Providing 75mm thick (average) grouting with picked brick sqm
chips (LAA value not exceeding 40) and using 60/70 or 80/100
penetration grade straight run bitumen conforming to the requirements
of ASTM/ AASHTO, laying and spreading picked brick chips 100mm thick
(loose) in two layers, 1st layer of 60mm thick (loose) with 40mm to
25mm size and 2nd layer of 40mm thick (loose) mixing with 80% of
25mm to 20mm size and 20% of 20mm to 10mm size picked brick
chips, maintaining proper camber, level, grade, super elevation and
spraying hot bitumen @2.00kg per sqm uniformly on the 1st layer and
@2.20kg per sqm on 2nd layer, including rolling hard to full compaction
with 8 to 10 MT road roller including cleaning the surface & heating
bitumen from 140°C to 160°C temperature and spreading crushed
stone chips/Sand (FM-1.80) @0.006 cum per sqm on road surface etc.
all complete in all respect as per direction of the Engineer-in-charge.
25mm down graded Brick Chips 0.0400 cum 2895.00 115.80
Sand (FM - 1.8) 0.0060 m3 970.00 5.82
Bitumen [Grade 80/100] 4.2000 kg 49.00 205.80
Fire wood 3.3600 kg 7.75 26.04
Mason 0.0020 day 550.00 1.10
Skilled Labour 0.0400 day 450.00 18.00
Ordinary Labour 0.1000 day 370.00 37.00
H.C. of Vibratory Road Roller (8-10 ton) 0.0030 day 3000.00 9.00
Diesel 0.0280 liter 68.00 1.90
Lubricant 0.0028 liter 220.00 0.62
1st Class/ Picked Brick chips (40mm down graded) 0.0600 m3 2786.00 167.16

Subtotal-A: 588.24

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 600.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 660.01


VAT 6% of Total 44.00
IT 4% of Total 29.33
Total: 733.34

Note : Rates of all items should be inclusive of all supply and carriage. Page: 151 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.10.05.2 75mmSGSS: Providing 75mm thick (average) grouting with broken sqm
stone shingles (LAA value not exceeding 35) and using 60/70 or 80/100
penetration grade straight run bitumen conforming to the requirements
of ASTM/ AASHTO, laying and spreading stone shingles 94mm thick
(loose) in two layers, 1st layer of 56mm thick (loose) with 40mm to
25mm size and 2nd layer of 38mm thick (loose) mixing with 80% of
25mm to 20mm size and 20% of 20mm to 10mm size stone shingles,
maintaining proper camber, level, grade, super elevation and spraying
hot bitumen @1.50kg per sqm uniformly on the 1st layer and @2.00kg
per sqm on 2nd layer, including rolling hard to full compaction with 8 to
10 MT road roller including cleaning the surface & heating bitumen from
140°C to 160°C temperature and spreading crushed stone chips/Sand
(FM-1.80) @0.006 cum per sqm on road surface etc. all complete in all
respect as per direction of the Engineer-in-charge.
Stone Shingles (20mm down graded) 0.0940 m3 3500.00 329.00
Bitumen [Grade 80/100] 3.5000 kg 49.00 171.50
Fire wood 2.8000 kg 7.75 21.70
Mason 0.0020 day 550.00 1.10
Skilled Labour 0.0600 day 450.00 27.00
Ordinary Labour 0.0800 day 370.00 29.60
H.C. of Vibratory Road Roller (8-10 ton) 0.0030 day 3000.00 9.00
Diesel 0.0300 liter 68.00 2.04
Lubricant 0.0030 liter 220.00 0.66
Sand (FM - 1.8) 0.0060 m3 970.00 5.82

Subtotal-A: 597.42

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 609.37

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 670.31


VAT 6% of Total 44.69
IT 4% of Total 29.79
Total: 744.78

Note : Rates of all items should be inclusive of all supply and carriage. Page: 152 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.10.05.3 75mmSGSC: Providing 75mm thick (average) grouting with Stone metal sqm
(LAA value not exceeding 35) and using 60/70 or 80/100 penetration
grade straight run bitumen conforming to the requirements of ASTM/
AASHTO, laying and spreading Stone metal 94mm thick (loose) in two
layers, 1st layer of 56mm thick (loose) with 40mm to 25mm size and
2nd layer of 38mm thick (loose) mixing with 80% of 25mm to 20mm
size and 20% of 20mm to 10mm size stone shingles, maintaining proper
camber, level, grade, super elevation and spraying hot bitumen
@1.50kg per sqm uniformly on the 1st layer and @2.00kg per sqm on
2nd layer, including rolling hard to full compaction with 8 to 10 MT road
roller including cleaning the surface & heating bitumen from 140°C to
160°C temperature and spreading crushed stone chips/Sand (FM-1.80)
@0.006 cum per sqm on road surface etc. all complete in all respect as
per direction of the Engineer-in-charge.
Stone Boulder 0.0940 m3 3700.00 347.80
Sand (FM - 1.8) 0.0060 m3 970.00 5.82
Bitumen [Grade 80/100] 3.5000 kg 49.00 171.50
Fire wood 2.8000 kg 7.75 21.70
Mason 0.0020 day 550.00 1.10
Skilled Labour 0.0600 day 450.00 27.00
Ordinary Labour 0.1000 day 370.00 37.00
H.C. of Vibratory Road Roller (8-10 ton) 0.0030 day 3000.00 9.00
Diesel 0.0300 liter 68.00 2.04
Lubricant 0.0030 liter 220.00 0.66

Subtotal-A: 623.62

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 636.09

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 699.70


VAT 6% of Total 46.65
IT 4% of Total 31.10
Total: 777.45

Note : Rates of all items should be inclusive of all supply and carriage. Page: 153 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.10.06 100mmSGBC: Providing 100mm thick (average) grouting with picked sqm
brick chips (LAA value not exceeding 40) and using 60/70 or 80/100
penetration grade straight run bitumen conforming to the requirements
of ASTM/ AASHTO, laying and spreading picked brick chips 130mm thick
(loose) in two layers, 1st layer of 80mm thick (loose) with 40mm to
25mm size and 2nd layer of 50mm thick (loose) mixing with 80% of
25mm to 20mm size and 20% of 20mm to 10mm size picked brick
chips, maintaining proper camber, level, grade, super elevation and
spraying hot bitumen @2.00kg per sqm uniformly on the 1st layer and
@3.00kg per sqm on 2nd layer, including rolling hard to full compaction
with 8 to 10 MT road roller including cleaning the surface & heating
bitumen from 140°C to 160°C temperature and spreading crushed
stone chips/Sand (FM-1.80) @0.006 cum per sqm on road surface etc.
all complete in all respect as per direction of the Engineer-in-charge.
1st Class/ Picked Brick chips (40mm down graded) 0.0800 m3 2786.00 222.88
Sand (FM - 1.2) 0.0060 m3 584.00 3.50
Bitumen [Grade 80/100] 5.0000 kg 49.00 245.00
Fire wood 4.0000 kg 7.75 31.00
Mason 0.0020 day 550.00 1.10
Skilled Labour 0.0400 day 450.00 18.00
Ordinary Labour 0.1000 day 370.00 37.00
H.C. of Vibratory Road Roller (8-10 ton) 0.0030 day 3000.00 9.00
Diesel 0.0280 liter 68.00 1.90
Lubricant 0.0028 liter 220.00 0.62
25mm down graded Brick Chips 0.0500 cum 2895.00 144.75

Subtotal-A: 714.75

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 729.05

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 801.95


VAT 6% of Total 53.46
IT 4% of Total 35.64
Total: 891.06

Note : Rates of all items should be inclusive of all supply and carriage. Page: 154 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.10.07.1 50mmSGSS(BE): Providing 50mm thick (average) grouting with broken sqm
stone shingles (LAA value not exceeding 35) and using bitumen
emulsion of grade k-1-60 conforming to the requirements of
ASTM/AASHTO, laying and spreading stone shingles 60mm thick (loose)
in two layers, 1st layer of 35mm thick (loose) with 25mm to 16mm size
and 2nd layer of 25mm thick (loose) mixing with 80% of 16mm to
12mm size and 20% of 12mm to 8mm size stone shingles, spraying
tack coat @ 0.750kg per sqm over the cleaned road surface,
maintaining proper camber, level, grade, super elevation and spraying
bitumen emulsion @1.75kg per sqm uniformly on the 1st layer and
@2.00kg per sqm on 2nd layer, including rolling hard to full compaction
with 8 to 10 MT road roller and cleaning the surface, spreading crushed
stone chips/Sand (FM-1.80) @0.006 cum per sqm on road surface etc.
all complete in all respect as per direction of the Engineer-in-charge.
Stone Shingles (20mm down graded) 0.0600 m3 3500.00 210.00
Bitumen Emulsion 4.5000 kg 61.00 274.50
Mason 0.0020 day 550.00 1.10
Skilled Labour 0.0300 day 450.00 13.50
Ordinary Labour 0.0500 day 370.00 18.50
H.C. of Vibratory Road Roller (8-10 ton) 0.0030 day 3000.00 9.00
Diesel 0.0280 liter 68.00 1.90
Lubricant 0.0028 liter 220.00 0.62
Sand (FM - 1.5) 0.0060 m3 795.00 4.77

Subtotal-A: 533.89

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 544.57

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 599.02


VAT 6% of Total 39.93
IT 4% of Total 26.62
Total: 665.58

Note : Rates of all items should be inclusive of all supply and carriage. Page: 155 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.10.07.2 75mmSGSS(BE): Providing 75mm thick (average) grouting with broken sqm
stone shingles (LAA value not exceeding 35) and using bitumen
emulsion of grade k-1-60 conforming to the requirements of
ASTM/AASHTO, laying and spreading stone shingles 94mm thick (loose)
in two layers, 1st layer of 56mm thick (loose) with 40mm to 25mm size
and 2nd layer of 38mm thick (loose) mixing with 80% of 25mm to
20mm size and 20% of 20mm to 10mm size stone shingles, maintaining
proper camber, level, grade, super elevation and spraying bitumen
emulsion @2.25kg per sqm uniformly on the 1st layer and @3.00kg per
sqm on 2nd layer, including rolling hard to full compaction with 8 to 10
MT road roller and cleaning the surface, spreading crushed stone
chips/Sand (FM-1.80) @0.006 cum per sqm on road surface etc. all
complete in all respect as per direction of the Engineer-in-charge.
Stone Shingles (20mm down graded) 0.0940 m3 3500.00 329.00
Bitumen Emulsion 5.2500 kg 61.00 320.25
Mason 0.0020 day 550.00 1.10
Skilled Labour 0.0300 day 450.00 13.50
Ordinary Labour 0.0500 day 370.00 18.50
H.C. of Vibratory Road Roller (8-10 ton) 0.0030 day 3000.00 9.00
Diesel 0.0300 liter 68.00 2.04
Lubricant 0.0030 liter 220.00 0.66
Sand (FM - 1.5) 0.0060 m3 795.00 4.77

Subtotal-A: 698.82

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 712.80

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 784.08


VAT 6% of Total 52.27
IT 4% of Total 34.85
Total: 871.20

Note : Rates of all items should be inclusive of all supply and carriage. Page: 156 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.10.08.1 CS@0.75MD: Providing a single coat chip sealing over a low cracked sqm
road surface, using 60/70 or 80/100 penetration grade straight run
bitumen conforming to the requirements of ASTM/ AASHTO, spraying
bitumen by mechanical distributor on road surface @ 0.75kg/sqm, after
spraying bitumen instantly spreading uniform graded crushed stone
aggregates of 6.5mm average size defined as 100% passing through
10mm sieve and retain on 4.75mm sieve LAA value not exceeding 35 @
0.006cum/sqm over the surface, sweeping the surface and hand
packing for identical spreading of aggregate, surface rolling to embed
the aggregate with Pneumatic Multiple Tired Roller (7 tires, 6-8 tons),
including properly surface cleaning, heating bitumen upto 140°C to
180°C, etc. including cost of all materials, their carriages, hire charges
of machineries, equipment for construction and quality control as per
specification, fuels, lubricants and wages of operational staff etc. all
complete in all respect as per direction of the Engineer-in-charge.
Stone Chips (6mm down graded) [LAA≤35] 0.0060 cum 3690.00 22.14
Bitumen [Grade 80/100] 0.7500 kg 49.00 36.75
Fire wood 0.5625 kg 7.75 4.36
Skilled Labour 0.0011 day 450.00 0.50
Ordinary Labour 0.0100 day 370.00 3.70
H.C. of Pneumatic Multiple Tired Roller (7 tires, 6-8 tons) 0.0003 day 3000.00 0.90
H.C. of Distributor 0.0003 day 3750.00 1.13
Diesel 0.0120 liter 68.00 0.82
Lubricant 0.0010 liter 220.00 0.22
Foreman 0.0003 day 800.00 0.24

Subtotal-A: 70.75

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 72.16

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 79.38


VAT 6% of Total 5.29
IT 4% of Total 3.53
Total: 88.20

Note : Rates of all items should be inclusive of all supply and carriage. Page: 157 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.10.08.2 CS@1.00MD: Providing single coat chip sealing over a moderate cracked sqm
road surface, using 60/70 or 80/100 penetration grade straight run
bitumen conforming to the requirements of ASTM/ AASHTO, spraying
bitumen by mechanical distributor on road surface @ 1.00kg/sqm, after
spraying bitumen instantly spreading uniform graded crushed stone
aggregates of 6.5mm average size defined as 100% passing through
10mm sieve and retain on 4.75mm sieve with LAA value not exceeding
35 @ 0.007cum/sqm over the surface, sweeping the surface and hand
packing for identical spreading of aggregate, surface rolling to embed
the aggregate with Pneumatic Multiple Tired Roller (7 tires, 6-8 tons),
including properly surface cleaning, heating bitumen upto 140°C to
180°C, etc. including cost of all materials, their carriages, hire charges
of machineries, equipment for construction and quality control as per
specification, fuels, lubricants and wages of operational staff etc. all
complete in all respect as per direction of the Engineer-in-charge.
Stone Chips (6mm down graded) [LAA≤35] 0.0070 cum 3690.00 25.83
Bitumen [Grade 80/100] 1.0000 kg 49.00 49.00
Fire wood 0.7500 kg 7.75 5.81
Skilled Labour 0.0010 day 450.00 0.45
Ordinary Labour 0.0100 day 370.00 3.70
H.C. of Pneumatic Multiple Tired Roller (7 tires, 6-8 tons) 0.0003 day 3000.00 0.90
H.C. of Distributor 0.0003 day 3750.00 1.13
Diesel 0.0120 liter 68.00 0.82
Lubricant 0.0010 liter 220.00 0.22
Foreman 0.0003 day 800.00 0.24

Subtotal-A: 88.09

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 89.86

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 98.84


VAT 6% of Total 6.59
IT 4% of Total 4.39
Total: 109.82

Note : Rates of all items should be inclusive of all supply and carriage. Page: 158 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.10.08.3 CS@1.20MD(BE): Providing a single coat chip sealing over a moderate sqm
cracked road surface, using bitumen emulsion of grade k-1-60
conforming to the requirements of ASTM/ AASHTO, spraying bitumen
emulsion by mechanical distributor on cleaned road surface @
1.20kg/sqm, after spraying bitumen emulsion instantly spreading
uniform graded crushed stone aggregates of 6.5mm average size
defined as 100% passing through 10mm sieve and retain on 4.75mm
sieve with LAA value not exceeding 35 @ 0.007cum/sqm over the
surface, sweeping the surface and hand packing for identical spreading
of aggregate, surface rolling to embed the aggregate with Pneumatic
Multiple Tired Roller (7 tires, 6-8 tons), including cost of all materials,
their carriages, hire charges of machineries, equipment for construction
and quality control as per specification, fuels, lubricants and wages of
operational staff etc. all complete in all respect as per direction of the
Engineer-in-charge.
Stone Chips (6mm down graded) [LAA≤35] 0.0070 cum 3690.00 25.83
Bitumen Emulsion 1.2000 kg 61.00 73.20
Foreman 0.0003 day 800.00 0.24
Skilled Labour 0.0011 day 450.00 0.50
Ordinary Labour 0.0100 day 370.00 3.70
H.C. of Pneumatic Multiple Tired Roller (7 tires, 6-8 tons) 0.0003 day 3000.00 0.90
Diesel 0.0120 liter 68.00 0.82
Lubricant 0.0010 liter 220.00 0.22
H.C. of Distributor 0.0003 day 3750.00 1.13

Subtotal-A: 106.53

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 108.66

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 119.52


VAT 6% of Total 7.97
IT 4% of Total 5.31
Total: 132.80

Note : Rates of all items should be inclusive of all supply and carriage. Page: 159 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.10.09 12mmSC: Providing 12mm thick (minimum) compacted pre-mixed sqm


bituminous surfacing - wearing course to be prepared using 10mm
down, 6mm down graded crushed stone chips & Stone Dust to comply
the gradation as specified in the relevant item of Road Design Standards
– 2005, mixed with 60/70 (Preferable) or 80/100 penetration grade
minimum @5.0% by weight of total mix or as determined by job mix
design. The bitumen and chips shall be separately heated to a
temperature 140°C – 155°C and 150°C – 170°C respectively. The
mixing shall be done at temperature between 140°C – 160°C at a
separate place away from the fire. The mixture of bitumen and chips
shall be laid uniformly on the road surface in appropriate layer so as to
produce the specified compacted thickness, rolling at a temperature not
bellow 90°C with appropriate Steel Drum Roller (3-5 tons) & pneumatic
multiple tire roller (8-10 tons) to the desired compaction, including
supplying of all materials, their carriage, labours, tools and equipment
etc. all complete in all respect as per direction of the Engineer-in-
charge. [Excluding the cost of applying Prime/Tack coat].
Stone Chips (12mm down graded) [LAA≤35] 0.0039 cum 4320.00 16.85
Stone Chips (6mm down graded) [LAA≤35] 0.0076 cum 3690.00 28.04
Stone Dust (2.38mm down) 0.0059 cum 1500.00 8.85
Bitumen [Grade 80/100] 1.4100 kg 49.00 69.09
Fire wood 1.4100 kg 7.75 10.93
Mason 0.0011 day 550.00 0.61
Skilled Labour 0.0060 day 450.00 2.70
Ordinary Labour 0.0300 day 370.00 11.10
H.C. of Pneumatic Multiple Tired Roller (7 tires, 8-10 tons) 0.0007 day 3000.00 2.10
H.C. of Vibratory (Ride On) Roller 2 Steel Drum Compactor (3- 0.0007 day 3000.00 2.10
5 tons)
Diesel 0.0110 liter 68.00 0.75
Lubricant 0.0011 liter 220.00 0.24

Subtotal-A: 153.35

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 156.42

Note : Rates of all items should be inclusive of all supply and carriage. Page: 160 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 172.06


VAT 6% of Total 11.47
IT 4% of Total 7.65
Total: 191.18

3.10.10.1 CP-BB: Supplying, cutting and fitting of 6mm thick Chequer Plate for kg
bailey bridge decking with minimum 6mm thick mild steel chequer plate
of unit weight 49.20kg/sqm, including cutting and shaping of required
sizes of bridge deck with cleaning, removing rust, etc. including local
handling, carriage of the plate to the site with loading & unloading and
placing, etc. all complete in all respect as per direction of the Engineer-
in-charge. Rate is inclusive of cost of all materials, labour and all
incidental charges in this connection.
Chequer Plate (thickness 6mm) 1.0100 sqm 110.00 111.10
Bailey Bridge Mistry 0.0010 day 680.00 0.68
Skilled Labour 0.0020 day 450.00 0.90
Ordinary Labour 0.0020 day 370.00 0.74

Subtotal-A: 113.42
Carrying cost to Working Site, etc. ( +1.00 % on Subtotal-A ) 1.13
Subtotal-A1: 114.55

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 116.85

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 128.53


VAT 6% of Total 8.57
IT 4% of Total 5.71
Total: 142.81

Note : Rates of all items should be inclusive of all supply and carriage. Page: 161 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.10.10.2 Welding at the splicing point of mild steel chequer plate with joist of each
deck at 3 points (each point being 25mm in length) using electrodes,
including cleaning, local handling, cost of all materials, labours, tools,
equipment, cost of power, etc. all complete as per drawings,
specifications and directions of the Engineer.
Electrode 0.0200 pkt 810.00 16.20
Welder 0.0025 day 680.00 1.70
Welder Helper 0.0025 day 470.00 1.18
H.C. of Tripod and Mechanical Winch Machine complete with 0.0025 day 3000.00 7.50
power unit and accessories

Subtotal-A: 26.58
Portable staging, etc. ( +75.00 % on Subtotal-A ) 19.93
Subtotal-A1: 46.51

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 47.44

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 52.18


VAT 6% of Total 3.48
IT 4% of Total 2.32
Total: 57.98

Note : Rates of all items should be inclusive of all supply and carriage. Page: 162 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.10.11.01 CCRM-30SCCM: Providing and laying 12BWG G.I. wire meshed cement cum
concrete layer over an old RCC/CC pavement with minimum cement
content and maximum water cement ratio as specified by the laboratory
through mix design having minimum required average compressive
strength, f'cr = 38.5 MPa and satisfying a specified compressive
strength, f'c = 30 MPa at 28 days on standard cylinder as per standard
practice of Code AASHTO/ ASTM and cement conforming to BDS EN
197-1 : 2003 CEM-I 52.5N/ASTM C150 Type-1, sand of minimum FM
2.50 and 20mm down well graded crushed stone chips broken from
boulders (Preferably stone chips from Madhyapara, Dinajpur, LAA value
not exceeding 30) conforming to ASTM C-33 including breaking chips,
screening through proper sieves, cleaning, placing shutter in position
and maintaining true to the alignment, making shutter water-tight
properly, mixing in standard concrete mixture machine, maintaining
allowable slump of 50mm to 75mm, including spraying cement
grouting/slurry over the cleaned existing road surface, casting in forms,
placing 50mm rhombus 12 BWG G.I. wire mesh in position, compacting
by mechanical vibrator machine and finished in a continuous operation
including provision of contraction, curing for 28 days, finishing to lines
and grades, removing centering-shuttering after specified time
approved, etc. all complete as per drawing, specification & direction of
the E-I-C. The cost of 12 BWG G.I. wire mesh is not included in this unit
rate. Additional quantity of cement to be added if required to attain the
required strength at the contractors own cost. The Mix Design has to be
approved by the Central Quality Control Laboratory (CQCL), LGED or
any other reputed laboratory approved by the competent authority
before execution of the work. (Unit cost including all materials, cleaning
the existing surface shuttering, casting, curing for 28 days, and all other
incidental charges, etc.)
Ordinary Portland Cement (CEM I, 52.5N) 8.9000 bag 455.00 4049.50
Stone Chips (20mm down graded) [LAA≤30] 0.4547 m3 5320.00 2419.00
Stone Chips (12mm down graded) [LAA≤30] 0.3032 m3 4470.00 1355.30
Sand (FM - 2.5) 0.4260 m3 1500.00 639.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50

Note : Rates of all items should be inclusive of all supply and carriage. Page: 163 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Ordinary Labour 2.0000 day 370.00 740.00


H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 9919.31
Cost of Form Works/Shuttering, necessary ( +.50 % on Subtotal-A ) 49.60
supports, etc.
Subtotal-A1: 9968.90

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10168.28

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 11185.11


VAT 6% of Total 745.67
IT 4% of Total 497.12
Total: 12427.90

3.10.12.01 12 BWG (WM): Supplying and laying 50mm rhombus 12 BWG G.I. wire sqm
mesh of required size in cement concreting work, placing mesh in the
middle of concreting work or as mentioned in the drawing, including
cutting and carrying of wire mesh to the site, etc. all complete in all
respect as per approved drawing, specification and direction of the
Engineer-in-charge. (Rate is inclusive of cost of materials, labour and all
incidental charges in this connection).
GI Wire Net (12 BWG) [Rhombus Size 50mm] 1.0000 sqm 130.00 130.00
Ordinary Labour 0.0050 day 370.00 1.85

Subtotal-A: 131.85

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 134.49

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 147.94


VAT 6% of Total 9.86
IT 4% of Total 6.57
Total: 164.37

Note : Rates of all items should be inclusive of all supply and carriage. Page: 164 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.01 PCCBC-10: Plain cement concrete work in foundation with minimum cum
compressive strength of 10 Mpa at 28 days (sugessted mix proportion
1:3:6) on standard cylinder as per standard practice of Code AASTHTO/
ASTM and cement conforming to BDS EN 197-1 : 2003 CEM-II /A-M,
42.5 N, best quality sand (FM. 1.2) and 20mm down well graded picked
brick chips (LAA value and maximum water absorption not exceeding 38
& 15% respectively) conforming ASTM C-33, including breaking chips
and screening, placing shutter in position and maintaining true to the
alignment, making shutter water-tight properly, mixing in standard
mixture machine, casting in forms, compacting by vibrator machine and
curing for 28 days, removing shuttering after specified time approved,
etc. all complete approved and accepted by the E-I-C. (Additional
quantity of cement to be added if required to attain the strength at the
contractors own cost).
1st Class Brick Chips (20mm down graded) 0.9000 m3 2940.00 2646.00
Sand (FM - 1.2) 0.4500 m3 584.00 262.80
Head Mason 0.1000 day 650.00 65.00
Skilled Labour 0.4000 day 450.00 180.00
Ordinary Labour 1.2000 day 370.00 444.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 4.2340 bag 430.00 1820.62
Mason 0.3000 day 550.00 165.00

Subtotal-A: 5679.42
Form Work: ( +.50 % on Subtotal-A ) 28.40
Subtotal-A1: 5707.82

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 5821.97

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 6404.17


VAT 6% of Total 426.94
IT 4% of Total 284.63
Total: 7115.75

Note : Rates of all items should be inclusive of all supply and carriage. Page: 165 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.02.1 125mmBW(1:3): 125mm thick brick work with 1st class brick in sqm
specified cement mortar (1:3) in foundation with sand of minimum FM
1.20 and cement conforming to BDS EN 197-1 : 2003 CEM-II/A-M
42.5N, making bond with connected walls, including necessary
scaffolding, raking out joints, cleaning and soaking the bricks at least for
24 hours before use, washing of sand, curing for requisite period, etc.
all complete in all respect as per approved drawing, specification and
direction of the Engineer-in-charge.
1st Class Brick 52.0000 each 9.00 468.00
Sand (FM - 1.2) 0.0258 m3 584.00 15.07
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.2500 bag 430.00 107.50
Head Mason 0.0100 day 650.00 6.50
Mason 0.0500 day 550.00 27.50
Ordinary Labour 0.3500 day 370.00 129.50
Skilled Labour 0.1000 day 450.00 45.00

Subtotal-A: 799.07

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 815.05

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 896.55


VAT 6% of Total 59.77
IT 4% of Total 39.85
Total: 996.17

Note : Rates of all items should be inclusive of all supply and carriage. Page: 166 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.02.2 BW(1:3): Brick works with 1st class bricks in cement mortar (1:3) in cum
foundation and wall with sand of minimum FM 1.20 and cement
conforming to BDS EN 197-1 : 2003 CEM-II/A-M 42.5N, including filling
the interstices tightly with mortar, raking out joints, cleaning and
soaking bricks at least for 24 hours before use, washing of sand, curing
for requisite period, etc. all complete in all respect as per approved
drawing, specification and direction of the Engineer-in-charge.
1st Class Brick 404.0000 each 9.00 3636.00
Sand (FM - 1.2) 0.2894 m3 584.00 169.01
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 2.7230 bag 430.00 1170.89
Head Mason 0.0600 day 650.00 39.00
Mason 0.4000 day 550.00 220.00
Skilled Labour 0.7000 day 450.00 315.00
Ordinary Labour 1.0000 day 370.00 370.00

Subtotal-A: 5919.90

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 6038.30

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 6642.13


VAT 6% of Total 442.81
IT 4% of Total 295.21
Total: 7380.14

Note : Rates of all items should be inclusive of all supply and carriage. Page: 167 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.03 FP(1:2): Flush pointing to brick wall with sand of minimum FM 1.20 and sqm
cement conforming to BDS EN 197-1 : 2003 CEM-II/A-M 42.5N morter
(1:2), including raking out the joints, and necessary scaffolding, curing
for the requisite period etc. all complete in all respect as per direction of
the Engineer-in-charge.
Sand (FM - 1.2) 0.0030 m3 584.00 1.75
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.0430 bag 430.00 18.49
Head Mason 0.0270 day 650.00 17.55
Mason 0.0540 day 550.00 29.70
Ordinary Labour 0.1080 day 370.00 39.96

Subtotal-A: 107.45

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 109.60

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 120.56


VAT 6% of Total 8.04
IT 4% of Total 5.36
Total: 133.96

Note : Rates of all items should be inclusive of all supply and carriage. Page: 168 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.04 RCC-20BCCM(PW): Reinforced cement concrete in Protective Works


using steel shutter, with picked brick chips and minimum cement
content relates to mix ratio 1:1.5:3 and maximum water cement ratio
0.4 having minimum required average strength, f'cr = 28.5 Mpa and
satisfying a compressive strength f'c = 20 Mpa at 28 days on standard
cylinders as per standard practice of Code AASHTO/ ASTM and cement
conforming to Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N),
with best quality sand [50% quantity of medium sand (FM. 1.2) and
50% quantity of coarse sand of equivalent FM = 2.2] and 25mm down
well graded picked brick chips (LAA value & maximum water absorption
not exceeding 38 & 15% respectively) conforming ASTM C-33, including
breaking chips and screening, making, placing shutter in position and
maintaining true to the alignment, making shutter water-tight properly,
placing reinforcement in position, mixing in standard mixture machine
with hoper fed by standard measuring boxes, casting in forms,
compacting by vibrator machine and curing for 28 days, removing
centering-shuttering after specified time approved, including cost of
water, electricity, additional testing charges of materials and cylinders
required by Engineer, other charges etc. all complete approved and
accepted by the E-I-C. Additional quantity of cement to be added if
required to attain the strength at the contractors own cost. (Rate is
excluding the cost of reinforcement and its fabrication, placing and
binding etc.)

Note : Rates of all items should be inclusive of all supply and carriage. Page: 169 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.04.1 Pilining Work cum


1st Class Picked Brick Chips (20mm down graded) 0.8180 m3 2940.00 2404.92
Sand (FM - 1.8) 0.4090 m3 970.00 396.73
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7000 bag 430.00 3311.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.3500 day 550.00 192.50
Skilled Labour 0.4000 day 450.00 180.00
Ordinary Labour 1.5000 day 370.00 555.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 7188.15
Form Work: ( +15.00 % on Subtotal-A ) 1078.22
Subtotal-A1: 8266.37

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 8431.70

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 9274.87


VAT 6% of Total 618.32
IT 4% of Total 412.22
Total: 10305.41

Note : Rates of all items should be inclusive of all supply and carriage. Page: 170 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.04.2 Vertical Wall, Grade Beams, etc. cum


1st Class Picked Brick Chips (20mm down graded) 0.8180 m3 2940.00 2404.92
Sand (FM - 1.8) 0.4090 m3 970.00 396.73
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7000 bag 430.00 3311.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.3500 day 550.00 192.50
Skilled Labour 0.4000 day 450.00 180.00
Ordinary Labour 1.7000 day 370.00 629.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 7262.15
Form Work: ( +25.00 % on Subtotal-A ) 1815.54
Subtotal-A1: 9077.69

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9259.24

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 10185.17


VAT 6% of Total 679.01
IT 4% of Total 452.67
Total: 11316.85

Note : Rates of all items should be inclusive of all supply and carriage. Page: 171 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.05 Supplying and fabrication of Ribbed or deformed bar reinforcement


conforming to BDS ISO 6935-2:2006 (or standard subsequently
released from BSTI) for all types of RCC work including straightening,
removing ruts, cleaning, cutting, hooking, bending, lapping and/or
welding wherever required as directed, placing in position, tieing with
22 BWG black annealed binding wire double fold, cost of binding wire
and anchoring to the adjoining members wherever necessary, supplying
and placing with proper cover blocks (1:1), supports, chairs, spacers,
splices or laps etc. including cost of all materials, cost of labour, cost of
equipment & machinery, loading and unloading, transportation, all other
incidental charges and work at all leads and lifts etc. to complete the
work as per design, drawing, specifications and direction of the E-I-C.
Reinforcement shall be measured only in lengths of bars as
actually placed in position on standard weight i.e. 7850 kg/m3
(BNBC Table 6.2.1) basis. No separate payment shall be allowed for
Chairs of any shape & profile, spacer bar of any shape & profile, lap/
splice, wastages, binding wire, concrete cover blocks etc. as the cost of
these is included in the unit rate.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 172 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.05.1 RB 300: Ribbed or Deformed bar produced and marked as per BDS ISO kg
6935-2:2006 with minimum yield strength, fy (ReH) = 300 MPa, but the
actual yield strength based on mill tests does not exceed fy by more
than the 125 MPa and the ratio of actual ultimate strength, fu (Re) to
actual tensile yield strength (fy) shall be at least 1.25 and minimum
elongation after fracture (A5.65) & minimum total elongation at
maximum force (Agt) is 16% and 2.5% respectively.
GI Wire (22 BWG) 0.0100 kg 90.00 0.90
Re-bar Fabricator 0.0030 day 570.00 1.71
Skilled Labour 0.0025 day 450.00 1.13
Ordinary Labour 0.0075 day 370.00 2.78
M.S. Ribbed/ Deformed Bar (Grade 300) 1.0200 kg 54.00 55.08

Subtotal-A: 61.59

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 62.82

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 69.10


VAT 6% of Total 4.61
IT 4% of Total 3.07
Total: 76.78

Note : Rates of all items should be inclusive of all supply and carriage. Page: 173 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.05.2 RB 400 / 400W: Ribbed or Deformed bar produced and marked as per kg
BDS ISO 6935-2:2006 with minimum yield stress, fy (ReH) = 400 MPa,
but the actual yield strength based on mill tests does not exceed fy by
more than the 125 MPa, the ratio of actual ultimate strength, fu (Re) to
actual tensile yield strength (fy) shall be at least 1.25 and minimum
elongation after fracture (A5.65) & minimum total elongation at
maximum force (Agt) is 14% and 2.5% respectively.
GI Wire (22 BWG) 0.0100 kg 90.00 0.90
Re-bar Fabricator 0.0030 day 570.00 1.71
Skilled Labour 0.0025 day 450.00 1.13
Ordinary Labour 0.0075 day 370.00 2.78
M.S. Ribbed/ Deformed Bar (Grade 400) 1.0200 kg 58.00 59.16

Subtotal-A: 65.67

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 66.98

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 73.68


VAT 6% of Total 4.91
IT 4% of Total 3.27
Total: 81.87

Note : Rates of all items should be inclusive of all supply and carriage. Page: 174 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.05.3 Grade 420 (B420DWR): Ribbed or Deformed bar produced and marked kg
as per ISO 6935-2:2015/ ASTM A706M - 16 with minimum yield
strength, fy(ReH) = 420 MPa but fy(ReH) not exceeding 540 MPa, the
ratio of ultimate tensile strength, fu(Rm) to actual yield strength,
fy(ReH) shall be at least 1.25 and minimum elongation in 200mm shall
be at least 14% for bar sizes 10mm through 20mm, at least 12% for
bar sizes 22mm through 32mm and at least 10% for bar sizes 40mm
and 50mm.
GI Wire (22 BWG) 0.0100 kg 90.00 0.90
Re-bar Fabricator 0.0030 day 570.00 1.71
Skilled Labour 0.0025 day 450.00 1.13
Ordinary Labour 0.0075 day 370.00 2.78
M.S. Ribbed/ Deformed Bar (Grade 420) 1.0200 kg 58.00 59.16

Subtotal-A: 65.67

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 66.98

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 73.68


VAT 6% of Total 4.91
IT 4% of Total 3.27
Total: 81.87

Note : Rates of all items should be inclusive of all supply and carriage. Page: 175 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.06 Labour for breaking head of hardened cast-in-situ bored pile/ pre-cast cum
piles to the correct lines and levels from the top of the piles to the cut-
off level as indicated in the approved drawing and exposing pile
reinforcement for embedment in pile cap by any means and disposal of
the debris to an unobjectionable place outside the site premises
including scrapping and removing concrete from steel/ MS rods,
straightening and bending of pile bars, preparation and making of
platform where necessary, carrying, all sorts of handling, stacking the
same properly after clearing, leveling and dressing the site and clearing
the river bed, etc. all complete as per direction of the E-I-C.
Measurement will be given for the actual pile head volume to be
broken.The debris from pile chipping shall be disposed outside the site
premises at an environmentally safe place with minimum traffic
disruption and procuring entity will not be responsilbe for any
irregularities by the party regarding dumping of the debris.
(Measurement will be given for the actual pile head volume to be
broken).
Skilled Labour 0.1500 day 450.00 67.50
Ordinary Labour 9.0000 day 370.00 3330.00

Subtotal-A: 3397.50
Repairing of pile head including materials ( +10.00 % on Subtotal-A ) 339.75
Straightening and bending of pile bars, removing ( +10.00 % on Subtotal-A ) 339.75
the debris to a safe distance, tools & plant,
sundries etc.
Subtotal-A1: 4077.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4158.54

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 4574.39


VAT 6% of Total 304.96
IT 4% of Total 203.31
Total: 5082.66

Note : Rates of all items should be inclusive of all supply and carriage. Page: 176 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.07 Labour charge for driving pre-cast RCC piles with drop hammer type rig
in any type of soil, handling and keeping in position and driving with
suitable monkey/drop hammer for small pile otherwise suitable
mechanical means to the required depth including fitting and fixing steel
cap, etc. cost included hire charges of machineries, tools & equipments,
wages of operational staff etc. all complete in all respect as per
approved drawing, specification and direction of the Engineer-in-charge.

3.11.07.1 Cost of pile driving (Size-150mmx150mm) depth up to 6 m m


Skilled Labour 0.0200 day 450.00 9.00
Ordinary Labour 0.4000 day 370.00 148.00
H.C. of Driving Equipment 0.0400 day 350.00 14.00

Subtotal-A: 171.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 174.42

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 191.86


VAT 6% of Total 12.79
IT 4% of Total 8.53
Total: 213.18

Note : Rates of all items should be inclusive of all supply and carriage. Page: 177 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.07.2 Cost of pile driving (Size-150mm to 200mmx200mm) depth up to 6 m m


Operator 0.0208 day 570.00 11.86
Skilled Labour 0.0417 day 450.00 18.77
Ordinary Labour 0.1250 day 370.00 46.25
H.C. of Tripod and Mechanical Winch Machine complete with 0.0208 day 3000.00 62.40
power unit and accessories
Diesel 0.3000 liter 68.00 20.40

Subtotal-A: 159.67
Preparation of Machine Base/Platform ( +75.00 % on Subtotal-A ) 119.75
Subtotal-A1: 279.42

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 285.01

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 313.51


VAT 6% of Total 20.90
IT 4% of Total 13.93
Total: 348.35

Note : Rates of all items should be inclusive of all supply and carriage. Page: 178 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.07.3 Cost of pile driving (Size-150mm to 200mmx200mm) depth 6m to 12m m


and above
Operator 0.0278 day 570.00 15.85
Skilled Labour 0.0556 day 450.00 25.02
Ordinary Labour 0.1944 day 370.00 71.93
H.C. of Tripod and Mechanical Winch Machine complete with 0.0278 day 3000.00 83.40
power unit and accessories
Diesel 0.4000 liter 68.00 27.20

Subtotal-A: 223.39
Preparation of Machine Base/Platform ( +75.00 % on Subtotal-A ) 167.55
Subtotal-A1: 390.94

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 398.76

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 438.63


VAT 6% of Total 29.24
IT 4% of Total 19.49
Total: 487.37

Note : Rates of all items should be inclusive of all supply and carriage. Page: 179 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.07.4 Cost of pile driving (Size-200mm to 250mmx250mm) depth upto 6m m


Operator 0.0238 day 570.00 13.57
Skilled Labour 0.0476 day 450.00 21.42
Ordinary Labour 0.1429 day 370.00 52.87
H.C. of Tripod and Mechanical Winch Machine complete with 0.0238 day 3000.00 71.40
power unit and accessories
Diesel 0.3800 liter 68.00 25.84

Subtotal-A: 185.10
Preparation of Machine Base/Platform ( +75.00 % on Subtotal-A ) 138.82
Subtotal-A1: 323.92

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 330.40

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 363.44


VAT 6% of Total 24.23
IT 4% of Total 16.15
Total: 403.82

Note : Rates of all items should be inclusive of all supply and carriage. Page: 180 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.07.5 Cost of pile driving (Size-200mm to 250mmx250mm) depth 6m to 12m m


and above
Operator 0.0417 day 570.00 23.77
Skilled Labour 0.0833 day 450.00 37.49
Ordinary Labour 0.2917 day 370.00 107.93
H.C. of Tripod and Mechanical Winch Machine complete with 0.0417 day 3000.00 125.10
power unit and accessories
Diesel 0.6700 liter 68.00 45.56

Subtotal-A: 339.84
Preparation of Machine Base/Platform ( +75.00 % on Subtotal-A ) 254.88
Subtotal-A1: 594.73

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 606.62

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 667.28


VAT 6% of Total 44.49
IT 4% of Total 29.66
Total: 741.42

Note : Rates of all items should be inclusive of all supply and carriage. Page: 181 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.07.6 Cost of pile driving (Size-250mm to 300mmx300mm) depth upto 6m m


Operator 0.0278 day 570.00 15.85
Skilled Labour 0.0556 day 450.00 25.02
Ordinary Labour 0.1944 day 370.00 71.93
H.C. of Tripod and Mechanical Winch Machine complete with 0.0278 day 3000.00 83.40
power unit and accessories
Diesel 0.4400 liter 68.00 29.92

Subtotal-A: 226.11
Preparation of Machine Base/Platform ( +75.00 % on Subtotal-A ) 169.59
Subtotal-A1: 395.70

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 403.61

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 443.97


VAT 6% of Total 29.60
IT 4% of Total 19.73
Total: 493.31

Note : Rates of all items should be inclusive of all supply and carriage. Page: 182 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.07.7 Cost of pile driving (Size-250mm to 300mmx300mm) depth 6m to 12m m


and above
Operator 0.0556 day 570.00 31.69
Skilled Labour 0.1111 day 450.00 50.00
Ordinary Labour 0.4440 day 370.00 164.28
H.C. of Tripod and Mechanical Winch Machine complete with 0.0556 day 3000.00 166.80
power unit and accessories
Diesel 0.8800 liter 68.00 59.84

Subtotal-A: 472.61
Preparation of Machine Base/Platform ( +75.00 % on Subtotal-A ) 354.46
Subtotal-A1: 827.06

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 843.60

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 927.96


VAT 6% of Total 61.86
IT 4% of Total 41.24
Total: 1031.07

Note : Rates of all items should be inclusive of all supply and carriage. Page: 183 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.07.8 Cost of pile driving (Size-300mm to 350mmx350mm) depth upto 6m m


Operator 0.0417 day 570.00 23.77
Skilled Labour 0.0833 day 450.00 37.49
Ordinary Labour 0.2917 day 370.00 107.93
H.C. of Tripod and Mechanical Winch Machine complete with 0.0417 day 3000.00 125.10
power unit and accessories
Diesel 0.6700 liter 68.00 45.56

Subtotal-A: 339.84
Preparation of Machine Base/Platform ( +75.00 % on Subtotal-A ) 254.88
Subtotal-A1: 594.73

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 606.62

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 667.28


VAT 6% of Total 44.49
IT 4% of Total 29.66
Total: 741.42

Note : Rates of all items should be inclusive of all supply and carriage. Page: 184 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.07.9 Cost of pile driving (Size-300mm to 350mmx350mm) depth 6m to 12m m


and above
Operator 0.0833 day 570.00 47.48
Skilled Labour 0.1667 day 450.00 75.02
Ordinary Labour 0.5833 day 370.00 215.82
H.C. of Tripod and Mechanical Winch Machine complete with 0.0833 day 3000.00 249.90
power unit and accessories
Diesel 1.3300 liter 68.00 90.44

Subtotal-A: 678.66
Preparation of Machine Base/Platform ( +75.00 % on Subtotal-A ) 508.99
Subtotal-A1: 1187.65

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1211.40

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1332.54


VAT 6% of Total 88.84
IT 4% of Total 59.22
Total: 1480.60

3.11.08 CCBSS-10(PW): Manufacturing and supplying Plain Cement Concrete


(PCC) Blocks with cement conforming to BDS EN 197-1 : 2003 CEM-II/A-
M 42.5N, sand of minimum FM 1.5 and 40 mm down well graded
shingles to attain a minimum 28 days cylinder strength of 10.00 Mpa
(suggested mix proporation 1:3:6), including grading, washings
shingles, mixing in standard mixture machine, casting in forms, making
shutter water-tight properly, compacting by vibrator machine and curing
for at least 28 days, including preparation of platform, shuttering and
stacking in measurable stacks, cost of all materials, labour, equiptment
and machinery, work at all leads and lifts, loading and unloading,
transportation and all other incidental charges etc. all complete in all
respect as per approved drawing, specification and direction of the
Engineer-in-charge. Steel shutter shall be used to perform the job.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 185 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.08.01 Size 500mmX500mmX300mm each


Stone Shingles (20mm down graded) 0.0675 m3 3500.00 236.25
Sand (FM - 1.5) 0.0338 m3 795.00 26.87
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.3175 bag 430.00 136.53
Mason 0.0060 day 550.00 3.30
Skilled Labour 0.0300 day 450.00 13.50
Ordinary Labour 0.1125 day 370.00 41.63
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0045 day 1200.00 5.40
Hire and running charges of Concrete Vibrator 0.0045 day 400.00 1.80

Subtotal-A: 465.27
Form Work: ( +2.00 % on Subtotal-A ) 9.31
Subtotal-A1: 474.58

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 484.07

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 532.47


VAT 6% of Total 35.50
IT 4% of Total 23.67
Total: 591.64

Note : Rates of all items should be inclusive of all supply and carriage. Page: 186 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.08.02 Size 400mmX400mmX300mm each


Stone Shingles (20mm down graded) 0.0432 m3 3500.00 151.20
Sand (FM - 1.5) 0.0216 m3 795.00 17.17
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.2032 bag 430.00 87.38
Mason 0.0168 day 550.00 9.24
Skilled Labour 0.0192 day 450.00 8.64
Ordinary Labour 0.0720 day 370.00 26.64
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0029 day 1200.00 3.48
Hire and running charges of Concrete Vibrator 0.0029 day 400.00 1.16

Subtotal-A: 304.91
Form Work: ( +1.00 % on Subtotal-A ) 3.05
Subtotal-A1: 307.96

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 314.12

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 345.53


VAT 6% of Total 23.04
IT 4% of Total 15.36
Total: 383.92

Note : Rates of all items should be inclusive of all supply and carriage. Page: 187 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.08.03 Size 300mmX300mmX300mm each


Stone Shingles (20mm down graded) 0.0243 m3 3500.00 85.05
Sand (FM - 1.5) 0.0122 m3 795.00 9.70
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.1143 bag 430.00 49.15
Mason 0.0113 day 550.00 6.22
Skilled Labour 0.0130 day 450.00 5.85
Ordinary Labour 0.0486 day 370.00 17.98
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0019 day 1200.00 2.28
Hire and running charges of Concrete Vibrator 0.0019 day 400.00 0.76

Subtotal-A: 176.99
Form Work: ( +2.00 % on Subtotal-A ) 3.54
Subtotal-A1: 180.52

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 184.14

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 202.55


VAT 6% of Total 13.50
IT 4% of Total 9.00
Total: 225.05

Note : Rates of all items should be inclusive of all supply and carriage. Page: 188 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.08.04 Size 500mmX500mmX200mm each


Stone Shingles (20mm down graded) 0.0450 m3 3500.00 157.50
Sand (FM - 1.5) 0.0225 m3 795.00 17.89
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.2117 bag 430.00 91.03
Mason 0.0175 day 550.00 9.63
Skilled Labour 0.0220 day 450.00 9.90
Ordinary Labour 0.0825 day 370.00 30.53
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0030 day 1200.00 3.60
Hire and running charges of Concrete Vibrator 0.0030 day 400.00 1.20

Subtotal-A: 321.27
Form Work: ( +2.00 % on Subtotal-A ) 6.43
Subtotal-A1: 327.69

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 334.25

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 367.67


VAT 6% of Total 24.51
IT 4% of Total 16.34
Total: 408.53

Note : Rates of all items should be inclusive of all supply and carriage. Page: 189 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.08.05 Size 500mmX500mmX150mm each


Stone Shingles (20mm down graded) 0.0338 m3 3500.00 118.30
Sand (FM - 1.5) 0.0169 m3 795.00 13.44
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.1588 bag 430.00 68.28
Mason 0.0131 day 550.00 7.21
Skilled Labour 0.0165 day 450.00 7.43
Ordinary Labour 0.0619 day 370.00 22.90
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0025 day 1200.00 3.00
Hire and running charges of Concrete Vibrator 0.0025 day 400.00 1.00

Subtotal-A: 241.55
Form Work: ( +2.00 % on Subtotal-A ) 4.83
Subtotal-A1: 246.38

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 251.31

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 276.44


VAT 6% of Total 18.43
IT 4% of Total 12.29
Total: 307.16

Note : Rates of all items should be inclusive of all supply and carriage. Page: 190 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.08.06 Size 400mmX400mmX150mm each


Stone Shingles (20mm down graded) 0.0216 m3 3500.00 75.60
Sand (FM - 1.5) 0.0108 m3 795.00 8.59
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.1016 bag 430.00 43.69
Mason 0.0084 day 550.00 4.62
Skilled Labour 0.0106 day 450.00 4.77
Ordinary Labour 0.0396 day 370.00 14.65
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0016 day 1200.00 1.92
Hire and running charges of Concrete Vibrator 0.0016 day 400.00 0.64

Subtotal-A: 154.48
Form Work: ( +2.00 % on Subtotal-A ) 3.09
Subtotal-A1: 157.57

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 160.72

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 176.79


VAT 6% of Total 11.79
IT 4% of Total 7.86
Total: 196.43

Note : Rates of all items should be inclusive of all supply and carriage. Page: 191 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.08.07 Size 300mmX300mmX150mm each


Stone Shingles (20mm down graded) 0.0122 m3 3500.00 42.70
Sand (FM - 1.5) 0.0061 m3 795.00 4.85
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.0572 bag 430.00 24.60
Mason 0.0052 day 550.00 2.86
Skilled Labour 0.0065 day 450.00 2.93
Ordinary Labour 0.0243 day 370.00 8.99
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0010 day 1200.00 1.20
Hire and running charges of Concrete Vibrator 0.0010 day 400.00 0.40

Subtotal-A: 88.52
Form Work: ( +2.00 % on Subtotal-A ) 1.77
Subtotal-A1: 90.29

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 92.10

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 101.31


VAT 6% of Total 6.75
IT 4% of Total 4.50
Total: 112.56

Note : Rates of all items should be inclusive of all supply and carriage. Page: 192 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.08.08 Size 250mmX250mmX250mm each


Stone Shingles (20mm down graded) 0.0141 m3 3500.00 49.35
Sand (FM - 1.5) 0.0070 m3 795.00 5.57
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.0662 bag 430.00 28.47
Mason 0.0066 day 550.00 3.63
Skilled Labour 0.0075 day 450.00 3.38
Ordinary Labour 0.0281 day 370.00 10.40
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0011 day 1200.00 1.32
Hire and running charges of Concrete Vibrator 0.0011 day 400.00 0.44

Subtotal-A: 102.54
Form Work: ( +2.50 % on Subtotal-A ) 2.56
Subtotal-A1: 105.11

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 107.21

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 117.93


VAT 6% of Total 7.86
IT 4% of Total 5.24
Total: 131.03

Note : Rates of all items should be inclusive of all supply and carriage. Page: 193 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.08.09 Size 400mmX400mmX100mm each


Stone Shingles (20mm down graded) 0.0144 m3 3500.00 50.40
Sand (FM - 1.5) 0.0072 m3 795.00 5.72
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.0677 bag 430.00 29.11
Mason 0.0056 day 550.00 3.08
Skilled Labour 0.0077 day 450.00 3.47
Ordinary Labour 0.0288 day 370.00 10.66
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0012 day 1200.00 1.44
Hire and running charges of Concrete Vibrator 0.0012 day 400.00 0.48

Subtotal-A: 104.36
Form Work: ( +2.50 % on Subtotal-A ) 2.61
Subtotal-A1: 106.96

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 109.10

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 120.01


VAT 6% of Total 8.00
IT 4% of Total 5.33
Total: 133.35

Note : Rates of all items should be inclusive of all supply and carriage. Page: 194 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.08.10 Size 375mmX225mmX150mm each


Stone Shingles (20mm down graded) 0.0114 m3 3500.00 39.90
Sand (FM - 1.5) 0.0057 m3 795.00 4.53
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.0536 bag 430.00 23.05
Mason 0.0044 day 550.00 2.42
Skilled Labour 0.0061 day 450.00 2.75
Ordinary Labour 0.0228 day 370.00 8.44
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0009 day 1200.00 1.08
Hire and running charges of Concrete Vibrator 0.0009 day 400.00 0.36

Subtotal-A: 82.52
Form Work: ( +2.50 % on Subtotal-A ) 2.06
Subtotal-A1: 84.58

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 86.28

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 94.90


VAT 6% of Total 6.33
IT 4% of Total 4.22
Total: 105.45

Note : Rates of all items should be inclusive of all supply and carriage. Page: 195 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.09 LC-CCB(PW): Labour charge for laying single layer CC Block of different cum
sizes on slope of embankment, including preparation of slopes by
cutting or filling with ramming the filled up earth to the same profile as
that of the finished slope level, including carrying CC blocks, supplying
and filling the interstices tightly with local sand (FM - 0.5), etc. all
complete in all respect as per approved drawing, specification and
direction of the Engineer-in-charge. [Excluding the cost of CC Blocks].
Mason 0.0200 day 550.00 11.00
Skilled Labour 0.3000 day 450.00 135.00
Ordinary Labour 1.3000 day 370.00 481.00

Subtotal-A: 627.00
Bamboo Ladder, Jute Rope, Tools, etc. ( +10.00 % on Subtotal-A ) 62.70
Subtotal-A1: 689.70

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 703.49

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 773.84


VAT 6% of Total 51.59
IT 4% of Total 34.39
Total: 859.83

Note : Rates of all items should be inclusive of all supply and carriage. Page: 196 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.10 WMCCBSS-20(PW): Providing and laying cast in place 12 BWG G.I. wire sqm
meshed Cement Concrete Blocks (1000mm X 1000mm X 100mm) at
bridge approaches/road slopes with cement conforming to BDS EN 197-
1 : 2003 CEM-II/A-M 42.5N, sand of minimum FM 1.5 and 25 mm down
well graded shingles (LAA value not exceeding 35) to attain a minimum
28 days cylinder strength of 20MPa (suggested mix proporation 1:2:4),
including grading, washings shingles, shuttering, mixing in satndard
concrete mixture machine, casting with supplying and laying 75mm
rhombus 12 BWG G.I. wire mesh for required size and length in CC
Block, placing mesh in the middle of CC block as it should be,
compacting concrete properly, curing for 28 days, including preparation
of slopes by cutting or filling with ramming the filled up earth to the
same profile as that of the finished slope level, etc. all complete in all
respect as per approved drawing, specification and direction of the
Engineer-in-charge. (Unit cost including all materials, shuttering,
casting, curing for 28 days, and all other incidental charges, etc.)
Stone Shingles (20mm down graded) 0.0857 m3 3500.00 299.95
Sand (FM - 1.5) 0.0428 m3 795.00 34.03
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.6040 bag 430.00 259.72
GI Wire Net (12 BWG) [Rhombus Size 75mm] 1.0000 m2 100.00 100.00
Mason 0.0050 day 550.00 2.75
Skilled Labour 0.0500 day 450.00 22.50
Ordinary Labour 0.2000 day 370.00 74.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0010 day 1200.00 1.20

Subtotal-A: 794.15
Form works ( +2.50 % on Subtotal-A ) 19.85
Subtotal-A1: 814.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 830.28

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 913.31


VAT 6% of Total 60.89
IT 4% of Total 40.59

Note : Rates of all items should be inclusive of all supply and carriage. Page: 197 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 1014.79

3.11.11 Geo-Textile: Supplying and laying of a geo-textile filter between CC


blocks and embankment slopes properly with non-woven needle
punched type geo-textile filter of different grades, specification for
effective erosion protection in hydraulic structures/river training works
including local handling placing in position, providing machine seamed
joints (with 100% polypropylene or nylon thread) or 35cm lap in dry
condition or minimum 100cm lap under water including protecting the
geo-textile material; from UV ray and from any other damages etc. all
complete in all respect as per approved drawing, specification and
direction of the Engineer-in-charge. (Geo-textile delivered at site should
be clearly labeled with brand name and grade printed at regular
intervals across the body of the fabric)

3.11.11.1 Grade-I : Specification of which Mass (minimum) =170 gm/m2, sqm


Thickness under pressure 2kpa (minimum)=1.5mm, Strip tensile
strength (minimum)=12.0kn/m, Elongation (minimum) =35%, Grab
tensile strength (minimum)=700 N, CBR puncture resistance
(minimum)=2000 N, Effective opening size (Maximum) = 0.10mm,
Permeability vertical under 2 kpa pressure h is 100mm
(minimum)=0.003 m/s and Permeability horizontal under 2 kpa
pressure (minimum)=0.004 m/s.
Geo Textile (Grade-I-DF-20-1.5mm thick) 1.0700 m2 60.00 64.20
Skilled Labour 0.0300 day 450.00 13.50
Ordinary Labour 0.1000 day 370.00 37.00

Subtotal-A: 114.70

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 116.99

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 128.69


VAT 6% of Total 8.58
IT 4% of Total 5.72
Total: 142.99

Note : Rates of all items should be inclusive of all supply and carriage. Page: 198 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.11.2 Grade-II : Specification of which Mass (minimum)=190 gm/m2, sqm


Thickness under pressure 2kpa (minimum)=1.8mm, Strip tensile
strength (minimum)=14.0 kn/m, Elongation (minimum)=35%, Grab
tensile strength (minimum)=750 N, CBR puncture resistance
(minimum)=2200 N, Effective opening size (Maximum)=0.10mm,
Permeability vertical under 2 kpa pressure h is 100mm
(minimum)=0.003 m/s and Permeability horizontal under 2 kpa
pressure (minimum)=0.004 m/s.
Geo Textile (Grade-II-DF-30-2.0mm thick) 1.0700 m2 60.00 64.20
Skilled Labour 0.0300 day 450.00 13.50
Ordinary Labour 0.1000 day 370.00 37.00

Subtotal-A: 114.70

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 116.99

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 128.69


VAT 6% of Total 8.58
IT 4% of Total 5.72
Total: 142.99

Note : Rates of all items should be inclusive of all supply and carriage. Page: 199 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.11.3 Grade-III : Specification of which Mass (minimum)=240 gm/m2, sqm


Thickness under pressure 2kpa (minimum)=2.0mm, Strip tensile
strength (minimum)=18.0 kn/m, Elongation (minimum)=35%, Grab
tensile strength (minimum)=1000 N, CBR puncture resistance
(minimum)=2700 N, Effective opening size (Maximum)=0.09mm,
Permeability vertical under 2 kpa pressure h is 100mm
(minimum)=0.003 m/s and Permeability horizontal under 2 kpa
pressure (minimum)=0.004 m/s.
Geo Textile (Grade-III-DF-40-2.3mm thick) 1.0700 m2 65.00 69.55
Skilled Labour 0.0300 day 450.00 13.50
Ordinary Labour 0.1000 day 370.00 37.00

Subtotal-A: 120.05

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 122.45

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 134.70


VAT 6% of Total 8.98
IT 4% of Total 5.99
Total: 149.66

Note : Rates of all items should be inclusive of all supply and carriage. Page: 200 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.11.4 Grade-IV : Specification of which Mass (minimum)=310 gm/m2, sqm


Thickness under pressure 2kpa (minimum)=2.6mm, Strip tensile
strength (minimum)=22.0 kn/m, Elongation (minimum)=40%, Grab
tensile strength (minimum)=1300 N, CBR puncture resistance
(minimum)=3700 N, Effective opening size (Maximum) = 0.09mm,
Permeability vertical under 2 kpa pressure h is100mm
(minimum)=0.003 m/s and Permeability horizontal under 2 kpa
pressure (minimum)=0.004 m/s.
Geo Textile (Grade-IV-DF-50-2.5mm thick) 1.0700 m2 75.00 80.25
Skilled Labour 0.0300 day 450.00 13.50
Ordinary Labour 0.1000 day 370.00 37.00

Subtotal-A: 130.75

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 133.37

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 146.70


VAT 6% of Total 9.78
IT 4% of Total 6.52
Total: 163.00

Note : Rates of all items should be inclusive of all supply and carriage. Page: 201 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.11.5 Grade-V : Specification of which Mass (minimum)=365 gm/m2, sqm


Thickness under pressure 2kpa (minimum)=3.0mm, Strip tensile
strength (minimum)=25.0 kn/m, Elongation (minimum)=40%, Grab
tensile strength (minimum)=1500 N, CBR puncture resistance
(minimum)=4000 N, Effective opening size (Maximum) = 0.08mm,
Permeability vertical under 2 kpa pressure h is 100mm (minimum) =
0.003 m/s and Permeability horizontal under 2 kpa pressure (minimum)
= 0.004 m/s.
Geo Textile (Grade-V-DF-60-3.0mm thick) 1.0700 m2 90.00 96.30
Skilled Labour 0.0300 day 450.00 13.50
Ordinary Labour 0.1000 day 370.00 37.00

Subtotal-A: 146.80

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 149.74

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 164.71


VAT 6% of Total 10.98
IT 4% of Total 7.32
Total: 183.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 202 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.12 LC-Geo-Tex: Labour charge for laying of a geo-textile filter between CC sqm
blocks and embankment slopes properly with non-woven needle
punched type geo- textile filter of different grades for effective erosion
protection in hydraulic structures/river training works including local
handling, placing in proper position, leveling, dressing, maintaining
slope, etc. all complete in all respect as per approved drawing,
specification and direction of the Engineer-in-charge.
Skilled Labour 0.0100 day 450.00 4.50
Ordinary Labour 0.0300 day 370.00 11.10

Subtotal-A: 15.60

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 15.91

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 17.50


VAT 6% of Total 1.17
IT 4% of Total 0.78
Total: 19.45

Note : Rates of all items should be inclusive of all supply and carriage. Page: 203 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.13 RCC(P+W)BC-PW: Construction and Installing in position palisading m


work as per standard drawing enumerated in Appendix-6 (type designs
for protective works) using Pre-Cast RCC Post & Cast-In-Situ RCC Wall
with 02 (two) meter long (size 150mmX150mm) pre-cast RCC (1:1.5:3)
post made of 20mm down graded brick chips to be driven by suitable
monkey/drop hammer in full length of the post @ 1.0meter c/c into the
ground laying on proper alignment, breaking head (150mm length) of
all post carefully, scrapping and removing concrete from Steel/MS rod,
including in-situ casting of 150mm X 150mm Grade beam and 100mm
thick and 1 meter high RCC vertical wall along the protective work using
1st class bricks/ picked 20mm down graded bricks chips, sand
(minimum FM 1.80) and cement conforming to BDS EN 197-1 : 2003
CEM-II/A-M 42.5N to attain a minimum 28 days ultimate cylinder
crushing 20.00 Mpa (suggested mix proportion 1:1.5:3), supplying,
fabricating and binding of M. S. High strength deformed bar of required
size, length and spacing by means approved designed including form
work, etc. all complete in all respect as per approved drawing,
specification and direction of the Engineer-in-charge. (Unit cost
including reinforcement, its fabrication, shuttering, casting, curing for 28
days, driving of the post and all other incidental charges, etc.)
Earthwork in excavation of foundation trenches, including 0.0450 cum 75.80 3.41
layout, ……. (2.04.1.1)
Reinforced cement concrete works (1:1.5:3) Below Plinth 0.0450 cum 8266.37 371.99
Level and in Ground Floor……… (3.11.04.1)
Pre-cast pile driving (Size-150mmx150mm) ………… 2.0350 m 171.00 347.99
(3.11.07.1)
Labour for breaking head of cast-in-situ bored pile/pre-cast 0.0037 cum 7474.50 27.66
pile……. (3.11.06)
Reinforced cement concrete works (1:1.5:3) In foundation 0.1320 cum 9077.69 1198.25
beam……. (3.11.04.2)
M.S. Ribbed bar of steel grade RB 300 with minimum fy=300 28.3210 kg 61.59 1744.29
Mpa ………. (3.11.05.1)

Subtotal-A: 3693.58

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 3767.46

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 4144.20

Note : Rates of all items should be inclusive of all supply and carriage. Page: 204 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

VAT 6% of Total 276.28


IT 4% of Total 184.19
Total: 4604.67

Note : Rates of all items should be inclusive of all supply and carriage. Page: 205 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.14 RCC(P+BW)-PW: Construction and Installing in position palisading work m


as per standard drawing enumerated in Appendix-6 (type designs for
protective works) with 250mm thick Brick Masonry work & pre cast RCC
Post of 03 (three) meter long (size 150mmX150mm) pre-cast RCC
(1:1.5:3) post made by 20mm down graded brick chips to be driven by
suitable monkey/drop hammer in 2/3rd of its total length @ 1 meter c/c
into the ground laying on proper alignment, constructing of 250mm
thick and 1 meter high vertical wall along the protective work using
Brick Masonry work in cement mortar (1:3), filling the interstices tightly
with mortar, raking out joints, cleaning and soaking bricks at least for
24 hours before use, washing of sand, including flush pointing at front
face of the brick wall with cement mortar (1:2), curing for requisite
period, including excavating minimum 300mm depth foundation
trenches for brick wall and laying one layer polythene sheet,
constructing 50mm thick cement concrete (1:3:6) on it & below the
brick work by means approved designed including form work, etc. all
complete in all respect as per approved drawing, specification and
direction of the Engineer-in-charge. (Unit cost including reinforcement,
its fabrication, shuttering, casting, curing for 28 days, driving of the post
and all other incidental charges, etc.)
Earthwork in excavation of foundation trenches, including 0.1140 cum 75.80 8.64
layout, ……. (2.04.1.1)
Providing single layer polythene sheet (0.18mm thick)……… 0.3500 sqm 12.68 4.44
(3.07.1)
Mass concrete in foundation (1:3:6) with cement, sand and 0.0130 cum 5707.82 74.20
brick chips ……….. (3.11.01)
First class brick works in cement mortar (1:3)……… 0.2500 cum 5919.90 1479.97
(3.11.02.2)
Reinforced cement concrete works (1:1.5:3) Below Plinth 0.0690 cum 8266.37 570.38
Level and in Ground Floor……… (3.11.04.1)
Pre-cast pile driving (Size-150mmx150mm) ………… 2.4200 m 171.00 413.82
(3.11.07.1)
M.S. Ribbed bar of steel grade RB 300 with minimum fy=300 16.6630 kg 61.59 1026.27
Mpa ………. (3.11.05.1)
Flush pointing to brick wall with cement mortar (1:2) for 1.0630 sqm 107.45 114.22
Ground floor…….. (3.11.03)

Note : Rates of all items should be inclusive of all supply and carriage. Page: 206 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Subtotal-A: 3691.95

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 3765.79

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 4142.37


VAT 6% of Total 276.16
IT 4% of Total 184.11
Total: 4602.63

Note : Rates of all items should be inclusive of all supply and carriage. Page: 207 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.15.1 RCC(P+SP)-PW: Palisading work with Single pre-cast RCC (1:1.5:3) m


plate (1050mm X 600mm X 75mm) fitted with RCC (1:1.5:3) post of
150mm x 150mm, 2m long, 0.9m center to center to be driven 2/3rd of
the total length (2m) of the post made of 20mm down graded brick
chips. Pre-cast plate to be fitted with RCC post fixed necessary nuts and
bolts at driving of post supplying all necessary nuts and bolts etc. all
complete in all respect as per approved drawing enumerated in
Appendix-6, specification and direction of the Engineer-in-charge.
Measurement will be made on center to center distance of the post.
Reinforced cement concrete works (1:1.5:3) Below Plinth 0.1020 cum 8266.37 843.17
Level and in Ground Floor……… (3.11.04.1)
Pre-cast pile driving (Size-150mmx150mm) ………… 1.9560 m 171.00 334.48
(3.11.07.1)
M.S. Ribbed bar of steel grade RB 300 with minimum fy=300 14.1230 kg 61.59 869.84
Mpa ………. (3.11.05.1)
Nails/ Nut bolts/ Screw/ Spikes 0.4070 kg 65.00 26.46
Ordinary Labour 0.1500 day 370.00 55.50
Skilled Labour 0.1000 day 450.00 45.00

Subtotal-A: 2174.44

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2217.93

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2439.72


VAT 6% of Total 162.65
IT 4% of Total 108.43
Total: 2710.80

Note : Rates of all items should be inclusive of all supply and carriage. Page: 208 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.15.2 RCC(P+DP)-PW: Palisading work with Double pre-cast RCC (1:1.5:3) m


plate (1050mm X 600mm X 75mm) fitted with RCC (1:1.5:3) post of
150mm x 150mm, 3m long, 0.9m center to center to be driven 2/3rd of
the total length (3m) of the post made of 20mm down graded brick
chips. Pre-cast plate to be fitted with RCC post fixed necessary nuts and
bolts at driving of post supplying all necessary nuts and bolts etc..all
complete in all respect as per approved drawing (Road Design
Standards – 2005, Plate UPR-UNR-EM1-2-1)/enumerated in Appendix-6,
specification and direction of the Engineer-in- charge. Measurement will
be made on center to center distance of the post.
Reinforced cement concrete works (1:1.5:3) Below Plinth 0.1820 cum 8266.37 1504.48
Level and in Ground Floor……… (3.11.04.1)
Pre-cast pile driving (Size-150mmx150mm) ………… 2.4440 m 171.00 417.92
(3.11.07.1)
M.S. Ribbed bar of steel grade RB 300 with minimum fy=300 23.2410 kg 61.59 1431.41
Mpa ………. (3.11.05.1)
Nails/ Nut bolts/ Screw/ Spikes 0.8140 kg 65.00 52.91
Ordinary Labour 0.2000 day 370.00 74.00
Skilled Labour 0.1000 day 450.00 45.00

Subtotal-A: 3525.73

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 3596.24

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 3955.87


VAT 6% of Total 263.72
IT 4% of Total 175.82
Total: 4395.41

Note : Rates of all items should be inclusive of all supply and carriage. Page: 209 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.16.1 ReSP-PW: Labour charge for Re-setting of existing distorted/collapsed m


RCC single plate palisading work including pulling out of
distorted/collapsed existing RCC post (150mmX150mm, 3m long, 0.9m
c/c) and re-driven the post 2/3rd (minimum) of its total length by
suitable monkey/drop hammer. Existing RCC plate to be fitted with
necessary nuts & bolts at appropriate location of driven RCC post,
including supplying required nuts and bolts etc. all complete in all
respect as per approved drawing, specification and direction of the
Engineer-in-charge.
Skilled Labour 0.0250 day 450.00 11.25
Ordinary Labour 1.2500 day 370.00 462.50
H.C. of Driving Equipment 0.0500 day 350.00 17.50
Nails/ Nut bolts/ Screw/ Spikes 0.3400 kg 65.00 22.10

Subtotal-A: 513.35

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 523.62

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 575.98


VAT 6% of Total 38.40
IT 4% of Total 25.60
Total: 639.98

Note : Rates of all items should be inclusive of all supply and carriage. Page: 210 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.16.2 ReDP-PW: Labour charge for Re-setting of existing distorted/collapsed m


RCC Double plate palisading work including pulling out of
distorted/collapsed existing RCC post (150mmX150mm, 3m long, 0.9m
c/c) and re-driven the post 2/3rd (minimum) of its total length by
suitable monkey/drop hammer. Existing RCC plate to be fitted with
necessary nuts & bolts at appropriate location of driven RCC post
including supplying required nuts and bolts etc. all complete in all
respect as per approved drawing, specification and direction of the
Engineer-in-charge.
Skilled Labour 0.3500 day 450.00 157.50
Ordinary Labour 1.7500 day 370.00 647.50
H.C. of Driving Equipment 0.0500 day 350.00 17.50
Nails/ Nut bolts/ Screw/ Spikes 0.6700 kg 65.00 43.55

Subtotal-A: 866.05

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 883.37

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 971.71


VAT 6% of Total 64.78
IT 4% of Total 43.19
Total: 1079.68

Note : Rates of all items should be inclusive of all supply and carriage. Page: 211 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.17 BP(Ø75mm): Supplying of straight & strong bamboo posts of minimum m


75mm dia (at all sections) and driving the same vertically in the ground
upto required depth by any means, all complete in all respect as per
approved drawing, specification and direction of the Engineer-in-charge.
The rate is for single pin. (Total length embedded and above ground
shall be considered towards payment)
Skilled Labour 0.0001 day 450.00 0.05
Ordinary Labour 0.0300 day 370.00 11.10
Borak Bamboo (75mm dia) 1.0000 m 38.00 38.00

Subtotal-A: 49.15

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 50.13

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 55.14


VAT 6% of Total 3.68
IT 4% of Total 2.45
Total: 61.27

Note : Rates of all items should be inclusive of all supply and carriage. Page: 212 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.18 CHB-PW(Ø75mm): Closed hole bamboo palisading with matured borak sqm
bamboo of minimum diameter of 75mm including driving at least half of
its length below G.L. including carrying of all materials, fitting fixing with
half split borak bamboo runners @450mm c/c horizontally with iron
nails, GI wire etc. with double tarza etc. all complete in all respect as
per approved drawing, specification and direction of the Engineer-in-
charge. (Payment will be made for the work above ground water levels).
Tarza 0.7500 m2 210.00 157.50
Skilled Labour 0.1000 day 450.00 45.00
Ordinary Labour 0.4000 day 370.00 148.00
Borak Bamboo (75mm dia) 18.0000 m 38.00 684.00
Nails/ Nut bolts/ Screw/ Spikes 0.2000 kg 65.00 13.00
GI Wire (22 BWG) 0.1200 kg 90.00 10.80

Subtotal-A: 1058.30

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1079.47

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1187.41


VAT 6% of Total 79.16
IT 4% of Total 52.77
Total: 1319.35

Note : Rates of all items should be inclusive of all supply and carriage. Page: 213 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.19.1 BDS-PW: Providing Palisading with Bitumen drum sheet walling tied with sqm
20 gauge G.I. wire, fixing the same with already driven bamboo posts
with half split Borrak bamboo (75mm to 100mm dia) runners @450mm
c/c horizontally with iron nail, G.I wire etc. all complete in all respect as
per approved drawing, specification and direction of the Engineer-in-
charge. (Cost excluded the bamboo posts)
Bitumen Drum Sheet 1.0000 m2 269.00 269.00
Skilled Labour 0.0100 day 450.00 4.50
Ordinary Labour 0.4000 day 370.00 148.00
Borak Bamboo (75mm to 100mm) 1.5000 m 42.00 63.00
GI Wire (22 BWG) 0.1000 kg 90.00 9.00
Nails/ Nut bolts/ Screw/ Spikes 0.1500 kg 65.00 9.75

Subtotal-A: 503.25

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 513.32

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 564.65


VAT 6% of Total 37.64
IT 4% of Total 25.10
Total: 627.39

Note : Rates of all items should be inclusive of all supply and carriage. Page: 214 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.19.2 BDS-PW(Ø150mmGP): Providing Palisading with bitumen drum sheet sqm


fitted with gazari post 150mm minimum dia, 0.90m c/c to be driven half
of the total length of the post Drum sheet to be fitted with
Shisu/Mehagoni wooden batten 50mmx50mm size at 0.60 meter c/c
supplying and fixing with 150mm dia gazari post crosses 1.80 meter c/c
fixed with necessary nuts and bolts at the slope side of palisading and
tied up the palisading work by GI wire No. 10 with gazari post 150mm
dia and 1.8 meter c/c driven at the opposite direction up to 1.20 meter
depth including supplying all necessary nails and spikes etc. all complete
in all respect as per approved drawing, specification and direction of the
Engineer-in-charge.(Payment will be made for the work above ground
levels.)
Bitumen Drum Sheet 1.0000 m2 269.00 269.00
Skilled Labour 0.0100 day 450.00 4.50
Ordinary Labour 0.4000 day 370.00 148.00
Mehagoni/ Shishu 0.0040 m3 59730.00 238.92
Shal/sundari/gazari Bullah (150mm to 200mm) 2.4000 m 225.00 540.00
Nails/ Nut bolts/ Screw/ Spikes 0.4000 kg 65.00 26.00
GI Wire (22 BWG) 0.1500 kg 90.00 13.50

Subtotal-A: 1239.92

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1264.72

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1391.19


VAT 6% of Total 92.75
IT 4% of Total 61.83
Total: 1545.77

Note : Rates of all items should be inclusive of all supply and carriage. Page: 215 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.20 GBW(1:8)-PW: Providing single layer gunny bag barrier/wall for toe sqm
protection with cement (conforming to BDS EN 197-1 : 2003 CEM-II/A-
M 42.5N) and sand (FM-1.00) mortar 1:8 filled gunny bags [minimum
size L: 650mmX W:400mmX H:175mm], including washing of sand,
mixing in standard mixture machine, filled & tamping the bags in place,
stitching bags by hand sewing machine, curing by sprinkling water over
the bags, including preparation of trenches (bed) by cutting or filling
with ramming the filled up earth to the same profile as that of the
finished toe level, placing the filled gunny bags along the toe line by
avoiding vertical joints, etc. all complete in all respect as per approved
drawing, specification and direction of the Engineer-in-charge. Rate is
inclusive of cost of all materials, labour and all incidental charges in this
connection.
Sand (FM - 0.8) 0.3203 m3 480.00 153.74
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 1.1301 bag 430.00 485.94
Empty Gunny Bag 8.0000 each 30.00 240.00
Mason 0.1000 day 550.00 55.00
Skilled Labour 0.1000 day 450.00 45.00
Ordinary Labour 1.0000 day 370.00 370.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.1000 day 1200.00 120.00

Subtotal-A: 1469.69

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1499.08

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1648.99


VAT 6% of Total 109.93
IT 4% of Total 73.29
Total: 1832.21

Note : Rates of all items should be inclusive of all supply and carriage. Page: 216 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.21 GB(1:8)-SPW: Providing single layer gunny bag on slope of sqm


embankment for slope protection with cement (conforming to BDS EN
197-1 : 2003 CEM-II/A-M 42.5N) and sand (FM-1.00) mortar 1:8 filled
gunny bags [minimum size L: 650mmX W:400mmX H:175mm],
including washing of sand, mixing in standard mixture machine, filled &
tamping the bags in place, stitching bags by hand sewing machine,
curing by sprinkling water over the bags, including preparation of slope
(bed) by cutting or filling with ramming the filled up earth to the same
profile as that of the finished slope level, placing the filled gunny bags
along the slope by minimum 40% overlapping to the successive
previous layer and avoiding vertical joints, etc. all complete in all respect
as per approved drawing, specification and direction of the Engineer-in-
charge. Rate is inclusive of cost of all materials, labour and all incidental
charges in this connection.
Sand (FM - 0.8) 0.1820 m3 480.00 87.36
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.6421 bag 430.00 276.10
Empty Gunny Bag 5.0000 each 30.00 150.00
Mason 0.0625 day 550.00 34.38
Skilled Labour 0.0625 day 450.00 28.13
Ordinary Labour 0.6250 day 370.00 231.25
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0625 day 1200.00 75.00

Subtotal-A: 882.21

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 899.86

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 989.84


VAT 6% of Total 65.99
IT 4% of Total 43.99
Total: 1099.83

Note : Rates of all items should be inclusive of all supply and carriage. Page: 217 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.22 DSFGB: Supplying & dumping of soil filled geo-textile bags of different
size and capacity (fill volume and weight when filled with dry
sand/earth) at the specified locations along the bottom of piles of piers/
toe line properly, including loading, unloading, carrying geo-bags from
stack-yard to dumping place by head load and power driven flat top
country boat etc. including supplying of geo-textile bags (empty) of
different sizes and capacity at project/work site conforming to the
following Technical Specifications, filling of empty geo-textile bags of
different sizes with suitable soil, stitching the bags by hand sewing
machine in accordance with the detailed drawing and technical
specifications with plastic thread, protecting the geo-textile bags from
UV ray or any other damages and dumping the same in position etc.
including higher charge and mobilization of all equipment, materials,
labours, taxes, incidental charges etc. complete in all respect as per
approved drawing, specification and direction of E-I-C.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 218 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.22.01 Geo-Textile Bag: Empty Size: 800mm x 650mm, Fill Volumn: 0.0520 bag
cum & Weight: 80 Kg, [Geo-Textile Grade: Grade-III-DF-40-2.3mm
thick]
Geo Textile (Grade-III-DF-40-2.3mm thick) 1.1900 m2 65.00 77.35
Royalty of Earth 0.0520 m3 25.00 1.30
Skilled Labour 0.0070 day 450.00 3.15
Ordinary Labour 0.0514 day 370.00 19.02
H.C. of Sewing Machine 0.0029 day 500.00 1.45
H.C. of Cutter (Geo-Textile) 0.0017 day 500.00 0.85

Subtotal-A: 103.12
Cost of Polyproplene/ Nylon thread & other ( +5.00 % on Subtotal-A ) 5.16
consumables etc.
Subtotal-A1: 108.27

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 110.44

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 121.48


VAT 6% of Total 8.10
IT 4% of Total 5.40
Total: 134.98

Note : Rates of all items should be inclusive of all supply and carriage. Page: 219 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.22.02 Geo-Textile Bag: Empty Bag Size: 900mm x 700mm, Fill Volumn: bag
0.0730 cum & Weight: 110 Kg, [Geo-Textile Grade: Grade-III-DF-40-
2.3mm thick]
Geo Textile (Grade-III-DF-40-2.3mm thick) 1.4250 m2 65.00 92.63
Operator 0.0033 day 570.00 1.88
Helper 0.0017 day 400.00 0.68
Royalty of Earth 0.0730 m3 25.00 1.83
Foreman 0.0002 day 800.00 0.16
Skilled Labour 0.0040 day 450.00 1.80
Ordinary Labour 0.0600 day 370.00 22.20
H.C. of Sewing Machine 0.0033 day 500.00 1.65
H.C. of Cutter (Geo-Textile) 0.0020 day 500.00 1.00

Subtotal-A: 123.82
Cost of Polyproplene/ Nylon thread & other ( +5.00 % on Subtotal-A ) 6.19
consumables etc.
Subtotal-A1: 130.01

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 132.61

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 145.87


VAT 6% of Total 9.72
IT 4% of Total 6.48
Total: 162.08

Note : Rates of all items should be inclusive of all supply and carriage. Page: 220 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.22.03 Geo-Textile Bag: Empty Bag Size: 950mm x 750mm, Fill Volumn: bag
0.0840 cum & Weight: 125 Kg, [Geo-Textile Grade: Grade-III-DF-40-
2.3mm thick]
Geo Textile (Grade-III-DF-40-2.3mm thick) 1.6000 m2 65.00 104.00
Operator 0.0033 day 570.00 1.88
Helper 0.0020 day 400.00 0.80
Royalty of Earth 0.0840 m3 25.00 2.10
Foreman 0.0002 day 800.00 0.16
Skilled Labour 0.0040 day 450.00 1.80
Ordinary Labour 0.0700 day 370.00 25.90
H.C. of Sewing Machine 0.0033 day 500.00 1.65
H.C. of Cutter (Geo-Textile) 0.0017 day 500.00 0.85

Subtotal-A: 139.14
Cost of Polyproplene/ Nylon thread & other ( +5.00 % on Subtotal-A ) 6.96
consumables etc.
Subtotal-A1: 146.10

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 149.02

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 163.92


VAT 6% of Total 10.93
IT 4% of Total 7.29
Total: 182.14

Note : Rates of all items should be inclusive of all supply and carriage. Page: 221 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.22.04 Geo-Textile Bag: Empty Bag Size: 1075mm x 850mm, Fill Volumn: bag
0.1164 cum & Weight: 175 Kg, [Geo-Textile Grade: Grade-V-DF-60-
3.0mm thick]
Geo Textile (Grade-V-DF-60-3.0mm thick) 2.0250 m2 90.00 182.25
Operator 0.0040 day 570.00 2.28
Helper 0.0020 day 400.00 0.80
Royalty of Earth 0.1164 m3 25.00 2.91
Foreman 0.0002 day 800.00 0.16
Skilled Labour 0.0040 day 450.00 1.80
Ordinary Labour 0.0800 day 370.00 29.60
H.C. of Sewing Machine 0.0040 day 500.00 2.00
H.C. of Cutter (Geo-Textile) 0.0025 day 500.00 1.25

Subtotal-A: 223.05
Cost of Polyproplene/ Nylon thread & other ( +5.00 % on Subtotal-A ) 11.15
consumables etc.
Subtotal-A1: 234.20

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 238.89

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 262.78


VAT 6% of Total 17.52
IT 4% of Total 11.68
Total: 291.97

Note : Rates of all items should be inclusive of all supply and carriage. Page: 222 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.22.05 Geo-Textile Bag: Empty Bag Size: 1100mm x 850mm, Fill Volumn: bag
0.1333 cum & Weight: 200 Kg, [Geo-Textile Grade: Grade-V-DF-60-
3.0mm thick]
Geo Textile (Grade-V-DF-60-3.0mm thick) 2.0700 m2 90.00 186.30
Operator 0.0040 day 570.00 2.28
Helper 0.0020 day 400.00 0.80
Royalty of Earth 0.1333 m3 25.00 3.33
Foreman 0.0002 day 800.00 0.16
Skilled Labour 0.0040 day 450.00 1.80
Ordinary Labour 0.0900 day 370.00 33.30
H.C. of Sewing Machine 0.0040 day 500.00 2.00
H.C. of Cutter (Geo-Textile) 0.0025 day 500.00 1.25

Subtotal-A: 231.22
Cost of Polyproplene/ Nylon thread & other ( +5.00 % on Subtotal-A ) 11.56
consumables etc.
Subtotal-A1: 242.78

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 247.64

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 272.40


VAT 6% of Total 18.16
IT 4% of Total 12.11
Total: 302.67

Note : Rates of all items should be inclusive of all supply and carriage. Page: 223 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.22.06 Geo-Textile Bag: Empty Bag Size: 1300mm x 1050mm, Fill Volumn: bag
0.1664 cum & Weight: 250 Kg, [Geo-Textile Grade: Grade-V-DF-60-
3.0mm thick]
Geo Textile (Grade-V-DF-60-3.0mm thick) 2.9700 m2 90.00 267.30
Operator 0.0040 day 570.00 2.28
Helper 0.0020 day 400.00 0.80
Royalty of Earth 0.1664 m3 25.00 4.16
Foreman 0.0002 day 800.00 0.16
Skilled Labour 0.0040 day 450.00 1.80
Ordinary Labour 0.1000 day 370.00 37.00
H.C. of Sewing Machine 0.0040 day 500.00 2.00
H.C. of Cutter (Geo-Textile) 0.0025 day 500.00 1.25

Subtotal-A: 316.75
Cost of Polyproplene/ Nylon thread & other ( +5.00 % on Subtotal-A ) 15.84
consumables etc.
Subtotal-A1: 332.59

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 339.24

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 373.16


VAT 6% of Total 24.88
IT 4% of Total 16.59
Total: 414.63

Note : Rates of all items should be inclusive of all supply and carriage. Page: 224 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.23 DSFPB: Supplying and Dumping of soil filled Plastic bags at the specified bag
locations bridge approaches/damaged slope areas properly (Each bag
shall be 50kg Capacity minimum), including supplying of plastic bags,
filling with suitable soil and stitching bags by hand sewing machine
properly with plastic thread and dumping the same in position etc. all
complete in all respect as per approved drawing, specification and
direction of the Engineer-in-charge. (Unit cost including Plastic Bags,
Stitching of bags, Filled with suitable soil, Dumping at specified locations
and all other incidental charges, etc.)
Empty Plastic Cement/Fertilizer Bag 1.0000 each 10.00 10.00
Royalty of Earth 0.0300 m3 25.00 0.75
Skilled Labour 0.0067 day 450.00 3.02
Ordinary Labour 0.0733 day 370.00 27.12

Subtotal-A: 40.89
Cost of Polyproplene/ Nylon thread & other ( +3.00 % on Subtotal-A ) 1.23
consumables etc.
Subtotal-A1: 42.11

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 42.95

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 47.25


VAT 6% of Total 3.15
IT 4% of Total 2.10
Total: 52.50

3.11.24 JGT_RBP: Supplying and laying of natural additive treated woven type
double warp plain weave jute geo-textile (JGT) conforming to BDS
1909: 2016 for river bank and slope protection work including local
handling, unrolling, placing in position, ensuring proper drapability (JGT
should touch the ground surface at all points), stapling JGT by 6mm dia.
U-shapped pegs/ hooknails or 37mm long mushroom shaped nails at an
interval of 300mm with overlaps of 100mm, protecting the JGT from
any other damages etc. all complete in all respect as per instructions
given in Annexure-B (JGT Installation Guideline for River Bank
Protection) of BDS 1909 : 2016 and approval of Engineer-In-Charge.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 225 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.24.01 JGT_RBP-1: Applicable for mild to moderate River River Bank Protection sqm
work. This type of treated JGT shall have the following requirements.
Ends x Picks /dm ≥ 85 x 32, Width(m) ≥ 1, Mass per unit area (gsm) =
627 ± 15%, Thickness under 2 kPa pressure (mm) = 2.0 ± 20%, AOS
(O95) (μm) ≤ 150, Vertical Permeability (m/sec) ≥ 1.0 x10-3,
Horizontal Permeability (m/sec) ≥ 6.0 x10-3, Grab Tensile Strength (N)
MD x CD ≥ 950 x 230, Grab Tensile Elongation (%) MD x CD ≤ 35 x 45,
CBR Puncture Resistance (N) ≥ 2500, Wide Width Tensile Strength
(KN/m) MD x CD ≥ 20 x 10, Wide Width Elongation (%) MD x CD ≤ 12
x 10.
Jute Geo-Textile (JGT): Natural Additive Treated Double 1.0800 sqm 139.00 150.12
Warp Plain Weave - 627 gsm
Skilled Labour 0.0100 day 450.00 4.50
Ordinary Labour 0.0200 day 370.00 7.40

Subtotal-A: 162.02
Cost of U-shaped peg, mashroom nails etc. ( +10.00 % on Subtotal-A ) 16.20
Subtotal-A1: 178.22

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 181.79

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 199.97


VAT 6% of Total 13.33
IT 4% of Total 8.89
Total: 222.18

Note : Rates of all items should be inclusive of all supply and carriage. Page: 226 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.25 JGT-HSM: Supplying and laying of open mesh Plain Weave jute geo-
textile (JGT) commonly known as Soil Saver of different grades
conforming to BDS 1909: 2016 for Hill Slope Management work
including local handling, unrolling, placing in position, unrolling of JGT in
the direction of surface run-off, stapling JGT by 6mm dia. U-shapped
hooknails at an interval of 300mm with overlaps of 100mm at the sides
and 150mm at the ends, anchoring JGT within a trench at the two ends
by filling the trench with big bats/gravel or other suitable materials,
ensuring proper drapability (JGT must touch the ground surface at all
points), filling drain materials immediately after laying of JGT, protecting
the JGT from any other damages etc. all complete in all respect as per
instructions given in Annexure-C (JGT Installation Guideline for Hill
Slope Management) of BDS 1909 : 2016 and approval of Engineer-In-
Charge.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 227 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.25.01 JGT_HSM-1: Applicable for Moderate slope (≤35 degree) & annual sqm
rainfall ≤ 2000mm. This type of JGT shall have the following
requirements.
Ends x Picks /dm ≥ 6.5 x 4.5, Width(m) = 1.22, Mass per unit area
(gsm) = 500 ± 10%, Thickness under 2 kPa pressure (mm) = 4.5 ±
10%, Water Holding Capacity (% by weight) ≥ 400, Wide Width Tensile
Strength (kN/m) MD x CD ≥ 6.5 x 6.0, Wide Width Elongation (%) MD x
CD ≤ 14.0 x 14.0.
Jute Geo-Textile (JGT): Open Mesh Plain Weave (Soil Saver) - 1.0800 sqm 29.00 31.32
500 gsm
Skilled Labour 0.0100 day 450.00 4.50
Ordinary Labour 0.0200 day 370.00 7.40

Subtotal-A: 43.22
Cost of U-shaped peg, mashroom nails etc. ( +10.00 % on Subtotal-A ) 4.32
Subtotal-A1: 47.54

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 48.49

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 53.34


VAT 6% of Total 3.56
IT 4% of Total 2.37
Total: 59.27

Note : Rates of all items should be inclusive of all supply and carriage. Page: 228 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.25.02 JGT_HSM-2: Applicable for Moderate slope (≤35 degree) & annual sqm
rainfall ≥ 2000mm and steep stope (>35 degree to ≤ 45 degree) &
annual rainfall ≤ 2000mm. This type of JGT shall have the following
requirements.
Ends x Picks /dm ≥ 8 x 7, Width(m) = 1.22, Mass per unit area (gsm) =
600±10%, Thickness under 2 kPa pressure (mm) = 5.5±10%, Water
Holding Capacity (% by weight) ≥ 400, Wide Width Tensile Strength
(kN/m) MD x CD ≥ 12.0 x 6.0, Wide Width Elongation (%) MD x CD ≤
14.0 x 14.0.
Jute Geo-Textile (JGT): Open Mesh Plain Weave (Soil Saver) - 1.0800 sqm 32.00 34.56
600 gsm
Skilled Labour 0.0100 day 450.00 4.50
Ordinary Labour 0.0200 day 370.00 7.40

Subtotal-A: 46.46
Cost of U-shaped peg, mashroom nails etc. ( +10.00 % on Subtotal-A ) 4.65
Subtotal-A1: 51.11

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 52.13

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 57.34


VAT 6% of Total 3.82
IT 4% of Total 2.55
Total: 63.71

Note : Rates of all items should be inclusive of all supply and carriage. Page: 229 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.25.03 JGT_HSM-3: Applicable for steep stope (>35 degree to ≤ 45 degree) & sqm
annual rainfall > 2000mm. This type of JGT shall have the following
requirements.
Ends x Picks /dm ≥ 8 x 8, Width(m) = 1.22, Mass per unit area (gsm) =
700±10%, Thickness under 2 kPa pressure (mm) = 5.5±10%, Water
Holding Capacity (% by weight) ≥ 400, Wide Width Tensile Strength
(kN/m) MD x CD ≥ 14.0 x 7.0, Wide Width Elongation (%) MD x CD ≤
14.0 x 14.0.
Jute Geo-Textile (JGT): Open Mesh Plain Weave (Soil Saver) - 1.0800 sqm 35.00 37.80
700 gsm
Skilled Labour 0.0100 day 450.00 4.50
Ordinary Labour 0.0200 day 370.00 7.40

Subtotal-A: 49.70
Cost of U-shaped peg, mashroom nails etc. ( +10.00 % on Subtotal-A ) 4.97
Subtotal-A1: 54.67

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 55.76

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 61.34


VAT 6% of Total 4.09
IT 4% of Total 2.73
Total: 68.16

3.11.26 JGT_RRC: Supplying and laying of woven type untreated double warp
plain weave jute geo-textile (JGT) of different grades conforming to BDS
1909: 2016 for strengthening subgrade of Road & Bridge approach
including local handling, unrolling, placing in position, ensuring proper
drapability (JGT should touch the ISG surface at all points), stapling JGT
by 6mm dia. U-shapped pegs/ hooknails or 37mm long mushroom
shaped nails at an interval of 300mm with overlaps of 100mm,
protecting the JGT from any other damages etc. all complete in all
respect as per instructions given in Annexure-A (JGT Installation
Guideline for Rural Road Construction) of BDS 1909 : 2016 and
approval of Engineer-In-Charge.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 230 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.26.01 JGT_RRC-1 : Applicable for Strengthening subgrade of Village Roads. sqm


This type of JGT shall have the following requirements.
Ends x Picks /dm ≥ 85 x 32, Width(m) ≥ 1, Mass per unit area (gsm) =
627 ± 10%, Thickness under 2 kPa pressure (mm) = 2.0 ± 10%, AOS
(O95) (μm) ≤ 450, Vertical Permeability (m/sec) ≥ 3.0 x10-3,
Horizontal Permeability (m/sec) ≥ 7.0 x10-3, Grab Tensile Strength (N)
MD x CD ≥ 850 x 200, Grab Tensile Elongation (%) MD x CD ≤ 30 x 35,
CBR Puncture Resistance (N) ≥ 2000, Wide Width Tensile Strength
(kN/m) MD x CD ≥ 20 x 10, Wide Width Elongation (%) MD x CD ≤ 12
x 10.
Jute Geo-Textile (JGT): Double Warp Plain Weave - 627 gsm 1.0800 sqm 99.00 106.92
Skilled Labour 0.0100 day 450.00 4.50
Ordinary Labour 0.0200 day 370.00 7.40

Subtotal-A: 118.82
Cost of U-shaped peg, mashroom nails etc. ( +10.00 % on Subtotal-A ) 11.88
Subtotal-A1: 130.70

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 133.32

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 146.65


VAT 6% of Total 9.78
IT 4% of Total 6.52
Total: 162.94

Note : Rates of all items should be inclusive of all supply and carriage. Page: 231 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.26.02 JGT_RRC-2 : Applicable for Strengthening subgrade of Union or Higher sqm


Roads. This type of JGT shall have the following requirements.
Ends x Picks /dm ≥ 94 x 39, Width(m) ≥ 1, Mass per unit area (gsm) =
724 ± 10%, Thickness under 2 kPa pressure (mm) = 2.0 ± 10%, AOS
(O95) (μm) ≤ 300, Vertical Permeability (m/sec) ≥ 2.0 x10-3,
Horizontal Permeability (m/sec) ≥ 6.0 x10-3, Grab Tensile Strength (N)
MD x CD ≥ 925 x 425, Grab Tensile Elongation (%) MD x CD ≤ 35 x 40,
CBR Puncture Resistance (N) ≥ 2150, Wide Width Tensile Strength
(kN/m) MD x CD ≥ 25 x 10, Wide Width Elongation (%) MD x CD ≤ 15
x 12.
Jute Geo-Textile (JGT): Double Warp Plain Weave - 724 gsm 1.0800 sqm 117.00 126.36
Skilled Labour 0.0100 day 450.00 4.50
Ordinary Labour 0.0200 day 370.00 7.40

Subtotal-A: 138.26
Cost of U-shaped peg, mashroom nails etc. ( +10.00 % on Subtotal-A ) 13.83
Subtotal-A1: 152.09

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 155.13

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 170.64


VAT 6% of Total 11.38
IT 4% of Total 7.58
Total: 189.60

Note : Rates of all items should be inclusive of all supply and carriage. Page: 232 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.27 S&DSP: Supplying, delivering, assembling & installing of circular steel


pipe conforming to ASTM A 252/ AASHTO M 183 of different diameter
(internal) to a depth as shown in approved construction drawings for
piling works including lowering & pitching the fabricated pipe in position,
driving the pipe below bed level through all types of soils, fixing the pipe
in position with necessary lateral bracings (if required) etc. for stability
until completion of all works, including cost of gas cutting, bending,
welding at fabrication shop & construction site, transporting & unloading
safely at working site, driving of pipes, all sorts of labour, materials, hire
charges of driving equipment, tools, any other related equipment, fuel,
lubricants and wages of operational staff, taxes etc. all complete as per
design, drawing, specification & direction of E-I-C. Only length of steel
pipe driven as per drawing will be paid, wastage shall not be considered
for payment. All longitudinal and transverse welds shall be made with
full penetration butt welds and adjacent segments shall be rotated 90
degree relative to each other so that longitudinal welds on the
fabricated casing are staggered. The outside (expose) surface of the
steel pipe shall receive two coats of anti-corrosion tar type paint which
shall be approved by the E-I-C and its application shall follow the
manufacturer's instructions. If the handling, transportation, driving
arrangement requires a greater thickness to avoid deformation or
buckling of pipe, the increase in thickness shall be provided by the
contractor at his own expense.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 233 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.11.27.01 200mm internal diameter and 6mm wall thickness m


5mm thick 200mm dia MS pipe-6.5mm thick 1.0000 m 3608.00 3608.00
H.C. of Tripod and Mechanical Winch Machine complete with 0.0088 day 3000.00 26.40
power unit and accessories
H.C. of Derrick 0.0175 day 400.00 7.00
H.C. of Welding Machine 0.0175 day 500.00 8.75
Foreman 0.0088 day 800.00 7.04
Operator 0.0088 day 570.00 5.02
Skilled Labour 0.0175 day 450.00 7.88
Diesel 0.5000 liter 68.00 34.00
Lubricant 0.0090 liter 220.00 1.98

Subtotal-A: 3706.06
Cost of welding & other consumables etc. ( +5.00 % on Subtotal-A ) 185.30
Subtotal-A1: 3891.36

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 3969.19

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 4366.11


VAT 6% of Total 291.07
IT 4% of Total 194.05
Total: 4851.23

Note : Rates of all items should be inclusive of all supply and carriage. Page: 234 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.12.01.1 kmPost: Providing, fitting and fixing rectangular Kilometer Post as per each
standard drawing enumerated in Appendix-6 (type design for Kilometer
post) with Reinforced Cement Concrete (1:2:4) Plate with 20mm down
well graded brick chips in correct position true to line and level,
including cost of providing 4 nos. of 12mm dia M.S. rods in vertical
direction of length 1085mm and 7nos. Of 10mm dia M.S. rods in
horizontal direction of length 520mm, RCC Plate firmly fixed to the
ground by means properly designed foundation as per approved
drawing with 1st class bricks work in cement mortar (1:4), filling the
interstices tightly with mortar, raking out joints, cleaning and soaking
bricks at least for 24 hours before use, washing of sand, including 6mm
thick plaster (1:4) in all exposed portion, curing for requisite period,
with two coat of painting on the exposed portion of the post with best
quality synthetic enamel paint of approved brand of different shades
over a coat of priming, including carriage of the post to the site with
loading & unloading and printing of letters and numbers, etc. all
complete in all respect as per approved drawing, specification and
direction of the Engineer-in-charge. Rate is inclusive of cost of all
materials, labour and all incidental charges in this connection.
Earthwork in excavation of foundation trenches, including 0.2450 cum 75.80 18.57
layout, ……. (2.04.1.1)
Brick work with 1st class bricks in cement mortar (1:4) in 0.1390 cum 5849.80 813.12
foundation and plinth….(5.04.02)
Providing and laying reinforced, cement concrete pavement 0.0510 cum 6851.66 349.43
over a prepared sub-base with picked brick chips and
minimum cement content relates to mix ratio 1:2:4 satisfying
……… (3.07.2.1)
M.S. Ribbed bar of steel grade RB 300 with minimum fy=300 6.0960 kg 61.59 375.45
Mpa ………. (3.11.05.1)
Minimum 6mm thick cement plaster (1:4) to ceiling RCC 1.9430 sqm 168.65 327.68
columns, beams for Ground Floor……….. (5.12.03.01)
Earthwork in excavation of foundation trenches, including 0.0490 cum 75.80 3.71
layout, ……. (2.04.1.1)
Painting with Synthetic Enamel paint………. (3.12.5.1) 1.0670 sqm 166.35 177.49

Subtotal-A: 2065.47

Note : Rates of all items should be inclusive of all supply and carriage. Page: 235 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Writing of km post with approved colour ( +12.00 % on Subtotal-A ) 247.86


Subtotal-A1: 2313.33

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2359.59

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2595.55


VAT 6% of Total 173.04
IT 4% of Total 115.36
Total: 2883.95

Note : Rates of all items should be inclusive of all supply and carriage. Page: 236 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.12.01.2 RNPlate: Providing, fitting and fixing rectangular Road Name Plate as each
per standard drawing enumerated in Appendix-6 (type design for Road
Name Plate) with Reinforced Cement Concrete (1:2:4) Plate with 20mm
down well graded brick chips in correct position true to line and level,
including cost of providing 7 nos. of 12mm dia M.S. rods in vertical
direction of length 1125mm and 8nos. Of 10mm dia M.S. rods in
horizontal direction of length 970mm, RCC Plate firmly fixed to the
ground by means properly designed foundation as per approved
drawing with 1st class bricks work in cement mortar (1:4), filling the
interstices tightly with mortar, raking out joints, cleaning and soaking
bricks at least for 24 hours before use, washing of sand, including 6mm
thick plaster (1:4) in all exposed portion, curing for requisite period,
with two coat of painting on the exposed portion of the post with best
quality synthetic enamel paint of approved brand of different shades
over a coat of priming, including carriage of the post to the site with
loading & unloading and printing of letters and numbers, etc. all
complete in all respect as per approved drawing, specification and
direction of the Engineer-in-charge. Rate is inclusive of cost of all
materials, labour and all incidental charges in this connection.
Earthwork in excavation of foundation trenches, including 0.4890 cum 75.80 37.07
layout, ……. (2.04.1.1)
Brick work with 1st class bricks in cement mortar (1:4) in 0.2780 cum 5849.80 1626.24
foundation and plinth….(5.04.02)
Providing and laying reinforced, cement concrete pavement 0.0950 cum 6851.66 650.91
over a prepared sub-base with picked brick chips and
minimum cement content relates to mix ratio 1:2:4 satisfying
……… (3.07.2.1)
M.S. Ribbed bar of steel grade RB 300 with minimum fy=300 11.7420 kg 61.59 723.19
Mpa ………. (3.11.05.1)
Minimum 6mm thick cement plaster (1:4) to ceiling RCC 3.5330 sqm 168.65 595.83
columns, beams for Ground Floor……….. (5.12.03.01)
Earthwork in excavation of foundation trenches, including 0.0980 cum 75.80 7.43
layout, ……. (2.04.1.1)
Painting with Synthetic Enamel paint………. (3.12.5.1) 1.7780 sqm 166.35 295.77

Subtotal-A: 3936.43

Note : Rates of all items should be inclusive of all supply and carriage. Page: 237 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Writing of Road Name Plate post with approved ( +12.00 % on Subtotal-A ) 472.37
colour
Subtotal-A1: 4408.81

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4496.98

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 4946.68


VAT 6% of Total 329.78
IT 4% of Total 219.85
Total: 5496.31

Note : Rates of all items should be inclusive of all supply and carriage. Page: 238 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.12.02 RCC-Gpost: Prroviding, fitting and fixing 200mm dia round RCC Guide each
Post 1.70m long as per standard drawing enumerated in Appendix-6
(type design for Guide Post) with Reinforced Cement Concrete (1:2:4)
with 20mm down well graded brick chips casting, curing for requisite
period, including cost of providing 4nos.of 12mm dia. Rod of length
1.65m as main reinforcement and 12 nos. of round shaped 8mm dia
rods used as binders; including two coats of painting with best quality
synthetic enamel paint over a prime coat of approved brand of different
colour and grade to form 6 nos. horizontal alternate bands in
white/yellow and red to 90 cm length standing up above ground,
making hole in ground of 800mm depth and 300m minimum dia, fixing
the guard posts in the same holes and repacking the earth properly so
as to keep the guard posts standing properly erect in correct position
true to line and length including carriage of RCC Guide Post with due
care to the site including loading into the truck and unloading at site
complete in all respect as per approved drawing, specification and
direction of the Engineer-in-charge. Rate is inclusive of cost of all
materials, labour and all incidental charges in this connection.
Earthwork in excavation of foundation trenches, including 0.0860 cum 75.80 6.52
layout, ……. (2.04.1.1)
Providing and laying reinforced, cement concrete pavement 0.0650 cum 6851.66 445.36
over a prepared sub-base with picked brick chips and
minimum cement content relates to mix ratio 1:2:4 satisfying
……… (3.07.2.1)
M.S. Ribbed bar of steel grade RB 300 with minimum fy=300 8.4680 kg 61.59 521.54
Mpa ………. (3.11.05.1)
Earthwork in excavation of foundation trenches, including 0.0170 cum 75.80 1.29
layout, ……. (2.04.1.1)
Painting with Synthetic Enamel paint………. (3.12.5.1) 0.6280 sqm 166.35 104.47

Subtotal-A: 1079.18

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1100.76

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1210.83


VAT 6% of Total 80.72
IT 4% of Total 53.81

Note : Rates of all items should be inclusive of all supply and carriage. Page: 239 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 1345.37

Note : Rates of all items should be inclusive of all supply and carriage. Page: 240 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.12.03 RS-Plate: Supplying, fitting and fixing of Road Sign plates sqm
(Precautionary/Mandatory/Informative/Direction) made of 18 BWG M.S.
sheet of equilateral triangle/Circular/Rectangular plates of different sizes
as per standard drawing enumerated in Appendix-6 fitted with MS
triangular/Rectangular frame of same size as plates by point welding
(frames made by thorough welding of 25mmX25mmX3mm MS angle
covering all sides of the plates and maximum 150mm center to center in
the middle of frames in each vertical & horizontal directions), Plates are
fitted with 50mm dia & 2.90mm thick GI pipes by continuous welding,
including cutting of MS angle touched with GI pipe and 200mm long 4
nos. 12mm dia anchor bars be fitted at the lower part of the MS pipes
by welding, making finishing, grinding and carrying to the working sites,
etc. all complete in all respect as per design, specification and direction
of the Engineer-in-charge. (Rate excludes the material cost of 50mm dia
MS pipes & 4 nos. 12mm dia anchor bar)
18/20/22 BWG MS Sheet/plate 9.9600 kg 70.00 697.20
MS Angle 25mmx25mmx3mm 14.6360 kg 58.00 848.89
Electrode 0.2300 pkt 810.00 186.30
Foreman 0.0800 day 800.00 64.00
Welder 0.4000 day 680.00 272.00
Skilled Labour 0.1500 day 450.00 67.50
Ordinary Labour 0.6000 day 370.00 222.00
H.C. of Welding Machine 0.3000 day 500.00 150.00
H.C. of Grinding Machine 0.3000 day 100.00 30.00

Subtotal-A: 2537.89
Carrying cost to working site, etc. ( +3.00 % on Subtotal-A ) 76.14
Subtotal-A1: 2614.02

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2666.31

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2932.94


VAT 6% of Total 195.53
IT 4% of Total 130.35

Note : Rates of all items should be inclusive of all supply and carriage. Page: 241 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 3258.82

3.12.04 CRS-Plate: Providing and fixing of retro-reflectorized cautionary,


mandatory and informatory sign as per standard drawing enumerated in
Appendix-6 (type design for Traffic Signs) made of 18 BWG M.S. sheet
of equilateral triangle/Circular/Rectangular plates of different sizes as
mentioned in the drawing fitted with MS triangular/Rectangular frame of
same size as plates by point welding (frames made by thorough welding
of 25mmX25mmX3mm MS angle covering all sides of the plates and
maximum 150mm center to center in the middle of frames in each
vertical & horizontal directions), Plates are fitted with 50mm dia &
2.90mm thick MS pipes by continuous welding, including cutting of MS
angle at touched point of MS pipe, including cost of providing 200mm
long 4 nos. 12mm dia anchor bars be fitted at the lower part of the GI
pipes by welding, making finishing, grinding and carrying to the working
sites, the post firmly fixed to the ground by means of properly deigned
foundation with cement concrete of minimum cylinder crushing strength
of concrete 17.0Mpa at 28 days of curing (Suggested Mix Proportion
1:2:4), 60cm below the ground level, the signs properly erect in correct
position, true to line and length, including two coats of painting with
best quality synthetic enamel paint of approved brand & printing with
retro-reflective paint of different approved colour, etc. all complete in all
respect as per approved drawing, specification and direction of the
Engineer-in-charge. Rate is inclusive of cost of all materials, labour and
all incidental charges in this connection.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 242 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.12.04.1 600mm equilateral triangle with 671mm X 202mm supplementary Plate each
(For Precautionary Sign)
Earthwork in excavation of foundation trenches, including 0.3380 cum 75.80 25.62
layout, ……. (2.04.1.1)
2.9mm thick MS Pipe (50mm dia) 3.2700 m 440.00 1438.80
Providing single layer polythene sheet (0.18mm thick)……… 1.4400 sqm 12.68 18.26
(3.07.1)
Cement concrete work in foundation……….. (4.1.10.01.2) 0.1690 cum 6964.15 1176.94
Supplying, fitting and fixing of Road Sign plates………. (3.12.3) 0.3370 sqm 2614.02 880.93
M.S. Ribbed bar of steel grade RB 300 with minimum fy=300 0.7100 kg 61.59 43.73
Mpa ………. (3.11.05.1)
Earthwork in excavation of foundation trenches, including 0.0680 cum 75.80 5.15
layout, ……. (2.04.1.1)
Painting with Synthetic Enamel paint………. (3.12.5.1) 1.2980 sqm 166.35 215.92

Subtotal-A: 3805.35
Writing & Printing of Road Sign with Retro- ( +12.00 % on Subtotal-A ) 456.64
Reflective Paint, etc.
Subtotal-A1: 4261.99

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4347.23

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 4781.95


VAT 6% of Total 318.80
IT 4% of Total 212.53
Total: 5313.28

Note : Rates of all items should be inclusive of all supply and carriage. Page: 243 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.12.04.2 600mm circular with 600mm X 202mm supplementary Plate (For each
Compulsory Sign)
2.9mm thick MS Pipe (50mm dia) 3.2700 m 440.00 1438.80
Earthwork in excavation of foundation trenches, including 0.3380 cum 75.80 25.62
layout, ……. (2.04.1.1)
Providing single layer polythene sheet (0.18mm thick)……… 1.4400 sqm 12.68 18.26
(3.07.1)
Cement concrete work in foundation……….. (4.1.10.01.2) 0.1690 cum 6964.15 1176.94
Supplying, fitting and fixing of Road Sign plates………. (3.12.3) 0.4040 sqm 2614.02 1056.07
M.S. Ribbed bar of steel grade RB 300 with minimum fy=300 0.7100 kg 61.59 43.73
Mpa ………. (3.11.05.1)
Earthwork in excavation of foundation trenches, including 0.0680 cum 75.80 5.15
layout, ……. (2.04.1.1)
Painting with Synthetic Enamel paint………. (3.12.5.1) 1.4320 sqm 166.35 238.21

Subtotal-A: 4002.78
Writing & Printing of Road Sign with Tetro- ( +12.00 % on Subtotal-A ) 480.33
Reflective Paint, etc.
Subtotal-A1: 4483.11

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4572.77

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 5030.05


VAT 6% of Total 335.34
IT 4% of Total 223.56
Total: 5588.95

Note : Rates of all items should be inclusive of all supply and carriage. Page: 244 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.12.04.3 435mm X 500mm Square with 435mm X 202mm supplementary Plate each
(For Informative Sign)
Earthwork in excavation of foundation trenches, including 0.3380 cum 75.80 25.62
layout, ……. (2.04.1.1)
2.9mm thick MS Pipe (50mm dia) 3.2200 m 440.00 1416.80
Providing single layer polythene sheet (0.18mm thick)……… 1.4400 sqm 12.68 18.26
(3.07.1)
Cement concrete work in foundation……….. (4.1.10.01.2) 0.1690 cum 6964.15 1176.94
Supplying, fitting and fixing of Road Sign plates………. (3.12.3) 0.3050 sqm 2614.02 797.28
M.S. Ribbed bar of steel grade RB 300 with minimum fy=300 0.7100 kg 61.59 43.73
Mpa ………. (3.11.05.1)
Earthwork in excavation of foundation trenches, including 0.0680 cum 75.80 5.15
layout, ……. (2.04.1.1)
Painting with Synthetic Enamel paint………. (3.12.5.1) 1.2230 sqm 166.35 203.44

Subtotal-A: 3687.22
Writing & Printing of Road Sign with Tetro- ( +12.00 % on Subtotal-A ) 442.47
Reflective Paint, etc.
Subtotal-A1: 4129.69

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4212.28

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 4633.51


VAT 6% of Total 308.90
IT 4% of Total 205.93
Total: 5148.35

Note : Rates of all items should be inclusive of all supply and carriage. Page: 245 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.12.04.4 810mm X 480mm Rectangular (For Informative Sign) each


2.9mm thick MS Pipe (50mm dia) 3.0300 m 440.00 1333.20
Earthwork in excavation of foundation trenches, including 0.3380 cum 75.80 25.62
layout, ……. (2.04.1.1)
Providing single layer polythene sheet (0.18mm thick)……… 1.4400 sqm 12.68 18.26
(3.07.1)
Cement concrete work in foundation……….. (4.1.10.01.2) 0.1690 cum 6964.15 1176.94
Supplying, fitting and fixing of Road Sign plates………. (3.12.3) 0.3890 sqm 2614.02 1016.86
M.S. Ribbed bar of steel grade RB 300 with minimum fy=300 0.7100 kg 61.59 43.73
Mpa ………. (3.11.05.1)
Earthwork in excavation of foundation trenches, including 0.0680 cum 75.80 5.15
layout, ……. (2.04.1.1)
Painting with Synthetic Enamel paint………. (3.12.5.1) 1.3850 sqm 166.35 230.39

Subtotal-A: 3850.15
Writing & Printing of Road Sign with Tetro- ( +11.00 % on Subtotal-A ) 423.52
Reflective Paint, etc.
Subtotal-A1: 4273.67

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4359.14

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 4795.05


VAT 6% of Total 319.67
IT 4% of Total 213.11
Total: 5327.84

Note : Rates of all items should be inclusive of all supply and carriage. Page: 246 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.12.04.5 600mm X 605mm Rectangular (For Chevron Sign) each


Supplying, fitting and fixing of Road Sign plates………. (3.12.3) 0.3630 sqm 2614.02 948.89
Earthwork in excavation of foundation trenches, including 0.0300 cum 75.80 2.27
layout, ……. (2.04.1.1)
Providing single layer polythene sheet (0.18mm thick)……… 1.0400 sqm 12.68 13.19
(3.07.1)
Painting with Synthetic Enamel paint………. (3.12.5.1) 0.7870 sqm 166.35 130.92
Earthwork in excavation of foundation trenches, including 0.1510 cum 75.80 11.45
layout, ……. (2.04.1.1)
Cement concrete work in foundation……….. (4.1.10.01.2) 0.1040 cum 6964.15 724.27
M.S. Ribbed bar of steel grade RB 300 with minimum fy=300 0.6000 kg 61.59 36.95
Mpa ………. (3.11.05.1)
2.9mm thick MS Pipe (50mm dia) 3.2000 m 440.00 1408.00

Subtotal-A: 3275.94
Providing Retro-Reflective Sheeting for Sign ( +15.00 % on Subtotal-A ) 491.39
Subtotal-A1: 3767.33

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 3842.68

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 4226.94


VAT 6% of Total 281.80
IT 4% of Total 187.86
Total: 4696.60

Note : Rates of all items should be inclusive of all supply and carriage. Page: 247 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.12.05 Painting the vertical end faces of posts, wheel guard, railing, rail post,
parapet wall, kilometer post, road name plate, guide post, traffic signs,
etc. in two coats with best quality synthetic enamel paint of approved
make and brand of different shades over a coat of priming, applying one
vertical and one horizontal coat for each coat and successive coat is to
be applied after drying up of previous coat by brush/roller/spray,
including cleaning and washing the surface, rubbing and mending good
damages as necessary and necessary scaffolding, etc. all complete in all
respect as direction of the Engineer-in-charge. Rate is inclusive of cost
of all materials, labour and all incidental charges in this connection.

3.12.05.1 Two coats over a prime coat for new concrete surface. sqm
Synthetic Enamel Paint 0.1194 litre 260.00 31.04
Synthetic enamel paint primer/ sealer 0.0833 litre 206.00 17.16
Thinner T-6 of Synthetic Enamel Paint 0.0119 liter 130.00 1.55
Plumber/ Electric Mistry/ Painter 0.0945 day 680.00 64.26
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.0945 day 470.00 44.42
Operator

Subtotal-A: 158.43
All other remaining costs covering sand paper, ( +5.00 % on Subtotal-A ) 7.92
putty, scaffolding, etc.
Subtotal-A1: 166.35

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 169.67

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 186.64


VAT 6% of Total 12.44
IT 4% of Total 8.30
Total: 207.38

Note : Rates of all items should be inclusive of all supply and carriage. Page: 248 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.12.05.2 Two coats for old concrete surface and steel surface. sqm
Synthetic Enamel Paint 0.1194 litre 260.00 31.04
Thinner T-6 of Synthetic Enamel Paint 0.0119 liter 130.00 1.55
Plumber/ Electric Mistry/ Painter 0.0540 day 680.00 36.72
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.0540 day 470.00 25.38
Operator

Subtotal-A: 94.69
All other remaining costs covering sand paper, ( +5.00 % on Subtotal-A ) 4.73
putty, scaffolding, etc.
Subtotal-A1: 99.43

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 101.41

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 111.56


VAT 6% of Total 7.44
IT 4% of Total 4.96
Total: 123.95

Note : Rates of all items should be inclusive of all supply and carriage. Page: 249 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.12.06 Painting and writing on kilometer post, road name plate, traffic signs, sqm
etc. in two coats with best quality synthetic enamel paint of approved
make and brand of different shades, applying one vertical and one
horizontal coat for each coat and successive coat is to be applied after
drying up of previous coat by brush/roller/spray with cleaning and
washing the surface, rubbing and mending good damages as necessary
and necessary scaffolding, including printing new letter and figures of
any shade with synthetic enamel paint black or any other approved
colour to give an even shade etc. all complete in all respect as direction
of the Engineer-in-charge. Rate is inclusive of cost of all materials,
labour and all incidental charges in this connection.
Synthetic Enamel Paint 0.1194 litre 260.00 31.04
Thinner T-6 of Synthetic Enamel Paint 0.0119 liter 130.00 1.55
Plumber/ Electric Mistry/ Painter 0.1000 day 680.00 68.00
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.0540 day 470.00 25.38
Operator

Subtotal-A: 125.97
All other remaining costs covering sand paper, ( +100.00 % on Subtotal-A ) 125.97
putty, scaffolding, printing/writing, etc.
Subtotal-A1: 251.94

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 256.98

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 282.68


VAT 6% of Total 18.85
IT 4% of Total 12.56
Total: 314.09

Note : Rates of all items should be inclusive of all supply and carriage. Page: 250 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.12.07 RMP: Providing and applying road marking paint (lines, dashes, arrows,
etc.) on road hump, pedestrian crossing, lane line, warning line, barrier
line, edge line, zig-zag line, give-way marking, etc. on road/plain surface
by brush/roller in two coats with ready mixed road marking paint,
including cleaning the surface of all dirt, oils, grease, dust and other
contaminants, demarcation at site and traffic control involved. The
finished surface to be level, uniform and free from streaks and holes,
etc. all complete in all respect as direction of the Engineer-in-charge.
Rate is inclusive of cost of all materials, labour machinery, lighting,
guarding, maintenance of diversion and all incidental charges in this
connection.

3.12.07.1 Two coats for new surface sqm


Ready Mixed Road Marking Paint 0.3591 liter 608.75 218.60
Thinner T-4 of Ready Mixed Road Marking Paint 0.0539 liter 212.50 11.45
Plumber/ Electric Mistry/ Painter 0.0500 day 680.00 34.00
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.0500 day 470.00 23.50
Operator

Subtotal-A: 287.56
All other remaining costs covering sand paper, ( +5.00 % on Subtotal-A ) 14.38
putty, tools, etc.
Subtotal-A1: 301.93

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 307.97

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 338.77


VAT 6% of Total 22.58
IT 4% of Total 15.06
Total: 376.41

Note : Rates of all items should be inclusive of all supply and carriage. Page: 251 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.12.07.2 Two coats on old surface sqm


Ready Mixed Road Marking Paint 0.2873 liter 608.75 174.89
Thinner T-4 of Ready Mixed Road Marking Paint 0.0431 liter 212.50 9.16
Plumber/ Electric Mistry/ Painter 0.0438 day 680.00 29.78
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.0438 day 470.00 20.59
Operator

Subtotal-A: 234.42
All other remaining costs covering sand paper, ( +5.00 % on Subtotal-A ) 11.72
putty, tools, etc.
Subtotal-A1: 246.14

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 251.07

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 276.17


VAT 6% of Total 18.41
IT 4% of Total 12.27
Total: 306.86

Note : Rates of all items should be inclusive of all supply and carriage. Page: 252 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.12.08 RMP(By-TPC): Providing and applying road markings of center line and sqm
stop line etc. with 2.5mm thick hot applied thermoplastic compound
including reflectorising glass beads @ 250mgs per sqm area by special
applicator machine on road/plain surface, including cleaning the surface
of all dirt, oils, grease, dust and other contaminants, demarcation at site
and traffic control involved, the finished surface to be level, uniform and
free from streaks and holes, etc. all complete in all respect as direction
of the Engineer-in-charge. Rate is inclusive of cost of all materials,
labour machinery, lighting, guarding, maintenance of diversion and all
incidental charges in this connection.
Thermoplastic Compound 5.0000 kg 121.40 607.00
Reflectorising Glass Beads 0.2500 kg 121.40 30.35
H. C. of Thermoplastic Appilicator Machine 0.0286 day 2000.00 57.20
Foreman 0.0286 day 800.00 22.88
Skilled Labour 0.0571 day 450.00 25.70
Ordinary Labour 0.1143 day 370.00 42.29

Subtotal-A: 785.42

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 801.12

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 881.24


VAT 6% of Total 58.75
IT 4% of Total 39.17
Total: 979.15

3.12.09 Maintenance and protection of traffic at all times (at all hours during the LS
day and night) along the existing roads, rivers or canals throughout the
working period by maintaining all detours, including additional
embankment filling, necessary barricades, warning lights and guide
signs as well as other equipment, removal of all temporary constructions
on completion of the bridge, etc. all complete as per requirement and
instruction of E-I-C.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 253 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.12.10 RRSheeting: Supplying and fixing retro-reflectorised reflective sheeting sqm


on cautionary, mandatory and informatory traffic signs with honey comb
retro-reflectorised (encapsulated lens type) reflective sheet of approved
brand of different colour, including cleaning and washing the surface
and necessary scaffolding, etc. including carriage of sheet to the site
and fixing, etc. all complete in all respect as per approved drawing,
specification and direction of the Engineer-in-charge. Rate is inclusive of
cost of all materials, labour and all incidental charges in this connection.
Retro-Reflecting Sheet 1.0000 sqm 2260.00 2260.00
Skilled Labour 0.0500 day 450.00 22.50
Ordinary Labour 0.0500 day 370.00 18.50

Subtotal-A: 2301.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2347.02

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2581.72


VAT 6% of Total 172.11
IT 4% of Total 114.74
Total: 2868.58

Note : Rates of all items should be inclusive of all supply and carriage. Page: 254 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

3.12.11 AR-Paint: Supplying & providing flexible and acrylic type reflectorized sqm
traffic painting/ coating on rail post, rail bar, wheel guard, Guide Post,
Pier column etc. Including cleaning the surface of all dirt, oils, grease,
dust and other contaminants, demarcation at site and traffic control
involved. The finished surface to be level, uniform and free from streaks
and holes, etc. all complete in all respect as direction of the Engineer-in-
charge. Rate is inclusive of cost of all materials, labour machinery,
lighting, guarding and all incidental charges in this connection.
Reflectorized paint 0.1200 liter 2528.00 303.36
Sealer/Primer (for texture paint) 0.0900 litre 200.00 18.00
Plumber/ Electric Mistry/ Painter 0.1500 day 680.00 102.00
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.1500 day 470.00 70.50
Operator

Subtotal-A: 493.86

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 503.74

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 554.11


VAT 6% of Total 36.94
IT 4% of Total 24.63
Total: 615.68

Note : Rates of all items should be inclusive of all supply and carriage. Page: 255 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Chapter - 4 : Bridge Works

4.01.01 Dismantling of existing/ damaged structures like culverts, bridges,


retaining walls comprising of masonry, cement concrete, wood work,
steel work by manual/ mechanical means and sorting the dismantled
material, disposal of unserviceable material and stackting the
serviceable material with all lifts and lead up to 1000 meters including
scrapping and removing concrete from MS rods, preparation and
erection of platform where necessary, carrying, all sorts of handling,
stacking the same properly after clearing, leveling and dressing the site
and clearing the river/canal bed, etc. all complete as per direction of the
E-I-C. Cost of conveying, loading, transportation of unserviceable
material accumulated during dismantling operation is included in this
unit rate. The unserviceable material must be disposed at a safe place
outside the site premises with minimum traffic disruption and the
procuring entity will not provide any environmentally safe place for
disposing the unserviceable materials.

