2018 Road Commission for Oakland County Road Construction and Permit Projects (7/13/18 update)

Community or Prime Anticipated


Road Project Limits Project Description Road Closure Detour Project Start Project Website
Communities Contractor Completion
*10 Mile Road 10 Mile Road and Novi Resurfacing project that is being No, traffic will be under flag No Cadillac 7/18/18 7/18/18 (intersection City of Novi Taft
and Taft Road Taft Road done by the City of Novi as part of control Asphalt (intersection only) Road
(PERMIT intersection the Taft Road rehabilitation project only) Rehabilitation
PROJECT) (between 10 Mile and Grand River)

12 Mile Road East of Farmington Farmington Hills Storm sewer replacement on No, flag control to direct No CI Contracting 7/10/18 STOMER SEWER Weekend,
Road and Hamilton eastbound 12 Mile Road traffic and RCOC WORK IS Emergency &
Court COMPLETE Short-Term
Road Closures
Baldwin Road Phase I-Morgan Orion Township Reconstruction of Baldwin Road No; intermittent lane No Dan's 4/2/18 Late Fall (Phase II will Baldwin Road
(Phase I) Road to Gregory including: 5 roundabouts, widening, closures (NB and SB Excavating begin Spring of 2019)
Road 2017-2018; Americans with Disabilities Act Baldwin Road traffic (Phase I
Phase II-Gregory to (ADA) compliant crosswalks, maintained) contractor)
Waldon 2018-2019 improved lighting, pedestrian paths,
concrete curb and gutter
Gregory Road Gregory Road at Orion Township Storm sewers, drainage, water Yes Baldwin Rd to Dan's 5/14/18 Late August Baldwin Road
(part of the Baldwin Road main and pavement preparation Morgan Rd to Rohr Excavating
Baldwin Road Rd, back to Gregory
Phase I project) Rd and vice versa
Concrete Slab Various heavier Various Remove and replace concrete No, expect lane closures No Cipparone 6/4/18 TBA Concrete Slab
Replacements traveled roads Replacement
*Dequindre Burningbush Troy and Widening to 5 lanes with center No No; traffic shift to Dan's 3/5/18 Late Fall Dequindre Road
Road (Phase II) Drive to Long Sterling Heights left-turn lane, traffic signal new lanes expected Excavating
Lake Road border upgrades, improved drainage, to take place on
Americans with Disabilities Act 7/14/18
(ADA) compliant crosswalks
Hamlin Road and Hamlin and Rochester Hills Concrete repairs Yes. Eastbound Hamlin and Detour City of 7/5/19 7/19/18 Rochester Hills
Adams Road Adams Road northbound and Rochester Project -27
intersection southbound Adams Road at Hills
Hamlin are closed. contractor
Westbound Hamlin
remains open.

1 of 5 (*indicates new or updated project; TBA=To Be Announced)


