12 Mile Road East of Farmington Farmington Hills Storm sewer replacement on No, flag control to direct No CI Contracting 7/10/18 STOMER SEWER Weekend,
Road and Hamilton eastbound 12 Mile Road traffic and RCOC WORK IS Emergency &
Court COMPLETE Short-Term
Road Closures
Baldwin Road Phase I-Morgan Orion Township Reconstruction of Baldwin Road No; intermittent lane No Dan's 4/2/18 Late Fall (Phase II will Baldwin Road
(Phase I) Road to Gregory including: 5 roundabouts, widening, closures (NB and SB Excavating begin Spring of 2019)
Road 2017-2018; Americans with Disabilities Act Baldwin Road traffic (Phase I
Phase II-Gregory to (ADA) compliant crosswalks, maintained) contractor)
Waldon 2018-2019 improved lighting, pedestrian paths,
concrete curb and gutter
Gregory Road Gregory Road at Orion Township Storm sewers, drainage, water Yes Baldwin Rd to Dan's 5/14/18 Late August Baldwin Road
(part of the Baldwin Road main and pavement preparation Morgan Rd to Rohr Excavating
Baldwin Road Rd, back to Gregory
Phase I project) Rd and vice versa
Concrete Slab Various heavier Various Remove and replace concrete No, expect lane closures No Cipparone 6/4/18 TBA Concrete Slab
Replacements traveled roads Replacement
*Dequindre Burningbush Troy and Widening to 5 lanes with center No No; traffic shift to Dan's 3/5/18 Late Fall Dequindre Road
Road (Phase II) Drive to Long Sterling Heights left-turn lane, traffic signal new lanes expected Excavating
Lake Road border upgrades, improved drainage, to take place on
Americans with Disabilities Act 7/14/18
(ADA) compliant crosswalks
Hamlin Road and Hamlin and Rochester Hills Concrete repairs Yes. Eastbound Hamlin and Detour City of 7/5/19 7/19/18 Rochester Hills
Adams Road Adams Road northbound and Rochester Project -27
intersection southbound Adams Road at Hills
Hamlin are closed. contractor
Westbound Hamlin
remains open.