4.01.01.01 RCC works

Note : Rates of all items should be inclusive of all supply and carriage. Page: 256 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.01.01.01.01 Case I: By Manual Means cum


Blacksmith 0.2000 day 450.00 90.00
Skilled Labour 0.1200 day 450.00 54.00
Ordinary Labour 2.8000 day 370.00 1036.00
H.C. of Tractor (4 WD) 0.0200 day 2200.00 44.00

Subtotal-A: 1224.00
Scaffolding & other consumables etc. ( +5.00 % on Subtotal-A ) 61.20
Subtotal-A1: 1285.20

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1310.90

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1441.99


VAT 6% of Total 96.13
IT 4% of Total 64.09
Total: 1602.22

4.01.01.01.02 Case II: By Manual Means submersed in water cum Add +50.00% with Item No 4.01.01.01.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 257 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.01.01.01.03 Case III: By Mechanical Means cum


Blacksmith 0.2000 day 450.00 90.00
Skilled Labour for Pneumatic breaker 0.5280 day 470.00 248.16
Skilled Labour 0.0400 day 450.00 18.00
Ordinary Labour 0.2000 day 370.00 74.00
Air Compressor 250 cfm with pneumatic breaker/ jack 0.1000 day 2500.00 250.00
hammer along with accessories.
Hire & running charges of Joint cutting machine with 2-3 0.1000 day 1500.00 150.00
blades
H.C. of Tractor (4 WD) 0.0200 day 2200.00 44.00

Subtotal-A: 874.16
Scaffolding & other consumables etc. ( +5.00 % on Subtotal-A ) 43.71
Subtotal-A1: 917.87

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 936.23

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1029.85


VAT 6% of Total 68.66
IT 4% of Total 45.77
Total: 1144.28

4.01.01.01.04 Case IV: By Mechanical Means submersed in water cum Add +50.00% with Item No 4.01.01.01.03

4.01.01.02 PCC Works

Note : Rates of all items should be inclusive of all supply and carriage. Page: 258 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.01.01.02.01 Case I: By Manual Means cum


Skilled Labour 0.0400 day 450.00 18.00
Ordinary Labour 1.0000 day 370.00 370.00
H.C. of Tractor (4 WD) 0.0200 day 2200.00 44.00

Subtotal-A: 432.00
Scaffolding & other consumables etc. ( +5.00 % on Subtotal-A ) 21.60
Subtotal-A1: 453.60

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 462.67

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 508.94


VAT 6% of Total 33.93
IT 4% of Total 22.62
Total: 565.49

4.01.01.02.02 Case II: By Manual Means submersed in water cum Add +50.00% with Item No 4.01.01.02.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 259 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.01.01.02.03 Case III: By Mechanical Means cum


Skilled Labour for Pneumatic breaker 0.2000 day 470.00 94.00
Skilled Labour 0.0160 day 450.00 7.20
Ordinary Labour 0.2000 day 370.00 74.00
Air Compressor 250 cfm with pneumatic breaker/ jack 0.0667 day 2500.00 166.75
hammer along with accessories.
H.C. of Tractor (4 WD) 0.0200 day 2200.00 44.00

Subtotal-A: 385.95
Scaffolding & other consumables etc. ( +5.00 % on Subtotal-A ) 19.30
Subtotal-A1: 405.25

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 413.35

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 454.69


VAT 6% of Total 30.31
IT 4% of Total 20.21
Total: 505.21

4.01.01.02.04 Case IV: By Mechanical Means submersed in water cum Add +50.00% with Item No 4.01.01.02.03

4.01.01.03 Brick Works

Note : Rates of all items should be inclusive of all supply and carriage. Page: 260 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.01.01.03.01 Case I :By Manual/ Mechanical Means cum


Skilled Labour 0.0200 day 450.00 9.00
Ordinary Labour 0.6000 day 370.00 222.00
H.C. of Tractor (4 WD) 0.0200 day 2200.00 44.00

Subtotal-A: 275.00
Equipment staging etc. ( +5.00 % on Subtotal-A ) 13.75
Subtotal-A1: 288.75

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 294.53

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 323.98


VAT 6% of Total 21.60
IT 4% of Total 14.40
Total: 359.98

4.01.01.03.02 Case II :By Manual/ Mechanical Means submersed in water cum Add +50.00% with Item No 4.01.01.03.01

4.01.01.04 Steel Work in all types of sections upto a height of 10m above plinth
level including cutting of rivets.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 261 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.01.01.04.01 Case I: Including dismembering MT


Blacksmith 1.0000 day 450.00 450.00
Skilled Labour 0.1400 day 450.00 63.00
Ordinary Labour 2.5000 day 370.00 925.00
H.C. of Tractor (4 WD) 0.0250 day 2200.00 55.00

Subtotal-A: 1493.00
cost of labour for gas cutting, ropes, pulleys etc. ( +20.00 % on Subtotal-A ) 298.60
Subtotal-A1: 1791.60

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1827.43

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2010.18


VAT 6% of Total 134.01
IT 4% of Total 89.34
Total: 2233.53

Note : Rates of all items should be inclusive of all supply and carriage. Page: 262 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.01.01.04.02 Case II: Excluding dismembering MT


Blacksmith 0.5000 day 450.00 225.00
Skilled Labour 0.2200 day 450.00 99.00
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Tractor (4 WD) 0.0250 day 2200.00 55.00

Subtotal-A: 1119.00
cost of labour for gas cutting, ropes, pulleys etc. ( +20.00 % on Subtotal-A ) 223.80
Subtotal-A1: 1342.80

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1369.66

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1506.62


VAT 6% of Total 100.44
IT 4% of Total 66.96
Total: 1674.02

Note : Rates of all items should be inclusive of all supply and carriage. Page: 263 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.01.01.05 Wood Work wrought framed and fixed in frames of trusses upto a cum
height of 10 m above plinth level
Carpenter 0.4000 day 680.00 272.00
Skilled Labour 0.0480 day 450.00 21.60
Ordinary Labour 0.8000 day 370.00 296.00
H.C. of Tractor (4 WD) 0.0200 day 2200.00 44.00

Subtotal-A: 633.60
Equipment staging etc. ( +5.00 % on Subtotal-A ) 31.68
Subtotal-A1: 665.28

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 678.59

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 746.44


VAT 6% of Total 49.76
IT 4% of Total 33.18
Total: 829.38

4.01.01.06 Dismantling wooden bullah in posts and structs m


Skilled Labour 0.0125 day 450.00 5.63
Ordinary Labour 0.0125 day 370.00 4.63
H.C. of Tractor (4 WD) 0.0006 day 2200.00 1.32

Subtotal-A: 11.57
Equipment staging etc. ( +5.00 % on Subtotal-A ) 0.58
Subtotal-A1: 12.15

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12.39

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 13.63


VAT 6% of Total 0.91
IT 4% of Total 0.61
Total: 15.15

Note : Rates of all items should be inclusive of all supply and carriage. Page: 264 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.01.01.07 Scraping of Bricks dismantled from Brick Work including Stacking 1000
nos.
Skilled Labour 0.1400 day 450.00 63.00
Ordinary Labour 3.5000 day 370.00 1295.00

Subtotal-A: 1358.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1385.16

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1523.68


VAT 6% of Total 101.58
IT 4% of Total 67.72
Total: 1692.97

4.01.01.08 Removing & disposing all types of Pre-cast/ cast-in-situ pipes including
Earthwork and Dismantling of Masonry Works.

4.01.01.08.01 Up to 600mm diameter m


Skilled Labour 0.0200 day 450.00 9.00
Ordinary Labour 0.5200 day 370.00 192.40

Subtotal-A: 201.40

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 205.43

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 225.97


VAT 6% of Total 15.06
IT 4% of Total 10.04
Total: 251.08

Note : Rates of all items should be inclusive of all supply and carriage. Page: 265 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.01.01.08.02 For 600mm to 900mm diameter m


Skilled Labour 0.0300 day 450.00 13.50
Ordinary Labour 0.7000 day 370.00 259.00

Subtotal-A: 272.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 277.95

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 305.75


VAT 6% of Total 20.38
IT 4% of Total 13.59
Total: 339.72

4.01.01.08.03 For above 900mm diameter m


Skilled Labour 0.0500 day 450.00 22.50
Ordinary Labour 1.2000 day 370.00 444.00

Subtotal-A: 466.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 475.83

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 523.41


VAT 6% of Total 34.89
IT 4% of Total 23.26
Total: 581.57

4.01.02 Removal of telephone/ Electric poles including excavation and LS


dismantling of foundation concrete and lines under the supervision of
concerned department, disposal with all lifts and up to a lead of 1km
and stacking the serviceable and unserviceable material separately.

4.01.03 Dismantling of CI water pipe line of various diameter under supervision LS


of concerned department including disposal with all lifts and lead up to
1Km and stacking of serviceable material and unserviceable material
separately but excluding earth excavation and dismantling of masonry
works.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 266 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.01.04 Removal of cement concrete pipe of sewer gutter 1500 mm dia under LS
the supervision of concerned department including disposal with all lifts
and up to a lead of 1Km and stacking of serviceable and unserviceable
material separately but excluding earth excavation and dismantling of
masonry works.

4.01.05 Providing and maintaining semi pucca site office (Appendix 5) with
necessary furniture, sanitary & electrical/ power facilities, water supply
arrangement, office and survey equipment for the use of the Engineer
and his staff, all complete including removal of structures and
restoration of the site on completion of the work. The contractor shall
submit the detailed plan and drawing of the site office for approval of
the engineer. The site office should be provided with sufficient natural
light, heat protecting ceiling, dam proofing etc. as per direction of E-I-C.
All materials, equipment and plant, furniture, fittings recovered from
dismantling the office and removing access road will be the property of
the contractor upon completion of the work. The contractor will
responsilbe for maintaining the facilities of site office in good condition
throughout the contract period and payment of this item shall be made
only with the final bill.

4.01.05.01 Area of field office: 30 sqm LS

4.01.05.02 Area of field office: 50 sqm LS

4.01.05.03 Area of field office: 80 sqm LS

4.01.06 Videography: Providing and carrying out video shoting of roads, bridges,
buildings, other programmes by professional videographer including
hiring of vehicle, equipment for video shooting, titling, lightening,
mixing, lettering, editing including cost of two DVDs of approved makes
and quality etc. all complete as per direction of E-I-C. The edition of the
video film and the script for narration shall be as approved by the
engineer.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 267 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.01.06.01 Within 50 Kilometer from district head quarter for full day day
Videographer 1.0000 day 2500.00 2500.00

Subtotal-A: 2500.00
Video Editing, Digital Storage media etc. all ( +15.00 % on Subtotal-A ) 375.00
complete
Subtotal-A1: 2875.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2932.50

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 3225.75


VAT 6% of Total 215.05
IT 4% of Total 143.37
Total: 3584.17

4.01.06.02 Beyond 50 Kilometer from district head quarter for full day day
Videographer 1.0000 day 2500.00 2500.00

Subtotal-A: 2500.00
Distance beyond 50 KM ( +10.00 % on Subtotal-A ) 250.00
Video Editing, Digital Storage media etc. all ( +15.00 % on Subtotal-A ) 375.00
complete
Subtotal-A1: 3125.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 3187.50

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 3506.25


VAT 6% of Total 233.75
IT 4% of Total 155.83
Total: 3895.83

Note : Rates of all items should be inclusive of all supply and carriage. Page: 268 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.01.06.03 Work upto 5 hours per day only day


Videographer 0.6500 day 2500.00 1625.00

Subtotal-A: 1625.00
Video Editing, Digital Storage media etc. all ( +15.00 % on Subtotal-A ) 243.75
complete
Subtotal-A1: 1868.75

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1906.13

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2096.74


VAT 6% of Total 139.78
IT 4% of Total 93.19
Total: 2329.71

4.01.07 Photography: Shooting of still photographs by professinal photographer hour


at outdoor and indoor of construction and other works of building,
bridges, roads etc. for recording the progress of works at any distances
including hiring of vehicle, equipment for photo shooting, lightening,
mixing, lettering, editing including cost of digitized media & min. 10
nos.4R images printed on photo paper etc. all complete as per direction
of E-I-C.
Photographer 0.2000 day 1200.00 240.00

Subtotal-A: 240.00
cost of Image editing, Photo Paper, storage ( +50.00 % on Subtotal-A ) 120.00
media, printing, transport etc.
Subtotal-A1: 360.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 367.20

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 403.92


VAT 6% of Total 26.93
IT 4% of Total 17.95
Total: 448.80

Note : Rates of all items should be inclusive of all supply and carriage. Page: 269 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.01.08 As-Built Drawings: Providing 3 full sets of as-built drawings of the per
completed works subject to Engineer's approval in AutoCAD software in scheme
standard drawing paper. The As-Built Drawing shall clearly show the
lines and dimensions of the permanent construction actually made
based on the changes to the original design from time to time as
ordered by the Engineer or proposed by the Contractor and approved by
the Engineer. One set of as-built drawings shall be considered for final
measurement and payment. The soft copy of the as-built drawings must
be submitted to the Design Unit, LGED for future reference. If the
contractor does not supply the as-built drawings by the date stated in
the Particular Conditions of Contract (PCC), or they do not receive the
Engineer's approval, the Engineer shall withhold the amount stated in
the PCC from the payment due to the contractor.
CAD Operator 20.0000 day 600.00 12000.00

Subtotal-A: 12000.00
cost of Paper, printing, binding etc. ( +10.00 % on Subtotal-A ) 1200.00
Subtotal-A1: 13200.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 13464.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 14810.40


VAT 6% of Total 987.36
IT 4% of Total 658.24
Total: 16456.00

Note : Rates of all items should be inclusive of all supply and carriage. Page: 270 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.01.09 Project Profile Signboard: Providing and maintenance one project profile sqm
signboard as per direction of E-I-C, to be placed at a suitable place of
the site including submission of proposals for the materials & size of the
signboards (recommended size: 1800mm x 1200 mm with 2 nos. 75mm
dia. MS post, outer & inner frames of board shall be 50mm x 50mm x
5mm & 20mm x 25mm x 5 mm respectively ) and text layout to the
engineer for approval which will be positioned as directed by the
engineer and removing the same on completeion of the works or as
instructed by the E-I-C. Sheeting will be made of encapsulated lens with
retro-reflective type and messages/ borders will be screen printed. The
text shall mention among others the name of the project, name of the
implementing agency, cost of the project, completion time, name of the
contractor etc.
MS Angle, Flat bar, Z bar 30.0000 kg 59.00 1770.00
75mm dia. MS pipe and wall thickness 4mm 7.3000 m 780.00 5694.00
24 SWG GP Sheet 10.6500 kg 80.00 852.00
Skilled Labour 1.5300 day 450.00 688.50

Subtotal-A: 9004.50
Cost of fabrication, welding, painting, writing, ( +25.00 % on Subtotal-A ) 2251.13
placing in position & PCC (1:2:4) etc.
Subtotal-A1: 11255.63

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11480.74

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12628.81


VAT 6% of Total 841.92
IT 4% of Total 561.28
Total: 14032.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 271 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.01.10 Bench Mark Pillar: Manufacturing, supplying & fixing in position RCC each
(1:2:4) Bench Mark Pillars of size 150mm x 150mm x 750mm, with
400mm x 400mm x 100mm base having 3 nos. 10mm dia MS bar each
way at base, 4 nos. 10mm dia vertical bar and 8 nos. 6mm dia tie,
including cost of form works, concreting, reinforcement, plastering at
top, inscribing on exposed surface, finishing surface, curing, earth
cutting, embedding 450mm below GL., backfilling, ramming etc.
complete as per direction of E-I-C.
RCC-17BCCM: Reinforced cement concrete work with 0.0329 cum 7674.21 252.48
minimum cement content ralates to nominal mix ratio 1:2:4
and maximum water cement ratio 0.45 having minimum
required average strength, f'cr = 24 Mpa a.............4.09.01.02
Minimum 6mm thick cement plaster including neat cement 0.4725 sqm 181.40 85.71
finishing (1:3) …… 4.06.05.01
Earth work in excavation of foundation of structures by 0.0911 cum 124.75 11.36
mechanical (Hydraulic excavator - Long Boom)/ manual
means in all sorts of soil up to specified depth in accordance
with requirements of lines, .............4.05.01.01.01
Supplying and fabrication of Ribbed or deformed bar 4.7015 kg 61.59 289.57
reinforcement conforming to BDS ISO 6935-2:2006 (or
standard subsequently released from BSTI) for all types of
RCC work including straightening, rem.............4.11.01.01
Head Mason 0.0005 day 650.00 0.33
Mason 0.0060 day 550.00 3.30
Skilled Labour 0.0060 day 450.00 2.70
Ordinary Labour 0.1016 day 370.00 37.59

Subtotal-A: 683.04
Misc. Sundry etc. ( +10.00 % on Subtotal-A ) 68.30
Subtotal-A1: 751.34

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 766.37

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 843.01


VAT 6% of Total 56.20

Note : Rates of all items should be inclusive of all supply and carriage. Page: 272 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

IT 4% of Total 37.47
Total: 936.67

4.01.11 Overall environment management in addition to the clause 27 & 29 of


GCC to the entire satisfaction of Engineer-in-charge

4.01.11.01 Improvement of Waste Disposal Facility for temporary camp site. each
There should be atleast one camp in each site, there should be 1 no of
organic waste and 1 no of inorganic waste disposal facility.
Waste Disposal Facility 1.0000 each 10000.00 10000.00

Subtotal-A: 10000.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10200.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 11220.00


VAT 6% of Total 748.00
IT 4% of Total 498.67
Total: 12466.67

4.01.11.02 Dust suppression measures km


Dust suppresion measures 1.0000 km 2000.00 2000.00

Subtotal-A: 2000.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2040.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2244.00


VAT 6% of Total 149.60
IT 4% of Total 99.73
Total: 2493.33

4.01.12 Providing and maintaining adequate portable water supply and


sanitation facilities at camp site and work site to the entire satisfaction
of Engineer-in-charge.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 273 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.01.12.01 Temporary Toilet: There should be 1 camp in each site. In each camp, each
there should be 1 no of toilet for women and 1 no of toilet for men
Temporary Toilet Facility at site 1.0000 each 10000.00 10000.00

Subtotal-A: 10000.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10200.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 11220.00


VAT 6% of Total 748.00
IT 4% of Total 498.67
Total: 12466.67

4.02.01 Conducting detailed topographical survey by electronic total station


(digital survey equipment) and investigation and collection of hydraulic
data (essential design data as per appraisal format for bridges and
culvert) regarding catchment area, L-section of road and canal, X-
section of canal at the point of crossing at upstream and down stream
as well as making of HFL/OFL, transferring and fixing of pucca bench
mark at site, to pin point all salient features such as roads, building,
trees, water body, play field, green area, water supply lines, sewer
lines, electric/ telephonic lines with poles, wells etc., taking all the
boundary measurement, internal angles, North direction, preparation of
survey drawing including spot levels/ contours ongrids 5m x 5m and
plotting on AutoCAD etc. complete including of all necessary material
and labour required for survey work. Contractor shall submit final
topographical survey drawings in five copies duly spiral binded along
with soft copy.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 274 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.02.01.01 For catchment area less then 1.25 sq. Km. each
Digital Topographical Survey & Collection of Hydraulic Data 1.2500 km2 20000.00 25000.00
including equipment & transportation

Subtotal-A: 25000.00
Report Generation and consumables etc. ( +10.00 % on Subtotal-A ) 2500.00
Subtotal-A1: 27500.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 28050.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 30855.00


VAT 6% of Total 2057.00
IT 4% of Total 1371.33
Total: 34283.33

4.02.01.02 For catchment area less then 1.25 to 2.50 sq. Km. each
Digital Topographical Survey & Collection of Hydraulic Data 2.5000 km2 20000.00 50000.00
including equipment & transportation

Subtotal-A: 50000.00
Report Generation and consumables etc. ( +10.00 % on Subtotal-A ) 5000.00
Subtotal-A1: 55000.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 56100.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 61710.00


VAT 6% of Total 4114.00
IT 4% of Total 2742.67
Total: 68566.67

Note : Rates of all items should be inclusive of all supply and carriage. Page: 275 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.02.01.03 For catchment area beyond then 2.50 sq. Km. each
Digital Topographical Survey & Collection of Hydraulic Data 3.5000 km2 20000.00 70000.00
including equipment & transportation

Subtotal-A: 70000.00
Report Generation and consumables etc. ( +10.00 % on Subtotal-A ) 7000.00
Subtotal-A1: 77000.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 78540.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 86394.00


VAT 6% of Total 5759.60
IT 4% of Total 3839.73
Total: 95993.33

4.02.02 Survey and investigation and preparation of Report for bridge approach
road work with chain and compass, auto level, theodolite or total station
including fixing of permanent benchmark and also fixing of bench mark
on all the permanent structures, along the alignment, like boundary
wall, electrical poles etc. Also marking of locations of boundary wall,
electric poles, telephone poles trees etc. in the road boundary, collection
and submission of existing inventory of the road all along the alignment
conducting survey@20 metre interval for L-section and for single lane X-
section interval will be @ 0.75, 1.25, 1.875, 2.60, 3.75, 4.50, 5.50 and
6.50 metre on both side of centre line for double or other lane interval
for x-section shall be as specified by the E-I-C. Data collected as
specified above are required to be submitted in both hard and soft
copies, L-section, X-section and plan is required to be submitted in the
shape of drawing sheets drawn with the help of auto plotter.
Preparation of report complete and submission of the same in five
copies duly spiral binded.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 276 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.02.02.01 For single lane road km


Digital Topographical Survey of Single Lane Road Alignment 1.0000 km 15000.00 15000.00
including equipment & transportation

Subtotal-A: 15000.00
Report Generation and consumables etc. ( +10.00 % on Subtotal-A ) 1500.00
Subtotal-A1: 16500.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 16830.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 18513.00


VAT 6% of Total 1234.20
IT 4% of Total 822.80
Total: 20570.00

4.02.02.02 For double lane road km


Digital Topographical Survey of Single Lane Road Alignment 1.3000 km 15000.00 19500.00
including equipment & transportation

Subtotal-A: 19500.00
Report Generation and consumables etc. ( +10.00 % on Subtotal-A ) 1950.00
Subtotal-A1: 21450.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 21879.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 24066.90


VAT 6% of Total 1604.46
IT 4% of Total 1069.64
Total: 26741.00

Note : Rates of all items should be inclusive of all supply and carriage. Page: 277 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.02.02.03 Beyond the double lane km


Digital Topographical Survey of Single Lane Road Alignment 1.6000 km 15000.00 24000.00
including equipment & transportation

Subtotal-A: 24000.00
Report Generation and consumables etc. ( +10.00 % on Subtotal-A ) 2400.00
Subtotal-A1: 26400.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 26928.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 29620.80


VAT 6% of Total 1974.72
IT 4% of Total 1316.48
Total: 32912.00

4.02.03 Sub-soil investigation at the actual locations of each abutment and pier
positions in accordance with the specifications of ASTM D 1586 and D
1587. The bore holes shall have a minimum diameter of 100mm and
shall be lined throughout and shall be minimum 30m to 45m deep or to
a depth as specified in the ASTM/ AASHTO or as directed by the E-I-C
from the existing GL and taking all cautions and steps to collect the
disturbed and undisturbed samples and making the bore holes. The
item is inclusive of mobilization & demobilization, proper method of
borings, arrangement of boat/barge all cost of materials, labourers, field
and laboratory tests including report and records. (The Testing Party
will be selected taking prior approval of Procuring Entity)

4.02.03.01 Test on ground surface LS

4.02.03.02 Test under water LS

4.02.03.03 Test under water for flashy river with flow velocity > 1m/s LS

Note : Rates of all items should be inclusive of all supply and carriage. Page: 278 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.02.04 Conducting Electronic Cone Penetration Test with pore pressure


measurement, dissipation test as per ASTM D 5778 method upto 50m
depth to measure friction angle, undrained shear strength, tip
resistance,skin friction , Relative density, pore pressure etc. (The
Testing Party will be selected taking prior approval of Procuring Entity)

4.02.04.01 Test on ground surface LS

4.02.04.02 Test under water LS

4.03.01 Construction of 2m wide temporary bamboo diversion bridge with m


100mm average dia pucca borak bamboo in 4 (four) lines of posts
longitudinally and required lines of posts 2m c/c transversely with
beams and struts and every post with double bracing’s and each post
driven to at least 0.75m depth including half split bamboo decking
including supplying nuts, bolts, etc. fitting, fixing and supply, carrying
and cost of all materials & labour, etc. all complete as per direction of
the Engineer.
Borak Bamboo (75mm to 100mm) 50.0000 m 42.00 2100.00
Nails/ Nut bolts/ Screw/ Spikes 1.0000 kg 65.00 65.00
Skilled Labour 0.5000 day 450.00 225.00
Ordinary Labour 0.7600 day 370.00 281.20

Subtotal-A: 2671.20

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2724.62

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2997.09


VAT 6% of Total 199.81
IT 4% of Total 133.20
Total: 3330.10

Note : Rates of all items should be inclusive of all supply and carriage. Page: 279 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.03.02 Construction of 0.25m width bamboo sanko with 100mm dia pucca m
borak bamboo posts of required length @2.5m c/c driven at least 1m
below ground level of stream with 75mm dia full bamboo decking
beams, breaching diagonals with 100mm dia bamboo including fitting,
fixing to complete satisfaction including supply of nails, nuts, bolts, etc.
all materials, carrying and labour, etc. all complete as per direction of
the Engineer.
Borak Bamboo (75mm to 100mm) 20.0000 m 42.00 840.00
Nails/ Nut bolts/ Screw/ Spikes 0.5000 kg 65.00 32.50
Skilled Labour 0.2500 day 450.00 112.50
Ordinary Labour 0.5000 day 370.00 185.00

Subtotal-A: 1170.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1193.40

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1312.74


VAT 6% of Total 87.52
IT 4% of Total 58.34
Total: 1458.60

Note : Rates of all items should be inclusive of all supply and carriage. Page: 280 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.03.03 MS work in timber bridge or timber structure including the supply, kg


carrying and fitting of specified approved nuts, bolts, hinges, cleats,
screws, washer, fish plate of specified and approved size and make, etc.
all complete as per drawing and direction of the E-I-C.
Re-bar Fabricator 0.0030 day 570.00 1.71
Welder 0.0600 day 680.00 40.80
Nails/ Nut bolts/ Screw/ Spikes 1.0000 kg 65.00 65.00

Subtotal-A: 107.51

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 109.66

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 120.63


VAT 6% of Total 8.04
IT 4% of Total 5.36
Total: 134.03

4.03.04 Wood work with specified timber of different sizes in superstructure of


timber bridges i.e. bracing’s, struts, diagonals, beams, cross beams,
decking, railings, etc. including supply and carrying of timber, sizing and
shaping, fitting, fixing with nut, bolt, nails, screw, washer including
providing fish plate, etc. all complete as per design. The wood must be
free from rots, knots, sap and shall be seasoned and creosoted with
creosote oil, etc. all complete including supply, carrying and cost of all
materials and labour, etc. all complete as per direction of the E-I-C.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 281 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.03.04.01 Jam (Black Berry/Jarul/Local Korai) cum


Jam/Jarul 1.0000 m3 65650.00 65650.00
Nails/ Nut bolts/ Screw/ Spikes 3.0000 kg 65.00 195.00
Carpenter 8.0000 day 680.00 5440.00
Skilled Labour 16.0000 day 450.00 7200.00

Subtotal-A: 78485.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 80054.70

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 88060.17


VAT 6% of Total 5870.68
IT 4% of Total 3913.79
Total: 97844.63

4.03.04.02 Chittagong Silkorai cum


Sil Korai 1.0000 m3 88000.00 88000.00
Nails/ Nut bolts/ Screw/ Spikes 3.0000 kg 65.00 195.00
Carpenter 8.0000 day 680.00 5440.00
Skilled Labour 16.0000 day 450.00 7200.00

Subtotal-A: 100835.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 102851.70

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 113136.87


VAT 6% of Total 7542.46
IT 4% of Total 5028.31
Total: 125707.63

Note : Rates of all items should be inclusive of all supply and carriage. Page: 282 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.03.04.03 Sundari/ Garjan cum


Sundari/ Garzen 1.0000 m3 67580.00 67580.00
Nails/ Nut bolts/ Screw/ Spikes 3.0000 kg 65.00 195.00
Carpenter 8.0000 day 680.00 5440.00
Skilled Labour 16.0000 day 450.00 7200.00

Subtotal-A: 80415.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 82023.30

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 90225.63


VAT 6% of Total 6015.04
IT 4% of Total 4010.03
Total: 100250.70

4.03.04.04 Shisu/ Mehagoni cum


Mehagoni/ Shishu 1.0000 m3 59730.00 59730.00
Nails/ Nut bolts/ Screw/ Spikes 3.0000 kg 65.00 195.00
Carpenter 8.0000 day 680.00 5440.00
Skilled Labour 16.0000 day 450.00 7200.00

Subtotal-A: 72565.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 74016.30

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 81417.93


VAT 6% of Total 5427.86
IT 4% of Total 3618.57
Total: 90464.37

Note : Rates of all items should be inclusive of all supply and carriage. Page: 283 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.03.04.05 Shal cum


Shal 1.0000 m3 75000.00 75000.00
Nails/ Nut bolts/ Screw/ Spikes 3.0000 kg 65.00 195.00
Carpenter 8.0000 day 680.00 5440.00
Skilled Labour 16.0000 day 450.00 7200.00

Subtotal-A: 87835.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 89591.70

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 98550.87


VAT 6% of Total 6570.06
IT 4% of Total 4380.04
Total: 109500.97

4.03.04.06 Babla cum


Babla 1.0000 m3 42000.00 42000.00
Nails/ Nut bolts/ Screw/ Spikes 3.0000 kg 65.00 195.00
Carpenter 8.0000 day 680.00 5440.00
Skilled Labour 16.0000 day 450.00 7200.00

Subtotal-A: 54835.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 55931.70

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 61524.87


VAT 6% of Total 4101.66
IT 4% of Total 2734.44
Total: 68360.97

Note : Rates of all items should be inclusive of all supply and carriage. Page: 284 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.03.05 Construction of temporary diversion road of minimum width 4.8m on


detour with arranged earth, protected with bamboo palisading if
necessary, compacting the earth, keeping provision of drainage facilities
with providing RCC pipe of required size, nos. and length, leveling,
dressing the road surface for smoothly plying vehicle & maintaining the
same till completion of bridges/ culvert construction including all
materials labour and removal of the same after construction of bridge/
culvert all complete as per direction of the E-I-C.

4.03.05.01 Road Surface: Earthen LS

4.03.05.02 Road Surface: 3.7m HBB pavement over BFS & 150mm ISG LS

4.04.01 Labour charge for erecting and assembling of PSB, fitting, fixing in
proper position and providing necessary decking by arrangement of all
necessary tools and equipment including local handling of bridge parts
and all incidental charges, etc. all complete as per direction of the E-I-C.

4.04.01.01 Single Bailey Bridge or Acrow panel. m


Bailey Bridge Mistry 0.1430 day 680.00 97.24
Skilled Labour 1.0000 day 450.00 450.00
Ordinary Labour 7.2800 day 370.00 2693.60

Subtotal-A: 3240.84
H.C. of Lunching equipment ( +19.00 % on Subtotal-A ) 615.76
Bullah, Bamboo, Wire, Nylon Rope, Jute, etc. ( +26.00 % on Subtotal-A ) 842.62
Subtotal-A1: 4699.22

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4793.20

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 5272.52


VAT 6% of Total 351.50
IT 4% of Total 234.33
Total: 5858.36

Note : Rates of all items should be inclusive of all supply and carriage. Page: 285 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.04.01.02 Double single Bailey Bridge or Acrow panel. m


Bailey Bridge Mistry 0.1680 day 680.00 114.24
Skilled Labour 1.1740 day 450.00 528.30
Ordinary Labour 8.5500 day 370.00 3163.50

Subtotal-A: 3806.04
H.C. of Lunching equipment ( +19.00 % on Subtotal-A ) 723.15
Bullah, Bamboo, Wire, Nylon Rope, Jute, etc. ( +26.00 % on Subtotal-A ) 989.57
Subtotal-A1: 5518.76

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 5629.13

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 6192.05


VAT 6% of Total 412.80
IT 4% of Total 275.20
Total: 6880.05

4.04.01.03 Calender Hamilton truss bridge m


Bailey Bridge Mistry 0.7000 day 680.00 476.00
Skilled Labour 4.8700 day 450.00 2191.50
Ordinary Labour 35.0000 day 370.00 12950.00

Subtotal-A: 15617.50
H.C. of Lunching equipment ( +19.00 % on Subtotal-A ) 2967.33
Bullah, Bamboo, Wire, Nylon Rope, Jute, etc. ( +26.00 % on Subtotal-A ) 4060.55
Subtotal-A1: 22645.38

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 23098.28

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 25408.11


VAT 6% of Total 1693.87
IT 4% of Total 1129.25
Total: 28231.23

Note : Rates of all items should be inclusive of all supply and carriage. Page: 286 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.04.01.04 Indian quadricon bridge m


Bailey Bridge Mistry 0.5600 day 680.00 380.80
Skilled Labour 3.9200 day 450.00 1764.00
Ordinary Labour 28.5400 day 370.00 10559.80

Subtotal-A: 12704.60
H.C. of Lunching equipment ( +19.00 % on Subtotal-A ) 2413.87
Bullah, Bamboo, Wire, Nylon Rope, Jute, etc. ( +26.00 % on Subtotal-A ) 3303.20
Subtotal-A1: 18421.67

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 18790.10

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 20669.11


VAT 6% of Total 1377.94
IT 4% of Total 918.63
Total: 22965.68

4.04.01.05 UCB and Chinese truss bridge m


Bailey Bridge Mistry 0.8400 day 680.00 571.20
Skilled Labour 5.8300 day 450.00 2623.50
Ordinary Labour 42.4400 day 370.00 15702.80

Subtotal-A: 18897.50
H.C. of Lunching equipment ( +19.00 % on Subtotal-A ) 3590.53
Bullah, Bamboo, Wire, Nylon Rope, Jute, etc. ( +26.00 % on Subtotal-A ) 4913.35
Subtotal-A1: 27401.38

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 27949.40

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 30744.34


VAT 6% of Total 2049.62
IT 4% of Total 1366.42
Total: 34160.38

Note : Rates of all items should be inclusive of all supply and carriage. Page: 287 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.04.02 Labour charge for delaunching of PSB with all necessary arrangements
including necessary decking by arrangement of all necessary tools and
equipment, all incidental charges, etc. all complete as per direction of
the E-I-C.

4.04.02.01 Single Bailey Bridge or Acrow panel bridge. m


Bailey Bridge Mistry 0.1000 day 680.00 68.00
Skilled Labour 0.7200 day 450.00 324.00
Ordinary Labour 5.1900 day 370.00 1920.30

Subtotal-A: 2312.30
H.C. of De-lunching Equipment ( +19.00 % on Subtotal-A ) 439.34
Bullah, Bamboo, Wire, Nylon Rope, Jute, etc. ( +26.00 % on Subtotal-A ) 601.20
Subtotal-A1: 3352.84

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 3419.89

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 3761.88


VAT 6% of Total 250.79
IT 4% of Total 167.19
Total: 4179.87

Note : Rates of all items should be inclusive of all supply and carriage. Page: 288 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.04.02.02 Double single Bailey Bridge or Acrow panel bridge. m


Bailey Bridge Mistry 0.1200 day 680.00 81.60
Skilled Labour 0.8640 day 450.00 388.80
Ordinary Labour 6.2300 day 370.00 2305.10

Subtotal-A: 2775.50
H.C. of De-lunching Equipment ( +19.00 % on Subtotal-A ) 527.35
Bullah, Bamboo, Wire, Nylon Rope, Jute, etc. ( +26.00 % on Subtotal-A ) 721.63
Subtotal-A1: 4024.48

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4104.96

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 4515.46


VAT 6% of Total 301.03
IT 4% of Total 200.69
Total: 5017.18

4.04.02.03 Calender Hamilton truss bridge. m


Bailey Bridge Mistry 0.4940 day 680.00 335.92
Skilled Labour 3.5600 day 450.00 1602.00
Ordinary Labour 25.6400 day 370.00 9486.80

Subtotal-A: 11424.72
H.C. of De-lunching Equipment ( +19.00 % on Subtotal-A ) 2170.70
Bullah, Bamboo, Wire, Nylon Rope, Jute, etc. ( +26.00 % on Subtotal-A ) 2970.43
Subtotal-A1: 16565.84

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 16897.16

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 18586.88


VAT 6% of Total 1239.13
IT 4% of Total 826.08
Total: 20652.09

Note : Rates of all items should be inclusive of all supply and carriage. Page: 289 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.04.02.04 Indian quadricon bridge m


Bailey Bridge Mistry 0.4000 day 680.00 272.00
Skilled Labour 2.8700 day 450.00 1291.50
Ordinary Labour 20.6600 day 370.00 7644.20

Subtotal-A: 9207.70
H.C. of De-lunching equipment ( +19.00 % on Subtotal-A ) 1749.46
Bullah, Bamboo, Wire, Nylon Rope, Jute, etc. ( +26.00 % on Subtotal-A ) 2394.00
Subtotal-A1: 13351.17

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 13618.19

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 14980.01


VAT 6% of Total 998.67
IT 4% of Total 665.78
Total: 16644.45

4.04.02.05 UCB and Chinese truss bridge m


Bailey Bridge Mistry 0.5900 day 680.00 401.20
Skilled Labour 4.2400 day 450.00 1908.00
Ordinary Labour 30.5700 day 370.00 11310.90

Subtotal-A: 13620.10
H.C. of De-lunching equipment ( +19.00 % on Subtotal-A ) 2587.82
Bullah, Bamboo, Wire, Nylon Rope, Jute, etc. ( +26.00 % on Subtotal-A ) 3541.23
Subtotal-A1: 19749.15

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 20144.13

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 22158.54


VAT 6% of Total 1477.24
IT 4% of Total 984.82
Total: 24620.60

Note : Rates of all items should be inclusive of all supply and carriage. Page: 290 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.04.03 Supply and installation of steel pontoon of size 7.20mx4.00mx0.915m LS


with plates (4mm thick), angles, flat bars, etc. shall be of steel of
shipbuilding quality, hand capstan, hosting system pulley, bollards,
winch, counter weight, manhole, CI roof, deck fittings, ramps, provision
of inside inspection and carry out repair work in case of necessity,
provision of de-watering, appropriate anchorage, steel fabrication, gas
cutting, welding, paints (paints shall be used of BERGER Robbialac
marine quality paints. Scrapping the entire steel surface shall be done
before painting. Two coats of black bituminous paints to be used inside
the pontoon and out side level including ramp) and other required
accessories complete as per design, drawings, specifications and
direction of the E-I-C. (Rate shall include all materials, labour, tools,
equipment, plants, accessories, transportation, all taxes, VATs. charges,
profits and maintenance for one year)

4.04.04 Supply and installation of steel pontoon of size 18.00mx8.00mx1.00m LS


with plates (8mm thick), angles, flat bars, etc. shall be of steel of
shipbuilding quality, hand capstan, hosting system pulley, bollards,
winch, counter weight, manhole, CI roof, deck fittings, ramps, provision
of inside inspection and carry out repair work in case of necessity,
provision of de-watering, appropriate anchorage, steel fabrication, gas
cutting, welding, paints (paints shall be used of BERGER Robbialac
marine quality paints. Scrapping the entire steel surface shall be done
before painting. Two coats of black bituminous paints to be used inside
the pontoon and out side level including ramp) and other required
accessories complete as per design, drawings, specifications and
direction of the E-I-C. (Rate shall include all materials, labour, tools,
equipment, plants, accessories, transportation, all taxes, VATs. charges,
profits and maintenance for one year)

Note : Rates of all items should be inclusive of all supply and carriage. Page: 291 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.04.05 Labour for erection of E.I. Rail including hoisting and placing in position m
etc. all complete as per direction of the E/C.
Jute Rope 0.4000 kg 120.00 48.00
Ordinary Labour 0.7500 day 370.00 277.50

Subtotal-A: 325.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 332.01

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 365.21


VAT 6% of Total 24.35
IT 4% of Total 16.23
Total: 405.79

4.04.06 Supplying C.I. Shoe of specified diameter including fitting, fixing etc. all
complete as per direction of the E-I-C.

4.04.06.01 For 300mm dia.: Weight of each shoe should be at least 1.0 cwt each
CI Shoe (300mm dia) 1.0000 each 1650.00 1650.00
Ordinary Labour 0.2500 day 370.00 92.50

Subtotal-A: 1742.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1777.35

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1955.09


VAT 6% of Total 130.34
IT 4% of Total 86.89
Total: 2172.32

Note : Rates of all items should be inclusive of all supply and carriage. Page: 292 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.04.06.02 For 600mm dia.: Weight of each shoe should be at least 2.0 cwt each
CI Shoe (600mm dia) 1.0000 each 5200.00 5200.00
Ordinary Labour 0.3000 day 370.00 111.00

Subtotal-A: 5311.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 5417.22

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 5958.94


VAT 6% of Total 397.26
IT 4% of Total 264.84
Total: 6621.05

4.04.06.03 For 750mm dia.: Weight of each shoe should be atleast 3.0 cwt each
CI Shoe (750mm dia) 1.0000 each 6750.00 6750.00
Ordinary Labour 0.4500 day 370.00 166.50

Subtotal-A: 6916.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 7054.83

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 7760.31


VAT 6% of Total 517.35
IT 4% of Total 344.90
Total: 8622.57

4.04.07 Supplying C.I. Cap of standard size to fit on single/ double E.I. Rail, with
necessary fittings etc. all complete as per direction of the E-I-C.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 293 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.04.07.01 CI Cap (Single Headed) each


CI Cap (single headed) 1.0000 each 1650.00 1650.00
Ordinary Labour 0.2500 day 370.00 92.50

Subtotal-A: 1742.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1777.35

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1955.09


VAT 6% of Total 130.34
IT 4% of Total 86.89
Total: 2172.32

4.04.07.02 CI Cap (Double Headed) each


CI Cap (double headed) 1.0000 each 1875.00 1875.00
Ordinary Labour 0.3500 day 370.00 129.50

Subtotal-A: 2004.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2044.59

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2249.05


VAT 6% of Total 149.94
IT 4% of Total 99.96
Total: 2498.94

4.04.08 Labour for taking out E.I. Rail post with specified diameter C.I. shoe (
Portion embedded within earth only will be paid ) etc. all complete as
per direction of the E/C.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 294 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.04.08.01 For 300mm dia. CI shoe m


Ordinary Labour 1.0000 day 370.00 370.00

Subtotal-A: 370.00
Necessary arrangement ( +15.00 % on Subtotal-A ) 55.50
Subtotal-A1: 425.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 434.01

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 477.41


VAT 6% of Total 31.83
IT 4% of Total 21.22
Total: 530.46

4.04.08.02 For 600mm dia. CI shoe m


Ordinary Labour 1.5000 day 370.00 555.00

Subtotal-A: 555.00
Necessary arrangement ( +20.00 % on Subtotal-A ) 111.00
Subtotal-A1: 666.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 679.32

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 747.25


VAT 6% of Total 49.82
IT 4% of Total 33.21
Total: 830.28

4.04.09 Labour for driving E.I. Rail post with specified diameter C.I. shoe with
all driving arrangements ( only under ground portion with shoe will be
considered for measurement) etc. all complete as per direction of the E-
I-C.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 295 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.04.09.01 For 300mm dia CI shoe m


Ordinary Labour 1.3800 day 370.00 510.60

Subtotal-A: 510.60
Necessary arrangement ( +18.00 % on Subtotal-A ) 91.91
Subtotal-A1: 602.51

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 614.56

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 676.01


VAT 6% of Total 45.07
IT 4% of Total 30.05
Total: 751.13

4.04.09.02 For 600mm dia CI shoe m


Ordinary Labour 1.6500 day 370.00 610.50

Subtotal-A: 610.50
Necessary arrangement ( +22.00 % on Subtotal-A ) 134.31
Subtotal-A1: 744.81

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 759.71

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 835.68


VAT 6% of Total 55.71
IT 4% of Total 37.14
Total: 928.53

Note : Rates of all items should be inclusive of all supply and carriage. Page: 296 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.04.10 Supplying double headed EI rail of standard size at site to construction m


iron bridge including necessary fitting, fixing, drilling the hole and
priming a coat of red oxide etc. all complete as per direction of E-I-C.
Double Headed EI Rail 1.0000 m 2558.00 2558.00
Skilled Labour 0.5000 day 450.00 225.00

Subtotal-A: 2783.00
All other cost including priming ( +2.00 % on Subtotal-A ) 55.66
Subtotal-A1: 2838.66

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2895.43

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 3184.98


VAT 6% of Total 212.33
IT 4% of Total 141.55
Total: 3538.86

4.04.11 Supplying RS joist of different sizes at site to construct iron bridge in/c kg
fitting, fixing etc. all complete as per direction of E-I-C.
RS Joist 1.0000 kg 75.00 75.00
Skilled Labour 0.0100 day 450.00 4.50

Subtotal-A: 79.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 81.09

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 89.20


VAT 6% of Total 5.95
IT 4% of Total 3.96
Total: 99.11

Note : Rates of all items should be inclusive of all supply and carriage. Page: 297 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.04.12 Labour for utilizing RS joist of different sizes of necessary fitting, fixing, kg
drilling hole etc. all complete as per direction of the E-I-C.
Skilled Labour 0.0200 day 450.00 9.00

Subtotal-A: 9.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9.18

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 10.10


VAT 6% of Total 0.67
IT 4% of Total 0.45
Total: 11.22

4.04.13 Supplying utilizing MS Angle, flat bar of different sizes or section in/c kg
fitting, fixing etc. all complete as per direction if E-I-C.
MS Angle, Flat bar, Z bar 1.0000 kg 59.00 59.00
Skilled Labour 0.0250 day 450.00 11.25

Subtotal-A: 70.25

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 71.66

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 78.82


VAT 6% of Total 5.25
IT 4% of Total 3.50
Total: 87.58

Note : Rates of all items should be inclusive of all supply and carriage. Page: 298 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.01 Earth work in excavation of foundation of structures by mechanical


(Hydraulic excavator - Long Boom)/ manual means in all sorts of soil up
to specified depth in accordance with requirements of lines, grades,
cross sections and elevation as shown in the drawing including setting
out, removal of stumps, logs, boulders and other deleterious materials,
providing necessary tools and plants, construction of shoring and
bracing, cleaning the excavated materials to a safe distance out of the
site premises, cut to a firm surface including pumping/ bailing out
water, removal of spoils to a safe distance, dressing of sides and bottom
and backfilling of trenches up to original level with approved material
etc. all complete as per approval of E-I-C. Contractor shall get
acquainted with site conditions, nature of soil and adopt suitable
adequate dewatering system as deemed fit for the nature of soil and
prevailing water table to get the surface reasonably dry for laying PCC
at the time of execution so that execution will not be hampered or
delayed. Back-filled materials shall be compacted to a density
comparable with the adjacent undisturbed material.

4.05.01.01 Earth work in Ordinary Soil by Manual Means for an initial lead up to
30m

4.05.01.01.01 For depth up to 3m cum


Mason 0.0250 day 550.00 13.75
Ordinary Labour 0.3000 day 370.00 111.00

Subtotal-A: 124.75

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 127.25

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 139.97


VAT 6% of Total 9.33
IT 4% of Total 6.22
Total: 155.52

Note : Rates of all items should be inclusive of all supply and carriage. Page: 299 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.01.01.02 For depth 3m to 6m cum


Mason 0.0250 day 550.00 13.75
Ordinary Labour 0.3500 day 370.00 129.50

Subtotal-A: 143.25

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 146.12

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 160.73


VAT 6% of Total 10.72
IT 4% of Total 7.14
Total: 178.59

4.05.01.01.03 For depth above 6m cum


Mason 0.0250 day 550.00 13.75
Ordinary Labour 0.6000 day 370.00 222.00

Subtotal-A: 235.75

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 240.47

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 264.51


VAT 6% of Total 17.63
IT 4% of Total 11.76
Total: 293.90

4.05.01.02 Earth work in Ordinary Soil by Mechanical Means (Hydaulic Excavator)


for an initial lead of 30m

Note : Rates of all items should be inclusive of all supply and carriage. Page: 300 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.01.02.01 For depth up to 3m cum


Skilled Labour 0.0030 day 450.00 1.35
Ordinary Labour 0.0182 day 370.00 6.73
Operator 0.0030 day 570.00 1.71
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.0061 day 470.00 2.87
Operator
H.C. of Excavator (Medium Size) 0.0030 day 8880.00 26.64
Diesel 0.3697 liter 68.00 25.14
Lubricant 0.0109 liter 220.00 2.40

Subtotal-A: 66.84

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 68.18

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 74.99


VAT 6% of Total 5.00
IT 4% of Total 3.33
Total: 83.33

Note : Rates of all items should be inclusive of all supply and carriage. Page: 301 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.01.02.02 For depth 3m to 6m cum


Skilled Labour 0.0033 day 450.00 1.49
Ordinary Labour 0.0233 day 370.00 8.62
Operator 0.0033 day 570.00 1.88
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.0067 day 470.00 3.15
Operator
H.C. of Excavator (Medium Size) 0.0033 day 8880.00 29.30
Diesel 0.4067 liter 68.00 27.66
Lubricant 0.0120 liter 220.00 2.64

Subtotal-A: 74.74

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 76.23

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 83.85


VAT 6% of Total 5.59
IT 4% of Total 3.73
Total: 93.17

Note : Rates of all items should be inclusive of all supply and carriage. Page: 302 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.01.02.03 For depth above 6m cum


Skilled Labour 0.0037 day 450.00 1.67
Ordinary Labour 0.0296 day 370.00 10.95
Operator 0.0037 day 570.00 2.11
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.0074 day 470.00 3.48
Operator
H.C. of Excavator (Medium Size) 0.0037 day 8880.00 32.86
Diesel 0.4519 liter 68.00 30.73
Lubricant 0.0133 liter 220.00 2.93

Subtotal-A: 84.72

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 86.41

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 95.05


VAT 6% of Total 6.34
IT 4% of Total 4.22
Total: 105.61

4.05.01.03 Earth work in Rocky, gravelly, slushy or organic type Soil by Manual
Means for an initial lead of 30m

Note : Rates of all items should be inclusive of all supply and carriage. Page: 303 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.01.03.01 For depth up to 3m cum


Mason 0.0250 day 550.00 13.75
Ordinary Labour 0.4000 day 370.00 148.00

Subtotal-A: 161.75

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 164.99

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 181.48


VAT 6% of Total 12.10
IT 4% of Total 8.07
Total: 201.65

4.05.01.03.02 For depth 3m to 6m cum


Mason 0.0250 day 550.00 13.75
Ordinary Labour 0.5500 day 370.00 203.50

Subtotal-A: 217.25

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 221.60

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 243.75


VAT 6% of Total 16.25
IT 4% of Total 10.83
Total: 270.84

Note : Rates of all items should be inclusive of all supply and carriage. Page: 304 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.01.03.03 For depth above 6m cum


Mason 0.0250 day 550.00 13.75
Ordinary Labour 0.6500 day 370.00 240.50

Subtotal-A: 254.25

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 259.34

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 285.27


VAT 6% of Total 19.02
IT 4% of Total 12.68
Total: 316.97

4.05.01.04 Earth work Rocky, gravelly, slushy or organic type Soil by Mechanical
Means (Hydaulic Excavator) for an initial lead of 30m

Note : Rates of all items should be inclusive of all supply and carriage. Page: 305 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.01.04.01 For depth up to 3m cum


Skilled Labour 0.0033 day 450.00 1.49
Ordinary Labour 0.0200 day 370.00 7.40
Operator 0.0033 day 570.00 1.88
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.0067 day 470.00 3.15
Operator
H.C. of Excavator (Medium Size) 0.0033 day 8880.00 29.30
Diesel 0.4067 liter 68.00 27.66
Lubricant 0.0120 liter 220.00 2.64

Subtotal-A: 73.51

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 74.98

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 82.48


VAT 6% of Total 5.50
IT 4% of Total 3.67
Total: 91.65

Note : Rates of all items should be inclusive of all supply and carriage. Page: 306 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.01.04.02 For depth 3m to 6m cum


Skilled Labour 0.0036 day 450.00 1.62
Ordinary Labour 0.0291 day 370.00 10.77
Operator 0.0036 day 570.00 2.05
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.0073 day 470.00 3.43
Operator
H.C. of Excavator (Medium Size) 0.0036 day 8880.00 31.97
Diesel 0.4436 liter 68.00 30.16
Lubricant 0.0131 liter 220.00 2.88

Subtotal-A: 82.88

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 84.54

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 93.00


VAT 6% of Total 6.20
IT 4% of Total 4.13
Total: 103.33

Note : Rates of all items should be inclusive of all supply and carriage. Page: 307 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.01.04.03 For depth above 6m cum


Skilled Labour 0.0040 day 450.00 1.80
Ordinary Labour 0.0400 day 370.00 14.80
Operator 0.0040 day 570.00 2.28
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.0080 day 470.00 3.76
Operator
H.C. of Excavator (Medium Size) 0.0040 day 8880.00 35.52
Diesel 0.4880 liter 68.00 33.18
Lubricant 0.0144 liter 220.00 3.17

Subtotal-A: 94.51

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 96.40

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 106.04


VAT 6% of Total 7.07
IT 4% of Total 4.71
Total: 117.82

4.05.02 Disposing surplus excavated soils of all types outside the site premises
up to a lead of specified distance including cost of labour, cost of
equipment and machinery, loading and unloading at both ends,
transportation, all other incidental charges at all leads and lifts etc.
complete as per approval of the E-I-C. The surplus excavated material
must be dumped in an unobjectionable place outside the site premises
with minimum traffic disruption and the procuring entity will not be
responsible for any irregularities by the party regarding disposing of the
earth.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 308 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.02.01 Lead up to 500m cum


Operator 0.0057 day 570.00 3.25
Ordinary Labour 0.0114 day 370.00 4.22
H.C. of Tipper -5 cum capacity 0.0057 day 4500.00 25.65
H.C. of Tipper -5 cum capacity for lead beyond 1 km 0.6000 ton.km 6.00 3.60

Subtotal-A: 36.72

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 37.45

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 41.20


VAT 6% of Total 2.75
IT 4% of Total 1.83
Total: 45.77

4.05.02.02 Lead 500m to 1km cum


Operator 0.0057 day 570.00 3.25
Ordinary Labour 0.0114 day 370.00 4.22
H.C. of Tipper -5 cum capacity 0.0057 day 4500.00 25.65
H.C. of Tipper -5 cum capacity for lead beyond 1 km 1.2000 ton.km 6.00 7.20

Subtotal-A: 40.32

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 41.12

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 45.24


VAT 6% of Total 3.02
IT 4% of Total 2.01
Total: 50.26

Note : Rates of all items should be inclusive of all supply and carriage. Page: 309 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.02.03 Lead 1km to 2km cum


Operator 0.0057 day 570.00 3.25
Ordinary Labour 0.0114 day 370.00 4.22
H.C. of Tipper -5 cum capacity 0.0057 day 4500.00 25.65
H.C. of Tipper -5 cum capacity for lead beyond 1 km 2.4000 ton.km 6.00 14.40

Subtotal-A: 47.52

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 48.47

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 53.31


VAT 6% of Total 3.55
IT 4% of Total 2.37
Total: 59.24

4.05.02.04 Lead 2km to 3km cum


Operator 0.0057 day 570.00 3.25
Ordinary Labour 0.0114 day 370.00 4.22
H.C. of Tipper -5 cum capacity 0.0057 day 4500.00 25.65
H.C. of Tipper -5 cum capacity for lead beyond 1 km 3.6000 ton.km 6.00 21.60

Subtotal-A: 54.72

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 55.81

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 61.39


VAT 6% of Total 4.09
IT 4% of Total 2.73
Total: 68.21

Note : Rates of all items should be inclusive of all supply and carriage. Page: 310 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.02.05 Lead 3km to 4km cum


Operator 0.0057 day 570.00 3.25
Ordinary Labour 0.0114 day 370.00 4.22
H.C. of Tipper -5 cum capacity 0.0057 day 4500.00 25.65
H.C. of Tipper -5 cum capacity for lead beyond 1 km 4.8000 ton.km 6.00 28.80

Subtotal-A: 61.92

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 63.16

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 69.47


VAT 6% of Total 4.63
IT 4% of Total 3.09
Total: 77.19

4.05.02.06 Lead 4km to 5km cum


Operator 0.0057 day 570.00 3.25
Ordinary Labour 0.0114 day 370.00 4.22
H.C. of Tipper -5 cum capacity 0.0057 day 4500.00 25.65
H.C. of Tipper -5 cum capacity for lead beyond 1 km 6.0000 ton.km 6.00 36.00

Subtotal-A: 69.12

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 70.50

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 77.55


VAT 6% of Total 5.17
IT 4% of Total 3.45
Total: 86.17

Note : Rates of all items should be inclusive of all supply and carriage. Page: 311 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.02.07 Lead above 5km cum


Operator 0.0057 day 570.00 3.25
Ordinary Labour 0.0114 day 370.00 4.22
H.C. of Tipper -5 cum capacity 0.0057 day 4500.00 25.65
H.C. of Tipper -5 cum capacity for lead beyond 1 km 7.2000 ton.km 6.00 43.20

Subtotal-A: 76.32

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 77.84

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 85.63


VAT 6% of Total 5.71
IT 4% of Total 3.81
Total: 95.14

4.05.03 P&B: Pumping and bailing out water from the interior of any foundation LS
enclosure of work site with all leads and lifts including supply, operation
and maintenance of requisite number of water pumps, arrangements for
protection of ringh bund and side slopes of foundation pit against
erosion or washout etc. It should be carried out in such a manner as to
preclude the possibility of the movement of water through or alongside
any concrete being placed, etc. all complete as per direction of E-I-C.
No pumping or bailing will be permitted during the placing of concrete.

4.05.04 RB: Making earthen ring/ cross bundh of required height and width to LS
prevent water from entering in the working area for any type of
foundation with earth arranged and carried by the contractor including
bullah/bamboo palisading and double tarja mat/drum sheets walling as
and where necessary, maintaining the same throughout the working
period, filling by throwing earth in layers, removal of structure totally on
completion of the bridge, etc. all complete as per requirement and
instruction of the E-I-C.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 312 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.05 AI: Making artificial island in river/channel having standing water


suitable for well sinking/ cast-in-situ bored pile with supplying and
driving sal-bullah (150mm to 200mm dia) and bamboo posts (75mm to
100mm dia) up to required depth, tarja walling and all other necessary
iron fitting, earth arranged and carried by contractor by any means
including cost of all materials required for the work and maintaining the
same till the completion of the main component of the structure for
which the island is made, etc. all complete as per direction of the
Engineer-in-Charge. The structures are to be completely removed on
completion of the main component of the structure.

4.05.05.01 Beyond 900mm and up to 1500mm of standing water

4.05.05.01.01 For 3000mm x 6000mm wells each


Shal/sundari/gazari Bullah (150mm to 200mm) 140.0000 m 225.00 31500.00
Borak Bamboo (75mm to 100mm) 541.0000 m 42.00 22722.00
Tarza 56.0000 m2 210.00 11760.00
Royalty of Earth 114.0000 m3 25.00 2850.00
Sardar 0.4000 day 800.00 320.00
Ordinary Labour 114.0000 day 370.00 42180.00

Subtotal-A: 111332.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 113558.64

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 124914.50


VAT 6% of Total 8327.63
IT 4% of Total 5551.76
Total: 138793.89

Note : Rates of all items should be inclusive of all supply and carriage. Page: 313 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.05.01.02 For 3000mm x 7200mm wells each


Shal/sundari/gazari Bullah (150mm to 200mm) 154.0000 m 225.00 34650.00
Borak Bamboo (75mm to 100mm) 595.0000 m 42.00 24990.00
Tarza 62.0000 m2 210.00 13020.00
Royalty of Earth 125.0000 m3 25.00 3125.00
Sardar 0.4400 day 800.00 352.00
Ordinary Labour 125.0000 day 370.00 46250.00

Subtotal-A: 122387.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 124834.74

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 137318.21


VAT 6% of Total 9154.55
IT 4% of Total 6103.03
Total: 152575.79

Note : Rates of all items should be inclusive of all supply and carriage. Page: 314 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.05.01.03 For 3600mm x 7200mm wells each


Shal/sundari/gazari Bullah (150mm to 200mm) 156.0000 m 225.00 35100.00
Borak Bamboo (75mm to 100mm) 601.0000 m 42.00 25242.00
Tarza 63.0000 m2 210.00 13230.00
Royalty of Earth 126.0000 m3 25.00 3150.00
Sardar 0.4500 day 800.00 360.00
Ordinary Labour 126.0000 day 370.00 46620.00

Subtotal-A: 123702.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 126176.04

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 138793.64


VAT 6% of Total 9252.91
IT 4% of Total 6168.61
Total: 154215.16

Note : Rates of all items should be inclusive of all supply and carriage. Page: 315 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.05.01.04 For 3000mm x 8100mm wells each


Shal/sundari/gazari Bullah (150mm to 200mm) 164.0000 m 225.00 36900.00
Borak Bamboo (75mm to 100mm) 631.0000 m 42.00 26502.00
Tarza 66.0000 m2 210.00 13860.00
Royalty of Earth 132.0000 m3 25.00 3300.00
Sardar 0.4700 day 800.00 376.00
Ordinary Labour 132.0000 day 370.00 48840.00

Subtotal-A: 129778.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 132373.56

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 145610.92


VAT 6% of Total 9707.39
IT 4% of Total 6471.60
Total: 161789.91

Note : Rates of all items should be inclusive of all supply and carriage. Page: 316 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.05.01.05 For 3600mm x 8100mm wells each


Shal/sundari/gazari Bullah (150mm to 200mm) 167.0000 m 225.00 37575.00
Borak Bamboo (75mm to 100mm) 644.0000 m 42.00 27048.00
Tarza 67.0000 m2 210.00 14070.00
Royalty of Earth 135.0000 m3 25.00 3375.00
Sardar 0.4800 day 800.00 384.00
Ordinary Labour 135.0000 day 370.00 49950.00

Subtotal-A: 132402.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 135050.04

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 148555.04


VAT 6% of Total 9903.67
IT 4% of Total 6602.45
Total: 165061.16

Note : Rates of all items should be inclusive of all supply and carriage. Page: 317 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.05.01.06 For 3300mm x 8400mm wells each


Shal/sundari/gazari Bullah (150mm to 200mm) 169.0000 m 225.00 38025.00
Borak Bamboo (75mm to 100mm) 650.0000 m 42.00 27300.00
Tarza 68.0000 m2 210.00 14280.00
Royalty of Earth 136.0000 m3 25.00 3400.00
Sardar 0.4800 day 800.00 384.00
Ordinary Labour 136.0000 day 370.00 50320.00

Subtotal-A: 133709.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 136383.18

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 150021.50


VAT 6% of Total 10001.43
IT 4% of Total 6667.62
Total: 166690.55

Note : Rates of all items should be inclusive of all supply and carriage. Page: 318 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.05.01.07 For 3900mm x 7800mm wells each


Shal/sundari/gazari Bullah (150mm to 200mm) 170.0000 m 225.00 38250.00
Borak Bamboo (75mm to 100mm) 656.0000 m 42.00 27552.00
Tarza 68.0000 m2 210.00 14280.00
Royalty of Earth 137.0000 m3 25.00 3425.00
Sardar 0.4900 day 800.00 392.00
Ordinary Labour 137.0000 day 370.00 50690.00

Subtotal-A: 134589.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 137280.78

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 151008.86


VAT 6% of Total 10067.26
IT 4% of Total 6711.50
Total: 167787.62

Note : Rates of all items should be inclusive of all supply and carriage. Page: 319 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.05.01.08 For 4800mm x 7800mm wells each


Shal/sundari/gazari Bullah (150mm to 200mm) 172.0000 m 225.00 38700.00
Borak Bamboo (75mm to 100mm) 662.0000 m 42.00 27804.00
Tarza 69.0000 m2 210.00 14490.00
Royalty of Earth 138.0000 m3 25.00 3450.00
Sardar 0.4900 day 800.00 392.00
Ordinary Labour 138.0000 day 370.00 51060.00

Subtotal-A: 135896.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 138613.92

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 152475.31


VAT 6% of Total 10165.02
IT 4% of Total 6776.68
Total: 169417.01

4.05.05.02 Extra for each additional 300mm above 1500mm and upto 3000mm
depth of water

4.05.05.02.01 For 3000mm x 6000mm wells each Add +8.00% with Item No 4.05.05.01.01

4.05.05.02.02 For 3000mm x 7200mm wells each Add +14.00% with Item No 4.05.05.01.02

4.05.05.02.03 For 3600mm x 7200mm wells each Add +15.00% with Item No 4.05.05.01.03

4.05.05.02.04 For 3000mm x 8100mm wells each Add +15.00% with Item No 4.05.05.01.04

4.05.05.02.05 For 3600mm x 8100mm wells each Add +15.00% with Item No 4.05.05.01.05

4.05.05.02.06 For 3300mm x 8400mm wells each Add +15.00% with Item No 4.05.05.01.06

4.05.05.02.07 For 3900mm x 7800mm wells each Add +15.00% with Item No 4.05.05.01.07

Note : Rates of all items should be inclusive of all supply and carriage. Page: 320 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.05.02.08 For 4800mm x 7800mm wells each Add +16.00% with Item No 4.05.05.01.08

4.05.05.03 Extra for each additional 300mm above 3000mm and up to 4500mm
depth of water

4.05.05.03.01 For 3000mm x 6000mm wells each Add +16.00% with Item No 4.05.05.01.01

4.05.05.03.02 For 3000mm x 7200mm wells each Add +17.00% with Item No 4.05.05.01.02

4.05.05.03.03 For 3600mm x 7200mm wells each Add +18.00% with Item No 4.05.05.01.03

4.05.05.03.04 For 3000mm x 8100mm wells each Add +18.00% with Item No 4.05.05.01.04

4.05.05.03.05 For 3600mm x 8100mm wells each Add +19.00% with Item No 4.05.05.01.05

4.05.06 Making temporary artificial island in river/ channel required for cast-in-
situ bored pile with supplying and driving bamboo posts of 75 to
100mm diameter at specified spacing up to required depth with nails,
driving additional gazari/ shalbullah posts of 150 to 175mm diameter at
specified spacing up to required depth & half split bullah bracing at top
level for longer depth, dram sheet walling & internal cross tie by re-bar
with specified diameter & spacing and all other necessary iron fitting,
earth arrangement and carried by contractor by any means including
cost of all materials required for the work and maintaining the same till
the completion of the work for which the island is made. The structures
are to be completely removed on completion of the work and the cost is
inclusive of this element also.

4.05.06.01 For depth up to 2.0m: Spacing of bamboo posts: 250mm c/c, internal
cross ties: 12mm dia re-bar @ 2m c/c

Note : Rates of all items should be inclusive of all supply and carriage. Page: 321 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.06.01.01 Size of Island: 11m x 15m each


Borak Bamboo (75mm to 100mm) 800.0000 m 42.00 33600.00
Bitumen Drum Sheet 117.0000 m2 269.00 31473.00
MS Rod (Plain, 40 Grade) 145.6300 kg 45.00 6553.35
Royalty of Earth 346.5000 m3 25.00 8662.50
Sardar 1.7500 day 800.00 1400.00
Ordinary Labour 76.0000 day 370.00 28120.00
Borak Bamboo (75mm to 100mm) 312.0000 m 42.00 13104.00
Nails/ Nut bolts/ Screw/ Spikes 10.0000 kg 65.00 650.00

Subtotal-A: 123562.85
Lobour charge for removal of island ( +3.00 % on Subtotal-A ) 3706.89
Subtotal-A1: 127269.74

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 129815.13

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 142796.64


VAT 6% of Total 9519.78
IT 4% of Total 6346.52
Total: 158662.94

4.05.06.01.02 Size of Island: 11m x 18m each Add +12.00% with Item No 4.05.06.01.01

4.05.06.01.03 Size of Island: 11m x 20m each Add +21.00% with Item No 4.05.06.01.01

4.05.06.02 For depth above 2.0m: Spacing of bamboo post: close hole, spacing of
Gazari/ Shalbullah posts: 1m c/c, internal cross ties: 16mm dia. re-bar
at alternate bullah post.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 322 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.06.02.01 Size of Island: 11m x 15m each


Borak Bamboo (75mm to 100mm) 2704.0000 m 42.00 113568.00
Shal/sundari/gazari Bullah (150mm to 200mm) 317.2000 m 225.00 71370.00
Bitumen Drum Sheet 195.0000 m2 269.00 52455.00
MS Rod (Plain, 40 Grade) 259.1200 kg 45.00 11660.40
Royalty of Earth 594.0000 m3 25.00 14850.00
Sardar 5.0000 day 800.00 4000.00
Ordinary Labour 167.0000 day 370.00 61790.00
Borak Bamboo (75mm dia) 884.0000 m 38.00 33592.00
Nails/ Nut bolts/ Screw/ Spikes 25.0000 kg 65.00 1625.00

Subtotal-A: 364910.40
Labour Charge for removal of Island ( +10.00 % on Subtotal-A ) 36491.04
Subtotal-A1: 401401.44

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 409429.47

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 450372.42


VAT 6% of Total 30024.83
IT 4% of Total 20016.55
Total: 500413.80

4.05.06.02.02 Size of Island: 11m x 18m each Add +12.00% with Item No 4.05.06.02.01

4.05.06.02.03 Size of Island: 11m x 20m each Add +21.00% with Item No 4.05.06.02.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 323 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.07 Making arrangement of barge of required size & capacity for


construction of cast-in-site bored piles / pre-cast pile at pier locations in
river/channel having water depth more than 3.0m. including
mobilization and demobilization, setting of piling rigs, fuel, lubricants,
other incidental charges etc. all complete as per direction of the
engineer.
Note: Measurement/ Unit shall be nos. of piers in river with water depth
above 3.0m

4.05.07.01 Size: 26.0m x 8.5m, Loaded Draft: 1.8m/1.2m, Carrying capacity: 150 each/
Ton month
H.C. of Barge (Size: 26.0m x 8.5m, Loaded Draft: 30.0000 day 6500.00 195000.00
1.8m/1.2m, Carrying capacity: 150 Ton) including
mobilization, demobilization and shifting at site

Subtotal-A: 195000.00
Mobilization and demobilization etc. ( +15.00 % on Subtotal-A ) 29250.00
Subtotal-A1: 224250.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 228735.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 251608.50


VAT 6% of Total 16773.90
IT 4% of Total 11182.60
Total: 279565.00

Note : Rates of all items should be inclusive of all supply and carriage. Page: 324 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.07.02 Size: 30.0m x 9.0m, Loaded Draft: 1.8m/1.2m, Carrying capacity: 200 each/
Ton month
H.C. of Barge (Size: 30.0m x 9.0m, Loaded Draft: 30.0000 day 9000.00 270000.00
1.8m/1.2m, Carrying capacity: 200 Ton) including
mobilization, demobilization and shifting at site

Subtotal-A: 270000.00
Mobilization and demobilization etc. ( +15.00 % on Subtotal-A ) 40500.00
Subtotal-A1: 310500.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 316710.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 348381.00


VAT 6% of Total 23225.40
IT 4% of Total 15483.60
Total: 387090.00

4.05.07.03 Size: 38.0m x 9.0m, Loaded Draft: 2.0m/1.37m, Carrying capacity: 300 each/
Ton month
H.C. of Barge (Size: 38.0m x 9.0m, Loaded Draft: 30.0000 day 10500.00 315000.00
2.0m/1.37m, Carrying capacity: 300 Ton) including
mobilization, demobilization and shifting at site

Subtotal-A: 315000.00
Mobilization and demobilization etc. ( +15.00 % on Subtotal-A ) 47250.00
Subtotal-A1: 362250.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 369495.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 406444.50


VAT 6% of Total 27096.30
IT 4% of Total 18064.20
Total: 451605.00

Note : Rates of all items should be inclusive of all supply and carriage. Page: 325 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.07.04 Size: 36.5m x 12.0m, Loaded Draft: 2.4m/1.8m, Carrying capacity: 400 each/
Ton month
H.C. of Barge (Size: 36.5m x 12.0m, Loaded Draft: 30.0000 day 14000.00 420000.00
2.4m/1.8m, Carrying capacity: 400 Ton) including
mobilization, demobilization and shifting at site

Subtotal-A: 420000.00
Mobilization and demobilization etc. ( +15.00 % on Subtotal-A ) 63000.00
Subtotal-A1: 483000.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 492660.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 541926.00


VAT 6% of Total 36128.40
IT 4% of Total 24085.60
Total: 602140.00

4.05.07.05 Size: 38.0m x 13.5m, Loaded Draft: 2.4m/1.8m, Carrying capacity: 500 each/
Ton month
H.C. of Barge (Size: 38.0m x 13.5m, Loaded Draft: 30.0000 day 16500.00 495000.00
2.4m/1.8m, Carrying capacity: 500 Ton) including
mobilization, demobilization and shifting at site

Subtotal-A: 495000.00
Mobilization and demobilization etc. ( +15.00 % on Subtotal-A ) 74250.00
Subtotal-A1: 569250.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 580635.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 638698.50


VAT 6% of Total 42579.90
IT 4% of Total 28386.60
Total: 709665.00

Note : Rates of all items should be inclusive of all supply and carriage. Page: 326 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.08 Making arrangement of steel staging for construction of Cast-in-situ pile


by driving of double headed EI Rail post up to 4.00 m to 6m with
600/750mm dia C.I Shoe (screw) @ 1.00m c/c in transverse dimension
and 4.00m c/c in longitudinal direction povided with double headed C.I
cap and RS Joist of required size in both direction . The double headed
EI vertical post shall be cross-braced with 3"x3" MS Angle. The RS joist
frame shall be covered with MS plate (6mm thick) to make a smooth
platform.The work shall be completed including cost of all material,
fitting fixing with nut bolt etc,all labour cost and maintaining the same
till the completion of the work for which it is made. The structure is to
be completely removed on completion of the work and the cost is
inclusive of the element also. All work shall be done as per supplied
drawing and direction of the Engineer-in- charge. Contractor shall take
necessary safety measure for the stage and shall be responsible for any
accident. He will prepare the staging design & get it approved by the E-
I-C.
Note: This item shall be selected as per instruction given in the drawing
& after getting approval from Design unit, LGED.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 327 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.08.01 For 5.00m to 9.00m depth of water sqm


Diesel 2.0500 liter 68.00 139.40
H.C. of Welding Machine 0.0500 day 500.00 25.00
H.C. of Engine Boat 0.0500 day 1000.00 50.00
H.C. of Tripod Stand 0.0500 day 400.00 20.00
H.C. of Chain Pulley (1.5 ton) 0.0500 day 500.00 25.00
H.C. of Vertical Drill Machine 0.0100 day 150.00 1.50
H.C. of Electric Auto Gas Cutter Set 0.0100 day 500.00 5.00
Ordinary Labour 8.6000 day 370.00 3182.00
Skilled Labour 4.8300 day 450.00 2173.50
Foreman 0.0600 day 800.00 48.00
Welder 0.0200 day 680.00 13.60

Subtotal-A: 5683.00
H.C for Double Headed EI Rail, RS Joist, MS ( +63.00 % on Subtotal-A ) 3580.29
Double Angle, CI Shoe,CI Cap, Nut bolts, MS
Plate, Electrode etc all other elements whice is
required
Subtotal-A1: 9263.29

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9448.56

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 10393.41


VAT 6% of Total 692.89
IT 4% of Total 461.93
Total: 11548.23

Note : Rates of all items should be inclusive of all supply and carriage. Page: 328 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.08.02 For 9.00m to 12.00m depth of water sqm


Diesel 2.0500 liter 68.00 139.40
H.C. of Welding Machine 0.0500 day 500.00 25.00
H.C. of Engine Boat 0.0500 day 1000.00 50.00
H.C. of Tripod Stand 0.0500 day 400.00 20.00
H.C. of Chain Pulley (1.5 ton) 0.0500 day 500.00 25.00
H.C. of Vertical Drill Machine 0.0100 day 150.00 1.50
H.C. of Electric Auto Gas Cutter Set 0.0100 day 500.00 5.00
Ordinary Labour 9.2200 day 370.00 3411.40
Skilled Labour 5.3400 day 450.00 2403.00
Foreman 0.0600 day 800.00 48.00
Welder 0.0200 day 680.00 13.60

Subtotal-A: 6141.90
H.C for Double Headed EI Rail, RS Joist, MS ( +74.00 % on Subtotal-A ) 4545.01
Double Angle, CI Shoe,CI Cap, Nut bolts, MS
Plate, Electrode etc all other elements whice is
required
Subtotal-A1: 10686.91

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10900.64

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 11990.71


VAT 6% of Total 799.38
IT 4% of Total 532.92
Total: 13323.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 329 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.08.03 For 12.00m to 15.00m depth of water sqm


Diesel 2.0500 liter 68.00 139.40
H.C. of Welding Machine 0.0500 day 500.00 25.00
H.C. of Engine Boat 0.0500 day 1000.00 50.00
H.C. of Tripod Stand 0.0500 day 400.00 20.00
H.C. of Chain Pulley (1.5 ton) 0.0500 day 500.00 25.00
H.C. of Vertical Drill Machine 0.0100 day 150.00 1.50
H.C. of Electric Auto Gas Cutter Set 0.0100 day 500.00 5.00
Ordinary Labour 9.8200 day 370.00 3633.40
Skilled Labour 5.4200 day 450.00 2439.00
Foreman 0.0600 day 800.00 48.00
Welder 0.0200 day 680.00 13.60

Subtotal-A: 6399.90
H.C for Double Headed EI Rail, RS Joist, MS ( +77.00 % on Subtotal-A ) 4927.92
Double Angle, CI Shoe,CI Cap, Nut bolts, MS
Plate, Electrode etc all other elements whice is
required
Subtotal-A1: 11327.82

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11554.38

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12709.82


VAT 6% of Total 847.32
IT 4% of Total 564.88
Total: 14122.02

Note : Rates of all items should be inclusive of all supply and carriage. Page: 330 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.08.04 For 15.00m to 18.00m depth of water sqm


Diesel 2.0500 liter 68.00 139.40
H.C. of Welding Machine 0.0500 day 500.00 25.00
H.C. of Engine Boat 0.0500 day 1000.00 50.00
H.C. of Tripod Stand 0.0500 day 400.00 20.00
H.C. of Chain Pulley (1.5 ton) 0.0500 day 500.00 25.00
H.C. of Vertical Drill Machine 0.0100 day 150.00 1.50
H.C. of Electric Auto Gas Cutter Set 0.0100 day 500.00 5.00
Ordinary Labour 10.4100 day 370.00 3851.70
Skilled Labour 5.5000 day 450.00 2475.00
Foreman 0.0600 day 800.00 48.00
Welder 0.0200 day 680.00 13.60

Subtotal-A: 6654.20
H.C for Double Headed EI Rail, RS Joist, MS ( +80.00 % on Subtotal-A ) 5323.36
Double Angle, CI Shoe,CI Cap, Nut bolts, MS
Plate, Electrode etc all other elements whice is
required
Subtotal-A1: 11977.56

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12217.11

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 13438.82


VAT 6% of Total 895.92
IT 4% of Total 597.28
Total: 14932.02

Note : Rates of all items should be inclusive of all supply and carriage. Page: 331 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.08.05 For 18.00m & Above depth of water sqm


Diesel 2.0500 liter 68.00 139.40
H.C. of Welding Machine 0.0500 day 500.00 25.00
H.C. of Engine Boat 0.0500 day 1000.00 50.00
H.C. of Tripod Stand 0.0500 day 400.00 20.00
H.C. of Chain Pulley (1.5 ton) 0.0500 day 500.00 25.00
H.C. of Vertical Drill Machine 0.0100 day 150.00 1.50
H.C. of Electric Auto Gas Cutter Set 0.0100 day 500.00 5.00
Ordinary Labour 11.0100 day 370.00 4073.70
Skilled Labour 5.5800 day 450.00 2511.00
Foreman 0.0600 day 800.00 48.00
Welder 0.0200 day 680.00 13.60

Subtotal-A: 6912.20
H.C for Double Headed EI Rail, RS Joist, MS ( +83.00 % on Subtotal-A ) 5737.13
Double Angle, CI Shoe,CI Cap, Nut bolts, MS
Plate, Electrode etc all other elements whice is
required
Subtotal-A1: 12649.33

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12902.31

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 14192.54


VAT 6% of Total 946.17
IT 4% of Total 630.78
Total: 15769.49

Note : Rates of all items should be inclusive of all supply and carriage. Page: 332 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.09 Construction of steel cofferdam with bottom frame with a required


number of hole, side frame with necessary nos. of bracings at different
level and top platform with provision of adequate access, light and
ventilation including cost of MS plate, MS angle, joists, fabrication,
welding, grinding, shifting the cofferdam from bank to pier location,
lowering of cofferdam to it's design level, bottom plugging of cofferdam
by 30MPa Tremie Concrete (underwater concrete) through a tube
usually 200 to 250mm pipe, dewater the interior area, breaking head of
hardened cast-in-situ bored pile to the cut-off level and exposing pile
reinforcement for embedment in pile cap, erection and removal of
cofferdam by unifloat (pontoon), monitoring the behavior of the
cofferdam and surrounding area, tower crane, generator, gas cutter set
etc. all complete in all respect as per direction of Design Unit & concern
Engineer-in-Charge. Contractor shall submit the design calculations and
methodology which must be compatible with the weather conditions,
waves, currents, construction equipment, construction method, internal
permanent structures and ground condition. Contractor shall take
necessary safety measure for the construction of cofferdam and
responsible for all obligations.
Note: Measurement will be based on the actual pile cap area. This item
shall be selected as per instruction given in the drawing & after getting
approval from Design unit, LGED.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 333 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.09.01 For depth up to 5m from LWL sqm


RCC-30SCBP: Reinforced cement concrete work for cast-in- 0.3984 cum 10839.17 4318.33
situ pile with minimum cement content and maximum water
cement ratio as specified by the laboratory through mix
design having minimum required a.............4.07.05
MS Plate (3mm) 74.6957 kg 55.00 4108.26
MS Angle, Flat bar, Z bar 79.0087 kg 59.00 4661.51
RS Joist 36.8348 kg 75.00 2762.61
MS Plate (6mm) 7.0087 kg 70.00 490.61
H.C. of MS Plate, MS Angle & I-Beam etc. 532.8311 kg 18.00 9590.96
Fabrication cost for MS plate, Angle & I-beam for cofferdam 650.9223 kg 32.00 20829.51
Erection at site, shifting from river bank to pier location 628.0474 kg 28.00 17585.33
including cost of consumable materials (i.e., electrode, LP,
Oxygen etc.), welding machine, grinding machine &
manpower
Nails/ Nut bolts/ Screw/ Spikes 1.1858 kg 65.00 77.08
Removal of Cofferdam materials after completion of pier shaft 448.4585 kg 8.00 3587.67
above water level
H.C. of 150mm dia & 4mm thick MS pipe 11.9526 m/month 65.00 776.92
MS pipe driving in river bed and removal 7.9684 m 250.00 1992.10
H. C. of Dredger 0.0237 day 12000.00 284.40
H.C. of Unifloat/ Pontoon 4.5850 day 1200.00 5502.00
H.C. of Tower Crane 0.4585 day 5000.00 2292.50
H.C. of Tripod and Mechanical Winch Machine complete with 0.9170 day 3000.00 2751.00
power unit and accessories
H.C. of Generator (40 KVA) 0.9170 day 2500.00 2292.50
Diesel 145.4545 liter 68.00 9890.91

Subtotal-A: 93794.19
All other Cost including mobilization & ( +3.00 % on Subtotal-A ) 2813.83

Note : Rates of all items should be inclusive of all supply and carriage. Page: 334 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

demobilization of equipment
Subtotal-A1: 96608.02

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 98540.18

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 108394.20


VAT 6% of Total 7226.28
IT 4% of Total 4817.52
Total: 120438.00

4.05.09.02 For depth 5m to 6m from LWL sqm Add +10.00% with Item No 4.05.09.01

4.05.09.03 For depth 6m to 7m from LWL sqm Add +20.00% with Item No 4.05.09.01

4.05.09.04 For depth 7m to 8m from LWL sqm Add +30.00% with Item No 4.05.09.01

4.05.09.05 For depth 8m to 9m from LWL sqm Add +40.00% with Item No 4.05.09.01

4.05.09.06 For depth 9m to 10m from LWL sqm Add +50.00% with Item No 4.05.09.01

4.05.09.07 For depth above 10m from LWL sqm Add +60.00% with Item No 4.05.09.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 335 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.10 Making arrangement of dewatering system to provide temporary


reductions in ground water level for construction of pile caps/
foundation of any other structure which extend to below ground water
level including installation of a wellpoint system consists of a closely
spaced series of small-diameter shallow wells connected to a common
headermain and pumped with a high-efficiency vacuum dewatering
pump or installation and operation of series of submersible pumps so as
to lower the water table to provide stable and dry conditions to facilitate
excavation. For drawdowns in excess of 6m further stages of wellpoints
are required, installed at successively lower levels as excavation
proceeds. Dewatering system may be used around open cut excavations
or in conjunction with shoring or retaining wall used to support the
excavation. The choise of pumping system used for dewatering or
groundwater systems depends on the amount of drawdown required
and the ground conditions. Contractor shall submit the design
calculations and methodology which must be compatible with the sub-
soil & weather condition, construction equipment, construction method,
ground water level etc. Contractor shall take necessary safety measure
for making arrangement of dewatering system and responsible for all
obligations.
Note: Measurement will be based on the actual pile cap/ foundation
area. This item shall be selected as per instruction given in the drawing
& after getting approval from Design unit, LGED.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 336 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.10.01 Dewatering system for depth up to 3m sqm


Earth filling work in any type of embankment/pond/low lands 20.6341 cum 149.37 3082.12
with suitable dredged soil (sandy clay/silty clay/silt), collected
from silt-up river/canal bed by dredging with appropriate
local dredger, ………….2.02.4.01
H.C. of Generator (40 KVA) 0.0884 day 2500.00 221.00
H.C. of Submersible Pump - 3 HP 0.7070 day 1200.00 848.40
Diesel 7.4231 liter 68.00 504.77
Foreman 0.0442 day 800.00 35.36
Electricians 0.0442 day 600.00 26.52
Asst Electrician 0.0884 day 680.00 60.11
Skilled Labour 0.1767 day 450.00 79.52
Ordinary Labour 0.4419 day 370.00 163.50

Subtotal-A: 5021.30
All other Cost including mobilization & ( +3.00 % on Subtotal-A ) 150.64
demobilization of equipment, regular maintenance
of Generator & submersible pumps etc.
Subtotal-A1: 5171.94

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 5275.37

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 5802.91


VAT 6% of Total 386.86
IT 4% of Total 257.91
Total: 6447.68

Note : Rates of all items should be inclusive of all supply and carriage. Page: 337 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.10.02 Dewatering system for depth 3m to 6m sqm


Earth filling work in any type of embankment/pond/low lands 70.5779 cum 149.37 10542.22
with suitable dredged soil (sandy clay/silty clay/silt), collected
from silt-up river/canal bed by dredging with appropriate
local dredger, ………….2.02.4.01
H.C. of Generator (100 KVA) 0.1237 day 3500.00 432.95
H.C. of Submersible Pump - 3 HP 1.8558 day 1200.00 2226.96
Diesel 23.9024 liter 68.00 1625.36
Foreman 0.0619 day 800.00 49.52
Electricians 0.0619 day 600.00 37.14
Asst Electrician 0.1237 day 680.00 84.12
Skilled Labour 0.2474 day 450.00 111.33
Ordinary Labour 0.6186 day 370.00 228.88

Subtotal-A: 15338.48
All other Cost including mobilization & ( +3.00 % on Subtotal-A ) 460.15
demobilization of equipment, regular maintenance
of Generator & submersible pumps etc.
Subtotal-A1: 15798.64

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 16114.61

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 17726.07


VAT 6% of Total 1181.74
IT 4% of Total 787.83
Total: 19695.63

Note : Rates of all items should be inclusive of all supply and carriage. Page: 338 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.05.10.03 Dewatering system for depth 6m to 9m sqm


Earth filling work in any type of embankment/pond/low lands 179.1868 cum 149.37 26765.13
with suitable dredged soil (sandy clay/silty clay/silt), collected
from silt-up river/canal bed by dredging with appropriate
local dredger, ………….2.02.4.01
H.C. of Generator (150 KVA) 0.1767 day 5000.00 883.50
H.C. of Submersible Pump - 3 HP 5.3022 day 1200.00 6362.64
Diesel 51.1135 liter 68.00 3475.72
Foreman 0.0884 day 800.00 70.72
Electricians 0.0884 day 600.00 53.04
Asst Electrician 0.1767 day 680.00 120.16
Skilled Labour 0.3535 day 450.00 159.08
Ordinary Labour 0.8837 day 370.00 326.97

Subtotal-A: 38216.95
All other Cost including mobilization & ( +3.00 % on Subtotal-A ) 1146.51
demobilization of equipment, regular maintenance
of Generator & submersible pumps etc.
Subtotal-A1: 39363.46

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 40150.73

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 44165.80


VAT 6% of Total 2944.39
IT 4% of Total 1962.92
Total: 49073.11

4.05.10.04 Dewatering system for depth above 9m sqm Add +25.00% with Item No 4.05.10.03

Note : Rates of all items should be inclusive of all supply and carriage. Page: 339 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.06.01 Sand filling on the prepared foundation bed with sand of specified FM in
layers not more than 150mm thick including necessary carriage,
leveling, watering and ramming to achieve minimum dry density (MDD)
of 95% STD compaction with optimum moisture content (OMC) by
ramming each layer up to finished level as per direction of E-I-C.

4.06.01.01 Sand of Minimum FM 0.8 cum


Sand (FM - 0.8) 1.2000 m3 480.00 576.00
Ordinary Labour 0.3000 day 370.00 111.00

Subtotal-A: 687.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 700.74

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 770.81


VAT 6% of Total 51.39
IT 4% of Total 34.26
Total: 856.46

4.06.01.02 Sand of Minimum FM 1.2 cum


Sand (FM - 1.2) 1.2000 m3 584.00 700.80
Ordinary Labour 0.3000 day 370.00 111.00

Subtotal-A: 811.80

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 828.04

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 910.84


VAT 6% of Total 60.72
IT 4% of Total 40.48
Total: 1012.04

Note : Rates of all items should be inclusive of all supply and carriage. Page: 340 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.06.01.03 Sand of Minimum FM 1.8 cum


Sand (FM - 1.8) 1.2000 m3 970.00 1164.00
Ordinary Labour 0.3000 day 370.00 111.00

Subtotal-A: 1275.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1300.50

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1430.55


VAT 6% of Total 95.37
IT 4% of Total 63.58
Total: 1589.50

4.06.01.04 Sand of Minimum FM 2.5 cum


Sand (FM - 2.5) 1.2000 m3 1500.00 1800.00
Ordinary Labour 0.3000 day 370.00 111.00

Subtotal-A: 1911.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1949.22

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2144.14


VAT 6% of Total 142.94
IT 4% of Total 95.30
Total: 2382.38

Note : Rates of all items should be inclusive of all supply and carriage. Page: 341 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.06.02 Single layer brick flat soling with 1st class or picked kiln burnt bricks in sqm
foundation, filling the interstices tightly with sand of minimum FM 0.50,
watering, leveling, dressing, etc. all complete as per instruction of the E-
I-C.
1st Class Brick 31.0000 each 9.00 279.00
Sand (FM - 0.5) 0.0120 m3 420.00 5.04
Mason 0.0250 day 550.00 13.75
Ordinary Labour 0.1000 day 370.00 37.00

Subtotal-A: 334.79

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 341.49

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 375.63


VAT 6% of Total 25.04
IT 4% of Total 16.69
Total: 417.37

Note : Rates of all items should be inclusive of all supply and carriage. Page: 342 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.06.03 PCC-10: Plain cement concrete work in foundation with minimum cum
compressive strength of 10 MPa at 28 days (sugessted mix proportion
1:3:6) on standard cylinder as per standard practice of Code AASHTO/
ASTM and cement conforming to BDS EN 197-1 : 2003 CEM-II/A-
L/M/V/W 42.5N, sand of minimum FM 1.8 and 20mm down well graded
1st class/ picked brick chips (LAA value not exceeding 40) comforming
to ASTM C 33 including breaking bricks into chips, shuttering, mixing by
concrete mixer machine, casting, laying compacting and curing for the
requisite period etc. all complete as per direction of the E-I-C.
Additional quantity of cement to be added if required to attain the
strength at the contractor's own cost.
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 4.2400 bag 430.00 1823.20
1st Class Brick Chips (20mm down graded) 0.9000 m3 2940.00 2646.00
Sand (FM - 1.8) 0.4500 m3 970.00 436.50
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 1.8000 day 370.00 666.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 6288.20
Loading & Unloading and other costs ( +.50 % on Subtotal-A ) 31.44
Subtotal-A1: 6319.64

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 6446.03

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 7090.64


VAT 6% of Total 472.71
IT 4% of Total 315.14
Total: 7878.49

Note : Rates of all items should be inclusive of all supply and carriage. Page: 343 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.06.04 PCC-17: Plain cement concrete work in foundation with minimum cum
compressive strength of 17 MPa at 28 days (sugessted mix proportion
1:2:4 & maximum w/c ratio 0.45) on standard cylinder as per standard
practice of Code AASHTO/ ASTM/ and cement conforming to BDS EN
197-1 : 2003 CEM-II/A-L/M/V/W 42.5N, sand of minimum FM 1.8 and
20mm down well graded 1st class/ picked brick chips (LAA value not
exceeding 40) comforming to ASTM C 33 including breaking bricks into
chips, shuttering, mixing by concrete mixer machine, casting, laying
compacting and curing for the requisite period etc. all complete as per
direction of the E-I-C. Additional quantity of cement to be added if
required to attain the strength at the contractor's own cost.
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0500 bag 430.00 2601.50
1st Class Brick Chips (20mm down graded) 0.8600 m3 2940.00 2528.40
Sand (FM - 1.8) 0.4300 m3 970.00 417.10
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 1.8000 day 370.00 666.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 6929.50
Loading & Unloading and other costs ( +.50 % on Subtotal-A ) 34.65
Subtotal-A1: 6964.15

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 7103.43

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 7813.77


VAT 6% of Total 520.92
IT 4% of Total 347.28
Total: 8681.97

Note : Rates of all items should be inclusive of all supply and carriage. Page: 344 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.06.05 Brick work with 1st class brick in specified cement mortar in foundation
with sand of minimum FM 1.20 and cement conforming to BDS EN 197-
1 : 2003 CEM-II/A-L/M/V/W 42.5N, filling the interstices tightly with
mortar, raking out joints, cleaning and soaking bricks at least for 24
hours before use, washing of sand, curing at least for 7 days etc. all
complete as per design, specification & direction of the E-I-C.

4.06.05.01 Cement mortar (1:3) cum


Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 2.8600 bag 430.00 1229.80
1st Class Brick 406.0000 each 9.00 3654.00
Sand (FM - 1.2) 0.3600 m3 584.00 210.24
Head Mason 0.0600 day 650.00 39.00
Mason 0.7000 day 550.00 385.00
Skilled Labour 0.7000 day 450.00 315.00
Ordinary Labour 1.0000 day 370.00 370.00

Subtotal-A: 6203.04

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 6327.10

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 6959.81


VAT 6% of Total 463.99
IT 4% of Total 309.32
Total: 7733.12

Note : Rates of all items should be inclusive of all supply and carriage. Page: 345 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.06.05.02 Cement mortar (1:4) cum


Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 2.1200 bag 430.00 911.60
1st Class Brick 406.0000 each 9.00 3654.00
Sand (FM - 1.2) 0.3000 m3 584.00 175.20
Head Mason 0.0600 day 650.00 39.00
Mason 0.7000 day 550.00 385.00
Skilled Labour 0.7000 day 450.00 315.00
Ordinary Labour 1.0000 day 370.00 370.00

Subtotal-A: 5849.80

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 5966.80

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 6563.48


VAT 6% of Total 437.57
IT 4% of Total 291.71
Total: 7292.75

Note : Rates of all items should be inclusive of all supply and carriage. Page: 346 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.06.05.03 Cement mortar (1:6) cum


Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 1.4000 bag 430.00 602.00
1st Class Brick 406.0000 each 9.00 3654.00
Sand (FM - 1.2) 0.2825 m3 584.00 164.98
Head Mason 0.0600 day 650.00 39.00
Mason 0.7000 day 550.00 385.00
Skilled Labour 0.7000 day 450.00 315.00
Ordinary Labour 1.0000 day 370.00 370.00

Subtotal-A: 5529.98

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 5640.58

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 6204.64


VAT 6% of Total 413.64
IT 4% of Total 275.76
Total: 6894.04

4.06.06 Minimum 6mm thick cement plaster including neat cement finishing over
concrete faces with sand of minimum FM 1.20 and cement conforming
to BDS EN 197-1 : 2003 CEM-II/A-L/M/V/W 42.5N including washing of
sand, cleaning junctiongs of concrete, grouting, dabbing, doing
independent double-legged scaffolding, finishing the edges and corners,
cleaning of surfaces and curing for requisite period etc. all complete at
all leads & lifts as per drawings, specification & direction of the E-I-C.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 347 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.06.06.01 Cement mortar (1:3) sqm


Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.0795 bag 430.00 34.19
Sand (FM - 1.2) 0.0068 m3 584.00 3.97
Head Mason 0.0250 day 650.00 16.25
Mason 0.1000 day 550.00 55.00
Ordinary Labour 0.1500 day 370.00 55.50

Subtotal-A: 164.91
Other consumables etc. ( +10.00 % on Subtotal-A ) 16.49
Subtotal-A1: 181.40

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 185.02

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 203.53


VAT 6% of Total 13.57
IT 4% of Total 9.05
Total: 226.14

Note : Rates of all items should be inclusive of all supply and carriage. Page: 348 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.06.06.02 Cement mortar (1:4) sqm


Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.0636 bag 430.00 27.35
Sand (FM - 1.2) 0.0054 m3 584.00 3.15
Head Mason 0.0250 day 650.00 16.25
Mason 0.1000 day 550.00 55.00
Ordinary Labour 0.1500 day 370.00 55.50

Subtotal-A: 157.25
Other consumables etc. ( +10.00 % on Subtotal-A ) 15.73
Subtotal-A1: 172.98

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 176.44

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 194.08


VAT 6% of Total 12.94
IT 4% of Total 8.63
Total: 215.64

Note : Rates of all items should be inclusive of all supply and carriage. Page: 349 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.01 BCIS: Boring for cast-in-situ piles up to the required depth and specified
diameter with driving temporary steel casing (shall be 8mm thick with
necessary stiffener bands and sharp edge at bottom and provided up to
non-collapsible strata from the existing ground level but not less then
4.0 m) in all types of soils including min. 2-chamber slurry tank, drilling
with bentonite circulation (Dry Bentonite powder of liquid limit of
minimum 350 shall be mixed with water @ minimum 4% by weight to
make the fresh drilling fluid of viscosity between 32-50 seconds and
density less than 1.1gm/cc), maintaining fluid level inside casing at all
time at least 2 m higher than outside the casings, washing bore hole by
air lift cleanup method with fresh bentonite slurry until the slurry from
bore hole bottom have density less than 1.15gm/cc and sand content is
less than 4%, make the bore hole ready for concreting including
disposal/removal of all bored material, hire charge of mechanical winch
machine/ skid mounted mechanical table drive rotary/ hydraulic rotary
boring equipment, derrick, trimie pipe, cost of fuel, lubricant,
mobilization, demobilization, spares, insurance coverage, water,
electricity and other charges all complete as per design, drawing,
specification and direction of E-I-C. Contractor shall submit the
methodology of cast-in-situ pile work including information on boring
equipment, sequence of boring & casting, quality control, disposal of
spoils, test result of materials to the E-I-C for approval before
commencing any boring operation. Boring and excavation for a pile shall
not commence until 24 hours after completion of any pile within radius
of 6 meters c/c. Cost of collecting, conveying, loading, transportation of
spoils/mud accumulated during boring of cast-in-situ pile with all lifts
and lead is included in this unit rate. The spoils must be dumped in an
unobjectionable place outside the site premises with minimum traffic
disruption and the procuring entity will not be responsible for any
irregularities by the party regarding dumping of the spoils.
Note: Boring method shall be selected as per instruction given in the
drawing.

4.07.01.01 BCIS_PM: Boring by PERCUSSION METHOD using Direct Mud Circulation


(DMC) or Bailer and Chisel technique by tripod and mechanical winch
machine. Tubewell boring machine shall not be used.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 350 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.01.01.01 450mm diameter m


Bentonite 7.0000 kg 36.00 252.00
Foreman 0.0500 day 800.00 40.00
Skilled Labour 0.1500 day 450.00 67.50
Ordinary Labour 0.3000 day 370.00 111.00
H.C. of Tripod and Mechanical Winch Machine complete with 0.0500 day 3000.00 150.00
power unit and accessories
H.C. of Derrick 0.0500 day 400.00 20.00
H.C. of Water Pump 0.0500 day 500.00 25.00
H.C. of Tremie Pipe 0.0500 day 500.00 25.00
H.C. of Bailer 0.0500 day 300.00 15.00
H.C. of Cutter 0.0500 day 200.00 10.00
H.C. of Water Sealing Device 0.0500 day 200.00 10.00
H.C. of Welding Machine 0.0200 day 500.00 10.00
Diesel 3.0000 liter 68.00 204.00
Lubricant 0.0300 liter 220.00 6.60
Air compressor (screw type) 250 cfm with necessary piping 0.0083 Day 3000.00 24.90
arranagement and accessories.

Subtotal-A: 971.00
Bentonite mixing & circulation from slurry Tank ( +10.00 % on Subtotal-A ) 97.10
Subtotal-A1: 1068.10

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1089.46

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1198.41


VAT 6% of Total 79.89
IT 4% of Total 53.26
Total: 1331.56

Note : Rates of all items should be inclusive of all supply and carriage. Page: 351 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.01.01.02 500mm diameter m


Bentonite 8.7500 kg 36.00 315.00
Foreman 0.0625 day 800.00 50.00
Skilled Labour 0.1875 day 450.00 84.38
Ordinary Labour 0.5000 day 370.00 185.00
H.C. of Tripod and Mechanical Winch Machine complete with 0.0600 day 3000.00 180.00
power unit and accessories
H.C. of Derrick 0.0600 day 400.00 24.00
H.C. of Water Pump 0.0600 day 500.00 30.00
H.C. of Tremie Pipe 0.0600 day 500.00 30.00
H.C. of Bailer 0.0600 day 300.00 18.00
H.C. of Cutter 0.0600 day 200.00 12.00
H.C. of Water Sealing Device 0.0600 day 200.00 12.00
H.C. of Welding Machine 0.0300 day 500.00 15.00
Diesel 3.0000 liter 68.00 204.00
Lubricant 0.0300 liter 220.00 6.60
Air compressor (screw type) 250 cfm with necessary piping 0.0083 Day 3000.00 24.90
arranagement and accessories.

Subtotal-A: 1190.88
Bentonite mixing & circulation from slurry Tank ( +10.00 % on Subtotal-A ) 119.09
Subtotal-A1: 1309.96

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1336.16

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1469.78


VAT 6% of Total 97.99
IT 4% of Total 65.32
Total: 1633.09

Note : Rates of all items should be inclusive of all supply and carriage. Page: 352 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.01.01.03 600mm diameter m


Bentonite 12.5000 kg 36.00 450.00
Foreman 0.0750 day 800.00 60.00
Skilled Labour 0.2250 day 450.00 101.25
Ordinary Labour 0.5000 day 370.00 185.00
H.C. of Tripod and Mechanical Winch Machine complete with 0.0750 day 3000.00 225.00
power unit and accessories
H.C. of Derrick 0.0750 day 400.00 30.00
H.C. of Water Pump 0.0750 day 500.00 37.50
H.C. of Tremie Pipe 0.0750 day 500.00 37.50
H.C. of Bailer 0.0750 day 300.00 22.50
H.C. of Cutter 0.0750 day 200.00 15.00
H.C. of Water Sealing Device 0.0750 day 200.00 15.00
H.C. of Welding Machine 0.0400 day 500.00 20.00
Diesel 3.0000 liter 68.00 204.00
Lubricant 0.0300 liter 220.00 6.60
Air compressor (screw type) 250 cfm with necessary piping 0.0083 Day 3000.00 24.90
arranagement and accessories.

Subtotal-A: 1434.25
Bentonite mixing & circulation from slurry Tank ( +10.00 % on Subtotal-A ) 143.43
Subtotal-A1: 1577.68

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1609.23

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1770.15


VAT 6% of Total 118.01
IT 4% of Total 78.67
Total: 1966.83

Note : Rates of all items should be inclusive of all supply and carriage. Page: 353 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.01.01.04 700mm diameter m


Bentonite 17.0000 kg 36.00 612.00
Foreman 0.0875 day 800.00 70.00
Skilled Labour 0.2500 day 450.00 112.50
Ordinary Labour 0.5000 day 370.00 185.00
H.C. of Tripod and Mechanical Winch Machine complete with 0.0875 day 3000.00 262.50
power unit and accessories
H.C. of Derrick 0.0875 day 400.00 35.00
H.C. of Water Pump 0.0875 day 500.00 43.75
H.C. of Tremie Pipe 0.0875 day 500.00 43.75
H.C. of Bailer 0.0875 day 300.00 26.25
H.C. of Cutter 0.0875 day 200.00 17.50
H.C. of Water Sealing Device 0.0875 day 200.00 17.50
H.C. of Welding Machine 0.0500 day 500.00 25.00
Diesel 3.0000 liter 68.00 204.00
Lubricant 0.0300 liter 220.00 6.60
Air compressor (screw type) 250 cfm with necessary piping 0.0083 Day 3000.00 24.90
arranagement and accessories.

Subtotal-A: 1686.25
Bentonite mixing & circulation from slurry Tank ( +10.00 % on Subtotal-A ) 168.63
Subtotal-A1: 1854.88

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1891.97

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2081.17


VAT 6% of Total 138.74
IT 4% of Total 92.50
Total: 2312.41

Note : Rates of all items should be inclusive of all supply and carriage. Page: 354 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.01.01.05 800mm diameter m


Bentonite 22.0000 kg 36.00 792.00
Foreman 0.0900 day 800.00 72.00
Skilled Labour 0.2500 day 450.00 112.50
Ordinary Labour 0.5000 day 370.00 185.00
H.C. of Tripod and Mechanical Winch Machine complete with 0.0900 day 3000.00 270.00
power unit and accessories
H.C. of Derrick 0.0900 day 400.00 36.00
H.C. of Water Pump 0.0900 day 500.00 45.00
H.C. of Tremie Pipe 0.0900 day 500.00 45.00
H.C. of Bailer 0.0900 day 300.00 27.00
H.C. of Cutter 0.0900 day 200.00 18.00
H.C. of Water Sealing Device 0.0900 day 200.00 18.00
H.C. of Welding Machine 0.0600 day 500.00 30.00
Diesel 3.0000 liter 68.00 204.00
Lubricant 0.0300 liter 220.00 6.60
Air compressor (screw type) 250 cfm with necessary piping 0.0083 Day 3000.00 24.90
arranagement and accessories.

Subtotal-A: 1886.00
Bentonite mixing & circulation from slurry Tank ( +10.00 % on Subtotal-A ) 188.60
Subtotal-A1: 2074.60

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2116.09

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2327.70


VAT 6% of Total 155.18
IT 4% of Total 103.45
Total: 2586.33

Note : Rates of all items should be inclusive of all supply and carriage. Page: 355 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.01.02 BCIS_SMMTD: Boring by Skid Mounted Mechanical Table Drive Rotary


Boring/ Spindle Type Rotary Drilling Machine. Tube well boring
machine/ Bailer and chisel technique by tripod and mechanical winch
machine shall not be used.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 356 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.01.02.01 800mm diameter m


Bentonite 22.0000 kg 36.00 792.00
Foreman 0.0093 day 800.00 7.44
Skilled Labour 0.0667 day 450.00 30.02
Ordinary Labour 0.2333 day 370.00 86.32
Hire and running charges of Skid Mounted Mechanical Table 0.0467 Day 20000.00 934.00
Drive Rotary Boring/ Spindle Type Rotary Drilling Machine
with power unit including boring attachment and other
accessories and shifting at site
Air compressor (screw type) 250 cfm with necessary piping 0.0083 Day 3000.00 24.90
arranagement and accessories.
Hire and running charges of light crane for lowering 0.0040 day 4500.00 18.00
reinforcement cage & operating tremie pipe
Hire and running charges of bentonite pump 0.0500 day 3200.00 160.00
H.C. of Backhoe End Loader (6 tons) 0.0200 day 6000.00 120.00
H.C. of Tipper -5 cum capacity 0.0200 day 4500.00 90.00
H.C. of Tremie Pipe 0.0200 day 500.00 10.00

Subtotal-A: 2272.68
Bentonite mixing & circulation from slurry Tank ( +10.00 % on Subtotal-A ) 227.27
Subtotal-A1: 2499.94

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2549.94

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2804.94


VAT 6% of Total 187.00
IT 4% of Total 124.66
Total: 3116.60

Note : Rates of all items should be inclusive of all supply and carriage. Page: 357 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.01.02.02 900mm diameter m


Bentonite 27.2000 kg 36.00 979.20
Foreman 0.0120 day 800.00 9.60
Skilled Labour 0.0900 day 450.00 40.50
Ordinary Labour 0.3000 day 370.00 111.00
Hire and running charges of Skid Mounted Mechanical Table 0.0556 Day 20000.00 1112.00
Drive Rotary Boring/ Spindle Type Rotary Drilling Machine
with power unit including boring attachment and other
accessories and shifting at site
Air compressor (screw type) 250 cfm with necessary piping 0.0100 Day 3000.00 30.00
arranagement and accessories.
Hire and running charges of light crane for lowering 0.0048 day 4500.00 21.60
reinforcement cage & operating tremie pipe
Hire and running charges of bentonite pump 0.0600 day 3200.00 192.00
H.C. of Backhoe End Loader (6 tons) 0.0280 day 6000.00 168.00
H.C. of Tipper -5 cum capacity 0.0280 day 4500.00 126.00
H.C. of Tremie Pipe 0.0280 day 500.00 14.00

Subtotal-A: 2803.90
Bentonite mixing & circulation from slurry Tank ( +10.00 % on Subtotal-A ) 280.39
Subtotal-A1: 3084.29

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 3145.98

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 3460.57


VAT 6% of Total 230.70
IT 4% of Total 153.80
Total: 3845.08

Note : Rates of all items should be inclusive of all supply and carriage. Page: 358 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.01.02.03 1000mm diameter m


Bentonite 35.0000 kg 36.00 1260.00
Foreman 0.0160 day 800.00 12.80
Skilled Labour 0.1250 day 450.00 56.25
Ordinary Labour 0.4000 day 370.00 148.00
Hire and running charges of Skid Mounted Mechanical Table 0.0690 Day 20000.00 1380.00
Drive Rotary Boring/ Spindle Type Rotary Drilling Machine
with power unit including boring attachment and other
accessories and shifting at site
Air compressor (screw type) 250 cfm with necessary piping 0.0125 Day 3000.00 37.50
arranagement and accessories.
Hire and running charges of light crane for lowering 0.0060 day 4500.00 27.00
reinforcement cage & operating tremie pipe
Hire and running charges of bentonite pump 0.0750 day 3200.00 240.00
H.C. of Backhoe End Loader (6 tons) 0.0400 day 6000.00 240.00
H.C. of Tipper -5 cum capacity 0.0400 day 4500.00 180.00
H.C. of Tremie Pipe 0.0400 day 500.00 20.00

Subtotal-A: 3601.55
Bentonite mixing & circulation from slurry Tank ( +10.00 % on Subtotal-A ) 360.16
Subtotal-A1: 3961.71

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4040.94

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 4445.03


VAT 6% of Total 296.34
IT 4% of Total 197.56
Total: 4938.93

Note : Rates of all items should be inclusive of all supply and carriage. Page: 359 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.01.02.04 1200mm diameter m


Bentonite 42.7778 kg 36.00 1540.00
Foreman 0.0200 day 800.00 16.00
Skilled Labour 0.1667 day 450.00 75.02
Ordinary Labour 0.5000 day 370.00 185.00
Hire and running charges of Skid Mounted Mechanical Table 0.0744 Day 20000.00 1488.00
Drive Rotary Boring/ Spindle Type Rotary Drilling Machine
with power unit including boring attachment and other
accessories and shifting at site
Air compressor (screw type) 250 cfm with necessary piping 0.0139 Day 3000.00 41.70
arranagement and accessories.
Hire and running charges of light crane for lowering 0.0067 day 4500.00 30.15
reinforcement cage & operating tremie pipe
Hire and running charges of bentonite pump 0.0833 day 3200.00 266.56
H.C. of Backhoe End Loader (6 tons) 0.0556 day 6000.00 333.60
H.C. of Tipper -5 cum capacity 0.0556 day 4500.00 250.20
H.C. of Tremie Pipe 0.0556 day 500.00 27.80

Subtotal-A: 4254.03
Bentonite mixing & circulation from slurry Tank ( +10.00 % on Subtotal-A ) 425.40
Subtotal-A1: 4679.43

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4773.02

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 5250.32


VAT 6% of Total 350.02
IT 4% of Total 233.35
Total: 5833.69

Note : Rates of all items should be inclusive of all supply and carriage. Page: 360 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.01.03 BCIS_HRM: Boring by HYDRAULIC ROTARY METHOD using Crawler


mounted, telescopic boom hydraulic piling rig. Tube well boring
machine/ Bailer and chisel technique by tripod and mechanical winch
machine/ Skid Mounted Mechanical Table Drive Rotary Boring/ Spindle
Type Rotary Drilling Machine shall not be used.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 361 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.01.03.01 800mm diameter m


Bentonite 22.0000 kg 36.00 792.00
Foreman 0.0093 day 800.00 7.44
Skilled Labour 0.0667 day 450.00 30.02
Ordinary Labour 0.2333 day 370.00 86.32
Hire and running charges of hydraulic rotary drilling 0.0467 day 37000.00 1727.90
equipment with power unit including 0.8m to 2.5m dia boring
attachment and other accessories and shifting at site
Air compressor (screw type) 250 cfm with necessary piping 0.0083 Day 3000.00 24.90
arranagement and accessories.
Hire and running charges of light crane for lowering 0.0040 day 4500.00 18.00
reinforcement cage & operating tremie pipe
Hire and running charges of bentonite pump 0.0500 day 3200.00 160.00
H.C. of Backhoe End Loader (6 tons) 0.0200 day 6000.00 120.00
H.C. of Tipper -5 cum capacity 0.0200 day 4500.00 90.00
H.C. of Tremie Pipe 0.0200 day 500.00 10.00

Subtotal-A: 3066.58
Bentonite mixing & circulation from slurry Tank ( +10.00 % on Subtotal-A ) 306.66
Subtotal-A1: 3373.23

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 3440.70

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 3784.77


VAT 6% of Total 252.32
IT 4% of Total 168.21
Total: 4205.30

Note : Rates of all items should be inclusive of all supply and carriage. Page: 362 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.01.03.02 900mm diameter m


Bentonite 27.2000 kg 36.00 979.20
Foreman 0.0120 day 800.00 9.60
Skilled Labour 0.0900 day 450.00 40.50
Ordinary Labour 0.3000 day 370.00 111.00
Hire and running charges of hydraulic rotary drilling 0.0556 day 37000.00 2057.20
equipment with power unit including 0.8m to 2.5m dia boring
attachment and other accessories and shifting at site
Air compressor (screw type) 250 cfm with necessary piping 0.0100 Day 3000.00 30.00
arranagement and accessories.
Hire and running charges of light crane for lowering 0.0048 day 4500.00 21.60
reinforcement cage & operating tremie pipe
Hire and running charges of bentonite pump 0.0600 day 3200.00 192.00
H.C. of Backhoe End Loader (6 tons) 0.0280 day 6000.00 168.00
H.C. of Tipper -5 cum capacity 0.0280 day 4500.00 126.00
H.C. of Tremie Pipe 0.0280 day 500.00 14.00

Subtotal-A: 3749.10
Bentonite mixing & circulation from slurry Tank ( +10.00 % on Subtotal-A ) 374.91
Subtotal-A1: 4124.01

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4206.49

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 4627.14


VAT 6% of Total 308.48
IT 4% of Total 205.65
Total: 5141.27

Note : Rates of all items should be inclusive of all supply and carriage. Page: 363 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.01.03.03 1000mm diameter m


Bentonite 35.0000 kg 36.00 1260.00
Foreman 0.0160 day 800.00 12.80
Skilled Labour 0.1250 day 450.00 56.25
Ordinary Labour 0.4000 day 370.00 148.00
Hire and running charges of hydraulic rotary drilling 0.0690 day 37000.00 2553.00
equipment with power unit including 0.8m to 2.5m dia boring
attachment and other accessories and shifting at site
Air compressor (screw type) 250 cfm with necessary piping 0.0125 Day 3000.00 37.50
arranagement and accessories.
Hire and running charges of light crane for lowering 0.0060 day 4500.00 27.00
reinforcement cage & operating tremie pipe
Hire and running charges of bentonite pump 0.0750 day 3200.00 240.00
H.C. of Backhoe End Loader (6 tons) 0.0400 day 6000.00 240.00
H.C. of Tipper -5 cum capacity 0.0400 day 4500.00 180.00
H.C. of Tremie Pipe 0.0400 day 500.00 20.00

Subtotal-A: 4774.55
Bentonite mixing & circulation from slurry Tank ( +10.00 % on Subtotal-A ) 477.46
Subtotal-A1: 5252.01

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 5357.05

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 5892.75


VAT 6% of Total 392.85
IT 4% of Total 261.90
Total: 6547.50

Note : Rates of all items should be inclusive of all supply and carriage. Page: 364 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.01.03.04 1200mm diameter m


Bentonite 42.7778 kg 36.00 1540.00
Foreman 0.0200 day 800.00 16.00
Skilled Labour 0.1667 day 450.00 75.02
Ordinary Labour 0.5000 day 370.00 185.00
Hire and running charges of hydraulic rotary drilling 0.0744 day 37000.00 2752.80
equipment with power unit including 0.8m to 2.5m dia boring
attachment and other accessories and shifting at site
Air compressor (screw type) 250 cfm with necessary piping 0.0139 Day 3000.00 41.70
arranagement and accessories.
Hire and running charges of light crane for lowering 0.0067 day 4500.00 30.15
reinforcement cage & operating tremie pipe
Hire and running charges of bentonite pump 0.0833 day 3200.00 266.56
H.C. of Backhoe End Loader (6 tons) 0.0556 day 6000.00 333.60
H.C. of Tipper -5 cum capacity 0.0556 day 4500.00 250.20
H.C. of Tremie Pipe 0.0556 day 500.00 27.80

Subtotal-A: 5518.83
Bentonite mixing & circulation from slurry Tank ( +10.00 % on Subtotal-A ) 551.88
Subtotal-A1: 6070.71

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 6192.12

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 6811.33


VAT 6% of Total 454.09
IT 4% of Total 302.73
Total: 7568.15

Note : Rates of all items should be inclusive of all supply and carriage. Page: 365 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.01.03.05 1500mm diameter m


Bentonite 50.0000 kg 36.00 1800.00
Foreman 0.0278 day 800.00 22.24
Skilled Labour 0.2222 day 450.00 99.99
Ordinary Labour 0.5556 day 370.00 205.57
Hire and running charges of hydraulic rotary drilling 0.0856 day 37000.00 3167.20
equipment with power unit including 0.8m to 2.5m dia boring
attachment and other accessories and shifting at site
Air compressor (screw type) 250 cfm with necessary piping 0.0139 Day 3000.00 41.70
arranagement and accessories.
Hire and running charges of light crane for lowering 0.0111 day 4500.00 49.95
reinforcement cage & operating tremie pipe
Hire and running charges of bentonite pump 0.1067 day 3200.00 341.44
H.C. of Backhoe End Loader (6 tons) 0.0833 day 6000.00 499.80
H.C. of Tipper -5 cum capacity 0.0833 day 4500.00 374.85
H.C. of Tremie Pipe 0.0833 day 500.00 41.65

Subtotal-A: 6644.39
Bentonite mixing & circulation from slurry Tank ( +10.00 % on Subtotal-A ) 664.44
Subtotal-A1: 7308.83

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 7455.01

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 8200.51


VAT 6% of Total 546.70
IT 4% of Total 364.47
Total: 9111.68

Note : Rates of all items should be inclusive of all supply and carriage. Page: 366 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.01.03.06 1800mm diameter m


Bentonite 63.3333 kg 36.00 2280.00
Foreman 0.0311 day 800.00 24.88
Skilled Labour 0.2778 day 450.00 125.01
Ordinary Labour 0.6667 day 370.00 246.68
Hire and running charges of hydraulic rotary drilling 0.0967 day 37000.00 3577.90
equipment with power unit including 0.8m to 2.5m dia boring
attachment and other accessories and shifting at site
Air compressor (screw type) 250 cfm with necessary piping 0.0139 Day 3000.00 41.70
arranagement and accessories.
Hire and running charges of light crane for lowering 0.0111 day 4500.00 49.95
reinforcement cage & operating tremie pipe
Hire and running charges of bentonite pump 0.1111 day 3200.00 355.52
H.C. of Backhoe End Loader (6 tons) 0.1111 day 6000.00 666.60
H.C. of Tipper -5 cum capacity 0.1111 day 4500.00 499.95
H.C. of Tremie Pipe 0.1111 day 500.00 55.55

Subtotal-A: 7923.74
Bentonite mixing & circulation from slurry Tank ( +10.00 % on Subtotal-A ) 792.37
Subtotal-A1: 8716.11

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 8890.43

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 9779.48


VAT 6% of Total 651.97
IT 4% of Total 434.64
Total: 10866.09

Note : Rates of all items should be inclusive of all supply and carriage. Page: 367 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.01.03.07 2000mm diameter m


Bentonite 72.2222 kg 36.00 2600.00
Foreman 0.0333 day 800.00 26.64
Skilled Labour 0.3333 day 450.00 149.99
Ordinary Labour 0.7778 day 370.00 287.79
Hire and running charges of hydraulic rotary drilling 0.1044 day 37000.00 3862.80
equipment with power unit including 0.8m to 2.5m dia boring
attachment and other accessories and shifting at site
Air compressor (screw type) 250 cfm with necessary piping 0.0139 Day 3000.00 41.70
arranagement and accessories.
Hire and running charges of light crane for lowering 0.0111 day 4500.00 49.95
reinforcement cage & operating tremie pipe
Hire and running charges of bentonite pump 0.1111 day 3200.00 355.52
H.C. of Backhoe End Loader (6 tons) 0.1222 day 6000.00 733.20
H.C. of Tipper -5 cum capacity 0.1222 day 4500.00 549.90
H.C. of Tremie Pipe 0.1222 day 500.00 61.10

Subtotal-A: 8718.58
Bentonite mixing & circulation from slurry Tank ( +10.00 % on Subtotal-A ) 871.86
Subtotal-A1: 9590.44

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9782.25

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 10760.47


VAT 6% of Total 717.36
IT 4% of Total 478.24
Total: 11956.08

Note : Rates of all items should be inclusive of all supply and carriage. Page: 368 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.01.03.08 2500mm diameter m


Bentonite 94.4444 kg 36.00 3400.00
Foreman 0.0389 day 800.00 31.12
Skilled Labour 0.3889 day 450.00 175.01
Ordinary Labour 0.8889 day 370.00 328.89
Hire and running charges of hydraulic rotary drilling 0.1111 day 37000.00 4110.70
equipment with power unit including 0.8m to 2.5m dia boring
attachment and other accessories and shifting at site
Air compressor (screw type) 250 cfm with necessary piping 0.0139 Day 3000.00 41.70
arranagement and accessories.
Hire and running charges of light crane for lowering 0.0111 day 4500.00 49.95
reinforcement cage & operating tremie pipe
Hire and running charges of bentonite pump 0.1111 day 3200.00 355.52
H.C. of Backhoe End Loader (6 tons) 0.1333 day 6000.00 799.80
H.C. of Tipper -5 cum capacity 0.1333 day 4500.00 599.85
H.C. of Tremie Pipe 0.1333 day 500.00 66.65

Subtotal-A: 9959.19
Bentonite mixing & circulation from slurry Tank ( +10.00 % on Subtotal-A ) 995.92
Subtotal-A1: 10955.11

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11174.21

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12291.63


VAT 6% of Total 819.44
IT 4% of Total 546.29
Total: 13657.36

Note : Rates of all items should be inclusive of all supply and carriage. Page: 369 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.02 DCIS: Driven Cast-in-Situ vertical R.C.C. pile of specified diameter and
length (length to be measured from the bottom of pile cap to the
bottom of shoe), to carry safe working load not less than specified,
including cost shoe & all other materials and labour for casting, hoisting,
driving etc. and also including cost of dummy lengths of pile and of hire
charges of all instruments as necessary but excluding concrete &
reinforcement etc. all complete as per drawing, specification and
direction of Engineer-in-Charge.