2018 Road Commission for Oakland County Road Construction and Permit Projects (7/13/18 update)
Community or Prime Anticipated
Road Project Limits Project Description Road Closure Detour Project Start Project Website
Communities Contractor Completion
*Inkster Road North of 14 Mile Bloomfield Repair of a failed roadside bank Yes, Inkster Road north of 14 Mile Rd to CI Contracting 7/17/18 7/20/18 only Weekend,
Road Township and 14 Mile will close in both Middlebelt Rd to (complete southbound Inkster Emergency &
West directions for repair work Maple Rd, back to closure) Rd will open; Short-Term
Bloomfield beginning 7/17/18 through Inkster Rd northbound Inkster Road Closures
Township 7/20/18. Northbound will Rd will remain closed
remain closed until late July until late July for
pavement and curb
repairs
*Joint Various heavier Various Milling out road joints and filling No; however, expect lane No Cadillac 7/17/18 Early October Road Joint
Replacement traveled roads with hot mix asphalt restrictions in work zones Asphalt Repairs
throughout
Oakland County
*Livernois Road Maple Road and Troy Paving and concrete repairs No No Cadillac TBA TBA Livernois Road
Big Beaver Road Asphalt
Maple Road Halsted Road to West Reconstruction including center
Yes, westbound Maple Westbound Maple Dan's 4/9/18 Late July Maple Road
(Phase II) Drake Road Bloomfield turn lane, right turn lane Road is closed; however, 2- Road detour is Excavating (Drake to
Township extensions, drainage way traffic maintained Haggerty Rd to 14 Halsted)
improvements, traffic-signal between Drake and Ring Mile Rd to Drake Rd
modernizations roads (Henry Ford Hospital back to Maple Rd
Entrance). Eastbound and vice versa
Maple Road remains open
to traffic
Halsted Road South half of West Intersection improvements and No No Dan's 6/11/18 COMPLETE Maple Road
(part of the intersection Bloomfield paving Excavating (Drake to
Maple Road Township Halsted)
Phase II project)
Middlebelt Road 10 Mile Road and Farmington Hills Replacement of high pressure No, currently under flag No Consumers Late April Late summer Consumers
(PERMIT 14 Mile Road gas transmission line control from 9 a.m. - 3 p.m. Energy Energy
PROJECT) daily (closed between 11 Mile
and 12 Mile roads, see below)

2 of 5 (*indicates new or updated project; TBA=To Be Announced)


2018 Road Commission for Oakland County Road Construction and Permit Projects (7/13/18 update)
Community or Prime Anticipated
Road Project Limits Project Description Road Closure Detour Project Start Project Website
Communities Contractor Completion
Middlebelt Road 11 Mile and 12 Farmington Hills Consumers Energy installation of Yes (local and emergency 11 Mile Rd to Consumers 6/16/18 8/10/18 Traffic Alerts
(PERMIT Mile Road high pressure gas main access maintained) Orchard Lake Rd to Energy
PROJECT) 12 Mile Rd, back to
Middlebelt Rd and
vice versa
Opdyke Road Auburn Road to Pontiac and Bridge replacement over the Yes, between Auburn Road Auburn Rd to Dan's 6/18/18 Mid-October Opdyke Road
Perry Road Auburn Hills Clinton River, resurfacing, and M-59 is closed for Martin Luther King Excavating
Americans with Disabilities Act bridge replacement, two- Blvd to
compliant crosswalks/bus stops, way traffic maintained Featherstone, back
improved drainage, construction from M-59 to Perry Road to Opdyke Rd and
of a pedestrian pathway from vice versa
Auburn Rd to I-75 & water main
work between Featherstone and
Walton Blvd
*Pine Tree Road Clarkston Road Orion Township Road rehabilitation including Yes. Residential traffic will Clarkston Rd to Joslyn Cadillac TBA TBA Pine Tree Road
to Heights Road paving, ditching, drainage be maintained Rd to Heights Rd, back Asphalt
improvements and Americans to Pine Tree Rd and
with Disabilities Act compliant vice versa
sidewalks
Preservation Various heavier Various Simple resurfacing, placing 1.5-2 No, mostly done under flag No Ajax Paving April Various dates through 2018
Overlays traveled roads inches of asphalt on the road control the end of July Preservation
throughout surface; work is weather- Overlay (list and
Oakland County dependent schedule)
South Blvd Coolidge Hwy to Rochester Hills Culvert replacement just west of Yes, closed in both Squirrel Rd to Pro-Line 7/16/18 at 7:00 7/21/18 (once South Blvd
Adams Road and Troy Coolidge Hwy directions just west of Square Lake Rd to Asphalt a.m. complete, eastbound
Coolidge Hwy Crooks Rd, back to South Blvd from
South Blvd and vice Coolidge Hwy to Adams
will remain closed.
versa
Westbound South Blvd
will open to traffic.