4.07.02.01 Pile diameter - 450 mm m


C.I. Shoes for the pile 4.0000 kg 70.00 280.00
M.S. Clamps for Shoe 1.7500 kg 85.00 148.75
Steel Helmet and Cushion block on top of casing head during 2.5000 kg 65.00 162.50
driving
Hire and running charges of hydraulic piling rig Including 0.0240 day 40000.00 960.00
double
acting pile driving hammer complete with power unit,
accessories and shifting at site
Hire and running charges of light crane for lowering 0.0030 day 4500.00 13.50
reinforcement cage & operating tremie pipe
Operator 0.0040 day 570.00 2.28
Skilled Labour 0.1000 day 450.00 45.00

Subtotal-A: 1612.03

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1644.27

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1808.70


VAT 6% of Total 120.58
IT 4% of Total 80.39
Total: 2009.66

Note : Rates of all items should be inclusive of all supply and carriage. Page: 370 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.02.02 Pile diameter - 500 mm m


C.I. Shoes for the pile 4.0000 kg 70.00 280.00
M.S. Clamps for Shoe 1.7500 kg 85.00 148.75
Steel Helmet and Cushion block on top of casing head during 2.5000 kg 65.00 162.50
driving
Hire and running charges of hydraulic piling rig Including 0.0270 day 40000.00 1080.00
double
acting pile driving hammer complete with power unit,
accessories and shifting at site
Hire and running charges of light crane for lowering 0.0030 day 4500.00 13.50
reinforcement cage & operating tremie pipe
Operator 0.0040 day 570.00 2.28
Skilled Labour 0.1000 day 450.00 45.00

Subtotal-A: 1732.03

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1766.67

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1943.34


VAT 6% of Total 129.56
IT 4% of Total 86.37
Total: 2159.26

Note : Rates of all items should be inclusive of all supply and carriage. Page: 371 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.02.03 Pile diameter - 600 mm m


C.I. Shoes for the pile 4.0000 kg 70.00 280.00
M.S. Clamps for Shoe 1.7500 kg 85.00 148.75
Steel Helmet and Cushion block on top of casing head during 2.5000 kg 65.00 162.50
driving
Hire and running charges of hydraulic piling rig Including 0.0300 day 40000.00 1200.00
double
acting pile driving hammer complete with power unit,
accessories and shifting at site
Hire and running charges of light crane for lowering 0.0030 day 4500.00 13.50
reinforcement cage & operating tremie pipe
Operator 0.0040 day 570.00 2.28
Skilled Labour 0.1000 day 450.00 45.00

Subtotal-A: 1852.03

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1889.07

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2077.98


VAT 6% of Total 138.53
IT 4% of Total 92.35
Total: 2308.86

Note : Rates of all items should be inclusive of all supply and carriage. Page: 372 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.02.04 Pile diameter - 700 mm m


C.I. Shoes for the pile 5.3330 kg 70.00 373.31
M.S. Clamps for Shoe 2.3330 kg 85.00 198.31
Steel Helmet and Cushion block on top of casing head during 3.3330 kg 65.00 216.65
driving
Hire and running charges of hydraulic piling rig Including 0.0470 day 40000.00 1880.00
double
acting pile driving hammer complete with power unit,
accessories and shifting at site
Hire and running charges of light crane for lowering 0.0040 day 4500.00 18.00
reinforcement cage & operating tremie pipe
Operator 0.0090 day 570.00 5.13
Skilled Labour 0.2330 day 450.00 104.85

Subtotal-A: 2796.24

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2852.16

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 3137.38


VAT 6% of Total 209.16
IT 4% of Total 139.44
Total: 3485.98

Note : Rates of all items should be inclusive of all supply and carriage. Page: 373 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.02.05 Pile diameter - 800 mm m


C.I. Shoes for the pile 6.4000 kg 70.00 448.00
M.S. Clamps for Shoe 2.8000 kg 85.00 238.00
Steel Helmet and Cushion block on top of casing head during 4.0000 kg 65.00 260.00
driving
Hire and running charges of hydraulic piling rig Including 0.0520 day 40000.00 2080.00
double
acting pile driving hammer complete with power unit,
accessories and shifting at site
Hire and running charges of light crane for lowering 0.0060 day 4500.00 27.00
reinforcement cage & operating tremie pipe
Operator 0.0130 day 570.00 7.41
Skilled Labour 0.3000 day 450.00 135.00

Subtotal-A: 3195.41

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 3259.32

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 3585.25


VAT 6% of Total 239.02
IT 4% of Total 159.34
Total: 3983.61

Note : Rates of all items should be inclusive of all supply and carriage. Page: 374 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.02.06 Pile diameter - 900 mm m


C.I. Shoes for the pile 6.4000 kg 70.00 448.00
M.S. Clamps for Shoe 2.8000 kg 85.00 238.00
Steel Helmet and Cushion block on top of casing head during 4.0000 kg 65.00 260.00
driving
Hire and running charges of hydraulic piling rig Including 0.0580 day 40000.00 2320.00
double
acting pile driving hammer complete with power unit,
accessories and shifting at site
Hire and running charges of light crane for lowering 0.0060 day 4500.00 27.00
reinforcement cage & operating tremie pipe
Operator 0.0140 day 570.00 7.98
Skilled Labour 0.3200 day 450.00 144.00

Subtotal-A: 3444.98

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 3513.88

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 3865.27


VAT 6% of Total 257.68
IT 4% of Total 171.79
Total: 4294.74

Note : Rates of all items should be inclusive of all supply and carriage. Page: 375 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.02.07 Pile diameter - 1000 mm m


C.I. Shoes for the pile 8.0000 kg 70.00 560.00
M.S. Clamps for Shoe 3.5000 kg 85.00 297.50
Steel Helmet and Cushion block on top of casing head during 5.0000 kg 65.00 325.00
driving
Hire and running charges of hydraulic piling rig Including 0.0680 day 40000.00 2720.00
double
acting pile driving hammer complete with power unit,
accessories and shifting at site
Hire and running charges of light crane for lowering 0.0060 day 4500.00 27.00
reinforcement cage & operating tremie pipe
Operator 0.0160 day 570.00 9.12
Skilled Labour 0.4000 day 450.00 180.00

Subtotal-A: 4118.62

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4200.99

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 4621.09


VAT 6% of Total 308.07
IT 4% of Total 205.38
Total: 5134.55

Note : Rates of all items should be inclusive of all supply and carriage. Page: 376 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.02.08 Pile diameter - 1200 mm m


C.I. Shoes for the pile 8.8890 kg 70.00 622.23
M.S. Clamps for Shoe 3.8890 kg 85.00 330.57
Steel Helmet and Cushion block on top of casing head during 5.5560 kg 65.00 361.14
driving
Hire and running charges of hydraulic piling rig Including 0.0740 day 40000.00 2960.00
double
acting pile driving hammer complete with power unit,
accessories and shifting at site
Hire and running charges of light crane for lowering 0.0070 day 4500.00 31.50
reinforcement cage & operating tremie pipe
Operator 0.0200 day 570.00 11.40
Skilled Labour 0.5000 day 450.00 225.00

Subtotal-A: 4541.84

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4632.67

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 5095.94


VAT 6% of Total 339.73
IT 4% of Total 226.49
Total: 5662.15

Note : Rates of all items should be inclusive of all supply and carriage. Page: 377 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.02.09 Pile diameter - 1500 mm m


C.I. Shoes for the pile 8.8890 kg 70.00 622.23
M.S. Clamps for Shoe 3.8890 kg 85.00 330.57
Steel Helmet and Cushion block on top of casing head during 5.5560 kg 65.00 361.14
driving
Hire and running charges of hydraulic piling rig Including 0.0860 day 40000.00 3440.00
double
acting pile driving hammer complete with power unit,
accessories and shifting at site
Hire and running charges of light crane for lowering 0.0110 day 4500.00 49.50
reinforcement cage & operating tremie pipe
Operator 0.0220 day 570.00 12.54
Skilled Labour 0.5560 day 450.00 250.20

Subtotal-A: 5066.18

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 5167.50

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 5684.25


VAT 6% of Total 378.95
IT 4% of Total 252.63
Total: 6315.83

Note : Rates of all items should be inclusive of all supply and carriage. Page: 378 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.03 RCC-25SCCM: Reinforced cement concrete work for cast-in-situ pile with cum
minimum cement content relates to mix ratio 1:1.5:3 and maximum
water cement ratio 0.4 having minimum required average compressive
strength, f'cr = 33.5 MPa and satisfying a compressive strength f'c = 25
MPa at 28 days on standard cylinders as per standard practice of code
AASHTO/ ASTM and cement conforming to BDS EN 197-1 : 2003 CEM-
II/A-L/M/V/W 42.5N, high range water reducing admixture of complying
type A or F under ASTM C 494 (Doses of admixture to be fixed by the
mix design), sand of minimum FM 2.5 and 20mm down well graded
crushed stone chips broken from boulders (Preferably stone chips from
Madhyapara, Dinajpur, LAA value not exceeding 30) conforming to
ASTM C 33, including breaking chips, screening through proper sieves,
placing & maintaining re-bar cage in position, jointing longitudinal bars
by welding or re-bar coupling method, placing and removing tripod/
derrick as per requirement, mixing in standard mixture machine with
hoper, maintaining allowable slump of 150mm to 200mm, placing a
sliding plug or barrier to prevent direct contact between the first charge
of concrete in the pipe of the tremie and the water of drilling fluid,
pouring the concrete in bore hole with the help of trimie pipe,
maintaining the trimie pipe immersed in concrete by at least 1.5m
throughout the period of concreting etc. including cost of all materials,
labour, equipment and all incidental charges but excluding the cost of
reinforcement and its fabrication, welding, coupling and placing etc. all
complete as per design, drawing, specifications and direction of the E-I-
C. The contractor shall maintain a continuous record of the volume of
concrete used and the level of the concrete in the pipe. Any deviations
from the theoretical, or expected, volume/ level relationship shall be
immediately reported to the E-I-C. Additional quantity of cement to be
added if required to attain the specified strength to be provided by the
contractor at his own cost.
Note: Using Concrete Mixer
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 3.8550 liter 160.00 616.80
Foreman 0.1240 day 800.00 99.20

Note : Rates of all items should be inclusive of all supply and carriage. Page: 379 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Fitter Helper 0.1240 day 470.00 58.28


Skilled Labour 0.6780 day 450.00 305.10
Ordinary Labour 1.3600 day 370.00 503.20
H.C. of Tripod and Mechanical Winch Machine complete with 0.1240 day 3000.00 372.00
power unit and accessories
H.C. of Derrick 0.1240 day 400.00 49.60
H.C. of Tremie Pipe 0.1240 day 500.00 62.00
H.C. of Casing 0.1240 day 260.00 32.24
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00

Subtotal-A: 10182.62

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10386.27

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 11424.90


VAT 6% of Total 761.66
IT 4% of Total 507.77
Total: 12694.33

Note : Rates of all items should be inclusive of all supply and carriage. Page: 380 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.04 RCC-25SCBP: Reinforced cement concrete work for cast-in-situ pile with cum
minimum cement content relates to mix ratio 1:1.5:3 and maximum
water cement ratio 0.4 having minimum required average compressive
strength, f'cr = 33.5 MPa and satisfying a compressive strength f'c = 25
MPa at 28 days on standard cylinders as per standard practice of code
AASHTO/ ASTM and cement conforming to BDS EN 197-1 : 2003 CEM-
II/A-L/M/V/W 42.5N, high range water reducing admixture of complying
type A or F under ASTM C 494 (Doses of admixture to be fixed by the
mix design), sand of minimum FM 2.5 and 20mm down well graded
crushed stone chips broken from boulders (Preferably stone chips from
Madhyapara, Dinajpur, LAA value not exceeding 30) conforming to
ASTM C 33, including breaking chips, screening through proper sieves,
placing & maintaining re-bar cage in position, jointing longitudinal bars
by welding or re-bar coupling method, placing and removing tripod/
derrick as per requirement, mixing in mechanized batch mix plant &
pumping using line pump or boom placer, maintaining allowable slump
of 150mm to 200mm, placing a sliding plug or barrier to prevent direct
contact between the first charge of concrete in the pipe of the tremie
and the water of drilling fluid, pouring the concrete in bore hole with the
help of trimie pipe, maintaining the trimie pipe immersed in concrete by
at least 1.5m throughout the period of concreting etc. including cost of
all materials, labour, equipment and all incidental charges but excluding
the cost of reinforcement and its fabrication, welding, coupling and
placing etc. all complete as per design, drawing, specifications and
direction of the E-I-C. The contractor shall maintain a continuous record
of the volume of concrete used and the level of the concrete in the pipe.
Any deviations from the theoretical, or expected, volume/ level
relationship shall be immediately reported to the E-I-C. Additional
quantity of cement to be added if required to attain the specified
strength to be provided by the contractor at his own cost.
Note: Using Batching Plant, Transit Mixer & Concrete Pump
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 3.8550 liter 160.00 616.80
Foreman 0.1240 day 800.00 99.20

Note : Rates of all items should be inclusive of all supply and carriage. Page: 381 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Fitter Helper 0.1240 day 470.00 58.28


Skilled Labour 0.6780 day 450.00 305.10
Ordinary Labour 1.3600 day 370.00 503.20
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of light crane for lowering 0.0100 day 4500.00 45.00
reinforcement cage & operating tremie pipe
H.C. of Tremie Pipe 0.1240 day 500.00 62.00
H.C. of Casing 0.1240 day 260.00 32.24

Subtotal-A: 10170.27

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10373.68

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 11411.04


VAT 6% of Total 760.74
IT 4% of Total 507.16
Total: 12678.94

Note : Rates of all items should be inclusive of all supply and carriage. Page: 382 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.05 RCC-30SCBP: Reinforced cement concrete work for cast-in-situ pile with cum
minimum cement content and maximum water cement ratio as specified
by the laboratory having minimum required average compressive
strength, f'cr = 38.5 MPa and satisfying a specified compressive
strength, f'c = 30 MPa at 28 days on standard cylinder as per standard
practice of Code AASHTO/ ASTM and cement conforming to BDS EN
197-1 : 2003 CEM-I 52.5N / ASTM C150 Type-1, high range water
reducing admixture of complying type A or F under ASTM C 494 (Doses
of admixture to be fixed by the mix design), sand of minimum FM 2.5
and 20mm down well graded crushed stone chips broken from boulders
(Preferably stone chips from Madhyapara, Dinajpur, LAA value not
exceeding 30) conforming to ASTM C 33 including breaking chips,
screening through proper sieves, placing & maintaining re-bar cage in
position, jointing longitudinal bars by welding or re-bar coupling
method, placing and removing tripod/ derrick as per requirement,
mixing in mechanized batch mix plant & pumping using line pump or
boom placer, maintaining allowable slump of 150mm to 200mm, placing
a sliding plug or barrier to prevent direct contact between the first
charge of concrete in the pipe of the tremie and the water of drilling
fluid, pouring the concrete in bore hole with the help of trimie pipe,
maintaining the trimie pipe immersed in concrete by at least 1.5m
throughout the period of concreting etc. including cost of all materials,
labour, equipment and all incidental charges but excluding the cost of
reinforcement and its fabrication, welding, coupling and placing etc. all
complete as per design, drawing, specifications and direction of the E-I-
C. The contractor shall maintain a continuous record of the volume of
concrete used and the level of the concrete in the pipe. Any deviations
from the theoretical, or expected volume/ level relationship shall be
immediately reported to the E-I-C. Additional quantity of cement to be
added if required to attain the specified strength to be provided by the
contractor at his own cost. The Mix Design shall have to be approved by
the concerned District Quality Control Laboratory or any other reputed
laboratory approved by the competent authority before execution of the
work.
Note: Using Batching Plant, Transit Mixer & Concrete Pump
Ordinary Portland Cement (CEM I, 52.5N) 8.6000 bag 455.00 3913.00
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10

Note : Rates of all items should be inclusive of all supply and carriage. Page: 383 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Sand (FM - 2.5) 0.4100 m3 1500.00 615.00


Water-reducing high range chemical admixture : Type-F 4.3000 liter 160.00 688.00
Foreman 0.1240 day 800.00 99.20
Fitter Helper 0.1240 day 470.00 58.28
Skilled Labour 0.6780 day 450.00 305.10
Ordinary Labour 1.3600 day 370.00 503.20
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of light crane for lowering 0.0100 day 4500.00 45.00
reinforcement cage & operating tremie pipe
H.C. of Tremie Pipe 0.1240 day 500.00 62.00
H.C. of Casing 0.1240 day 260.00 32.24

Subtotal-A: 10839.17

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11055.95

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12161.55


VAT 6% of Total 810.77
IT 4% of Total 540.51
Total: 13512.83

Note : Rates of all items should be inclusive of all supply and carriage. Page: 384 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.06 Permanent Casing: Supplying, fabricating and placing in position


permanent Steel casing conforming to ASTM A 36/ AASHTO M 183 for
RCC bored cast-in-situ piles of specified diameters (internal) to a depth
as shown in approved construction drawings including lowering &
pitching the fabricated casing in position, driving the casing below bed
level through all types of soil/clay/boulders/weathered or fissured or
hard rock, fixing the casing in position with necessary lateral bracings (if
required) etc. for stability until completion of all deck works, gas cutting,
bending, welding at fabrication shop & site, painting with Red Oxide
paint, transporting from fabrication shop to site, unloading at site,
driving of casing, all sorts of labour, materials, tools, equipment, fuel,
taxes etc. all complete as per design, drawing, specification & direction
of Engineer-in-charge. Only length of steel casing driven as per drawing
will be paid, wastage shall not be paid. All longitudinal and transverse
welds shall be made with full penetration butt welds and adjacent
segments shall be rotated 90 degree relative to each other so that
longitudinal welds on the fabricated casing are staggered. The outside
surface of the permanent casing shall receive two coats of anti-corrosion
tar type paint which shall be approved by the Engineer-in-charge and
it's application shall follow the manufacturer's instructions. If the
handling, transportation, driving arrangement require a greater
thickness to avoid deformation or buckling of casing, the increase in
thickness shall be provided by the contractor at his own expense.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 385 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.06.01 400mm diameter and 6mm thick wall m


6mm Thick MS Casing (400mm dia) 1.0000 m 3900.00 3900.00
H.C. of Tripod and Mechanical Winch Machine complete with 0.0125 day 3000.00 37.50
power unit and accessories
H.C. of Derrick 0.0250 day 400.00 10.00
H.C. of Welding Machine 0.0250 day 500.00 12.50
Foreman 0.0125 day 800.00 10.00
Operator 0.0125 day 570.00 7.13
Skilled Labour 0.0250 day 450.00 11.25
Diesel 0.9100 liter 68.00 61.88
Lubricant 0.0130 liter 220.00 2.86

Subtotal-A: 4053.12
Cost of welding & other consumables etc. ( +10.00 % on Subtotal-A ) 405.31
Subtotal-A1: 4458.43

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4547.60

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 5002.35


VAT 6% of Total 333.49
IT 4% of Total 222.33
Total: 5558.17

Note : Rates of all items should be inclusive of all supply and carriage. Page: 386 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.06.02 500mm diameter and 6mm thick wall m


6mm Thick MS Casing (500mm dia) 1.0000 m 4850.00 4850.00
H.C. of Tripod and Mechanical Winch Machine complete with 0.0125 day 3000.00 37.50
power unit and accessories
H.C. of Derrick 0.0250 day 400.00 10.00
H.C. of Welding Machine 0.0250 day 500.00 12.50
Foreman 0.0125 day 800.00 10.00
Operator 0.0125 day 570.00 7.13
Skilled Labour 0.0250 day 450.00 11.25
Diesel 0.9100 liter 68.00 61.88
Lubricant 0.0130 liter 220.00 2.86

Subtotal-A: 5003.12
Cost of welding & other consumables etc. ( +15.00 % on Subtotal-A ) 750.47
Subtotal-A1: 5753.58

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 5868.65

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 6455.52


VAT 6% of Total 430.37
IT 4% of Total 286.91
Total: 7172.80

Note : Rates of all items should be inclusive of all supply and carriage. Page: 387 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.06.03 600mm diameter and 6mm thick wall m


6mm Thick MS Casing (600mm dia) 1.0000 m 5800.00 5800.00
H.C. of Tripod and Mechanical Winch Machine complete with 0.0140 day 3000.00 42.00
power unit and accessories
H.C. of Derrick 0.0280 day 400.00 11.20
H.C. of Welding Machine 0.0280 day 500.00 14.00
Foreman 0.0140 day 800.00 11.20
Operator 0.0140 day 570.00 7.98
Skilled Labour 0.0280 day 450.00 12.60
Diesel 1.0000 liter 68.00 68.00
Lubricant 0.0140 liter 220.00 3.08

Subtotal-A: 5970.06
Cost of welding & other consumables etc. ( +15.00 % on Subtotal-A ) 895.51
Subtotal-A1: 6865.57

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 7002.88

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 7703.17


VAT 6% of Total 513.54
IT 4% of Total 342.36
Total: 8559.08

Note : Rates of all items should be inclusive of all supply and carriage. Page: 388 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.06.04 700mm diameter and 6mm thick wall m


6mm Thick MS Casing (700mm dia) 1.0000 m 6700.00 6700.00
H.C. of Tripod and Mechanical Winch Machine complete with 0.0140 day 3000.00 42.00
power unit and accessories
H.C. of Derrick 0.0280 day 400.00 11.20
H.C. of Welding Machine 0.0280 day 500.00 14.00
Foreman 0.0140 day 800.00 11.20
Operator 0.0140 day 570.00 7.98
Skilled Labour 0.0280 day 450.00 12.60
Diesel 1.0000 liter 68.00 68.00
Lubricant 0.0140 liter 220.00 3.08

Subtotal-A: 6870.06
Cost of welding & other consumables etc. ( +15.00 % on Subtotal-A ) 1030.51
Subtotal-A1: 7900.57

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 8058.58

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 8864.44


VAT 6% of Total 590.96
IT 4% of Total 393.98
Total: 9849.38

Note : Rates of all items should be inclusive of all supply and carriage. Page: 389 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.06.05 800mm diameter and 8mm thick wall m


8mm Thick MS Casing (800mm dia) 1.0000 m 10300.00 10300.00
H.C. of Tripod and Mechanical Winch Machine complete with 0.0150 day 3000.00 45.00
power unit and accessories
H.C. of Derrick 0.0300 day 400.00 12.00
H.C. of Welding Machine 0.0300 day 500.00 15.00
Foreman 0.0150 day 800.00 12.00
Operator 0.0150 day 570.00 8.55
Skilled Labour 0.0300 day 450.00 13.50
Diesel 1.1000 liter 68.00 74.80
Lubricant 0.0150 liter 220.00 3.30

Subtotal-A: 10484.15
Cost of welding & other consumables etc. ( +15.00 % on Subtotal-A ) 1572.62
Subtotal-A1: 12056.77

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12297.91

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 13527.70


VAT 6% of Total 901.85
IT 4% of Total 601.23
Total: 15030.78

Note : Rates of all items should be inclusive of all supply and carriage. Page: 390 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.06.06 900mm diameter and 8mm thick wall m


8mm Thick MS Casing (900mm dia) 1.0000 m 11590.00 11590.00
H.C. of Tripod and Mechanical Winch Machine complete with 0.0150 day 3000.00 45.00
power unit and accessories
H.C. of Derrick 0.0300 day 400.00 12.00
H.C. of Welding Machine 0.0300 day 500.00 15.00
Foreman 0.0150 day 800.00 12.00
Operator 0.0150 day 570.00 8.55
Skilled Labour 0.0300 day 450.00 13.50
Diesel 1.1000 liter 68.00 74.80
Lubricant 0.0150 liter 220.00 3.30

Subtotal-A: 11774.15
Cost of welding & other consumables etc. ( +15.00 % on Subtotal-A ) 1766.12
Subtotal-A1: 13540.27

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 13811.08

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 15192.19


VAT 6% of Total 1012.81
IT 4% of Total 675.21
Total: 16880.21

Note : Rates of all items should be inclusive of all supply and carriage. Page: 391 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.06.07 1000mm diameter and 10mm thick wall m


10mm Thick MS Casing (1000mm dia) 1.0000 m 16110.00 16110.00
H.C. of Tripod and Mechanical Winch Machine complete with 0.0160 day 3000.00 48.00
power unit and accessories
H.C. of Derrick 0.0320 day 400.00 12.80
H.C. of Welding Machine 0.0320 day 500.00 16.00
Foreman 0.0160 day 800.00 12.80
Operator 0.0160 day 570.00 9.12
Skilled Labour 0.0320 day 450.00 14.40
Diesel 1.2000 liter 68.00 81.60
Lubricant 0.0160 liter 220.00 3.52

Subtotal-A: 16308.24
Cost of welding & other consumables etc. ( +15.00 % on Subtotal-A ) 2446.24
Subtotal-A1: 18754.48

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 19129.57

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 21042.52


VAT 6% of Total 1402.83
IT 4% of Total 935.22
Total: 23380.58

Note : Rates of all items should be inclusive of all supply and carriage. Page: 392 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.06.08 1200mm diameter and 10mm thick wall m


10mm Thick MS Casing (1200mm dia) 1.0000 m 19320.00 19320.00
H.C. of Tripod and Mechanical Winch Machine complete with 0.0170 day 3000.00 51.00
power unit and accessories
H.C. of Derrick 0.0340 day 400.00 13.60
H.C. of Welding Machine 0.0340 day 500.00 17.00
Foreman 0.0170 day 800.00 13.60
Operator 0.0170 day 570.00 9.69
Skilled Labour 0.0340 day 450.00 15.30
Diesel 1.2000 liter 68.00 81.60
Lubricant 0.0170 liter 220.00 3.74

Subtotal-A: 19525.53
Cost of welding & other consumables etc. ( +10.00 % on Subtotal-A ) 1952.55
Subtotal-A1: 21478.08

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 21907.64

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 24098.41


VAT 6% of Total 1606.56
IT 4% of Total 1071.04
Total: 26776.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 393 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.06.09 1500mm diameter and 12mm thick wall m


12mm Thick MS Casing (1500mm dia) 1.0000 m 28970.00 28970.00
H.C. of Tripod and Mechanical Winch Machine complete with 0.0180 day 3000.00 54.00
power unit and accessories
H.C. of Derrick 0.0360 day 400.00 14.40
H.C. of Welding Machine 0.0360 day 500.00 18.00
Foreman 0.0180 day 800.00 14.40
Operator 0.0180 day 570.00 10.26
Skilled Labour 0.0360 day 450.00 16.20
Diesel 1.3000 liter 68.00 88.40
Lubricant 0.0180 liter 220.00 3.96

Subtotal-A: 29189.62
Cost of welding & other consumables etc. ( +7.50 % on Subtotal-A ) 2189.22
Subtotal-A1: 31378.84

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 32006.42

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 35207.06


VAT 6% of Total 2347.14
IT 4% of Total 1564.76
Total: 39118.96

Note : Rates of all items should be inclusive of all supply and carriage. Page: 394 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.06.10 1800mm diameter and 12mm thick wall m


12mm Thick MS Casing (1800mm dia) 1.0000 m 34740.00 34740.00
H.C. of Tripod and Mechanical Winch Machine complete with 0.0210 day 3000.00 63.00
power unit and accessories
H.C. of Derrick 0.0420 day 400.00 16.80
H.C. of Welding Machine 0.0420 day 500.00 21.00
Foreman 0.0210 day 800.00 16.80
Operator 0.0210 day 570.00 11.97
Skilled Labour 0.0420 day 450.00 18.90
Diesel 1.4000 liter 68.00 95.20
Lubricant 0.0210 liter 220.00 4.62

Subtotal-A: 34988.29
Cost of welding & other consumables etc. ( +7.50 % on Subtotal-A ) 2624.12
Subtotal-A1: 37612.41

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 38364.66

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 42201.13


VAT 6% of Total 2813.41
IT 4% of Total 1875.61
Total: 46890.14

Note : Rates of all items should be inclusive of all supply and carriage. Page: 395 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.06.11 2000mm diameter and 16mm thick wall m


16mm Thick MS Casing (2000mm dia) 1.0000 m 51500.00 51500.00
H.C. of Tripod and Mechanical Winch Machine complete with 0.0240 day 3000.00 72.00
power unit and accessories
H.C. of Derrick 0.0480 day 400.00 19.20
H.C. of Welding Machine 0.0480 day 500.00 24.00
Foreman 0.0240 day 800.00 19.20
Operator 0.0240 day 570.00 13.68
Skilled Labour 0.0480 day 450.00 21.60
Diesel 1.5000 liter 68.00 102.00
Lubricant 0.0240 liter 220.00 5.28

Subtotal-A: 51776.96
Cost of welding & other consumables etc. ( +7.50 % on Subtotal-A ) 3883.27
Subtotal-A1: 55660.23

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 56773.44

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 62450.78


VAT 6% of Total 4163.39
IT 4% of Total 2775.59
Total: 69389.76

Note : Rates of all items should be inclusive of all supply and carriage. Page: 396 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.06.12 2500mm diameter and 20mm thick wall m


20mm Thick MS Casing (2500mm dia) 1.0000 m 80470.00 80470.00
H.C. of Tripod and Mechanical Winch Machine complete with 0.0270 day 3000.00 81.00
power unit and accessories
H.C. of Derrick 0.0540 day 400.00 21.60
H.C. of Welding Machine 0.0540 day 500.00 27.00
Foreman 0.0270 day 800.00 21.60
Operator 0.0270 day 570.00 15.39
Skilled Labour 0.0540 day 450.00 24.30
Diesel 1.6000 liter 68.00 108.80
Lubricant 0.0270 liter 220.00 5.94

Subtotal-A: 80775.63
Cost of welding & other consumables etc. ( +7.50 % on Subtotal-A ) 6058.17
Subtotal-A1: 86833.80

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 88570.48

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 97427.53


VAT 6% of Total 6495.17
IT 4% of Total 4330.11
Total: 108252.81

4.07.07 Welding: Providing and making specified welding conforming to AWS


D1.4 by electric arc welding for construction of cast-in-situ bored pile
carefully with highly oxidized electrodes making the points prominent
and accepted by the Engineer-in-charge. The cost of all materials,
labour, tools and plants, electricity and all equipment is included in this
unit rate. Welding shall be carried out under the continuous direction of
an experienced and competent superisor.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 397 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.07.01 SW: spot/tack welding at contact point of the spirals at reasonalbe each
intervals with the main vertical reinforcements of re-bar cage to be
placed in borehole.
Welder Helper 0.0040 day 470.00 1.88
Electrode 0.0010 pkt 810.00 0.81
H.C. of Welding Machine 0.0010 day 500.00 0.50

Subtotal-A: 3.19

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 3.25

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 3.58


VAT 6% of Total 0.24
IT 4% of Total 0.16
Total: 3.98

4.07.07.02 LW: Direct type Lap-welded splice over two sides of contact by welding meter
of minimum length not less than 10 times of bar diameter unless
otherwise mentioned in the working drawing at the lap of main
reinforcement in re-bar cage to be placed in borehole.
Welder 0.1250 day 680.00 85.00
Electrode 0.3330 pkt 810.00 269.73
H.C. of Welding Machine 0.0400 day 500.00 20.00

Subtotal-A: 374.73

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 382.22

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 420.45


VAT 6% of Total 28.03
IT 4% of Total 18.69
Total: 467.16

Note : Rates of all items should be inclusive of all supply and carriage. Page: 398 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.08 Labour for breaking head of hardened cast-in-situ bored pile/ pre-cast cum
piles to the correct lines and levels from the top of the piles to the cut-
off level as indicated in the approved drawing and exposing pile
reinforcement for embedment in pile cap by any means and disposal of
the debris to an unobjectionable place outside the site premises
including scrapping and removing concrete from steel/ MS rods,
straightening and bending of pile bars, preparation and making of
platform where necessary, carrying, all sorts of handling, stacking the
same properly after clearing, leveling and dressing the site and clearing
the river bed, etc. all complete as per direction of the E-I-C.
Measurement will be given for the actual pile head volume to be
broken.The debris from pile chipping shall be disposed outside the site
premises at an environmentally safe place with minimum traffic
disruption and procuring entity will not be responsilbe for any
irregularities by the party regarding dumping of the debris.
Skilled Labour 0.1500 day 450.00 67.50
Ordinary Labour 9.0000 day 370.00 3330.00
Mason 0.0100 day 550.00 5.50

Subtotal-A: 3403.00
Repairing of pile head including materials ( +10.00 % on Subtotal-A ) 340.30
Straightening and bending of pile bars, removing ( +10.00 % on Subtotal-A ) 340.30
the debris to a safe distance, tools & plant,
sundries etc.
Subtotal-A1: 4083.60

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4165.27

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 4581.80


VAT 6% of Total 305.45
IT 4% of Total 203.64
Total: 5090.89

Note : Rates of all items should be inclusive of all supply and carriage. Page: 399 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.09 RCC-17BCCM: Reinforced cement concrete work for pre-cast pile with cum
minimum cement content relates to nominal mix ratio 1:2:4 and
maximum water cement ratio 0.4 having minimum required average
strength, f'cr = 24 MPa and satisfying a compressive strength f'c = 17
MPa at 28 days on standard cylinders as per standard practice of Code
AASHTO/ ASTM and cement conforming to BDS EN 197-1 : 2003 CEM-
II/A-L/M/V/W 42.5N, sand of minimum FM 1.8 and 20mm down well
graded crushed picked brick chips (LAA value & maximum water
absorption not exceeding 38 & 15% respectively) conforming to ASTM C
33 including breaking chips, screening through proper sieves, cleaning
and washing, centering and shuttering with MS sheet, MS angle, nuts
and bolts, chamfering edges, preparation of casting beds, laying
polythene, placing reinforcement cages in position, mixing in standard
mixture machine with hoper, maintaining allowable slump of 50mm to
100mm, casting, compacting by mechanical vibrators and tapered rods
as where necessary, curing for 28 days etc. The cost of reinforcement
and it's fabrication, binding, welding and placing is not included in this
unit rate. Additional quantity of cement to be added if required to attain
the specified strength to be provided by the contractor at his own cost.
Note: Using Concrete Mixer
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0500 bag 430.00 2601.50
1st Class Picked Brick Chips (20mm down graded) 0.5200 m3 2940.00 1528.80
1st Class Brick Chips (10mm down graded) 0.3400 m3 3049.00 1036.66
Sand (FM - 1.8) 0.4300 m3 970.00 417.10
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 7040.56
Formwork/ shuttering and consumables etc. ( +9.00 % on Subtotal-A ) 633.65
Subtotal-A1: 7674.21

Note : Rates of all items should be inclusive of all supply and carriage. Page: 400 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 7827.69

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 8610.46


VAT 6% of Total 574.03
IT 4% of Total 382.69
Total: 9567.18

Note : Rates of all items should be inclusive of all supply and carriage. Page: 401 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.10 RCC-25SCCM: Reinforced cement concrete work for pre-cast pile with cum
cement content relates to mix ratio 1:1.5:3 and maximum water cement
ratio 0.4 having minimum required average compressive strength, f'cr =
33.5 MPa and satisfying a compressive strength f'c = 25 MPa at 28 days
on standard cylinders as per standard practice of code AASHTO/ ASTM
and cement conforming to BDS EN 197-1 : 2003 CEM-II/A-L/M/V/W
42.5N, water reducing admixture of complying type A under ASTM C
494 (Doses of admixture to be fixed by the mix design), sand of
minimum FM 2.5 and 20mm down well graded crushed stone chips
broken from boulders (Preferably stone chips from Madhyapara,
Dinajpur, LAA value not exceeding 30) conforming to ASTM C 33,
including breaking stone boulders into chips, screening through proper
sieves, cleaning and washing, centering and shuttering with MS sheet,
MS angle, nuts and bolts, chamfering edges, preparation of casting
beds, laying polythene, placing reinforcement cages in position, mixing
in standard mixture machine with hoper, maintaining allowable slump of
50mm to 100mm, casting, compacting by mechanical vibrators and
tapered rods as where necessary, curing for 28 days etc. The cost of
reinforcement and it's fabrication, binding, welding and placing is not
included but the cost of admixture is included in this unit rate. Additional
quantity of cement to be added if required to attain the specified
strength to be provided by the contractor at his own cost.
Note: Using Concrete Mixer
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water reducing chemical admixture : Type-A 1.9275 liter 130.00 250.58
Head Mason 0.0600 day 650.00 39.00
Mason 0.3500 day 550.00 192.50
Skilled Labour 1.0000 day 450.00 450.00
Ordinary Labour 1.1000 day 370.00 407.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Note : Rates of all items should be inclusive of all supply and carriage. Page: 402 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Subtotal-A: 9447.28
Steel formwork and consumables etc. ( +17.00 % on Subtotal-A ) 1606.04
Subtotal-A1: 11053.31

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11274.38

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12401.82


VAT 6% of Total 826.79
IT 4% of Total 551.19
Total: 13779.80

Note : Rates of all items should be inclusive of all supply and carriage. Page: 403 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.11 RCC-25SCBP: Reinforced cement concrete work for pre-cast pile with cum
cement content relates to mix ratio 1:1.5:3 and maximum water cement
ratio 0.4 having minimum required average compressive strength, f'cr =
33.5 MPa and satisfying a compressive strength f'c = 25 MPa at 28 days
on standard cylinders as per standard practice of code AASHTO/ ASTM
and cement conforming to BDS EN 197-1 : 2003 CEM-II/A-L/M/V/W
42.5N, water reducing admixture of complying type A under ASTM C
494 (Doses of admixture to be fixed by the mix design), sand of
minimum FM 2.5 and 20mm down well graded crushed stone chips
broken from boulders (Preferably stone chips from Madhyapara,
Dinajpur, LAA value not exceeding 30) conforming to ASTM C 33,
including breaking stone boulders into chips, screening through proper
sieves, cleaning and washing, centering and shuttering with MS sheet,
MS angle, nuts and bolts, chamfering edges, preparation of casting
beds, laying polythene, placing reinforcement cages in position, mixing
in mechanized batch mix plant & pumping using line pump or boom
placer, maintaining allowable slump of 50mm to 100mm, casting,
compacting by mechanical vibrators and tapered rods as where
necessary, curing for 28 days etc. The cost of reinforcement and it's
fabrication, binding, welding and placing is not included but the cost of
admixture is included in this unit rate. Additional quantity of cement to
be added if required to attain the specified strength to be provided by
the contractor at his own cost.
Note: Using Batching Plant, Transit Mixer & Concrete Pump
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water reducing chemical admixture : Type-A 1.9275 liter 130.00 250.58
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost

Note : Rates of all items should be inclusive of all supply and carriage. Page: 404 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Head Mason 0.0600 day 650.00 39.00
Mason 0.3500 day 550.00 192.50
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 1.0000 day 370.00 370.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 9662.03
Steel Forwork and consumables etc. ( +17.00 % on Subtotal-A ) 1642.54
Subtotal-A1: 11304.57

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11530.66

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12683.73


VAT 6% of Total 845.58
IT 4% of Total 563.72
Total: 14093.03

Note : Rates of all items should be inclusive of all supply and carriage. Page: 405 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.12 RCC-30SCBP: Reinforced cement concrete work for pre-cast pile with cum
minimum cement content and maximum water cement ratio as specified
by the laboratory having minimum required average compressive
strength, f'cr = 38.5 MPa and satisfying a specified compressive
strength, f'c = 30 MPa at 28 days on standard cylinders as per standard
practice of code AASHTO/ ASTM and cement conforming to BDS EN 197-
1 : 2003 CEM-I 52.5N / ASTM C150 Type-1, water reducing admixture
of complying type A under ASTM C 494 (Doses of admixture to be fixed
by the mix design), sand of minimum FM 2.5 and 20mm down well
graded crushed stone chips broken from boulders (Preferably stone
chips from Madhyapara, Dinajpur, LAA value not exceeding 30)
conforming to ASTM C 33, including breaking stone boulders into chips,
screening through proper sieves, cleaning and washing, centering and
shuttering with MS sheet, MS angle, nuts and bolts, chamfering edges,
preparation of casting beds, laying polythene, placing reinforcement
cages in position, mixing in mechanized batch mix plant & pumping
using line pump or boom placer, maintaining allowable slump of 50mm
to 100mm, casting, compacting by mechanical vibrators and tapered
rods as where necessary, curing for 28 days etc. The cost of
reinforcement and it's fabrication, binding, welding and placing is not
included but the cost of admixture is included in this unit rate. Additional
quantity of cement to be added if required to attain the specified
strength to be provided by the contractor at his own cost. The Mix
Design shall have to be approved by the concerned District Quality
Control Laboratory or any other reputed laboratory approved by the
competent authority before execution of the work.
Note: Using Batching Plant, Transit Mixer & Concrete Pump
Ordinary Portland Cement (CEM I, 52.5N) 8.6000 bag 455.00 3913.00
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water reducing chemical admixture : Type-A 2.1500 liter 130.00 279.50
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80

Note : Rates of all items should be inclusive of all supply and carriage. Page: 406 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Head Mason 0.0600 day 650.00 39.00
Mason 0.3500 day 550.00 192.50
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 1.0000 day 370.00 370.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 10288.65
Steel Formwork and consumables etc. ( +17.00 % on Subtotal-A ) 1749.07
Subtotal-A1: 12037.72

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12278.47

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 13506.32


VAT 6% of Total 900.42
IT 4% of Total 600.28
Total: 15007.02

Note : Rates of all items should be inclusive of all supply and carriage. Page: 407 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.13 Mobilization and demobilization of drop hammer type pre-cast pile set/site
driving rig set..
H.C. of Flat Body Truck (3 tons) 2.0000 day 2000.00 4000.00

Subtotal-A: 4000.00
Incidental & Sundries ( +10.00 % on Subtotal-A ) 400.00
Subtotal-A1: 4400.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4488.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 4936.80


VAT 6% of Total 329.12
IT 4% of Total 219.41
Total: 5485.33

4.07.14 Driving pre-cast RCC piles with drop hammer type rig in any type of soil
to the required depth including fitting and fixing steel cap, handling and
keeping in position and maintaining driving log in prescribed format as
per design, drawing & direction of the E-I-C. Before commencing driving
operation, contractor shall submit the methodology for carrying the
driving operation including sequence of driving to the E-I-C. The
maximum permitted deviation of the finished pile from the horizontal &
vertical shall be 50mm & 25mm respectively. Cutting of a pile not being
installed to the planned depth is exclusively subject to the approval of
Design Unit, LGED.

4.07.14.01 X-section of pre-cast pile: 225mm X 225mm

Note : Rates of all items should be inclusive of all supply and carriage. Page: 408 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.14.01.01 For height: Up to 6m m


H.C. of pre-cast pile driving complete rig set 0.0256 day 10500.00 268.80
Rig Operator 0.0333 day 600.00 19.98
Skilled Labour 0.0333 day 450.00 14.99
Ordinary Labour 0.2500 day 370.00 92.50

Subtotal-A: 396.27
Preparation of Driving Log & Other Charges ( +5.00 % on Subtotal-A ) 19.81
Subtotal-A1: 416.08

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 424.40

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 466.84


VAT 6% of Total 31.12
IT 4% of Total 20.75
Total: 518.71

4.07.14.01.02 For height: 6m and above m Add +15.00% with Item No 4.07.14.01.01

4.07.14.02 X-section of pre-cast pile:250mm X 250mm

Note : Rates of all items should be inclusive of all supply and carriage. Page: 409 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.14.02.01 For height: Up to 6m m


H.C. of pre-cast pile driving complete rig set 0.0278 day 10500.00 291.90
Rig Operator 0.0417 day 600.00 25.02
Skilled Labour 0.0417 day 450.00 18.77
Ordinary Labour 0.3333 day 370.00 123.32

Subtotal-A: 459.01
Preparation of Driving Log & Other Charges ( +5.00 % on Subtotal-A ) 22.95
Subtotal-A1: 481.96

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 491.60

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 540.75


VAT 6% of Total 36.05
IT 4% of Total 24.03
Total: 600.84

4.07.14.02.02 For height: 6m and above m Add +15.00% with Item No 4.07.14.02.01

4.07.14.03 X-section of pre-cast pile:300mm X 300mm

Note : Rates of all items should be inclusive of all supply and carriage. Page: 410 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.14.03.01 For height: Up to 6m m


H.C. of pre-cast pile driving complete rig set 0.0303 day 10500.00 318.15
Rig Operator 0.0483 day 600.00 28.98
Skilled Labour 0.0625 day 450.00 28.13
Ordinary Labour 0.4167 day 370.00 154.18

Subtotal-A: 529.43
Preparation of Driving Log & Other Charges ( +5.00 % on Subtotal-A ) 26.47
Subtotal-A1: 555.91

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 567.02

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 623.73


VAT 6% of Total 41.58
IT 4% of Total 27.72
Total: 693.03

4.07.14.03.02 For height: 6m and above m Add +15.00% with Item No 4.07.14.03.01

4.07.14.04 X-section of pre-cast pile: 350mm X 350mm

Note : Rates of all items should be inclusive of all supply and carriage. Page: 411 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.14.04.01 For height: Up to 6m m


H.C. of pre-cast pile driving complete rig set 0.0333 day 10500.00 349.65
Rig Operator 0.0556 day 600.00 33.36
Skilled Labour 0.0833 day 450.00 37.49
Ordinary Labour 0.5000 day 370.00 185.00

Subtotal-A: 605.50
Preparation of Driving Log & Other Charges ( +5.00 % on Subtotal-A ) 30.27
Subtotal-A1: 635.77

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 648.49

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 713.33


VAT 6% of Total 47.56
IT 4% of Total 31.70
Total: 792.59

4.07.14.04.02 For height: 6m and above m Add +15.00% with Item No 4.07.14.04.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 412 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.15 Mobilization and demobilization of automatic diesel hammer mounted per site
compete rig set.
H.C. of Crane for lifting & movement of diesel mounted 2.0000 day 50000.00 100000.00
hammer up to site
H.C. of Truck for carrying diesel hammer mounted rig 2.0000 day 12000.00 24000.00

Subtotal-A: 124000.00
Loading & Unloading and other costs ( +15.00 % on Subtotal-A ) 18600.00
Subtotal-A1: 142600.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 145452.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 159997.20


VAT 6% of Total 10666.48
IT 4% of Total 7110.99
Total: 177774.67

4.07.16 Driving pre-cast RCC piles with automatic diesel hammer mounted rig in
any type of soil to the required depth including fitting and fixing steel
cap, handling and keeping in position and maintaining driving log in
prescribed format as per design, drawing & direction of the E-I-C.
Before commencing driving operation, contractor shall submit the
methodology for carrying the driving operation including sequence of
driving to the E-I-C. The maximum permitted deviation of the finished
pile from the horizontal & vertical shall be 50mm & 25mm respectively.
Cutting of a pile not being installed to the planned depth is exclusively
subject to the approval of Design Unit, LGED.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 413 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.16.01 X-section of pre-cast pile: 225 mm X 225 mm m


Hire and running charges of double acting diesel hammer 0.0105 day 25000.00 262.50
mounted complete rig set with power unit and accessories
Diesel 0.5263 liter 68.00 35.79
Lubricant 0.0211 liter 220.00 4.64
Foreman 0.0211 day 800.00 16.88
Rig Operator 0.0105 day 600.00 6.30
Rig Operator Helper 0.0842 day 400.00 33.68
Skilled Labour 0.0526 day 450.00 23.67

Subtotal-A: 383.46
Tools & plant, consumables, spares, maintenance, ( +10.00 % on Subtotal-A ) 38.35
insurance etc.
Subtotal-A1: 421.81

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 430.24

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 473.27


VAT 6% of Total 31.55
IT 4% of Total 21.03
Total: 525.85

Note : Rates of all items should be inclusive of all supply and carriage. Page: 414 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.16.02 X-section of pre-cast pile: 250 mm X 250 mm m


Hire and running charges of double acting diesel hammer 0.0133 day 25000.00 332.50
mounted complete rig set with power unit and accessories
Diesel 0.6667 liter 68.00 45.34
Lubricant 0.0267 liter 220.00 5.87
Foreman 0.0267 day 800.00 21.36
Rig Operator 0.0133 day 600.00 7.98
Rig Operator Helper 0.1067 day 400.00 42.68
Skilled Labour 0.0667 day 450.00 30.02

Subtotal-A: 485.74
Tools & plant, consumables, spares, maintenance, ( +10.00 % on Subtotal-A ) 48.57
insurance etc.
Subtotal-A1: 534.32

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 545.01

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 599.51


VAT 6% of Total 39.97
IT 4% of Total 26.64
Total: 666.12

Note : Rates of all items should be inclusive of all supply and carriage. Page: 415 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.16.03 X-section of pre-cast pile: 300 mm X 300 mm m


Hire and running charges of double acting diesel hammer 0.0182 day 25000.00 455.00
mounted complete rig set with power unit and accessories
Diesel 0.9091 liter 68.00 61.82
Lubricant 0.0364 liter 220.00 8.01
Foreman 0.0364 day 800.00 29.12
Rig Operator 0.0182 day 600.00 10.92
Rig Operator Helper 0.1455 day 400.00 58.20
Skilled Labour 0.0909 day 450.00 40.91

Subtotal-A: 663.97
Tools & plant, consumables, spares, maintenance, ( +10.00 % on Subtotal-A ) 66.40
insurance etc.
Subtotal-A1: 730.37

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 744.98

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 819.47


VAT 6% of Total 54.63
IT 4% of Total 36.42
Total: 910.53

Note : Rates of all items should be inclusive of all supply and carriage. Page: 416 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.16.04 X-section of pre-cast pile: 350 mm X 350 mm m


Hire and running charges of double acting diesel hammer 0.0200 day 25000.00 500.00
mounted complete rig set with power unit and accessories
Diesel 1.0000 liter 68.00 68.00
Lubricant 0.0400 liter 220.00 8.80
Foreman 0.0400 day 800.00 32.00
Rig Operator 0.0200 day 600.00 12.00
Rig Operator Helper 0.1600 day 400.00 64.00
Skilled Labour 0.1000 day 450.00 45.00

Subtotal-A: 729.80
Tools & plant, consumables, spares, maintenance, ( +10.00 % on Subtotal-A ) 72.98
insurance etc.
Subtotal-A1: 802.78

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 818.84

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 900.72


VAT 6% of Total 60.05
IT 4% of Total 40.03
Total: 1000.80

Note : Rates of all items should be inclusive of all supply and carriage. Page: 417 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.16.05 X-section of pre-cast pile: 400 mm X 400 mm m


Hire and running charges of double acting diesel hammer 0.0222 day 25000.00 555.00
mounted complete rig set with power unit and accessories
Diesel 1.1111 liter 68.00 75.55
Lubricant 0.0444 liter 220.00 9.77
Foreman 0.0444 day 800.00 35.52
Rig Operator 0.0222 day 600.00 13.32
Rig Operator Helper 0.1778 day 400.00 71.12
Skilled Labour 0.1111 day 450.00 50.00

Subtotal-A: 810.28
Tools & plant, consumables, spares, maintenance, ( +10.00 % on Subtotal-A ) 81.03
insurance etc.
Subtotal-A1: 891.31

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 909.13

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1000.04


VAT 6% of Total 66.67
IT 4% of Total 44.45
Total: 1111.16

4.07.17 Mobilization and demobilization of Hydraulic Static Pile driver (HSPD)


including complete accessories

Note : Rates of all items should be inclusive of all supply and carriage. Page: 418 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.17.01 Maximum pile driving force up to 120 ton set/site


H.C. of Low bed Trailers for carrying Hydraulic static pile 1.0000 per trip 140000.00 140000.00
driver
H.C. of high bed Trailers for carrying Long leg, short leg & 2.0000 each 45000.00 90000.00
generator of Hydraulic static pile driver
H.C. of Truck for carrying Counter Weights of Hydraulic static 2.0000 per trip 20000.00 40000.00
pile driver
H.C. of Crane for lifting & movement of Hydraulic static pile 1.0000 day 55000.00 55000.00
driver up to site

Subtotal-A: 325000.00
Loading & Unloading and consumables etc. ( +2.50 % on Subtotal-A ) 8125.00
Subtotal-A1: 333125.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 339787.50

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 373766.25


VAT 6% of Total 24917.75
IT 4% of Total 16611.83
Total: 415295.83

Note : Rates of all items should be inclusive of all supply and carriage. Page: 419 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.17.02 Maximum pile driving force 120 to 180 ton set/site


H.C. of Low bed Trailers for carrying Hydraulic static pile 1.0000 per trip 140000.00 140000.00
driver
H.C. of high bed Trailers for carrying Long leg, short leg & 2.0000 each 45000.00 90000.00
generator of Hydraulic static pile driver
H.C. of Truck for carrying Counter Weights of Hydraulic static 4.0000 per trip 20000.00 80000.00
pile driver
H.C. of Crane for lifting & movement of Hydraulic static pile 1.0000 day 55000.00 55000.00
driver up to site

Subtotal-A: 365000.00
Loading & Unloading and consumables etc. ( +3.00 % on Subtotal-A ) 10950.00
Subtotal-A1: 375950.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 383469.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 421815.90


VAT 6% of Total 28121.06
IT 4% of Total 18747.37
Total: 468684.33

Note : Rates of all items should be inclusive of all supply and carriage. Page: 420 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.17.03 Maximum pile driving force 180 to 260 ton set/site


H.C. of Low bed Trailers for carrying Hydraulic static pile 1.0000 per trip 140000.00 140000.00
driver
H.C. of high bed Trailers for carrying Long leg, short leg & 2.0000 each 45000.00 90000.00
generator of Hydraulic static pile driver
H.C. of Truck for carrying Counter Weights of Hydraulic static 6.0000 per trip 20000.00 120000.00
pile driver
H.C. of Crane for lifting & movement of Hydraulic static pile 1.0000 day 55000.00 55000.00
driver up to site

Subtotal-A: 405000.00
Loading & Unloading and consumables etc. ( +5.00 % on Subtotal-A ) 20250.00
Subtotal-A1: 425250.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 433755.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 477130.50


VAT 6% of Total 31808.70
IT 4% of Total 21205.80
Total: 530145.00

Note : Rates of all items should be inclusive of all supply and carriage. Page: 421 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.17.04 Maximum pile driving force 260 to 360 ton set/site


H.C. of Low bed Trailers for carrying Hydraulic static pile 1.0000 per trip 140000.00 140000.00
driver
H.C. of high bed Trailers for carrying Long leg, short leg & 2.0000 each 45000.00 90000.00
generator of Hydraulic static pile driver
H.C. of Truck for carrying Counter Weights of Hydraulic static 9.0000 per trip 20000.00 180000.00
pile driver
H.C. of Crane for lifting & movement of Hydraulic static pile 1.0000 day 55000.00 55000.00
driver up to site

Subtotal-A: 465000.00
Loading & Unloading and consumables etc. ( +2.50 % on Subtotal-A ) 11625.00
Subtotal-A1: 476625.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 486157.50

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 534773.25


VAT 6% of Total 35651.55
IT 4% of Total 23767.70
Total: 594192.50

Note : Rates of all items should be inclusive of all supply and carriage. Page: 422 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.17.05 Maximum pile driving force above 360 ton set/site


H.C. of Low bed Trailers for carrying Hydraulic static pile 1.0000 per trip 140000.00 140000.00
driver
H.C. of high bed Trailers for carrying Long leg, short leg & 2.0000 each 45000.00 90000.00
generator of Hydraulic static pile driver
H.C. of Truck for carrying Counter Weights of Hydraulic static 11.0000 per trip 20000.00 220000.00
pile driver
H.C. of Crane for lifting & movement of Hydraulic static pile 1.0000 day 55000.00 55000.00
driver up to site

Subtotal-A: 505000.00
Loading & Unloading and other consumables etc. ( +2.50 % on Subtotal-A ) 12625.00
Subtotal-A1: 517625.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 527977.50

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 580775.25


VAT 6% of Total 38718.35
IT 4% of Total 25812.23
Total: 645305.83

Note : Rates of all items should be inclusive of all supply and carriage. Page: 423 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.18 Driving pre-cast RCC piles of various sizes (250 mm x 250 mm to 600 m
mm x 600 mm) in any type of soil using Hydraulic Static pile driver
having free of any noise and vibration during driving including handling
and installation of pile keeping in position as shown in the drawing, all
labours, operators, tools, all equipment charges, power source, piles
splicing, site arrangement, keeping all measures to avoid any
disturbance to the adjacent structure, keeping driving record & pile
capacity Record etc. all complete as per design, drawing, specification &
direction of the E-I-C and finally submission of pile driving report in
3(three) copies duly signed by professional engineer. The maximum
permitted deviation of the finished pile from the horizontal & vertical
shall be 50mm & 25mm respectively. Cutting of a pile not being
installed to the planned depth is exclusively subject to the approval of E-
I-C.
Hire and running charges of hydraulic static pile driver 0.0025 day 280000.00 700.00
including complete accessories and shifting at site
Foreman 0.0025 day 800.00 2.00
Rig Operator 0.0025 day 600.00 1.50
Skilled Labour 0.0100 day 450.00 4.50

Subtotal-A: 708.00
Report Generation and consumables etc. ( +2.50 % on Subtotal-A ) 17.70
Subtotal-A1: 725.70

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 740.21

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 814.24


VAT 6% of Total 54.28
IT 4% of Total 36.19
Total: 904.71

4.07.19 Driven vertical Steel piles of required shape and length including cost of
all materials and labour for hoisting, driving etc. and also including cost
of dummy lengths of pile and of hire charges of all instruments as
necessary complete as per drawing and & Technical Specification.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 424 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.19.01 Steel H-Piles of 400mm x 250mm conforming to requirements of m


AASHTO M 183.
Corrosion resistant Structural steel 86.3140 kg 58.00 5006.21
H.C. of Excavator (Medium Size) 0.0110 day 8880.00 97.68
H.C. of Letourneau Mobile Crane (20 ton) 0.0110 day 6000.00 66.00
Operator 0.0020 day 570.00 1.14
Skilled Labour 0.0430 day 450.00 19.35

Subtotal-A: 5190.38
For providing steel helmet during driving, stacking ( +1.00 % on Subtotal-A ) 51.90
of piles at site, providing anti-corrosion treatment
and other imponderables during installation.
Subtotal-A1: 5242.29

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 5347.13

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 5881.84


VAT 6% of Total 392.12
IT 4% of Total 261.42
Total: 6535.38

Note : Rates of all items should be inclusive of all supply and carriage. Page: 425 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.19.02 Steel H-Piles of 450mm x 250mm conforming to requirements of m


AASHTO M 183.
Corrosion resistant Structural steel 97.1330 kg 58.00 5633.71
H.C. of Excavator (Medium Size) 0.0130 day 8880.00 115.44
H.C. of Letourneau Mobile Crane (20 ton) 0.0130 day 6000.00 78.00
Operator 0.0020 day 570.00 1.14
Skilled Labour 0.0500 day 450.00 22.50

Subtotal-A: 5850.79
For providing steel helmet during driving, stacking ( +1.00 % on Subtotal-A ) 58.51
of piles at site, providing anti-corrosion treatment
and other imponderables during installation.
Subtotal-A1: 5909.30

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 6027.49

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 6630.24


VAT 6% of Total 442.02
IT 4% of Total 294.68
Total: 7366.93

Note : Rates of all items should be inclusive of all supply and carriage. Page: 426 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.20 Manufacturing, supplying and fitting fixing MS shoe at RCC pre-cast pile each
tip with tip area 12mm x 12 mm, butt area 150mm x 150mm and height
250mm, fabricated with 6mm thick 4 nos MS plate (12mm x 150mm x
250mm) at sides and one plate (12mm x 12mm) at tip, having 6mm
thick continuous fillet weld at all joints and 20mm dia. 800mm long
anchor MS re-bar along with 4 nos. 20mm x 20mm x 3mm MS angle
welded to the tip plate including cost of all materials, labour etc. all
complete as per design, drawing & direction of the E-I-C.
LW: Direct type Lap-welded splice over two sides of contact 1.0800 meter 374.73 404.71
by welding of minimum length not less than 10 times of bar
diameter …...(4.07.07.02)
MS Angle 20mmx20mmx3mm 0.8620 kg 58.00 50.00
M.S. Ribbed/ Deformed Bar (Grade 300) 8.6900 kg 54.00 469.26
MS Plate (6mm thick) in Wt. 4.9200 kg 70.00 344.40
Ordinary Labour 0.0400 day 370.00 14.80

Subtotal-A: 1283.16
Cost of grinding. ( +5.00 % on Subtotal-A ) 64.16
Manufacturing cost for making, fitting and fixing of ( +25.00 % on Subtotal-A ) 320.79
pile shoe including cutting, shaping, sizing of MS
Plate & trasportation from workshop to site
Subtotal-A1: 1668.11

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1701.48

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1871.62


VAT 6% of Total 124.77
IT 4% of Total 83.18
Total: 2079.58

Note : Rates of all items should be inclusive of all supply and carriage. Page: 427 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.21 RCC-30SCCM: Reinforced cement concrete work for pre-cast driven


micro pile with minimum cement content and maximum water cement
ratio as specified by laboratory having minimum required average
compressive strength, f'cr = 38.5 MPa and satisfying a specified
compressive strength, f'c = 30 MPa at 28 days on standard cylinders as
per standard practice of code AASHTO/ ASTM and cement conforming
to BDS EN 197-1 : 2003 CEM-I 52.5N/ ASTM C150 Type-1, water
reducing admixture of complying type A under ASTM C 494 (Doses of
admixture to be fixed by the mix design), sand of minimum FM 2.5 and
20mm down well graded crushed stone chips broken from boulders
(Preferably stone chips from Madhyapara, Dinajpur, LAA value not
exceeding 30) conforming to ASTM C 33, mixing in standard mixture
machine with hoper and fed by standard measuring boxes, including all
related works like breaking stone boulders into chips, screening through
proper sieves, cleaning and washing, centering and shuttering with MS
sheet, MS angle, nuts and bolts, chamfering edges, preparation of
casting beds, laying polythene, placing reinforcement cages in position,
casting in steel forms, compacting by vibrators and tapered rods as
where necessary , curing for 28 days, driving the pile upto the design
depth as per standard practice or specified method, providing all
equipment, labour, materials including carrying etc. all complete as per
design, drawing and direction of the E-I-C. The cost of reinforcement
and it's fabrication, binding, welding and placing is not included but the
cost of admixture is included in this unit rate. Additional quantity of
cement to be added if required to attain the specified strength to be
provided by the contractor at his own cost. The Mix Design shall have to
be approved by the concerned District Quality Control Laboratory or any
other reputed laboratory approved by the competent authority before
execution of the work.
Note: Using Concrete Mixer

4.07.21.01 X-section of pre-cast pile: 150mm x 150mm

Note : Rates of all items should be inclusive of all supply and carriage. Page: 428 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.21.01.01 Cost of reinforced cement concrete m


Ordinary Portland Cement (CEM I, 52.5N) 0.1935 bag 455.00 88.04
Stone Chips (20mm down graded) [LAA≤30] 0.0110 m3 5320.00 58.52
Stone Chips (12mm down graded) [LAA≤30] 0.0074 m3 4470.00 33.08
Sand (FM - 2.5) 0.0092 m3 1500.00 13.80
Water reducing chemical admixture : Type-A 0.0484 liter 130.00 6.29
Head Mason 0.0030 day 650.00 1.95
Mason 0.0110 day 550.00 6.05
Skilled Labour 0.0160 day 450.00 7.20
Ordinary Labour 0.0200 day 370.00 7.40
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0013 day 1200.00 1.56
Hire and running charges of Concrete Vibrator 0.0013 day 400.00 0.52

Subtotal-A: 224.41
Steel Formwork ( +17.00 % on Subtotal-A ) 38.15
Subtotal-A1: 262.56

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 267.81

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 294.60


VAT 6% of Total 19.64
IT 4% of Total 13.09
Total: 327.33

Note : Rates of all items should be inclusive of all supply and carriage. Page: 429 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.21.01.02 Cost of driving up to 8.00m m


Rig Operator 0.0250 day 600.00 15.00
Skilled Labour 0.0500 day 450.00 22.50
Ordinary Labour 0.1563 day 370.00 57.83
H.C. of pre-cast micro pile driving complete rig set 0.0125 day 5000.00 62.50

Subtotal-A: 157.83

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 160.99

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 177.09


VAT 6% of Total 11.81
IT 4% of Total 7.87
Total: 196.76

4.07.21.02 X-section of pre-cast pile: 200mm x 200mm

Note : Rates of all items should be inclusive of all supply and carriage. Page: 430 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.21.02.01 Cost of reinforced cement concrete m


Ordinary Portland Cement (CEM I, 52.5N) 0.3440 bag 455.00 156.52
Stone Chips (20mm down graded) [LAA≤30] 0.0196 m3 5320.00 104.27
Stone Chips (12mm down graded) [LAA≤30] 0.0132 m3 4470.00 59.00
Sand (FM - 2.5) 0.0164 m3 1500.00 24.60
Water reducing chemical admixture : Type-A 0.0860 liter 130.00 11.18
Head Mason 0.0050 day 650.00 3.25
Mason 0.0200 day 550.00 11.00
Skilled Labour 0.0280 day 450.00 12.60
Ordinary Labour 0.0350 day 370.00 12.95
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0020 day 1200.00 2.40
Hire and running charges of Concrete Vibrator 0.0023 day 400.00 0.92

Subtotal-A: 398.70
Steel Formwork ( +17.00 % on Subtotal-A ) 67.78
Subtotal-A1: 466.47

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 475.80

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 523.38


VAT 6% of Total 34.89
IT 4% of Total 23.26
Total: 581.54

Note : Rates of all items should be inclusive of all supply and carriage. Page: 431 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.21.02.02 Cost of driving up to 8.00m m


Rig Operator 0.0313 day 600.00 18.78
Skilled Labour 0.0625 day 450.00 28.13
Ordinary Labour 0.2188 day 370.00 80.96
H.C. of pre-cast micro pile driving complete rig set 0.0156 day 5000.00 78.00

Subtotal-A: 205.86

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 209.98

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 230.98


VAT 6% of Total 15.40
IT 4% of Total 10.27
Total: 256.64

4.07.22 Supplying, fitting, fixing prefabricated square shaped two steel caps for
Pre-cast spliced pile made up by 6mm thick MS plate conforming to
ASTM A 36, sides formed by bent in channel shape to have only two line
of joinery on faces, having min 50 mm dia hole on its web; capping by
min. 12mm thick MS Plate shaping the edges in 45 degree, having min.
40 mm dia hole at centre to pass 25mm MS bar 450 mm in length;
jointed at channels root by welding; cap fitted with 2 nos. BDS ISO
6935-2: 2006 RB 400W complied 20mm U-bar 1250mm in length by
welding equidistance from centre holes of cap and shall have min 75mm
clear from pile faces; and finally, the system be fitted in correct
alignments on pile head positions waiting for concreting; both the pile
heads fitted with the steel caps be welded together through v-notches
in field, while one of the companion segment of piles drived in ground
and other one placed over it maintaining true verticality; all complete as
per design, drawing, specification & direction of E-I-C.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 432 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.22.01 X-section of pile segment: 300 mm x 300 mm each


MS Angle, Flat bar, Z bar 18.3400 kg 59.00 1082.06
M.S. Ribbed/ Deformed Bar (Grade 300) 17.2462 kg 54.00 931.29
MS Plate (12mm thick) 16.9560 kg 70.00 1186.92
MS Plate (6mm thick) in Wt. 19.4994 kg 70.00 1364.96
32mm dia GI pipe wall thickness 3.25mm 0.4500 m 380.00 171.00
Skilled Labour 0.1000 day 450.00 45.00

Subtotal-A: 4781.23
Cost of Welding, grinding etc. ( +20.00 % on Subtotal-A ) 956.25
Manufacturing cost including cutting, shaping, ( +30.00 % on Subtotal-A ) 1434.37
sizing of MS Plate & trasportation from workshop
to site
Subtotal-A1: 7171.85

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 7315.29

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 8046.81


VAT 6% of Total 536.45
IT 4% of Total 357.64
Total: 8940.91

Note : Rates of all items should be inclusive of all supply and carriage. Page: 433 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.22.02 X-section of pile segment: 350 mm x 350 mm each


MS Angle, Flat bar, Z bar 18.3400 kg 59.00 1082.06
M.S. Ribbed/ Deformed Bar (Grade 300) 17.2462 kg 54.00 931.29
MS Plate (12mm thick) 23.0790 kg 70.00 1615.53
MS Plate (6mm thick) in Wt. 22.5609 kg 70.00 1579.26
32mm dia GI pipe wall thickness 3.25mm 0.4500 m 380.00 171.00
Skilled Labour 0.1000 day 450.00 45.00

Subtotal-A: 5424.15
Cost of Welding, grinding etc. ( +20.00 % on Subtotal-A ) 1084.83
Manufacturing cost including cutting, shaping, ( +30.00 % on Subtotal-A ) 1627.24
sizing of MS Plate & trasportation from workshop
to site
Subtotal-A1: 8136.22

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 8298.95

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 9128.84


VAT 6% of Total 608.59
IT 4% of Total 405.73
Total: 10143.16

Note : Rates of all items should be inclusive of all supply and carriage. Page: 434 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.22.03 X-section of pile segment: 400 mm x 400 mm each


MS Angle, Flat bar, Z bar 18.3400 kg 59.00 1082.06
M.S. Ribbed/ Deformed Bar (Grade 300) 17.2462 kg 54.00 931.29
MS Plate (12mm thick) 30.1440 kg 70.00 2110.08
MS Plate (6mm thick) in Wt. 25.6224 kg 70.00 1793.57
32mm dia GI pipe wall thickness 3.25mm 0.4500 m 380.00 171.00
Skilled Labour 0.1000 day 450.00 45.00

Subtotal-A: 6133.00
Cost of Welding, grinding etc. ( +20.00 % on Subtotal-A ) 1226.60
Manufacturing cost including cutting, shaping, ( +30.00 % on Subtotal-A ) 1839.90
sizing of MS Plate & trasportation from workshop
to site
Subtotal-A1: 9199.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9383.49

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 10321.84


VAT 6% of Total 688.12
IT 4% of Total 458.75
Total: 11468.72

Note : Rates of all items should be inclusive of all supply and carriage. Page: 435 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.23 SLT: Conducting static load test as per ASTM D 1143 or equivalent
standard for the cast in situ/ pre-cast pile providing required scaffolding,
bracing, jacks, pressure test gauge, loading unloading, arranging other
necessary plants and equipment including staging, mobilization,
demobilization, hire charge of gunny bag/ concrete block/ steel sheet,
sand and filling sacs/ gunny bags for loading, record readings and
preparation of results in standard forms and other incidental charges as
per standard practice and procedures including submission of load test
report, furnishing all graph and chart etc. complete in all respects
approved and accepted by the Engineer (Minimum two cyclic loading;
one at service load and another cycle at double the load of service load
then to continue loading till failure of the pile). Before commencing load
test, Contractor shall submit methodology along with combined
calibration report for conducting load test to the E-I-C for approval. The
Testing firm will be selected taking prior approval of procuring entity.
The methodology of static load test and driving logs/ boring & pouring
logs shall be the part of test report. Load Test and Report shall be
conducted under the supervision of a professional Geotechnical
Engineer registered in the Bangladesh Professional Engineers
Registration Board (BPERB), Institute of Engineers Bangladesh (IEB).
[Cost of Combined Calibration Test (Hydraulic Jack, pressure gauge &
electric/hydraulic pump) has been included in all sub-items.]

Note : Rates of all items should be inclusive of all supply and carriage. Page: 436 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.23.01 Up to 75 ton each


Empty Gunny Bag 675.0000 each 30.00 20250.00
Sand (FM - 0.5) 19.0000 m3 420.00 7980.00
Foreman 2.0000 day 800.00 1600.00
Skilled Labour 6.0000 day 450.00 2700.00
Ordinary Labour 12.0000 day 370.00 4440.00
H.C. of Load Test Equipment and Accessories including 1.0000 set 10500.00 10500.00
Transportation: up to 125 Ton Capacity
H.C. of Flat Body Truck (5 tons) 3.0000 day 3000.00 9000.00
Calibration of Hydraulic Jack 1.0000 set 30000.00 30000.00

Subtotal-A: 86470.00
Cost of Labour for bag filling, Stitching, loading & ( +30.00 % on Subtotal-A ) 25941.00
unloading
Report Generation and consumables etc. ( +5.00 % on Subtotal-A ) 4323.50
Subtotal-A1: 116734.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 119069.19

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 130976.11


VAT 6% of Total 8731.74
IT 4% of Total 5821.16
Total: 145529.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 437 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.23.02 Above 75 ton and up to 125 ton each


Empty Gunny Bag 1125.0000 each 30.00 33750.00
Sand (FM - 0.5) 32.0000 m3 420.00 13440.00
Foreman 2.0000 day 800.00 1600.00
Skilled Labour 6.0000 day 450.00 2700.00
Ordinary Labour 12.0000 day 370.00 4440.00
H.C. of Load Test Equipment and Accessories including 1.0000 set 10500.00 10500.00
Transportation: up to 125 Ton Capacity
H.C. of Flat Body Truck (5 tons) 4.0000 day 3000.00 12000.00
Calibration of Hydraulic Jack 1.0000 set 30000.00 30000.00

Subtotal-A: 108430.00
Cost of Labour for bag filling, Stitching, loading & ( +30.00 % on Subtotal-A ) 32529.00
unloading
Report Generation and consumables etc. ( +5.00 % on Subtotal-A ) 5421.50
Subtotal-A1: 146380.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 149308.11

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 164238.92


VAT 6% of Total 10949.26
IT 4% of Total 7299.51
Total: 182487.69

Note : Rates of all items should be inclusive of all supply and carriage. Page: 438 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.23.03 Above 125 ton and up to 175 ton each


Empty Gunny Bag 1575.0000 each 30.00 47250.00
Sand (FM - 0.5) 45.0000 m3 420.00 18900.00
Foreman 2.0000 day 800.00 1600.00
Skilled Labour 8.0000 day 450.00 3600.00
Ordinary Labour 16.0000 day 370.00 5920.00
H.C. of Load Test Equipment and Accessories including 1.0000 set 12500.00 12500.00
Transportation: above 125 Ton capacity
H.C. of Flat Body Truck (5 tons) 5.0000 day 3000.00 15000.00
Calibration of Hydraulic Jack 1.0000 set 30000.00 30000.00

Subtotal-A: 134770.00
Cost of Labour for bag filling, Stitching, loading & ( +30.00 % on Subtotal-A ) 40431.00
unloading
Report Generation and consumables etc. ( +5.00 % on Subtotal-A ) 6738.50
Subtotal-A1: 181939.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 185578.29

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 204136.12


VAT 6% of Total 13609.07
IT 4% of Total 9072.72
Total: 226817.91

Note : Rates of all items should be inclusive of all supply and carriage. Page: 439 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.23.04 Above 175 ton and up to 225 ton each


Empty Gunny Bag 2025.0000 each 30.00 60750.00
Sand (FM - 0.5) 57.5000 m3 420.00 24150.00
Foreman 2.0000 day 800.00 1600.00
Skilled Labour 8.0000 day 450.00 3600.00
Ordinary Labour 16.0000 day 370.00 5920.00
H.C. of Load Test Equipment and Accessories including 1.0000 set 12500.00 12500.00
Transportation: above 125 Ton capacity
H.C. of Flat Body Truck (5 tons) 6.0000 day 3000.00 18000.00
Calibration of Hydraulic Jack 1.0000 set 30000.00 30000.00

Subtotal-A: 156520.00
Cost of Labour for bag filling, Stitching, loading & ( +30.00 % on Subtotal-A ) 46956.00
unloading
Report Generation and consumables etc. ( +5.00 % on Subtotal-A ) 7826.00
Subtotal-A1: 211302.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 215528.04

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 237080.84


VAT 6% of Total 15805.39
IT 4% of Total 10536.93
Total: 263423.16

Note : Rates of all items should be inclusive of all supply and carriage. Page: 440 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.23.05 Above 225 ton and up to 275 ton each


Empty Gunny Bag 2475.0000 each 30.00 74250.00
Sand (FM - 0.5) 70.0000 m3 420.00 29400.00
Foreman 2.0000 day 800.00 1600.00
Skilled Labour 8.0000 day 450.00 3600.00
Ordinary Labour 16.0000 day 370.00 5920.00
H.C. of Load Test Equipment and Accessories including 1.0000 set 12500.00 12500.00
Transportation: above 125 Ton capacity
H.C. of Flat Body Truck (5 tons) 7.0000 day 3000.00 21000.00
Calibration of Hydraulic Jack 1.0000 set 30000.00 30000.00

Subtotal-A: 178270.00
Cost of Labour for bag filling, Stitching, loading & ( +30.00 % on Subtotal-A ) 53481.00
unloading
Report Generation and consumables etc. ( +5.00 % on Subtotal-A ) 8913.50
Subtotal-A1: 240664.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 245477.79

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 270025.57


VAT 6% of Total 18001.70
IT 4% of Total 12001.14
Total: 300028.41

Note : Rates of all items should be inclusive of all supply and carriage. Page: 441 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.23.06 Above 275 ton and up to 325 ton each


Empty Gunny Bag 2912.5000 each 30.00 87375.00
Sand (FM - 0.5) 82.5000 m3 420.00 34650.00
Foreman 2.0000 day 800.00 1600.00
Skilled Labour 8.0000 day 450.00 3600.00
Ordinary Labour 20.0000 day 370.00 7400.00
H.C. of Load Test Equipment and Accessories including 1.0000 set 12500.00 12500.00
Transportation: above 125 Ton capacity
H.C. of Flat Body Truck (5 tons) 8.0000 day 3000.00 24000.00
Calibration of Hydraulic Jack 1.0000 set 30000.00 30000.00

Subtotal-A: 201125.00
Cost of Labour for bag filling, Stitching, loading & ( +30.00 % on Subtotal-A ) 60337.50
unloading
Report Generation and consumables etc. ( +5.00 % on Subtotal-A ) 10056.25
Subtotal-A1: 271518.75

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 276949.13

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 304644.04


VAT 6% of Total 20309.60
IT 4% of Total 13539.74
Total: 338493.38

Note : Rates of all items should be inclusive of all supply and carriage. Page: 442 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.23.07 Above 325 ton and up to 375 ton each


Empty Gunny Bag 3360.0000 each 30.00 100800.00
Sand (FM - 0.5) 95.0000 m3 420.00 39900.00
Foreman 2.0000 day 800.00 1600.00
Skilled Labour 10.0000 day 450.00 4500.00
Ordinary Labour 20.0000 day 370.00 7400.00
H.C. of Load Test Equipment and Accessories including 1.0000 set 12500.00 12500.00
Transportation: above 125 Ton capacity
H.C. of Flat Body Truck (5 tons) 9.0000 day 3000.00 27000.00
Calibration of Hydraulic Jack 1.0000 set 30000.00 30000.00

Subtotal-A: 223700.00
Cost of Labour for bag filling, Stitching, loading & ( +30.00 % on Subtotal-A ) 67110.00
unloading
Report Generation and consumables etc. ( +5.00 % on Subtotal-A ) 11185.00
Subtotal-A1: 301995.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 308034.90

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 338838.39


VAT 6% of Total 22589.23
IT 4% of Total 15059.48
Total: 376487.10

Note : Rates of all items should be inclusive of all supply and carriage. Page: 443 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.23.08 Above 375 ton and up to 500 ton each


H.C. of Concrete Block (Size: 1.0m x 1.0m x 1.0m) 208.0000each/month 833.00 173264.00
H.C. of Load Test Equipment and Accessories including 1.0000 set 100000.00 100000.00
Transportation: 500 - 1500 Ton Capacity
Calibration of Hydraulic Jack 1.0000 set 30000.00 30000.00
H.C. of KATO Mobile Crane (upto 5 ton) 4.0000 day 4000.00 16000.00
Foreman 2.0000 day 800.00 1600.00
Skilled Labour 8.0000 day 450.00 3600.00
H.C. of Flat Body Truck (5 tons) 6.0000 day 3000.00 18000.00

Subtotal-A: 342464.00
Report Generation and consumables etc. ( +5.00 % on Subtotal-A ) 17123.20
Subtotal-A1: 359587.20

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 366778.94

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 403456.84


VAT 6% of Total 26897.12
IT 4% of Total 17931.42
Total: 448285.38

Note : Rates of all items should be inclusive of all supply and carriage. Page: 444 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.23.09 Above 500 ton and up to 700 ton each


H.C. of Concrete Block (Size: 1.0m x 1.0m x 1.0m) 292.0000each/month 833.00 243236.00
H.C. of Load Test Equipment and Accessories including 1.0000 set 100000.00 100000.00
Transportation: 500 - 1500 Ton Capacity
Calibration of Hydraulic Jack 1.0000 set 30000.00 30000.00
H.C. of KATO Mobile Crane (upto 5 ton) 4.0000 day 4000.00 16000.00
Foreman 2.0000 day 800.00 1600.00
Skilled Labour 8.0000 day 450.00 3600.00
H.C. of Flat Body Truck (5 tons) 6.0000 day 3000.00 18000.00

Subtotal-A: 412436.00
Report Generation and consumables etc. ( +5.00 % on Subtotal-A ) 20621.80
Subtotal-A1: 433057.80

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 441718.96

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 485890.85


VAT 6% of Total 32392.72
IT 4% of Total 21595.15
Total: 539878.72

Note : Rates of all items should be inclusive of all supply and carriage. Page: 445 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.23.10 Above 700 ton and up to 900 ton each


H.C. of Concrete Block (Size: 1.0m x 1.0m x 1.0m) 375.0000each/month 833.00 312375.00
H.C. of Load Test Equipment and Accessories including 1.0000 set 100000.00 100000.00
Transportation: 500 - 1500 Ton Capacity
Calibration of Hydraulic Jack 1.0000 set 30000.00 30000.00
H.C. of KATO Mobile Crane (upto 5 ton) 4.0000 day 4000.00 16000.00
Foreman 2.0000 day 800.00 1600.00
Skilled Labour 8.0000 day 450.00 3600.00
H.C. of Flat Body Truck (5 tons) 6.0000 day 3000.00 18000.00

Subtotal-A: 481575.00
Report Generation and consumables etc. ( +5.00 % on Subtotal-A ) 24078.75
Subtotal-A1: 505653.75

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 515766.83

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 567343.51


VAT 6% of Total 37822.90
IT 4% of Total 25215.27
Total: 630381.68

Note : Rates of all items should be inclusive of all supply and carriage. Page: 446 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.23.11 Above 900 ton and up to 1100 ton each


H.C. of Concrete Block (Size: 1.0m x 1.0m x 1.0m) 458.0000each/month 833.00 381514.00
H.C. of Load Test Equipment and Accessories including 1.0000 set 100000.00 100000.00
Transportation: 500 - 1500 Ton Capacity
Calibration of Hydraulic Jack 1.0000 set 30000.00 30000.00
H.C. of KATO Mobile Crane (upto 5 ton) 4.0000 day 4000.00 16000.00
Foreman 2.0000 day 800.00 1600.00
Skilled Labour 8.0000 day 450.00 3600.00
H.C. of Flat Body Truck (5 tons) 6.0000 day 3000.00 18000.00

Subtotal-A: 550714.00
Report Generation and consumables etc. ( +5.00 % on Subtotal-A ) 27535.70
Subtotal-A1: 578249.70

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 589814.69

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 648796.16


VAT 6% of Total 43253.08
IT 4% of Total 28835.39
Total: 720884.63

Note : Rates of all items should be inclusive of all supply and carriage. Page: 447 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.23.12 Above 1100 ton and up to 1300 ton each


H.C. of Concrete Block (Size: 1.0m x 1.0m x 1.0m) 542.0000each/month 833.00 451486.00
H.C. of Load Test Equipment and Accessories including 1.0000 set 100000.00 100000.00
Transportation: 500 - 1500 Ton Capacity
Calibration of Hydraulic Jack 1.0000 set 30000.00 30000.00
H.C. of KATO Mobile Crane (upto 5 ton) 4.0000 day 4000.00 16000.00
Foreman 2.0000 day 800.00 1600.00
Skilled Labour 8.0000 day 450.00 3600.00
H.C. of Flat Body Truck (5 tons) 6.0000 day 3000.00 18000.00

Subtotal-A: 620686.00
Report Generation and consumables etc. ( +5.00 % on Subtotal-A ) 31034.30
Subtotal-A1: 651720.30

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 664754.71

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 731230.18


VAT 6% of Total 48748.68
IT 4% of Total 32499.12
Total: 812477.97

Note : Rates of all items should be inclusive of all supply and carriage. Page: 448 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.23.13 Above 1300 ton and up to 1500 ton each


H.C. of Concrete Block (Size: 1.0m x 1.0m x 1.0m) 625.0000each/month 833.00 520625.00
H.C. of Load Test Equipment and Accessories including 1.0000 set 100000.00 100000.00
Transportation: 500 - 1500 Ton Capacity
Calibration of Hydraulic Jack 1.0000 set 30000.00 30000.00
H.C. of KATO Mobile Crane (upto 5 ton) 4.0000 day 4000.00 16000.00
Foreman 2.0000 day 800.00 1600.00
Skilled Labour 8.0000 day 450.00 3600.00
H.C. of Flat Body Truck (5 tons) 6.0000 day 3000.00 18000.00

Subtotal-A: 689825.00
Report Generation and consumables etc. ( +5.00 % on Subtotal-A ) 34491.25
Subtotal-A1: 724316.25

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 738802.58

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 812682.83


VAT 6% of Total 54178.86
IT 4% of Total 36119.24
Total: 902980.93

4.07.23.14 Above 1500 ton LS

Note : Rates of all items should be inclusive of all supply and carriage. Page: 449 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.24 LLT: Performing Lateral load test for test load of 1.5 times of the
working lateral load in accordance with ASTM D 3966 (Standard Test
Methods for Deep Foundations under Lateral Load) on working pile
including the cost of arranging kenteldge, jacks, platform, reaction
frame with required anchorage, island where required, preparing the
pile head if necessary, dial gauges, joist and all other necessary
arrangement, loading and unloading, submission of the result, removal
of all arrangement after completion, cost of all labour, material,
carriage, leads and lift etc. complete as per approved drawing,
Technical specification and as directed by the Engineer-in-charge.
Before commencing load test, Contractor shall submit methodology for
conducting load test to the E-I-C for approval. The Testing firm will be
selected taking prior approval of procuring entity.
The methodology of lateral load test and driving logs/ boring & pouring
logs shall be the part of test report. Lateral Load Test and Report shall
be conducted under the supervision of a professional Geotechnical
Engineer registered in the Bangladesh Professional Engineers
Registration Board (BPERB), Institute of Engineers Bangladesh (IEB).

4.07.24.01 LLT_50: Up to 50 ton capacity pile each


Lateral load testing of single pile in accordance with ASTM D 1.0000 Per Test 25000.00 25000.00
3966 for determining safe allowable lateral load on pile. Upto
50 ton capacity

Subtotal-A: 25000.00
Report Generation and consumables etc. ( +5.00 % on Subtotal-A ) 1250.00
Subtotal-A1: 26250.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 26775.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 29452.50


VAT 6% of Total 1963.50
IT 4% of Total 1309.00
Total: 32725.00

Note : Rates of all items should be inclusive of all supply and carriage. Page: 450 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.24.02 LLT_50+: Above 50 ton capacity pile each


Lateral load testing of single pile in accordance with ASTM D 1.0000 Per Test 38000.00 38000.00
3966 for determining safe allowable lateral load on pile.
Above 50 ton capacity

Subtotal-A: 38000.00
Report Generation and consumables etc. ( +5.00 % on Subtotal-A ) 1900.00
Subtotal-A1: 39900.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 40698.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 44767.80


VAT 6% of Total 2984.52
IT 4% of Total 1989.68
Total: 49742.00

Note : Rates of all items should be inclusive of all supply and carriage. Page: 451 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.25 Conducting initial load test upto three times the design load capacity on LS
single pile including installation of bored cast-in-situ pile to required
depth using reinforced cement concrete with minimum compressive
strength of 25 MPa at 28 days (suggested mix proportion 1:1.5:3, w/c
max. 0.4) on standard cylinders as per standard practice of Code
AASHTO/ ASTM and cement conforming to BDS EN 197-1 : 2003 CEM-
II 42.5N, coarse sand of minimum FM 2.5 and 20mm down well graded
crushed stone chips conforming to ASTM C33 (Preferably stone chips
from Madhyapara, Dinajpur, LAA value not exceeding 30) including
materials, boring/ drilling in all types of strata from ground level to
termination depth of pile including providing bentonite slurry (Dry
Bentonite powder of liquid limit of minimum 350 shall be mixed with
water @ minimum 4% by weight to make the fresh drilling fluid of
viscosity between 32-50 seconds and density less than 1.1gm/cc) and/
or casing for stabilization of pile bore, flushing of pile bore, cleaning,
providing plasticizer wherever required, breaking pile head to cut off
level and exposing pile reinforcement for embedment in pile cap,
constructing test pile cap including materials, excavation, all
arrangements of loading, unloading, equipments, jacks, recording of
results, labour, dismantling the pile cap after test, submission of test
report etc complete for the following as per design, drawing,
specification and direction of E-I-C.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 452 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.26 PIT (Pile Integrity Test): Conducting Low-Strain Impact Integrity Testing
on cast-in-situ/ pre-cast piles in accordance with ASTM D 5882
(Standard Test Method for Low Strain Impact Integrity Testing of Deep
Foundations) using pile integrity tester containing calibrated measuring
devices like highly sensitive accelerometer, a magnification device, an
amplification box, a small impact device (hammer) & a computer with
ability to convert data from analog to digital form with graphical display
on completion of required setting/ driving of piles, preparation of pile
top by removing soil, mud, dust & chipping lean concrete lumps etc.,
mobilizing and demobilizing of equipment, preparation of results in
standard forms and compiling final report with recommendations on the
tests etc. complete in all respects approved and accepted by the E-I-C.
Report should include proper presentable graph of same wave speed
(m/sec), impendence reduction, interpretation of results, cross sectional
or material changes (if any), length of pile, concrete quality etc. Routine
test samples shall be chosen by E-I-C on random basis. Methodology for
conducting PIT shall be submitted to the E-I-C for approval and shall be
the part of PIT report. All pile integrity tests shall be performed and
analyzed under the supervison of a professional geotechnical engineer
registered in the Bangladesh Professional Engineers Registration Board
(BPERB), Institute of Engineers Bangladesh (IEB).

Note : Rates of all items should be inclusive of all supply and carriage. Page: 453 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.26.01 PIT on 10 (ten) nos. piles or less of a single bridge set


PIT: Mobilization, demobilization of Pile Integrity Testing 1.0000 set 15000.00 15000.00
Equipment including 10 nos. tests
Skilled Technician 1.0000 day 680.00 680.00
Semi Skilled Technician 1.0000 day 570.00 570.00

Subtotal-A: 16250.00
Reporting charges and consumables etc. ( +5.00 % on Subtotal-A ) 812.50
Subtotal-A1: 17062.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 17403.75

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 19144.13


VAT 6% of Total 1276.28
IT 4% of Total 850.85
Total: 21271.25

4.07.26.02 Additional charge on Mobilization & demobilization beyond 100km of Per km


Dhaka/ nearby source to site
PIT/ CSL: Beyond 100km from Dhaka 1.0000 per km 35.00 35.00

Subtotal-A: 35.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 35.70

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 39.27


VAT 6% of Total 2.62
IT 4% of Total 1.75
Total: 43.63

Note : Rates of all items should be inclusive of all supply and carriage. Page: 454 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.26.03 PIT on each additional pile after 10(ten) piles tested. each
PIT: per PIT after 1st 10 nos. PIT 1.0000 Each 1200.00 1200.00
Skilled Technician 0.0667 day 680.00 45.36
Semi Skilled Technician 0.0667 day 570.00 38.02

Subtotal-A: 1283.38
Reporting charges and consumables etc. ( +5.00 % on Subtotal-A ) 64.17
Subtotal-A1: 1347.54

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1374.49

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1511.94


VAT 6% of Total 100.80
IT 4% of Total 67.20
Total: 1679.94

Note : Rates of all items should be inclusive of all supply and carriage. Page: 455 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.27 PDA (Pile Driving Analyzer) Test: Performing high-strain dynamic testing
on piles in accordance with ASTM D 4945 (Standard Method for High-
Strain Dynamic Testing of Deep Foundation) to evaluate integrity of the
hardened pile using pile driving analyser by impacting a weight of
atleast 1.5% to 2% of required ultimate pile bearing capacity with a fall
varying from 1m to 3m including preparing head, providing ply and
sheet plates, fixing atleast 2 pairs of strain & acceleration sensors at
diametrically opposite sides, experts, labour, mobilization,
demobilization, data acquisition, CAPWAP analysis, integrity,
interpolation, preparation of results in standard forms etc. complete in
all respects approved and accepted by the E-I-C. Routine test samples
shall be chosen by E-I-C on random basis. Before commencing PDA test,
Contractor shall submit methodology for conducting test to the E-I-C for
approval. The report should include true static capacity of the pile at the
time of testing, simulated static load test curve, total skin variation
along the length of pile, skin friction variation along the length of the
pile, compressive and tensile stressses developed in pile during testing,
net and total displacement of the pile & pile integrity. The Testing firm
will be selected taking prior approval of procuring entity. All PDA testing
shall be performed and analyzed under the supervison of a professional
geotechnical engineer registered in the Bangladesh Professional
Engineers Registration Board (BPERB), Institute of Engineers
Bangladesh (IEB).

4.07.27.01 For test load up to 100 MT

Note : Rates of all items should be inclusive of all supply and carriage. Page: 456 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.27.01.01 Only one pile at a site to test in single run each


Hire and running Charges of Pile Driving Analyzer (PDA) with 1.0000 day 30000.00 30000.00
four (4) Strain transducers and two (2) Piezoelectric
accelerometers
H.C. of KATO Mobile Crane Truck Mounted (20 ton) 1.0000 day 11000.00 11000.00
H.C. of Vertical Drill Machine 1.0000 day 150.00 150.00
H.C. of electric grinding machine 1.0000 day 165.00 165.00
H.C. of Flat Body Truck (5 tons) 4.0000 day 3000.00 12000.00
Foreman 1.0000 day 800.00 800.00
Electricians 1.0000 day 600.00 600.00
Mason 1.0000 day 550.00 550.00
Skilled Labour 3.0000 day 450.00 1350.00

Subtotal-A: 56615.00
Hire charges for Hammer, Hammer guide, 50mm ( +10.00 % on Subtotal-A ) 5661.50
thick timber cushion, steel plate cap cover,
computer etc.
CAPWAP software analysis with reporting charges ( +15.00 % on Subtotal-A ) 8492.25
etc.
Subtotal-A1: 70768.75

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 72184.13

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 79402.54


VAT 6% of Total 5293.50
IT 4% of Total 3529.00
Total: 88225.04

Note : Rates of all items should be inclusive of all supply and carriage. Page: 457 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.27.01.02 Up to two piles at a site to test in single run each


Hire and running Charges of Pile Driving Analyzer (PDA) with 1.0000 day 30000.00 30000.00
four (4) Strain transducers and two (2) Piezoelectric
accelerometers
H.C. of KATO Mobile Crane Truck Mounted (20 ton) 1.0000 day 11000.00 11000.00
H.C. of Vertical Drill Machine 1.0000 day 150.00 150.00
H.C. of electric grinding machine 1.0000 day 165.00 165.00
H.C. of Flat Body Truck (5 tons) 2.0000 day 3000.00 6000.00
Foreman 1.0000 day 800.00 800.00
Electricians 1.0000 day 600.00 600.00
Mason 1.0000 day 550.00 550.00
Skilled Labour 3.0000 day 450.00 1350.00

Subtotal-A: 50615.00
Hire charges for Hammer, Hammer guide, 50mm ( +10.00 % on Subtotal-A ) 5061.50
thick timber cushion, steel plate cap cover,
computer etc.
CAPWAP software analysis with reporting charges ( +15.00 % on Subtotal-A ) 7592.25
etc.
Subtotal-A1: 63268.75

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 64534.13

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 70987.54


VAT 6% of Total 4732.50
IT 4% of Total 3155.00
Total: 78875.04

Note : Rates of all items should be inclusive of all supply and carriage. Page: 458 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.27.01.03 Up to three piles at a site to test in single run each


Hire and running Charges of Pile Driving Analyzer (PDA) with 1.0000 day 30000.00 30000.00
four (4) Strain transducers and two (2) Piezoelectric
accelerometers
H.C. of KATO Mobile Crane Truck Mounted (20 ton) 1.0000 day 11000.00 11000.00
H.C. of Vertical Drill Machine 1.0000 day 150.00 150.00
H.C. of electric grinding machine 1.0000 day 165.00 165.00
H.C. of Flat Body Truck (5 tons) 1.3333 day 3000.00 3999.90
Foreman 1.0000 day 800.00 800.00
Electricians 1.0000 day 600.00 600.00
Mason 1.0000 day 550.00 550.00
Skilled Labour 3.0000 day 450.00 1350.00

Subtotal-A: 48614.90
Hire charges for Hammer, Hammer guide, 50mm ( +10.00 % on Subtotal-A ) 4861.49
thick timber cushion, steel plate cap cover,
computer etc.
CAPWAP software analysis with reporting charges ( +15.00 % on Subtotal-A ) 7292.24
etc.
Subtotal-A1: 60768.63

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 61984.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 68182.40


VAT 6% of Total 4545.49
IT 4% of Total 3030.33
Total: 75758.22

Note : Rates of all items should be inclusive of all supply and carriage. Page: 459 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.27.01.04 four or above piles at a site to test in single run each


Hire and running Charges of Pile Driving Analyzer (PDA) with 1.0000 day 30000.00 30000.00
four (4) Strain transducers and two (2) Piezoelectric
accelerometers
H.C. of KATO Mobile Crane Truck Mounted (20 ton) 1.0000 day 11000.00 11000.00
H.C. of Vertical Drill Machine 1.0000 day 150.00 150.00
H.C. of electric grinding machine 1.0000 day 165.00 165.00
H.C. of Flat Body Truck (5 tons) 1.0000 day 3000.00 3000.00
Foreman 1.0000 day 800.00 800.00
Electricians 1.0000 day 600.00 600.00
Mason 1.0000 day 550.00 550.00
Skilled Labour 3.0000 day 450.00 1350.00

Subtotal-A: 47615.00
Hire charges for Hammer, Hammer guide, 50mm ( +10.00 % on Subtotal-A ) 4761.50
thick timber cushion, steel plate cap cover,
computer etc.
CAPWAP software analysis with reporting charges ( +15.00 % on Subtotal-A ) 7142.25
etc.
Subtotal-A1: 59518.75

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 60709.13

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 66780.04


VAT 6% of Total 4452.00
IT 4% of Total 2968.00
Total: 74200.04

4.07.27.02 For test load above 100 MT to 300 MT

Note : Rates of all items should be inclusive of all supply and carriage. Page: 460 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.27.02.01 Only one pile at a site to test in single run each


Hire and running Charges of Pile Driving Analyzer (PDA) with 1.0000 day 30000.00 30000.00
four (4) Strain transducers and two (2) Piezoelectric
accelerometers
Hire and running charges of Crane (Capacity 50 MT) 1.0000 day 60000.00 60000.00
H.C. of Vertical Drill Machine 1.0000 day 150.00 150.00
H.C. of electric grinding machine 1.0000 day 165.00 165.00
H.C. of Flat Body Truck (5 tons) 10.0000 day 3000.00 30000.00
Foreman 1.0000 day 800.00 800.00
Electricians 1.0000 day 600.00 600.00
Mason 1.0000 day 550.00 550.00
Skilled Labour 3.0000 day 450.00 1350.00

Subtotal-A: 123615.00
Hire charges for Hammer, Hammer guide, 50mm ( +10.00 % on Subtotal-A ) 12361.50
thick timber cushion, steel plate cap cover,
computer etc.
CAPWAP software analysis with reporting charges ( +15.00 % on Subtotal-A ) 18542.25
etc.
Subtotal-A1: 154518.75

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 157609.13

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 173370.04


VAT 6% of Total 11558.00
IT 4% of Total 7705.34
Total: 192633.38

Note : Rates of all items should be inclusive of all supply and carriage. Page: 461 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.27.02.02 Up to two piles at a site to test in single run each


Hire and running Charges of Pile Driving Analyzer (PDA) with 1.0000 day 30000.00 30000.00
four (4) Strain transducers and two (2) Piezoelectric
accelerometers
Hire and running charges of Crane (Capacity 50 MT) 1.0000 day 60000.00 60000.00
H.C. of Vertical Drill Machine 1.0000 day 150.00 150.00
H.C. of electric grinding machine 1.0000 day 165.00 165.00
H.C. of Flat Body Truck (5 tons) 5.0000 day 3000.00 15000.00
Foreman 1.0000 day 800.00 800.00
Electricians 1.0000 day 600.00 600.00
Mason 1.0000 day 550.00 550.00
Skilled Labour 3.0000 day 450.00 1350.00

Subtotal-A: 108615.00
Hire charges for Hammer, Hammer guide, 50mm ( +10.00 % on Subtotal-A ) 10861.50
thick timber cushion, steel plate cap cover,
computer etc.
CAPWAP software analysis with reporting charges ( +15.00 % on Subtotal-A ) 16292.25
etc.
Subtotal-A1: 135768.75

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 138484.13

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 152332.54


VAT 6% of Total 10155.50
IT 4% of Total 6770.34
Total: 169258.38

Note : Rates of all items should be inclusive of all supply and carriage. Page: 462 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.27.02.03 Up to three piles at a site to test in single run each


Hire and running Charges of Pile Driving Analyzer (PDA) with 1.0000 day 30000.00 30000.00
four (4) Strain transducers and two (2) Piezoelectric
accelerometers
Hire and running charges of Crane (Capacity 50 MT) 1.0000 day 60000.00 60000.00
H.C. of Vertical Drill Machine 1.0000 day 150.00 150.00
H.C. of electric grinding machine 1.0000 day 165.00 165.00
H.C. of Flat Body Truck (5 tons) 3.3333 day 3000.00 9999.90
Foreman 1.0000 day 800.00 800.00
Electricians 1.0000 day 600.00 600.00
Mason 1.0000 day 550.00 550.00
Skilled Labour 3.0000 day 450.00 1350.00

Subtotal-A: 103614.90
Hire charges for Hammer, Hammer guide, 50mm ( +10.00 % on Subtotal-A ) 10361.49
thick timber cushion, steel plate cap cover,
computer etc.
CAPWAP software analysis with reporting charges ( +15.00 % on Subtotal-A ) 15542.24
etc.
Subtotal-A1: 129518.63

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 132109.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 145319.90


VAT 6% of Total 9687.99
IT 4% of Total 6458.66
Total: 161466.55

Note : Rates of all items should be inclusive of all supply and carriage. Page: 463 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.27.02.04 four or above piles at a site to test in single run each


Hire and running Charges of Pile Driving Analyzer (PDA) with 1.0000 day 30000.00 30000.00
four (4) Strain transducers and two (2) Piezoelectric
accelerometers
Hire and running charges of Crane (Capacity 50 MT) 1.0000 day 60000.00 60000.00
H.C. of Vertical Drill Machine 1.0000 day 150.00 150.00
H.C. of electric grinding machine 1.0000 day 165.00 165.00
H.C. of Flat Body Truck (5 tons) 2.5000 day 3000.00 7500.00
Foreman 1.0000 day 800.00 800.00
Electricians 1.0000 day 600.00 600.00
Mason 1.0000 day 550.00 550.00
Skilled Labour 3.0000 day 450.00 1350.00

Subtotal-A: 101115.00
Hire charges for Hammer, Hammer guide, 50mm ( +10.00 % on Subtotal-A ) 10111.50
thick timber cushion, steel plate cap cover,
computer etc.
CAPWAP software analysis with reporting charges ( +15.00 % on Subtotal-A ) 15167.25
etc.
Subtotal-A1: 126393.75

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 128921.63

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 141813.79


VAT 6% of Total 9454.25
IT 4% of Total 6302.84
Total: 157570.88

4.07.27.03 For test load above 300 MT to 500 MT

Note : Rates of all items should be inclusive of all supply and carriage. Page: 464 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.27.03.01 Only one pile at a site to test in single run each


Hire and running Charges of Pile Driving Analyzer (PDA) with 1.0000 day 30000.00 30000.00
four (4) Strain transducers and two (2) Piezoelectric
accelerometers
Hire and running charges of Crane (Capacity 80 MT) 1.0000 day 70000.00 70000.00
H.C. of Vertical Drill Machine 1.0000 day 150.00 150.00
H.C. of electric grinding machine 1.0000 day 165.00 165.00
H.C. of Flat Body Truck (5 tons) 16.0000 day 3000.00 48000.00
Foreman 1.0000 day 800.00 800.00
Electricians 1.0000 day 600.00 600.00
Mason 1.0000 day 550.00 550.00
Skilled Labour 3.0000 day 450.00 1350.00

Subtotal-A: 151615.00
Hire charges for Hammer, Hammer guide, 50mm ( +10.00 % on Subtotal-A ) 15161.50
thick timber cushion, steel plate cap cover,
computer etc.
CAPWAP software analysis with reporting charges ( +15.00 % on Subtotal-A ) 22742.25
etc.
Subtotal-A1: 189518.75

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 193309.13

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 212640.04


VAT 6% of Total 14176.00
IT 4% of Total 9450.67
Total: 236266.71

Note : Rates of all items should be inclusive of all supply and carriage. Page: 465 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.27.03.02 Up to two piles at a site to test in single run each


Hire and running Charges of Pile Driving Analyzer (PDA) with 1.0000 day 30000.00 30000.00
four (4) Strain transducers and two (2) Piezoelectric
accelerometers
Hire and running charges of Crane (Capacity 80 MT) 1.0000 day 70000.00 70000.00
H.C. of Vertical Drill Machine 1.0000 day 150.00 150.00
H.C. of electric grinding machine 1.0000 day 165.00 165.00
H.C. of Flat Body Truck (5 tons) 8.0000 day 3000.00 24000.00
Foreman 1.0000 day 800.00 800.00
Electricians 1.0000 day 600.00 600.00
Mason 1.0000 day 550.00 550.00
Skilled Labour 3.0000 day 450.00 1350.00

Subtotal-A: 127615.00
Hire charges for Hammer, Hammer guide, 50mm ( +10.00 % on Subtotal-A ) 12761.50
thick timber cushion, steel plate cap cover,
computer etc.
CAPWAP software analysis with reporting charges ( +15.00 % on Subtotal-A ) 19142.25
etc.
Subtotal-A1: 159518.75

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 162709.13

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 178980.04


VAT 6% of Total 11932.00
IT 4% of Total 7954.67
Total: 198866.71

Note : Rates of all items should be inclusive of all supply and carriage. Page: 466 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.27.03.03 Up to three piles at a site to test in single run each


Hire and running Charges of Pile Driving Analyzer (PDA) with 1.0000 day 30000.00 30000.00
four (4) Strain transducers and two (2) Piezoelectric
accelerometers
Hire and running charges of Crane (Capacity 80 MT) 1.0000 day 70000.00 70000.00
H.C. of Vertical Drill Machine 1.0000 day 150.00 150.00
H.C. of electric grinding machine 1.0000 day 165.00 165.00
H.C. of Flat Body Truck (5 tons) 5.3333 day 3000.00 15999.90
Foreman 1.0000 day 800.00 800.00
Electricians 1.0000 day 600.00 600.00
Mason 1.0000 day 550.00 550.00
Skilled Labour 3.0000 day 450.00 1350.00

Subtotal-A: 119614.90
Hire charges for Hammer, Hammer guide, 50mm ( +10.00 % on Subtotal-A ) 11961.49
thick timber cushion, steel plate cap cover,
computer etc.
CAPWAP software analysis with reporting charges ( +15.00 % on Subtotal-A ) 17942.24
etc.
Subtotal-A1: 149518.63

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 152509.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 167759.90


VAT 6% of Total 11183.99
IT 4% of Total 7456.00
Total: 186399.89

Note : Rates of all items should be inclusive of all supply and carriage. Page: 467 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.27.03.04 four or above piles at a site to test in single run each


Hire and running Charges of Pile Driving Analyzer (PDA) with 1.0000 day 30000.00 30000.00
four (4) Strain transducers and two (2) Piezoelectric
accelerometers
Hire and running charges of Crane (Capacity 80 MT) 1.0000 day 70000.00 70000.00
H.C. of Vertical Drill Machine 1.0000 day 150.00 150.00
H.C. of electric grinding machine 1.0000 day 165.00 165.00
H.C. of Flat Body Truck (5 tons) 4.0000 day 3000.00 12000.00
Foreman 1.0000 day 800.00 800.00
Electricians 1.0000 day 600.00 600.00
Mason 1.0000 day 550.00 550.00
Skilled Labour 3.0000 day 450.00 1350.00

Subtotal-A: 115615.00
Hire charges for Hammer, Hammer guide, 50mm ( +10.00 % on Subtotal-A ) 11561.50
thick timber cushion, steel plate cap cover,
computer etc.
CAPWAP software analysis with reporting charges ( +15.00 % on Subtotal-A ) 17342.25
etc.
Subtotal-A1: 144518.75

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 147409.13

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 162150.04


VAT 6% of Total 10810.00
IT 4% of Total 7206.67
Total: 180166.71

4.07.27.04 For test load above 500 MT

Note : Rates of all items should be inclusive of all supply and carriage. Page: 468 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.27.04.01 Only one pile at a site to test in single run each


Hire and running Charges of Pile Driving Analyzer (PDA) with 1.0000 day 30000.00 30000.00
four (4) Strain transducers and two (2) Piezoelectric
accelerometers
Hire and running charges of Crane (Capacity 100 MT) 1.0000 day 80000.00 80000.00
H.C. of Vertical Drill Machine 1.0000 day 150.00 150.00
H.C. of electric grinding machine 1.0000 day 165.00 165.00
H.C. of Flat Body Truck (5 tons) 21.0000 day 3000.00 63000.00
Foreman 1.0000 day 800.00 800.00
Electricians 1.0000 day 600.00 600.00
Mason 1.0000 day 550.00 550.00
Skilled Labour 3.0000 day 450.00 1350.00

Subtotal-A: 176615.00
Hire charges for Hammer, Hammer guide, 50mm ( +10.00 % on Subtotal-A ) 17661.50
thick timber cushion, steel plate cap cover,
computer etc.
CAPWAP software analysis with reporting charges ( +15.00 % on Subtotal-A ) 26492.25
etc.
Subtotal-A1: 220768.75

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 225184.13

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 247702.54


VAT 6% of Total 16513.50
IT 4% of Total 11009.00
Total: 275225.04

Note : Rates of all items should be inclusive of all supply and carriage. Page: 469 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.27.04.02 Up to two piles at a site to test in single run each


Hire and running Charges of Pile Driving Analyzer (PDA) with 1.0000 day 30000.00 30000.00
four (4) Strain transducers and two (2) Piezoelectric
accelerometers
Hire and running charges of Crane (Capacity 100 MT) 1.0000 day 80000.00 80000.00
H.C. of Vertical Drill Machine 1.0000 day 150.00 150.00
H.C. of electric grinding machine 1.0000 day 165.00 165.00
H.C. of Flat Body Truck (5 tons) 10.5000 day 3000.00 31500.00
Foreman 1.0000 day 800.00 800.00
Electricians 1.0000 day 600.00 600.00
Mason 1.0000 day 550.00 550.00
Skilled Labour 3.0000 day 450.00 1350.00

Subtotal-A: 145115.00
Hire charges for Hammer, Hammer guide, 50mm ( +10.00 % on Subtotal-A ) 14511.50
thick timber cushion, steel plate cap cover,
computer etc.
CAPWAP software analysis with reporting charges ( +15.00 % on Subtotal-A ) 21767.25
etc.
Subtotal-A1: 181393.75

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 185021.63

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 203523.79


VAT 6% of Total 13568.25
IT 4% of Total 9045.50
Total: 226137.54

Note : Rates of all items should be inclusive of all supply and carriage. Page: 470 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.27.04.03 Up to three piles at a site to test in single run each


Hire and running Charges of Pile Driving Analyzer (PDA) with 1.0000 day 30000.00 30000.00
four (4) Strain transducers and two (2) Piezoelectric
accelerometers
Hire and running charges of Crane (Capacity 100 MT) 1.0000 day 80000.00 80000.00
H.C. of Vertical Drill Machine 1.0000 day 150.00 150.00
H.C. of electric grinding machine 1.0000 day 165.00 165.00
H.C. of Flat Body Truck (5 tons) 7.0000 day 3000.00 21000.00
Foreman 1.0000 day 800.00 800.00
Electricians 1.0000 day 600.00 600.00
Mason 1.0000 day 550.00 550.00
Skilled Labour 3.0000 day 450.00 1350.00

Subtotal-A: 134615.00
Hire charges for Hammer, Hammer guide, 50mm ( +10.00 % on Subtotal-A ) 13461.50
thick timber cushion, steel plate cap cover,
computer etc.
CAPWAP software analysis with reporting charges ( +15.00 % on Subtotal-A ) 20192.25
etc.
Subtotal-A1: 168268.75

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 171634.13

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 188797.54


VAT 6% of Total 12586.50
IT 4% of Total 8391.00
Total: 209775.04

Note : Rates of all items should be inclusive of all supply and carriage. Page: 471 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.27.04.04 four or above piles at a site to test in single run each


Hire and running Charges of Pile Driving Analyzer (PDA) with 1.0000 day 30000.00 30000.00
four (4) Strain transducers and two (2) Piezoelectric
accelerometers
Hire and running charges of Crane (Capacity 100 MT) 1.0000 day 80000.00 80000.00
H.C. of Vertical Drill Machine 1.0000 day 150.00 150.00
H.C. of electric grinding machine 1.0000 day 165.00 165.00
H.C. of Flat Body Truck (5 tons) 5.2500 day 3000.00 15750.00
Foreman 1.0000 day 800.00 800.00
Electricians 1.0000 day 600.00 600.00
Mason 1.0000 day 550.00 550.00
Skilled Labour 3.0000 day 450.00 1350.00

Subtotal-A: 129365.00
Hire charges for Hammer, Hammer guide, 50mm ( +10.00 % on Subtotal-A ) 12936.50
thick timber cushion, steel plate cap cover,
computer etc.
CAPWAP software analysis with reporting charges ( +15.00 % on Subtotal-A ) 19404.75
etc.
Subtotal-A1: 161706.25

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 164940.38

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 181434.41


VAT 6% of Total 12095.63
IT 4% of Total 8063.75
Total: 201593.79

Note : Rates of all items should be inclusive of all supply and carriage. Page: 472 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.28 CSL Access Tube Installation: Supplying and Installation of 38 to 50mm m


inside diameter standard weight MS access tubes in each diameter
drilled shaft to permit possible inspection by CSL having regular internal
diameter, free of defects and obstructions, free from corrosion with
clean internal and external faces to ensure a good bond between the
concrete and the tubes, fit with a watertight shoe on the bottom and
removable cap on the top, extended to within 150mm of the bottom of
the drilled shaft to at least 1.0m above the top of the concrete and at
least 0.6m but not more than 1.5m above the ground surface including
materials, labour, tools and equipment necessary for unobstructed
passage of the probes during the CSL Testing.
MS Pipe (50mm dia, 2.35mm thick) 1.0000 m 407.00 407.00
50mm dia end cap 0.0667 each 74.00 4.94
50mm Dia MS Socket 0.1333 Nos. 150.00 20.00
PVC tape 0.1667 each 15.00 2.50
Construction Water 0.0042 KL 500.00 2.10
H.C. of Generator (150 KVA) 0.0042 day 5000.00 21.00
H.C. of Water Tanker (Truck Mounted) 0.0167 day 2500.00 41.75
Diesel 0.4583 liter 68.00 31.16
Foreman 0.0083 day 800.00 6.64
Re-bar Fabricator 0.0167 day 570.00 9.52
Skilled Labour 0.0250 day 450.00 11.25
Ordinary Labour 0.0500 day 370.00 18.50
Pump Operator 0.0042 day 500.00 2.10
Pump Operator Helper 0.0042 day 350.00 1.47

Subtotal-A: 579.92
MS pipe Thread 40mm long including Tools & ( +7.50 % on Subtotal-A ) 43.49
Equipment
Subtotal-A1: 623.42

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 635.89

Note : Rates of all items should be inclusive of all supply and carriage. Page: 473 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 699.48


VAT 6% of Total 46.63
IT 4% of Total 31.09
Total: 777.20

4.07.29 CSL (Crosshole Sonic Logging) Test: Conducting ultrasonic crosshole


testing for checking homogeneity, structural integrity, location of defects
(if any) of concrete in bored pile/ drilled shafts in accordance with ASTM
D 6760 (Standard Test Method for Integrity Testing of Concrete Deep
Foundation by Ultrasonic Crosshole Testing) providing all equipment,
experts, labour, mobilization, demobilization, data acquisition, analysis
software, integrity, interpolation, preparation of results in standard
forms etc. complete in all respects approved and accepted by the E-I-C.
The contractor shall provide a pleliminary report to the E-I-C within 72
hours after the CSL testing has been finished and furnish two copies of
the final CSL testing report sealed by the professional Geotechnical
Engineer within 10 working days of testing. The final report should
include CSL logs with analysis of the initial pulse arrival time versus
depth and pulse energy/ amplitude versus depth and summary of the
CSL test results which covers bored pile identification, test data, shaft
age at time of CSL testing, bored pile diameter, number of CSL tubes
tested, test length, average compression velocity & a drecription of
defects detected. Before commencing CSL test, Contractor shall submit
methodology with resumes of the consulting personnel for conducting
test to the E-I-C for approval. All CSL testing shall be performed and
analyzed under the supervison of a professional geotechnical engineer
registered in the Bangladesh Professional Engineers Registration Board
(BPERB), Institute of Engineers Bangladesh (IEB). The Testing firm will
be selected taking prior approval of procuring entity.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 474 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.29.01 Mobilization & demobilization within 100km of Dhaka/ nearby source to set
site and CSL Testing on 4 (four) nos. access tubes or less of a single
bored pile/drilled shafts
CSL: Mobilization, demobilization & accomodation including 4 1.0000 set 200000.00 200000.00
nos. CSL (Crosshole Sonic Logging)
Plumber/ Electric Mistry/ Painter 1.0000 day 680.00 680.00
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 1.0000 day 470.00 470.00
Operator

Subtotal-A: 201150.00
Reporting charges and consumables etc. ( +5.00 % on Subtotal-A ) 10057.50
Subtotal-A1: 211207.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 215431.65

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 236974.82


VAT 6% of Total 15798.32
IT 4% of Total 10532.21
Total: 263305.35

4.07.29.02 Additional charge on Mobilization & demobilization beyond 100km of Per Km


Dhaka/ nearby source to site
PIT/ CSL: Beyond 100km from Dhaka 1.0000 per km 35.00 35.00

Subtotal-A: 35.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 35.70

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 39.27


VAT 6% of Total 2.62
IT 4% of Total 1.75
Total: 43.63

Note : Rates of all items should be inclusive of all supply and carriage. Page: 475 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.07.29.03 CSL Testing on each additional access tube after 4(four) access tubes each
CSL: per CSL after 1st 4 nos. CSL 1.0000 each 40000.00 40000.00
Plumber/ Electric Mistry/ Painter 0.2500 day 680.00 170.00
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.2500 day 470.00 117.50
Operator

Subtotal-A: 40287.50
Reporting charges and consumables etc. ( +5.00 % on Subtotal-A ) 2014.38
Subtotal-A1: 42301.88

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 43147.91

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 47462.70


VAT 6% of Total 3164.18
IT 4% of Total 2109.45
Total: 52736.34

4.08.01 Sinking of Well as per specification through all types of strata namely
sandy soil, clayey soil and rock as shown against each case, including
drawing Foundation Wells true to position and plumb with dia under
cutting edge as mentioned below, including hire charges of all tools and
plants etc. and supplying power, dewatering etc., initial excavation of
earth complete as per drawing and technical specifications and direction
of the Engineer-in-charge including throwing the spoils clear off the well
up to 150m radius (Measurement to be taken in the following stages
from the level of the bottom of capping slab on well up to the bottom of
cutting edge) through any kind of soil including rocky soil and rock till
25% of cutting edge (linear) comes in contact with rock including
testing of bottom plug by dewatering the well upto 5 meters and
checking the rise in water level as per Specification. Depth of sinking is
reckoned from bed level.

4.08.01.01 Sinking of 6m external diameter well in Sandy Soil

Note : Rates of all items should be inclusive of all supply and carriage. Page: 476 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.01.01 Depth below bed level up to 3.0 m m


Mason 0.1200 day 550.00 66.00
Sareng 1.0000 day 570.00 570.00
Khalashi 2.0000 day 390.00 780.00
Hire & running charges of crane with grab bucket of 0.75 0.2500 day 12000.00 3000.00
cum capacity and accessories.

Subtotal-A: 4416.00
Consumables in sinking ( +10.00 % on Subtotal-A ) 441.60
Subtotal-A1: 4857.60

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4954.75

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 5450.23


VAT 6% of Total 363.35
IT 4% of Total 242.23
Total: 6055.81

Note : Rates of all items should be inclusive of all supply and carriage. Page: 477 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.01.02 Depth beyond 3.0 m up to 10.0 m m


Mason 0.1500 day 550.00 82.50
Sareng 1.2500 day 570.00 712.50
Khalashi 2.5000 day 390.00 975.00
Hire & running charges of crane with grab bucket of 0.75 0.3750 day 12000.00 4500.00
cum capacity and accessories.

Subtotal-A: 6270.00
Consumables in sinking ( +10.00 % on Subtotal-A ) 627.00
Subtotal-A1: 6897.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 7034.94

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 7738.43


VAT 6% of Total 515.90
IT 4% of Total 343.93
Total: 8598.26

4.08.01.01.03 Depth beyond 10.0 m up to 15.0 m m Add +16.00% with Item No 4.08.01.01.02

4.08.01.01.04 Depth beyond 15.0 m up to 20.0 m m Add +48.00% with Item No 4.08.01.01.02

4.08.01.01.05 Depth beyond 20.0 m up to 25.0 m m Add +145.00% with Item No 4.08.01.01.02
[Considering additional cost for Kentledge including supports, loading
arrangement and Labour.]

4.08.01.01.06 Depth beyond 25.0 m up to 30.0 m m Add +250.00% with Item No 4.08.01.01.02
[Considering additional cost for Kentledge including supports, loading
arrangement and Labour.]

4.08.01.01.07 Depth beyond 30.0 m m Add +440.00% with Item No 4.08.01.01.02


[Considering additional cost for Kentledge including supports, loading
arrangement and Labour.]

4.08.01.02 Sinking of 6m external diameter well in Clayey Soil

Note : Rates of all items should be inclusive of all supply and carriage. Page: 478 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.02.01 Depth below bed level up to 3.0 m m


Mason 0.1500 day 550.00 82.50
Sareng 1.5000 day 570.00 855.00
Khalashi 2.2500 day 390.00 877.50
Hire & running charges of crane with grab bucket of 0.75 0.3750 day 12000.00 4500.00
cum capacity and accessories.

Subtotal-A: 6315.00
Consumables in sinking ( +10.00 % on Subtotal-A ) 631.50
Subtotal-A1: 6946.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 7085.43

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 7793.97


VAT 6% of Total 519.60
IT 4% of Total 346.40
Total: 8659.97

Note : Rates of all items should be inclusive of all supply and carriage. Page: 479 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.02.02 Depth beyond 3.0 m up to 10.0 m m


Mason 0.3000 day 550.00 165.00
Sareng 3.0000 day 570.00 1710.00
Khalashi 4.5000 day 390.00 1755.00
Hire & running charges of crane with grab bucket of 0.75 0.7500 day 12000.00 9000.00
cum capacity and accessories.
Air Compressor 250 cfm with pneumatic breaker/ jack 0.2500 day 2500.00 625.00
hammer along with accessories.

Subtotal-A: 13255.00
Consumables in sinking ( +10.00 % on Subtotal-A ) 1325.50
Subtotal-A1: 14580.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 14872.11

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 16359.32


VAT 6% of Total 1090.62
IT 4% of Total 727.08
Total: 18177.02

4.08.01.02.03 Depth beyond 10.0 m up to 15.0 m m Add +20.00% with Item No 4.08.01.02.02

4.08.01.02.04 Depth beyond 15.0 m up to 20.0 m m Add +55.00% with Item No 4.08.01.02.02

4.08.01.02.05 Depth beyond 20.0 m up to 25.0 m m Add +160.00% with Item No 4.08.01.02.02
[Considering additional cost for Dewatering, Kentledge including
supports, loading arrangement and Labour.]

4.08.01.02.06 Depth beyond 25.0 m up to 30.0 m m Add +280.00% with Item No 4.08.01.02.02
[Considering additional cost for Dewatering, Kentledge including
supports, loading arrangement and Labour.]

4.08.01.02.07 Depth beyond 30.0 m m Add +460.00% with Item No 4.08.01.02.02


[Considering additional cost for Dewatering, Kentledge including
supports, loading arrangement and Labour.]

Note : Rates of all items should be inclusive of all supply and carriage. Page: 480 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.03 Sinking of 6m external diameter well in Soft Rock

4.08.01.03.01 Depth below bed level up to 3.0 m m


Mason 0.9200 day 550.00 506.00
Sareng 3.0000 day 570.00 1710.00
Khalashi 20.0000 day 390.00 7800.00
Operator 0.5000 day 570.00 285.00
Hire & running charges of crane with grab bucket of 0.75 0.5000 day 12000.00 6000.00
cum capacity and accessories.
Air Compressor 250 cfm with pneumatic breaker/ jack 0.4375 day 2500.00 1093.75
hammer along with accessories.

Subtotal-A: 17394.75
Consumables in sinking ( +10.00 % on Subtotal-A ) 1739.48
Cost for Dewatering ( +5.00 % on Subtotal-A ) 869.74
Subtotal-A1: 20003.96

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 20404.04

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 22444.45


VAT 6% of Total 1496.30
IT 4% of Total 997.53
Total: 24938.27

4.08.01.04 Sinking of 7m external diameter well in Sandy Soil

Note : Rates of all items should be inclusive of all supply and carriage. Page: 481 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.04.01 Depth below bed level up to 3.0 m m


Mason 0.1500 day 550.00 82.50
Sareng 1.2500 day 570.00 712.50
Khalashi 2.5000 day 390.00 975.00
Hire & running charges of crane with grab bucket of 0.75 0.4063 day 12000.00 4875.60
cum capacity and accessories.

Subtotal-A: 6645.60
Consumables in sinking ( +10.00 % on Subtotal-A ) 664.56
Subtotal-A1: 7310.16

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 7456.36

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 8202.00


VAT 6% of Total 546.80
IT 4% of Total 364.53
Total: 9113.33

Note : Rates of all items should be inclusive of all supply and carriage. Page: 482 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.04.02 Depth beyond 3.0 m up to 10.0 m m


Mason 0.1800 day 550.00 99.00
Sareng 1.5000 day 570.00 855.00
Khalashi 3.0000 day 390.00 1170.00
Hire & running charges of crane with grab bucket of 0.75 0.5625 day 12000.00 6750.00
cum capacity and accessories.

Subtotal-A: 8874.00
Consumables in sinking ( +10.00 % on Subtotal-A ) 887.40
Subtotal-A1: 9761.40

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9956.63

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 10952.29


VAT 6% of Total 730.15
IT 4% of Total 486.77
Total: 12169.21

4.08.01.04.03 Depth beyond 10.0 m up to 15.0 m m Add +16.00% with Item No 4.08.01.04.02

4.08.01.04.04 Depth beyond 15.0 m up to 20.0 m m Add +48.00% with Item No 4.08.01.04.02

4.08.01.04.05 Depth beyond 20.0 m up to 25.0 m m Add +145.00% with Item No 4.08.01.04.02
[Considering additional cost for Kentledge including supports, loading
arrangement and Labour.]

4.08.01.04.06 Depth beyond 25.0 m up to 30.0 m m Add +250.00% with Item No 4.08.01.04.02
[Considering additional cost for Kentledge including supports, loading
arrangement and Labour.]

4.08.01.04.07 Depth beyond 30.0 m m Add +440.00% with Item No 4.08.01.04.02


[Considering additional cost for Kentledge including supports, loading
arrangement and Labour.]

4.08.01.05 Sinking of 7m external diameter well in Clayey Soil

Note : Rates of all items should be inclusive of all supply and carriage. Page: 483 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.05.01 Depth below bed level up to 3.0 m m


Mason 0.1800 day 550.00 99.00
Sareng 1.5000 day 570.00 855.00
Khalashi 3.0000 day 390.00 1170.00
Hire & running charges of crane with grab bucket of 0.75 0.5625 day 12000.00 6750.00
cum capacity and accessories.

Subtotal-A: 8874.00
Consumables in sinking ( +10.00 % on Subtotal-A ) 887.40
Subtotal-A1: 9761.40

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9956.63

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 10952.29


VAT 6% of Total 730.15
IT 4% of Total 486.77
Total: 12169.21

Note : Rates of all items should be inclusive of all supply and carriage. Page: 484 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.05.02 Depth beyond 3.0 m up to 10.0 m m


Mason 0.2600 day 550.00 143.00
Sareng 2.0000 day 570.00 1140.00
Khalashi 4.0000 day 390.00 1560.00
Hire & running charges of crane with grab bucket of 0.75 0.7500 day 12000.00 9000.00
cum capacity and accessories.
Air Compressor 250 cfm with pneumatic breaker/ jack 0.4063 day 2500.00 1015.75
hammer along with accessories.

Subtotal-A: 12858.75
Consumables in sinking ( +10.00 % on Subtotal-A ) 1285.88
Subtotal-A1: 14144.63

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 14427.52

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 15870.27


VAT 6% of Total 1058.02
IT 4% of Total 705.35
Total: 17633.63

4.08.01.05.03 Depth beyond 10.0 m up to 15.0 m m Add +20.00% with Item No 4.08.01.05.02

4.08.01.05.04 Depth beyond 15.0 m up to 20.0 m m Add +55.00% with Item No 4.08.01.05.02

4.08.01.05.05 Depth beyond 20.0 m up to 25.0 m m Add +160.00% with Item No 4.08.01.05.02
[Considering additional cost for Dewatering, Kentledge including
supports, loading arrangement and Labour.]

4.08.01.05.06 Depth beyond 25.0 m up to 30.0 m m Add +280.00% with Item No 4.08.01.05.02
[Considering additional cost for Dewatering, Kentledge including
supports, loading arrangement and Labour.]

4.08.01.05.07 Depth beyond 30.0 m m Add +460.00% with Item No 4.08.01.05.02


[Considering additional cost for Dewatering, Kentledge including
supports, loading arrangement and Labour.]

Note : Rates of all items should be inclusive of all supply and carriage. Page: 485 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.06 Sinking of 7m external diameter well in Soft Rock

4.08.01.06.01 Depth below bed level up to 3.0 m m


Mason 0.5800 day 550.00 319.00
Sareng 4.0000 day 570.00 2280.00
Khalashi 10.0000 day 390.00 3900.00
Operator 0.7500 day 570.00 427.50
Hire & running charges of crane with grab bucket of 0.75 0.5625 day 12000.00 6750.00
cum capacity and accessories.
Air Compressor 250 cfm with pneumatic breaker/ jack 0.4688 day 2500.00 1172.00
hammer along with accessories.

Subtotal-A: 14848.50
Consumables in sinking ( +10.00 % on Subtotal-A ) 1484.85
Cost for Dewatering ( +5.00 % on Subtotal-A ) 742.43
Subtotal-A1: 17075.78

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 17417.29

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 19159.02


VAT 6% of Total 1277.27
IT 4% of Total 851.51
Total: 21287.80

4.08.01.07 Sinking of 8m external diameter well in Sandy Soil

Note : Rates of all items should be inclusive of all supply and carriage. Page: 486 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.07.01 Depth below bed level up to 3.0 m m


Mason 0.1800 day 550.00 99.00
Sareng 1.5000 day 570.00 855.00
Khalashi 3.0000 day 390.00 1170.00
Hire & running charges of crane with grab bucket of 0.75 0.5000 day 12000.00 6000.00
cum capacity and accessories.

Subtotal-A: 8124.00
Consumables in sinking ( +10.00 % on Subtotal-A ) 812.40
Subtotal-A1: 8936.40

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9115.13

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 10026.64


VAT 6% of Total 668.44
IT 4% of Total 445.63
Total: 11140.71

Note : Rates of all items should be inclusive of all supply and carriage. Page: 487 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.07.02 Depth beyond 3.0 m up to 10.0 m m


Mason 0.2500 day 550.00 137.50
Sareng 1.7500 day 570.00 997.50
Khalashi 3.5000 day 390.00 1365.00
Hire & running charges of crane with grab bucket of 0.75 0.6250 day 12000.00 7500.00
cum capacity and accessories.

Subtotal-A: 10000.00
Consumables in sinking ( +10.00 % on Subtotal-A ) 1000.00
Subtotal-A1: 11000.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11220.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12342.00


VAT 6% of Total 822.80
IT 4% of Total 548.53
Total: 13713.33

4.08.01.07.03 Depth beyond 10.0 m up to 15.0 m m Add +16.00% with Item No 4.08.01.07.02

4.08.01.07.04 Depth beyond 15.0 m up to 20.0 m m Add +48.00% with Item No 4.08.01.07.02

4.08.01.07.05 Depth beyond 20.0 m up to 25.0 m m Add +145.00% with Item No 4.08.01.07.02
[Considering additional cost for Kentledge including supports, loading
arrangement and Labour.]

4.08.01.07.06 Depth beyond 25.0 m up to 30.0 m m Add +250.00% with Item No 4.08.01.07.02
[Considering additional cost for Kentledge including supports, loading
arrangement and Labour.]

4.08.01.07.07 Depth beyond 30.0 m m Add +440.00% with Item No 4.08.01.07.02


[Considering additional cost for Kentledge including supports, loading
arrangement and Labour.]

4.08.01.08 Sinking of 8m external diameter well in Clayey Soil

Note : Rates of all items should be inclusive of all supply and carriage. Page: 488 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.08.01 Depth below bed level up to 3.0 m m


Mason 0.2200 day 550.00 121.00
Sareng 2.0000 day 570.00 1140.00
Khalashi 3.5000 day 390.00 1365.00
Hire & running charges of crane with grab bucket of 0.75 0.6875 day 12000.00 8250.00
cum capacity and accessories.

Subtotal-A: 10876.00
Consumables in sinking ( +10.00 % on Subtotal-A ) 1087.60
Subtotal-A1: 11963.60

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12202.87

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 13423.16


VAT 6% of Total 894.88
IT 4% of Total 596.58
Total: 14914.62

Note : Rates of all items should be inclusive of all supply and carriage. Page: 489 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.08.02 Depth beyond 3.0 m up to 10.0 m m


Mason 0.3200 day 550.00 176.00
Sareng 2.5000 day 570.00 1425.00
Khalashi 4.5000 day 390.00 1755.00
Hire & running charges of crane with grab bucket of 0.75 0.7500 day 12000.00 9000.00
cum capacity and accessories.
Air Compressor 250 cfm with pneumatic breaker/ jack 0.4063 day 2500.00 1015.75
hammer along with accessories.

Subtotal-A: 13371.75
Consumables in sinking ( +10.00 % on Subtotal-A ) 1337.18
Subtotal-A1: 14708.93

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 15003.10

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 16503.41


VAT 6% of Total 1100.23
IT 4% of Total 733.49
Total: 18337.13

4.08.01.08.03 Depth beyond 10.0 m up to 15.0 m m Add +20.00% with Item No 4.08.01.08.02
[Considering additional cost for Dewatering]

4.08.01.08.04 Depth beyond 15.0 m up to 20.0 m m Add +55.00% with Item No 4.08.01.08.02
[Considering additional cost for Dewatering]

4.08.01.08.05 Depth beyond 20.0 m up to 25.0 m m Add +160.00% with Item No 4.08.01.08.02
[Considering additional cost for Dewatering, Kentledge including
supports, loading arrangement and Labour.]

4.08.01.08.06 Depth beyond 25.0 m up to 30.0 m m Add +280.00% with Item No 4.08.01.08.02
[Considering additional cost for Dewatering, Kentledge including
supports, loading arrangement and Labour.]

Note : Rates of all items should be inclusive of all supply and carriage. Page: 490 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.08.07 Depth beyond 30.0 m m Add +460.00% with Item No 4.08.01.08.02


[Considering additional cost for Dewatering, Kentledge including
supports, loading arrangement and Labour.]

4.08.01.09 Sinking of 8m external diameter well in Soft Rock

4.08.01.09.01 Depth below bed level up to 3.0 m m


Mason 0.6800 day 550.00 374.00
Sareng 4.0000 day 570.00 2280.00
Khalashi 12.0000 day 390.00 4680.00
Operator 1.0000 day 570.00 570.00
Hire & running charges of crane with grab bucket of 0.75 0.6250 day 12000.00 7500.00
cum capacity and accessories.
Air Compressor 250 cfm with pneumatic breaker/ jack 0.4688 day 2500.00 1172.00
hammer along with accessories.

Subtotal-A: 16576.00
Consumables in sinking ( +10.00 % on Subtotal-A ) 1657.60
Cost for Dewatering ( +5.00 % on Subtotal-A ) 828.80
Subtotal-A1: 19062.40

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 19443.65

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 21388.01


VAT 6% of Total 1425.87
IT 4% of Total 950.58
Total: 23764.46

4.08.01.10 Sinking of 9m external diameter well in Sandy Soil

Note : Rates of all items should be inclusive of all supply and carriage. Page: 491 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.10.01 Depth below bed level up to 3.0 m m


Mason 0.1900 day 550.00 104.50
Sareng 1.5000 day 570.00 855.00
Khalashi 3.2500 day 390.00 1267.50
Hire & running charges of crane with grab bucket of 0.75 0.5000 day 12000.00 6000.00
cum capacity and accessories.

Subtotal-A: 8227.00
Consumables in sinking ( +10.00 % on Subtotal-A ) 822.70
Subtotal-A1: 9049.70

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9230.69

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 10153.76


VAT 6% of Total 676.92
IT 4% of Total 451.28
Total: 11281.96

Note : Rates of all items should be inclusive of all supply and carriage. Page: 492 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.10.02 Depth beyond 3.0 m up to 10.0 m m


Mason 0.2700 day 550.00 148.50
Sareng 1.7500 day 570.00 997.50
Khalashi 4.0000 day 390.00 1560.00
Hire & running charges of crane with grab bucket of 0.75 0.6875 day 12000.00 8250.00
cum capacity and accessories.

Subtotal-A: 10956.00
Consumables in sinking ( +10.00 % on Subtotal-A ) 1095.60
Subtotal-A1: 12051.60

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12292.63

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 13521.90


VAT 6% of Total 901.46
IT 4% of Total 600.97
Total: 15024.33

4.08.01.10.03 Depth beyond 10.0 m up to 15.0 m m Add +16.00% with Item No 4.08.01.10.02

4.08.01.10.04 Depth beyond 15.0 m up to 20.0 m m Add +48.00% with Item No 4.08.01.10.02

4.08.01.10.05 Depth beyond 20.0 m up to 25.0 m m Add +145.00% with Item No 4.08.01.10.02
[Considering additional cost for Kentledge including supports, loading
arrangement and Labour.]

4.08.01.10.06 Depth beyond 25.0 m up to 30.0 m m Add +250.00% with Item No 4.08.01.10.02
[Considering additional cost for Kentledge including supports, loading
arrangement and Labour.]

4.08.01.10.07 Depth beyond 30.0 m m Add +440.00% with Item No 4.08.01.10.02


[Considering additional cost for Kentledge including supports, loading
arrangement and Labour.]

4.08.01.11 Sinking of 9m external diameter well in Clayey Soil

Note : Rates of all items should be inclusive of all supply and carriage. Page: 493 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.11.01 Depth below bed level up to 3.0 m m


Mason 0.2400 day 550.00 132.00
Sareng 2.2500 day 570.00 1282.50
Khalashi 3.7500 day 390.00 1462.50
Hire & running charges of crane with grab bucket of 0.75 0.7188 day 12000.00 8625.60
cum capacity and accessories.

Subtotal-A: 11502.60
Consumables in sinking ( +10.00 % on Subtotal-A ) 1150.26
Subtotal-A1: 12652.86

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12905.92

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 14196.51


VAT 6% of Total 946.43
IT 4% of Total 630.96
Total: 15773.90

Note : Rates of all items should be inclusive of all supply and carriage. Page: 494 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.11.02 Depth beyond 3.0 m up to 10.0 m m


Mason 0.3400 day 550.00 187.00
Sareng 2.5000 day 570.00 1425.00
Khalashi 5.0000 day 390.00 1950.00
Hire & running charges of crane with grab bucket of 0.75 0.8125 day 12000.00 9750.00
cum capacity and accessories.
Air Compressor 250 cfm with pneumatic breaker/ jack 0.4688 day 2500.00 1172.00
hammer along with accessories.

Subtotal-A: 14484.00
Consumables in sinking ( +10.00 % on Subtotal-A ) 1448.40
+.
Subtotal-A1: 15932.40

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 16251.05

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 17876.15


VAT 6% of Total 1191.74
IT 4% of Total 794.50
Total: 19862.39

4.08.01.11.03 Depth beyond 10.0 m up to 15.0 m m Add +20.00% with Item No 4.08.01.11.02
[Considering additional cost for Dewatering]

4.08.01.11.04 Depth beyond 15.0 m up to 20.0 m m Add +55.00% with Item No 4.08.01.11.02
[Considering additional cost for Dewatering]

4.08.01.11.05 Depth beyond 20.0 m up to 25.0 m m Add +160.00% with Item No 4.08.01.11.02
[Considering additional cost for Dewatering, Kentledge including
supports, loading arrangement and Labour.]

4.08.01.11.06 Depth beyond 25.0 m up to 30.0 m m Add +280.00% with Item No 4.08.01.11.02
[Considering additional cost for Dewatering, Kentledge including
supports, loading arrangement and Labour.]

Note : Rates of all items should be inclusive of all supply and carriage. Page: 495 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.11.07 Depth beyond 30.0 m m Add +460.00% with Item No 4.08.01.11.02


[Considering additional cost for Dewatering, Kentledge including
supports, loading arrangement and Labour.]

4.08.01.12 Sinking of 9m external diameter well in Soft Rock

4.08.01.12.01 Depth below bed level up to 3.0 m m


Mason 0.7600 day 550.00 418.00
Sareng 4.0000 day 570.00 2280.00
Khalashi 14.0000 day 390.00 5460.00
Operator 1.2000 day 570.00 684.00
Hire & running charges of crane with grab bucket of 0.75 0.8125 day 12000.00 9750.00
cum capacity and accessories.
Air Compressor 250 cfm with pneumatic breaker/ jack 0.5000 day 2500.00 1250.00
hammer along with accessories.

Subtotal-A: 19842.00
Consumables in sinking ( +10.00 % on Subtotal-A ) 1984.20
Cost for Dewatering ( +5.00 % on Subtotal-A ) 992.10
Subtotal-A1: 22818.30

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 23274.67

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 25602.13


VAT 6% of Total 1706.81
IT 4% of Total 1137.87
Total: 28446.81

4.08.01.13 Sinking of 10m external diameter well in Sandy Soil

Note : Rates of all items should be inclusive of all supply and carriage. Page: 496 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.13.01 Depth below bed level up to 3.0 m m


Mason 0.2000 day 550.00 110.00
Sareng 1.5000 day 570.00 855.00
Khalashi 3.5000 day 390.00 1365.00
Hire & running charges of crane with grab bucket of 0.75 0.6250 day 12000.00 7500.00
cum capacity and accessories.

Subtotal-A: 9830.00
Consumables in sinking ( +10.00 % on Subtotal-A ) 983.00
Subtotal-A1: 10813.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11029.26

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12132.19


VAT 6% of Total 808.81
IT 4% of Total 539.21
Total: 13480.21

Note : Rates of all items should be inclusive of all supply and carriage. Page: 497 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.13.02 Depth beyond 3.0 m up to 10.0 m m


Mason 0.3100 day 550.00 170.50
Sareng 2.0000 day 570.00 1140.00
Khalashi 4.2500 day 390.00 1657.50
Hire & running charges of crane with grab bucket of 0.75 0.7188 day 12000.00 8625.60
cum capacity and accessories.

Subtotal-A: 11593.60
Consumables in sinking ( +10.00 % on Subtotal-A ) 1159.36
Subtotal-A1: 12752.96

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 13008.02

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 14308.82


VAT 6% of Total 953.92
IT 4% of Total 635.95
Total: 15898.69

4.08.01.13.03 Depth beyond 10.0 m up to 15.0 m m Add +16.00% with Item No 4.08.01.13.02

4.08.01.13.04 Depth beyond 15.0 m up to 20.0 m m Add +48.00% with Item No 4.08.01.13.02

4.08.01.13.05 Depth beyond 20.0 m up to 25.0 m m Add +145.00% with Item No 4.08.01.13.02
[Considering additional cost for Kentledge including supports, loading
arrangement and Labour.]

4.08.01.13.06 Depth beyond 25.0 m up to 30.0 m m Add +250.00% with Item No 4.08.01.13.02
[Considering additional cost for Kentledge including supports, loading
arrangement and Labour.]

4.08.01.13.07 Depth beyond 30.0 m m Add +440.00% with Item No 4.08.01.13.02


[Considering additional cost for Kentledge including supports, loading
arrangement and Labour.]

4.08.01.14 Sinking of 10m external diameter well in Clayey Soil

Note : Rates of all items should be inclusive of all supply and carriage. Page: 498 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.14.01 Depth below bed level up to 3.0 m m


Mason 0.2500 day 550.00 137.50
Sareng 2.5000 day 570.00 1425.00
Khalashi 5.5000 day 390.00 2145.00
Hire & running charges of crane with grab bucket of 0.75 0.7500 day 12000.00 9000.00
cum capacity and accessories.

Subtotal-A: 12707.50
Consumables in sinking ( +10.00 % on Subtotal-A ) 1270.75
Subtotal-A1: 13978.25

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 14257.82

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 15683.60


VAT 6% of Total 1045.57
IT 4% of Total 697.05
Total: 17426.22

Note : Rates of all items should be inclusive of all supply and carriage. Page: 499 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.14.02 Depth beyond 3.0 m up to 10.0 m m


Mason 0.4000 day 550.00 220.00
Sareng 3.0000 day 570.00 1710.00
Khalashi 5.5000 day 390.00 2145.00
Hire & running charges of crane with grab bucket of 0.75 0.7500 day 12000.00 9000.00
cum capacity and accessories.
Air Compressor 250 cfm with pneumatic breaker/ jack 0.5000 day 2500.00 1250.00
hammer along with accessories.

Subtotal-A: 14325.00
Consumables in sinking ( +10.00 % on Subtotal-A ) 1432.50
Subtotal-A1: 15757.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 16072.65

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 17679.92


VAT 6% of Total 1178.66
IT 4% of Total 785.77
Total: 19644.35

4.08.01.14.03 Depth beyond 10.0 m up to 15.0 m m Add +20.00% with Item No 4.08.01.14.02
[Considering additional cost for Dewatering]

4.08.01.14.04 Depth beyond 15.0 m up to 20.0 m m Add +55.00% with Item No 4.08.01.14.02
[Considering additional cost for Dewatering]

4.08.01.14.05 Depth beyond 20.0 m up to 25.0 m m Add +160.00% with Item No 4.08.01.14.02
[Considering additional cost for Dewatering, Kentledge including
supports, loading arrangement and Labour.]

4.08.01.14.06 Depth beyond 25.0 m up to 30.0 m m Add +280.00% with Item No 4.08.01.14.02
[Considering additional cost for Dewatering, Kentledge including
supports, loading arrangement and Labour.]

Note : Rates of all items should be inclusive of all supply and carriage. Page: 500 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.14.07 Depth beyond 30.0 m m Add +460.00% with Item No 4.08.01.14.02


[Considering additional cost for Dewatering, Kentledge including
supports, loading arrangement and Labour.]

4.08.01.15 Sinking of 10m external diameter well in Soft Rock

4.08.01.15.01 Depth below bed level up to 3.0 m m


Mason 0.8600 day 550.00 473.00
Sareng 4.0000 day 570.00 2280.00
Khalashi 16.0000 day 390.00 6240.00
Operator 1.4000 day 570.00 798.00
Hire & running charges of crane with grab bucket of 0.75 0.8750 day 12000.00 10500.00
cum capacity and accessories.
Air Compressor 250 cfm with pneumatic breaker/ jack 0.5313 day 2500.00 1328.25
hammer along with accessories.

Subtotal-A: 21619.25
Consumables in sinking ( +10.00 % on Subtotal-A ) 2161.93
Cost for Dewatering ( +5.00 % on Subtotal-A ) 1080.96
Subtotal-A1: 24862.14

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 25359.38

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 27895.32


VAT 6% of Total 1859.69
IT 4% of Total 1239.79
Total: 30994.80

4.08.01.16 Sinking of 11m external diameter well in Sandy Soil

Note : Rates of all items should be inclusive of all supply and carriage. Page: 501 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.16.01 Depth below bed level up to 3.0 m m


Mason 0.4200 day 550.00 231.00
Sareng 3.0000 day 570.00 1710.00
Khalashi 6.6000 day 390.00 2574.00
Hire & running charges of crane with grab bucket of 0.75 1.5000 day 12000.00 18000.00
cum capacity and accessories.

Subtotal-A: 22515.00
Consumables in sinking ( +10.00 % on Subtotal-A ) 2251.50
Subtotal-A1: 24766.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 25261.83

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 27788.01


VAT 6% of Total 1852.53
IT 4% of Total 1235.02
Total: 30875.57

Note : Rates of all items should be inclusive of all supply and carriage. Page: 502 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.16.02 Depth beyond 3.0 m up to 10.0 m m


Mason 0.6400 day 550.00 352.00
Sareng 4.0000 day 570.00 2280.00
Khalashi 9.0000 day 390.00 3510.00
Hire & running charges of crane with grab bucket of 0.75 1.0000 day 12000.00 12000.00
cum capacity and accessories.

Subtotal-A: 18142.00
Consumables in sinking ( +10.00 % on Subtotal-A ) 1814.20
Subtotal-A1: 19956.20

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 20355.32

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 22390.86


VAT 6% of Total 1492.72
IT 4% of Total 995.15
Total: 24878.73

4.08.01.16.03 Depth beyond 10.0 m up to 15.0 m m Add +16.00% with Item No 4.08.01.16.02

4.08.01.16.04 Depth beyond 15.0 m up to 20.0 m m Add +48.00% with Item No 4.08.01.16.02

4.08.01.16.05 Depth beyond 20.0 m up to 25.0 m m Add +145.00% with Item No 4.08.01.16.02
[Considering additional cost for Kentledge including supports, loading
arrangement and Labour.]

4.08.01.16.06 Depth beyond 25.0 m up to 30.0 m m Add +250.00% with Item No 4.08.01.16.02
[Considering additional cost for Kentledge including supports, loading
arrangement and Labour.]

4.08.01.16.07 Depth beyond 30.0 m m Add +440.00% with Item No 4.08.01.16.02


[Considering additional cost for Kentledge including supports, loading
arrangement and Labour.]

4.08.01.17 Sinking of 11m external diameter well in Clayey Soil

Note : Rates of all items should be inclusive of all supply and carriage. Page: 503 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.17.01 Depth below bed level up to 3.0 m m


Mason 0.5200 day 550.00 286.00
Sareng 5.0000 day 570.00 2850.00
Khalashi 8.0000 day 390.00 3120.00
Hire & running charges of crane with grab bucket of 0.75 1.2500 day 12000.00 15000.00
cum capacity and accessories.

Subtotal-A: 21256.00
Consumables in sinking ( +10.00 % on Subtotal-A ) 2125.60
Subtotal-A1: 23381.60

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 23849.23

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 26234.16


VAT 6% of Total 1748.94
IT 4% of Total 1165.96
Total: 29149.06

Note : Rates of all items should be inclusive of all supply and carriage. Page: 504 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.17.02 Depth beyond 3.0 m up to 10.0 m m


Mason 0.8600 day 550.00 473.00
Sareng 7.0000 day 570.00 3990.00
Khalashi 11.5000 day 390.00 4485.00
Hire & running charges of crane with grab bucket of 0.75 1.5000 day 12000.00 18000.00
cum capacity and accessories.
Air Compressor 250 cfm with pneumatic breaker/ jack 1.0625 day 2500.00 2656.25
hammer along with accessories.

Subtotal-A: 29604.25
Consumables in sinking ( +10.00 % on Subtotal-A ) 2960.43
Subtotal-A1: 32564.68

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 33215.97

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 36537.57


VAT 6% of Total 2435.84
IT 4% of Total 1623.89
Total: 40597.29

4.08.01.17.03 Depth beyond 10.0 m up to 15.0 m m Add +20.00% with Item No 4.08.01.17.02
[Considering additional cost for Dewatering]

4.08.01.17.04 Depth beyond 15.0 m up to 20.0 m m Add +55.00% with Item No 4.08.01.17.02
[Considering additional cost for Dewatering]

4.08.01.17.05 Depth beyond 20.0 m up to 25.0 m m Add +160.00% with Item No 4.08.01.17.02
[Considering additional cost for Dewatering, Kentledge including
supports, loading arrangement and Labour.]

4.08.01.17.06 Depth beyond 25.0 m up to 30.0 m m Add +280.00% with Item No 4.08.01.17.02
[Considering additional cost for Dewatering, Kentledge including
supports, loading arrangement and Labour.]

Note : Rates of all items should be inclusive of all supply and carriage. Page: 505 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.17.07 Depth beyond 30.0 m m Add +460.00% with Item No 4.08.01.17.02


[Considering additional cost for Dewatering, Kentledge including
supports, loading arrangement and Labour.]

4.08.01.18 Sinking of 11m external diameter well in Soft Rock

4.08.01.18.01 Depth below bed level up to 3.0 m m


Mason 1.9000 day 550.00 1045.00
Sareng 8.5000 day 570.00 4845.00
Khalashi 36.0000 day 390.00 14040.00
Operator 3.0000 day 570.00 1710.00
Hire & running charges of crane with grab bucket of 0.75 2.0000 day 12000.00 24000.00
cum capacity and accessories.
Air Compressor 250 cfm with pneumatic breaker/ jack 1.1250 day 2500.00 2812.50
hammer along with accessories.

Subtotal-A: 48452.50
Consumables in sinking ( +10.00 % on Subtotal-A ) 4845.25
Cost for Dewatering ( +5.00 % on Subtotal-A ) 2422.63
Subtotal-A1: 55720.38

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 56834.78

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 62518.26


VAT 6% of Total 4167.88
IT 4% of Total 2778.59
Total: 69464.73

4.08.01.19 Sinking of 12m external diameter well in Sandy Soil

Note : Rates of all items should be inclusive of all supply and carriage. Page: 506 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.19.01 Depth below bed level up to 3.0 m m


Mason 0.8800 day 550.00 484.00
Sareng 7.0000 day 570.00 3990.00
Khalashi 16.0000 day 390.00 6240.00
Hire & running charges of crane with grab bucket of 0.75 3.0000 day 12000.00 36000.00
cum capacity and accessories.

Subtotal-A: 46714.00
Consumables in sinking ( +10.00 % on Subtotal-A ) 4671.40
Subtotal-A1: 51385.40

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 52413.11

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 57654.42


VAT 6% of Total 3843.63
IT 4% of Total 2562.42
Total: 64060.47

Note : Rates of all items should be inclusive of all supply and carriage. Page: 507 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.19.02 Depth beyond 3.0 m up to 10.0 m m


Mason 1.4800 day 550.00 814.00
Sareng 10.0000 day 570.00 5700.00
Khalashi 19.0000 day 390.00 7410.00
Hire & running charges of crane with grab bucket of 0.75 3.2500 day 12000.00 39000.00
cum capacity and accessories.

Subtotal-A: 52924.00
Consumables in sinking ( +10.00 % on Subtotal-A ) 5292.40
Subtotal-A1: 58216.40

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 59380.73

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 65318.80


VAT 6% of Total 4354.59
IT 4% of Total 2903.06
Total: 72576.45

4.08.01.19.03 Depth beyond 10.0 m up to 15.0 m m Add +16.00% with Item No 4.08.01.19.02

4.08.01.19.04 Depth beyond 15.0 m up to 20.0 m m Add +48.00% with Item No 4.08.01.19.02

4.08.01.19.05 Depth beyond 20.0 m up to 25.0 m m Add +145.00% with Item No 4.08.01.19.02
[Considering additional cost for Kentledge including supports, loading
arrangement and Labour.]

4.08.01.19.06 Depth beyond 25.0 m up to 30.0 m m Add +250.00% with Item No 4.08.01.19.02
[Considering additional cost for Kentledge including supports, loading
arrangement and Labour.]

4.08.01.19.07 Depth beyond 30.0 m m Add +440.00% with Item No 4.08.01.19.02


[Considering additional cost for Kentledge including supports, loading
arrangement and Labour.]

4.08.01.20 Sinking of 12m external diameter well in Clayey Soil

Note : Rates of all items should be inclusive of all supply and carriage. Page: 508 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.20.01 Depth below bed level up to 3.0 m m


Mason 1.2000 day 550.00 660.00
Sareng 12.0000 day 570.00 6840.00
Khalashi 18.0000 day 390.00 7020.00
Hire & running charges of crane with grab bucket of 0.75 3.1250 day 12000.00 37500.00
cum capacity and accessories.

Subtotal-A: 52020.00
Consumables in sinking ( +10.00 % on Subtotal-A ) 5202.00
Subtotal-A1: 57222.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 58366.44

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 64203.08


VAT 6% of Total 4280.21
IT 4% of Total 2853.47
Total: 71336.76

Note : Rates of all items should be inclusive of all supply and carriage. Page: 509 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.20.02 Depth beyond 3.0 m up to 10.0 m m


Mason 1.9200 day 550.00 1056.00
Sareng 15.0000 day 570.00 8550.00
Khalashi 24.0000 day 390.00 9360.00
Hire & running charges of crane with grab bucket of 0.75 4.1650 day 12000.00 49980.00
cum capacity and accessories.
Air Compressor 250 cfm with pneumatic breaker/ jack 2.2500 day 2500.00 5625.00
hammer along with accessories.

Subtotal-A: 74571.00
Consumables in sinking ( +10.00 % on Subtotal-A ) 7457.10
Subtotal-A1: 82028.10

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 83668.66

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 92035.53


VAT 6% of Total 6135.70
IT 4% of Total 4090.47
Total: 102261.70

4.08.01.20.03 Depth beyond 10.0 m up to 15.0 m m Add +20.00% with Item No 4.08.01.20.02
[Considering additional cost for Dewatering]

4.08.01.20.04 Depth beyond 15.0 m up to 20.0 m m Add +55.00% with Item No 4.08.01.20.02
[Considering additional cost for Dewatering]

4.08.01.20.05 Depth beyond 20.0 m up to 25.0 m m Add +160.00% with Item No 4.08.01.20.02
[Considering additional cost for Dewatering, Kentledge including
supports, loading arrangement and Labour.]

4.08.01.20.06 Depth beyond 25.0 m up to 30.0 m m Add +280.00% with Item No 4.08.01.20.02
[Considering additional cost for Dewatering, Kentledge including
supports, loading arrangement and Labour.]

Note : Rates of all items should be inclusive of all supply and carriage. Page: 510 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.01.20.07 Depth beyond 30.0 m m Add +460.00% with Item No 4.08.01.20.02


[Considering additional cost for Dewatering, Kentledge including
supports, loading arrangement and Labour.]

4.08.01.21 Sinking of 12m external diameter well in Soft Rock

4.08.01.21.01 Depth below bed level up to 3.0 m m


Mason 4.2400 day 550.00 2332.00
Sareng 18.0000 day 570.00 10260.00
Khalashi 80.0000 day 390.00 31200.00
Operator 7.0000 day 570.00 3990.00
Hire & running charges of crane with grab bucket of 0.75 5.0000 day 12000.00 60000.00
cum capacity and accessories.
Air Compressor 250 cfm with pneumatic breaker/ jack 2.3750 day 2500.00 5937.50
hammer along with accessories.

Subtotal-A: 113719.50
Consumables in sinking ( +10.00 % on Subtotal-A ) 11371.95
Cost for Dewatering ( +5.00 % on Subtotal-A ) 5685.98
Subtotal-A1: 130777.43

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 133392.97

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 146732.27


VAT 6% of Total 9782.15
IT 4% of Total 6521.43
Total: 163035.86

Note : Rates of all items should be inclusive of all supply and carriage. Page: 511 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.02 Sinking of Twin D Type Well as per specification through all types of
strata namely sandy soil, clayey soil and rock as shown against each
case, including drawing Foundation Wells true to position and plumb
with dia under cutting edge as mentioned below, including hire charges
of all tools and plants etc. and supplying power, dewatering etc., initial
excavation of earth complete as per drawing and technical specifications
and direction of the Engineer-in-charge including throwing the spoils
clear off the well up to 150m radius (Measurement to be taken in the
following stages from the level of the bottom of capping slab on well up
to the bottom of cutting edge). Depth of sinking is reckoned from bed
level.

4.08.02.01 Sinking of 8m external diameter well in Sandy Soil

4.08.02.01.01 Depth below bed level up to 3.0 m m


Mason 0.2000 day 550.00 110.00
Sareng 1.2500 day 570.00 712.50
Khalashi 3.7500 day 390.00 1462.50
Hire & running charges of crane with grab bucket of 0.75 0.6875 day 12000.00 8250.00
cum capacity and accessories.

Subtotal-A: 10535.00
Consumables in sinking ( +10.00 % on Subtotal-A ) 1053.50
Subtotal-A1: 11588.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11820.27

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 13002.30


VAT 6% of Total 866.82
IT 4% of Total 577.88
Total: 14447.00

Note : Rates of all items should be inclusive of all supply and carriage. Page: 512 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.02.01.02 Depth beyond 3.0 m up to 10.0 m m


Mason 0.3000 day 550.00 165.00
Sareng 1.5000 day 570.00 855.00
Khalashi 4.0000 day 390.00 1560.00
Hire & running charges of crane with grab bucket of 0.75 0.7350 day 12000.00 8820.00
cum capacity and accessories.

Subtotal-A: 11400.00
Consumables in sinking ( +10.00 % on Subtotal-A ) 1140.00
Subtotal-A1: 12540.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12790.80

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 14069.88


VAT 6% of Total 937.99
IT 4% of Total 625.33
Total: 15633.20

4.08.02.01.03 Depth beyond 10.0 m up to 15.0 m m Add +16.00% with Item No 4.08.02.01.02

4.08.02.01.04 Depth beyond 15.0 m up to 20.0 m m Add +48.00% with Item No 4.08.02.01.02

4.08.02.01.05 Depth beyond 20.0 m up to 25.0 m m Add +145.00% with Item No 4.08.02.01.02
[Considering additional cost for Kentledge including supports, loading
arrangement and Labour.]

4.08.02.01.06 Depth beyond 25.0 m up to 30.0 m m Add +250.00% with Item No 4.08.02.01.02
[Considering additional cost for Kentledge including supports, loading
arrangement and Labour.]

4.08.02.01.07 Depth beyond 30.0 m m Add +440.00% with Item No 4.08.02.01.02


[Considering additional cost for Kentledge including supports, loading
arrangement and Labour.]

4.08.02.02 Sinking of 8m external diameter well in Clayey Soil

Note : Rates of all items should be inclusive of all supply and carriage. Page: 513 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.02.02.01 Depth below bed level up to 3.0 m m


Mason 0.2600 day 550.00 143.00
Sareng 2.5000 day 570.00 1425.00
Khalashi 4.0000 day 390.00 1560.00
Hire & running charges of crane with grab bucket of 0.75 0.7813 day 12000.00 9375.60
cum capacity and accessories.

Subtotal-A: 12503.60
Consumables in sinking ( +10.00 % on Subtotal-A ) 1250.36
Subtotal-A1: 13753.96

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 14029.04

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 15431.94


VAT 6% of Total 1028.80
IT 4% of Total 685.86
Total: 17146.60

Note : Rates of all items should be inclusive of all supply and carriage. Page: 514 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.02.02.02 Depth beyond 3.0 m up to 10.0 m m


Mason 0.4500 day 550.00 247.50
Sareng 3.2500 day 570.00 1852.50
Khalashi 6.0000 day 390.00 2340.00
Hire & running charges of crane with grab bucket of 0.75 0.8338 day 12000.00 10005.60
cum capacity and accessories.
Air Compressor 250 cfm with pneumatic breaker/ jack 0.5625 day 2500.00 1406.25
hammer along with accessories.

Subtotal-A: 15851.85
Consumables in sinking ( +10.00 % on Subtotal-A ) 1585.19
Subtotal-A1: 17437.04

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 17785.78

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 19564.35


VAT 6% of Total 1304.29
IT 4% of Total 869.53
Total: 21738.17

4.08.02.02.03 Depth beyond 10.0 m up to 15.0 m m Add +20.00% with Item No 4.08.02.02.02

4.08.02.02.04 Depth beyond 15.0 m up to 20.0 m m Add +55.00% with Item No 4.08.02.02.02

4.08.02.02.05 Depth beyond 20.0 m up to 25.0 m m Add +160.00% with Item No 4.08.02.02.02
[Considering additional cost for Dewatering, Kentledge including
supports, loading arrangement and Labour.]

4.08.02.02.06 Depth beyond 25.0 m up to 30.0 m m Add +280.00% with Item No 4.08.02.02.02
[Considering additional cost for Dewatering, Kentledge including
supports, loading arrangement and Labour.]

4.08.02.02.07 Depth beyond 30.0 m m Add +460.00% with Item No 4.08.02.02.02


[Considering additional cost for Dewatering, Kentledge including
supports, loading arrangement and Labour.]

Note : Rates of all items should be inclusive of all supply and carriage. Page: 515 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.02.03 Sinking of 8m external diameter well in Soft Rock

4.08.02.03.01 Depth below bed level up to 3.0 m m


Mason 0.8600 day 550.00 473.00
Sareng 4.5000 day 570.00 2565.00
Khalashi 15.0000 day 390.00 5850.00
Operator 1.5000 day 570.00 855.00
Hire & running charges of crane with grab bucket of 0.75 1.0413 day 12000.00 12495.60
cum capacity and accessories.
Air Compressor 250 cfm with pneumatic breaker/ jack 0.7500 day 2500.00 1875.00
hammer along with accessories.

Subtotal-A: 24113.60
Consumables in sinking ( +10.00 % on Subtotal-A ) 2411.36
Cost for Dewatering ( +5.00 % on Subtotal-A ) 1205.68
Subtotal-A1: 27730.64

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 28285.25

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 31113.78


VAT 6% of Total 2074.25
IT 4% of Total 1382.83
Total: 34570.86

Note : Rates of all items should be inclusive of all supply and carriage. Page: 516 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.03 SL: Providing Steel liner 10 mm thick for Curbs and 6 mm thick for MT
Steining of Wells including fabrication and setting out as per detailed
drawing, specification and direction of Engineer-in-Charge.
Corrosion resistant Structural steel 1050.0000 kg 58.00 60900.00
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 1.2400 day 470.00 582.80
Operator
Fitter 6.0000 day 680.00 4080.00
Blacksmith 5.0000 day 450.00 2250.00
Welder 5.0000 day 680.00 3400.00
Ordinary Labour 10.0000 day 370.00 3700.00

Subtotal-A: 74912.80
Electrodes, gas cutting and other consumables ( +5.00 % on Subtotal-A ) 3745.64
Subtotal-A1: 78658.44

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 80231.61

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 88254.77


VAT 6% of Total 5883.65
IT 4% of Total 3922.43
Total: 98060.86

Note : Rates of all items should be inclusive of all supply and carriage. Page: 517 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.04 SCE: Providing and laying Steel Cutting edge weighing not less than 40 MT
kg per metre for Well foundation including cost & carriage of all
materials complete as per drawing, specification and direction of
Engineer-in-charge.
Corrosion resistant Structural steel 1050.0000 kg 58.00 60900.00
Nails/ Nut bolts/ Screw/ Spikes 20.0000 kg 65.00 1300.00
Fitter 5.5000 day 680.00 3740.00
Blacksmith 5.5000 day 450.00 2475.00
Welder 5.5000 day 680.00 3740.00
Skilled Labour 1.3200 day 450.00 594.00
Ordinary Labour 16.5000 day 370.00 6105.00

Subtotal-A: 78854.00
Electrodes, gas cutting and other consumables ( +10.00 % on Subtotal-A ) 7885.40
Subtotal-A1: 86739.40

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 88474.19

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 97321.61


VAT 6% of Total 6488.11
IT 4% of Total 4325.40
Total: 108135.12

4.08.05 PCC/RCC_WF: Plain/ Reinforced Cement Concrete, in Well foundation


with coarse aggregates of appropriate nominal size and grading, fine
aggregate (sand) conforming to proper grading zone, both of approved
quality, cement and water reducing admixtures, as necessary, including
labour, cost and carriage of all materials and including preparation of
design mix, approval of the same by the Engineer-in-Charge and cost
for quality control, sampling, testing etc. all complete as per drawing
and technical specification including the cost of necessary form work
and staging complete.

4.08.05.01 In well curb

Note : Rates of all items should be inclusive of all supply and carriage. Page: 518 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.05.01.01 RCC-17BCCM : Compressive strength, f'c = 17 MPa MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-
II/A-L/M/V/W 42.5N, sand of minimum FM 1.8 and 20mm down well
graded crushed picked brick chips (LAA <=38)
[Using Concrete Mixture]
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0500 bag 430.00 2601.50
1st Class Picked Brick Chips (20mm down graded) 0.5200 m3 2940.00 1528.80
1st Class Brick Chips (10mm down graded) 0.3400 m3 3049.00 1036.66
Sand (FM - 1.8) 0.4300 m3 970.00 417.10
Mason 0.1000 day 550.00 55.00
Skilled Labour 0.0500 day 450.00 22.50
Ordinary Labour 1.3330 day 370.00 493.21
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
H.C. of Generator (40 KVA) 0.0600 day 2500.00 150.00

Subtotal-A: 6376.77
Formwork ( +20.00 % on Subtotal-A ) 1275.35
Subtotal-A1: 7652.12

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 7805.17

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 8585.68


VAT 6% of Total 572.38
IT 4% of Total 381.59
Total: 9539.65

Note : Rates of all items should be inclusive of all supply and carriage. Page: 519 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.05.01.02 RCC-20SCCM : Compressive strength, f'c = 20 MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-
II/A-L/M/V/W 42.5N, sand of minimum FM 2.2 and 20mm down well
graded crushed stone chips (LAA <=35), water reducing admixture of
complying type A under ASTM C 494
[Using Concrete Mixture]
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0500 bag 430.00 2601.50
Stone Chips (20mm down graded) [LAA≤35] 0.5200 cum 4930.00 2563.60
Stone Chips (12mm down graded) [LAA≤35] 0.3400 cum 4320.00 1468.80
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Water reducing chemical admixture : Type-A 1.2100 liter 130.00 157.30
Mason 0.1000 day 550.00 55.00
Skilled Labour 0.0573 day 450.00 25.79
Ordinary Labour 1.3333 day 370.00 493.32
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0500 day 1200.00 60.00
H.C. of Generator (40 KVA) 0.0500 day 2500.00 125.00

Subtotal-A: 8104.15
Formwork ( +20.00 % on Subtotal-A ) 1620.83
Subtotal-A1: 9724.98

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9919.47

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 10911.42


VAT 6% of Total 727.43
IT 4% of Total 484.95
Total: 12123.80

Note : Rates of all items should be inclusive of all supply and carriage. Page: 520 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.05.01.03 RCC-20SCBP : Compressive strength, f'c = 20 MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-
II/A-L/M/V/W 42.5N, sand of minimum FM 2.2 and 20mm down well
graded crushed stone chips (LAA <=35),, water reducing admixture of
complying type A under ASTM C 494
[Using Batching Plant, Transit Mixer & Concrete Pump]
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0500 bag 430.00 2601.50
Stone Chips (20mm down graded) [LAA≤35] 0.5200 cum 4930.00 2563.60
Stone Chips (12mm down graded) [LAA≤35] 0.3400 cum 4320.00 1468.80
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Water reducing chemical admixture : Type-A 1.2100 liter 130.00 157.30
Mason 0.0250 day 550.00 13.75
Skilled Labour 0.0070 day 450.00 3.15
Ordinary Labour 0.1500 day 370.00 55.50
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0156 day 10000.00 156.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)

Subtotal-A: 7809.69
Formwork ( +20.00 % on Subtotal-A ) 1561.94
Subtotal-A1: 9371.63

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9559.06

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 10514.97


VAT 6% of Total 701.00

Note : Rates of all items should be inclusive of all supply and carriage. Page: 521 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

IT 4% of Total 467.33
Total: 11683.30

4.08.05.01.04 RCC-25SCCM : Compressive strength, f'c = 25 MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-
II/A-L/M/V/W 42.5N, sand of minimum FM 2.5 and 20mm down well
graded crushed stone chips (LAA <=30), high range water reducing
admixture of complying type F under ASTM C 494
[Using Concrete Mixture]
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 1.9275 liter 160.00 308.40
Mason 0.1000 day 550.00 55.00
Skilled Labour 0.0573 day 450.00 25.79
Ordinary Labour 1.3333 day 370.00 493.32
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0500 day 1200.00 60.00
H.C. of Generator (40 KVA) 0.0500 day 2500.00 125.00

Subtotal-A: 9079.71
Formwork ( +20.00 % on Subtotal-A ) 1815.94
Subtotal-A1: 10895.65

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11113.56

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12224.92


VAT 6% of Total 814.99
IT 4% of Total 543.33
Total: 13583.24

Note : Rates of all items should be inclusive of all supply and carriage. Page: 522 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.05.01.05 RCC-25SCBP : Compressive strength, f'c = 25 MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-
II/A-L/M/V/W 42.5N, sand of minimum FM 2.5 and 20mm down well
graded crushed stone chips (LAA <=30), high range water reducing
admixture of complying type F under ASTM C 494
[Using Batching Plant, Transit Mixer & Concrete Pump]
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 1.9275 liter 160.00 308.40
Mason 0.0250 day 550.00 13.75
Skilled Labour 0.0070 day 450.00 3.15
Ordinary Labour 0.1500 day 370.00 55.50
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0156 day 10000.00 156.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)

Subtotal-A: 8785.25
Formwork ( +20.00 % on Subtotal-A ) 1757.05
Subtotal-A1: 10542.30

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10753.15

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 11828.46


VAT 6% of Total 788.56
IT 4% of Total 525.71

Note : Rates of all items should be inclusive of all supply and carriage. Page: 523 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 13142.73

4.08.05.01.06 RCC-30SCCM : Compressive strength, f'c = 30 MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-I
52.5N, sand of minimum FM 2.5 and 20mm down well graded crushed
stone chips (LAA <=30), high range water reducing admixture of
complying type F under ASTM C 494.
[Using Concrete Mixture]
Ordinary Portland Cement (CEM I, 52.5N) 8.6000 bag 455.00 3913.00
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Mason 0.1000 day 550.00 55.00
Skilled Labour 0.0573 day 450.00 25.79
Ordinary Labour 1.3333 day 370.00 493.32
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0500 day 1200.00 60.00
H.C. of Generator (40 KVA) 0.0500 day 2500.00 125.00

Subtotal-A: 9713.01
Formwork ( +20.00 % on Subtotal-A ) 1942.60
Subtotal-A1: 11655.61

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11888.72

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 13077.59


VAT 6% of Total 871.84
IT 4% of Total 581.23
Total: 14530.66

Note : Rates of all items should be inclusive of all supply and carriage. Page: 524 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.05.01.07 RCC-30SCBP : Compressive strength, f'c = 30 MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-I
52.5N, high range water reducing admixture of complying type F under
ASTM C 494, sand of minimum FM 2.5 and 20mm down well graded
crushed stone chips (LAA <=30).
[Using Batching Plant, Transit Mixer & Concrete Pump]
Ordinary Portland Cement (CEM I, 52.5N) 8.6000 bag 455.00 3913.00
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Mason 0.0250 day 550.00 13.75
Skilled Labour 0.0070 day 450.00 3.15
Ordinary Labour 0.1500 day 370.00 55.50
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0156 day 10000.00 156.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)

Subtotal-A: 9418.55
Formwork ( +20.00 % on Subtotal-A ) 1883.71
Subtotal-A1: 11302.26

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11528.31

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12681.14


VAT 6% of Total 845.41
IT 4% of Total 563.61

Note : Rates of all items should be inclusive of all supply and carriage. Page: 525 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 14090.15

4.08.05.02 In well steining

4.08.05.02.01 RCC-17BCCM : Compressive strength, f'c = 17 MPa MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-
II/A-L/M/V/W 42.5N, sand of minimum FM 1.8 and 20mm down well
graded crushed picked brick chips (LAA <=38)
[Using Concrete Mixture]
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0500 bag 430.00 2601.50
1st Class Picked Brick Chips (20mm down graded) 0.5200 m3 2940.00 1528.80
1st Class Brick Chips (10mm down graded) 0.3400 m3 3049.00 1036.66
Sand (FM - 1.8) 0.4300 m3 970.00 417.10
Mason 0.1000 day 550.00 55.00
Skilled Labour 0.0500 day 450.00 22.50
Ordinary Labour 1.3330 day 370.00 493.21
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
H.C. of Generator (40 KVA) 0.0600 day 2500.00 150.00

Subtotal-A: 6376.77
Formwork ( +10.00 % on Subtotal-A ) 637.68
Subtotal-A1: 7014.45

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 7154.74

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 7870.21


VAT 6% of Total 524.68
IT 4% of Total 349.79
Total: 8744.68

Note : Rates of all items should be inclusive of all supply and carriage. Page: 526 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.05.02.02 RCC-20SCCM : Compressive strength, f'c = 20 MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-
II/A-L/M/V/W 42.5N, sand of minimum FM 2.2 and 20mm down well
graded crushed stone chips (LAA <=35), water reducing admixture of
complying type A under ASTM C 494
[Using Concrete Mixture]
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0500 bag 430.00 2601.50
Stone Chips (20mm down graded) [LAA≤35] 0.5200 cum 4930.00 2563.60
Stone Chips (12mm down graded) [LAA≤35] 0.3400 cum 4320.00 1468.80
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Water reducing chemical admixture : Type-A 1.2100 liter 130.00 157.30
Mason 0.1000 day 550.00 55.00
Skilled Labour 0.0573 day 450.00 25.79
Ordinary Labour 1.3333 day 370.00 493.32
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0500 day 1200.00 60.00
H.C. of Generator (40 KVA) 0.0500 day 2500.00 125.00

Subtotal-A: 8104.15
Formwork ( +10.00 % on Subtotal-A ) 810.41
Subtotal-A1: 8914.56

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9092.85

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 10002.14


VAT 6% of Total 666.81
IT 4% of Total 444.54
Total: 11113.49

Note : Rates of all items should be inclusive of all supply and carriage. Page: 527 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.05.02.03 RCC-20SCBP : Compressive strength, f'c = 20 MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-
II/A-L/M/V/W 42.5N, sand of minimum FM 2.2 and 20mm down well
graded crushed stone chips (LAA <=35),, water reducing admixture of
complying type A under ASTM C 494
[Using Batching Plant, Transit Mixer & Concrete Pump]
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0500 bag 430.00 2601.50
Stone Chips (20mm down graded) [LAA≤35] 0.5200 cum 4930.00 2563.60
Stone Chips (12mm down graded) [LAA≤35] 0.3400 cum 4320.00 1468.80
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Water reducing chemical admixture : Type-A 1.2100 liter 130.00 157.30
Mason 0.0250 day 550.00 13.75
Skilled Labour 0.0070 day 450.00 3.15
Ordinary Labour 0.1500 day 370.00 55.50
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0156 day 10000.00 156.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)

Subtotal-A: 7809.69
Formwork ( +10.00 % on Subtotal-A ) 780.97
Subtotal-A1: 8590.66

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 8762.47

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 9638.72


VAT 6% of Total 642.58

Note : Rates of all items should be inclusive of all supply and carriage. Page: 528 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

IT 4% of Total 428.39
Total: 10709.69

4.08.05.02.04 RCC-25SCCM : Compressive strength, f'c = 25 MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-
II/A-L/M/V/W 42.5N, high range water reducing admixture of complying
type F under ASTM C 494, sand of minimum FM 2.5 and 20mm down
well graded crushed stone chips (LAA <=30).
[Using Concrete Mixture]
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 1.9275 liter 160.00 308.40
Mason 0.1000 day 550.00 55.00
Skilled Labour 0.0573 day 450.00 25.79
Ordinary Labour 1.3333 day 370.00 493.32
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0500 day 1200.00 60.00
H.C. of Generator (40 KVA) 0.0500 day 2500.00 125.00

Subtotal-A: 9079.71
Formwork ( +10.00 % on Subtotal-A ) 907.97
Subtotal-A1: 9987.68

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10187.43

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 11206.17


VAT 6% of Total 747.08
IT 4% of Total 498.05
Total: 12451.30

Note : Rates of all items should be inclusive of all supply and carriage. Page: 529 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.05.02.05 RCC-25SCBP : Compressive strength, f'c = 25 MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-
II/A-L/M/V/W 42.5N, high range water reducing admixture of complying
type F under ASTM C 494, sand of minimum FM 2.5 and 20mm down
well graded crushed stone chips (LAA <=30).
[Using Batching Plant, Transit Mixer & Concrete Pump]
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 1.9275 liter 160.00 308.40
Mason 0.0250 day 550.00 13.75
Skilled Labour 0.0070 day 450.00 3.15
Ordinary Labour 0.1500 day 370.00 55.50
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0156 day 10000.00 156.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)

Subtotal-A: 8785.25
Formwork ( +10.00 % on Subtotal-A ) 878.53
Subtotal-A1: 9663.78

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9857.05

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 10842.76


VAT 6% of Total 722.85
IT 4% of Total 481.90

Note : Rates of all items should be inclusive of all supply and carriage. Page: 530 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 12047.51

4.08.05.02.06 RCC-30SCCM : Compressive strength, f'c = 30 MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-I
52.5N, high range water reducing admixture of complying type F under
ASTM C 494, sand of minimum FM 2.5 and 20mm down well graded
crushed stone chips (LAA <=30).
[Using Concrete Mixture]
Ordinary Portland Cement (CEM I, 52.5N) 8.6000 bag 455.00 3913.00
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Mason 0.1000 day 550.00 55.00
Skilled Labour 0.0573 day 450.00 25.79
Ordinary Labour 1.3333 day 370.00 493.32
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0500 day 1200.00 60.00
H.C. of Generator (40 KVA) 0.0500 day 2500.00 125.00

Subtotal-A: 9713.01
Formwork ( +10.00 % on Subtotal-A ) 971.30
Subtotal-A1: 10684.31

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10897.99

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 11987.79


VAT 6% of Total 799.19
IT 4% of Total 532.79
Total: 13319.77

Note : Rates of all items should be inclusive of all supply and carriage. Page: 531 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.05.02.07 RCC-30SCBP : Compressive strength, f'c = 30 MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-I
52.5N, high range water reducing admixture of complying type F under
ASTM C 494, sand of minimum FM 2.5 and 20mm down well graded
crushed stone chips (LAA <=30).
[Using Batching Plant, Transit Mixer & Concrete Pump]
Ordinary Portland Cement (CEM I, 52.5N) 8.6000 bag 455.00 3913.00
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Mason 0.0250 day 550.00 13.75
Skilled Labour 0.0070 day 450.00 3.15
Ordinary Labour 0.1500 day 370.00 55.50
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0156 day 10000.00 156.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)

Subtotal-A: 9418.55
Formwork ( +10.00 % on Subtotal-A ) 941.86
Subtotal-A1: 10360.41

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10567.61

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 11624.37


VAT 6% of Total 774.96
IT 4% of Total 516.64

Note : Rates of all items should be inclusive of all supply and carriage. Page: 532 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 12915.97

Note : Rates of all items should be inclusive of all supply and carriage. Page: 533 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.05.02.09 RCC-35SCBP : Compressive strength, f'c = 35 MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-I
52.5N, high range water reducing admixture of complying type F under
ASTM C 494, sand of minimum FM 2.8 and 20mm down well graded
crushed stone chips (LAA <=25).
[Using Batching Plant, Transit Mixer & Concrete Pump]
Ordinary Portland Cement (CEM I, 52.5N) 9.0000 bag 455.00 4095.00
Stone Chips (20mm down graded) [LAA≤25] 0.4900 cum 5730.00 2807.70
Stone Chips (12mm down graded) [LAA≤25] 0.3300 cum 4640.00 1531.20
Sand (FM - 2.8) 0.4100 m3 1602.00 656.82
Water-reducing high range chemical admixture : Type-F 2.2500 liter 160.00 360.00
Mason 0.0250 day 550.00 13.75
Skilled Labour 0.0070 day 450.00 3.15
Ordinary Labour 0.1500 day 370.00 55.50
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0156 day 10000.00 156.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)

Subtotal-A: 9915.37
Formwork ( +10.00 % on Subtotal-A ) 991.54
Subtotal-A1: 10906.91

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11125.05

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12237.55


VAT 6% of Total 815.84
IT 4% of Total 543.89

Note : Rates of all items should be inclusive of all supply and carriage. Page: 534 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 13597.28

4.08.05.03 In Bottom Plug


[Concrete to be placed using tremie pipe, 10% extra cement is included
in these unit rates.]

Note : Rates of all items should be inclusive of all supply and carriage. Page: 535 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.05.03.01 PCC-17BCCM : Compressive strength, f'c = 17 MPa MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-
II/A-L/M/V/W 42.5N, sand of minimum FM 1.8 and 40mm down well
graded crushed picked brick chips (LAA <=38)
[Using Concrete Mixture]
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.6550 bag 430.00 2861.65
1st Class/ Picked Brick chips (40mm down graded) 0.3440 m3 2786.00 958.38
1st Class Picked Brick Chips (20mm down graded) 0.3440 m3 2940.00 1011.36
1st Class Brick Chips (10mm down graded) 0.1720 m3 3049.00 524.43
Sand (FM - 1.8) 0.4300 m3 970.00 417.10
Water reducing chemical admixture : Type-A 1.6638 liter 130.00 216.29
Mason 0.1000 day 550.00 55.00
Skilled Labour 0.0600 day 450.00 27.00
Ordinary Labour 1.3333 day 370.00 493.32
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0500 day 1200.00 60.00
H.C. of Generator (40 KVA) 0.0500 day 2500.00 125.00
Hire and running charges of light crane for lowering 0.0500 day 4500.00 225.00
reinforcement cage & operating tremie pipe

Subtotal-A: 6974.54
Cost of foming sump, protective bunds, chiselling ( +5.00 % on Subtotal-A ) 348.73
and making arrangement for under water
concreting with tremie pipe.
Subtotal-A1: 7323.26

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 7469.73

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 8216.70


VAT 6% of Total 547.78
IT 4% of Total 365.19
Total: 9129.67

Note : Rates of all items should be inclusive of all supply and carriage. Page: 536 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.05.03.02 PCC-20SCCM : Compressive strength, f'c = 20 MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-
II/A-L/M/V/W 42.5N, water reducing admixture of complying type A
under ASTM C 494, sand of minimum FM 2.2 and 38mm down well
graded crushed stone chips (LAA <=35).
[Using Concrete Mixture]
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.6550 bag 430.00 2861.65
Stone Chips (38mm down graded) [LAA≤35] 0.3440 cum 4850.00 1668.40
Stone Chips (20mm down graded) [LAA≤35] 0.3440 cum 4930.00 1695.92
Stone Chips (12mm down graded) [LAA≤35] 0.1720 cum 4320.00 743.04
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Water reducing chemical admixture : Type-A 1.3310 liter 130.00 173.03
Mason 0.1000 day 550.00 55.00
Skilled Labour 0.0600 day 450.00 27.00
Ordinary Labour 1.3333 day 370.00 493.32
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0500 day 1200.00 60.00
H.C. of Generator (40 KVA) 0.0500 day 2500.00 125.00
Hire and running charges of light crane for lowering 0.0500 day 4500.00 225.00
reinforcement cage & operating tremie pipe

Subtotal-A: 8681.20
Cost of foming sump, protective bunds, chiselling ( +5.00 % on Subtotal-A ) 434.06
and making arrangement for under water
concreting with tremie pipe.
Subtotal-A1: 9115.26

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9297.57

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 10227.32


VAT 6% of Total 681.82
IT 4% of Total 454.55

Note : Rates of all items should be inclusive of all supply and carriage. Page: 537 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 11363.69

Note : Rates of all items should be inclusive of all supply and carriage. Page: 538 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.05.03.03 PCC-20SCBP : Compressive strength, f'c = 20 MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-
II/A-L/M/V/W 42.5N, water reducing admixture of complying type A
under ASTM C 494, sand of minimum FM 2.2 and 38mm down well
graded crushed stone chips (LAA <=35).
[Using Batching Plant, Transit Mixer & Crane/ Concrete Pump]
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.6550 bag 430.00 2861.65
Stone Chips (38mm down graded) [LAA≤35] 0.3440 cum 4850.00 1668.40
Stone Chips (20mm down graded) [LAA≤35] 0.3440 cum 4930.00 1695.92
Stone Chips (12mm down graded) [LAA≤35] 0.1720 cum 4320.00 743.04
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Water reducing chemical admixture : Type-A 1.3310 liter 130.00 173.03
Mason 0.0250 day 550.00 13.75
Skilled Labour 0.0073 day 450.00 3.29
Ordinary Labour 0.1500 day 370.00 55.50
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0156 day 10000.00 156.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)

Subtotal-A: 8160.67
Cost of foming sump, protective bunds, chiselling ( +5.00 % on Subtotal-A ) 408.03
and making arrangement for under water
concreting with tremie pipe.
Subtotal-A1: 8568.70

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 8740.07
Note : Rates of all items should be inclusive of all supply and carriage. Page: 539 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 9614.08


VAT 6% of Total 640.94
IT 4% of Total 427.29
Total: 10682.31

Note : Rates of all items should be inclusive of all supply and carriage. Page: 540 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.05.03.04 PCC-25SCCM : Compressive strength, f'c = 25 MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-
II/A-L/M/V/W 42.5N, high range water reducing admixture of complying
type F under ASTM C 494, sand of minimum FM 2.5 and 38mm down
well graded crushed stone chips (LAA <=30).
[Using Concrete Mixture]
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 8.4810 bag 430.00 3646.83
Stone Chips (38mm down graded) [LAA≤30] 0.3280 cum 5230.00 1715.44
Stone Chips (20mm down graded) [LAA≤30] 0.3280 m3 5320.00 1744.96
Stone Chips (12mm down graded) [LAA≤30] 0.1640 m3 4470.00 733.08
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 2.1203 liter 160.00 339.25
Mason 0.1000 day 550.00 55.00
Skilled Labour 0.0600 day 450.00 27.00
Ordinary Labour 1.3333 day 370.00 493.32
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0500 day 1200.00 60.00
H.C. of Generator (40 KVA) 0.0500 day 2500.00 125.00
Hire and running charges of light crane for lowering 0.0500 day 4500.00 225.00
reinforcement cage & operating tremie pipe

Subtotal-A: 9779.88
Cost of foming sump, protective bunds, chiselling ( +5.00 % on Subtotal-A ) 488.99
and making arrangement for under water
concreting with tremie pipe.
Subtotal-A1: 10268.87

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10474.25

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 11521.68


VAT 6% of Total 768.11
IT 4% of Total 512.07
Total: 12801.86

Note : Rates of all items should be inclusive of all supply and carriage. Page: 541 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.05.03.05 PCC-25SCBP : Compressive strength, f'c = 25 MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-
II/A-L/M/V/W 42.5N, high range water reducing admixture of complying
type F under ASTM C 494, sand of minimum FM 2.5 and 38mm down
well graded crushed stone chips (LAA <=30).
[Using Batching Plant, Transit Mixer & Crane/ Concrete Pump]
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 8.4810 bag 430.00 3646.83
Stone Chips (38mm down graded) [LAA≤30] 0.3280 cum 5230.00 1715.44
Stone Chips (20mm down graded) [LAA≤30] 0.3280 m3 5320.00 1744.96
Stone Chips (12mm down graded) [LAA≤30] 0.1640 m3 4470.00 733.08
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 2.1203 liter 160.00 339.25
Mason 0.0250 day 550.00 13.75
Skilled Labour 0.0073 day 450.00 3.29
Ordinary Labour 0.1500 day 370.00 55.50
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0156 day 10000.00 156.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)

Subtotal-A: 9259.34
Cost of foming sump, protective bunds, chiselling ( +5.00 % on Subtotal-A ) 462.97
and making arrangement for under water
concreting with tremie pipe.
Subtotal-A1: 9722.31

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9916.76

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 10908.43


Note : Rates of all items should be inclusive of all supply and carriage. Page: 542 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

VAT 6% of Total 727.23


IT 4% of Total 484.82
Total: 12120.48

Note : Rates of all items should be inclusive of all supply and carriage. Page: 543 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.05.03.06 RCC-30SCCM : Compressive strength, f'c = 30 MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-I
52.5N, high range water reducing admixture of complying type F under
ASTM C 494, sand of minimum FM 2.5 and 38mm down well graded
crushed stone chips (LAA <=30).
[Using Concrete Mixture]
Ordinary Portland Cement (CEM I, 52.5N) 9.4600 bag 455.00 4304.30
Stone Chips (38mm down graded) [LAA≤30] 0.3280 cum 5230.00 1715.44
Stone Chips (20mm down graded) [LAA≤30] 0.3280 m3 5320.00 1744.96
Stone Chips (12mm down graded) [LAA≤30] 0.1640 m3 4470.00 733.08
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 2.3650 liter 160.00 378.40
Mason 0.1000 day 550.00 55.00
Skilled Labour 0.0573 day 450.00 25.79
Ordinary Labour 1.3333 day 370.00 493.32
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0500 day 1200.00 60.00
H.C. of Generator (40 KVA) 0.0500 day 2500.00 125.00
Hire and running charges of light crane for lowering 0.0500 day 4500.00 225.00
reinforcement cage & operating tremie pipe

Subtotal-A: 10475.29
Cost of foming sump, protective bunds, chiselling ( +5.00 % on Subtotal-A ) 523.76
and making arrangement for under water
concreting with tremie pipe.
Subtotal-A1: 10999.05

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11219.03

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12340.93


VAT 6% of Total 822.73
IT 4% of Total 548.49
Total: 13712.15

Note : Rates of all items should be inclusive of all supply and carriage. Page: 544 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.05.03.07 PCC-30SCBP : Compressive strength, f'c = 35 Mpa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-I
52.5N, high range water reducing admixture of complying type F under
ASTM C 494, sand of minimum FM 2.5 and 38mm down well graded
crushed stone chips (LAA <=25).
[Using Batching Plant, Transit Mixer & Crane/ Concrete Pump]
Ordinary Portland Cement (CEM I, 52.5N) 9.4600 bag 455.00 4304.30
Stone Chips (38mm down graded) [LAA≤30] 0.3280 cum 5230.00 1715.44
Stone Chips (20mm down graded) [LAA≤30] 0.3280 m3 5320.00 1744.96
Stone Chips (12mm down graded) [LAA≤30] 0.1640 m3 4470.00 733.08
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 2.3650 liter 160.00 378.40
Mason 0.0250 day 550.00 13.75
Skilled Labour 0.0073 day 450.00 3.29
Ordinary Labour 0.1500 day 370.00 55.50
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0063 day 10000.00 63.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)

Subtotal-A: 9862.97
Cost of foming sump, protective bunds, chiselling ( +5.00 % on Subtotal-A ) 493.15
and making arrangement for under water
concreting with tremie pipe.
Subtotal-A1: 10356.11

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10563.24

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 11619.56


Note : Rates of all items should be inclusive of all supply and carriage. Page: 545 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

VAT 6% of Total 774.64


IT 4% of Total 516.42
Total: 12910.62

4.08.05.04 In Intermediate Plug


[Concrete to be placed using tremie pipe, 10% extra cement is included
in these unit rates.]

Note : Rates of all items should be inclusive of all supply and carriage. Page: 546 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.05.04.01 PCC-17BCCM : Compressive strength, f'c = 17 MPa MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-
II/A-L/M/V/W 42.5N, sand of minimum FM 1.8 and 40mm down well
graded crushed picked brick chips (LAA <=38)
[Using Concrete Mixture]
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.6550 bag 430.00 2861.65
1st Class/ Picked Brick chips (40mm down graded) 0.3440 m3 2786.00 958.38
1st Class Picked Brick Chips (20mm down graded) 0.3440 m3 2940.00 1011.36
1st Class Brick Chips (10mm down graded) 0.1720 m3 3049.00 524.43
Sand (FM - 1.8) 0.4300 m3 970.00 417.10
Water reducing chemical admixture : Type-A 1.6638 liter 130.00 216.29
Mason 0.1000 day 550.00 55.00
Skilled Labour 0.0600 day 450.00 27.00
Ordinary Labour 1.3333 day 370.00 493.32
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0500 day 1200.00 60.00
H.C. of Generator (40 KVA) 0.0500 day 2500.00 125.00
Hire and running charges of light crane for lowering 0.0500 day 4500.00 225.00
reinforcement cage & operating tremie pipe

Subtotal-A: 6974.54

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 7114.03

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 7825.43


VAT 6% of Total 521.70
IT 4% of Total 347.80
Total: 8694.92

Note : Rates of all items should be inclusive of all supply and carriage. Page: 547 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.05.04.02 PCC-20SCCM : Compressive strength, f'c = 20 MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-
II/A-L/M/V/W 42.5N, water reducing admixture of complying type A
under ASTM C 494, sand of minimum FM 2.2 and 38mm down well
graded crushed stone chips (LAA <=35).
[Using Concrete Mixture]
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.6550 bag 430.00 2861.65
Stone Chips (38mm down graded) [LAA≤35] 0.3440 cum 4850.00 1668.40
Stone Chips (20mm down graded) [LAA≤35] 0.3440 cum 4930.00 1695.92
Stone Chips (12mm down graded) [LAA≤35] 0.1720 cum 4320.00 743.04
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Water reducing chemical admixture : Type-A 1.3310 liter 130.00 173.03
Mason 0.1000 day 550.00 55.00
Skilled Labour 0.0600 day 450.00 27.00
Ordinary Labour 1.3333 day 370.00 493.32
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0500 day 1200.00 60.00
H.C. of Generator (40 KVA) 0.0500 day 2500.00 125.00
Hire and running charges of light crane for lowering 0.0500 day 4500.00 225.00
reinforcement cage & operating tremie pipe

Subtotal-A: 8681.20

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 8854.83

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 9740.31


VAT 6% of Total 649.35
IT 4% of Total 432.90
Total: 10822.56

Note : Rates of all items should be inclusive of all supply and carriage. Page: 548 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.05.04.03 PCC-20SCBP : Compressive strength, f'c = 20 MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-
II/A-L/M/V/W 42.5N, water reducing admixture of complying type A
under ASTM C 494, sand of minimum FM 2.2 and 38mm down well
graded crushed stone chips (LAA <=35).
[Using Batching Plant, Transit Mixer & Crane/ Concrete Pump]
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.6550 bag 430.00 2861.65
Stone Chips (38mm down graded) [LAA≤35] 0.3440 cum 4850.00 1668.40
Stone Chips (20mm down graded) [LAA≤35] 0.3440 cum 4930.00 1695.92
Stone Chips (12mm down graded) [LAA≤35] 0.1720 cum 4320.00 743.04
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Water reducing chemical admixture : Type-A 1.3310 liter 130.00 173.03
Mason 0.0250 day 550.00 13.75
Skilled Labour 0.0073 day 450.00 3.29
Ordinary Labour 0.1500 day 370.00 55.50
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0156 day 10000.00 156.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)

Subtotal-A: 8160.67

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 8323.88

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 9156.27


VAT 6% of Total 610.42
IT 4% of Total 406.95

Note : Rates of all items should be inclusive of all supply and carriage. Page: 549 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 10173.63

4.08.05.04.04 PCC-25SCCM : Compressive strength, f'c = 25 MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-
II/A-L/M/V/W 42.5N, high range water reducing admixture of complying
type F under ASTM C 494, sand of minimum FM 2.5 and 38mm down
well graded crushed stone chips (LAA <=30).
[Using Concrete Mixture]
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 8.4810 bag 430.00 3646.83
Stone Chips (38mm down graded) [LAA≤30] 0.3280 cum 5230.00 1715.44
Stone Chips (20mm down graded) [LAA≤30] 0.3280 m3 5320.00 1744.96
Stone Chips (12mm down graded) [LAA≤30] 0.1640 m3 4470.00 733.08
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 2.1203 liter 160.00 339.25
Mason 0.1000 day 550.00 55.00
Skilled Labour 0.0600 day 450.00 27.00
Ordinary Labour 1.3333 day 370.00 493.32
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0500 day 1200.00 60.00
H.C. of Generator (40 KVA) 0.0500 day 2500.00 125.00
Hire and running charges of light crane for lowering 0.0500 day 4500.00 225.00
reinforcement cage & operating tremie pipe

Subtotal-A: 9779.88

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9975.48

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 10973.02


VAT 6% of Total 731.53
IT 4% of Total 487.69
Total: 12192.25

Note : Rates of all items should be inclusive of all supply and carriage. Page: 550 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.05.04.05 PCC-25SCBP : Compressive strength, f'c = 25 MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-
II/A-L/M/V/W 42.5N, high range water reducing admixture of complying
type F under ASTM C 494, sand of minimum FM 2.5 and 38mm down
well graded crushed stone chips (LAA <=30).
[Using Batching Plant, Transit Mixer & Crane/ Concrete Pump]
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 8.4810 bag 430.00 3646.83
Stone Chips (38mm down graded) [LAA≤30] 0.3280 cum 5230.00 1715.44
Stone Chips (20mm down graded) [LAA≤30] 0.3280 m3 5320.00 1744.96
Stone Chips (12mm down graded) [LAA≤30] 0.1640 m3 4470.00 733.08
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 2.1203 liter 160.00 339.25
Mason 0.0250 day 550.00 13.75
Skilled Labour 0.0073 day 450.00 3.29
Ordinary Labour 0.1500 day 370.00 55.50
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0156 day 10000.00 156.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)

Subtotal-A: 9259.34

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9444.53

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 10388.98


VAT 6% of Total 692.60
IT 4% of Total 461.73
Total: 11543.31

Note : Rates of all items should be inclusive of all supply and carriage. Page: 551 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.05.05 In Top Plug

4.08.05.05.01 PCC-17BCCM : Compressive strength, f'c = 17 MPa MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-
II/A-L/M/V/W 42.5N, sand of minimum FM 1.8 and 40mm down well
graded crushed picked brick chips (LAA <=38)
[Using Concrete Mixture]
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0500 bag 430.00 2601.50
1st Class/ Picked Brick chips (40mm down graded) 0.3440 m3 2786.00 958.38
1st Class Picked Brick Chips (20mm down graded) 0.3440 m3 2940.00 1011.36
1st Class Brick Chips (10mm down graded) 0.1720 m3 3049.00 524.43
Sand (FM - 1.8) 0.4300 m3 970.00 417.10
Mason 0.1000 day 550.00 55.00
Skilled Labour 0.0573 day 450.00 25.79
Ordinary Labour 1.3333 day 370.00 493.32
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0500 day 1200.00 60.00
H.C. of Generator (40 KVA) 0.0500 day 2500.00 125.00

Subtotal-A: 6271.88

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 6397.32

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 7037.05


VAT 6% of Total 469.14
IT 4% of Total 312.76
Total: 7818.94

Note : Rates of all items should be inclusive of all supply and carriage. Page: 552 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.05.05.02 PCC-20SCCM : Compressive strength, f'c = 20 MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-
II/A-L/M/V/W 42.5N, water reducing admixture of complying type A
under ASTM C 494, sand of minimum FM 2.2 and 38mm down well
graded crushed stone chips (LAA <=35).
[Using Concrete Mixture]
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0500 bag 430.00 2601.50
Stone Chips (38mm down graded) [LAA≤35] 0.3440 cum 4850.00 1668.40
Stone Chips (20mm down graded) [LAA≤35] 0.3440 cum 4930.00 1695.92
Stone Chips (12mm down graded) [LAA≤35] 0.1720 cum 4320.00 743.04
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Mason 0.1000 day 550.00 55.00
Skilled Labour 0.0573 day 450.00 25.79
Ordinary Labour 1.3333 day 370.00 493.32
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0500 day 1200.00 60.00
H.C. of Generator (40 KVA) 0.0500 day 2500.00 125.00

Subtotal-A: 8021.81

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 8182.24

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 9000.47


VAT 6% of Total 600.03
IT 4% of Total 400.02
Total: 10000.52

Note : Rates of all items should be inclusive of all supply and carriage. Page: 553 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.05.05.03 PCC-20SCBP : Compressive strength, f'c = 20 MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-
II/A-L/M/V/W 42.5N, water reducing admixture of complying type A
under ASTM C 494, sand of minimum FM 2.2 and 38mm down well
graded crushed stone chips (LAA <=35).
[Using Batching Plant, Transit Mixer & Concrete Pump]
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0500 bag 430.00 2601.50
Stone Chips (38mm down graded) [LAA≤35] 0.3440 cum 4850.00 1668.40
Stone Chips (20mm down graded) [LAA≤35] 0.3440 cum 4930.00 1695.92
Stone Chips (12mm down graded) [LAA≤35] 0.1720 cum 4320.00 743.04
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Mason 0.0250 day 550.00 13.75
Skilled Labour 0.0070 day 450.00 3.15
Ordinary Labour 0.1500 day 370.00 55.50
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0156 day 10000.00 156.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)

Subtotal-A: 7727.35

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 7881.90

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 8670.09


VAT 6% of Total 578.01
IT 4% of Total 385.34
Total: 9633.43

Note : Rates of all items should be inclusive of all supply and carriage. Page: 554 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.05.05.04 PCC-25SCCM : Compressive strength, f'c = 25 MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-
II/A-L/M/V/W 42.5N, high range water reducing admixture of complying
type F under ASTM C 494, sand of minimum FM 2.5 and 38mm down
well graded crushed stone chips (LAA <=30).
[Using Concrete Mixture]
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Stone Chips (38mm down graded) [LAA≤30] 0.3280 cum 5230.00 1715.44
Stone Chips (20mm down graded) [LAA≤30] 0.3280 m3 5320.00 1744.96
Stone Chips (12mm down graded) [LAA≤30] 0.1640 m3 4470.00 733.08
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 1.9275 liter 160.00 308.40
Mason 0.1000 day 550.00 55.00
Skilled Labour 0.0573 day 450.00 25.79
Ordinary Labour 1.3333 day 370.00 493.32
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0500 day 1200.00 60.00
H.C. of Generator (40 KVA) 0.0500 day 2500.00 125.00

Subtotal-A: 9191.29

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9375.11

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 10312.62


VAT 6% of Total 687.51
IT 4% of Total 458.34
Total: 11458.47

Note : Rates of all items should be inclusive of all supply and carriage. Page: 555 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.05.05.05 PCC-25SCBP : Compressive strength, f'c = 25 MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-
II/A-L/M/V/W 42.5N, high range water reducing admixture of complying
type F under ASTM C 494, sand of minimum FM 2.5 and 38mm down
well graded crushed stone chips (LAA <=30).
[Using Batching Plant, Transit Mixer & Concrete Pump]
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Stone Chips (38mm down graded) [LAA≤30] 0.3280 cum 5230.00 1715.44
Stone Chips (20mm down graded) [LAA≤30] 0.3280 m3 5320.00 1744.96
Stone Chips (12mm down graded) [LAA≤30] 0.1640 m3 4470.00 733.08
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 1.9275 liter 160.00 308.40
Mason 0.0250 day 550.00 13.75
Skilled Labour 0.0070 day 450.00 3.15
Ordinary Labour 0.1500 day 370.00 55.50
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0156 day 10000.00 156.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)

Subtotal-A: 8896.83

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9074.77

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 9982.24


VAT 6% of Total 665.48
IT 4% of Total 443.66
Total: 11091.38

Note : Rates of all items should be inclusive of all supply and carriage. Page: 556 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.05.06 In well cap

4.08.05.06.01 RCC-17BCCM : Compressive strength, f'c = 17 MPa MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-
II/A-L/M/V/W 42.5N, sand of minimum FM 1.8 and 20mm down well
graded crushed picked brick chips (LAA <=38)
[Using Concrete Mixture]
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0500 bag 430.00 2601.50
1st Class Picked Brick Chips (20mm down graded) 0.5200 m3 2940.00 1528.80
1st Class Brick Chips (10mm down graded) 0.3400 m3 3049.00 1036.66
Sand (FM - 1.8) 0.4300 m3 970.00 417.10
Mason 0.1000 day 550.00 55.00
Skilled Labour 0.0573 day 450.00 25.79
Ordinary Labour 1.3333 day 370.00 493.32
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0500 day 1200.00 60.00
H.C. of Generator (40 KVA) 0.0500 day 2500.00 125.00

Subtotal-A: 6343.17
Formwork ( +4.00 % on Subtotal-A ) 253.73
Subtotal-A1: 6596.89

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 6728.83

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 7401.71


VAT 6% of Total 493.45
IT 4% of Total 328.97
Total: 8224.13

Note : Rates of all items should be inclusive of all supply and carriage. Page: 557 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.05.06.02 RCC-20SCCM : Compressive strength, f'c = 20 MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-
II/A-L/M/V/W 42.5N, sand of minimum FM 2.2 and 20mm down well
graded crushed stone chips (LAA <=35), water reducing admixture of
complying type A under ASTM C 494
[Using Concrete Mixture]
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0500 bag 430.00 2601.50
Stone Chips (20mm down graded) [LAA≤35] 0.5200 cum 4930.00 2563.60
Stone Chips (12mm down graded) [LAA≤35] 0.3400 cum 4320.00 1468.80
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Water reducing chemical admixture : Type-A 1.2100 liter 130.00 157.30
Mason 0.1000 day 550.00 55.00
Skilled Labour 0.0573 day 450.00 25.79
Ordinary Labour 1.3333 day 370.00 493.32
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0500 day 1200.00 60.00
H.C. of Generator (40 KVA) 0.0500 day 2500.00 125.00

Subtotal-A: 8104.15
Formwork ( +3.75 % on Subtotal-A ) 303.91
Subtotal-A1: 8408.05

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 8576.21

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 9433.83


VAT 6% of Total 628.92
IT 4% of Total 419.28
Total: 10482.04

Note : Rates of all items should be inclusive of all supply and carriage. Page: 558 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.05.06.03 RCC-20SCBP : Compressive strength, f'c = 20 MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-
II/A-L/M/V/W 42.5N, sand of minimum FM 2.2 and 20mm down well
graded crushed stone chips (LAA <=35),, water reducing admixture of
complying type A under ASTM C 494
[Using Batching Plant, Transit Mixer & Concrete Pump]
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0500 bag 430.00 2601.50
Stone Chips (20mm down graded) [LAA≤35] 0.5200 cum 4930.00 2563.60
Stone Chips (12mm down graded) [LAA≤35] 0.3400 cum 4320.00 1468.80
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Water reducing chemical admixture : Type-A 1.2100 liter 130.00 157.30
Mason 0.0250 day 550.00 13.75
Skilled Labour 0.0070 day 450.00 3.15
Ordinary Labour 0.1500 day 370.00 55.50
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0156 day 10000.00 156.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)

Subtotal-A: 7809.69
Formwork ( +3.75 % on Subtotal-A ) 292.86
Subtotal-A1: 8102.55

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 8264.60

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 9091.06


VAT 6% of Total 606.07

Note : Rates of all items should be inclusive of all supply and carriage. Page: 559 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

IT 4% of Total 404.05
Total: 10101.18

4.08.05.06.04 RCC-25SCCM : Compressive strength, f'c = 25 MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-
II/A-L/M/V/W 42.5N, high range water reducing admixture of complying
type F under ASTM C 494, sand of minimum FM 2.5 and 20mm down
well graded crushed stone chips (LAA <=30).
[Using Concrete Mixture]
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 1.9275 liter 160.00 308.40
Mason 0.1000 day 550.00 55.00
Skilled Labour 0.0573 day 450.00 25.79
Ordinary Labour 1.3333 day 370.00 493.32
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0500 day 1200.00 60.00
H.C. of Generator (40 KVA) 0.0500 day 2500.00 125.00

Subtotal-A: 9079.71
Formwork ( +3.50 % on Subtotal-A ) 317.79
Subtotal-A1: 9397.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9585.45

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 10543.99


VAT 6% of Total 702.93
IT 4% of Total 468.62
Total: 11715.54

Note : Rates of all items should be inclusive of all supply and carriage. Page: 560 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.05.06.05 RCC-25SCBP : Compressive strength, f'c = 25 MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-
II/A-L/M/V/W 42.5N, high range water reducing admixture of complying
type F under ASTM C 494, sand of minimum FM 2.5 and 20mm down
well graded crushed stone chips (LAA <=30).
[Using Batching Plant, Transit Mixer & Concrete Pump]
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 1.9275 liter 160.00 308.40
Mason 0.0250 day 550.00 13.75
Skilled Labour 0.0070 day 450.00 3.15
Ordinary Labour 0.1500 day 370.00 55.50
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0156 day 10000.00 156.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)

Subtotal-A: 8785.25
Formwork ( +3.50 % on Subtotal-A ) 307.48
Subtotal-A1: 9092.73

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9274.59

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 10202.05


VAT 6% of Total 680.14
IT 4% of Total 453.42

Note : Rates of all items should be inclusive of all supply and carriage. Page: 561 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 11335.61

4.08.05.06.06 RCC-30SCCM : Compressive strength, f'c = 30 MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-I
52.5N, high range water reducing admixture of complying type F under
ASTM C 494, sand of minimum FM 2.5 and 20mm down well graded
crushed stone chips (LAA <=30).
[Using Concrete Mixture]
Ordinary Portland Cement (CEM I, 52.5N) 8.6000 bag 455.00 3913.00
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Mason 0.1000 day 550.00 55.00
Skilled Labour 0.0573 day 450.00 25.79
Ordinary Labour 1.3333 day 370.00 493.32
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0500 day 1200.00 60.00
H.C. of Generator (40 KVA) 0.0500 day 2500.00 125.00

Subtotal-A: 9713.01
Formwork ( +3.00 % on Subtotal-A ) 291.39
Subtotal-A1: 10004.40

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10204.48

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 11224.93


VAT 6% of Total 748.33
IT 4% of Total 498.89
Total: 12472.15

Note : Rates of all items should be inclusive of all supply and carriage. Page: 562 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.05.06.07 RCC-30SCBP : Compressive strength, f'c = 30 MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-I
52.5N, high range water reducing admixture of complying type F under
ASTM C 494, sand of minimum FM 2.5 and 20mm down well graded
crushed stone chips (LAA <=30).
[Using Batching Plant, Transit Mixer & Concrete Pump]
Ordinary Portland Cement (CEM I, 52.5N) 8.6000 bag 455.00 3913.00
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Mason 0.0250 day 550.00 13.75
Skilled Labour 0.0070 day 450.00 3.15
Ordinary Labour 0.1500 day 370.00 55.50
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0156 day 10000.00 156.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)

Subtotal-A: 9418.55
Formwork ( +3.00 % on Subtotal-A ) 282.56
Subtotal-A1: 9701.11

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9895.13

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 10884.64


VAT 6% of Total 725.64
IT 4% of Total 483.76

Note : Rates of all items should be inclusive of all supply and carriage. Page: 563 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 12094.05

Note : Rates of all items should be inclusive of all supply and carriage. Page: 564 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.05.06.08 RCC-35SCBP : Compressive strength, f'c = 35 MPa at 28 days on cum


standard cylinders, cement conforming to BDS EN 197-1 : 2003 CEM-I
52.5N, high range water reducing admixture of complying type F under
ASTM C 494, sand of minimum FM 2.8 and 20mm down well graded
crushed stone chips (LAA <=25).
[Using Batching Plant, Transit Mixer & Concrete Pump]
Ordinary Portland Cement (CEM I, 52.5N) 9.0000 bag 455.00 4095.00
Stone Chips (20mm down graded) [LAA≤25] 0.4900 cum 5730.00 2807.70
Stone Chips (12mm down graded) [LAA≤25] 0.3300 cum 4640.00 1531.20
Sand (FM - 2.8) 0.4100 m3 1602.00 656.82
Water-reducing high range chemical admixture : Type-F 2.2500 liter 160.00 360.00
Mason 0.0250 day 550.00 13.75
Skilled Labour 0.0070 day 450.00 3.15
Ordinary Labour 0.1500 day 370.00 55.50
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0156 day 10000.00 156.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)

Subtotal-A: 9915.37
Formwork ( +3.00 % on Subtotal-A ) 297.46
Subtotal-A1: 10212.83

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10417.09

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 11458.80


VAT 6% of Total 763.92
IT 4% of Total 509.28

Note : Rates of all items should be inclusive of all supply and carriage. Page: 565 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 12732.00

4.08.06 Brick work with 1st class brick in specified cement mortar in staining of
wells with sand of minimum FM 1.50 and cement conforming to BDS EN
197-1 : 2003 CEM-II/A-L/M/V/W 42.5N, cutting bricks to required sizes,
cleaning and soaking bricks at least for 24 hours before use, hoisting
and keeping in position the MS bond rods and finished with flush
pointing joints, watering, etc. complete including cost of all materials
but excluding cost of MS bond rods and bottle nuts, etc. all complete as
per direction of the E-I-C.

4.08.06.01 Cement mortar (1:3) cum


1st Class Brick 406.0000 each 9.00 3654.00
Sand (FM - 1.5) 0.3800 m3 795.00 302.10
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 2.8600 bag 430.00 1229.80
Head Mason 0.0600 day 650.00 39.00
Mason 0.7000 day 550.00 385.00
Skilled Labour 0.7000 day 450.00 315.00
Ordinary Labour 1.0000 day 370.00 370.00

Subtotal-A: 6294.90

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 6420.80

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 7062.88


VAT 6% of Total 470.86
IT 4% of Total 313.91
Total: 7847.64

Note : Rates of all items should be inclusive of all supply and carriage. Page: 566 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.08.06.02 Cement mortar (1:4) cum


1st Class Brick 406.0000 each 9.00 3654.00
Sand (FM - 1.5) 0.3800 m3 795.00 302.10
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 2.1200 bag 430.00 911.60
Head Mason 0.0600 day 650.00 39.00
Mason 0.7000 day 550.00 385.00
Skilled Labour 0.7000 day 450.00 315.00
Ordinary Labour 1.0000 day 370.00 370.00

Subtotal-A: 5976.70

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 6096.23

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 6705.86


VAT 6% of Total 447.06
IT 4% of Total 298.04
Total: 7450.95

Note : Rates of all items should be inclusive of all supply and carriage. Page: 567 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.01 RCC-17BCCM: Reinforced cement concrete work with minimum cement


content relates to nominal mix ratio 1:2:4 and maximum water cement
ratio 0.45 having minimum required average strength, f'cr = 24 MPa
and satisfying a compressive strength f'c = 17 MPa at 28 days on
standard cylinders as per standard practice of Code AASHTO/ ASTM and
cement conforming to BDS EN 197-1 : 2003 CEM-II/A-L/M/V/W 42.5N,
sand of minimum FM 1.8 and 20mm down well graded crushed picked
brick chips (LAA value & maximum water absorption not exceeding 38 &
15% respectively ) conforming to garadation requirement as per ASTM
C 33 including screening chips through proper sieves, cleaning, placing
shutter in position, making shutter water-tight properly, placing
reinforcement in position, mixing in standard mixture machine with
hoper, fed by standard measuring boxes, maintaining allowable slump
of 50mm to 100mm, casting in forms, compacting by mechanical
vibrator machine, curing for 28 days, removing centering-shuttering
after approved specified time period, other incidental charges, etc. all
complete as per drawing, specification & direction of the E-I-C. The cost
of reinforcement and it's fabrication, welding, coupling, placing, binding
etc. is not included in this unit rate. Additional quantity of cement to be
added if required to attain the specified strength at the contractor's own
cost.
Note: Using Concrete Mixer

Note : Rates of all items should be inclusive of all supply and carriage. Page: 568 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.01.01 For pile caps, abutment base of bridges and bottom slab of box culverts cum
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0500 bag 430.00 2601.50
1st Class Picked Brick Chips (20mm down graded) 0.5200 m3 2940.00 1528.80
1st Class Brick Chips (10mm down graded) 0.3400 m3 3049.00 1036.66
Sand (FM - 1.8) 0.4300 m3 970.00 417.10
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 7040.56
Formwork/ shuttering, prop with necessary ( +9.00 % on Subtotal-A ) 633.65
supports etc.
Subtotal-A1: 7674.21

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 7827.69

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 8610.46


VAT 6% of Total 574.03
IT 4% of Total 382.69
Total: 9567.18

4.09.01.02 For diaphragm walls, wing walls, piers, columns, pier caps, abutments
of bridges and vertical members of box culverts

Note : Rates of all items should be inclusive of all supply and carriage. Page: 569 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.01.02.01 For height up to 5m cum


Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0500 bag 430.00 2601.50
1st Class Picked Brick Chips (20mm down graded) 0.5200 m3 2940.00 1528.80
1st Class Brick Chips (10mm down graded) 0.3400 m3 3049.00 1036.66
Sand (FM - 1.8) 0.4300 m3 970.00 417.10
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 7040.56
Formwork ( +14.00 % on Subtotal-A ) 985.68
Subtotal-A1: 8026.24

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 8186.76

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 9005.44


VAT 6% of Total 600.36
IT 4% of Total 400.24
Total: 10006.04

4.09.01.02.02 For height above 5m cum Add +25.00% with Item No 4.09.01.02.01

4.09.01.03 For solid slab type super-structure including cantilever, side walk, curb,
wheel guard of bridges

Note : Rates of all items should be inclusive of all supply and carriage. Page: 570 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.01.03.01 For height Up to 5m cum


Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0500 bag 430.00 2601.50
1st Class Picked Brick Chips (20mm down graded) 0.5200 m3 2940.00 1528.80
1st Class Brick Chips (10mm down graded) 0.3400 m3 3049.00 1036.66
Sand (FM - 1.8) 0.4300 m3 970.00 417.10
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 7040.56
Formwork/ shuttering, prop with necessary ( +40.00 % on Subtotal-A ) 2816.22
supports etc.
Subtotal-A1: 9856.78

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10053.92

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 11059.31


VAT 6% of Total 737.29
IT 4% of Total 491.52
Total: 12288.12

4.09.01.03.02 For height above 5m cum Add +12.50% with Item No 4.09.01.03.01

4.09.01.04 For T-girder & slab type super-structure including cross girders, side
walk, curb, wheel guard of bridges

Note : Rates of all items should be inclusive of all supply and carriage. Page: 571 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.01.04.01 For height up to 5m cum


Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0500 bag 430.00 2601.50
1st Class Picked Brick Chips (20mm down graded) 0.5200 m3 2940.00 1528.80
1st Class Brick Chips (10mm down graded) 0.3400 m3 3049.00 1036.66
Sand (FM - 1.8) 0.4300 m3 970.00 417.10
Head Mason 0.0800 day 650.00 52.00
Mason 0.4500 day 550.00 247.50
Skilled Labour 1.0000 day 450.00 450.00
Ordinary Labour 2.2500 day 370.00 832.50
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 7262.06
Formwork/ shuttering, prop with necessary ( +45.00 % on Subtotal-A ) 3267.93
supports etc.
Subtotal-A1: 10529.99

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10740.59

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 11814.65


VAT 6% of Total 787.64
IT 4% of Total 525.10
Total: 13127.38

4.09.01.04.02 For height above 5m cum Add +13.75% with Item No 4.09.01.04.01

4.09.01.05 For top slab including curb and wheel guard of box culvert

Note : Rates of all items should be inclusive of all supply and carriage. Page: 572 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.01.05.01 For height up to 5m cum


Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0500 bag 430.00 2601.50
1st Class Picked Brick Chips (20mm down graded) 0.5200 m3 2940.00 1528.80
1st Class Brick Chips (10mm down graded) 0.3400 m3 3049.00 1036.66
Sand (FM - 1.8) 0.4300 m3 970.00 417.10
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 7040.56
Formwork/ shuttering, prop with necessary ( +28.00 % on Subtotal-A ) 1971.36
supports etc.
Subtotal-A1: 9011.92

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9192.16

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 10111.37


VAT 6% of Total 674.09
IT 4% of Total 449.39
Total: 11234.86

4.09.01.05.02 For height above 5m cum Add +6.00% with Item No 4.09.01.05.01

4.09.01.06 For cast-in-situ/ pre-cast railing and rail post of bridges and box culverts

Note : Rates of all items should be inclusive of all supply and carriage. Page: 573 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.01.06.01 For pre-cast railing and rail post cum


Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0500 bag 430.00 2601.50
1st Class Picked Brick Chips (20mm down graded) 0.5200 m3 2940.00 1528.80
1st Class Brick Chips (10mm down graded) 0.3400 m3 3049.00 1036.66
Sand (FM - 1.8) 0.4300 m3 970.00 417.10
Head Mason 0.0800 day 650.00 52.00
Mason 0.4500 day 550.00 247.50
Skilled Labour 1.0000 day 450.00 450.00
Ordinary Labour 2.2500 day 370.00 832.50
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 7262.06
Formwork/ shuttering, prop with necessary ( +29.00 % on Subtotal-A ) 2106.00
supports etc.
Subtotal-A1: 9368.06

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9555.42

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 10510.96


VAT 6% of Total 700.73
IT 4% of Total 467.15
Total: 11678.84

Note : Rates of all items should be inclusive of all supply and carriage. Page: 574 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.01.06.02 For cast-in-situ railing and rail post cum


Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0500 bag 430.00 2601.50
1st Class Picked Brick Chips (20mm down graded) 0.5200 m3 2940.00 1528.80
1st Class Brick Chips (10mm down graded) 0.3400 m3 3049.00 1036.66
Sand (FM - 1.8) 0.4300 m3 970.00 417.10
Head Mason 0.0800 day 650.00 52.00
Mason 0.4500 day 550.00 247.50
Skilled Labour 1.0000 day 450.00 450.00
Ordinary Labour 2.2500 day 370.00 832.50
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 7262.06
Formwork/ shuttering, prop with necessary ( +14.00 % on Subtotal-A ) 1016.69
supports etc.
Subtotal-A1: 8278.75

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 8444.32

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 9288.76


VAT 6% of Total 619.25
IT 4% of Total 412.83
Total: 10320.84

Note : Rates of all items should be inclusive of all supply and carriage. Page: 575 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.02 RCC-20SCCM: Reinforced cement concrete work with minimum cement


content relates to nominal mix ratio 1:2:4 and maximum water cement
ratio 0.4 having minimum required average strength, f'cr = 28.5 MPa
and satisfying a compressive strength f'c = 20 MPa at 28 days on
standard cylinders as per standard practice of Code AASHTO/ ASTM and
cement conforming to BDS EN 197-1 : 2003 CEM-II/A-L/M/V/W 42.5N,
high range water reducing admixture of complying type A or F under
ASTM C 494 (Doses of admixture to be fixed by the mix design), sand of
minimum FM 2.2 and 20mm down well graded crushed stone chips
broken from boulders (Preferably stone chips from Madhyapara,
Dinajpur, LAA value not exceeding 35) conforming to ASTM C33
including screening chips through proper sieves, cleaning, placing
shutter in position, making shutter water-tight properly, placing
reinforcement in position, mixing in standard mixture machine with
hoper, fed by standard measuring boxes, maintaining allowable slump
of 75mm to 100mm, casting in forms, compacting by mechanical
vibrator machine, curing for 28 days, removing centering-shuttering
after approved specified time period, other incidental charges, etc. all
complete as per drawing, specification & direction of the E-I-C. The cost
of reinforcement and it's fabrication, welding, coupling, placing, binding
etc. is not included but the cost of admixture is included in this unit rate.
Additional quantity of cement to be added if required to attain the
strength at the contractor's own cost.
Note: Using Concrete Mixer

Note : Rates of all items should be inclusive of all supply and carriage. Page: 576 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.02.01 For pile caps, abutment base of bridges and bottom slab of Box Culvert cum
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0500 bag 430.00 2601.50
Stone Chips (20mm down graded) [LAA≤35] 0.5200 cum 4930.00 2563.60
Stone Chips (12mm down graded) [LAA≤25] 0.3400 cum 4640.00 1577.60
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Water reducing chemical admixture : Type-A 1.2100 liter 130.00 157.30
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 8910.34
Steel Formwork/ shuttering, prop with necessary ( +9.00 % on Subtotal-A ) 801.93
supports etc.
Subtotal-A1: 9712.27

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9906.52

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 10897.17


VAT 6% of Total 726.48
IT 4% of Total 484.32
Total: 12107.96

4.09.02.02 For diaphragm walls, wing walls, piers, columns, abutments of bridges
and vertical members of box culverts

Note : Rates of all items should be inclusive of all supply and carriage. Page: 577 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.02.02.01 For height up to 5m cum


Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0500 bag 430.00 2601.50
Stone Chips (20mm down graded) [LAA≤35] 0.5200 cum 4930.00 2563.60
Stone Chips (12mm down graded) [LAA≤35] 0.3400 cum 4320.00 1468.80
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Water reducing chemical admixture : Type-A 1.2100 liter 130.00 157.30
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 8801.54
Steel Formwork/ shuttering, prop with necessary ( +14.00 % on Subtotal-A ) 1232.22
supports etc.
Subtotal-A1: 10033.76

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10234.43

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 11257.87


VAT 6% of Total 750.52
IT 4% of Total 500.35
Total: 12508.75

4.09.02.02.02 For height above 5m to 10m cum Add +25.00% with Item No 4.09.02.02.01

4.09.02.02.03 For height above 10m to 15m cum Add +50.00% with Item No 4.09.02.02.01

4.09.02.02.04 For height above 15m to 20m cum Add +75.00% with Item No 4.09.02.02.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 578 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.02.02.05 For height above 20m cum Add +80.00% with Item No 4.09.02.02.01

4.09.02.03 For solid slab type super-structure including cantilever, side walk, curb,
wheel guard of bridges

4.09.02.03.01 For height up to 5m cum


Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0500 bag 430.00 2601.50
Stone Chips (20mm down graded) [LAA≤35] 0.5200 cum 4930.00 2563.60
Stone Chips (12mm down graded) [LAA≤35] 0.3400 cum 4320.00 1468.80
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Water reducing chemical admixture : Type-A 1.2100 liter 130.00 157.30
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 8801.54
Steel Formwork/ shuttering, prop with necessary ( +40.00 % on Subtotal-A ) 3520.62
supports etc.
Subtotal-A1: 12322.16

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12568.60

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 13825.46


VAT 6% of Total 921.70
IT 4% of Total 614.46
Total: 15361.62

Note : Rates of all items should be inclusive of all supply and carriage. Page: 579 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.02.03.02 For height above 5m to 10m cum Add +12.50% with Item No 4.09.02.03.01

4.09.02.03.03 For height above 10m to 15m cum Add +25.00% with Item No 4.09.02.03.01

4.09.02.03.04 For height above 15m to 20m cum Add +37.50% with Item No 4.09.02.03.01

4.09.02.03.05 For height above 20m cum Add +40.00% with Item No 4.09.02.03.01

4.09.02.04 For T-girder & slab type super-structure including cross girders, side
walk, curb, wheel guard of bridges

Note : Rates of all items should be inclusive of all supply and carriage. Page: 580 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.02.04.01 For height up to 5 m cum


Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0500 bag 430.00 2601.50
Stone Chips (20mm down graded) [LAA≤35] 0.5200 cum 4930.00 2563.60
Stone Chips (12mm down graded) [LAA≤35] 0.3400 cum 4320.00 1468.80
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Water reducing chemical admixture : Type-A 1.2100 liter 130.00 157.30
Head Mason 0.0800 day 650.00 52.00
Mason 0.4500 day 550.00 247.50
Skilled Labour 1.0000 day 450.00 450.00
Ordinary Labour 2.2500 day 370.00 832.50
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 9023.04
Steel Formwork/ shuttering, prop with necessary ( +45.00 % on Subtotal-A ) 4060.37
supports etc.
Subtotal-A1: 13083.41

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 13345.08

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 14679.58


VAT 6% of Total 978.64
IT 4% of Total 652.43
Total: 16310.65

4.09.02.04.02 For height above 5m to 10m cum Add +13.75% with Item No 4.09.02.04.01

4.09.02.04.03 For height above 10m to 15m cum Add +27.50% with Item No 4.09.02.04.01

4.09.02.04.04 For height above 15m to 20m cum Add +41.25% with Item No 4.09.02.04.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 581 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.02.04.05 For height above 20m cum Add +44.00% with Item No 4.09.02.04.01

4.09.02.05 For top slab including curb and wheel guard of box culvert

4.09.02.05.01 For height up to 5m cum


Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0500 bag 430.00 2601.50
Stone Chips (20mm down graded) [LAA≤35] 0.5200 cum 4930.00 2563.60
Stone Chips (12mm down graded) [LAA≤35] 0.3400 cum 4320.00 1468.80
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Water reducing chemical admixture : Type-A 1.2100 liter 130.00 157.30
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 8801.54
Steel Formwork/ shuttering, prop with necessary ( +28.00 % on Subtotal-A ) 2464.43
supports etc.
Subtotal-A1: 11265.97

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11491.29

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12640.42


VAT 6% of Total 842.69
IT 4% of Total 561.80
Total: 14044.91

4.09.02.05.02 For height above 5m cum Add +6.00% with Item No 4.09.02.05.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 582 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.02.06 For cast-in-situ/ pre-cast railing & rail post of bridges and box culverts

4.09.02.06.01 For pre-cast railing & rail post cum


Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0500 bag 430.00 2601.50
Stone Chips (12mm down graded) [LAA≤35] 0.8600 cum 4320.00 3715.20
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Water reducing chemical admixture : Type-A 1.2100 liter 130.00 157.30
Head Mason 0.0800 day 650.00 52.00
Mason 0.4500 day 550.00 247.50
Skilled Labour 1.0000 day 450.00 450.00
Ordinary Labour 2.2500 day 370.00 832.50
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 8705.84
Steel Formwork/ shuttering, prop with necessary ( +29.00 % on Subtotal-A ) 2524.69
supports etc.
Subtotal-A1: 11230.53

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11455.14

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12600.66


VAT 6% of Total 840.04
IT 4% of Total 560.03
Total: 14000.73

Note : Rates of all items should be inclusive of all supply and carriage. Page: 583 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.02.06.02 For cast-in-situ railing & rail post cum


Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0500 bag 430.00 2601.50
Stone Chips (12mm down graded) [LAA≤35] 0.8600 cum 4320.00 3715.20
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Water reducing chemical admixture : Type-A 1.2100 liter 130.00 157.30
Head Mason 0.0800 day 650.00 52.00
Mason 0.4500 day 550.00 247.50
Skilled Labour 1.0000 day 450.00 450.00
Ordinary Labour 2.2500 day 370.00 832.50
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 8705.84
Steel Formwork/ shuttering, prop with necessary ( +14.00 % on Subtotal-A ) 1218.82
supports etc.
Subtotal-A1: 9924.66

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10123.15

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 11135.47


VAT 6% of Total 742.36
IT 4% of Total 494.91
Total: 12372.74

Note : Rates of all items should be inclusive of all supply and carriage. Page: 584 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.03 RCC-25SCCM: Reinforced cement concrete work with minimum cement


content relates to mix ratio 1:1.5:3 and maximum water cement ratio
0.4 having minimum required average strength, f'cr = 33.5 MPa and
satisfying a compressive strength f'c = 25 MPa at 28 days on standard
cylinders as per standard practice of Code AASHTO/ ASTM and cement
conforming to BDS EN 197-1 : 2003 CEM-II/A-L/M/V/W 42.5N, high
range water reducing admixture of complying type A or F under ASTM C
494 (Doses of admixture to be fixed by the mix design), sand of
minimum FM 2.5 and 20mm down well graded crushed stone chips
broken from boulders (Preferably stone chips from Madhyapara,
Dinajpur, LAA value not exceeding 30) conforming to ASTM C33
including breaking chips, screening through proper sieves, cleaning,
placing shutter in position, making shutter water-tight properly, placing
reinforcement in position, mixing in standard mixture machine with
hoper, maintaining allowable slump of 75mm to 100mm, casting in
forms, compacting by mechanical vibrator machine, curing for 28 days,
removing centering-shuttering after approved specified time period,
other incidental charges, etc. all complete as per drawing, specification
& direction of the E-I-C. The cost of reinforcement and it's fabrication,
welding, coupling, placing, binding etc. is not included but the cost of
admixture is included in this unit rate. Additional quantity of cement to
be added if required to attain the strength at the contractor's own cost.
Note: Using Concrete Mixer

Note : Rates of all items should be inclusive of all supply and carriage. Page: 585 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.03.01 For pile caps, abutment base, facing elements of Reinforced/ cum
Mechanically Stabilized Earth Structure, bottom slab of Box Culvert etc.
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 1.9275 liter 160.00 308.40
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 9777.10
Steel Formwork/ shuttering, prop with necessary ( +9.00 % on Subtotal-A ) 879.94
supports etc.
Subtotal-A1: 10657.04

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10870.18

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 11957.20


VAT 6% of Total 797.15
IT 4% of Total 531.43
Total: 13285.78

4.09.03.02 For diaphragm walls, wing walls, piers, columns, projected pile cap
above water level, pier caps, abutments of bridges and vertical
members of box culverts

Note : Rates of all items should be inclusive of all supply and carriage. Page: 586 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.03.02.01 For height up to 5m cum


Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 1.9275 liter 160.00 308.40
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 9777.10
Steel Formwork/ shuttering, prop with necessary ( +14.00 % on Subtotal-A ) 1368.79
supports etc.
Subtotal-A1: 11145.89

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11368.81

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12505.69


VAT 6% of Total 833.71
IT 4% of Total 555.81
Total: 13895.21

4.09.03.02.02 For height above 5m to 10m cum Add +25.00% with Item No 4.09.03.02.01

4.09.03.02.03 For height above 10m to 15m cum Add +50.00% with Item No 4.09.03.02.01

4.09.03.02.04 For height above 15m to 20m cum Add +75.00% with Item No 4.09.03.02.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 587 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.03.02.05 For height above 20m cum Add +80.00% with Item No 4.09.03.02.01

4.09.03.03 For solid slab type super-structure including cantilever, side walk, curb
and wheel guard of bridges

4.09.03.03.01 For height up to 5 m cum


Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 1.9275 liter 160.00 308.40
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 9777.10
Steel Formwork/ shuttering, prop with necessary ( +55.00 % on Subtotal-A ) 5377.41
supports etc.
Subtotal-A1: 15154.51

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 15457.60

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 17003.35


VAT 6% of Total 1133.56
IT 4% of Total 755.70
Total: 18892.62

4.09.03.03.02 For height above 5m to 10m cum Add +11.00% with Item No 4.09.03.03.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 588 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.03.03.03 For height above 10m to 15m cum Add +22.00% with Item No 4.09.03.03.01

4.09.03.03.04 For height above 15 m to 20 m cum Add +33.00% with Item No 4.09.03.03.01

4.09.03.03.05 For height above 20m cum Add +44.00% with Item No 4.09.03.03.01

4.09.03.04 For T-girder & slab type super-structure including cross girders, side
walk, curb and wheel guard of bridges

Note : Rates of all items should be inclusive of all supply and carriage. Page: 589 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.03.04.01 Height up to 5 m cum


Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 1.9275 liter 160.00 308.40
Head Mason 0.0800 day 650.00 52.00
Mason 0.4500 day 550.00 247.50
Skilled Labour 1.0000 day 450.00 450.00
Ordinary Labour 2.2500 day 370.00 832.50
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 9998.60
Steel Formwork/ shuttering, prop with necessary ( +60.00 % on Subtotal-A ) 5999.16
supports etc.
Subtotal-A1: 15997.76

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 16317.72

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 17949.49


VAT 6% of Total 1196.63
IT 4% of Total 797.75
Total: 19943.87

4.09.03.04.02 For height above 5m to 10m cum Add +7.50% with Item No 4.09.03.04.01

4.09.03.04.03 For height above 10m to 15m cum Add +15.00% with Item No 4.09.03.04.01

4.09.03.04.04 For height above 15m to 20m cum Add +22.50% with Item No 4.09.03.04.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 590 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.03.04.05 For height above 20m cum Add +30.00% with Item No 4.09.03.04.01

4.09.03.05 For top slab including curb and wheel guard of box culvert

4.09.03.05.01 Height up to 5 m cum


Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 1.9275 liter 160.00 308.40
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 9777.10
Steel Formwork/ shuttering, prop with necessary ( +30.00 % on Subtotal-A ) 2933.13
supports etc.
Subtotal-A1: 12710.23

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12964.43

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 14260.88


VAT 6% of Total 950.73
IT 4% of Total 633.82
Total: 15845.42

4.09.03.05.02 For height above 5m cum Add +6.00% with Item No 4.09.03.05.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 591 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.03.06 For Arch/ inclined girder of bridges

4.09.03.06.01 For height up to 5m cum


Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 1.9275 liter 160.00 308.40
Head Mason 0.0800 day 650.00 52.00
Mason 0.7500 day 550.00 412.50
Skilled Labour 1.0000 day 450.00 450.00
Ordinary Labour 2.2500 day 370.00 832.50
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 10163.60
Steel Formwork/ shuttering, prop with necessary ( +65.00 % on Subtotal-A ) 6606.34
supports etc.
Subtotal-A1: 16769.94

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 17105.34

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 18815.87


VAT 6% of Total 1254.39
IT 4% of Total 836.26
Total: 20906.53

4.09.03.06.02 For height above 5m to 10m cum Add +12.50% with Item No 4.09.03.06.01

4.09.03.06.03 For height above 10m to 15m cum Add +25.00% with Item No 4.09.03.06.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 592 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.03.06.04 For height above 15m to 20m cum Add +37.50% with Item No 4.09.03.06.01

4.09.03.06.05 For height above 20m cum Add +40.00% with Item No 4.09.03.06.01

4.09.03.07 For RCC deck slab/Cross girder/diaphragm supported on PSC Girder cum
using suspended type staging/ centering and shuttering for any height
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 1.9275 liter 160.00 308.40
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 9777.10
Steel Formwork/ shuttering, prop with necessary ( +60.00 % on Subtotal-A ) 5866.26
supports etc.
Subtotal-A1: 15643.36

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 15956.23

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 17551.85


VAT 6% of Total 1170.12
IT 4% of Total 780.08
Total: 19502.06

4.09.03.08 For cast-in-situ/ pre-cast railing and rail post of bridges & culverts

Note : Rates of all items should be inclusive of all supply and carriage. Page: 593 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.03.08.01 For pre-cast railing and rail post cum


Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Stone Chips (12mm down graded) [LAA≤30] 0.8200 m3 4470.00 3665.40
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 1.9275 liter 160.00 308.40
Head Mason 0.0800 day 650.00 52.00
Mason 0.4500 day 550.00 247.50
Skilled Labour 1.0000 day 450.00 450.00
Ordinary Labour 2.2500 day 370.00 832.50
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 9582.10
Steel Formwork/ shuttering, prop with necessary ( +29.00 % on Subtotal-A ) 2778.81
supports etc.
Subtotal-A1: 12360.91

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12608.13

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 13868.94


VAT 6% of Total 924.60
IT 4% of Total 616.40
Total: 15409.93

Note : Rates of all items should be inclusive of all supply and carriage. Page: 594 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.03.08.02 For cast-in-situ railing and rail post cum


Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Stone Chips (12mm down graded) [LAA≤30] 0.8200 m3 4470.00 3665.40
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 1.9275 liter 160.00 308.40
Head Mason 0.0800 day 650.00 52.00
Mason 0.4500 day 550.00 247.50
Skilled Labour 1.0000 day 450.00 450.00
Ordinary Labour 2.2500 day 370.00 832.50
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 9582.10
Steel Formwork/ shuttering, prop with necessary ( +14.00 % on Subtotal-A ) 1341.49
supports etc.
Subtotal-A1: 10923.59

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11142.07

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12256.27


VAT 6% of Total 817.08
IT 4% of Total 544.72
Total: 13618.08

Note : Rates of all items should be inclusive of all supply and carriage. Page: 595 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.03.09 For Pre-cast paving slab for bridge footpath cum


Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 1.9275 liter 160.00 308.40
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 9777.10
Steel Formwork/ shuttering, prop with necessary ( +9.00 % on Subtotal-A ) 879.94
supports etc.
Subtotal-A1: 10657.04

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10870.18

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 11957.20


VAT 6% of Total 797.15
IT 4% of Total 531.43
Total: 13285.78

Note : Rates of all items should be inclusive of all supply and carriage. Page: 596 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.04 RCC-25SCBP: Reinforced cement concrete work with minimum cement


content relates to mix ratio 1:1.5:3 and maximum water cement ratio
0.4 having minimum required average strength, f'cr = 33.5 MPa and
satisfying a compressive strength f'c = 25 MPa at 28 days on standard
cylinders as per standard practice of Code AASHTO/ ASTM and cement
conforming to BDS EN 197-1 : 2003 CEM-II/A-L/M/V/W 42.5N, high
range water reducing admixture of complying type A or F under ASTM C
494 (Doses of admixture to be fixed by the mix design), sand of
minimum FM 2.5 and 20mm down well graded crushed stone chips
broken from boulders (Preferably stone chips from Madhyapara,
Dinajpur, LAA value not exceeding 30) conforming to ASTM C33
including breaking chips, screening through proper sieves, cleaning,
placing shutter in position, making shutter water-tight properly, placing
reinforcement in position, mixing in mechanized batch mix plant and
pumping using line pump or boom placer, maintaining allowable slump
of 75mm to 100mm, casting in forms, compacting by mechanical
vibrator machine, curing for 28 days, removing centering-shuttering
after approved specified time period, other incidental charges, etc. all
complete as per drawing, specification & direction of the E-I-C. The cost
of reinforcement and it's fabrication, welding, coupling, placing, binding
etc. is not included but the cost of admixture is included in this unit rate.
Additional quantity of cement to be added if required to attain the
strength at the contractor's own cost.
Note: Using Batching Plant, Transit Mixer & Concrete Pump

Note : Rates of all items should be inclusive of all supply and carriage. Page: 597 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.04.01 For pile caps, abutment base, facing elements of Reinforced/ cum
Mechanically Stabilized Earth Structure, bottom slab of Box Culvert etc.
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 1.9275 liter 160.00 308.40
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.5000 day 450.00 225.00
Ordinary Labour 1.5000 day 370.00 555.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 9843.85
Steel Formwork/ shuttering, prop with necessary ( +9.00 % on Subtotal-A ) 885.95
supports etc.
Subtotal-A1: 10729.80

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10944.39

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12038.83


VAT 6% of Total 802.59
IT 4% of Total 535.06

Note : Rates of all items should be inclusive of all supply and carriage. Page: 598 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 13376.48

4.09.04.02 For diaphragm walls, wing walls, piers, columns, projected pile cap
above water level, pier caps, abutments of bridges and vertical
members of box culverts

Note : Rates of all items should be inclusive of all supply and carriage. Page: 599 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.04.02.01 For height up to 5m cum


Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 1.9275 liter 160.00 308.40
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.5000 day 450.00 225.00
Ordinary Labour 1.5000 day 370.00 555.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 9843.85
Steel Formwork/ shuttering, prop with necessary ( +14.00 % on Subtotal-A ) 1378.14
supports etc.
Subtotal-A1: 11221.99

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11446.43

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12591.07


VAT 6% of Total 839.40
IT 4% of Total 559.60

Note : Rates of all items should be inclusive of all supply and carriage. Page: 600 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 13990.08

4.09.04.02.02 For height above 5m to 10m cum Add +25.00% with Item No 4.09.04.02.01

4.09.04.02.03 For height above 10m to 15m cum Add +50.00% with Item No 4.09.04.02.01

4.09.04.02.04 For height above 15m to 20m cum Add +75.00% with Item No 4.09.04.02.01

4.09.04.02.05 For height above 20m cum Add +80.00% with Item No 4.09.04.02.01

4.09.04.03 For solid slab type super-structure including cantilever, side walk, curb
and wheel guard of bridges

Note : Rates of all items should be inclusive of all supply and carriage. Page: 601 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.04.03.01 For height up to 5 m cum


Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 1.9275 liter 160.00 308.40
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.5000 day 450.00 225.00
Ordinary Labour 1.5000 day 370.00 555.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 9843.85
Steel Formwork/ shuttering, prop with necessary ( +55.00 % on Subtotal-A ) 5414.12
supports etc.
Subtotal-A1: 15257.97

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 15563.13

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 17119.44


VAT 6% of Total 1141.30
IT 4% of Total 760.86

Note : Rates of all items should be inclusive of all supply and carriage. Page: 602 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 19021.60

4.09.04.03.02 For height above 5m to 10m cum Add +11.00% with Item No 4.09.04.03.01

4.09.04.03.03 For height above 10m to 15m cum Add +22.00% with Item No 4.09.04.03.01

4.09.04.03.04 For height above 15m to 20m cum Add +33.00% with Item No 4.09.04.03.01

4.09.04.03.05 For height above 20m cum Add +44.00% with Item No 4.09.04.03.01

4.09.04.04 For T-girder & slab type super-structure including cross girders, side
walk, curb and wheel guard of bridges

Note : Rates of all items should be inclusive of all supply and carriage. Page: 603 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.04.04.01 For height up to 5m cum


Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 1.9275 liter 160.00 308.40
Head Mason 0.0800 day 650.00 52.00
Mason 0.4500 day 550.00 247.50
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 1.7500 day 370.00 647.50
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 10065.35
Steel Formwork/ shuttering, prop with necessary ( +60.00 % on Subtotal-A ) 6039.21
supports etc.
Subtotal-A1: 16104.56

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 16426.65

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 18069.32


VAT 6% of Total 1204.62
IT 4% of Total 803.08

Note : Rates of all items should be inclusive of all supply and carriage. Page: 604 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 20077.02

4.09.04.04.02 For height above 5m to 10m cum Add +7.50% with Item No 4.09.04.04.01

4.09.04.04.03 For height above 10m to 15m cum Add +15.00% with Item No 4.09.04.04.01

4.09.04.04.04 For height above 15m to 20m cum Add +22.50% with Item No 4.09.04.04.01

4.09.04.04.05 For height above 20m cum Add +30.00% with Item No 4.09.04.04.01

4.09.04.05 For top slab including curb and wheel guard of box culvert

Note : Rates of all items should be inclusive of all supply and carriage. Page: 605 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.04.05.01 For height up to 5 m cum


Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 1.9275 liter 160.00 308.40
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.5000 day 450.00 225.00
Ordinary Labour 1.5000 day 370.00 555.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 9843.85
Steel Formwork/ shuttering, prop with necessary ( +30.00 % on Subtotal-A ) 2953.16
supports etc.
Subtotal-A1: 12797.01

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 13052.95

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 14358.24


VAT 6% of Total 957.22
IT 4% of Total 638.14

Note : Rates of all items should be inclusive of all supply and carriage. Page: 606 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 15953.60

4.09.04.05.02 For height above 5m cum Add +6.00% with Item No 4.09.04.05.01

4.09.04.06 For Arch/ inclined girder of bridges

Note : Rates of all items should be inclusive of all supply and carriage. Page: 607 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.04.06.01 For height up to 5 m cum


Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 1.9275 liter 160.00 308.40
Head Mason 0.0800 day 650.00 52.00
Mason 0.7500 day 550.00 412.50
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 1.7500 day 370.00 647.50
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 10230.35
Steel Formwork/ shuttering, prop with necessary ( +65.00 % on Subtotal-A ) 6649.73
supports etc.
Subtotal-A1: 16880.08

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 17217.68

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 18939.45


VAT 6% of Total 1262.63
IT 4% of Total 841.75

Note : Rates of all items should be inclusive of all supply and carriage. Page: 608 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 21043.83

4.09.04.06.02 For height above 5m to 10m cum Add +12.50% with Item No 4.09.04.06.01

4.09.04.06.03 For height above 10m to 15m cum Add +25.00% with Item No 4.09.04.06.01

4.09.04.06.04 For height above 15m to 20m cum Add +37.50% with Item No 4.09.04.06.01

4.09.04.06.05 For height above 20m cum Add +40.00% with Item No 4.09.04.06.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 609 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.04.07 For RCC deck slab/Cross girder/diaphragm supported on PSC Girder cum
using suspended type staging/ centering and shuttering for any height
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 1.9275 liter 160.00 308.40
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.5000 day 450.00 225.00
Ordinary Labour 1.5000 day 370.00 555.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 9843.85
Steel Formwork/ shuttering, prop with necessary ( +60.00 % on Subtotal-A ) 5906.31
supports etc.
Subtotal-A1: 15750.16

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 16065.16

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 17671.68


VAT 6% of Total 1178.11
IT 4% of Total 785.41

Note : Rates of all items should be inclusive of all supply and carriage. Page: 610 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 19635.20

4.09.04.08 For cast-in-situ/ pre-cast railing and rail post of bridges & culverts

Note : Rates of all items should be inclusive of all supply and carriage. Page: 611 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.04.08.01 For pre-cast railing and rail post cum


Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Stone Chips (12mm down graded) [LAA≤30] 0.8200 m3 4470.00 3665.40
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 1.9275 liter 160.00 308.40
Head Mason 0.0800 day 650.00 52.00
Mason 0.4500 day 550.00 247.50
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 1.7500 day 370.00 647.50
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 9648.85
Steel Formwork/ shuttering, prop with necessary ( +29.00 % on Subtotal-A ) 2798.17
supports etc.
Subtotal-A1: 12447.02

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12695.96

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 13965.55


VAT 6% of Total 931.04
IT 4% of Total 620.69
Total: 15517.28

Note : Rates of all items should be inclusive of all supply and carriage. Page: 612 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.04.08.02 For cast-in-situ railing and rail post cum


Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Stone Chips (12mm down graded) [LAA≤30] 0.8200 m3 4470.00 3665.40
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 1.9275 liter 160.00 308.40
Head Mason 0.0800 day 650.00 52.00
Mason 0.4500 day 550.00 247.50
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 1.7500 day 370.00 647.50
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 9648.85
Steel Formwork/ shuttering, prop with necessary ( +14.00 % on Subtotal-A ) 1350.84
supports etc.
Subtotal-A1: 10999.69

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11219.68

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12341.65


VAT 6% of Total 822.78
IT 4% of Total 548.52
Total: 13712.95

Note : Rates of all items should be inclusive of all supply and carriage. Page: 613 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.04.09 For Pre-cast paving slab for bridge footpath cum


Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 1.9275 liter 160.00 308.40
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.5000 day 450.00 225.00
Ordinary Labour 1.5000 day 370.00 555.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 9843.85
Steel Formwork/ shuttering, prop with necessary ( +9.00 % on Subtotal-A ) 885.95
supports etc.
Subtotal-A1: 10729.80

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10944.39

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12038.83


VAT 6% of Total 802.59
IT 4% of Total 535.06

Note : Rates of all items should be inclusive of all supply and carriage. Page: 614 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 13376.48

4.09.05 RCC-30SCCM: Reinforced cement concrete work with minimum cement


content and maximum water cement ratio as specified by the laboratory
through mix design having minimum required average strength, f'cr =
38.5 MPa and satisfying a compressive strength f'c = 30 MPa at 28
days on standard cylinders as per standard practice of Code AASHTO/
ASTM and cement conforming to BDS EN 197-1 : 2003 CEM-I 52.5N /
ASTM C150 Type-1, high range water reducing admixture of complying
type A or F under ASTM C 494 (Doses of admixture to be fixed by the
mix design), sand of minimum FM 2.5 and 20mm down well graded
crushed stone chips broken from boulders (Preferably stone chips from
Madhyapara, Dinajpur, LAA value not exceeding 30) conforming to
ASTM C33 including breaking chips, screening through proper sieves,
cleaning, placing shutter in position, making shutter water-tight
properly, placing reinforcement in position, mixing in standard mixture
machine with hoper, maintaining allowable slump of 100mm to 150mm,
casting in forms, compacting by mechanical vibrator machine, curing for
28 days, removing centering-shuttering after approved specified time
period, other incidental charges, etc. all complete as per drawing,
specification & direction of the E-I-C. The cost of reinforcement and it's
fabrication, welding, coupling, placing, binding etc. is not included but
the cost of admixture is included in this unit rate. The Mix Design shall
have to be approved by the concerned District Quality Control
Laboratory or any other reputed laboratory approved by the competent
authority before execution of the work.
Note: Using Concrete Mixer

Note : Rates of all items should be inclusive of all supply and carriage. Page: 615 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.05.01 For foundation of Pier & Abutment of Bridges and Box Culverts cum
Ordinary Portland Cement (CEM I, 52.5N) 8.6000 bag 455.00 3913.00
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 10410.40
Steel Formwork/ shuttering, prop with necessary ( +9.00 % on Subtotal-A ) 936.94
supports etc.
Subtotal-A1: 11347.34

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11574.28

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12731.71


VAT 6% of Total 848.78
IT 4% of Total 565.85
Total: 14146.35

4.09.05.02 For diaphragm walls, wing walls, piers, columns, projected pile cap
above water level, pier caps, abutments of bridges and vertical
members of box culverts

Note : Rates of all items should be inclusive of all supply and carriage. Page: 616 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.05.02.01 For height up to 5m cum


Ordinary Portland Cement (CEM I, 52.5N) 8.6000 bag 455.00 3913.00
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 10410.40
Steel Formwork/ shuttering, prop with necessary ( +14.00 % on Subtotal-A ) 1457.46
supports etc.
Subtotal-A1: 11867.86

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12105.21

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 13315.73


VAT 6% of Total 887.72
IT 4% of Total 591.81
Total: 14795.26

4.09.05.02.02 For height above 5m to 10m cum Add +25.00% with Item No 4.09.05.02.01

4.09.05.02.03 For height above 10m to 15m cum Add +50.00% with Item No 4.09.05.02.01

4.09.05.02.04 For height above 15m to 20m cum Add +75.00% with Item No 4.09.05.02.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 617 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.05.02.05 For height above 20m cum Add +80.00% with Item No 4.09.05.02.01

4.09.05.03 For solid slab type super-structure including cantilever, side walk, curb
and wheel guard of bridges

4.09.05.03.01 For height up to 5m cum


Ordinary Portland Cement (CEM I, 52.5N) 8.6000 bag 455.00 3913.00
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 10410.40
Steel Formwork/ shuttering, prop with necessary ( +55.00 % on Subtotal-A ) 5725.72
supports etc.
Subtotal-A1: 16136.12

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 16458.84

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 18104.73


VAT 6% of Total 1206.98
IT 4% of Total 804.65
Total: 20116.36

4.09.05.03.02 For height above 5m to 10m cum Add +11.00% with Item No 4.09.05.03.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 618 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.05.03.03 For height above 10m to 15m cum Add +22.00% with Item No 4.09.05.03.01

4.09.05.03.04 For height above 15m to 20m cum Add +33.00% with Item No 4.09.05.03.01

4.09.05.03.05 For height above 20m cum Add +44.00% with Item No 4.09.05.03.01

4.09.05.04 For T-girder & slab type super-structure including cross girders, side
walk, curb and wheel guard of bridges

Note : Rates of all items should be inclusive of all supply and carriage. Page: 619 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.05.04.01 For height up to 5m cum


Ordinary Portland Cement (CEM I, 52.5N) 8.6000 bag 455.00 3913.00
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.4500 day 550.00 247.50
Skilled Labour 1.0000 day 450.00 450.00
Ordinary Labour 2.2500 day 370.00 832.50
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 10631.90
Steel Formwork/ shuttering, prop with necessary ( +60.00 % on Subtotal-A ) 6379.14
supports etc.
Subtotal-A1: 17011.04

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 17351.26

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 19086.39


VAT 6% of Total 1272.43
IT 4% of Total 848.28
Total: 21207.10

4.09.05.04.02 For height above 5m to 10m cum Add +7.50% with Item No 4.09.05.04.01

4.09.05.04.03 For height above 10m to 15m cum Add +15.00% with Item No 4.09.05.04.01

4.09.05.04.04 For height above 15m to 20m cum Add +22.50% with Item No 4.09.05.04.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 620 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.05.04.05 For height above 20m cum Add +30.00% with Item No 4.09.05.04.01

4.09.05.05 For top slab including curb and wheel guard of box culvert

4.09.05.05.01 For height up to 5m cum


Ordinary Portland Cement (CEM I, 52.5N) 8.6000 bag 455.00 3913.00
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 10410.40
Steel Formwork/ shuttering, prop with necessary ( +30.00 % on Subtotal-A ) 3123.12
supports etc.
Subtotal-A1: 13533.52

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 13804.19

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 15184.61


VAT 6% of Total 1012.31
IT 4% of Total 674.87
Total: 16871.79

4.09.05.05.02 For height above 5m cum Add +6.00% with Item No 4.09.05.05.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 621 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.05.06 For Arch/ inclined girder of bridges

4.09.05.06.01 For height up to 5m cum


Ordinary Portland Cement (CEM I, 52.5N) 8.6000 bag 455.00 3913.00
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.7500 day 550.00 412.50
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.2500 day 370.00 832.50
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 10684.40
Steel Formwork/ shuttering, prop with necessary ( +65.00 % on Subtotal-A ) 6944.86
supports etc.
Subtotal-A1: 17629.26

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 17981.85

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 19780.03


VAT 6% of Total 1318.67
IT 4% of Total 879.11
Total: 21977.81

4.09.05.06.02 For height above 5m to 10m cum Add +12.50% with Item No 4.09.05.06.01

4.09.05.06.03 For height above 10m to 15m cum Add +25.00% with Item No 4.09.05.06.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 622 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.05.06.04 For height above 15m to 20m cum Add +37.50% with Item No 4.09.05.06.01