3 of 5 (*indicates new or updated project; TBA=To Be Announced)


2018 Road Commission for Oakland County Road Construction and Permit Projects (7/13/18 update)
Community or Prime Anticipated
Road Project Limits Project Description Road Closure Detour Project Start Project Website
Communities Contractor Completion
South Blvd Crooks Road and Rochester Hills Resurfacing, drainage Yes, just west of Coolidge Hwy South Blvd. to Pro-Line 6/20/18 Mid-September South Blvd
Adams Road and Troy improvements, traffic signal for culvert replacement. Once Squirrel Rd to Asphalt
upgrades and Borden Drain complete, the road will be Square Lake Rd to
culvert replacement. South Blvd open to westbound traffic Crooks Rd, back to
from Coolidge to Adams;
from Crooks to Coolidge will be South Blvd and vice
eastbound South Blvd will
partially reconstructed. remain closed
versa
South Blvd over West of John R Rochester Hills Culvert replacement Yes TBA Z Contractors October, TBA TBA South Blvd Over
Ferry Creek and Troy Ferry Creek
Drain Drain
South Blvd. Crooks Road to Rochester Hills Resurfacing, drainage Yes, just west of Coolidge Hwy South Blvd. to Pro-Line 6/20/18 Mid-September South Blvd.
Adams Road and Troy improvements, traffic signal for culvert replacement. Once Squirrel Rd to Asphalt
upgrades and Borden Drain complete, the road will be Square Lake Rd to
culvert replacement. South Blvd open to westbound traffic Crooks Rd, back to
from Coolidge to Adams;
from Crooks to Coolidge will be South Blvd and vice
eastbound South Blvd will
partially reconstructed. remain closed
versa.
Tripp Road Van Road to Groveland Reconstruction of road including Yes, date to be announced Dixie Hwy to Grange TBA Late July, TBA TBA Tripp Road
Dixie Highway Township culvert replacement, improved Hall Rd, back to
drainage, widening/paving of road Tripp Rd and vice
shoulders, curb and gutter versa
installation.
Walton Blvd. Adams Road and Auburn Hills Replacement of three culverts, No, two-way traffic is No, Firewood and Z Contractors 5/14/18 Late fall (remaining Walton Blvd
Squirrel Road and Rochester improved drainage, concrete shifted to the north half of
Bellarmine drives resurfacing work Culvert
Hills curbs/gutters and resurfacing Walton Blvd. Firewood and are closed at could take place in Replacement
Bellarmine drives are Walton Blvd. 2019)
closed at Walton Blvd. Residents can use
Tienken or Adams
roads.
West Long Lake Corporate Drive Troy Concrete slab replacement No, one lane maintained in No Rigid 6/18/18 Late July Concrete Slab
Road to Tower Drive each direction Pavement Replacements
Construction
4 of 5 (*indicates new or updated project; TBA=To Be Announced)
2018 Road Commission for Oakland County Road Construction and Permit Projects (7/13/18 update)
Community or Prime Anticipated
Road Project Limits Project Description Road Closure Detour Project Start Project Website
Communities Contractor Completion
West Long Lake East and west Bloomfield Remove West Long Lake Road No, one lane maintained in No Pro-Line 6/21/18 Late July West Long Lake
Road approaches to Township concrete approaches at each direction Asphalt Road at
Telegraph Road Telegraph Road and replace with Telegraph
asphalt
Wood Trail South of Oxford Culvert replacement Yes, closed to through No set detour, Angelo Iafrate 5/21/18 (road TBA (gas, water and Weekend,
(subdivision Drahner, Township vehicle traffic. Polly Ann residential traffic is closed since sewer utility work is Emergency &
road) between M-24 Trail (a pedestrian/bike maintained north 2/24/18 due to currently in progress Short-Term
and Newman trail) is closed at Paint and south of closure a culvert and must be complete Road Closures
Road Creek failure) prior to paving)

5 of 5 (*indicates new or updated project; TBA=To Be Announced)