4.09.05.06.05 For height above 20m cum Add +40.00% with Item No 4.09.05.06.01

4.09.05.07 For RCC deck slab/Cross girder/diaphragm supported on PSC Girder cum
using suspended type staging/ centering and shuttering for any height
Ordinary Portland Cement (CEM I, 52.5N) 8.6000 bag 455.00 3913.00
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 10410.40
Steel Formwork/ shuttering, prop with necessary ( +60.00 % on Subtotal-A ) 6246.24
supports etc.
Subtotal-A1: 16656.64

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 16989.77

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 18688.75


VAT 6% of Total 1245.92
IT 4% of Total 830.61
Total: 20765.28

4.09.05.08 For cast-in-situ/ pre-cast railing and rail post of bridges & box culverts

Note : Rates of all items should be inclusive of all supply and carriage. Page: 623 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.05.08.01 For pre-cast railing and rail post cum


Ordinary Portland Cement (CEM I, 52.5N) 8.6000 bag 455.00 3913.00
Stone Chips (12mm down graded) [LAA≤30] 0.8200 m3 4470.00 3665.40
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.4500 day 550.00 247.50
Skilled Labour 1.0000 day 450.00 450.00
Ordinary Labour 2.2500 day 370.00 832.50
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 10215.40
Steel Formwork/ shuttering, prop with necessary ( +29.00 % on Subtotal-A ) 2962.47
supports etc.
Subtotal-A1: 13177.87

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 13441.42

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 14785.57


VAT 6% of Total 985.70
IT 4% of Total 657.14
Total: 16428.41

Note : Rates of all items should be inclusive of all supply and carriage. Page: 624 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.05.08.02 For cast-in-situ railing and rail post cum


Ordinary Portland Cement (CEM I, 52.5N) 8.6000 bag 455.00 3913.00
Stone Chips (12mm down graded) [LAA≤30] 0.8200 m3 4470.00 3665.40
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.4500 day 550.00 247.50
Skilled Labour 1.0000 day 450.00 450.00
Ordinary Labour 2.2500 day 370.00 832.50
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 10215.40
Steel Formwork/ shuttering, prop with necessary ( +14.00 % on Subtotal-A ) 1430.16
supports etc.
Subtotal-A1: 11645.56

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11878.47

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 13066.31


VAT 6% of Total 871.09
IT 4% of Total 580.73
Total: 14518.13

Note : Rates of all items should be inclusive of all supply and carriage. Page: 625 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.05.09 For Pre-cast paving slab for bridge footpath cum


Ordinary Portland Cement (CEM I, 52.5N) 8.6000 bag 455.00 3913.00
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 10410.40
Steel Formwork/ shuttering, prop with necessary ( +9.00 % on Subtotal-A ) 936.94
supports etc.
Subtotal-A1: 11347.34

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11574.28

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12731.71


VAT 6% of Total 848.78
IT 4% of Total 565.85
Total: 14146.35

Note : Rates of all items should be inclusive of all supply and carriage. Page: 626 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.06 RCC-30SCBP: Reinforced cement concrete work with minimum cement


content and maximum water cement ratio as specified by the laboratory
through mix design having minimum required average compressive
strength, f'cr = 38.5 MPa and satisfying a specified compressive
strength, f'c = 30 MPa at 28 days on standard cylinder as per standard
practice of Code AASHTO/ ASTM and cement conforming to BDS EN
197-1 : 2003 CEM-I 52.5N / ASTM C150 Type-1, high range water
reducing admixture of complying type F/ G under ASTM C494 (Doses of
admixture to be fixed by the mix design) for smart dynamic concrete
(i.e. Low fines self compacting concrete), sand of minimum FM 2.50 and
20mm down well graded crushed stone chips broken from boulders
(Preferably stone chips from Madhyapara, Dinajpur, LAA value not
exceeding 30) conforming to ASTM C 33 including breaking chips,
screening through proper sieves, cleaning, placing shutter in position,
making shutter water-tight properly, placing reinforcement in position,
mixing in mechanized batch mix plant, pumping using line pump or
boom placer, maintaining allowable slump of 100mm to 150mm, casting
in forms, compacting by mechanical vibrator machine, curing for 28
days, removing centering-shuttering after approved specified time
period, other incidental charges, etc. all complete as per drawing,
specification & direction of the E-I-C. The cost of reinforcement and it's
fabrication, placing, binding etc. is not included but the cost of
admixture is included in this unit rate. The Mix Design shall have to be
approved by the concerned District Quality Control Laboratory or any
other reputed laboratory approved by the competent authority before
execution of the work.
Note: Using Batching Plant, Transit Mixer & Concrete Pump

Note : Rates of all items should be inclusive of all supply and carriage. Page: 627 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.06.01 For foundation of Pier & Abutment of Bridges and Facing Elements of cum
Reinforced/ Mechanically Stabilized Earth Structure
Ordinary Portland Cement (CEM I, 52.5N) 8.6000 bag 455.00 3913.00
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.5000 day 450.00 225.00
Ordinary Labour 1.5000 day 370.00 555.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 10477.15
Steel Formwork/ shuttering, prop with necessary ( +9.00 % on Subtotal-A ) 942.94
supports etc.
Subtotal-A1: 11420.09

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11648.50

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12813.34


VAT 6% of Total 854.22
IT 4% of Total 569.48

Note : Rates of all items should be inclusive of all supply and carriage. Page: 628 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 14237.05

4.09.06.02 For diaphragm walls, wing walls, piers, columns, projected pile cap
above water level, pier caps, abutments of bridges

Note : Rates of all items should be inclusive of all supply and carriage. Page: 629 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.06.02.01 For height up to 5 m cum


Ordinary Portland Cement (CEM I, 52.5N) 8.6000 bag 455.00 3913.00
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.5000 day 450.00 225.00
Ordinary Labour 1.5000 day 370.00 555.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 10477.15
Steel Formwork/ shuttering, prop with necessary ( +14.00 % on Subtotal-A ) 1466.80
supports etc.
Subtotal-A1: 11943.95

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12182.83

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 13401.11


VAT 6% of Total 893.41
IT 4% of Total 595.61

Note : Rates of all items should be inclusive of all supply and carriage. Page: 630 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 14890.13

4.09.06.02.02 For height above 5m to 10m cum Add +25.00% with Item No 4.09.06.02.01

4.09.06.02.03 For height above 10m to 15m cum Add +50.00% with Item No 4.09.06.02.01

4.09.06.02.04 For height above 15m to 20m cum Add +75.00% with Item No 4.09.06.02.01

4.09.06.02.05 For height above 20m cum Add +80.00% with Item No 4.09.06.02.01

4.09.06.03 For solid slab type super-structure including cantilever, side walk, curb
and wheel guard of bridges

Note : Rates of all items should be inclusive of all supply and carriage. Page: 631 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.06.03.01 For Height up to 5m cum


Ordinary Portland Cement (CEM I, 52.5N) 8.6000 bag 455.00 3913.00
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.5000 day 450.00 225.00
Ordinary Labour 1.5000 day 370.00 555.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 10477.15
Steel Formwork/ shuttering, prop with necessary ( +55.00 % on Subtotal-A ) 5762.43
supports etc.
Subtotal-A1: 16239.58

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 16564.37

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 18220.81


VAT 6% of Total 1214.72
IT 4% of Total 809.81

Note : Rates of all items should be inclusive of all supply and carriage. Page: 632 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 20245.35

4.09.06.03.02 For height above 5m to 10m cum Add +10.00% with Item No 4.09.06.03.01

4.09.06.03.03 For height above 10m to 15m cum Add +20.00% with Item No 4.09.06.03.01

4.09.06.03.04 For height above 15m to 20m cum Add +30.00% with Item No 4.09.06.03.01

4.09.06.03.05 For height above 20m cum Add +40.00% with Item No 4.09.06.03.01

4.09.06.04 For T-girder & slab type super-structure including cross girders, side
walk, curb and wheel guard of bridges

Note : Rates of all items should be inclusive of all supply and carriage. Page: 633 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.06.04.01 For Height up to 5m cum


Ordinary Portland Cement (CEM I, 52.5N) 8.6000 bag 455.00 3913.00
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.4500 day 550.00 247.50
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 1.7500 day 370.00 647.50
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 10698.65
Steel Formwork/ shuttering, prop with necessary ( +60.00 % on Subtotal-A ) 6419.19
supports etc.
Subtotal-A1: 17117.84

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 17460.20

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 19206.22


VAT 6% of Total 1280.41
IT 4% of Total 853.61

Note : Rates of all items should be inclusive of all supply and carriage. Page: 634 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 21340.24

4.09.06.04.02 For height above 5m to 10m cum Add +6.50% with Item No 4.09.06.04.01

4.09.06.04.03 For height above 10m to 15m cum Add +13.00% with Item No 4.09.06.04.01

4.09.06.04.04 For height above 15m to 20m cum Add +19.50% with Item No 4.09.06.04.01

4.09.06.04.05 For height above 20m cum Add +26.00% with Item No 4.09.06.04.01

4.09.06.05 For top slab including curb and wheel guard of box culvert

Note : Rates of all items should be inclusive of all supply and carriage. Page: 635 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.06.05.01 For height up to 5m cum


Ordinary Portland Cement (CEM I, 52.5N) 8.6000 bag 455.00 3913.00
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.5000 day 450.00 225.00
Ordinary Labour 1.5000 day 370.00 555.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 10477.15
Steel Formwork/ shuttering, prop with necessary ( +30.00 % on Subtotal-A ) 3143.15
supports etc.
Subtotal-A1: 13620.30

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 13892.70

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 15281.97


VAT 6% of Total 1018.80
IT 4% of Total 679.20

Note : Rates of all items should be inclusive of all supply and carriage. Page: 636 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 16979.97

4.09.06.05.02 For height above 5m cum Add +5.50% with Item No 4.09.06.05.01

4.09.06.06 For Arch/ inclined girder of bridges

Note : Rates of all items should be inclusive of all supply and carriage. Page: 637 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.06.06.01 For Height up to 5m cum


Ordinary Portland Cement (CEM I, 52.5N) 8.6000 bag 455.00 3913.00
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.7500 day 550.00 412.50
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 1.7500 day 370.00 647.50
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 10863.65
Steel Formwork/ shuttering, prop with necessary ( +62.50 % on Subtotal-A ) 6789.78
supports etc.
Subtotal-A1: 17653.43

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 18006.50

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 19807.15


VAT 6% of Total 1320.48
IT 4% of Total 880.32

Note : Rates of all items should be inclusive of all supply and carriage. Page: 638 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 22007.94

4.09.06.06.02 For height above 5m to 10m cum Add +12.50% with Item No 4.09.06.06.01

4.09.06.06.03 For height above 10m to 15m cum Add +25.00% with Item No 4.09.06.06.01

4.09.06.06.04 For height above 15m to 20m cum Add +37.50% with Item No 4.09.06.06.01

4.09.06.06.05 For height above 20m cum Add +40.00% with Item No 4.09.06.06.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 639 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.06.07 For RCC deck slab/Cross girder/diaphragm supported on PSC Girder cum
using suspended type staging/ centering and shuttering for any height
Ordinary Portland Cement (CEM I, 52.5N) 8.6000 bag 455.00 3913.00
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.5000 day 450.00 225.00
Ordinary Labour 1.5000 day 370.00 555.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 10477.15
Steel Formwork/ shuttering, prop with necessary ( +60.00 % on Subtotal-A ) 6286.29
supports etc.
Subtotal-A1: 16763.44

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 17098.71

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 18808.58


VAT 6% of Total 1253.91
IT 4% of Total 835.94

Note : Rates of all items should be inclusive of all supply and carriage. Page: 640 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 20898.42

4.09.06.08 For Box Girder and Balanced Cantilever

Note : Rates of all items should be inclusive of all supply and carriage. Page: 641 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.06.08.01 For height up to 5m cum


Ordinary Portland Cement (CEM I, 52.5N) 8.6000 bag 455.00 3913.00
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.7500 day 550.00 412.50
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 1.7500 day 370.00 647.50
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 10863.65
Steel Formwork/ shuttering, prop with necessary ( +65.00 % on Subtotal-A ) 7061.37
supports etc.
Subtotal-A1: 17925.02

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 18283.52

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 20111.88


VAT 6% of Total 1340.79
IT 4% of Total 893.86

Note : Rates of all items should be inclusive of all supply and carriage. Page: 642 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 22346.53

4.09.06.08.02 For height above 5m to 10m cum Add +12.50% with Item No 4.09.06.08.01

4.09.06.08.03 For height above 10m to 15m cum Add +25.00% with Item No 4.09.06.08.01

4.09.06.08.04 For height above 15m to 20m cum Add +37.50% with Item No 4.09.06.08.01

4.09.06.08.05 For height above 20m cum Add +40.00% with Item No 4.09.06.08.01

4.09.07 RCC-35SCBP: Reinforced cement concrete work with minimum cement


content and maximum water cement ratio as specified by the laboratory
through mix design having minimum required average compressive
strength, f'cr = 45 MPa and satisfying a specified compressive strength,
f'c = 35 MPa at 28 days on standard cylinder as per standard practice of
Code AASHTO/ ASTM and cement conforming to BDS EN 197-1 : 2003
CEM-I 52.5N / ASTM C150 Type-1, high range water reducing
admixture of complying type F/ G under ASTM C494 (Doses of
admixture to be fixed by the mix design) for smart dynamic concrete
(i.e. Low fines self compacting concrete), sand of minimum FM 2.80 and
20mm down well graded crushed stone chips broken from boulders
(LAA value not exceeding 25) conforming to ASTM C 33 including
breaking chips, screening through proper sieves, cleaning, placing
shutter in position, making shutter water-tight properly, placing
reinforcement in position, mixing in mechanized batch mix plant,
pumping using line pump or boom placer, maintaining allowable slump
of 100mm to 150mm, casting in forms, compacting by mechanical
vibrator machine, curing for 28 days, removing centering-shuttering
after approved specified time period, other incidental charges, etc. all
complete as per drawing, specification & direction of the E-I-C. The cost
of reinforcement and it's fabrication, placing, binding etc. is not included
but the cost of admixture is included in this unit rate. The Mix Design
shall have to be approved by Central Quality Control Laboratory (CQCL),
LGED or any other reputed laboratory approved by the competent
authority before execution of the work.
Note: Using Batching Plant, Transit Mixer & Concrete Pump

Note : Rates of all items should be inclusive of all supply and carriage. Page: 643 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.07.01 For foundation of Pier & Abutment of Bridges and Facing Elements of cum
Reinforced/ Mechanically Stabilized Earth Structure
Ordinary Portland Cement (CEM I, 52.5N) 9.0000 bag 455.00 4095.00
Stone Chips (20mm down graded) [LAA≤25] 0.4900 cum 5730.00 2807.70
Stone Chips (12mm down graded) [LAA≤25] 0.3300 cum 4640.00 1531.20
Sand (FM - 2.8) 0.4100 m3 1602.00 656.82
Water-reducing high range chemical admixture : Type-F 2.2500 liter 160.00 360.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.5000 day 450.00 225.00
Ordinary Labour 1.5000 day 370.00 555.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 10973.97
Steel Formwork/ shuttering, prop with necessary ( +9.00 % on Subtotal-A ) 987.66
supports etc.
Subtotal-A1: 11961.63

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12200.86

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 13420.95


VAT 6% of Total 894.73
IT 4% of Total 596.49

Note : Rates of all items should be inclusive of all supply and carriage. Page: 644 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 14912.16

4.09.07.02 For diaphragm walls, wing walls, piers, columns, projected pile cap
above water level, pier caps, abutments of bridges

Note : Rates of all items should be inclusive of all supply and carriage. Page: 645 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.07.02.01 For height up to 5 m cum


Ordinary Portland Cement (CEM I, 52.5N) 9.0000 bag 455.00 4095.00
Stone Chips (20mm down graded) [LAA≤25] 0.4900 cum 5730.00 2807.70
Stone Chips (12mm down graded) [LAA≤25] 0.3300 cum 4640.00 1531.20
Sand (FM - 2.8) 0.4100 m3 1602.00 656.82
Water-reducing high range chemical admixture : Type-F 2.2500 liter 160.00 360.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.5000 day 450.00 225.00
Ordinary Labour 1.5000 day 370.00 555.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 10973.97
Steel Formwork/ shuttering, prop with necessary ( +14.00 % on Subtotal-A ) 1536.36
supports etc.
Subtotal-A1: 12510.33

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12760.53

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 14036.59


VAT 6% of Total 935.77
IT 4% of Total 623.85

Note : Rates of all items should be inclusive of all supply and carriage. Page: 646 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 15596.21

4.09.07.02.02 For height above 5m to 10m cum Add +25.00% with Item No 4.09.07.02.01

4.09.07.02.03 For height above 10m to 15m cum Add +50.00% with Item No 4.09.07.02.01

4.09.07.02.04 For height above 15m to 20m cum Add +75.00% with Item No 4.09.07.02.01

4.09.07.02.05 For height above 20m cum Add +80.00% with Item No 4.09.07.02.01

4.09.07.03 For solid slab type super-structure including cantilever, side walk, curb
and wheel guard of bridges

Note : Rates of all items should be inclusive of all supply and carriage. Page: 647 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.07.03.01 For height up to 5 m cum


Ordinary Portland Cement (CEM I, 52.5N) 9.0000 bag 455.00 4095.00
Stone Chips (20mm down graded) [LAA≤25] 0.4900 cum 5730.00 2807.70
Stone Chips (12mm down graded) [LAA≤25] 0.3300 cum 4640.00 1531.20
Sand (FM - 2.8) 0.4100 m3 1602.00 656.82
Water-reducing high range chemical admixture : Type-F 2.2500 liter 160.00 360.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.5000 day 450.00 225.00
Ordinary Labour 1.5000 day 370.00 555.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 10973.97
Steel Formwork/ shuttering, prop with necessary ( +50.00 % on Subtotal-A ) 5486.99
supports etc.
Subtotal-A1: 16460.96

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 16790.17

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 18469.19


VAT 6% of Total 1231.28
IT 4% of Total 820.85

Note : Rates of all items should be inclusive of all supply and carriage. Page: 648 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 20521.32

4.09.07.03.02 For height above 5m to 10m cum Add +9.50% with Item No 4.09.07.03.01

4.09.07.03.03 For height above 10m to 15m cum Add +19.00% with Item No 4.09.07.03.01

4.09.07.03.04 For height above 15m to 20m cum Add +28.50% with Item No 4.09.07.03.01

4.09.07.03.05 For height above 20m cum Add +38.00% with Item No 4.09.07.03.01

4.09.07.04 For T-girder & slab type super-structure including cross girders, side
walk, curb and wheel guard of bridges

Note : Rates of all items should be inclusive of all supply and carriage. Page: 649 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.07.04.01 For height up to 5 m cum


Ordinary Portland Cement (CEM I, 52.5N) 9.0000 bag 455.00 4095.00
Stone Chips (20mm down graded) [LAA≤25] 0.4900 cum 5730.00 2807.70
Stone Chips (12mm down graded) [LAA≤25] 0.3300 cum 4640.00 1531.20
Sand (FM - 2.8) 0.4100 m3 1602.00 656.82
Water-reducing high range chemical admixture : Type-F 2.2500 liter 160.00 360.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.4500 day 550.00 247.50
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 1.7500 day 370.00 647.50
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 11195.47
Steel Formwork/ shuttering, prop with necessary ( +55.00 % on Subtotal-A ) 6157.51
supports etc.
Subtotal-A1: 17352.98

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 17700.04

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 19470.04


VAT 6% of Total 1298.00
IT 4% of Total 865.34

Note : Rates of all items should be inclusive of all supply and carriage. Page: 650 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 21633.38

4.09.07.04.02 For height above 5m to 10m cum Add +6.50% with Item No 4.09.07.04.01

4.09.07.04.03 For height above 10m to 15m cum Add +13.00% with Item No 4.09.07.04.01

4.09.07.04.04 For height above 15m to 20m cum Add +19.50% with Item No 4.09.07.04.01

4.09.07.04.05 For height above 20m cum Add +26.00% with Item No 4.09.07.04.01

4.09.07.05 For Arch/ inclined girder of bridges

Note : Rates of all items should be inclusive of all supply and carriage. Page: 651 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.07.05.01 For height up to 5 m cum


Ordinary Portland Cement (CEM I, 52.5N) 9.0000 bag 455.00 4095.00
Stone Chips (20mm down graded) [LAA≤25] 0.4900 cum 5730.00 2807.70
Stone Chips (12mm down graded) [LAA≤25] 0.3300 cum 4640.00 1531.20
Sand (FM - 2.8) 0.4100 m3 1602.00 656.82
Water-reducing high range chemical admixture : Type-F 2.2500 liter 160.00 360.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.7500 day 550.00 412.50
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 1.7500 day 370.00 647.50
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 11360.47
Steel Formwork/ shuttering, prop with necessary ( +60.00 % on Subtotal-A ) 6816.28
supports etc.
Subtotal-A1: 18176.75

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 18540.29

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 20394.32


VAT 6% of Total 1359.62
IT 4% of Total 906.41

Note : Rates of all items should be inclusive of all supply and carriage. Page: 652 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 22660.35

4.09.07.05.02 For height above 5m to 10m cum Add +12.50% with Item No 4.09.07.05.01

4.09.07.05.03 For height above 10m to 15m cum Add +25.00% with Item No 4.09.07.05.01

4.09.07.05.04 For height above 15m to 20m cum Add +37.50% with Item No 4.09.07.05.01

4.09.07.05.05 For height above 20m cum Add +40.00% with Item No 4.09.07.05.01

4.09.07.06 For Box Girder, Segmental Construction and Balanced Cantilever

Note : Rates of all items should be inclusive of all supply and carriage. Page: 653 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.07.06.01 For height up to 5m cum


Ordinary Portland Cement (CEM I, 52.5N) 9.0000 bag 455.00 4095.00
Stone Chips (20mm down graded) [LAA≤25] 0.4900 cum 5730.00 2807.70
Stone Chips (12mm down graded) [LAA≤25] 0.3300 cum 4640.00 1531.20
Sand (FM - 2.8) 0.4100 m3 1602.00 656.82
Water-reducing high range chemical admixture : Type-F 2.2500 liter 160.00 360.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.7500 day 550.00 412.50
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 1.7500 day 370.00 647.50
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 11360.47
Steel Formwork/ shuttering, prop with necessary ( +62.50 % on Subtotal-A ) 7100.29
supports etc.
Subtotal-A1: 18460.76

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 18829.98

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 20712.98


VAT 6% of Total 1380.87
IT 4% of Total 920.58

Note : Rates of all items should be inclusive of all supply and carriage. Page: 654 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 23014.42

4.09.07.06.02 For height above 5m to 10m cum Add +12.50% with Item No 4.09.07.06.01

4.09.07.06.03 For height above 10m to 15m cum Add +25.00% with Item No 4.09.07.06.01

4.09.07.06.04 For height above 15m to 20m cum Add +37.50% with Item No 4.09.07.06.01

4.09.07.06.05 For height above 20m cum Add +40.00% with Item No 4.09.07.06.01

4.09.08 RCC-40SCBP: Reinforced cement concrete work with minimum cement


content and maximum water cement ratio as specified by the laboratory
through mix design having minimum required average compressive
strength, f'cr = 50 MPa and satisfying a specified compressive strength,
f'c = 40 MPa at 28 days on standard cylinder as per standard practice of
Code AASHTO/ ASTM and cement conforming to BDS EN 197-1 : 2003
CEM-I 52.5N / ASTM C150 Type-1, high range water reducing
admixture of complying type F/ G under ASTM C494 (Doses of
admixture to be fixed by the mix design) for smart dynamic concrete
(i.e. Low fines self compacting concrete), sand of minimum FM 2.80 and
20mm down well graded crushed stone chips broken from boulders
(LAA value not exceeding 25) conforming to ASTM C 33 including
breaking chips, screening through proper sieves, cleaning, placing
shutter in position, making shutter water-tight properly, placing
reinforcement in position, mixing in mechanized batch mix plant,
pumping using line pump or boom placer, maintaining allowable slump
of 100mm to 150mm, casting in forms, compacting by mechanical
vibrator machine, curing for 28 days, removing centering-shuttering
after approved specified time period, other incidental charges, etc. all
complete as per drawing, specification & direction of the E-I-C. The cost
of reinforcement and it's fabrication, placing, binding etc. is not included
but the cost of admixture is included in this unit rate. The Mix Design
shall have to be approved by Central Quality Control Laboratory (CQCL),
LGED or any other reputed laboratory approved by the competent
authority before execution of the work.
Note: Using Batching Plant, Transit Mixer & Concrete Pump

Note : Rates of all items should be inclusive of all supply and carriage. Page: 655 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.08.01 For foundation of Pier & Abutment of bridges cum


Ordinary Portland Cement (CEM I, 52.5N) 9.4000 bag 455.00 4277.00
Stone Chips (20mm down graded) [LAA≤25] 0.4900 cum 5730.00 2807.70
Stone Chips (12mm down graded) [LAA≤25] 0.3300 cum 4640.00 1531.20
Sand (FM - 2.8) 0.4100 m3 1602.00 656.82
Water-reducing high range chemical admixture : Type-F 2.3500 liter 160.00 376.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.5000 day 450.00 225.00
Ordinary Labour 1.5000 day 370.00 555.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 11171.97
Steel Formwork/ shuttering, prop with necessary ( +9.00 % on Subtotal-A ) 1005.48
supports etc.
Subtotal-A1: 12177.45

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12421.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 13663.10


VAT 6% of Total 910.87
IT 4% of Total 607.25

Note : Rates of all items should be inclusive of all supply and carriage. Page: 656 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 15181.22

4.09.08.02 For diaphragm walls, wing walls, piers, columns, projected pile cap
above water level, pier caps, abutments of bridges

Note : Rates of all items should be inclusive of all supply and carriage. Page: 657 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.08.02.01 For height up to 5m cum


Ordinary Portland Cement (CEM I, 52.5N) 9.4000 bag 455.00 4277.00
Stone Chips (20mm down graded) [LAA≤25] 0.4900 cum 5730.00 2807.70
Stone Chips (12mm down graded) [LAA≤25] 0.3300 cum 4640.00 1531.20
Sand (FM - 2.8) 0.4100 m3 1602.00 656.82
Water-reducing high range chemical admixture : Type-F 2.3500 liter 160.00 376.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.5000 day 450.00 225.00
Ordinary Labour 1.5000 day 370.00 555.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 11171.97
Steel Formwork/ shuttering, prop with necessary ( +14.00 % on Subtotal-A ) 1564.08
supports etc.
Subtotal-A1: 12736.05

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12990.77

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 14289.84


VAT 6% of Total 952.66
IT 4% of Total 635.10

Note : Rates of all items should be inclusive of all supply and carriage. Page: 658 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 15877.60

4.09.08.02.02 For height above 5m to 10m cum Add +25.00% with Item No 4.09.08.02.01

4.09.08.02.03 For height above 10m to 15m cum Add +50.00% with Item No 4.09.08.02.01

4.09.08.02.04 For height above 15m to 20m cum Add +75.00% with Item No 4.09.08.02.01

4.09.08.02.05 For height above 20m cum Add +80.00% with Item No 4.09.08.02.01

4.09.08.03 For solid slab type super-structure including cantilever, side walk, curb
and wheel guard of bridges

Note : Rates of all items should be inclusive of all supply and carriage. Page: 659 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.08.03.01 For height up to 5m cum


Ordinary Portland Cement (CEM I, 52.5N) 9.4000 bag 455.00 4277.00
Stone Chips (20mm down graded) [LAA≤25] 0.4900 cum 5730.00 2807.70
Stone Chips (12mm down graded) [LAA≤25] 0.3300 cum 4640.00 1531.20
Sand (FM - 2.8) 0.4100 m3 1602.00 656.82
Water-reducing high range chemical admixture : Type-F 2.3500 liter 160.00 376.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.5000 day 450.00 225.00
Ordinary Labour 1.5000 day 370.00 555.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Diesel 1.0730 liter 68.00 72.96

Subtotal-A: 11244.93
Steel Formwork/ shuttering, prop with necessary ( +50.00 % on Subtotal-A ) 5622.47
supports etc.
Subtotal-A1: 16867.40

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 17204.75

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 18925.22


VAT 6% of Total 1261.68

Note : Rates of all items should be inclusive of all supply and carriage. Page: 660 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

IT 4% of Total 841.12
Total: 21028.03

4.09.08.03.02 For height above 5m to 10m cum Add +9.50% with Item No 4.09.08.03.01

4.09.08.03.03 For height above 14m to 15m cum Add +19.00% with Item No 4.09.08.03.01

4.09.08.03.04 For height above 19m to 20m cum Add +28.50% with Item No 4.09.08.03.01

4.09.08.03.05 For height above 20m cum Add +38.00% with Item No 4.09.08.03.01

4.09.08.04 For T-girder & slab type super-structure including cross girders, side
walk, curb and wheel guard of bridges

Note : Rates of all items should be inclusive of all supply and carriage. Page: 661 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.08.04.01 For height up to 5m cum


Ordinary Portland Cement (CEM I, 52.5N) 9.4000 bag 455.00 4277.00
Stone Chips (20mm down graded) [LAA≤25] 0.4900 cum 5730.00 2807.70
Stone Chips (12mm down graded) [LAA≤25] 0.3300 cum 4640.00 1531.20
Sand (FM - 2.8) 0.4100 m3 1602.00 656.82
Water-reducing high range chemical admixture : Type-F 2.3500 liter 160.00 376.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.4500 day 550.00 247.50
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 1.7500 day 370.00 647.50
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 11393.47
Steel Formwork/ shuttering, prop with necessary ( +55.00 % on Subtotal-A ) 6266.41
supports etc.
Subtotal-A1: 17659.88

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 18013.08

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 19814.38


VAT 6% of Total 1320.96
IT 4% of Total 880.64

Note : Rates of all items should be inclusive of all supply and carriage. Page: 662 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 22015.98

4.09.08.04.02 For height above 5m to 10m cum Add +6.00% with Item No 4.09.08.04.01

4.09.08.04.03 For height above 10m to 15m cum Add +12.00% with Item No 4.09.08.04.01

4.09.08.04.04 For height above 15m to 20m cum Add +18.00% with Item No 4.09.08.04.01

4.09.08.04.05 For height above 20m cum Add +24.00% with Item No 4.09.08.04.01

4.09.08.05 For Arch/ inclined girder of bridges

Note : Rates of all items should be inclusive of all supply and carriage. Page: 663 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.08.05.01 For height up to 5m cum


Ordinary Portland Cement (CEM I, 52.5N) 9.4000 bag 455.00 4277.00
Stone Chips (20mm down graded) [LAA≤25] 0.4900 cum 5730.00 2807.70
Stone Chips (12mm down graded) [LAA≤25] 0.3300 cum 4640.00 1531.20
Sand (FM - 2.8) 0.4100 m3 1602.00 656.82
Water-reducing high range chemical admixture : Type-F 2.3500 liter 160.00 376.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.7500 day 550.00 412.50
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 1.7500 day 370.00 647.50
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 11558.47
Steel Formwork/ shuttering, prop with necessary ( +57.50 % on Subtotal-A ) 6646.12
supports etc.
Subtotal-A1: 18204.59

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 18568.68

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 20425.55


VAT 6% of Total 1361.70
IT 4% of Total 907.80

Note : Rates of all items should be inclusive of all supply and carriage. Page: 664 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 22695.06

4.09.08.05.02 For height above 5m to 10m cum Add +12.50% with Item No 4.09.08.05.01

4.09.08.05.03 For height above 10m to 15m cum Add +25.00% with Item No 4.09.08.05.01

4.09.08.05.04 For height above 15m to 20m cum Add +37.50% with Item No 4.09.08.05.01

4.09.08.05.05 For height above 20m cum Add +40.00% with Item No 4.09.08.05.01

4.09.08.06 For Box Girder, Segmental Construction and Balanced Cantilever

Note : Rates of all items should be inclusive of all supply and carriage. Page: 665 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.09.08.06.01 For height up to 5m cum


Ordinary Portland Cement (CEM I, 52.5N) 9.4000 bag 455.00 4277.00
Stone Chips (20mm down graded) [LAA≤25] 0.4900 cum 5730.00 2807.70
Stone Chips (12mm down graded) [LAA≤25] 0.3300 cum 4640.00 1531.20
Sand (FM - 2.8) 0.4100 m3 1602.00 656.82
Water-reducing high range chemical admixture : Type-F 2.3500 liter 160.00 376.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.7500 day 550.00 412.50
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 1.7500 day 370.00 647.50
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 11558.47
Steel Formwork/ shuttering, prop with necessary ( +62.50 % on Subtotal-A ) 7224.04
supports etc.
Subtotal-A1: 18782.51

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 19158.16

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 21073.98


VAT 6% of Total 1404.93
IT 4% of Total 936.62

Note : Rates of all items should be inclusive of all supply and carriage. Page: 666 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 23415.53

4.09.08.06.02 For height above 5m to 10m cum Add +12.50% with Item No 4.09.08.06.01

4.09.08.06.03 For height above 10m to 15m cum Add +25.00% with Item No 4.09.08.06.01

4.09.08.06.04 For height above 15m to 20m cum Add +37.50% with Item No 4.09.08.06.01

4.09.08.06.05 For height above 20m cum Add +40.00% with Item No 4.09.08.06.01

4.10.01 PSC-35SCCM: Providing and laying Cement Concrete in Pre-stressed


Concrete works with minimum cement content and maximum water
cement ratio as specified by the laboratory through mix design having
minimum required average compressive strength, f'cr = 45 MPa and
satisfying a specified compressive strength, f'c = 35 MPa at 28 days on
standard cylinder as per standard practice of Code AASHTO/ ASTM and
cement conforming to BDS EN 197-1 : 2003 CEM-I 52.5N / ASTM C150
Type-1, high range water reducing admixture of complying type F/ G
under ASTM C494 (Doses of admixture to be fixed by the mix design)
for smart dynamic concrete (i.e. Low fines self compacting concrete),
sand of minimum FM 2.80 and 20mm down well graded crushed stone
chips broken from boulders (LAA value not exceeding 25) conforming to
ASTM C 33 , including breaking stone boulders into chips, screening
through proper sieves, making and placing shutter in position, making
shutter water-tight properly, placing non prestressing reinforcement, HT
Strand, sheath, anchorage in position, mixing in standard mixture
machine with hoper, maintaining allowable slump of 75mm to 100mm,
casting in forms, compacting by mechanical vibrator machine, curing at
least for 28 days, removing shutter after specified time period, finishing,
launching, shifting & placing in position etc. including cost of water,
electricity, other incidental charges etc. all complete as per design,
drawing, specification & directionn of E-I-C. The cost of non
prestressing reinforcement, HT Strand and it's fabrication, binding,
welding and placing is not included but the cost of admixture is included
in this unit rate. The Mix Design shall have to be approved by Central
Quality Control Laboratory (CQCL), LGED or any other reputed
laboratory approved by the competent authority before execution of the
work.
Note: Using Concrete Mixture

Note : Rates of all items should be inclusive of all supply and carriage. Page: 667 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.10.01.01 For Solid Slab/ voided slab Super-structure.

4.10.01.01.01 For height up to 5 m cum


Ordinary Portland Cement (CEM I, 52.5N) 9.0000 bag 455.00 4095.00
Stone Chips (20mm down graded) [LAA≤25] 0.4900 cum 5730.00 2807.70
Stone Chips (12mm down graded) [LAA≤25] 0.3300 cum 4640.00 1531.20
Sand (FM - 2.8) 0.4100 m3 1602.00 656.82
Water-reducing high range and retrading chemical admixture 2.7000 liter 160.00 432.00
: Type-G
Head Mason 0.0600 day 650.00 39.00
Mason 0.3500 day 550.00 192.50
Skilled Labour 1.0000 day 450.00 450.00
Ordinary Labour 2.5000 day 370.00 925.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 11225.22
Steel Formwork/ shuttering, prop with necessary ( +50.00 % on Subtotal-A ) 5612.61
supports, girder shifting/ launching, steel sheath &
all necessary equipment etc.
Subtotal-A1: 16837.83

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 17174.59

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 18892.05


VAT 6% of Total 1259.47
IT 4% of Total 839.65
Total: 20991.16

4.10.01.01.02 For height above 5 m to 10 m cum Add +10.00% with Item No 4.10.01.01.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 668 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.10.01.01.03 For height above 10 m to 15 m cum Add +20.00% with Item No 4.10.01.01.01

4.10.01.01.04 For height above 15 m to 20 m cum Add +30.00% with Item No 4.10.01.01.01

4.10.01.01.05 For height above 20 m cum Add +40.00% with Item No 4.10.01.01.01

4.10.01.02 For I-Girder/T-Girder including casting of girders on staging at site or


launching of precast girders by launching truss.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 669 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.10.01.02.01 For height up to 5 m cum


Ordinary Portland Cement (CEM I, 52.5N) 9.0000 bag 455.00 4095.00
Stone Chips (20mm down graded) [LAA≤25] 0.4900 cum 5730.00 2807.70
Stone Chips (12mm down graded) [LAA≤25] 0.3300 cum 4640.00 1531.20
Sand (FM - 2.8) 0.4100 m3 1602.00 656.82
Water-reducing high range and retrading chemical admixture 2.7000 liter 160.00 432.00
: Type-G
Head Mason 0.0600 day 650.00 39.00
Mason 0.3500 day 550.00 192.50
Skilled Labour 1.0000 day 450.00 450.00
Ordinary Labour 2.5000 day 370.00 925.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 11225.22
Steel Formwork/ shuttering, prop with necessary ( +80.00 % on Subtotal-A ) 8980.18
supports, girder shifting/ launching, steel sheath &
all necessary equipment etc.
Subtotal-A1: 20205.40

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 20609.50

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 22670.45


VAT 6% of Total 1511.36
IT 4% of Total 1007.58
Total: 25189.39

4.10.01.02.02 For height above 5 m to 10 m cum Add +6.00% with Item No 4.10.01.02.01

4.10.01.02.03 For height above 10 m to 15 m cum Add +12.00% with Item No 4.10.01.02.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 670 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.10.01.02.04 For height above 15 m to 20 m cum Add +18.00% with Item No 4.10.01.02.01

4.10.01.02.05 For height above 20 m cum Add +24.00% with Item No 4.10.01.02.01

4.10.01.03 For cast-in-situ box girder, segmental construction and balanced


cantilever.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 671 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.10.01.03.01 For height up to 5 m cum


Ordinary Portland Cement (CEM I, 52.5N) 9.0000 bag 455.00 4095.00
Stone Chips (20mm down graded) [LAA≤25] 0.4900 cum 5730.00 2807.70
Stone Chips (12mm down graded) [LAA≤25] 0.3300 cum 4640.00 1531.20
Sand (FM - 2.8) 0.4100 m3 1602.00 656.82
Water-reducing high range and retrading chemical admixture 2.7000 liter 160.00 432.00
: Type-G
Head Mason 0.0600 day 650.00 39.00
Mason 0.3500 day 550.00 192.50
Skilled Labour 1.0000 day 450.00 450.00
Ordinary Labour 2.5000 day 370.00 925.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 11225.22
Steel Formwork/ shuttering, prop with necessary ( +100.00 % on Subtotal-A ) 11225.22
supports, girder shifting/ launching, steel sheath &
all necessary equipment etc.
Subtotal-A1: 22450.44

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 22899.45

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 25189.39


VAT 6% of Total 1679.29
IT 4% of Total 1119.53
Total: 27988.22

4.10.01.03.02 For height above 5 m to 10 m cum Add +6.50% with Item No 4.10.01.03.01

4.10.01.03.03 For height above 10 m to 15 m cum Add +13.00% with Item No 4.10.01.03.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 672 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.10.01.03.04 For height above 15 m to 20 m cum Add +19.50% with Item No 4.10.01.03.01

4.10.01.03.05 For height above 20 m cum Add +26.00% with Item No 4.10.01.03.01

4.10.02 PSC-35SCBP: Providing and laying Cement Concrete in Pre-stressed


Concrete works with minimum cement content and maximum water
cement ratio as specified by the laboratory through mix design having
minimum required average compressive strength, f'cr = 45 MPa and
satisfying a specified compressive strength, f'c = 35 MPa at 28 days on
standard cylinder as per standard practice of Code AASHTO/ ASTM and
cement conforming to BDS EN 197-1 : 2003 CEM-I 52.5N / ASTM C150
Type-1, high range water reducing admixture of complying type F/ G
under ASTM C494 (Doses of admixture to be fixed by the mix design)
for smart dynamic concrete (i.e. Low fines self compacting concrete),
sand of minimum FM 2.80 and 20mm down well graded crushed stone
chips broken from boulders (LAA value not exceeding 25) conforming to
ASTM C 33, including breaking stone boulders into chips, screening
through proper sieves, making and placing shutter in position, making
shutter water-tight properly, placing non prestressing reinforcement, HT
Strand, sheath, anchorage in position, mixing in mechanized batch mix
plant & pumping using line pump or boom placer, maintaining allowable
slump of 125mm to 150mm, casting in forms, compacting by
mechanical vibrator machine, curing at least for 28 days, removing
shutter after specified time period, finishing, launching, shifting &
placing in position etc. including cost of water, electricity, other
incidental charges etc. all complete as per design, drawing, specification
& directionn of E-I-C. The cost of non prestressing reinforcement, HT
Strand and it's fabrication, binding, welding and placing is not included
but the cost of admixture is included in this unit rate. The Mix Design
shall have to be approved by Central Quality Control Laboratory (CQCL),
LGED or or any other reputed laboratory approved by the competent
authority before execution of the workk.
Note: Using Batching Plant, Transit Mixer & Concrete Pump

4.10.02.01 For Solid Slab/voided slab Super-structure.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 673 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.10.02.01.01 For height up to 5 m cum


Ordinary Portland Cement (CEM I, 52.5N) 9.0000 bag 455.00 4095.00
Stone Chips (20mm down graded) [LAA≤25] 0.4900 cum 5730.00 2807.70
Stone Chips (12mm down graded) [LAA≤25] 0.3300 cum 4640.00 1531.20
Sand (FM - 2.8) 0.4100 m3 1602.00 656.82
Water-reducing high range and retrading chemical admixture 3.6000 liter 160.00 576.00
: Type-G
Head Mason 0.0600 day 650.00 39.00
Mason 0.3500 day 550.00 192.50
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 11435.97
Steel Formwork/ shuttering, prop with necessary ( +50.00 % on Subtotal-A ) 5717.99
supports, girder shifting/ launching, steel sheath &
all necessary equipment etc.
Subtotal-A1: 17153.96

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 17497.03

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 19246.74


VAT 6% of Total 1283.12

Note : Rates of all items should be inclusive of all supply and carriage. Page: 674 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

IT 4% of Total 855.41
Total: 21385.26

4.10.02.01.02 For height above 5 m to 10 m cum Add +10.00% with Item No 4.10.02.01.01

4.10.02.01.03 For height above 10 m to 15 m cum Add +20.00% with Item No 4.10.02.01.01

4.10.02.01.04 For height above 15 m to 20 m cum Add +30.00% with Item No 4.10.02.01.01

4.10.02.01.05 For height above 20 m cum Add +40.00% with Item No 4.10.02.01.01

4.10.02.02 For I-Girder/T-Girder including casting of girders on staging at site or


launching of precast girders by launching truss.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 675 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.10.02.02.01 For height up to 5 m cum


Ordinary Portland Cement (CEM I, 52.5N) 9.0000 bag 455.00 4095.00
Stone Chips (20mm down graded) [LAA≤25] 0.4900 cum 5730.00 2807.70
Stone Chips (12mm down graded) [LAA≤25] 0.3300 cum 4640.00 1531.20
Sand (FM - 2.8) 0.4100 m3 1602.00 656.82
Water-reducing high range and retrading chemical admixture 3.6000 liter 160.00 576.00
: Type-G
Head Mason 0.0600 day 650.00 39.00
Mason 0.3500 day 550.00 192.50
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 11435.97
Steel Formwork/ shuttering, prop with necessary ( +80.00 % on Subtotal-A ) 9148.78
supports, girder shifting/ launching, steel sheath &
all necessary equipment etc.
Subtotal-A1: 20584.75

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 20996.44

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 23096.09


VAT 6% of Total 1539.74

Note : Rates of all items should be inclusive of all supply and carriage. Page: 676 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

IT 4% of Total 1026.49
Total: 25662.32

4.10.02.02.02 For height above 5 m to 10 m cum Add +6.00% with Item No 4.10.02.02.01

4.10.02.02.03 For height above 10 m to 15 m cum Add +12.00% with Item No 4.10.02.02.01

4.10.02.02.04 For height above 15 m to 20 m cum Add +18.00% with Item No 4.10.02.02.01

4.10.02.02.05 For height above 20 m cum Add +24.00% with Item No 4.10.02.02.01

4.10.02.03 For cast-in-situ box girder, segmental construction and balanced


cantilever.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 677 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.10.02.03.01 For height up to 5 m cum


Ordinary Portland Cement (CEM I, 52.5N) 9.0000 bag 455.00 4095.00
Stone Chips (20mm down graded) [LAA≤25] 0.4900 cum 5730.00 2807.70
Stone Chips (12mm down graded) [LAA≤25] 0.3300 cum 4640.00 1531.20
Sand (FM - 2.8) 0.4100 m3 1602.00 656.82
Water-reducing high range and retrading chemical admixture 3.6000 liter 160.00 576.00
: Type-G
Head Mason 0.0600 day 650.00 39.00
Mason 0.3500 day 550.00 192.50
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 11435.97
Steel Formwork/ shuttering, prop with necessary ( +100.00 % on Subtotal-A ) 11435.97
supports, girder shifting/ launching, steel sheath &
all necessary equipment etc.
Subtotal-A1: 22871.94

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 23329.38

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 25662.32


VAT 6% of Total 1710.82

Note : Rates of all items should be inclusive of all supply and carriage. Page: 678 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

IT 4% of Total 1140.55
Total: 28513.69

4.10.02.03.02 For height above 5 m to 10 m cum Add +6.50% with Item No 4.10.02.03.01

4.10.02.03.03 For height above 10 m to 15 m cum Add +13.00% with Item No 4.10.02.03.01

4.10.02.03.04 For height above 15 m to 20 m cum Add +19.50% with Item No 4.10.02.03.01

4.10.02.03.05 For height above 20 m cum Add +26.00% with Item No 4.10.02.03.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 679 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.10.03 PSC-40SCRDM: Providing and laying Cement Concrete in Pre-stressed


Concrete works with minimum cement content and maximum water
cement ratio as specified by the laboratory through mix design having
minimum required average compressive strength, f'cr = 50 MPa and
satisfying a specified compressive strength, f'c = 40 MPa at 28 days on
standard cylinder as per standard practice of Code AASHTO/ ASTM and
cement conforming to BDS EN 197-1 : 2003 CEM-I 52.5N / ASTM C150
Type-1, high range water reducing admixture of complying type F/ G
under ASTM C 494 (Doses of admixture to be fixed by the mix design)
for smart dynamic concrete (i.e. Low fines self compacting concrete),
sand of minimum FM 2.80 and 20mm down well graded crushed stone
chips broken from boulders (LAA value not exceeding 25) conforming to
ASTM C 33 , including breaking stone boulders into chips, screening
through proper sieves, making and placing shutter in position, making
shutter water-tight properly, placing non prestressing reinforcement, HT
Strand, sheath, anchorage in position, mixing in Reversible Drum Mixer/
Batch Mix Plant, maintaining allowable slump of 125mm to 150mm,
casting in forms, compacting by mechanical vibrator machine, curing at
least for 28 days, removing shutter after specified time period, finishing,
launching, shifting & placing in position etc. including cost of water,
electricity, other incidental charges etc. all complete as per design,
drawing, specification & directionn of E-I-C. The cost of non
prestressing reinforcement, HT Strand and it's fabrication, binding,
welding and placing is not included but the cost of admixture is included
in this unit rate. The Mix Design shall have to be approved by Central
Quality Control Laboratory (CQCL), LGED or any other reputed
laboratory approved by the competent authority before execution of the
work.
Note: Using Reversible Drum Mixer/ Batch Mix Plant

4.10.03.01 For Solid Slab/voided slab Super-structure

Note : Rates of all items should be inclusive of all supply and carriage. Page: 680 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.10.03.01.01 For height up to 5 m cum


Ordinary Portland Cement (CEM I, 52.5N) 9.4000 bag 455.00 4277.00
Stone Chips (20mm down graded) [LAA≤25] 0.4900 cum 5730.00 2807.70
Stone Chips (12mm down graded) [LAA≤25] 0.3300 cum 4640.00 1531.20
Sand (FM - 2.8) 0.4100 m3 1602.00 656.82
Water-reducing high range and retrading chemical admixture 3.7600 liter 160.00 601.60
: Type-G
Head Mason 0.0600 day 650.00 39.00
Mason 0.3500 day 550.00 192.50
Skilled Labour 1.0000 day 450.00 450.00
Ordinary Labour 2.5000 day 370.00 925.00
Hire and running charges of Reversible Drum Mixer/ Batch 0.0083 day 15000.00 124.50
Mix Plant (15 cum/hr)
Hire and running charges of Concrete Pump (30 & 45 cum 0.0083 day 5000.00 41.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 11670.82
Steel Formwork/ shuttering, prop with necessary ( +50.00 % on Subtotal-A ) 5835.41
supports, girder shifting/ launching, steel sheath &
all necessary equipment etc.
Subtotal-A1: 17506.23

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 17856.35

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 19641.99


VAT 6% of Total 1309.47
IT 4% of Total 872.98
Total: 21824.43

4.10.03.01.02 For height above 5 m to 10 m cum Add +10.00% with Item No 4.10.03.01.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 681 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.10.03.01.03 For height above 10 m to 15 m cum Add +20.00% with Item No 4.10.03.01.01

4.10.03.01.04 For height above 15 m to 20 m cum Add +30.00% with Item No 4.10.03.01.01

4.10.03.01.05 For height above 20 m cum Add +40.00% with Item No 4.10.03.01.01

4.10.03.02 For I-Girder/T-Girder including casting of girders on staging at site or


launching of precast girders by launching truss.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 682 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.10.03.02.01 For height up to 5 m cum


Ordinary Portland Cement (CEM I, 52.5N) 9.4000 bag 455.00 4277.00
Stone Chips (20mm down graded) [LAA≤25] 0.4900 cum 5730.00 2807.70
Stone Chips (12mm down graded) [LAA≤25] 0.3300 cum 4640.00 1531.20
Sand (FM - 2.8) 0.4100 m3 1602.00 656.82
Water-reducing high range and retrading chemical admixture 3.7600 liter 160.00 601.60
: Type-G
Head Mason 0.0600 day 650.00 39.00
Mason 0.3500 day 550.00 192.50
Skilled Labour 1.0000 day 450.00 450.00
Ordinary Labour 2.5000 day 370.00 925.00
Hire and running charges of Reversible Drum Mixer/ Batch 0.0083 day 15000.00 124.50
Mix Plant (15 cum/hr)
Hire and running charges of Concrete Pump (30 & 45 cum 0.0083 day 5000.00 41.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 11670.82
Steel Formwork/ shuttering, prop with necessary ( +80.00 % on Subtotal-A ) 9336.66
supports, girder shifting/ launching, steel sheath &
all necessary equipment etc.
Subtotal-A1: 21007.48

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 21427.63

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 23570.39


VAT 6% of Total 1571.36
IT 4% of Total 1047.57
Total: 26189.32

4.10.03.02.02 For height above 5 m to 10 m cum Add +6.00% with Item No 4.10.03.02.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 683 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.10.03.02.03 For height above 10 m to 15 m cum Add +12.00% with Item No 4.10.03.02.01

4.10.03.02.04 For height above 15 m to 20 m cum Add +18.00% with Item No 4.10.03.02.01

4.10.03.02.05 For height above 20 m cum Add +24.00% with Item No 4.10.03.02.01

4.10.04 PSC-40SCBP: Providing and laying Cement Concrete in Pre-stressed


Concrete works with minimum cement content and maximum water
cement ratio as specified by the laboratory through mix design having
minimum required average compressive strength, f'cr = 50 MPa and
satisfying a specified compressive strength, f'c = 40 MPa at 28 days on
standard cylinder as per standard practice of Code AASHTO/ ASTM and
cement conforming to BDS EN 197-1 : 2003 CEM-I 52.5N / ASTM C150
Type-1, high range water reducing admixture of complying type F/ G
under ASTM C494 (Doses of admixture to be fixed by the mix design)
for smart dynamic concrete (i.e. Low fines self compacting concrete),
sand of minimum FM 2.80 and 20mm down well graded crushed stone
chips broken from boulders (LAA value not exceeding 25) conforming to
ASTM C 33, including breaking stone boulders into chips, screening
through proper sieves, making and placing shutter in position, making
shutter water-tight properly, placing non prestressing reinforcement, HT
Strand, sheath, anchorage in position, mixing in mechanized batch mix
plant & pumping using line pump or boom placer, maintaining allowable
slump of 100mm to 150mm, casting in forms, compacting by
mechanical vibrator machine, curing at least for 28 days, removing
shutter after specified time period, finishing, launching, shifting &
placing in position etc. including cost of water, electricity, other
incidental charges etc. all complete as per design, drawing, specification
& directionn of E-I-C. The cost of non prestressing reinforcement, HT
Strand and it's fabrication, binding, welding and placing is not included
but the cost of admixture is included in this unit rate. The Mix Design
shall have to be approved by Central Quality Control Laboratory (CQCL),
LGED or any other reputed laboratory approved by the competent
authority before execution of the work.
Note: Using Batching Plant, Transit Mixer & Concrete Pump

4.10.04.01 For Solid Slab/voided slab Super-structure.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 684 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.10.04.01.01 For height up to 5 m cum


Ordinary Portland Cement (CEM I, 52.5N) 9.4000 bag 455.00 4277.00
Stone Chips (20mm down graded) [LAA≤25] 0.4900 cum 5730.00 2807.70
Stone Chips (12mm down graded) [LAA≤25] 0.3300 cum 4640.00 1531.20
Sand (FM - 2.8) 0.4100 m3 1602.00 656.82
Water-reducing high range and retrading chemical admixture 3.7600 liter 160.00 601.60
: Type-G
Head Mason 0.0600 day 650.00 39.00
Mason 0.3500 day 550.00 192.50
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 11643.57
Steel Formwork/ shuttering, prop with necessary ( +50.00 % on Subtotal-A ) 5821.79
supports, girder shifting/ launching, steel sheath &
all necessary equipment etc.
Subtotal-A1: 17465.36

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 17814.66

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 19596.13


VAT 6% of Total 1306.41

Note : Rates of all items should be inclusive of all supply and carriage. Page: 685 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

IT 4% of Total 870.94
Total: 21773.48

4.10.04.01.02 For height above 5 m to 10 m cum Add +10.00% with Item No 4.10.04.01.01

4.10.04.01.03 For height above 10 m to 15 m cum Add +20.00% with Item No 4.10.04.01.01

4.10.04.01.04 For height above 15 m to 20 m cum Add +30.00% with Item No 4.10.04.01.01

4.10.04.01.05 For height above 20 m cum Add +40.00% with Item No 4.10.04.01.01

4.10.04.02 For I-Girder/T-Girder including casting of girders on staging at site or


launching of precast girders by launching truss.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 686 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.10.04.02.01 For height up to 5 m cum


Ordinary Portland Cement (CEM I, 52.5N) 9.4000 bag 455.00 4277.00
Stone Chips (20mm down graded) [LAA≤25] 0.4900 cum 5730.00 2807.70
Stone Chips (12mm down graded) [LAA≤25] 0.3300 cum 4640.00 1531.20
Sand (FM - 2.8) 0.4100 m3 1602.00 656.82
Water-reducing high range and retrading chemical admixture 3.7600 liter 160.00 601.60
: Type-G
Head Mason 0.0600 day 650.00 39.00
Mason 0.3500 day 550.00 192.50
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 11643.57
Steel Formwork/ shuttering, prop with necessary ( +80.00 % on Subtotal-A ) 9314.86
supports, girder shifting/ launching, steel sheath &
all necessary equipment etc.
Subtotal-A1: 20958.43

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 21377.59

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 23515.35


VAT 6% of Total 1567.69

Note : Rates of all items should be inclusive of all supply and carriage. Page: 687 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

IT 4% of Total 1045.13
Total: 26128.17

4.10.04.02.02 For height above 5 m to 10 m cum Add +6.00% with Item No 4.10.04.02.01

4.10.04.02.03 For height above 10 m to 15 m cum Add +12.00% with Item No 4.10.04.02.01

4.10.04.02.04 For height above 15 m to 20 m cum Add +18.00% with Item No 4.10.04.02.01

4.10.04.02.05 For height above 20 m cum Add +24.00% with Item No 4.10.04.02.01

4.10.04.03 For cast-in-situ box girder, segmental construction and balanced


cantilever.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 688 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.10.04.03.01 For height up to 5 m cum


Ordinary Portland Cement (CEM I, 52.5N) 9.4000 bag 455.00 4277.00
Stone Chips (20mm down graded) [LAA≤25] 0.4900 cum 5730.00 2807.70
Stone Chips (12mm down graded) [LAA≤25] 0.3300 cum 4640.00 1531.20
Sand (FM - 2.8) 0.4100 m3 1602.00 656.82
Water-reducing high range and retrading chemical admixture 3.7600 liter 160.00 601.60
: Type-G
Head Mason 0.0600 day 650.00 39.00
Mason 0.3500 day 550.00 192.50
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 11643.57
Steel Formwork/ shuttering, prop with necessary ( +100.00 % on Subtotal-A ) 11643.57
supports, girder shifting/ launching, steel sheath &
all necessary equipment etc.
Subtotal-A1: 23287.14

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 23752.88

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 26128.17


VAT 6% of Total 1741.88

Note : Rates of all items should be inclusive of all supply and carriage. Page: 689 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

IT 4% of Total 1161.25
Total: 29031.30

4.10.04.03.02 For height above 5 m to 10 m cum Add +6.50% with Item No 4.10.04.03.01

4.10.04.03.03 For height above 10 m to 15 m cum Add +13.00% with Item No 4.10.04.03.01

4.10.04.03.04 For height above 15 m to 20 m cum Add +19.50% with Item No 4.10.04.03.01

4.10.04.03.05 For height above 20 m cum Add +26.00% with Item No 4.10.04.03.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 690 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.10.05 PSC-45SCBP: Providing and laying Cement Concrete in Pre-stressed


Concrete workswith minimum cement content and maximum water
cement ratio as specified by the laboratory having minimum required
average compressive strength, f'cr = 55 MPa and satisfying a specified
compressive strength, f'c = 45 MPa at 28 days on standard cylinder as
per standard practice of Code AASHTO/ ASTM and cement conforming
to BDS EN 197-1 : 2003 CEM-I 52.5N / ASTM C150 Type-1, silica fume
conforming to ASTM C 1240, high range water reducing admixture of
complying type F/ G under ASTM C494 (Doses of admixture to be fixed
by the mix design) for smart dynamic concrete (i.e. Low fines self
compacting concrete), sand of minimum FM 2.80 and 20mm down well
graded crushed stone chips broken from boulders (LAA value not
exceeding 25) conforming to ASTM C 33, including breaking stone
boulders into chips, screening through proper sieves, making and
placing shutter in position, making shutter water-tight properly, placing
non prestressing reinforcement, HT Strand, sheath, anchorage in
position, mixing in mechanized batch mix plant & pumping using line
pump or boom placer, maintaining allowable slump of 75mm to 100mm,
casting in forms, compacting by mechanical vibrator machine, curing at
least for 28 days, removing shutter after specified time period, finishing,
launching, shifting & placing in position etc. including cost of water,
electricity, other incidental charges etc. all complete as per design,
drawing, specification & directionn of E-I-C. The cost of non
prestressing reinforcement, HT Strand and it's fabrication, binding,
welding and placing is not included but the cost of admixture is included
in this unit rate. The Mix Design shall have to be approved by Central
Quality Control Laboratory (CQCL), LGED or any other reputed
laboratory approved by the competent authority before execution of the
work.
Note: Using Batching Plant, Transit Mixer & Concrete Pump

4.10.05.01 For cast-in-situ box girder, segmental construction and balanced


cantilever.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 691 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.10.05.01.01 For height up to 5 m cum


Ordinary Portland Cement (CEM I, 52.5N) 9.8000 bag 455.00 4459.00
Stone Chips (20mm down graded) [LAA≤25] 0.4900 cum 5730.00 2807.70
Stone Chips (12mm down graded) [LAA≤25] 0.3300 cum 4640.00 1531.20
Sand (FM - 2.8) 0.4100 m3 1602.00 656.82
Water-reducing high range and retrading chemical admixture 3.9200 liter 160.00 627.20
: Type-G
Head Mason 0.0600 day 650.00 39.00
Mason 0.3500 day 550.00 192.50
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Silica Fume in accordance with ASTM C 1240 75.0000 kg 30.00 2250.00

Subtotal-A: 14101.17
Steel Formwork/ shuttering, prop with necessary ( +80.00 % on Subtotal-A ) 11280.94
supports, girder shifting/ launching, steel sheath &
all necessary equipment etc.
Subtotal-A1: 25382.11

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 25889.75

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 28478.72

Note : Rates of all items should be inclusive of all supply and carriage. Page: 692 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

VAT 6% of Total 1898.58


IT 4% of Total 1265.72
Total: 31643.03

4.10.05.01.02 For height above 5 m to 10 m cum Add +5.75% with Item No 4.10.05.01.01

4.10.05.01.03 For height above 10 m to 15 m cum Add +11.50% with Item No 4.10.05.01.01

4.10.05.01.04 For height above 15 m to 20 m cum Add +17.50% with Item No 4.10.05.01.01

4.10.05.01.05 For height above 20 m cum Add +23.00% with Item No 4.10.05.01.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 693 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.10.06 PSC-50SCBP: Providing and laying Cement Concrete in Pre-stressed


Concrete workswith minimum cement content and maximum water
cement ratio as specified by the laboratory having minimum required
average compressive strength, f'cr = 60 MPa and satisfying a specified
compressive strength, f'c = 50 MPa at 28 days on standard cylinder as
per standard practice of Code AASHTO/ ASTM and cement conforming
to BDS EN 197-1 : 2003 CEM-I 52.5N / ASTM C150 Type-1, silica fume
conforming to ASTM C 1240, high range water reducing admixture of
complying type F/ G under ASTM C 494 (Doses of admixture to be fixed
by the mix design) for smart dynamic concrete (i.e. Low fines self
compacting concrete), sand of minimum FM 2.80 and 20mm down well
graded crushed stone chips broken from boulders (LAA value not
exceeding 25) conforming to ASTM C 33 , including breaking stone
boulders into chips, screening through proper sieves, making and
placing shutter in position, making shutter water-tight properly, placing
non prestressing reinforcement, HT Strand, sheath, anchorage in
position, mixing in mechanized batch mix plant & pumping using line
pump or boom placer, maintaining allowable slump of 75mm to 100mm,
casting in forms, compacting by mechanical vibrator machine, curing at
least for 28 days, removing shutter after specified time period, finishing,
launching, shifting & placing in position etc. including cost of water,
electricity, other incidental charges etc. all complete as per design,
drawing, specification & directionn of E-I-C. The cost of non
prestressing reinforcement, HT Strand and it's fabrication, binding,
welding and placing is not included but the cost of admixture is included
in this unit rate. The Mix Design shall have to be approved by Central
Quality Control Laboratory (CQCL), LGED or any other reputed
laboratory approved by the competent authority before execution of the
work.
Note: Using Batching Plant, Transit Mixer & Concrete Pump

4.10.06.01 For cast-in-situ box girder, segmental construction and balanced


cantilever.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 694 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.10.06.01.01 For height up to 5 m cum


Ordinary Portland Cement (CEM I, 52.5N) 9.8000 bag 455.00 4459.00
Stone Chips (20mm down graded) [LAA≤25] 0.4900 cum 5730.00 2807.70
Stone Chips (12mm down graded) [LAA≤25] 0.3300 cum 4640.00 1531.20
Sand (FM - 2.8) 0.4100 m3 1602.00 656.82
Water-reducing high range and retrading chemical admixture 3.9200 liter 160.00 627.20
: Type-G
Head Mason 0.0600 day 650.00 39.00
Mason 0.3500 day 550.00 192.50
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0063 day 23000.00 144.90
cum/hour
H.C. of Generator (100 KVA) 0.0063 day 3500.00 22.05
H.C. of Backhoe End Loader (6 tons) 0.0063 day 6000.00 37.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0063 day 5000.00 31.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Silica Fume in accordance with ASTM C 1240 90.0000 kg 30.00 2700.00

Subtotal-A: 14551.17
Steel Formwork/ shuttering, prop with necessary ( +80.00 % on Subtotal-A ) 11640.94
supports, girder shifting/ launching, steel sheath &
all necessary equipment etc.
Subtotal-A1: 26192.11

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 26715.95

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 29387.54

Note : Rates of all items should be inclusive of all supply and carriage. Page: 695 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

VAT 6% of Total 1959.17


IT 4% of Total 1306.11
Total: 32652.83

4.10.06.01.02 For height above 5 m to 10 m cum Add +5.75% with Item No 4.10.06.01.01

4.10.06.01.03 For height above 10 m to 15 m cum Add +11.50% with Item No 4.10.06.01.01

4.10.06.01.04 For height above 15 m to 20 m cum Add +17.25% with Item No 4.10.06.01.01

4.10.06.01.05 For height above 20 m cum Add +23.00% with Item No 4.10.06.01.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 696 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.10.07 Providing and laying of 7-ply un-coated HT strand conforming to MT


AASHTO M 203/ ASTM A 416 (Grade 1860, low relaxation type) having
minimum ultimate tensile strength 1860 MPa of required size as per
design including supplying, fabrication, placing in position, providing
corrugated galvanized steel sheathing duct of minimum 0.4mm thick
and minimum 75mm internal diameter, decoling the strands, cutting to
the required lengths, preparing cables of required number strands as
per drawings, making dead ends of cables in flowers to achieve rigid
ends, spacers & joineries of approved quality, inserting cables within the
sheathing, fixind tendon support bars, supervising anti bursting
reinforcements, maintaning profile during concreting operations,
stressing of cables in sequence as per design to required loads with
approved stressing jacks, Blocking with proper pressure, measuring
and recording elongation and force, grouting the duct with pumpable,
nonbleeeding, high strength non-shrink cementitious grout with non-
shrink grout admixture conforming to ASTM C 1107, maintaining the
water cement ratio between 0.47 to 0.53, cutting the excess HT strand
after satisfactory tensioning & anchorage, providing patch concrete at
recess end with epoxy coating, all materials, labors, equipment, tools
etc. all complete including leads and lifts as per design, drawing,
specification and direction of the E-I-C.
[Extra Length required for stressing operation is included in this unit
rate]
H.T. Strand 1.0500 MT 100000.00 105000.00
Corrugated Galvanized Steel Sheathing Duct 111.4060 m 165.00 18381.99
Ordinary Portland Cement (CEM I, 52.5N) 6.6310 bag 455.00 3017.11
H.C. of Grout pump with agitator & accessories 2.6530 hour 200.00 530.60
H.C. of Generator (40 KVA) 1.1600 day 2500.00 2900.00
H.C. of Stressing Jack with Pump and other accessories 0.8290 Day 1500.00 1243.50
Foreman 0.6900 day 800.00 552.00
Re-bar Fabricator 2.6530 day 570.00 1512.21
Mason 0.6630 day 550.00 364.65
Operator 0.6630 day 570.00 377.91
Skilled Labour 13.2630 day 450.00 5968.35

Note : Rates of all items should be inclusive of all supply and carriage. Page: 697 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Subtotal-A: 139848.32
Grouting, Erection & all other accessories ( +25.00 % on Subtotal-A ) 34962.08
H.C. of all Machines and Equipment ( +25.00 % on Subtotal-A ) 34962.08
Subtotal-A1: 209772.47

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 213967.92

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 235364.71


VAT 6% of Total 15690.98
IT 4% of Total 10460.65
Total: 261516.35

4.10.08 Multi-Strand Steel Anchorage: Supplying, fitting and fixing of best


quality international branded (preferably of Freyssinet, Dynamic, Poston
or equivalent) post tensioning multi-strand steel anchorage system
comprising bearing plate, wedge plate, guide tube and gripping
accessories with necessary test certificate from manufacturer for origin,
performance and capacity including cost of all materials and accessories,
necessary performance and capacity test from BUET, placing properly in
position, labour, welding and carrying etc. all complete as design,
drawing and direction of the E-I-C. The geometrical size and shape of
the anchorage system shall be confirmed as per drawing or
manufacturer’s recommendation with necessary test results. One set of
extra anchorage will be required for laboratory test and necessary
arrangement.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 698 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.10.08.01 Anchorage Type: 4K13/ 4T13 set


Anchorage of 4K13/ 4T13 System 1.0000 Set 3000.00 3000.00

Subtotal-A: 3000.00
All other cost & fitting & fixing ( +10.00 % on Subtotal-A ) 300.00
Subtotal-A1: 3300.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 3366.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 3702.60


VAT 6% of Total 246.84
IT 4% of Total 164.56
Total: 4114.00

4.10.08.02 Anchorage Type: 7K13/ 7T13 set


Anchorage of 7K13/ 7T13 System 1.0000 set 3500.00 3500.00

Subtotal-A: 3500.00
All other cost & fitting & fixing ( +10.00 % on Subtotal-A ) 350.00
Subtotal-A1: 3850.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 3927.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 4319.70


VAT 6% of Total 287.98
IT 4% of Total 191.99
Total: 4799.67

Note : Rates of all items should be inclusive of all supply and carriage. Page: 699 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.10.08.03 Anchorage Type: 12K13/ 12T13 set


Anchorage of 12K13/ 12T13 System 1.0000 set 5600.00 5600.00

Subtotal-A: 5600.00
All other cost & fitting & fixing ( +10.00 % on Subtotal-A ) 560.00
Subtotal-A1: 6160.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 6283.20

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 6911.52


VAT 6% of Total 460.77
IT 4% of Total 307.18
Total: 7679.47

4.10.08.04 Anchorage Type: 19K13/ 19T13 set


Anchorage of 19K13/ 19T13 System 1.0000 set 7000.00 7000.00

Subtotal-A: 7000.00
All other cost & fitting & fixing ( +10.00 % on Subtotal-A ) 700.00
Subtotal-A1: 7700.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 7854.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 8639.40


VAT 6% of Total 575.96
IT 4% of Total 383.97
Total: 9599.33

Note : Rates of all items should be inclusive of all supply and carriage. Page: 700 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.10.08.05 Anchorage Type: 27K13/ 27T13 set


Anchorage of 27K13/ 27T13 System 1.0000 Set 9000.00 9000.00

Subtotal-A: 9000.00
All other cost & fitting & fixing ( +10.00 % on Subtotal-A ) 900.00
Subtotal-A1: 9900.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10098.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 11107.80


VAT 6% of Total 740.52
IT 4% of Total 493.68
Total: 12342.00

4.10.08.06 Anchorage Type: 37K13/ 37T13 set


Anchorage of 37K13/ 37T13 System 1.0000 Set 12000.00 12000.00

Subtotal-A: 12000.00
All other cost & fitting & fixing ( +10.00 % on Subtotal-A ) 1200.00
Subtotal-A1: 13200.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 13464.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 14810.40


VAT 6% of Total 987.36
IT 4% of Total 658.24
Total: 16456.00

Note : Rates of all items should be inclusive of all supply and carriage. Page: 701 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.10.08.07 Anchorage Type: 4K15/ 4T15 set


Anchorage of 4K15/ 4T15 System 1.0000 Set 3500.00 3500.00

Subtotal-A: 3500.00
All other cost & fitting & fixing ( +10.00 % on Subtotal-A ) 350.00
Subtotal-A1: 3850.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 3927.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 4319.70


VAT 6% of Total 287.98
IT 4% of Total 191.99
Total: 4799.67

4.10.08.08 Anchorage Type: 7K15/ 7T15 set


Anchorage of 7K15/ 7T15 System 1.0000 set 5000.00 5000.00

Subtotal-A: 5000.00
All other cost & fitting & fixing ( +10.00 % on Subtotal-A ) 500.00
Subtotal-A1: 5500.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 5610.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 6171.00


VAT 6% of Total 411.40
IT 4% of Total 274.27
Total: 6856.67

Note : Rates of all items should be inclusive of all supply and carriage. Page: 702 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.10.08.09 Anchorage Type: 12K15/ 12T15 set


Anchorage of 12K15/ 12T15 System 1.0000 set 8000.00 8000.00

Subtotal-A: 8000.00
All other cost & fitting & fixing ( +10.00 % on Subtotal-A ) 800.00
Subtotal-A1: 8800.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 8976.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 9873.60


VAT 6% of Total 658.24
IT 4% of Total 438.83
Total: 10970.67

4.10.08.10 Anchorage Type: 19K15/ 19T15 set


Anchorage of 19K15/ 19T15 System 1.0000 set 10000.00 10000.00

Subtotal-A: 10000.00
All other cost & fitting & fixing ( +10.00 % on Subtotal-A ) 1000.00
Subtotal-A1: 11000.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11220.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12342.00


VAT 6% of Total 822.80
IT 4% of Total 548.53
Total: 13713.33

Note : Rates of all items should be inclusive of all supply and carriage. Page: 703 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.10.08.11 Anchorage Type: 27K15/ 27T15 set


Anchorage of 27K15/ 27T15 System 1.0000 Set 11000.00 11000.00

Subtotal-A: 11000.00
All other cost & fitting & fixing ( +10.00 % on Subtotal-A ) 1100.00
Subtotal-A1: 12100.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12342.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 13576.20


VAT 6% of Total 905.08
IT 4% of Total 603.39
Total: 15084.67

4.10.08.12 Anchorage Type: 37K15/ 37T15 set


Anchorage of 37K15/ 37T15 System 1.0000 Set 12500.00 12500.00

Subtotal-A: 12500.00
All other cost & fitting & fixing ( +10.00 % on Subtotal-A ) 1250.00
Subtotal-A1: 13750.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 14025.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 15427.50


VAT 6% of Total 1028.50
IT 4% of Total 685.67
Total: 17141.67

Note : Rates of all items should be inclusive of all supply and carriage. Page: 704 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.10.09 Unbonded Monostrand: Providing and laying of cold-drawn, low MT


relaxation 7-wire coated HT strand conform to ASTM A 416 (Grade
1860, the outer diameter of HDPE sheathing should not be less then
1.27mm) having minimum ultimate tensile strength 1860 MPa of
required size as per design including supplying, fabrication, placing in
position, support chairs, spacers, joineries of approved quality, properly
stage wise tensioning with approved jacks, Blocking with proper
pressure, measuring and recording elongation and force, cutting the
excess HT strand after satisfactory tensioning & anchorage, providing
patch concrete at recess end with epoxy coating, all materials, labors,
equipment, tools etc. all complete including leads and lifts as per design,
drawing, specification and direction of the E-I-C.
Unbonded Monostrand 1.0000 MT 150000.00 150000.00
H.C. of Generator (40 KVA) 1.1600 day 2500.00 2900.00
H.C. of Stressing Jack with Pump and other accessories 0.8290 Day 1500.00 1243.50
Foreman 0.5000 day 800.00 400.00
Operator 2.0000 day 570.00 1140.00
Re-bar Fabricator 2.0000 day 570.00 1140.00
Mason 0.5000 day 550.00 275.00
Skilled Labour 3.0000 day 450.00 1350.00
Ordinary Labour 6.0000 day 370.00 2220.00

Subtotal-A: 160668.50
H.C. of all Machines and Equipment ( +25.00 % on Subtotal-A ) 40167.13
Subtotal-A1: 200835.63

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 204852.34

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 225337.57


VAT 6% of Total 15022.50
IT 4% of Total 10015.00
Total: 250375.08

Note : Rates of all items should be inclusive of all supply and carriage. Page: 705 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.10.10 Mono Strand Anchorage: Supplying, fitting and fixing of best quality
international branded (preferably Freyssinet, Dynamic, Poston, VSL or
equivalent) post tensioning monostrand steel anchorage system
comprising bearing plate, wedge plate, guide tube and gripping
accessories with necessary test certificate from manufacturer for origin,
performance and capacity including cost of all materials and accessories,
necessary performance and capacity test from BUET, placing properly in
position, labour, welding and carrying etc. all complete as design,
drawing and direction of the E-I-C. The geometrical size and shape of
the anchorage system shall be confirmed as per drawing or
manufacturer’s recommendation with necessary test results. One set of
extra anchorage will be required for laboratory test and necessary
arrangement.

4.10.10.01 MSA: 1K13/ 1T13 set


Monostrand Steel Anchorage (1K13/ 1T13) 1.0000 set 850.00 850.00

Subtotal-A: 850.00
All other costs including fitting, fixing, installation, ( +30.00 % on Subtotal-A ) 255.00
testing, transportation etc.
Subtotal-A1: 1105.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1127.10

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1239.81


VAT 6% of Total 82.65
IT 4% of Total 55.10
Total: 1377.57

Note : Rates of all items should be inclusive of all supply and carriage. Page: 706 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.10.10.02 MSA: 1K15/ 1T15 set


Monostrand Steel Anchorage (1K15/ 1T15) 1.0000 each 950.00 950.00

Subtotal-A: 950.00
All other costs including fitting, fixing, installation, ( +30.00 % on Subtotal-A ) 285.00
testing, transportation etc.
Subtotal-A1: 1235.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1259.70

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1385.67


VAT 6% of Total 92.38
IT 4% of Total 61.59
Total: 1539.63

4.10.11 Stay Cables: Supplying, fabricating and fixing Stay Cables (preferably LS
VSL, Tensaccial, Freyssinet, BBR or equivalent) in position having a
tendon formed from multiple and parallel 15.7mm dia. high tensile 7-
wire steel low relaxation strands with nominal cross-sectional area of
150 mm2 and a minimum ultimate tensile strengh of 1860 MPa, strands
shall be galvanized and corrosion inhibited, a greased or waxed strand
with a tightly extruded plastic sheathing, an outer thick-walled plastic
stay pipe, factory prefabricated fixed/ adjustable anchorages,
elastomeric dampers at the end of the form tube, appropriate saddle
system (if required) including cost of equipment, labour etc. complete in
all respect as per drawing, specification and direction of Engineer-in-
charge.
[Contractors generally do not have expertise for this item. The job is
therefore, got done from specialised/patented firms who have the
expertise in the field of stay cables. The prevailing rate in the market is
required to be ascertained from the market and added in the cost
estimate.]

Note : Rates of all items should be inclusive of all supply and carriage. Page: 707 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.10.12 Dummy Cable Duct: Supplying, fabricating and fixing dummy cable duct m
including end anchor cone, cost of equipment, labour etc. complete as
per drawing, specification and direction of Engineer-in-charge.
Corrugated Galvanized Steel Sheathing Duct 1.0500 m 165.00 173.25
Anchorage of 19K15/ 19T15 System 0.0400 set 10000.00 400.00
Non-Shrink Grout 0.1600 Kg 40.00 6.40
Stone Chips (12mm down graded) [LAA≤25] 0.0007 cum 4640.00 3.25
H.C. of Sheating Pipe Machine 0.0075 Day 2500.00 18.75
H.C. of Generator (40 KVA) 0.0075 day 2500.00 18.75
Skilled Technician 0.0075 day 680.00 5.10
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.0575 day 470.00 27.03
Operator
Carpenter 0.0600 day 680.00 40.80
Mason 0.0200 day 550.00 11.00

Subtotal-A: 704.32
Cost of material for Spacers, Insulation Tape, ( +7.50 % on Subtotal-A ) 52.82
Plywood and Miscellaneous items
Subtotal-A1: 757.15

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 772.29

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 849.52


VAT 6% of Total 56.63
IT 4% of Total 37.76
Total: 943.91

Note : Rates of all items should be inclusive of all supply and carriage. Page: 708 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.11.01 Supplying and fabrication of Ribbed or deformed bar reinforcement for


all types of RCC work including straightening, removing ruts, cleaning,
cutting, hooking, bending, lapping and/or welding wherever required as
directed, placing in position, tieing with 22 BWG black annealed binding
wire (PVC coated in case of FBEC rebar) double fold, cost of binding
wire and anchoring to the adjoining members wherever necessary,
supplying and placing with proper cover blocks (1:1), supports, chairs,
spacers, splices or laps etc. including cost of all materials, cost of
labour, cost of equipment & machinery, loading and unloading,
transportation, all other incidental charges and work at all leads and lifts
etc. to complete the work as per design, drawing, specifications and
direction of the E-I-C. Measurement relating to nominal mass,
dimensions and tolerances of various types of steel shall conform to
relevant BDS/ ASTM codes. Reinforcement shall be measured only in
lengths of bar as actually placed in position on standard weight i.e.
7850 kg/m3 (BNBC Table 6.2.1) basis. No separate payment shall be
allowed for chairs of any shape & profile, spacer bar of any shape &
profile, lap/ splice unless otherwise shown in the drawing, wastages,
binding wire, concrete cover blocks etc. as the cost of these is included
in the unit rate.
Note: Tests for reinforcing bars shall be conducted at LGED/ BUET/
CUET/ KUET/ RUET.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 709 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.11.01.01 Grade 300 (RB 300): Ribbed or Deformed bar produced and marked as kg
per BDS ISO 6935-2:2006 with minimum yield strength, fy (ReH) = 300
MPa, but the tested yield strength shall not exceed fy by more than the
125 MPa and the ratio of tested ultimate strength, fu (Re) to tested
yield strength (fy) shall be at least 1.25 and minimum elongation after
fracture (A5.65) & minimum total elongation at maximum force (Agt) is
16% and 2.5% respectively.
M.S. Ribbed/ Deformed Bar (Grade 300) 1.0200 kg 54.00 55.08
GI Wire (22 BWG) 0.0100 kg 90.00 0.90
Re-bar Fabricator 0.0030 day 570.00 1.71
Skilled Labour 0.0025 day 450.00 1.13
Ordinary Labour 0.0075 day 370.00 2.78

Subtotal-A: 61.59

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 62.82

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 69.10


VAT 6% of Total 4.61
IT 4% of Total 3.07
Total: 76.78

Note : Rates of all items should be inclusive of all supply and carriage. Page: 710 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.11.01.02 Grade 400 (RB 400/ 400W): Ribbed or Deformed bar produced and kg
marked as per BDS ISO 6935-2:2006 with minimum yield strength, fy
(ReH) = 400 MPa, but the tested yield strength shall not exceed fy by
more than the 125 MPa and the ratio of tested ultimate strength, fu
(Re) to tested yield strength (fy) shall be at least 1.25 and minimum
elongation after fracture (A5.65) & minimum total elongation at
maximum force (Agt) is 14% and 2.5% respectively.
M.S. Ribbed/ Deformed Bar (Grade 400) 1.0200 kg 58.00 59.16
GI Wire (22 BWG) 0.0100 kg 90.00 0.90
Re-bar Fabricator 0.0030 day 570.00 1.71
Skilled Labour 0.0025 day 450.00 1.13
Ordinary Labour 0.0075 day 370.00 2.78

Subtotal-A: 65.67

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 66.98

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 73.68


VAT 6% of Total 4.91
IT 4% of Total 3.27
Total: 81.87

Note : Rates of all items should be inclusive of all supply and carriage. Page: 711 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.11.01.03 Grade 420 (B420DWR): Ribbed or Deformed bar produced and marked kg
as per ISO 6935-2:2015/ ASTM A706M - 16 with minimum yield
strength, fy(ReH) = 420 MPa but fy(ReH) not exceeding 540 MPa, the
ratio of ultimate tensile strength, fu(Rm) to actual yield strength,
fy(ReH) shall be at least 1.25 and minimum elongation in 200mm shall
be at least 14% for bar sizes 10mm through 20mm, at least 12% for
bar sizes 22mm through 32mm and at least 10% for bar sizes 40mm
and 50mm.
M.S. Ribbed/ Deformed Bar (Grade 420) 1.0200 kg 58.00 59.16
GI Wire (22 BWG) 0.0100 kg 90.00 0.90
Re-bar Fabricator 0.0030 day 570.00 1.71
Skilled Labour 0.0025 day 450.00 1.13
Ordinary Labour 0.0075 day 370.00 2.78

Subtotal-A: 65.67

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 66.98

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 73.68


VAT 6% of Total 4.91
IT 4% of Total 3.27
Total: 81.87

Note : Rates of all items should be inclusive of all supply and carriage. Page: 712 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.11.01.04 Grade 500 (RB 500/ 500W): Ribbed or Deformed bar produced and kg
marked as per BDS ISO 6935-2:2006 with minimum yield stress, fy
(ReH) = 500 MPa and minimum elongation after fracture (A5.65) &
minimum total elongation at maximum force (Agt) is 14% and 2.5%
respectively.
[This reinforcement shall be selected as per instruction given in the
drawing & after getting approval from Design unit, LGED.]
M.S. Ribbed/ Deformed Bar (Grade 500) 1.0200 kg 57.00 58.14
GI Wire (22 BWG) 0.0100 kg 90.00 0.90
Re-bar Fabricator 0.0030 day 570.00 1.71
Skilled Labour 0.0025 day 450.00 1.13
Ordinary Labour 0.0075 day 370.00 2.78

Subtotal-A: 64.65

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 65.94

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 72.54


VAT 6% of Total 4.84
IT 4% of Total 3.22
Total: 80.60

Note : Rates of all items should be inclusive of all supply and carriage. Page: 713 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.11.01.05 Grade 550: Deformed bar produced and marked as per ASTM A706M - kg
16 with minimum yield strength, fy = 550 MPa but fy not exceeding 675
MPa, minimum ultimate strength, fu = 690 MPa, the ratio of actual
ultimate tensile strength, fu to actual yield strength, fy shall be at least
1.25 and minimum elongation in 200mm shall be at least 12% for bar
sizes 10mm through 32mm and at least 10% for bar sizes 40mm and
50mm.
[This reinforcement shall be selected as per instruction given in the
drawing & after getting approval from Design unit, LGED.]
M.S. Ribbed/ Deformed Bar (Grade 550) 1.0200 kg 59.00 60.18
GI Wire (22 BWG) 0.0100 kg 90.00 0.90
Re-bar Fabricator 0.0030 day 570.00 1.71
Skilled Labour 0.0025 day 450.00 1.13
Ordinary Labour 0.0075 day 370.00 2.78

Subtotal-A: 66.69

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 68.02

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 74.83


VAT 6% of Total 4.99
IT 4% of Total 3.33
Total: 83.14

Note : Rates of all items should be inclusive of all supply and carriage. Page: 714 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.11.02 FBECR: Extra over item code: 4.11.01 for providing Fusion Bonded
Epoxy Coating (FBEC) to reinforcement bars as per ASTM A775/ BDS
ISO 14654: 2013 specification for a coating thickness (after curing) of
175 to 300 microns for 10mm to 16mm and 175 to 400 microns for
20mmm to 50mm re-bars including extra cost on account of careful
handling during straightening, cutting, bending & placing, extra cost on
account of using PVC coated binding wire instead of G.I. wire, extra cost
on account of touch-up material (All cut edges/weld areas and bend
locations where coating has been damaged touch up shall be done with
same paint, the upper thickness limit shall not apply to repaired areas of
damaged coating) supplied by coating agency and repair work, extra
cost on account of transportation to and fro from steel yard to plant and
plant to work site by trailer (if required), loading, unloading, flexibility &
holiday testing, including all taxes, etc. complete to ensure proper
resistance of FBE against corrosive environment.
[Fusion Bonded Epoxy Coating to be proposed only in Coastal
Area/Severe Exposure Condition with prior approval of Design Unit,
LGED.]

4.11.02.01 For Re-bar diameter: 8mm to 12mm kg


Fusion Bonded Epoxy Coating (FBEC) to Reinforcing Bar as 1.0000 kg 10.00 10.00
per ASTM A775 (Average rate for bars of 8mm to 12mm)

Subtotal-A: 10.00
Extra Cost for Handling, Epoxy Touch Up, PVC ( +5.00 % on Subtotal-A ) 0.50
coated binding wire etc.
Subtotal-A1: 10.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10.71

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 11.78


VAT 6% of Total 0.79
IT 4% of Total 0.52
Total: 13.09

Note : Rates of all items should be inclusive of all supply and carriage. Page: 715 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.11.02.02 For Re-bar diameter: 16mm to 50mm kg


Fusion Bonded Epoxy Coating (FBEC) to Reinforcing Bar as 1.0000 kg 8.00 8.00
per ASTM A775 (Average rate for bars of 16mm to 50mm)

Subtotal-A: 8.00
Extra Cost for Handling, Epoxy Touch Up, PVC ( +5.00 % on Subtotal-A ) 0.40
coated binding wire etc.
Subtotal-A1: 8.40

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 8.57

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 9.42


VAT 6% of Total 0.63
IT 4% of Total 0.42
Total: 10.47

Note : Rates of all items should be inclusive of all supply and carriage. Page: 716 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.11.03 Supplying and fabrication of High Yield strength (500 MPa, Galvanized kg
wire rope) of required size and length for all types of Arch Bridge work
including cutting, fitting , securing and placing them in position, etc.
including cost of all materials, labour, local handling, laboratory test,
incidentals charge to complete the work as per specifications, drawings
and direction of the Engineer. Laboratory test for physical property,
strength, to be performed as per ASTM
High Yield strength wire 1.0000 kg 200.00 200.00
Re-bar Fabricator 0.0030 day 570.00 1.71
Skilled Labour 0.0025 day 450.00 1.13
Ordinary Labour 0.0075 day 370.00 2.78

Subtotal-A: 205.61

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 209.72

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 230.69


VAT 6% of Total 15.38
IT 4% of Total 10.25
Total: 256.33

4.11.04 Supplying, fitting and fixing mechanical couplers of various diameter


confirming to ACI/ AASHTO having minimum connection strength at
least 125% of nominal yield strength, fy of the reinforcing bars including
fitting & fixing in proper position as shown in drawing and attach to the
reinforcement bars by thread, cold swaging and extrusion or hot forging
including cost of all materials, labors, equipment, tools etc. all complete
as per design, drawing and direction of the E-I-C. All operations relating
to reinforcement coupling shall be done using supplier's petented
machine/ equipment and in the presence of the supplier's
representative. The contractor shall submit relevant trade literature, mill
certificates, certificate of origin and letters of approval for each
proposed application. A sample of each type of mechanical coupler shall
be submitted for testing and approval prior to the use of any coupler in
the works

Note : Rates of all items should be inclusive of all supply and carriage. Page: 717 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.11.04.01 For 25mm diameter rebar Coupler each


Coupler (Min. Outer diameter 45mm & Length 150mm) 1.0200 each 160.00 163.20
including wastage 2% & carrying
Pressing Machine 0.0080 day 3000.00 24.00
Foreman 0.0100 day 800.00 8.00
Skilled Labour 0.0300 day 450.00 13.50
Ordinary Labour 0.0400 day 370.00 14.80

Subtotal-A: 223.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 227.97

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 250.77


VAT 6% of Total 16.72
IT 4% of Total 11.15
Total: 278.63

Note : Rates of all items should be inclusive of all supply and carriage. Page: 718 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.11.04.02 For 32mm diameter rebar Coupler each


Coupler (Min. Outer diameter 56mm & Length 192mm) 1.0200 each 240.00 244.80
including wastage 2% & carrying
Pressing Machine 0.0080 day 3000.00 24.00
Foreman 0.0100 day 800.00 8.00
Skilled Labour 0.0300 day 450.00 13.50
Ordinary Labour 0.0400 day 370.00 14.80

Subtotal-A: 305.10

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 311.20

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 342.32


VAT 6% of Total 22.82
IT 4% of Total 15.21
Total: 380.36

Note : Rates of all items should be inclusive of all supply and carriage. Page: 719 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.11.04.03 For 40mm diameter rebar Coupler each


Coupler (Min. Outer diameter 70mm & Length 240mm) 1.0200 each 400.00 408.00
including wastage 2% & carrying
Pressing Machine 0.0080 day 3000.00 24.00
Foreman 0.0100 day 800.00 8.00
Skilled Labour 0.0300 day 450.00 13.50
Ordinary Labour 0.0400 day 370.00 14.80

Subtotal-A: 468.30

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 477.67

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 525.43


VAT 6% of Total 35.03
IT 4% of Total 23.35
Total: 583.81

Note : Rates of all items should be inclusive of all supply and carriage. Page: 720 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.11.04.04 For 50mm diameter rebar Coupler each


Coupler (Min. Outer diameter 82mm & Length 300mm) 1.0200 each 450.00 459.00
including wastage 2% & carrying
Pressing Machine 0.0080 day 3000.00 24.00
Foreman 0.0100 day 800.00 8.00
Skilled Labour 0.0300 day 450.00 13.50
Ordinary Labour 0.0400 day 370.00 14.80

Subtotal-A: 519.30

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 529.69

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 582.65


VAT 6% of Total 38.84
IT 4% of Total 25.90
Total: 647.39

4.11.05 Providing nosing with MS angles of different sizes. including cost of all kg
materials, welding, carrying, etc. all complete as per design, drawing
and direction of the E-I-C.
MS Angle, Flat bar, Z bar 1.0000 kg 59.00 59.00

Subtotal-A: 59.00
Welding, fitting, fixing etc. ( +96.00 % on Subtotal-A ) 56.64
Subtotal-A1: 115.64

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 117.95

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 129.75


VAT 6% of Total 8.65
IT 4% of Total 5.77
Total: 144.16

Note : Rates of all items should be inclusive of all supply and carriage. Page: 721 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.11.06 Supplying, fitting, fixing & installation of expansion joints as indicated on


the drawing and conforming to the following specifications and as
directed by the E-I-C.

4.11.06.01 Providing expansion joints between the breast walls (abutment top wall) kg
and girders or in between the girders with steel sheet and filling the gap
with sand and bitumen (80/100) as per design, drawing and direction of
the E-I-C.
MS Angle, Flat bar, Z bar 1.0000 kg 59.00 59.00
Bitumen [Grade 80/100] 0.0300 kg 49.00 1.47
Sand (FM - 0.8) 0.0070 m3 480.00 3.36

Subtotal-A: 63.83
Welding, fitting, fixing etc. ( +100.00 % on Subtotal-A ) 63.83
Subtotal-A1: 127.66

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 130.21

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 143.23


VAT 6% of Total 9.55
IT 4% of Total 6.37
Total: 159.15

Note : Rates of all items should be inclusive of all supply and carriage. Page: 722 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.11.06.02 Strip Seal Expansion Joint: Providing and laying of Strip Seal type bridge m
deck expansion joint catering to maximum horizontal movement up to
80 mm including all materials (edge beams, Strip seal, anchorage,
angle, bar, plate etc.), installation in proper position, labour charges,
testing, handling, tools, equipment etc. all complete as per approved
drawing, specification and direction of the E-I-C. The Installation shall
be done by the manufacturer/ supplier or their authorised
representative ensuring compliance to the manufacturer's instruction for
installation.
[The concreting for joining the expansion joint assembly with the deck
has not been included in this analysis as the same is catered in the
quantities of RCC Deck.]
Supply of complete assembly of strip seal expansion joint 1.0000 m 15200.00 15200.00
comprising of edge beams, anchorage, strip seal element and
complete accessories as per approved specifications and
drawings.
Mason 0.0042 day 550.00 2.31
Skilled Labour 0.0208 day 450.00 9.36
Ordinary Labour 0.0833 day 370.00 30.82

Subtotal-A: 15242.49
Steel Formwork/ shuttering, prop with necessary ( +5.00 % on Subtotal-A ) 762.12
supports etc.
Subtotal-A1: 16004.62

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 16324.71

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 17957.18


VAT 6% of Total 1197.15
IT 4% of Total 798.10
Total: 19952.42

Note : Rates of all items should be inclusive of all supply and carriage. Page: 723 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.11.06.03 Modular Strip/ Box Seal Expansion Joint: Providing and laying of
modular strip/ Box seal expansion joint catering to maximum horizontal
movement beyond 80 mm and up to 240 mm including all materials,
installation in proper position, labour charges, testing, handling, tools,
equipment etc. all complete as per drawing, specification and direction
of the E-I-C. The anchoring bars of the expansion joint assembly shall
be welded to the main reinforcement of the deck. The installation shall
be done by the manufacturer/ supplier or their authorised
representative ensuring compliance to the manufacturer's instruction for
installation.
[The concreting for joining the expansion joint assembly with the deck
has not been included in this analysis as the same is catered in the
quantities of RCC Deck.]

4.11.06.03.01 Modular Strip Expansion: beyond 80 mm and up to 160 mm m


Modular strip expansion joint comprising of edge beams, 1.0000 m 80000.00 80000.00
central beam, 2 modules chloroprene seal, anchorage
elements, support and control system, all steel sections
protected against corrosion and installed by the manufacturer
(+80 to 160mm)
Mason 0.0042 day 550.00 2.31
Skilled Labour 0.0333 day 450.00 14.99
Ordinary Labour 0.0833 day 370.00 30.82

Subtotal-A: 80048.12
Fitting, fixing & Installation Charge ( +5.00 % on Subtotal-A ) 4002.41
Subtotal-A1: 84050.52

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 85731.53

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 94304.69


VAT 6% of Total 6286.98
IT 4% of Total 4191.32
Total: 104782.98

Note : Rates of all items should be inclusive of all supply and carriage. Page: 724 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.11.06.03.02 Modular Strip Expansion: beyond 160 mm and up to 240 mm m


Modular strip expansion joint comprising of edge beams, 1.0000 m 120000.00 120000.00
central beam, 2 modules chloroprene seal, anchorage
elements, support and control system, all steel sections
protected against corrosion and installed by the manufacturer
(+160 to 240mm)
Mason 0.0058 day 550.00 3.19
Skilled Labour 0.0417 day 450.00 18.77
Ordinary Labour 0.1042 day 370.00 38.55

Subtotal-A: 120060.51
Steel Formwork/ shuttering, prop with necessary ( +5.00 % on Subtotal-A ) 6003.03
supports etc.
Subtotal-A1: 126063.53

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 128584.81

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 141443.29


VAT 6% of Total 9429.55
IT 4% of Total 6286.37
Total: 157159.21

4.11.07 Supplying, fitting and fixing bridge bearings including cost of all
materials, labour, welding and carrying etc. complete in all respect as
per design, drawing, specification and direction of the E-I-C.

4.11.07.01 Roller bearing with required numbers of rollers, plate and other fittings

Note : Rates of all items should be inclusive of all supply and carriage. Page: 725 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.11.07.01.01 Each set up to 150 mm diameter kg


MS Plate (8mm thick) 0.5000 kg 70.00 35.00
Roller Bearing (150mm dia) 0.5000 kg 125.00 62.50
MS Angle, Flat bar, Z bar 0.1700 kg 59.00 10.03
Skilled Labour 0.3100 day 450.00 139.50

Subtotal-A: 247.03

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 251.97

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 277.17


VAT 6% of Total 18.48
IT 4% of Total 12.32
Total: 307.96

4.11.07.01.02 Each set beyond 150 mm diameter kg


MS Plate (8mm thick) 0.5000 kg 70.00 35.00
Roller Bearing (beyond 150mm dia) 0.5000 kg 150.00 75.00
MS Angle, Flat bar, Z bar 0.1700 kg 59.00 10.03
Skilled Labour 0.6000 day 450.00 270.00

Subtotal-A: 390.03

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 397.83

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 437.61


VAT 6% of Total 29.17
IT 4% of Total 19.45
Total: 486.24

4.11.07.02 Hinge plate bearing with lead plates and other fittings

Note : Rates of all items should be inclusive of all supply and carriage. Page: 726 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.11.07.02.01 Each set with plate up to 25 mm thick kg


Hinge Plate Bearing (25mm dia) 0.6860 kg 275.00 188.65
Lead Sheet 0.1900 kg 350.00 66.50
MS Rod (Plain, 40 Grade) 0.1300 kg 45.00 5.85
MS Angle, Flat bar, Z bar 0.0800 kg 59.00 4.72
Skilled Labour 0.2000 day 450.00 90.00

Subtotal-A: 355.72

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 362.83

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 399.12


VAT 6% of Total 26.61
IT 4% of Total 17.74
Total: 443.46

4.11.07.02.02 Each set with plate beyond 25 mm thick kg


Hinge Plate Bearing (beyond 25mm dia) 0.6860 kg 335.00 229.81
Lead Sheet 0.1900 kg 350.00 66.50
MS Rod (Plain, 40 Grade) 0.1300 kg 45.00 5.85
MS Angle, Flat bar, Z bar 0.0800 kg 59.00 4.72
Skilled Labour 0.2000 day 450.00 90.00

Subtotal-A: 396.88

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 404.82

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 445.30


VAT 6% of Total 29.69
IT 4% of Total 19.79
Total: 494.78

Note : Rates of all items should be inclusive of all supply and carriage. Page: 727 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.11.07.03 Free plate bearing with lead plates and other fittings

4.11.07.03.01 Each set with plate up to 25 mm thick kg


MS Plate Bearing (upto 25mm thick) 0.6860 kg 59.40 40.75
Lead Sheet 0.1900 kg 350.00 66.50
MS Rod (Plain, 40 Grade) 0.1300 kg 45.00 5.85
MS Angle, Flat bar, Z bar 0.0800 kg 59.00 4.72
Skilled Labour 0.2000 day 450.00 90.00

Subtotal-A: 207.82

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 211.97

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 233.17


VAT 6% of Total 15.54
IT 4% of Total 10.36
Total: 259.08

Note : Rates of all items should be inclusive of all supply and carriage. Page: 728 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.11.07.03.02 Each set with plate beyond 25 mm thick kg


MS Plate Bearing (beyond 25mm thick) 0.6860 kg 64.80 44.45
Lead Sheet 0.1900 kg 350.00 66.50
MS Rod (Plain, 40 Grade) 0.1300 kg 45.00 5.85
MS Angle, Flat bar, Z bar 0.0800 kg 59.00 4.72
Skilled Labour 0.2000 day 450.00 90.00

Subtotal-A: 211.52

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 215.75

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 237.33


VAT 6% of Total 15.82
IT 4% of Total 10.55
Total: 263.70

4.11.07.04 Hinge plate bearing with lead sheets including fitting & fixing kg
MS Plate (8mm thick) 0.6860 kg 70.00 48.02
Lead Sheet 0.1900 kg 350.00 66.50
MS Rod (Plain, 40 Grade) 0.1300 kg 45.00 5.85
MS Angle, Flat bar, Z bar 0.0800 kg 59.00 4.72
Skilled Labour 0.2000 day 450.00 90.00

Subtotal-A: 215.09

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 219.39

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 241.33


VAT 6% of Total 16.09
IT 4% of Total 10.73
Total: 268.15

Note : Rates of all items should be inclusive of all supply and carriage. Page: 729 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.11.08 SLEB: Supplying, fitting and fixing steel-laminated Elastomeric/ cucm


Neoprene bearings (preferably from Mageba, VSL, Tensa, Watson or
equivalent) in exact positions as per drawing, specifications and
direction of the E-I-C including cost of all materials, labour, carrying etc.
The set shall be of 100% virgin Chloroprene Rubber (CR), grades of raw
elastomer of proven use in elastomeric bearings, with low crystallization
rates and adequate shelf life viz. Neoprene WRT, Neoprene W,
Bayprene 110, Bayprene 210, Skyprene B-5, Skyprene B-30, Denka S-
40V and Denka M-40, shall be used. No reclaimed rubber or Vulcanized
wastes or natural rubber shall be used. Use of synthetic rubber-like
materials such as Ethyl Propylene Dimonomer (EPDM), Isobutane
Isoprene Copolymer (IIR) and Chloro-Isoprene Copolymer (CIIR) shall
not be permitted. Laboratory test to be performed from BUET, Dhaka
for Elastomer hardness limits determined in accordance with ASTM D
2240 shall be 60 ± 5 duro, minimum tensile strength determined in
accordance with ASTM D 412 shall be 17 MPa, ultimate elongation
determined in accordance with ASTM D 412 shall be minimum 400%,
compression set value after 22 hours at 100 degree centigrade
determined in accordance with ASTM D 395 Method B shall be
maximum 35%, Elastomeric content determined in accordance with
ASTM D 297 shall not be less than 60%, Ash content determined in
accordance with ASTM D 297 shall not exceed 5%, Shear modulus of
elastomeric bearing determined in accordance with ASTM D 4014 shall
neither be less than 0.8 MPa nor greater than 1.2 MPa, the adhesion
strength of elastomer to steel plates (Peel Strength) determined in
accordance with ASTM D 429 Method B shall not be less than 7kN/m.
One set of Elastomeric Bearing must be taken as extra for laboratory
test.
Elastomeric/Neoprene Bearing 1.0000 cm3 1.73 1.73
Foreman 0.0001 day 800.00 0.08
Skilled Labour 0.0001 day 450.00 0.05
Ordinary Labour 0.0002 day 370.00 0.07

Subtotal-A: 1.93
Add 15% of cost of bearing assembly for ( +15.00 % on Subtotal-A ) 0.29
foundation anchorage bolts and comsumables
Subtotal-A1: 2.22

Note : Rates of all items should be inclusive of all supply and carriage. Page: 730 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2.26

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2.49


VAT 6% of Total 0.17
IT 4% of Total 0.11
Total: 2.77

4.11.09 Filling of expansion joints upto a depth of 40 mm with bitumen mixed


with coarse sand (FM ≥ 2.5) in concrete works including supply of all
materials etc. complete as per specification and direction of E-I-C.

4.11.09.01 25mm wide m


Sand (FM - 2.5) 0.0010 m3 1500.00 1.50
Bitumen [Grade 80/100] 0.5412 kg 49.00 26.52
Fire wood 0.6560 kg 7.75 5.08
Skilled Labour 0.0246 day 450.00 11.07
Ordinary Labour 0.0492 day 370.00 18.20

Subtotal-A: 62.38
Miscellaneous Sundry etc. ( +5.00 % on Subtotal-A ) 3.12
Subtotal-A1: 65.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 66.81

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 73.49


VAT 6% of Total 4.90
IT 4% of Total 3.27
Total: 81.65

Note : Rates of all items should be inclusive of all supply and carriage. Page: 731 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.11.09.02 20mm wide m


Sand (FM - 2.5) 0.0008 m3 1500.00 1.20
Bitumen [Grade 80/100] 0.4330 kg 49.00 21.22
Fire wood 0.5248 kg 7.75 4.07
Skilled Labour 0.0197 day 450.00 8.87
Ordinary Labour 0.0394 day 370.00 14.58

Subtotal-A: 49.93
Miscellaneous Sundry etc. ( +5.00 % on Subtotal-A ) 2.50
Subtotal-A1: 52.42

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 53.47

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 58.82


VAT 6% of Total 3.92
IT 4% of Total 2.61
Total: 65.35

4.11.10 POT Bearing: Supplying, fitting and fixing in position true to line and
level free/ fixed/guided POT-PTFE bearing consisting of a metal piston
supported by a disc or unreinforced elastomer confined within a metal
cylinder, sealing rings, dust seals, PTFE surface sliding against stainless
steel mating surface, complete assembly to be of cast steel/fabricated
structural steel, metal and elastomer elements to be as per AASHTO
Specifications and direction of the E-I-C. One set must be taken as extra
for laboratory test which to be performed from BUET.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 732 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.11.10.01 PBG: Guided/ Free Type Pot Bearing MT


Pot type bearing assembly consisting of a metal piston 1.0000 each 780.00 780.00
supported by a disc, PTFE pads providing sliding surfaces
against stainless steel mating together with fabricated
structural steel assemblies duly painted with all components -
Guided/ Free Type
Head Mason 0.0006 day 650.00 0.39
Skilled Labour 0.0034 day 450.00 1.53
Ordinary Labour 0.0103 day 370.00 3.81

Subtotal-A: 785.73
Cost of bearing assembly for foundation achorage ( +5.00 % on Subtotal-A ) 39.29
bolts and comsumables
Subtotal-A1: 825.02

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 841.52

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 925.67


VAT 6% of Total 61.71
IT 4% of Total 41.14
Total: 1028.52

Note : Rates of all items should be inclusive of all supply and carriage. Page: 733 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.11.10.02 PBF: Fixed Type Pot Bearing MT


Pot type bearing assembly consisting of a metal piston 1.0000 MT 470.00 470.00
supported by a disc, PTFE pads providing sliding surfaces
against stainless steel mating together with fabricated
structural steel assemblies duly painted with all components -
Fixed Type
Head Mason 0.0003 day 650.00 0.20
Skilled Labour 0.0022 day 450.00 0.99
Ordinary Labour 0.0065 day 370.00 2.41

Subtotal-A: 473.59
Cost of bearing assembly for foundation achorage ( +5.00 % on Subtotal-A ) 23.68
bolts and comsumables
Subtotal-A1: 497.27

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 507.21

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 557.94


VAT 6% of Total 37.20
IT 4% of Total 24.80
Total: 619.93

Note : Rates of all items should be inclusive of all supply and carriage. Page: 734 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.11.11 Spherical Bearing: Supplying fitting and fixing in position true to line and MT
level cast steel spherical/ cylindrical type bearing with stainless steel
plate with PTFE sliding surface as per AASHTO specification complete
with all accessories as per drawing and direction of E-I-C and including
cost of all material installation. One set must be taken as extra for
laboratory test which to be performed from BUET.
Spherical type bearing assembly consisting of a metal piston 1.0000 MT 825.00 825.00
supported by a disc, PTFE pads providing sliding surfaces
against stainless steel mating together with fabricated
structural steel assemblies duly painted with all components
Head Mason 0.0003 day 650.00 0.20
Skilled Labour 0.0017 day 450.00 0.77
Ordinary Labour 0.0050 day 370.00 1.85

Subtotal-A: 827.81
Cost of bearing assembly for foundation achorage ( +5.00 % on Subtotal-A ) 41.39
bolts and comsumables
Subtotal-A1: 869.20

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 886.58

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 975.24


VAT 6% of Total 65.02
IT 4% of Total 43.34
Total: 1083.60

4.11.12 STU: Providing and fitting in position true to line and level shock
transmission unit as per AASHTO specification complete with all
accessories as per drawing and direction of Engineer-in-charge and
including cost of all material for installation. The installation shall be
done by the manufacturer/ supplier or their authorised representative
ensuring compliance to the manufacturer's instruction for installation.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 735 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.11.12.01 STU_50: Up to 50 MT of Horizontal Load MT


Shock Tramission Unit (For Horizontal Load <= 50 MT) 1.0000 MT 30500.00 30500.00
Head Mason 0.0286 day 650.00 18.59
Mason 0.0286 day 550.00 15.73
Skilled Labour 0.0571 day 450.00 25.70
Ordinary Labour 0.1143 day 370.00 42.29

Subtotal-A: 30602.31
Cost of temporary works (staging etc.), Anchorage ( +5.00 % on Subtotal-A ) 1530.12
Bolts, Grout, Concrete and rent of Equipment,
Machinery, tools etc.
Subtotal-A1: 32132.42

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 32775.07

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 36052.58


VAT 6% of Total 2403.51
IT 4% of Total 1602.34
Total: 40058.42

Note : Rates of all items should be inclusive of all supply and carriage. Page: 736 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.11.12.02 STU_50+: Above 50 MT of Horizontal Load MT


Shock Tramission Unit (For Horizontal Load >= 50 MT) 1.0000 MT 23000.00 23000.00
Head Mason 0.0125 day 650.00 8.13
Mason 0.0125 day 550.00 6.88
Skilled Labour 0.0250 day 450.00 11.25
Ordinary Labour 0.0500 day 370.00 18.50

Subtotal-A: 23044.75
Cost of temporary works (staging etc.), Anchorage ( +3.00 % on Subtotal-A ) 691.34
Bolts, Grout, Concrete and rent of Equipment,
Machinery, tools etc.
Subtotal-A1: 23736.09

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 24210.81

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 26631.90


VAT 6% of Total 1775.46
IT 4% of Total 1183.64
Total: 29591.00

Note : Rates of all items should be inclusive of all supply and carriage. Page: 737 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.12.01 Supplying and mixing specified type chemical admixture delivered from
an authorized local agent or manufacturer, comply with the ASTM C 494
requirements, confirming the current compliance of the admixture to
specification requirements like physical properties, unifomity and
equivalence in composition etc., performance (water content, fresh
concrete setting time and compressive strength) requirements,
delivered in sealed water-tight containers having and confirming plainly
marked the proprietary name of the admixture, type under this
specification, net weight or volume, manufacturing and expiry date, non
aggressiveness to environment, aggregates and metals in concrete etc.
and mixing the admixture in non prestressed cement concrete mixture
in the field under the strict accordance with manufacturers
recommendation and instruction, providing safety provisions in all
respects etc. all complete as per instruction and approved by the E-I-C.
Dose (quantity in milliliters per 50 kg bag cement) and
brand/origin/manufacturer with respect to particular brand of cement
and particular stock of aggregates and method of use to be determined
by mix design/ trial mix at the cost borne by the Contractor and shall be
carried out prior to start the work.
Note: The minimum cement specified shall not be reduced on account
of the use of admixtures. Use of admixture is subject to prior approval
of Central Quality Control Laboratory (CQCL), LGED or any specified
laboratory approved by the Engineer.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 738 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.12.01.01 Supply and use of water reducing chemical admixture in concrete, litre
complying to ASTM C 494 Type - A of approved brand/ origin/
manufacturer and supplied by only manufacturer's authorised dealer
with certificate of origin. An admixture that reduces quantity of mixing
water required to produce concrete of a given consistency.
Water reducing chemical admixture : Type-A 1.0000 liter 130.00 130.00

Subtotal-A: 130.00
Carriage, safe storage, mixing & sundries etc. ( +4.00 % on Subtotal-A ) 5.20
Subtotal-A1: 135.20

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 137.90

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 151.69


VAT 6% of Total 10.11
IT 4% of Total 6.74
Total: 168.55

Note : Rates of all items should be inclusive of all supply and carriage. Page: 739 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.12.01.02 Supply and use of retarding chemical admixture in concrete, complying litre
to ASTM C 494 Type B of approved brand/origin/ manufacturer and
supplied by only manufacturer's authorised dealer with certificate of
origin. An admixture that retards the setting of concrete, there by
reducing shrinkage in concrete specially for concrete laid in thick layers
and intended delayed construction for improved construction joints,
reconcreting etc.
Retrading chemical admixture : Type-B 1.0000 liter 125.00 125.00

Subtotal-A: 125.00
Carriage, safe storage, mixing & sundries etc. ( +4.00 % on Subtotal-A ) 5.00
Subtotal-A1: 130.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 132.60

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 145.86


VAT 6% of Total 9.72
IT 4% of Total 6.48
Total: 162.07

Note : Rates of all items should be inclusive of all supply and carriage. Page: 740 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.12.01.03 Supply and use of accelerating chemical admixture in concrete, litre


complying to ASTM C 494 Type C of approved brand/origin/
manufacturer and supplied by only manufacturer's authorised dealer
with certificate of origin. An admixture that accelerates the setting time
and early strength developmnet of concrete.
Accelerating chemical admixture : Type-C 1.0000 liter 135.00 135.00

Subtotal-A: 135.00
Carriage, safe storage, mixing & sundries etc. ( +4.00 % on Subtotal-A ) 5.40
Subtotal-A1: 140.40

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 143.21

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 157.53


VAT 6% of Total 10.50
IT 4% of Total 7.00
Total: 175.03

Note : Rates of all items should be inclusive of all supply and carriage. Page: 741 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.12.01.04 Supply and use of water-reducing and retarding chemical admixture in litre
concrete, complying to ASTM C 494 Type D of approved brand/ origin/
manufacturer and supplied by only manufacturer's authorised dealer
with certificate of origin. An admixture that reduces the quantity of
mixing water required to produce concrete of a given consistency i.e.
low w/c ratio and retards the setting of concrete specially for layerd,
thick laid concrete etc.
Water-reducing and retrading chemical admixture : Type-D 1.0000 liter 125.00 125.00

Subtotal-A: 125.00
Carriage, safe storage, mixing & sundries etc. ( +4.00 % on Subtotal-A ) 5.00
Subtotal-A1: 130.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 132.60

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 145.86


VAT 6% of Total 9.72
IT 4% of Total 6.48
Total: 162.07

Note : Rates of all items should be inclusive of all supply and carriage. Page: 742 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.12.01.05 Supply and use of water-reducing and accelerating chemical admixture litre
in concrete, complying ASTM C 494 Type E of approved brand/origin/
manufacturer and supplied by only manufacturer's authorised dealer
with certificate of origin. An admixture that reduces the quantity of
mixing water required to produce concrete of a given consistency i.e.
low w/c ratio and accelerates setting and early strength development of
concrete.
Water-reducing and accelerating chemical admixture : Type-E 1.0000 liter 135.00 135.00

Subtotal-A: 135.00
Carriage, safe storage, mixing & sundries etc. ( +4.00 % on Subtotal-A ) 5.40
Subtotal-A1: 140.40

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 143.21

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 157.53


VAT 6% of Total 10.50
IT 4% of Total 7.00
Total: 175.03

Note : Rates of all items should be inclusive of all supply and carriage. Page: 743 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.12.01.06 Supply and use of water-reducing high range chemical admixture in litre
concrete, complying to ASTM C 494 Type F of approved brand/origin/
manufacturer and supplied by only manufacturer's authorised dealer
with certificate of origin. An admixture that reduces the quantity of
mixing water required to produce concrete of a given consistency by 12
or greater (flowing concrete) and for higher strength of concrete
Water-reducing high range chemical admixture : Type-F 1.0000 liter 160.00 160.00

Subtotal-A: 160.00
Carriage, safe storage, mixing & sundries etc. ( +4.00 % on Subtotal-A ) 6.40
Subtotal-A1: 166.40

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 169.73

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 186.70


VAT 6% of Total 12.45
IT 4% of Total 8.30
Total: 207.45

Note : Rates of all items should be inclusive of all supply and carriage. Page: 744 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.12.01.07 Supply and use of water-reducing high range and retarding chemical litre
admixture in concrete, complying to ASTM C 494 Type G of approved
brand/ origin/ manufacturer and supplied by only manufacturer's
authorised dealer with certificate of origin. An admixture that reduces
the quantity of mixing water required to produce concrete of a given
consistency by 12% or greater (flowing concrete) and retards setting of
concrete.
Water-reducing high range and retrading chemical admixture 1.0000 liter 160.00 160.00
: Type-G

Subtotal-A: 160.00
Carriage, safe storage, mixing & sundries etc. ( +4.00 % on Subtotal-A ) 6.40
Subtotal-A1: 166.40

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 169.73

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 186.70


VAT 6% of Total 12.45
IT 4% of Total 8.30
Total: 207.45

4.12.02 Providing Film Galvanizing Compound having 96% of zinc (purity is


99.99%), corrosion rate shall be less than 0.05mm per year, solid
content shall not be more than 40% by volume and relative density shall
not more than 2.70 gm/cc and should be complied the international test
result like salt spray test, frame test, weathering test and humidity test.
Shelf and drying time shall not be more than 25 minuities for the
cathodic (galvanic/sacrificial) protection of all steel structure for a
specified time against formation of rust and corrosion. All complete as
per direction of E-I-C.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 745 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.12.02.01 20 Micron Film Galvanizing Compound for minimum 5 years protection sqm
against rust & corrosion.
Film Galvanizing Compound 0.1650 kg 4550.00 750.75
Water Paper 1.0000 each 22.00 22.00
Emery Paper 0.5000 each 21.00 10.50
Wire Brush 0.1000 each 50.00 5.00
Scrapper 0.1000 each 55.00 5.50
Chissel 0.1000 each 65.00 6.50
Roll Brush 0.0500 each 50.00 2.50
Jute 0.0800 kg 20.00 1.60
Markin cloth 0.0800 m 10.00 0.80
Hand Gloves 0.0300 Pair 130.00 3.90
Galvanize Coating Expert 0.0200 day 800.00 16.00
Plumber/ Electric Mistry/ Painter 0.0500 day 680.00 34.00
Skilled Technician 0.0500 day 680.00 34.00
Semi Skilled Technician 0.0500 day 570.00 28.50

Subtotal-A: 921.55

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 939.98

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1033.98


VAT 6% of Total 68.93
IT 4% of Total 45.95
Total: 1148.87

Note : Rates of all items should be inclusive of all supply and carriage. Page: 746 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.12.02.02 40 Micron Film Galvanizing Compound for minimum 10 years protection sqm
against rust & corrosion.
Film Galvanizing Compound 0.3300 kg 4550.00 1501.50
Water Paper 1.0000 each 22.00 22.00
Emery Paper 0.5000 each 21.00 10.50
Wire Brush 0.1000 each 50.00 5.00
Scrapper 0.1000 each 55.00 5.50
Chissel 0.1000 each 65.00 6.50
Roll Brush 0.1000 each 50.00 5.00
Jute 0.1000 kg 20.00 2.00
Markin cloth 0.1000 m 10.00 1.00
Hand Gloves 0.0500 Pair 130.00 6.50
Galvanize Coating Expert 0.0400 day 800.00 32.00
Plumber/ Electric Mistry/ Painter 0.1000 day 680.00 68.00
Skilled Technician 0.1600 day 680.00 108.80
Semi Skilled Technician 1.0000 day 570.00 570.00

Subtotal-A: 2344.30

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2391.19

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2630.30


VAT 6% of Total 175.35
IT 4% of Total 116.90
Total: 2922.56

Note : Rates of all items should be inclusive of all supply and carriage. Page: 747 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.12.02.03 40 Micron Film Galvanizing Compound including top coat of sqm


Polyurethane combined with micaceous iron oxide (MIO), aluminium
and magnesium silicate for minimum 10 years protection against rust &
corrosion.
Film Galvanizing Compound 0.3300 kg 4550.00 1501.50
Water Paper 1.0000 each 22.00 22.00
Emery Paper 0.5000 each 21.00 10.50
Wire Brush 0.1000 each 50.00 5.00
Scrapper 0.1000 each 55.00 5.50
Chissel 0.1000 each 65.00 6.50
Roll Brush 0.1000 each 50.00 5.00
Jute 0.1000 kg 20.00 2.00
Markin cloth 0.1000 m 10.00 1.00
Hand Gloves 0.0500 Pair 130.00 6.50
Galvanize Coating Expert 0.0400 day 800.00 32.00
Plumber/ Electric Mistry/ Painter 0.0800 day 680.00 54.40
Skilled Technician 0.1600 day 680.00 108.80
Semi Skilled Technician 1.0000 day 570.00 570.00
Polyurethane with micaceous iron oxide 0.0900 liter 6000.00 540.00
Rust & Paint Removing Solution 0.1000 liter 400.00 40.00
Ditergent Powder 0.0500 kg 180.00 9.00

Subtotal-A: 2919.70

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2978.09

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 3275.90


VAT 6% of Total 218.39
IT 4% of Total 145.60
Total: 3639.89

Note : Rates of all items should be inclusive of all supply and carriage. Page: 748 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.12.03 CCC: Supplying and spraying liquid membrane-forming water/resin sqm


based concrete curing compounds conforming to ASTM C 309/ AASHTO
M 148 on freshly cast concrete or newly exposed concrete surfaces
immediately after removal of shuttering or after initial moist curing at a
rate of 5.0 m2/L or in accordance with the manufacturer's instructions
to form a thin continuous firm barrier/ temporary membrane which will
retain sufficient moisture for effective curing to take place during the
early-hardening period without disturbing the normal setting action of
concrete including labour, equipment, other incidental charges etc. all
complete as per specification and direction of E-I-C. The curing
compound shall exhibit water loss not more than 0.55 Kg/m2 in 72
hours when tested as per ASTM C 156, shall exhibit a daylight
reflectance of not less than 60% when tested as per ASTM E 1347 and
shall dry to touch in not more than 4 hours.
[This unit rate includes 10% extra curing compound for overlaps and
wastage.]
Water based Concrete Curing Compound conforming to ASTM 0.2200 Liter 400.00 88.00
C 309/ AASHTO M 148
Skilled Labour 0.0500 day 450.00 22.50

Subtotal-A: 110.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 112.71

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 123.98


VAT 6% of Total 8.27
IT 4% of Total 5.51
Total: 137.76

Note : Rates of all items should be inclusive of all supply and carriage. Page: 749 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.13.01 CWC: Providing and laying wearing course on deck slab of bridge with cum
minimum cement content ralates to mix ratio 1:1.5:3 and maximum
water cement ratio 0.4 having minimum required average strength, f'cr
= 33.5 MPa and satisfying a compressive strength f'c = 25 MPa at 28
days on standard cylinders as per standard practice of Code AASHTO/
ASTM and cement conforming to BDS EN 197-1 : 2003 CEM-II/A-
L/M/V/W 42.5N, Coarse sand of minimum FM 2.5 and 6mm down well
graded crushed stone chips broken from boulders (preferably stone
chips from Madhyapara, Dinajpur, LAA value not exceeding 30),
including breaking stone boulders into chips, screening through proper
sieves, casting, finishing complete to camber and grade, compacting,
curing at least for 28 days, etc. including cost and carriage of all
materials, labour, water, electricity, other incidental cost etc. all
complete as per design, drawing, specification & directionn of E-I-C.
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Stone Chips (6mm down graded) [LAA≤30] 0.8200 m3 3800.00 3116.00
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Water reducing chemical admixture : Type-A 1.9275 liter 130.00 250.58
Head Mason 0.0600 day 650.00 39.00
Mason 0.3500 day 550.00 192.50
Skilled Labour 1.0000 day 450.00 450.00
Ordinary Labour 1.1000 day 370.00 407.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 8481.38

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 8651.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 9516.10


VAT 6% of Total 634.41
IT 4% of Total 422.94
Total: 10573.45

Note : Rates of all items should be inclusive of all supply and carriage. Page: 750 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.13.02 RWDP: Providing & fixing rainwater down pipes including cost of all
materials, labours, equipment, transportation, fixtures, accessories etc.
at any level as per specification, drawings and direction of the E-I-C.

4.13.02.01 RWDP40GI: 40mm dia GI pipe of 2.90mm wall thickness conforming to m


BDS 1031/ BS 1387 Light Class
40mm dia GI pipe wall thickness 2.90mm 1.0000 m 380.48 380.48
Skilled Labour 0.0800 day 450.00 36.00

Subtotal-A: 416.48

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 424.81

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 467.29


VAT 6% of Total 31.15
IT 4% of Total 20.77
Total: 519.21

4.13.02.02 RWDP50GI: 50mm dia GI pipe of 2.90mm wall thickness conforming to m


BDS 1031/ BS 1387 Light Class
50mm dia GI pipe wall thickness 2.90mm 1.0000 m 457.42 457.42
Skilled Labour 0.0900 day 450.00 40.50

Subtotal-A: 497.92

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 507.88

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 558.67


VAT 6% of Total 37.24
IT 4% of Total 24.83
Total: 620.74

Note : Rates of all items should be inclusive of all supply and carriage. Page: 751 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.13.02.03 RWDP65GI: 65mm dia GI pipe of 3.25mm wall thickness conforming to m


BDS 1031/ BS 1387 Light Class
65mm dia GI pipe wall thickness 3.25mm 1.0000 m 701.10 701.10
Skilled Labour 0.1000 day 450.00 45.00

Subtotal-A: 746.10

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 761.02

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 837.12


VAT 6% of Total 55.81
IT 4% of Total 37.21
Total: 930.14

4.13.02.04 RWDP80GI: 80mm dia GI pipe of 3.25mm wall thickness conforming to m


BDS 1031/ BS 1387 Light Class
80mm dia GI pipe wall thickness 3.25mm 1.0000 m 784.90 784.90
Skilled Labour 0.1100 day 450.00 49.50

Subtotal-A: 834.40

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 851.09

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 936.20


VAT 6% of Total 62.41
IT 4% of Total 41.61
Total: 1040.22

Note : Rates of all items should be inclusive of all supply and carriage. Page: 752 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.13.02.05 RWDP100GILC: 100mm dia GI pipe of 3.65mm wall thickness m


conforming to BDS 1031/ BS 1387 Light Class
100mm dia GI pipe wall thickness 3.65mm 1.0000 m 1132.88 1132.88
Skilled Labour 0.1100 day 450.00 49.50

Subtotal-A: 1182.38

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1206.03

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1326.63


VAT 6% of Total 88.44
IT 4% of Total 58.96
Total: 1474.03

4.13.02.06 RWDP100GIMC: 100mm dia GI pipe of 4.05mm wall thickness m


conforming to BDS 1031/ BS 1387 Medium Class
100mm dia GI pipe wall thickness 4.05mm 1.0000 m 1660.00 1660.00
Skilled Labour 0.1100 day 450.00 49.50

Subtotal-A: 1709.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1743.69

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1918.06


VAT 6% of Total 127.87
IT 4% of Total 85.25
Total: 2131.18

Note : Rates of all items should be inclusive of all supply and carriage. Page: 753 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.13.02.07 RWDP50PVC: 50mm uPVC Pipe of 2.5mm to 3mm wall thickness m


conforming to BS 3505
50mm PVC Pipe-2.5mm to 3mm wall thick 1.0000 m 93.00 93.00
Skilled Labour 0.0400 day 450.00 18.00

Subtotal-A: 111.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 113.22

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 124.54


VAT 6% of Total 8.30
IT 4% of Total 5.54
Total: 138.38

4.13.02.08 RWDP75PVC: 75mm uPVC Pipe of 2.9mm to 3.4mm wall thickness m


conforming to BS 3505
75mm PVC Pipe -2.9mm to 3.4mm wall thick 1.0000 m 165.00 165.00
Skilled Labour 0.0450 day 450.00 20.25

Subtotal-A: 185.25

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 188.96

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 207.85


VAT 6% of Total 13.86
IT 4% of Total 9.24
Total: 230.95

Note : Rates of all items should be inclusive of all supply and carriage. Page: 754 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.13.03 BF: Back filling behind abutments, wing walls and retaining walls with cum
selected granular material (50:50 best quality picked brick chips & sand
of min. FM 1.00) of minimum 450 mm width, in layers of 150 mm
thickness free from dust, impurities etc. including compaction using
plate compactor, watering & dressing, supply & cost of all materials,
carrying and labour, hire charge of plate compactor and other tools etc.
all complete as per direction of the Engineer-In-Charge. Payment to be
made for the compacted volume only for a compaction of 90% of the
maximum dry density.
1st Class Picked Brick Bats 0.6650 m3 2150.00 1429.75
Sand (FM - 1.0) 0.6650 m3 567.00 377.06
Ordinary Labour 0.5000 day 370.00 185.00
H.C. of Plate Compactor (LF-72) 0.0313 day 850.00 26.61
H.C. of Water Tanker (Truck Mounted) 0.0020 day 2500.00 5.00

Subtotal-A: 2023.41

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2063.88

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2270.27


VAT 6% of Total 151.35
IT 4% of Total 100.90
Total: 2522.52

Note : Rates of all items should be inclusive of all supply and carriage. Page: 755 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.13.04 WH: Providing weep holes in Brick masonry/ Plain/ Reinforced concrete each
retaining wall, abutment, wing/ return wall, with 50 - 100 mm dia PVC
pipe extending through the full width of structure with slope 1V : 20H
towards draining face including hand packing of 0.85 cum pervious
backfill material (40mm - 63mm sized 1st class/picked brick) wrapped in
filter fabric in the back of each weep hole etc. all compete as per
direction of the E-I-C.
[Cost of PVC pipe is included in this item and shall not be paid
separately.]
1st Class Brick Chips (20mm down graded) 0.0850 m3 2940.00 249.90
75mm PVC Pipe -2.9mm to 3.4mm wall thick 0.6000 m 165.00 99.00
Sand (FM - 0.8) 0.0270 m3 480.00 12.96
Empty Gunny Bag 1.0000 each 30.00 30.00
Skilled Labour 0.1000 day 450.00 45.00

Subtotal-A: 436.86

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 445.60

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 490.16


VAT 6% of Total 32.68
IT 4% of Total 21.78
Total: 544.62

Note : Rates of all items should be inclusive of all supply and carriage. Page: 756 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.13.05 DS: Supplying, fitting and fixing in position galvanized drainage spouts each
for bridge decks made up by minimum 100mm dia. MS pipe of 4.05mm
wall thickness conforming to BDS 1031/ BS 1387 Medium Class, grating
formed by 262mm x 262mm top rim of 32mm X 28mm ASTM A36
complied MS rectangular bars and 4 nos. 198mm X 12mm X 25mm
ASTM A36 complied MS flat bars, square shaped collection pit of
210mm X 210mm made up by 6mm thick ASTM A36 complied MS plate
with necessary anchorage and fixing the grating frame by minimum 6
nos. of 10mm dia. bolts and other necessary fittings including all labour,
tools, plant, equipment, machinery, leads & lifts, fuel, electric charges
etc. complete in all respectas as per drawing, specifications and
direction of Engineer-in-Charge. The grating has to carry a spot load of
100 kN. Drainage spouts has to be constructed in such a way so that
the gratings can be temporarily fixed to protect against theft. After
fabrication, the complete assembly shall be given a hot dipped
galvanized coating.
[600mm MS Pipe is included in this unit rate, Extra length must be
added if necessary]
LW: Direct type Lap-welded splice over two sides of contact 0.9800 meter 374.73 367.24
by welding of minimum length not less than 10 times of bar
diameter …...(4.07.07.02)
Corrosion resistant Structural steel 18.9030 kg 58.00 1096.37
100mm dia MS pipe and wall thickness 4mm 0.6000 m 1300.00 780.00
Hot-dip Galvanizing in accordance with BS EN ISO 1461: 25.1380 kg 65.00 1633.97
1999 with minimum coat thickness of 85 microns or 610 gm
per square meter
GI bolt 10mm diameter 6.0000 each 20.00 120.00
Nails/ Nut bolts/ Screw/ Spikes 0.5000 kg 65.00 32.50
Mason 0.0100 day 550.00 5.50
Welder 0.0200 day 680.00 13.60
Skilled Labour 0.0100 day 450.00 4.50
Ordinary Labour 0.2500 day 370.00 92.50

Subtotal-A: 4146.18
Cost of cutting, sealant, grinding and fabrication ( +10.00 % on Subtotal-A ) 414.62
Note : Rates of all items should be inclusive of all supply and carriage. Page: 757 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

etc.
Subtotal-A1: 4560.80

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4652.01

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 5117.21


VAT 6% of Total 341.15
IT 4% of Total 227.43
Total: 5685.79

Note : Rates of all items should be inclusive of all supply and carriage. Page: 758 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.13.06 DG: Supplying, fitting and fixing in position galvanized drainage grating each
for bridge decks made up by 200mm x 150mm outer frame of 25mm x
25mm x 6mm ASTM A 36 complied MS Angles and 4 nos. 25mm x 6mm
ASTM A36 complied MS flat bars, grating fitted with 4 nos. BDS ISO
6935-2: 2006 (Grade 400) complied 12mm dia. anchor bar 100mm in
length by welding and other necessary fittings including all labour,
tools, plant, equipment, machinery, leads & lifts, fuel, electric charges
etc. complete in all respect as per drawing, specifications and direction
of Engineer-in-Charge. After fabrication, grating shall be given a hot
dipped galvanized coating.
LW: Direct type Lap-welded splice over two sides of contact 0.2000 meter 374.73 74.95
by welding of minimum length not less than 10 times of bar
diameter …...(4.07.07.02)
Supplying and fabrication of Ribbed or deformed bar 0.3720 kg 65.67 24.43
reinforcement conforming to BDS ISO 6935-2:2006 (Grade
400)………….(4.11.01.04)
Corrosion resistant Structural steel 1.8010 kg 58.00 104.46
Hot-dip Galvanizing in accordance with BS EN ISO 1461: 2.1730 kg 65.00 141.25
1999 with minimum coat thickness of 85 microns or 610 gm
per square meter
Mason 0.0100 day 550.00 5.50
Welder 0.0100 day 680.00 6.80
Skilled Labour 0.0100 day 450.00 4.50
Ordinary Labour 0.0500 day 370.00 18.50

Subtotal-A: 380.38
Cost of cutting, sealant, grinding and fabrication ( +10.00 % on Subtotal-A ) 38.04
etc.
Subtotal-A1: 418.42

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 426.78

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 469.46


VAT 6% of Total 31.30
IT 4% of Total 20.87

Note : Rates of all items should be inclusive of all supply and carriage. Page: 759 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 521.63

4.13.07 PS: Providing cork sheet/ polystyrene sheet in expansion joints of


concrete works including supply of all materials etc. complete as per
direction of E-I-C.

4.13.07.01 PS_25 mm thick sheet sqm


Cork/ Polystyrene Sheet (25mm thick) 1.0000 sqm 160.00 160.00
Skilled Labour 0.1000 day 450.00 45.00

Subtotal-A: 205.00
Miscellaneous Sundry etc. ( +1.00 % on Subtotal-A ) 2.05
Subtotal-A1: 207.05

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 211.19

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 232.31


VAT 6% of Total 15.49
IT 4% of Total 10.32
Total: 258.12

Note : Rates of all items should be inclusive of all supply and carriage. Page: 760 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.13.07.02 PS_20 mm thick sheet sqm


Cork/ Polystyrene Sheet (20mm thick) 1.0000 sqm 550.00 550.00
Skilled Labour 0.1000 day 450.00 45.00

Subtotal-A: 595.00
Miscellaneous Sundry etc. ( +1.00 % on Subtotal-A ) 5.95
Subtotal-A1: 600.95

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 612.97

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 674.27


VAT 6% of Total 44.95
IT 4% of Total 29.97
Total: 749.18

Note : Rates of all items should be inclusive of all supply and carriage. Page: 761 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.13.08 MA: Providing and laying mastic asphalt wearing course on top of deck
slab excluding prime/tack coat with 10/20 penetration grade bitumen
satisfying the requirements of ASTM/AASHTO code, coarse aggregate
should be crushed stone chips (LAA value <=30) complying with the
specified grading requirement of the relevant item of Road Design
Standard - 2005, water absorption not >2%, flakiness index not >
35%, fine aggregate shall be the fraction passing the 2.36mm and
retained on the 0.075mm sieve, filler shall be limestone powder passing
75 micron sieve and shall have a calcium carbonate content of not <
80%, prepared by using mastic cooker and laid to required level and
slope after cleaning the surface, including hire charges of all tools,
plants and machinery, wages of operational staff, cost of fuel &
lubricants and all other incidental charges all complete as per design,
specification and direction of Engineer-in-Charge.
The contractor shall submit to the Engineer for approval at least one
month before the start of the work the job mix formula proposed to be
used by him for the work. [Excluding the cost of applying Prime/Tack
coat]
Notes:
1. Where prime/tack coat is required to be provided before laying
mastic asphalt, the same is required to be measured and paid
separately. The rate for prime/tack coat shall be taken from Road
Works.
2. Bituminous wearing course of specified thickness shall be overlaid
with this mastic asphalt and the rate for bituminous wearing course
shall be taken from Road Works.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 762 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.13.08.01 MA_12: 12mm thick mastic asphalt wearing course sqm


Bitumen (Drum/Bulk) of Penetration Grade 10/20 4.8045 kg 52.00 249.83
Stone Dust (2.38mm down) 0.0092 cum 1500.00 13.80
Limestone Powder 8.4786 kg 12.00 101.74
Stone Chips (6mm down graded) [LAA≤30] 0.0130 m3 3800.00 49.40
Mason 0.0115 day 550.00 6.33
Skilled Labour 0.0294 day 450.00 13.23
Ordinary Labour 0.2591 day 370.00 95.87
H.C. of Mechanical Road Sweeper Broom 0.0002 day 1000.00 0.20
Air compressor (screw type) 250 cfm with necessary piping 0.0002 Day 3000.00 0.60
arranagement and accessories.
H.C. of Mastic Cooker (1 tonne capacity) 0.0177 day 3000.00 53.10
H.C. of Bitumen Heater & Decanter 0.0177 day 5000.00 88.50
H.C. of Tractor (4 WD) 0.0029 day 2200.00 6.38

Subtotal-A: 678.98
Other incidental charges ( +5.00 % on Subtotal-A ) 33.95
Subtotal-A1: 712.93

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 727.19

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 799.91


VAT 6% of Total 53.33
IT 4% of Total 35.55
Total: 888.78

Note : Rates of all items should be inclusive of all supply and carriage. Page: 763 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.13.08.02 MA_25: 25mm thick mastic asphalt wearing course sqm


Bitumen (Drum/Bulk) of Penetration Grade 10/20 5.8286 kg 52.00 303.09
Stone Dust (2.38mm down) 0.0111 cum 1500.00 16.65
Limestone Powder 10.2857 kg 12.00 123.43
Stone Chips (12mm down graded) [LAA≤30] 0.0079 m3 4470.00 35.31
Stone Chips (6mm down graded) [LAA≤30] 0.0079 m3 3800.00 30.02
Mason 0.0126 day 550.00 6.93
Skilled Labour 0.0286 day 450.00 12.87
Ordinary Labour 0.2857 day 370.00 105.71
H.C. of Mechanical Road Sweeper Broom 0.0017 day 1000.00 1.70
Air compressor (screw type) 250 cfm with necessary piping 0.0017 Day 3000.00 5.10
arranagement and accessories.
H.C. of Mastic Cooker (1 tonne capacity) 0.0214 day 3000.00 64.20
H.C. of Bitumen Heater & Decanter 0.0214 day 5000.00 107.00
H.C. of Tractor (4 WD) 0.0036 day 2200.00 7.92

Subtotal-A: 819.93
Other incidental charges ( +5.00 % on Subtotal-A ) 41.00
Subtotal-A1: 860.92

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 878.14

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 965.96


VAT 6% of Total 64.40
IT 4% of Total 42.93
Total: 1073.29

Note : Rates of all items should be inclusive of all supply and carriage. Page: 764 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.01 Manufacturing and supplying Plain Cement Concrete (PCC) Blocks with
cement conforming to BDS EN 197-1 : 2003 CEM-II/A-L/M/V/W 42.5N,
sand of minimum FM 1.5 and 40 mm down well graded shingles to
attain a minimum 28 days cylinder strength of 9.00 MPa (suggested mix
proporation 1:3:6) including grading, washings shingles, mixing, laying
in forms, consolidating, curing for at least 21 days, including preparation
of platform, shuttering and stacking in measurable stacks, cost of all
materials, labour, equiptment and machinery, work at all leads and lifts,
loading and unloading, transportation and all other incidental charges
etc. all complete as per drawing, specification & direction of the E-I-C.
Steel shutter shall be used to perform the job.
[Payment shall be done after laying of PCC Blocks]

4.14.01.01 Size: 400 mm x 400 mm x 150 mm each


Stone Shingles (20mm down graded) 0.0216 m3 3500.00 75.60
Sand (FM - 1.5) 0.0100 m3 795.00 7.95
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.1016 bag 430.00 43.69
Mason 0.0020 day 550.00 1.10
Skilled Labour 0.0180 day 450.00 8.10
Ordinary Labour 0.0430 day 370.00 15.91
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0014 day 1200.00 1.68

Subtotal-A: 154.03

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 157.11

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 172.82


VAT 6% of Total 11.52
IT 4% of Total 7.68
Total: 192.02

Note : Rates of all items should be inclusive of all supply and carriage. Page: 765 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.01.02 Size: 500 mm x 500 mm x 150 mm each


Stone Shingles (20mm down graded) 0.0336 m3 3500.00 117.60
Sand (FM - 1.5) 0.0170 m3 795.00 13.52
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.1580 bag 430.00 67.94
Mason 0.0012 day 550.00 0.66
Skilled Labour 0.0280 day 450.00 12.60
Ordinary Labour 0.0675 day 370.00 24.98
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0022 day 1200.00 2.64

Subtotal-A: 239.93

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 244.73

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 269.20


VAT 6% of Total 17.95
IT 4% of Total 11.96
Total: 299.11

Note : Rates of all items should be inclusive of all supply and carriage. Page: 766 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.01.03 Size: 500 mm x 500 mm x 200 mm each


Stone Shingles (20mm down graded) 0.0450 m3 3500.00 157.50
Sand (FM - 1.5) 0.0230 m3 795.00 18.29
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.2210 bag 430.00 95.03
Mason 0.0015 day 550.00 0.83
Skilled Labour 0.0350 day 450.00 15.75
Ordinary Labour 0.0675 day 370.00 24.98
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0022 day 1200.00 2.64

Subtotal-A: 315.01

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 321.31

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 353.44


VAT 6% of Total 23.56
IT 4% of Total 15.71
Total: 392.71

Note : Rates of all items should be inclusive of all supply and carriage. Page: 767 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.02 Labour charge for protective works in laying Plain Cement Concret (PCC) cum
blocks of different sizes including preparation, watering and ramming of
base, packing the residual space between masonry & other structural
members like columns, beams, slabs etc., providing opening as directed
and finishing neatly around the same, works at all leads and lifts,
loading and unloading, transportaiton and all other incidental charges
etc. all complete as per drawing, specification & direction of the E-I-C.
Mason 0.0200 day 550.00 11.00
Skilled Labour 0.3000 day 450.00 135.00
Ordinary Labour 1.3000 day 370.00 481.00

Subtotal-A: 627.00
H.C for jute & bamboo ( +10.00 % on Subtotal-A ) 62.70
Subtotal-A1: 689.70

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 703.49

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 773.84


VAT 6% of Total 51.59
IT 4% of Total 34.39
Total: 859.83

4.14.03 Providing brick mattressing in bridge approaches as protective work


with required layer soling of 1st class/ picked bricks encased in 12 BWG
galvanised wire 100mm square mesh wire net over a 25mm thick filter
bed of sand (minimum FM 2.50) & brick chips (20mm down graded)
mixed with proportion 1:1 including necessary earth cutting and fitting,
fixing with 750mm long bamboo peg @ 1m c/c, dressing, leveling,
compacting, etc. all complete in all respect as per approved design,
specification and direction of E-I-C. Rate is inclusive of cost of materials,
labour, equiptment & machinery, work at all leads and lifts, loading &
unloading, transportation and all incidental charges in this connection.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 768 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.03.01 Single Layer Soling of 1st Class/ picked bricks sqm


1st Class Brick 31.0000 each 9.00 279.00
Sand (FM - 2.5) 0.0180 m3 1500.00 27.00
1st Class Brick Chips (20mm down graded) 0.0180 m3 2940.00 52.92
Borak Bamboo (50mm dia) 1.5000 m 30.00 45.00
GI Wire Net (12 BWG) [Rhombus Size 75mm] 2.0000 m2 100.00 200.00
Skilled Labour 0.0310 day 450.00 13.95
Ordinary Labour 0.1820 day 370.00 67.34

Subtotal-A: 685.21

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 698.91

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 768.81


VAT 6% of Total 51.25
IT 4% of Total 34.17
Total: 854.23

Note : Rates of all items should be inclusive of all supply and carriage. Page: 769 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.03.02 Double Layer Soling of 1st Class/ picked bricks sqm


1st Class Brick 62.0000 each 9.00 558.00
Sand (FM - 2.5) 0.0180 m3 1500.00 27.00
1st Class Brick Chips (20mm down graded) 0.0180 m3 2940.00 52.92
Borak Bamboo (50mm dia) 1.5000 m 30.00 45.00
GI Wire Net (12 BWG) [Rhombus Size 75mm] 2.0000 m2 100.00 200.00
Skilled Labour 0.0620 day 450.00 27.90
Ordinary Labour 0.2820 day 370.00 104.34

Subtotal-A: 1015.16

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1035.46

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1139.01


VAT 6% of Total 75.93
IT 4% of Total 50.62
Total: 1265.57

4.14.04 Supplying and placing of required layers of gunny bagged Riprap filled
with cement (BDS EN 197-1 : 2003 CEM-II/A-L/M/V/W 42.5N) and
Sand (minimum FM 1.00) mortar (1:8) along slopes of abutments, piers,
banks of river/ khal including washing of sand, mixing in standard
mixture machine, filled & tamping the bags in place, stitching bags by
hand sewing machine, curing by sprinkling water over the bags
including preparation of slope (bed) by cutting or filling with ramming
the filled up earth to the same profile as that of the finished slope level,
placing the filled gunny bags along the slope, etc. all complete in all
respect as per approved design, specification and direction of the E-I-C.
Rate is inclusive of cost of all materials, labour and all incidental charges
in this connection.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 770 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.04.01 Single layer of Gunny Bagged Riprap sqm


Sand (FM - 1.0) 0.1100 m3 567.00 62.37
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.3800 bag 430.00 163.40
Empty Gunny Bag 5.0000 each 30.00 150.00
Mason 0.0100 day 550.00 5.50
Ordinary Labour 0.4000 day 370.00 148.00

Subtotal-A: 529.27

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 539.86

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 593.84


VAT 6% of Total 39.59
IT 4% of Total 26.39
Total: 659.82

4.14.04.02 Two layers of Gunny Bagged Riprap sqm


Sand (FM - 1.0) 0.2200 m3 567.00 124.74
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.7800 bag 430.00 335.40
Empty Gunny Bag 10.0000 each 30.00 300.00
Mason 0.0100 day 550.00 5.50
Ordinary Labour 0.7100 day 370.00 262.70

Subtotal-A: 1028.34

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1048.91

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1153.80


VAT 6% of Total 76.92
IT 4% of Total 51.28
Total: 1282.00

Note : Rates of all items should be inclusive of all supply and carriage. Page: 771 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.05 Supplying best quality sal/ sundari/ gazari/ sonali/ tetul/ Jam etc. bullah
piles free from rots, knots, sap and uniform in size at work site including
carrying, stacking, etc. all complete as per direction of the Engineer-in-
Charge. Before any piling work is commenced the contractor shall
submit to the engineer full details of the pile driving equipment and the
method he intends to use in carrying out the work. Diameter of bullah
pile to be measured at a distance of 1.5m from the thicker end.

4.14.05.01 Bullah piles of 150mm to 200mm diameter m


Shal/sundari/gazari Bullah (150mm to 200mm) 1.0000 m 225.00 225.00
Ordinary Labour 0.0200 day 370.00 7.40

Subtotal-A: 232.40

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 237.05

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 260.75


VAT 6% of Total 17.38
IT 4% of Total 11.59
Total: 289.73

4.14.05.02 Bullah piles of 200mm to 250mm diameter m


Shal/sundari/gazari Bullah (200mm to 250mm) 1.0000 m 426.40 426.40
Ordinary Labour 0.0200 day 370.00 7.40

Subtotal-A: 433.80

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 442.48

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 486.72


VAT 6% of Total 32.45
IT 4% of Total 21.63
Total: 540.80

Note : Rates of all items should be inclusive of all supply and carriage. Page: 772 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.06 Labour for driving best quality bullah piles up to required depth by
monkey/ power winch in all sorts of soil including hoisting and placing
piles in position, protecting the pile head with iron ring and cutting and
shaping heads before and after driving and including hire and labour for
necessary driving appliances etc. complete in all respect as per direction
of the Engineer-in-Charge. Pamyment to be made on the length driven
into the ground.

4.14.06.01 Bullah piles of 150mm to 200mm diameter

4.14.06.01.01 For driving from ground with staging m


Skilled Labour 0.0200 day 450.00 9.00
Ordinary Labour 0.4000 day 370.00 148.00
H.C. of Driving Equipment 0.0500 day 350.00 17.50

Subtotal-A: 174.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 177.99

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 195.79


VAT 6% of Total 13.05
IT 4% of Total 8.70
Total: 217.54

4.14.06.01.02 For driving from pontoon or boats with staging m Add +4.00% with Item No 4.14.06.01.01

4.14.06.01.03 For driving from pontoon or boats with heavy staging m Add +7.00% with Item No 4.14.06.01.01

4.14.06.02 Bullah piles of 200mm to 250mm diameter

Note : Rates of all items should be inclusive of all supply and carriage. Page: 773 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.06.02.01 For driving from ground with staging m


Skilled Labour 0.0300 day 450.00 13.50
Ordinary Labour 0.6000 day 370.00 222.00
H.C. of Driving Equipment 0.0500 day 350.00 17.50

Subtotal-A: 253.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 258.06

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 283.87


VAT 6% of Total 18.92
IT 4% of Total 12.62
Total: 315.41

4.14.06.02.02 For driving from pontoon or boats with staging m Add +4.00% with Item No 4.14.06.02.01

4.14.06.02.03 For driving from pontoon or boats with heavy staging m Add +7.00% with Item No 4.14.06.02.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 774 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.07 Providing & Installtion of 100mm x 200mm x 8mm steel joist or any m
other required steel sections of 7.62m length @ 200mm c/c for Shore
protection work during excavation in foundation trenches to protect the
adjacent property including rent, conveyance, labour, material for
cutting to required size & for driving the same upto required depth
including cost of all fittings etc. complete as per direction of the E-I-C.
The contractor will remove the joists after completing the work without
any extra payment & the contractor will be the owner of these joists.
Note: Measurement shall be based on lengths of protection work in
horizontal direction.
H.C. of MS Plate, MS Angle & I-Beam etc. 982.1900 kg 18.00 17679.42
Skilled Labour 2.5000 day 450.00 1125.00
Ordinary Labour 7.0000 day 370.00 2590.00
H.C. of Driving Equipment 1.0000 day 350.00 350.00

Subtotal-A: 21744.42
All other costs & consumables etc. ( +5.00 % on Subtotal-A ) 1087.22
Subtotal-A1: 22831.64

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 23288.27

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 25617.10


VAT 6% of Total 1707.81
IT 4% of Total 1138.54
Total: 28463.45

Note : Rates of all items should be inclusive of all supply and carriage. Page: 775 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.08 Supplying & dumping of soil filled geo-textile bags of different size and
capacity (fill volumn and weight when filled with dry sand/earth) at the
specified locations along the bottom of piles of piers/ toe line properly
including supply of geo-textile fabric as per following grading, sewing in
accordance with the detailed drawing and technical specifications,
protecting the geo-textile bags from UV ray or any other damages,
filling with suitable soil/ sand and stitching bags by hand sewing
machine properly with plastic thread and dumping the same in position
etc. including cost of all materials, labours, taxes, incidental charges
etc. complete in all respect as per approved drawing, specification and
direction of E-I-C.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 776 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.08.01 Geo-Textile Bag: Empty Size: 800mm x 650mm, Fill Volumn: 0.0520 bag
cum & Weight: 80 Kg
Geo-Textile Grade: Grade-III-DF-40-2.3mm thick
Geo Textile (Grade-III-DF-40-2.3mm thick) 1.1900 m2 65.00 77.35
Operator 0.0029 day 570.00 1.65
Helper 0.0014 day 400.00 0.56
Royalty of Earth 0.0520 m3 25.00 1.30
Foreman 0.0002 day 800.00 0.16
Skilled Labour 0.0040 day 450.00 1.80
Ordinary Labour 0.0500 day 370.00 18.50
H.C. of Sewing Machine 0.0029 day 500.00 1.45
H.C. of Cutter (Geo-Textile) 0.0017 day 500.00 0.85

Subtotal-A: 103.62
Cost of Polyproplene/ Nylon thread & other ( +5.00 % on Subtotal-A ) 5.18
consumables etc.
Subtotal-A1: 108.80

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 110.98

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 122.08


VAT 6% of Total 8.14
IT 4% of Total 5.43
Total: 135.64

Note : Rates of all items should be inclusive of all supply and carriage. Page: 777 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.08.02 Geo-Textile Bag: Empty Bag Size: 900mm x 700mm, Fill Volumn: bag
0.0730 cum & Weight: 110 Kg
Geo-Textile Grade: Grade-III-DF-40-2.3mm thick
Geo Textile (Grade-III-DF-40-2.3mm thick) 1.4250 m2 65.00 92.63
Operator 0.0033 day 570.00 1.88
Helper 0.0017 day 400.00 0.68
Royalty of Earth 0.0730 m3 25.00 1.83
Foreman 0.0002 day 800.00 0.16
Skilled Labour 0.0040 day 450.00 1.80
Ordinary Labour 0.0600 day 370.00 22.20
H.C. of Sewing Machine 0.0033 day 500.00 1.65
H.C. of Cutter (Geo-Textile) 0.0020 day 500.00 1.00

Subtotal-A: 123.82
Cost of Polyproplene/ Nylon thread & other ( +5.00 % on Subtotal-A ) 6.19
consumables etc.
Subtotal-A1: 130.01

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 132.61

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 145.87


VAT 6% of Total 9.72
IT 4% of Total 6.48
Total: 162.08

Note : Rates of all items should be inclusive of all supply and carriage. Page: 778 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.08.03 Geo-Textile Bag: Empty Bag Size: 950mm x 750mm, Fill Volumn: bag
0.0840 cum & Weight: 125 Kg
Geo-Textile Grade: Grade-III-DF-40-2.3mm thick
Geo Textile (Grade-III-DF-40-2.3mm thick) 1.6000 m2 65.00 104.00
Operator 0.0033 day 570.00 1.88
Helper 0.0020 day 400.00 0.80
Royalty of Earth 0.0840 m3 25.00 2.10
Foreman 0.0002 day 800.00 0.16
Skilled Labour 0.0040 day 450.00 1.80
Ordinary Labour 0.0700 day 370.00 25.90
H.C. of Sewing Machine 0.0033 day 500.00 1.65
H.C. of Cutter (Geo-Textile) 0.0017 day 500.00 0.85

Subtotal-A: 139.14
Cost of Polyproplene/ Nylon thread & other ( +5.00 % on Subtotal-A ) 6.96
consumables etc.
Subtotal-A1: 146.10

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 149.02

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 163.92


VAT 6% of Total 10.93
IT 4% of Total 7.29
Total: 182.14

Note : Rates of all items should be inclusive of all supply and carriage. Page: 779 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.08.04 Geo-Textile Bag: Empty Bag Size: 1075mm x 850mm, Fill Volumn: bag
0.1164 cum & Weight: 175 Kg
Geo-Textile Grade: Grade-V-DF-60-3.0mm thick
Geo Textile (Grade-V-DF-60-3.0mm thick) 2.0250 m2 90.00 182.25
Operator 0.0040 day 570.00 2.28
Helper 0.0020 day 400.00 0.80
Royalty of Earth 0.1164 m3 25.00 2.91
Foreman 0.0002 day 800.00 0.16
Skilled Labour 0.0040 day 450.00 1.80
Ordinary Labour 0.0800 day 370.00 29.60
H.C. of Sewing Machine 0.0040 day 500.00 2.00
H.C. of Cutter (Geo-Textile) 0.0025 day 500.00 1.25

Subtotal-A: 223.05
Cost of Polyproplene/ Nylon thread & other ( +5.00 % on Subtotal-A ) 11.15
consumables etc.
Subtotal-A1: 234.20

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 238.89

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 262.78


VAT 6% of Total 17.52
IT 4% of Total 11.68
Total: 291.97

Note : Rates of all items should be inclusive of all supply and carriage. Page: 780 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.08.05 Geo-Textile Bag: Empty Bag Size: 1100mm x 850mm, Fill Volumn: bag
0.1333 cum & Weight: 200 Kg
Geo-Textile Grade: Grade-V-DF-60-3.0mm thick
Geo Textile (Grade-V-DF-60-3.0mm thick) 2.0700 m2 90.00 186.30
Operator 0.0040 day 570.00 2.28
Helper 0.0020 day 400.00 0.80
Royalty of Earth 0.1333 m3 25.00 3.33
Foreman 0.0002 day 800.00 0.16
Skilled Labour 0.0040 day 450.00 1.80
Ordinary Labour 0.0900 day 370.00 33.30
H.C. of Sewing Machine 0.0040 day 500.00 2.00
H.C. of Cutter (Geo-Textile) 0.0025 day 500.00 1.25

Subtotal-A: 231.22
Cost of Polyproplene/ Nylon thread & other ( +5.00 % on Subtotal-A ) 11.56
consumables etc.
Subtotal-A1: 242.78

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 247.64

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 272.40


VAT 6% of Total 18.16
IT 4% of Total 12.11
Total: 302.67

Note : Rates of all items should be inclusive of all supply and carriage. Page: 781 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.08.06 Geo-Textile Bag: Empty Bag Size: 1300mm x 1050mm, Fill Volumn: bag
0.1664 cum & Weight: 250 Kg
Geo-Textile Grade: Grade-V-DF-60-3.0mm thick
Geo Textile (Grade-V-DF-60-3.0mm thick) 2.9700 m2 90.00 267.30
Operator 0.0040 day 570.00 2.28
Helper 0.0020 day 400.00 0.80
Royalty of Earth 0.1664 m3 25.00 4.16
Foreman 0.0002 day 800.00 0.16
Skilled Labour 0.0040 day 450.00 1.80
Ordinary Labour 0.1000 day 370.00 37.00
H.C. of Sewing Machine 0.0040 day 500.00 2.00
H.C. of Cutter (Geo-Textile) 0.0025 day 500.00 1.25

Subtotal-A: 316.75
Cost of Polyproplene/ Nylon thread & other ( +5.00 % on Subtotal-A ) 15.84
consumables etc.
Subtotal-A1: 332.59

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 339.24

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 373.16


VAT 6% of Total 24.88
IT 4% of Total 16.59
Total: 414.63

Note : Rates of all items should be inclusive of all supply and carriage. Page: 782 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.09 Providing, preparing and laying of geogrid crated apron 1 m x 5 m, 600 cum
mm thick including excavation and backfilling with baffles at 1 m
interval, made with geogrids having , joining sides with connectors/ring
staples, top corners to be tie tensioned, placing of suitable cross interval
ties in layers of 300 mm connecting opposite side with lateral braces
and tied with polymer braids to avoid bulging, filled with stone with
minimum size of 200 mm and specific gravity not less than 2.65, packed
with stone spalls, keyed to the foundation recess in case of sloping
ground and laid over a layer of geotextile to prevent migration of fines,
all as per approved design and direction of E-I-C
Synthetic Geogrids as per approved design and specifications 7.0000 sqm 180.00 1260.00
Stone Boulder 1.3000 m3 3700.00 4810.00
Mason 0.0200 day 550.00 11.00
Skilled Labour 0.2000 day 450.00 90.00
Ordinary Labour 0.5000 day 370.00 185.00

Subtotal-A: 6356.00
Cost of material for miscellaneous items ( +20.00 % on Subtotal-A ) 1271.20
Connectors, Staples, Polymer braids, etc.
Subtotal-A1: 7627.20

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 7779.74

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 8557.72


VAT 6% of Total 570.51
IT 4% of Total 380.34
Total: 9508.58

Note : Rates of all items should be inclusive of all supply and carriage. Page: 783 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.10 Construction of single/ double row bamboo spur, with full length borak
bamboo of specified dia. & length, at 0.3m c/c, two rows at 1.5m apart
(not applicable for single row spur) and stays with bamboo at 3 m apart
on the D/S side of the spur, single/ double (for length > 6m) row
runner with half split bamboo on both sides and also with double layer
cross tie at 3.0m interval, including 2.4m to 3.0m driving of bamboo
pins by monkey hammer, necessary staging etc. complete with supply
of all materials including local carriage within 150m and as per drawing
and direction of E-I-C.

4.14.10.01 Single bamboo spur: dia. = 75mm, Length = 6.0m to 7.5m m


Borak Bamboo (75mm dia) 32.6000 m 38.00 1238.80
Nails/ Nut bolts/ Screw/ Spikes 0.0990 kg 65.00 6.44
GI Wire (22 BWG) 0.0260 kg 90.00 2.34
H.C. of Driving Equipment 0.0328 day 350.00 11.48
H.C. of Engine Boat 0.0328 day 1000.00 32.80
Ordinary Labour 0.8770 day 370.00 324.49

Subtotal-A: 1616.35
Other consumables etc. ( +5.00 % on Subtotal-A ) 80.82
Subtotal-A1: 1697.16

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1731.11

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1904.22


VAT 6% of Total 126.95
IT 4% of Total 84.63
Total: 2115.80

Note : Rates of all items should be inclusive of all supply and carriage. Page: 784 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.10.02 Double row bamboo spur: dia. = 75mm, Length = 3.0m to 4.5m m
Borak Bamboo (75mm dia) 29.7200 m 38.00 1129.36
Nails/ Nut bolts/ Screw/ Spikes 0.2000 kg 65.00 13.00
GI Wire (22 BWG) 0.0450 kg 90.00 4.05
H.C. of Driving Equipment 0.0100 day 350.00 3.50
H.C. of Engine Boat 0.0100 day 1000.00 10.00
Ordinary Labour 1.0000 day 370.00 370.00

Subtotal-A: 1529.91
Other consumables etc. ( +5.00 % on Subtotal-A ) 76.50
Subtotal-A1: 1606.41

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1638.53

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1802.39


VAT 6% of Total 120.16
IT 4% of Total 80.11
Total: 2002.65

Note : Rates of all items should be inclusive of all supply and carriage. Page: 785 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.10.03 Double row bamboo spur: dia. = 75mm, Length = 4.5m to 6.0m m
Borak Bamboo (75mm dia) 44.4000 m 38.00 1687.20
Nails/ Nut bolts/ Screw/ Spikes 0.2500 kg 65.00 16.25
GI Wire (22 BWG) 0.0520 kg 90.00 4.68
H.C. of Driving Equipment 0.0650 day 350.00 22.75
H.C. of Engine Boat 0.1300 day 1000.00 130.00
Ordinary Labour 1.8600 day 370.00 688.20

Subtotal-A: 2549.08
Other consumables etc. ( +5.00 % on Subtotal-A ) 127.45
Subtotal-A1: 2676.53

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2730.06

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 3003.07


VAT 6% of Total 200.20
IT 4% of Total 133.47
Total: 3336.75

Note : Rates of all items should be inclusive of all supply and carriage. Page: 786 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.10.04 Double row bamboo spur: dia. = 100mm, Length = 7.5m to 11.0m m
Borak Bamboo (75mm to 100mm) 80.1000 m 42.00 3364.20
Nails/ Nut bolts/ Screw/ Spikes 0.3100 kg 65.00 20.15
GI Wire (22 BWG) 0.0520 kg 90.00 4.68
H.C. of Driving Equipment 0.0328 day 350.00 11.48
H.C. of Engine Boat 0.1312 day 1000.00 131.20
Ordinary Labour 2.0330 day 370.00 752.21

Subtotal-A: 4283.92
Other consumables etc. ( +5.00 % on Subtotal-A ) 214.20
Subtotal-A1: 4498.12

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4588.08

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 5046.89


VAT 6% of Total 336.46
IT 4% of Total 224.31
Total: 5607.65

Note : Rates of all items should be inclusive of all supply and carriage. Page: 787 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.11 Construction of a narrow filter sub- surface drain consisting of porous or m


perforated pipe laid in narrow trench surrounded by a geotextile filter
fabric, with a minimum of 450 mm overlap of fabric and installed
including excavation and backfilling.
Perforated geosynthetic pipe 150 mm dia 1.0000 m 120.00 120.00
Geo Textile (Grade-V-DF-60-3.0mm thick) 1.0000 m2 90.00 90.00
Mason 0.0400 day 550.00 22.00
Skilled Labour 0.2500 day 450.00 112.50
Ordinary Labour 0.5000 day 370.00 185.00

Subtotal-A: 529.50
Cost of material for miscellaneous items like ( +5.00 % on Subtotal-A ) 26.48
synthetic cord
Subtotal-A1: 555.98

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 567.09

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 623.80


VAT 6% of Total 41.59
IT 4% of Total 27.72
Total: 693.12

4.14.12 JGT_RRC: Supplying and laying of woven type untreated double warp
plain weave jute geo-textile (JGT) of different grades conforming to BDS
1909: 2016 for strengthening subgrade of Road & Bridge approach
including local handling, unrolling, placing in position, ensuring proper
drapability (JGT should touch the ISG surface at all points), stapling JGT
by 6mm dia. U-shapped pegs/ hooknails or 37mm long mushroom
shaped nails at an interval of 300mm with overlaps of 100mm,
protecting the JGT from any other damages etc. all complete in all
respect as per instructions given in Annexure-A (JGT Installation
Guideline for Rural Road Construction) of BDS 1909 : 2016 and
approval of Engineer-In-Charge.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 788 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.12.01 JGT_RRC-1 : Applicable for Strengthening subgrade of Village Roads. sqm


This type of JGT shall have the following requirements.
Ends x Picks /dm ≥ 85 x 32, Width(m) ≥ 1, Mass per unit area (gsm) =
627 ± 10%, Thickness under 2 kPa pressure (mm) = 2.0 ± 10%, AOS
(O95) (μm) ≤ 450, Vertical Permeability (m/sec) ≥ 3.0 x10-3,
Horizontal Permeability (m/sec) ≥ 7.0 x10-3, Grab Tensile Strength (N)
MD x CD ≥ 850 x 200, Grab Tensile Elongation (%) MD x CD ≤ 30 x 35,
CBR Puncture Resistance (N) ≥ 2000, Wide Width Tensile Strength
(kN/m) MD x CD ≥ 20 x 10, Wide Width Elongation (%) MD x CD ≤ 12
x 10.
Jute Geo-Textile (JGT): Double Warp Plain Weave - 627 gsm 1.0800 sqm 99.00 106.92
Skilled Labour 0.0100 day 450.00 4.50
Ordinary Labour 0.0200 day 370.00 7.40

Subtotal-A: 118.82
Cost of U-shaped peg, mashroom nails etc. ( +10.00 % on Subtotal-A ) 11.88
Subtotal-A1: 130.70

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 133.32

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 146.65


VAT 6% of Total 9.78
IT 4% of Total 6.52
Total: 162.94

Note : Rates of all items should be inclusive of all supply and carriage. Page: 789 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.12.02 JGT_RRC-2 : Applicable for Strengthening subgrade of Union or Higher sqm


Roads. This type of JGT shall have the following requirements.
Ends x Picks /dm ≥ 94 x 39, Width(m) ≥ 1, Mass per unit area (gsm) =
724 ± 10%, Thickness under 2 kPa pressure (mm) = 2.0 ± 10%, AOS
(O95) (μm) ≤ 300, Vertical Permeability (m/sec) ≥ 2.0 x10-3,
Horizontal Permeability (m/sec) ≥ 6.0 x10-3, Grab Tensile Strength (N)
MD x CD ≥ 925 x 425, Grab Tensile Elongation (%) MD x CD ≤ 35 x 40,
CBR Puncture Resistance (N) ≥ 2150, Wide Width Tensile Strength
(kN/m) MD x CD ≥ 25 x 10, Wide Width Elongation (%) MD x CD ≤ 15
x 12.
Jute Geo-Textile (JGT): Double Warp Plain Weave - 724 gsm 1.0800 sqm 117.00 126.36
Skilled Labour 0.0100 day 450.00 4.50
Ordinary Labour 0.0200 day 370.00 7.40

Subtotal-A: 138.26
Cost of U-shaped peg, mashroom nails etc. ( +10.00 % on Subtotal-A ) 13.83
Subtotal-A1: 152.09

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 155.13

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 170.64


VAT 6% of Total 11.38
IT 4% of Total 7.58
Total: 189.60

4.14.13 JGT_RBP: Supplying and laying of natural additive treated woven type
double warp plain weave jute geo-textile (JGT) conforming to BDS
1909: 2016 for river bank and slope protection work including local
handling, unrolling, placing in position, ensuring proper drapability (JGT
should touch the ground surface at all points), stapling JGT by 6mm dia.
U-shapped pegs/ hooknails or 37mm long mushroom shaped nails at an
interval of 300mm with overlaps of 100mm, protecting the JGT from
any other damages etc. all complete in all respect as per instructions
given in Annexure-B (JGT Installation Guideline for River Bank
Protection) of BDS 1909 : 2016 and approval of Engineer-In-Charge.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 790 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.13.01 JGT_RBP-1: Applicable for mild to moderate River River Bank Protection sqm
work. This type of treated JGT shall have the following requirements.
Ends x Picks /dm ≥ 85 x 32, Width(m) ≥ 1, Mass per unit area (gsm) =
627 ± 15%, Thickness under 2 kPa pressure (mm) = 2.0 ± 20%, AOS
(O95) (μm) ≤ 150, Vertical Permeability (m/sec) ≥ 1.0 x10-3,
Horizontal Permeability (m/sec) ≥ 6.0 x10-3, Grab Tensile Strength (N)
MD x CD ≥ 950 x 230, Grab Tensile Elongation (%) MD x CD ≤ 35 x 45,
CBR Puncture Resistance (N) ≥ 2500, Wide Width Tensile Strength
(KN/m) MD x CD ≥ 20 x 10, Wide Width Elongation (%) MD x CD ≤ 12
x 10.
Jute Geo-Textile (JGT): Natural Additive Treated Double 1.0800 sqm 139.00 150.12
Warp Plain Weave - 627 gsm
Skilled Labour 0.0100 day 450.00 4.50
Ordinary Labour 0.0200 day 370.00 7.40

Subtotal-A: 162.02
Cost of U-shaped peg, mashroom nails etc. ( +10.00 % on Subtotal-A ) 16.20
Subtotal-A1: 178.22

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 181.79

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 199.97


VAT 6% of Total 13.33
IT 4% of Total 8.89
Total: 222.18

Note : Rates of all items should be inclusive of all supply and carriage. Page: 791 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.14 JGT-HSM: Supplying and laying of open mesh Plain Weave jute geo-
textile (JGT) commonly known as Soil Saver of different grades
conforming to BDS 1909: 2016 for Hill Slope Management work
including local handling, unrolling, placing in position, unrolling of JGT in
the direction of surface run-off, stapling JGT by 6mm dia. U-shapped
hooknails at an interval of 300mm with overlaps of 100mm at the sides
and 150mm at the ends, anchoring JGT within a trench at the two ends
by filling the trench with big bats/gravel or other suitable materials,
ensuring proper drapability (JGT must touch the ground surface at all
points), filling drain materials immediately after laying of JGT, protecting
the JGT from any other damages etc. all complete in all respect as per
instructions given in Annexure-C (JGT Installation Guideline for Hill
Slope Management) of BDS 1909 : 2016 and approval of Engineer-In-
Charge.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 792 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.14.01 JGT_HSM-1: Applicable for Moderate slope (≤35 degree) & annual sqm
rainfall ≤ 2000mm. This type of JGT shall have the following
requirements.
Ends x Picks /dm ≥ 6.5 x 4.5, Width(m) = 1.22, Mass per unit area
(gsm) = 500 ± 10%, Thickness under 2 kPa pressure (mm) = 4.5 ±
10%, Water Holding Capacity (% by weight) ≥ 400, Wide Width Tensile
Strength (kN/m) MD x CD ≥ 6.5 x 6.0, Wide Width Elongation (%) MD x
CD ≤ 14.0 x 14.0.
Jute Geo-Textile (JGT): Open Mesh Plain Weave (Soil Saver) - 1.0800 sqm 29.00 31.32
500 gsm
Skilled Labour 0.0100 day 450.00 4.50
Ordinary Labour 0.0200 day 370.00 7.40

Subtotal-A: 43.22
Cost of U-shaped peg, mashroom nails etc. ( +10.00 % on Subtotal-A ) 4.32
Subtotal-A1: 47.54

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 48.49

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 53.34


VAT 6% of Total 3.56
IT 4% of Total 2.37
Total: 59.27

Note : Rates of all items should be inclusive of all supply and carriage. Page: 793 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.14.02 JGT_HSM-2: Applicable for Moderate slope (≤35 degree) & annual sqm
rainfall ≥ 2000mm and steep stope (>35 degree to ≤ 45 degree) &
annual rainfall ≤ 2000mm. This type of JGT shall have the following
requirements.
Ends x Picks /dm ≥ 8 x 7, Width(m) = 1.22, Mass per unit area (gsm) =
600±10%, Thickness under 2 kPa pressure (mm) = 5.5±10%, Water
Holding Capacity (% by weight) ≥ 400, Wide Width Tensile Strength
(kN/m) MD x CD ≥ 12.0 x 6.0, Wide Width Elongation (%) MD x CD ≤
14.0 x 14.0.
Jute Geo-Textile (JGT): Open Mesh Plain Weave (Soil Saver) - 1.0800 sqm 32.00 34.56
600 gsm
Skilled Labour 0.0100 day 450.00 4.50
Ordinary Labour 0.0200 day 370.00 7.40

Subtotal-A: 46.46
Cost of U-shaped peg, mashroom nails etc. ( +10.00 % on Subtotal-A ) 4.65
Subtotal-A1: 51.11

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 52.13

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 57.34


VAT 6% of Total 3.82
IT 4% of Total 2.55
Total: 63.71

Note : Rates of all items should be inclusive of all supply and carriage. Page: 794 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.14.03 JGT_HSM-3: Applicable for steep stope (>35 degree to ≤ 45 degree) & sqm
annual rainfall > 2000mm. This type of JGT shall have the following
requirements.
Ends x Picks /dm ≥ 8 x 8, Width(m) = 1.22, Mass per unit area (gsm) =
700±10%, Thickness under 2 kPa pressure (mm) = 5.5±10%, Water
Holding Capacity (% by weight) ≥ 400, Wide Width Tensile Strength
(kN/m) MD x CD ≥ 14.0 x 7.0, Wide Width Elongation (%) MD x CD ≤
14.0 x 14.0.
Jute Geo-Textile (JGT): Open Mesh Plain Weave (Soil Saver) - 1.0800 sqm 35.00 37.80
700 gsm
Skilled Labour 0.0100 day 450.00 4.50
Ordinary Labour 0.0200 day 370.00 7.40

Subtotal-A: 49.70
Cost of U-shaped peg, mashroom nails etc. ( +10.00 % on Subtotal-A ) 4.97
Subtotal-A1: 54.67

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 55.76

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 61.34


VAT 6% of Total 4.09
IT 4% of Total 2.73
Total: 68.16

4.14.15 Supplying best quality MS pipes of different diameter at work site


including, carrying, stacking, handling etc. all complete as per direction
of the E-I-C.

4.14.15.01 MS pipe of 100mm diameter & 4mm wall thickness

Note : Rates of all items should be inclusive of all supply and carriage. Page: 795 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.15.01.01 For permanent use, cost of MS pipe is included in this unit rate. m
100mm dia MS pipe and wall thickness 4mm 1.0000 m 1300.00 1300.00

Subtotal-A: 1300.00
Stacking, Handling & other consumables ( +5.00 % on Subtotal-A ) 65.00
Subtotal-A1: 1365.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1392.30

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1531.53


VAT 6% of Total 102.10
IT 4% of Total 68.07
Total: 1701.70

4.14.15.01.02 For temporary use, rent of MS pipe is included in this unit rate. m
H.C. of 100mm dia & 4mm thick MS pipe 1.0000 m/month 45.00 45.00

Subtotal-A: 45.00
Stacking, Handling & other consumables ( +5.00 % on Subtotal-A ) 2.25
Subtotal-A1: 47.25

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 48.20

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 53.01


VAT 6% of Total 3.53
IT 4% of Total 2.36
Total: 58.91

4.14.15.02 MS pipe of 150mm diameter & 4mm wall thickness

Note : Rates of all items should be inclusive of all supply and carriage. Page: 796 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.15.02.01 For permanent use, cost of MS pipe is included in this unit rate. m
150mm dia. MS pipe and wall thickness 4mm 1.0000 m 1950.00 1950.00

Subtotal-A: 1950.00
Stacking, Handling & other consumables ( +5.00 % on Subtotal-A ) 97.50
Subtotal-A1: 2047.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2088.45

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2297.30


VAT 6% of Total 153.15
IT 4% of Total 102.10
Total: 2552.55

4.14.15.02.02 For temporary use, rent of MS pipe is included in this unit rate. m
H.C. of 150mm dia & 4mm thick MS pipe 1.0000 m/month 65.00 65.00

Subtotal-A: 65.00
Stacking, Handling & other consumables ( +5.00 % on Subtotal-A ) 3.25
Subtotal-A1: 68.25

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 69.62

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 76.58


VAT 6% of Total 5.11
IT 4% of Total 3.40
Total: 85.09

4.14.15.03 MS pipe of 200mm diameter & 6.5mm wall thickness

Note : Rates of all items should be inclusive of all supply and carriage. Page: 797 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.15.03.01 For permanent use, cost of MS pipe is included in this unit rate. m
200mm dia. MS pipe and wall thickness 6.5mm 1.0000 m 3510.00 3510.00

Subtotal-A: 3510.00
Stacking, Handling & other consumables ( +5.00 % on Subtotal-A ) 175.50
Subtotal-A1: 3685.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 3759.21

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 4135.13


VAT 6% of Total 275.68
IT 4% of Total 183.78
Total: 4594.59

4.14.15.03.02 For temporary use, rent of MS pipe is included in this unit rate. m
H.C. of 200mm dia & 6.5mm thick MS pipe 1.0000 m/month 115.00 115.00

Subtotal-A: 115.00
Stacking, Handling & other consumables ( +5.00 % on Subtotal-A ) 5.75
Subtotal-A1: 120.75

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 123.17

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 135.48


VAT 6% of Total 9.03
IT 4% of Total 6.02
Total: 150.54

Note : Rates of all items should be inclusive of all supply and carriage. Page: 798 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.16 Labour for driving MS steel pipes of any size up to required depth with m
monkey, power winch etc. including all necessary tools, equipment and
accessories and hoisting piles in true & vertical position etc. all complete
as per direction of E-I-C.
Skilled Labour 0.0500 day 450.00 22.50
Ordinary Labour 0.2000 day 370.00 74.00
H.C. of Tripod and Mechanical Winch Machine complete with 0.0500 day 3000.00 150.00
power unit and accessories
H.C. of Derrick 0.0500 day 400.00 20.00
Diesel 0.2500 liter 68.00 17.00
Lubricant 0.0100 liter 220.00 2.20

Subtotal-A: 285.70
Other consumables etc. ( +5.00 % on Subtotal-A ) 14.29
Subtotal-A1: 299.99

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 305.98

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 336.58


VAT 6% of Total 22.44
IT 4% of Total 14.96
Total: 373.98

Note : Rates of all items should be inclusive of all supply and carriage. Page: 799 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.17 Labour for extraction of MS steel/ micro pipes of any size with monkey, m
power winch etc. including all necessary tools, equipment and
accessories all complete as per direction of E-I-C.
Skilled Labour 0.0500 day 450.00 22.50
Ordinary Labour 0.2000 day 370.00 74.00
H.C. of Tripod and Mechanical Winch Machine complete with 0.0300 day 3000.00 90.00
power unit and accessories
H.C. of Derrick 0.0300 day 400.00 12.00
Diesel 0.2500 liter 68.00 17.00
Lubricant 0.0100 liter 220.00 2.20

Subtotal-A: 217.70
Other consumables etc. ( +5.00 % on Subtotal-A ) 10.89
Subtotal-A1: 228.59

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 233.16

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 256.47


VAT 6% of Total 17.10
IT 4% of Total 11.40
Total: 284.97

4.14.18 Labour charge for taking out bullah from river bed (measurement for
the driven portion to be taken only); or cross ties walling pieces,
including cutting and opening out bolts and nuts; or old bamboo pieces
and struts from river bed and stacking the materials on the bank as per
direction of E-I-C.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 800 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.18.01 Bullah m
Ordinary Labour 0.0950 day 370.00 35.15

Subtotal-A: 35.15
Other consumables etc. ( +5.00 % on Subtotal-A ) 1.76
Subtotal-A1: 36.91

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 37.65

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 41.41


VAT 6% of Total 2.76
IT 4% of Total 1.84
Total: 46.01

4.14.18.02 Cross ties walling pieces m


Ordinary Labour 0.0250 day 370.00 9.25

Subtotal-A: 9.25
Other consumables etc. ( +5.00 % on Subtotal-A ) 0.46
Subtotal-A1: 9.71

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9.91

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 10.90


VAT 6% of Total 0.73
IT 4% of Total 0.48
Total: 12.11

Note : Rates of all items should be inclusive of all supply and carriage. Page: 801 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.14.18.03 Old bamboo pieces and struts m


Ordinary Labour 0.0200 day 370.00 7.40

Subtotal-A: 7.40
Other consumables etc. ( +5.00 % on Subtotal-A ) 0.37
Subtotal-A1: 7.77

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 7.93

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 8.72


VAT 6% of Total 0.58
IT 4% of Total 0.39
Total: 9.69

Note : Rates of all items should be inclusive of all supply and carriage. Page: 802 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.15.01 Providing and erecting a "W" metal beam crash barrier comprising of 3 m
mm thick corrugated sheet metal beam rail, 70 cm above road/ground
level, fixed on channel vertical post, 150 x 75 x 5 mm spaced 2 m
centre to centre, 1.8 m high, 1.10 m below ground/road level, all steel
parts and fittings to be galvanised by hot dip process (zinc coated, 550
gsm, minimum single spot), all fittings to conform to AASHTO M 180,
metal beam rail to be fixed on the vertical post with a spacer of channel
section 150 x 75 x 5 mm, 330 mm long etc. all complete as per
specification & direction of the Engineer in charge.
Corrugated sheet,3 mm thick, "W" beam section railing 9.1578 kg 150.00 1373.67
Channel post 150 x 75 x 5 mm,1.8 long 19.6800 kg 120.00 2361.60
Spacer 150 x 75 x 5 mm channel 0.33 m long, 3.6089 kg 120.00 433.07
Nails/ Nut bolts/ Screw/ Spikes 4.4444 kg 65.00 288.89
Foreman 0.0133 day 800.00 10.64
Welder 0.1111 day 680.00 75.55
Skilled Labour 0.2222 day 450.00 99.99
H.C. of Flat Body Truck (3 tons) 0.0028 day 2000.00 5.60

Subtotal-A: 4649.00
Cost of material for fabrication, nuts, bolts and ( +25.00 % on Subtotal-A ) 1162.25
washers etc.
Subtotal-A1: 5811.25

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 5927.48

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 6520.23


VAT 6% of Total 434.68
IT 4% of Total 289.79
Total: 7244.69

Note : Rates of all items should be inclusive of all supply and carriage. Page: 803 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.15.02 Providing and erecting a "Thrie" metal beam crash barrier comprising of m
3 mm thick corrugated sheet metal rail, 70 cm above road/ground level,
fixed on channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to
centre, 1.8 m high with 1.15 m below ground level, all steel parts and
fitments to be galvanised by hot dip process (zinc coated, 550 gsm,
minimum single spot), all fittings to conform to AASHTO M 180, metal
rail to be fixed on the vertical post with a spacer of channel section 150
x 75 x 5 mm, 546 mm long etc. all complete as per specification &
direction of the E-I-C.
Corrugated sheet,3 mm thick, "W" beam section railing 16.2089 kg 150.00 2431.34
Channel post 150 x 75 x 5 mm,1.8 long 21.8667 kg 120.00 2624.00
Spacer 150 x 75 x 5 mm channel 0.33 m long, 5.9689 kg 120.00 716.27
Nails/ Nut bolts/ Screw/ Spikes 6.6667 kg 65.00 433.34
Foreman 0.0133 day 800.00 10.64
Welder 0.1111 day 680.00 75.55
Skilled Labour 0.2222 day 450.00 99.99
H.C. of Flat Body Truck (3 tons) 0.0028 day 2000.00 5.60

Subtotal-A: 6396.72
Cost of material for fabrication, nuts, bolts and ( +15.00 % on Subtotal-A ) 959.51
washers etc.
Subtotal-A1: 7356.23

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 7503.35

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 8253.69


VAT 6% of Total 550.25
IT 4% of Total 366.83
Total: 9170.76

Note : Rates of all items should be inclusive of all supply and carriage. Page: 804 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.15.03 Supplying fitting and fixing railing & rail post made of various dia MS
pipes of standard thickness for normal, ornamental Bridge or any other
structure including required ms plate, nutbolt, cutting, welding, painting
with anticorrosive paint, laying in position etc. all complete as per
design, drawing, spacification & the direction of the E-I-C.

4.15.03.01 50mm dia. and wall thickness 4mm m


50mm dia. MS pipe and wall thickness 4mm 1.0000 m 640.00 640.00
Skilled Labour 0.1500 day 450.00 67.50

Subtotal-A: 707.50
Workshop Charges, Anti corrosive paint & ( +25.00 % on Subtotal-A ) 176.88
other costing
Subtotal-A1: 884.38

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 902.06

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 992.27


VAT 6% of Total 66.15
IT 4% of Total 44.10
Total: 1102.52

Note : Rates of all items should be inclusive of all supply and carriage. Page: 805 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.15.03.02 75mm dia. and wall thickness 4mm m


75mm dia. MS pipe and wall thickness 4mm 1.0000 m 780.00 780.00
Skilled Labour 0.1500 day 450.00 67.50

Subtotal-A: 847.50
Workshop Charges, Anti corrosive ( +25.00 % on Subtotal-A ) 211.88
paint & other costing
Subtotal-A1: 1059.38

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1080.56

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1188.62


VAT 6% of Total 79.24
IT 4% of Total 52.83
Total: 1320.69

4.15.03.03 100mm dia. and wall thickness 4mm m


100mm dia MS pipe and wall thickness 4mm 1.0000 m 1300.00 1300.00
Skilled Labour 0.1500 day 450.00 67.50

Subtotal-A: 1367.50
Workshop Charges, Anti corrosive paint & other ( +25.00 % on Subtotal-A ) 341.88
costing
Subtotal-A1: 1709.38

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1743.56

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1917.92


VAT 6% of Total 127.86
IT 4% of Total 85.24
Total: 2131.02

Note : Rates of all items should be inclusive of all supply and carriage. Page: 806 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.15.03.04 150mm dia. and wall thickness 4mm m


150mm dia. MS pipe and wall thickness 4mm 1.0000 m 1950.00 1950.00
Skilled Labour 0.1500 day 450.00 67.50

Subtotal-A: 2017.50
Workshop Charges, Anti corrosive paint & other ( +25.00 % on Subtotal-A ) 504.38
costing
Subtotal-A1: 2521.88

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2572.31

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2829.54


VAT 6% of Total 188.64
IT 4% of Total 125.76
Total: 3143.94

4.15.03.05 200mm dia. and wall thickness 6.5mm m


200mm dia. MS pipe and wall thickness 6.5mm 1.0000 m 3510.00 3510.00
Skilled Labour 0.1500 day 450.00 67.50

Subtotal-A: 3577.50
Workshop Charges, Anti corrosive paint & ( +25.00 % on Subtotal-A ) 894.38
other costing
Subtotal-A1: 4471.88

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4561.31

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 5017.44


VAT 6% of Total 334.50
IT 4% of Total 223.00
Total: 5574.94

Note : Rates of all items should be inclusive of all supply and carriage. Page: 807 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.15.04 Supplying fitting and fixing railing & rail post made of various size MS
Square Box of standard thickness for normal & ornamental Bridge or
any other structure, including required ms plate, nut-bolt, cutting,
welding, painting with anticorrosive paint, laying in position, etc. all
complete as per design, drawing, spacification & the direction of the E-I-
C.

4.15.04.01 Size: 25mm x 25mm MS box and wall thickness 4mm m


25mm x 25mm MS box and wall thickness 4mm 1.0000 m 350.00 350.00
Skilled Labour 0.1500 day 450.00 67.50

Subtotal-A: 417.50
Workshop Charges, Anti corrosive paint & other ( +25.00 % on Subtotal-A ) 104.38
costing
Subtotal-A1: 521.88

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 532.31

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 585.54


VAT 6% of Total 39.04
IT 4% of Total 26.02
Total: 650.60

Note : Rates of all items should be inclusive of all supply and carriage. Page: 808 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.15.04.02 Size: 40mm x 40mm MS box and wall thickness 4mm m


40mm x 40mm MS box and wall thickness 4mm 1.0000 m 475.00 475.00
Skilled Labour 0.1500 day 450.00 67.50

Subtotal-A: 542.50
Workshop Charges, Anti corrosive paint & other ( +25.00 % on Subtotal-A ) 135.63
costing
Subtotal-A1: 678.13

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 691.69

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 760.86


VAT 6% of Total 50.72
IT 4% of Total 33.82
Total: 845.40

4.15.04.03 Size: 50mm x 50mm MS box and wall thickness 6mm m


50mm x 50mm MS box and wall thickness 6mm 1.0000 m 870.00 870.00
Skilled Labour 0.1500 day 450.00 67.50

Subtotal-A: 937.50
Workshop Charges, Anti corrosive paint & other ( +25.00 % on Subtotal-A ) 234.38
costing
Subtotal-A1: 1171.88

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1195.31

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1314.84


VAT 6% of Total 87.66
IT 4% of Total 58.44
Total: 1460.94

Note : Rates of all items should be inclusive of all supply and carriage. Page: 809 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.15.04.04 Size: 62.5mm x 62.5mm MS box and wall thickness 6mm m


62.5mm x 62.5mm MS box and wall thickness 6mm 1.0000 m 1050.00 1050.00
Skilled Labour 0.1500 day 450.00 67.50

Subtotal-A: 1117.50
Workshop Charges, Anti corrosive paint & other ( +25.00 % on Subtotal-A ) 279.38
costing
Subtotal-A1: 1396.88

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1424.81

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1567.29


VAT 6% of Total 104.49
IT 4% of Total 69.66
Total: 1741.44

4.15.04.05 Size: 75mm x 75mm MS box and wall thickness 8mm m


75mm x 75mm MS box and wall thickness 8mm 1.0000 m 1720.00 1720.00
Skilled Labour 0.1500 day 450.00 67.50

Subtotal-A: 1787.50
Workshop Charges, Anti corrosive paint & other ( +25.00 % on Subtotal-A ) 446.88
costing
Subtotal-A1: 2234.38

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2279.06

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2506.97


VAT 6% of Total 167.13
IT 4% of Total 111.42
Total: 2785.52

Note : Rates of all items should be inclusive of all supply and carriage. Page: 810 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.15.04.06 Size: 100mm x 100mm MS box and wall thickness 8mm m


100mm x 100mm MS box and wall thickness 8mm 1.0000 m 2225.00 2225.00
Skilled Labour 0.1500 day 450.00 67.50

Subtotal-A: 2292.50
Workshop Charges, Anti corrosive paint & other ( +25.00 % on Subtotal-A ) 573.13
costing
Subtotal-A1: 2865.63

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2922.94

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 3215.23


VAT 6% of Total 214.35
IT 4% of Total 142.90
Total: 3572.48

4.15.04.07 Size: 125mm x 125mm MS box and wall thickness 8mm m


125mm x 125mm MS box and wall thickness 8mm 1.0000 m 2750.00 2750.00
Skilled Labour 0.1500 day 450.00 67.50

Subtotal-A: 2817.50
Workshop Charges, Anti corrosive paint & other ( +25.00 % on Subtotal-A ) 704.38
costing
Subtotal-A1: 3521.88

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 3592.31

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 3951.54


VAT 6% of Total 263.44
IT 4% of Total 175.62
Total: 4390.60

Note : Rates of all items should be inclusive of all supply and carriage. Page: 811 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.15.04.08 Size: 125mm x 125mm MS box and wall thickness 10mm m


125mm x 125mm MS box and wall thickness 10mm 1.0000 m 3350.00 3350.00
Skilled Labour 0.1500 day 450.00 67.50

Subtotal-A: 3417.50
Workshop Charges, Anti corrosive paint & other ( +25.00 % on Subtotal-A ) 854.38
costing
Subtotal-A1: 4271.88

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4357.31

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 4793.04


VAT 6% of Total 319.54
IT 4% of Total 213.02
Total: 5325.60

4.15.04.09 Size: 150mm x 150mm MS box and wall thickness 8mm m


150mm x 150mm MS box and wall thickness 8mm 1.0000 m 3220.00 3220.00
Skilled Labour 0.1500 day 450.00 67.50

Subtotal-A: 3287.50
Workshop Charges, Anti corrosive paint & other ( +25.00 % on Subtotal-A ) 821.88
costing
Subtotal-A1: 4109.38

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4191.56

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 4610.72


VAT 6% of Total 307.38
IT 4% of Total 204.92
Total: 5123.02

Note : Rates of all items should be inclusive of all supply and carriage. Page: 812 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.15.04.10 Size: 150mm x 150mm MS box and wall thickness 10mm m


150mm x 150mm MS box and wall thickness 10mm 1.0000 m 3950.00 3950.00
Skilled Labour 0.1500 day 450.00 67.50

Subtotal-A: 4017.50
Workshop Charges, Anti corrosive paint & other ( +25.00 % on Subtotal-A ) 1004.38
costing
Subtotal-A1: 5021.88

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 5122.31

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 5634.54


VAT 6% of Total 375.64
IT 4% of Total 250.42
Total: 6260.60

Note : Rates of all items should be inclusive of all supply and carriage. Page: 813 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.15.05 Supplying & providing flexible and acrylic type reflectorized traffic sqm
painting/ coating on rail post, rail bar, wheel guard, Pier column etc.
including surface preparation, applying paint, all materials, labour
charges, tools, equipment etc. all complete as per specification &
direction of the E-I-C.
Reflectorized paint 0.1200 liter 2528.00 303.36
Sealer/Primer (for texture paint) 0.0900 litre 200.00 18.00
Plumber/ Electric Mistry/ Painter 0.1500 day 680.00 102.00
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.1500 day 470.00 70.50
Operator

Subtotal-A: 493.86

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 503.74

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 554.11


VAT 6% of Total 36.94
IT 4% of Total 24.63
Total: 615.68

Note : Rates of all items should be inclusive of all supply and carriage. Page: 814 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.15.06 Lighting on Bridges: each


Supplying and Installation of mild steel hollow bent light pole of overall
length 8.9m having 150mm dia. at bottom & 75mm dia. at top & wall
thickness 4mm with base plate 275 x 27 5x 16mm thick, providing
32mm dia MS/GI pipe for incoming and outgoing cable connection to
jucntion box, 20 m apart and fitted with pole light fitting, sodium vapour
lamp, circuit breaker, bending of steel poles, two coats of silver white
aluminium paint over steel pole, steel reducers for changing diameter
from 150mm to 75mm, scaffolding, holes at top of the pole for fixing
ring type GI braket/ pole light fitting, suitable precautions for ensuring
prevention of water ingress etc. all complete in all respect as per design,
specification and direction of E-I-C. The cost of pole light fitting, sodium
vapour lamp, circuit breaker and cable is not included in this unit rate.
Note: Length of pole: 8.9m ( Straight portion = 4m of 150mm dia. &
bent portion = 4.9m of 75mm dia.)
150mm dia. MS pipe and wall thickness 4mm 4.0000 m 1950.00 7800.00
75mm dia. MS pipe and wall thickness 4mm 4.9000 m 780.00 3822.00
MS Plate (16mm) 9.4985 kg 80.00 759.88
MS Plate (6mm) 2.1195 kg 70.00 148.37
Nails/ Nut bolts/ Screw/ Spikes 6.1654 kg 65.00 400.75
Skilled Labour 0.0200 day 450.00 9.00
Ordinary Labour 0.4000 day 370.00 148.00

Subtotal-A: 13088.00
Cost of pipe bending, reducer, scaffolding etc. ( +25.00 % on Subtotal-A ) 3272.00
Cost of two coats of alluminium paint over steel ( +2.50 % on Subtotal-A ) 327.20
circular hollow pipe
Subtotal-A1: 16687.19

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 17020.94

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 18723.03


VAT 6% of Total 1248.20
IT 4% of Total 832.13
Total: 20803.37

Note : Rates of all items should be inclusive of all supply and carriage. Page: 815 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.15.07 Lighting on Bridge Approaches:


Supplying and Installation of mild steel hollow bent light pole of
specifiedlength having 150mm dia. at bottom & 75mm dia. at top & wall
thickness 4mm with base plate 275 x 275 x 16mm thick, providing
32mm dia MS/GI pipe for incoming and outgoing cable connection to
jucntion box, 20 m apart and fitted with pole light fitting, sodium vapour
lamp, circuit breaker, bending of steel poles, two coats of silver white
aluminium paint over steel pole, steel reducers for changing diameter
from 150mm to 75mm, laying 500 x 500 x 1200 mm cement concrete
block in the ratio 1:3:6 and block be continued up to 300mm above the
ground level i.e. 900mm below ground level including excavation,
centering, shuttering and refilling, providing props for pole, holes at top
of the pole for fixing ring type GI braket/ pole light fitting etc. all
complete in all respect as per design, specification and direction of E-I-
C. The cost of pole light fitting, sodium vapour lamp, circuit breaker and
cable is not included in this unit rate.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 816 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.15.07.01 Pole with double arm if fixed in the median each


Note: Length of pole: 12.9m ( Straight portion = 5.0m of 150mm dia. &
bent portion on both sides = 7.9m of 75mm dia.)
150mm dia. MS pipe and wall thickness 4mm 5.0000 m 1950.00 9750.00
75mm dia. MS pipe and wall thickness 4mm 7.9000 m 780.00 6162.00
MS Plate (16mm) 9.4985 kg 80.00 759.88
MS Plate (6mm) 2.1195 kg 70.00 148.37
Nails/ Nut bolts/ Screw/ Spikes 6.1654 kg 65.00 400.75
Skilled Labour 0.0300 day 450.00 13.50
Ordinary Labour 0.5000 day 370.00 185.00

Subtotal-A: 17419.50
Cost of Excavation, concreting, pipe bending, ( +25.00 % on Subtotal-A ) 4354.87
reducer, scaffolding etc.
Cost of two coats of alluminium paint over steel ( +2.50 % on Subtotal-A ) 435.49
circular hollow pipe
Subtotal-A1: 22209.86

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 22654.05

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 24919.46


VAT 6% of Total 1661.30
IT 4% of Total 1107.53
Total: 27688.29

Note : Rates of all items should be inclusive of all supply and carriage. Page: 817 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.15.07.02 Pole with single arm if fixed on the footpath each


Note: Length of pole: 9.9m ( Straight portion = 5.0m of 150mm dia. &
bent portion = 4.9m of 75mm dia.)
150mm dia. MS pipe and wall thickness 4mm 5.0000 m 1950.00 9750.00
75mm dia. MS pipe and wall thickness 4mm 4.9000 m 780.00 3822.00
MS Plate (16mm) 9.4985 kg 80.00 759.88
MS Plate (6mm) 2.1195 kg 70.00 148.37
Nails/ Nut bolts/ Screw/ Spikes 6.1654 kg 65.00 400.75
Skilled Labour 0.0300 day 450.00 13.50
Ordinary Labour 0.5000 day 370.00 185.00

Subtotal-A: 15079.50
Cost of Excavation, concreting, pipe bending, ( +25.00 % on Subtotal-A ) 3769.87
reducer, scaffolding etc.
Cost of two coats of alluminium paint over steel ( +2.50 % on Subtotal-A ) 376.99
circular hollow pipe
Subtotal-A1: 19226.36

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 19610.88

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 21571.97


VAT 6% of Total 1438.13
IT 4% of Total 958.75
Total: 23968.86

4.15.08 Construction of pre-cast/ Cast-in-situ RCC Railing of specified strength


having aggregate size not exceeding 12mm, true to line and grade,
tolerance of vertical RCC post not to exceed 1 in 500, centre to centre
spacing between vertical post not to exceed 1500mm, leaving adequate
space between vertical post for expansion, complete as per Bridge
Design Standard For LGED- June 2012, approved drawings, technical
specification and approval of E-I-C. The cost of reinforcement and it's
fabrication, binding, welding and placing is included in this unit rate.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 818 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.15.08.01 Pre-cast RCC Railing of 25 MPa concrete m


RCC-25SCCM: Reinforced cement concrete work with 0.0889 cum 12360.91 1098.88
minimum cement content ralates to mix ratio 1:1.5:3 and
maximum water cement ratio 0.4 having minimum required
average strength, f'cr = 33.5 Mpa and
sa.............4.09.03.06.01
Supplying and fabrication of Ribbed or deformed bar 19.7191 kg 65.67 1294.95
reinforcement conforming to BDS ISO 6935-2:2006 (Grade
400)………….(4.11.01.04)

Subtotal-A: 2393.84
Cost for form work for casting in casting yard ( +5.00 % on Subtotal-A ) 119.69
Cost for handling and fixing of precast panels in ( +5.00 % on Subtotal-A ) 119.69
position
Subtotal-A1: 2633.22

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2685.89

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2954.47


VAT 6% of Total 196.96
IT 4% of Total 131.31
Total: 3282.75

Note : Rates of all items should be inclusive of all supply and carriage. Page: 819 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.15.08.02 Cast-in-Situ RCC Railing of 25 MPa concrete m


Supplying and fabrication of Ribbed or deformed bar 19.7191 kg 65.67 1294.95
reinforcement conforming to BDS ISO 6935-2:2006 (Grade
400)………….(4.11.01.04)
RCC-25SCCM: Reinforced cement concrete work with 0.0889 cum 10923.59 971.11
minimum cement content ralates to mix ratio 1:1.5:3 and
maximum water cement ratio 0.4 having minimum required
average strength, f'cr = 33.5 Mpa and
sa.............4.09.03.06.02

Subtotal-A: 2266.06
Cost of formwork ( +5.00 % on Subtotal-A ) 113.30
Subtotal-A1: 2379.36

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2426.95

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2669.65


VAT 6% of Total 177.98
IT 4% of Total 118.65
Total: 2966.27

4.15.09 Supplying fitting and fixing railing & rail post made of various dia
Stainless Steel (SS) pipes of standard thickness for normal , ornamental
Bridge or any other structure including required SS plate, nutbolt,
cutting, welding, laying in position etc. all complete as per design,
drawing,spacification & the direction of the Engineer in charge.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 820 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.15.09.01 25mm dia. and wall thickness 1.5mm m


25mm dia. Stainless Steel pipe and wall thickness 2.00mm 1.0000 m 335.00 335.00
Skilled Labour 0.1500 day 450.00 67.50

Subtotal-A: 402.50
Workshop Charges, & other consumables. ( +25.00 % on Subtotal-A ) 100.63
Subtotal-A1: 503.13

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 513.19

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 564.51


VAT 6% of Total 37.63
IT 4% of Total 25.09
Total: 627.23

4.15.09.02 38mm dia. and wall thickness 2.5mm m


38mm dia. Stainless Steel pipe and wall thickness 2.50mm 1.0000 m 710.00 710.00
Skilled Labour 0.1500 day 450.00 67.50

Subtotal-A: 777.50
Workshop Charges, & other consumables. ( +25.00 % on Subtotal-A ) 194.38
Subtotal-A1: 971.88

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 991.31

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1090.44


VAT 6% of Total 72.70
IT 4% of Total 48.46
Total: 1211.60

Note : Rates of all items should be inclusive of all supply and carriage. Page: 821 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.15.09.03 50mm dia. and wall thickness 2.50mm m


50mm dia. Stainless Steel pipe and wall thickness 2.50mm 1.0000 m 960.00 960.00
Skilled Labour 0.1500 day 450.00 67.50

Subtotal-A: 1027.50
Workshop Charges, & other consumables. ( +25.00 % on Subtotal-A ) 256.88
Subtotal-A1: 1284.38

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1310.06

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1441.07


VAT 6% of Total 96.07
IT 4% of Total 64.05
Total: 1601.19

4.15.09.04 62.50mm dia. and wall thickness 3.00mm m


62.5mm dia. Stainless Steel pipe and wall thickness 3.00mm 1.0000 m 1450.00 1450.00
Skilled Labour 0.1500 day 450.00 67.50

Subtotal-A: 1517.50
Workshop Charges, & other consumables. ( +25.00 % on Subtotal-A ) 379.38
Subtotal-A1: 1896.88

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1934.81

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2128.29


VAT 6% of Total 141.89
IT 4% of Total 94.59
Total: 2364.77

Note : Rates of all items should be inclusive of all supply and carriage. Page: 822 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.15.09.05 75mm dia. and wall thickness 3.00mm m


75mm dia. Stainless Steel pipe and wall thickness 3.00mm 1.0000 m 1700.00 1700.00
Skilled Labour 0.1500 day 450.00 67.50

Subtotal-A: 1767.50
Workshop Charges, & other consumables. ( +25.00 % on Subtotal-A ) 441.88
Subtotal-A1: 2209.38

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2253.56

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2478.92


VAT 6% of Total 165.26
IT 4% of Total 110.17
Total: 2754.35

4.15.09.06 100mm dia. and wall thickness 3.00mm m


100mm dia. Stainless Steel pipe and wall thickness 3.00mm 1.0000 m 2450.00 2450.00
Skilled Labour 0.1500 day 450.00 67.50

Subtotal-A: 2517.50
Workshop Charges, & other consumables. ( +25.00 % on Subtotal-A ) 629.38
Subtotal-A1: 3146.88

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 3209.81

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 3530.79


VAT 6% of Total 235.39
IT 4% of Total 156.92
Total: 3923.10

Note : Rates of all items should be inclusive of all supply and carriage. Page: 823 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.15.09.07 125mm dia. and wall thickness 3.00mm m


125mm dia. Stainless Steel pipe and wall thickness 3.00mm 1.0000 m 3200.00 3200.00
Skilled Labour 0.1500 day 450.00 67.50

Subtotal-A: 3267.50
Workshop Charges, & other consumables. ( +25.00 % on Subtotal-A ) 816.88
Subtotal-A1: 4084.38

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4166.06

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 4582.67


VAT 6% of Total 305.51
IT 4% of Total 203.67
Total: 5091.85

4.15.10 Supplying fitting and fixing railing & rail post made of various size
Stainless Steel (SS) Square/Rectangular Box of standard thickness for
normal & ornamental Bridge or any other structure, including required
SS plate, nutbolt, cutting, welding, laying in position, etc. all complete
as per design, drawing, spacification & the direction of the Engineer in
charge.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 824 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.15.10.01 Size: 25mm x 25mm Stainless Steel box and wall thickness 2.00mm m
25mm x 25mm Stainless Steel box and wall thickness 2.00mm 1.0000 m 570.00 570.00
Skilled Labour 0.1500 day 450.00 67.50

Subtotal-A: 637.50
Size: 50mm x 50mm Stainless Steel box and wall ( +25.00 % on Subtotal-A ) 159.38
thickness 2.00mm
Subtotal-A1: 796.88

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 812.81

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 894.09


VAT 6% of Total 59.61
IT 4% of Total 39.74
Total: 993.44

4.15.10.02 Size: 32mm x 32mm Stainless Steel box and wall thickness 1.50mm m
32mm x 32mm Stainless Steel box and wall thickness 1.50mm 1.0000 m 555.00 555.00
Skilled Labour 0.1500 day 450.00 67.50

Subtotal-A: 622.50
Size: 50mm x 50mm Stainless Steel box and wall ( +25.00 % on Subtotal-A ) 155.63
thickness 2.00mm
Subtotal-A1: 778.13

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 793.69

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 873.06


VAT 6% of Total 58.20
IT 4% of Total 38.80
Total: 970.06

Note : Rates of all items should be inclusive of all supply and carriage. Page: 825 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.15.10.03 Size: 38mm x 38mm Stainless Steel box and wall thickness 2.50mm m
38mm x 38mm Stainless Steel box and wall thickness 2.50mm 1.0000 m 915.00 915.00
Skilled Labour 0.1500 day 450.00 67.50

Subtotal-A: 982.50
Size: 50mm x 50mm Stainless Steel box and wall ( +25.00 % on Subtotal-A ) 245.63
thickness 2.00mm
Subtotal-A1: 1228.13

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1252.69

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1377.96


VAT 6% of Total 91.86
IT 4% of Total 61.24
Total: 1531.06

4.15.10.04 Size: 50mm x 50mm Stainless Steel box and wall thickness 2.00mm m
50mm x 50mm Stainless Steel box and wall thickness 2.00mm 1.0000 m 1150.00 1150.00
Skilled Labour 0.1500 day 450.00 67.50

Subtotal-A: 1217.50
Size: 50mm x 50mm Stainless Steel box and wall ( +25.00 % on Subtotal-A ) 304.38
thickness 2.00mm
Subtotal-A1: 1521.88

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1552.31

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1707.54


VAT 6% of Total 113.84
IT 4% of Total 75.89
Total: 1897.27

Note : Rates of all items should be inclusive of all supply and carriage. Page: 826 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.15.10.05 Size: 62.5mm x 62.5mm Stainless Steel box and wall thickness 2.00mm m
62.5mm x 62.5mm Stainless Steel box and wall thickness 1.0000 m 1495.00 1495.00
2.00mm
Skilled Labour 0.1500 day 450.00 67.50

Subtotal-A: 1562.50
Size: 50mm x 50mm Stainless Steel box and wall ( +25.00 % on Subtotal-A ) 390.63
thickness 2.00mm
Subtotal-A1: 1953.13

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1992.19

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2191.41


VAT 6% of Total 146.09
IT 4% of Total 97.40
Total: 2434.90

4.15.10.06 Size: 50mm x 25mm Stainless Steel box and wall thickness 1.50mm m
50mm x 25mm Stainless Steel box and wall thickness 1.50mm 1.0000 m 680.00 680.00
Skilled Labour 0.1500 day 450.00 67.50

Subtotal-A: 747.50
Size: 50mm x 50mm Stainless Steel box and wall ( +25.00 % on Subtotal-A ) 186.88
thickness 2.00mm
Subtotal-A1: 934.38

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 953.06

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1048.37


VAT 6% of Total 69.89
IT 4% of Total 46.59
Total: 1164.85

Note : Rates of all items should be inclusive of all supply and carriage. Page: 827 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.15.10.07 Size: 75mm x 25mm Stainless Steel box and wall thickness 1.50mm m
75mm x 25mm Stainless Steel box and wall thickness 1.50mm 1.0000 m 910.00 910.00
Skilled Labour 0.1500 day 450.00 67.50

Subtotal-A: 977.50
Size: 50mm x 50mm Stainless Steel box and wall ( +25.00 % on Subtotal-A ) 244.38
thickness 2.00mm
Subtotal-A1: 1221.88

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1246.31

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1370.94


VAT 6% of Total 91.40
IT 4% of Total 60.93
Total: 1523.27

4.15.10.08 Size: 75mm x 50mm Stainless Steel box and wall thickness 2.00mm m
75mm x 50mm Stainless Steel box and wall thickness 2.00mm 1.0000 m 1405.00 1405.00
Skilled Labour 0.1500 day 450.00 67.50

Subtotal-A: 1472.50
Size: 50mm x 50mm Stainless Steel box and wall ( +25.00 % on Subtotal-A ) 368.13
thickness 2.00mm
Subtotal-A1: 1840.63

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1877.44

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2065.18


VAT 6% of Total 137.68
IT 4% of Total 91.79
Total: 2294.65

Note : Rates of all items should be inclusive of all supply and carriage. Page: 828 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.15.10.09 Size: 100mm x 50mm Stainless Steel box and wall thickness 2.00mm m
100mm x 50mm Stainless Steel box and wall thickness 1.0000 m 1765.00 1765.00
2.00mm
Skilled Labour 0.1500 day 450.00 67.50

Subtotal-A: 1832.50
Size: 50mm x 50mm Stainless Steel box and wall ( +25.00 % on Subtotal-A ) 458.13
thickness 2.00mm
Subtotal-A1: 2290.63

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2336.44

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2570.08


VAT 6% of Total 171.34
IT 4% of Total 114.23
Total: 2855.65

Note : Rates of all items should be inclusive of all supply and carriage. Page: 829 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.15.11 Painting on Concrete Surface: Providing and applying 2 coats of water sqm
based cement paint to unplastered concrete surface after cleaning the
surface of dirt, dust, oil, grease, efflorescence and applying paint @ 1
litre for 2 sqm including cost of all materialas, labour etc. complete as
per direction of the E-I-C.
Cement Paint 0.5000 kg 80.00 40.00
Plumber/ Electric Mistry/ Painter 0.0010 day 680.00 0.68
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.0250 day 470.00 11.75
Operator
Skilled Labour 0.0250 day 450.00 11.25

Subtotal-A: 63.68

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 64.95

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 71.45


VAT 6% of Total 4.76
IT 4% of Total 3.18
Total: 79.39

4.16.01 Lifting of Super-Structure of Bridge for resetting if required/ refixing of


new bearing including removal of old bearings and including all higher
and runing expenses of all plants, jacks, machines and equipment,
temporary supports, required for keeping the super-structure in lifted
position for completing the operation, lowering of super-structure on
bearings and without causing any detrimental effect to any part of the
bridge structure, diversion of traffic if necessary etc. all complete as per
design, drawing, specification & direction of E-I-C. The cost of replaced
bearings has not been included in this rate. The work entails
replacement of all the bearings on one side of the span.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 830 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.16.01.01 Span up to 20 m per end


Foreman 0.5000 day 800.00 400.00
Skilled Labour 1.0000 day 450.00 450.00
Ordinary Labour 3.0000 day 370.00 1110.00
H.C. of Jack for Lifting 50 ton lifting capacity 3.0000 day 1250.00 3750.00

Subtotal-A: 5710.00
Wooden packing, Scaffolding Works etc. ( +20.00 % on Subtotal-A ) 1142.00
Subtotal-A1: 6852.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 6989.04

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 7687.94


VAT 6% of Total 512.53
IT 4% of Total 341.69
Total: 8542.16

Note : Rates of all items should be inclusive of all supply and carriage. Page: 831 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.16.01.02 Span beyond 20 m and upto 30 m per end


Foreman 0.5000 day 800.00 400.00
Skilled Labour 1.0000 day 450.00 450.00
Ordinary Labour 3.0000 day 370.00 1110.00
H.C. of Jack for Lifting 50 ton lifting capacity 4.0000 day 1250.00 5000.00

Subtotal-A: 6960.00
Wooden packing, Scaffolding Works etc. ( +20.00 % on Subtotal-A ) 1392.00
Subtotal-A1: 8352.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 8519.04

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 9370.94


VAT 6% of Total 624.73
IT 4% of Total 416.49
Total: 10412.16

Note : Rates of all items should be inclusive of all supply and carriage. Page: 832 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.16.01.03 Span beyond 30 m per end


Foreman 0.5000 day 800.00 400.00
Skilled Labour 1.0000 day 450.00 450.00
Ordinary Labour 3.0000 day 370.00 1110.00
H.C. of Jack for Lifting 50 ton lifting capacity 8.0000 day 1250.00 10000.00

Subtotal-A: 11960.00
Wooden packing, Scaffolding Works etc. ( +20.00 % on Subtotal-A ) 2392.00
Subtotal-A1: 14352.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 14639.04

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 16102.94


VAT 6% of Total 1073.53
IT 4% of Total 715.69
Total: 17892.16

4.16.02 Removal of existing cement concrete/ bituminous wearing course over


existing bridge deck including its disposal as per direction of E-I-C
without causing any detrimental effect to any part of the bridge
structure and removal of dismantled material with all lifts and lead upto
1 km. The dismantled materials must be dumped in an unobjectionable
place outside the site premises with minimum traffic disruption and the
procuring entity will not be responsible for any irregularities by the party
regarding dumping of the materials.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 833 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.16.02.01 Cement concrete wearing course of avg. 75mm thick sqm


Skilled Labour 0.0500 day 450.00 22.50
Ordinary Labour 0.5000 day 370.00 185.00
Air Compressor 250 cfm with pneumatic breaker/ jack 0.0200 day 2500.00 50.00
hammer along with accessories.
H.C. of Tractor (2 WD) 0.0100 day 2200.00 22.00

Subtotal-A: 279.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 285.09

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 313.60


VAT 6% of Total 20.91
IT 4% of Total 13.94
Total: 348.44

4.16.02.02 Bituminous wearing course of avg. 50mm thick asphaltic concrete laid sqm
over 12 mm thick mastic asphalt
Skilled Labour 0.0500 day 450.00 22.50
Ordinary Labour 0.4000 day 370.00 148.00
Air Compressor 250 cfm with pneumatic breaker/ jack 0.0200 day 2500.00 50.00
hammer along with accessories.
H.C. of Tractor (2 WD) 0.0100 day 2200.00 22.00

Subtotal-A: 242.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 247.35

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 272.09


VAT 6% of Total 18.14
IT 4% of Total 12.09
Total: 302.32

Note : Rates of all items should be inclusive of all supply and carriage. Page: 834 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.16.03 Sealing of cracks/ porous concrete by injecting grout through nipples


including cleaning the affected area by wire brush, compressed air,
15mm dia and 150 to 200mm deep holes along the length of the cracks
at a spacing of 500mm may be drilled by wet drilling using rotary
percussion drills and nipples, inerterd in these holes. Only non-shrink
grout admixture conforming to ASTM C 1107 has been included in this
unit rate. Where necessary and approved by the Engineer, admixutures
to protland cement grout mixtures may be added for delaying the
setting time, increasing flow ability, minimising segregation and
shrinkage, not being added to the analysis.

4.16.03.01 Cement Grout kg


Ordinary Portland Cement (CEM I, 52.5N) 0.0220 bag 455.00 10.01
Non-Shrink Grout Admixture conforming to ASTM C 1107 0.0100 Kg 400.00 4.00
Skilled Labour 0.1250 day 450.00 56.25
Ordinary Labour 0.2500 day 370.00 92.50

Subtotal-A: 162.76
Carriage, safe storage, mixing, cleaning, H.C. of ( +20.00 % on Subtotal-A ) 32.55
Injecting equipment & sundries etc.
Subtotal-A1: 195.31

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 199.22

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 219.14


VAT 6% of Total 14.61
IT 4% of Total 9.74
Total: 243.49

Note : Rates of all items should be inclusive of all supply and carriage. Page: 835 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.16.03.02 Cement Mortar (1:1) Grout kg


Ordinary Portland Cement (CEM I, 52.5N) 0.0110 bag 455.00 5.01
Sand (FM - 1.8) 0.0100 m3 970.00 9.70
Non-Shrink Grout Admixture conforming to ASTM C 1107 0.0100 Kg 400.00 4.00
Skilled Labour 0.1250 day 450.00 56.25
Ordinary Labour 0.2500 day 370.00 92.50

Subtotal-A: 167.46
Carriage, safe storage, mixing, cleaning, H.C. of ( +20.00 % on Subtotal-A ) 33.49
Injecting equipment & sundries etc.
Subtotal-A1: 200.95

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 204.96

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 225.46


VAT 6% of Total 15.03
IT 4% of Total 10.02
Total: 250.51

Note : Rates of all items should be inclusive of all supply and carriage. Page: 836 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.16.04 Sealing of cracks/ porous concrete by injection of epoxy resin through kg


nipples including cleaning the affected surfaces adjacent to cracks or
other areas of application from dirt, grease, oil efflorescence or other
foreign matter by brushing/ water jetting/ sand blasting. Just before
use, the two components i.e. resin and hardeer, shall be thoroughly
mixed in the ratios specified by the manufacturer. Acids and corrosives
shall not be permitted for cleaning. Epoxy adhesive injection shall be
performed until crakcs are complely filled. The Contractor shall furnish
detailed methodology of construction including source of supply of
material, tools, equipment and appliances to be used on work, details of
personel and supervision and take approval from Design Unit, LGED.
Epoxy compound with accessories for preparing epoxy mortar 1.1000 kg 500.00 550.00
Skilled Labour 0.1250 day 450.00 56.25
Ordinary Labour 0.2500 day 370.00 92.50

Subtotal-A: 698.75
H.C. of Epoxy Injection Gun, Carriage, safe ( +20.00 % on Subtotal-A ) 139.75
storage, mixing, cleaning & sundries etc.
Subtotal-A1: 838.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 855.27

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 940.80


VAT 6% of Total 62.72
IT 4% of Total 41.81
Total: 1045.33

Note : Rates of all items should be inclusive of all supply and carriage. Page: 837 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.16.05 Shotcrete/ guniting concrete surface with 40mm thick (avg.) cement sqm
mortar comprising of cement, graded sand conforming to ASTM C 33,
coarse aggregate (20 to 40% of total aggregate for thick sections if
adequate guniting equptment is available), water and quick setting
compound conforming to ASTM C 1141 in the proportion as per
guidence of Central Quality Control Laboratory (CQCL), LGED or any
approved laboratory instructed by Engineer-in-Charge, water cement
ratio ranging from 0.35 to 0.5, density of shotcrete/ gunite not less than
2000kg/cum, strength not less than 25 MPa, applied with compressed
air under pressure after cleaning removing old guniting/ part of
defective concrete, cleaning the surface and exposed reinforcement
thoroughly by sand blasting, spraying with epoxy conforming to ASTM C
881 @ 67 kg/sqm including cost of wire mesh fabrics 50mm x 50mm x
10 BWG in first layer of guniting complete as per drawings & direction of
E-I-C. Wherever the reinforcement have been corroded, the same shall
be removed and replaced by additional reinforcement.
Ordinary Portland Cement (CEM I, 52.5N) 0.3200 bag 455.00 145.60
Sand (FM - 2.5) 0.0400 m3 1500.00 60.00
Epoxy resin-hardner mix for prime/seal coat conforming to 0.6700 kg 785.00 525.95
ASTM C 881/ AASHTO M 235
Quick Setting Compound 0.6400 Kg 160.00 102.40
10 BWG wire reinforcement 2.0000 kg 90.00 180.00
Mason 0.1000 day 550.00 55.00
Skilled Labour 0.1250 day 450.00 56.25
Ordinary Labour 0.2000 day 370.00 74.00
Air Compressor 250 cfm with pneumatic breaker/ jack 0.0125 day 2500.00 31.25
hammer along with accessories.
H.C. of Shotcreting equipment 0.1000 hour 500.00 50.00
H.C. of Water Tanker (Towed by Tractor) 0.0100 day 1500.00 15.00

Subtotal-A: 1295.45
Misellaneous consumables like nozzles, wire brush, ( +5.00 % on Subtotal-A ) 64.77
cotton waste etc.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 838 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Subtotal-A1: 1360.22

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1387.43

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1526.17


VAT 6% of Total 101.74
IT 4% of Total 67.83
Total: 1695.74

4.16.06 Patching of damages concrete surface with 25mm thick (avg.) polymer sqm
concrete and curing compounds, initiator and promoter, available in
present formulations, to be applied as per instruction of manufacturer
and as approved by the E-I-C. This item is a proprietory item available
in market as pre-packed plymer concrete and is required to be applied
as per instructions of the manufacturer.
Acrylic Polymer Bonding Agent 0.1400 liter 160.00 22.40
Pre-packed cement based polymer mortar of strength 45 Mpa 3.1500 kg 100.00 315.00
at 28 days
Mason 0.1000 day 550.00 55.00
Skilled Labour 0.5000 day 450.00 225.00
Ordinary Labour 1.0000 day 370.00 370.00
H.C. of Grout pump with agitator & accessories 1.0000 hour 200.00 200.00

Subtotal-A: 1187.40
Misellaneous consumables like wire brush, cotton ( +20.00 % on Subtotal-A ) 237.48
waste etc.
Subtotal-A1: 1424.88

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1453.38

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1598.72


VAT 6% of Total 106.58
IT 4% of Total 71.05
Total: 1776.35

Note : Rates of all items should be inclusive of all supply and carriage. Page: 839 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.16.07 Providing and applying 10mm thick (avg.) pre-packed cement based sqm
polymer mortar of strength 45 MPa at 28 days by trowels & float over
the spalled concrete for bridge deck, pier cap etc. including scaffolding,
shuttering, supplying required material including polymer etc. complete
as per the specification & as directed by E-I-C. Primer coat by Nylon
brush must be applied on the spalled out concrete location before
applying polymer mortar.
Acrylic Polymer Bonding Agent 0.1400 liter 160.00 22.40
Pre-packed cement based polymer mortar of strength 45 Mpa 1.2000 kg 100.00 120.00
at 28 days
Mason 0.1000 day 550.00 55.00
Skilled Labour 0.2000 day 450.00 90.00
Ordinary Labour 0.4000 day 370.00 148.00

Subtotal-A: 435.40
Misellaneous consumables like wire brush, cotton ( +5.00 % on Subtotal-A ) 21.77
waste, wastage of chemical etc.
Subtotal-A1: 457.17

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 466.31

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 512.94


VAT 6% of Total 34.20
IT 4% of Total 22.80
Total: 569.94

Note : Rates of all items should be inclusive of all supply and carriage. Page: 840 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.16.08 EBA: Providing & applying epoxy bonding agent conforming to ASTM C sqm
881/ AASHTO M 235 to exposed old concrete surfaces for bonding of
freshly mixed concrete to hardened concrete at the rate of 0.80 Kg/sqm
or as per manufacturer's recommendation with pot life not less than 60-
90 minutes at normal temperature including cost of materials, storage,
labour, tools, lead lifts, preparation of surface, cleaning the surface,
tackles etc. complete as per manufacturer's specification and as directed
& instructed by Engineer-In-charge.
Epoxy resin-hardner mix for prime/seal coat conforming to 0.8000 kg 785.00 628.00
ASTM C 881/ AASHTO M 235
Mason 0.1000 day 550.00 55.00
Skilled Labour 0.1250 day 450.00 56.25
Ordinary Labour 0.2500 day 370.00 92.50

Subtotal-A: 831.75
Carriage, safe storage, wastage, mixing & sundries ( +4.00 % on Subtotal-A ) 33.27
etc.
Subtotal-A1: 865.02

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 882.32

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 970.55


VAT 6% of Total 64.70
IT 4% of Total 43.14
Total: 1078.39

Note : Rates of all items should be inclusive of all supply and carriage. Page: 841 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.16.09 Applying epoxy mortar over leached, honey combed and spalled sqm
concrete surface and exposed steel reinforcement complete as per
direction of E-I-C. Thickness of epoxy mortar shall not be less than
10mm
Epoxy resin-hardner mix for prime/seal coat conforming to 0.2500 kg 785.00 196.25
ASTM C 881/ AASHTO M 235
Epoxy mortar 0.2200 kg 275.00 60.50
Epoxy resin-hardner mix for prime/seal coat conforming to 0.2000 kg 785.00 157.00
ASTM C 881/ AASHTO M 235
Mason 0.1000 day 550.00 55.00
Skilled Labour 0.1250 day 450.00 56.25
Ordinary Labour 0.2500 day 370.00 92.50

Subtotal-A: 617.50
Carriage, safe storage, wastage, mixing & sundries ( +5.00 % on Subtotal-A ) 30.88
etc.
Subtotal-A1: 648.38

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 661.34

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 727.48


VAT 6% of Total 48.50
IT 4% of Total 32.33
Total: 808.31

Note : Rates of all items should be inclusive of all supply and carriage. Page: 842 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.16.10 Replacement of Expansion Joints including removal and replacement of m


300 mm wide portion of a existing deck slab to accommodate expansion
joint, cleaning by blower, fabrication of additional reinforcement (if
required), applying epoxy bonding agent for old to new concrete
conforming to ASTM C 881, concreting with 35 MPa concrete after fixing
the expansion joint complete as per manufacture specifications &
direction of E-I-C. The cost of admixture & epoxy required for this work
has been included in this analysis. The rate for the installation of new
exapansion joints may be taken from the chapter 11 on Bridge Works.
Epoxy resin-hardner mix for prime/seal coat conforming to 0.8000 kg 785.00 628.00
ASTM C 881/ AASHTO M 235
Stone Chips (20mm down graded) [LAA≤30] 0.0700 m3 5320.00 372.40
Sand (FM - 2.5) 0.0350 m3 1500.00 52.50
Ordinary Portland Cement (CEM I, 52.5N) 0.8000 bag 455.00 364.00
Water-reducing high range chemical admixture : Type-F 0.2500 liter 160.00 40.00
Head Mason 0.0150 day 650.00 9.75
Mason 0.1500 day 550.00 82.50
Skilled Labour 0.5000 day 450.00 225.00
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0300 day 1200.00 36.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 2574.15
Labour for epoxy application etc. ( +5.00 % on Subtotal-A ) 128.71
Subtotal-A1: 2702.86

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2756.91

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 3032.61


VAT 6% of Total 202.17
IT 4% of Total 134.78
Total: 3369.56

Note : Rates of all items should be inclusive of all supply and carriage. Page: 843 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.16.11 Clearing slab/ box/ pipe culverts including cleaning and reshapping of cum
both upstream and down stream faces of existing culvert with in right of
way by removing deposited debris, silt, soil and any other foreign
material. The job includes safe disposal of excess material recovered
from site including vegetation outside ROW with all leads and lifts
complete in all respect as per direction of Engineer In-Charge.
Frequency of cleaning will be one time in a year i.e. before start of
monsoon.
Skilled Labour 0.0333 day 450.00 14.99
Ordinary Labour 0.1667 day 370.00 61.68
H.C. of Tractor (2 WD) 0.0042 day 2200.00 9.24

Subtotal-A: 85.90
Cost of Hand Tools etc. ( +5.00 % on Subtotal-A ) 4.30
Subtotal-A1: 90.20

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 92.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 101.20


VAT 6% of Total 6.75
IT 4% of Total 4.50
Total: 112.45

Note : Rates of all items should be inclusive of all supply and carriage. Page: 844 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.16.12 Carrying out proper cleaning of carriageways, footpaths, verges, rm of


expansion joints (for free movement), drainage spouts of bridge bridge
including removal and disposal of trash, plastic, vegetation etc. from site
outside ROW complete as per direction of E-I-C. Frequency of cleaning
will be two times in a year i.e. before and after the monsoon.
Skilled Labour 0.0100 day 450.00 4.50
Ordinary Labour 0.0400 day 370.00 14.80

Subtotal-A: 19.30
Cost of Hand Tools etc. ( +5.00 % on Subtotal-A ) 0.97
Subtotal-A1: 20.27

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 20.67

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 22.74


VAT 6% of Total 1.52
IT 4% of Total 1.01
Total: 25.26

Note : Rates of all items should be inclusive of all supply and carriage. Page: 845 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.16.13 Replacement of Damaged RCC Railing of 25 MPa strength having m


aggregate size not exceeding 12mm, true to line and grade, tolerance of
vertical RCC post not to exceed 1 in 500, centre to centre spacing
between vertical post not to exceed 1500mm, leaving adequate space
between vertical post for expansion, complete as per Bridge Design
Standard For LGED- June 2012, approved drawings, technical
specification and approval of E-I-C. The cost of reinforcement and it's
fabrication, binding, welding and placing is included in this unit rate.
Construction of pre-cast/ Cast-in-situ RCC Railing of specified 1.0000 m 2379.36 2379.36
strength having aggregate size not exceeding 12mm, true to
line and grade, tolerance of vertical RCC post not to exceed 1
in 500, centre.............4.15.08.02
Skilled Labour 0.0200 day 450.00 9.00
Ordinary Labour 0.5000 day 370.00 185.00
H.C. of Tractor (2 WD) 0.0125 day 2200.00 27.50

Subtotal-A: 2600.86

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2652.88

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2918.17


VAT 6% of Total 194.54
IT 4% of Total 129.70
Total: 3242.41

Note : Rates of all items should be inclusive of all supply and carriage. Page: 846 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.16.14 Carrying out repair of RCC railing of 25 MPa concrete to bring it to the m
original shape including dismantling and trimming the surface to a
regular shape and removal of damaged material as per Bridge Design
Standard for LGED, 2012 and direction of E-I-C.
[Note: It is assumed that damage is to the extent of 10%]
RCC-25SCCM: Reinforced cement concrete work with 0.0100 cum 10923.59 109.24
minimum cement content ralates to mix ratio 1:1.5:3 and
maximum water cement ratio 0.4 having minimum required
average strength, f'cr = 33.5 Mpa and
sa.............4.09.03.06.02
Supplying and fabrication of Ribbed or deformed bar 1.3000 kg 65.67 85.37
reinforcement conforming to BDS ISO 6935-2:2006 (Grade
400)………….(4.11.01.04)
Skilled Labour 0.0016 day 450.00 0.72
Ordinary Labour 0.0200 day 370.00 7.40

Subtotal-A: 202.73

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 206.78

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 227.46


VAT 6% of Total 15.16
IT 4% of Total 10.11
Total: 252.73

Note : Rates of all items should be inclusive of all supply and carriage. Page: 847 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.16.15 Micro Concrete Work: Providing and laying in position Micro concrete cum
having minimum compressive strength 50 MPa after 28 days (as per
ASTM C 109), tensile strength 2 MPa after 28 days (as per ASTM C 307)
and flexular strength 5 MPa after 28 days (as per ASTM C 580), cement
based prepacked single component, chloride free, non shrink, free flow,
self compacting, ready to use after mixing water in specified proportion
obtained from approved manufacture including water tight shuttering
and scaffolding etc. complete as per specification and as per direction of
Engineer-in-charge.
Micro Concrete (25 kg ) 50.5122 bag 1850.00 93447.57
Stone Chips (12mm down graded) [LAA≤25] 0.8301 cum 4640.00 3851.66
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.3532 day 1200.00 423.84
Head Mason 0.3532 day 650.00 229.58
Mason 0.7065 day 550.00 388.58
Skilled Labour 1.4129 day 450.00 635.81
Ordinary Labour 5.6517 day 370.00 2091.13

Subtotal-A: 101068.16
Steel Formwork/ shuttering, prop with necessary ( +2.00 % on Subtotal-A ) 2021.36
supports etc.
Subtotal-A1: 103089.53

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 105151.32

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 115666.45


VAT 6% of Total 7711.10
IT 4% of Total 5140.73
Total: 128518.28

Note : Rates of all items should be inclusive of all supply and carriage. Page: 848 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.16.16 Chemically Bonded Anchor: Providing and fixing reinforcing bars by


drilling holes up to specified depth and fixing required diameter anchor
rods at every specified spacing on the surfaces of the slabs, columns,
beams as the case may be, clean the same using water and make sure
that there are no fine particles present in the hole, mix the base and
hardener of the polyester resin with the spatula thoroughly, fill the
drilled and cleaned holes to a maximum depth of 2/3rd of the hole with
the prepared polyester resin, make sure that the resin has reached till
the end of the hole. At this stage push the shear connector gently in to
the hole and finish the excess resin which comes out of the hole and
allow the shear connectors not to be disturbed for minimum 20 minutes,
complete in all respect and direction of E-I-C. The cost of reinforcement
is not included in this unit rate.

4.16.16.01 CBA_8: Diameter of Rebar = 8mm, minimum drilling diameter = 14mm, each
minimum drilling depth = 80mm
Epoxy resin based anchoring mortar for fixing heavy loads 0.0159 Cartridge 2700.00 42.93
H.C. of Vertical Drill Machine 0.0053 day 150.00 0.80
Operator 0.0053 day 570.00 3.02
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.0053 day 470.00 2.49
Operator
Mason 0.0053 day 550.00 2.92
Skilled Labour 0.0106 day 450.00 4.77

Subtotal-A: 56.92

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 58.06

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 63.87


VAT 6% of Total 4.26
IT 4% of Total 2.84
Total: 70.96

Note : Rates of all items should be inclusive of all supply and carriage. Page: 849 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.16.16.02 CBA_10: Diameter of Rebar = 10mm, minimum drilling diameter = each


14mm, minimum drilling depth = 90mm
Epoxy resin based anchoring mortar for fixing heavy loads 0.0238 Cartridge 2700.00 64.26
H.C. of Vertical Drill Machine 0.0079 day 150.00 1.19
Operator 0.0079 day 570.00 4.50
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.0079 day 470.00 3.71
Operator
Mason 0.0079 day 550.00 4.35
Skilled Labour 0.0159 day 450.00 7.16

Subtotal-A: 85.16

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 86.86

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 95.55


VAT 6% of Total 6.37
IT 4% of Total 4.25
Total: 106.17

Note : Rates of all items should be inclusive of all supply and carriage. Page: 850 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.16.16.03 CBA_12: Diameter of Rebar = 12mm, minimum drilling diameter = each


16mm, minimum drilling depth = 110mm
Epoxy resin based anchoring mortar for fixing heavy loads 0.0345 Cartridge 2700.00 93.15
H.C. of Vertical Drill Machine 0.0115 day 150.00 1.73
Operator 0.0115 day 570.00 6.56
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.0115 day 470.00 5.41
Operator
Mason 0.0115 day 550.00 6.33
Skilled Labour 0.0230 day 450.00 10.35

Subtotal-A: 123.51

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 125.98

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 138.58


VAT 6% of Total 9.24
IT 4% of Total 6.16
Total: 153.98

Note : Rates of all items should be inclusive of all supply and carriage. Page: 851 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.16.16.04 CBA_16: Diameter of Rebar = 16mm, minimum drilling diameter = each


20mm, minimum drilling depth = 125mm
Epoxy resin based anchoring mortar for fixing heavy loads 0.0625 Cartridge 2700.00 168.75
H.C. of Vertical Drill Machine 0.0208 day 150.00 3.12
Operator 0.0208 day 570.00 11.86
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.0208 day 470.00 9.78
Operator
Mason 0.0208 day 550.00 11.44
Skilled Labour 0.0417 day 450.00 18.77

Subtotal-A: 223.71

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 228.18

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 251.00


VAT 6% of Total 16.73
IT 4% of Total 11.16
Total: 278.89

Note : Rates of all items should be inclusive of all supply and carriage. Page: 852 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.16.16.05 CBA_20: Diameter of Rebar = 20mm, minimum drilling diameter = each


25mm, minimum drilling depth = 170mm
Epoxy resin based anchoring mortar for fixing heavy loads 0.1250 Cartridge 2700.00 337.50
H.C. of Vertical Drill Machine 0.0417 day 150.00 6.26
Operator 0.0417 day 570.00 23.77
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.0417 day 470.00 19.60
Operator
Mason 0.0417 day 550.00 22.94
Skilled Labour 0.0833 day 450.00 37.49

Subtotal-A: 447.54

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 456.49

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 502.14


VAT 6% of Total 33.48
IT 4% of Total 22.32
Total: 557.94

Note : Rates of all items should be inclusive of all supply and carriage. Page: 853 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.16.16.06 CBA_25: Diameter of Rebar = 25mm, minimum drilling diameter = each


32mm, minimum drilling depth = 250mm
Epoxy resin based anchoring mortar for fixing heavy loads 0.3333 Cartridge 2700.00 899.91
H.C. of Vertical Drill Machine 0.1111 day 150.00 16.67
Operator 0.1111 day 570.00 63.33
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.1111 day 470.00 52.22
Operator
Mason 0.1111 day 550.00 61.11
Skilled Labour 0.2222 day 450.00 99.99

Subtotal-A: 1193.21

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1217.08

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1338.79


VAT 6% of Total 89.25
IT 4% of Total 59.50
Total: 1487.54

Note : Rates of all items should be inclusive of all supply and carriage. Page: 854 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.16.16.07 CBA_32: Diameter of Rebar = 32mm, minimum drilling diameter = each


40mm, minimum drilling depth = 300mm
Epoxy resin based anchoring mortar for fixing heavy loads 0.5000 Cartridge 2700.00 1350.00
H.C. of Vertical Drill Machine 0.1667 day 150.00 25.01
Operator 0.1667 day 570.00 95.02
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.1667 day 470.00 78.35
Operator
Mason 0.1667 day 550.00 91.69
Skilled Labour 0.3333 day 450.00 149.99

Subtotal-A: 1790.04

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1825.84

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2008.43


VAT 6% of Total 133.90
IT 4% of Total 89.26
Total: 2231.59

4.16.17 EP: Providing external prestressing with high tensile steel wires/strands
including drilling for passage of prestessing steel, all accessories for
stressing and stressing operation and grouting complete as per drawing
and Technical specification.
[This item shall be selected as per instruction given in the drawing &
after getting approval from Desing Unit, LGED.]

Note : Rates of all items should be inclusive of all supply and carriage. Page: 855 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.16.17.01 EP_25m: Span assumed: 25 m (12.7mm dia. Strand in 12T13/12K13 MT


system. Weight-9.42 kg/m of cable.)
H.T. Strand 1.0500 MT 100000.00 105000.00
75mm diameter HDPE Sheathing Duct 112.0000 m 160.00 17920.00
Ordinary Portland Cement (CEM I, 52.5N) 8.0000 bag 455.00 3640.00
Corrosion resistant Structural steel 2100.0000 kg 58.00 121800.00
Epoxy compound with accessories for preparing epoxy mortar 8.0000 kg 500.00 4000.00
Foreman 0.2600 day 800.00 208.00
Mason 1.3800 day 550.00 759.00
Fitter 0.7000 day 680.00 476.00
Re-bar Fabricator 3.0000 day 570.00 1710.00
Skilled Labour 3.0000 day 450.00 1350.00
Ordinary Labour 16.3000 day 370.00 6031.00
H.C. of Stressing Jack with Pump and other accessories 0.5000 Day 1500.00 750.00
H.C. of Grout pump with agitator & accessories 1.3500 hour 200.00 270.00

Subtotal-A: 263914.00
Cost of achorage set, bearing plate, permanent ( +20.00 % on Subtotal-A ) 52782.80
wedges, lead sheet, sleeves, deviator fixtures etc.
Subtotal-A1: 316696.80

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 323030.74

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 355333.81


VAT 6% of Total 23688.92
IT 4% of Total 15792.61
Total: 394815.34

Note : Rates of all items should be inclusive of all supply and carriage. Page: 856 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.16.17.02 EP_50m: Span assumed: 50 m (12.7mm dia. Strand in 19T13/19K13 MT


system. Weight-14.73 kg/m of cable.)
H.T. Strand 3.1000 MT 100000.00 310000.00
90mm diameter HDPE Sheathing Duct 224.0000 m 170.00 38080.00
Ordinary Portland Cement (CEM I, 52.5N) 20.2000 bag 455.00 9191.00
Corrosion resistant Structural steel 7000.0000 kg 58.00 406000.00
Epoxy compound with accessories for preparing epoxy mortar 10.0000 kg 500.00 5000.00
Foreman 0.4600 day 800.00 368.00
Mason 2.8600 day 550.00 1573.00
Fitter 1.0000 day 680.00 680.00
Re-bar Fabricator 7.0000 day 570.00 3990.00
Skilled Labour 8.0000 day 450.00 3600.00
Ordinary Labour 42.0000 day 370.00 15540.00
H.C. of Stressing Jack with Pump and other accessories 0.8750 Day 1500.00 1312.50
H.C. of Grout pump with agitator & accessories 3.0000 hour 200.00 600.00

Subtotal-A: 795934.50
Cost of achorage set, bearing plate, permanent ( +20.00 % on Subtotal-A ) 159186.90
wedges, lead sheet, sleeves, deviator fixtures etc.
Subtotal-A1: 955121.40

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 974223.83

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1071646.21


VAT 6% of Total 71443.08
IT 4% of Total 47628.72
Total: 1190718.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 857 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.17.01 Supplying and laying machine made pre-cast RCC pipes with collars of
different diameter, length & thickness including screening, grading and
washing aggregates with clear water, mixing, laying in steel forms,
placing re-bars in position, consolidating, curing for at least 14 days
including the cost of formwork, lifting, loading and unloading from
factory/ yard, laying in position etc including tools, plants, testing etc. all
complete as per direction of the E-I-C. The collars shall be of 200mm
wide made by RCC and having the same strength as the pipes to be
jointed. The spirals shall end in a complete ring/ turn at both the ends
of pipes and collars. The cost of reinforcement and it's fabrication,
welding, coupling, placing, binding etc. is included in this unit rate.

4.17.01.01 For Light/ Medium Traffic: Cross drains/ culverts/ outlet and any other
works carrying light traffic in leanest mix 1:1.5:3 with cement
conforming to BDS EN 197-1 : 2003 CEM-II/A-L/M/V/W 42.5N, 20mm
down well graded picked brick chips, sand of minimum FM 2.5 to attain
a minimum 28 days cylinder strength of 20 MPa.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 858 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.17.01.01.01 300mm internal dia, wall thickness not less than 50mm, Re-bar for m
pipe:- circumferential: 10 turns - 6mmΦ and longitudinal: 8 nos. -
6mmΦ , Re-bar for Collar:- circumferential: 3 turns - 6mmΦ and
longitudinal: 8 nos. - 6mmΦ
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.4740 bag 430.00 203.82
Sand (FM - 2.5) 0.0252 m3 1500.00 37.80
1st Class Brick Chips (10mm down graded) 0.0503 m3 3049.00 153.36
M.S. Ribbed/ Deformed Bar (Grade 300) 5.1304 kg 54.00 277.04
Mason 0.0678 day 550.00 37.29
Operator 0.0250 day 570.00 14.25
Re-bar Fabricator 0.0250 day 570.00 14.25
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.1000 day 470.00 47.00
Operator
Skilled Labour 0.1285 day 450.00 57.83
Ordinary Labour 0.3412 day 370.00 126.24
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0250 day 1200.00 30.00
Diesel 0.0363 liter 68.00 2.47
Lubricant 0.0073 liter 220.00 1.61

Subtotal-A: 1002.96
H.C. of Pipe manufacturing plant, Steel Formwork ( +20.00 % on Subtotal-A ) 200.59
Earth oil, Power consumption & other
Consumables etc.
Subtotal-A1: 1203.55

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1227.62

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1350.38


VAT 6% of Total 90.03
IT 4% of Total 60.02
Total: 1500.43

Note : Rates of all items should be inclusive of all supply and carriage. Page: 859 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.17.01.01.02 400mm internal dia, wall thickness not less than 75mm, Re-bar for m
pipe:- circumferential: 14 turns - 6mmΦ and longitudinal: 8 nos. -
6mmΦ , Re-bar for Collar:- circumferential: 3 turns - 6mmΦ and
longitudinal: 8 nos. - 6mmΦ
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.9680 bag 430.00 416.24
Sand (FM - 2.5) 0.0514 m3 1500.00 77.10
1st Class Brick Chips (20mm down graded) 0.1028 m3 2940.00 302.23
M.S. Ribbed/ Deformed Bar (Grade 300) 7.4198 kg 54.00 400.67
Mason 0.0856 day 550.00 47.08
Operator 0.0286 day 570.00 16.30
Re-bar Fabricator 0.0286 day 570.00 16.30
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.1072 day 470.00 50.38
Operator
Skilled Labour 0.1543 day 450.00 69.44
Ordinary Labour 0.7028 day 370.00 260.04
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0286 day 1200.00 34.32
Diesel 0.0363 liter 68.00 2.47
Lubricant 0.0073 liter 220.00 1.61

Subtotal-A: 1694.17
H.C. of Pipe manufacturing plant, Steel Formwork ( +20.00 % on Subtotal-A ) 338.83
Earth oil, Power consumption & other
Consumables etc.
Subtotal-A1: 2033.01

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2073.67

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2281.04


VAT 6% of Total 152.07
IT 4% of Total 101.38
Total: 2534.49

Note : Rates of all items should be inclusive of all supply and carriage. Page: 860 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.17.01.01.03 500mm internal dia, wall thickness not less than 75mm, Re-bar for m
pipe:- circumferential: 16 turns - 6mmΦ and longitudinal: 8 nos. -
6mmΦ , Re-bar for Collar:- circumferential: 3 turns - 6mmΦ and
longitudinal: 8 nos. - 6mmΦ
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 1.1850 bag 430.00 509.55
Sand (FM - 2.5) 0.0629 m3 1500.00 94.35
1st Class Brick Chips (20mm down graded) 0.1258 m3 2940.00 369.85
M.S. Ribbed/ Deformed Bar (Grade 300) 9.3332 kg 54.00 503.99
Mason 0.0856 day 550.00 47.08
Operator 0.0286 day 570.00 16.30
Re-bar Fabricator 0.0286 day 570.00 16.30
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.1072 day 470.00 50.38
Operator
Skilled Labour 0.1543 day 450.00 69.44
Ordinary Labour 0.7028 day 370.00 260.04
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0286 day 1200.00 34.32
Diesel 0.0444 liter 68.00 3.02
Lubricant 0.0089 liter 220.00 1.96

Subtotal-A: 1976.58
H.C. of Pipe manufacturing plant, Steel Formwork ( +20.00 % on Subtotal-A ) 395.32
Earth oil, Power consumption & other
Consumables etc.
Subtotal-A1: 2371.90

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2419.34

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2661.27


VAT 6% of Total 177.42
IT 4% of Total 118.28
Total: 2956.97

Note : Rates of all items should be inclusive of all supply and carriage. Page: 861 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.17.01.01.04 600mm internal dia, wall thickness not less than 85mm, Re-bar for m
pipe:- circumferential: 10 turns - 6mmΦ for inner cage & 8 turns -
6mmΦ for outer cage and longitudinal: 6 nos. - 6mmΦ for inner cage &
6 nos. - 6mmΦ for outer cage , Re-bar for Collar:- circumferential: 3
turns - 6mmΦ and longitudinal: 8 nos. - 6mmΦ
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 1.5738 bag 430.00 676.73
Sand (FM - 2.5) 0.0835 m3 1500.00 125.25
1st Class Brick Chips (20mm down graded) 0.1671 m3 2940.00 491.27
M.S. Ribbed/ Deformed Bar (Grade 300) 13.1686 kg 54.00 711.10
Mason 0.0856 day 550.00 47.08
Operator 0.0286 day 570.00 16.30
Re-bar Fabricator 0.0286 day 570.00 16.30
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.1072 day 470.00 50.38
Operator
Skilled Labour 0.1543 day 450.00 69.44
Ordinary Labour 0.7028 day 370.00 260.04
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0286 day 1200.00 34.32
Diesel 0.0577 liter 68.00 3.92
Lubricant 0.0115 liter 220.00 2.53

Subtotal-A: 2504.68
H.C. of Pipe manufacturing plant and cost of Steel ( +20.00 % on Subtotal-A ) 500.94
Formwork, Earth oil, Power consumption & other
Consumables etc.
Subtotal-A1: 3005.61

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 3065.72

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 3372.29


VAT 6% of Total 224.82
IT 4% of Total 149.88
Total: 3746.99

Note : Rates of all items should be inclusive of all supply and carriage. Page: 862 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Note : Rates of all items should be inclusive of all supply and carriage. Page: 863 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.17.01.01.05 700mm internal dia, wall thickness not less than 85mm, Re-bar for m
pipe:- circumferential: 13 turns - 6mmΦ for inner cage & 10 turns -
6mmΦ for outer cage and longitudinal: 6 nos. - 6mmΦ for inner cage &
6 nos. - 6mmΦ for outer cage , Re-bar for Collar:- circumferential: 3
turns - 6mmΦ and longitudinal: 8 nos. - 6mmΦ
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 1.8230 bag 430.00 783.89
Sand (FM - 2.5) 0.0968 m3 1500.00 145.20
1st Class Brick Chips (20mm down graded) 0.1936 m3 2940.00 569.18
M.S. Ribbed/ Deformed Bar (Grade 300) 17.3356 kg 54.00 936.12
Mason 0.0856 day 550.00 47.08
Operator 0.0368 day 570.00 20.98
Re-bar Fabricator 0.0368 day 570.00 20.98
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.1472 day 470.00 69.18
Operator
Skilled Labour 0.1543 day 450.00 69.44
Ordinary Labour 0.7028 day 370.00 260.04
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0368 day 1200.00 44.16
Diesel 0.0837 liter 68.00 5.69
Lubricant 0.0167 liter 220.00 3.67

Subtotal-A: 2975.61
H.C. of Pipe manufacturing plant and cost of Steel ( +20.00 % on Subtotal-A ) 595.12
Formwork, Earth oil, Power consumption & other
Consumables etc.
Subtotal-A1: 3570.73

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 3642.15

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 4006.36


VAT 6% of Total 267.09
IT 4% of Total 178.06
Total: 4451.51

Note : Rates of all items should be inclusive of all supply and carriage. Page: 864 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Note : Rates of all items should be inclusive of all supply and carriage. Page: 865 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.17.01.01.06 800mm internal dia, wall thickness not less than 95mm, Re-bar for m
pipe:- circumferential: 15 turns - 6mmΦ for inner cage & 11 turns -
6mmΦ for outer cage and longitudinal: 7 nos. - 6mmΦ for inner cage &
7 nos. - 6mmΦ for outer cage , Re-bar for Collar:- circumferential: 3
turns - 6mmΦ and longitudinal: 8 nos. - 6mmΦ
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 2.3194 bag 430.00 997.34
Sand (FM - 2.5) 0.1231 m3 1500.00 184.65
1st Class Brick Chips (20mm down graded) 0.2463 m3 2940.00 724.12
M.S. Ribbed/ Deformed Bar (Grade 300) 21.6004 kg 54.00 1166.42
Mason 0.1000 day 550.00 55.00
Operator 0.0470 day 570.00 26.79
Re-bar Fabricator 0.0470 day 570.00 26.79
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.1879 day 470.00 88.31
Operator
Skilled Labour 0.1800 day 450.00 81.00
Ordinary Labour 0.8200 day 370.00 303.40
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0470 day 1200.00 56.40
Diesel 0.1069 liter 68.00 7.27
Lubricant 0.0214 liter 220.00 4.71

Subtotal-A: 3722.21
H.C. of Pipe manufacturing plant and cost of Steel ( +20.00 % on Subtotal-A ) 744.44
Formwork, Earth oil, Power consumption & other
Consumables etc.
Subtotal-A1: 4466.65

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4555.98

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 5011.58


VAT 6% of Total 334.11
IT 4% of Total 222.74
Total: 5568.42

Note : Rates of all items should be inclusive of all supply and carriage. Page: 866 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Note : Rates of all items should be inclusive of all supply and carriage. Page: 867 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.17.01.01.07 900mm internal dia, wall thickness not less than 100mm, Re-bar for m
pipe:- circumferential: 18 turns - 6mmΦ for inner cage & 14 turns -
6mmΦ for outer cage and longitudinal: 7 nos. - 6mmΦ for inner cage &
7 nos. - 6mmΦ for outer cage , Re-bar for Collar:- circumferential: 3
turns - 6mmΦ and longitudinal: 12 nos. - 6mmΦ
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 2.7387 bag 430.00 1177.64
Sand (FM - 2.5) 0.1454 m3 1500.00 218.10
1st Class Brick Chips (20mm down graded) 0.2908 m3 2940.00 854.95
M.S. Ribbed/ Deformed Bar (Grade 300) 28.0370 kg 54.00 1514.00
Mason 0.1142 day 550.00 62.81
Operator 0.0572 day 570.00 32.60
Re-bar Fabricator 0.0572 day 570.00 32.60
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.2286 day 470.00 107.44
Operator
Skilled Labour 0.2056 day 450.00 92.52
Ordinary Labour 0.9371 day 370.00 346.73
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0572 day 1200.00 68.64
Diesel 0.1300 liter 68.00 8.84
Lubricant 0.0260 liter 220.00 5.72

Subtotal-A: 4522.60
H.C. of Pipe manufacturing plant and cost of Steel ( +20.00 % on Subtotal-A ) 904.52
Formwork, Earth oil, Power consumption & other
Consumables etc.
Subtotal-A1: 5427.12

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 5535.66

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 6089.23


VAT 6% of Total 405.95
IT 4% of Total 270.63
Total: 6765.81

Note : Rates of all items should be inclusive of all supply and carriage. Page: 868 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.17.01.02 For Heavy Traffic: Cross drains/ culverts/ outlet and any other works
carrying heavy traffic in leanest mix 1:1.25:2.5 with cement conforming
to BDS EN 197-1 : 2003 BDS EN 197-1 : 2003 CEM-I 52.5N / ASTM
C150 Type-1, 20mm down well graded stone chips broken from boulder
(LAA not exceeding 30), sand of minimum FM 2.5 and water reducing
admixture conforming to ASTM C 494 Type -A @ 1.75 liter per cubic
meter of concrete to attain a minimum 28 days cylinder strength of 30
MPa.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 869 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.17.01.02.01 300mm internal dia, wall thickness not less than 50mm, Re-bar for m
pipe:- circumferential: 14 turns - 6mmΦ and longitudinal: 8 nos. -
6mmΦ , Re-bar for Collar:- circumferential: 3 turns - 6mmΦ and
longitudinal: 8 nos. - 6mmΦ
Ordinary Portland Cement (CEM I, 52.5N) 0.5488 bag 455.00 249.70
Sand (FM - 2.5) 0.0243 m3 1500.00 36.45
Stone Chips (12mm down graded) [LAA≤30] 0.0486 m3 4470.00 217.24
M.S. Ribbed/ Deformed Bar (Grade 300) 6.0285 kg 54.00 325.54
Water reducing chemical admixture : Type-A 0.1207 liter 130.00 15.69
Mason 0.0678 day 550.00 37.29
Operator 0.0250 day 570.00 14.25
Re-bar Fabricator 0.0250 day 570.00 14.25
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.1000 day 470.00 47.00
Operator
Skilled Labour 0.1285 day 450.00 57.83
Ordinary Labour 0.3412 day 370.00 126.24
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0250 day 1200.00 30.00
Diesel 0.0363 liter 68.00 2.47
Lubricant 0.0073 liter 220.00 1.61

Subtotal-A: 1175.56
H.C. of Pipe manufacturing plant, Steel Formwork ( +20.00 % on Subtotal-A ) 235.11
Earth oil, Power consumption & other
Consumables etc.
Subtotal-A1: 1410.67

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1438.88

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1582.77


VAT 6% of Total 105.52
IT 4% of Total 70.35

Note : Rates of all items should be inclusive of all supply and carriage. Page: 870 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 1758.64

Note : Rates of all items should be inclusive of all supply and carriage. Page: 871 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.17.01.02.02 400mm internal dia, wall thickness not less than 75mm, Re-bar for m
pipe:- circumferential: 14 turns - 6mmΦ and longitudinal: 8 nos. -
6mmΦ , Re-bar for Collar:- circumferential: 3 turns - 6mmΦ and
longitudinal: 8 nos. - 6mmΦ
Ordinary Portland Cement (CEM I, 52.5N) 1.1209 bag 455.00 510.01
Sand (FM - 2.5) 0.0496 m3 1500.00 74.40
Stone Chips (12mm down graded) [LAA≤30] 0.0992 m3 4470.00 443.42
M.S. Ribbed/ Deformed Bar (Grade 300) 7.4198 kg 54.00 400.67
Water reducing chemical admixture : Type-A 0.2466 liter 130.00 32.06
Mason 0.0856 day 550.00 47.08
Operator 0.0286 day 570.00 16.30
Re-bar Fabricator 0.0286 day 570.00 16.30
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.1072 day 470.00 50.38
Operator
Skilled Labour 0.1543 day 450.00 69.44
Ordinary Labour 0.7028 day 370.00 260.04
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0286 day 1200.00 34.32
Diesel 0.0363 liter 68.00 2.47
Lubricant 0.0073 liter 220.00 1.61

Subtotal-A: 1958.49
H.C. of Pipe manufacturing plant, Steel Formwork ( +20.00 % on Subtotal-A ) 391.70
Earth oil, Power consumption & other
Consumables etc.
Subtotal-A1: 2350.19

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2397.20

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2636.92


VAT 6% of Total 175.79
IT 4% of Total 117.20

Note : Rates of all items should be inclusive of all supply and carriage. Page: 872 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 2929.91

Note : Rates of all items should be inclusive of all supply and carriage. Page: 873 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.17.01.02.03 500mm internal dia, wall thickness not less than 75mm, Re-bar for m
pipe:- circumferential: 19 turns - 6mmΦ and longitudinal: 8 nos. -
6mmΦ , Re-bar for Collar:- circumferential: 3 turns - 6mmΦ and
longitudinal: 8 nos. - 6mmΦ
Ordinary Portland Cement (CEM I, 52.5N) 1.3721 bag 455.00 624.31
Sand (FM - 2.5) 0.0607 m3 1500.00 91.05
Stone Chips (12mm down graded) [LAA≤30] 0.1214 m3 4470.00 542.66
M.S. Ribbed/ Deformed Bar (Grade 300) 10.4251 kg 54.00 562.96
Water reducing chemical admixture : Type-A 0.3019 liter 130.00 39.25
Mason 0.0856 day 550.00 47.08
Operator 0.0286 day 570.00 16.30
Re-bar Fabricator 0.0286 day 570.00 16.30
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.1072 day 470.00 50.38
Operator
Skilled Labour 0.1543 day 450.00 69.44
Ordinary Labour 0.7028 day 370.00 260.04
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0286 day 1200.00 34.32
Diesel 0.0444 liter 68.00 3.02
Lubricant 0.0089 liter 220.00 1.96

Subtotal-A: 2359.05
H.C. of Pipe manufacturing plant, Steel Formwork ( +20.00 % on Subtotal-A ) 471.81
Earth oil, Power consumption & other
Consumables etc.
Subtotal-A1: 2830.86

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2887.48

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 3176.23


VAT 6% of Total 211.75
IT 4% of Total 141.17

Note : Rates of all items should be inclusive of all supply and carriage. Page: 874 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 3529.14

Note : Rates of all items should be inclusive of all supply and carriage. Page: 875 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.17.01.02.04 600mm internal dia, wall thickness not less than 85mm, Re-bar for m
pipe:- circumferential: 19 turns - 6mmΦ for inner cage & 14 turns -
6mmΦ for outer cage and longitudinal: 6 nos. - 6mmΦ for inner cage &
6 nos. - 6mmΦ for outer cage , Re-bar for Collar:- circumferential: 3
turns - 6mmΦ and longitudinal: 8 nos. - 6mmΦ
Ordinary Portland Cement (CEM I, 52.5N) 1.8223 bag 455.00 829.15
Sand (FM - 2.5) 0.0806 m3 1500.00 120.90
Stone Chips (12mm down graded) [LAA≤30] 0.1612 m3 4470.00 720.56
M.S. Ribbed/ Deformed Bar (Grade 300) 20.2307 kg 54.00 1092.46
Water reducing chemical admixture : Type-A 0.4009 liter 130.00 52.12
Mason 0.0856 day 550.00 47.08
Operator 0.0286 day 570.00 16.30
Re-bar Fabricator 0.0286 day 570.00 16.30
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.1072 day 470.00 50.38
Operator
Skilled Labour 0.1543 day 450.00 69.44
Ordinary Labour 0.7028 day 370.00 260.04
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0286 day 1200.00 34.32
Diesel 0.0577 liter 68.00 3.92
Lubricant 0.0115 liter 220.00 2.53

Subtotal-A: 3315.50
H.C. of Pipe manufacturing plant, Steel Formwork ( +20.00 % on Subtotal-A ) 663.10
Earth oil, Power consumption & other
Consumables etc.
Subtotal-A1: 3978.60

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4058.17

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 4463.99


VAT 6% of Total 297.60
IT 4% of Total 198.40

Note : Rates of all items should be inclusive of all supply and carriage. Page: 876 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 4959.98

Note : Rates of all items should be inclusive of all supply and carriage. Page: 877 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.17.01.02.05 700mm internal dia, wall thickness not less than 85mm, Re-bar for m
pipe:- circumferential: 19 turns - 6mmΦ for inner cage & 14 turns -
6mmΦ for outer cage and longitudinal: 8 nos. - 6mmΦ for inner cage &
8 nos. - 6mmΦ for outer cage , Re-bar for Collar:- circumferential: 3
turns - 6mmΦ and longitudinal: 8 nos. - 6mmΦ
Ordinary Portland Cement (CEM I, 52.5N) 2.1109 bag 455.00 960.46
Sand (FM - 2.5) 0.0934 m3 1500.00 140.10
Stone Chips (12mm down graded) [LAA≤30] 0.1868 m3 4470.00 835.00
M.S. Ribbed/ Deformed Bar (Grade 300) 23.6199 kg 54.00 1275.47
Water reducing chemical admixture : Type-A 0.4644 liter 130.00 60.37
Mason 0.0856 day 550.00 47.08
Operator 0.0368 day 570.00 20.98
Re-bar Fabricator 0.0368 day 570.00 20.98
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.1472 day 470.00 69.18
Operator
Skilled Labour 0.1543 day 450.00 69.44
Ordinary Labour 0.7028 day 370.00 260.04
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0368 day 1200.00 44.16
Diesel 0.0837 liter 68.00 5.69
Lubricant 0.0167 liter 220.00 3.67

Subtotal-A: 3812.61
H.C. of Pipe manufacturing plant and cost of Steel ( +20.00 % on Subtotal-A ) 762.52
Formwork, Earth oil, Power consumption & other
Consumables etc.
Subtotal-A1: 4575.14

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4666.64

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 5133.30


VAT 6% of Total 342.22
IT 4% of Total 228.15

Note : Rates of all items should be inclusive of all supply and carriage. Page: 878 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 5703.67

Note : Rates of all items should be inclusive of all supply and carriage. Page: 879 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.17.01.02.06 800mm internal dia, wall thickness not less than 95mm, Re-bar for m
pipe:- circumferential: 22 turns - 6mmΦ for inner cage & 17 turns -
6mmΦ for outer cage and longitudinal: 8 nos. - 6mmΦ for inner cage &
8 nos. - 6mmΦ for outer cage , Re-bar for Collar:- circumferential: 3
turns - 6mmΦ and longitudinal: 8 nos. - 6mmΦ
Ordinary Portland Cement (CEM I, 52.5N) 2.6856 bag 455.00 1221.95
Sand (FM - 2.5) 0.1188 m3 1500.00 178.20
Stone Chips (12mm down graded) [LAA≤30] 0.2376 m3 4470.00 1062.07
M.S. Ribbed/ Deformed Bar (Grade 300) 30.1117 kg 54.00 1626.03
Water reducing chemical admixture : Type-A 0.5908 liter 130.00 76.80
Mason 0.1000 day 550.00 55.00
Operator 0.0470 day 570.00 26.79
Re-bar Fabricator 0.0470 day 570.00 26.79
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.1879 day 470.00 88.31
Operator
Skilled Labour 0.1800 day 450.00 81.00
Ordinary Labour 0.8200 day 370.00 303.40
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0470 day 1200.00 56.40
Diesel 0.1069 liter 68.00 7.27
Lubricant 0.0214 liter 220.00 4.71

Subtotal-A: 4814.73
H.C. of Pipe manufacturing plant and cost of Steel ( +20.00 % on Subtotal-A ) 962.95
Formwork, Earth oil, Power consumption & other
Consumables etc.
Subtotal-A1: 5777.67

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 5893.22

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 6482.55


VAT 6% of Total 432.17
IT 4% of Total 288.11

Note : Rates of all items should be inclusive of all supply and carriage. Page: 880 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 7202.83

Note : Rates of all items should be inclusive of all supply and carriage. Page: 881 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.17.01.02.07 900mm internal dia, wall thickness not less than 100mm, Re-bar for m
pipe:- circumferential: 14 turns - 8mmΦ for inner cage & 11 turns -
8mmΦ for outer cage and longitudinal: 8 nos. - 6mmΦ for inner cage &
8 nos. - 6mmΦ for outer cage , Re-bar for Collar:- circumferential: 3
turns - 6mmΦ and longitudinal: 12 nos. - 6mmΦ
Ordinary Portland Cement (CEM I, 52.5N) 3.1711 bag 455.00 1442.85
Sand (FM - 2.5) 0.1403 m3 1500.00 210.45
Stone Chips (12mm down graded) [LAA≤30] 0.2806 m3 4470.00 1254.28
M.S. Ribbed/ Deformed Bar (Grade 300) 37.1018 kg 54.00 2003.50
Water reducing chemical admixture : Type-A 0.6976 liter 130.00 90.69
Mason 0.1142 day 550.00 62.81
Operator 0.0572 day 570.00 32.60
Re-bar Fabricator 0.0572 day 570.00 32.60
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.2286 day 470.00 107.44
Operator
Skilled Labour 0.2056 day 450.00 92.52
Ordinary Labour 0.9371 day 370.00 346.73
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0572 day 1200.00 68.64
Diesel 0.1300 liter 68.00 8.84
Lubricant 0.0260 liter 220.00 5.72

Subtotal-A: 5759.67
H.C. of Pipe manufacturing plant and cost of Steel ( +20.00 % on Subtotal-A ) 1151.93
Formwork, Earth oil, Power consumption & other
Consumables etc.
Subtotal-A1: 6911.61

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 7049.84

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 7754.83


VAT 6% of Total 516.99
IT 4% of Total 344.66

Note : Rates of all items should be inclusive of all supply and carriage. Page: 882 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 8616.47

Note : Rates of all items should be inclusive of all supply and carriage. Page: 883 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.17.01.02.08 1000mm internal dia, wall thickness not less than 115mm, Re-bar for m
pipe:- circumferential: 17 turns - 8mmΦ for inner cage & 13 turns -
8mmΦ for outer cage and longitudinal: 8 nos. - 8mmΦ for inner cage &
8 nos. - 8mmΦ for outer cage , Re-bar for Collar:- circumferential: 3
turns - 8mmΦ and longitudinal: 12 nos. - 6mmΦ
Ordinary Portland Cement (CEM I, 52.5N) 4.0411 bag 455.00 1838.70
Sand (FM - 2.5) 0.1788 m3 1500.00 268.20
Stone Chips (12mm down graded) [LAA≤30] 0.3575 m3 4470.00 1598.03
M.S. Ribbed/ Deformed Bar (Grade 300) 52.5381 kg 54.00 2837.06
Water reducing chemical admixture : Type-A 0.8890 liter 130.00 115.57
Mason 0.1142 day 550.00 62.81
Operator 0.0572 day 570.00 32.60
Re-bar Fabricator 0.0572 day 570.00 32.60
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.2286 day 470.00 107.44
Operator
Skilled Labour 0.2056 day 450.00 92.52
Ordinary Labour 0.9371 day 370.00 346.73
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0572 day 1200.00 68.64
Diesel 0.1500 liter 68.00 10.20
Lubricant 0.0300 liter 220.00 6.60

Subtotal-A: 7417.70
H.C. of Pipe manufacturing plant and cost of Steel ( +20.00 % on Subtotal-A ) 1483.54
Formwork, Earth oil, Power consumption & other
Consumables etc.
Subtotal-A1: 8901.24

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9079.26

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 9987.19


VAT 6% of Total 665.81
IT 4% of Total 443.88

Note : Rates of all items should be inclusive of all supply and carriage. Page: 884 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 11096.88

Note : Rates of all items should be inclusive of all supply and carriage. Page: 885 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.17.01.02.09 1100mm internal dia, wall thickness not less than 115mm, Re-bar for m
pipe:- circumferential: 19 turns - 8mmΦ for inner cage & 14 turns -
8mmΦ for outer cage and longitudinal: 8 nos. - 8mmΦ for inner cage &
8 nos. - 8mmΦ for outer cage , Re-bar for Collar:- circumferential: 3
turns - 8mmΦ and longitudinal: 12 nos. - 6mmΦ
Ordinary Portland Cement (CEM I, 52.5N) 4.4390 bag 455.00 2019.75
Sand (FM - 2.5) 0.1964 m3 1500.00 294.60
Stone Chips (12mm down graded) [LAA≤30] 0.3928 m3 4470.00 1755.82
M.S. Ribbed/ Deformed Bar (Grade 300) 61.0518 kg 54.00 3296.80
Water reducing chemical admixture : Type-A 0.9766 liter 130.00 126.96
Mason 0.1142 day 550.00 62.81
Operator 0.0715 day 570.00 40.76
Re-bar Fabricator 0.0715 day 570.00 40.76
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.2286 day 470.00 107.44
Operator
Skilled Labour 0.2056 day 450.00 92.52
Ordinary Labour 0.9371 day 370.00 346.73
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0715 day 1200.00 85.80
Diesel 0.1650 liter 68.00 11.22
Lubricant 0.0330 liter 220.00 7.26

Subtotal-A: 8289.21
H.C. of Pipe manufacturing plant and cost of Steel ( +20.00 % on Subtotal-A ) 1657.84
Formwork, Earth oil, Power consumption & other
Consumables etc.
Subtotal-A1: 9947.05

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10145.99

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 11160.59


VAT 6% of Total 744.04
IT 4% of Total 496.03

Note : Rates of all items should be inclusive of all supply and carriage. Page: 886 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 12400.65

Note : Rates of all items should be inclusive of all supply and carriage. Page: 887 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.17.01.02.10 1200mm internal dia, wall thickness not less than 120mm, Re-bar for m
pipe:- circumferential: 21 turns - 8mmΦ for inner cage & 16 turns -
8mmΦ for outer cage and longitudinal: 8 nos. - 8mmΦ for inner cage &
8 nos. - 8mmΦ for outer cage , Re-bar for Collar:- circumferential: 3
turns - 8mmΦ and longitudinal: 12 nos. - 8mmΦ
Ordinary Portland Cement (CEM I, 52.5N) 5.0933 bag 455.00 2317.45
Sand (FM - 2.5) 0.2253 m3 1500.00 337.95
Stone Chips (12mm down graded) [LAA≤30] 0.4506 m3 4470.00 2014.18
M.S. Ribbed/ Deformed Bar (Grade 300) 72.5811 kg 54.00 3919.38
Water reducing chemical admixture : Type-A 1.1205 liter 130.00 145.67
Mason 0.1142 day 550.00 62.81
Operator 0.0858 day 570.00 48.91
Re-bar Fabricator 0.0858 day 570.00 48.91
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.2286 day 470.00 107.44
Operator
Skilled Labour 0.2056 day 450.00 92.52
Ordinary Labour 0.9371 day 370.00 346.73
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0858 day 1200.00 102.96
Diesel 0.1793 liter 68.00 12.19
Lubricant 0.0360 liter 220.00 7.92

Subtotal-A: 9565.01
H.C. of Pipe manufacturing plant and cost of Steel ( +20.00 % on Subtotal-A ) 1913.00
Formwork, Earth oil, Power consumption & other
Consumables etc.
Subtotal-A1: 11478.01

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11707.57

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12878.33


VAT 6% of Total 858.56
IT 4% of Total 572.37

Note : Rates of all items should be inclusive of all supply and carriage. Page: 888 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 14309.26

Note : Rates of all items should be inclusive of all supply and carriage. Page: 889 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.17.01.02.11 1400mm internal dia, wall thickness not less than 135mm, Re-bar for m
pipe:- circumferential: 17 turns - 10mmΦ for inner cage & 13 turns -
10mmΦ for outer cage and longitudinal: 12 nos. - 8mmΦ for inner
cage & 12 nos. - 8mmΦ for outer cage , Re-bar for Collar:-
circumferential: 3 turns - 8mmΦ for inner cage & 3 turns - 8mmΦ for
outer cage and longitudinal: 8 nos. - 8mmΦ for inner cage & 8 nos. -
8mmΦ for outer cage
Ordinary Portland Cement (CEM I, 52.5N) 6.6109 bag 455.00 3007.96
Sand (FM - 2.5) 0.2925 m3 1500.00 438.75
Stone Chips (12mm down graded) [LAA≤30] 0.5849 m3 4470.00 2614.50
M.S. Ribbed/ Deformed Bar (Grade 300) 112.0797 kg 54.00 6052.30
Water reducing chemical admixture : Type-A 1.4544 liter 130.00 189.07
Mason 0.1142 day 550.00 62.81
Operator 0.0858 day 570.00 48.91
Re-bar Fabricator 0.0858 day 570.00 48.91
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.2286 day 470.00 107.44
Operator
Skilled Labour 0.2056 day 450.00 92.52
Ordinary Labour 0.9371 day 370.00 346.73
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0858 day 1200.00 102.96
Diesel 0.2324 liter 68.00 15.80
Lubricant 0.0464 liter 220.00 10.21

Subtotal-A: 13138.87
H.C. of Pipe manufacturing plant and cost of Steel ( +20.00 % on Subtotal-A ) 2627.77
Formwork, Earth oil, Power consumption & other
Consumables etc.
Subtotal-A1: 15766.64

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 16081.98

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 17690.18

Note : Rates of all items should be inclusive of all supply and carriage. Page: 890 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

VAT 6% of Total 1179.35


IT 4% of Total 786.23
Total: 19655.75

Note : Rates of all items should be inclusive of all supply and carriage. Page: 891 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.17.01.02.12 1600mm internal dia, wall thickness not less than 140mm, Re-bar for m
pipe:- circumferential: 21 turns - 10mmΦ for inner cage & 16 turns -
10mmΦ for outer cage and longitudinal: 12 nos. - 8mmΦ for inner
cage & 12 nos. - 8mmΦ for outer cage , Re-bar for Collar:-
circumferential: 3 turns - 8mmΦ for inner cage & 3 turns - 8mmΦ for
outer cage and longitudinal: 8 nos. - 8mmΦ for inner cage & 8 nos. -
8mmΦ for outer cage
Ordinary Portland Cement (CEM I, 52.5N) 7.8418 bag 455.00 3568.02
Sand (FM - 2.5) 0.3469 m3 1500.00 520.35
Stone Chips (12mm down graded) [LAA≤30] 0.6938 m3 4470.00 3101.29
M.S. Ribbed/ Deformed Bar (Grade 300) 148.9871 kg 54.00 8045.30
Water reducing chemical admixture : Type-A 1.7252 liter 130.00 224.28
Mason 0.1142 day 550.00 62.81
Operator 0.0858 day 570.00 48.91
Re-bar Fabricator 0.0858 day 570.00 48.91
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.2286 day 470.00 107.44
Operator
Skilled Labour 0.2056 day 450.00 92.52
Ordinary Labour 0.9371 day 370.00 346.73
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0858 day 1200.00 102.96
Diesel 0.2324 liter 68.00 15.80
Lubricant 0.0464 liter 220.00 10.21

Subtotal-A: 16295.52
H.C. of Pipe manufacturing plant and cost of Steel ( +20.00 % on Subtotal-A ) 3259.10
Formwork, Earth oil, Power consumption & other
Consumables etc.
Subtotal-A1: 19554.62

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 19945.71

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 21940.28

Note : Rates of all items should be inclusive of all supply and carriage. Page: 892 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

VAT 6% of Total 1462.69


IT 4% of Total 975.12
Total: 24378.09

Note : Rates of all items should be inclusive of all supply and carriage. Page: 893 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.17.01.02.13 1800mm internal dia, wall thickness not less than 150mm, Re-bar for m
pipe:- circumferential: 22 turns - 10mmΦ for inner cage & 22 turns -
10mmΦ for outer cage and longitudinal: 14 nos. - 10mmΦ for inner
cage & 14 nos. - 10mmΦ for outer cage , Re-bar for Collar:-
circumferential: 3 turns - 8mmΦ for inner cage & 3 turns - 8mmΦ for
outer cage and longitudinal: 12 nos. - 8mmΦ for inner cage & 12 nos. -
8mmΦ for outer cage
Ordinary Portland Cement (CEM I, 52.5N) 9.4541 bag 455.00 4301.62
Sand (FM - 2.5) 0.4182 m3 1500.00 627.30
Stone Chips (12mm down graded) [LAA≤30] 0.8365 m3 4470.00 3739.16
M.S. Ribbed/ Deformed Bar (Grade 300) 201.3434 kg 54.00 10872.54
Water reducing chemical admixture : Type-A 2.0799 liter 130.00 270.39
Mason 0.1142 day 550.00 62.81
Operator 0.0858 day 570.00 48.91
Re-bar Fabricator 0.0858 day 570.00 48.91
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.2286 day 470.00 107.44
Operator
Skilled Labour 0.2056 day 450.00 92.52
Ordinary Labour 0.9371 day 370.00 346.73
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0858 day 1200.00 102.96
Diesel 0.2324 liter 68.00 15.80
Lubricant 0.0464 liter 220.00 10.21

Subtotal-A: 20647.28
H.C. of Pipe manufacturing plant and cost of Steel ( +20.00 % on Subtotal-A ) 4129.46
Formwork, Earth oil, Power consumption & other
Consumables etc.
Subtotal-A1: 24776.74

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 25272.27

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 27799.50

Note : Rates of all items should be inclusive of all supply and carriage. Page: 894 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

VAT 6% of Total 1853.30


IT 4% of Total 1235.53
Total: 30888.34

Note : Rates of all items should be inclusive of all supply and carriage. Page: 895 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.17.01.02.14 2000mm internal dia, wall thickness not less than 170mm, Re-bar for m
pipe:- circumferential: 22 turns - 10mmΦ for inner cage & 22 turns -
10mmΦ for outer cage and longitudinal: 14 nos. - 10mmΦ for inner
cage & 14 nos. - 10mmΦ for outer cage , Re-bar for Collar:-
circumferential: 3 turns - 8mmΦ for inner cage & 3 turns - 8mmΦ for
outer cage and longitudinal: 12 nos. - 8mmΦ for inner cage & 12 nos. -
8mmΦ for outer cage
Ordinary Portland Cement (CEM I, 52.5N) 11.8754 bag 455.00 5403.31
Sand (FM - 2.5) 0.5254 m3 1500.00 788.10
Stone Chips (12mm down graded) [LAA≤30] 1.0507 m3 4470.00 4696.63
M.S. Ribbed/ Deformed Bar (Grade 300) 221.9522 kg 54.00 11985.42
Water reducing chemical admixture : Type-A 2.6126 liter 130.00 339.64
Mason 0.1142 day 550.00 62.81
Operator 0.0858 day 570.00 48.91
Re-bar Fabricator 0.0858 day 570.00 48.91
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.2286 day 470.00 107.44
Operator
Skilled Labour 0.2056 day 450.00 92.52
Ordinary Labour 0.9371 day 370.00 346.73
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0858 day 1200.00 102.96
Diesel 0.2324 liter 68.00 15.80
Lubricant 0.0464 liter 220.00 10.21

Subtotal-A: 24049.38
H.C. of Pipe manufacturing plant and cost of Steel ( +20.00 % on Subtotal-A ) 4809.88
Formwork, Earth oil, Power consumption & other
Consumables etc.
Subtotal-A1: 28859.25

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 29436.44

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 32380.08

Note : Rates of all items should be inclusive of all supply and carriage. Page: 896 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

VAT 6% of Total 2158.67


IT 4% of Total 1439.11
Total: 35977.87

4.18.01 RHT (Rebound/ Schmidt Hammer Test): Conducting rebound hammer


test to assess quality of the concrete on built structure in accordance
with ASTM C 805 (Standard Test Method for Rebound Number of
Hardened Concrete) including preparing the surface of RCC structural
members such as beams, columns, slabs etc. by chipping the plastered
surface/ finishing/ cladding to expose the concrete, smoothening the
area using carborndum stone all as directed by E-I-C, preparation of
separate report for each structure with observations and
recommendations for remedial measures if any. Before commencing
RHT, Contractor shall submit methodology with resumes of the
consulting personnel for conducting test to the E-I-C for approval.

4.18.01.01 Mobilization & demobilization within 100km of Dhaka/ nearby source to set
site and RHT on 10 (ten) nos. spots or less of a single structure
RHT: Mobilization, demobilization & accomodation including 1.0000 ithin 100k 10000.00 10000.00
10 nos. RHT (Rebound Hammer Test)
Foreman 1.0000 day 800.00 800.00
Ordinary Labour 1.0000 day 370.00 370.00

Subtotal-A: 11170.00
Reporting charges and consumables etc. ( +5.00 % on Subtotal-A ) 558.50
Subtotal-A1: 11728.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11963.07

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 13159.38


VAT 6% of Total 877.29
IT 4% of Total 584.86
Total: 14621.53

Note : Rates of all items should be inclusive of all supply and carriage. Page: 897 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.18.01.02 Additional charge on Mobilization & demobilization beyond 100km of per km


dhaka/ nearby source to site
RHT/UPV: Beyond 100km from Dhaka 1.0000 per km 25.00 25.00

Subtotal-A: 25.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 25.50

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 28.05


VAT 6% of Total 1.87
IT 4% of Total 1.25
Total: 31.17

4.18.01.03 RHT on each additional spot after 10(ten) spots tested. each
RHT: per impact after 1st 10 RHT 1.0000 each 1000.00 1000.00
Foreman 0.1000 day 800.00 80.00
Ordinary Labour 0.1000 day 370.00 37.00

Subtotal-A: 1117.00
Reporting charges and consumables etc. ( +5.00 % on Subtotal-A ) 55.85
Subtotal-A1: 1172.85

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1196.31

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1315.94


VAT 6% of Total 87.73
IT 4% of Total 58.49
Total: 1462.15

Note : Rates of all items should be inclusive of all supply and carriage. Page: 898 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.18.02 UPV (Ultrasonic Pulse Velocity) Test: Conducting Ultrasonic Pulse


Velocity test to assess uniformity, homogeneity and quality of the
concrete, in terms of cracks, voids, flaws, honeycombing etc. and other
inperfections in accordance with ASTM C 597 (Standard Test Method for
Pulse Velocity Through Concrete) including preparing the surface of RCC
structural members such as beams, columns, slabs etc. by chipping the
plastered surface/ finishing/ cladding to expose the concrete,
smoothening the area using carborndum stone all as directed by E-I-C,
preparation of separate report for each structure with observations and
recommendations for remedial measures if any. Before commencing
UPV, Contractor shall submit methodology with resumes of the
consulting personnel for conducting test to the E-I-C for approval.

4.18.02.01 Mobilization & demobilization within 100km of Dhaka/ nearby source to set
site and UPV on 10 (ten) nos. spots or less of a single structure
UPV: Mobilization, demobilization & accomodation including 1.0000 ithin 100k 15000.00 15000.00
10 nos. UPV (Ultrasonic Pulse Velocity) Test
Foreman 1.0000 day 800.00 800.00
Ordinary Labour 1.0000 day 370.00 370.00

Subtotal-A: 16170.00
Reporting charges and consumables etc. ( +5.00 % on Subtotal-A ) 808.50
Subtotal-A1: 16978.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 17318.07

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 19049.88


VAT 6% of Total 1269.99
IT 4% of Total 846.66
Total: 21166.53

Note : Rates of all items should be inclusive of all supply and carriage. Page: 899 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.18.02.02 Additional charge on Mobilization & demobilization beyond 100km of per km


dhaka/ nearby source to site
RHT/UPV: Beyond 100km from Dhaka 1.0000 per km 25.00 25.00

Subtotal-A: 25.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 25.50

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 28.05


VAT 6% of Total 1.87
IT 4% of Total 1.25
Total: 31.17

4.18.02.03 UPV on each additional spot after 10(ten) spots tested. each
UPV: per test after 1st 10 UPV 1.0000 each 1500.00 1500.00
Foreman 0.1000 day 800.00 80.00
Ordinary Labour 0.1000 day 370.00 37.00

Subtotal-A: 1617.00
Reporting charges and consumables etc. ( +5.00 % on Subtotal-A ) 80.85
Subtotal-A1: 1697.85

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1731.81

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1904.99


VAT 6% of Total 127.00
IT 4% of Total 84.67
Total: 2116.65

Note : Rates of all items should be inclusive of all supply and carriage. Page: 900 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.18.03 Core Cutter: Obtaining, preparing and testing in-situ cylindrical core
specimens of specified diameter drilled from hardened concrete
including core location determination by rebar locator/ scanning and
preparing the structural members as directed to expose the concrete,
cleaning the area with blower/ wire brush and taking out the comcrete
sample with cutter and testing as per standard specification. The
procedure for drilling, examination, measurement and testing for
comprehensive strength shall be in accordance with ASTM C 42
(Standard Test Method for obtaining and testing drilled cores and sawed
beams of concrete). Before commencing Core cutting, contractor shall
submit methodology with resumes of the consulting personnel for
conducting test to the E-I-C for approval. The cost of cutting the core
with necessary laboratory test fees is included in this unit rate.

4.18.03.01 Mobilization & demobilization within 100km of Dhaka/ nearby source to set
site and in-situ core cutting on 3 (three) nos. spots or less of a single
structure
Mobilization, demobilization & accomodation including 3 nos. 1.0000 ithin 100k 16000.00 16000.00
in-situ core cutting & testing
Foreman 1.0000 day 800.00 800.00
Ordinary Labour 1.0000 day 370.00 370.00

Subtotal-A: 17170.00
Reporting charges and consumables etc. ( +5.00 % on Subtotal-A ) 858.50
Subtotal-A1: 18028.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 18389.07

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 20227.98


VAT 6% of Total 1348.53
IT 4% of Total 899.02
Total: 22475.53

Note : Rates of all items should be inclusive of all supply and carriage. Page: 901 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.18.03.02 Additional charge on Mobilization & demobilization beyond 100km of per km


Dhaka/ nearby source to site
Core Cutter: Beyond 100km from Dhaka 1.0000 per km 35.00 35.00

Subtotal-A: 35.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 35.70

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 39.27


VAT 6% of Total 2.62
IT 4% of Total 1.75
Total: 43.63

4.18.03.03 In-situ core cutting on each additional nos. after 3(three) spots each
Core Cutter: per core after 1st 3 cores 1.0000 each 4200.00 4200.00
Foreman 0.2500 day 800.00 200.00
Ordinary Labour 0.2500 day 370.00 92.50

Subtotal-A: 4492.50
Reporting charges and consumables etc. ( +5.00 % on Subtotal-A ) 224.63
Subtotal-A1: 4717.13

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4811.47

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 5292.61


VAT 6% of Total 352.84
IT 4% of Total 235.23
Total: 5880.68

Note : Rates of all items should be inclusive of all supply and carriage. Page: 902 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01 Sand Compaction Pile: Execution of sand compaction pile through


displacement method by using tripod rig, mechanical winch, special type
drop hammer (weighing minimum 1.00 ton) and casing pipe of inner
diameter 200mm to 300mm upto a maximum depth of 10.0m,
compacting the sand with desired sand volume and FM value of sand
upto desired relative density (60% to 65%), to attain the desired SPT
value between sand piles etc. complete including the cost of compacted
sand as per design, specification and direction of Engineer in charge.

4.19.01.01 Pile diameter: 200mm

4.19.01.01.01 Sand Volumn 0.075 cum/m, minimum FM = 1.5 m


Sand (FM - 1.5) 0.0750 m3 795.00 59.63
H.C. of Casing 0.0077 day 260.00 2.00
H.C. of Tripod and Mechanical Winch Machine complete with 0.0077 day 3000.00 23.10
power unit and accessories
H.C. of Driving Equipment 0.0077 day 350.00 2.70
Operator 0.0077 day 570.00 4.39
Foreman 0.0062 day 800.00 4.96
Skilled Labour 0.0246 day 450.00 11.07
Ordinary Labour 0.0215 day 370.00 7.96
Diesel 0.4892 liter 68.00 33.27
Lubricant 0.0061 liter 220.00 1.34

Subtotal-A: 150.40

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 153.41

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 168.75


VAT 6% of Total 11.25
IT 4% of Total 7.50
Total: 187.50

Note : Rates of all items should be inclusive of all supply and carriage. Page: 903 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.01.02 Sand Volumn 0.075 cum/m, minimum FM = 1.8 m


Sand (FM - 1.8) 0.0750 m3 970.00 72.75
H.C. of Casing 0.0077 day 260.00 2.00
H.C. of Tripod and Mechanical Winch Machine complete with 0.0077 day 3000.00 23.10
power unit and accessories
H.C. of Driving Equipment 0.0077 day 350.00 2.70
Operator 0.0077 day 570.00 4.39
Foreman 0.0062 day 800.00 4.96
Skilled Labour 0.0246 day 450.00 11.07
Ordinary Labour 0.0215 day 370.00 7.96
Diesel 0.4892 liter 68.00 33.27
Lubricant 0.0061 liter 220.00 1.34

Subtotal-A: 163.53

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 166.80

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 183.48


VAT 6% of Total 12.23
IT 4% of Total 8.15
Total: 203.87

Note : Rates of all items should be inclusive of all supply and carriage. Page: 904 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.01.03 Sand Volumn 0.075 cum/m, minimum FM = 2.5 m


Sand (FM - 2.5) 0.0750 m3 1500.00 112.50
H.C. of Casing 0.0077 day 260.00 2.00
H.C. of Tripod and Mechanical Winch Machine complete with 0.0077 day 3000.00 23.10
power unit and accessories
H.C. of Driving Equipment 0.0077 day 350.00 2.70
Operator 0.0077 day 570.00 4.39
Foreman 0.0062 day 800.00 4.96
Skilled Labour 0.0246 day 450.00 11.07
Ordinary Labour 0.0215 day 370.00 7.96
Diesel 0.4892 liter 68.00 33.27
Lubricant 0.0061 liter 220.00 1.34

Subtotal-A: 203.28

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 207.34

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 228.08


VAT 6% of Total 15.21
IT 4% of Total 10.14
Total: 253.42

Note : Rates of all items should be inclusive of all supply and carriage. Page: 905 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.01.04 Sand Volumn 0.1 cum/m, minimum FM = 1.5 m


Sand (FM - 1.5) 0.1000 m3 795.00 79.50
H.C. of Casing 0.0091 day 260.00 2.37
H.C. of Tripod and Mechanical Winch Machine complete with 0.0091 day 3000.00 27.30
power unit and accessories
H.C. of Driving Equipment 0.0091 day 350.00 3.19
Operator 0.0091 day 570.00 5.19
Foreman 0.0073 day 800.00 5.84
Skilled Labour 0.0291 day 450.00 13.10
Ordinary Labour 0.0255 day 370.00 9.44
Diesel 0.5782 liter 68.00 39.32
Lubricant 0.0072 liter 220.00 1.58

Subtotal-A: 186.81

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 190.55

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 209.60


VAT 6% of Total 13.97
IT 4% of Total 9.32
Total: 232.89

Note : Rates of all items should be inclusive of all supply and carriage. Page: 906 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.01.05 Sand Volumn 0.1 cum/m, minimum FM = 1.8 m


Sand (FM - 1.8) 0.1000 m3 970.00 97.00
H.C. of Casing 0.0091 day 260.00 2.37
H.C. of Tripod and Mechanical Winch Machine complete with 0.0091 day 3000.00 27.30
power unit and accessories
H.C. of Driving Equipment 0.0091 day 350.00 3.19
Operator 0.0091 day 570.00 5.19
Foreman 0.0073 day 800.00 5.84
Skilled Labour 0.0291 day 450.00 13.10
Ordinary Labour 0.0255 day 370.00 9.44
Diesel 0.5782 liter 68.00 39.32
Lubricant 0.0072 liter 220.00 1.58

Subtotal-A: 204.31

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 208.40

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 229.24


VAT 6% of Total 15.28
IT 4% of Total 10.19
Total: 254.71

Note : Rates of all items should be inclusive of all supply and carriage. Page: 907 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.01.06 Sand Volumn 0.1 cum/m, minimum FM = 2.5 m


Sand (FM - 2.5) 0.1000 m3 1500.00 150.00
H.C. of Casing 0.0091 day 260.00 2.37
H.C. of Tripod and Mechanical Winch Machine complete with 0.0091 day 3000.00 27.30
power unit and accessories
H.C. of Driving Equipment 0.0091 day 350.00 3.19
Operator 0.0091 day 570.00 5.19
Foreman 0.0073 day 800.00 5.84
Skilled Labour 0.0291 day 450.00 13.10
Ordinary Labour 0.0255 day 370.00 9.44
Diesel 0.5782 liter 68.00 39.32
Lubricant 0.0072 liter 220.00 1.58

Subtotal-A: 257.31

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 262.46

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 288.70


VAT 6% of Total 19.25
IT 4% of Total 12.83
Total: 320.78

Note : Rates of all items should be inclusive of all supply and carriage. Page: 908 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.01.07 Sand Volumn 0.15 cum/m, minimum FM = 1.5 m


Sand (FM - 1.5) 0.1500 m3 795.00 119.25
H.C. of Casing 0.0133 day 260.00 3.46
H.C. of Tripod and Mechanical Winch Machine complete with 0.0133 day 3000.00 39.90
power unit and accessories
H.C. of Driving Equipment 0.0133 day 350.00 4.66
Operator 0.0133 day 570.00 7.58
Foreman 0.0107 day 800.00 8.56
Skilled Labour 0.0427 day 450.00 19.22
Ordinary Labour 0.0373 day 370.00 13.80
Diesel 0.8480 liter 68.00 57.66
Lubricant 0.0106 liter 220.00 2.33

Subtotal-A: 276.42

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 281.94

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 310.14


VAT 6% of Total 20.68
IT 4% of Total 13.78
Total: 344.60

Note : Rates of all items should be inclusive of all supply and carriage. Page: 909 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.01.08 Sand Volumn 0.15 cum/m, minimum FM = 1.8 m


Sand (FM - 1.8) 0.1500 m3 970.00 145.50
H.C. of Casing 0.0133 day 260.00 3.46
H.C. of Tripod and Mechanical Winch Machine complete with 0.0133 day 3000.00 39.90
power unit and accessories
H.C. of Driving Equipment 0.0133 day 350.00 4.66
Operator 0.0133 day 570.00 7.58
Foreman 0.0107 day 800.00 8.56
Skilled Labour 0.0427 day 450.00 19.22
Ordinary Labour 0.0373 day 370.00 13.80
Diesel 0.8480 liter 68.00 57.66
Lubricant 0.0106 liter 220.00 2.33

Subtotal-A: 302.67

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 308.72

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 339.59


VAT 6% of Total 22.64
IT 4% of Total 15.09
Total: 377.32

Note : Rates of all items should be inclusive of all supply and carriage. Page: 910 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.01.09 Sand Volumn 0.15 cum/m, minimum FM = 2.5 m


Sand (FM - 2.5) 0.1500 m3 1500.00 225.00
H.C. of Casing 0.0133 day 260.00 3.46
H.C. of Tripod and Mechanical Winch Machine complete with 0.0133 day 3000.00 39.90
power unit and accessories
H.C. of Driving Equipment 0.0133 day 350.00 4.66
Operator 0.0133 day 570.00 7.58
Foreman 0.0107 day 800.00 8.56
Skilled Labour 0.0427 day 450.00 19.22
Ordinary Labour 0.0373 day 370.00 13.80
Diesel 0.8480 liter 68.00 57.66
Lubricant 0.0106 liter 220.00 2.33

Subtotal-A: 382.17

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 389.81

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 428.79


VAT 6% of Total 28.59
IT 4% of Total 19.06
Total: 476.43

4.19.01.02 Pile diameter: 250mm

Note : Rates of all items should be inclusive of all supply and carriage. Page: 911 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.02.01 Sand Volumn 0.1 cum/m, minimum FM = 1.5 m


Sand (FM - 1.5) 0.1000 m3 795.00 79.50
H.C. of Casing 0.0095 day 260.00 2.47
H.C. of Tripod and Mechanical Winch Machine complete with 0.0095 day 3000.00 28.50
power unit and accessories
H.C. of Driving Equipment 0.0095 day 350.00 3.33
Operator 0.0095 day 570.00 5.42
Foreman 0.0076 day 800.00 6.08
Skilled Labour 0.0305 day 450.00 13.73
Ordinary Labour 0.0267 day 370.00 9.88
Diesel 0.6057 liter 68.00 41.19
Lubricant 0.0076 liter 220.00 1.67

Subtotal-A: 191.75

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 195.59

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 215.15


VAT 6% of Total 14.34
IT 4% of Total 9.56
Total: 239.05

Note : Rates of all items should be inclusive of all supply and carriage. Page: 912 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.02.02 Sand Volumn 0.1 cum/m, minimum FM = 1.8 m


Sand (FM - 1.8) 0.1000 m3 970.00 97.00
H.C. of Casing 0.0095 day 260.00 2.47
H.C. of Tripod and Mechanical Winch Machine complete with 0.0095 day 3000.00 28.50
power unit and accessories
H.C. of Driving Equipment 0.0095 day 350.00 3.33
Operator 0.0095 day 570.00 5.42
Foreman 0.0076 day 800.00 6.08
Skilled Labour 0.0305 day 450.00 13.73
Ordinary Labour 0.0267 day 370.00 9.88
Diesel 0.6057 liter 68.00 41.19
Lubricant 0.0076 liter 220.00 1.67

Subtotal-A: 209.25

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 213.44

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 234.78


VAT 6% of Total 15.65
IT 4% of Total 10.43
Total: 260.87

Note : Rates of all items should be inclusive of all supply and carriage. Page: 913 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.02.03 Sand Volumn 0.1 cum/m, minimum FM = 2.5 m


Sand (FM - 2.5) 0.1000 m3 1500.00 150.00
H.C. of Casing 0.0095 day 260.00 2.47
H.C. of Tripod and Mechanical Winch Machine complete with 0.0095 day 3000.00 28.50
power unit and accessories
H.C. of Driving Equipment 0.0095 day 350.00 3.33
Operator 0.0095 day 570.00 5.42
Foreman 0.0076 day 800.00 6.08
Skilled Labour 0.0305 day 450.00 13.73
Ordinary Labour 0.0267 day 370.00 9.88
Diesel 0.6057 liter 68.00 41.19
Lubricant 0.0076 liter 220.00 1.67

Subtotal-A: 262.25

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 267.50

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 294.25


VAT 6% of Total 19.62
IT 4% of Total 13.08
Total: 326.94

Note : Rates of all items should be inclusive of all supply and carriage. Page: 914 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.02.04 Sand Volumn 0.15 cum/m, minimum FM = 1.5 m


Sand (FM - 1.5) 0.1500 m3 795.00 119.25
H.C. of Casing 0.0143 day 260.00 3.72
H.C. of Tripod and Mechanical Winch Machine complete with 0.0143 day 3000.00 42.90
power unit and accessories
H.C. of Driving Equipment 0.0143 day 350.00 5.01
Operator 0.0143 day 570.00 8.15
Foreman 0.0114 day 800.00 9.12
Skilled Labour 0.0457 day 450.00 20.57
Ordinary Labour 0.0400 day 370.00 14.80
Diesel 0.9086 liter 68.00 61.78
Lubricant 0.0114 liter 220.00 2.51

Subtotal-A: 287.80

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 293.56

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 322.91


VAT 6% of Total 21.53
IT 4% of Total 14.35
Total: 358.79

Note : Rates of all items should be inclusive of all supply and carriage. Page: 915 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.02.05 Sand Volumn 0.15 cum/m, minimum FM = 1.8 m


Sand (FM - 1.8) 0.1500 m3 970.00 145.50
H.C. of Casing 0.0143 day 260.00 3.72
H.C. of Tripod and Mechanical Winch Machine complete with 0.0143 day 3000.00 42.90
power unit and accessories
H.C. of Driving Equipment 0.0143 day 350.00 5.01
Operator 0.0143 day 570.00 8.15
Foreman 0.0114 day 800.00 9.12
Skilled Labour 0.0457 day 450.00 20.57
Ordinary Labour 0.0400 day 370.00 14.80
Diesel 0.9086 liter 68.00 61.78
Lubricant 0.0114 liter 220.00 2.51

Subtotal-A: 314.05

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 320.33

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 352.37


VAT 6% of Total 23.49
IT 4% of Total 15.66
Total: 391.52

Note : Rates of all items should be inclusive of all supply and carriage. Page: 916 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.02.06 Sand Volumn 0.15 cum/m, minimum FM = 2.5 m


Sand (FM - 2.5) 0.1500 m3 1500.00 225.00
H.C. of Casing 0.0143 day 260.00 3.72
H.C. of Tripod and Mechanical Winch Machine complete with 0.0143 day 3000.00 42.90
power unit and accessories
H.C. of Driving Equipment 0.0143 day 350.00 5.01
Operator 0.0143 day 570.00 8.15
Foreman 0.0114 day 800.00 9.12
Skilled Labour 0.0457 day 450.00 20.57
Ordinary Labour 0.0400 day 370.00 14.80
Diesel 0.9086 liter 68.00 61.78
Lubricant 0.0114 liter 220.00 2.51

Subtotal-A: 393.55

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 401.42

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 441.57


VAT 6% of Total 29.44
IT 4% of Total 19.63
Total: 490.63

Note : Rates of all items should be inclusive of all supply and carriage. Page: 917 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.02.07 Sand Volumn 0.20 cum/m, minimum FM = 1.5 m


Sand (FM - 1.5) 0.2000 m3 795.00 159.00
H.C. of Casing 0.0182 day 260.00 4.73
H.C. of Tripod and Mechanical Winch Machine complete with 0.0182 day 3000.00 54.60
power unit and accessories
H.C. of Driving Equipment 0.0182 day 350.00 6.37
Operator 0.0182 day 570.00 10.37
Foreman 0.0145 day 800.00 11.60
Skilled Labour 0.0582 day 450.00 26.19
Ordinary Labour 0.0509 day 370.00 18.83
Diesel 1.1564 liter 68.00 78.64
Lubricant 0.0145 liter 220.00 3.19

Subtotal-A: 373.52

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 380.99

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 419.09


VAT 6% of Total 27.94
IT 4% of Total 18.63
Total: 465.66

Note : Rates of all items should be inclusive of all supply and carriage. Page: 918 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.02.08 Sand Volumn 0.20 cum/m, minimum FM = 1.8 m


Sand (FM - 1.8) 0.2000 m3 970.00 194.00
H.C. of Casing 0.0182 day 260.00 4.73
H.C. of Tripod and Mechanical Winch Machine complete with 0.0182 day 3000.00 54.60
power unit and accessories
H.C. of Driving Equipment 0.0182 day 350.00 6.37
Operator 0.0182 day 570.00 10.37
Foreman 0.0145 day 800.00 11.60
Skilled Labour 0.0582 day 450.00 26.19
Ordinary Labour 0.0509 day 370.00 18.83
Diesel 1.1564 liter 68.00 78.64
Lubricant 0.0145 liter 220.00 3.19

Subtotal-A: 408.52

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 416.69

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 458.36


VAT 6% of Total 30.56
IT 4% of Total 20.37
Total: 509.29

Note : Rates of all items should be inclusive of all supply and carriage. Page: 919 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.02.09 Sand Volumn 0.20 cum/m, minimum FM = 2.5 m


Sand (FM - 2.5) 0.2000 m3 1500.00 300.00
H.C. of Casing 0.0182 day 260.00 4.73
H.C. of Tripod and Mechanical Winch Machine complete with 0.0182 day 3000.00 54.60
power unit and accessories
H.C. of Driving Equipment 0.0182 day 350.00 6.37
Operator 0.0182 day 570.00 10.37
Foreman 0.0145 day 800.00 11.60
Skilled Labour 0.0582 day 450.00 26.19
Ordinary Labour 0.0509 day 370.00 18.83
Diesel 1.1564 liter 68.00 78.64
Lubricant 0.0145 liter 220.00 3.19

Subtotal-A: 514.52

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 524.81

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 577.30


VAT 6% of Total 38.49
IT 4% of Total 25.66
Total: 641.44

Note : Rates of all items should be inclusive of all supply and carriage. Page: 920 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.02.10 Sand Volumn 0.25 cum/m, minimum FM = 1.5 m


Sand (FM - 1.5) 0.2500 m3 795.00 198.75
H.C. of Casing 0.0222 day 260.00 5.77
H.C. of Tripod and Mechanical Winch Machine complete with 0.0222 day 3000.00 66.60
power unit and accessories
H.C. of Driving Equipment 0.0222 day 350.00 7.77
Operator 0.0222 day 570.00 12.65
Foreman 0.0178 day 800.00 14.24
Skilled Labour 0.0711 day 450.00 32.00
Ordinary Labour 0.0622 day 370.00 23.01
Diesel 1.4133 liter 68.00 96.10
Lubricant 0.0177 liter 220.00 3.89

Subtotal-A: 460.79

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 470.01

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 517.01


VAT 6% of Total 34.47
IT 4% of Total 22.98
Total: 574.46

Note : Rates of all items should be inclusive of all supply and carriage. Page: 921 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.02.11 Sand Volumn 0.25 cum/m, minimum FM = 1.8 m


Sand (FM - 1.8) 0.2500 m3 970.00 242.50
H.C. of Casing 0.0222 day 260.00 5.77
H.C. of Tripod and Mechanical Winch Machine complete with 0.0222 day 3000.00 66.60
power unit and accessories
H.C. of Driving Equipment 0.0222 day 350.00 7.77
Operator 0.0222 day 570.00 12.65
Foreman 0.0178 day 800.00 14.24
Skilled Labour 0.0711 day 450.00 32.00
Ordinary Labour 0.0622 day 370.00 23.01
Diesel 1.4133 liter 68.00 96.10
Lubricant 0.0177 liter 220.00 3.89

Subtotal-A: 504.54

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 514.63

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 566.10


VAT 6% of Total 37.74
IT 4% of Total 25.16
Total: 629.00

Note : Rates of all items should be inclusive of all supply and carriage. Page: 922 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.02.12 Sand Volumn 0.25 cum/m, minimum FM = 2.5 m


Sand (FM - 2.5) 0.2500 m3 1500.00 375.00
H.C. of Casing 0.0222 day 260.00 5.77
H.C. of Tripod and Mechanical Winch Machine complete with 0.0222 day 3000.00 66.60
power unit and accessories
H.C. of Driving Equipment 0.0222 day 350.00 7.77
Operator 0.0222 day 570.00 12.65
Foreman 0.0178 day 800.00 14.24
Skilled Labour 0.0711 day 450.00 32.00
Ordinary Labour 0.0622 day 370.00 23.01
Diesel 1.4133 liter 68.00 96.10
Lubricant 0.0177 liter 220.00 3.89

Subtotal-A: 637.04

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 649.78

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 714.76


VAT 6% of Total 47.65
IT 4% of Total 31.77
Total: 794.18

4.19.01.03 Pile diameter: 300mm

Note : Rates of all items should be inclusive of all supply and carriage. Page: 923 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.03.01 Sand Volumn 0.15 cum/m, minimum FM = 1.5 m


Sand (FM - 1.5) 0.1500 m3 795.00 119.25
H.C. of Casing 0.0150 day 260.00 3.90
H.C. of Tripod and Mechanical Winch Machine complete with 0.0150 day 3000.00 45.00
power unit and accessories
H.C. of Driving Equipment 0.0150 day 350.00 5.25
Operator 0.0150 day 570.00 8.55
Foreman 0.0120 day 800.00 9.60
Skilled Labour 0.0480 day 450.00 21.60
Ordinary Labour 0.0420 day 370.00 15.54
Diesel 0.9540 liter 68.00 64.87
Lubricant 0.0119 liter 220.00 2.62

Subtotal-A: 296.18

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 302.10

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 332.31


VAT 6% of Total 22.15
IT 4% of Total 14.77
Total: 369.24

Note : Rates of all items should be inclusive of all supply and carriage. Page: 924 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.03.02 Sand Volumn 0.15 cum/m, minimum FM = 1.8 m


Sand (FM - 1.8) 0.1500 m3 970.00 145.50
H.C. of Casing 0.0150 day 260.00 3.90
H.C. of Tripod and Mechanical Winch Machine complete with 0.0150 day 3000.00 45.00
power unit and accessories
H.C. of Driving Equipment 0.0150 day 350.00 5.25
Operator 0.0150 day 570.00 8.55
Foreman 0.0120 day 800.00 9.60
Skilled Labour 0.0480 day 450.00 21.60
Ordinary Labour 0.0420 day 370.00 15.54
Diesel 0.9540 liter 68.00 64.87
Lubricant 0.0119 liter 220.00 2.62

Subtotal-A: 322.43

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 328.88

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 361.77


VAT 6% of Total 24.12
IT 4% of Total 16.08
Total: 401.96

Note : Rates of all items should be inclusive of all supply and carriage. Page: 925 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.03.03 Sand Volumn 0.15 cum/m, minimum FM = 2.5 m


Sand (FM - 2.5) 0.1500 m3 1500.00 225.00
H.C. of Casing 0.0150 day 260.00 3.90
H.C. of Tripod and Mechanical Winch Machine complete with 0.0150 day 3000.00 45.00
power unit and accessories
H.C. of Driving Equipment 0.0150 day 350.00 5.25
Operator 0.0150 day 570.00 8.55
Foreman 0.0120 day 800.00 9.60
Skilled Labour 0.0480 day 450.00 21.60
Ordinary Labour 0.0420 day 370.00 15.54
Diesel 0.9540 liter 68.00 64.87
Lubricant 0.0119 liter 220.00 2.62

Subtotal-A: 401.93

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 409.97

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 450.97


VAT 6% of Total 30.06
IT 4% of Total 20.04
Total: 501.07

Note : Rates of all items should be inclusive of all supply and carriage. Page: 926 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.03.04 Sand Volumn 0.20 cum/m, minimum FM = 1.5 m


Sand (FM - 1.5) 0.2000 m3 795.00 159.00
H.C. of Casing 0.0200 day 260.00 5.20
H.C. of Tripod and Mechanical Winch Machine complete with 0.0200 day 3000.00 60.00
power unit and accessories
H.C. of Driving Equipment 0.0200 day 350.00 7.00
Operator 0.0200 day 570.00 11.40
Foreman 0.0160 day 800.00 12.80
Skilled Labour 0.0640 day 450.00 28.80
Ordinary Labour 0.0560 day 370.00 20.72
Diesel 1.2720 liter 68.00 86.50
Lubricant 0.0159 liter 220.00 3.50

Subtotal-A: 394.91

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 402.81

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 443.09


VAT 6% of Total 29.54
IT 4% of Total 19.69
Total: 492.33

Note : Rates of all items should be inclusive of all supply and carriage. Page: 927 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.03.05 Sand Volumn 0.20 cum/m, minimum FM = 1.8 m


Sand (FM - 1.8) 0.2000 m3 970.00 194.00
H.C. of Casing 0.0200 day 260.00 5.20
H.C. of Tripod and Mechanical Winch Machine complete with 0.0200 day 3000.00 60.00
power unit and accessories
H.C. of Driving Equipment 0.0200 day 350.00 7.00
Operator 0.0200 day 570.00 11.40
Foreman 0.0160 day 800.00 12.80
Skilled Labour 0.0640 day 450.00 28.80
Ordinary Labour 0.0560 day 370.00 20.72
Diesel 1.2720 liter 68.00 86.50
Lubricant 0.0159 liter 220.00 3.50

Subtotal-A: 429.91

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 438.51

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 482.36


VAT 6% of Total 32.16
IT 4% of Total 21.44
Total: 535.96

Note : Rates of all items should be inclusive of all supply and carriage. Page: 928 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.03.06 Sand Volumn 0.20 cum/m, minimum FM = 2.5 m


Sand (FM - 2.5) 0.2000 m3 1500.00 300.00
H.C. of Casing 0.0200 day 260.00 5.20
H.C. of Tripod and Mechanical Winch Machine complete with 0.0200 day 3000.00 60.00
power unit and accessories
H.C. of Driving Equipment 0.0200 day 350.00 7.00
Operator 0.0200 day 570.00 11.40
Foreman 0.0160 day 800.00 12.80
Skilled Labour 0.0640 day 450.00 28.80
Ordinary Labour 0.0560 day 370.00 20.72
Diesel 1.2720 liter 68.00 86.50
Lubricant 0.0159 liter 220.00 3.50

Subtotal-A: 535.91

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 546.63

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 601.30


VAT 6% of Total 40.09
IT 4% of Total 26.72
Total: 668.11

Note : Rates of all items should be inclusive of all supply and carriage. Page: 929 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.03.07 Sand Volumn 0.25 cum/m, minimum FM = 1.5 m


Sand (FM - 1.5) 0.2500 m3 795.00 198.75
H.C. of Casing 0.0250 day 260.00 6.50
H.C. of Tripod and Mechanical Winch Machine complete with 0.0250 day 3000.00 75.00
power unit and accessories
H.C. of Driving Equipment 0.0250 day 350.00 8.75
Operator 0.0250 day 570.00 14.25
Foreman 0.0200 day 800.00 16.00
Skilled Labour 0.0800 day 450.00 36.00
Ordinary Labour 0.0700 day 370.00 25.90
Diesel 1.5900 liter 68.00 108.12
Lubricant 0.0199 liter 220.00 4.38

Subtotal-A: 493.65

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 503.52

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 553.87


VAT 6% of Total 36.92
IT 4% of Total 24.62
Total: 615.41

Note : Rates of all items should be inclusive of all supply and carriage. Page: 930 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.03.08 Sand Volumn 0.25 cum/m, minimum FM = 1.8 m


Sand (FM - 1.8) 0.2500 m3 970.00 242.50
H.C. of Casing 0.0250 day 260.00 6.50
H.C. of Tripod and Mechanical Winch Machine complete with 0.0250 day 3000.00 75.00
power unit and accessories
H.C. of Driving Equipment 0.0250 day 350.00 8.75
Operator 0.0250 day 570.00 14.25
Foreman 0.0200 day 800.00 16.00
Skilled Labour 0.0800 day 450.00 36.00
Ordinary Labour 0.0700 day 370.00 25.90
Diesel 1.5900 liter 68.00 108.12
Lubricant 0.0199 liter 220.00 4.38

Subtotal-A: 537.40

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 548.15

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 602.96


VAT 6% of Total 40.20
IT 4% of Total 26.80
Total: 669.96

Note : Rates of all items should be inclusive of all supply and carriage. Page: 931 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.03.09 Sand Volumn 0.25 cum/m, minimum FM = 2.5 m


Sand (FM - 2.5) 0.2500 m3 1500.00 375.00
H.C. of Casing 0.0250 day 260.00 6.50
H.C. of Tripod and Mechanical Winch Machine complete with 0.0250 day 3000.00 75.00
power unit and accessories
H.C. of Driving Equipment 0.0250 day 350.00 8.75
Operator 0.0250 day 570.00 14.25
Foreman 0.0200 day 800.00 16.00
Skilled Labour 0.0800 day 450.00 36.00
Ordinary Labour 0.0700 day 370.00 25.90
Diesel 1.5900 liter 68.00 108.12
Lubricant 0.0199 liter 220.00 4.38

Subtotal-A: 669.90

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 683.30

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 751.63


VAT 6% of Total 50.11
IT 4% of Total 33.41
Total: 835.14

Note : Rates of all items should be inclusive of all supply and carriage. Page: 932 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.03.10 Sand Volumn 0.30 cum/m, minimum FM = 1.5 m


Sand (FM - 1.5) 0.3000 m3 795.00 238.50
H.C. of Casing 0.0300 day 260.00 7.80
H.C. of Tripod and Mechanical Winch Machine complete with 0.0300 day 3000.00 90.00
power unit and accessories
H.C. of Driving Equipment 0.0300 day 350.00 10.50
Operator 0.0300 day 570.00 17.10
Foreman 0.0240 day 800.00 19.20
Skilled Labour 0.0960 day 450.00 43.20
Ordinary Labour 0.0840 day 370.00 31.08
Diesel 1.9080 liter 68.00 129.74
Lubricant 0.0239 liter 220.00 5.26

Subtotal-A: 592.38

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 604.23

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 664.65


VAT 6% of Total 44.31
IT 4% of Total 29.54
Total: 738.50

Note : Rates of all items should be inclusive of all supply and carriage. Page: 933 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.03.11 Sand Volumn 0.30 cum/m, minimum FM = 1.8 m


Sand (FM - 1.8) 0.3000 m3 970.00 291.00
H.C. of Casing 0.0300 day 260.00 7.80
H.C. of Tripod and Mechanical Winch Machine complete with 0.0300 day 3000.00 90.00
power unit and accessories
H.C. of Driving Equipment 0.0300 day 350.00 10.50
Operator 0.0300 day 570.00 17.10
Foreman 0.0240 day 800.00 19.20
Skilled Labour 0.0960 day 450.00 43.20
Ordinary Labour 0.0840 day 370.00 31.08
Diesel 1.9080 liter 68.00 129.74
Lubricant 0.0239 liter 220.00 5.26

Subtotal-A: 644.88

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 657.78

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 723.56


VAT 6% of Total 48.24
IT 4% of Total 32.16
Total: 803.95

Note : Rates of all items should be inclusive of all supply and carriage. Page: 934 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.03.12 Sand Volumn 0.30 cum/m, minimum FM = 2.5 m


Sand (FM - 2.5) 0.3000 m3 1500.00 450.00
H.C. of Casing 0.0300 day 260.00 7.80
H.C. of Tripod and Mechanical Winch Machine complete with 0.0300 day 3000.00 90.00
power unit and accessories
H.C. of Driving Equipment 0.0300 day 350.00 10.50
Operator 0.0300 day 570.00 17.10
Foreman 0.0240 day 800.00 19.20
Skilled Labour 0.0960 day 450.00 43.20
Ordinary Labour 0.0840 day 370.00 31.08
Diesel 1.9080 liter 68.00 129.74
Lubricant 0.0239 liter 220.00 5.26

Subtotal-A: 803.88

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 819.96

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 901.96


VAT 6% of Total 60.13
IT 4% of Total 40.09
Total: 1002.17

Note : Rates of all items should be inclusive of all supply and carriage. Page: 935 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.03.13 Sand Volumn 0.35 cum/m, minimum FM = 1.5 m


Sand (FM - 1.5) 0.3500 m3 795.00 278.25
H.C. of Casing 0.0350 day 260.00 9.10
H.C. of Tripod and Mechanical Winch Machine complete with 0.0350 day 3000.00 105.00
power unit and accessories
H.C. of Driving Equipment 0.0350 day 350.00 12.25
Operator 0.0350 day 570.00 19.95
Foreman 0.0280 day 800.00 22.40
Skilled Labour 0.1120 day 450.00 50.40
Ordinary Labour 0.0980 day 370.00 36.26
Diesel 2.2260 liter 68.00 151.37
Lubricant 0.0278 liter 220.00 6.12

Subtotal-A: 691.09

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 704.92

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 775.41


VAT 6% of Total 51.69
IT 4% of Total 34.46
Total: 861.56

Note : Rates of all items should be inclusive of all supply and carriage. Page: 936 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.03.14 Sand Volumn 0.35 cum/m, minimum FM = 1.8 m


Sand (FM - 1.8) 0.3500 m3 970.00 339.50
H.C. of Casing 0.0350 day 260.00 9.10
H.C. of Tripod and Mechanical Winch Machine complete with 0.0350 day 3000.00 105.00
power unit and accessories
H.C. of Driving Equipment 0.0350 day 350.00 12.25
Operator 0.0350 day 570.00 19.95
Foreman 0.0280 day 800.00 22.40
Skilled Labour 0.1120 day 450.00 50.40
Ordinary Labour 0.0980 day 370.00 36.26
Diesel 2.2260 liter 68.00 151.37
Lubricant 0.0278 liter 220.00 6.12

Subtotal-A: 752.34

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 767.39

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 844.13


VAT 6% of Total 56.28
IT 4% of Total 37.52
Total: 937.92

Note : Rates of all items should be inclusive of all supply and carriage. Page: 937 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.01.03.15 Sand Volumn 0.35 cum/m, minimum FM = 2.5 m


Sand (FM - 2.5) 0.3500 m3 1500.00 525.00
H.C. of Casing 0.0350 day 260.00 9.10
H.C. of Tripod and Mechanical Winch Machine complete with 0.0350 day 3000.00 105.00
power unit and accessories
H.C. of Driving Equipment 0.0350 day 350.00 12.25
Operator 0.0350 day 570.00 19.95
Foreman 0.0280 day 800.00 22.40
Skilled Labour 0.1120 day 450.00 50.40
Ordinary Labour 0.0980 day 370.00 36.26
Diesel 2.2260 liter 68.00 151.37
Lubricant 0.0278 liter 220.00 6.12

Subtotal-A: 937.84

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 956.60

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1052.26


VAT 6% of Total 70.15
IT 4% of Total 46.77
Total: 1169.18

Note : Rates of all items should be inclusive of all supply and carriage. Page: 938 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.02 Stone Column: Providing and installing cast-in-situ compaction stone


column of speicified diameter and length to increase bearing capacity
and reduce the settlement of construction by driving of suitable MS
casing pipe (removable) having a detachable M.S.shoe (flat/conical) at
the bottom and filling inside the casing pipe in layers of 1m using
1(sand; minimum FM 2.5) : 2(Shingles; Shingles shall be 50mm down
graded) and each layer be well compacted by dynamic compaction
method (before compaction lift the casing for 800mm from bottom and
then the backfill shall be throughly compacted. This procedure shall be
repeated for every layer till the ground level is reached) for ground
improvement including all materials, labour etc complete as per
specification, drawings and as directed by the E-I-C.

4.19.02.01 For 300mm diameter:

Note : Rates of all items should be inclusive of all supply and carriage. Page: 939 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.02.01.01 Fill Volumn 0.2 cum/m m


Stone Shingles (20mm down graded) 0.1333 m3 3500.00 466.55
Sand (FM - 2.5) 0.0667 m3 1500.00 100.05
H.C. of Casing 0.0250 day 260.00 6.50
H.C. of Tripod and Mechanical Winch Machine complete with 0.0250 day 3000.00 75.00
power unit and accessories
H.C. of Driving Equipment 0.0250 day 350.00 8.75
Operator 0.0250 day 570.00 14.25
Foreman 0.0200 day 800.00 16.00
Skilled Labour 0.0800 day 450.00 36.00
Ordinary Labour 0.0700 day 370.00 25.90
Diesel 1.5900 liter 68.00 108.12
Lubricant 0.0199 liter 220.00 4.38

Subtotal-A: 861.50
Other consumables etc. ( +5.00 % on Subtotal-A ) 43.07
Subtotal-A1: 904.57

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 922.66

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1014.93


VAT 6% of Total 67.66
IT 4% of Total 45.11
Total: 1127.70

Note : Rates of all items should be inclusive of all supply and carriage. Page: 940 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.02.01.02 Fill Volumn 0.3 cum/m m


Stone Shingles (20mm down graded) 0.2000 m3 3500.00 700.00
Sand (FM - 2.5) 0.1000 m3 1500.00 150.00
H.C. of Casing 0.0300 day 260.00 7.80
H.C. of Tripod and Mechanical Winch Machine complete with 0.0300 day 3000.00 90.00
power unit and accessories
H.C. of Driving Equipment 0.0300 day 350.00 10.50
Operator 0.0300 day 570.00 17.10
Foreman 0.0240 day 800.00 19.20
Skilled Labour 0.0960 day 450.00 43.20
Ordinary Labour 0.0840 day 370.00 31.08
Diesel 1.9080 liter 68.00 129.74
Lubricant 0.0239 liter 220.00 5.26

Subtotal-A: 1203.88
Other consumables etc. ( +5.00 % on Subtotal-A ) 60.19
Subtotal-A1: 1264.08

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1289.36

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1418.29


VAT 6% of Total 94.55
IT 4% of Total 63.04
Total: 1575.88

4.19.02.02 For 500mm diameter:

Note : Rates of all items should be inclusive of all supply and carriage. Page: 941 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.02.02.01 Fill Volumn 0.6 cum/m m


Stone Shingles (20mm down graded) 0.4000 m3 3500.00 1400.00
Sand (FM - 2.5) 0.2000 m3 1500.00 300.00
H.C. of Casing 0.0300 day 260.00 7.80
H.C. of Tripod and Mechanical Winch Machine complete with 0.0300 day 3000.00 90.00
power unit and accessories
H.C. of Driving Equipment 0.0300 day 350.00 10.50
Operator 0.0300 day 570.00 17.10
Foreman 0.0240 day 800.00 19.20
Skilled Labour 0.0960 day 450.00 43.20
Ordinary Labour 0.0840 day 370.00 31.08
Diesel 1.9080 liter 68.00 129.74
Lubricant 0.0239 liter 220.00 5.26

Subtotal-A: 2053.88
Other consumables etc. ( +5.00 % on Subtotal-A ) 102.69
Subtotal-A1: 2156.58

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2199.71

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2419.68


VAT 6% of Total 161.31
IT 4% of Total 107.54
Total: 2688.53

Note : Rates of all items should be inclusive of all supply and carriage. Page: 942 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.02.02.02 Fill Volumn 0.8 cum/m m


Stone Shingles (20mm down graded) 0.5333 m3 3500.00 1866.55
Sand (FM - 2.5) 0.2667 m3 1500.00 400.05
H.C. of Casing 0.0350 day 260.00 9.10
H.C. of Tripod and Mechanical Winch Machine complete with 0.0350 day 3000.00 105.00
power unit and accessories
H.C. of Driving Equipment 0.0350 day 350.00 12.25
Operator 0.0350 day 570.00 19.95
Foreman 0.0280 day 800.00 22.40
Skilled Labour 0.1120 day 450.00 50.40
Ordinary Labour 0.0980 day 370.00 36.26
Diesel 2.2260 liter 68.00 151.37
Lubricant 0.0278 liter 220.00 6.12

Subtotal-A: 2679.44
Other consumables etc. ( +5.00 % on Subtotal-A ) 133.97
Subtotal-A1: 2813.42

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2869.68

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 3156.65


VAT 6% of Total 210.44
IT 4% of Total 140.30
Total: 3507.39

Note : Rates of all items should be inclusive of all supply and carriage. Page: 943 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.03 Prefabricated Vertical Drain (PVD)/ Wick Drain: Supply & Installation of
prefabricated virtical drains/ wick drains to reduce the preload time & to
accelerate settlement of embankments for bridge approach or roadways
including unrolling the wick drain roll, changing & splicing wick drain
roll, pushing hollow mandrel carrying into the ground carring the wick
drain inside to protect it from tear, cuts and abrasion, providing anchor
plate/ rod at the bottom of the mandrel to prevent soil from entering
the mandrel during installation, maintain the mandrel in a vertical
position, providing a minimum of 30 ton of static push force when
setting on firm ground, installing by specialized wick drain installation
equipment mounted on hydraulic excavator or crane, withdrawn the
mandrel after the installtion of the drain, cost of furnishing all tools,
materials, labour, equipment and all other costs necessary to complete
the work as per design, specification & direction of the E-I-C. Hydraulic
jetting shall not be permitted for installtion of the drains. The locations
and depth of wick drain, sequene of installation will be as directed by
the Engineer and specifications in conjuction with all drawings and logs.
All drains will go to maximum allowable/ anchorable depth or until
refusal as directed in the specification and logs.
Note: Prior to installation of PVD the Contractor shall demonstrate that
the equipment, method, and materials produce a satisfactory installation
in accordance with the specifications. For this purpose, the Contractor
will be required to install 2 trial drains at locations designated by the
Engineer. Trial drains will be paid at the contract unit price unless the
drain is improperly installed. 5% wastage is considered in this unit rate.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 944 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.03.01 SPVD: Prefabricated Vertical Synthetic Drains shall consist of a m


continuous plastic drainage core wrapped in a non-woven
polypropylene/polyester geotexile material having discharge capacity at
240 kPa and Hydraulic Gradient of 1 should be greater than 500 m3/yr
and shall meet the following specifications.
Composite Drain Properties:
Weight (g/m) > 75± 10%, Width(mm) ≥ 100 ± 2, Thickness (mm) >
3.0, Tensile Strength (kN) > 2.2, Elongation at 2.0 kN (%) > 25,
Strength at 10% Elongation (kN) > 1.3
Filter Fabric Properties:
CBR Puncture Resistance (N) > 150, Trapezoidal Tear Strength (N) >
200, Grab Tensile Strength (N) > 550, Apparent opening size(AOS,
O95) (micron) ≤ 90, Permeability/ Permittivity (cm/s) > 200 x 100
Prefabricated Vertical Synthetic Drains (SPVD)- Non-woven 1.0500 m 130.00 136.50
polypropylene/ polyester geotextile
Skilled Labour 0.0030 day 450.00 1.35
Ordinary Labour 0.0182 day 370.00 6.73
Operator 0.0040 day 570.00 2.28
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.0080 day 470.00 3.76
Operator
H.C. of Excavator (Medium Size) 0.0020 day 8880.00 17.76
Diesel 0.2030 liter 68.00 13.80
Lubricant 0.0025 liter 220.00 0.55

Subtotal-A: 182.74
Anchor Plates, Staplers, Stapler Pins and other ( +5.00 % on Subtotal-A ) 9.14
consumables etc.
Subtotal-A1: 191.87

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 195.71

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 215.28


VAT 6% of Total 14.35
IT 4% of Total 9.57
Total: 239.20
Note : Rates of all items should be inclusive of all supply and carriage. Page: 945 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.03.02 PVJD: Prefabricated Vertical Jute Drains (PVJD) shall consist of an outer m
sheath (jacket) made of woven jute geotextile (JGT) with 4-coir wicks
separated by stitched compartments having discharge capacity at 7
days (200 kPa at hydraulic gradient of 1.0) shall be greater than 500
m3/yr and shall meet the following specifications.
Composite Drain Properties:
Width (mm) ≥ 90 ± 10%, Thickness (mm) > 5, Grab Tensile Strength
(N), MD X CD > 350 X 350, Trapezoidal Tear Strength (N), MD X CD >
100 X 100, Puncture Resistance (N) > 100, Burst Strength (N) > 900,
Apparent Opening size (AOS, O95) (micron) ≤ 90.
Filter Fabric Properties:
Equivalent Diameter (mm) > 50.
Prefabricated Vertical Jute Drain (PVJD) - Jute sheath with 1.0500 m 110.00 115.50
coir wick
Skilled Labour 0.0030 day 450.00 1.35
Ordinary Labour 0.0182 day 370.00 6.73
Operator 0.0040 day 570.00 2.28
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.0080 day 470.00 3.76
Operator
H.C. of Excavator (Medium Size) 0.0020 day 8880.00 17.76
Diesel 0.2030 liter 68.00 13.80
Lubricant 0.0025 liter 220.00 0.55

Subtotal-A: 161.74
Anchor Plates, Staplers, Stapler Pins and other ( +5.00 % on Subtotal-A ) 8.09
consumables etc.
Subtotal-A1: 169.82

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 173.22

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 190.54


VAT 6% of Total 12.70
IT 4% of Total 8.47
Total: 211.72

Note : Rates of all items should be inclusive of all supply and carriage. Page: 946 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.04 Khoa Consolidation: 50mm down graded picked jhama Khoa


Consolidation in foundation trenches by mixing in mixture machine with
local sand of min. FM 1.2 incluing/ excluding cement to achieve
minimum dry density of 90% with optimum mositure content (Modified
Proctor Test) including breaking and screening chips, laying and
spreading in 150mm layers uniformly and compacting etc. all complete
and accepted by the E-I-C.

4.19.04.01 Khoa: Sand = 2: 1 cum


1st Class Picked Brick Chips (20mm down graded) 0.9000 m3 2940.00 2646.00
Sand (FM - 1.2) 0.4500 m3 584.00 262.80
Head Mason 0.0883 day 650.00 57.40
Mason 0.2650 day 550.00 145.75
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 0.7500 day 370.00 277.50

Subtotal-A: 3726.95
Other consumables etc. ( +2.50 % on Subtotal-A ) 93.17
Subtotal-A1: 3820.12

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 3896.52

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 4286.17


VAT 6% of Total 285.74
IT 4% of Total 190.50
Total: 4762.41

Note : Rates of all items should be inclusive of all supply and carriage. Page: 947 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.04.02 Cement: Sand: Khoa: = 1:6:12 cum


Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 2.0080 bag 430.00 863.44
1st Class Picked Brick Chips (20mm down graded) 0.8526 m3 2940.00 2506.64
Sand (FM - 1.2) 0.4263 m3 584.00 248.96
Head Mason 0.0883 day 650.00 57.40
Mason 0.2650 day 550.00 145.75
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 0.7500 day 370.00 277.50

Subtotal-A: 4437.19
Other consumables etc. ( +2.50 % on Subtotal-A ) 110.93
Subtotal-A1: 4548.12

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4639.08

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 5102.99


VAT 6% of Total 340.20
IT 4% of Total 226.80
Total: 5669.99

Note : Rates of all items should be inclusive of all supply and carriage. Page: 948 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.05 MSE: Construction of Mechanically Stabilized/Reinforced Earth retaining


walls, viaduct access ramps, road widening and bridge abutments with
pre-cast Facia panels, reinforcing element, foundation beam, caping
beam including excavation for foundation, concreting the foundation
with appropriate groove seating for facing elements, placement of
facing elements, assembling, joining with facing elements, laying of the
reinforcing elements, earth filling with granular material etc. as per
design, drawing, specification and direction of Engineer-in-charge.
Contractor shall submit the methodology of reinforced earth work to the
Engineer-in-Charge for approval before commencing the work.
Notes:
i) Drainage arrangement including filter media shall be made as per
approved design & drawings and calculated separately.
ii) The rates for excavation and foundation concrete shall be taken from
section 5 & 9 of Bridge Works.
iii) The earth fill to be retained is not included in this analysis which is to
be worked out and provide separately.
iv) Capping beam is to be priced separately as per approved design.
The rate for cement concrete shall be taken from the section 7 of bridge
works.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 949 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.05.01 MSE_FP: Providing, hoisting and placing of pre-cast RCC Facia Panels of sqm
minimum 0.80 sqm area and 180mm thickness, made with minimum 35
MPa concrete inclusive of reinforcement, shuttering, casting in yard,
curing, storing, transporting, lifting, placing in position, erection with all
necessary accessories i.e., rubber pad, universal hook, anchor block,
nut, washer, joint fillers, fasteners etc. complete in all respect as per
approved drawing, specification and direction of Engineer-in-charge.
RCC-35SCBP: Reinforced cement concrete work with 0.1800 cum 11961.63 2153.09
minimum cement content and maximum water cement ratio
as specified by the laboratory through mix design having
minimum required average compressive
str.............4.09.06.01
Supplying and fabrication of Ribbed or deformed bar 5.0000 kg 64.65 323.25
reinforcement conforming to BDS ISO 6935-2:2006 (Grade
500)………….(4.11.01.04)
Mason 0.0100 day 550.00 5.50
Skilled Labour 0.0200 day 450.00 9.00
Ordinary Labour 0.0400 day 370.00 14.80
H.C. of KATO Mobile Crane (upto 5 ton) 0.0600 day 4000.00 240.00

Subtotal-A: 2745.64
For all necessary temporary form work, scaffolding ( +30.00 % on Subtotal-A ) 823.69
and provision of loops/lugs for lifting of pannels
and joining the reinforcing elements
Subtotal-A1: 3569.34

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 3640.72

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 4004.79


VAT 6% of Total 266.99
IT 4% of Total 177.99
Total: 4449.77

Note : Rates of all items should be inclusive of all supply and carriage. Page: 950 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.05.02 Reinforcing Elements: Providing, assembling, joining with facing


elements and laying of reinforcing elements (metal strip/geotextile/steel
etc.) in the form of grid or strip or strap or combination of metallic or
synthetic or any other proprietary material as per approved drawing,
specification and direction of Engineer-in-Charge. The packaging of
reinforcing elements shall clearly indicate the name of the
manufacturer/ supplier and brand name, date of production, expiry, if
any and batch identification number along with the manufacturers test
certificates.

4.19.05.02.01 MSE_MSR_GCS: With reinforcing elements of Galvanised carbon steel m


strips of 60mm wide and 5mm thick with minimum bearing and shear
strength of 490 MPa conforming to BS EN 10025, Grade S 355 JR. The
fabricated element shall be galvanized and the minimum zinc coating
weight shall not be less than 1000gm/sqm.
Reinforcement strips 60 mm wide 5 mm thick Galvanised 1.1000 m 800.00 880.00
carbon steel strips
Foreman 0.0020 day 800.00 1.60
Skilled Labour 0.0100 day 450.00 4.50
Ordinary Labour 0.0200 day 370.00 7.40

Subtotal-A: 893.50
Cost of accessories for joining reinforcing elements ( +10.00 % on Subtotal-A ) 89.35
with the facia panels, overlaps, heat bonding or
extension.
Subtotal-A1: 982.85

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1002.51

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1102.76


VAT 6% of Total 73.52
IT 4% of Total 49.01
Total: 1225.29

Note : Rates of all items should be inclusive of all supply and carriage. Page: 951 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.05.02.02 MSE_MSR_Cu: With reinforcing element of Copper Strips of 60mm wide m


and 5mm thick conforming to BS 2870 quality C 101 or C 102 in the
1/2H condition and shall have 0.2 percent proof stress of not less than
180 MPa.
Reinforcement strips 60 mm wide 5 mm thick Copper Strips 1.1000 m 800.00 880.00
Foreman 0.0020 day 800.00 1.60
Skilled Labour 0.0100 day 450.00 4.50
Ordinary Labour 0.0200 day 370.00 7.40

Subtotal-A: 893.50
Cost of accessories for joining reinforcing elements ( +10.00 % on Subtotal-A ) 89.35
with the facia panels, overlaps, heat bonding or
extension.
Subtotal-A1: 982.85

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1002.51

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1102.76


VAT 6% of Total 73.52
IT 4% of Total 49.01
Total: 1225.29

Note : Rates of all items should be inclusive of all supply and carriage. Page: 952 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.05.02.03 MSE_MSR_Al: With reinforcing elements of Aluminium Strips of 60mm m


wide and 5mm thick conforming to Bs 1470 quality 5454 in H 24
condition.
Reinforcement strips 60 mm wide 5 mm thick Aluminium 1.1000 m 400.00 440.00
strips
Foreman 0.0020 day 800.00 1.60
Skilled Labour 0.0100 day 450.00 4.50
Ordinary Labour 0.0200 day 370.00 7.40

Subtotal-A: 453.50
Cost of accessories for joining reinforcing elements ( +10.00 % on Subtotal-A ) 45.35
with the facia panels, overlaps, heat bonding or
extension.
Subtotal-A1: 498.85

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 508.83

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 559.71


VAT 6% of Total 37.31
IT 4% of Total 24.88
Total: 621.90

Note : Rates of all items should be inclusive of all supply and carriage. Page: 953 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.05.02.04 MSE_MSR_SS: With reinforcing element of Stainless steel strips of m


60mm wide and 5mm thick.
Reinforcement strips 60 mm wide 5 mm thick Stainless steel 1.1000 m 400.00 440.00
strips
Foreman 0.0020 day 800.00 1.60
Skilled Labour 0.0100 day 450.00 4.50
Ordinary Labour 0.0200 day 370.00 7.40

Subtotal-A: 453.50
Cost of accessories for joining reinforcing elements ( +10.00 % on Subtotal-A ) 45.35
with the facia panels, overlaps, heat bonding or
extension.
Subtotal-A1: 498.85

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 508.83

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 559.71


VAT 6% of Total 37.31
IT 4% of Total 24.88
Total: 621.90

Note : Rates of all items should be inclusive of all supply and carriage. Page: 954 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.05.02.05 MSE_MSR_FRP: with reinforcing element of Glass reinforced polymer/ m


fibre reinforced polymer/ polymeric strips of 60mm wide and 5mm thick.
Reinforcement strips 60 mm wide 5 mm thick Glass 1.1000 m 800.00 880.00
reinforced polymer/ fibre reinforced polymer/ polymeric strips
Foreman 0.0020 day 800.00 1.60
Skilled Labour 0.0100 day 450.00 4.50
Ordinary Labour 0.0200 day 370.00 7.40

Subtotal-A: 893.50
Cost of accessories for joining reinforcing elements ( +10.00 % on Subtotal-A ) 89.35
with the facia panels, overlaps, heat bonding or
extension.
Subtotal-A1: 982.85

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1002.51

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1102.76


VAT 6% of Total 73.52
IT 4% of Total 49.01
Total: 1225.29

Note : Rates of all items should be inclusive of all supply and carriage. Page: 955 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.05.02.06 MSE_GTR: With reinforcing elements of synthetic geogrids. sqm


Synthetic Geogrids as per approved design and specifications 1.1000 sqm 180.00 198.00
Foreman 0.0020 day 800.00 1.60
Skilled Labour 0.0100 day 450.00 4.50
Ordinary Labour 0.0200 day 370.00 7.40

Subtotal-A: 211.50
Cost of accessories for joining reinforcing elements ( +10.00 % on Subtotal-A ) 21.15
with the facia panels, overlaps and other
protective elements for synthetic geogrids.
Subtotal-A1: 232.65

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 237.30

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 261.03


VAT 6% of Total 17.40
IT 4% of Total 11.60
Total: 290.04

Note : Rates of all items should be inclusive of all supply and carriage. Page: 956 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.05.02.07 MSE_HDGSR: With reinforcing elements of high yield ribbed/ deformed kg


steel reinforcement complying with BDS ISO 6935-2: 2006 and fully hot-
dip Galvanized to BS EN ISO 1461: 1999 with minimum coat thickness
of 85 microns or 610 gm per meter squre surface.
Foreman 0.0020 day 800.00 1.60
Skilled Labour 0.0100 day 450.00 4.50
Ordinary Labour 0.0200 day 370.00 7.40
M.S. Ribbed/ Deformed Bar (Grade 500) 1.1000 kg 57.00 62.70
Hot-dip Galvanizing in accordance with BS EN ISO 1461: 1.1000 kg 65.00 71.50
1999 with minimum coat thickness of 85 microns or 610 gm
per square meter

Subtotal-A: 147.70

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 150.65

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 165.72


VAT 6% of Total 11.05
IT 4% of Total 7.37
Total: 184.13

Note : Rates of all items should be inclusive of all supply and carriage. Page: 957 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.05.03 MSE_BF: Backfill with selected granular material in layers in approaches cum
of work over metal strip/synthetic geogrid/steel which is to be retained
by mechanically stabilized/ reinforced earth wall including grading,
placement and compaction complete as per drawing, Technical
specification and as directed by the Engineer-in-charge. The backfill
material shall be clean, free draining, granular with high friction and low
cohesion having particle size not more than 100mm and angle of
internal friction not less than 34 degree, plasticity index shall not exceed
6 as determined by AASHTO T 90, non-corrosive, coarse grained with
not 10 per cent of particles passing 75 micron sieve, free of shale or
other soft, poor durability particles, any deleterious matter, chlorides,
salts, acids, alkalies, mineral oil, fungus and microbes and pH shall be
between 5.0 to 10.0 as determined by AASHTO T 289. The backfill
material shall be compacted for AASHTO T 236 to 95 percent of the
maximum density determined according to AASHTO T 99 method C or D
and corrected for oversized material according to AASHTO T 99, Note 9.
1st Class Picked Brick Bats 0.6650 m3 2150.00 1429.75
Sand (FM - 1.0) 0.6650 m3 567.00 377.06
Ordinary Labour 0.5000 day 370.00 185.00
H.C. of Plate Compactor (LF-72) 0.0313 day 850.00 26.61
H.C. of Water Tanker (Towed by Tractor) 0.0020 day 1500.00 3.00

Subtotal-A: 2021.41

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2061.84

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2268.02


VAT 6% of Total 151.20
IT 4% of Total 100.80
Total: 2520.02

Note : Rates of all items should be inclusive of all supply and carriage. Page: 958 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.06 Jet Grouting: Execution of Jet grouted pile including mobilization &
demobilization of Jet Grouting Machine, cost of furnishing all materials,
labour and equipment necessary to complete the work, cost of trial
columns, coring, testing and disposal of waste materials. Every
completed jet grouted column/s shall be supported with Jet Grout Pile
Data. No separate payment shall be made for drilling holes,
washing/cleaning of holes, placing grout, labor, equipment, processing,
mixing, hooking-up to the hole, injecting grout, hole closures, clearing
up, cost of furnishing samples of grouting materials, providing
assistance for sampling including verification testing, all of which shall
be considered part of the Work of jet grouting.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 959 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.06.01 JGC_600: Diameter of Jet grouted column = 600mm m


Hire and running charges of Jet Grout Machine with power 0.0130 Day 20000.00 260.00
unit including High-Pressure Jet Grout Pump, Air compressor,
mixing plant and other accessories and shifting at site
Ordinary Portland Cement (CEM I, 52.5N) 3.9600 bag 455.00 1801.80
Skilled Labour 0.0270 day 450.00 12.15
Foreman 0.0130 day 800.00 10.40
Operator 0.0130 day 570.00 7.41
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.0270 day 470.00 12.69
Operator
Skilled Labour 0.0130 day 450.00 5.85
Ordinary Labour 0.1330 day 370.00 49.21

Subtotal-A: 2159.51
Other consumables etc. ( +10.00 % on Subtotal-A ) 215.95
Subtotal-A1: 2375.46

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2422.97

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2665.27


VAT 6% of Total 177.68
IT 4% of Total 118.46
Total: 2961.41

Note : Rates of all items should be inclusive of all supply and carriage. Page: 960 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.06.02 JGC_800: Diameter of Jet grouted column = 800 mm m


Hire and running charges of Jet Grout Machine with power 0.0240 Day 20000.00 480.00
unit including High-Pressure Jet Grout Pump, Air compressor,
mixing plant and other accessories and shifting at site
Ordinary Portland Cement (CEM I, 52.5N) 7.0400 bag 455.00 3203.20
Skilled Labour 0.0470 day 450.00 21.15
Foreman 0.0240 day 800.00 19.20
Operator 0.0240 day 570.00 13.68
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.0470 day 470.00 22.09
Operator
Skilled Labour 0.0240 day 450.00 10.80
Ordinary Labour 0.2370 day 370.00 87.69

Subtotal-A: 3857.81
Other consumables etc. ( +10.00 % on Subtotal-A ) 385.78
Subtotal-A1: 4243.59

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 4328.46

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 4761.31


VAT 6% of Total 317.42
IT 4% of Total 211.61
Total: 5290.34

Note : Rates of all items should be inclusive of all supply and carriage. Page: 961 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.06.03 JGC_1000: Diameter of Jet grouted column = 1000 mm m


Hire and running charges of Jet Grout Machine with power 0.0370 Day 20000.00 740.00
unit including High-Pressure Jet Grout Pump, Air compressor,
mixing plant and other accessories and shifting at site
Ordinary Portland Cement (CEM I, 52.5N) 11.0000 bag 455.00 5005.00
Skilled Labour 0.0740 day 450.00 33.30
Foreman 0.0370 day 800.00 29.60
Operator 0.0370 day 570.00 21.09
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.0740 day 470.00 34.78
Operator
Skilled Labour 0.0370 day 450.00 16.65
Ordinary Labour 0.3700 day 370.00 136.90

Subtotal-A: 6017.32
Other consumables etc. ( +10.00 % on Subtotal-A ) 601.73
Subtotal-A1: 6619.05

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 6751.43

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 7426.58


VAT 6% of Total 495.11
IT 4% of Total 330.07
Total: 8251.75

Note : Rates of all items should be inclusive of all supply and carriage. Page: 962 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.06.04 JGC_1200: Diameter of Jet grouted column = 1200 mm m


Hire and running charges of Jet Grout Machine with power 0.0530 Day 20000.00 1060.00
unit including High-Pressure Jet Grout Pump, Air compressor,
mixing plant and other accessories and shifting at site
Ordinary Portland Cement (CEM I, 52.5N) 15.8400 bag 455.00 7207.20
Skilled Labour 0.1070 day 450.00 48.15
Foreman 0.0530 day 800.00 42.40
Operator 0.0530 day 570.00 30.21
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.1070 day 470.00 50.29
Operator
Skilled Labour 0.0530 day 450.00 23.85
Ordinary Labour 0.5330 day 370.00 197.21

Subtotal-A: 8659.31
Other consumables etc. ( +10.00 % on Subtotal-A ) 865.93
Subtotal-A1: 9525.24

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9715.75

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 10687.32


VAT 6% of Total 712.49
IT 4% of Total 474.99
Total: 11874.80

Note : Rates of all items should be inclusive of all supply and carriage. Page: 963 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.07 Soil Nailing: Supply and installation of soil nail of specified diameter,
spacing and length as shown in drawings including setting-up, drilling in
soil or rock, galvanized re-bar, centralizers, grout injection (30 MPa
Concrete) as specified in specification. Works also include supply and fix
nail head and all necessary works for proper completion including UPVC
pipe as casing required for soil nailing work.
The constractor shall submit the Methodology for the installtion of Soil
Nail to the Engineer-in-charge for prior written approval (at least 7
days) before the commencement of works.
The constractor shall keep records for each soil nail installation and
submit one signed copy to the Engineer not later than next working day
after the soil nails have been installed. The record for each soil nail shall
include soil nail reference number, date/time of commencement and
completion of drilling and grouting, names of supervisor and operators,
the necessary drilling and grouting details etc.
Only dry type drilling equipment shall be used to minimize slope
disturbance.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 964 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.07.01 Diameter of Drill Hole: 100 mm, Diameter of Re-bar = 25mm (Grade m
500, conforming to BDS ISO 6935-2:2006)
Hire and running charges for horizontal/inclined rock drilling 0.0110 day 20000.00 220.00
machine (Diameter of Drill Hole = 125mm)
H.C. of Grout pump with agitator & accessories 0.0440 hour 200.00 8.80
H.C. of Generator (40 KVA) 0.0060 day 2500.00 15.00
Ordinary Portland Cement (CEM I, 52.5N) 0.1110 bag 455.00 50.51
M.S. Ribbed/ Deformed Bar (Grade 500) 4.3330 kg 57.00 246.98
Hot-dip Galvanizing in accordance with BS EN ISO 1461: 4.3330 kg 65.00 281.65
1999 with minimum coat thickness of 85 microns or 610 gm
per square meter
Nails/ Nut bolts/ Screw/ Spikes 0.5560 kg 65.00 36.14
PVC Centralizers for Soil Nails 0.3330 each 50.00 16.65
Skilled Labour 0.0440 day 450.00 19.80
Foreman 0.0110 day 800.00 8.80
Operator 0.0110 day 570.00 6.27
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.0220 day 470.00 10.34
Operator
Ordinary Labour 0.0670 day 370.00 24.79

Subtotal-A: 945.72
Other consumables etc. ( +10.00 % on Subtotal-A ) 94.57
Subtotal-A1: 1040.29

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1061.10

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1167.21


VAT 6% of Total 77.81
IT 4% of Total 51.88
Total: 1296.90

Note : Rates of all items should be inclusive of all supply and carriage. Page: 965 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.08 Conducting pull out test for soil nail to 1.5 × Working Load or as LS
specified by E-I-C providing all necessary resources including all torque
wrenhches, jacks, gauges, reaction frame, pump, load cell, bearing
plates, and other equipment required to carry out the pull-out test of
the soil nails as specified in Engineer's specification. The complete
jacking system including hydraulic jack, pump and pressure gauge
should be calibrated as single unit before use to an accuracy of not less
than 5% of the applied load.

4.19.09 Anchor Bar: Fixing anchor bars upto 28mm. dia to the founding level at
rock strata as per approved design including cost, conveyance & all
taxes of all materials and T&P required for the work but excluding cost
of TS rod & labour charges for bending, binding, tying the grills &
placing in position as per specification & direction of Engineer-in-Charge.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 966 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.09.01 With G.I/MS pipe nos


MS Pipe (50mm dia, 2.35mm thick) 1.0000 m 407.00 407.00
50mm dia end cap 0.0667 each 74.00 4.94
50mm Dia MS Socket 0.1333 Nos. 150.00 20.00
PVC tape 0.1667 each 15.00 2.50
Construction Water 0.0042 KL 500.00 2.10
H.C. of Generator (150 KVA) 0.0042 day 5000.00 21.00
H.C. of Water Tanker (Truck Mounted) 0.0167 day 2500.00 41.75
Diesel 0.4583 liter 68.00 31.16
Foreman 0.0083 day 800.00 6.64
Re-bar Fabricator 0.0167 day 570.00 9.52
Skilled Labour 0.0250 day 450.00 11.25
Ordinary Labour 0.0500 day 370.00 18.50
Pump Operator 0.0042 day 500.00 2.10
Pump Operator Helper 0.0042 day 350.00 1.47

Subtotal-A: 579.92
MS pipe Thread 40mm long including Tools & ( +7.50 % on Subtotal-A ) 43.49
Equipment
Subtotal-A1: 623.42

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 635.89

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 699.48


VAT 6% of Total 46.63
IT 4% of Total 31.09
Total: 777.20

Note : Rates of all items should be inclusive of all supply and carriage. Page: 967 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.10 Rock Drilling: Drilling hole of specified length and diameter (more than
150mm diameter) below foundation bed at weathered rock/rock strata
in flat/slopping ground by special drilling equipment with diamond drill
bit including mobilization & demobilization of drilling equipment, setting-
up, drilling in rock as per drawing, specification & direction of Engineer-
in-Charge.
The constractor shall submit the Methodology for the drilling holes in
rock to the Engineer-in-charge for prior written approval (at least 7
days) before the commencement of works.

4.19.10.01 RD_250: Diameter of Drill Hole: 250 mm m


Hire and running charges for rock drilling machine (Diameter 0.1250 day 46000.00 5750.00
of Drill Hole = 250 - 300mm)
H.C. of Generator (40 KVA) 0.0630 day 2500.00 157.50
Skilled Labour 0.2500 day 450.00 112.50
Foreman 0.1250 day 800.00 100.00
Operator 0.1250 day 570.00 71.25
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.2500 day 470.00 117.50
Operator
Ordinary Labour 0.7500 day 370.00 277.50

Subtotal-A: 6586.25
Other consumables etc. ( +10.00 % on Subtotal-A ) 658.63
Subtotal-A1: 7244.88

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 7389.77

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 8128.75


VAT 6% of Total 541.92
IT 4% of Total 361.28
Total: 9031.94

Note : Rates of all items should be inclusive of all supply and carriage. Page: 968 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

4.19.10.02 RD_300: Diameter of Drill Hole: 300 mm m


Hire and running charges for rock drilling machine (Diameter 0.1430 day 46000.00 6578.00
of Drill Hole = 250 - 300mm)
H.C. of Generator (40 KVA) 0.0710 day 2500.00 177.50
Skilled Labour 0.2860 day 450.00 128.70
Foreman 0.1430 day 800.00 114.40
Operator 0.1430 day 570.00 81.51
Helper of Plumber/ Electric Mistry/ Painter/ Carpenter/ 0.2860 day 470.00 134.42
Operator
Ordinary Labour 0.8570 day 370.00 317.09

Subtotal-A: 7531.62
Other consumables etc. ( +10.00 % on Subtotal-A ) 753.16
Subtotal-A1: 8284.78

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 8450.48

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 9295.53


VAT 6% of Total 619.70
IT 4% of Total 413.13
Total: 10328.36

Note : Rates of all items should be inclusive of all supply and carriage. Page: 969 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Chapter - 5 : Building Works

5.01.01 Providing Layout and carry over Bench Mark (BM) at site from nearby sqm
BM pillar, demarcating property lines, existing ground level (EGL),
formation ground level (FGL), highest flood level (HFL), plinth level (PL).
Setting and marking all pillars, markers, pegs etc. showing and
maintaining reduced levels (RLs) including locating, establishing,
protecting all public utilities within the premise of work and finally all to
be presented in black and white etc. all complete as per direction of the
E-I-C.
Surveyor 0.0022 day 1400.00 3.08
Surveyor Helper 0.0022 day 800.00 1.76
H. C. of Level/Theodolite 0.0022 day 600.00 1.32
Ordinary Labour 0.0044 day 370.00 1.63

Subtotal-A: 7.79
Construction & Protect bench-mark, test pit,tools- ( +20.00 % on Subtotal-A ) 1.56
plants, etc
Subtotal-A1: 9.35

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9.53

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 10.49


VAT 6% of Total 0.70
IT 4% of Total 0.47
Total: 11.65

Note : Rates of all items should be inclusive of all supply and carriage. Page: 970 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.02.01 Earthwork in excavation of foundation trenches, including layout, by cum


excavating earth to the lines, grades and elevation as shown in the
drawing providing center lines, local bench mark pillars, fixing bamboo
spikes and marking layout with chalk powder filling baskets, carrying
and disposing of all excavated materials at a safe distance designated
by the E-I-C in all types of soils except rocky, gravelly, slushy or organic
soil, leveling, ramming, dressing and preparing the base, etc. all
complete for an initial excavation depth of 2m and an initial lead not
exceeding 20m, including arranging all necessary tools and equipment
at work site, etc. complete as per direction of the E-I-C.
Ordinary Labour 0.3000 day 370.00 111.00
Mason 0.0250 day 550.00 13.75

Subtotal-A: 124.75

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 127.25

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 139.97


VAT 6% of Total 9.33
IT 4% of Total 6.22
Total: 155.52

Note : Rates of all items should be inclusive of all supply and carriage. Page: 971 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.02.02 Sand filling in foundation trenches and inside plinth with sand cum
(minimum FM 0.50) in 150mm layers in/c leveling, watering and
consolidating each layer up to finished level etc. all complete as per
direction of the E-I-C. Dry density after compaction shall not be less
than 95% of MDD (STD).
Sand (FM - 0.5) 1.1500 m3 420.00 483.00
Ordinary Labour 0.3000 day 370.00 111.00

Subtotal-A: 594.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 605.88

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 666.47


VAT 6% of Total 44.43
IT 4% of Total 29.62
Total: 740.52

5.02.03 Sand filling in foundation trenches and inside plinth with sand (minimum cum
FM 0.80) in 150mm layers in/c leveling, watering and consolidating each
layer up to finished level etc. all complete as per direction of the E-I-C.
Dry density after compaction shall not be less than 95% of MDD (STD).
Sand (FM - 0.8) 1.1500 m3 480.00 552.00
Ordinary Labour 0.3000 day 370.00 111.00

Subtotal-A: 663.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 676.26

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 743.89


VAT 6% of Total 49.59
IT 4% of Total 33.06
Total: 826.54

Note : Rates of all items should be inclusive of all supply and carriage. Page: 972 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.02.04 Sand filling in foundation trenches and inside plinth with sand (minimum cum
FM 1.20) in 150mm layers in/c leveling, watering and consolidating each
layer up to finished level, etc. all complete as per direction of the E-I-C.
(to be used only if required by the design). Dry density after compaction
shall not be less than 95% of MDD (STD).
Sand (FM - 1.2) 1.1500 m3 584.00 671.60
Ordinary Labour 0.3000 day 370.00 111.00

Subtotal-A: 782.60

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 798.25

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 878.08


VAT 6% of Total 58.54
IT 4% of Total 39.03
Total: 975.64

5.02.05 Sand filling in foundation trenches and inside plinth with sand (minimum cum
FM 2.50) in 150mm layers in/c leveling, watering and consolidating each
layer up to finished level etc. all complete as per direction of the E-I-C.
(to be used only required by the design). Dry density after compaction
shall not be less than 95% of MDD (STD).
Sand (FM - 2.5) 1.1500 m3 1500.00 1725.00
Ordinary Labour 0.3000 day 370.00 111.00

Subtotal-A: 1836.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1872.72

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2059.99


VAT 6% of Total 137.33
IT 4% of Total 91.56
Total: 2288.88

Note : Rates of all items should be inclusive of all supply and carriage. Page: 973 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.02.06 Earth filling inside plinth in 150mm layers with earth available within cum
90m of the building site, watering, leveling and consolidating each layer
up to finished level, etc. all complete as per direction of the E-I-C.. Dry
density after compaction shall not be less than 90% of MDD (STD).
Sardar 0.0040 day 800.00 3.20
Ordinary Labour 0.8600 day 370.00 318.20

Subtotal-A: 321.40

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 327.83

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 360.61


VAT 6% of Total 24.04
IT 4% of Total 16.03
Total: 400.68

5.02.07 Site improvement/earth filling in foundation trenches and plinth with


specified soil in/c supplying, carrying, filling by throwing earth in 150mm
layers with carted earth carried by truck or any other means to be
supplied at the contractor’s own cost etc. all complete as per direction
of the E-I-C. (Carried from a distance beyond 200m).

Note : Rates of all items should be inclusive of all supply and carriage. Page: 974 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.02.07.1 Municipal Area. cum


Ordinary Labour 0.5000 day 370.00 185.00
Sardar 0.0040 day 800.00 3.20
H.C. of Flat Body Truck (3 tons) 0.0200 day 2000.00 40.00
Royalty of Earth (Within Municipal Area) 1.2000 m3 50.00 60.00

Subtotal-A: 288.20

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 293.96

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 323.36


VAT 6% of Total 21.56
IT 4% of Total 14.37
Total: 359.29

5.02.07.2 Outside municipal area. cum


Ordinary Labour 0.5000 day 370.00 185.00
Sardar 0.0040 day 800.00 3.20
H.C. of Flat Body Truck (3 tons) 0.0200 day 2000.00 40.00
Royalty of Earth (Outside Municipal Area) 1.2000 m3 35.00 42.00

Subtotal-A: 270.20

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 275.60

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 303.16


VAT 6% of Total 20.21
IT 4% of Total 13.47
Total: 336.85

Note : Rates of all items should be inclusive of all supply and carriage. Page: 975 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.02.08 Manual compaction of earth in 150mm thick compacted layers by cum


breaking clods to a maximum size of 25mm using wooden drag or
ladder and compacting using concrete drop hammer (Durmus), watering
or drying to obtain optimum moisture content if necessary including
supplying of wooden drag, ladder, bamboo hammer, steel/concrete
hammer and other requisite tools, etc. all complete as per direction of
the E-I-C. 85% compaction of the maximum dry density is to be
obtained by the standard compaction test (Rate is for each layer of
150mm thick)
Ordinary Labour 0.0800 day 370.00 29.60

Subtotal-A: 29.60

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 30.19

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 33.21


VAT 6% of Total 2.21
IT 4% of Total 1.48
Total: 36.90

Note : Rates of all items should be inclusive of all supply and carriage. Page: 976 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.02.09 Mechanical compaction of earthworks in 150mm thick compacted layers cum


by breaking clods to a maximum size of 25mm using wooden drag or
ladder and compacting using mechanical equipment, watering or drying
to obtain optimum moisture content watering if necessary including the
equipment and other tools required to work site, etc. all complete as per
direction of the E-I-C. 98% compaction of the maximum dry density is
to be obtained by the standard compaction test (Rate is for each layer
of 150mm thick).
Ordinary Labour 0.0250 day 370.00 9.25
H.C. of Vibratory Road Roller (8-10 ton) 0.0070 day 3000.00 21.00
Diesel 0.0300 liter 68.00 2.04
Lubricant 0.0025 liter 220.00 0.55

Subtotal-A: 32.84

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 33.50

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 36.85


VAT 6% of Total 2.46
IT 4% of Total 1.64
Total: 40.94

Note : Rates of all items should be inclusive of all supply and carriage. Page: 977 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.02.10 Supplying of straight and strong borrak bamboo posts of having m


minimum 75 mm diameter although and driving the same vertically in
the ground up to required depth by any means shaping the top of the
post, all complete and as directed by the Engineer.
Borak Bamboo (75mm dia) 1.0000 m 38.00 38.00

Subtotal-A: 38.00
Driving and carriage cost ( +33.00 % on Subtotal-A ) 12.54
Subtotal-A1: 50.54

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 51.55

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 56.71


VAT 6% of Total 3.78
IT 4% of Total 2.52
Total: 63.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 978 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.02.11 Supplying wooden ballah having an average diameter not less then 150 m
mm (without barks) at one third distance from large end with a
minimum end diameter of 100 mm for retaining purpose and driving to
a depth as per design drawing by any method including all arrangement
for staging. hoisting, carrying etc. complete and as directed by the E-I-C.
Shal/sundari/gazari Bullah (150mm to 200mm) 1.0000 m 225.00 225.00
Skilled Labour 0.1640 day 450.00 73.80
Ordinary Labour 0.5000 day 370.00 185.00

Subtotal-A: 483.80
Removing of skin, sizinf and coaltaring i/c hire ( +6.80 % on Subtotal-A ) 32.90
charge of monkey with driving arrangement.
Subtotal-A1: 516.70

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 527.03

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 579.74


VAT 6% of Total 38.65
IT 4% of Total 25.77
Total: 644.15

Note : Rates of all items should be inclusive of all supply and carriage. Page: 979 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.02.12 Palisading work by Supplying bitumen drum sheet walling tied with 20 sqm
BWG G. I wire fixing the same with alredy driven borrak bamboo posts
with half split borrak bamboo runners @ 450mm c/c horizontally with
iron nails. G.I wire etc. all complete and as directed by the E-I-C.. (Rate
is excluding the cost of bamboo post)
Borak Bamboo (75mm dia) 1.3100 m 38.00 49.78
Bitumen Drum Sheet 1.4500 m2 269.00 390.05
Skilled Labour 0.1500 day 450.00 67.50
Ordinary Labour 0.2200 day 370.00 81.40

Subtotal-A: 588.73
Nails, gozzal and wire, local cariage, etc ( +16.00 % on Subtotal-A ) 94.20
Subtotal-A1: 682.93

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 696.59

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 766.24


VAT 6% of Total 51.08
IT 4% of Total 34.06
Total: 851.38

Note : Rates of all items should be inclusive of all supply and carriage. Page: 980 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.02.13 Supplying and fitting – fixing horizontal barcing in palisading with ½ m


split wooden ballah having an average diameter not less then 150 mm
with a minimum end diameter of 100 mm @ 450 mm c/c including
supply of iron nails, gazals etc. complete as directed approved and
accepted by the E-I-C.
Shal/sundari/gazari Bullah (150mm to 200mm) 1.0000 m 225.00 225.00
Skilled Labour 0.0420 day 450.00 18.90
Ordinary Labour 0.0420 day 370.00 15.54

Subtotal-A: 259.44
Gajals,nails and wires, etc. ( +6.00 % on Subtotal-A ) 15.57
Subtotal-A1: 275.01

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 280.51

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 308.56


VAT 6% of Total 20.57
IT 4% of Total 13.71
Total: 342.84

Note : Rates of all items should be inclusive of all supply and carriage. Page: 981 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.02.14 Shore protection work during excavation in foundation trenches up to sqm


1.5 m depth, to protect loose soil due to damage of property by
supplying Bitumen drum sheet walling tied with 20 gauge G. I wire,
fixing the same with already driven bamboo posts with half split Borrak
bamboo runners @450mm c/c horizontally with iron nail, G.I wire etc.
all complete as plan and direction of E-I-C. (the rate is including cost of
vertical posts)
Bitumen Drum Sheet 1.0000 m2 269.00 269.00
Borak Bamboo (50mm dia) 1.5000 m 30.00 45.00
Skilled Labour 0.1500 day 450.00 67.50
Ordinary Labour 0.2200 day 370.00 81.40
Nails/ Nut bolts/ Screw/ Spikes 0.0500 kg 65.00 3.25
GI Wire (22 BWG) 0.1000 kg 90.00 9.00

Subtotal-A: 475.15

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 484.65

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 533.12


VAT 6% of Total 35.54
IT 4% of Total 23.69
Total: 592.35

Note : Rates of all items should be inclusive of all supply and carriage. Page: 982 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.02.15 Shore protection work during excavation in foundation trenches to sqm


protect loose soil due to damage of property with bitumen drum sheet
fitted with gazari post 150mm minimum dia, 0.90m c/c to be driven half
of the total length of the post Drum sheet to be fitted with Garzan
wooden batten 50mmx50mm size at 0.60 meter c/c supplying and fixing
with 150mm dia gazari post crosses 1.80 meter c/c fixed with necessary
nuts and bolts at the slope side of palisading and tied up the palisading
work by GI wire No. 10 with gazari past 150mm dia and 1.8 meter c/c
driven at the opposite direction up to 1.20 meter depth including
supplying all necessary nails and spikes etc. complete as per direction of
E-I-C. (Payment will be made for the work above ground levels.).(the
rate is including cost of vertical posts)
Bitumen Drum Sheet 1.0000 m2 269.00 269.00
Shal/sundari/gazari Bullah (150mm to 200mm) 2.4700 m 225.00 555.75
Sundari/ Garzen 0.0010 m3 67580.00 67.58
Skilled Labour 0.1000 day 450.00 45.00
Ordinary Labour 0.0600 day 370.00 22.20
Nails/ Nut bolts/ Screw/ Spikes 0.3600 kg 65.00 23.40
GI Wire (22 BWG) 0.2000 kg 90.00 18.00

Subtotal-A: 1000.93

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1020.95

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1123.04


VAT 6% of Total 74.87
IT 4% of Total 49.91
Total: 1247.83

Note : Rates of all items should be inclusive of all supply and carriage. Page: 983 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.03.01.01 Single layer brick flat soling with 1st class or picked bricks, true to level, sqm
camber/super elevation and grade including carrying bricks, filling the
interstices tightly with sand of minimum FM 0.80, etc. all complete as
per direction of the E-I-C.
Sand (FM - 0.8) 0.0120 m3 480.00 5.76
Mason 0.0250 day 550.00 13.75
Ordinary Labour 0.1000 day 370.00 37.00
1st Class Brick 31.0000 each 9.00 279.00

Subtotal-A: 335.51

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 342.22

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 376.44


VAT 6% of Total 25.10
IT 4% of Total 16.73
Total: 418.27

Note : Rates of all items should be inclusive of all supply and carriage. Page: 984 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.03.01.02 SCBFS (FM-0.80) Providing Single Layer Solid Concrete Block Flat Soling sqm
(SCBFS) with Solid Concrete Blocks having minimum compressive
strength of 20 Mpa, true to level, maintaining camber/super elevation
and grade including filling the interstices tightly with sand of minimum
FM 0.80, etc. all complete in all respect as per approved drawing,
specification and direction of the Engineer-in-charg.
Solid Concrete Block Size (240mmx110mmx70mm to
(215mmx100mmx70mm
Solid Concrete Bricks of Size (240x110x70)mm to 1.0000 sqm 651.16 651.16
(215x100x70)mm
Sand (FM - 0.8) 0.0120 m3 480.00 5.76
Mason 0.0250 day 550.00 13.75
Ordinary Labour 0.1000 day 370.00 37.00

Subtotal-A: 707.67

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 721.82

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 794.01


VAT 6% of Total 52.93
IT 4% of Total 35.29
Total: 882.23

Note : Rates of all items should be inclusive of all supply and carriage. Page: 985 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.03.02 Brick on edge pavement in single layer of Herring Bone Bond with 1st sqm
class or picked bricks true to level, camber, super elevation and grade
over 25mm thick sand (minimum FM 0.80) cushion including filling the
interstices tightly with same type of sand, etc. all complete as per
direction of the E-I-C.
Sand (FM - 0.8) 0.0280 m3 480.00 13.44
Mason 0.0500 day 550.00 27.50
Ordinary Labour 0.1700 day 370.00 62.90
1st Class Brick 52.0000 each 9.00 468.00

Subtotal-A: 571.84

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 583.28

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 641.60


VAT 6% of Total 42.77
IT 4% of Total 28.52
Total: 712.89

Note : Rates of all items should be inclusive of all supply and carriage. Page: 986 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.03.03 Brick on end edging (75mm across) with 1st class/picked bricks m
including cutting trenches true to level & grade including removing
earth, re-filling & ramming the sides properly & filling the gaps with
local sand, etc. all complete as per direction of the E-I-C.
Sand (FM - 0.5) 0.0030 m3 420.00 1.26
Mason 0.0080 day 550.00 4.40
Ordinary Labour 0.0300 day 370.00 11.10
1st Class Brick 8.0000 each 9.00 72.00

Subtotal-A: 88.76

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 90.54

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 99.59


VAT 6% of Total 6.64
IT 4% of Total 4.43
Total: 110.65

5.03.04 Mass concrete work in foundation or floor with Portland Composite


Cement (CEM II/AM, 42.5N), sand (minimum FM 1.20) and 20mm down
well graded 1st class/picked brick chips (LAA value not exceeding 38),
including shuttering, mixing by concrete mixer machine, casting, laying
compacting with mechanical vibrator machine and curing for the
requisite period breaking bricks into chips etc. all complete as per
direction of the E-I-C. Cylinder crushing strength of concrete should not
be less than 10.5Mpa at 28 days of curing (suggested mix proportion
1:3:6). Additional quantity of cement to be added if required to attain
the strength at the contractors own cost.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 987 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.03.04.01 Mass concrete in foundation (1:3:6) with Portland Composite Cement cum
(CEM II/AM, 42.5N), sand (minimum FM 1.20) and 20mm down well
graded 1st class/picked brick chips.
1st Class Brick Chips (20mm down graded) 0.9000 m3 2940.00 2646.00
Sand (FM - 1.2) 0.4500 m3 584.00 262.80
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 4.2400 bag 430.00 1823.20
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 1.8000 day 370.00 666.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 6114.50
Other costs (form work etc.) ( +.50 % on Subtotal-A ) 30.57
Subtotal-A1: 6145.07

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 6267.97

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 6894.77


VAT 6% of Total 459.65
IT 4% of Total 306.43
Total: 7660.86

Note : Rates of all items should be inclusive of all supply and carriage. Page: 988 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.03.04.02 Mass concrete in floor (1:3:6) with Portland Composite Cement (CEM cum
II/AM, 42.5N), sand (minimum FM 1.20) and 20mm down well graded
1st class/picked brick chips..
1st Class Brick Chips (20mm down graded) 0.9000 m3 2940.00 2646.00
Sand (FM - 1.2) 0.4500 m3 584.00 262.80
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 4.2400 bag 430.00 1823.20
Head Mason 0.0800 day 650.00 52.00
Mason 0.7700 day 550.00 423.50
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 1.8000 day 370.00 666.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 6307.00

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 6433.14

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 7076.45


VAT 6% of Total 471.76
IT 4% of Total 314.51
Total: 7862.73

5.03.05 Mass concrete work in foundation or floor with Portland Composite


Cement (CEM II/AM, 42.5N), sand (minimum FM 1.20) and 20mm down
well graded 1st class/picked brick chips (LAA value not exceeding 38),
including shuttering, mixing by concrete mixer machine, casting, laying
compacting with mechanical vibrator machine and curing for the
requisite period breaking bricks into chips etc. all complete as per
direction of the E-I-C. Cylinder crushing strength of concrete should not
be less than 17Mpa at 28 days of curing (suggested mix proportion
1:2:4). Additional quantity of cement to be added if required to attain
the strength at the contractors own cost.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 989 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.03.05.01 Mass concrete in foundation (1:2:4) with Portland Composite Cement cum
(CEM II/AM, 42.5N), sand (minimum FM 1.20) and 20mm down well
graded 1st class/picked brick chips.
1st Class Brick Chips (20mm down graded) 0.8600 m3 2940.00 2528.40
Sand (FM - 1.2) 0.4300 m3 584.00 251.12
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0540 bag 430.00 2603.22
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 1.8000 day 370.00 666.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 6765.24
Other cost (from work etc) ( +.50 % on Subtotal-A ) 33.83
Subtotal-A1: 6799.07

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 6935.05

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 7628.55


VAT 6% of Total 508.57
IT 4% of Total 339.05
Total: 8476.17

Note : Rates of all items should be inclusive of all supply and carriage. Page: 990 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.03.05.02 Mass concrete in floor (1:2:4) with Portland Composite Cement (CEM cum
II/AM, 42.5N), sand (minimum FM 1.20) and 20mm down well graded
1st class/picked brick chips.
1st Class Brick Chips (20mm down graded) 0.8600 m3 2940.00 2528.40
Sand (FM - 1.2) 0.4300 m3 584.00 251.12
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0540 bag 430.00 2603.22
Head Mason 0.0800 day 650.00 52.00
Mason 0.7700 day 550.00 423.50
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 1.8000 day 370.00 666.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 6957.74

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 7096.89

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 7806.58


VAT 6% of Total 520.44
IT 4% of Total 346.96
Total: 8673.98

Note : Rates of all items should be inclusive of all supply and carriage. Page: 991 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.03.06 75mm thick lean cement concrete (1:3:6) in floor and wherever needed sqm
with Portland Composite Cement (CEM II/AM, 42.5N), best quality
coarse sand (minimum FM1.2) and 20mm down well graded picked
brick chips (LAA value not exceeding 38), in/c breaking bricks into chips
screening, mixing by concrete mixer machine, laying, compacting,
washing of sand, curing for requisite period, etc. all complete as per
direction of the E-I-C.
1st Class Picked Brick Chips (20mm down graded) 0.0700 m3 2940.00 205.80
Sand (FM - 1.2) 0.0340 m3 584.00 19.86
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.3230 bag 430.00 138.89
Head Mason 0.0070 day 650.00 4.55
Mason 0.0200 day 550.00 11.00
Skilled Labour 0.0600 day 450.00 27.00
Ordinary Labour 0.1300 day 370.00 48.10
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0044 day 1200.00 5.28

Subtotal-A: 460.48
Form Work ( +.04 % on Subtotal-A ) 0.18
Subtotal-A1: 460.66

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 469.87

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 516.86


VAT 6% of Total 34.46
IT 4% of Total 22.97
Total: 574.29

Note : Rates of all items should be inclusive of all supply and carriage. Page: 992 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.03.07 25mm thick Damp Proof Course (DPC) with cement concrete (1:2:4) in sqm
Portland Composite Cement (CEM II/AM, 42.5N), sand (minimum FM
1.80) and 10mm down well graded 1st class/picked brick chips (LAA
value not exceeding 38), in/c casting by concrete mixture machine,
compacting, curing for requisite period, coal tar/bitumen painting, etc.
all complete as per direction of the E-I-C.
1st Class Brick Chips (10mm down graded) 0.0220 m3 3049.00 67.08
Sand (FM - 1.8) 0.0110 m3 970.00 10.67
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.1540 bag 430.00 66.22
Head Mason 0.0200 day 650.00 13.00
Mason 0.0700 day 550.00 38.50
Skilled Labour 0.0900 day 450.00 40.50
Ordinary Labour 0.0900 day 370.00 33.30
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0015 day 1200.00 1.80

Subtotal-A: 271.07
Others costs (Tar/Bitumen/Painting etc.) ( +1.00 % on Subtotal-A ) 2.71
Subtotal-A1: 273.78

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 279.25

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 307.18


VAT 6% of Total 20.48
IT 4% of Total 13.65
Total: 341.31

Note : Rates of all items should be inclusive of all supply and carriage. Page: 993 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.03.08 38mm thick Damp Proof Course (DPC) with cement concrete (1:1.5:3) sqm
in Portland Composite Cement (CEM II/AM, 42.5N), sand (minimum FM
1.80) and 10mm down well graded 1st class/picked brick chips (LAA
value not exceeding 38), in/c casting by concrete mixture machine,
compacting, curing for requisite period, coal tar/bitumen painting, etc.
all complete as per direction of the E-I-C.
1st Class Brick Chips (10mm down graded) 0.0310 m3 3049.00 94.52
Sand (FM - 1.8) 0.0160 m3 970.00 15.52
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.2930 bag 430.00 125.99
Head Mason 0.0200 day 650.00 13.00
Mason 0.0700 day 550.00 38.50
Skilled Labour 0.0900 day 450.00 40.50
Ordinary Labour 0.0900 day 370.00 33.30
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0022 day 1200.00 2.64

Subtotal-A: 363.97
Others costs ( +1.00 % on Subtotal-A ) 3.64
Subtotal-A1: 367.61

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 374.96

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 412.46


VAT 6% of Total 27.50
IT 4% of Total 18.33
Total: 458.29

Note : Rates of all items should be inclusive of all supply and carriage. Page: 994 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.03.09 Providing single layer polythene sheet (0.18mm thick) weighing one sqm
kilogram per 6.5 square meter in floor or any where in ground floor
underneath the cement concrete, etc. all complete as per specifications
and direction of the E-I-C.
0.18mm thick polythene sheet 1.0000 m2 12.31 12.31
Ordinary Labour 0.0100 day 370.00 3.70

Subtotal-A: 16.01

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 16.33

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 17.96


VAT 6% of Total 1.20
IT 4% of Total 0.80
Total: 19.96

Note : Rates of all items should be inclusive of all supply and carriage. Page: 995 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.03.10 Dismantling of existing/damaged cement concrete work in foundation cum


or floor works on any type of works manualy or any other means
without any damage in structure and sorting the dismantled materials
disposal of unserviceable materials and stacking the serviceable
materials properly for measurment for all floors, Cost of conveying,
loading, transportation of unserviceable material accumulated during
dismantling operation is included in this unit rate. The unserviceable
material must be disposed at a safe place outside the site premises with
minimum traffic disruption and the procuring entity will not provide any
environmentally safe place for disposing the unserviceable materials.etc.
all complete as per direction of the E-I-C.
Ordinary Labour 1.5000 day 370.00 555.00

Subtotal-A: 555.00
Cost of carriage, tools, plants & other remaining ( +5.00 % on Subtotal-A ) 27.75
cost etc.
Subtotal-A1: 582.75

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 594.41

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 653.85


VAT 6% of Total 43.59
IT 4% of Total 29.06
Total: 726.50

Note : Rates of all items should be inclusive of all supply and carriage. Page: 996 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.04.01 Brick work with 1st class bricks in cement mortar (1:6) in foundation cum
and plinth with Portland Composite cement (CEM II/AM, 42.5N) and
best quality sand (minimum FM1.2), filling the interstices tightly with
mortar, raking out joints, cleaning and soaking bricks at least for 24
hours before use, washing of sand, curing for requisite period, etc. all
complete as per direction of the E-I-C.
1st Class Brick 406.0000 each 9.00 3654.00
Sand (FM - 1.2) 0.3600 m3 584.00 210.24
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 1.4000 bag 430.00 602.00
Head Mason 0.0600 day 650.00 39.00
Mason 0.7000 day 550.00 385.00
Skilled Labour 0.7000 day 450.00 315.00
Ordinary Labour 1.0000 day 370.00 370.00

Subtotal-A: 5575.24

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 5686.74

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 6255.42


VAT 6% of Total 417.03
IT 4% of Total 278.02
Total: 6950.47

Note : Rates of all items should be inclusive of all supply and carriage. Page: 997 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.04.02 Brick work with 1st class bricks in cement mortar (1:4) in foundation cum
and plinth with Portland Composite cement (CEM II/AM, 42.5N) and
best quality sand (minimum FM1.2), filling the interstices tightly with
mortar, raking out joints, cleaning and soaking bricks at least for 24
hours before use, washing of sand, curing for requisite period, etc. all
complete as per direction of the E-I-C.
1st Class Brick 406.0000 each 9.00 3654.00
Sand (FM - 1.2) 0.3000 m3 584.00 175.20
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 2.1200 bag 430.00 911.60
Head Mason 0.0600 day 650.00 39.00
Mason 0.7000 day 550.00 385.00
Skilled Labour 0.7000 day 450.00 315.00
Ordinary Labour 1.0000 day 370.00 370.00

Subtotal-A: 5849.80

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 5966.80

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 6563.48


VAT 6% of Total 437.57
IT 4% of Total 291.71
Total: 7292.75

5.04.03 Brick work of 1st class bricks in cement mortar (1:6) in superstructure
with Portland Composite cement (CEM II/AM, 42.5N) and best quality
sand (minimum FM1.2) with uniform width and depth joints, true to
vertical and horizontal lines, in/c raking out joints, filling interstices
tightly with mortar, cleaning and soaking bricks at least for 24 hours
before use, washing of sand, necessary scaffolding, curing for requisite
period, etc. all complete as per direction of the E-I-C.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 998 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.04.03.01 Ground Floor cum


1st Class Brick 406.0000 each 9.00 3654.00
Sand (FM - 1.2) 0.3600 m3 584.00 210.24
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 1.4000 bag 430.00 602.00
Head Mason 0.0600 day 650.00 39.00
Mason 0.7000 day 550.00 385.00
Skilled Labour 0.7000 day 450.00 315.00
Ordinary Labour 1.5200 day 370.00 562.40

Subtotal-A: 5767.64
Scaffolding ( +1.50 % on Subtotal-A ) 86.51
Subtotal-A1: 5854.15

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 5971.24

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 6568.36


VAT 6% of Total 437.89
IT 4% of Total 291.93
Total: 7298.18

5.04.03.02 Add for each additional floor up to 5th floor cum Add +1.20% with Item No 5.04.03.01

5.04.03.03 Add for each additional floor from 6th floor up to 9th floor cum Add +1.50% with Item No 5.04.03.01

5.04.03.04 Add for each additional floor for 10th floor and above cum Add +2.00% with Item No 5.04.03.01

5.04.04 Brick work with 1st class bricks in cement mortar (1:4) in exterior walls
with Portland Composite cement (CEM II/AM, 42.5N) and best quality
sand (minimum FM1.2) with uniform width and depth joints, true to
vertical and horizontal lines, in/c filling the interstices tightly with
mortar, racking out joints, cleaning and soaking bricks at least for 24
hours before use, washing of sand, necessary scaffolding, curing for
requisite period, etc. all complete as per direction of the E-I-C.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 999 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.04.04.01 Ground Floor cum


1st Class Brick 406.0000 each 9.00 3654.00
Sand (FM - 1.2) 0.3000 m3 584.00 175.20
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 2.1200 bag 430.00 911.60
Head Mason 0.0600 day 650.00 39.00
Mason 0.7000 day 550.00 385.00
Skilled Labour 0.7000 day 450.00 315.00
Ordinary Labour 1.5200 day 370.00 562.40

Subtotal-A: 6042.20
Scaffolding ( +1.50 % on Subtotal-A ) 90.63
Subtotal-A1: 6132.83

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 6255.49

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 6881.04


VAT 6% of Total 458.74
IT 4% of Total 305.82
Total: 7645.60

5.04.04.02 Add for each additional floor up to 5th floor cum Add +1.10% with Item No 5.04.04.01

5.04.04.03 Add for each additional floor from 6th floor up to 9th floor cum Add +1.40% with Item No 5.04.04.01

5.04.04.04 Add for each additional floor for 10th floor and above cum Add +1.80% with Item No 5.04.04.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1000 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.04.05 Exposed brick work (for exterior wall without outside plaster) with
special quality sorted out 1st class bricks, very carefully laid in cement
mortar (1:4) in superstructure with Portland Composite cement (CEM
II/AM, 42.5N) and best quality sand (minimum FM1.2) with uniform
width and depth joints, true to vertical and horizontal lines in/c racking
out joints, scaffolding, soaking the bricks at least for 24 hours before
use, washing of sand, curing for requisite period and high class flush
pointing with cement mortar (1:1) , etc. all complete as per direction of
the E-I-C.

5.04.05.01 Ground Floor cum


1st Class Brick 406.0000 each 9.00 3654.00
Sand (FM - 1.2) 0.4000 m3 584.00 233.60
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 2.2800 bag 430.00 980.40
Head Mason 0.0900 day 650.00 58.50
Mason 0.7000 day 550.00 385.00
Skilled Labour 0.7000 day 450.00 315.00
Ordinary Labour 1.3100 day 370.00 484.70

Subtotal-A: 6111.20
Scaffolding ( +1.50 % on Subtotal-A ) 91.67
Subtotal-A1: 6202.87

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 6326.93

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 6959.62


VAT 6% of Total 463.97
IT 4% of Total 309.32
Total: 7732.91

5.04.05.02 Add for each additional floor up to 5th floor cum Add +1.00% with Item No 5.04.05.01

5.04.05.03 Add for each additional floor from 6th floor up to 9th floor cum Add +1.16% with Item No 5.04.05.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1001 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.04.05.04 Add for each additional floor for 10th floor and above cum Add +1.54% with Item No 5.04.05.01

5.04.06 Brick work with 10 holes machine made bricks of approved size having
uniform colour, carefully laid in cement mortar (1:4) in superstructure
with Portland Composite cement (CEM II/AM, 42.5N) and best quality
sand (minimum FM1.2) with uniform width and depth joints, true to
vertical and horizontal lines in/c raking out joints, filling the interstices
with mortar, cleaning and soaking the bricks at least for 24 hours before
use, washing of sand, necessary scaffolding, curing for requisite period
and pointing with cement mortar (1:2), etc. all complete as per direction
of the E-I-C.

5.04.06.01 Ground Floor cum


10 holes machine made bricks 406.0000 each 18.90 7673.40
Sand (FM - 1.2) 0.4000 m3 584.00 233.60
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 2.3000 bag 430.00 989.00
Head Mason 0.0900 day 650.00 58.50
Mason 0.7000 day 550.00 385.00
Skilled Labour 0.7000 day 450.00 315.00
Ordinary Labour 1.3100 day 370.00 484.70

Subtotal-A: 10139.20
Scaffolding ( +1.00 % on Subtotal-A ) 101.39
Subtotal-A1: 10240.59

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10445.40

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 11489.94


VAT 6% of Total 766.00
IT 4% of Total 510.66
Total: 12766.60

5.04.06.02 Add for each additional floor up to 5th floor cum Add +.80% with Item No 5.04.06.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1002 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.04.06.03 Add for each additional floor from 6th floor up to 9th floor cum Add +1.00% with Item No 5.04.06.01

5.04.06.04 Add for each additional floor for 10th floor and above cum Add +1.30% with Item No 5.04.06.01

5.04.07 Extra rate over the rate of Ground Floor (or any floor as the case may cum
be) for each additional meter height of brick wall in Auditorium,
Godown, Overhead water tank, etc. where free height of the structure
exceeds beyond 4.00 meter up to 11 meter. The description of the item
is same as in item nos. 5.04.03, 5.04.04, 5.04.05 and 5.04.06 above.
(For each additional meter of extra height beyond 4.00 meter)

(For extra height the total height of the wall from the floor should be
measured and then 4.00 meter to be deducted. The maximum rate thus
calculated on the top height of the wall shall be admissible for the whole
volume of brick work above 4.00 meter. Extra payment shall be
admissible only when both sides of the wall is uninterruptedly free
beyond 4.00 meter)
Head Mason 0.0200 day 650.00 13.00
Mason 0.0400 day 550.00 22.00
Skilled Labour 0.0400 day 450.00 18.00
Ordinary Labour 0.0600 day 370.00 22.20

Subtotal-A: 75.20
Scaffolding ( +29.00 % on Subtotal-A ) 21.81
Subtotal-A1: 97.01

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 98.95

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 108.84


VAT 6% of Total 7.26
IT 4% of Total 4.84
Total: 120.94

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1003 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.04.08 Providing brick work in facing in super structure with


200mmx100mmx50mm machine made ceramic hard pressed bricks of
approved quality in cement mortar (1:4) with Portland Composite
cement (CEM II/AM, 42.5N) and best quality sand (minimum FM1.2),
in/c raking out joints, cutting the bricks to required size wherever
necessary in/c high class recessed pointing, cleaning and soaking the
bricks at least for 24 hours before use, washing of sand, necessary
scaffolding, curing for requisite period, etc. all complete as per direction
of the E-I-C .

5.04.08.01 200mmx100mmx50mm machine made ceramic hard pressed bricks

5.04.08.01.01 Ground floor sqm


Ceramic Bricks (200x100x50mm) 50.0000 each 18.50 925.00
Sand (FM - 1.2) 0.0300 m3 584.00 17.52
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.3800 bag 430.00 163.40
Head Mason 0.0300 day 650.00 19.50
Mason 0.3200 day 550.00 176.00
Skilled Labour 0.1100 day 450.00 49.50
Ordinary Labour 0.4000 day 370.00 148.00

Subtotal-A: 1498.92
Scaffolding and other ( +1.30 % on Subtotal-A ) 19.49
Subtotal-A1: 1518.41

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1548.77

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1703.65


VAT 6% of Total 113.58
IT 4% of Total 75.72
Total: 1892.95

5.04.08.01.02 Add for each additional floor up to 5th Floor sqm Add +1.00% with Item No 5.04.08.01.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1004 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.04.08.01.03 Add for each additional floor from 6th up to 9th Floor sqm Add +1.16% with Item No 5.04.08.01.01

5.04.08.01.04 Add for each additional floor for 10th Floor and above sqm Add +1.54% with Item No 5.04.08.01.01

5.04.08.02 200mmx62mmx16.51mm machine made ceramic hard pressed bricks

5.04.08.02.01 Ground Floor sqm


Ceramic Bricks (200x62x16.51mm) 76.0000 each 18.00 1368.00
Sand (FM - 1.2) 0.0300 m3 584.00 17.52
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.3800 bag 430.00 163.40
Head Mason 0.0300 day 650.00 19.50
Mason 0.3200 day 550.00 176.00
Skilled Labour 0.1100 day 450.00 49.50
Ordinary Labour 0.4000 day 370.00 148.00

Subtotal-A: 1941.92
Scaffolding and others ( +1.30 % on Subtotal-A ) 25.24
Subtotal-A1: 1967.16

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2006.51

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2207.16


VAT 6% of Total 147.14
IT 4% of Total 98.10
Total: 2452.40

5.04.08.02.02 Add for each additional floor up to 5th Floor sqm Add +1.00% with Item No 5.04.08.02.01

5.04.08.02.03 Add for each additional floor from 6th up to 9th Floor sqm Add +1.16% with Item No 5.04.08.02.01

5.04.08.02.04 Add for each additional floor for 10th Floor and above sqm Add +1.54% with Item No 5.04.08.02.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1005 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.04.09 125mm brick work with 1st class bricks in cement mortar (1:6) with
Portland Composite cement (CEM II/AM, 42.5N) and best quality sand
(minimum FM1.2) and making bond with connected walls with uniform
width and depth joints, true to vertical and horizontal lines in/c
necessary scaffolding, raking out joints, cleaning and soaking the bricks
at least for 24 hours before use, washing of sand, curing for requisite
period, etc. all complete as per direction of the E-I-C.

5.04.09.01 Ground Floor sqm


1st Class Brick 52.0000 each 9.00 468.00
Sand (FM - 1.2) 0.0600 m3 584.00 35.04
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.1900 bag 430.00 81.70
Head Mason 0.0100 day 650.00 6.50
Mason 0.0500 day 550.00 27.50
Ordinary Labour 0.4300 day 370.00 159.10

Subtotal-A: 777.84
Scaffolding ( +5.00 % on Subtotal-A ) 38.89
Subtotal-A1: 816.73

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 833.07

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 916.37


VAT 6% of Total 61.09
IT 4% of Total 40.73
Total: 1018.19

5.04.09.02 Add for each additional floor up to 5th floor sqm Add +1.30% with Item No 5.04.09.01

5.04.09.03 Add for each additional floor from 6th floor up to 9th floor sqm Add +1.60% with Item No 5.04.09.01

5.04.09.04 Add for each additional floor for 10th floor and above sqm Add +2.30% with Item No 5.04.09.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1006 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.04.10 125mm brick work with 1st class bricks in cement mortar (1:4) with
Portland Composite cement (CEM II/AM, 42.5N) and best quality sand
(minimum FM1.2) and making bond with connected walls with uniform
width and depth joints, true to vertical and horizontal lines in/c
necessary scaffolding, raking out joints, cleaning and soaking the bricks
at least for 24 hours before use, washing of sand, curing for requisite
period, etc. all complete as per direction of the E-I-C.

5.04.10.01 Ground Floor sqm


1st Class Brick 52.0000 each 9.00 468.00
Sand (FM - 1.2) 0.0500 m3 584.00 29.20
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.2800 bag 430.00 120.40
Head Mason 0.0100 day 650.00 6.50
Mason 0.0500 day 550.00 27.50
Ordinary Labour 0.4300 day 370.00 159.10

Subtotal-A: 810.70
Scaffolding ( +3.00 % on Subtotal-A ) 24.32
Subtotal-A1: 835.02

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 851.72

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 936.89


VAT 6% of Total 62.46
IT 4% of Total 41.64
Total: 1040.99

5.04.10.02 Add for each additional floor up to 5th floor sqm Add +1.30% with Item No 5.04.10.01

5.04.10.03 Add for each additional floor from 6th floor up to 9th floor sqm Add +1.60% with Item No 5.04.10.01

5.04.10.04 Add for each additional floor for 10th floor and above sqm Add +2.30% with Item No 5.04.10.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1007 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.04.11 125mm thick partition wall brick work with 10 holes machine made
ceramic bricks of approved size having uniform colour, carefully laid in
cement mortar (1:4) in superstructure with Portland Composite cement
(CEM II/AM, 42.5N) and best quality sand (minimum FM1.2) with
uniform width and depth joints, true to vertical and horizontal lines in/c
raking out joints, filling the interstices with mortar, cleaning and soaking
the bricks at least for 24 hours before use, washing of sand, necessary
scaffolding, curing for requisite period and pointing with cement mortar
(1:2), etc. all complete as per direction of the E-I-C.

5.04.11.01 Ground Floor sqm


10 holes machine made bricks 52.0000 each 18.90 982.80
Sand (FM - 1.2) 0.0500 m3 584.00 29.20
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.2800 bag 430.00 120.40
Head Mason 0.0100 day 650.00 6.50
Mason 0.0500 day 550.00 27.50
Ordinary Labour 0.4300 day 370.00 159.10

Subtotal-A: 1325.50
Scaffolding ( +2.40 % on Subtotal-A ) 31.81
Subtotal-A1: 1357.31

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1384.46

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 1522.90


VAT 6% of Total 101.53
IT 4% of Total 67.68
Total: 1692.12

5.04.11.02 Add for each additional floor up to 5th floor sqm Add +1.00% with Item No 5.04.11.01

5.04.11.03 Add for each additional floor from 6th floor up to 9th floor sqm Add +1.20% with Item No 5.04.11.01

5.04.11.04 Add for each additional floor for 10th floor and above sqm Add +1.70% with Item No 5.04.11.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1008 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.04.12 125mm thick Jaffrey brick work with 1st class bricks and cement sand sqm
mortar (1:4) with Portland Composite cement (CEM II/AM, 42.5N) and
best quality sand (minimum FM1.2) in/c raking out joints, filling the
interstices with mortar, cleaning and soaking the bricks at least for 24
hours before use, washing of sand, necessary scaffolding, curing for
requisite period etc. all complete as per direction of the E-I-C. .
1st Class Brick 30.0000 each 9.00 270.00
Sand (FM - 1.2) 0.0070 m3 584.00 4.09
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.0500 bag 430.00 21.50
Mason 0.1500 day 550.00 82.50
Ordinary Labour 0.2240 day 370.00 82.88

Subtotal-A: 460.97

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 470.19

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 517.21


VAT 6% of Total 34.48
IT 4% of Total 22.99
Total: 574.67

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1009 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.04.13 75mm thick cornice of brick masonry in cement mortar (1:4) having m
minimum 12mm thick cement plaster (1:6) with Portland Composite
cement (CEM II/AM, 42.5N) and best quality sand (minimum FM1.2),
in/c scaffolding and curing for requisite period in all floors, etc. all
complete as per direction of the E-I-C.
Exposed brick work for ground floor (for exterior wall without 0.0060 cum 6202.87 37.22
outside plaster)….(5.04.05.01)
12mm thick cement plaster (1:6) to wall for ground 0.2400 sqm 184.48 44.27
floor…..(5.12.02.01)
Ordinary Labour 0.3300 day 370.00 122.10

Subtotal-A: 203.59

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 207.66

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 228.43


VAT 6% of Total 15.23
IT 4% of Total 10.15
Total: 253.81

5.04.14 Fancy screen (Ornamental Screen) work with different size machine
made design blocks with uniform colour, carefully laid in coloured
cement mortar (1:3) in all floors in wall with Portland Composite cement
(CEM II/AM, 42.5N) and best quality sand (minimum FM1.2) with
uniform mortar joints, true to vertical and horizontal line including
racking out joints, cleaning and soaking the blocks for minimum 24
hours before use including washing and screening of sand, scaffolding,
curing for requisite period etc. complete in all respect including supply
of all necessary materials including cost of water, electricity and other
charges etc. all complete as per direction of the E-I-C.

5.04.14.01 Block Size :110mmx110mmx110mm (MCW-Design No.3 or equivalent


volume & design)

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1010 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.04.14.01.1 Ground floor sqm


Fancy screen Block 110x110x110mm (MCW-Design No.3) or 83.0000 each 26.00 2158.00
equivalent
Sand (FM - 1.2) 0.0120 m3 584.00 7.01
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.1100 bag 430.00 47.30
Colour Pigment 0.0500 kg 120.00 6.00
Head Mason 0.1100 day 650.00 71.50
Mason 0.2400 day 550.00 132.00
Skilled Labour 0.2700 day 450.00 121.50
Ordinary Labour 0.3100 day 370.00 114.70

Subtotal-A: 2658.01
Scaffolding ( +1.30 % on Subtotal-A ) 34.55
Subtotal-A1: 2692.56

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2746.41

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 3021.05


VAT 6% of Total 201.40
IT 4% of Total 134.27
Total: 3356.73

5.04.14.01.2 Add for each additional floor up to 5th Floor sqm Add +1.00% with Item No 5.04.14.01.1

5.04.14.01.3 Add for each additional floor from 6th up to 9th Floor sqm Add +1.16% with Item No 5.04.14.01.1

5.04.14.01.4 Add for each additional floor for 10th Floor and above sqm Add +1.54% with Item No 5.04.14.01.1

5.04.14.02 Block Size : 140mmx140mmx100mm (MCW-Design No.1 or equivalent


volume & design)

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1011 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.04.14.02.1 Ground floor sqm


Fancy screen Block: 140x140x100mm (MCW-Design No.1) or 52.0000 each 32.00 1664.00
equivalent
Sand (FM - 1.2) 0.0120 m3 584.00 7.01
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.1100 bag 430.00 47.30
Colour Pigment 0.0500 kg 120.00 6.00
Head Mason 0.1100 day 650.00 71.50
Mason 0.2200 day 550.00 121.00
Skilled Labour 0.2200 day 450.00 99.00
Ordinary Labour 0.2600 day 370.00 96.20

Subtotal-A: 2112.01
Scaffolding ( +1.30 % on Subtotal-A ) 27.46
Subtotal-A1: 2139.46

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 2182.25

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2400.48


VAT 6% of Total 160.03
IT 4% of Total 106.69
Total: 2667.20

5.04.14.02.2 Add for each additional floor up to 5th Floor sqm Add +1.00% with Item No 5.04.14.02.1

5.04.14.02.3 Add for each additional floor from 6th up to 9th Floor sqm Add +1.16% with Item No 5.04.14.02.1

5.04.14.02.4 Add for each additional floor for 10th Floor and above sqm Add +1.54% with Item No 5.04.14.02.1

5.04.14.03 Block Size : 150mmx160mmx100mm (MCW-Design No.20/27 or


equivalent volume & design)

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1012 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.04.14.03.1 Ground floor sqm


Fancy screen Block: 150x160x100mm (MCW-Design No.27) 42.0000 each 35.00 1470.00
or equivalent
Sand (FM - 1.2) 0.0120 m3 584.00 7.01
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 0.1100 bag 430.00 47.30
Colour Pigment 0.0500 kg 120.00 6.00
Head Mason 0.1100 day 650.00 71.50
Mason 0.2200 day 550.00 121.00
Skilled Labour 0.2200 day 450.00 99.00
Ordinary Labour 0.2600 day 370.00 96.20

Subtotal-A: 1918.01
Scaffolding ( +1.30 % on Subtotal-A ) 24.93
Subtotal-A1: 1942.94

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 1981.80

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 2179.98


VAT 6% of Total 145.33
IT 4% of Total 96.89
Total: 2422.20

5.04.14.03.2 Add for each additional floor up to 5th Floor sqm Add +1.00% with Item No 5.04.14.03.1

5.04.14.03.3 Add for each additional floor from 6th up to 9th Floor sqm Add +1.16% with Item No 5.04.14.03.1

5.04.14.03.4 Add for each additional floor for 10th Floor and above sqm Add +1.54% with Item No 5.04.14.03.1

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1013 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.04.15 Exposed brick work (for exterior wall without outside plaster) with
automatic machine made 1st class bricks, very carefully laid in cement
mortar (1:4) in superstructure with Portland Composite cement (CEM
II/AM, 42.5N) and best quality sand (minimum FM1.2) with uniform
width and depth joints, true to vertical and horizontal lines in/c racking
out joints, scaffolding, soaking the bricks at least for 24 hours before
use, washing of sand, curing for requisite period and high class flush
pointing with cement mortar (1:1) , etc. all complete as per direction of
the E-I-C.

5.04.15.01 Ground Floor cum


Automatic machine made 1st class bricks 406.0000 no 9.00 3654.00
Sand (FM - 1.2) 0.4000 m3 584.00 233.60
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 2.2800 bag 430.00 980.40
Head Mason 0.0900 day 650.00 58.50
Mason 0.7000 day 550.00 385.00
Skilled Labour 0.7000 day 450.00 315.00
Ordinary Labour 1.3100 day 370.00 484.70

Subtotal-A: 6111.20
Scaffolding ( +1.50 % on Subtotal-A ) 91.67
Subtotal-A1: 6202.87

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 6326.93

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 6959.62


VAT 6% of Total 463.97
IT 4% of Total 309.32
Total: 7732.91

5.04.15.02 Add for each additional floor up to 5th Floor cum Add +1.00% with Item No 5.04.15.01

5.04.15.03 Add for each additional floor from 6th up to 9th Floor cum Add +1.16% with Item No 5.04.15.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1014 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.04.15.04 Add for each additional floor for 10th Floor and above cum Add +1.54% with Item No 5.04.15.01

5.04.16 Dismantling of existing/damaged brick work in sub-structure or cum


superstructure works of any type manualy or any other means without
any damage in structure and sorting the dismantled materials disposal
of unserviceable materials and stacking the serviceable materials
properly for measurment for all floors, Cost of conveying, loading,
transportation of unserviceable material accumulated during dismantling
operation is included in this unit rate. The unserviceable material must
be disposed at a safe place outside the site premises with minimum
traffic disruption and the procuring entity will not provide any
environmentally safe place for disposing the unserviceable materials.etc.
all complete as per direction of the E-I-C.
Ordinary Labour 1.0200 day 370.00 377.40

Subtotal-A: 377.40
Cost of carriage, tools, plants & other remaining ( +5.00 % on Subtotal-A ) 18.87
cost etc.
Subtotal-A1: 396.27

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 404.20

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 444.61


VAT 6% of Total 29.64
IT 4% of Total 19.76
Total: 494.02

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1015 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.01 RCC:1:2:4, 17MPa, Brick Chips (BC): Reinforced cement concrete works
with minimum cement content relates to mix ratio (tentative 1:2:4) and
maximum water cement ratio 0.45 having minimum required average
strength, f'cr = 24 Mpa and satisfied a specified compressive strength
f'c = 17 Mpa at 28 days on standard cylinders as per standard practice
of Code AASHTO/ ASTM and Portland Composite Cement conforming to
BDS EN 197-1 : 2003 CEM-II 42.5N sand of minimum FM 1.8 and
20mm down well graded picked brick chips (LAA value and maximum
water absorption not exceeding 38 and 15% respectively) conforming to
ASTM C 33 or Aggregate Grading Appendix-3 LGED Schedule of Rates
or any other International recognized envelop in/c breaking chips and
screening through proper sieves, centering, shuttering in position,
making shuttering fully leak proof & shuttering with plain 16 BWG steel
sheet fitted over 38mm thick wooden plank panels and Standard size
Bamboo Props suitably braced, placing of reinforcement in position,
mixing the aggregates with standard mixer machine with hoper, fed by
standard measuring boxes, maintaining allowable slump of 50mm
(without plasticizer) & 75mm to 100mm (when plasticizer use), pouring,
casting, compacting by mechanical vibrator machine and curing at least
for 28 days, removing centering-shuttering after approved specified
time period, i/c cost of additional testing charges of materials and
cylinders required. Excluding the cost of reinforcement and its
fabrication, welding, coupling, placing, binding etc. Additional quantity
of cement and Plasticizer i.e. Water reducing chemical admixture of
complying type A under ASTM C 494 to reduce mixing water required
for normal workability and to maintain low water-cement (W/C) ratio
(Doses of admixture to be fixed by the mix design from approved
laboratory instruction by the Engineer) Additional quantity of cement to
be added if required to attain the strength at the contractor's own cost)
etc. all complete as per direction and approval of the Engineer in charge.
Note : Using Concrete Mixer.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1016 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.01.01 In individual and continuous footing of column, raft and floor slab at cum
plinth level.
1st Class Picked Brick Chips (20mm down graded) 0.5200 m3 2940.00 1528.80
Sand (FM - 1.8) 0.4300 m3 970.00 417.10
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0600 bag 430.00 2605.80
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
1st Class Brick Chips (10mm down graded) 0.3400 m3 3049.00 1036.66

Subtotal-A: 7044.86
Wooden form work & all other remaining costs ( +8.50 % on Subtotal-A ) 598.81
Subtotal-A1: 7643.67

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 7796.55

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 8576.20


VAT 6% of Total 571.75
IT 4% of Total 381.16
Total: 9529.11

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1017 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.01.02 In foundation beam cum


1st Class Picked Brick Chips (20mm down graded) 0.5200 m3 2940.00 1528.80
Sand (FM - 1.8) 0.4300 m3 970.00 417.10
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0600 bag 430.00 2605.80
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
1st Class Brick Chips (10mm down graded) 0.3400 m3 3049.00 1036.66

Subtotal-A: 7044.86
Wooden form work & all other remaining costs ( +20.00 % on Subtotal-A ) 1408.97
Subtotal-A1: 8453.83

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 8622.91

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 9485.20


VAT 6% of Total 632.35
IT 4% of Total 421.56
Total: 10539.11

5.05.01.03 In pedestal, column, capital lift wall and wall :

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1018 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.01.03.1 Below Plinth Level and in Ground Floor cum


1st Class Picked Brick Chips (20mm down graded) 0.5200 m3 2940.00 1528.80
Sand (FM - 1.8) 0.4300 m3 970.00 417.10
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0600 bag 430.00 2605.80
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
1st Class Brick Chips (10mm down graded) 0.3400 m3 3049.00 1036.66

Subtotal-A: 7044.86
Wooden form work & all other remaining costs ( +56.00 % on Subtotal-A ) 3945.12
Subtotal-A1: 10989.98

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11209.78

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12330.76


VAT 6% of Total 822.05
IT 4% of Total 548.03
Total: 13700.84

5.05.01.03.2 Add for each additional floor up to 5th Floor cum Add +.36% with Item No 5.05.01.03.1

5.05.01.03.3 Add for each additional floor from 6th floor upto 9th floor cum Add +.66% with Item No 5.05.01.03.1

5.05.01.03.4 Add for each additional floor for 10th floor and above cum Add +.87% with Item No 5.05.01.03.1

5.05.01.04 In Tie Beam and Lintel :

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1019 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.01.04.1 Below Plinth Level and in Ground Floor cum


1st Class Picked Brick Chips (20mm down graded) 0.5200 m3 2940.00 1528.80
Sand (FM - 1.8) 0.4300 m3 970.00 417.10
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0600 bag 430.00 2605.80
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
1st Class Brick Chips (10mm down graded) 0.3400 m3 3049.00 1036.66

Subtotal-A: 7044.86
Wooden form work & all other remaining costs ( +35.00 % on Subtotal-A ) 2465.70
Subtotal-A1: 9510.56

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9700.77

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 10670.85


VAT 6% of Total 711.39
IT 4% of Total 474.26
Total: 11856.50

5.05.01.04.2 Add for each additional floor up to 5th Floor cum Add +.43% with Item No 5.05.01.04.1

5.05.01.04.3 Add for each additional floor from 6th floor upto 9th floor cum Add +.78% with Item No 5.05.01.04.1

5.05.01.04.4 Add for each additional floor for 10th floor and above cum Add +1.03% with Item No 5.05.01.04.1

5.05.01.05 In Tee Beam, Ell Beam, Rectangular Beam etc. (exposed breadth and
width of ribs to be measured only).

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1020 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.01.05.1 Below Plinth Level and in Ground Floor cum


1st Class Picked Brick Chips (20mm down graded) 0.5200 m3 2940.00 1528.80
Sand (FM - 1.8) 0.4300 m3 970.00 417.10
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0600 bag 430.00 2605.80
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
1st Class Brick Chips (10mm down graded) 0.3400 m3 3049.00 1036.66

Subtotal-A: 7044.86
Wooden form work & all other remaining costs ( +42.00 % on Subtotal-A ) 2958.84
Subtotal-A1: 10003.70

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10203.78

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 11224.15


VAT 6% of Total 748.28
IT 4% of Total 498.85
Total: 12471.28

5.05.01.05.2 Add for each additional floor up to 5th Floor cum Add +.40% with Item No 5.05.01.05.1

5.05.01.05.3 Add for each additional floor from 6th floor upto 9th floor cum Add +.71% with Item No 5.05.01.05.1

5.05.01.05.4 Add for each additional floor for 10th floor and above cum Add +.95% with Item No 5.05.01.05.1

5.05.01.06 In roof slab of all types, cantilever slab and drop panels (excluding floor
slab of ground floor at plinth level).

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1021 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.01.06.1 Below Plinth Level and in Ground Floor cum


1st Class Picked Brick Chips (20mm down graded) 0.5200 m3 2940.00 1528.80
Sand (FM - 1.8) 0.4300 m3 970.00 417.10
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0600 bag 430.00 2605.80
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
1st Class Brick Chips (10mm down graded) 0.3400 m3 3049.00 1036.66

Subtotal-A: 7044.86
Wooden form work & all other remaining costs ( +40.00 % on Subtotal-A ) 2817.94
Subtotal-A1: 9862.80

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10060.06

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 11066.07


VAT 6% of Total 737.74
IT 4% of Total 491.83
Total: 12295.63

5.05.01.06.2 Add for each additional floor up to 5th Floor cum Add +.41% with Item No 5.05.01.06.1

5.05.01.06.3 Add for each additional floor from 6th floor upto 9th floor cum Add +.74% with Item No 5.05.01.06.1

5.05.01.06.4 Add for each additional floor for 10th floor and above cum Add +.99% with Item No 5.05.01.06.1

5.05.01.07 In sunshade, cornice, railing, drop wall, louver and fins (Average 62mm
to 87mm thick)

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1022 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.01.07.1 Below Plinth Level and in Ground Floor cum


1st Class Picked Brick Chips (20mm down graded) 0.5200 m3 2940.00 1528.80
Sand (FM - 1.8) 0.4300 m3 970.00 417.10
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0600 bag 430.00 2605.80
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
1st Class Brick Chips (10mm down graded) 0.3400 m3 3049.00 1036.66

Subtotal-A: 7020.86
Wooden Form work & all other remaining costs ( +85.00 % on Subtotal-A ) 5967.73
Subtotal-A1: 12988.59

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 13248.36

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 14573.20


VAT 6% of Total 971.55
IT 4% of Total 647.70
Total: 16192.44

5.05.01.07.2 Add for each additional floor up to 5th Floor cum Add +.98% with Item No 5.05.01.07.1

5.05.01.07.3 Add for each additional floor from 6th floor upto 9th floor cum Add +1.80% with Item No 5.05.01.07.1

5.05.01.07.4 Add for each additional floor for 10th floor and above cum Add +2.46% with Item No 5.05.01.07.1

5.05.01.08 In Stair case slab and step

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1023 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.01.08.1 Below Plinth Level and in Ground Floor cum


1st Class Picked Brick Chips (20mm down graded) 0.5200 m3 2940.00 1528.80
Sand (FM - 1.8) 0.4300 m3 970.00 417.10
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0600 bag 430.00 2605.80
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
1st Class Brick Chips (10mm down graded) 0.3400 m3 3049.00 1036.66

Subtotal-A: 7044.86
Wooden form work & all other remaining costs ( +43.00 % on Subtotal-A ) 3029.29
Subtotal-A1: 10074.15

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10275.63

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 11303.20


VAT 6% of Total 753.55
IT 4% of Total 502.36
Total: 12559.11

5.05.01.08.2 Add for each additional floor up to 5th Floor cum Add +.42% with Item No 5.05.01.08.1

5.05.01.08.3 Add for each additional floor from 6th floor upto 9th floor cum Add +.75% with Item No 5.05.01.08.1

5.05.01.08.4 Add for each additional floor for 10th floor and above cum Add +1.00% with Item No 5.05.01.08.1

5.05.01.09 In Waffle or Ribbed floor/roof slab

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1024 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.01.09.1 Below Plinth Level and in Ground Floor cum


1st Class Picked Brick Chips (20mm down graded) 0.5200 m3 2940.00 1528.80
Sand (FM - 1.8) 0.4300 m3 970.00 417.10
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0600 bag 430.00 2605.80
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
1st Class Brick Chips (10mm down graded) 0.3400 m3 3049.00 1036.66

Subtotal-A: 7044.86
Wooden form work & all other remaining costs ( +120.00 % on Subtotal-A ) 8453.83
Subtotal-A1: 15498.69

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 15808.67

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 17389.53


VAT 6% of Total 1159.30
IT 4% of Total 772.87
Total: 19321.70

5.05.01.09.2 Add for each additional floor up to 5th Floor cum Add +.27% with Item No 5.05.01.09.1

5.05.01.09.3 Add for each additional floor from 6th floor upto 9th floor cum Add +.48% with Item No 5.05.01.09.1

5.05.01.09.4 Add for each additional floor for 10th floor and above cum Add +.63% with Item No 5.05.01.09.1

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1025 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.02 RCC:1:2:4, 20MPa, Stone Chips (SC): Reinforced cement concrete


works with minimum cement content relates to mix ratio (tentative
1:2:4) and maximum water cement ratio 0.40 having minimum required
average strength, f'cr = 26 Mpa and satisfying a specified compressive
strength f'c = 20 Mpa at 28 days on standard cylinders as per standard
practice of Code AASHTO/ ASTM and Portland Composite Cement
conforming to BDS EN 197-1 : 2003 CEM-II 42.5N, best quality sand of
minimum FM 2.2, 20mm down well graded crushed stone chips
(Preferably stone chips from Madhyapara, Dinajpur) (LAA value not
exceeding 35) conforming to ASTM C 33 or Aggregate Grading
Appendix-3 LGED Schedule of Rates or any other International
recognized envelop and Water reducing chemical admixture of
complying type A under ASTM C 494, in/c cost of breaking chips,
screening through proper sieves, cleaning and washing thoroughly,
centering, shuttering in position, with plain 16 BWG steel sheet fitted
over 38mm thick wooden plank panels suitably braced and Standard
size Bamboo Props making shuttering fully leak proof, placing of
reinforcement cage in position, mixing the aggregates with standard
mixer machine with hoper, fed by standard measuring boxes,
maintaining allowable slump of 75mm to 100mm casting in steel forms,
compacting by Mechanical vibrators and tapered rods and curing at
least for 28 days, removing centering-shuttering after approved
specified time period, i/c cost of additional testing charges of materials
and cylinders required. Excluding the cost of reinforcement and its
fabrication, welding, coupling, placing, binding etc. additional quantity of
Plasticizer i.e. Water reducing chemical admixture of complying type A
under ASTM C 494 to reduce mixing water required for normal
workability and to maintain low water-cement (W/C) ratio (Doses of
admixture to be fixed by the mix design from approved laboratory
instruction by the Engineer) Additional quantity of cement to be added if
required to attain the strength at the contractor's own cost etc. all
complete as per direction and approval of the Engineer in charge.
Note : Using Concrete Mixer.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1026 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.02.01 In individual and continuous footing of column, raft and floor slab at cum
plinth level.
Stone Chips (20mm down graded) [LAA≤35] 0.5200 cum 4930.00 2563.60
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0600 bag 430.00 2605.80
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Water reducing chemical admixture : Type-A 1.2100 liter 130.00 157.30
Stone Chips (12mm down graded) [LAA≤35] 0.3400 cum 4320.00 1468.80

Subtotal-A: 8805.84
Wooden form work & all other remaining costs ( +7.00 % on Subtotal-A ) 616.41
Subtotal-A1: 9422.25

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9610.69

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 10571.76


VAT 6% of Total 704.78
IT 4% of Total 469.86
Total: 11746.40

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1027 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.02.02 In foundation beam cum


Stone Chips (20mm down graded) [LAA≤35] 0.5200 cum 4930.00 2563.60
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0600 bag 430.00 2605.80
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Water reducing chemical admixture : Type-A 1.2100 liter 130.00 157.30
Stone Chips (12mm down graded) [LAA≤35] 0.3400 cum 4320.00 1468.80

Subtotal-A: 8805.84
Wooden form work & all other remaining costs ( +18.00 % on Subtotal-A ) 1585.05
Subtotal-A1: 10390.89

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10598.71

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 11658.58


VAT 6% of Total 777.24
IT 4% of Total 518.16
Total: 12953.98

5.05.02.03 In pedestal, column, capital lift wall and wall :

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1028 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.02.03.1 Below Plinth Level and in Ground Floor cum


Stone Chips (20mm down graded) [LAA≤35] 0.5200 cum 4930.00 2563.60
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0600 bag 430.00 2605.80
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Water reducing chemical admixture : Type-A 1.2100 liter 130.00 157.30
Stone Chips (12mm down graded) [LAA≤35] 0.3400 cum 4320.00 1468.80

Subtotal-A: 8805.84
Wooden form work & all other remaining costs ( +54.00 % on Subtotal-A ) 4755.15
Subtotal-A1: 13560.99

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 13832.21

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 15215.43


VAT 6% of Total 1014.36
IT 4% of Total 676.24
Total: 16906.04

5.05.02.03.2 Add for each additional floor up to 5th Floor cum Add +.35% with Item No 5.05.02.03.1

5.05.02.03.3 Add for each additional floor from 6th floor upto 9th floor cum Add +.63% with Item No 5.05.02.03.1

5.05.02.03.4 Add for each additional floor for 10th floor and above cum Add +.85% with Item No 5.05.02.03.1

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1029 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.02.04 In Tie Beam and Lintel :

5.05.02.04.1 Below Plinth Level and in Ground Floor cum


Stone Chips (20mm down graded) [LAA≤35] 0.5200 cum 4930.00 2563.60
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0600 bag 430.00 2605.80
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Water reducing chemical admixture : Type-A 1.2100 liter 130.00 157.30
Stone Chips (12mm down graded) [LAA≤35] 0.3400 cum 4320.00 1468.80

Subtotal-A: 8805.84
Form work & all other remaining costs ( +30.00 % on Subtotal-A ) 2641.75
Subtotal-A1: 11447.59

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11676.54

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12844.20


VAT 6% of Total 856.28
IT 4% of Total 570.85
Total: 14271.33

5.05.02.04.2 Add for each additional floor up to 5th Floor cum Add +.41% with Item No 5.05.02.04.1

5.05.02.04.3 Add for each additional floor from 6th floor upto 9th floor cum Add +.75% with Item No 5.05.02.04.1

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1030 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.02.04.4 Add for each additional floor for 10th floor and above cum Add +1.00% with Item No 5.05.02.04.1

5.05.02.05 In Tee Beam, Ell Beam, Rectangular Beam etc. (exposed breadth and
width of ribs to be measured only).

5.05.02.05.1 Below Plinth Level and in Ground Floor cum


Stone Chips (20mm down graded) [LAA≤35] 0.5200 cum 4930.00 2563.60
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0600 bag 430.00 2605.80
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Water reducing chemical admixture : Type-A 1.2100 liter 130.00 157.30
Stone Chips (12mm down graded) [LAA≤35] 0.4300 cum 4320.00 1857.60

Subtotal-A: 9194.64
Wooden form work & all other remaining costs ( +28.00 % on Subtotal-A ) 2574.50
Subtotal-A1: 11769.14

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12004.52

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 13204.97


VAT 6% of Total 880.33
IT 4% of Total 586.89
Total: 14672.19

5.05.02.05.2 Add for each additional floor up to 5th Floor cum Add +.39% with Item No 5.05.02.05.1

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1031 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.02.05.3 Add for each additional floor from 6th floor upto 9th floor cum Add +.69% with Item No 5.05.02.05.1

5.05.02.05.4 Add for each additional floor for 10th floor and above cum Add +.92% with Item No 5.05.02.05.1

5.05.02.06 In roof slab of all types, cantilever slab and drop panels (excluding floor
slab of ground floor at plinth level).

5.05.02.06.1 Below Plinth Level and in Ground Floor cum


Stone Chips (20mm down graded) [LAA≤35] 0.5200 cum 4930.00 2563.60
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0600 bag 430.00 2605.80
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Water reducing chemical admixture : Type-A 1.2100 liter 130.00 157.30
Stone Chips (12mm down graded) [LAA≤35] 0.3400 cum 4320.00 1468.80

Subtotal-A: 8805.84
Wooden form work & all other remaining costs ( +33.00 % on Subtotal-A ) 2905.93
Subtotal-A1: 11711.77

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11946.00

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 13140.60


VAT 6% of Total 876.04
IT 4% of Total 584.03
Total: 14600.67

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1032 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.02.06.2 Add for each additional floor up to 5th Floor cum Add +.40% with Item No 5.05.02.06.1

5.05.02.06.3 Add for each additional floor from 6th floor upto 9th floor cum Add +.72% with Item No 5.05.02.06.1

5.05.02.06.4 Add for each additional floor for 10th floor and above cum Add +.96% with Item No 5.05.02.06.1

5.05.02.07 In sunshade, cornice, railing, drop wall, louver and fins (Average 62mm
to 87mm thick)

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1033 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.02.07.1 Below Plinth Level and in Ground Floor cum


Stone Chips (20mm down graded) [LAA≤35] 0.5200 cum 4930.00 2563.60
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0600 bag 430.00 2605.80
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Water reducing chemical admixture : Type-A 1.2100 liter 130.00 157.30
Stone Chips (12mm down graded) [LAA≤35] 0.3400 cum 4320.00 1468.80

Subtotal-A: 8781.84
Wooden form work & all other remaining costs ( +82.00 % on Subtotal-A ) 7201.11
Subtotal-A1: 15982.95

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 16302.61

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 17932.87


VAT 6% of Total 1195.52
IT 4% of Total 797.02
Total: 19925.41

5.05.02.07.2 Add for each additional floor up to 5th Floor cum Add +.95% with Item No 5.05.02.07.1

5.05.02.07.3 Add for each additional floor from 6th floor upto 9th floor cum Add +1.75% with Item No 5.05.02.07.1

5.05.02.07.4 Add for each additional floor for 10th floor and above cum Add +2.38% with Item No 5.05.02.07.1

5.05.02.08 In Stair case slab and step

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1034 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.02.08.1 Below Plinth Level and in Ground Floor cum


Stone Chips (20mm down graded) [LAA≤35] 0.5200 cum 4930.00 2563.60
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0600 bag 430.00 2605.80
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Water reducing chemical admixture : Type-A 1.2100 liter 130.00 157.30
Stone Chips (12mm down graded) [LAA≤35] 0.3400 cum 4320.00 1468.80

Subtotal-A: 8805.84
Wooden form work & all other remaining costs ( +38.00 % on Subtotal-A ) 3346.22
Subtotal-A1: 12152.06

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12395.10

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 13634.61


VAT 6% of Total 908.97
IT 4% of Total 605.98
Total: 15149.57

5.05.02.08.2 Add for each additional floor up to 5th Floor cum Add +.40% with Item No 5.05.02.08.1

5.05.02.08.3 Add for each additional floor from 6th floor upto 9th floor cum Add +.72% with Item No 5.05.02.08.1

5.05.02.08.4 Add for each additional floor for 10th floor and above cum Add +.96% with Item No 5.05.02.08.1

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1035 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.02.09 In Waffle or Ribbed floor/roof slab

5.05.02.09.1 Below Plinth Level and in Ground Floor cum


Stone Chips (20mm down graded) [LAA≤35] 0.5200 cum 4930.00 2563.60
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0600 bag 430.00 2605.80
Water reducing chemical admixture : Type-A 1.2100 liter 130.00 157.30
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Stone Chips (12mm down graded) [LAA≤35] 0.3400 cum 4320.00 1468.80

Subtotal-A: 8805.84
Wooden form work & all other remaining costs ( +110.00 % on Subtotal-A ) 9686.42
Subtotal-A1: 18492.26

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 18862.11

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 20748.32


VAT 6% of Total 1383.22
IT 4% of Total 922.15
Total: 23053.69

5.05.02.09.2 Add for each additional floor up to 5th Floor cum Add +.26% with Item No 5.05.02.09.1

5.05.02.09.3 Add for each additional floor from 6th floor upto 9th floor cum Add +.46% with Item No 5.05.02.09.1

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1036 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.02.09.4 Add for each additional floor for 10th floor and above cum Add +.62% with Item No 5.05.02.09.1

5.05.03 RCC:1:1.5:3, 20MPa, Brick Chips (BC): Reinforced cement concrete


works with minimum cement content relates to mix ratio (tentative
1:1.5:3) and maximum water cement ratio 0.40 having minimum
required average strength, f'cr = 26 Mpa and satisfying a specified
compressive strength f'c = 20 Mpa at 28 days on standard cylinders as
per standard practice of Code AASHTO/ ASTM and Portland Composite
Cement conforming to BDS EN 197-1 : 2003 CEM-II 42.5N, sand of
minimum FM 2.20, 20mm down well graded picked brick chips (LAA
value and maximum water absorption not exceeding 38 and 15%
respectively) conforming to ASTM C 33 or Aggregate Grading Appendix-
3 LGED Schedule of Rates or any other International recognized
envelop and Water reducing chemical admixture of complying type A
under ASTM C 494, in/c breaking chips and screening through proper
sieves, centering, shuttering in position, making shuttering fully leak
proof & shuttering with plain 16 BWG steel sheet fitted over 38mm thick
wooden plank panels and Standard size Bamboo Props suitably braced,
placing of reinforcement in position, mixing the aggregates with
standard mixer machine with hoper, fed by standard measuring boxes,
maintaining allowable slump of 75mm to 100mm, pouring, casting,
compacting by mechanical vibrator machine's and tampered rod and
curing at least for 28 days, removing centering-shuttering after
approved specified time period, i/c cost of additional testing charges of
materials and cylinders required. Excluding the cost of reinforcement
and its fabrication, welding, coupling, placing, binding etc. additional
quantity of Plasticizer i.e. Water reducing chemical admixture of
complying type A under ASTM C 494 to reduce mixing water required
for normal workability and to maintain low water-cement (W/C) ratio
(Doses of admixture to be fixed by the mix design from approved
laboratory instruction by the Engineer) and additional quantity of
Portland Composite Cement to be added if required to attain the
strength at the contractor's own cost. Etc. all complete as per direction
and approval of the Engineer in charge.
Note : Using Concrete Mixer.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1037 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.03.01 In individual and continuous footing of column, raft and floor slab at cum
plinth level.
1st Class Picked Brick Chips (20mm down graded) 0.5200 m3 2940.00 1528.80
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Water reducing chemical admixture : Type-A 1.2100 liter 130.00 157.30
1st Class Brick Chips (10mm down graded) 0.3400 m3 3049.00 1036.66

Subtotal-A: 8048.40
Wooden form work & all other remaining costs ( +8.00 % on Subtotal-A ) 643.87
Subtotal-A1: 8692.27

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 8866.12

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 9752.73


VAT 6% of Total 650.18
IT 4% of Total 433.45
Total: 10836.37

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1038 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.03.02 In foundation beam cum


1st Class Picked Brick Chips (20mm down graded) 0.5200 m3 2940.00 1528.80
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Water reducing chemical admixture : Type-A 1.2100 liter 130.00 157.30
1st Class Brick Chips (10mm down graded) 0.3400 m3 3049.00 1036.66

Subtotal-A: 8048.40
Wooden form work & all other remaining costs ( +19.00 % on Subtotal-A ) 1529.20
Subtotal-A1: 9577.60

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9769.15

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 10746.06


VAT 6% of Total 716.40
IT 4% of Total 477.60
Total: 11940.07

5.05.03.03 In pedestal, column, capital lift wall and wall :

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1039 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.03.03.1 Below Plinth Level and in Ground Floo cum


1st Class Picked Brick Chips (20mm down graded) 0.5200 m3 2940.00 1528.80
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Water reducing chemical admixture : Type-A 1.2100 liter 130.00 157.30
1st Class Brick Chips (10mm down graded) 0.3400 m3 3049.00 1036.66

Subtotal-A: 8048.40
Wooden form work & all other remaining costs ( +55.00 % on Subtotal-A ) 4426.62
Subtotal-A1: 12475.02

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12724.52

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 13996.97


VAT 6% of Total 933.13
IT 4% of Total 622.09
Total: 15552.19

5.05.03.03.2 Add for each additional floor upto 5th floor cum Add +.36% with Item No 5.05.03.03.1

5.05.03.03.3 Add for each additional floor from 6th floor upto 9th cum Add +.65% with Item No 5.05.03.03.1

5.05.03.03.4 Add for each additional floor for 10th floor and above. cum Add +.86% with Item No 5.05.03.03.1

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1040 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.03.04 In Tie Beam and Lintel :

5.05.03.04.1 Below Plinth Level and in Ground Floor cum


1st Class Picked Brick Chips (20mm down graded) 0.5200 m3 2940.00 1528.80
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Water reducing chemical admixture : Type-A 1.2100 liter 130.00 157.30
1st Class Brick Chips (10mm down graded) 0.3400 m3 3049.00 1036.66

Subtotal-A: 8048.40
Wooden form work & all other remaining costs ( +33.00 % on Subtotal-A ) 2655.97
Subtotal-A1: 10704.37

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10918.46

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12010.31


VAT 6% of Total 800.69
IT 4% of Total 533.79
Total: 13344.78

5.05.03.04.2 Add for each additional floor upto 5th floor cum Add +.42% with Item No 5.05.03.04.1

5.05.03.04.3 Add for each additional floor from 6th floor upto 9th cum Add +.76% with Item No 5.05.03.04.1

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1041 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.03.04.4 Add for each additional floor for 10th floor and above. cum Add +1.01% with Item No 5.05.03.04.1

5.05.03.05 In Tee Beam, Ell Beam, Rectangular Beam etc. (exposed breadth and
width of ribs to be measured only).

5.05.03.05.1 Below Plinth Level and in Ground Floor cum


1st Class Picked Brick Chips (20mm down graded) 0.5200 m3 2940.00 1528.80
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Water reducing chemical admixture : Type-A 1.2100 liter 130.00 157.30
1st Class Brick Chips (10mm down graded) 0.3400 m3 3049.00 1036.66

Subtotal-A: 8048.40
Wooden form work & all other remaining costs ( +41.00 % on Subtotal-A ) 3299.84
Subtotal-A1: 11348.24

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11575.21

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12732.73


VAT 6% of Total 848.85
IT 4% of Total 565.90
Total: 14147.48

5.05.03.05.2 Add for each additional floor upto 5th floor cum Add +.38% with Item No 5.05.03.05.1

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1042 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.03.05.3 Add for each additional floor from 6th floor upto 9th cum Add +.70% with Item No 5.05.03.05.1

5.05.03.05.4 Add for each additional floor for 10th floor and above. cum Add +.93% with Item No 5.05.03.05.1

5.05.03.06 In roof slab of all types, cantilever slab and drop panels (excluding floor
slab of ground floor at plinth level).

5.05.03.06.1 Below Plinth Level and in Ground Floor cum


1st Class Picked Brick Chips (20mm down graded) 0.5200 m3 2940.00 1528.80
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Water reducing chemical admixture : Type-A 1.2100 liter 130.00 157.30
1st Class Brick Chips (10mm down graded) 0.3400 m3 3049.00 1036.66

Subtotal-A: 8048.40
Wooden form work & all other remaining costs ( +38.00 % on Subtotal-A ) 3058.39
Subtotal-A1: 11106.79

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11328.93

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12461.82


VAT 6% of Total 830.79
IT 4% of Total 553.86
Total: 13846.47

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1043 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.03.06.2 Add for each additional floor upto 5th floor cum Add +.41% with Item No 5.05.03.06.1

5.05.03.06.3 Add for each additional floor from 6th floor upto 9th cum Add +.73% with Item No 5.05.03.06.1

5.05.03.06.4 Add for each additional floor for 10th floor and above. cum Add +.97% with Item No 5.05.03.06.1

5.05.03.07 In sunshade, cornice, railing, drop wall, louver and fins (Average 62mm
to 87mm thick)

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1044 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.03.07.1 Below Plinth Level and in Ground Floor cum


1st Class Picked Brick Chips (20mm down graded) 0.5200 m3 2940.00 1528.80
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Water reducing chemical admixture : Type-A 1.2100 liter 130.00 157.30
1st Class Brick Chips (10mm down graded) 0.3400 m3 3049.00 1036.66

Subtotal-A: 8024.40
Wooden form work & all other remaining costs ( +83.00 % on Subtotal-A ) 6660.25
Subtotal-A1: 14684.65

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 14978.35

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 16476.18


VAT 6% of Total 1098.41
IT 4% of Total 732.27
Total: 18306.87

5.05.03.07.2 Add for each additional floor upto 5th floor cum Add +.97% with Item No 5.05.03.07.1

5.05.03.07.3 Add for each additional floor from 6th floor upto 9th cum Add +1.78% with Item No 5.05.03.07.1

5.05.03.07.4 Add for each additional floor for 10th floor and above. cum Add +2.42% with Item No 5.05.03.07.1

5.05.03.08 In Stair case slab and step

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1045 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.03.08.1 Below Plinth Level and in Ground Floor cum


1st Class Picked Brick Chips (20mm down graded) 0.5200 m3 2940.00 1528.80
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Water reducing chemical admixture : Type-A 1.2100 liter 130.00 157.30
1st Class Brick Chips (10mm down graded) 0.3400 m3 3049.00 1036.66

Subtotal-A: 8048.40
Wooden form work & all other remaining costs ( +40.00 % on Subtotal-A ) 3219.36
Subtotal-A1: 11267.76

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11493.12

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12642.43


VAT 6% of Total 842.83
IT 4% of Total 561.89
Total: 14047.14

5.05.03.08.2 Add for each additional floor upto 5th floor cum Add +.42% with Item No 5.05.03.08.1

5.05.03.08.3 Add for each additional floor from 6th floor upto 9th cum Add +.75% with Item No 5.05.03.08.1

5.05.03.08.4 Add for each additional floor for 10th floor and above. cum Add +.98% with Item No 5.05.03.08.1

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1046 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.03.09 In Waffle or Ribbed floor/roof slab

5.05.03.09.1 Below Plinth Level and in Ground Floor cum


1st Class Picked Brick Chips (20mm down graded) 0.5200 m3 2940.00 1528.80
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Water reducing chemical admixture : Type-A 1.2100 liter 130.00 157.30
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
1st Class Brick Chips (10mm down graded) 0.3400 m3 3049.00 1036.66

Subtotal-A: 8048.40
Wooden form work & all other remaining costs ( +115.00 % on Subtotal-A ) 9255.66
Subtotal-A1: 17304.06

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 17650.14

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 19415.16


VAT 6% of Total 1294.34
IT 4% of Total 862.90
Total: 21572.39

5.05.03.09.2 Add for each additional floor upto 5th floor cum Add +.27% with Item No 5.05.03.09.1

5.05.03.09.3 Add for each additional floor from 6th floor upto 9th cum Add +.47% with Item No 5.05.03.09.1

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1047 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.03.09.4 Add for each additional floor for 10th floor and above. cum Add +.63% with Item No 5.05.03.09.1

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1048 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.04 RCC: Mix Design 20MPa, Stone Chips (SC):, Batching Plant (BP):
Reinforced cement concrete work with minimum cement content and
maximum water cement ratio as specified by specified Laboratory
through mix design having minimum required average compressive
strength, f'cr = 26 Mpa and satisfying a specified compressive strength,
f'c = 20 Mpa at 28 days on standard cylinder as per standard practice of
Code AASHTO/ ASTM and Portland Composite Cement conforming to
BDS EN 197-1 : 2003 CEM-II 42.5N, high range water reducing
chemical admixture of complying type F under ASTM C494 which is
required to produce concrete of consistency by 12% or greater (flowing
concrete) and for higher strength and intend to retard setting time of
concrete. (Doses of admixture to be fixed by the mix design from
approved laboratory instruction by the Engineer) for smart dynamic
concrete (i.e. Low fines self compacting concrete), sand of minimum FM
2.20 and 20mm down well graded crushed stone chips broken from
boulders (Preferably stone chips from Madhyapara, Dinajpur) (LAA value
not exceeding 35) conforming to ASTM C33 or Aggregate Grading
Appendix-3 LGED Schedule of Rates or any other International
recognized envelop, in/c cost of breaking chips, screening through
proper sieves, cleaning and washing thoroughly, centering, shuttering in
position, making shuttering fully leak proof & shuttering with plain 16
BWG steel sheet fitted over 38mm thick wooden plank panels and
Standard size Bamboo Props suitably braced, placing of reinforcement in
position, mixing in mechanized a batching and mixing plant and
pumping using line pump or boom placer, maintaining allowable slump
of 100mm to 150mm casting in steel forms, compacting by Mechanical
vibrators and tapered rods and curing at least for 28 days, removing
centering-shuttering after approved specified time period i/c cost of
additional testing charges of materials and cylinders required etc all
complete as per direction of the Engineer in charge. (Excluding the cost
of reinforcements and its fabrication welding, coupling, placing, binding
etc. Additional quantity of cement to be added if required to attain the
strength at the contractor's own cost) etc. all complete as per direction
and approval of the Engineer
The Mix Design shall have to be approved by the District Quality Control
Laboratory, LGED or approved laboratory instruction by the Engineer
before execution of the work.
Note: Using Batching Plant, Transit Mixer & Concrete Pump

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1049 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.04.01 In individual and continuous footing of column, raft and floor slab at cum
plinth level.
Stone Chips (20mm down graded) [LAA≤35] 0.5200 cum 4930.00 2563.60
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0600 bag 430.00 2605.80
Water-reducing high range chemical admixture : Type-F 1.9270 liter 160.00 308.32
Hire and running charges of Batching and Mixing Plant @ 20 0.0083 day 23000.00 190.90
cum/hour
H.C. of Generator (100 KVA) 0.0083 day 3500.00 29.05
H.C. of Backhoe End Loader (6 tons) 0.0083 day 6000.00 49.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0083 day 5000.00 41.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Stone Chips (12mm down graded) [LAA≤35] 0.3400 cum 4320.00 1468.80
Head Mason 0.0800 day 650.00 52.00
Mason 0.3000 day 550.00 165.00
Skilled Labour 0.4000 day 450.00 180.00
Ordinary Labour 1.2000 day 370.00 444.00

Subtotal-A: 8876.61
Wooden form work & all other remaining costs ( +8.00 % on Subtotal-A ) 710.13
Subtotal-A1: 9586.74

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 9778.47

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 10756.32


VAT 6% of Total 717.09
IT 4% of Total 478.06

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1050 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 11951.47

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1051 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.04.02 In foundation beam cum


Stone Chips (20mm down graded) [LAA≤35] 0.5200 cum 4930.00 2563.60
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0600 bag 430.00 2605.80
Water-reducing high range chemical admixture : Type-F 1.9270 liter 160.00 308.32
Hire and running charges of Batching and Mixing Plant @ 20 0.0083 day 23000.00 190.90
cum/hour
H.C. of Generator (100 KVA) 0.0083 day 3500.00 29.05
H.C. of Backhoe End Loader (6 tons) 0.0083 day 6000.00 49.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0083 day 5000.00 41.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Stone Chips (12mm down graded) [LAA≤35] 0.3400 cum 4320.00 1468.80
Head Mason 0.0800 day 650.00 52.00
Mason 0.3000 day 550.00 165.00
Skilled Labour 0.4000 day 450.00 180.00
Ordinary Labour 1.2000 day 370.00 444.00

Subtotal-A: 8876.61
Wooden form work & all other remaining costs ( +18.00 % on Subtotal-A ) 1597.79
Subtotal-A1: 10474.40

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10683.89

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 11752.28


VAT 6% of Total 783.49
IT 4% of Total 522.32

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1052 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 13058.09

5.05.04.03 In pedestal, column, capital lift wall and wall :

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1053 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.04.03.1 Below Plinth Level and in Ground Floor cum


Stone Chips (20mm down graded) [LAA≤35] 0.5200 cum 4930.00 2563.60
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0600 bag 430.00 2605.80
Water-reducing high range chemical admixture : Type-F 1.9270 liter 160.00 308.32
Hire and running charges of Batching and Mixing Plant @ 20 0.0083 day 23000.00 190.90
cum/hour
H.C. of Generator (100 KVA) 0.0083 day 3500.00 29.05
H.C. of Backhoe End Loader (6 tons) 0.0083 day 6000.00 49.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0083 day 5000.00 41.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Stone Chips (12mm down graded) [LAA≤35] 0.3400 cum 4320.00 1468.80
Head Mason 0.0800 day 650.00 52.00
Mason 0.3000 day 550.00 165.00
Skilled Labour 0.4000 day 450.00 180.00
Ordinary Labour 1.2000 day 370.00 444.00

Subtotal-A: 8876.61
Wooden form work & all other remaining costs ( +54.00 % on Subtotal-A ) 4793.37
Subtotal-A1: 13669.98

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 13943.38

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 15337.72


VAT 6% of Total 1022.51
IT 4% of Total 681.68

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1054 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 17041.91

5.05.04.03.2 Add for each additional floor upto 5th floor cum Add +.35% with Item No 5.05.04.03.1

5.05.04.03.3 Add for each additional floor from 6th floor upto 9th cum Add +.63% with Item No 5.05.04.03.1

5.05.04.03.4 Add for each additional floor for 10th floor and above. cum Add +.85% with Item No 5.05.04.03.1

5.05.04.04 In Tie Beam and Lintel :

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1055 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.04.04.1 Below Plinth Level and in Ground Floor cum


Stone Chips (20mm down graded) [LAA≤35] 0.5200 cum 4930.00 2563.60
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0600 bag 430.00 2605.80
Water-reducing high range chemical admixture : Type-F 1.9270 liter 160.00 308.32
Hire and running charges of Batching and Mixing Plant @ 20 0.0083 day 23000.00 190.90
cum/hour
H.C. of Generator (100 KVA) 0.0083 day 3500.00 29.05
H.C. of Backhoe End Loader (6 tons) 0.0083 day 6000.00 49.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0083 day 5000.00 41.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Stone Chips (12mm down graded) [LAA≤35] 0.3400 cum 4320.00 1468.80
Head Mason 0.0800 day 650.00 52.00
Mason 0.3000 day 550.00 165.00
Skilled Labour 0.4000 day 450.00 180.00
Ordinary Labour 1.2000 day 370.00 444.00

Subtotal-A: 8876.61
Wooden form work & all other remaining costs ( +30.00 % on Subtotal-A ) 2662.98
Subtotal-A1: 11539.59

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11770.38

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12947.42


VAT 6% of Total 863.16
IT 4% of Total 575.44

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1056 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 14386.03

5.05.04.04.2 Add for each additional floor upto 5th floor cum Add +.41% with Item No 5.05.04.04.1

5.05.04.04.3 Add for each additional floor from 6th floor upto 9th cum Add +.75% with Item No 5.05.04.04.1

5.05.04.04.4 Add for each additional floor for 10th floor and above. cum Add +1.00% with Item No 5.05.04.04.1

5.05.04.05 In Tee Beam, Ell Beam, Rectangular Beam etc. (exposed breadth and
width of ribs to be measured only).

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1057 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.04.05.1 Below Plinth Level and in Ground Floor cum


Stone Chips (20mm down graded) [LAA≤35] 0.5200 cum 4930.00 2563.60
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0600 bag 430.00 2605.80
Water-reducing high range chemical admixture : Type-F 1.9270 liter 160.00 308.32
Hire and running charges of Batching and Mixing Plant @ 20 0.0083 day 23000.00 190.90
cum/hour
H.C. of Generator (100 KVA) 0.0083 day 3500.00 29.05
H.C. of Backhoe End Loader (6 tons) 0.0083 day 6000.00 49.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0083 day 5000.00 41.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Stone Chips (12mm down graded) [LAA≤35] 0.3400 cum 4320.00 1468.80
Head Mason 0.0800 day 650.00 52.00
Mason 0.3000 day 550.00 165.00
Skilled Labour 0.4000 day 450.00 180.00
Ordinary Labour 1.2000 day 370.00 444.00

Subtotal-A: 8876.61
Wooden form work & all other remaining costs ( +38.00 % on Subtotal-A ) 3373.11
Subtotal-A1: 12249.72

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12494.72

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 13744.19


VAT 6% of Total 916.28
IT 4% of Total 610.85

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1058 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 15271.32

5.05.04.05.2 Add for each additional floor upto 5th floor cum Add +.38% with Item No 5.05.04.05.1

5.05.04.05.4 Add for each additional floor from 6th floor upto 9th cum Add +.69% with Item No 5.05.04.05.1

5.05.04.05.5 Add for each additional floor for 10th floor and above. cum Add +.92% with Item No 5.05.04.05.1

5.05.04.06 In roof slab of all types, cantilever slab and drop panels (excluding floor
slab of ground floor at plinth level).

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1059 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.04.06.1 Below Plinth Level and in Ground Floor cum


Stone Chips (20mm down graded) [LAA≤35] 0.5200 cum 4930.00 2563.60
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0600 bag 430.00 2605.80
Water-reducing high range chemical admixture : Type-F 1.9270 liter 160.00 308.32
Hire and running charges of Batching and Mixing Plant @ 20 0.0083 day 23000.00 190.90
cum/hour
H.C. of Generator (100 KVA) 0.0083 day 3500.00 29.05
H.C. of Backhoe End Loader (6 tons) 0.0083 day 6000.00 49.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0083 day 5000.00 41.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Stone Chips (12mm down graded) [LAA≤35] 0.3400 cum 4320.00 1468.80
Head Mason 0.0800 day 650.00 52.00
Mason 0.3000 day 550.00 165.00
Skilled Labour 0.4000 day 450.00 180.00
Ordinary Labour 1.2000 day 370.00 444.00

Subtotal-A: 8876.61
Wooden form work & all other remaining costs ( +33.00 % on Subtotal-A ) 2929.28
Subtotal-A1: 11805.89

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12042.01

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 13246.21


VAT 6% of Total 883.08
IT 4% of Total 588.72

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1060 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 14718.01

5.05.04.06.2 Add for each additional floor upto 5th floor cum Add +.40% with Item No 5.05.04.06.1

5.05.04.06.3 Add for each additional floor from 6th floor upto 9th cum Add +.72% with Item No 5.05.04.06.1

5.05.04.06.4 Add for each additional floor for 10th floor and above. cum Add +.96% with Item No 5.05.04.06.1

5.05.04.07 In sunshade, cornice, railing, drop wall, louver and fins (Average 62mm
to 87mm thick)

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1061 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.04.07.1 Below Plinth Level and in Ground Floor cum


Stone Chips (20mm down graded) [LAA≤35] 0.5200 cum 4930.00 2563.60
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0600 bag 430.00 2605.80
Water-reducing high range chemical admixture : Type-F 1.9270 liter 160.00 308.32
Hire and running charges of Batching and Mixing Plant @ 20 0.0083 day 23000.00 190.90
cum/hour
H.C. of Generator (100 KVA) 0.0083 day 3500.00 29.05
H.C. of Backhoe End Loader (6 tons) 0.0083 day 6000.00 49.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0083 day 5000.00 41.50
capacity)
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Stone Chips (12mm down graded) [LAA≤35] 0.3400 cum 4320.00 1468.80
Head Mason 0.0800 day 650.00 52.00
Mason 0.3000 day 550.00 165.00
Skilled Labour 0.4000 day 450.00 180.00
Ordinary Labour 1.2000 day 370.00 444.00

Subtotal-A: 8852.61
Wooden form work & all other remaining costs ( +85.00 % on Subtotal-A ) 7524.72
Subtotal-A1: 16377.33

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 16704.88

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 18375.36


VAT 6% of Total 1225.02
IT 4% of Total 816.68
Total: 20417.07

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1062 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.04.07.2 Add for each additional floor upto 5th floor cum Add +.95% with Item No 5.05.04.07.1

5.05.04.07.3 Add for each additional floor from 6th floor upto 9th cum Add +1.75% with Item No 5.05.04.07.1

5.05.04.07.4 Add for each additional floor for 10th floor and above. cum Add +2.40% with Item No 5.05.04.07.1

5.05.04.08 In Stair case slab and step

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1063 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.04.08.1 Below Plinth Level and in Ground Floor cum


Stone Chips (20mm down graded) [LAA≤35] 0.5200 cum 4930.00 2563.60
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0600 bag 430.00 2605.80
Water-reducing high range chemical admixture : Type-F 1.9270 liter 160.00 308.32
Hire and running charges of Batching and Mixing Plant @ 20 0.0083 day 23000.00 190.90
cum/hour
H.C. of Generator (100 KVA) 0.0083 day 3500.00 29.05
H.C. of Backhoe End Loader (6 tons) 0.0083 day 6000.00 49.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0083 day 5000.00 41.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Stone Chips (12mm down graded) [LAA≤35] 0.3400 cum 4320.00 1468.80
Head Mason 0.0800 day 650.00 52.00
Mason 0.3000 day 550.00 165.00
Skilled Labour 0.4000 day 450.00 180.00
Ordinary Labour 1.2000 day 370.00 444.00

Subtotal-A: 8876.61
Wooden form work & all other remaining costs ( +40.00 % on Subtotal-A ) 3550.64
Subtotal-A1: 12427.25

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12675.80

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 13943.38


VAT 6% of Total 929.56
IT 4% of Total 619.71

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1064 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 15492.64

5.05.04.08.2 Add for each additional floor upto 5th floor cum Add +.40% with Item No 5.05.04.08.1

5.05.04.08.3 Add for each additional floor from 6th floor upto 9th cum Add +.72% with Item No 5.05.04.08.1

5.05.04.08.4 Add for each additional floor for 10th floor and above. cum Add +.96% with Item No 5.05.04.08.1

5.05.04.09 In Waffle or Ribbed floor/roof slab

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1065 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.04.09.1 Below Plinth Level and in Ground Floor cum


Stone Chips (20mm down graded) [LAA≤35] 0.5200 cum 4930.00 2563.60
Sand (FM - 2.5) 0.2580 m3 1500.00 387.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 6.0600 bag 430.00 2605.80
Water-reducing high range chemical admixture : Type-F 1.9270 liter 160.00 308.32
Hire and running charges of Batching and Mixing Plant @ 20 0.0083 day 23000.00 190.90
cum/hour
H.C. of Generator (100 KVA) 0.0083 day 3500.00 29.05
H.C. of Backhoe End Loader (6 tons) 0.0083 day 6000.00 49.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0083 day 5000.00 41.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Sand (FM - 1.8) 0.1720 m3 970.00 166.84
Stone Chips (12mm down graded) [LAA≤35] 0.3400 cum 4320.00 1468.80
Head Mason 0.0800 day 650.00 52.00
Mason 0.3000 day 550.00 165.00
Skilled Labour 0.4000 day 450.00 180.00
Ordinary Labour 1.2000 day 370.00 444.00

Subtotal-A: 8876.61
Form work & all other remaining costs ( +112.00 % on Subtotal-A ) 9941.80
Subtotal-A1: 18818.41

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 19194.78

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 21114.26


VAT 6% of Total 1407.62
IT 4% of Total 938.41

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1066 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 23460.29

5.05.04.09.2 Add for each additional floor upto 5th floor cum Add +.26% with Item No 5.05.04.09.1

5.05.04.09.3 Add for each additional floor from 6th floor upto 9th cum Add +.46% with Item No 5.05.04.09.1

5.05.04.09.4 Add for each additional floor for 10th floor and above. cum Add +.62% with Item No 5.05.04.09.1

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1067 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.05 RCC:1:1.5:3, 25MPa, Stone Chips (SC): Reinforced cement concrete


works with minimum cement content relates to mix ratio (tentative
1:1.5:3) and maximum water cement ratio 0.4 having minimum
required average strength, f'cr = 33.5 Mpa and satisfying a specified
compressive strength f'c = 25 Mpa at 28 days on standard cylinders as
per standard practice of Code AASHTO/ ASTM and Portland Composite
Cement conforming to BDS EN 197-1 : 2003 CEM-II 42.5N, best quality
sand of minimum FM 2.50, 20mm down well graded crushed stone
chips broken from boulder (Preferably stone chips from Madhyapara,
Dinajpur) (LAA value not exceeding 30) conforming to ASTM C33 or
Aggregate Grading Appendix-3 LGED Schedule of Rates or any other
International recognized envelop, Water reducing chemical admixture
of complying type A under ASTM C 494, in/c cost of breaking chips,
screening through proper sieves, cleaning and washing thoroughly,
centering, shuttering in position, with fully leak proof & shuttering with
plain 16 BWG steel sheet fitted over 38mmx38mmx5mm MS angle and
25mmx5mm FI bar frame and 38mm/50mm steel or GI pipe props
suitably braced and 12 BWG steel sheet plate box of proper size where
required, i/c cost of nuts, bolts, J-hooks etc, placing of reinforcement in
position, mixing in standard mixer machine with hoper or mixing in
mechanized batching and mixing plant and pumping using line pump or
boom placer as per approved mix design unless otherwise approved by
the Engineer, fed by standard measuring boxes, maintaining allowable
slump of 75mm to 100mm, casting in steel forms, compacting by
Mechanical vibrators and tapered rods and curing at least for 28 days,
removing centering-shuttering after approved specified time period, i/c
cost of additional testing charges of materials and cylinders required.
Excluding the cost of reinforcement and its fabrication, welding,
coupling, placing, binding etc. Water reducing chemical admixture of
complying type A under ASTM C 494 to reduce mixing water required
for normal workability and to maintain low water-cement (W/C) ratio
(Doses of admixture to be fixed by the mix design from approved
laboratory instruction by the Engineer) Additional quantity of cement to
be added if required to attain the strength at the contractor's own cost)
etc. all complete as per direction and approval of the Engineer in charge.
Note : Using Concrete Mixer.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1068 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.05.01 In individual and continuous footing of column, raft and floor slab at cum
plinth level
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.5000 day 450.00 225.00
Ordinary Labour 1.5000 day 370.00 555.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Water reducing chemical admixture : Type-A 1.9270 liter 130.00 250.51

Subtotal-A: 9421.71
Steel form work & all other remaining costs ( +6.00 % on Subtotal-A ) 565.30
Subtotal-A1: 9987.01

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10186.75

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 11205.43


VAT 6% of Total 747.03
IT 4% of Total 498.02
Total: 12450.48

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1069 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.05.02 In foundation beam cum


Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.5000 day 450.00 225.00
Ordinary Labour 1.5000 day 370.00 555.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Water reducing chemical admixture : Type-A 1.9270 liter 130.00 250.51

Subtotal-A: 9421.71
Steel form work & all other remaining costs ( +14.00 % on Subtotal-A ) 1319.04
Subtotal-A1: 10740.75

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10955.56

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12051.12


VAT 6% of Total 803.41
IT 4% of Total 535.61
Total: 13390.13

5.05.05.03 In pedestal, column, capital lift wall and wall :

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1070 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.05.03.1 Below Plinth Level and in Ground Floor cum


Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.5000 day 450.00 225.00
Ordinary Labour 1.5000 day 370.00 555.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Water reducing chemical admixture : Type-A 1.9270 liter 130.00 250.51

Subtotal-A: 9421.71
Steel form work & all other remaining costs ( +50.00 % on Subtotal-A ) 4710.86
Subtotal-A1: 14132.57

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 14415.22

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 15856.74


VAT 6% of Total 1057.12
IT 4% of Total 704.74
Total: 17618.60

5.05.05.03.2 Add for each additional floor up to 5th Floor cum Add +.35% with Item No 5.05.05.03.1

5.05.05.03.3 Add for each additional floor from 6th floor upto 9th floor cum Add +.63% with Item No 5.05.05.03.1

5.05.05.03.4 Add for each additional floor for 10th floor and above cum Add +.85% with Item No 5.05.05.03.1

5.05.05.04 In Tie Beam and Lintel :

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1071 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.05.04.1 Below Plinth Level and in Ground Floor cum


Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.5000 day 450.00 225.00
Ordinary Labour 1.5000 day 370.00 555.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Water reducing chemical admixture : Type-A 1.9270 liter 130.00 250.51

Subtotal-A: 9421.71
Steel form work & all other remaining costs ( +32.00 % on Subtotal-A ) 3014.95
Subtotal-A1: 12436.66

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12685.39

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 13953.93


VAT 6% of Total 930.26
IT 4% of Total 620.17
Total: 15504.37

5.05.05.04.2 Add for each additional floor upto 5th floor cum Add +.41% with Item No 5.05.05.04.1

5.05.05.04.3 Add for each additional floor from 6th floor upto 9th cum Add +.75% with Item No 5.05.05.04.1

5.05.05.04.4 Add for each additional floor for 10th floor and above. cum Add +1.00% with Item No 5.05.05.04.1

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1072 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.05.05 In Tee Beam, Ell Beam, Rectangular Beam etc. (exposed breadth and
width of ribs to be measured only).

5.05.05.05.1 Ground Floor cum


Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.5000 day 450.00 225.00
Ordinary Labour 1.5000 day 370.00 555.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Water reducing chemical admixture : Type-A 1.9270 liter 130.00 250.51

Subtotal-A: 9421.71
Steel form work & all other remaining costs ( +35.00 % on Subtotal-A ) 3297.60
Subtotal-A1: 12719.31

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12973.69

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 14271.06


VAT 6% of Total 951.40
IT 4% of Total 634.27
Total: 15856.74

5.05.05.05.2 Add for each additional floor upto 5th floor cum Add +.38% with Item No 5.05.05.05.1

5.05.05.05.3 Add for each additional floor from 6th floor upto 9th cum Add +.69% with Item No 5.05.05.05.1

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1073 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.05.05.4 Add for each additional floor for 10th floor and above. cum Add +.92% with Item No 5.05.05.05.1

5.05.05.06 In roof slab of all types, cantilever slab and drop panels (excluding floor
slab of ground floor at plinth level).

5.05.05.06.1 Ground Floor cum


Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.5000 day 450.00 225.00
Ordinary Labour 1.5000 day 370.00 555.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Water reducing chemical admixture : Type-A 1.9270 liter 130.00 250.51

Subtotal-A: 9421.71
Steel form work & all other remaining costs ( +30.00 % on Subtotal-A ) 2826.51
Subtotal-A1: 12248.22

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12493.19

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 13742.51


VAT 6% of Total 916.17
IT 4% of Total 610.78
Total: 15269.45

5.05.05.06.2 Add for each additional floor upto 5th floor cum Add +.40% with Item No 5.05.05.06.1

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1074 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.05.06.3 Add for each additional floor from 6th floor upto 9th cum Add +.72% with Item No 5.05.05.06.1

5.05.05.06.4 Add for each additional floor for 10th floor and above. cum Add +.96% with Item No 5.05.05.06.1

5.05.05.07 In sunshade, cornice, railing, drop wall, louver and fins (Average 62mm
to 87mm thick)

5.05.05.07.1 Ground Floor cum


Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.5000 day 450.00 225.00
Ordinary Labour 1.5000 day 370.00 555.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Water reducing chemical admixture : Type-A 1.9270 liter 130.00 250.51

Subtotal-A: 9397.71
Steel form work & all other remaining costs ( +82.00 % on Subtotal-A ) 7706.12
Subtotal-A1: 17103.83

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 17445.91

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 19190.50


VAT 6% of Total 1279.37
IT 4% of Total 852.91
Total: 21322.78

5.05.05.07.2 Add for each additional floor upto 5th floor cum Add +.95% with Item No 5.05.05.07.1

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1075 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.05.07.3 Add for each additional floor from 6th floor upto 9th cum Add +1.75% with Item No 5.05.05.07.1

5.05.05.07.4 Add for each additional floor for 10th floor and above. cum Add +2.38% with Item No 5.05.05.07.1

5.05.05.08 In Stair case slab and step

5.05.05.08.1 Ground Floor cum


Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Water reducing chemical admixture : Type-A 1.9270 liter 130.00 250.51

Subtotal-A: 9719.21
Steel form work & all other remaining costs ( +30.00 % on Subtotal-A ) 2915.76
Subtotal-A1: 12634.97

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12887.67

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 14176.44


VAT 6% of Total 945.10
IT 4% of Total 630.06
Total: 15751.60

5.05.05.08.2 Add for each additional floor upto 5th floor cum Add +.40% with Item No 5.05.05.08.1

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1076 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.05.08.3 Add for each additional floor from 6th floor upto 9th cum Add +.72% with Item No 5.05.05.08.1

5.05.05.08.4 Add for each additional floor for 10th floor and above. cum Add +.96% with Item No 5.05.05.08.1

5.05.05.09 In Waffle or Ribbed floor/roof slab

5.05.05.09.1 Ground Floor cum


Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Water reducing chemical admixture : Type-A 1.9270 liter 130.00 250.51

Subtotal-A: 9719.21
Steel form work & all other remaining costs ( +94.00 % on Subtotal-A ) 9136.06
Subtotal-A1: 18855.27

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 19232.37

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 21155.61


VAT 6% of Total 1410.37
IT 4% of Total 940.25
Total: 23506.23

5.05.05.09.2 Add for each additional floor upto 5th floor cum Add +.26% with Item No 5.05.05.09.1

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1077 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.05.09.3 Add for each additional floor from 6th floor upto 9th cum Add +.46% with Item No 5.05.05.09.1

5.05.05.09.4 Add for each additional floor for 10th floor and above. cum Add +.62% with Item No 5.05.05.09.1

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1078 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.06 RCC: Mix Design 25MPa, Stone Chips (SC), Batching Plant (BP):
Reinforced cement concrete work with minimum cement content and
maximum water cement ratio as specified by Laboratory through mix
design having minimum required average compressive strength, f'cr =
33.5 Mpa and satisfying a specified compressive strength, f'c = 25 Mpa
at 28 days on standard cylinder as per standard practice of Code
AASHTO/ ASTM and Portland Composite Cement conforming to BDS EN
197-1 : 2003 CEM-II 42.5N, high range water reducing chemical
admixture of complying type F/G under ASTM C494 which is required to
produce concrete of consistency by 12% or greater (flowing concrete)
and for higher strength and intend to retard setting time of concrete.
(Doses of admixture to be fixed by the mix design from approved
laboratory instruction by the Engineer) for smart dynamic concrete (i.e.
Low fines self-compacting concrete), sand of minimum FM 2.50 and
20mm down well graded crushed stone chips broken from boulders
(Preferably stone chips from Madhyapara, Dinajpur) (LAA value not
exceeding 30) conforming to ASTM C33 and Aggregate Grading
Appendix-3 LGED Schedule of Rates or any other International
recognized envelop in/c cost of breaking chips, screening through
proper sieves, cleaning and washing thoroughly, centering, shuttering in
position with plain 16 BWG steel sheet fitted over 38mmx38mmx5mm
MS angle and 25mmx5mm FI bar frame and 38mm/50mm steel or GI
pipe props suitably braced and 12 BWG steel sheet plate box of proper
size where required i/c cost of nuts, bolts, J-hooks etc, placing of
reinforcement in position, mixing in mechanized a batching and mixing
plant and pumping using line pump or boom placer, maintaining
allowable slump of 100mm to 150mm casting in steel forms, compacting
by Mechanical vibrators and tapered rods and curing at least for 28 days
removing centering-shuttering after approved specified time period i/c
cost of additional testing charges of materials and cylinders required
(Excluding the cost of reinforcements and its fabrication welding,
coupling, placing, binding etc. Additional quantity of cement to be added
if required to attain the strength at the contractor's own cost) etc. all
complete as per direction and approval of the Engineer in charge.
The Mix Design shall have to be approved by the District Quality
Control Laboratory, LGED or approved laboratory instruction by the
Engineer before execution of the work.
Note: Using Batching Plant, Transit Mixer & Concrete Pump

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1079 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.06.01 In individual and continuous footing of column, raft and floor slab at cum
plinth level.
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Water-reducing high range chemical admixture : Type-F 1.9270 liter 160.00 308.32
Hire and running charges of Batching and Mixing Plant @ 20 0.0083 day 23000.00 190.90
cum/hour
H.C. of Generator (100 KVA) 0.0083 day 3500.00 29.05
H.C. of Backhoe End Loader (6 tons) 0.0083 day 6000.00 49.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0083 day 5000.00 41.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Head Mason 0.0800 day 650.00 52.00
Mason 0.3000 day 550.00 165.00
Skilled Labour 0.4000 day 450.00 180.00
Ordinary Labour 1.2000 day 370.00 444.00

Subtotal-A: 9696.77
Steel form work & all other remaining costs ( +6.00 % on Subtotal-A ) 581.81
Subtotal-A1: 10278.58

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 10484.15

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 11532.56


VAT 6% of Total 768.84
IT 4% of Total 512.56
Total: 12813.96

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1080 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.06.02 In foundation beam cum


Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Water-reducing high range chemical admixture : Type-F 1.9270 liter 160.00 308.32
Hire and running charges of Batching and Mixing Plant @ 20 0.0083 day 23000.00 190.90
cum/hour
H.C. of Generator (100 KVA) 0.0083 day 3500.00 29.05
H.C. of Backhoe End Loader (6 tons) 0.0083 day 6000.00 49.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0083 day 5000.00 41.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Head Mason 0.0800 day 650.00 52.00
Mason 0.3000 day 550.00 165.00
Skilled Labour 0.4000 day 450.00 180.00
Ordinary Labour 1.2000 day 370.00 444.00

Subtotal-A: 9696.77
Steel form work & all other remaining costs ( +14.00 % on Subtotal-A ) 1357.55
Subtotal-A1: 11054.32

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11275.40

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12402.94


VAT 6% of Total 826.86
IT 4% of Total 551.24
Total: 13781.05

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1081 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.06.03 In pedestal, column, column capitals, lift wall and walls

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1082 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.06.03.1 Below Plinth Level and in Ground Floor cum


Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Water-reducing high range chemical admixture : Type-F 1.9270 liter 160.00 308.32
Hire and running charges of Batching and Mixing Plant @ 20 0.0083 day 23000.00 190.90
cum/hour
H.C. of Generator (100 KVA) 0.0083 day 3500.00 29.05
H.C. of Backhoe End Loader (6 tons) 0.0083 day 6000.00 49.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0083 day 5000.00 41.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Head Mason 0.0800 day 650.00 52.00
Mason 0.3000 day 550.00 165.00
Skilled Labour 0.4000 day 450.00 180.00
Ordinary Labour 1.2000 day 370.00 444.00

Subtotal-A: 9696.77
Steel form work & all other remaining costs ( +48.00 % on Subtotal-A ) 4654.45
Subtotal-A1: 14351.22

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 14638.24

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 16102.07


VAT 6% of Total 1073.47
IT 4% of Total 715.65
Total: 17891.19

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1083 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.06.03.2 Add for each additional floor up to 5th Floor cum Add +.35% with Item No 5.05.06.03.1

5.05.06.03.3 Add for each additional floor from 6th floor up to 9th floor cum Add +.63% with Item No 5.05.06.03.1

5.05.06.03.4 Add for each additional floor for 10th floor & above cum Add +.85% with Item No 5.05.06.03.1

5.05.06.04 In Tie Beam and lintel :

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1084 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.06.04.1 Below Plinth Level and in Ground Floor cum


Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Water-reducing high range chemical admixture : Type-F 1.9270 liter 160.00 308.32
Hire and running charges of Batching and Mixing Plant @ 20 0.0083 day 23000.00 190.90
cum/hour
H.C. of Generator (100 KVA) 0.0083 day 3500.00 29.05
H.C. of Backhoe End Loader (6 tons) 0.0083 day 6000.00 49.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0083 day 5000.00 41.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Head Mason 0.0800 day 650.00 52.00
Mason 0.3000 day 550.00 165.00
Skilled Labour 0.4000 day 450.00 180.00
Ordinary Labour 1.2000 day 370.00 444.00

Subtotal-A: 9696.77
Steel form work & all other remaining costs ( +31.00 % on Subtotal-A ) 3006.00
Subtotal-A1: 12702.77

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12956.82

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 14252.51


VAT 6% of Total 950.17
IT 4% of Total 633.44
Total: 15836.12

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1085 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.06.04.2 Add for each additional floor up to 5th Floor cum Add +.41% with Item No 5.05.06.04.1

5.05.06.04.3 Add for each additional floor from 6th floor up to 9th floor cum Add +.75% with Item No 5.05.06.04.1

5.05.06.04.4 Add for each additional floor for 10th floor & above cum Add +1.00% with Item No 5.05.06.04.1

5.05.06.05 In Tee Beam, Ell Beam, Rectangular Beam etc. (exposed breadth and
width of ribs to be measured only).

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1086 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.06.05.1 Ground Floor cum


Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Water-reducing high range chemical admixture : Type-F 1.9270 liter 160.00 308.32
Hire and running charges of Batching and Mixing Plant @ 20 0.0083 day 23000.00 190.90
cum/hour
H.C. of Generator (100 KVA) 0.0083 day 3500.00 29.05
H.C. of Backhoe End Loader (6 tons) 0.0083 day 6000.00 49.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0083 day 5000.00 41.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Head Mason 0.0800 day 650.00 52.00
Mason 0.3000 day 550.00 165.00
Skilled Labour 0.4000 day 450.00 180.00
Ordinary Labour 1.2000 day 370.00 444.00

Subtotal-A: 9696.77
Steel form work & all other remaining costs ( +34.00 % on Subtotal-A ) 3296.90
Subtotal-A1: 12993.67

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 13253.55

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 14578.90


VAT 6% of Total 971.93
IT 4% of Total 647.95
Total: 16198.78

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1087 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.06.05.2 Add for each additional floor up to 5th Floor cum Add +.38% with Item No 5.05.06.05.1

5.05.06.05.3 Add for each additional floor from 6th floor up to 9th floor cum Add +.69% with Item No 5.05.06.05.1

5.05.06.05.4 Add for each additional floor for 10th floor & above cum Add +.92% with Item No 5.05.06.05.1

5.05.06.06 In roof slab of all types, cantilever slab and drop panels (excluding floor
slab of ground floor at plinth level).

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1088 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.06.06.1 Ground Floor cum


Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Water-reducing high range chemical admixture : Type-F 1.9270 liter 160.00 308.32
Hire and running charges of Batching and Mixing Plant @ 20 0.0083 day 23000.00 190.90
cum/hour
H.C. of Generator (100 KVA) 0.0083 day 3500.00 29.05
H.C. of Backhoe End Loader (6 tons) 0.0083 day 6000.00 49.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0083 day 5000.00 41.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Head Mason 0.0800 day 650.00 52.00
Mason 0.3000 day 550.00 165.00
Skilled Labour 0.4000 day 450.00 180.00
Ordinary Labour 1.2000 day 370.00 444.00

Subtotal-A: 9696.77
Steel form work & all other remaining costs ( +28.00 % on Subtotal-A ) 2715.10
Subtotal-A1: 12411.87

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12660.10

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 13926.11


VAT 6% of Total 928.41
IT 4% of Total 618.94
Total: 15473.46

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1089 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.06.06.2 Add for each additional floor up to 5th Floor cum Add +.40% with Item No 5.05.06.06.1

5.05.06.06.3 Add for each additional floor from 6th floor up to 9th floor cum Add +.72% with Item No 5.05.06.06.1

5.05.06.06.4 Add for each additional floor for 10th floor & above cum Add +.96% with Item No 5.05.06.06.1

5.05.06.07 In sunshade, cornice, railing, drop wall, louver and fins (Average 62mm
to 87mm thick).

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1090 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.06.07.1 Ground Floor cum


Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Water-reducing high range chemical admixture : Type-F 1.9270 liter 160.00 308.32
Hire and running charges of Batching and Mixing Plant @ 20 0.0083 day 23000.00 190.90
cum/hour
H.C. of Generator (100 KVA) 0.0083 day 3500.00 29.05
H.C. of Backhoe End Loader (6 tons) 0.0083 day 6000.00 49.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0083 day 5000.00 41.50
capacity)
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Head Mason 0.0800 day 650.00 52.00
Mason 0.3000 day 550.00 165.00
Skilled Labour 0.4000 day 450.00 180.00
Ordinary Labour 1.2000 day 370.00 444.00

Subtotal-A: 9672.77
Steel form work & all other remaining costs ( +82.00 % on Subtotal-A ) 7931.67
Subtotal-A1: 17604.44

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 17956.53

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 19752.18


VAT 6% of Total 1316.81
IT 4% of Total 877.87
Total: 21946.87

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1091 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.06.07.2 Add for each additional floor upto 5th floor cum Add +.95% with Item No 5.05.06.07.1

5.05.06.07.3 Add for each additional floor from 6th floor upto 9th cum Add +1.75% with Item No 5.05.06.07.1

5.05.06.07.4 Add for each additional floor for 10th floor and above. cum Add +2.38% with Item No 5.05.06.07.1

5.05.06.08 In Stair case slab and step

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1092 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.06.08.1 Ground Floor cum


Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Water-reducing high range chemical admixture : Type-F 1.9270 liter 160.00 308.32
Hire and running charges of Batching and Mixing Plant @ 20 0.0083 day 23000.00 190.90
cum/hour
H.C. of Generator (100 KVA) 0.0083 day 3500.00 29.05
H.C. of Backhoe End Loader (6 tons) 0.0083 day 6000.00 49.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0083 day 5000.00 41.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Head Mason 0.0800 day 650.00 52.00
Mason 0.3000 day 550.00 165.00
Skilled Labour 0.4000 day 450.00 180.00
Ordinary Labour 1.2000 day 370.00 444.00

Subtotal-A: 9696.77
Steel form work & all other remaining costs ( +33.00 % on Subtotal-A ) 3199.93
Subtotal-A1: 12896.70

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 13154.64

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 14470.10


VAT 6% of Total 964.67
IT 4% of Total 643.12
Total: 16077.89

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1093 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.06.08.2 Add for each additional floor up to 5th Floor cum Add +.40% with Item No 5.05.06.08.1

5.05.06.08.3 Add for each additional floor from 6th floor up to 9th floor cum Add +.72% with Item No 5.05.06.08.1

5.05.06.08.4 Add for each additional floor for 10th floor & above cum Add +.96% with Item No 5.05.06.08.1

5.05.06.09 In Waffle or Ribbed floor/roof slab

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1094 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.06.09.1 Ground Floor cum


Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Sand (FM - 2.5) 0.4100 m3 1500.00 615.00
Portland Composite Cement (CEM-II/A-L/M/V/W 42.5N) 7.7100 bag 430.00 3315.30
Water-reducing high range chemical admixture : Type-F 1.9270 liter 160.00 308.32
Hire and running charges of Batching and Mixing Plant @ 20 0.0083 day 23000.00 190.90
cum/hour
H.C. of Generator (100 KVA) 0.0083 day 3500.00 29.05
H.C. of Backhoe End Loader (6 tons) 0.0083 day 6000.00 49.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0083 day 5000.00 41.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Head Mason 0.0800 day 650.00 52.00
Mason 0.3000 day 550.00 165.00
Skilled Labour 0.4000 day 450.00 180.00
Ordinary Labour 1.2000 day 370.00 444.00

Subtotal-A: 9696.77
Steel form work & all other remaining costs ( +98.00 % on Subtotal-A ) 9502.83
Subtotal-A1: 19199.60

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 19583.60

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 21541.96


VAT 6% of Total 1436.13
IT 4% of Total 957.42
Total: 23935.51

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1095 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.06.09.2 Add for each additional floor up to 5th Floor cum Add +.26% with Item No 5.05.06.09.1

5.05.06.09.3 Add for each additional floor from 6th floor up to 9th floor cum Add +.46% with Item No 5.05.06.09.1

5.05.06.09.4 Add for each additional floor for 10th floor & above cum Add +.62% with Item No 5.05.06.09.1

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1096 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.07 RCC:1:1.25:2.5, 30MPa, Stone Chips (SC): Reinforced cement concrete


works using steel shutter with minimum cement content relates to mix
ratio tentative 1:1.25:2.5 and maximum water cement ratio 0.4 having
minimum cylinder crushing strength f’cr = 40 Mpa and satisfied a
specified compressive strength f’c = 30 Mpa at 28 days on standard
cylinders as per standard practice of Code AASHTO/ ASTM and Ordinary
Portland cement conforming to BDS EN 197-1 : 2003 CEM-I
52.5N/ASTM C150 Type-1 and adding approved high range water
reducing chemical admixture of complying specific type (generally be
Type-F) under ASTM-C 494 which is required to produce concrete of
consistency by 12% or greater (flowing concrete) and for higher
strength and intend to retard setting time of concrete. (Doses of
admixture to be fixed by the mix design and used only instruction of
Central Quality Control Laboratory of LGED or approved laboratory
instruction by the Engineer), best quality sand of minimum FM 2.5 and
20mm down well graded crushed stone chips broken from boulder (LAA
value not exceeding 30) conforming to ASTM C33 and Aggregate
Grading Appendix-3 LGED Schedule of Rates in/c cost of breaking chips,
screening, centering, shuttering in position with plain 16 BWG steel
sheet fitted over 38mmx38mmx5mm MS angle and 25mmx5mm FI bar
frame and 38mm/50mm steel or GI pipe props suitably braced and 12
BWG steel sheet plate box of proper size where required i/c cost of
nuts, bolts, J-hooks etc, making shuttering fully leak proof placing of
reinforcement in position, mixing in a standard mixer machine with
hoper or batching and mixing plant and pumping using line pump or
boom placer as per approved mix design unless other wise approved by
the Engineer, fed by standard measuring boxes, maintaining allowable
slump of 75mm to 100mm pouring, casting, compacting by Mechanical
vibrator machine and curing at least for 28 days removing centering-
shuttering after approved specified time period i/c cost of additional
testing charges of materials and cylinders required. Excluding the cost
of reinforcement and its fabrication, welding, coupling, placing, binding
etc. Additional quantity of cement to be added if required to attain the
strength at the contractor's own cost etc. all complete as per direction
and approval of the Engineer in charge.
The Mix Design shall be got approved by the District Quality Control
Laboratory, LGED or approved laboratory instruction by the Engineer
before execution of the work.
Note : Using Concrete Mixer.

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1097 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.07.01 In individual and continuous footing of column, raft and floor slab at cum
plinth level
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Sand (FM - 2.5) 0.4000 m3 1500.00 600.00
Ordinary Portland Cement (CEM I, 52.5N) 8.9220 bag 455.00 4059.51
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10

Subtotal-A: 10541.91
Steel form work & all other remaining costs ( +5.00 % on Subtotal-A ) 527.10
Subtotal-A1: 11069.01

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11290.39

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 12419.42


VAT 6% of Total 827.96
IT 4% of Total 551.97
Total: 13799.36

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1098 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.07.02 In foundation beam cum


Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Sand (FM - 2.5) 0.4000 m3 1500.00 600.00
Ordinary Portland Cement (CEM I, 52.5N) 8.9220 bag 455.00 4059.51
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Stone Chips (12mm down graded) [LAA≤30] 0.3900 m3 4470.00 1743.30

Subtotal-A: 10810.11
Steel form work & all other remaining costs ( +13.00 % on Subtotal-A ) 1405.31
Subtotal-A1: 12215.42

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12459.73

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 13705.71


VAT 6% of Total 913.71
IT 4% of Total 609.14
Total: 15228.56

5.05.07.03 In pedestal, column, capital lift wall and wall :

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1099 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.07.03.1 Below Plinth Level and in Ground Floor cum


Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Sand (FM - 2.5) 0.4000 m3 1500.00 600.00
Ordinary Portland Cement (CEM I, 52.5N) 8.9220 bag 455.00 4059.51
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10

Subtotal-A: 10541.91
Steel form work & all other remaining costs ( +46.00 % on Subtotal-A ) 4849.28
Subtotal-A1: 15391.19

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 15699.01

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 17268.91


VAT 6% of Total 1151.26
IT 4% of Total 767.51
Total: 19187.68

5.05.07.03.2 Add for each additional floor up to 5th Floor cum Add +.35% with Item No 5.05.07.03.1

5.05.07.03.3 Add for each additional floor from 6th floor upto 9th floor cum Add +.63% with Item No 5.05.07.03.1

5.05.07.03.4 Add for each additional floor for 10th floor and above cum Add +.85% with Item No 5.05.07.03.1

5.05.07.04 In Tie Beam and Lintel :

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1100 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.07.04.1 Below Plinth Level and in Ground Floor cum


Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Sand (FM - 2.5) 0.4000 m3 1500.00 600.00
Ordinary Portland Cement (CEM I, 52.5N) 8.9220 bag 455.00 4059.51
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10

Subtotal-A: 10541.91
Steel form work & all other remaining costs ( +30.00 % on Subtotal-A ) 3162.57
Subtotal-A1: 13704.48

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 13978.57

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 15376.43


VAT 6% of Total 1025.10
IT 4% of Total 683.40
Total: 17084.92

5.05.07.04.2 Add for each additional floor up to 5th Floor cum Add +.41% with Item No 5.05.07.04.1

5.05.07.04.3 Add for each additional floor from 6th floor upto 9th floor cum Add +.75% with Item No 5.05.07.04.1

5.05.07.04.4 Add for each additional floor for 10th floor and above cum Add +1.00% with Item No 5.05.07.04.1

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1101 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.07.05 In Tee Beam, Ell Beam, Rectangular Beam etc. (exposed breadth and
width of ribs to be measured only).

5.05.07.05.1 Below Plinth Level and in Ground Floor cum


Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Sand (FM - 2.5) 0.4000 m3 1500.00 600.00
Ordinary Portland Cement (CEM I, 52.5N) 8.9220 bag 455.00 4059.51
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10

Subtotal-A: 10541.91
Steel form work & all other remaining costs ( +34.00 % on Subtotal-A ) 3584.25
Subtotal-A1: 14126.16

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 14408.68

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 15849.55


VAT 6% of Total 1056.64
IT 4% of Total 704.42
Total: 17610.61

5.05.07.05.2 Add for each additional floor up to 5th Floor cum Add +.38% with Item No 5.05.07.05.1

5.05.07.05.3 Add for each additional floor from 6th floor upto 9th floor cum Add +.69% with Item No 5.05.07.05.1

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1102 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.07.05.4 Add for each additional floor for 10th floor and above cum Add +.92% with Item No 5.05.07.05.1

5.05.07.06 In roof slab of all types, cantilever slab and drop panels (excluding floor
slab of ground floor at plinth level).

5.05.07.06.1 Below Plinth Level and in Ground Floor cum


Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Sand (FM - 2.5) 0.4000 m3 1500.00 600.00
Ordinary Portland Cement (CEM I, 52.5N) 8.9220 bag 455.00 4059.51
Head Mason 0.0800 day 650.00 52.00
Mason 0.4500 day 550.00 247.50
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10

Subtotal-A: 10558.41
Steel form work & all other remaining costs ( +28.00 % on Subtotal-A ) 2956.35
Subtotal-A1: 13514.76

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 13785.06

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 15163.57


VAT 6% of Total 1010.90
IT 4% of Total 673.94
Total: 16848.41

5.05.07.06.2 Add for each additional floor up to 5th Floor cum Add +.40% with Item No 5.05.07.06.1

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1103 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.07.06.3 Add for each additional floor from 6th floor upto 9th floor cum Add +.72% with Item No 5.05.07.06.1

5.05.07.06.4 Add for each additional floor for 10th floor and above cum Add +.96% with Item No 5.05.07.06.1

5.05.07.07 In sunshade, cornice, railing, drop wall, louver and fins (Average 62mm
to 87mm thick)

5.05.07.07.1 Below Plinth Level and in Ground Floor cum


Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Sand (FM - 2.5) 0.4000 m3 1500.00 600.00
Ordinary Portland Cement (CEM I, 52.5N) 8.9220 bag 455.00 4059.51
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Water-reducing high range and retrading chemical admixture 2.1500 liter 160.00 344.00
: Type-G
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10

Subtotal-A: 10517.91
Steel form work & all other remaining costs ( +81.00 % on Subtotal-A ) 8519.51
Subtotal-A1: 19037.42

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 19418.17

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 21359.98


VAT 6% of Total 1424.00
IT 4% of Total 949.33
Total: 23733.31

5.05.07.07.2 Add for each additional floor up to 5th Floor cum Add +.95% with Item No 5.05.07.07.1

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1104 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.07.07.3 Add for each additional floor from 6th floor upto 9th floor cum Add +1.75% with Item No 5.05.07.07.1

5.05.07.07.4 Add for each additional floor for 10th floor and above cum Add +2.38% with Item No 5.05.07.07.1

5.05.07.08 In Stair case slab and step

5.05.07.08.1 Below Plinth Level and in Ground Floor cum


Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Sand (FM - 2.5) 0.4000 m3 1500.00 600.00
Ordinary Portland Cement (CEM I, 52.5N) 8.9220 bag 455.00 4059.51
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10

Subtotal-A: 10541.91
Steel form work & all other remaining costs ( +31.00 % on Subtotal-A ) 3267.99
Subtotal-A1: 13809.90

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 14086.10

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 15494.71


VAT 6% of Total 1032.98
IT 4% of Total 688.65
Total: 17216.34

5.05.07.08.2 Add for each additional floor up to 5th Floor cum Add +.40% with Item No 5.05.07.08.1

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1105 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.07.08.3 Add for each additional floor from 6th floor upto 9th floor cum Add +.72% with Item No 5.05.07.08.1

5.05.07.08.4 Add for each additional floor for 10th floor and above cum Add +.96% with Item No 5.05.07.08.1

5.05.07.09 In Waffle or Ribbed floor/roof slab

5.05.07.09.1 Below Plinth Level and in Ground Floor cum


Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Sand (FM - 2.5) 0.4000 m3 1500.00 600.00
Ordinary Portland Cement (CEM I, 52.5N) 8.9220 bag 455.00 4059.51
Head Mason 0.0800 day 650.00 52.00
Mason 0.4200 day 550.00 231.00
Skilled Labour 0.7500 day 450.00 337.50
Ordinary Labour 2.0000 day 370.00 740.00
H.C. of Concrete Mixture Machine (Capacity 0.40/ 0.28 cum) 0.0600 day 1200.00 72.00
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10

Subtotal-A: 10541.91
Steel form work & all other remaining costs ( +96.00 % on Subtotal-A ) 10120.23
Subtotal-A1: 20662.14

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 21075.39

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 23182.93


VAT 6% of Total 1545.53
IT 4% of Total 1030.35
Total: 25758.81

5.05.07.09.2 Add for each additional floor up to 5th Floor cum Add +.26% with Item No 5.05.07.09.1

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1106 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.07.09.3 Add for each additional floor from 6th floor upto 9th floor cum Add +.46% with Item No 5.05.07.09.1

5.05.07.09.4 Add for each additional floor for 10th floor and above cum Add +.62% with Item No 5.05.07.09.1

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1107 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.08 RCC-30MPa, Stone Chips (SC), Batching Plant (BP): Reinforced cement
concrete work with minimum cement content and maximum water
cement ratio as specified by Quality Control Laboratory, LGED or
approved laboratory instruction by the Engineer before execution of the
work. Having minimum required average compressive strength, f'cr =
38.5 Mpa and satisfying a specified compressive strength, f'c = 30 Mpa
at 28 days on standard cylinder as per standard practice of Code
AASHTO/ ASTM and cement conforming to BDS EN 197-1 : 2003 CEM-I
52.5N / ASTM C150 Type-1, high range water reducing admixture of
complying type F/ G under ASTM C494 (Doses of admixture to be fixed
by the mix design from approved laboratory instruction by the Engineer)
for smart dynamic concrete (i.e. Low fines self compacting concrete),
sand of minimum FM 2.50 and 20mm down well graded crushed stone
chips broken from boulders (Preferably stone chips from Madhyapara,
Dinajpur, LAA value not exceeding 30) conforming to ASTM C33 and
Aggregate Grading Appendix-3 LGED Schedule of Rates or any other
International recognized envelop in/c cost of breaking chips, screening
through proper sieves, cleaning and washing thoroughly, centering,
shuttering in position with plain 16 BWG steel sheet fitted over
38mmx38mmx5mm MS angle and 25mmx5mm FI bar frame and
38mm/50mm steel or GI pipe props suitably braced and 12 BWG steel
sheet plate box of proper size where required i/c cost of nuts, bolts, J-
hooks etc, placing of reinforcement in position, mixing in mechanized a
batching and mixing plant and pumping using line pump or boom
placer, maintaining allowable slump of 100mm to150mm casting in steel
forms, compacting by Mechanical vibrators and tapered rods and curing
at least for 28 days removing centering-shuttering after approved
specified time period i/c cost of additional testing charges of materials
and cylinders required (Excluding the cost of reinforcements and its
fabrication welding, coupling, placing, binding etc. Additional quantity of
cement to be added if required to attain the strength at the contractor's
own cost) etc. all complete as per approval of the Engineer in charge.
The Mix Design shall have to approved by the Central Quality Control
Laboratory (CQCL), LGED or approved laboratory instruction by the
Engineer before execution of the work.
Note: Using Batching Plant, Transit Mixer & Concrete Pump

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1108 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.08.01 In individual and continuous footing of column, raft and floor slab at cum
plinth level
Ordinary Portland Cement (CEM I, 52.5N) 8.9220 bag 455.00 4059.51
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4000 m3 1500.00 600.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.5000 day 550.00 275.00
Skilled Labour 1.0000 day 450.00 450.00
Ordinary Labour 1.5000 day 370.00 555.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0083 day 23000.00 190.90
cum/hour
H.C. of Generator (100 KVA) 0.0083 day 3500.00 29.05
H.C. of Backhoe End Loader (6 tons) 0.0083 day 6000.00 49.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0083 day 5000.00 41.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00
Diesel 1.0730 liter 68.00 72.96

Subtotal-A: 11025.62
Steel Formwork/ shuttering, prop with necessary ( +6.00 % on Subtotal-A ) 661.54
supports etc.
Subtotal-A1: 11687.16

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 11920.90

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 13113.00


VAT 6% of Total 874.20

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1109 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

IT 4% of Total 582.80
Total: 14569.99

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1110 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.08.02 In foundation beam cum


Ordinary Portland Cement (CEM I, 52.5N) 8.9220 bag 455.00 4059.51
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4000 m3 1500.00 600.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.5000 day 550.00 275.00
Skilled Labour 1.0000 day 450.00 450.00
Ordinary Labour 1.5000 day 370.00 555.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0083 day 23000.00 190.90
cum/hour
H.C. of Generator (100 KVA) 0.0083 day 3500.00 29.05
H.C. of Backhoe End Loader (6 tons) 0.0083 day 6000.00 49.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0083 day 5000.00 41.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 10952.66
Steel Formwork/ shuttering, prop with necessary ( +14.00 % on Subtotal-A ) 1533.37
supports etc.
Subtotal-A1: 12486.03

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 12735.75

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 14009.33


VAT 6% of Total 933.96
IT 4% of Total 622.64

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1111 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 15565.92

5.05.08.03 In pedestal, column, capital lift wall and wall :

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1112 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.08.03.01 Below Plinth Level and in Ground Floor cum


Ordinary Portland Cement (CEM I, 52.5N) 8.9220 bag 455.00 4059.51
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4000 m3 1500.00 600.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.5000 day 550.00 275.00
Skilled Labour 1.0000 day 450.00 450.00
Ordinary Labour 1.5000 day 370.00 555.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0083 day 23000.00 190.90
cum/hour
H.C. of Generator (100 KVA) 0.0083 day 3500.00 29.05
H.C. of Backhoe End Loader (6 tons) 0.0083 day 6000.00 49.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0083 day 5000.00 41.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 10952.66
Steel Formwork/ shuttering, prop with necessary ( +48.00 % on Subtotal-A ) 5257.28
supports etc.
Subtotal-A1: 16209.94

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 16534.14

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 18187.55


VAT 6% of Total 1212.50
IT 4% of Total 808.34

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1113 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 20208.39

5.05.08.03.02 Add for each additional floor up to 5th Floor cum Add +.35% with Item No 5.05.08.03.01

5.05.08.03.03 Add for each additional floor from 6th floor upto 9th floor cum Add +.63% with Item No 5.05.08.03.01

5.05.08.03.04 Add for each additional floor for 10th floor and above cum Add +.85% with Item No 5.05.08.03.01

5.05.08.04 In Tie Beam and Lintel :

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1114 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.08.04.01 Below Plinth Level and in Ground Floor cum


Ordinary Portland Cement (CEM I, 52.5N) 8.9220 bag 455.00 4059.51
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4000 m3 1500.00 600.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.5000 day 550.00 275.00
Skilled Labour 1.0000 day 450.00 450.00
Ordinary Labour 1.5000 day 370.00 555.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0083 day 23000.00 190.90
cum/hour
H.C. of Generator (100 KVA) 0.0083 day 3500.00 29.05
H.C. of Backhoe End Loader (6 tons) 0.0083 day 6000.00 49.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0083 day 5000.00 41.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 10952.66
Steel Formwork/ shuttering, prop with necessary ( +31.00 % on Subtotal-A ) 3395.32
supports etc.
Subtotal-A1: 14347.98

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 14634.94

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 16098.44


VAT 6% of Total 1073.23
IT 4% of Total 715.49

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1115 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 17887.15

5.05.08.04.02 Add for each additional floor up to 5th Floor cum Add +.41% with Item No 5.05.08.04.01

5.05.08.04.03 Add for each additional floor from 6th floor upto 9th floor cum Add +.75% with Item No 5.05.08.04.01

5.05.08.04.04 Add for each additional floor for 10th floor and above cum Add +1.00% with Item No 5.05.08.04.01

5.05.08.05 In Tee Beam, Ell Beam, Rectangular Beam etc. (exposed breadth and
width of ribs to be measured only).

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1116 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.08.05.01 Below Plinth Level and in Ground Floor cum


Ordinary Portland Cement (CEM I, 52.5N) 8.9220 bag 455.00 4059.51
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4000 m3 1500.00 600.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.5000 day 550.00 275.00
Skilled Labour 1.0000 day 450.00 450.00
Ordinary Labour 1.5000 day 370.00 555.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0083 day 23000.00 190.90
cum/hour
H.C. of Generator (100 KVA) 0.0083 day 3500.00 29.05
H.C. of Backhoe End Loader (6 tons) 0.0083 day 6000.00 49.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0083 day 5000.00 41.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 10952.66
Steel Formwork/ shuttering, prop with necessary ( +34.00 % on Subtotal-A ) 3723.90
supports etc.
Subtotal-A1: 14676.56

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 14970.10

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 16467.11


VAT 6% of Total 1097.81
IT 4% of Total 731.87

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1117 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 18296.78

5.05.08.05.02 Add for each additional floor up to 5th Floor cum Add +.38% with Item No 5.05.08.05.01

5.05.08.05.03 Add for each additional floor from 6th floor upto 9th floor cum Add +.69% with Item No 5.05.08.05.01

5.05.08.05.04 Add for each additional floor for 10th floor and above cum Add +.92% with Item No 5.05.08.05.01

5.05.08.06 In roof slab of all types, cantilever slab and drop panels (excluding floor
slab of ground floor at plinth level).

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1118 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.08.06.01 Below Plinth Level and in Ground Floor cum


Ordinary Portland Cement (CEM I, 52.5N) 8.9220 bag 455.00 4059.51
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4000 m3 1500.00 600.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.5000 day 550.00 275.00
Skilled Labour 1.0000 day 450.00 450.00
Ordinary Labour 1.5000 day 370.00 555.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0083 day 23000.00 190.90
cum/hour
H.C. of Generator (100 KVA) 0.0083 day 3500.00 29.05
H.C. of Backhoe End Loader (6 tons) 0.0083 day 6000.00 49.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0083 day 5000.00 41.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 10952.66
Steel Formwork/ shuttering, prop with necessary ( +28.00 % on Subtotal-A ) 3066.74
supports etc.
Subtotal-A1: 14019.40

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 14299.79

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 15729.77


VAT 6% of Total 1048.65
IT 4% of Total 699.10

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1119 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 17477.52

5.05.08.06.02 Add for each additional floor up to 5th Floor cum Add +.40% with Item No 5.05.08.06.01

5.05.08.06.03 Add for each additional floor from 6th floor upto 9th floor cum Add +.72% with Item No 5.05.08.06.01

5.05.08.06.04 Add for each additional floor for 10th floor and above cum Add +.96% with Item No 5.05.08.06.01

5.05.08.07 In sunshade, cornice, railing, drop wall, louver and fins (Average 62mm
to 87mm thick)

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1120 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.08.07.01 Below Plinth Level and in Ground Floor cum


Ordinary Portland Cement (CEM I, 52.5N) 8.9220 bag 455.00 4059.51
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4000 m3 1500.00 600.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.5000 day 550.00 275.00
Skilled Labour 1.0000 day 450.00 450.00
Ordinary Labour 1.5000 day 370.00 555.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0083 day 23000.00 190.90
cum/hour
H.C. of Generator (100 KVA) 0.0083 day 3500.00 29.05
H.C. of Backhoe End Loader (6 tons) 0.0083 day 6000.00 49.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0083 day 5000.00 41.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 10952.66
Steel Formwork/ shuttering, prop with necessary ( +82.00 % on Subtotal-A ) 8981.18
supports etc.
Subtotal-A1: 19933.84

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 20332.52

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 22365.77


VAT 6% of Total 1491.05
IT 4% of Total 994.03

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1121 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 24850.86

5.05.08.07.02 Add for each additional floor up to 5th Floor cum Add +.95% with Item No 5.05.08.07.01

5.05.08.07.03 Add for each additional floor from 6th floor upto 9th floor cum Add +1.75% with Item No 5.05.08.07.01

5.05.08.07.04 Add for each additional floor for 10th floor and above cum Add +2.38% with Item No 5.05.08.07.01

5.05.08.08 In Stair case slab and step

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1122 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.08.08.01 Below Plinth Level and in Ground Floor cum


Ordinary Portland Cement (CEM I, 52.5N) 8.9220 bag 455.00 4059.51
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4000 m3 1500.00 600.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.5000 day 550.00 275.00
Skilled Labour 1.0000 day 450.00 450.00
Ordinary Labour 1.5000 day 370.00 555.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0083 day 23000.00 190.90
cum/hour
H.C. of Generator (100 KVA) 0.0083 day 3500.00 29.05
H.C. of Backhoe End Loader (6 tons) 0.0083 day 6000.00 49.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0083 day 5000.00 41.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 10952.66
Steel Formwork/ shuttering, prop with necessary ( +33.00 % on Subtotal-A ) 3614.38
supports etc.
Subtotal-A1: 14567.04

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 14858.38

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 16344.22


VAT 6% of Total 1089.61
IT 4% of Total 726.41

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1123 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 18160.24

5.05.08.08.02 Add for each additional floor up to 5th Floor cum Add +.40% with Item No 5.05.08.08.01

5.05.08.08.03 Add for each additional floor from 6th floor upto 9th floor cum Add +.72% with Item No 5.05.08.08.01

5.05.08.08.04 Add for each additional floor for 10th floor and above cum Add +.96% with Item No 5.05.08.08.01

5.05.08.09 In Waffle or Ribbed floor/roof slab

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1124 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.08.09.01 Below Plinth Level and in Ground Floor cum


Ordinary Portland Cement (CEM I, 52.5N) 8.9220 bag 455.00 4059.51
Stone Chips (20mm down graded) [LAA≤30] 0.4900 m3 5320.00 2606.80
Stone Chips (12mm down graded) [LAA≤30] 0.3300 m3 4470.00 1475.10
Sand (FM - 2.5) 0.4000 m3 1500.00 600.00
Water-reducing high range chemical admixture : Type-F 2.1500 liter 160.00 344.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.5000 day 550.00 275.00
Skilled Labour 1.0000 day 450.00 450.00
Ordinary Labour 1.5000 day 370.00 555.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0083 day 23000.00 190.90
cum/hour
H.C. of Generator (100 KVA) 0.0083 day 3500.00 29.05
H.C. of Backhoe End Loader (6 tons) 0.0083 day 6000.00 49.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0083 day 5000.00 41.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 10952.66
Steel Formwork/ shuttering, prop with necessary ( +98.00 % on Subtotal-A ) 10733.61
supports etc.
Subtotal-A1: 21686.27

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 22119.99

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 24331.99


VAT 6% of Total 1622.13
IT 4% of Total 1081.42

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1125 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 27035.55

5.05.08.09.02 Add for each additional floor up to 5th Floor cum Add +.26% with Item No 5.05.08.09.01

5.05.08.09.03 Add for each additional floor from 6th floor upto 9th floor cum Add +.46% with Item No 5.05.08.09.01

5.05.08.09.04 Add for each additional floor for 10th floor and above cum Add +.62% with Item No 5.05.08.09.01

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1126 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.09 RCC-35 Mpa, Stone Chips (SC), Batching Plant (BP): Reinforced cement
concrete work with minimum cement content and maximum water
cement ratio as specified by CQCL, LGED having minimum required
average compressive strength, f'cr = 45 Mpa and satisfying a specified
compressive strength, f'c = 35 Mpa at 28 days on standard cylinder as
per standard practice of Code AASHTO/ ASTM and cement conforming
to BDS EN 197-1 : 2003 CEM-I 52.5N / ASTM C150 Type-1, high range
water reducing admixture of complying type F/ G under ASTM C494
(Doses of admixture to be fixed by the mix design from approved
laboratory instruction by the Engineer) for smart dynamic concrete (i.e.
Low fines self compacting concrete), sand of minimum FM 2.80 and
20mm down well graded crushed stone chips broken from boulders
(LAA value not exceeding 25) conforming to ASTM C33 and Aggregate
Grading Appendix-3 LGED Schedule of Rates or any other International
recognized envelop, in/c cost of breaking chips, screening through
proper sieves, cleaning and washing thoroughly, centering, shuttering in
position with plain 16 BWG steel sheet fitted over 38mmx38mmx5mm
MS angle and 25mmx5mm FI bar frame and 38mm/50mm steel or GI
pipe props suitably braced and 12 BWG steel sheet plate box of proper
size where required, i/c cost of nuts, bolts, J-hooks etc, placing of
reinforcement in position, mixing in mechanized a batching and mixing
plant and pumping using line pump or boom placer, maintaining
allowable slump of 100mm to 150mm casting in steel forms, compacting
by Mechanical vibrators and tapered rods and curing at least for 28
days, removing centering-shuttering after approved specified time
period, i/c cost of additional testing charges of materials and cylinders
required (Excluding the cost of reinforcements and its fabrication
welding, coupling, placing, binding etc. Additional quantity of cement to
be added if required to attain the strength at the contractor's own cost),
etc. all complete as per approval of the Engineer in charge.
The Mix Design shall have to approved by the Central Quality Control
Laboratory (CQCL), LGED or approved laboratory instruction by the
Engineer before execution of the work.
Note: Using Batching Plant, Transit Mixer & Concrete Pump

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1127 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.09.01 In individual and continuous footing of column, raft and floor slab at cum
plinth level
Ordinary Portland Cement (CEM I, 52.5N) 9.0000 bag 455.00 4095.00
Stone Chips (20mm down graded) [LAA≤25] 0.4900 cum 5730.00 2807.70
Stone Chips (12mm down graded) [LAA≤25] 0.3300 cum 4640.00 1531.20
Sand (FM - 2.8) 0.4100 m3 1602.00 656.82
Water-reducing high range chemical admixture : Type-F 2.2500 liter 160.00 360.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.7500 day 550.00 412.50
Skilled Labour 1.5000 day 450.00 675.00
Ordinary Labour 2.5000 day 370.00 925.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0083 day 23000.00 190.90
cum/hour
H.C. of Generator (100 KVA) 0.0083 day 3500.00 29.05
H.C. of Backhoe End Loader (6 tons) 0.0083 day 6000.00 49.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0083 day 5000.00 41.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 12050.47
Steel Formwork/ shuttering, prop with necessary ( +6.00 % on Subtotal-A ) 723.03
supports etc.
Subtotal-A1: 12773.50

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 13028.97

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 14331.86


VAT 6% of Total 955.46
IT 4% of Total 636.97

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1128 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 15924.29

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1129 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

5.05.09.02 In foundation beam cum


Ordinary Portland Cement (CEM I, 52.5N) 9.0000 bag 455.00 4095.00
Stone Chips (20mm down graded) [LAA≤25] 0.4900 cum 5730.00 2807.70
Stone Chips (12mm down graded) [LAA≤25] 0.3300 cum 4640.00 1531.20
Sand (FM - 2.8) 0.4100 m3 1602.00 656.82
Water-reducing high range chemical admixture : Type-F 2.2500 liter 160.00 360.00
Head Mason 0.0800 day 650.00 52.00
Mason 0.7500 day 550.00 412.50
Skilled Labour 1.5000 day 450.00 675.00
Ordinary Labour 2.5000 day 370.00 925.00
Hire and running charges of Batching and Mixing Plant @ 20 0.0083 day 23000.00 190.90
cum/hour
H.C. of Generator (100 KVA) 0.0083 day 3500.00 29.05
H.C. of Backhoe End Loader (6 tons) 0.0083 day 6000.00 49.80
H.C. of Transit Mixer 4.0/4.5 cum capacity including fuel & 0.0200 day 10000.00 200.00
other related cost
Hire and running charges of Concrete Pump (30 & 45 cum 0.0083 day 5000.00 41.50
capacity)
Hire and running charges of Concrete Vibrator 0.0600 day 400.00 24.00

Subtotal-A: 12050.47
Steel Formwork/ shuttering, prop with necessary ( +14.00 % on Subtotal-A ) 1687.07
supports etc.
Subtotal-A1: 13737.54

Subtotal-B: Lab Test Fees, Incidental charges & Overhead ( Add 2% on Subtotal-A/ A1) : 14012.29

Subtotal-C: 10% Profit ( Add 10% on Subtotal-B) : 15413.52


VAT 6% of Total 1027.57
IT 4% of Total 685.05

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1130 of 2994
Unit Cost Analysis for Schedule of Rates
Schedule of Rates, LGED, July 2017

District : DHAKA, GAZIPUR, NARSHINGDI, NARAYANGANJ, MUNSHIGANJ, MANIKGANJ

Detailed Analysis
Item
Code Brief Description of Item Unit Sub-Item Quantity Unit Rate Amount
1 2 3 4 5 6 7 8

Total: 17126.13

5.05.09.03 In pedestal, column, capital lift wall and wall :

Note : Rates of all items should be inclusive of all supply and carriage. Page: 1131 of 2994